4.3. PERHITUNGAN BALOKDenah rencana pembebanan balok lantai pada perencanaan bangunan hunian sewa dua lantai adalah sebagai berikut:
Gambar 4.8. Denah Rencana Pembebanan Balok Lantai
Diketahui:fc= 25 MPafy= 240 MPaDL pelat lantai= 429 kg/m2LL pelat lantai= 200 kg/m2
4.3.1. Perhitungan Perataan Momen
Balok As 1 A-BRA= = = 1,88Msg 3= = = 0,42Msg 4= = ( = 0,19Mmax= RA Msg 3 Msg 4= 1,88 0,42 0,19 = 2,44Mmax Sg 4 = Mmax Sg 3=Mmax Sg 3=== m
Selanjutnya perhitungan h balok As lainnya menggunakan cara yang sama dengan perhitungan h balok As 1 A-B. Sehingga dihasilkan perhitungan yang tercantum di tabel.Tabel Daftar perhitungan perataan momenBALOKLhRAMsg 3Msg 4Mmaxh'
meter(1)(2)
As 1 A-B4.001.501.881.130.192.441.22
As 1 D-E2.000.750.470.140.020.300.61
As 2 D-F40.751.220.420.591.430.71
As 2 D-E21----0.67
As A 1-231.5----1.00
As D 1-1'1.50.75----0.50
As D 2-3311.000.420.130.960.85
4.3.2. Balok Lantai Arah Memendek (As B 1-4)a. Dimensi Balok~ dipakai 300 mm
b. Pembebanan Balok
Gambar 4.8. Balok Arah Memanjang1. Balok As D (1-1) dan As D (1-2)h' = 0,50h' = 1 Beban Mati (DL)Berat sendiri balok= 0,2 (0,3-0,12) 2400= 86,4kg/mPelat lantai= 0,5429= 214,50kg/m= 1 429= 429kg/mDinding = (3,5 - 0,3) 250= 800kg/mDL= 1529,90kg/m Beban Hidup (LL)Beban hidup= 0,5200= 100kg/m= 1 200= 200kg/mLL= 300kg/m Kombinasi PembebananWu= 1,2 DL + 1,6 LL= 1,2 (1529,90) + 1,6 (300)= 2255,88kg/m= 22,11 kN/m
2. Balok As D (2-3)h' = 1h' = 0,85 Beban Mati (DL)Berat sendiri balok= 0,2 (0,3-0,12) 2400= 86,4kg/mPelat lantai= 1 429= 429kg/m= 0,85 429= 365,44kg/mDL= 880,84kg/m Beban Hidup (LL)Beban hidup= 1 200= 200kg/m= 0,85 200= 170kg/mLL= 370kg/m Kombinasi PembebananWu= 1,2 DL + 1,6 LL= 1,2 (880,84) + 1,6 (370)= 1337,01kg/m= 13,10 kN/m
4.3.3. Balok Lantai Arah Memanjang (As 2 A-F)a. Dimensi Balok ~ dipakai 300 mm
Jadi dimensi balok arah memanjang adalah 20 30 cmb. Pembebanan BalokPerhitungan pembebanan balok arah memanjangmenggunakan cara yang sama dengan perhitungan balok arah memendek sehingga dihasilkan beban yang tercantum dalam tabel.Tabel. Daftar perhitungan pembebanan balokBalokh'B.S. BalokB.S. PelatBerat DindingTotal DLLLTotal LLWu (kg/m')Wu (kN/m')
BALOK ARAH MEMANJANG
As 1 A-F
As 1 A-B1.2286.40522.848001409.24487.50487.502373.5923.26
As 1 B-C1.2286.40522.848001409.24487.50487.502373.5923.26
As 1 C-D1.2286.40522.848001409.24487.50487.502373.5923.26
As 1 D-E0.6186.40261.42800347.82121.88121.88588.015.76
As 1 E-F0.6186.40261.42800347.82121.88121.88588.015.76
TOTAL WU 8296.8081.31
As 1' D-F
As 1' D-E0.6128.80261.428001396.89121.88264.842047.0520.06
0.71306.67142.97
As 1' E-F0.6128.80261.428001396.89121.88264.842047.0520.06
0.71306.67142.97
TOTAL WU4094.1040.12
As 2 A-F
As 2 A-B1.2286.401045.698001932.09487.50487.503001.0129.41
As 2 B-C1.2286.401045.698001932.09487.50487.503001.0129.41
As 2 C-D1.2286.401045.698001932.09487.50487.503001.0129.41
As 2 D-E0.6786.40286.00-679.07133.33276.301201.7011.78
0.71306.67142.97
As 2 E-F0.7186.40306.67-393.07142.97142.97671.846.58
TOTAL WU 10876.56106.59
As 3 A-F
As 3 A-B1.2286.40522.848001409.24487.50487.502373.5923.26
