tugas ekotek rab
TRANSCRIPT
UPAH 2012DAFTAR HARGA SATUAN UPAH TENAGA KERJAKABUPATEN JEMBERTAHUN ANGGARAN 2012
NO.PEKERJAKODEUPAH ( Rp / hari )
2012 BULAT2011KENAIKAN 6,6%1Mandor lapanganL-0156,300.0056,300.0052,800.0056,284.801.0043,000.0043,000.0043,000.002Kepala tukangL-0251,200.0051,200.0047,970.0051,136.021.0035,000.0035,000.0035,000.003Tukang kayuL-0347,600.0047,600.0044,600.0047,543.601.0034,000.0034,000.0034,000.004Tukang batuL-0445,900.0045,900.0043,000.0045,838.001.0033,000.0033,000.0033,000.005Tukang besiL-0545,900.0045,900.0043,000.0045,838.001.0033,000.0033,000.0033,000.006Tukang pipa airL-0645,900.0045,900.0043,000.0045,838.001.0033,000.0033,000.0033,000.007Tukang listrikL-0745,900.0042,300.0039,600.0042,213.601.0033,000.0033,000.0033,000.008Tukang aluminiumL-0845,900.0042,300.0039,600.0042,213.601.0033,000.0033,000.0033,000.009Tukang catL-0945,900.0042,300.0039,600.0042,213.601.0033,000.0033,000.0033,000.0010Tukang las L-1045,900.0041,600.0039,000.0041,574.001.0033,000.0033,000.0033,000.0011Tukang masak aspalL-1145,900.0042,700.0040,000.0042,640.001.0034,000.0034,000.0034,000.0012Pekerja L-1240,500.0032,000.0030,000.0031,980.001.0028,000.0028,000.0028,000.0013Buruh L-1340,500.0032,000.0030,000.0031,980.001.0028,000.0028,000.0028,000.0014MekanikL-14105,100.00105,100.0098,550.00105,054.301.0024,000.0024,000.0024,000.0015Pembantu MekanikL-1569,800.0069,800.0065,450.0069,769.701.0024,000.0024,000.0024,000.0016OperatorL-16104,500.00104,500.0098,000.00104,468.001.0036,000.0036,000.0036,000.0017Pembantu operatorL-1769,300.0069,300.0065,000.0069,290.001.0024,000.0024,000.0024,000.0018Sopir L-18105,100.00105,100.0098,550.00105,054.301.0033,000.0033,000.0033,000.0019Pembantu sopir L-1969,800.0069,800.0065,450.0069,769.701.0033,000.0033,000.0033,000.0020Penjaga MalamL-2028,300.0028,300.0026,500.0028,249.001.0021,000.0021,000.0021,000.0021Biaya langsiran bahan kelokasi sulit per 100 m`1.00a,yang satuan M310,000.001.0010,500.0010,500.00b,Yang satuan M2250.001.00770.00770.00c,Semen PC yang satuan Zak1,500.001.001,150.001,150.00d,Yang satuan Kg85.0022Pengeboran Darat Wilayah Kecamatana,Kaliwates, Ajung, Rambipuji, BangsalsariM'260,000.00b,Tanggul, Semboro, Umbulsari, SumberbaruM'325,000.00c,Jenggawah, Ambulu, Wuluhan, BalungM'292,500.00d,Panti, Sukorambi, PatrangM'325,000.00e,Arjasa, Jelbuk, Kalisat, Ledokombo, Sukowono, SumberjambeM'351,000.00f,Sempolan, Mayang, Mumbulsari, Tempurejo, PakusariM'338,000.00g,Puger, Gumukmas, Kencong, JombangM'351,000.00h,SumbersariM'390,000.00
Jember, Januari 2012
KEPALA DINAS PU. CIPTA KERYA DAN TATA RUANG KABUPATEN JEMBER
Ir. MERWIN LUSIANI, MMPembina. Tk. I NIP. 19650415 199003 2 008
DAFTAR HARGA SATUAN UPAH TENAGA KERJAKABUPATEN JEMBERTAHUN ANGGARAN 2009
NOMORPEKERJAKODEUPAH ( Rp / hari )
1Mandor lapanganL0350,000.002Kepala tukangL1040,000.003Tukang kayuL1138,000.004Tukang batuL0237,500.005Tukang besiL0237,500.006Tukang pipa airL0237,500.007Tukang listrikL0237,500.008Tukang catL0237,500.009Tukang las L0237,500.0010Tukang masak aspalL1238,000.0011Pekerja L0125,000.0012Buruh L1325,000.0013MekanikL0898,000.0014Pembantu MekanikL0960,000.0015OperatorL0498,000.0016Pembantu operatorL0560,000.0017Sopir L0698,000.0018Pembantu sopir L0760,000.0019Penjaga MalamL1425,000.0020Biaya langsiran bahan kelokasi sulit per 100 m`a,yang satuan M323,000.00b,Yang satuan M2250.00c,Semen PC yang satuan Zak3,000.00d,Yang satuan Kg85.0021Pengeboran Darat Wilayah Kecamatana,Kaliwates, Ajung, Rambipuji, BangsalsariM'260,000.00b,Tanggul, Semboro, Umbulsari, SumberbaruM'325,000.001.312,000.0015,600.0015,000.00c,Jenggawah, Ambulu, Wuluhan, BalungM'292,500.001.324,000.0031,200.0031,000.00d,Panti, Sukorambi, PatrangM'325,000.001.314,000.0018,200.0018,000.00e,Arjasa, Jelbuk, Kalisat, Ledokombo, Sukowono, SumberjambeM'351,000.001.35,000.006,500.006,000.00f,Sempolan, Mayang, Mumbulsari, Tempurejo, PakusariM'338,000.001.311,000.0014,300.0014,000.00g,Puger, Gumukmas, Kencong, JombangM'351,000.001.322,000.0028,600.0028,000.00h,SumbersariM'390,000.001.3389,500.00506,350.00506,000.001.3346,500.00450,450.00450,000.001.3342,300.00444,990.00444,000.001.3112,800.00146,640.00146,000.00Jember, Maret 20091.3568,000.00738,400.00738,000.001.3182,700.00237,510.00237,000.001.389,200.00115,960.00115,000.00KABUPATEN JEMBER1.3124,900.00162,370.00162,000.001.3265,600.00345,280.00345,000.001.3312,900.00406,770.00406,000.001.3130,200.00169,260.00169,000.001.3176,400.00229,320.00229,000.001.3179,500.00233,350.00233,000.00Ir. MERWIN LUSIANI, MM1.3231,000.00300,300.00300,000.00Pembina. 1.351,400.0066,820.0066,000.00NIP. 19650415 199003 2 0081.3332,800.00432,640.00432,000.0025Tamper, vibrator plate 4 HPE 08827,000.001.321,000.0027,300.0027,000.0026Concrette vibrator 4 HPE 08927,000.001.321,000.0027,300.0027,000.0027Chip spreader 3 tonE 13027,000.001.321,000.0027,300.0027,000.0028Sprayer self - prop 40001E 152247,000.001.3190,000.00247,000.00247,000.0029Mesin penyemprot aspal 1000 ltrE 153101,000.001.377,700.00101,010.00101,000.0030Asphalt sprayer towed 4001E 15481,000.001.363,000.0081,900.0081,000.0031Mesin penc. Asphal / AMP 30 tonE 1552,758,000.001.32,122,000.002,758,600.002,758,000.0032AMP 10 t/hE 1561,108,000.001.3852,600.001,108,380.001,108,000.0033Mesin penghampar 1820 men / 30 HPE 157412,000.001.3317,100.00412,230.00412,000.0034Fuel Tank Truck 115 HPE 172189,000.001.3145,900.00189,670.00189,000.0035Water Tank Truck 115 HPE 182143,000.001.3110,200.00143,260.00143,000.0036Trailler towed 1 tonE 19112,000.001.39,400.0012,220.0012,000.0037Low Loader + Tractor 175 HPE 192305,000.001.3235,200.00305,760.00305,000.0038Dump Truck 3.5 ton / 115 HP E 211211,000.001.3162,700.00211,510.00211,000.0039Dump Truck 5 ton / 145 HP E 212274,000.001.3211,000.00274,300.00274,000.0040Dump Truck 8 ton / 175 HPE 213341,000.001.3262,500.00341,250.00341,000.0041Flat Bed Truck 3.5 ton / 115 HPE 221260,000.001.3200,500.00260,650.00260,000.0042Pick up Truck 61 HPE 22285,000.001.366,100.0085,930.0085,000.0044Flat Bed Truck 5 ton / 145 HPE 224311,000.001.3239,400.00311,220.00311,000.0045Flat Bed Truck with craneE 225151,000.001.3116,500.00151,450.00151,000.0048Lube Truck 5 t / 145 HPE 23279,000.001.361,200.0079,560.0079,000.0049Concrette mixer 0.125 m3 / 6 HPE 25121,000.001.316,800.0021,840.0021,000.0050Concrette mixer 0.25 m3 / 10 HPE 25242,000.001.332,500.0042,250.0042,000.0051Concrette mixer 0.5 m3 / 20 HPE 25370,000.001.354,600.0070,980.0070,000.0052Compressor 210 m3 / jamE 30121,000.001.316,800.0021,840.0021,000.0053Generator 3 - 5 KVAE 31121,000.001.316,800.0021,840.0021,000.0054Pump water ( 5 cm ) 30 m3 /hrE 34125,000.001.319,900.0025,870.0025,000.0055Pump water ( 10 cm ) 40 m3 /hrE 34232,000.001.325,200.0032,760.0032,000.0056Jack hammer equipmentE 35125,000.001.319,900.0025,870.0025,000.0057Tractor equipmentE 40187,000.001.367,200.0087,360.0087,000.0058Tempat penggorengan aspalE 40227,000.001.321,000.0027,300.0027,000.0059Kereta dorongE 40349,000.001.337,800.0049,140.0049,000.00ERROR:#REF!
KEPALA DINAS PEKERJAAN UMUMKABUPATEN JEMBER
Ir. SOEHARDIJANTO,MMPembina. Tk.INIP. 510 110 781
&"Brush Script MT,Regular"&11Daftar Upah dan Biaya LangsiranDPU Cipta Karya dan Tata Ruang Kabupaten JemberTahun Anggaran 2012
HARGA BAHAN 2012DAFTAR HARGA SATUAN DASAR BAHAN TERTINGGIKABUPATEN JEMBER TAHUN ANGGARAN 2012
NoJENIS BAHANSATUAN VOLUMEHARGA SATUANHARGA SATUAN 2012NoJENIS
BAHANSATUAN VOLUMEHarga Survei Konsultan dan Sumber LainnyaHarga
survei terendahHarga survei tertinggiSelisih hargaHarga survei
tertinggi x 30%Harga satuan TA 2010Selisih harga survei 2011 dg
2010HARGA SATUAN IJENIS BAHAN BANGUNAN BAHAN PENUTUP ATAP &
PLAFON1Asbes gelombang besar tebal 5 mm (2.50 x 0.92
m)lbr65,000.0065,000.0086,210.0087,500.0065,000.0087,500.0022,500.00113,750.0090,800.009080090,750.0090,750.00113,750.002Asbes
gelombang kecil tebal 5 mm (2.25 x 0.92
m)lbr60,000.0060,000.0077,180.0065,000.0060,000.0077,180.0017,180.00100,334.0075,000.007500075,000.0075,000.00100,334.003Asbes
gelombang kecil tebal 5 mm (2.00 x 0.92
m)lbr55,000.0055,000.0071,250.0062,500.0055,000.0071,250.0016,250.0092,625.0070,500.007050070,500.0070,500.0092,625.004Asbes
gelombang kecil tebal 5 mm (1.80 x 0.92
m)lbr50,000.0050,000.0065,940.0057,000.0050,000.0065,940.0015,940.0085,722.0064,200.006420064,200.0064,200.0085,722.005Asbes
gelombang kecil tebal 4 mm (3.00 x 1.05
m)lbr66,000.0065,000.0065,000.0079,040.0065,000.0079,040.0014,040.00102,752.0087,750.0087,800.008780087,750.0087,750.0011.026Asbes
gelombang kecil tebal 4 mm (2.70 x 1.05
m)lbr57,500.0057,500.0068,585.0057,500.0068,585.0011,085.0089,160.5069,000.006900069,000.0069,000.007Asbes
gelombang kecil tebal 4 mm (2.40 x 1.05
m)lbr53,000.0052,500.0052,500.0061,000.0052,500.0061,000.008,500.0079,300.0063,300.006330063,300.0063,300.008Asbes
gelombang kecil tebal 4 mm (2.10 x 1.05
m)lbr45,000.0045,000.0053,420.0045,000.0053,420.008,420.0069,446.0054,000.005400054,000.0054,000.009Asbes
gelombang kecil tebal 4 mm (1.50 x 1.05
m)lbr35,000.0035,000.0038,410.0035,000.0038,410.003,410.0049,933.0046,100.004610046,100.0046,100.0010Asbes
gelombang kecil tebal 6 mm (3.00 x 1.08
m)lbr63,000.00126,320.0063,000.00126,320.0063,320.00164,216.00139,000.00139000126,350.00126,350.0011Asbes
gelombang kecil tebal 6 mm (2.70 x 1.08
m)lbr24,500.0099,020.0024,500.0099,020.0074,520.00128,726.00109,100.0010910099,100.0099,100.0012Asbes
gelombang kecil tebal 6 mm (2.10 x 1.08
m)lbr23,000.0092,500.0023,000.0092,500.0069,500.00120,250.00101,800.0010180092,500.0092,500.0013Asbes
gelombang kecil 6 mm (2.10 x 1.08
m)lbr29,400.0092,500.0029,400.0092,500.0063,100.00120,250.0097,900.009790092,500.0092,500.0014Asbes
gelombang kecil tebal 6 mm (1.80 x 1.08
m)lbr23,000.0075,920.0023,000.0075,920.0052,920.0098,696.0083,600.008360075,950.0075,950.0015Asbes
wuwung stel gelombang 0.92
mmset18,000.0018,000.0018,000.000.0023,400.0021,600.002160021,600.0021,600.0016Asbes
wuwung stel gelombang 1.05
mmset18,500.0020,000.0044,700.0018,500.0044,700.0026,200.0058,110.0036,600.003660033,250.0033,250.0017Asbes
wuwung stel gelombang 1.08
mmlbr17,000.0017,000.0017,000.000.0022,100.0038,500.003850035,000.0035,000.0018Plat
asbes tebal 3.5
mmlbr49,400.0049,400.0049,400.000.0064,220.0065,300.006530065,300.0065,300.0019Plat
asbes tebal 4
mmlbr68,760.0068,760.0068,760.000.0089,388.0092,600.009260084,100.0084,100.0020Plat
asbes tebal 6
mmlbr98,130.0098,130.0098,130.000.00127,569.00117,500.00117500117,500.00117,500.0021Genteng
Palentong
/vlampressbj1,000.00800.00800.001,000.00200.001,300.001,200.00120022Genteng
palentong
superbh1,100.001,600.001,100.001,600.00500.002,080.0011,200.001120023Genteng
Nok Palentong
/vlampressbj3,000.003,000.003,000.000.003,900.005,800.00580024Genteng
bubung kodok /
karangpilangbj2,500.002,500.002,500.000.003,250.0010,100.001010025Genteng
Betonbj2,500.002,400.006,000.002,400.006,000.003,600.007,800.003,500.003,500.0035003,500.003,500.00(41.67)26Genteng
Metallbr55,000.0055,000.0055,000.000.0071,500.0097,500.0097,500.009750097,500.0097,500.0071,500.0027Nok
genteng
betonbj2,600.008,000.002,600.008,000.005,400.0010,400.003,200.0032003,150.003,150.0028Nok
paten 0.92
mbj17,500.0018,000.0030,000.0017,500.0030,000.0012,500.0039,000.0021,600.002160021,600.0021,600.0029Nok
stel rata 0.92
mbj44,700.0038,000.0038,000.0044,700.006,700.0058,110.0053,700.005370053,650.0053,650.0030Nok
stel
gelombangbj44,700.0022,500.0022,500.0044,700.0022,200.0058,110.0026,800.0053,700.005370053,650.0053,650.0031Genteng
kodok / karang
pilangbj800.00800.00800.000.001,040.003,500.00350032Seng gelombang
3" x 6" BJLS
28lbr63,000.0062,500.0023,500.0036,750.0023,500.0063,000.0039,500.0081,900.0084,000.008400084,000.0084,000.0033Seng
plat 3' x 6' BJLS
