rab 2009

252
document.xls Rekapitulasi Hal - 1 REKAPITULASI RENCANA ANGGARAN BIAYA PENATAAN PEMUKIMAN NELAYAN DUSUN PAOREBBE, SALABU, PATANDE DESA WEWANGRIU KEC.MALILI KAB.LU SUMBER DANA ADB + APBD NO. JENIS PEKERJAAN JUMLAH HARGA A. PEKERJAAN JALAN BETON ROW 5.00 Meter 2,180,562,000.00 B. PEKERJAAN TALUD, P = 100 M' 175,032,000.00 C. PEKERJAAN PLAT JEMBATAN BETON A, B DAN C 197,981,000.00 D. PEKERJAAN RUMAH SEDERHANA 30 (Tiga Puluh) UNIT 1,500,000,000.00 E. PEKERJAAN BALAI DESA 220,899,000.00 F. PENGADAAN LAMPU PENERANG JALAN 258,890,000.00 G. PEKERJAAN PENGADAAN PEWADAHAN SAMPAH 114,080,000.00 H. PEKERJAAN PEMBANGUNAN MCK UMUM 104,562,000.00 I. PEKERJAAN JALAN RABAT BETON + 1 UNIT PLAT PELIN 715,543,000.00 Jumlah Total 5,467,549,000.00 Dibulatkan 5,467,549,000.00 Dengan kata : LIMA MILYAR EMPAT RATUS ENAM PULUH TUJUH JUTA LIMA RATUS EMPAT PULUH SEMB Malili, Disetujui Direnca SATKER NUSSP KONSULTAN P KABUPATEN LUWU TIMUR CV. INTRA EZRA LALLO, ST. MT ( Ir. ASNADI A. Nip. 19790531 200604 1 007 Team Le Mengetahui Menget LCO KABUPATEN LUWU TIMUR OVERSIGHT CON KEPALA OC ( Ir. ABD. JABBAR SYAH Ir. ADI Nip. 19601231 198903 1 126

Upload: iwan-irwan-arnol

Post on 03-Aug-2015

352 views

Category:

Documents


7 download

TRANSCRIPT

Page 1: RAB 2009

document.xls Rekapitulasi Hal - 1

REKAPITULASI RENCANA ANGGARAN BIAYAPENATAAN PEMUKIMAN NELAYAN

DUSUN PAOREBBE, SALABU, PATANDE DESA WEWANGRIU KEC.MALILI KAB.LUWU TIMURSUMBER DANA ADB + APBD

NO. JENIS PEKERJAAN JUMLAH HARGA

A. PEKERJAAN JALAN BETON ROW 5.00 Meter 2,180,562,000.00

B. PEKERJAAN TALUD, P = 100 M' 175,032,000.00

C. PEKERJAAN PLAT JEMBATAN BETON A, B DAN C 197,981,000.00

D. PEKERJAAN RUMAH SEDERHANA 30 (Tiga Puluh) UNIT 1,500,000,000.00

E. PEKERJAAN BALAI DESA 220,899,000.00

F. PENGADAAN LAMPU PENERANG JALAN 258,890,000.00

G. PEKERJAAN PENGADAAN PEWADAHAN SAMPAH 114,080,000.00

H. PEKERJAAN PEMBANGUNAN MCK UMUM 104,562,000.00

I. PEKERJAAN JALAN RABAT BETON + 1 UNIT PLAT PELINTAS 715,543,000.00

Jumlah Total 5,467,549,000.00

Dibulatkan 5,467,549,000.00

Dengan kata :

LIMA MILYAR EMPAT RATUS ENAM PULUH TUJUH JUTA LIMA RATUS EMPAT PULUH SEMBILAN RIBU 0 RUPIAH,-

Malili, Mei 2009

Disetujui Direncanakan

SATKER NUSSP KONSULTAN PERENCANA

KABUPATEN LUWU TIMUR CV. INTRANUSA EM

EZRA LALLO, ST. MT ( Ir. ASNADI A. MACHMUD, MT )

Nip. 19790531 200604 1 007 Team Leader

Mengetahui Mengetahui

LCO KABUPATEN LUWU TIMUR OVERSIGHT CONSULTANT III

KEPALA OC ( 3 )