As 3 B-C1.2286.40522.848001409.24487.50487.502373.5923.26
As 3 C-D1.2286.40522.848001409.24487.50487.502373.5923.26
As 3 D-E0.6186.40261.42800347.82121.88121.88588.015.76
As 3 E-F-86.40-80086.40--103.681.02
TOTAL WU 7812.4776.56
BALOK ARAH MEMENDEK
As A 1-4
As A 1-2186.404298001315.402002001858.4818.21
As A 2-3186.404298001315.402002001858.4818.21
As A 3-486.40-800886.40-1063.6810.42
TOTAL WU 4780.6446.85
As B 1-4
As B 1-2186.40858.008001744.404004002653.2826.00
As B 2-3186.40858.00-944.404004001693.2816.59
As B 3-4-86.40-800886.40--1063.6810.42
TOTAL WU 5410.2453.02
As C 1-3
As C 1-2186.40858.008001744.404004002653.2826.00
As C 2-3186.40858.00-944.404004001693.2816.59
TOTAL WU 4346.5642.60
As D 1-3
As D 1-1'0.586.40214.508001529.901003002255.8822.11
1429.00200
As D 1'-20.586.40214.508001529.901003002255.8822.11
1429200
As D 2-3186.40429.00-880.842003701337.0113.10
0.85365.44170
TOTAL WU 5848.7757.32
As E 1-3
As E 1-1'0.528.80429.008001257.80200.00200.001789.3617.54
As E 2-30.8528.80365.44-394.24170.37170.37711.616.97
TOTAL WU 2500.9724.51
As F 1-3
As F 1-1'186.402158001100.901001001461.0814.32
As F 1'-1186.402158001100.901001001461.0814.32
As F 2-386.40-800886.40-1063.6810.42
TOTAL WU 3985.8439.06
4.3.4. Perhitungan Ring BalokDimensi ring balok yang digunakan adalah 20 30 cmPembebanan Ring BalokBerat sendiri= (0,2 0,3) 2400= 144kg/m= 1,41 kN/m4.3.5. Perhitungan Beban Terpusata. Akibat Balok AnakDimensi Balok Anak
~ dipakai 150 mmJadi dimensi balok anak adalah 1520 cmBalok Anak Arah Memanjang As 1 (D-F)Dari tabel, didapat Wu = 40,12 kN/m Jumlah Beban kNBalok Anak Arah Memendek As E (2-3)Dari tabel, didapat Wu = 6,97 kN/m Jumlah Beban kN
b. Akibat TanggaBerat pelat= tebal pelat lebar tanggasudut miring tangga bj beton= 0,12 m 1 m 2,34 m 2400 kg/m3= 674,47 kgAdukan Antrede= tebal adukan lebar tangga lebar antrede banyaknya antrede berat adukan semen= 4 1 m 0,26 m 721 kg/m2= 152,88 kgAdukan Optrede=tebal adukan lebar tangga tinggi optrede banyaknya optrede berat adukan semen= 41 m 0,19 m 821 kg/m=127,68 kgKeramik Antrede= lebar antrede lebar tangga banyaknya antrede berat keramik=0,26 m 1 m 724 kg/m2=43,86 kgKeramik Optrede= tinggi optrede lebar tangga banyaknya optrede berat keramik=0,19 m 1 m 824 kg/m2=36,48 kgBerat railing= panjang lebar tinggi bj kayu meranti= 0,055 m 0,07 m1 m 550 kg/m3= 2,12 kgTotal Beban DL=674,47+ 152,88 + 127,68 + 43,68 + 36,48 + 2,12=1037,30kgBerat anak tanggaBerat 1 anak tangga= alas tinggi lebar tangga bj beton= 0,26 0,19 1 2400 = 59,28 kgBerat 8 anak tangga= 59,28 8 = 474,24 kgTotal DL tangga= 1037,30 + 474,24 = 1511,54 kgLL= 2,34 1 200= 468,38kgKombinasi BebanWu=1,2 DL + 1,4 LL= 1,2 (1511,54) + 1,6 (468,38)= 2563,26 kg= 25,12 kNBalok menahan sepertiga dari total beban tangga:=23,12 : 3 = 7,71 kN
4.4.4. Perhitungan Momen Inersiaa. Balok LantaiLebar pelat efektif (be)sebagai bagian dari sayap balok-T dirumuskan sebagai berikut:[footnoteRef:2] [2: SNI 03- 2847- 2002, Tata Cara Perhitungan Struktur Beton Untuk Bangunan Gedung, (Jakarta, 2002), 56.]