28lbr36,750.0036,750.0036,750.000.0047,775.0050,900.0046,000.004600041,800.0041,800.0034Seng
datarlbr22,500.0022,500.0048,000.0022,500.0048,000.0025,500.0062,400.0056,000.005600050,900.0050,900.0035Teakwood
tebal 4 mm (1.22 x
2.44)lbr76,000.0075,000.0076,000.00105,000.0075,000.00105,000.0030,000.00136,500.00137,700.00137700125,100.00125,100.0036Teakwood
tebal 4 mm (1.10 x
2.10)lbr57,000.0058,000.0057,000.0058,000.001,000.0075,400.0069,600.006960069,600.0069,600.0037Plywood
tebal 4 mm (1.22 x
2.44)lbr61,500.0060,000.0060,000.0060,000.0060,000.0061,500.001,500.0079,950.0089,500.0089,500.008950089,500.0089,500.0038Plywood
tebal 9 mm (1.22 x
2.44)lbr120,000.00120,000.00120,000.000.00156,000.00178,500.00181,500.00181500178,500.00178,500.0039Triplek
tebal 4 mm (0.90 x
2.00)lbr41,000.0038,000.0038,000.0041,000.003,000.0053,300.0047,400.004740047,400.0047,400.0040Triplek
tebal 4 mm (1.22 x
2.44)lbr48,000.0047,500.0050,000.0065,000.0047,500.0065,000.0017,500.0084,500.0063,400.006340057,600.0057,600.0041Formite
penjaga jarak bekisting /
spacerbh20,000.0020,000.0020,000.000.0026,000.0020,000.002000042Rolling
door
allumuniumm475,000.00475,000.00475,000.000.00617,500.00639,600.00703,600.00703600639,600.00639,600.0043Pintu
allumuniumm'300,000.00300,000.00300,000.000.00390,000.00239,700.00263,700.00263700239,700.00239,700.0044Gypsum
boardlbr55,000.0055,000.0058,000.0055,000.0058,000.003,000.0075,400.0089,700.0066,000.006600066,000.0066,000.0045Profil
allumunium " T " / kusen
aluminiumm70,000.0070,000.0070,000.000.0091,000.00119,100.0011910046Fiberglass
gelombang (180 x 90)
cmlbr19,000.0019,000.0019,000.000.0024,700.0061,500.006150047Ramsetbh13,000.0013,000.0013,000.000.0016,900.001,700.001,700.0017001,700.001,700.0048List
gypsum profilm'0.000.000.000.0023,700.002370049Talang
karetm'0.000.000.000.0017,700.0017700IIBAHAN MENGGUNAKAN
KAYU1Dolken kayu O 8 - 10 / 400 cm
amanda ayu putri handayani: amanda ayu putri handayani:1 m3 = 33
batang1 batang = 700000/33=21212=21250/
btangm700,000.00700,000.00700,000.000.00910,000.00770,000.007700001
batang=0.032Kayu kelas I
(Balok)m30.000.000.000.0010,450,000.001045000011,817,000.003Kayu
kelas I
(Papan)m30.000.000.000.0011,817,000.001181700011,874,000.004Kayu
kelas II
(Balok)m30.000.000.000.005,280,000.0052800000.014011,817,000.005Kayu
kelas II
(Papan)m30.000.000.000.006,500,000.00650000071.4311,874,000.006Kayu
kelas III
(Balok)m30.000.000.000.003,480,000.00348000073,920.0012,600,000.007Kayu
kelas III
(Papan)m30.000.000.000.003,480,000.00348000012,467,700.008Kayu
5/7m0.000.000.000.002,580,000.002,838,000.0028380002,580,000.002,580,000.0010,400,000.009Kayu
cetakan /
begistingm0.000.000.000.004,355,000.004,355,000.0043550004,355,000.004,355,000.0010,400,000.0010Perancah
kayum0.000.000.000.002,580,000.002,750,000.0027500002,580,000.002,580,000.0010,400,000.0011Kayu
terentengm0.000.000.000.002,580,000.002,750,000.0027500002,580,000.002,580,000.006,750,000.0012Tali
ijukkg5,000.005,000.005,000.000.006,500.0033,900.0033,900.003390033,900.0033,900.005,200,000.0013Ijukkg5,000.005,000.005,000.005,000.000.006,500.0033,900.0020,000.002000020,000.0020,000.006,500,000.0014Tebalan
rumputm30,000.0015Kaso
5/7m0.000.000.000.002,580,000.002,838,000.0028380002,580,000.002,580,000.002,490,000.0016Kayu
papan tebal 9
mmm0.000.000.000.003,480,000.003,480,000.0034800003,480,000.003,480,000.003,480,000.0017Bambu
6 - 10/600
cmbtg8,000.008,000.0010,000.008,000.0010,000.002,000.0013,000.0012,500.0012,500.001250012,500.0012,500.006,955,000.0018Bilik
bambum'16,000.0015,000.0015,000.0016,000.001,000.0020,800.0018,600.001860018,600.0018,600.007,215,000.0019Minyak
bekesting /
pelumasliter0.000.000.000.0033,000.0027,500.002750025,000.0025,000.005,400,000.00IIIBAHAN
MENGGUNAKAN BATU / PASIR & SEMEN1Batu bata merah
bh350.00350.00390.00350.00390.0040.00507.00375.00450.00450410.00410.002Batu
pecah / belah
15/20m53,000.0053,000.0065,700.0053,000.0065,700.0012,700.0085,410.0097,500.00147,500.0014750097,500.0097,500.003Batu
pecah
7/10m56,000.0056,000.00215,000.0056,000.00215,000.00159,000.00279,500.00144,500.00147,500.004Batu
pecah
5/7m56,000.0056,000.00215,000.0056,000.00215,000.00159,000.00279,500.00144,500.00159,000.00159000144,500.00144,500.005Batu
pecah
2/3m82,000.0081,000.00215,000.0081,000.00215,000.00134,000.00279,500.00143,750.00165,300.00165300150,200.00150,200.006Batu
pecah
1/2m86,000.0086,000.00215,000.0086,000.00215,000.00129,000.00279,500.00168,000.00184,800.00184800168,000.00168,000.007Batu
pecah mesin 1 - 2 cmm210,100.008Batu pecah mesin 0,5 - 1
cmm210,100.009Batu kali pecah
3/5m76,000.0076,000.00215,000.0076,000.00215,000.00139,000.00279,500.00160,100.00160100145,500.00145,500.0010Batu
tempelm30,000.0030,000.0030,000.000.0039,000.0039,600.003960036,000.0036,000.0011Batu
kerikil beton
amanda ayu putri handayani: amanda ayu putri handayani:Bila dalam
Kg (Bj Kerikil = 1800Kg/m3)1Kg =
175.000/1400=125m0.000.000.000.00175,000.00165,000.00165000123.00175,000.00175,000.0012Batu
bobos uk. (10x 20 x 1,5) cmbh3,800.00380013Pasir cor / beton
amanda ayu putri handayani: amanda ayu putri handayani:Bila dalam
Kg (Bj Kerikil = 1350Kg/m3)1Kg =
110.000/1350=78.6=80m75,000.0075,000.0075,000.0075,000.000.0097,500.00110,000.00121,000.0012100090.00110,000.00110,000.0014Pasir
pasangm75,000.0075,000.0051,500.0051,500.0075,000.0023,500.0097,500.00110,000.00121,000.00121000110,000.00110,000.0015pasir
urugm60,000.0035,000.0032,000.0032,000.0060,000.0028,000.0078,000.0060,000.0060,000.006000060,000.0060,000.0016Sirtum52,500.0017Pasir
silikakg15,000.0015,000.0015,000.000.0019,500.0080.0010018Semen
berwarna
yiyitankg10,000.0010,000.0010,000.000.0013,000.004,800.005,300.0053004,800.004,800.0019Semen
PC (Portland Cement) / Semen Gresik (50
Kg)kg1,150.001,125.001,100.001,125.001,100.001,150.0050.001,495.001,400.001,400.0014001,400.001,400.0020Semen
tiga roda (50
Kg)kg1,087.501,037.501,037.501,087.5050.001,413.751,400.001,400.0014001,400.001,400.0021Semen
PC ( 40 kg
)kg2,000.0068,000.0010,000.002,000.0068,000.0066,000.0088,400.003,200.001,400.0036003,200.003,200.0022Semen
putihkg2,000.0068,000.0010,000.002,000.0068,000.0066,000.0088,400.003,200.003,600.0036003,200.003,200.0023Semen
merahm0.000.000.000.00169,400.00186,400.00186400169,400.00169,400.0024Kapur
pasang (10
Kg)kg4,500.004,500.005,000.004,500.005,000.00500.006,500.005,400.005,500.0055005,400.005,400.0025Tanah
urugm32,000.0032,000.0040,000.0032,000.0040,000.008,000.0052,000.0052,500.0057,800.005780052,500.0052,500.0026Tanah
sirtum0.000.000.000.0052,500.0052,500.005250052,500.0052,500.0027Tanah
liatm47,000.0047,000.0047,000.000.0061,100.0052,500.005250028Kapur
padamm1,600,000.001,600,000.001,600,000.000.002,080,000.00364,500.00401,000.00401000364,500.00364,500.0029Kapur
sirihkg6,000.006,000.006,000.000.007,800.00540.00600.00600540.00540.0030Airliter0.000.000.000.0090.00100.0010090.0090.0031Semen
natkg10,000.0010,000.0010,000.0010,000.000.0013,000.005,300.0053004,800.004,800.00IVBAHAN
MENGGUNAKAN BESI / LOGAM1Besi begel /
bautkg12,000.0012,500.0015,000.0012,000.0015,000.003,000.0019,500.0012,400.0016,500.001650015,000.0015,000.002Besi
beton
poloskg8,000.007,500.007,500.007,000.008,100.007,000.008,100.001,100.0010,530.0014,400.0015,900.001590014,400.0014,400.003Besi
beton
ulirkg8,500.008,000.008,000.007,500.0010,350.007,500.0010,350.002,850.0013,455.0016,200.0017,900.001790016,200.0016,200.004Besi
pipaljr0.000.000.000.0044,500.0044,500.004450044,500.0044,500.005Besi
pipa galvanis medium 1 1/2, 6
mljr112,000.00110,000.00110,000.00110,000.00112,000.002,000.00145,600.00134,400.00134400134,400.00134,400.006Besi
pipa galvanis medium 1 1/4, 6
mljr91,750.0090,000.0090,000.0090,000.0091,750.001,750.00119,275.00110,100.00110100110,100.00110,100.007Besi
pipa galvanis medium 1, 6
mljr76,250.0075,000.0075,000.0075,000.0076,250.001,250.0099,125.0093,500.009350091,500.0091,500.008Besi
pipa galvanis medium 1/2, 6
mljr52,000.0050,000.0050,500.0050,000.0052,000.002,000.0067,600.0068,700.006870062,400.0062,400.009Besi
pipa galvanis medium 2 1/2, 6
mljr217,000.00215,000.00215,000.00215,000.00217,000.002,000.00282,100.00286,500.00286500260,400.00260,400.0010Besi
pipa galvanis medium 2, 6
mljr135,500.00135,000.00135,000.00135,000.00135,500.00500.00176,150.00170,500.00170500162,600.00162,600.0011Besi
pipa galvanis medium 3, 6
mljr276,750.00275,000.00275,000.00275,000.00276,750.001,750.00359,775.00365,400.00365400332,100.00332,100.0012Besi
pipa galvanis medium 4, 6
mljr351,000.00350,000.00350,000.00350,000.00351,000.001,000.00456,300.00463,400.00463400421,200.00421,200.0013Besi
pipa galvanis medium 5, 6
mljr876,500.00875,000.00875,000.00875,000.00876,500.001,500.001,139,450.001,051,800.0010518001,051,800.001,051,800.0014Besi
pipa galvanis medium 6, 6
mljr1,376,500.001,375,000.001,375,000.001,375,000.001,376,500.001,500.001,789,450.001,817,000.0018170001,651,800.001,651,800.0015Besi
pipa galvanis medium 3/4, 6
mljr65,000.0065,000.0065,000.0065,000.0065,000.000.0084,500.0085,800.008580078,000.0078,000.0016Pipa
besi GI diameter 0,50" Medium
Bm`12,000.0012,500.0015,000.0012,000.0015,000.003,000.0019,500.0012,400.0018,000.001800015,000.0015,000.0017Pipa
besi GI diameter 0,75" Medium
Bm`8,000.007,500.007,500.007,000.008,100.007,000.008,100.001,100.0010,530.0014,400.0023,300.002330014,400.0014,400.0018Pipa
besi GI diameter 1" Medium
Bm`8,500.008,000.008,000.007,500.0010,350.007,500.0010,350.002,850.0013,455.0016,200.0033,600.003360016,200.0016,200.0019Pipa
besi GI diameter 1,5" Medium
Bm`152,000.00151,500.00133,000.00133,000.00152,000.0019,000.00197,600.0048,500.0048500182,400.00182,400.0020Pipa
besi GI diameter 2" Medium
Bm`87,000.0085,000.0063,000.0058,000.0058,000.0087,000.0029,000.00113,100.0063,500.0063500104,400.00104,400.0021Pipa
besi GI diameter 2,5" Medium
Bm`61,000.0059,000.0052,000.0048,000.0048,000.0061,000.0013,000.0079,300.0093,400.009340073,200.0073,200.0022Pipa
besi GI diameter 3" Medium
Bm`38,000.0037,500.0034,000.0029,500.0029,500.0038,000.008,500.0049,400.00110,800.0011080045,600.0045,600.0023Pipa
besi GI diameter 4" Medium
Bm`23,500.0022,500.0024,000.0019,000.0019,000.0024,000.005,000.0031,200.00161,900.0016190028,800.0028,800.0024Pipa
besi GI diameter 6" Medium
Bm`14,000.0014,000.0014,000.000.0018,200.00436,000.0043600016,800.0016,800.0025Pipa
besi GI diameter 0,50"
m`0.000.000.000.0044,500.0028,600.002860044,500.0044,500.0026Pipa
besi GI diameter 0,75"
m`112,000.00110,000.00110,000.00110,000.00112,000.002,000.00145,600.0036,100.0036100134,400.00134,400.0027Pipa
besi GI diameter 1"
m`91,750.0090,000.0090,000.0090,000.0091,750.001,750.00119,275.0044,900.0044900110,100.00110,100.0028Pipa
besi GI diameter 1,5"
m`76,250.0075,000.0075,000.0075,000.0076,250.001,250.0099,125.0068,600.006860091,500.0091,500.0029Pipa
besi GI diameter 2"
m`52,000.0050,000.0050,500.0050,000.0052,000.002,000.0067,600.0093,400.009340062,400.0062,400.0030Pipa
besi GI diameter 2,5"
m`217,000.00215,000.00215,000.00215,000.00217,000.002,000.00282,100.00118,300.00118300260,400.00260,400.0031Pipa
besi GI diameter 3"
m`135,500.00135,000.00135,000.00135,000.00135,500.00500.00176,150.00193,100.00193100162,600.00162,600.0032Pipa
besi GI diameter 4"
m`276,750.00275,000.00275,000.00275,000.00276,750.001,750.00359,775.00223,000.00223000332,100.00332,100.0033Pipa
besi GI diameter 6"
m`351,000.00350,000.00350,000.00350,000.00351,000.001,000.00456,300.00361,200.00361200421,200.00421,200.0034Pipa
beton 30 - 100
cmbh41,000.0040,500.00425,000.0040,500.00425,000.00384,500.00552,500.0053,800.005380048,900.0048,900.0035Pipa
vent ( udara ) GI dia 1"bh94,875.0036Water mur / shock
dratbh20,000.0037Besi plat 4 x 8 tebal 2
mmKg675,000.00675,000.009,500.009,500.00675,000.00665,500.00877,500.002,000.00
amanda ayu putri handayani: amanda ayu putri handayani:per Kg, Rp.
