PERHITUNGAN VOLUME No Gambar / Sketsa Uraian Perhitungan Unit a . Galian Tanah 1 = ( 1.30 + 1.00 ) x 1.10 = 1.27 2.00 = 38.50 + 1.27 = 39.77 = ( 0.71 + 0.55 ) x 0.39 = 0.25 2.00 = 3.50 + 0.25 = 3.75 Luas Total = 43.51 b. Urugan Pasir dibawah Pondasi = 0.85 x 0.15 x 38.50 = 4.91 = 0.45 x 0.04 x 3.50 = 0.06 Luas Total = 4.97 c. Pasangan Batu Kosong = 1.00 x 0.25 x 38.50 = 9.63 = 0.45 x 0.25 x 3.50 = 0.39 Luas Total = 10.02 d. Pasangan Pondasi = ( 0.30 + 0.80 ) x 0.85 = 0.47 2.00 38.50 + 0.47 = 38.97 = ( 0.20 + 0.35 ) x 0.40 = 0.11 2.00 3.50 + 0.11 = 3.61 Luas Total = 42.58 e. Timbunan Tanah / Backfill = ( 0.40 * 2.00 ) x 1.10 = 0.44 2.00 38.50 x 0.44 x 2.00 = 33.88 8.00 x 3.75 x 0.20 = 6.00 6.00 x 2.75 x 0.20 = 3.30 Luas Total = 43.18 f. Uugan Pasir Dibawa Lantai 3.00 x 6.50 x 0.45 = 8.78 3.00 x 6.50 x 0.40 = 7.80 2.00 x 3.75 x 0.30 = 2.25 Luas Total = 18.83 m 2 m 3 m 2 m 3 m 3 m 3 m 3 m 3 m 3 m 3 m 3 m 3 m 3 m 3 m 3 m 3 m 3 m 3 m 3 m 3 m 3 +0.30 0.00 - 0.40 - 1.20 - 1.40 - 1.45 PAS. BATU BATA PAS. TRASRAM SLOOF20/30 +0.30 0.00 - 0.40 - 1.20 - 1.40 - 1.45 PAS. BATU BATA PAS. TRASRAM SLOOF20/30 LANTAI KERJA PAS. BATU KOSONG TANAH ASLI TANAH URUG PAS. BATU KALI PASIR URUG LANTAI TEGEL40X40 LANTAI KERJA PAS. BATU KOSONG TANAH ASLI TANAH URUG PAS. BATU KALI PASIR URUG LANTAI TEGEL40X40

Upload: azhar-s-manur

Post on 28-Oct-2015

196 views

Category:

Documents


52 download

DESCRIPTION

Smoga membantu

TRANSCRIPT

Page 1: Tugas Besar Rab Rumah Tinggal Pribadi

PERHITUNGAN VOLUME

No Gambar / Sketsa Uraian Perhitungan Unit Ket.

a . Galian Tanah

1=

( 1.30 + 1.00 )x 1.10 = 1.27

2.00

= 38.50 + 1.27 = 39.77

=( 0.71 + 0.55 )

x 0.39 = 0.252.00 TERAS

= 3.50 + 0.25 = 3.75

Luas Total = 43.51

b. Urugan Pasir dibawah Pondasi

= 0.85 x 0.15 x 38.50 = 4.91

= 0.45 x 0.04 x 3.50 = 0.06

Luas Total = 4.97

c. Pasangan Batu Kosong

= 1.00 x 0.25 x 38.50 = 9.63

= 0.45 x 0.25 x 3.50 = 0.39

Luas Total = 10.02

d.Pasangan Pondasi

=( 0.30 + 0.80 )

x 0.85 = 0.472.00

38.50 + 0.47 = 38.97

=( 0.20 + 0.35 )

x 0.40 = 0.112.00

3.50 + 0.11 = 3.61

Luas Total = 42.58

e. Timbunan Tanah / Backfill

=( 0.40 * 2.00 )

x 1.10 = 0.442.00

38.50 x 0.44 x 2.00 = 33.88

8.00 x 3.75 x 0.20 = 6.00

6.00 x 2.75 x 0.20 = 3.30

Luas Total = 43.18

f. Uugan Pasir Dibawa Lantai

3.00 x 6.50 x 0.45 = 8.78

3.00 x 6.50 x 0.40 = 7.80

2.00 x 3.75 x 0.30 = 2.25

Luas Total = 18.83

m2

m3

m2

m3

m3

m3

m3

m3

m3

m3

m3

m3

m3

m3

m3

m3

m3

m3

m3

m3

m3

+ 0.30

0.00

- 0.40

- 1.20

- 1.40- 1.45

PAS. BATU BATA

PAS. TRASRAMSLOOF 20/30+ 0.30

0.00

- 0.40

- 1.20

- 1.40- 1.45

PAS. BATU BATA

PAS. TRASRAMSLOOF 20/30

LANTAI KERJA

PAS. BATU KOSONG

TANAH ASLI

TANAH URUG

PAS. BATU KALI

PASIR URUG

LANTAI TEGEL 40X40

LANTAI KERJA

PAS. BATU KOSONG

TANAH ASLI

TANAH URUG

PAS. BATU KALI

PASIR URUG

LANTAI TEGEL 40X40

Page 2: Tugas Besar Rab Rumah Tinggal Pribadi

PERHITUNGAN VOLUME

No Gambar / Sketsa Uraian Perhitungan Unit Ket.

