tugas ekotek rab

252
Daftar Upah dan Biaya Langsiran DPU Cipta Karya dan Tata Ruang Kabupaten Jember Tahun Anggaran 2012 DAFTAR HARGA SATUAN UPAH TENAGA KERJA KABUPATEN JEMBER TAHUN ANGGARAN 2012 NO. PEKERJA KODE 1 Mandor lapangan L-01 2 Kepala tukang L-02 3 Tukang kayu L-03 4 Tukang batu L-04 5 Tukang besi L-05 6 Tukang pipa air L-06 7 Tukang listrik L-07 8 Tukang aluminium L-08 9 Tukang cat L-09 10 Tukang las L-10 11 Tukang masak aspal L-11 12 Pekerja L-12 13 Buruh L-13 14 Mekanik L-14 15 Pembantu Mekanik L-15 16 Operator L-16 17 Pembantu operator L-17 18 Sopir L-18 19 Pembantu sopir L-19 20 Penjaga Malam L-20 21 Biaya langsiran bahan kelokasi sulit per 100 m` a, yang satuan M3 b, Yang satuan M2 c, Semen PC yang satuan Zak d, Yang satuan Kg 22 Pengeboran Darat Wilayah Kecamatan a, Kaliwates, Ajung, Rambipuji, Bangsalsari M' b, Tanggul, Semboro, Umbulsari, Sumberbaru M' c, Jenggawah, Ambulu, Wuluhan, Balung M' d, Panti, Sukorambi, Patrang M' e, Arjasa, Jelbuk, Kalisat, Ledokombo, Sukowono, Sum M' f, Sempolan, Mayang, Mumbulsari, Tempurejo, Pakusari M' g, Puger, Gumukmas, Kencong, Jombang M' h, Sumbersari M'

Upload: rakhmat-nurfathoni-arifiyanto

Post on 26-Nov-2015

94 views

Category:

Documents


8 download

TRANSCRIPT

UPAH 2012DAFTAR HARGA SATUAN UPAH TENAGA KERJAKABUPATEN JEMBERTAHUN ANGGARAN 2012

NO.PEKERJAKODEUPAH ( Rp / hari )

2012 BULAT2011KENAIKAN 6,6%1Mandor lapanganL-0156,300.0056,300.0052,800.0056,284.801.0043,000.0043,000.0043,000.002Kepala tukangL-0251,200.0051,200.0047,970.0051,136.021.0035,000.0035,000.0035,000.003Tukang kayuL-0347,600.0047,600.0044,600.0047,543.601.0034,000.0034,000.0034,000.004Tukang batuL-0445,900.0045,900.0043,000.0045,838.001.0033,000.0033,000.0033,000.005Tukang besiL-0545,900.0045,900.0043,000.0045,838.001.0033,000.0033,000.0033,000.006Tukang pipa airL-0645,900.0045,900.0043,000.0045,838.001.0033,000.0033,000.0033,000.007Tukang listrikL-0745,900.0042,300.0039,600.0042,213.601.0033,000.0033,000.0033,000.008Tukang aluminiumL-0845,900.0042,300.0039,600.0042,213.601.0033,000.0033,000.0033,000.009Tukang catL-0945,900.0042,300.0039,600.0042,213.601.0033,000.0033,000.0033,000.0010Tukang las L-1045,900.0041,600.0039,000.0041,574.001.0033,000.0033,000.0033,000.0011Tukang masak aspalL-1145,900.0042,700.0040,000.0042,640.001.0034,000.0034,000.0034,000.0012Pekerja L-1240,500.0032,000.0030,000.0031,980.001.0028,000.0028,000.0028,000.0013Buruh L-1340,500.0032,000.0030,000.0031,980.001.0028,000.0028,000.0028,000.0014MekanikL-14105,100.00105,100.0098,550.00105,054.301.0024,000.0024,000.0024,000.0015Pembantu MekanikL-1569,800.0069,800.0065,450.0069,769.701.0024,000.0024,000.0024,000.0016OperatorL-16104,500.00104,500.0098,000.00104,468.001.0036,000.0036,000.0036,000.0017Pembantu operatorL-1769,300.0069,300.0065,000.0069,290.001.0024,000.0024,000.0024,000.0018Sopir L-18105,100.00105,100.0098,550.00105,054.301.0033,000.0033,000.0033,000.0019Pembantu sopir L-1969,800.0069,800.0065,450.0069,769.701.0033,000.0033,000.0033,000.0020Penjaga MalamL-2028,300.0028,300.0026,500.0028,249.001.0021,000.0021,000.0021,000.0021Biaya langsiran bahan kelokasi sulit per 100 m`1.00a,yang satuan M310,000.001.0010,500.0010,500.00b,Yang satuan M2250.001.00770.00770.00c,Semen PC yang satuan Zak1,500.001.001,150.001,150.00d,Yang satuan Kg85.0022Pengeboran Darat Wilayah Kecamatana,Kaliwates, Ajung, Rambipuji, BangsalsariM'260,000.00b,Tanggul, Semboro, Umbulsari, SumberbaruM'325,000.00c,Jenggawah, Ambulu, Wuluhan, BalungM'292,500.00d,Panti, Sukorambi, PatrangM'325,000.00e,Arjasa, Jelbuk, Kalisat, Ledokombo, Sukowono, SumberjambeM'351,000.00f,Sempolan, Mayang, Mumbulsari, Tempurejo, PakusariM'338,000.00g,Puger, Gumukmas, Kencong, JombangM'351,000.00h,SumbersariM'390,000.00

Jember, Januari 2012

KEPALA DINAS PU. CIPTA KERYA DAN TATA RUANG KABUPATEN JEMBER

Ir. MERWIN LUSIANI, MMPembina. Tk. I NIP. 19650415 199003 2 008

DAFTAR HARGA SATUAN UPAH TENAGA KERJAKABUPATEN JEMBERTAHUN ANGGARAN 2009

NOMORPEKERJAKODEUPAH ( Rp / hari )

1Mandor lapanganL0350,000.002Kepala tukangL1040,000.003Tukang kayuL1138,000.004Tukang batuL0237,500.005Tukang besiL0237,500.006Tukang pipa airL0237,500.007Tukang listrikL0237,500.008Tukang catL0237,500.009Tukang las L0237,500.0010Tukang masak aspalL1238,000.0011Pekerja L0125,000.0012Buruh L1325,000.0013MekanikL0898,000.0014Pembantu MekanikL0960,000.0015OperatorL0498,000.0016Pembantu operatorL0560,000.0017Sopir L0698,000.0018Pembantu sopir L0760,000.0019Penjaga MalamL1425,000.0020Biaya langsiran bahan kelokasi sulit per 100 m`a,yang satuan M323,000.00b,Yang satuan M2250.00c,Semen PC yang satuan Zak3,000.00d,Yang satuan Kg85.0021Pengeboran Darat Wilayah Kecamatana,Kaliwates, Ajung, Rambipuji, BangsalsariM'260,000.00b,Tanggul, Semboro, Umbulsari, SumberbaruM'325,000.001.312,000.0015,600.0015,000.00c,Jenggawah, Ambulu, Wuluhan, BalungM'292,500.001.324,000.0031,200.0031,000.00d,Panti, Sukorambi, PatrangM'325,000.001.314,000.0018,200.0018,000.00e,Arjasa, Jelbuk, Kalisat, Ledokombo, Sukowono, SumberjambeM'351,000.001.35,000.006,500.006,000.00f,Sempolan, Mayang, Mumbulsari, Tempurejo, PakusariM'338,000.001.311,000.0014,300.0014,000.00g,Puger, Gumukmas, Kencong, JombangM'351,000.001.322,000.0028,600.0028,000.00h,SumbersariM'390,000.001.3389,500.00506,350.00506,000.001.3346,500.00450,450.00450,000.001.3342,300.00444,990.00444,000.001.3112,800.00146,640.00146,000.00Jember, Maret 20091.3568,000.00738,400.00738,000.001.3182,700.00237,510.00237,000.001.389,200.00115,960.00115,000.00KABUPATEN JEMBER1.3124,900.00162,370.00162,000.001.3265,600.00345,280.00345,000.001.3312,900.00406,770.00406,000.001.3130,200.00169,260.00169,000.001.3176,400.00229,320.00229,000.001.3179,500.00233,350.00233,000.00Ir. MERWIN LUSIANI, MM1.3231,000.00300,300.00300,000.00Pembina. 1.351,400.0066,820.0066,000.00NIP. 19650415 199003 2 0081.3332,800.00432,640.00432,000.0025Tamper, vibrator plate 4 HPE 08827,000.001.321,000.0027,300.0027,000.0026Concrette vibrator 4 HPE 08927,000.001.321,000.0027,300.0027,000.0027Chip spreader 3 tonE 13027,000.001.321,000.0027,300.0027,000.0028Sprayer self - prop 40001E 152247,000.001.3190,000.00247,000.00247,000.0029Mesin penyemprot aspal 1000 ltrE 153101,000.001.377,700.00101,010.00101,000.0030Asphalt sprayer towed 4001E 15481,000.001.363,000.0081,900.0081,000.0031Mesin penc. Asphal / AMP 30 tonE 1552,758,000.001.32,122,000.002,758,600.002,758,000.0032AMP 10 t/hE 1561,108,000.001.3852,600.001,108,380.001,108,000.0033Mesin penghampar 1820 men / 30 HPE 157412,000.001.3317,100.00412,230.00412,000.0034Fuel Tank Truck 115 HPE 172189,000.001.3145,900.00189,670.00189,000.0035Water Tank Truck 115 HPE 182143,000.001.3110,200.00143,260.00143,000.0036Trailler towed 1 tonE 19112,000.001.39,400.0012,220.0012,000.0037Low Loader + Tractor 175 HPE 192305,000.001.3235,200.00305,760.00305,000.0038Dump Truck 3.5 ton / 115 HP E 211211,000.001.3162,700.00211,510.00211,000.0039Dump Truck 5 ton / 145 HP E 212274,000.001.3211,000.00274,300.00274,000.0040Dump Truck 8 ton / 175 HPE 213341,000.001.3262,500.00341,250.00341,000.0041Flat Bed Truck 3.5 ton / 115 HPE 221260,000.001.3200,500.00260,650.00260,000.0042Pick up Truck 61 HPE 22285,000.001.366,100.0085,930.0085,000.0044Flat Bed Truck 5 ton / 145 HPE 224311,000.001.3239,400.00311,220.00311,000.0045Flat Bed Truck with craneE 225151,000.001.3116,500.00151,450.00151,000.0048Lube Truck 5 t / 145 HPE 23279,000.001.361,200.0079,560.0079,000.0049Concrette mixer 0.125 m3 / 6 HPE 25121,000.001.316,800.0021,840.0021,000.0050Concrette mixer 0.25 m3 / 10 HPE 25242,000.001.332,500.0042,250.0042,000.0051Concrette mixer 0.5 m3 / 20 HPE 25370,000.001.354,600.0070,980.0070,000.0052Compressor 210 m3 / jamE 30121,000.001.316,800.0021,840.0021,000.0053Generator 3 - 5 KVAE 31121,000.001.316,800.0021,840.0021,000.0054Pump water ( 5 cm ) 30 m3 /hrE 34125,000.001.319,900.0025,870.0025,000.0055Pump water ( 10 cm ) 40 m3 /hrE 34232,000.001.325,200.0032,760.0032,000.0056Jack hammer equipmentE 35125,000.001.319,900.0025,870.0025,000.0057Tractor equipmentE 40187,000.001.367,200.0087,360.0087,000.0058Tempat penggorengan aspalE 40227,000.001.321,000.0027,300.0027,000.0059Kereta dorongE 40349,000.001.337,800.0049,140.0049,000.00ERROR:#REF!

KEPALA DINAS PEKERJAAN UMUMKABUPATEN JEMBER

Ir. SOEHARDIJANTO,MMPembina. Tk.INIP. 510 110 781

&"Brush Script MT,Regular"&11Daftar Upah dan Biaya LangsiranDPU Cipta Karya dan Tata Ruang Kabupaten JemberTahun Anggaran 2012