17502000810,000.00810,000.0038Besi plat bordes 4" x 8" tebal 3
mmkg9,500.009,500.009,500.000.0012,350.002,000.00200039Besi profil
WF < = 200
mmkg10,600.0011,000.0013,500.0010,600.0013,500.002,900.0017,550.0019,000.001900017,250.0017,250.0040Besi
profil WF < = 200 mm s/d 400
mmkg11,000.0010,600.0011,000.0013,500.0010,600.0013,500.002,900.0017,550.0019,000.001900017,250.0017,250.0041Besi
profil WF < = 200 s/d 500
mmkg11,000.0010,600.0013,500.0010,600.0013,500.002,900.0017,550.0019,000.001900017,250.0017,250.0042Besi
siku L
50.50.5kg176,000.00175,000.00175,000.0014,000.0014,000.00176,000.00162,000.00228,800.0022,200.001850016,800.0016,800.0043Besi
siku L
70.70.7kg30,000.0027,500.0027,500.0014,000.0014,000.0030,000.0016,000.0039,000.0022,200.001850016,800.0016,800.0044Besi
siku L
60.60.6kg176,000.00175,000.00175,000.0014,000.0014,000.00176,000.00162,000.00228,800.0022,200.001850016,800.0016,800.0045Besi
siku L
30.30.3kg30,000.0027,500.0027,500.0014,000.0014,000.0030,000.0016,000.0039,000.0022,200.001850016,800.0016,800.0046Besi
strip tebal 5
mmkg14,000.0014,000.0014,000.000.0018,200.0013,700.001370047Besi
plat tebal 0,7
mmLbr14,000.0014,000.0014,000.000.0018,200.002,400,000.001370048Kawat
ikat
betonkg15,000.009,500.0012,500.009,500.0015,000.005,500.0019,500.0019,000.001900017,250.0017,250.0049Kawat
nyamuk kasa
allumuniumm18,000.0017,500.0017,500.0017,500.0018,000.00500.0023,400.0021,000.002100021,000.0021,000.0050Kawat
harmonikam15,000.0015,000.0025,000.0015,000.0025,000.0010,000.0032,500.0050,200.005020045,600.0045,600.0051Kawat
las
listrikkg22,500.0022,000.0022,000.0022,000.0022,500.00500.0029,250.00126,500.00126500115,000.00115,000.0052Kawat
4
mmkg12,500.0012,500.0012,500.000.0016,250.0017,800.001780016,100.0016,100.0053Jendela
nako lengkap kaca
raybendaun160,000.00160,000.00160,000.000.00208,000.0028,400.002840054Besi
angkur 8
mmkg7,500.007,500.007,500.000.009,750.008,300.0083007,500.007,500.0055Pintu
gulung
besim45,000.00400,000.00340,000.0045,000.00400,000.00355,000.00520,000.00550,000.00550000510,000.00510,000.0056Pintu
lipat /
harmonikabh1,350,000.001,350,000.001,350,000.000.001,755,000.00967,400.0096740057Kasa
ghas / harmonikam'20,400.0058Kasa nyamuk logamm'20,000.0059Skrup
fixerbh500.00500.00500.000.00650.00900.0090060Rolling door
allumuniumm475,000.00475,000.00475,000.000.00617,500.00639,600.00639600639,600.00639,600.0061Kawat
durim'2,650.002,500.0015,500.002,500.0015,500.0013,000.0020,150.003,100.0031003,100.003,100.0062Kunci
lemaribh7,500.007,500.008,000.007,500.008,000.00500.0010,400.009,900.0099009,000.009,000.0063Sok
diameter 0,75 bh8,690.0064Mur baut + kuku macanbj16,500.0065Kawat 4
mm digalvanokg16,100.0066Glas bestkg19,100.0067Alat bantu ( set @ 3
alat )set66,300.0068Alas tomerm3670,000.0069Kawat seling 12
mm'18,000.0070Trecker 20 cmbh27,500.0071Klaim begel / setrip 12
mbh13,500.0072Pengadaan Mour baut 3/4 "bh4,700.0073Pipa Besi GI
diameter 0,75" Medium Am121,400.0074Reduser GI
0,75"bh44,550.0075Tee GI diameter 0,50"bh4,800.0076Tee GI diameter
1"bh12,000.0077Tee GI diameter 2"bh30,000.0078Tee GI diameter
3"bh95,000.0079Tee GI diameter 4"bh177,500.0080Weel pipe diameter
3"bh518,375.0081Weel pipe diameter 4"bh657,800.0082Weel pipe
diameter 6"bh1,115,900.0083Air Valve diameter 1/2"bh8,400.0084Tee
GI diameter 0,75"bh5,500.0085Bend GI diameter
0,75"bh10,000.0086Bend GI diameter 1"bh15,000.0087Bend GI diameter
1,5"bh30,000.0088Bend GI diameter 2"bh63,000.0089Bend GI diameter
2,5"bh107,500.0090Bend GI diameter 3"bh157,500.0091Tangga monyet
dari plat baja lengkapunit564,190.0092man hole 60 x 60 dari baja
lengkapunit469,150.0093man hole 40 x 40 dari baja
lengkapunit341,800.0094man hole 20 x 20 dari baja
lengkapunit170,800.0095Clampe sadle GI diameter
1"bh67,980.0096Clampe sadle GI diameter 2"bh103,620.0097Dop GI
diameter 1/2"bh3,000.0098Dop GI diameter 1"bh5,000.0099Dop GI
diameter 2"bh14,000.00100Dop GI diameter 3"bh48,000.00101Dop GI
diameter 4"bh75,000.00102Dop GI diameter 6"bh186,875.00103Flang
spigot socket diameter 2"bh82,500.00104Flang spigot socket diameter
3"bh164,450.00105Flang spigot socket diameter
4"bh197,340.00106Flang spigot socket diameter 6"bh394,680.00107Gate
valve diameter 2"bh360,000.00108Gate valve diameter
2,5"bh1,409,760.00109Gate valve diameter 3"bh732,000.00110Gate
valve diameter 4"bh1,413,600.00111Kran Air diameter 0,50"
bh16,800.00112Kran Air diameter 0,50" handle silver
starbh24,000.00113Kran Air diameter 0,75" bh21,600.00114Screen (
pipa GI diameter 3" ) panjang 1,5 m'bh469,150.00115Screen ( pipa GI
diameter 2" ) panjang 1,5 m'bh285,000.00VBAHAN UNTUK LANTAI1Paving
stone persegi abu - abu tebal 6 cm
kasarm249,650.0049,650.0049,650.000.0064,545.0045,500.004550045,500.0059,600.002Paving
stone persegi abu - abu tebal 8 cm
kasarm262,700.0062,700.0062,700.000.0081,510.0057,900.005790057,900.0057,900.003Tegel
PC abu - abu 20 x 20
cmbh1,040.001,000.002,200.001,000.002,200.001,200.002,860.001,500.0015001,500.001,500.004Tegel
keramik 10 x 20
cmbh720.00720.00720.000.00936.001,100.0011001,050.001,050.005Tegel
keramik 20 x 20
cmbh1,750.001,600.001,600.001,600.001,750.00150.002,275.002,600.0026002,600.002,600.006Tegel
keramik 20 x 25
cmbh1,750.001,600.001,600.001,600.001,750.00150.002,275.002,700.0027002,600.002,600.007Tegel
keramik 30 x 30
cmbh2,600.002,590.003,680.002,590.003,680.001,090.004,784.004,700.0047004,650.004,650.008Tegel
keramik 40 x 40 cmbh0.000.000.000.006,400.0064009Plint keramik (5 x
20)
cmbh5,000.005,000.005,000.005,000.000.006,500.006,100.0061006,000.006,000.0010Terawang
(Roster)bh15,000.0015,000.0015,000.000.0019,500.007,300.0073006,600.006,600.0011Karpetm15,000.0012,500.0012,500.0015,000.002,500.0019,500.0019,800.001980018,000.0018,000.0012Perquet
kayu kelas
Im230,000.00230,000.00230,000.000.00299,000.00140,000.0014000013Batu
Parasm125,000.0070,000.0070,000.00125,000.0055,000.00162,500.00165,000.00165000150,000.00150,000.0014Batu
tempel
hitamm125,500.00125,000.0094,000.0094,000.00125,500.0031,500.00163,150.00165,400.00165400150,300.00150,300.0015Lem
Vinylkg35,000.0060,000.0035,000.0060,000.0025,000.0078,000.0044,000.004400042,000.0042,000.0016Wall
paper lebar 50
cmm30,000.00150,000.0030,000.00150,000.00120,000.00195,000.0037,400.003740036,000.0036,000.0017Terawang
(Roster)bh15,000.0015,000.0015,000.000.0019,500.006,600.0066006,000.006,000.0018Lantai
Batu
Alamm12,500.0012,500.0012,500.000.0016,250.00115,000.001150006,000.006,000.00VIBAHAN
UNTUK PENGECATAN1Cat besi
kg43,250.0042,500.0043,000.0038,000.0039,000.0038,000.0043,250.005,250.0056,225.0063,000.006300057,200.0057,200.002Cat
kayu
kg43,250.0042,500.0043,000.0038,000.0038,000.0038,000.0043,250.005,250.0056,225.0070,600.007060064,100.0064,100.003Cat
meni (besi / kayu)
kg18,000.0017,500.0018,000.0018,000.007,000.007,000.0018,000.0011,000.0023,400.0026,800.002680024,350.0024,350.004Cat
residultr20,000.0020,000.006,000.006,000.0020,000.0014,000.0026,000.0026,400.002640024,000.0024,000.005Cat
tembok
kg14,600.0014,000.0012,000.0030,000.0012,000.0030,000.0018,000.0039,000.0026,300.002630023,900.0023,900.006Cerlakkg112,000.00110,000.00110,000.00150,000.00110,000.00150,000.0040,000.00195,000.00145,900.00145900132,550.00132,550.007Politurltr21,000.0021,000.0021,000.000.0027,300.0044,000.00440008Politur
jadiltr52,500.0052,500.0036,000.0036,000.0052,500.0016,500.0068,250.0062,100.006210056,400.0056,400.009Vernisltr18,250.0017,500.0017,500.0025,000.0017,500.0025,000.007,500.0032,500.0023,100.002310021,000.0021,000.0010Cat
genteng setara merk mowilekkg60,000.0011Cat water shill setara
mowilek ( untuk bagian luar )kg80,000.0012Cat brown /
silverkg40,000.0013Dempulkg26,500.0025,000.0030,000.009,000.009,000.0030,000.0021,000.0039,000.0023,500.002350021,275.0021,275.0014Minyak
cat /
afdunerltr17,500.0017,500.0017,500.005,000.005,000.0017,500.0012,500.0022,750.0021,000.002100021,000.0021,000.0015Teerkg66,000.0065,000.0065,000.0065,000.0066,000.001,000.0085,800.0085,800.008580078,000.0078,000.0016Kertas
gosok /
ampelaslbr2,600.002,500.002,500.002,000.002,000.002,600.00600.003,380.004,000.0040004,000.004,000.0017Plamur
tembokkg28,500.0028,000.0028,000.0028,500.00500.0037,050.0028,500.002850028,500.0028,500.0018Plamur
kayukg18,000.0017,500.0015,000.0017,000.0015,000.0018,000.003,000.0023,400.0023,100.002310022,750.0022,750.0019Spiritusltr13,250.0013,500.0012,000.0013,500.0012,000.0013,500.001,500.0017,550.0018,100.001810018,050.0018,050.0020Lem
kayukg28,250.0027,500.0027,600.009,000.009,000.0028,250.0019,250.0036,725.0036,500.003650033,100.0033,100.0021Thinner
A / minyak
catltr5,250.005,000.005,000.0018,000.005,000.0018,000.0013,000.0023,400.0019,800.001980018,000.0018,000.0022Thinner
B / minyak
catltr5,250.005,000.005,000.0018,000.005,000.0018,000.0013,000.0023,400.0019,300.001930018,000.0018,000.0023Soda
apikg12,500.0012,500.0012,500.000.0016,250.0016,500.001650015,000.0015,000.0024Sabunkg10,000.0010,000.0010,000.000.0013,000.009,800.00980025Teak
oilltr17,500.0017,500.0017,500.000.0022,750.004,500.00450026Kuasbh11,000.0011,000.0012,500.0011,000.0012,500.001,500.0016,250.0014,600.001460013,200.0013,200.0027Alang
-
alangikat1,600.001,500.001,500.001,600.00100.002,080.001,900.0019001,900.001,900.0028Plastikm25,000.00VIIBAHAN
PENGGANTUNG DAN PENGUNCI1Engsel
Hstl3,600.003,500.003,500.003,500.003,600.00100.004,680.004,700.0047004,200.004,200.002Engsel
kuning Kualitas
Iistl7,500.007,500.007,500.007,500.007,500.000.009,750.009,000.0090009,000.009,000.003Engsel
jendelabh6,500.006,000.006,000.006,000.006,500.00500.008,450.008,000.0080007,200.007,200.004Engsel
anginbh1,750.001,500.001,500.001,500.001,750.00250.002,275.002,400.0024002,100.002,100.005Engsel
pintubh18,000.007,500.0010,000.007,500.0018,000.0010,500.0023,400.0022,000.002200021,600.0021,600.006Espanyoletstl2,500.002,500.002,500.000.003,250.003,300.0033003,000.003,000.007Grendelbj3,750.002,500.002,500.002,500.003,750.001,250.004,875.0010,700.00107009,700.009,700.008Grendel
biasa
(besar)bh2,000.003,500.003,500.002,000.003,500.001,500.004,550.004,700.0047004,200.004,200.009Grendel
biasa
(kecil)bh25,500.001,500.001,500.001,500.0025,500.0024,000.0033,150.002,800.0028002,500.002,500.0010Grendel
tanambh25,000.0030,000.0025,000.0030,000.005,000.0039,000.0044,500.004900044,500.0044,500.0011Kunci
tanam