g. Lantai Beton Rabat 5 Cm

18.83 x 0.05 = 0.94

h. Sloof

0.15 x 0.15 x 38.50 = 0.87

i. Kolom

0.12 x 0.12 x 3.40 = 0.05

0.05 x 14.00 = 0.69

j. Dinding

3.40 x 38.50 = 130.90

130.90 - 15.75 = 115.15

115.15 x 0.12 = 13.82

13.82 - 0.69 = 9.47

Luas Total = ###

k. Plasteran

3.50 x 115.15 x 2.00 = ###

l. Ring Bal

0.15 x 0.15 x 38.50 = 0.87

m. Kuda-Kuda Batu

8.15x 2.77 x 2.00 = 22.58 m2

2.00

5.90x 1.98 x 1.00 = 5.84

2.00

28.42 x 0.12 = 3.41

Luas Total = 31.83

n.Plasteran Kuda-kuda

8.15x 2.77 x 2.00 = 22.58 m2

2.00

5.90x 1.98 x 1.00 = 5.84

2.00

28.42 x 2.00 = 56.83

Luas Total = 56.83

m3

m3

m3

m3

m2

m2

m2

m3

m2

m3

m2

m3

m2

m2

m2

m2

Page 3: Tugas Besar Rab Rumah Tinggal Pribadi

PERHITUNGAN VOLUME

No Gambar / Sketsa Uraian Perhitungan Unit Ket.

o. Kuda- kuda kayu

6.39 x 0.06 x 0.12 x 2.00 = 0.09 kaki

3.05 x 0.06 x 0.12 x 2.00 = 0.04 gapit

3.07 x 0.06 x 0.12 x 2.00 = 0.04 skoor

3.88 x 0.06 x 0.12 x 1.00 = 0.03 tiang

7.50 x 0.06 x 0.12 x 1.00 = 0.05 tarik

2.63 x 0.06 x 0.12 x 1.00 = 0.02 skoor

Luas Total = 0.18

p. Gording

8.65 x 0.06 x 0.12 x 12.00 = 0.75

1.50 x 0.06 x 0.12 x 12.00 = 0.13

10.15 x 0.05 x 0.07 x 12.00 = 0.43 Kasau

Luas Total = 1.30

q. Atap

3.78 + 1.43x 1.65 x 2.00 = 8.60 m2

2.00

8.65 x 4.97 x 2.00 = 85.98m2

( 1.98 * 5.60 )x 2.61 = -14.44 m2

2.00

Luas Total = 80.14

r. Listplank

5.00 x 0.03 x 0.30 x 2.00 = 0.09

1.60 x 0.03 x 0.30 x 2.00 = 0.03

2.06 x 0.03 x 0.30 x 2.00 = 0.04

8.65 x 0.03 x 0.30 x 2.00 = 0.16

Luas Total = 0.31

m3

m3

m3

m3

m3

m3

m3

m3

m3

m3

m3

m2

m3

m3

m3

m3

m3

Page 4: Tugas Besar Rab Rumah Tinggal Pribadi

DAFTAR VOLUME

No. Jenis Pekerjaan Sat. Volume

I. PEKERJAAN GALIAN DAN URUGAN1 Galian tanah 43.51 2 Timbunan tanah kembali 43.18 3 Urugan Pasir di bawah pondasi 4.97 4 Urugan Pasir dibawah lantai 18.83

II. PEKERJAAN PONDASI DAN BETON1 Pasangan batu kali 1 : 5 42.58 2 Pasangan beton sloof 0.87 3 Kolom beton 0.69 4 Beton ring balk 0.87

III. PEKERJAAN PASANGAN DAN PLESTERAN1 Pas. Dinding bata merah 124.62 2 Plesteran 862.88 3 Acian 862.88

IV. PEKERJAAN LANTAI DAN DINDING1 Lantai Beton Rabat 5 Cm 0.94

V. PEKERJAAN ATAP1 Pasangan kuda-kuda batu 31.83 2 Pasangan kuda-kuda kayu 0.18 3 Gording 1.30 4 Atap 80.14 5 Listplank 0.31

M2

M3

M3

M3

M3

M3

M3

M3

M2

M2

M2

M3

M3

M3

M2

M3

M3

Page 5: Tugas Besar Rab Rumah Tinggal Pribadi

DAFTAR ANALISA SATUAN PEKERJAAN

1. 1 m³ Galian Tanah Untuk Pondasi

- Pekerja 0.400 Oh x Rp. 35,000.00 = Rp. 14,000.00 - Mandor 0.040 Oh x Rp. 50,000.00 = Rp. 2,000.00 - Alat Bantu 1.000 Ls x Rp. 200.00 = Rp. 200.00

JUMLAH = Rp. 16,200.00

2. 1 m³ Timbunan Tanah Kembali

- Pekerja 0.192 Oh x Rp. 35,000.00 = Rp. 6,720.00 - Mandor 0.019 Oh x Rp. 50,000.00 = Rp. 950.00 - Alat Bantu 1.000 Ls x Rp. 200.00 = Rp. 200.00

JUMLAH = Rp. 7,870.00

3. 1 m³ Urugan Pasir Urug

- Pasir Urug 1.200 x Rp. 120,000.00 = Rp. 144,000.00 - Pekerja 0.150 Oh x Rp. 35,000.00 = Rp. 5,250.00 - Mandor 0.010 Oh x Rp. 50,000.00 = Rp. 500.00

JUMLAH = Rp. 197,890.00

4. 1 m³ Pasangan Batu Kali 1: 5

- Batu Kali 1.200 x Rp. 210,000.00 = Rp. 252,000.00 - Semen (PC) 2.160 Sak x Rp. 67,500.00 = Rp. 145,800.00 - Pasir Pasang 0.430 x Rp. 165,000.00 = Rp. 70,950.00 - Pekerja 2.250 Oh x Rp. 35,000.00 = Rp. 78,750.00 - Tukang Batu 1.125 Oh x Rp. 42,500.00 = Rp. 47,812.50 - Kepala Tukang Batu 0.112 Oh x Rp. 45,000.00 = Rp. 5,040.00 - Mandor 0.168 Oh x Rp. 50,000.00 = Rp. 8,400.00