HARGA BAHAN 2012DAFTAR HARGA SATUAN DASAR BAHAN TERTINGGIKABUPATEN JEMBER TAHUN ANGGARAN 2012

NoJENIS BAHANSATUAN VOLUMEHARGA SATUANHARGA SATUAN 2012NoJENIS BAHANSATUAN VOLUMEHarga Survei Konsultan dan Sumber LainnyaHarga survei terendahHarga survei tertinggiSelisih hargaHarga survei tertinggi x 30%Harga satuan TA 2010Selisih harga survei 2011 dg 2010HARGA SATUAN IJENIS BAHAN BANGUNAN BAHAN PENUTUP ATAP & PLAFON1Asbes gelombang besar tebal 5 mm (2.50 x 0.92 m)lbr65,000.0065,000.0086,210.0087,500.0065,000.0087,500.0022,500.00113,750.0090,800.009080090,750.0090,750.00113,750.002Asbes gelombang kecil tebal 5 mm (2.25 x 0.92 m)lbr60,000.0060,000.0077,180.0065,000.0060,000.0077,180.0017,180.00100,334.0075,000.007500075,000.0075,000.00100,334.003Asbes gelombang kecil tebal 5 mm (2.00 x 0.92 m)lbr55,000.0055,000.0071,250.0062,500.0055,000.0071,250.0016,250.0092,625.0070,500.007050070,500.0070,500.0092,625.004Asbes gelombang kecil tebal 5 mm (1.80 x 0.92 m)lbr50,000.0050,000.0065,940.0057,000.0050,000.0065,940.0015,940.0085,722.0064,200.006420064,200.0064,200.0085,722.005Asbes gelombang kecil tebal 4 mm (3.00 x 1.05 m)lbr66,000.0065,000.0065,000.0079,040.0065,000.0079,040.0014,040.00102,752.0087,750.0087,800.008780087,750.0087,750.0011.026Asbes gelombang kecil tebal 4 mm (2.70 x 1.05 m)lbr57,500.0057,500.0068,585.0057,500.0068,585.0011,085.0089,160.5069,000.006900069,000.0069,000.007Asbes gelombang kecil tebal 4 mm (2.40 x 1.05 m)lbr53,000.0052,500.0052,500.0061,000.0052,500.0061,000.008,500.0079,300.0063,300.006330063,300.0063,300.008Asbes gelombang kecil tebal 4 mm (2.10 x 1.05 m)lbr45,000.0045,000.0053,420.0045,000.0053,420.008,420.0069,446.0054,000.005400054,000.0054,000.009Asbes gelombang kecil tebal 4 mm (1.50 x 1.05 m)lbr35,000.0035,000.0038,410.0035,000.0038,410.003,410.0049,933.0046,100.004610046,100.0046,100.0010Asbes gelombang kecil tebal 6 mm (3.00 x 1.08 m)lbr63,000.00126,320.0063,000.00126,320.0063,320.00164,216.00139,000.00139000126,350.00126,350.0011Asbes gelombang kecil tebal 6 mm (2.70 x 1.08 m)lbr24,500.0099,020.0024,500.0099,020.0074,520.00128,726.00109,100.0010910099,100.0099,100.0012Asbes gelombang kecil tebal 6 mm (2.10 x 1.08 m)lbr23,000.0092,500.0023,000.0092,500.0069,500.00120,250.00101,800.0010180092,500.0092,500.0013Asbes gelombang kecil 6 mm (2.10 x 1.08 m)lbr29,400.0092,500.0029,400.0092,500.0063,100.00120,250.0097,900.009790092,500.0092,500.0014Asbes gelombang kecil tebal 6 mm (1.80 x 1.08 m)lbr23,000.0075,920.0023,000.0075,920.0052,920.0098,696.0083,600.008360075,950.0075,950.0015Asbes wuwung stel gelombang 0.92 mmset18,000.0018,000.0018,000.000.0023,400.0021,600.002160021,600.0021,600.0016Asbes wuwung stel gelombang 1.05 mmset18,500.0020,000.0044,700.0018,500.0044,700.0026,200.0058,110.0036,600.003660033,250.0033,250.0017Asbes wuwung stel gelombang 1.08 mmlbr17,000.0017,000.0017,000.000.0022,100.0038,500.003850035,000.0035,000.0018Plat asbes tebal 3.5 mmlbr49,400.0049,400.0049,400.000.0064,220.0065,300.006530065,300.0065,300.0019Plat asbes tebal 4 mmlbr68,760.0068,760.0068,760.000.0089,388.0092,600.009260084,100.0084,100.0020Plat asbes tebal 6 mmlbr98,130.0098,130.0098,130.000.00127,569.00117,500.00117500117,500.00117,500.0021Genteng Palentong /vlampressbj1,000.00800.00800.001,000.00200.001,300.001,200.00120022Genteng palentong superbh1,100.001,600.001,100.001,600.00500.002,080.0011,200.001120023Genteng Nok Palentong /vlampressbj3,000.003,000.003,000.000.003,900.005,800.00580024Genteng bubung kodok / karangpilangbj2,500.002,500.002,500.000.003,250.0010,100.001010025Genteng Betonbj2,500.002,400.006,000.002,400.006,000.003,600.007,800.003,500.003,500.0035003,500.003,500.00(41.67)26Genteng Metallbr55,000.0055,000.0055,000.000.0071,500.0097,500.0097,500.009750097,500.0097,500.0071,500.0027Nok genteng betonbj2,600.008,000.002,600.008,000.005,400.0010,400.003,200.0032003,150.003,150.0028Nok paten 0.92 mbj17,500.0018,000.0030,000.0017,500.0030,000.0012,500.0039,000.0021,600.002160021,600.0021,600.0029Nok stel rata 0.92 mbj44,700.0038,000.0038,000.0044,700.006,700.0058,110.0053,700.005370053,650.0053,650.0030Nok stel gelombangbj44,700.0022,500.0022,500.0044,700.0022,200.0058,110.0026,800.0053,700.005370053,650.0053,650.0031Genteng kodok / karang pilangbj800.00800.00800.000.001,040.003,500.00350032Seng gelombang 3" x 6" BJLS 28lbr63,000.0062,500.0023,500.0036,750.0023,500.0063,000.0039,500.0081,900.0084,000.008400084,000.0084,000.0033Seng plat 3' x 6' BJLS 28lbr36,750.0036,750.0036,750.000.0047,775.0050,900.0046,000.004600041,800.0041,800.0034Seng datarlbr22,500.0022,500.0048,000.0022,500.0048,000.0025,500.0062,400.0056,000.005600050,900.0050,900.0035Teakwood tebal 4 mm (1.22 x 2.44)lbr76,000.0075,000.0076,000.00105,000.0075,000.00105,000.0030,000.00136,500.00137,700.00137700125,100.00125,100.0036Teakwood tebal 4 mm (1.10 x 2.10)lbr57,000.0058,000.0057,000.0058,000.001,000.0075,400.0069,600.006960069,600.0069,600.0037Plywood tebal 4 mm (1.22 x 2.44)lbr61,500.0060,000.0060,000.0060,000.0060,000.0061,500.001,500.0079,950.0089,500.0089,500.008950089,500.0089,500.0038Plywood tebal 9 mm (1.22 x 2.44)lbr120,000.00120,000.00120,000.000.00156,000.00178,500.00181,500.00181500178,500.00178,500.0039Triplek tebal 4 mm (0.90 x 2.00)lbr41,000.0038,000.0038,000.0041,000.003,000.0053,300.0047,400.004740047,400.0047,400.0040Triplek tebal 4 mm (1.22 x 2.44)lbr48,000.0047,500.0050,000.0065,000.0047,500.0065,000.0017,500.0084,500.0063,400.006340057,600.0057,600.0041Formite penjaga jarak bekisting / spacerbh20,000.0020,000.0020,000.000.0026,000.0020,000.002000042Rolling door allumuniumm475,000.00475,000.00475,000.000.00617,500.00639,600.00703,600.00703600639,600.00639,600.0043Pintu allumuniumm'300,000.00300,000.00300,000.000.00390,000.00239,700.00263,700.00263700239,700.00239,700.0044Gypsum boardlbr55,000.0055,000.0058,000.0055,000.0058,000.003,000.0075,400.0089,700.0066,000.006600066,000.0066,000.0045Profil allumunium " T " / kusen aluminiumm70,000.0070,000.0070,000.000.0091,000.00119,100.0011910046Fiberglass gelombang (180 x 90) cmlbr19,000.0019,000.0019,000.000.0024,700.0061,500.006150047Ramsetbh13,000.0013,000.0013,000.000.0016,900.001,700.001,700.0017001,700.001,700.0048List gypsum profilm'0.000.000.000.0023,700.002370049Talang karetm'0.000.000.000.0017,700.0017700IIBAHAN MENGGUNAKAN KAYU1Dolken kayu O 8 - 10 / 400 cm
amanda ayu putri handayani: amanda ayu putri handayani:1 m3 = 33 batang1 batang = 700000/33=21212=21250/ btangm700,000.00700,000.00700,000.000.00910,000.00770,000.007700001 batang=0.032Kayu kelas I (Balok)m30.000.000.000.0010,450,000.001045000011,817,000.003Kayu kelas I (Papan)m30.000.000.000.0011,817,000.001181700011,874,000.004Kayu kelas II (Balok)m30.000.000.000.005,280,000.0052800000.014011,817,000.005Kayu kelas II (Papan)m30.000.000.000.006,500,000.00650000071.4311,874,000.006Kayu kelas III (Balok)m30.000.000.000.003,480,000.00348000073,920.0012,600,000.007Kayu kelas III (Papan)m30.000.000.000.003,480,000.00348000012,467,700.008Kayu 5/7m0.000.000.000.002,580,000.002,838,000.0028380002,580,000.002,580,000.0010,400,000.009Kayu cetakan / begistingm0.000.000.000.004,355,000.004,355,000.0043550004,355,000.004,355,000.0010,400,000.0010Perancah kayum0.000.000.000.002,580,000.002,750,000.0027500002,580,000.002,580,000.0010,400,000.0011Kayu terentengm0.000.000.000.002,580,000.002,750,000.0027500002,580,000.002,580,000.006,750,000.0012Tali ijukkg5,000.005,000.005,000.000.006,500.0033,900.0033,900.003390033,900.0033,900.005,200,000.0013Ijukkg5,000.005,000.005,000.005,000.000.006,500.0033,900.0020,000.002000020,000.0020,000.006,500,000.0014Tebalan rumputm30,000.0015Kaso 5/7m0.000.000.000.002,580,000.002,838,000.0028380002,580,000.002,580,000.002,490,000.0016Kayu papan tebal 9 mmm0.000.000.000.003,480,000.003,480,000.0034800003,480,000.003,480,000.003,480,000.0017Bambu 6 - 10/600 cmbtg8,000.008,000.0010,000.008,000.0010,000.002,000.0013,000.0012,500.0012,500.001250012,500.0012,500.006,955,000.0018Bilik bambum'16,000.0015,000.0015,000.0016,000.001,000.0020,800.0018,600.001860018,600.0018,600.007,215,000.0019Minyak bekesting / pelumasliter0.000.000.000.0033,000.0027,500.002750025,000.0025,000.005,400,000.00IIIBAHAN MENGGUNAKAN BATU / PASIR & SEMEN1Batu bata merah bh350.00350.00390.00350.00390.0040.00507.00375.00450.00450410.00410.002Batu pecah / belah 15/20m53,000.0053,000.0065,700.0053,000.0065,700.0012,700.0085,410.0097,500.00147,500.0014750097,500.0097,500.003Batu pecah 7/10m56,000.0056,000.00215,000.0056,000.00215,000.00159,000.00279,500.00144,500.00147,500.004Batu pecah 5/7m56,000.0056,000.00215,000.0056,000.00215,000.00159,000.00279,500.00144,500.00159,000.00159000144,500.00144,500.005Batu pecah 2/3m82,000.0081,000.00215,000.0081,000.00215,000.00134,000.00279,500.00143,750.00165,300.00165300150,200.00150,200.006Batu pecah 1/2m86,000.0086,000.00215,000.0086,000.00215,000.00129,000.00279,500.00168,000.00184,800.00184800168,000.00168,000.007Batu pecah mesin 1 - 2 cmm210,100.008Batu pecah mesin 0,5 - 1 cmm210,100.009Batu kali pecah 3/5m76,000.0076,000.00215,000.0076,000.00215,000.00139,000.00279,500.00160,100.00160100145,500.00145,500.0010Batu tempelm30,000.0030,000.0030,000.000.0039,000.0039,600.003960036,000.0036,000.0011Batu kerikil beton
amanda ayu putri handayani: amanda ayu putri handayani:Bila dalam Kg (Bj Kerikil = 1800Kg/m3)1Kg = 175.000/1400=125m0.000.000.000.00175,000.00165,000.00165000123.00175,000.00175,000.0012Batu bobos uk. (10x 20 x 1,5) cmbh3,800.00380013Pasir cor / beton
amanda ayu putri handayani: amanda ayu putri handayani:Bila dalam Kg (Bj Kerikil = 1350Kg/m3)1Kg = 110.000/1350=78.6=80m75,000.0075,000.0075,000.0075,000.000.0097,500.00110,000.00121,000.0012100090.00110,000.00110,000.0014Pasir pasangm75,000.0075,000.0051,500.0051,500.0075,000.0023,500.0097,500.00110,000.00121,000.00121000110,000.00110,000.0015pasir urugm60,000.0035,000.0032,000.0032,000.0060,000.0028,000.0078,000.0060,000.0060,000.006000060,000.0060,000.0016Sirtum52,500.0017Pasir silikakg15,000.0015,000.0015,000.000.0019,500.0080.0010018Semen berwarna yiyitankg10,000.0010,000.0010,000.000.0013,000.004,800.005,300.0053004,800.004,800.0019Semen PC (Portland Cement) / Semen Gresik (50 Kg)kg1,150.001,125.001,100.001,125.001,100.001,150.0050.001,495.001,400.001,400.0014001,400.001,400.0020Semen tiga roda (50 Kg)kg1,087.501,037.501,037.501,087.5050.001,413.751,400.001,400.0014001,400.001,400.0021Semen PC ( 40 kg )kg2,000.0068,000.0010,000.002,000.0068,000.0066,000.0088,400.003,200.001,400.0036003,200.003,200.0022Semen putihkg2,000.0068,000.0010,000.002,000.0068,000.0066,000.0088,400.003,200.003,600.0036003,200.003,200.0023Semen merahm0.000.000.000.00169,400.00186,400.00186400169,400.00169,400.0024Kapur pasang (10 Kg)kg4,500.004,500.005,000.004,500.005,000.00500.006,500.005,400.005,500.0055005,400.005,400.0025Tanah urugm32,000.0032,000.0040,000.0032,000.0040,000.008,000.0052,000.0052,500.0057,800.005780052,500.0052,500.0026Tanah sirtum0.000.000.000.0052,500.0052,500.005250052,500.0052,500.0027Tanah liatm47,000.0047,000.0047,000.000.0061,100.0052,500.005250028Kapur padamm1,600,000.001,600,000.001,600,000.000.002,080,000.00364,500.00401,000.00401000364,500.00364,500.0029Kapur sirihkg6,000.006,000.006,000.000.007,800.00540.00600.00600540.00540.0030Airliter0.000.000.000.0090.00100.0010090.0090.0031Semen natkg10,000.0010,000.0010,000.0010,000.000.0013,000.005,300.0053004,800.004,800.00IVBAHAN MENGGUNAKAN BESI / LOGAM1Besi begel / bautkg12,000.0012,500.0015,000.0012,000.0015,000.003,000.0019,500.0012,400.0016,500.001650015,000.0015,000.002Besi beton poloskg8,000.007,500.007,500.007,000.008,100.007,000.008,100.001,100.0010,530.0014,400.0015,900.001590014,400.0014,400.003Besi beton ulirkg8,500.008,000.008,000.007,500.0010,350.007,500.0010,350.002,850.0013,455.0016,200.0017,900.001790016,200.0016,200.004Besi pipaljr0.000.000.000.0044,500.0044,500.004450044,500.0044,500.005Besi pipa galvanis medium 1 1/2, 6 mljr112,000.00110,000.00110,000.00110,000.00112,000.002,000.00145,600.00134,400.00134400134,400.00134,400.006Besi pipa galvanis medium 1 1/4, 6 mljr91,750.0090,000.0090,000.0090,000.0091,750.001,750.00119,275.00110,100.00110100110,100.00110,100.007Besi pipa galvanis medium 1, 6 mljr76,250.0075,000.0075,000.0075,000.0076,250.001,250.0099,125.0093,500.009350091,500.0091,500.008Besi pipa galvanis medium 1/2, 6 mljr52,000.0050,000.0050,500.0050,000.0052,000.002,000.0067,600.0068,700.006870062,400.0062,400.009Besi pipa galvanis medium 2 1/2, 6 mljr217,000.00215,000.00215,000.00215,000.00217,000.002,000.00282,100.00286,500.00286500260,400.00260,400.0010Besi pipa galvanis medium 2, 6 mljr135,500.00135,000.00135,000.00135,000.00135,500.00500.00176,150.00170,500.00170500162,600.00162,600.0011Besi pipa galvanis medium 3, 6 mljr276,750.00275,000.00275,000.00275,000.00276,750.001,750.00359,775.00365,400.00365400332,100.00332,100.0012Besi pipa galvanis medium 4, 6 mljr351,000.00350,000.00350,000.00350,000.00351,000.001,000.00456,300.00463,400.00463400421,200.00421,200.0013Besi pipa galvanis medium 5, 6 mljr876,500.00875,000.00875,000.00875,000.00876,500.001,500.001,139,450.001,051,800.0010518001,051,800.001,051,800.0014Besi pipa galvanis medium 6, 6 mljr1,376,500.001,375,000.001,375,000.001,375,000.001,376,500.001,500.001,789,450.001,817,000.0018170001,651,800.001,651,800.0015Besi