dari bentang balok= 400= 100 cm bw + 2 (8hf)= 20 + 2 (8 12)= 212 cm 2 (bentang bersih balok)= 2 ( 280)= 280 cmDiambil nilai be yang paling kecil yaitu be = 100 cm untuk mencari garis netral pada balok-T.A1= be hf= 100 12= 1200 cm2A2= bw hw= 2018= 360 cm2
Dengan y = 9,46 cm< hf= 12 cm maka balok tekan jatuh pada flens sehingga lebar balok sama dengan lebar be, yaitu 100 cm.
Gambar 4.10. Denah Penampang Balok TMomen InersiaI= = 28765,92 + 57661,78 = 86427,7 cm4
b. Ring BalokI= = = 45000 cm4
c. KolomDimensi kolom direncanakan 30 30 cm.Pembebanan KolomBerat sendiri= (0,3 0,3) 3,5 2400= 756kgWu= 1,2 756= 907,20kg= 8,89 kNI= = = 67500 cm41,280,674.4.5. Faktor Kekakuan
Gambar 4.11. Portal Arah Memendeka. KolomKAB = KBA = KBC = KCB = KDE = KED = KEF = KFE = KIH = KHI =KGH =KHG = = = 1,14 Icb. BalokKBE= KEB= = = 1,71 IcKEH= KHE= = = 1,71IcKCD= KDC= = = 0,89IcKDI= KID= = = 0,89Ic
Gambar 4.11. Faktor Kekakuan Portal4.4.6. Faktor Distribusia. JointBDBA= = = 0,29DBC= = = 0,29DBE= = = 0,42b. JointCDCD= = = 0,44DCB= = = 0,56
c. JointDDDC= = = 0,30DDE= = = 0,39DDI= = = 0,31d. JointEDEB= = = 0,30DED= = = 0,20DEH= = = 0,30DEF= = = 0,20e. JointIDIH= = = 0,56DID= = = 0,44f. JointHDHE= = = 0,43DHI= = = 0,29DHG= = = 0,28
4.4.7. Momen Primera. Momen Primer Beban Statis
Gambar 4.12. Momen Primer Beban Statis
CD=DC=DI=ID= 1/12 1,4132= 1,06kN/mBE=EB= 1/12 22,11321/8 80,24 3= 30,09kN/mEH=HE= 1/12 13,1032= 9,83kN/m
b. Momen Primer Akibat Goyangan 1
Gambar 4.12. Portal Akibat Goyangan 1
Momen Primer akibat goyangan 1 :EI =10
MF = += = + 4,90kNm (terjadi di kolom Lt. 2)
MF = -= = - 4,90kNm (terjadi di kolom Lt. 1)
c. Momen Primer Akibat Goyangan 2
Gambar 4.12. Portal Akibat Goyangan 2
Momen Primer akibat goyangan 2 :EI =10
MF = -= = -4,90kNm
18
Tabel Perhitungan momen akhir cross kondisi statisJOINTABCDE
MEMBERABBABEBCCBCDDCDEDIEBEDEHEF
FD0.000.290.420.290.560.440.300.390.310.300.200.300.20
MP-46.67-1.061.06-1.0646.67-9.83
B13.53419.60113.5340.5940.4660.0000.0000.000-11.052-7.368-11.052-7.368
CO6.767-5.5260.2976.7670.0000.233-3.684-0.2339.8010.000-2.113
B1.5162.1961.516-3.790-2.9781.1051.4371.142-2.306-1.537-2.306-1.537
CO0.758-1.153-1.8950.7580.553-1.489-0.7690.3141.0980.7181.252
B0.8841.2800.884-0.734-0.5770.5830.7580.603-0.921-0.614-0.921-0.614
CO0.442-0.460-0.3670.4420.292-0.288-0.307-0.3110.6400.3790.162
B0.2400.3470.240-0.411-0.3230.2720.3540.281-0.354-0.236-0.354-0.236
CO0.120-0.177-0.2050.1200.136-0.161-0.118-0.0900.1740.1770.184
B0.1110.1610.111-0.143-0.1130.1110.1440.115-0.160-0.107-0.160-0.107
CO0.055-0.080-0.0720.0550.055-0.056-0.053-0.0580.0800.0720.063
B0.0440.0640.044-0.062-0.0490.0500.0660.052-0.065-0.043-0.065-0.043