JUMLAH = Rp. 608,752.50

5. Cor beton

- Semen (PC) 6.800 Sak x Rp. 67,500.00 = Rp. 459,000.00 - Split Pecah Mesin 2/3 0.830 x Rp. 230,000.00 = Rp. 190,900.00 - Pasir Beton 0.540 x Rp. 150,000.00 = Rp. 81,000.00 - Peralatan 1.000 Ls x Rp. 500.00 = Rp. 500.00 - Pekerja 3.000 Oh x Rp. 35,000.00 = Rp. 105,000.00 - Tukang Batu 0.500 Oh x Rp. 42,500.00 = Rp. 21,250.00 - Kepala Tukang Batu 0.050 Oh x Rp. 45,000.00 = Rp. 2,250.00 - Mandor 0.010 Oh x Rp. 50,000.00 = Rp. 500.00

JUMLAH = Rp. 860,400.00

6. 1M³ Lantai Kerja (Rabat)

- Semen (PC) 3.956 Sak x Rp. 67,500.00 = Rp. 267,030.00 - Pasir Beton 0.550 x Rp. 150,000.00 = Rp. 82,500.00 - Split Pecah Mesin 2/3 0.930 x Rp. 230,000.00 = Rp. 213,900.00 - Peralatan 1.000 Ls x Rp. 500.00 = Rp. 500.00 - Pekerja 1.500 Oh x Rp. 35,000.00 = Rp. 52,500.00 - Tukang Batu 0.375 Oh x Rp. 42,500.00 = Rp. 15,937.50 - Kepala Tukang Batu 0.037 Oh x Rp. 45,000.00 = Rp. 1,665.00 - Mandor 0.007 Oh x Rp. 50,000.00 = Rp. 350.00

JUMLAH = Rp. 634,382.50

7. 1M² Pasangan Bata Merah

- Bata Merah 70.000 bh x Rp. 1,100.00 = Rp. 77,000.00 - Semen (PC) 0.525 Sak x Rp. 67,500.00 = Rp. 35,437.50 - Pasir Pasang 0.054 x Rp. 165,000.00 = Rp. 8,910.00 - Pekerja 0.321 Oh x Rp. 35,000.00 = Rp. 11,235.00 - Tukang Batu 0.160 Oh x Rp. 42,500.00 = Rp. 6,800.00 - Kepala Tukang Batu 0.015 Oh x Rp. 45,000.00 = Rp. 675.00 - Mandor 0.008 Oh x Rp. 50,000.00 = Rp. 400.00

JUMLAH = Rp. 140,457.50

M3

M3

M3

M3

M3

M3

M3

M3

Page 6: Tugas Besar Rab Rumah Tinggal Pribadi

DAFTAR ANALISA SATUAN PEKERJAAN

8. 1M² Plesteran Dinding Dan Acian

- Semen (PC) 0.160 Sak x Rp. 67,500.00 = Rp. 10,800.00 - Pasir Pasang 0.019 x Rp. 165,000.00 = Rp. 3,135.00 - Pekerja 0.286 Oh x Rp. 35,000.00 = Rp. 10,010.00 - Tukang Batu 0.214 Oh x Rp. 42,500.00 = Rp. 9,095.00 - Kepala Tukang Batu 0.021 Oh x Rp. 45,000.00 = Rp. 945.00 - Mandor 0.021 Oh x Rp. 50,000.00 = Rp. 1,050.00

JUMLAH = Rp. 35,035.00 9. 1 M³ Pasangan Kuda-Kuda Kayu

- Kayu balok Borneo Super 1.010 x Rp. 2,000,000.00 = Rp. 2,020,000.00 - Paku 8 cm - 12 cm 0.160 Kg x Rp. 18,200.00 = Rp. 2,912.00 - Pekerja 0.030 Oh x Rp. 35,000.00 = Rp. 1,050.00 - Tukang Kayu 0.013 Oh x Rp. 42,500.00 = Rp. 552.50 - Kepala Tukang Kayu 0.187 Oh x Rp. 45,000.00 = Rp. 8,415.00 - Mandor 0.375 Oh x Rp. 50,000.00 = Rp. 18,750.00

JUMLAH = Rp. ###

10. 1 M³ Pasangan Kuda-Kuda Batu

- Kayu balok Borneo Super 0.017 x Rp. 2,000,000.00 = Rp. 34,000.00 - Kayu Reng 3/4 Borneo Super 4.000 x Rp. 12,000.00 = Rp. 48,000.00 - Paku 5 cm - 7 cm 0.250 Kg x Rp. 18,200.00 = Rp. 4,550.00 - Pekerja 0.150 Oh x Rp. 35,000.00 = Rp. 5,250.00 - Tukang Kayu 0.150 Oh x Rp. 42,500.00 = Rp. 6,375.00 - Kepala Tukang Kayu 0.010 Oh x Rp. 45,000.00 = Rp. 450.00 - Mandor 0.005 Oh x Rp. 50,000.00 = Rp. 250.00

JUMLAH = Rp. 98,875.00

11.