(808)bj46,000.00105,000.00110,000.0046,000.00110,000.0064,000.00143,000.0014,900.001490013,500.0013,500.0012Kunci
tanam besar kuda terbang 2 x
putarbj31,500.0045,000.0050,000.0031,500.0050,000.0018,500.0065,000.0088,500.008850080,400.0080,400.0013Kunci
tanam kamar
mandibh30,000.0030,000.0030,000.0030,000.000.0039,000.0039,600.003960036,000.0036,000.0014Kunci
silinderbh95,000.0095,000.0095,000.0095,000.000.00123,500.00115,500.00115500114,000.00114,000.0015Door
closerbh7,500.007,500.007,500.000.009,750.009,900.0099009,000.009,000.0016Kunci
selotbh83,750.0085,000.0085,000.0083,750.0085,000.001,250.00110,500.00112,200.00112200102,000.00102,000.0017Hak
anginbj3,750.003,500.004,500.003,500.004,500.001,000.005,850.0010,800.00108009,750.009,750.0018Hak
angin 4 mm
(lurus)bj4,500.004,500.005,000.004,500.005,000.00500.006,500.008,800.0088008,000.008,000.0019Kait
anginbh1,750.001,500.001,500.001,750.00250.002,275.002,400.0024002,100.002,100.0020Kunci
tanam
biasabh35,000.0035,000.0035,000.0035,000.000.0045,500.0042,000.004200042,000.0042,000.00VIIIBAHAN
UNTUK KM / WC / URINOIR1Pipa / siang spiral saluran
kranset40,000.0040,000.0040,000.000.0052,000.0052,800.005280048,000.0048,000.002Closet
duduk putih porselin
komplitbh1,300,000.001,300,000.001,300,000.001,300,000.000.001,690,000.001,560,000.0015600001,560,000.001,560,000.003Closet
jongkok porselin warna
putihbh100,000.00145,000.00100,000.00145,000.0045,000.00188,500.00265,700.00265700241,500.00241,500.004Closet
jongkok
terasobh65,750.0065,000.0065,000.0065,000.0065,750.00750.0085,475.00126,500.00126500115,000.00115,000.005Bak
terasobh0.000.000.000.00255,900.00255900232,600.00232,600.006Bak
cuci stanless
steelbh180,000.00180,000.00180,000.000.00234,000.00286,000.00286000260,000.00260,000.007Bak
cuci
terasobh0.000.000.000.00393,700.00393700357,850.00357,850.008Steal
tapebh1,000.001,000.001,500.001,000.001,500.00500.001,950.002,000.0020001,800.001,800.009Wastafelbh275,000.00340,000.00275,000.00340,000.0065,000.00442,000.00495,000.00495000487,500.00487,500.0010Kran
airbh32,750.0035,000.0019,000.0097,400.0019,000.0097,400.0078,400.00126,620.0035,800.003580032,500.0032,500.0011Water
drain +
assesoriesset75,000.0075,000.0075,000.000.0097,500.0019,700.001970012Urionirbh700,000.00700,000.00700,000.000.00910,000.001,072,500.001072500975,000.00975,000.0013Floor
drainbh25,000.0045,000.0025,000.0045,000.0020,000.0058,500.0057,200.005720052,000.0052,000.0014Bak
fiberglassbh
1,100,000.001,100,000.001,100,000.000.001,430,000.00390,000.00390000390,000.00390,000.0015Airltr90.0090.0090.000.00117.00100.0010090.0090.0016Water
Meterbh18,000.0017Box Meterbh85,000.0018Pompa Air 3" / 7,5
PKunit6,600,000.0019Pompa Air 5,5 PKunit4,450,000.0020Pompa
Listrikbh2,400,000.0021Pompa Air Portable / dudu 5,5
PKbh6,000,000.0022Pompa Summersibleunit12,697,500.00IXBAHAN JENIS
KACAm1Kaca polos tb. 3
mmm47,000.0047,000.0047,000.000.0061,100.0071,500.007150071,500.0071,500.002Kaca
polos tb. 5
mmm49,500.0050,000.0060,000.0049,500.0060,000.0010,500.0078,000.0089,400.008940089,400.0089,400.003Kaca
polos tb. 8
mmm155,000.00155,000.00155,000.000.00201,500.00186,000.00186000186,000.00186,000.004Kaca
rayban tb. 5
mmm59,000.0060,000.0070,000.0059,000.0070,000.0011,000.0091,000.00108,000.00108000108,000.00108,000.005Sealanttube20,000.0020,000.0020,000.000.0026,000.0036,300.0036300XBAHAN
BETON CETAKAN1Buis beton diameter 40
cmbh65,000.0065,000.0065,000.000.0084,500.0071,500.007150066,500.0066,500.002Buis
beton diameter 50
cmbh122,000.00122,000.00122,000.000.00158,600.00156,000.00156000156,000.00156,000.003Buis
beton U 20
cmbh23,000.0023,000.0023,000.000.0029,900.0055,000.005500055,000.0055,000.004Buis
beton U 30
cmbh30,000.0030,000.0030,000.000.0039,000.0057,500.005750057,500.0057,500.00XIBAHAN
PLASTIK PIPA PVC1Keni PVC
1/2"bh1,250.001,000.001,000.001,200.001,000.001,250.00250.001,625.001,700.0017001,625.001,625.002Keni
PVC
3/4"bh1,250.001,250.001,250.001,500.001,250.001,500.00250.001,950.002,000.0020002,000.002,000.003Keni
PVC
2"bh2,750.002,500.002,500.0011,000.002,500.0011,000.008,500.0014,300.006,000.0060006,000.006,000.004Keni
PVC
3"bh5,000.005,000.005,000.0028,000.005,000.0028,000.0023,000.0036,400.0012,900.001290012,900.0012,900.005Keni
PVC
4"bh7,250.007,500.007,500.0024,500.007,250.0024,500.0017,250.0031,850.0014,100.001410014,025.0014,025.006Keni
PVC
5"bh26,500.0025,000.0025,000.0025,000.0026,500.001,500.0034,450.0030,600.003060030,600.0030,600.007Klem
PVCbh2,250.002,000.002,000.0030,000.002,000.0030,000.0028,000.0039,000.004,900.0049004,400.004,400.008Lem
PVCbh2,250.002,000.002,000.0030,000.002,000.0030,000.0028,000.0039,000.0035,800.00358004,400.004,400.009Pipa
paralon 5/8" panjang 4.00 mt
ljr5,750.005,000.005,000.005,000.005,750.00750.007,475.006,500.0065006,500.006,500.0010Pipa
PVC 1/2" panjang 4.00 mt
ljr18,000.0017,500.0017,500.0018,500.0017,500.0018,500.001,000.0024,050.0020,300.002030018,400.0018,400.0011Pipa
PVC 2" panjang 4.00 mt
ljr37,000.0035,000.0035,000.0073,000.0035,000.0073,000.0038,000.0094,900.0098,400.009840098,400.0098,400.0012Pipa
PVC 3" panjang 4.00 mt
ljr74,500.0075,000.0075,000.00135,000.0074,500.00135,000.0060,500.00175,500.00175,200.00175200175,200.00175,200.0013Pipa
PVC 3/4" panjang 4.00 mt
ljr23,000.0022,500.0022,500.0022,000.0022,000.0023,000.001,000.0029,900.0037,200.003720037,200.0037,200.0014Pipa
PVC 4" panjang 4.00 mt
ljr105,500.00105,000.00105,000.00195,000.00105,000.00195,000.0090,000.00253,500.00220,400.00220400220,400.00220,400.0015Pipa
PVC 5" panjang 4.00
mtljr176,000.00175,000.00175,000.00265,000.00175,000.00265,000.0090,000.00344,500.00247,500.00247500237,300.00237,300.0016Pipa
PVC 3/4" type AW panjang 6.00
mtljr37,000.0035,000.0035,000.0035,000.0037,000.002,000.0048,100.0055,800.005580055,800.0055,800.0017Pipa
PVC 1/2" type AW panjang 6.00
mtljr28,000.0027,500.0028,000.0027,500.0028,000.00500.0036,400.0036,800.003680033,400.0033,400.0018Pipa
PVC 1" type AW panjang 6.00
mtljr42,000.0042,500.0042,000.0042,000.0042,500.00500.0055,250.0061,400.006140055,800.0055,800.0019Pipa
PVC 1 1/2" type AW panjang 6.00
mtljr73,500.0072,500.0072,000.0072,000.0073,500.001,500.0095,550.00107,600.0010760097,800.0097,800.0020Pipa
PVC 2" type AW panjang 6.00
mtljr106,000.00105,000.00100,000.00100,000.00106,000.006,000.00137,800.00162,400.00162400147,600.00147,600.0021Pipa
PVC 2 1/2" type AW panjang 6.00
mtljr147,500.00145,000.00145,000.00145,000.00147,500.002,500.00191,750.00206,000.00206000187,200.00187,200.0022Pipa
PVC 3" type AW panjang 6.00
mtljr198,000.00197,500.00197,500.00197,500.00198,000.00500.00257,400.00289,100.00289100262,800.00262,800.0023Pipa
PVC 4" type AW panjang 6.00
mtljr295,500.00295,000.00295,000.00295,000.00295,500.00500.00384,150.00363,700.00363700330,600.00330,600.0024Pipa
PVC 5" type AW panjang 6.00
mtljr487,000.00485,000.00485,000.00485,000.00487,000.002,000.00633,100.00641,100.00641100582,800.00582,800.0025Pipa
PVC diameter 1"
SCJm`105,500.00105,000.00105,000.00195,000.00105,000.00195,000.0090,000.00253,500.0029,400.0029400220,400.00220,400.0026Pipa
PVC diameter 1,5"
SCJm`176,000.00175,000.00175,000.00265,000.00175,000.00265,000.0090,000.00344,500.0030,300.0030300237,300.00237,300.0027Pipa
PVC diameter 2"
RRJm`37,000.0035,000.0035,000.0035,000.0037,000.002,000.0048,100.0045,500.004550055,800.0055,800.0028Pipa
PVC diameter 2,5"
RRJm`28,000.0027,500.0028,000.0027,500.0028,000.00500.0036,400.0069,600.006960033,400.0033,400.0029Pipa
PVC diameter 3"
RRJm`42,000.0042,500.0042,000.0042,000.0042,500.00500.0055,250.0094,800.009480055,800.0055,800.0030Pipa
PVC diameter 4"
RRJm`73,500.0072,500.0072,000.0072,000.0073,500.001,500.0095,550.00137,800.0013780097,800.0097,800.0031Pipa
PVC diameter 6"
RRJm`106,000.00105,000.00100,000.00100,000.00106,000.006,000.00137,800.00292,200.00292200147,600.00147,600.0032Talang
Kotak
PVCm`106,000.00105,000.00100,000.00100,000.00106,000.006,000.00137,800.0072,700.0072700147,600.00147,600.0033Hak
penggantung talang
bh106,000.00105,000.00100,000.00100,000.00106,000.006,000.00137,800.0011,500.0011500147,600.00147,600.0034Tutup
samping
talangbh106,000.00105,000.00100,000.00100,000.00106,000.006,000.00137,800.008,800.008800147,600.00147,600.0035Sambungan
pipa tanpa
lobangbh106,000.00105,000.00100,000.00100,000.00106,000.006,000.00137,800.008,800.008800147,600.00147,600.0036Sambungan
pipa dengan
lobangbh106,000.00105,000.00100,000.00100,000.00106,000.006,000.00137,800.0026,700.0026700147,600.00147,600.0037Pipa
PVC diameter 0,5" SCJm15,500.0038Pipa PVC diameter 0,75"
SCJm17,800.0039Pipa PVC Maspion D diameter 0,5" m14,600.0040Pipa
PVC Maspion D diameter 0,75" m15,280.0041Pipa PVC Maspion D
diameter 1" m16,930.0042Pipa PVC Maspion D diameter 1,5"
m17,800.0043Pipa PVC Maspion D diameter 2" m19,500.0044Pipa PVC
Maspion D diameter 2,5" m116,200.0045Pipa PVC Maspion D diameter 3"
m120,625.0046Pipa PVC Maspion D diameter 4" m129,125.0047Pipa PVC
Maspion D diameter 6" m150,000.0048Reduser PVC 2,5" x
2"bh123,348.5049Reduser PVC 25" x 18,75"bh80,500.0050Reduser PVC
50" x 25"bh95,250.0051Reduser PVC 75" x 50"bh111,182.5052Reduser
PVC 100" x 75"bh190,547.5053Sok diameter 1/2" bh1,500.0054Sok
diameter 3/4" bh1,500.0055Sok diameter 1" bh2,000.0056Sok diameter
2" bh4,200.0057Sok diameter 3" bh65,000.0058Sok diameter 4"
bh7,800.0059Sok diameter 6" bh21,000.0060Stop kran air diameter
0,75" bh45,000.0061Stop kran air diameter 1" bh90,000.00
amanda ayu putri handayani: amanda ayu putri handayani:per Kg, Rp.
175062Stop kran air diameter 1,5" bh138,000.0063Stop kran air
diameter 2" bh180,000.0064Bend PVC diameter 3/4"bh2,500.0065Bend
PVC diameter 1"bh5,000.0066Bend PVC diameter 2"bh6,000.0067Bend PVC
diameter 2,5"bh8,000.0068Bend PVC diameter 3"bh12,900.0069Bend PVC
diameter 4"bh14,000.0070Bend PVC diameter 6"bh35,000.0071Dop PVC
diameter 1/2"bh1,500.0072Dop PVC diameter 1"bh2,400.0073Dop PVC
diameter 2"bh4,800.0074Dop PVC diameter 3"bh6,600.0075Dop PVC
diameter 4"bh15,000.0076Dop PVC diameter 6"bh2,400.0077Elbow PVC
diameter 1"bh4,200.0078Elbow PVC diameter 2"bh7,800.0079Elbow PVC
diameter 3"bh7,200.0080Flang PVC socket diameter
2"bh75,000.0081Flang PVC socket diameter 3"bh189,117.5082Flang PVC
socket diameter 4"bh254,897.5083Flang PVC socket diameter
6"bh328,900.00
amanda ayu putri handayani: amanda ayu putri handayani:per Kg, Rp.