Ir. ABD. JABBAR SYAH Ir. ADI BARCON

Nip. 19601231 198903 1 126

Page 2: RAB 2009

document.xls Rekapitulasi Hal - 2

REKAPITULASI RENCANA ANGGARAN BIAYAPENATAAN PEMUKIMAN NELAYAN

DUSUN PAOREBBE, SALABU, PATANDE DESA WEWANGRIU KEC.MALILI KAB.LUWU TIMURSUMBER DANA ADB + APBD

KETERANGAN

ADB

ADB

ADB

PEMDA (APBD)

PEMDA (APBD)

ADB

ADB

ADB

ADB

-

-

LIMA MILYAR EMPAT RATUS ENAM PULUH TUJUH JUTA LIMA RATUS EMPAT PULUH SEMBILAN RIBU 0 RUPIAH,-

Malili, Mei 2009

Direncanakan

KONSULTAN PERENCANA

CV. INTRANUSA EM

( Ir. ASNADI A. MACHMUD, MT )

Team Leader

Mengetahui

OVERSIGHT CONSULTANT III

OC ( 3 )

Ir. ADI BARCON

Page 3: RAB 2009

RENCANA ANGGARAN BIAYAPENATAAN PEMUKIMAN NELAYAN

DUSUN PAOREBBAE, SALABU, PATANDEDESA WEWANGRIU, KEC.MALILI, KAB.LUWU TIMUR

NEIGHBORHOOD UPGRADING SHELTER SECTOR PROJECT

PROJECT UPGRADING PLUS NUSSP LOAN ADBDESA WEWANGRIU KECAMATAN MALILI KABUPATEN LUWU TIMUR

TAHUN ANGGARAN 2009

Page 4: RAB 2009

BILL OF QUANTITYPENATAAN PEMUKIMAN NELAYAN

DUSUN PAOREBBAE, SALABU, PATANDEDESA WEWANGRIU, KEC.MALILI, KAB.LUWU TIMUR

NEIGHBORHOOD UPGRADING SHELTER SECTOR PROJECT

PROJECT UPGRADING PLUS NUSSP LOAN ADBDESA WEWANGRIU KECAMATAN MALILI KABUPATEN LUWU TIMUR

Page 5: RAB 2009

TAHUN ANGGARAN 2009

ANALISA HARGA SATUAN PEKERJAAN

Page 6: RAB 2009

HARGA SATUAN BAHAN DAN UPAH

Page 7: RAB 2009

document.xls RAB Hal - 7

RENCANA ANGGARAN BIAYAPENATAAN PEMUKIMAN NELAYAN (DESA WEWANGRIU)PEKERJAAN RUMAH SEDERHANA 20 ( DUA PULUH) UNIT

NO. URAIAN PEKERJAAN SAT. VOLUME HARGA

SATUAN

REKAPITULASI

A. PEKERJAAN PENDAHULUAN - - - B. PEKERJAAN TANAH DAN URUGAN - - - C. PEKERJAAN PONDASI,BETON DAN DINDING - - - D. PEKERJAAN KAYU - - - E. PEKERJAAN ATAP F. PEKERJAAN PENGGANTUNG/PENGUNCI - - - G. PEKERJAAN PENGECATAN - - - H. PEKERJAAN ANTI RAYAP - - - I. PEKERJAAN KLOSED DAN SANITASI - - - J. PEKERJAAN INSTALASI LISTRIK - - -

Biaya per unit - - -

PPn 10% per unit - - -

Jumlah total biaya per unit - - -

Jumlah Total untuk 20 unit (jumlah total biaya per unit x 20) - - -

dibulatkan - - -

Dengan kata :

SATU MILYAR LIMA RATUS JUTA 0 RUPIAH,-

Malili, Mei 2009 Disetujui Direncanakan

SATKER NUSSP KONSULTAN PERENCANA KABUPATEN LUWU TIMUR CV. INTRANUSA EM

EZRA LALLO, ST. MT ( Ir. ASNADI A. MACHMUD, MT )Nip. 19790531 200604 1 007 Team Leader

Mengetahui Mengetahui LCO KABUPATEN LUWU TIMUR OVERSIGHT CONSULTANT III

KEPALA OC ( 3 )