- Kayu Papan Kamper Medan 0.007 x Rp. 1,500,000.00 = Rp. 10,500.00 - Paku 5 cm - 7 cm 0.100 Kg x Rp. 18,200.00 = Rp. 1,820.00 - Pekerja 0.070 Oh x Rp. 35,000.00 = Rp. 2,450.00 - Tukang Kayu 0.200 Oh x Rp. 42,500.00 = Rp. 8,500.00 - Kepala Tukang Kayu 0.020 Oh x Rp. 45,000.00 = Rp. 900.00 - Mandor 0.004 Oh x Rp. 50,000.00 = Rp. 200.00

JUMLAH = Rp. 24,370.00

12. 1 M² Pekerjaan Atap

- Genteng Beton Natural 11.000 bh x Rp. 10,000.00 = Rp. 110,000.00 - Pekerja 0.120 Oh x Rp. 35,000.00 = Rp. 4,200.00 - Tukang Kayu 0.060 Oh x Rp. 42,500.00 = Rp. 2,550.00 - Kepala Tukang Kayu 0.006 Oh x Rp. 45,000.00 = Rp. 270.00 - Mandor 0.006 Oh x Rp. 50,000.00 = Rp. 300.00

JUMLAH = Rp. 117,320.00

M3

M3

M3

M'

1 M' Lis Plank

M3

Page 7: Tugas Besar Rab Rumah Tinggal Pribadi

DAFTAR HARGA SATUAN PEKERJAAN

NO URAIAN JENIS PEKERJAAN SATUAN HARGA SATUAN

(Rp)

I. PEKERJAAN GALIAN DAN URUGAN1 Galian tanah 16,200.00 2 Timbunan tanah kembali 7,870.00 3 Urugan Pasir di bawah pondasi 197,890.00 4 Urugan Pasir dibawah lantai 197,890.00

II. PEKERJAAN PONDASI DAN BETON1 Pasangan batu kali 1 : 5 608,752.50 2 Pasangan beton sloof 860,400.00 3 Kolom beton 860,400.00 4 Beton ring balk 860,400.00

III. PEKERJAAN PASANGAN DAN PLESTERAN1 Pas. Dinding bata merah 140,457.50 2 Plasteran 35,035.00 3 Acian 35,035.00

IV. PEKERJAAN LANTAI DAN DINDING1 Lantai Beton Rabat 5 Cm 634,382.50

V. PEKERJAAN ATAP1 Pasangan kuda-kuda batu 98,875.00 2 Pasangan kuda-kuda kayu 2,051,679.50 3 Gording 98,875.00 4 Atap 117,320.00 5 Listplank 24,370.00

M2

M3

M3

M3

M3

M3

M3

M3

M2

M2

M2

M3

M3

M3

M2

M3

M3

Page 8: Tugas Besar Rab Rumah Tinggal Pribadi

RENCANA ANGGARAN BIAYA

No JENIS PEKERJAAN SATUAN VOLUMEHARGA SATUAN

( Rp )

I. PEKERJAAN PERSIAPAN

1 Penyediaan P3K ls 1.00 250,000.00

2 Pengukuran / pas, Bouplank ls 1.00 350,000.00

3 Dokumen dan pelaporan ls 1.00 300,000.00

4 Pekerjaan Pembersihan ls 1.00 500,000.00

SUB TOTAL I

II. PEKERJAAN GALIAN DAN URUGAN

1 Galian tanah 43.51 16,200.00

2 Timbunan tanah kembali 43.18 7,870.00

3 Urugan Pasir di bawah pondasi 4.97 197,890.00

4 Urugan Pasir dibawah lantai 18.83 197,890.00

SUB TOTAL II

III. PEKERJAAN PONDASI DAN BETON

1 Pasangan batu kali 1 : 5 42.58 608,752.50

2 Pasangan beton sloof 0.87 860,400.00

3 Kolom beton 0.69 860,400.00

4 Beton ring balk 0.87 860,400.00

SUB TOTAL III

IV. PEKERJAAN PASANGAN DAN PLESTERAN

1 Pas. Dinding bata merah 124.62 140,457.50

2 Plesteran 862.88 35,035.00

3 Acian 862.88 35,035.00

SUB TOTAL IV

V. PEKERJAAN LANTAI DAN DINDING

1 Lantai Beton Rabat 5 Cm 0.94 634,382.50

SUB TOTAL V

VI. PEKERJAAN ATAP

1 Pasangan kuda-kuda batu 31.83 98,875.00

2 Pasangan kuda-kuda kayu 0.18 2,051,679.50

3 Gording 1.30 98,875.00

4 Atap 80.14 117,320.00

5 Listplank 0.31 24,370.00

SUB TOTAL VI

VII. PEK. INSTALASI LISTRIK

1 Pemasangan titik cahaya bh 12.00 204,000.00

2 Pemasangan stop kontak Broco bh 10.00 9,600.00

3 Pemasangan stop kontak AC Braco bh 1.00 9,600.00

4 Pemasangan stop kontak Telepon Braco bh 1.00 9,600.00

5 Pemasangan Saklar Tunggal Broco bh 8.00 9,600.00

6 Pemasangan Saklar Ganda Broco bh 4.00 9,600.00

M2

M3

M3

M3

M3

M3

M3

M3

M2

M2

M2

M3

M3

M3

M2

M3

M3

Page 9: Tugas Besar Rab Rumah Tinggal Pribadi

RENCANA ANGGARAN BIAYA

No JENIS PEKERJAAN SATUAN VOLUMEHARGA SATUAN

( Rp )