175084Tee PVC diameter 0,50"bh1,500.0085Tee PVC diameter
0,75"bh2,000.0086Tee PVC diameter 1"bh3,000.0087Tee PVC diameter
1,5"bh7,200.0088Tee Jint PVC diameter 2" x 1"bh5,400.0089Tee PVC
diameter 2,5"bh18,000.0090Tee Jint PVC diameter 2,5" x
1"bh180,895.0091Tee PVC diameter 3"bh27,000.0092Tee Jint PVC
diameter 3" x 1"bh205,503.1093Tee PVC diameter 4"bh33,000.0094Tee
Jint PVC diameter 4" x 1"bh121,660.0095Tee PVC diameter
6"bh624,910.0096Tee Jint PVC diameter 6" x 4"bh559,130.00XIIBAHAN
JENIS PAKU1Paku
asbeskg19,000.0018,500.00400.00400.0019,000.0018,600.0024,700.0022,800.002280022,800.0022,800.002Paku
rengkg11,500.0012,000.0011,000.0011,000.0012,000.001,000.0015,600.0013,800.001380013,800.0013,800.003Paku
triplekkg16,000.0014,000.0015,000.0014,000.0016,000.002,000.0020,800.0021,000.002100020,950.0020,950.004Paku
usukkg11,500.0012,000.0011,000.0010,000.0010,000.0012,000.002,000.0015,600.0013,400.001340013,350.0013,350.005Paku
pancingkg24,500.0025,000.0024,500.0025,000.00500.0032,500.0029,700.002970029,700.0029,700.006Paku
sekrup
3.5"kg26,000.0026,000.0026,000.000.0033,800.0076,000.00760007Paku
sekrup
2"kg26,000.0026,000.0026,000.000.0033,800.0076,000.0076000XIIIBAHAN
PERALATAN LISTRIK1Stop kontak Kwalitas
Ibh13,000.0012,500.0015,500.0012,500.0015,500.003,000.0020,150.0027,500.002750026,550.0026,550.002Skakelar
Kwalitas
Ibh13,000.0013,500.0017,500.0013,000.0017,500.004,500.0022,750.0027,500.002750026,700.0026,700.003Sekering
lengkapbh52,500.0051,700.0051,700.0052,500.00800.0068,250.0053,500.005350053,500.0053,500.004Lampu
pijar 25, 40, 75 / 220
Vbh7,500.007,000.007,000.007,500.00500.009,750.0014,600.001460013,200.0013,200.005Lampu
TL 20 W / 220 V Komplit balas, kaca
bh55,000.0053,000.0053,000.0055,000.002,000.0071,500.00107,300.0010730097,500.0097,500.006Lampu
TL 40 W / 220 V Komplit balas,
kacabh69,500.0068,000.0068,000.0069,500.001,500.0090,350.00137,700.00137700125,100.00125,100.007Kabel
NYA 1 x 2,5
mmm'1,700.00170026,550.0026,550.008Isolatorbh4,000.00400013,200.0013,200.009Las
Dopbh300.0030097,500.0097,500.0010Fiting
Plafondbh4,000.004000125,100.00125,100.0011T.Dos
PVCbh1,400.00140026,550.0026,550.0012Panel
Boxset28,600.002860026,700.0026,700.0013MCB 10
Ampbh53,500.005350053,500.0053,500.0014Miniswitch 32
Ampset250,600.0025060013,200.0013,200.0015Armatur lampu pijar
25Watt Kwalitas IBh14,600.0014600125,100.00125,100.0016AC. Window 2
PKBh13,435,500.0013435500125,100.00125,100.0017AC. Window 1,5
PKBh7,166,100.007166100125,100.00125,100.0018AC. Window 1
PKBh6,269,000.006269000125,100.00125,100.0019Exhaust Fan Ex
JepangBh984,100.00984100125,100.00125,100.0020Kipas angin Gantung
Ex JepangBh825,000.00825000125,100.00125,100.00XIVBAHAN
BBM1Bensinliter4,500.004,500.004,500.004,500.000.005,850.004,500.0045004,500.004,500.002Solarliter4,500.004,500.004,500.004,500.000.005,850.004,500.0045004,500.004,500.003Minyak
tanahliter8,000.008,000.008,000.008,000.000.0010,400.0013,200.00132008,000.008,000.004Aspal
AC (AC 60 - 70)
curahdrum850,000.00800,000.00800,000.00850,000.0050,000.001,105,000.001,375,000.001375000990,000.00990,000.00Jember,
Januari 2012KEPALA DINAS PU. CIPTA KARYA DAN TATA RUANGKABUPATEN
JEMBER
Ir. MERWIN LUSIANI,MMPembina Tk. I NIP. 19650415 199003 2 008
&"Brush Script MT,Regular"&11Daftar Harga Satuan Bahan Dinas PU. Cipta Karya dan Tata Ruang Kabupaten JemberTahun Anggaran 2012
A. PEKERJAAN PERSIAPANDAFTAR ANALISA SNI DINAS PU. CIPTA KARYA DAN TATA RUANGUNTUK PEKERJAAN BANGUNAN GEDUNG, PERUMAHANWILAYAH JEMBER TIMUR , JEMBER TENGAH DAN JEMBER KOTAKABUPATEN JEMBER TAHUN ANGGARAN 2012
Analisa SNI DPU Cipta Karya dan Tata Ruang Wilayah Jember
NO.JENIS PEKERJAANBAHANUPAHJUMLAHBULAT123456A.PEKERJAAN
PERSIAPAN
amanda ayu putri handayani: amanda ayu putri handayani:SUDAH FIX
PER 4 MARET20111Analisa SNI Dinas PU. Cipta Karya dan Tata Ruang1
m' pagar sementara dari kayu tinggi 2 meter.Bahan1.250BtgDolken
kayu 8-10/400 cmRp24,200.0030,250.002.500KgSemen
PortlandRp1,400.003,500.000.005m3Pasir
betonRp121,000.00605.000.009m3Koral
betonRp165,000.001,485.000.007850.072m3Kayu
5/7Rp2,838,000.00204,336.001btg dolken =0.0314m30.060KgPaku biasa
2" - 5"Rp13,800.00828.001 m3 dolken
=31.847133758btg0.400LtrResiduRp26,400.0010,560.001 batang
=24178Upah0.400OhPekerjaRp40,500.0016,200.000.200OhTukang
kayuRp47,600.009,520.000.020OhKepala
tukangRp51,200.001,024.000.020OhMandorRp56,300.001,126.00251,564.0027,870.00279,434.00279,400.007,543,800.002Analisa
SNI Dinas PU. Cipta Karya dan Tata Ruang1 m' pagar sementara dari
seng gelombang tinggi 2 meterBahan1.250BtgDolken kayu 8-10/400
cmRp24,200.0030,250.002.500KgSemen
PortlandRp1,400.003,500.001.200LbrSeng gelombang 3" - 6" BJLS
28Rp84,000.00100,800.000.005m3Pasir
betonRp121,000.00605.000.009m3Koral
betonRp165,000.001,485.000.072m3Kayu
5/7Rp2,838,000.00204,336.000.060KgPaku biasa 2" -
5"Rp13,800.00828.000.450KgMeni
besiRp26,800.0012,060.00Upah0.400OhPekerjaRp40,500.0016,200.000.200OhTukang
kayuRp47,600.009,520.000.020OhKepala
tukangRp51,200.001,024.000.020OhMandorRp56,300.001,126.00353,864.0027,870.00381,734.00381,700.0010,305,900.003Analisa
SNI Dinas PU. Cipta Karya dan Tata Ruang1 m' pagar sementara dari
kawat duri tinggi 1,8 meterBahan1.000BtgDolken kayu 8-10/400
cmRp24,200.0024,200.002.000KgSemen
PortlandRp1,400.002,800.0025.000Kg
amanda ayu putri handayani: amanda ayu putri handayani:Harga satuan
m'
Kawat DuriRp3,100.0077,500.000.005m3Pasir betonRp121,000.00605.000.009m3Koral betonRp165,000.001,485.000.060KgPaku biasa 2" - 5"Rp13,800.00828.00Upah0.300OhPekerjaRp40,500.0012,150.000.200OhTukang kayuRp47,600.009,520.000.020OhKepala tukangRp51,200.001,024.000.020OhMandorRp56,300.001,126.00107,418.0023,820.00131,238.00131,200.003,542,400.003Analisa SNI Dinas PU. Cipta Karya dan Tata Ruang1 m' Pengukuran dan Pas. BouwplankBahan0.012BtgKayu 5/7 Rp2,838,000.0034,056.000.020KgPaku biasa 2" - 5"Rp13,800.00276.000.007m3Papan Kayu 3/20 kayu kl. IIRp5,280,000.0036,960.00Upah0.100OhPekerjaRp40,500.004,050.000.100OhTukang kayuRp47,600.004,760.000.010OhKepala tukangRp51,200.00512.000.005OhMandorRp56,300.00281.5071,292.009,603.5080,895.5080,800.002,181,600.004Analisa SNI Dinas PU. Cipta Karya dan Tata Ruang1 m2 pembuatan kantor sementara dengan lantai plesteranBahan1.250BtgDolken kayu 8-10/400 cmRp24,200.0030,250.000.180m3KayuRp5,280,000.00950,400.00m20.850KgPaku biasaRp13,800.0011,730.001.100KgBesi stripRp13,700.0015,070.0035.000KgSemen portlandRp1,400.0049,000.000.150m3Pasir pasangRp121,000.0018,150.000.100m3Pasir betonRp121,000.0012,100.000.150m3Koral betonRp165,000.0024,750.0030.000BhBata merahRp450.0013,500.000.250LbrSeng platRp46,000.0011,500.002.000BhJendela nakoRp28,400.0056,800.000.080m2Kaca polosRp71,500.005,720.000.150BhKunci TanamRp14,900.002,235.000.060LbrPlywood 4mmRp89,500.005,370.00Upah2.000OhPekerjaRp40,500.0081,000.002.000OhTukang kayuRp47,600.0095,200.001.000OhTukang batuRp45,900.0045,900.000.300OhKepala tukangRp51,200.0015,360.000.050OhMandorRp56,300.002,815.001,206,575.00240,275.001,446,850.001,446,800.0039,063,600.005Analisa SNI Dinas PU. Cipta Karya dan Tata Ruang1 m2 pembuatan gedung semen dan alat-alatBahan1.700BtgDolken kayu 8-10/400 cmRp24,200.0041,140.000.210m3KayuRp3,480,000.00730,800.000.300KgPaku BiasaRp13,400.004,020.0010.500KgSemen portlandRp1,400.0014,700.000.030m3Pasir betonRp121,000.003,630.000.050m3Koral betonRp165,000.008,250.001.500LbrSeng gelombang 3" - 6" BJLS 28Rp84,000.00126,000.00Upah1.000OhPekerjaRp40,500.0040,500.002.000OhTukang kayuRp47,600.0095,200.000.200OhKepala tukangRp51,200.0010,240.000.050OhMandorRp56,300.002,815.00928,540.00148,755.001,077,295.001,077,200.0029,084,400.006Analisa SNI Dinas PU. Cipta Karya dan Tata Ruang1 m2 pembuatan rumah jaga / konstruksi kayuBahan3.000BtgDolken kayu 8-10/400 cmRp24,200.0072,600.000.276m3KayuRp3,480,000.00960,480.000.700KgPaku BiasaRp13,400.009,380.001.500LbrSeng gelombang 3" - 6" BJLS 28Rp84,000.00126,000.00Upah1.000OhPekerjaRp40,500.0040,500.001.500OhTukang kayuRp47,600.0071,400.000.150OhKepala tukangRp51,200.007,680.000.050OhMandorRp56,300.002,815.001,168,460.00122,395.001,290,855.001,290,800.0034,851,600.007Analisa SNI Dinas PU. Cipta Karya dan Tata Ruang1 m2 membersihkan lapangan dan perataanUpah0.100OhPekerjaRp40,500.004,050.000.050OhMandorRp56,300.002,815.006,865.006,865.008Analisa SNI Dinas PU. Cipta Karya dan Tata Ruang1 m2 pembuatan bedeng buruhBahan1.250BtgDolken kayu 8-10/400 cmRp24,200.0030,250.000.186m3KayuRp3,480,000.00647,280.000.300KgPaku BiasaRp13,400.004,020.0018.000KgSemen portlandRp1,400.0025,200.000.030m3Pasir betonRp121,000.003,630.000.050m3Koral betonRp165,000.008,250.001.500LbrSeng gelombang 3" - 6" BJLS 28Rp84,000.00126,000.001.350LbrPlywood 4mmRp89,500.00120,825.00Upah1.000OhPekerjaRp40,500.0040,500.002.000OhTukang kayuRp47,600.0095,200.000.200OhKepala tukangRp51,200.0010,240.000.050OhMandorRp56,300.002,815.00965,455.00148,755.001,114,210.001,114,200.0030,083,400.009Analisa SNI Dinas PU. Cipta Karya dan Tata Ruang1 m2 pembuatan bak adukan ukuran (40 x 50 x 20) cmBahan0.036m3Kayu terentangRp2,750,000.0099,000.000.080KgPaku BiasaRp13,400.001,072.001.000BtgKaso 5/7Rp36,000.0036,000.00Upah0.300OhTukang kayuRp47,600.0014,280.000.0015OhMandorRp56,300.0084.45136,072.0014,364.45150,436.45150,400.004,060,800.0010Analisa SNI Dinas PU. Cipta Karya dan Tata Ruang1 m2 pembuatan stegger dari bambu, ukuran (40 x 50 x 20) cmBahan1.000m3Bambu 6 - 8 / 600cmRp12,500.0012,500.000.250KgTali ijukRp33,900.008,475.00Upah0.250OhPekerjaRp40,500.0010,125.000.017OhTukang kayuRp47,600.00809.200.002OhKepala tukangRp51,200.00102.400.013OhMandorRp56,300.00731.9020,975.0011,768.5032,743.5032,700.00882,900.0011Analisa SNI Dinas PU. Cipta Karya dan Tata Ruang1 m2 pembuatan jalan sementaraBahan0.150m3Batu belah 15/20Rp147,500.0022,125.000.090m3Batu pecah 5/7Rp159,000.0014,310.000.010m3Pasir pasangRp121,000.001,210.00Upah1.000OhPekerjaRp40,500.0040,500.000.050OhMandorRp56,300.002,815.0037,645.0043,315.0080,960.0080,900.002,184,300.0012Analisa SNI Dinas PU. Cipta Karya dan Tata Ruang1 m3 bongkaran beton bertulangUpah6.667OhPekerjaRp40,500.00270,013.500.333OhMandorRp56,300.0018,747.90288,761.40288,761.40288,700.0013Analisa SNI Dinas PU. Cipta Karya dan Tata Ruang1 m3 bongkaran dinding tembok bata merahUpah6.667OhPekerjaRp40,500.00270,013.500.033OhMandorRp56,300.001,857.90271,871.40271,871.40271,800.0015Analisa SNI Dinas PU. Cipta Karya dan Tata Ruang1 m' Pasang pagar kawat jaring galvanis, tinggi 1,00 mBahan0.434LbrPagar kawat jaringRp0.00.0Upah0.042OhPekerjaRp40,500.001,701.000.042OhTukang Rp45,900.001,927.800.004OhKepala tukangRp51,200.00204.800.002OhMandorRp56,300.00112.600.03,946.203,946.203,900.00105,300.0016Analisa SNI Dinas PU. Cipta Karya dan Tata Ruang1 m' Pasang pagar beton pracetak (5 x 50 x 213) cmBahan0.986LbrPanel beton pracetakRp0.00.00.525BtgKolom beton pracetakRp0.00.00.074m3Pasir betonRp121,000.008,954.000.146m3Koral 2/3Rp165,300.0024,133.8045.000KgSemen abu-abuRp1,400.0063,000.00Upah0.375OhPekerjaRp40,500.0015,187.500.125OhTukang batu Rp45,900.005,737.500.012OhKepala tukangRp51,200.00614.400.019OhMandorRp56,300.001,069.7096,087.8022,609.10118,696.90118,600.003,202,200.00