CO0.022-0.032-0.0310.0220.025-0.024-0.022-0.0220.0320.0330.033
B0.0180.0270.018-0.026-0.0210.0200.0260.021-0.029-0.020-0.029-0.020
CO0.009-0.015-0.0130.0090.010-0.010-0.010-0.0110.0130.0130.013
B0.0080.0120.008-0.011-0.0090.0090.0120.010-0.012-0.008-0.012-0.008
CO0.004-0.006-0.0050.0040.005-0.004-0.004-0.0040.0060.0060.006
B0.0030.0050.003-0.005-0.0040.0040.0050.004-0.005-0.004-0.005-0.004
CO0.002-0.003-0.0020.0020.002-0.002-0.002-0.0020.0020.0020.002
B0.0010.0020.001-0.002-0.0020.0020.0020.002-0.002-0.001-0.002-0.001
FM8.18016.361-30.42714.0673.589-3.5891.414-2.1640.75043.610-8.537-25.135-9.938
LanjutanFGHI
FEGHHGHEHIIHID
0.000.000.280.430.290.560.44
9.831.06
-2.752-4.227-2.851-0.594-0.466
-3.684-1.376-5.526-0.297-1.4250.000
1.6302.5041.6890.7980.627
-0.7690.815-1.1530.3990.8440.571
0.2110.3240.219-0.793-0.623
-0.3070.106-0.460-0.3960.1090.301
0.2400.3680.248-0.230-0.181
-0.1180.120-0.177-0.1150.1240.141
0.0820.1260.085-0.148-0.116
-0.0530.041-0.080-0.0740.0420.057
0.0430.0660.045-0.056-0.044
-0.0220.022-0.032-0.0280.0220.026
0.0170.0260.017-0.027-0.021
-0.0100.008-0.015-0.0140.0090.011
0.0080.0120.008-0.011-0.008
-0.0040.004-0.006-0.0050.0040.005
0.0030.0050.003-0.005-0.004
-0.0020.002-0.003-0.0020.0020.002
0.0010.0020.002-0.002-0.002
-4.968-0.259-0.5171.584-1.068-1.3351.335
Tabel Perhitungan momen akhir cross akibat goyangan 1JOINTABCDE
MEMBERABBABEBCCBCDDCDEDIEBEDEHEF
FD0.000.290.420.290.560.440.300.390.310.300.200.300.20
MF-4.90-4.904.904.904.904.90-4.90
B0.0000.0000.000-2.743-2.155-1.469-1.910-1.5180.0000.0000.0000.000
CO0.0000.000-1.3710.000-0.735-1.0780.000-1.0780.000-0.9550.000
B0.3980.5760.3980.4110.3230.6470.8400.6680.2870.1910.2870.191
CO0.1990.1430.2060.1990.3230.1620.0960.1670.2880.4200.295
B-0.101-0.147-0.101-0.292-0.230-0.127-0.165-0.131-0.301-0.201-0.301-0.201
CO-0.051-0.150-0.146-0.051-0.064-0.115-0.100-0.117-0.073-0.083-0.077
B0.0860.1250.0860.0640.0500.1000.1300.1030.0700.0470.0700.047
CO0.0430.0350.0320.0430.0500.0250.0230.0260.0620.0650.064
B-0.019-0.028-0.019-0.052-0.041-0.022-0.029-0.023-0.057-0.038-0.057-0.038
CO-0.010-0.029-0.026-0.010-0.011-0.020-0.019-0.021-0.014-0.014-0.015
B0.0160.0230.0160.0120.0090.0180.0240.0190.0130.0090.0130.009
CO0.0080.0060.0060.0080.0090.0050.0040.0050.0110.0120.012
B-0.004-0.005-0.004-0.010-0.007-0.004-0.005-0.004-0.011-0.007-0.011-0.007
CO-0.002-0.005-0.005-0.002-0.002-0.004-0.004-0.004-0.003-0.003-0.003
B0.0030.0040.0030.0020.0020.0030.0040.0030.0020.0020.0020.002
CO0.0010.0010.0010.0010.0020.0010.0010.0010.0020.0020.002
B-0.001-0.001-0.001-0.002-0.001-0.001-0.001-0.001-0.002-0.001-0.002-0.001