pipa galvanis medium 3/4, 6 mljr65,000.0065,000.0065,000.0065,000.0065,000.000.0084,500.0085,800.008580078,000.0078,000.0016Pipa besi GI diameter 0,50" Medium Bm`12,000.0012,500.0015,000.0012,000.0015,000.003,000.0019,500.0012,400.0018,000.001800015,000.0015,000.0017Pipa besi GI diameter 0,75" Medium Bm`8,000.007,500.007,500.007,000.008,100.007,000.008,100.001,100.0010,530.0014,400.0023,300.002330014,400.0014,400.0018Pipa besi GI diameter 1" Medium Bm`8,500.008,000.008,000.007,500.0010,350.007,500.0010,350.002,850.0013,455.0016,200.0033,600.003360016,200.0016,200.0019Pipa besi GI diameter 1,5" Medium Bm`152,000.00151,500.00133,000.00133,000.00152,000.0019,000.00197,600.0048,500.0048500182,400.00182,400.0020Pipa besi GI diameter 2" Medium Bm`87,000.0085,000.0063,000.0058,000.0058,000.0087,000.0029,000.00113,100.0063,500.0063500104,400.00104,400.0021Pipa besi GI diameter 2,5" Medium Bm`61,000.0059,000.0052,000.0048,000.0048,000.0061,000.0013,000.0079,300.0093,400.009340073,200.0073,200.0022Pipa besi GI diameter 3" Medium Bm`38,000.0037,500.0034,000.0029,500.0029,500.0038,000.008,500.0049,400.00110,800.0011080045,600.0045,600.0023Pipa besi GI diameter 4" Medium Bm`23,500.0022,500.0024,000.0019,000.0019,000.0024,000.005,000.0031,200.00161,900.0016190028,800.0028,800.0024Pipa besi GI diameter 6" Medium Bm`14,000.0014,000.0014,000.000.0018,200.00436,000.0043600016,800.0016,800.0025Pipa besi GI diameter 0,50" m`0.000.000.000.0044,500.0028,600.002860044,500.0044,500.0026Pipa besi GI diameter 0,75" m`112,000.00110,000.00110,000.00110,000.00112,000.002,000.00145,600.0036,100.0036100134,400.00134,400.0027Pipa besi GI diameter 1" m`91,750.0090,000.0090,000.0090,000.0091,750.001,750.00119,275.0044,900.0044900110,100.00110,100.0028Pipa besi GI diameter 1,5" m`76,250.0075,000.0075,000.0075,000.0076,250.001,250.0099,125.0068,600.006860091,500.0091,500.0029Pipa besi GI diameter 2" m`52,000.0050,000.0050,500.0050,000.0052,000.002,000.0067,600.0093,400.009340062,400.0062,400.0030Pipa besi GI diameter 2,5" m`217,000.00215,000.00215,000.00215,000.00217,000.002,000.00282,100.00118,300.00118300260,400.00260,400.0031Pipa besi GI diameter 3" m`135,500.00135,000.00135,000.00135,000.00135,500.00500.00176,150.00193,100.00193100162,600.00162,600.0032Pipa besi GI diameter 4" m`276,750.00275,000.00275,000.00275,000.00276,750.001,750.00359,775.00223,000.00223000332,100.00332,100.0033Pipa besi GI diameter 6" m`351,000.00350,000.00350,000.00350,000.00351,000.001,000.00456,300.00361,200.00361200421,200.00421,200.0034Pipa beton 30 - 100 cmbh41,000.0040,500.00425,000.0040,500.00425,000.00384,500.00552,500.0053,800.005380048,900.0048,900.0035Pipa vent ( udara ) GI dia 1"bh94,875.0036Water mur / shock dratbh20,000.0037Besi plat 4 x 8 tebal 2 mmKg675,000.00675,000.009,500.009,500.00675,000.00665,500.00877,500.002,000.00
amanda ayu putri handayani: amanda ayu putri handayani:per Kg, Rp. 17502000810,000.00810,000.0038Besi plat bordes 4" x 8" tebal 3 mmkg9,500.009,500.009,500.000.0012,350.002,000.00200039Besi profil WF < = 200 mmkg10,600.0011,000.0013,500.0010,600.0013,500.002,900.0017,550.0019,000.001900017,250.0017,250.0040Besi profil WF < = 200 mm s/d 400 mmkg11,000.0010,600.0011,000.0013,500.0010,600.0013,500.002,900.0017,550.0019,000.001900017,250.0017,250.0041Besi profil WF < = 200 s/d 500 mmkg11,000.0010,600.0013,500.0010,600.0013,500.002,900.0017,550.0019,000.001900017,250.0017,250.0042Besi siku L 50.50.5kg176,000.00175,000.00175,000.0014,000.0014,000.00176,000.00162,000.00228,800.0022,200.001850016,800.0016,800.0043Besi siku L 70.70.7kg30,000.0027,500.0027,500.0014,000.0014,000.0030,000.0016,000.0039,000.0022,200.001850016,800.0016,800.0044Besi siku L 60.60.6kg176,000.00175,000.00175,000.0014,000.0014,000.00176,000.00162,000.00228,800.0022,200.001850016,800.0016,800.0045Besi siku L 30.30.3kg30,000.0027,500.0027,500.0014,000.0014,000.0030,000.0016,000.0039,000.0022,200.001850016,800.0016,800.0046Besi strip tebal 5 mmkg14,000.0014,000.0014,000.000.0018,200.0013,700.001370047Besi plat tebal 0,7 mmLbr14,000.0014,000.0014,000.000.0018,200.002,400,000.001370048Kawat ikat betonkg15,000.009,500.0012,500.009,500.0015,000.005,500.0019,500.0019,000.001900017,250.0017,250.0049Kawat nyamuk kasa allumuniumm18,000.0017,500.0017,500.0017,500.0018,000.00500.0023,400.0021,000.002100021,000.0021,000.0050Kawat harmonikam15,000.0015,000.0025,000.0015,000.0025,000.0010,000.0032,500.0050,200.005020045,600.0045,600.0051Kawat las listrikkg22,500.0022,000.0022,000.0022,000.0022,500.00500.0029,250.00126,500.00126500115,000.00115,000.0052Kawat 4 mmkg12,500.0012,500.0012,500.000.0016,250.0017,800.001780016,100.0016,100.0053Jendela nako lengkap kaca raybendaun160,000.00160,000.00160,000.000.00208,000.0028,400.002840054Besi angkur 8 mmkg7,500.007,500.007,500.000.009,750.008,300.0083007,500.007,500.0055Pintu gulung besim45,000.00400,000.00340,000.0045,000.00400,000.00355,000.00520,000.00550,000.00550000510,000.00510,000.0056Pintu lipat / harmonikabh1,350,000.001,350,000.001,350,000.000.001,755,000.00967,400.0096740057Kasa ghas / harmonikam'20,400.0058Kasa nyamuk logamm'20,000.0059Skrup fixerbh500.00500.00500.000.00650.00900.0090060Rolling door allumuniumm475,000.00475,000.00475,000.000.00617,500.00639,600.00639600639,600.00639,600.0061Kawat durim'2,650.002,500.0015,500.002,500.0015,500.0013,000.0020,150.003,100.0031003,100.003,100.0062Kunci lemaribh7,500.007,500.008,000.007,500.008,000.00500.0010,400.009,900.0099009,000.009,000.0063Sok diameter 0,75 bh8,690.0064Mur baut + kuku macanbj16,500.0065Kawat 4 mm digalvanokg16,100.0066Glas bestkg19,100.0067Alat bantu ( set @ 3 alat )set66,300.0068Alas tomerm3670,000.0069Kawat seling 12 mm'18,000.0070Trecker 20 cmbh27,500.0071Klaim begel / setrip 12 mbh13,500.0072Pengadaan Mour baut 3/4 "bh4,700.0073Pipa Besi GI diameter 0,75" Medium Am121,400.0074Reduser GI 0,75"bh44,550.0075Tee GI diameter 0,50"bh4,800.0076Tee GI diameter 1"bh12,000.0077Tee GI diameter 2"bh30,000.0078Tee GI diameter 3"bh95,000.0079Tee GI diameter 4"bh177,500.0080Weel pipe diameter 3"bh518,375.0081Weel pipe diameter 4"bh657,800.0082Weel pipe diameter 6"bh1,115,900.0083Air Valve diameter 1/2"bh8,400.0084Tee GI diameter 0,75"bh5,500.0085Bend GI diameter 0,75"bh10,000.0086Bend GI diameter 1"bh15,000.0087Bend GI diameter 1,5"bh30,000.0088Bend GI diameter 2"bh63,000.0089Bend GI diameter 2,5"bh107,500.0090Bend GI diameter 3"bh157,500.0091Tangga monyet dari plat baja lengkapunit564,190.0092man hole 60 x 60 dari baja lengkapunit469,150.0093man hole 40 x 40 dari baja lengkapunit341,800.0094man hole 20 x 20 dari baja lengkapunit170,800.0095Clampe sadle GI diameter 1"bh67,980.0096Clampe sadle GI diameter 2"bh103,620.0097Dop GI diameter 1/2"bh3,000.0098Dop GI diameter 1"bh5,000.0099Dop GI diameter 2"bh14,000.00100Dop GI diameter 3"bh48,000.00101Dop GI diameter 4"bh75,000.00102Dop GI diameter 6"bh186,875.00103Flang spigot socket diameter 2"bh82,500.00104Flang spigot socket diameter 3"bh164,450.00105Flang spigot socket diameter 4"bh197,340.00106Flang spigot socket diameter 6"bh394,680.00107Gate valve diameter 2"bh360,000.00108Gate valve diameter 2,5"bh1,409,760.00109Gate valve diameter 3"bh732,000.00110Gate valve diameter 4"bh1,413,600.00111Kran Air diameter 0,50" bh16,800.00112Kran Air diameter 0,50" handle silver starbh24,000.00113Kran Air diameter 0,75" bh21,600.00114Screen ( pipa GI diameter 3" ) panjang 1,5 m'bh469,150.00115Screen ( pipa GI diameter 2" ) panjang 1,5 m'bh285,000.00VBAHAN UNTUK LANTAI1Paving stone persegi abu - abu tebal 6 cm kasarm249,650.0049,650.0049,650.000.0064,545.0045,500.004550045,500.0059,600.002Paving stone persegi abu - abu tebal 8 cm kasarm262,700.0062,700.0062,700.000.0081,510.0057,900.005790057,900.0057,900.003Tegel PC abu - abu 20 x 20 cmbh1,040.001,000.002,200.001,000.002,200.001,200.002,860.001,500.0015001,500.001,500.004Tegel keramik 10 x 20 cmbh720.00720.00720.000.00936.001,100.0011001,050.001,050.005Tegel keramik 20 x 20 cmbh1,750.001,600.001,600.001,600.001,750.00150.002,275.002,600.0026002,600.002,600.006Tegel keramik 20 x 25 cmbh1,750.001,600.001,600.001,600.001,750.00150.002,275.002,700.0027002,600.002,600.007Tegel keramik 30 x 30 cmbh2,600.002,590.003,680.002,590.003,680.001,090.004,784.004,700.0047004,650.004,650.008Tegel keramik 40 x 40 cmbh0.000.000.000.006,400.0064009Plint keramik (5 x 20) cmbh5,000.005,000.005,000.005,000.000.006,500.006,100.0061006,000.006,000.0010Terawang (Roster)bh15,000.0015,000.0015,000.000.0019,500.007,300.0073006,600.006,600.0011Karpetm15,000.0012,500.0012,500.0015,000.002,500.0019,500.0019,800.001980018,000.0018,000.0012Perquet kayu kelas Im230,000.00230,000.00230,000.000.00299,000.00140,000.0014000013Batu Parasm125,000.0070,000.0070,000.00125,000.0055,000.00162,500.00165,000.00165000150,000.00150,000.0014Batu tempel hitamm125,500.00125,000.0094,000.0094,000.00125,500.0031,500.00163,150.00165,400.00165400150,300.00150,300.0015Lem Vinylkg35,000.0060,000.0035,000.0060,000.0025,000.0078,000.0044,000.004400042,000.0042,000.0016Wall paper lebar 50 cmm30,000.00150,000.0030,000.00150,000.00120,000.00195,000.0037,400.003740036,000.0036,000.0017Terawang (Roster)bh15,000.0015,000.0015,000.000.0019,500.006,600.0066006,000.006,000.0018Lantai Batu Alamm12,500.0012,500.0012,500.000.0016,250.00115,000.001150006,000.006,000.00VIBAHAN UNTUK PENGECATAN1Cat besi kg43,250.0042,500.0043,000.0038,000.0039,000.0038,000.0043,250.005,250.0056,225.0063,000.006300057,200.0057,200.002Cat kayu kg43,250.0042,500.0043,000.0038,000.0038,000.0038,000.0043,250.005,250.0056,225.0070,600.007060064,100.0064,100.003Cat meni (besi / kayu) kg18,000.0017,500.0018,000.0018,000.007,000.007,000.0018,000.0011,000.0023,400.0026,800.002680024,350.0024,350.004Cat residultr20,000.0020,000.006,000.006,000.0020,000.0014,000.0026,000.0026,400.002640024,000.0024,000.005Cat tembok kg14,600.0014,000.0012,000.0030,000.0012,000.0030,000.0018,000.0039,000.0026,300.002630023,900.0023,900.006Cerlakkg112,000.00110,000.00110,000.00150,000.00110,000.00150,000.0040,000.00195,000.00145,900.00145900132,550.00132,550.007Politurltr21,000.0021,000.0021,000.000.0027,300.0044,000.00440008Politur jadiltr52,500.0052,500.0036,000.0036,000.0052,500.0016,500.0068,250.0062,100.006210056,400.0056,400.009Vernisltr18,250.0017,500.0017,500.0025,000.0017,500.0025,000.007,500.0032,500.0023,100.002310021,000.0021,000.0010Cat genteng setara merk mowilekkg60,000.0011Cat water shill setara mowilek ( untuk bagian luar )kg80,000.0012Cat brown / silverkg40,000.0013Dempulkg26,500.0025,000.0030,000.009,000.009,000.0030,000.0021,000.0039,000.0023,500.002350021,275.0021,275.0014Minyak cat / afdunerltr17,500.0017,500.0017,500.005,000.005,000.0017,500.0012,500.0022,750.0021,000.002100021,000.0021,000.0015Teerkg66,000.0065,000.0065,000.0065,000.0066,000.001,000.0085,800.0085,800.008580078,000.0078,000.0016Kertas gosok / ampelaslbr2,600.002,500.002,500.002,000.002,000.002,600.00600.003,380.004,000.0040004,000.004,000.0017Plamur tembokkg28,500.0028,000.0028,000.0028,500.00500.0037,050.0028,500.002850028,500.0028,500.0018Plamur kayukg18,000.0017,500.0015,000.0017,000.0015,000.0018,000.003,000.0023,400.0023,100.002310022,750.0022,750.0019Spiritusltr13,250.0013,500.0012,000.0013,500.0012,000.0013,500.001,500.0017,550.0018,100.001810018,050.0018,050.0020Lem kayukg28,250.0027,500.0027,600.009,000.009,000.0028,250.0019,250.0036,725.0036,500.003650033,100.0033,100.0021Thinner A / minyak catltr5,250.005,000.005,000.0018,000.005,000.0018,000.0013,000.0023,400.0019,800.001980018,000.0018,000.0022Thinner B / minyak catltr5,250.005,000.005,000.0018,000.005,000.0018,000.0013,000.0023,400.0019,300.001930018,000.0018,000.0023Soda apikg12,500.0012,500.0012,500.000.0016,250.0016,500.001650015,000.0015,000.0024Sabunkg10,000.0010,000.0010,000.000.0013,000.009,800.00980025Teak oilltr17,500.0017,500.0017,500.000.0022,750.004,500.00450026Kuasbh11,000.0011,000.0012,500.0011,000.0012,500.001,500.0016,250.0014,600.001460013,200.0013,200.0027Alang - alangikat1,600.001,500.001,500.001,600.00100.002,080.001,900.0019001,900.001,900.0028Plastikm25,000.00VIIBAHAN PENGGANTUNG DAN PENGUNCI1Engsel Hstl3,600.003,500.003,500.003,500.003,600.00100.004,680.004,700.0047004,200.004,200.002Engsel kuning Kualitas Iistl7,500.007,500.007,500.007,500.007,500.000.009,750.009,000.0090009,000.009,000.003Engsel jendelabh6,500.006,000.006,000.006,000.006,500.00500.008,450.008,000.0080007,200.007,200.004Engsel anginbh1,750.001,500.001,500.001,500.001,750.00250.002,275.002,400.0024002,100.002,100.005Engsel pintubh18,000.007,500.0010,000.007,500.0018,000.0010,500.0023,400.0022,000.002200021,600.0021,600.006Espanyoletstl2,500.002,500.002,500.000.003,250.003,300.0033003,000.003,000.007Grendelbj3,750.002,500.002,500.002,500.003,750.001,250.004,875.0010,700.00107009,700.009,700.008Grendel biasa (besar)bh2,000.003,500.003,500.002,000.003,500.001,500.004,550.004,700.0047004,200.004,200.009Grendel biasa (kecil)bh25,500.001,500.001,500.001,500.0025,500.0024,000.0033,150.002,800.0028002,500.002,500.0010Grendel tanambh25,000.0030,000.0025,000.0030,000.005,000.0039,000.0044,500.004900044,500.0044,500.0011Kunci tanam (808)bj46,000.00105,000.00110,000.0046,000.00110,000.0064,000.00143,000.0014,900.001490013,500.0013,500.0012Kunci tanam besar kuda terbang 