Ir. ABD. JABBAR SYAH Ir. ADI BARCONNip. 19601231 198903 1 126

Page 8: RAB 2009

document.xls RAB Hal - 8

RENCANA ANGGARAN BIAYAPENATAAN PEMUKIMAN NELAYAN (DESA WEWANGRIU)PEKERJAAN RUMAH SEDERHANA 20 ( DUA PULUH) UNIT

NO. URAIAN PEKERJAAN SAT. VOLUME HARGA

SATUAN A. PEKERJAAN PENDAHULUAN

1 Pengukuran dan Pemasangan Bouwplank 20.21 80,740.00

2 Mobilisasi dan Demobilisasi Alat ls 1.00 1,000,000.00

3 Air Kerja bln 1.00 350,000.00

JUMLAH A

B. PEKERJAAN TANAH DAN URUGAN 1 Pekerjaan Galian Tanah 2.80 20,800.00

2 Urugan Tanah Kembali 0.64 9,970.00

3 Urugan Pasir 0.40 105,700.00

JUMLAH B

C. PEKERJAAN PONDASI,BETON DAN DINDING 1 Pek. Batu Kosong 0.95 20,800.00

2 Pek. Pondasi Batu Kali 1 : 4 2.07 624,530.00

3 Pas. Sloef Beton Bertulang 1 : 2 : 3 0.44 3,390,610.00

4 Pekerjaan Beton K125 1.32 604,780.00

5 Pek. Pas Batu Merah 1 : 4 2.50 81,290.00

6 Pek. Plesteran 1 : 5 5.00 28,270.00

7 Pek. Acian Dinding 5.00 27,590.00

8 Pek. Lantai Ploor 1.50 576,650.00

JUMLAH C

D. PEKERJAAN KAYU1 Pekerjaan kusen pintu dan jendela Kayu Klas II 0.30 9,017,000.00

2 Pasang pintu panel Kayu Klas II 4.10 496,300.00

3 Pekerjaan teralis besi ls 4.32 475,000.00

4 Pasang jalusi mati kusen kayu klas II 3.15 571,430.00

5 Pekerjaan kuda kuda + gording kayu klas II 1.01 7,981,500.00

6 Pekerjaan listplang kayu klas II 40.00 95,280.00

7 Dinding papan kayu klas II 74.21 208,040.00

8 Lantai papan kayu klas II 38.32 208,040.00

9 Tiang kayu klas I 1.02 266,230.00

10 Pekerjaan terali kayu / sandaran 0.09 266,230.00

11 Balok lantai kayu klas II 0.80 266,230.00

12 Pekerjaan tangga kayu klas II 0.30 474,270.00

JUMLAH D

E. PEKERJAAN ATAP1 Pekerjaan atap seng gelombang BJLS 25 95.43 38,580.00

2 Pekerjaan atap nok seng m' 8.50 22,260.00

JUMLAH E

F. PEKERJAAN PENGGANTUNG/PENGUNCI1 Pasang kunci tanam biasa bh 3.00 162,430.00

2 Pasang engsel pintu bh 9.00 22,210.00

3 Pasang engsel jendela bh 14.00 20,270.00

4 Pasang kait angin bh 14.00 25,770.00

5 Pas. Grendel pintu + jendela bh 10.00 24,150.00

JUMLAH F

m2

m3

m3

m3

m3

m3

m3

m3

m2

m2

m2

m2

m3

m2

m2

m3

m2

m2

m2

m3

m3

m3

m3

m2

Page 9: RAB 2009

document.xls RAB Hal - 9

G. PEKERJAAN PENGECATAN1 Pengecatan dinding bidang baru 74.21 32,100.00

2 Pengecatan atap seng 95.43 28,380.00

JUMLAH G

H. PEKERJAAN ANTI RAYAP1 Penyemprotan anti rayap 46.80 26,832.00

JUMLAH H

I. PEKERJAAN KLOSED DAN SANITASI 1 Pas. Klosed Jongkok bh 1.00 387,740.00

2 Pas. Pipa PVC 2" m' 3.50 25,320.00

3 Pas. Elbow bh 1.00 7,500.00

4 unit 1.00 1,154,710.00

5 Pas. Floor Drain bh 1.00 82,175.00

JUMLAH I

J. PEKERJAAN INSTALASI LISTRIK1 Main Panel + MCB bh 1.00 60,751.55

2 Box Sekring MCB, 8 group bh 1.00 32,594.50

3 Pas. Instalasi Listrik ttk 6.00 170,330.00

4 Pemasangan Lampu Sumpit 8 Watt bh 1.00 48,450.00

5 Pas. Lampu TL 1 x 20 Watt bh 5.00 65,000.00

6 Pas. Stop Kontak bh 3.00 27,930.00