7 Pemasangan Lampu Sumpit 20 watt philips bh 12.00 16,800.00

8 Pemasangan pipa Instalasi Listrik dia, "5/5" bh 12.00 6,000.00

9 Pemasangan MCB unit 1.00 42,000.00

10 Pemasangan Groding tembaga 1 = 4000 mm bh 1.00 180,000.00

11 Kabel Instalasi Dalam Bang. NYM - 2 x 3.5 mm m' 1.00 792,000.00

12 Kabel Instalasi Dalam Bang. NYM - 2 x 2.5 mm m' 1.00 552,000.00

SUB TOTAL VII

VIII. PEKERJAAN PENGECATAN

1 Pekerjaan Pengecatan tembok (Altex) M² 420.00 6,000.00

2 Pekerjaan Pengecatan plafon (Altex) M² 42.00 6,000.00

3 Pekerjaan Pengecatan kayu / Besi (Altex) M² 18.29 3,600.00

4 Pekerjaan Residu Rangka atap dan plafon M² 79.00 3,000.00

SUB TOTAL VIII

IX. PEKERJAAN SANITASI

1 Pasang Kloset Jongkok bh 1.00 180,000.00

2 Pasang Kran air bh 4.00 18,000.00

3 Pasang Floor Drain bh 2.00 21,600.00

4 Pas. Pipa Disp cair / air hujan dia, 3" PVC btg 6.00 51,600.00

5 Pas. Pipa Air bersih dia 3/4" PVC btg 6.00 45,600.00

6 Talang atap persegi PVC 4" btg 3.00 19,200.00

7 Pasang Septic tank dan peresapan set 1.00 600,000.00

8 Bak kontrol bh 2.00 18,000.00

9 Bak Tangki Air fiber 1 M³ bh 1.00 150,000.00

SUB TOTAL IX

TOTAL I+II+III+IV+V+VI+VII+VIII+IX

Page 10: Tugas Besar Rab Rumah Tinggal Pribadi

RENCANA ANGGARAN BIAYA

JUMLAH HARGA

( Rp )

250,000.00

350,000.00

300,000.00

500,000.00

1,400,000.00

704,873.34

339,826.60

983,859.61

3,725,279.25

5,753,838.80

25,919,159.57

745,321.50

589,752.58

745,321.50

27,999,555.14

17,504,011.68

30,231,105.91

30,231,105.91

77,966,223.49

597,112.53

597,112.53

3,146,843.21

375,639.54

128,859.83

9,401,482.78

7,593.20

3,651,342.58

2,448,000.00

96,000.00

9,600.00

9,600.00

76,800.00

38,400.00

Page 11: Tugas Besar Rab Rumah Tinggal Pribadi

RENCANA ANGGARAN BIAYA

JUMLAH HARGA

( Rp )

201,600.00

72,000.00

42,000.00

180,000.00

792,000.00

552,000.00

4,518,000.00

2,520,000.00

252,000.00

65,833.20

237,000.00

3,074,833.20

180,000.00

72,000.00

43,200.00

309,600.00

273,600.00

57,600.00

600,000.00

36,000.00

150,000.00

1,722,000.00

126,682,905.74

Page 12: Tugas Besar Rab Rumah Tinggal Pribadi

REKAPRENCANA ANGGARAN BIAYA

No JENIS PEKERJAANJUMLAH HARGA

( Rp )

I. PEKERJAAN PERSIAPAN 1,400,000.00

II. PEKERJAAN GALIAN DAN URUGAN 5,753,838.80

III. PEKERJAAN PONDASI DAN BETON 27,999,555.14

IV. PEKERJAAN PASANGAN DAN PLESTERAN 77,966,223.49

V. PEKERJAAN LANTAI DAN DINDING 597,112.53

VI. PEKERJAAN ATAP 3,651,342.58

VII. PEKERJAAN INSTALASI LISTRIK 4,518,000.00

VIII. PEKERJAAN PENGECATAN 3,074,833.20

IX. PEKERJAAN SANITASI 1,722,000.00

TOTAL 126,682,905.74

DIBULATKAN 127,000,000.00

Terbilang : Seratus Dua Puluh Tujuh juta Rupiah

Makassar, Pebruari 2009

Mengetahui : Dibuat oleh :

DOSEN ASISTEN

Page 13: Tugas Besar Rab Rumah Tinggal Pribadi

( Ir. H. M.NUR ABU ) (………………………. ) (AMBO DALLE)

Page 14: Tugas Besar Rab Rumah Tinggal Pribadi

HARGA SATUAN UPAH

No. TENAGA KERJA KODE SATUAN KET.

1 Mandor 50,000 MAN 1 Orang/hari/8 jam

2 Kepala Tukang Besi Beton 45,000 MEK 1 Orang/hari/8 jam

3 Tukang Besi Beton 42,500 PMEK 1 Orang/hari/8 jam

4 Kepala Tukang Batu 45,000 KTUK 1 Orang/hari/8 jam

5 Tukang Batu 42,500 1 Orang/hari/8 jam

6 Kepala Tukang Kayu 45,000 1 Orang/hari/8 jam

7 Tukang Kayu 42,500 1 Orang/hari/8 jam

8 Kepala Tukang Cat 45,000 SUP 1 Orang/hari/8 jam

9 Tukang Cat 42,500 SUP2 1 Orang/hari/8 jam

10 Pekerja 35,000 PSUP 1 Orang/hari/8 jam

11 Tukang Pipa 40,000 PSUP 1 Orang/hari/8 jam

12 Tukang Listrik 45,000 PSUP 1 Orang/hari/8 jam

UPAH (Rp/Hari)

Page 15: Tugas Besar Rab Rumah Tinggal Pribadi

DAFTAR HARGA BAHAN

NO JENIS BAHAN SATUAN HARGA (Rp.) KET.