Jember, Januari 2012
KEPALA DINAS PU. CIPTA KARYA DAN TATA RUANGKABUPATEN JEMBER
Ir. MERWIN LUSIANI,MMPembina Tk. I NIP. 19650415 199003 2 008
1 M2 Pasang Water Proofing atap beton3.0000LtrWater proofRp.0.0Rp.0.0Rp.0.0Rp.0.00.5000OrgPekerjaRp.Ir. MERWIN LUSIANI,MMRp.ERROR:#VALUE!Rp.0.0Rp.0.00.2000OrgTukang CatRp.0.0Rp.0.0Rp.0.0Rp.0.00.0500OrgKepala TukangRp.NIP. 19650415 199003 2 008Rp.ERROR:#VALUE!Rp.0.0Rp.0.00.0750OrgMandorRp.0.0Rp.0.0Rp.0.0Rp.0.0JumlahRp.ERROR:#VALUE!Rp.0.0DibulatkanRp.ERROR:#VALUE!Rp.0.0
&"Brush Script MT,Regular"&11Analisa Harga Satuan Pekerjaan : Pekerjaan PersiapanDinas PU. Cipta Karya dan Tata Ruang Kabupaten JemberTahun Anggaran 2012
B. PEKERJAAN TANAHDAFTAR ANALISA SNI DPU CIPTA KARYA DAN TATA RUANGUNTUK PEKERJAAN BANGUNAN GEDUNG, PERUMAHANWILAYAH JEMBER TIMUR , JEMBER TENGAH DAN JEMBER KOTAKABUPATEN JEMBER TAHUN ANGGARAN 2012
Analisa SNI DPU Cipta Karya dan Tata Ruang Wilayah Jember
NO.JENIS PEKERJAANBAHANUPAHJUMLAHBULAT123456B.PEKERJAAN TANAH
amanda ayu putri handayani: amanda ayu putri handayani:SUDAH FIX
PER 4 MARET20111Analisa SNI Dinas PU. Cipta Karya dan Tata
RuangMenggali 1 m3 tanah biasa sedalam 1
mUpah0.750OhPekerjaRp40,500.0030,375.000.025OhMandorRp56,300.001,407.5031,782.5031,782.5031,700.002Analisa
SNI Dinas PU. Cipta Karya dan Tata RuangMenggali 1 m3 tanah biasa
sedalam 2
mUpah0.900OhPekerjaRp40,500.0036,450.000.045OhMandorRp56,300.002,533.5038,983.5038,983.5038,900.003Analisa
SNI Dinas PU. Cipta Karya dan Tata RuangMenggali 1 m3 tanah biasa
sedalam 3
mUpah1.050OhPekerjaRp40,500.0042,525.000.067OhMandorRp56,300.003,772.1046,297.1046,297.1046,200.004Analisa
SNI Dinas PU. Cipta Karya dan Tata RuangMenggali 1 m3 tanah Keras
sedalam 1
mUpah1.000OhPekerjaRp40,500.0040,500.000.032OhMandorRp56,300.001,801.6042,301.6042,301.6042,300.005Analisa
SNI Dinas PU. Cipta Karya dan Tata RuangMenggali 1 m3 tanah cadas
sedalam 1
mUpah1.500OhPekerjaRp40,500.0060,750.000.060OhMandorRp56,300.003,378.0064,128.0064,128.0064,100.006Analisa
SNI Dinas PU. Cipta Karya dan Tata RuangMenggali 1 m3 tanah lumpur
sedalam 1
mUpah1.200OhPekerjaRp40,500.0048,600.000.045OhMandorRp56,300.002,533.5051,133.5051,133.5051,100.007Analisa
SNI Dinas PU. Cipta Karya dan Tata RuangMengerjakan 1 m2 stripping
tebing setinggi 1
mUpah0.050OhPekerjaRp40,500.002,025.000.005OhMandorRp56,300.00281.502,306.502,306.502,300.008Analisa
SNI Dinas PU. Cipta Karya dan Tata RuangMembuang 1 m3 tanah sejauh
15
mUpah0.330OhPekerjaRp40,500.0013,365.000.010OhMandorRp56,300.00563.0013,928.0013,928.0013,900.009Analisa
SNI Dinas PU. Cipta Karya dan Tata RuangMengurug kembali 1 m3
galianUpahUntuk Gedung 1/3 Pek. Galian An SNI
6.9Rp31,700.0010,566.6710,500.0010Analisa SNI Dinas PU. Cipta Karya
dan Tata RuangMemadatkan 1 m3 tanah (per 20 cm)
Upah0.500OhPekerjaRp40,500.0020,250.000.050OhMandorRp56,300.002,815.0023,065.0023,065.0023,000.0011Analisa
SNI Dinas PU. Cipta Karya dan Tata RuangMengurug 1 m3 pasir
urugBahan1.200m3Pasir
urugRp60,000.0072,000.00Upah0.300OhPekerjaRp40,500.0012,150.000.010OhMandorRp56,300.00563.0072,000.0012,713.0084,713.0084,700.0012Analisa
SNI Dinas PU. Cipta Karya dan Tata RuangMemasang 1 m3 lapisan pudel
campuran 1KP : 3PP : 7TL untuk stabilisasi
tanahBahan0.135m3KapurRp401,000.0054,135.000.400m3Pasir
pasangRp121,000.0048,400.000.948m3Tanah
LiatRp52,500.0049,770.00Upah0.800OhPekerjaRp40,500.0032,400.000.400OhTukang
batuRp45,900.0018,360.000.040OhKepala
tukangRp51,200.002,048.000.080OhMandorRp56,300.004,504.00152,305.0057,312.00209,617.00209,600.0013Analisa
SNI Dinas PU. Cipta Karya dan Tata RuangMemasang 1 m3 lapisan pudel
campuran 1KP : 5TL untuk stabilisasi
tanahBahan0.248m3KapurRp401,000.0099,448.001.240m3Tanah
LiatRp52,500.0065,100.00Upah0.800OhPekerjaRp40,500.0032,400.000.400OhTukang
batuRp45,900.0018,360.000.040OhKepala
tukangRp51,200.002,048.000.080OhMandorRp56,300.004,504.00164,548.0057,312.00221,860.00221,800.0014Analisa
SNI Dinas PU. Cipta Karya dan Tata RuangMemasang 1 m2 lapisan ijuk
tebal 10 cm, untuk bidang
resapanBahan6.000KgIjukRp20,000.00120,000.00Upah0.150OhPekerjaRp40,500.006,075.000.015OhMandorRp56,300.00844.50120,000.006,919.50126,919.50126,900.0015Analisa
SNI Dinas PU. Cipta Karya dan Tata RuangMengurug 1 m3 sirtu padat
untuk peninggian lantai
bangunanBahan1.200m3SirtuRp52,500.0063,000.00Upah0.250OhPekerjaRp40,500.0010,125.000.025OhMandorRp56,300.001,407.5063,000.0011,532.5074,532.5074,500.0016Analisa
SNI Dinas PU. Cipta Karya dan Tata RuangMengurug 1 m3 tanah dengan
pemadatanBahan1.200m3Tanah
UrugRp57,800.0069,360.00Upah0.250OhPekerjaRp40,500.0010,125.000.010OhMandorRp56,300.00563.0069,360.0010,688.0080,048.0080,000.00
Jember, Januari 2012
KEPALA DINAS PU. CIPTA KARYA DAN TATA RUANGKABUPATEN JEMBER
Ir. MERWIN LUSIANI,MMPembina Tk. I NIP. 19650415 199003 2 008
1 M2 Pasang Water Proofing atap beton3.0000LtrWater proofRp.0.0Rp.0.0Rp.0.0Rp.0.00.5000OrgPekerjaRp.Ir. MERWIN LUSIANI,MMRp.ERROR:#VALUE!Rp.0.0Rp.0.00.2000OrgTukang CatRp.0.0Rp.0.0Rp.0.0Rp.0.00.0500OrgKepala TukangRp.NIP. 19650415 199003 2 008Rp.ERROR:#VALUE!Rp.0.0Rp.0.00.0750OrgMandorRp.0.0Rp.0.0Rp.0.0Rp.0.0JumlahRp.ERROR:#VALUE!Rp.0.0DibulatkanRp.ERROR:#VALUE!Rp.0.0
&"Brush Script MT,Regular"&11Analisa Harga Satuan Pekerjaan : Pekerjaan TanahDinas PU. Cipta Karya dan Tata Ruang Kabupaten JemberTahun Anggaran 2012
C. PEKERJAAN PONDASIDAFTAR ANALISA SNI DPU CIPTA KARYA DAN TATA RUANGUNTUK PEKERJAAN BANGUNAN GEDUNG, PERUMAHANWILAYAH JEMBER TIMUR , JEMBER TENGAH DAN JEMBER KOTAKABUPATEN JEMBER TAHUN ANGGARAN 2012
Analisa SNI DPU Cipta Karya dan Tata Ruang Wilayah Jember
NO.JENIS PEKERJAANBAHANUPAHJUMLAHBULAT123456C.PEKERJAAN
PONDASI
amanda ayu putri handayani: amanda ayu putri handayani:SUDAH FIX
PER 4 MARET20111Analisa SNI Dinas PU. Cipta Karya dan Tata
RuangMemasang 1 m3 pondasi batu belah, camp. 1 PC : 3
PPBahan1.200m3Batu belah 15/20
cmRp147,500.00177,000.00202.000KgPCRp1,400.00282,800.000.485m3Pasir
PasangRp121,000.0058,685.00Upah1.500OhPekerjaRp40,500.0060,750.000.750OhTukang
batuRp45,900.0034,425.000.075OhKepala
tukangRp51,200.003,840.000.075OhMandorRp56,300.004,222.50518,485.00103,237.50621,722.50621,700.002Analisa
SNI Dinas PU. Cipta Karya dan Tata RuangMemasang 1 m3 pondasi batu
belah, camp. 1 PC : 4 PPBahan1.200m3Batu belah 15/20
cmRp147,500.00177,000.00163.000KgPCRp1,400.00228,200.000.520m3Pasir
PasangRp121,000.0062,920.00Upah1.500OhPekerjaRp40,500.0060,750.000.750OhTukang
batuRp45,900.0034,425.000.075OhKepala
tukangRp51,200.003,840.000.075OhMandorRp56,300.004,222.50468,120.00103,237.50571,357.50571,300.003Analisa
SNI Dinas PU. Cipta Karya dan Tata RuangMemasang 1 m3 pondasi batu
belah, camp. 1 PC : 5 PPBahan1.200m3Batu belah 15/20
cmRp147,500.00177,000.00136.000KgPCRp1,400.00190,400.000.544m3Pasir
PasangRp121,000.0065,824.00Upah1.500OhPekerjaRp40,500.0060,750.000.750OhTukang
batuRp45,900.0034,425.000.075OhKepala
tukangRp51,200.003,840.000.075OhMandorRp56,300.004,222.50433,224.00103,237.50536,461.50536,400.004Analisa
SNI Dinas PU. Cipta Karya dan Tata RuangMemasang 1 m3 pondasi batu
belah, camp. 1 PC : 6 PPBahan1.200m3Batu belah 15/20
cmRp147,500.00177,000.00117.000KgPCRp1,400.00163,800.000.561m3Pasir
PasangRp121,000.0067,881.00Upah1.500OhPekerjaRp40,500.0060,750.000.750OhTukang
batuRp45,900.0034,425.000.075OhKepala
tukangRp51,200.003,840.000.075OhMandorRp56,300.004,222.50408,681.00103,237.50511,918.50511,900.005Analisa
SNI Dinas PU. Cipta Karya dan Tata RuangMemasang 1 m3 pondasi batu
belah, camp. 1 PC : 8 PPBahan1.200m3Batu belah 15/20
cmRp147,500.00177,000.0091.000KgPCRp1,400.00127,400.000.584m3Pasir
PasangRp121,000.0070,664.00Upah1.500OhPekerjaRp40,500.0060,750.000.750OhTukang
batuRp45,900.0034,425.000.075OhKepala
tukangRp51,200.003,840.000.075OhMandorRp56,300.004,222.50375,064.00103,237.50478,301.50478,300.006Analisa
SNI Dinas PU. Cipta Karya dan Tata RuangMemasang 1 m3 batu belah,
camp. 1 KP : 1 Sm': 2 PPBahan1.200m3Batu belah 15/20
cmRp147,500.00177,000.000.170m3KapurRp401,000.0068,170.000.170m3Semen
MerahRp186,400.0031,688.000.340m3Pasir
PasangRp121,000.0041,140.00Upah1.500OhPekerjaRp40,500.0060,750.000.750OhTukang
batuRp45,900.0034,425.000.075OhKepala
tukangRp51,200.003,840.000.075OhMandorRp56,300.004,222.50317,998.00103,237.50421,235.50421,200.007Analisa
SNI Dinas PU. Cipta Karya dan Tata RuangMemasang 1 m3 batu belah,
camp. 1PC : 3KP : 10PPBahan1.200m3Batu belah 15/20
cmRp147,500.00177,000.0061.000KgPCRp1,400.0085,400.000.147m3Kapur
Rp401,000.0058,947.000.492m3Pasir
PasangRp121,000.0059,532.00Upah1.500OhPekerjaRp40,500.0060,750.000.750OhTukang
batuRp45,900.0034,425.000.075OhKepala
tukangRp51,200.003,840.000.075OhMandorRp56,300.004,222.50380,879.00103,237.50484,116.50484,100.008Analisa
SNI Dinas PU. Cipta Karya dan Tata RuangMemasang 1 m3 batu belah,
camp. 1/2PC : 1KP : 4PPBahan1.200m3Batu belah 15/20
cmRp147,500.00177,000.0041.000KgPCRp1,400.0057,400.000.131m3Kapur
Rp401,000.0052,531.000.523m3Pasir
PasangRp121,000.0063,283.00Upah1.500OhPekerjaRp40,500.0060,750.000.750OhTukang
batuRp45,900.0034,425.000.075OhKepala
tukangRp51,200.003,840.000.075OhMandorRp56,300.004,222.50350,214.00103,237.50453,451.50453,400.009Analisa
SNI Dinas PU. Cipta Karya dan Tata RuangMemasang 1 m3 batu kosong
(anstamping)Bahan1.200m3Batu belah 15/20
cmRp147,500.00177,000.000.432m3Pasir
UrugRp60,000.0025,920.00Upah0.780OhPekerjaRp40,500.0031,590.000.390OhTukang
batuRp45,900.0017,901.000.039OhKepala
tukangRp51,200.001,996.800.039OhMandorRp56,300.002,195.70202,920.0053,683.50256,603.50256,600.0010Analisa
SNI Dinas PU. Cipta Karya dan Tata RuangMemasang 1 m3 pondasi
siklop,80% beton campuran 1PC : 2PS : 3KR dan 40% batu
belahBahan0.480m3Batu belah 15/20
cmRp147,500.0070,800.00194.000KgPCRp1,400.00271,600.000.312m3Pasir
BetonRp121,000.0037,752.000.468m3KerikilRp165,000.0077,220.00126.000KgBesi
BetonRp15,900.002,003,400.001.800KgKawat
betonRp19,000.0034,200.00Upah3.400OhPekerjaRp40,500.00137,700.000.850OhTukang
batuRp45,900.0039,015.000.085OhKepala
tukangRp51,200.004,352.000.170OhMandorRp56,300.009,571.002,494,972.00190,638.002,685,610.002,685,600.0011Analisa
SNI Dinas PU. Cipta Karya dan Tata RuangMemasang 1 m3 pondasi
sumuran diameter 100 cmBahan0.450m3Batu belah 15/20
cmRp147,500.0066,375.00194.000KgPCRp1,400.00271,600.000.468m3KerikilRp165,000.0077,220.000.312m3Pasir
BetonRp121,000.0037,752.00Upah2.400OhPekerjaRp40,500.0097,200.000.800OhTukang
batuRp45,900.0036,720.000.080OhKepala
tukangRp51,200.004,096.000.119OhMandorRp56,300.006,699.70452,947.00144,715.70597,662.70597,600.00Jember,
Januari 2012KEPALA DINAS PU. CIPTA KARYA DAN TATA RUANGKABUPATEN
JEMBER
Ir. MERWIN LUSIANI,MMPembina Tk. I NIP. 19650415 199003 2 008
1 m2 Pasang Water Proofing atap beton3.0000LtrWater proofRp.0.0Rp.0.0Rp.0.0Rp.0.00.5000OrgPekerjaRp.Ir. MERWIN LUSIANI,MMRp.ERROR:#VALUE!Rp.0.0Rp.0.00.2000OrgTukang CatRp.0.0Rp.0.0Rp.0.0Rp.0.00.0500OrgKepala TukangRp.NIP. 19650415 199003 2 008Rp.ERROR:#VALUE!Rp.0.0Rp.0.00.0750OrgMandorRp.0.0Rp.0.0Rp.0.0Rp.0.0JumlahRp.ERROR:#VALUE!Rp.0.0DibulatkanRp.ERROR:#VALUE!Rp.0.0