FM-4.709-4.5200.5483.9722.478-2.478-1.8803.786-1.9060.2754.3430.280-4.898
Lanjutan
FGHI
FEGHHGHEHIIHID
0.000.000.280.430.290.560.44
-4.90-4.90-4.904.904.90
0.0000.0000.000-2.743-2.155
0.0000.0000.000-1.3710.000-0.759
0.3840.5900.3980.4250.334
0.0960.1920.1430.2130.1990.334
-0.100-0.153-0.103-0.298-0.234
-0.100-0.050-0.150-0.149-0.052-0.066
0.0840.1290.0870.0660.052
0.0230.0420.0350.0330.0430.052
-0.019-0.029-0.020-0.053-0.042
-0.019-0.009-0.029-0.027-0.010-0.012
0.0150.0240.0160.0120.009
0.0040.0080.0060.0060.0080.009
-0.003-0.005-0.004-0.010-0.008
-0.004-0.002-0.005-0.005-0.002-0.002
0.0030.0040.0030.0020.002
0.0010.0010.0010.0010.0010.002
-0.001-0.001-0.001-0.002-0.001
-4.897-4.716-4.5340.5603.9752.486-2.486
Tabel Perhitungan momen akhir cross akibat goyangan 2JOINTABCDE
MEMBERABBABEBCCBCDDCDEDIEBEDEHEF
FD0.000.290.420.290.560.440.300.390.310.300.200.300.20
MF-4.90-4.90-4.90-4.90
B1.4202.0571.4202.7432.1551.4691.9101.5181.4690.9801.4690.980
CO0.7100.7351.3710.7100.7351.0780.4901.0781.0290.9551.053
B-0.611-0.885-0.611-0.809-0.636-0.793-1.032-0.820-0.911-0.607-0.911-0.607
CO-0.305-0.456-0.405-0.305-0.397-0.318-0.304-0.323-0.442-0.516-0.453
B0.2490.3610.2490.3930.3090.2830.3680.2930.4230.2820.4230.282
CO0.1250.2120.1970.1250.1420.1540.1410.1570.1810.1840.186
B-0.118-0.171-0.118-0.149-0.117-0.136-0.177-0.140-0.165-0.110-0.165-0.110
CO-0.059-0.083-0.075-0.059-0.068-0.059-0.055-0.060-0.086-0.088-0.089
B0.0460.0660.0460.0710.0560.0520.0680.0540.0790.0530.0790.053
CO0.0230.0390.0360.0230.0260.0280.0260.0290.0330.0340.034
B-0.022-0.031-0.022-0.027-0.021-0.025-0.032-0.026-0.030-0.020-0.030-0.020
CO-0.011-0.015-0.014-0.011-0.012-0.011-0.010-0.011-0.016-0.016-0.016
B0.0080.0120.0080.0130.0100.0100.0120.0100.0140.0100.0140.010
CO0.0040.0070.0070.0040.0050.0050.0050.0050.0060.0060.006
B-0.004-0.006-0.004-0.005-0.004-0.005-0.006-0.005-0.006-0.004-0.006-0.004
CO-0.002-0.003-0.003-0.002-0.002-0.002-0.002-0.002-0.003-0.003-0.003
B0.0020.0020.0020.0020.0020.0020.0020.0020.0030.0020.0030.002
FM0.4840.9701.842-2.813-2.1822.1821.733-3.4921.7591.578-3.7581.5960.584
LanjutanFGHI
FEGHHGHEHIIHID
0.000.000.280.430.290.560.44
-4.90-4.90
1.3712.1061.4202.7432.155
0.4900.6860.7351.3710.7100.759
-0.590-0.906-0.611-0.823-0.647
-0.304-0.295-0.456-0.411-0.305-0.410
0.2430.3730.2510.4010.315
0.1410.1210.2120.2000.1260.146
-0.115-0.177-0.119-0.152-0.120
-0.055-0.058-0.083-0.076-0.060-0.070
0.0440.0680.0460.0730.057
0.0260.0220.0390.0360.0230.027
-0.021-0.033-0.022-0.028-0.022
-0.010-0.011-0.015-0.014-0.011-0.013
0.0080.0130.0080.0130.010
0.0050.0040.0070.0070.0040.005
-0.004-0.006-0.004-0.005-0.004