2 x putarbj31,500.0045,000.0050,000.0031,500.0050,000.0018,500.0065,000.0088,500.008850080,400.0080,400.0013Kunci tanam kamar mandibh30,000.0030,000.0030,000.0030,000.000.0039,000.0039,600.003960036,000.0036,000.0014Kunci silinderbh95,000.0095,000.0095,000.0095,000.000.00123,500.00115,500.00115500114,000.00114,000.0015Door closerbh7,500.007,500.007,500.000.009,750.009,900.0099009,000.009,000.0016Kunci selotbh83,750.0085,000.0085,000.0083,750.0085,000.001,250.00110,500.00112,200.00112200102,000.00102,000.0017Hak anginbj3,750.003,500.004,500.003,500.004,500.001,000.005,850.0010,800.00108009,750.009,750.0018Hak angin 4 mm (lurus)bj4,500.004,500.005,000.004,500.005,000.00500.006,500.008,800.0088008,000.008,000.0019Kait anginbh1,750.001,500.001,500.001,750.00250.002,275.002,400.0024002,100.002,100.0020Kunci tanam biasabh35,000.0035,000.0035,000.0035,000.000.0045,500.0042,000.004200042,000.0042,000.00VIIIBAHAN UNTUK KM / WC / URINOIR1Pipa / siang spiral saluran kranset40,000.0040,000.0040,000.000.0052,000.0052,800.005280048,000.0048,000.002Closet duduk putih porselin komplitbh1,300,000.001,300,000.001,300,000.001,300,000.000.001,690,000.001,560,000.0015600001,560,000.001,560,000.003Closet jongkok porselin warna putihbh100,000.00145,000.00100,000.00145,000.0045,000.00188,500.00265,700.00265700241,500.00241,500.004Closet jongkok terasobh65,750.0065,000.0065,000.0065,000.0065,750.00750.0085,475.00126,500.00126500115,000.00115,000.005Bak terasobh0.000.000.000.00255,900.00255900232,600.00232,600.006Bak cuci stanless steelbh180,000.00180,000.00180,000.000.00234,000.00286,000.00286000260,000.00260,000.007Bak cuci terasobh0.000.000.000.00393,700.00393700357,850.00357,850.008Steal tapebh1,000.001,000.001,500.001,000.001,500.00500.001,950.002,000.0020001,800.001,800.009Wastafelbh275,000.00340,000.00275,000.00340,000.0065,000.00442,000.00495,000.00495000487,500.00487,500.0010Kran airbh32,750.0035,000.0019,000.0097,400.0019,000.0097,400.0078,400.00126,620.0035,800.003580032,500.0032,500.0011Water drain + assesoriesset75,000.0075,000.0075,000.000.0097,500.0019,700.001970012Urionirbh700,000.00700,000.00700,000.000.00910,000.001,072,500.001072500975,000.00975,000.0013Floor drainbh25,000.0045,000.0025,000.0045,000.0020,000.0058,500.0057,200.005720052,000.0052,000.0014Bak fiberglassbh 1,100,000.001,100,000.001,100,000.000.001,430,000.00390,000.00390000390,000.00390,000.0015Airltr90.0090.0090.000.00117.00100.0010090.0090.0016Water Meterbh18,000.0017Box Meterbh85,000.0018Pompa Air 3" / 7,5 PKunit6,600,000.0019Pompa Air 5,5 PKunit4,450,000.0020Pompa Listrikbh2,400,000.0021Pompa Air Portable / dudu 5,5 PKbh6,000,000.0022Pompa Summersibleunit12,697,500.00IXBAHAN JENIS KACAm1Kaca polos tb. 3 mmm47,000.0047,000.0047,000.000.0061,100.0071,500.007150071,500.0071,500.002Kaca polos tb. 5 mmm49,500.0050,000.0060,000.0049,500.0060,000.0010,500.0078,000.0089,400.008940089,400.0089,400.003Kaca polos tb. 8 mmm155,000.00155,000.00155,000.000.00201,500.00186,000.00186000186,000.00186,000.004Kaca rayban tb. 5 mmm59,000.0060,000.0070,000.0059,000.0070,000.0011,000.0091,000.00108,000.00108000108,000.00108,000.005Sealanttube20,000.0020,000.0020,000.000.0026,000.0036,300.0036300XBAHAN BETON CETAKAN1Buis beton diameter 40 cmbh65,000.0065,000.0065,000.000.0084,500.0071,500.007150066,500.0066,500.002Buis beton diameter 50 cmbh122,000.00122,000.00122,000.000.00158,600.00156,000.00156000156,000.00156,000.003Buis beton U 20 cmbh23,000.0023,000.0023,000.000.0029,900.0055,000.005500055,000.0055,000.004Buis beton U 30 cmbh30,000.0030,000.0030,000.000.0039,000.0057,500.005750057,500.0057,500.00XIBAHAN PLASTIK PIPA PVC1Keni PVC 1/2"bh1,250.001,000.001,000.001,200.001,000.001,250.00250.001,625.001,700.0017001,625.001,625.002Keni PVC 3/4"bh1,250.001,250.001,250.001,500.001,250.001,500.00250.001,950.002,000.0020002,000.002,000.003Keni PVC 2"bh2,750.002,500.002,500.0011,000.002,500.0011,000.008,500.0014,300.006,000.0060006,000.006,000.004Keni PVC 3"bh5,000.005,000.005,000.0028,000.005,000.0028,000.0023,000.0036,400.0012,900.001290012,900.0012,900.005Keni PVC 4"bh7,250.007,500.007,500.0024,500.007,250.0024,500.0017,250.0031,850.0014,100.001410014,025.0014,025.006Keni PVC 5"bh26,500.0025,000.0025,000.0025,000.0026,500.001,500.0034,450.0030,600.003060030,600.0030,600.007Klem PVCbh2,250.002,000.002,000.0030,000.002,000.0030,000.0028,000.0039,000.004,900.0049004,400.004,400.008Lem PVCbh2,250.002,000.002,000.0030,000.002,000.0030,000.0028,000.0039,000.0035,800.00358004,400.004,400.009Pipa paralon 5/8" panjang 4.00 mt ljr5,750.005,000.005,000.005,000.005,750.00750.007,475.006,500.0065006,500.006,500.0010Pipa PVC 1/2" panjang 4.00 mt ljr18,000.0017,500.0017,500.0018,500.0017,500.0018,500.001,000.0024,050.0020,300.002030018,400.0018,400.0011Pipa PVC 2" panjang 4.00 mt ljr37,000.0035,000.0035,000.0073,000.0035,000.0073,000.0038,000.0094,900.0098,400.009840098,400.0098,400.0012Pipa PVC 3" panjang 4.00 mt ljr74,500.0075,000.0075,000.00135,000.0074,500.00135,000.0060,500.00175,500.00175,200.00175200175,200.00175,200.0013Pipa PVC 3/4" panjang 4.00 mt ljr23,000.0022,500.0022,500.0022,000.0022,000.0023,000.001,000.0029,900.0037,200.003720037,200.0037,200.0014Pipa PVC 4" panjang 4.00 mt ljr105,500.00105,000.00105,000.00195,000.00105,000.00195,000.0090,000.00253,500.00220,400.00220400220,400.00220,400.0015Pipa PVC 5" panjang 4.00 mtljr176,000.00175,000.00175,000.00265,000.00175,000.00265,000.0090,000.00344,500.00247,500.00247500237,300.00237,300.0016Pipa PVC 3/4" type AW panjang 6.00 mtljr37,000.0035,000.0035,000.0035,000.0037,000.002,000.0048,100.0055,800.005580055,800.0055,800.0017Pipa PVC 1/2" type AW panjang 6.00 mtljr28,000.0027,500.0028,000.0027,500.0028,000.00500.0036,400.0036,800.003680033,400.0033,400.0018Pipa PVC 1" type AW panjang 6.00 mtljr42,000.0042,500.0042,000.0042,000.0042,500.00500.0055,250.0061,400.006140055,800.0055,800.0019Pipa PVC 1 1/2" type AW panjang 6.00 mtljr73,500.0072,500.0072,000.0072,000.0073,500.001,500.0095,550.00107,600.0010760097,800.0097,800.0020Pipa PVC 2" type AW panjang 6.00 mtljr106,000.00105,000.00100,000.00100,000.00106,000.006,000.00137,800.00162,400.00162400147,600.00147,600.0021Pipa PVC 2 1/2" type AW panjang 6.00 mtljr147,500.00145,000.00145,000.00145,000.00147,500.002,500.00191,750.00206,000.00206000187,200.00187,200.0022Pipa PVC 3" type AW panjang 6.00 mtljr198,000.00197,500.00197,500.00197,500.00198,000.00500.00257,400.00289,100.00289100262,800.00262,800.0023Pipa PVC 4" type AW panjang 6.00 mtljr295,500.00295,000.00295,000.00295,000.00295,500.00500.00384,150.00363,700.00363700330,600.00330,600.0024Pipa PVC 5" type AW panjang 6.00 mtljr487,000.00485,000.00485,000.00485,000.00487,000.002,000.00633,100.00641,100.00641100582,800.00582,800.0025Pipa PVC diameter 1" SCJm`105,500.00105,000.00105,000.00195,000.00105,000.00195,000.0090,000.00253,500.0029,400.0029400220,400.00220,400.0026Pipa PVC diameter 1,5" SCJm`176,000.00175,000.00175,000.00265,000.00175,000.00265,000.0090,000.00344,500.0030,300.0030300237,300.00237,300.0027Pipa PVC diameter 2" RRJm`37,000.0035,000.0035,000.0035,000.0037,000.002,000.0048,100.0045,500.004550055,800.0055,800.0028Pipa PVC diameter 2,5" RRJm`28,000.0027,500.0028,000.0027,500.0028,000.00500.0036,400.0069,600.006960033,400.0033,400.0029Pipa PVC diameter 3" RRJm`42,000.0042,500.0042,000.0042,000.0042,500.00500.0055,250.0094,800.009480055,800.0055,800.0030Pipa PVC diameter 4" RRJm`73,500.0072,500.0072,000.0072,000.0073,500.001,500.0095,550.00137,800.0013780097,800.0097,800.0031Pipa PVC diameter 6" RRJm`106,000.00105,000.00100,000.00100,000.00106,000.006,000.00137,800.00292,200.00292200147,600.00147,600.0032Talang Kotak PVCm`106,000.00105,000.00100,000.00100,000.00106,000.006,000.00137,800.0072,700.0072700147,600.00147,600.0033Hak penggantung talang bh106,000.00105,000.00100,000.00100,000.00106,000.006,000.00137,800.0011,500.0011500147,600.00147,600.0034Tutup samping talangbh106,000.00105,000.00100,000.00100,000.00106,000.006,000.00137,800.008,800.008800147,600.00147,600.0035Sambungan pipa tanpa lobangbh106,000.00105,000.00100,000.00100,000.00106,000.006,000.00137,800.008,800.008800147,600.00147,600.0036Sambungan pipa dengan lobangbh106,000.00105,000.00100,000.00100,000.00106,000.006,000.00137,800.0026,700.0026700147,600.00147,600.0037Pipa PVC diameter 0,5" SCJm15,500.0038Pipa PVC diameter 0,75" SCJm17,800.0039Pipa PVC Maspion D diameter 0,5" m14,600.0040Pipa PVC Maspion D diameter 0,75" m15,280.0041Pipa PVC Maspion D diameter 1" m16,930.0042Pipa PVC Maspion D diameter 1,5" m17,800.0043Pipa PVC Maspion D diameter 2" m19,500.0044Pipa PVC Maspion D diameter 2,5" m116,200.0045Pipa PVC Maspion D diameter 3" m120,625.0046Pipa PVC Maspion D diameter 4" m129,125.0047Pipa PVC Maspion D diameter 6" m150,000.0048Reduser PVC 2,5" x 2"bh123,348.5049Reduser PVC 25" x 18,75"bh80,500.0050Reduser PVC 50" x 25"bh95,250.0051Reduser PVC 75" x 50"bh111,182.5052Reduser PVC 100" x 75"bh190,547.5053Sok diameter 1/2" bh1,500.0054Sok diameter 3/4" bh1,500.0055Sok diameter 1" bh2,000.0056Sok diameter 2" bh4,200.0057Sok diameter 3" bh65,000.0058Sok diameter 4" bh7,800.0059Sok diameter 6" bh21,000.0060Stop kran air diameter 0,75" bh45,000.0061Stop kran air diameter 1" bh90,000.00
amanda ayu putri handayani: amanda ayu putri handayani:per Kg, Rp. 175062Stop kran air diameter 1,5" bh138,000.0063Stop kran air diameter 2" bh180,000.0064Bend PVC diameter 3/4"bh2,500.0065Bend PVC diameter 1"bh5,000.0066Bend PVC diameter 2"bh6,000.0067Bend PVC diameter 2,5"bh8,000.0068Bend PVC diameter 3"bh12,900.0069Bend PVC diameter 4"bh14,000.0070Bend PVC diameter 6"bh35,000.0071Dop PVC diameter 1/2"bh1,500.0072Dop PVC diameter 1"bh2,400.0073Dop PVC diameter 2"bh4,800.0074Dop PVC diameter 3"bh6,600.0075Dop PVC diameter 4"bh15,000.0076Dop PVC diameter 6"bh2,400.0077Elbow PVC diameter 1"bh4,200.0078Elbow PVC diameter 2"bh7,800.0079Elbow PVC diameter 3"bh7,200.0080Flang PVC socket diameter 2"bh75,000.0081Flang PVC socket diameter 3"bh189,117.5082Flang PVC socket diameter 4"bh254,897.5083Flang PVC socket diameter 6"bh328,900.00
amanda ayu putri handayani: amanda ayu putri handayani:per Kg, Rp. 175084Tee PVC diameter 0,50"bh1,500.0085Tee PVC diameter 0,75"bh2,000.0086Tee PVC diameter 1"bh3,000.0087Tee PVC diameter 1,5"bh7,200.0088Tee Jint PVC diameter 2" x 1"bh5,400.0089Tee PVC diameter 2,5"bh18,000.0090Tee Jint PVC diameter 2,5" x 1"bh180,895.0091Tee PVC diameter 3"bh27,000.0092Tee Jint PVC diameter 3" x 1"bh205,503.1093Tee PVC diameter 4"bh33,000.0094Tee Jint PVC diameter 4" x 1"bh121,660.0095Tee PVC diameter 6"bh624,910.0096Tee Jint PVC diameter 6" x 4"bh559,130.00XIIBAHAN JENIS PAKU1Paku asbeskg19,000.0018,500.00400.00400.0019,000.0018,600.0024,700.0022,800.002280022,800.0022,800.002Paku rengkg11,500.0012,000.0011,000.0011,000.0012,000.001,000.0015,600.0013,800.001380013,800.0013,800.003Paku triplekkg16,000.0014,000.0015,000.0014,000.0016,000.002,000.0020,800.0021,000.002100020,950.0020,950.004Paku usukkg11,500.0012,000.0011,000.0010,000.0010,000.0012,000.002,000.0015,600.0013,400.001340013,350.0013,350.005Paku pancingkg24,500.0025,000.0024,500.0025,000.00500.0032,500.0029,700.002970029,700.0029,700.006Paku sekrup 3.5"kg26,000.0026,000.0026,000.000.0033,800.0076,000.00760007Paku sekrup 2"kg26,000.0026,000.0026,000.000.0033,800.0076,000.0076000XIIIBAHAN PERALATAN LISTRIK1Stop kontak Kwalitas Ibh13,000.0012,500.0015,500.0012,500.0015,500.003,000.0020,150.0027,500.002750026,550.0026,550.002Skakelar Kwalitas Ibh13,000.0013,500.0017,500.0013,000.0017,500.004,500.0022,750.0027,500.002750026,700.0026,700.003Sekering lengkapbh52,500.0051,700.0051,700.0052,500.00800.0068,250.0053,500.005350053,500.0053,500.004Lampu pijar 25, 40, 75 / 220 Vbh7,500.007,000.007,000.007,500.00500.009,750.0014,600.001460013,200.0013,200.005Lampu TL 20 W / 220 V Komplit balas, kaca bh55,000.0053,000.0053,000.0055,000.002,000.0071,500.00107,300.0010730097,500.0097,500.006Lampu TL 40 W / 220 V Komplit balas, kacabh69,500.0068,000.0068,000.0069,500.001,500.0090,350.00137,700.00137700125,100.00125,100.007Kabel NYA 1 x 2,5 mmm'1,700.00170026,550.0026,550.008Isolatorbh4,000.00400013,200.0013,200.009Las Dopbh300.0030097,500.0097,500.0010Fiting Plafondbh4,000.004000125,100.00125,100.0011T.Dos PVCbh1,400.00140026,550.0026,550.0012Panel Boxset28,600.002860026,700.0026,700.0013MCB 10 Ampbh53,500.005350053,500.0053,500.0014Miniswitch 32 Ampset250,600.0025060013,200.0013,200.0015Armatur lampu pijar 25Watt Kwalitas IBh14,600.0014600125,100.00125,100.0016AC. Window 2 PKBh13,435,500.0013435500125,100.00125,100.0017AC. Window 1,5 PKBh7,166,100.007166100125,100.00125,100.0018AC. Window 1 PKBh6,269,000.006269000125,100.00125,100.0019Exhaust Fan Ex JepangBh984,100.00984100125,100.00125,100.0020Kipas angin Gantung Ex JepangBh825,000.00825000125,100.00125,100.00XIVBAHAN BBM1Bensinliter4,500.004,500.004,500.004,500.000.005,850.004,500.0045004,500.004,500.002Solarliter4,500.004,500.004,500.004,500.000.005,850.004,500.0045004,500.004,500.003Minyak tanahliter8,000.008,000.008,000.008,000.000.0010,400.0013,200.00132008,000.008,000.004Aspal AC (AC 60 - 70) curahdrum850,000.00800,000.00800,000.00850,000.0050,000.001,105,000.001,375,000.001375000990,000.00990,000.00Jember, Januari 2012KEPALA DINAS PU. CIPTA KARYA DAN TATA RUANGKABUPATEN JEMBER