&"Brush Script MT,Regular"&11Analisa Harga Satuan Pekerjaan : Pekerjaan PondasiDinas PU. Cipta Karya dan Tata Ruang Kabupaten JemberTahun Anggaran 2012
D.PEKERJAAN DINDINGDAFTAR ANALISA SNI DPU CIPTA KARYA DAN TATA RUANGUNTUK PEKERJAAN BANGUNAN GEDUNG, PERUMAHANWILAYAH JEMBER TIMUR , JEMBER TENGAH DAN JEMBER KOTAKABUPATEN JEMBER TAHUN ANGGARAN 2012
Analisa SNI DPU Cipta Karya dan Tata Ruang Wilayah Jember
NO.JENIS PEKERJAANBAHANUPAHJUMLAHBULAT123456D.PEKERJAAN
DINDING
amanda ayu putri handayani: amanda ayu putri handayani:SUDAH FIX
PER 4 MARET20111Analisa SNI DPU Cipta Karya dan Tata RuangMemasang
1 m2 dinding bata merah Uk. (5x11x22) cm tb. 1 bata , camp. 1PC : 2
PPBahan140.00BhBatu
merahRp450.0063,000.0043.500KgPCRp1,400.0060,900.000.080m3Pasir
pasangRp121,000.009,680.00Upah0.600OhPekerjaRp40,500.0024,300.000.200OhTukang
batuRp45,900.009,180.000.020OhKepala
tukangRp51,200.001,024.000.030OhMandorRp56,300.001,689.00133,580.0036,193.00169,773.00169,700.002Analisa
SNI DPU Cipta Karya dan Tata RuangMemasang 1 m2 dinding bata merah
Uk. (5x11x22) cm tb. 1 bata , camp. 1PC : 3 PPBahan140.00BhBh Batu
merahRp450.0063,000.0032.950KgPCRp1,400.0046,130.000.091m3Pasir
pasangRp121,000.0011,011.00Upah0.600OhPekerjaRp40,500.0024,300.000.200OhTukang
batuRp45,900.009,180.000.020OhKepala
tukangRp51,200.001,024.000.030OhMandorRp56,300.001,689.00120,141.0036,193.00156,334.00156,300.003Analisa
SNI DPU Cipta Karya dan Tata RuangMemasang 1 m2 dinding bata merah
Uk. (5x11x22) cm tb. 1 bata , camp. 1PC : 4 PPBahan140.00Bh Batu
merahRp450.0063,000.0026.550Kg PCRp1,400.0037,170.000.093m3Pasir
pasangRp121,000.0011,253.00Upah0.600OhPekerjaRp40,500.0024,300.000.200OhTukang
batuRp45,900.009,180.000.020OhKepala
tukangRp51,200.001,024.000.030OhMandorRp56,300.001,689.00111,423.0036,193.00147,616.00147,600.004Analisa
SNI DPU Cipta Karya dan Tata RuangMemasang 1 m2 dinding bata merah
Uk. (5x11x22) cm tb. 1 bata , camp. 1PC : 5 PPBahan140.00Bh Batu
merahRp450.0063,000.0022.000Kg PCRp1,400.0030,800.000.102m3Pasir
pasangRp121,000.0012,342.00Upah0.600OhPekerjaRp40,500.0024,300.000.200OhTukang
batuRp45,900.009,180.000.020OhKepala
tukangRp51,200.001,024.000.030OhMandorRp56,300.001,689.00106,142.0036,193.00142,335.00142,300.005Analisa
SNI DPU Cipta Karya dan Tata RuangMemasang 1 m2 dinding bata merah
Uk. (5x11x22) cm tb. 1 bata , camp. 1PC : 6 PPBahan140.00Bh Batu
merahRp450.0063,000.0018.500Kg PCRp1,400.0025,900.000.122m3Pasir
pasangRp121,000.0014,762.00Upah0.600OhPekerjaRp40,500.0024,300.000.200OhTukang
batuRp45,900.009,180.000.020OhKepala
tukangRp51,200.001,024.000.030OhMandorRp56,300.001,689.00103,662.0036,193.00139,855.00139,800.006Analisa
SNI DPU Cipta Karya dan Tata RuangMemasang 1 m2 dinding bata merah
Uk. (5x11x22) cm tb. 1 bata , camp. 1PC : 3 KP : 10 PPBahan140.00Bh
Batu merahRp450.0063,000.0010.080Kg
PCRp1,400.0014,112.000.093m3Pasir
pasangRp121,000.0011,192.500.028m3KapurRp401,000.0011,027.50Upah0.600OhPekerjaRp40,500.0024,300.000.200OhTukang
batuRp45,900.009,180.000.020OhKepala
tukangRp51,200.001,024.000.030OhMandorRp56,300.001,689.0099,332.0036,193.00135,525.00135,500.007Analisa
SNI DPU Cipta Karya dan Tata RuangMemasang 1 m2 dinding bata merah
Uk. (5x11x22) cm tb. 1/2 bata , camp. 1PC : 2 PPBahan70.00BhBatu
merahRp450.0031,500.0018.950KgPCRp1,400.0026,530.000.038m3Pasir
pasangRp121,000.004,598.00Upah0.300OhPekerjaRp40,500.0012,150.000.100OhTukang
batuRp45,900.004,590.000.010OhKepala
tukangRp51,200.00512.000.015OhMandorRp56,300.00844.5062,628.0018,096.5080,724.5080,700.008Analisa
SNI DPU Cipta Karya dan Tata RuangMemasang 1 m2 dinding bata merah
Uk. (5x11x22) cm tb. 1/2 bata , camp. 1PC : 3 PPBahan70.00BhBatu
merahRp450.0031,500.0014.370KgPCRp1,400.0020,118.000.040m3Pasir
pasangRp121,000.004,840.00Upah0.300OhPekerjaRp40,500.0012,150.000.100OhTukang
batuRp45,900.004,590.000.010OhKepala
tukangRp51,200.00512.000.015OhMandorRp56,300.00844.5056,458.0018,096.5074,554.5074,500.009Analisa
SNI DPU Cipta Karya dan Tata RuangMemasang 1 m2 dinding bata merah
Uk. (5x11x22) cm tb. 1/2 bata , camp. 1PC : 4 PPBahan70.00BhBatu
merahRp450.0031,500.0011.500KgPCRp1,400.0016,100.000.043m3Pasir
pasangRp121,000.005,203.00Upah0.300OhPekerjaRp40,500.0012,150.000.100OhTukang
batuRp45,900.004,590.000.010OhKepala
tukangRp51,200.00512.000.015OhMandorRp56,300.00844.5052,803.0018,096.5070,899.5070,800.0010Analisa
SNI DPU Cipta Karya dan Tata RuangMemasang 1 m2 dinding bata merah
Uk. (5x11x22) cm tb. 1/2 bata , camp. 1PC : 5 PPBahan70.00BhBatu
merahRp450.0031,500.009.680KgPCRp1,400.0013,552.000.045m3Pasir
pasangRp121,000.005,445.00Upah0.300OhPekerjaRp40,500.0012,150.000.100OhTukang
batuRp45,900.004,590.000.010OhKepala
tukangRp51,200.00512.000.015OhMandorRp56,300.00844.5050,497.0018,096.5068,593.5068,500.0011Analisa
SNI DPU Cipta Karya dan Tata RuangMemasang 1 m2 dinding bata merah
Uk. (5x11x22) cm tb. 1/2 bata , camp. 1PC : 6 PPBahan70.00BhBatu
merahRp450.0031,500.008.320KgPCRp1,400.0011,648.000.049m3Pasir
pasangRp121,000.005,929.00Upah0.300OhPekerjaRp40,500.0012,150.000.100OhTukang
batuRp45,900.004,590.000.010OhKepala
tukangRp51,200.00512.000.015OhMandorRp56,300.00844.5049,077.0018,096.5067,173.5067,100.0012Analisa
SNI DPU Cipta Karya dan Tata RuangMemasang 1 m2 dinding bata merah
Uk. (5x11x22) cm tb. 1/2 bata , camp. 1PC : 8 PPBahan70.00BhBatu
merahRp450.0031,500.006.500KgPCRp1,400.009,100.000.050m3Pasir
pasangRp121,000.006,050.00Upah0.300OhPekerjaRp40,500.0012,150.000.100OhTukang
batuRp45,900.004,590.000.010OhKepala
tukangRp51,200.00512.000.015OhMandorRp56,300.00844.5046,650.0018,096.5064,746.5064,700.0013Analisa
SNI DPU Cipta Karya dan Tata RuangMemasang 1 m2 dinding bata merah
Uk. (5x11x22) cm tb. 1/2 bata , camp. 1PC : 3 KP : 10
PPBahan70.00BhBatu
merahRp450.0031,500.004.500KgPCRp1,400.006,300.000.050m3Pasir
pasangRp121,000.006,050.000.015m3Kapur
PasangRp401,000.006,015.00Upah0.300OhPekerjaRp40,500.0012,150.000.100OhTukang
batuRp45,900.004,590.000.010OhKepala
tukangRp51,200.00512.000.015OhMandorRp56,300.00844.5049,865.0018,096.5067,961.5067,900.0014Analisa
SNI DPU Cipta Karya dan Tata RuangMemasang 1 m2 dinding bata merah
Uk. (5x11x22) cm tb. 1/2 bata , camp. 1KP : 1SM : 1
PPBahan70.00BhBatu merahRp450.0031,500.000.018m3Semen
MerahRp186,400.003,355.200.018m3Pasir
pasangRp121,000.002,178.000.018m3Kapur
PasangRp401,000.007,218.00Upah0.300OhPekerjaRp40,500.0012,150.000.100OhTukang
batuRp45,900.004,590.000.010OhKepala
tukangRp51,200.00512.000.015OhMandorRp56,300.00844.5044,251.2018,096.5062,347.7062,300.0015Analisa
SNI DPU Cipta Karya dan Tata RuangMemasang 1 m2 dinding bata merah
Uk. (5x11x22) cm tb. 1/2 bata , camp. 1KP : 1SM : 2
PPBahan70.00BhBatu merahRp450.0031,500.000.014m3Semen
MerahRp186,400.002,609.600.028m3Pasir
pasangRp121,000.003,388.000.014m3Kapur
PasangRp401,000.005,614.00Upah0.300OhPekerjaRp40,500.0012,150.000.100OhTukang
batuRp45,900.004,590.000.010OhKepala
tukangRp51,200.00512.000.015OhMandorRp56,300.00844.5043,111.6018,096.5061,208.1061,200.0016Analisa
SNI DPU Cipta Karya dan Tata RuangMemasang 1 m2 dinding HB / CB 20,
camp. 1PC : 3PP Bahan12.50BhHB/CB
20RpERROR:#REF!ERROR:#REF!30.320KgPCRp1,400.0042,448.000.728m3Pasir
pasangRp121,000.0088,088.000.280KgBesi angkur
8mmRp15,900.004,452.00Upah0.350OhPekerjaRp40,500.0014,175.000.150OhTukang
batuRp45,900.006,885.000.015OhKepala
tukangRp51,200.00768.000.018OhMandorRp56,300.001,013.40ERROR:#REF!22,841.40ERROR:#REF!ERROR:#REF!17Analisa
SNI DPU Cipta Karya dan Tata RuangMemasang 1 m2 dinding HB / CB 20,
camp. 1PC : 4PP Bahan12.50BhHB/CB
20RpERROR:#REF!ERROR:#REF!24.260KgPCRp1,400.0033,964.000.772m3Pasir
pasangRp121,000.0093,412.000.280KgBesi angkur
8mmRp15,900.004,452.00Upah0.350OhPekerjaRp40,500.0014,175.000.150OhTukang
batuRp45,900.006,885.000.015OhKepala
tukangRp51,200.00768.000.018OhMandorRp56,300.001,013.40ERROR:#REF!22,841.40ERROR:#REF!ERROR:#REF!18Analisa
SNI DPU Cipta Karya dan Tata RuangMemasang 1 m2 dinding HB / CB 15,
camp. 1PC : 3PP Bahan12.50BhHB/CB
15RpERROR:#REF!ERROR:#REF!24.740KgPCRp1,400.0034,636.000.550m3Pasir
pasangRp121,000.0066,550.000.280KgBesi angkur
8mmRp15,900.004,452.00Upah0.320OhPekerjaRp40,500.0012,960.000.120OhTukang
batuRp45,900.005,508.000.012OhKepala
tukangRp51,200.00614.400.016OhMandorRp56,300.00900.80ERROR:#REF!19,983.20ERROR:#REF!ERROR:#REF!19Analisa
SNI DPU Cipta Karya dan Tata RuangMemasang 1 m2 dinding HB / CB 15,
camp. 1PC : 4PP Bahan12.50BhHB/CB
15RpERROR:#REF!ERROR:#REF!18.200KgPCRp1,400.0025,480.000.582m3Pasir
pasangRp121,000.0070,422.000.280KgBesi angkur
8mmRp15,900.004,452.00Upah0.320OhPekerjaRp40,500.0012,960.000.120OhTukang
batuRp45,900.005,508.000.012OhKepala
tukangRp51,200.00614.400.016OhMandorRp56,300.00900.80ERROR:#REF!19,983.20ERROR:#REF!ERROR:#REF!20Analisa
SNI DPU Cipta Karya dan Tata RuangMemasang 1 m2 dinding HB / CB 10,
camp. 1PC : 3PP Bahan12.50BhHB/CB
10RpERROR:#REF!ERROR:#REF!15.160KgPCRp1,400.0021,224.000.364m3Pasir
pasangRp121,000.0044,044.000.280KgBesi angkur
8mmRp15,900.004,452.00Upah0.300OhPekerjaRp40,500.0012,150.000.100OhTukang
batuRp45,900.004,590.000.010OhKepala
tukangRp51,200.00512.000.015OhMandorRp56,300.00844.50ERROR:#REF!18,096.50ERROR:#REF!ERROR:#REF!21Analisa
SNI DPU Cipta Karya dan Tata RuangMemasang 1 m2 dinding HB / CB 10,
camp. 1PC : 4PP Bahan12.50BhHB/CB
10RpERROR:#REF!ERROR:#REF!12.130KgPCRp1,400.0016,982.000.388m3Pasir
pasangRp121,000.0046,948.000.280KgBesi angkur
8mmRp15,900.004,452.00Upah0.300OhPekerjaRp40,500.0012,150.000.100OhTukang
batuRp45,900.004,590.000.010OhKepala
tukangRp51,200.00512.000.015OhMandorRp56,300.00844.50ERROR:#REF!18,096.50ERROR:#REF!ERROR:#REF!16Analisa
SNI DPU Cipta Karya dan Tata RuangMemasang 1 m2 dinding terawang
(roster) Uk. (12x11x24) cm, camp. 1PC : 3 PPBahan30.00BhTerawang
rosterRp7,300.00219,000.0014.000KgPCRp1,400.0019,600.000.032m3Pasir
pasangRp121,000.003,872.00Upah0.300OhPekerjaRp40,500.0012,150.000.100OhTukang
batuRp45,900.004,590.000.010OhKepala
tukangRp51,200.00512.000.015OhMandorRp56,300.00844.50242,472.0018,096.50260,568.50260,500.0017Analisa
SNI DPU Cipta Karya dan Tata RuangMemasang 1 m2 dinding terawang
(roster) Uk. (12x11x24) cm, camp. 1PC : 4 PPBahan30.00BhTerawang
rosterRp7,300.00219,000.0011.000KgPCRp1,400.0015,400.000.035m3Pasir
pasangRp121,000.004,235.00Upah0.300OhPekerjaRp40,500.0012,150.000.100OhTukang
batuRp45,900.004,590.000.010OhKepala
tukangRp51,200.00512.000.015OhMandorRp56,300.00844.50238,635.0018,096.50256,731.50256,700.0024Analisa
DPU Cipta Karya dan Tata RuangMemasang 1 m2 Bata berongga ekspose
Uk. (6 x 11 x 24)cm, camp.1PC : 3PP Bahan70.00BhBata berongga
eksposeRpERROR:#REF!ERROR:#REF!14.000KgPCRp1,400.0019,600.000.032m3Pasir
pasangRp121,000.003,872.00Upah0.300OhPekerjaRp40,500.0012,150.000.150OhTukang
batuRp45,900.006,885.000.015OhKepala
tukangRp51,200.00768.000.015OhMandorRp56,300.00844.50.ERROR:#REF!20,647.50ERROR:#REF!ERROR:#REF!18Analisa
SNI DPU Cipta Karya dan Tata RuangMemasang 1 m2 Batu bobos Uk.