1 Batu Kali / Batu Gunung m3 210,000 2 Batu Belah 15 - 20 cm m3 210,000 3 Batu Belah 0.5 - 1 cm (Split) m3 240,000 4 Kerikil Beton / Koral m3 240,000 5 Sirtu m3 100,000 6 Timbunan Pilihan / Pasir Urug m3 120,000 7 Timbunan Biasa / Tanah Urug m3 70,000 8 Pasir Kasar / Pasir Beton m3 150,000 9 Pasir Halus / Pasir Pasangan m3 165,000

10 Balok Kayu Klas I m3 2,000,000 11 Balok kayu Klas II m3 1,500,000 12 Papan Klas I m3 2,000,000 13 Papan Klas II m3 1,500,000 14 Dolken Kayu Galam Ø 8-10 / 4 meter Btg 35,000 15 Kayu reng 3/4 borneo super m3 2,000,000 16 Kayu papan kamper medan m3 1,500,000 17 Kaso 5/7 Kayu Borneo super m3 2,000,000 18 Kayu reng 3/4 borneo super Btg 12,000 19 Kayu balok kamper singkil m3 3,500,000 20 Papan Kayu Cor Borneo m3 2,500,000 21 Lis Kayu Profil m' 2,500 22 Semen (PC) zak 67,500 23 Kawat Beton Kg 21,000 24 Kawat Bronjong Kg 24,000 25 Kawat Duri Kg 27,000 26 Besi Beton Staf 25,000 27 Paku Campuran Kg 18,200 28 Paku Tripleks Kg 18,200 29 Paku Seng Kg 18,200 30 Paku Beton Kg 19,700 31 Teakwood 3 mm Lbr 76,000 32 Tripleks 3 mm Lbr 48,500 33 Pipa Galvanis Medium B Staf 117,000 34 Pipa GIP Medium A Staf 227,000 35 Pipa PVC Staf 24,000 36 Tee PVC Bh 8,000 37 Tee reducer Bh 18,000 38 Batu Bata Bh 1,200 39 Paving Stone Bh 3,000 40 Bowling Bh 13,000 41 Besi Siku M' 37,000 42 Seng Gelombang Lbr 50,000 43 Seng Pelat Bubungan Lbr 27,000

Page 16: Tugas Besar Rab Rumah Tinggal Pribadi

HARGA SATUAN BAHAN FABRIKASI

No. JENIS BAHAN SATUAN HPS

(Rp) (Rp) (Rp)