Ir. MERWIN LUSIANI,MMPembina Tk. I NIP. 19650415 199003 2 008

&"Brush Script MT,Regular"&11Daftar Harga Satuan Bahan Dinas PU. Cipta Karya dan Tata Ruang Kabupaten JemberTahun Anggaran 2012

A. PEKERJAAN PERSIAPANDAFTAR ANALISA SNI DINAS PU. CIPTA KARYA DAN TATA RUANGUNTUK PEKERJAAN BANGUNAN GEDUNG, PERUMAHANWILAYAH JEMBER TIMUR , JEMBER TENGAH DAN JEMBER KOTAKABUPATEN JEMBER TAHUN ANGGARAN 2012

Analisa SNI DPU Cipta Karya dan Tata Ruang Wilayah Jember NO.JENIS PEKERJAANBAHANUPAHJUMLAHBULAT123456A.PEKERJAAN PERSIAPAN
amanda ayu putri handayani: amanda ayu putri handayani:SUDAH FIX PER 4 MARET20111Analisa SNI Dinas PU. Cipta Karya dan Tata Ruang1 m' pagar sementara dari kayu tinggi 2 meter.Bahan1.250BtgDolken kayu 8-10/400 cmRp24,200.0030,250.002.500KgSemen PortlandRp1,400.003,500.000.005m3Pasir betonRp121,000.00605.000.009m3Koral betonRp165,000.001,485.000.007850.072m3Kayu 5/7Rp2,838,000.00204,336.001btg dolken =0.0314m30.060KgPaku biasa 2" - 5"Rp13,800.00828.001 m3 dolken =31.847133758btg0.400LtrResiduRp26,400.0010,560.001 batang =24178Upah0.400OhPekerjaRp40,500.0016,200.000.200OhTukang kayuRp47,600.009,520.000.020OhKepala tukangRp51,200.001,024.000.020OhMandorRp56,300.001,126.00251,564.0027,870.00279,434.00279,400.007,543,800.002Analisa SNI Dinas PU. Cipta Karya dan Tata Ruang1 m' pagar sementara dari seng gelombang tinggi 2 meterBahan1.250BtgDolken kayu 8-10/400 cmRp24,200.0030,250.002.500KgSemen PortlandRp1,400.003,500.001.200LbrSeng gelombang 3" - 6" BJLS 28Rp84,000.00100,800.000.005m3Pasir betonRp121,000.00605.000.009m3Koral betonRp165,000.001,485.000.072m3Kayu 5/7Rp2,838,000.00204,336.000.060KgPaku biasa 2" - 5"Rp13,800.00828.000.450KgMeni besiRp26,800.0012,060.00Upah0.400OhPekerjaRp40,500.0016,200.000.200OhTukang kayuRp47,600.009,520.000.020OhKepala tukangRp51,200.001,024.000.020OhMandorRp56,300.001,126.00353,864.0027,870.00381,734.00381,700.0010,305,900.003Analisa SNI Dinas PU. Cipta Karya dan Tata Ruang1 m' pagar sementara dari kawat duri tinggi 1,8 meterBahan1.000BtgDolken kayu 8-10/400 cmRp24,200.0024,200.002.000KgSemen PortlandRp1,400.002,800.0025.000Kg
amanda ayu putri handayani: amanda ayu putri handayani:Harga satuan m'

Kawat DuriRp3,100.0077,500.000.005m3Pasir betonRp121,000.00605.000.009m3Koral betonRp165,000.001,485.000.060KgPaku biasa 2" - 5"Rp13,800.00828.00Upah0.300OhPekerjaRp40,500.0012,150.000.200OhTukang kayuRp47,600.009,520.000.020OhKepala tukangRp51,200.001,024.000.020OhMandorRp56,300.001,126.00107,418.0023,820.00131,238.00131,200.003,542,400.003Analisa SNI Dinas PU. Cipta Karya dan Tata Ruang1 m' Pengukuran dan Pas. BouwplankBahan0.012BtgKayu 5/7 Rp2,838,000.0034,056.000.020KgPaku biasa 2" - 5"Rp13,800.00276.000.007m3Papan Kayu 3/20 kayu kl. IIRp5,280,000.0036,960.00Upah0.100OhPekerjaRp40,500.004,050.000.100OhTukang kayuRp47,600.004,760.000.010OhKepala tukangRp51,200.00512.000.005OhMandorRp56,300.00281.5071,292.009,603.5080,895.5080,800.002,181,600.004Analisa SNI Dinas PU. Cipta Karya dan Tata Ruang1 m2 pembuatan kantor sementara dengan lantai plesteranBahan1.250BtgDolken kayu 8-10/400 cmRp24,200.0030,250.000.180m3KayuRp5,280,000.00950,400.00m20.850KgPaku biasaRp13,800.0011,730.001.100KgBesi stripRp13,700.0015,070.0035.000KgSemen portlandRp1,400.0049,000.000.150m3Pasir pasangRp121,000.0018,150.000.100m3Pasir betonRp121,000.0012,100.000.150m3Koral betonRp165,000.0024,750.0030.000BhBata merahRp450.0013,500.000.250LbrSeng platRp46,000.0011,500.002.000BhJendela nakoRp28,400.0056,800.000.080m2Kaca polosRp71,500.005,720.000.150BhKunci TanamRp14,900.002,235.000.060LbrPlywood 4mmRp89,500.005,370.00Upah2.000OhPekerjaRp40,500.0081,000.002.000OhTukang kayuRp47,600.0095,200.001.000OhTukang batuRp45,900.0045,900.000.300OhKepala tukangRp51,200.0015,360.000.050OhMandorRp56,300.002,815.001,206,575.00240,275.001,446,850.001,446,800.0039,063,600.005Analisa SNI Dinas PU. Cipta Karya dan Tata Ruang1 m2 pembuatan gedung semen dan alat-alatBahan1.700BtgDolken kayu 8-10/400 cmRp24,200.0041,140.000.210m3KayuRp3,480,000.00730,800.000.300KgPaku BiasaRp13,400.004,020.0010.500KgSemen portlandRp1,400.0014,700.000.030m3Pasir betonRp121,000.003,630.000.050m3Koral betonRp165,000.008,250.001.500LbrSeng gelombang 3" - 6" BJLS 28Rp84,000.00126,000.00Upah1.000OhPekerjaRp40,500.0040,500.002.000OhTukang kayuRp47,600.0095,200.000.200OhKepala tukangRp51,200.0010,240.000.050OhMandorRp56,300.002,815.00928,540.00148,755.001,077,295.001,077,200.0029,084,400.006Analisa SNI Dinas PU. Cipta Karya dan Tata Ruang1 m2 pembuatan rumah jaga / konstruksi kayuBahan3.000BtgDolken kayu 8-10/400 cmRp24,200.0072,600.000.276m3KayuRp3,480,000.00960,480.000.700KgPaku BiasaRp13,400.009,380.001.500LbrSeng gelombang 3" - 6" BJLS 28Rp84,000.00126,000.00Upah1.000OhPekerjaRp40,500.0040,500.001.500OhTukang kayuRp47,600.0071,400.000.150OhKepala tukangRp51,200.007,680.000.050OhMandorRp56,300.002,815.001,168,460.00122,395.001,290,855.001,290,800.0034,851,600.007Analisa SNI Dinas PU. Cipta Karya dan Tata Ruang1 m2 membersihkan lapangan dan perataanUpah0.100OhPekerjaRp40,500.004,050.000.050OhMandorRp56,300.002,815.006,865.006,865.008Analisa SNI Dinas PU. Cipta Karya dan Tata Ruang1 m2 pembuatan bedeng buruhBahan1.250BtgDolken kayu 8-10/400 cmRp24,200.0030,250.000.186m3KayuRp3,480,000.00647,280.000.300KgPaku BiasaRp13,400.004,020.0018.000KgSemen portlandRp1,400.0025,200.000.030m3Pasir betonRp121,000.003,630.000.050m3Koral betonRp165,000.008,250.001.500LbrSeng gelombang 3" - 6" BJLS 28Rp84,000.00126,000.001.350LbrPlywood 4mmRp89,500.00120,825.00Upah1.000OhPekerjaRp40,500.0040,500.002.000OhTukang kayuRp47,600.0095,200.000.200OhKepala tukangRp51,200.0010,240.000.050OhMandorRp56,300.002,815.00965,455.00148,755.001,114,210.001,114,200.0030,083,400.009Analisa SNI Dinas PU. Cipta Karya dan Tata Ruang1 m2 pembuatan bak adukan ukuran (40 x 50 x 20) cmBahan0.036m3Kayu terentangRp2,750,000.0099,000.000.080KgPaku BiasaRp13,400.001,072.001.000BtgKaso 5/7Rp36,000.0036,000.00Upah0.300OhTukang kayuRp47,600.0014,280.000.0015OhMandorRp56,300.0084.45136,072.0014,364.45150,436.45150,400.004,060,800.0010Analisa SNI Dinas PU. Cipta Karya dan Tata Ruang1 m2 pembuatan stegger dari bambu, ukuran (40 x 50 x 20) cmBahan1.000m3Bambu 6 - 8 / 600cmRp12,500.0012,500.000.250KgTali ijukRp33,900.008,475.00Upah0.250OhPekerjaRp40,500.0010,125.000.017OhTukang kayuRp47,600.00809.200.002OhKepala tukangRp51,200.00102.400.013OhMandorRp56,300.00731.9020,975.0011,768.5032,743.5032,700.00882,900.0011Analisa SNI Dinas PU. Cipta Karya dan Tata Ruang1 m2 pembuatan jalan sementaraBahan0.150m3Batu belah 15/20Rp147,500.0022,125.000.090m3Batu pecah 5/7Rp159,000.0014,310.000.010m3Pasir pasangRp121,000.001,210.00Upah1.000OhPekerjaRp40,500.0040,500.000.050OhMandorRp56,300.002,815.0037,645.0043,315.0080,960.0080,900.002,184,300.0012Analisa SNI Dinas PU. Cipta Karya dan Tata Ruang1 m3 bongkaran beton bertulangUpah6.667OhPekerjaRp40,500.00270,013.500.333OhMandorRp56,300.0018,747.90288,761.40288,761.40288,700.0013Analisa SNI Dinas PU. Cipta Karya dan Tata Ruang1 m3 bongkaran dinding tembok bata merahUpah6.667OhPekerjaRp40,500.00270,013.500.033OhMandorRp56,300.001,857.90271,871.40271,871.40271,800.0015Analisa SNI Dinas PU. Cipta Karya dan Tata Ruang1 m' Pasang pagar kawat jaring galvanis, tinggi 1,00 mBahan0.434LbrPagar kawat jaringRp0.00.0Upah0.042OhPekerjaRp40,500.001,701.000.042OhTukang Rp45,900.001,927.800.004OhKepala tukangRp51,200.00204.800.002OhMandorRp56,300.00112.600.03,946.203,946.203,900.00105,300.0016Analisa SNI Dinas PU. Cipta Karya dan Tata Ruang1 m' Pasang pagar beton pracetak (5 x 50 x 213) cmBahan0.986LbrPanel beton pracetakRp0.00.00.525BtgKolom beton pracetakRp0.00.00.074m3Pasir betonRp121,000.008,954.000.146m3Koral 2/3Rp165,300.0024,133.8045.000KgSemen abu-abuRp1,400.0063,000.00Upah0.375OhPekerjaRp40,500.0015,187.500.125OhTukang batu Rp45,900.005,737.500.012OhKepala tukangRp51,200.00614.400.019OhMandorRp56,300.001,069.7096,087.8022,609.10118,696.90118,600.003,202,200.00

Jember, Januari 2012

KEPALA DINAS PU. CIPTA KARYA DAN TATA RUANGKABUPATEN JEMBER

Ir. MERWIN LUSIANI,MMPembina Tk. I NIP. 19650415 199003 2 008

1 M2 Pasang Water Proofing atap beton3.0000LtrWater proofRp.0.0Rp.0.0Rp.0.0Rp.0.00.5000OrgPekerjaRp.Ir. MERWIN LUSIANI,MMRp.ERROR:#VALUE!Rp.0.0Rp.0.00.2000OrgTukang CatRp.0.0Rp.0.0Rp.0.0Rp.0.00.0500OrgKepala TukangRp.NIP. 19650415 199003 2 008Rp.ERROR:#VALUE!Rp.0.0Rp.0.00.0750OrgMandorRp.0.0Rp.0.0Rp.0.0Rp.0.0JumlahRp.ERROR:#VALUE!Rp.0.0DibulatkanRp.ERROR:#VALUE!Rp.0.0

&"Brush Script MT,Regular"&11Analisa Harga Satuan Pekerjaan : Pekerjaan PersiapanDinas PU. Cipta Karya dan Tata Ruang Kabupaten JemberTahun Anggaran 2012

B. PEKERJAAN TANAHDAFTAR ANALISA SNI DPU CIPTA KARYA DAN TATA RUANGUNTUK PEKERJAAN BANGUNAN GEDUNG, PERUMAHANWILAYAH JEMBER TIMUR , JEMBER TENGAH DAN JEMBER KOTAKABUPATEN JEMBER TAHUN ANGGARAN 2012