-0.002-0.002-0.003-0.003-0.002-0.002
0.0010.0020.0020.0020.002
0.2910.4680.9381.878-2.816-2.1892.189
Dari tabel diatas didapatlah keseluruhan momen dalam pada tiap kolom portal (SIG) pada lantai 1 dan 2 dalam keadaan statis, goyangan 1 serta goyangan 2 untuk mencari faktor koreksi :
Tabel. Hasil perhitungan momen akhir kolom tiap kondisiSTATISGOYANGAN 1GOYANGAN 2
KOLOM AB7.012BC5.045KOLOM AB-2.637BC1.843KOLOM AB0.416BC-1.427
KOLOM FE-4.259ED-3.058KOLOM FE-2.798ED2.322KOLOM FE0.250DE-2.071
KOLOM GH-0.222HI-0.686KOLOM GH-2.643HI1.846KOLOM HG0.402IH-1.430
SIG-H12.531SIG-H21.300SIG-H1-8.078SIG-H26.011SIG-H11.068SIG-H2-4.928
Mencari Faktor koreksi : SIG (Statis) + K1 SIG (Sway1) + K2 SIG (Sway2)SGH Lt.1 :2,531 - K1(8,078) + K2 (1,068) = 04,616SGH Lt.2 :1,300+K1(6,011) -K2 (4,928)= 0Eliminasi :SGH Lt.1 : 11,638- K1(37,289) + K2 (4,928) = 0SGH Lt.2 :0,716 +K1(6,011) -K2 (4,928)= 0+K1=0,415K2=0,242
d. Momen FinalMAB statis + K1 MAB sway 1 + K2 MAB sway 2 = 8,180+ {0,415 (-4,709)} + (0,2420,484) = 6,60kNmDan momen final yang lain dapat dilihat pada tabel :
Tabel Hasil momen final yang terjadi tiap batangMEMBERSAPCROSSSELISIHMEMBERSAPCROSSSELISIH
AB7.006.600.40GH-1.92-1.860.06
BA15.5315.230.30HG-2.35-1.680.67
BC14.0713.550.52BE-29.60-28.780.82
CB3.352.940.41EB43.4044.941.54
EF-11.58-11.520.06CD-3.35-2.940.41
FE-6.58-6.780.20DC1.471.970.50
ED-9.62-9.630.01EH-22.10-23.791.69
DE-3.24-3.280.04HE4.523.261.26
HI-2.17-1.590.58DI1.771.310.46
IH-2.38-1.990.39ID2.381.990.39
4.4.8. Perhitungan Reaksi PerletakanPERLETAKAN PADA BALOK Bidang B EME= 0(RB 3) ( 22,11 3) (80,24 1,5) 28,78 + 44,94 = 03 RB 203,70 = 0RB = 67,90 kN ()
MB= 0-(RE1 3) + ( 22,11 3) + (80,24 1,5) 28,78 + 44,94= 0 3 RE1+ 236,01= 0RE1 = 78,67 kN ()
Bidang C - DMD= 0(RC 3) ( 1,41 3) 2,94 + 1,97 = 03 RC 7,31 = 0RC = 2,44 kN ()
MC= 0-(RD1 3) + ( 1,41 3) 2,94 + 1,97= 0 3 RD1 + 5,38= 0RD1 = 1,79 kN () Bidang D - IMI= 0(RD2 3) ( 1,41 3) + 1,31 + 1,99 = 03 RD2 3,04 = 0RD2 = 1,01 kN ()
MD= 0-(RI 3) + ( 1,41 3) + 1,31 + 1,99= 0 3 RI + 9,65= 0RI = 3,22 kN ()
Bidang E - HMH= 0(RE2 3) ( 13,10 3) 23,79 + 3,26 = 03 RE2 79,48 = 0RE2 = 26,49 kN ()
ME= 0-(RH 3) + ( 13,10 3) 23,79 + 3,26 = 0 3 RH + 38,42= 0RH = 12,81 kN ()
PERLETAKAN PADA KOLOM Bidang A - BMB= 0(HA3,5) + 6,60 + 15,23 = 03,5HA+ 21,83 = 0HA = 6,24 kN ()
MA= 0 (HB1 3,5) + 6,60 + 15,23= 0 3,5 HB1 + 21,83= 0HB1 = 6,24 kN ()
Bidang B - CMC= 0(HB2 3,5) + 13,55 + 2,94 = 03,5 HB2 + 16,49 = 0HB2 = 4,71 kN ()
MB= 0-(HC 3,5) + 13,55 + 2,94= 0 3,5 HC + 16,49= 0HC = 4,71 kN ()
Bidang E - DMD= 0(HE1 3,5) 9,63 3,28 = 03,5 HE1 12,91 = 0HE1 = 3,69 kN ()
ME= 0-(HD 3,5) 9,63 3,28= 0 3,5 HD 12,91= 0HD = 3,69 kN ()