7 Pas. Saklar Tunggal Inbow bh 4.00 37,050.00

8 Pas. Saklar Ganda Inbow bh 1.00 57,000.00

9 Kabel Suplay Main ke Sub Panil m 5.00 6,878.00

10 Kabel Penghubung m 45.00 4,949.50

11 Pemasangan Grounding bh 1.00 69,330.00

JUMLAH J

m2

m2

m2

Pek. Septiktank Gorong-gorong ø 100 cm

Page 10: RAB 2009

document.xls RAB Hal - 10

RENCANA ANGGARAN BIAYAPENATAAN PEMUKIMAN NELAYAN (DESA WEWANGRIU)PEKERJAAN RUMAH SEDERHANA 20 ( DUA PULUH) UNIT

JUMLAH

HARGA

2,981,755.40

106,900.80

4,950,215.10

44,527,761.61

3,870,899.40

1,573,240.00

5,090,444.40

1,255,737.60

1,720,745.00

2,104,213.55

68,181,912.86

6,818,191.29

75,000,104.14

1,500,002,082.83

1,500,000,000.00

SATU MILYAR LIMA RATUS JUTA 0 RUPIAH,-

Malili, Mei 2009Direncanakan

KONSULTAN PERENCANACV. INTRANUSA EM

( Ir. ASNADI A. MACHMUD, MT )Team Leader

Mengetahui OVERSIGHT CONSULTANT III

OC ( 3 )

Ir. ADI BARCON

Page 11: RAB 2009

document.xls RAB Hal - 11

RENCANA ANGGARAN BIAYAPENATAAN PEMUKIMAN NELAYAN (DESA WEWANGRIU)PEKERJAAN RUMAH SEDERHANA 20 ( DUA PULUH) UNIT

JUMLAH

HARGA

1,631,755.40

1,000,000.00

350,000.00

2,981,755.40

58,240.00

6,380.80

42,280.00

106,900.80

19,760.00

1,292,777.10

1,491,868.40

798,309.60

203,225.00

141,350.00

137,950.00

864,975.00

4,950,215.10

2,705,100.00

2,034,830.00

2,052,000.00

1,800,004.50

8,061,315.00

3,811,200.00

15,438,648.40

7,972,092.80

271,554.60

25,158.74

213,979.70

141,877.87

44,527,761.61

3,681,689.40

189,210.00

3,870,899.40

487,290.00

199,890.00

283,780.00

360,780.00

241,500.00

1,573,240.00

Page 12: RAB 2009

document.xls RAB Hal - 12

2,382,141.00

2,708,303.40

5,090,444.40

1,255,737.60

1,255,737.60

387,740.00

88,620.00

7,500.00

1,154,710.00

82,175.00

1,720,745.00

60,751.55

32,594.50

1,021,980.00

48,450.00

325,000.00

83,790.00

148,200.00

57,000.00

34,390.00

222,727.50

69,330.00

2,104,213.55

Page 13: RAB 2009

13

document.xls - 1-RekHSP Hal - 13

REKAPITULASIANALISA HARGA SATUAN PEKERJAAN

DAERAH KABUPATEN LUWU TIMUR TA.2009

NO. URAIAN HSP (Rp)

A PEKERJAAN PENDAHULUAN

1. Pagar sementara dari kayu tinggi 2 meter tiap 1 m' 284,4502. Pagar sementara dari seng gelombang tinggi 2 meter tiap 1 m' 330,8103. Pagar sementara dari kawat duri tinggi 1,8 meter tiap 1 m' 50,1904. Pembuatan kantor sementara, dengan lantai plesteran tiap 1 m² 996,4405. Pembuatan kantor sementara (3,6x3,6) m² dengan lantai plesteran + meja & bangku kayu tiap 1 unit 6,887,9706. Pembuatan kantor sementara dengan lantai plesteran + meja & bangku kayu tiap 1 m² 539,6707. Pembuatan gudang semen dan peralatan tiap 1 m² 950,4908. Pembuatan rumah jaga/konstruksi kayu tiap 1 m² 1,116,0709. Pembuatan bedeng buruh tiap 1 m² 936,590

10. Pembuatan jalan sementara (tebal 20 cm) tiap 1 m² 103,76011. Pembuatan jalan sementara tebal 25 cm tiap 1 m² 125,22012. Pasang bouwplank tiap 1 m' 80,740