Analisa SNI DPU Cipta Karya dan Tata Ruang Wilayah Jember NO.JENIS PEKERJAANBAHANUPAHJUMLAHBULAT123456B.PEKERJAAN TANAH
amanda ayu putri handayani: amanda ayu putri handayani:SUDAH FIX PER 4 MARET20111Analisa SNI Dinas PU. Cipta Karya dan Tata RuangMenggali 1 m3 tanah biasa sedalam 1 mUpah0.750OhPekerjaRp40,500.0030,375.000.025OhMandorRp56,300.001,407.5031,782.5031,782.5031,700.002Analisa SNI Dinas PU. Cipta Karya dan Tata RuangMenggali 1 m3 tanah biasa sedalam 2 mUpah0.900OhPekerjaRp40,500.0036,450.000.045OhMandorRp56,300.002,533.5038,983.5038,983.5038,900.003Analisa SNI Dinas PU. Cipta Karya dan Tata RuangMenggali 1 m3 tanah biasa sedalam 3 mUpah1.050OhPekerjaRp40,500.0042,525.000.067OhMandorRp56,300.003,772.1046,297.1046,297.1046,200.004Analisa SNI Dinas PU. Cipta Karya dan Tata RuangMenggali 1 m3 tanah Keras sedalam 1 mUpah1.000OhPekerjaRp40,500.0040,500.000.032OhMandorRp56,300.001,801.6042,301.6042,301.6042,300.005Analisa SNI Dinas PU. Cipta Karya dan Tata RuangMenggali 1 m3 tanah cadas sedalam 1 mUpah1.500OhPekerjaRp40,500.0060,750.000.060OhMandorRp56,300.003,378.0064,128.0064,128.0064,100.006Analisa SNI Dinas PU. Cipta Karya dan Tata RuangMenggali 1 m3 tanah lumpur sedalam 1 mUpah1.200OhPekerjaRp40,500.0048,600.000.045OhMandorRp56,300.002,533.5051,133.5051,133.5051,100.007Analisa SNI Dinas PU. Cipta Karya dan Tata RuangMengerjakan 1 m2 stripping tebing setinggi 1 mUpah0.050OhPekerjaRp40,500.002,025.000.005OhMandorRp56,300.00281.502,306.502,306.502,300.008Analisa SNI Dinas PU. Cipta Karya dan Tata RuangMembuang 1 m3 tanah sejauh 15 mUpah0.330OhPekerjaRp40,500.0013,365.000.010OhMandorRp56,300.00563.0013,928.0013,928.0013,900.009Analisa SNI Dinas PU. Cipta Karya dan Tata RuangMengurug kembali 1 m3 galianUpahUntuk Gedung 1/3 Pek. Galian An SNI 6.9Rp31,700.0010,566.6710,500.0010Analisa SNI Dinas PU. Cipta Karya dan Tata RuangMemadatkan 1 m3 tanah (per 20 cm) Upah0.500OhPekerjaRp40,500.0020,250.000.050OhMandorRp56,300.002,815.0023,065.0023,065.0023,000.0011Analisa SNI Dinas PU. Cipta Karya dan Tata RuangMengurug 1 m3 pasir urugBahan1.200m3Pasir urugRp60,000.0072,000.00Upah0.300OhPekerjaRp40,500.0012,150.000.010OhMandorRp56,300.00563.0072,000.0012,713.0084,713.0084,700.0012Analisa SNI Dinas PU. Cipta Karya dan Tata RuangMemasang 1 m3 lapisan pudel campuran 1KP : 3PP : 7TL untuk stabilisasi tanahBahan0.135m3KapurRp401,000.0054,135.000.400m3Pasir pasangRp121,000.0048,400.000.948m3Tanah LiatRp52,500.0049,770.00Upah0.800OhPekerjaRp40,500.0032,400.000.400OhTukang batuRp45,900.0018,360.000.040OhKepala tukangRp51,200.002,048.000.080OhMandorRp56,300.004,504.00152,305.0057,312.00209,617.00209,600.0013Analisa SNI Dinas PU. Cipta Karya dan Tata RuangMemasang 1 m3 lapisan pudel campuran 1KP : 5TL untuk stabilisasi tanahBahan0.248m3KapurRp401,000.0099,448.001.240m3Tanah LiatRp52,500.0065,100.00Upah0.800OhPekerjaRp40,500.0032,400.000.400OhTukang batuRp45,900.0018,360.000.040OhKepala tukangRp51,200.002,048.000.080OhMandorRp56,300.004,504.00164,548.0057,312.00221,860.00221,800.0014Analisa SNI Dinas PU. Cipta Karya dan Tata RuangMemasang 1 m2 lapisan ijuk tebal 10 cm, untuk bidang resapanBahan6.000KgIjukRp20,000.00120,000.00Upah0.150OhPekerjaRp40,500.006,075.000.015OhMandorRp56,300.00844.50120,000.006,919.50126,919.50126,900.0015Analisa SNI Dinas PU. Cipta Karya dan Tata RuangMengurug 1 m3 sirtu padat untuk peninggian lantai bangunanBahan1.200m3SirtuRp52,500.0063,000.00Upah0.250OhPekerjaRp40,500.0010,125.000.025OhMandorRp56,300.001,407.5063,000.0011,532.5074,532.5074,500.0016Analisa SNI Dinas PU. Cipta Karya dan Tata RuangMengurug 1 m3 tanah dengan pemadatanBahan1.200m3Tanah UrugRp57,800.0069,360.00Upah0.250OhPekerjaRp40,500.0010,125.000.010OhMandorRp56,300.00563.0069,360.0010,688.0080,048.0080,000.00

Jember, Januari 2012

KEPALA DINAS PU. CIPTA KARYA DAN TATA RUANGKABUPATEN JEMBER

Ir. MERWIN LUSIANI,MMPembina Tk. I NIP. 19650415 199003 2 008

1 M2 Pasang Water Proofing atap beton3.0000LtrWater proofRp.0.0Rp.0.0Rp.0.0Rp.0.00.5000OrgPekerjaRp.Ir. MERWIN LUSIANI,MMRp.ERROR:#VALUE!Rp.0.0Rp.0.00.2000OrgTukang CatRp.0.0Rp.0.0Rp.0.0Rp.0.00.0500OrgKepala TukangRp.NIP. 19650415 199003 2 008Rp.ERROR:#VALUE!Rp.0.0Rp.0.00.0750OrgMandorRp.0.0Rp.0.0Rp.0.0Rp.0.0JumlahRp.ERROR:#VALUE!Rp.0.0DibulatkanRp.ERROR:#VALUE!Rp.0.0

&"Brush Script MT,Regular"&11Analisa Harga Satuan Pekerjaan : Pekerjaan TanahDinas PU. Cipta Karya dan Tata Ruang Kabupaten JemberTahun Anggaran 2012

C. PEKERJAAN PONDASIDAFTAR ANALISA SNI DPU CIPTA KARYA DAN TATA RUANGUNTUK PEKERJAAN BANGUNAN GEDUNG, PERUMAHANWILAYAH JEMBER TIMUR , JEMBER TENGAH DAN JEMBER KOTAKABUPATEN JEMBER TAHUN ANGGARAN 2012

Analisa SNI DPU Cipta Karya dan Tata Ruang Wilayah Jember NO.JENIS PEKERJAANBAHANUPAHJUMLAHBULAT123456C.PEKERJAAN PONDASI
amanda ayu putri handayani: amanda ayu putri handayani:SUDAH FIX PER 4 MARET20111Analisa SNI Dinas PU. Cipta Karya dan Tata RuangMemasang 1 m3 pondasi batu belah, camp. 1 PC : 3 PPBahan1.200m3Batu belah 15/20 cmRp147,500.00177,000.00202.000KgPCRp1,400.00282,800.000.485m3Pasir PasangRp121,000.0058,685.00Upah1.500OhPekerjaRp40,500.0060,750.000.750OhTukang batuRp45,900.0034,425.000.075OhKepala tukangRp51,200.003,840.000.075OhMandorRp56,300.004,222.50518,485.00103,237.50621,722.50621,700.002Analisa SNI Dinas PU. Cipta Karya dan Tata RuangMemasang 1 m3 pondasi batu belah, camp. 1 PC : 4 PPBahan1.200m3Batu belah 15/20 cmRp147,500.00177,000.00163.000KgPCRp1,400.00228,200.000.520m3Pasir PasangRp121,000.0062,920.00Upah1.500OhPekerjaRp40,500.0060,750.000.750OhTukang batuRp45,900.0034,425.000.075OhKepala tukangRp51,200.003,840.000.075OhMandorRp56,300.004,222.50468,120.00103,237.50571,357.50571,300.003Analisa SNI Dinas PU. Cipta Karya dan Tata RuangMemasang 1 m3 pondasi batu belah, camp. 1 PC : 5 PPBahan1.200m3Batu belah 15/20 cmRp147,500.00177,000.00136.000KgPCRp1,400.00190,400.000.544m3Pasir PasangRp121,000.0065,824.00Upah1.500OhPekerjaRp40,500.0060,750.000.750OhTukang batuRp45,900.0034,425.000.075OhKepala tukangRp51,200.003,840.000.075OhMandorRp56,300.004,222.50433,224.00103,237.50536,461.50536,400.004Analisa SNI Dinas PU. Cipta Karya dan Tata RuangMemasang 1 m3 pondasi batu belah, camp. 1 PC : 6 PPBahan1.200m3Batu belah 15/20 cmRp147,500.00177,000.00117.000KgPCRp1,400.00163,800.000.561m3Pasir PasangRp121,000.0067,881.00Upah1.500OhPekerjaRp40,500.0060,750.000.750OhTukang batuRp45,900.0034,425.000.075OhKepala tukangRp51,200.003,840.000.075OhMandorRp56,300.004,222.50408,681.00103,237.50511,918.50511,900.005Analisa SNI Dinas PU. Cipta Karya dan Tata RuangMemasang 1 m3 pondasi batu belah, camp. 1 PC : 8 PPBahan1.200m3Batu belah 15/20 cmRp147,500.00177,000.0091.000KgPCRp1,400.00127,400.000.584m3Pasir PasangRp121,000.0070,664.00Upah1.500OhPekerjaRp40,500.0060,750.000.750OhTukang batuRp45,900.0034,425.000.075OhKepala tukangRp51,200.003,840.000.075OhMandorRp56,300.004,222.50375,064.00103,237.50478,301.50478,300.006Analisa SNI Dinas PU. Cipta Karya dan Tata RuangMemasang 1 m3 batu belah, camp. 1 KP : 1 Sm': 2 PPBahan1.200m3Batu belah 15/20 cmRp147,500.00177,000.000.170m3KapurRp401,000.0068,170.000.170m3Semen MerahRp186,400.0031,688.000.340m3Pasir PasangRp121,000.0041,140.00Upah1.500OhPekerjaRp40,500.0060,750.000.750OhTukang batuRp45,900.0034,425.000.075OhKepala tukangRp51,200.003,840.000.075OhMandorRp56,300.004,222.50317,998.00103,237.50421,235.50421,200.007Analisa SNI Dinas PU. Cipta Karya dan Tata RuangMemasang 1 m3 batu belah, camp. 1PC : 3KP : 10PPBahan1.200m3Batu belah 15/20 cmRp147,500.00177,000.0061.000KgPCRp1,400.0085,400.000.147m3Kapur Rp401,000.0058,947.000.492m3Pasir PasangRp121,000.0059,532.00Upah1.500OhPekerjaRp40,500.0060,750.000.750OhTukang batuRp45,900.0034,425.000.075OhKepala tukangRp51,200.003,840.000.075OhMandorRp56,300.004,222.50380,879.00103,237.50484,116.50484,100.008Analisa SNI Dinas PU. Cipta Karya dan Tata RuangMemasang 1 m3 batu belah, camp. 1/2PC : 1KP : 4PPBahan1.200m3Batu belah 15/20 cmRp147,500.00177,000.0041.000KgPCRp1,400.0057,400.000.131m3Kapur Rp401,000.0052,531.000.523m3Pasir PasangRp121,000.0063,283.00Upah1.500OhPekerjaRp40,500.0060,750.000.750OhTukang batuRp45,900.0034,425.000.075OhKepala tukangRp51,200.003,840.000.075OhMandorRp56,300.004,222.50350,214.00103,237.50453,451.50453,400.009Analisa SNI Dinas PU. Cipta Karya dan Tata RuangMemasang 1 m3 batu kosong (anstamping)Bahan1.200m3Batu belah 15/20 cmRp147,500.00177,000.000.432m3Pasir UrugRp60,000.0025,920.00Upah0.780OhPekerjaRp40,500.0031,590.000.390OhTukang batuRp45,900.0017,901.000.039OhKepala tukangRp51,200.001,996.800.039OhMandorRp56,300.002,195.70202,920.0053,683.50256,603.50256,600.0010Analisa SNI Dinas PU. Cipta Karya dan Tata RuangMemasang 1 m3 pondasi siklop,80% beton campuran 1PC : 2PS : 3KR dan 40% batu belahBahan0.480m3Batu belah 15/20 cmRp147,500.0070,800.00194.000KgPCRp1,400.00271,600.000.312m3Pasir BetonRp121,000.0037,752.000.468m3KerikilRp165,000.0077,220.00126.000KgBesi BetonRp15,900.002,003,400.001.800KgKawat betonRp19,000.0034,200.00Upah3.400OhPekerjaRp40,500.00137,700.000.850OhTukang batuRp45,900.0039,015.000.085OhKepala tukangRp51,200.004,352.000.170OhMandorRp56,300.009,571.002,494,972.00190,638.002,685,610.002,685,600.0011Analisa SNI Dinas PU. Cipta Karya dan Tata RuangMemasang 1 m3 pondasi sumuran diameter 100 cmBahan0.450m3Batu belah 15/20 cmRp147,500.0066,375.00194.000KgPCRp1,400.00271,600.000.468m3KerikilRp165,000.0077,220.000.312m3Pasir BetonRp121,000.0037,752.00Upah2.400OhPekerjaRp40,500.0097,200.000.800OhTukang batuRp45,900.0036,720.000.080OhKepala tukangRp51,200.004,096.000.119OhMandorRp56,300.006,699.70452,947.00144,715.70597,662.70597,600.00Jember, Januari 2012KEPALA DINAS PU. CIPTA KARYA DAN TATA RUANGKABUPATEN JEMBER

Ir. MERWIN LUSIANI,MMPembina Tk. I NIP. 19650415 199003 2 008

1 m2 Pasang Water Proofing atap beton3.0000LtrWater proofRp.0.0Rp.0.0Rp.0.0Rp.0.00.5000OrgPekerjaRp.Ir. MERWIN LUSIANI,MMRp.ERROR:#VALUE!Rp.0.0Rp.0.00.2000OrgTukang CatRp.0.0Rp.0.0Rp.0.0Rp.0.00.0500OrgKepala TukangRp.NIP. 19650415 199003 2 008Rp.ERROR:#VALUE!Rp.0.0Rp.0.00.0750OrgMandorRp.0.0Rp.0.0Rp.0.0Rp.0.0JumlahRp.ERROR:#VALUE!Rp.0.0DibulatkanRp.ERROR:#VALUE!Rp.0.0

&"Brush Script MT,Regular"&11Analisa Harga Satuan Pekerjaan : Pekerjaan PondasiDinas PU. Cipta Karya dan Tata Ruang Kabupaten JemberTahun Anggaran 2012

D.PEKERJAAN DINDINGDAFTAR ANALISA SNI DPU CIPTA KARYA DAN TATA RUANGUNTUK PEKERJAAN BANGUNAN GEDUNG, PERUMAHANWILAYAH JEMBER TIMUR , JEMBER TENGAH DAN JEMBER KOTAKABUPATEN JEMBER TAHUN ANGGARAN 2012