(10x20x1.5) cm, camp. 1PC : 4 PPBahan50.00BhBatu
bobosRp3,800.00190,000.006.480KgPCRp1,400.009,072.000.021m3Pasir
pasangRp121,000.002,541.00Upah0.400OhPekerjaRp40,500.0016,200.000.200OhTukang
batuRp45,900.009,180.000.020OhKepala
tukangRp51,200.001,024.000.020OhMandorRp56,300.001,126.00201,613.0027,530.00229,143.00229,100.00Jember,
Januari 2012
KEPALA DINAS PU. CIPTA KARYA DAN TATA RUANGKABUPATEN JEMBER
Ir. MERWIN LUSIANI,MMPembina Tk. I NIP. 19650415 199003 2 008
1 M2 Pasang Water Proofing atap beton3.0000LtrWater proofRp.0.0Rp.0.0Rp.0.0Rp.0.00.5000OrgPekerjaRp.Ir. MERWIN LUSIANI,MMRp.ERROR:#VALUE!Rp.0.0Rp.0.00.2000OrgTukang CatRp.0.0Rp.0.0Rp.0.0Rp.0.00.0500OrgKepala TukangRp.NIP. 19650415 199003 2 008Rp.ERROR:#VALUE!Rp.0.0Rp.0.00.0750OrgMandorRp.0.0Rp.0.0Rp.0.0Rp.0.0JumlahRp.ERROR:#VALUE!Rp.0.0DibulatkanRp.ERROR:#VALUE!Rp.0.0
&"Brush Script MT,Regular"&11Analisa Harga Satuan Pekerjaan : Pekerjaan DindingDinas PU. Cipta Karya dan Tata Ruang Kabupaten JemberTahun Anggaran 2012
E. PEKERJAAN PLESTERANDAFTAR ANALISA SNI DPU CIPTA KARYA DAN TATA RUANGUNTUK PEKERJAAN BANGUNAN GEDUNG, PERUMAHANWILAYAH JEMBER TIMUR , JEMBER TENGAH DAN JEMBER KOTAKABUPATEN JEMBER TAHUN ANGGARAN 2012
Analisa SNI DPU Cipta Karya dan Tata Ruang Wilayah Jember
NO.JENIS PEKERJAANBAHANUPAHJUMLAHBULAT123456E.PEKERJAAN
PLESTERAN
amanda ayu putri handayani: amanda ayu putri handayani:SUDAH FIX
PER 4 MARET20111Analisa SNI DPU Cipta Karya dan Tata RuangMemasang
1 m2 Plesteran camp. 1 Pc : 1 Ps tebal
15mmBahan15.504KgPCRp1,400.0021,705.600.016m3Pasir
pasangRp121,000.001,936.00Upah0.300OhPekerjaRp40,500.0012,150.000.150OhTukang
batuRp45,900.006,885.000.015OhKepala
tukangRp51,200.00768.000.015OhMandorRp56,300.00844.5023,641.6020,647.5044,289.1044,200.002Analisa
SNI DPU Cipta Karya dan Tata RuangMemasang 1 m2 Plesteran camp. 1
Pc : 2 Ps tebal 15mmBahan10.224KgPCRp1,400.0014,313.600.020m3Pasir
pasangRp121,000.002,420.00Upah0.300OhPekerjaRp40,500.0012,150.000.150OhTukang
batuRp45,900.006,885.000.015OhKepala
tukangRp51,200.00768.000.015OhMandorRp56,300.00844.5016,733.6020,647.5037,381.1037,300.003Analisa
SNI DPU Cipta Karya dan Tata RuangMemasang 1 m2 Plesteran camp. 1
Pc : 3 Ps tebal 15mmBahan7.776KgPCRp1,400.0010,886.400.023m3Pasir
pasangRp121,000.002,783.00Upah0.300OhPekerjaRp40,500.0012,150.000.150OhTukang
batuRp45,900.006,885.000.015OhKepala
tukangRp51,200.00768.000.015OhMandorRp56,300.00844.5013,669.4020,647.5034,316.9034,300.004Analisa
SNI DPU Cipta Karya dan Tata RuangMemasang 1 m2 Plesteran camp. 1
Pc : 4 Ps tebal 15mmBahan6.240KgPCRp1,400.008,736.000.024m3Pasir
pasangRp121,000.002,904.00Upah0.300OhPekerjaRp40,500.0012,150.000.150OhTukang
batuRp45,900.006,885.000.015OhKepala
tukangRp51,200.00768.000.015OhMandorRp56,300.00844.5011,640.0020,647.5032,287.5032,200.005Analisa
SNI DPU Cipta Karya dan Tata RuangMemasang 1 m2 Plesteran camp. 1
Pc : 5 Ps tebal 15mmBahan5.184KgPCRp1,400.007,257.600.026m3Pasir
pasangRp121,000.003,146.00Upah0.300OhPekerjaRp40,500.0012,150.000.150OhTukang
batuRp45,900.006,885.000.015OhKepala
tukangRp51,200.00768.000.015OhMandorRp56,300.00844.5010,403.6020,647.5031,051.1031,000.006Analisa
SNI DPU Cipta Karya dan Tata RuangMemasang 1 m2 Plesteran camp. 1
Pc : 6 Ps tebal 15mmBahan4.416KgPCRp1,400.006,182.400.027m3Pasir
pasangRp121,000.003,267.00Upah0.300OhPekerjaRp40,500.0012,150.000.150OhTukang
batuRp45,900.006,885.000.015OhKepala
tukangRp51,200.00768.000.015OhMandorRp56,300.00844.509,449.4020,647.5030,096.9030,000.007Analisa
SNI DPU Cipta Karya dan Tata RuangMemasang 1 m2 Plesteran camp. 1
Pc : 7 Ps tebal 15mmBahan3.936KgPCRp1,400.005,510.400.028m3Pasir
pasangRp121,000.003,388.00Upah0.300OhPekerjaRp40,500.0012,150.000.150OhTukang
batuRp45,900.006,885.000.015OhKepala
tukangRp51,200.00768.000.015OhMandorRp56,300.00844.508,898.4020,647.5029,545.9029,500.008Analisa
SNI DPU Cipta Karya dan Tata RuangMemasang 1 m2 Plesteran camp. 1
Pc : 8 Ps tebal 15mmBahan3.456KgPCRp1,400.004,838.400.029m3Pasir
pasangRp121,000.003,509.00Upah0.300OhPekerjaRp40,500.0012,150.000.150OhTukang
batuRp45,900.006,885.000.015OhKepala
tukangRp51,200.00768.000.015OhMandorRp56,300.00844.508,347.4020,647.5028,994.9028,900.009Analisa
SNI DPU Cipta Karya dan Tata RuangMemasang 1 m2 Plesteran camp. 1
Pc : KP : 3 Ps tebal
15mmBahan5.760KgPCRp1,400.008,064.000.003m3Kapur
PasangRp401,000.001,203.000.013m3Pasir
pasangRp121,000.001,573.00Upah0.360OhPekerjaRp40,500.0014,580.000.120OhTukang
batuRp45,900.005,508.000.012OhKepala
tukangRp51,200.00614.400.018OhMandorRp56,300.001,013.4010,840.0021,715.8032,555.8032,500.0010Analisa
SNI DPU Cipta Karya dan Tata RuangMemasang 1 m2 Plesteran camp. 1
Pc : 2 KP : 8 Ps tebal
15mmBahan3.000KgPCRp1,400.004,200.000.005m3Kapur
PasangRp401,000.002,005.000.020m3Pasir
pasangRp121,000.002,420.00Upah0.360OhPekerjaRp40,500.0014,580.000.120OhTukang
batuRp45,900.005,508.000.012OhKepala
tukangRp51,200.00614.400.018OhMandorRp56,300.001,013.408,625.0021,715.8030,340.8030,300.0011Analisa
SNI DPU Cipta Karya dan Tata RuangMemasang 1 m2 Plesteran camp. 1
SM : 1 KP : 1 Ps tebal 15mmBahan0.009m3Semen
merahRp186,400.001,677.600.009m3Kapur
PasangRp401,000.003,609.000.009m3Pasir
pasangRp121,000.001,089.00Upah0.360OhPekerjaRp40,500.0014,580.000.120OhTukang
batuRp45,900.005,508.000.012OhKepala
tukangRp51,200.00614.400.018OhMandorRp56,300.001,013.406,375.6021,715.8028,091.4028,000.0012Analisa
SNI DPU Cipta Karya dan Tata RuangMemasang 1 m2 Plesteran camp. 1
SM : 1 KP : 2 Ps tebal 15mmBahan0.007m3Semen
merahRp186,400.001,304.800.007m3Kapur
PasangRp401,000.002,807.000.015m3Pasir
pasangRp121,000.001,815.00Upah0.360OhPekerjaRp40,500.0014,580.000.120OhTukang
batuRp45,900.005,508.000.012OhKepala
tukangRp51,200.00614.400.018OhMandorRp56,300.001,013.405,926.8021,715.8027,642.6027,600.0013Analisa
SNI DPU Cipta Karya dan Tata RuangMemasang 1 m2 Plesteran camp. 1
PC : 2 Ps tebal 20mmBahan13.632KgPCRp1,400.0019,084.800.027m3Pasir
pasangRp121,000.003,267.00Upah0.400OhPekerjaRp40,500.0016,200.000.200OhTukang
batuRp45,900.009,180.000.020OhKepala
tukangRp51,200.001,024.000.022OhMandorRp56,300.001,238.6022,351.8027,642.6049,994.4049,900.0014Analisa
SNI DPU Cipta Karya dan Tata RuangMemasang 1 m2 Plesteran camp. 1
PC : 3 Ps tebal 20mmBahan10.368KgPCRp1,400.0014,515.200.031m3Pasir
pasangRp121,000.003,751.00Upah0.260OhPekerjaRp40,500.0010,530.000.200OhTukang
batuRp45,900.009,180.000.020OhKepala
tukangRp51,200.001,024.000.013OhMandorRp56,300.00731.9018,266.2021,465.9039,732.1039,700.0015Analisa
SNI DPU Cipta Karya dan Tata RuangMemasang 1 m2 Plesteran camp. 1
PC : 4 Ps tebal 20mmBahan8.320KgPCRp1,400.0011,648.000.032m3Pasir
pasangRp121,000.003,872.00Upah0.400OhPekerjaRp40,500.0016,200.000.200OhTukang
batuRp45,900.009,180.000.020OhKepala
tukangRp51,200.001,024.000.022OhMandorRp56,300.001,238.6015,520.0027,642.6043,162.6043,100.0016Analisa
SNI DPU Cipta Karya dan Tata RuangMemasang 1 m2 Plesteran camp. 1
PC : 5 Ps tebal 20mmBahan6.912KgPCRp1,400.009,676.800.035m3Pasir
pasangRp121,000.004,235.00Upah0.400OhPekerjaRp40,500.0016,200.000.200OhTukang
batuRp45,900.009,180.000.020OhKepala
tukangRp51,200.001,024.000.022OhMandorRp56,300.001,238.6013,911.8027,642.6041,554.4041,500.0017Analisa
SNI DPU Cipta Karya dan Tata RuangMemasang 1 m2 Plesteran camp. 1
PC : 6 Ps tebal 20mmBahan5.888KgPCRp1,400.008,243.200.036m3Pasir
pasangRp121,000.004,356.00Upah0.400OhPekerjaRp40,500.0016,200.000.200OhTukang
batuRp45,900.009,180.000.020OhKepala
tukangRp51,200.001,024.000.022OhMandorRp56,300.001,238.6012,599.2027,642.6040,241.8040,200.0018Analisa
SNI DPU Cipta Karya dan Tata RuangMemasang 1 m2 Plesteran camp. 1
SM : 1 KP : 2 Ps tebal 20mmBahan0.009m3Semen
merahRp186,400.001,677.600.009m3Kapur
PasangRp401,000.003,609.000.018m3Pasir
pasangRp121,000.002,178.00Upah0.440OhPekerjaRp40,500.0017,820.000.220OhTukang
batuRp45,900.0010,098.000.022OhKepala
tukangRp51,200.001,126.400.022OhMandorRp56,300.001,238.607,464.6030,283.0037,747.6037,700.0019Analisa
SNI DPU Cipta Karya dan Tata RuangMemasang 1 m2 Berapen camp. 1 PC
: 5 Ps tebal 15mmBahan5.184KgPCRp1,400.007,257.600.026m3Pasir
pasangRp121,000.003,146.00Upah0.150OhPekerjaRp40,500.006,075.000.075OhTukang
batuRp45,900.003,442.500.008OhKepala
tukangRp51,200.00409.600.008OhMandorRp56,300.00450.4010,403.6010,377.5020,781.1020,700.0020Analisa
SNI DPU Cipta Karya dan Tata RuangMemasang 1 m2 Plesteran Skoning
lebar 10mm camp. 1 PC : 2 Ps
Bahan0.500KgPCRp1,400.00700.000.013m3Pasir
pasangRp121,000.001,573.00Upah0.080OhPekerjaRp40,500.003,240.000.400OhTukang
batuRp45,900.0018,360.000.040OhKepala
tukangRp51,200.002,048.000.004OhMandorRp56,300.00225.202,273.0023,873.2026,146.2026,100.0021Analisa
SNI DPU Cipta Karya dan Tata RuangMemasang 1 m2 Plesteran Granit,
camp. 1 PC : 2 Granit, tebal
10mmBahan10.000KgPCRp1,400.0014,000.0015.000Kg
amanda ayu putri handayani: amanda ayu putri handayani:DI HARGA
SATUAN, M3Batu
granitRpERROR:#REF!ERROR:#REF!Upah0.450OhPekerjaRp40,500.0018,225.000.225OhTukang
batuRp45,900.0010,327.500.023OhKepala
tukangRp51,200.001,177.600.023OhMandorRp56,300.001,294.90ERROR:#REF!31,025.00ERROR:#REF!ERROR:#REF!22Analisa
SNI DPU Cipta Karya dan Tata RuangMemasang 1 m2 Plesteran Teraso,
camp. 1 PC : 2 Batu Teraso, tebal
10mmBahan10.000KgPCRp1,400.0014,000.0015.000Kg
amanda ayu putri handayani: amanda ayu putri handayani:DI HARGA
SATUAN, M3Batu
terasoRpERROR:#REF!ERROR:#REF!Upah0.450OhPekerjaRp40,500.0018,225.000.225OhTukang
batuRp45,900.0010,327.500.023OhKepala
tukangRp51,200.001,177.600.023OhMandorRp56,300.001,294.90ERROR:#REF!31,025.00ERROR:#REF!ERROR:#REF!21Analisa
SNI DPU Cipta Karya dan Tata RuangMemasang 1 m2 Plesteran Ciprat /
Kamprotan, camp. 1 PC : 2
Ps.Bahan4.320KgPCRp1,400.006,048.000.006m3Pasir
pasangRp121,000.00726.00Upah0.300OhPekerjaRp40,500.0012,150.000.100OhTukang
batuRp45,900.004,590.000.010OhKepala
tukangRp51,200.00512.000.015OhMandorRp56,300.00844.506,774.0018,096.5024,870.5024,800.0022Analisa
SNI DPU Cipta Karya dan Tata RuangMemasang 1 m2 finishing siar pas.
dinding bata merah
(=20m')Bahan3.108KgPCRp1,400.004,351.20Upah0.150OhPekerjaRp40,500.006,075.000.075OhTukang
batuRp45,900.003,442.500.008OhKepala
tukangRp51,200.00409.600.008OhMandorRp56,300.00450.404,351.2010,377.5014,728.7014,700.0023Analisa
SNI DPU Cipta Karya dan Tata RuangMemasang 1 m2 finishing siar pas.
dinding conblock expose
(=8m')Bahan1.600KgPCRp1,400.002,240.00Upah0.070OhPekerjaRp40,500.002,835.000.035OhTukang
batuRp45,900.001,606.500.004OhKepala
tukangRp51,200.00204.800.004OhMandorRp56,300.00225.202,240.004,871.507,111.507,100.0024Analisa
SNI DPU Cipta Karya dan Tata RuangMemasang 1 m2 finishing siar pas.
batu kali adukan 1 PC : 2
Ps.Bahan6.340KgPCRp1,400.008,876.000.012m3Pasir
pasangRp121,000.001,452.00Upah0.300OhPekerjaRp40,500.0012,150.000.150OhTukang
batuRp45,900.006,885.000.015OhKepala
tukangRp51,200.00768.000.015OhMandorRp56,300.00844.5010,328.0020,647.5030,975.5030,900.0025Analisa
SNI DPU Cipta Karya dan Tata RuangMemasang 1 m2
AcianBahan3.250KgPCRp1,400.004,550.00Upah0.200OhPekerjaRp40,500.008,100.000.100OhTukang
batuRp45,900.004,590.000.010OhKepala
tukangRp51,200.00512.000.010OhMandorRp56,300.00563.004,550.0013,765.0018,315.0018,300.0026Analisa
SNI DPU Cipta Karya dan Tata RuangMemasang 1 m' Benangan 1 PC : 2
PP Bahan0.344KgPCRp1,400.00481.600.001m3Pasir
pasangRp121,000.00121.00Upah0.133OhPekerjaRp40,500.005,398.650.067OhTukang
batuRp45,900.003,056.940.007OhKepala
tukangRp51,200.00337.920.007OhMandorRp56,300.00371.58602.609,165.099,767.699,700.00
Jember, Januari 2012
KEPALA DINAS PU. CIPTA KARYA DAN TATA RUANGKABUPATEN JEMBER
Ir. MERWIN LUSIANI,MMPembina Tk. I NIP. 19650415 199003 2 008
1 m2 Pasang Water Proofing atap beton3.0000LtrWater proofRp.0.0Rp.0.0Rp.0.0Rp.0.00.5000OrgPekerjaRp.Ir. MERWIN LUSIANI,MMRp.ERROR:#VALUE!Rp.0.0Rp.0.00.2000OrgTukang CatRp.0.0Rp.0.0Rp.0.0Rp.0.00.0500OrgKepala TukangRp.NIP. 19650415 199003 2 008Rp.ERROR:#VALUE!Rp.0.0Rp.0.00.0750OrgMandorRp.0.0Rp.0.0Rp.0.0Rp.0.0JumlahRp.ERROR:#VALUE!Rp.0.0DibulatkanRp.ERROR:#VALUE!Rp.0.0
&"Brush Script MT,Regular"&11Analisa Harga Satuan Pekerjaan : Pekerjaan PlesteranDinas PU. Cipta Karya dan Tata Ruang Kabupaten JemberTahun Anggaran 2012
F.PEKERJAAN KAYUDAFTAR ANALISA SNI DPU CIPTA KARYA DAN TATA RUANGUNTUK PEKERJAAN BANGUNAN GEDUNG, PERUMAHANWILAYAH JEMBER TIMUR , JEMBER TENGAH DAN JEMBER KOTAKABUPATEN JEMBER TAHUN ANGGARAN 2012
Analisa SNI DPU Cipta Karya dan Tata Ruang Wilayah Jember
NO.JENIS PEKERJAANBAHANUPAHJUMLAHBULAT123456F.PEKERJAAN KAYU
amanda ayu putri handayani: amanda ayu putri handayani:S