B PEKERJAAN TANAH

1. Pembersihan lapangan dan perataan tiap 1 m² 8,0002. Pekerjaan stripping setinggi 1 meter (pembersihan lahan skala besar) tiap 1 m² 2,6002. Galian tanah biasa sedalam 1 meter tiap 1 m³ 20,8003. Galian tanah biasa sedalam 2 meter tiap 1 m³ 27,3105. Galian tanah biasa sedalam 3 meter tiap 1 m³ 38,1806. Galian tanah keras sedalam 1 meter tiap 1 m³ 32,4607. Galian tanah cadas sedalam 1 meter tiap 1 m³ 65,0008. Galian tanah lumpur sedalam 1 meter tiap 1 m³ 42,8409. Pembuangan tanah sejauh 150 m tiap 1 m³ 26,7204. Urugan tanah kembali tiap 1 m³ 9,970

11. Pemadatan tanah (tenaga manusia) tiap 1 m³ 26,00012. Pemadatan tanah (tenaga manusia) tebal 20 cm tiap 1 m² 5,20013. Pemadatan tanah dengan tamper/hand compactor 6 lintasan / tebal 20cm tiap 1 m³ 11,00114. Pemadatan tanah tebal 20 cm dengan tamper/hand compactor 6 lintasan / tebal 20cm tiap 1 m² 2,20315. Pemadatan tanah dengan tamper/hand compactor 10 lintasan / tebal 20cm tiap 1 m³ 18,33616. Pemadatan tanah tebal 20 cm dengan tamper/hand compactor 10 lintasan / tebal 20cm tiap 1 m² 3,66817. Pemadatan tanah dengan Vibrating Roller tiap 1 m³ 75318. Pemadatan tanah tebal 20 cm dengan Vibrating Roller tiap 1 m² 1595. Urugan sirtu tiap 1 m³ 148,9606. Urugan pasir urug tiap 1 m³ 105,7007. Urugan tanah merah tiap 1 m³ 73,0008. Urugan pasir pasang tiap 1 m³ 145,000

23. Pemancangan tiang/cerucuk dolken kecil dalam 2 m' tiap 1 titik 7,02024. Pemancangan tiang/cerucuk dolken besar dalam 2 m' tiap 1 titik 13,69025. Pemasangan lapisan ijuk tiap 1 m³ 7,800

C PEKERJAAN PASANGAN BATU KALI/BELAH

1. Pasang pondasi/pasangan batu kali/belah 1 Pc : 2 Ps tiap 1 m³ 743,2602. Pasang pondasi/pasangan batu kali/belah 1 Pc : 3 Ps tiap 1 m³ 669,0403. Pasang pondasi/pasangan batu kali/belah 1 Pc : 4 Ps tiap 1 m³ 624,5304. Pasang pondasi/pasangan batu kali/belah 1 Pc : 5 Ps tiap 1 m³ 593,6905. Pasang pondasi/pasangan batu kali/belah 1 Pc : 6 Ps tiap 1 m³ 572,0006. Pasang pondasi batu kosong (aanstamping) tiap 1 m³ 361,0007. Pasang pondasi siklop 40% batu kali tiap 1 m³ 1,333,7408. Pasang pondasi sumuran diameter 100 cm tiap 1 m³ 716,080

D PEKERJAAN DINDING

1. Pasangan bata merah tebal 1 bata, 1 Pc : 2 Ps tiap 1m² 187,8002. Pasangan bata merah tebal 1 bata, 1 Pc : 3 Ps tiap 1m² 175,9203. Pasangan bata merah tebal 1 bata, 1 Pc : 4 Ps tiap 1m² 168,2104. Pasangan bata merah tebal 1 bata, 1 Pc : 5 Ps tiap 1m² 163,8001. Pasangan bata merah tebal 1/2 bata, 1 Pc : 2 Ps tiap 1m² 89,9802. Pasangan bata merah tebal 1/2 bata, 1 Pc : 3 Ps tiap 1m² 84,520

Page 14: RAB 2009

14

document.xls - 1-RekHSP Hal - 14

NO. URAIAN HSP (Rp)

3. Pasangan bata merah tebal 1/2 bata, 1 Pc : 4 Ps tiap 1m² 81,2904. Pasangan bata merah tebal 1/2 bata, 1 Pc : 5 Ps tiap 1m² 79,2509. Pasangan bata merah tebal 1/2 bata, 1 Pc : 6 Ps tiap 1m² 78,010