Analisa SNI DPU Cipta Karya dan Tata Ruang Wilayah Jember NO.JENIS PEKERJAANBAHANUPAHJUMLAHBULAT123456D.PEKERJAAN DINDING
amanda ayu putri handayani: amanda ayu putri handayani:SUDAH FIX PER 4 MARET20111Analisa SNI DPU Cipta Karya dan Tata RuangMemasang 1 m2 dinding bata merah Uk. (5x11x22) cm tb. 1 bata , camp. 1PC : 2 PPBahan140.00BhBatu merahRp450.0063,000.0043.500KgPCRp1,400.0060,900.000.080m3Pasir pasangRp121,000.009,680.00Upah0.600OhPekerjaRp40,500.0024,300.000.200OhTukang batuRp45,900.009,180.000.020OhKepala tukangRp51,200.001,024.000.030OhMandorRp56,300.001,689.00133,580.0036,193.00169,773.00169,700.002Analisa SNI DPU Cipta Karya dan Tata RuangMemasang 1 m2 dinding bata merah Uk. (5x11x22) cm tb. 1 bata , camp. 1PC : 3 PPBahan140.00BhBh Batu merahRp450.0063,000.0032.950KgPCRp1,400.0046,130.000.091m3Pasir pasangRp121,000.0011,011.00Upah0.600OhPekerjaRp40,500.0024,300.000.200OhTukang batuRp45,900.009,180.000.020OhKepala tukangRp51,200.001,024.000.030OhMandorRp56,300.001,689.00120,141.0036,193.00156,334.00156,300.003Analisa SNI DPU Cipta Karya dan Tata RuangMemasang 1 m2 dinding bata merah Uk. (5x11x22) cm tb. 1 bata , camp. 1PC : 4 PPBahan140.00Bh Batu merahRp450.0063,000.0026.550Kg PCRp1,400.0037,170.000.093m3Pasir pasangRp121,000.0011,253.00Upah0.600OhPekerjaRp40,500.0024,300.000.200OhTukang batuRp45,900.009,180.000.020OhKepala tukangRp51,200.001,024.000.030OhMandorRp56,300.001,689.00111,423.0036,193.00147,616.00147,600.004Analisa SNI DPU Cipta Karya dan Tata RuangMemasang 1 m2 dinding bata merah Uk. (5x11x22) cm tb. 1 bata , camp. 1PC : 5 PPBahan140.00Bh Batu merahRp450.0063,000.0022.000Kg PCRp1,400.0030,800.000.102m3Pasir pasangRp121,000.0012,342.00Upah0.600OhPekerjaRp40,500.0024,300.000.200OhTukang batuRp45,900.009,180.000.020OhKepala tukangRp51,200.001,024.000.030OhMandorRp56,300.001,689.00106,142.0036,193.00142,335.00142,300.005Analisa SNI DPU Cipta Karya dan Tata RuangMemasang 1 m2 dinding bata merah Uk. (5x11x22) cm tb. 1 bata , camp. 1PC : 6 PPBahan140.00Bh Batu merahRp450.0063,000.0018.500Kg PCRp1,400.0025,900.000.122m3Pasir pasangRp121,000.0014,762.00Upah0.600OhPekerjaRp40,500.0024,300.000.200OhTukang batuRp45,900.009,180.000.020OhKepala tukangRp51,200.001,024.000.030OhMandorRp56,300.001,689.00103,662.0036,193.00139,855.00139,800.006Analisa SNI DPU Cipta Karya dan Tata RuangMemasang 1 m2 dinding bata merah Uk. (5x11x22) cm tb. 1 bata , camp. 1PC : 3 KP : 10 PPBahan140.00Bh Batu merahRp450.0063,000.0010.080Kg PCRp1,400.0014,112.000.093m3Pasir pasangRp121,000.0011,192.500.028m3KapurRp401,000.0011,027.50Upah0.600OhPekerjaRp40,500.0024,300.000.200OhTukang batuRp45,900.009,180.000.020OhKepala tukangRp51,200.001,024.000.030OhMandorRp56,300.001,689.0099,332.0036,193.00135,525.00135,500.007Analisa SNI DPU Cipta Karya dan Tata RuangMemasang 1 m2 dinding bata merah Uk. (5x11x22) cm tb. 1/2 bata , camp. 1PC : 2 PPBahan70.00BhBatu merahRp450.0031,500.0018.950KgPCRp1,400.0026,530.000.038m3Pasir pasangRp121,000.004,598.00Upah0.300OhPekerjaRp40,500.0012,150.000.100OhTukang batuRp45,900.004,590.000.010OhKepala tukangRp51,200.00512.000.015OhMandorRp56,300.00844.5062,628.0018,096.5080,724.5080,700.008Analisa SNI DPU Cipta Karya dan Tata RuangMemasang 1 m2 dinding bata merah Uk. (5x11x22) cm tb. 1/2 bata , camp. 1PC : 3 PPBahan70.00BhBatu merahRp450.0031,500.0014.370KgPCRp1,400.0020,118.000.040m3Pasir pasangRp121,000.004,840.00Upah0.300OhPekerjaRp40,500.0012,150.000.100OhTukang batuRp45,900.004,590.000.010OhKepala tukangRp51,200.00512.000.015OhMandorRp56,300.00844.5056,458.0018,096.5074,554.5074,500.009Analisa SNI DPU Cipta Karya dan Tata RuangMemasang 1 m2 dinding bata merah Uk. (5x11x22) cm tb. 1/2 bata , camp. 1PC : 4 PPBahan70.00BhBatu merahRp450.0031,500.0011.500KgPCRp1,400.0016,100.000.043m3Pasir pasangRp121,000.005,203.00Upah0.300OhPekerjaRp40,500.0012,150.000.100OhTukang batuRp45,900.004,590.000.010OhKepala tukangRp51,200.00512.000.015OhMandorRp56,300.00844.5052,803.0018,096.5070,899.5070,800.0010Analisa SNI DPU Cipta Karya dan Tata RuangMemasang 1 m2 dinding bata merah Uk. (5x11x22) cm tb. 1/2 bata , camp. 1PC : 5 PPBahan70.00BhBatu merahRp450.0031,500.009.680KgPCRp1,400.0013,552.000.045m3Pasir pasangRp121,000.005,445.00Upah0.300OhPekerjaRp40,500.0012,150.000.100OhTukang batuRp45,900.004,590.000.010OhKepala tukangRp51,200.00512.000.015OhMandorRp56,300.00844.5050,497.0018,096.5068,593.5068,500.0011Analisa SNI DPU Cipta Karya dan Tata RuangMemasang 1 m2 dinding bata merah Uk. (5x11x22) cm tb. 1/2 bata , camp. 1PC : 6 PPBahan70.00BhBatu merahRp450.0031,500.008.320KgPCRp1,400.0011,648.000.049m3Pasir pasangRp121,000.005,929.00Upah0.300OhPekerjaRp40,500.0012,150.000.100OhTukang batuRp45,900.004,590.000.010OhKepala tukangRp51,200.00512.000.015OhMandorRp56,300.00844.5049,077.0018,096.5067,173.5067,100.0012Analisa SNI DPU Cipta Karya dan Tata RuangMemasang 1 m2 dinding bata merah Uk. (5x11x22) cm tb. 1/2 bata , camp. 1PC : 8 PPBahan70.00BhBatu merahRp450.0031,500.006.500KgPCRp1,400.009,100.000.050m3Pasir pasangRp121,000.006,050.00Upah0.300OhPekerjaRp40,500.0012,150.000.100OhTukang batuRp45,900.004,590.000.010OhKepala tukangRp51,200.00512.000.015OhMandorRp56,300.00844.5046,650.0018,096.5064,746.5064,700.0013Analisa SNI DPU Cipta Karya dan Tata RuangMemasang 1 m2 dinding bata merah Uk. (5x11x22) cm tb. 1/2 bata , camp. 1PC : 3 KP : 10 PPBahan70.00BhBatu merahRp450.0031,500.004.500KgPCRp1,400.006,300.000.050m3Pasir pasangRp121,000.006,050.000.015m3Kapur PasangRp401,000.006,015.00Upah0.300OhPekerjaRp40,500.0012,150.000.100OhTukang batuRp45,900.004,590.000.010OhKepala tukangRp51,200.00512.000.015OhMandorRp56,300.00844.5049,865.0018,096.5067,961.5067,900.0014Analisa SNI DPU Cipta Karya dan Tata RuangMemasang 1 m2 dinding bata merah Uk. (5x11x22) cm tb. 1/2 bata , camp. 1KP : 1SM : 1 PPBahan70.00BhBatu merahRp450.0031,500.000.018m3Semen MerahRp186,400.003,355.200.018m3Pasir pasangRp121,000.002,178.000.018m3Kapur PasangRp401,000.007,218.00Upah0.300OhPekerjaRp40,500.0012,150.000.100OhTukang batuRp45,900.004,590.000.010OhKepala tukangRp51,200.00512.000.015OhMandorRp56,300.00844.5044,251.2018,096.5062,347.7062,300.0015Analisa SNI DPU Cipta Karya dan Tata RuangMemasang 1 m2 dinding bata merah Uk. (5x11x22) cm tb. 1/2 bata , camp. 1KP : 1SM : 2 PPBahan70.00BhBatu merahRp450.0031,500.000.014m3Semen MerahRp186,400.002,609.600.028m3Pasir pasangRp121,000.003,388.000.014m3Kapur PasangRp401,000.005,614.00Upah0.300OhPekerjaRp40,500.0012,150.000.100OhTukang batuRp45,900.004,590.000.010OhKepala tukangRp51,200.00512.000.015OhMandorRp56,300.00844.5043,111.6018,096.5061,208.1061,200.0016Analisa SNI DPU Cipta Karya dan Tata RuangMemasang 1 m2 dinding HB / CB 20, camp. 1PC : 3PP Bahan12.50BhHB/CB 20RpERROR:#REF!ERROR:#REF!30.320KgPCRp1,400.0042,448.000.728m3Pasir pasangRp121,000.0088,088.000.280KgBesi angkur 8mmRp15,900.004,452.00Upah0.350OhPekerjaRp40,500.0014,175.000.150OhTukang batuRp45,900.006,885.000.015OhKepala tukangRp51,200.00768.000.018OhMandorRp56,300.001,013.40ERROR:#REF!22,841.40ERROR:#REF!ERROR:#REF!17Analisa SNI DPU Cipta Karya dan Tata RuangMemasang 1 m2 dinding HB / CB 20, camp. 1PC : 4PP Bahan12.50BhHB/CB 20RpERROR:#REF!ERROR:#REF!24.260KgPCRp1,400.0033,964.000.772m3Pasir pasangRp121,000.0093,412.000.280KgBesi angkur 8mmRp15,900.004,452.00Upah0.350OhPekerjaRp40,500.0014,175.000.150OhTukang batuRp45,900.006,885.000.015OhKepala tukangRp51,200.00768.000.018OhMandorRp56,300.001,013.40ERROR:#REF!22,841.40ERROR:#REF!ERROR:#REF!18Analisa SNI DPU Cipta Karya dan Tata RuangMemasang 1 m2 dinding HB / CB 15, camp. 1PC : 3PP Bahan12.50BhHB/CB 15RpERROR:#REF!ERROR:#REF!24.740KgPCRp1,400.0034,636.000.550m3Pasir pasangRp121,000.0066,550.000.280KgBesi angkur 8mmRp15,900.004,452.00Upah0.320OhPekerjaRp40,500.0012,960.000.120OhTukang batuRp45,900.005,508.000.012OhKepala tukangRp51,200.00614.400.016OhMandorRp56,300.00900.80ERROR:#REF!19,983.20ERROR:#REF!ERROR:#REF!19Analisa SNI DPU Cipta Karya dan Tata RuangMemasang 1 m2 dinding HB / CB 15, camp. 1PC : 4PP Bahan12.50BhHB/CB 15RpERROR:#REF!ERROR:#REF!18.200KgPCRp1,400.0025,480.000.582m3Pasir pasangRp121,000.0070,422.000.280KgBesi angkur 8mmRp15,900.004,452.00Upah0.320OhPekerjaRp40,500.0012,960.000.120OhTukang batuRp45,900.005,508.000.012OhKepala tukangRp51,200.00614.400.016OhMandorRp56,300.00900.80ERROR:#REF!19,983.20ERROR:#REF!ERROR:#REF!20Analisa SNI DPU Cipta Karya dan Tata RuangMemasang 1 m2 dinding HB / CB 10, camp. 1PC : 3PP Bahan12.50BhHB/CB 10RpERROR:#REF!ERROR:#REF!15.160KgPCRp1,400.0021,224.000.364m3Pasir pasangRp121,000.0044,044.000.280KgBesi angkur 8mmRp15,900.004,452.00Upah0.300OhPekerjaRp40,500.0012,150.000.100OhTukang batuRp45,900.004,590.000.010OhKepala tukangRp51,200.00512.000.015OhMandorRp56,300.00844.50ERROR:#REF!18,096.50ERROR:#REF!ERROR:#REF!21Analisa SNI DPU Cipta Karya dan Tata RuangMemasang 1 m2 dinding HB / CB 10, camp. 1PC : 4PP Bahan12.50BhHB/CB 10RpERROR:#REF!ERROR:#REF!12.130KgPCRp1,400.0016,982.000.388m3Pasir pasangRp121,000.0046,948.000.280KgBesi angkur 8mmRp15,900.004,452.00Upah0.300OhPekerjaRp40,500.0012,150.000.100OhTukang batuRp45,900.004,590.000.010OhKepala tukangRp51,200.00512.000.015OhMandorRp56,300.00844.50ERROR:#REF!18,096.50ERROR:#REF!ERROR:#REF!16Analisa SNI DPU Cipta Karya dan Tata RuangMemasang 1 m2 dinding terawang (roster) Uk. (12x11x24) cm, camp. 1PC : 3 PPBahan30.00BhTerawang rosterRp7,300.00219,000.0014.000KgPCRp1,400.0019,600.000.032m3Pasir pasangRp121,000.003,872.00Upah0.300OhPekerjaRp40,500.0012,150.000.100OhTukang batuRp45,900.004,590.000.010OhKepala tukangRp51,200.00512.000.015OhMandorRp56,300.00844.50242,472.0018,096.50260,568.50260,500.0017Analisa SNI DPU Cipta Karya dan Tata RuangMemasang 1 m2 dinding terawang (roster) Uk. (12x11x24) cm, camp. 1PC : 4 PPBahan30.00BhTerawang rosterRp7,300.00219,000.0011.000KgPCRp1,400.0015,400.000.035m3Pasir pasangRp121,000.004,235.00Upah0.300OhPekerjaRp40,500.0012,150.000.100OhTukang batuRp45,900.004,590.000.010OhKepala tukangRp51,200.00512.000.015OhMandorRp56,300.00844.50238,635.0018,096.50256,731.50256,700.0024Analisa DPU Cipta Karya dan Tata RuangMemasang 1 m2 Bata berongga ekspose Uk. (6 x 11 x 24)cm, camp.1PC : 3PP Bahan70.00BhBata berongga eksposeRpERROR:#REF!ERROR:#REF!14.000KgPCRp1,400.0019,600.000.032m3Pasir pasangRp121,000.003,872.00Upah0.300OhPekerjaRp40,500.0012,150.000.150OhTukang batuRp45,900.006,885.000.015OhKepala tukangRp51,200.00768.000.015OhMandorRp56,300.00844.50.ERROR:#REF!20,647.50ERROR:#REF!ERROR:#REF!18Analisa SNI DPU Cipta Karya dan Tata RuangMemasang 1 m2 Batu bobos Uk. (10x20x1.5) cm, camp. 1PC : 4 PPBahan50.00BhBatu bobosRp3,800.00190,000.006.480KgPCRp1,400.009,072.000.021m3Pasir pasangRp121,000.002,541.00Upah0.400OhPekerjaRp40,500.0016,200.000.200OhTukang batuRp45,900.009,180.000.020OhKepala tukangRp51,200.001,024.000.020OhMandorRp56,300.001,126.00201,613.0027,530.00229,143.00229,100.00Jember, Januari 2012

KEPALA DINAS PU. CIPTA KARYA DAN TATA RUANGKABUPATEN JEMBER

Ir. MERWIN LUSIANI,MMPembina Tk. I NIP. 19650415 199003 2 008

1 M2 Pasang Water Proofing atap beton3.0000LtrWater proofRp.0.0Rp.0.0Rp.0.0Rp.0.00.5000OrgPekerjaRp.Ir. MERWIN LUSIANI,MMRp.ERROR:#VALUE!Rp.0.0Rp.0.00.2000OrgTukang CatRp.0.0Rp.0.0Rp.0.0Rp.0.00.0500OrgKepala TukangRp.NIP. 19650415 199003 2 008Rp.ERROR:#VALUE!Rp.0.0Rp.0.00.0750OrgMandorRp.0.0Rp.0.0Rp.0.0Rp.0.0JumlahRp.ERROR:#VALUE!Rp.0.0DibulatkanRp.ERROR:#VALUE!Rp.0.0

&"Brush Script MT,Regular"&11Analisa Harga Satuan Pekerjaan : Pekerjaan DindingDinas PU. Cipta Karya dan Tata Ruang Kabupaten JemberTahun Anggaran 2012

E. PEKERJAAN PLESTERANDAFTAR ANALISA SNI DPU CIPTA KARYA DAN TATA RUANGUNTUK PEKERJAAN BANGUNAN GEDUNG, PERUMAHANWILAYAH JEMBER TIMUR , JEMBER TENGAH DAN JEMBER KOTAKABUPATEN JEMBER TAHUN ANGGARAN 2012