Bidang F - EME= 0(HF 3,5) 11,52 6,78 = 03,5 HF 18,30 = 0HF = 5,23 kN ()
MF= 0-(HE2 3,5) 11,52 6,78= 0 3,5 HE2 18,30= 0HE2 = 5,23 kN ()
Bidang G - HMH= 0(HG 3,5) + 1,86 1,68 = 03,5 HG 3,53 = 0HG = 1,01 kN ()
MG= 0-(HH1 3,5) + 1,86 1,68= 0 3,5 HH1 3,53 = 0HH1 = 1,01 kN ()
Bidang H - IMI= 0(HH2 3,5) 1,59 1,99 = 03,5 HH2 3,58 = 0HH2 = 1,02 kN ()
MH= 0-(HI 3,5) 1,59 1,99= 0 3,5 HI 3,58= 0HI = 1,02 kN ()
4.4.9. Perhitungan Gaya-gaya DalamBALOK Bidang B E (0 x 3)MOMEN TUMPUANMx= (RBx) (qx2) (x P) +MBE= (67,90x) (11,06 x2) (x 80,24) 28,78x= 0M0 = 28,78 kNmx= 3M3 = (67,903)- (11,0632) - (380,24)-28,78= 44,94 kNmMOMEN LAPANGANMmax = = 67,90 22,12x 40,12 = 0 maka x = 1,26 m Mmax=(67,901,26) (11,06 1,262) 28,781= 39,08 kNmGAYA LINTANGLx= RB qx P = 67,90 (11,06 x) 80,24 x= 0L0= 67,90 kN ()x= 1,26L1,26 = 67,90 (11,06 1,26)= 40,12 kN ( + )x= 3L3= 67,90 (11,06 3) 80,24= 44,94 kN ( + )
GAYA NORMALNx= HB1 HB2 = 6,24 4,71 = 1,53kN ( + ) Bidang C D (0 x 3)MOMEN TUMPUANMx= (RC x) (qx2) + MCD= (2,44x) (0,71 x2) 2,94x= 0M0= 2,94 kNm x= 3M3= (2,44 3) (0,71 32) 2,94= 1,97 kNm MOMEN LAPANGANMmax = = 2,44 1,41x= 0 maka x = 1,73 m Mmax=(2,441,73) (0,71 1,732) 2,94= - 0,83 kNm GAYA LINTANGLx= RC qx= 2,44 (1,41x) x= 0L0= 2,44 kN ( + )x= 1,73L1,73= 2,44 (1,41 1,73)= 0,00 kN ( + )x= 3L3= 2,44 (1,41 3)= 1,79 kN ( + )GAYA NORMALNx= HC= 4,71 kN Bidang E - H (0 x 3)MOMEN TUMPUANMx= (RE x) (qx2) + MEH= (26,49x) (6,55x2) 23,79x= 0M0= 23,79 kNm x= 3M3= (26,49 3) (6,5532) 23,79= 3,26 kNm MOMEN LAPANGANMmax = = 26,49 13,10x= 0 maka x = 2,02 m Mmax=(26,492,02) (13,102,022) 23,79= 3,00 kNm GAYA LINTANGLx= RE qx= 26,49 (13,10x) x= 0L0= 26,49 kN ( + )x= 2,02L2,02= 26,49 (13,102,02)= 0,00 kN ( + )x= 3L3= 26,49 (13,10 3)= 12,81 kN ( + )GAYA NORMALNx= HB1+2 HE1 HE2 = 1,53 + 3,23 5,23 = -0,47 kN ( + + ) Bidang D I (0 x 3)MOMEN TUMPUANMx= (RD x) (qx2) + MDI= (1,01x) (0,71 x2)+ 1,31x= 0M0 = 1,31 kNm x= 3M3 = (1,01 3) (0,71 32) + 1,31= 1,99 kNm MOMEN LAPANGANMmax = = 1,01 1,41x= 0 maka x = 0,72 m Mmax=(1,010,72) (0,71 0,722) + 1,31= 1,68 kNm GAYA LINTANGLx= RC qx= 1,01 (1,41 x) x= 0L0= 1,01 kN ( + )x= 0,72L0,72= 1,01 (1,41 0,72) = 0,00 kN ( + )x= 3L3= 1,01 (1,41 3)= 3,22 kN ( + )GAYA NORMALNx= HC1+2 HD= 4,71 - 3,69= 1,02 kN ( + )
KOLOM Bidang A B (0 x 3,5)MOMENMy= - (HB1 y) + MBA= - (6,24 y) + 15,23y= 0M0= 15,25 kNm y= 3,5M3,5= - (6,24 3,5) + 15,23= 6,60 kNm GAYA LINTANGLy= - HB1= - 6,24kN y= 0L0= - 6,24 kN y= 3,5L3,5= - 6,24 kN GAYA NORMALNy= RBberat kolom lt.2 berat kuda-kuda RC= 67,90 10,37 19,19 2,44= 99,9 kN( + + + )