1 2 3 4 5 6 11

1 Semen (PC) 50 kg Zak 64,500.00 3,000.00 67,500.00

3 Kawat Beton Kg 20,000.00 1,000.00 21,000.00

4 Kawat Bronjong Kg 23,000.00 1,000.00 24,000.00

5 Kawat Duri Kg 25,000.00 2,000.00 27,000.00

6 Besi Beton Dia. 6 mm Staf 23,000.00 2,000.00 25,000.00

7 Besi Beton Dia. 8 mm Staf 36,000.00 2,000.00 38,000.00

8 Besi Beton Dia. 10 mm Staf 58,000.00 2,000.00 60,000.00

9 Besi Beton Dia. 12 mm Staf 74,000.00 2,000.00 76,000.00

10 Besi Beton Dia. 14 mm Staf 105,000.00 2,000.00 107,000.00

11 Besi Beton Dia. 16 mm Staf 154,000.00 2,000.00 156,000.00

12 Besi Beton Dia. 19 mm Staf 202,000.00 3,000.00 205,000.00

13 Besi Beton Dia. 22 mm Staf 253,000.00 3,000.00 256,000.00

14 Besi Beton Dia. 25 mm Staf 310,000.00 3,000.00 313,000.00

15 Besi Beton Dia. 32 mm Staf 420,000.00 3,000.00 423,000.00

16 Paku Campuran 4 cm - 12 cm Kg 17,500.00 700.00 18,200.00

17 Paku Tripleks 1 cm - 3 cm Kg 17,500.00 700.00 18,200.00

18 Paku Seng Kg 17,500.00 700.00 18,200.00

19 Paku Beton Kg 19,000.00 700.00 19,700.00

20 Teakwood 3 mm Uk. 122 x 244 cm Lbr 75,000.00 1,000.00 76,000.00

21 Tripleks 3 mm Uk. 122 x 244 cm Lbr 47,500.00 1,000.00 48,500.00

22 Tripleks 4 mm Uk. 122 x 244 cm Lbr 85,000.00 1,000.00 86,000.00

23 Tripleks 8 mm Uk. 122 x 244 cm Lbr 125,000.00 1,000.00 126,000.00

24 Tripleks 10 mm Uk. 122 x 244 cm Lbr 185,000.00 1,000.00 186,000.00

25 Tripleks 20 mm Uk. 122 x 244 cm Lbr 215,000.00 1,000.00 216,000.00

26 Pipa Galvanis Medium B Uk. 1/2 " Staf 115,000.00 2,000.00 117,000.00

27 Pipa Galvanis Medium B Uk. 3/4 " Staf 160,000.00 2,000.00 162,000.00

28 Pipa Galvanis Medium B Uk. 1 " Staf 185,000.00 2,000.00 187,000.00

29 Pipa Galvanis Medium B Staf 225,000.00 2,000.00 227,000.00

30 Pipa GIP Medium A Uk. 1/2 " Staf 225,000.00 2,000.00 227,000.00

31 Pipa GIP Medium A Uk. 3/4 " Staf 265,000.00 2,000.00 267,000.00

32 Pipa PVC Uk. 1/2 " Staf 22,000.00 2,000.00 24,000.00

33 Pipa PVC Uk. 3/4 " Staf 26,000.00 2,000.00 28,000.00

34 Pipa PVC Uk. 1 " Staf 30,000.00 2,000.00 32,000.00

35 Pipa PVC Staf 40,000.00 2,000.00 42,000.00

36 Pipa PVC Staf 50,000.00 2,000.00 52,000.00

37 Pipa PVC Uk. 2 " Staf 60,000.00 2,000.00 62,000.00

38 Pipa PVC Uk. 3 " Staf 88,000.00 2,000.00 90,000.00

39 Pipa PVC Uk. 4 " Staf 98,000.00 2,000.00 100,000.00

40 Knee PVC Uk. 1/2 " Bh 2,500.00 500.00 3,000.00

41 Knee PVC Uk. 3/4 " Bh 3,500.00 500.00 4,000.00

42 Knee PVC Uk. 2 " Bh 7,500.00 500.00 8,000.00

43 Knee PVC Uk. 4 " Bh 17,500.00 500.00 18,000.00

44 Tee PVC Uk. 1/2 " Bh 7,500.00 500.00 8,000.00

45 Tee PVC Uk. 3/4 " Bh 3,500.00 500.00 4,000.00

SPESIFIKASI / MERK / MODEL /

UKURAN

ONGKOS ANGKUT KE

LOKASI KERJA

HARGA SATUAN DI

LOKASI KERJA

Uk. 11/4 "

Uk. 11/4 "

Uk. 11/2 "

Page 17: Tugas Besar Rab Rumah Tinggal Pribadi

HARGA SATUAN BAHAN FABRIKASI

No. JENIS BAHAN SATUAN HPS

(Rp) (Rp) (Rp)

1 2 3 4 5 6 11

SPESIFIKASI / MERK / MODEL /

UKURAN

ONGKOS ANGKUT KE

LOKASI KERJA

HARGA SATUAN DI

LOKASI KERJA

46 Tee reducer Uk. 4 " Bh 17,500.00 500.00 18,000.00

47 Tee reducer Uk. 4 " Bh 17,500.00 500.00 18,000.00

48 Batu Bata Bh 1,100.00 100.00 1,200.00

49 Paving Stone Bh 2,500.00 500.00 3,000.00

50 Bowling Bh 12,500.00 500.00 13,000.00

51 Besi Siku Uk. 30.30.3 M' 35,000.00 2,000.00 37,000.00

52 Besi Siku Uk. 40.40.4 M' 47,500.00 2,000.00 49,500.00

53 Besi Siku Uk. 50.50.5 M' 87,500.00 2,000.00 89,500.00

54 Seng Gelombang BJLS 0.20 mm Lbr 48,000.00 2,000.00 50,000.00

55 Seng Gelombang BJLS 0.25 mm Lbr 58,700.00 2,000.00 60,700.00

56 Seng Gelombang BJLS 0.30 mm Lbr 70,091.00 2,000.00 72,091.00

57 Seng Pelat Bubungan BJLS 0.30 mm Lbr 25,000.00 2,000.00 27,000.00

58 Atap Asbes Gelombang Lbr 27,000.00 2,000.00 29,000.00

59 Genteng Semen (Beton) Bh 9,500.00 500.00 10,000.00

60 Tegel Semen 30 x 30 cm M2 35,000.00 2,000.00 37,000.00

61 Tegel Semen 20 x 20 cm M2 35,000.00 2,000.00 37,000.00

62 Tegel Porselin 10 x 20 cm M2 55,000.00 2,000.00 57,000.00

63 Tegel Porselin 10 x 10 cm M2 55,000.00 2,000.00 57,000.00

64 Tegel Keramik 10 x 20 cm M2 60,000.00 2,000.00 62,000.00

65 Tegel Keramik 20 x 20 cm M2 60,000.00 2,000.00 62,000.00

66 Tegel Keramik 20 x 25 cm M2 60,000.00 2,000.00 62,000.00

67 Tegel Keramik 30 x 30 cm M2 60,000.00 2,000.00 62,000.00

68 Tegel Keramik 40 x 40 cm M2 60,000.00 2,000.00 62,000.00

69 Cat Kayu / Besi Glotex Kg 30,000.00 2,000.00 32,000.00

70 Cat Kayu / Besi Platone Kg 30,000.00 2,000.00 32,000.00

71 Cat Tembok 1 Kg 15,000.00 2,000.00 17,000.00

72 Cat Tembok 5 Kg 65,000.00 2,000.00 67,000.00

73 Cat Meni Kayu Altex Kg 21,000.00 2,000.00 23,000.00

74 Cat Meni Besi Altex Kg 21,000.00 2,000.00 23,000.00

75 Minyak Cat Thinner Liter 15,000.00 2,000.00 17,000.00

76 Minyak Cat Afduner Liter 5,500.00 1,000.00 6,500.00

77 Pelumas / Olie Liter 15,000.00 1,000.00 16,000.00

78 Dempul Kayu Altex Kg 20,000.00 1,000.00 21,000.00

79 Plamir Tembok Kaleng 5 Kg 25,000.00 1,000.00 26,000.00

80 Kuas Cat Bh 7,500.00 200.00 7,700.00

Residu Liter 15,000.00 250.00 15,250.00

81 Kaca Rayban 3 mm M2 110,000.00 5,000.00 115,000.00

82 Kaca Rayban 5 mm M2 200,000.00 5,000.00 205,000.00

83 Kaca Bening 2 mm M2 65,000.00 5,000.00 70,000.00

84 Kaca Bening 3 mm M2 92,000.00 5,000.00 97,000.00

85 Kaca Bening 5 mm M2 170,000.00 5,000.00 175,000.00

Dudukan Nako Bh 50,000.00 500.00 50,500.00

86 Kran (Kualitas Baik) Bh 50,000.00 500.00 50,500.00

87 Avour / Saringan Air Kotor Bh 15,000.00 500.00 15,500.00

Page 18: Tugas Besar Rab Rumah Tinggal Pribadi

HARGA SATUAN BAHAN FABRIKASI

No. JENIS BAHAN SATUAN HPS

(Rp) (Rp) (Rp)