Analisa SNI DPU Cipta Karya dan Tata Ruang Wilayah Jember NO.JENIS PEKERJAANBAHANUPAHJUMLAHBULAT123456E.PEKERJAAN PLESTERAN
amanda ayu putri handayani: amanda ayu putri handayani:SUDAH FIX PER 4 MARET20111Analisa SNI DPU Cipta Karya dan Tata RuangMemasang 1 m2 Plesteran camp. 1 Pc : 1 Ps tebal 15mmBahan15.504KgPCRp1,400.0021,705.600.016m3Pasir pasangRp121,000.001,936.00Upah0.300OhPekerjaRp40,500.0012,150.000.150OhTukang batuRp45,900.006,885.000.015OhKepala tukangRp51,200.00768.000.015OhMandorRp56,300.00844.5023,641.6020,647.5044,289.1044,200.002Analisa SNI DPU Cipta Karya dan Tata RuangMemasang 1 m2 Plesteran camp. 1 Pc : 2 Ps tebal 15mmBahan10.224KgPCRp1,400.0014,313.600.020m3Pasir pasangRp121,000.002,420.00Upah0.300OhPekerjaRp40,500.0012,150.000.150OhTukang batuRp45,900.006,885.000.015OhKepala tukangRp51,200.00768.000.015OhMandorRp56,300.00844.5016,733.6020,647.5037,381.1037,300.003Analisa SNI DPU Cipta Karya dan Tata RuangMemasang 1 m2 Plesteran camp. 1 Pc : 3 Ps tebal 15mmBahan7.776KgPCRp1,400.0010,886.400.023m3Pasir pasangRp121,000.002,783.00Upah0.300OhPekerjaRp40,500.0012,150.000.150OhTukang batuRp45,900.006,885.000.015OhKepala tukangRp51,200.00768.000.015OhMandorRp56,300.00844.5013,669.4020,647.5034,316.9034,300.004Analisa SNI DPU Cipta Karya dan Tata RuangMemasang 1 m2 Plesteran camp. 1 Pc : 4 Ps tebal 15mmBahan6.240KgPCRp1,400.008,736.000.024m3Pasir pasangRp121,000.002,904.00Upah0.300OhPekerjaRp40,500.0012,150.000.150OhTukang batuRp45,900.006,885.000.015OhKepala tukangRp51,200.00768.000.015OhMandorRp56,300.00844.5011,640.0020,647.5032,287.5032,200.005Analisa SNI DPU Cipta Karya dan Tata RuangMemasang 1 m2 Plesteran camp. 1 Pc : 5 Ps tebal 15mmBahan5.184KgPCRp1,400.007,257.600.026m3Pasir pasangRp121,000.003,146.00Upah0.300OhPekerjaRp40,500.0012,150.000.150OhTukang batuRp45,900.006,885.000.015OhKepala tukangRp51,200.00768.000.015OhMandorRp56,300.00844.5010,403.6020,647.5031,051.1031,000.006Analisa SNI DPU Cipta Karya dan Tata RuangMemasang 1 m2 Plesteran camp. 1 Pc : 6 Ps tebal 15mmBahan4.416KgPCRp1,400.006,182.400.027m3Pasir pasangRp121,000.003,267.00Upah0.300OhPekerjaRp40,500.0012,150.000.150OhTukang batuRp45,900.006,885.000.015OhKepala tukangRp51,200.00768.000.015OhMandorRp56,300.00844.509,449.4020,647.5030,096.9030,000.007Analisa SNI DPU Cipta Karya dan Tata RuangMemasang 1 m2 Plesteran camp. 1 Pc : 7 Ps tebal 15mmBahan3.936KgPCRp1,400.005,510.400.028m3Pasir pasangRp121,000.003,388.00Upah0.300OhPekerjaRp40,500.0012,150.000.150OhTukang batuRp45,900.006,885.000.015OhKepala tukangRp51,200.00768.000.015OhMandorRp56,300.00844.508,898.4020,647.5029,545.9029,500.008Analisa SNI DPU Cipta Karya dan Tata RuangMemasang 1 m2 Plesteran camp. 1 Pc : 8 Ps tebal 15mmBahan3.456KgPCRp1,400.004,838.400.029m3Pasir pasangRp121,000.003,509.00Upah0.300OhPekerjaRp40,500.0012,150.000.150OhTukang batuRp45,900.006,885.000.015OhKepala tukangRp51,200.00768.000.015OhMandorRp56,300.00844.508,347.4020,647.5028,994.9028,900.009Analisa SNI DPU Cipta Karya dan Tata RuangMemasang 1 m2 Plesteran camp. 1 Pc : KP : 3 Ps tebal 15mmBahan5.760KgPCRp1,400.008,064.000.003m3Kapur PasangRp401,000.001,203.000.013m3Pasir pasangRp121,000.001,573.00Upah0.360OhPekerjaRp40,500.0014,580.000.120OhTukang batuRp45,900.005,508.000.012OhKepala tukangRp51,200.00614.400.018OhMandorRp56,300.001,013.4010,840.0021,715.8032,555.8032,500.0010Analisa SNI DPU Cipta Karya dan Tata RuangMemasang 1 m2 Plesteran camp. 1 Pc : 2 KP : 8 Ps tebal 15mmBahan3.000KgPCRp1,400.004,200.000.005m3Kapur PasangRp401,000.002,005.000.020m3Pasir pasangRp121,000.002,420.00Upah0.360OhPekerjaRp40,500.0014,580.000.120OhTukang batuRp45,900.005,508.000.012OhKepala tukangRp51,200.00614.400.018OhMandorRp56,300.001,013.408,625.0021,715.8030,340.8030,300.0011Analisa SNI DPU Cipta Karya dan Tata RuangMemasang 1 m2 Plesteran camp. 1 SM : 1 KP : 1 Ps tebal 15mmBahan0.009m3Semen merahRp186,400.001,677.600.009m3Kapur PasangRp401,000.003,609.000.009m3Pasir pasangRp121,000.001,089.00Upah0.360OhPekerjaRp40,500.0014,580.000.120OhTukang batuRp45,900.005,508.000.012OhKepala tukangRp51,200.00614.400.018OhMandorRp56,300.001,013.406,375.6021,715.8028,091.4028,000.0012Analisa SNI DPU Cipta Karya dan Tata RuangMemasang 1 m2 Plesteran camp. 1 SM : 1 KP : 2 Ps tebal 15mmBahan0.007m3Semen merahRp186,400.001,304.800.007m3Kapur PasangRp401,000.002,807.000.015m3Pasir pasangRp121,000.001,815.00Upah0.360OhPekerjaRp40,500.0014,580.000.120OhTukang batuRp45,900.005,508.000.012OhKepala tukangRp51,200.00614.400.018OhMandorRp56,300.001,013.405,926.8021,715.8027,642.6027,600.0013Analisa SNI DPU Cipta Karya dan Tata RuangMemasang 1 m2 Plesteran camp. 1 PC : 2 Ps tebal 20mmBahan13.632KgPCRp1,400.0019,084.800.027m3Pasir pasangRp121,000.003,267.00Upah0.400OhPekerjaRp40,500.0016,200.000.200OhTukang batuRp45,900.009,180.000.020OhKepala tukangRp51,200.001,024.000.022OhMandorRp56,300.001,238.6022,351.8027,642.6049,994.4049,900.0014Analisa SNI DPU Cipta Karya dan Tata RuangMemasang 1 m2 Plesteran camp. 1 PC : 3 Ps tebal 20mmBahan10.368KgPCRp1,400.0014,515.200.031m3Pasir pasangRp121,000.003,751.00Upah0.260OhPekerjaRp40,500.0010,530.000.200OhTukang batuRp45,900.009,180.000.020OhKepala tukangRp51,200.001,024.000.013OhMandorRp56,300.00731.9018,266.2021,465.9039,732.1039,700.0015Analisa SNI DPU Cipta Karya dan Tata RuangMemasang 1 m2 Plesteran camp. 1 PC : 4 Ps tebal 20mmBahan8.320KgPCRp1,400.0011,648.000.032m3Pasir pasangRp121,000.003,872.00Upah0.400OhPekerjaRp40,500.0016,200.000.200OhTukang batuRp45,900.009,180.000.020OhKepala tukangRp51,200.001,024.000.022OhMandorRp56,300.001,238.6015,520.0027,642.6043,162.6043,100.0016Analisa SNI DPU Cipta Karya dan Tata RuangMemasang 1 m2 Plesteran camp. 1 PC : 5 Ps tebal 20mmBahan6.912KgPCRp1,400.009,676.800.035m3Pasir pasangRp121,000.004,235.00Upah0.400OhPekerjaRp40,500.0016,200.000.200OhTukang batuRp45,900.009,180.000.020OhKepala tukangRp51,200.001,024.000.022OhMandorRp56,300.001,238.6013,911.8027,642.6041,554.4041,500.0017Analisa SNI DPU Cipta Karya dan Tata RuangMemasang 1 m2 Plesteran camp. 1 PC : 6 Ps tebal 20mmBahan5.888KgPCRp1,400.008,243.200.036m3Pasir pasangRp121,000.004,356.00Upah0.400OhPekerjaRp40,500.0016,200.000.200OhTukang batuRp45,900.009,180.000.020OhKepala tukangRp51,200.001,024.000.022OhMandorRp56,300.001,238.6012,599.2027,642.6040,241.8040,200.0018Analisa SNI DPU Cipta Karya dan Tata RuangMemasang 1 m2 Plesteran camp. 1 SM : 1 KP : 2 Ps tebal 20mmBahan0.009m3Semen merahRp186,400.001,677.600.009m3Kapur PasangRp401,000.003,609.000.018m3Pasir pasangRp121,000.002,178.00Upah0.440OhPekerjaRp40,500.0017,820.000.220OhTukang batuRp45,900.0010,098.000.022OhKepala tukangRp51,200.001,126.400.022OhMandorRp56,300.001,238.607,464.6030,283.0037,747.6037,700.0019Analisa SNI DPU Cipta Karya dan Tata RuangMemasang 1 m2 Berapen camp. 1 PC : 5 Ps tebal 15mmBahan5.184KgPCRp1,400.007,257.600.026m3Pasir pasangRp121,000.003,146.00Upah0.150OhPekerjaRp40,500.006,075.000.075OhTukang batuRp45,900.003,442.500.008OhKepala tukangRp51,200.00409.600.008OhMandorRp56,300.00450.4010,403.6010,377.5020,781.1020,700.0020Analisa SNI DPU Cipta Karya dan Tata RuangMemasang 1 m2 Plesteran Skoning lebar 10mm camp. 1 PC : 2 Ps Bahan0.500KgPCRp1,400.00700.000.013m3Pasir pasangRp121,000.001,573.00Upah0.080OhPekerjaRp40,500.003,240.000.400OhTukang batuRp45,900.0018,360.000.040OhKepala tukangRp51,200.002,048.000.004OhMandorRp56,300.00225.202,273.0023,873.2026,146.2026,100.0021Analisa SNI DPU Cipta Karya dan Tata RuangMemasang 1 m2 Plesteran Granit, camp. 1 PC : 2 Granit, tebal 10mmBahan10.000KgPCRp1,400.0014,000.0015.000Kg
amanda ayu putri handayani: amanda ayu putri handayani:DI HARGA SATUAN, M3Batu granitRpERROR:#REF!ERROR:#REF!Upah0.450OhPekerjaRp40,500.0018,225.000.225OhTukang batuRp45,900.0010,327.500.023OhKepala tukangRp51,200.001,177.600.023OhMandorRp56,300.001,294.90ERROR:#REF!31,025.00ERROR:#REF!ERROR:#REF!22Analisa SNI DPU Cipta Karya dan Tata RuangMemasang 1 m2 Plesteran Teraso, camp. 1 PC : 2 Batu Teraso, tebal 10mmBahan10.000KgPCRp1,400.0014,000.0015.000Kg
amanda ayu putri handayani: amanda ayu putri handayani:DI HARGA SATUAN, M3Batu terasoRpERROR:#REF!ERROR:#REF!Upah0.450OhPekerjaRp40,500.0018,225.000.225OhTukang batuRp45,900.0010,327.500.023OhKepala tukangRp51,200.001,177.600.023OhMandorRp56,300.001,294.90ERROR:#REF!31,025.00ERROR:#REF!ERROR:#REF!21Analisa SNI DPU Cipta Karya dan Tata RuangMemasang 1 m2 Plesteran Ciprat / Kamprotan, camp. 1 PC : 2 Ps.Bahan4.320KgPCRp1,400.006,048.000.006m3Pasir pasangRp121,000.00726.00Upah0.300OhPekerjaRp40,500.0012,150.000.100OhTukang batuRp45,900.004,590.000.010OhKepala tukangRp51,200.00512.000.015OhMandorRp56,300.00844.506,774.0018,096.5024,870.5024,800.0022Analisa SNI DPU Cipta Karya dan Tata RuangMemasang 1 m2 finishing siar pas. dinding bata merah (=20m')Bahan3.108KgPCRp1,400.004,351.20Upah0.150OhPekerjaRp40,500.006,075.000.075OhTukang batuRp45,900.003,442.500.008OhKepala tukangRp51,200.00409.600.008OhMandorRp56,300.00450.404,351.2010,377.5014,728.7014,700.0023Analisa SNI DPU Cipta Karya dan Tata RuangMemasang 1 m2 finishing siar pas. dinding conblock expose (=8m')Bahan1.600KgPCRp1,400.002,240.00Upah0.070OhPekerjaRp40,500.002,835.000.035OhTukang batuRp45,900.001,606.500.004OhKepala tukangRp51,200.00204.800.004OhMandorRp56,300.00225.202,240.004,871.507,111.507,100.0024Analisa SNI DPU Cipta Karya dan Tata RuangMemasang 1 m2 finishing siar pas. batu kali adukan 1 PC : 2 Ps.Bahan6.340KgPCRp1,400.008,876.000.012m3Pasir pasangRp121,000.001,452.00Upah0.300OhPekerjaRp40,500.0012,150.000.150OhTukang batuRp45,900.006,885.000.015OhKepala tukangRp51,200.00768.000.015OhMandorRp56,300.00844.5010,328.0020,647.5030,975.5030,900.0025Analisa SNI DPU Cipta Karya dan Tata RuangMemasang 1 m2 AcianBahan3.250KgPCRp1,400.004,550.00Upah0.200OhPekerjaRp40,500.008,100.000.100OhTukang batuRp45,900.004,590.000.010OhKepala tukangRp51,200.00512.000.010OhMandorRp56,300.00563.004,550.0013,765.0018,315.0018,300.0026Analisa SNI DPU Cipta Karya dan Tata RuangMemasang 1 m' Benangan 1 PC : 2 PP Bahan0.344KgPCRp1,400.00481.600.001m3Pasir pasangRp121,000.00121.00Upah0.133OhPekerjaRp40,500.005,398.650.067OhTukang batuRp45,900.003,056.940.007OhKepala tukangRp51,200.00337.920.007OhMandorRp56,300.00371.58602.609,165.099,767.699,700.00

Jember, Januari 2012

KEPALA DINAS PU. CIPTA KARYA DAN TATA RUANGKABUPATEN JEMBER

Ir. MERWIN LUSIANI,MMPembina Tk. I NIP. 19650415 199003 2 008

1 m2 Pasang Water Proofing atap beton3.0000LtrWater proofRp.0.0Rp.0.0Rp.0.0Rp.0.00.5000OrgPekerjaRp.Ir. MERWIN LUSIANI,MMRp.ERROR:#VALUE!Rp.0.0Rp.0.00.2000OrgTukang CatRp.0.0Rp.0.0Rp.0.0Rp.0.00.0500OrgKepala TukangRp.NIP. 19650415 199003 2 008Rp.ERROR:#VALUE!Rp.0.0Rp.0.00.0750OrgMandorRp.0.0Rp.0.0Rp.0.0Rp.0.0JumlahRp.ERROR:#VALUE!Rp.0.0DibulatkanRp.ERROR:#VALUE!Rp.0.0

&"Brush Script MT,Regular"&11Analisa Harga Satuan Pekerjaan : Pekerjaan PlesteranDinas PU. Cipta Karya dan Tata Ruang Kabupaten JemberTahun Anggaran 2012

F.PEKERJAAN KAYUDAFTAR ANALISA SNI DPU CIPTA KARYA DAN TATA RUANGUNTUK PEKERJAAN BANGUNAN GEDUNG, PERUMAHANWILAYAH JEMBER TIMUR , JEMBER TENGAH DAN JEMBER KOTAKABUPATEN JEMBER TAHUN ANGGARAN 2012

Analisa SNI DPU Cipta Karya dan Tata Ruang Wilayah Jember NO.JENIS PEKERJAANBAHANUPAHJUMLAHBULAT123456F.PEKERJAAN KAYU
amanda ayu putri handayani: amanda ayu putri handayani:S