Bidang B C (0 x 3,5)MOMENMy= - (HC y) + MCB= - (4,71 y) + 2,94y= 0M0= 2,94 kNm y= 3,5M3,5= - (4,71 3,5) + 2,94= 13,55 kNm GAYA LINTANGLy= - HC = - 4,71kN y= 0L0= - 4,71 kN y= 3,5L3,5= - 4,71 kN GAYA NORMALNy= berat kuda-kuda RC= 19,19 2,44 = 21,63 kN ( + )
Bidang F E (0 x 3,5)MOMENMy= - (HE2 y) + MEF= - (- 5,23 y) -11,52y= 0M0= -11,52 kNm y= 3,5M3,5= - (- 5,23 3,5) 11,52= 6,78 kNm GAYA LINTANGLy= - HE2= 5,23kN y= 0L0= 5,23kN y= 3,5L3,5= 5,23kN GAYA NORMALNy= RE1+2 berat kolom lt.2 RD1+2= 105,16 10,37 2,81= 118,34 kN ( + + + )
Bidang E D (0 x 3,5)MOMENMy= - (HD y) + MDE= - (- 3,69 y) -3,28y= 0M0= -3,28 kNm y= 3,5M3,5= - (- 3,69 3,5) 3,28= 9,63 kNm GAYA LINTANGLy= - HD= 3,69 kN y= 0L0= 3,69kN y= 3,5L3,5= 3,69kN
GAYA NORMALNy= RD1 RD2= 1,79 1,01= 0,78 kN ( + )
Bidang G H (0 x 3,5)MOMENMy= - (HH1 y) + MHG= - (- 1,01 y) 1,68y= 0M0= - 1,68 kNm y= 3,5M3,5= - (- 1,01 3,5) 1,68= 1,86 kNm GAYA LINTANGLy= - HH1= 1,01kN y= 0L0= 1,01kN y= 3,5L3,5= 1,01kN GAYA NORMALNy= RH berat kolom lt.2 berat kuda-kuda RI= 12,81 10,37 19,10 3,22= 45,5 kN ( + + + ) Bidang H I (0 x 3,5)MOMENMy= - (HI y) + MIH= - (- 1,02 y) 1,99y= 0M0= - 1,99 kNm y= 3,5M3,5= - (- 1,02 3,5) 1,99= 1,59 kNm GAYA LINTANGLy= - HI = 1,02kN y= 0L0= 1,02kN y= 3,5L3,5= 1,02kN GAYA NORMALNy= berat kuda-kuda RI= 19,10 3,22 = 22,32 kN ( + )
Tabel Perhitungan hasil cross dan SAPMEMBERJARAK meterCROSS AS D (1-3)SAP AS D (1-3)SELISIH (CROSS-SAP)
Momen kNmLintang kNNormal kNMomen kNmLintang kNNormal kNMomen kNmLintang kNNormal kN
B - E0.00-28.7867.901.53-29.6068.691.460.820.790.07
1.2639.0840.121.5338.7040.831.460.380.710.07
3.00-44.94-78.671.53-43.40-77.881.461.540.790.07
C - D0.00-2.942.444.71-3.352.744.980.410.300.27
1.73-0.830.004.71-0.76-0.304.980.070.300.27
3.00-1.97-1.794.71-1.47-1.494.980.500.300.27
E - H0.00-23.7926.49-0.01-22.1025.51-0.081.690.980.07
2.023.000.00-0.012.640.96-0.080.360.960.07
3.00-3.26-12.81-0.01-4.52-13.79-0.081.260.980.07
D - I0.001.311.011.021.770.731.300.460.280.28
0.721.680.001.021.890.291.300.210.290.28
3.00-1.99-3.221.02-2.38-2.381.300.390.840.28
A - B0.006.60-6.24-99.907.00-6.43-100.900.400.191.00
3.5015.23-6.24-99.9015.53-6.43-100.900.300.191.00
B - C0.0013.55-4.71-21.6314.07-4.98-21.930.520.270.30
3.502.94-4.71-21.633.35-4.98-21.930.410.270.30
F - E0.00-6.785.23-118.34-6.586.58-115.980.201.352.36
3.50-11.525.23-118.34-11.586.58-115.980.061.352.36
E - D0.00-9.633.69-0.78-9.623.68-2.220.010.011.44
3.50-3.283.69-0.78-3.243.68-2.220.040.011.44
G - H0.00-1.861.01-45.50-1.921.22-46.760.060.211.26
3.50-1.681.01-45.50-2.351.22-46.760.670.211.26
H - I0.00-1.591.02-22.32-2.171.30-22.600.580.280.28
3.50-1.991.02-22.32-2.381.30-22.600.390.280.28
Presentasi perbandingan hasil cross dan SAP