1 2 3 4 5 6 11

SPESIFIKASI / MERK / MODEL /

UKURAN

ONGKOS ANGKUT KE

LOKASI KERJA

HARGA SATUAN DI

LOKASI KERJA

88 Floor Drain Bh 35,000.00 4,000.00 39,000.00

89 Kloset Jongkok INA Bh 170,000.00 4,000.00 174,000.00

90 Kloset Jongkok TOTO Bh 170,000.00 4,000.00 174,000.00

91 Kloset Duduk / Lengkap INA Bh 1,400,000.00 4,000.00 1,404,000.00

92 Kloset Duduk / Lengkap TOTO Bh 1,400,000.00 4,000.00 1,404,000.00

93 Wastafel INA / TOTO Bh 1,100,000.00 4,000.00 1,104,000.00

I J U K Kg 25,000.00 200.00 25,200.00

94 Kunci Pintu 1 Slaag Cap Kuda Terbang Bh 110,000.00 500.00 110,500.00

95 Kunci Pintu 2 Slaag Cap SES Bh 215,000.00 500.00 215,500.00

96 Grendel Jendela Bh 7,500.00 500.00 8,000.00

97 Kait Angin Bh 5,000.00 500.00 5,500.00

98 Engsel Jendela Kuningan Bh 7,500.00 500.00 8,000.00

99 Engsel Pintu Kuningan Bh 11,000.00 500.00 11,500.00

100 Lis Profil 5 cm M' 17,500.00 500.00 18,000.00

101 Kertas Ampelas Lbr 4,000.00 500.00 4,500.00

102 Mur / Baut / Beugel / Angker Kg 12,500.00 500.00 13,000.00

103 Box Sekring 1 Group Bh 53,000.00 500.00 53,500.00

104 Box Sekring 2 Group Bh 85,000.00 500.00 85,500.00

105 MCB 2 Ampere Bh 45,000.00 500.00 45,500.00

106 MCB 4 Ampere Bh 45,000.00 500.00 45,500.00

107 MCB 6 Ampere Bh 55,000.00 500.00 55,500.00

108 MCB 10 Ampere Bh 65,000.00 500.00 65,500.00

109 Saklar Tunggal Tanam Bh 25,000.00 500.00 25,500.00

110 Saklar Ganda Tanam Bh 30,000.00 500.00 30,500.00

111 Saklar Tunggal Timbul Bh 23,000.00 500.00 23,500.00

112 Saklar Ganda Timbul Bh 27,000.00 500.00 27,500.00

113 Stop Kontak Tanam Bh 27,500.00 500.00 28,000.00

114 Stop Kontak Timbul Bh 25,000.00 500.00 25,500.00

115 Titik Lampu Bh 5,000.00 500.00 5,500.00

116 Lampu Pijar 5 Watt Bh 3,500.00 500.00 4,000.00

117 Lampu Pijar 10 Watt Bh 4,500.00 500.00 5,000.00

118 Lampu Pijar 15 Watt Bh 4,500.00 500.00 5,000.00

119 Lampu Pijar 25 Watt Bh 5,000.00 500.00 5,500.00

120 Lampu Pijar 40 Watt Bh 6,000.00 500.00 6,500.00

121 Lampu Pijar 60 Watt Bh 7,000.00 500.00 7,500.00

122 Lampu Pijar 75 Watt Bh 8,500.00 500.00 9,000.00

123 Lampu Pijar 100 Watt Bh 12,500.00 500.00 13,000.00

124 Lampu Jari-jari 14 Watt Philips Bh 37,500.00 700.00 38,200.00

125 Lampu Jari-jari 25 Watt Philips Bh 47,500.00 700.00 48,200.00

126 Mur / Baut / Beugel / Angker Bh 125.00 500.00 625.00

127 Lem Putih kg 45,000.00 500.00 45,500.00

128 Multiplek 12 mm 125,000.00 500.00 125,500.00

129 Kunci KM/WC Cap Kuda Terbang Bh 65,000.00 500.00 65,500.00

130 Fiber Glass Bh 125,000.00 500.00 125,500.00

Page 19: Tugas Besar Rab Rumah Tinggal Pribadi

HARGA SATUAN BAHAN FABRIKASI

No. JENIS BAHAN SATUAN HPS

(Rp) (Rp) (Rp)

1 2 3 4 5 6 11

SPESIFIKASI / MERK / MODEL /

UKURAN

ONGKOS ANGKUT KE

LOKASI KERJA

HARGA SATUAN DI

LOKASI KERJA

131 Rol Cat Bh 25,000.00 500.00 25,500.00

132 Flincote kg 15,000.00 500.00 15,500.00

133 Tarikan Jendela Bh 12,000.00 500.00 12,500.00

134 Kitchen sink Aluminium Bh 350,000.00 500.00 350,500.00

135 Kran Air Dapur Type Bebek Bh 35,000.00 500.00 35,500.00

136 Lampu Taman (Lengkap) Bh 225,000.00 500.00 225,500.00

137 Daun Pintu dan Kusen PVC Pabrikasi Bh 450,000.00 500.00 450,500.00

138 Panel Listri dan Asesories Broco unit 250,000.00 500.00 250,500.00

139 Fiting Broco Bh 2,500.00 500.00 3,000.00

140 Kabel NYM 2x2,5 mm 8,000 500.00 8,500.00

141 Kabel NYM 3x2,5 mm 9,500 500.00 10,000.00

M'