10. Pasangan bata merah 1 Pc : 2 Ps tiap 1m³ (dibagi tebal bata 11 cm) 817,24011. Pasangan bata merah 1 Pc : 3 Ps tiap 1m³ (dibagi tebal bata 11 cm) 767,71012. Pasangan bata merah 1 Pc : 4 Ps tiap 1m³ (dibagi tebal bata 11 cm) 738,33013. Pasangan bata merah 1 Pc : 5 Ps tiap 1m³ (dibagi tebal bata 11 cm) 719,79014. Pasangan bata merah 1 Pc : 6 Ps tiap 1m³ (dibagi tebal bata 11 cm) 708,42015. Pasangan rolag bata merah 1 Pc : 5 Ps tiap 1m' 18,3505. Pasangan dinding hollowblock (batako pres lubang) HB 20 tiap 1m² 69,1106. Pasangan dinding hollowblock (batako pres lubang) HB 15 tiap 1m² 60,5807. Pasangan dinding hollowblock (batako pres lubang) HB 10 tiap 1m² 54,2708. Pasangan dinding Roster bata merah 12 x 24 x 10 tiap 1m² 41,4709. Pasangan dinding Roster beton 20 x 20 x 7 tiap 1m² 27,140

10. Pasangan dinding Glass block 20 x 20 x 10 tiap 1m² 29,440

Page 15: RAB 2009

15

document.xls - 1-RekHSP Hal - 15

NO. URAIAN HSP (Rp)

E PEKERJAAN PLESTERAN

1. Plesteran 1 Pc : 2 Ps tebal 15 mm tiap 1m² 32,9302. Plesteran 1 Pc : 3 Ps tebal 15 mm tiap 1m² 30,6203. Plesteran 1 Pc : 4 Ps tebal 15 mm tiap 1m² 29,1404. Plesteran 1 Pc : 5 Ps tebal 15 mm tiap 1m² 28,2705. Plesteran 1 Pc : 6 Ps tebal 15 mm tiap 1m² 27,5906. Plesteran 1 Pc : 2 Ps tebal 20 mm tiap 1m² 46,7607. Plesteran 1 Pc : 3 Ps tebal 20 mm tiap 1m² 42,7708. Plesteran 1 Pc : 4 Ps tebal 20 mm tiap 1m² 40,3609. Plesteran 1 Pc : 5 Ps tebal 20 mm tiap 1m² 38,640

10. Plesteran 1 Pc : 6 Ps tebal 20 mm tiap 1m² 37,56011. Plesteran 1 Pc : 2 Ps tebal 25 mm tiap 1m² 49,46012. Plesteran 1 Pc : 3 Ps tebal 25 mm tiap 1m² 47,23013. Plesteran 1 Pc : 2 Ps tebal 30 mm tiap 1m² 60,42014. Plesteran 1 Pc : 3 Ps tebal 30 mm tiap 1m² 55,28015. Plesteran Berapen 1 Pc : 3 Ps tebal 15 mm tiap 1m² 23,42016. Plesteran Berapen 1 Pc : 5 Ps tebal 15 mm tiap 1m² 21,91017. Plesteran Skoning (Benangan/Tali Air) 1 Pc : 2 Ps tiap 1m' 8,67018. Plesteran Ciprat 1 Pc : 2 Ps tiap 1m² 26,6106. Plesteran Siar 1 Pc : 2 Ps untuk dinding batu kali/belah tiap 1m² 19,460

F PEKERJAAN KUSEN DAN DAUN PINTU/JENDELA KAYU

1. Pasang kusen pintu dan jendela Kayu Klas I tiap 1m³ 10,795,0002. Pasang kusen pintu dan jendela Kayu Klas I tiap 1m³ 11,489,0001. Pasang kusen pintu dan jendela Kayu Klas I tiap 1m³ 11,489,0004. Pasang kusen pintu dan jendela Kayu Klas I tiap 1m³ 9,017,0002. Pasang kusen pintu dan jendela Kayu Klas II tiap 1m³ 9,017,0003. Pasang kusen pintu dan jendela Kayu Klas III tiap 1m³ 5,309,0007. Pasang kusen pintu dan jendela Kayu Klas III tiap 1m³ 5,309,0008. Pasang kusen pintu dan jendela Kayu Klas III tiap 1m³ 5,309,0004. Pasang pintu panel Kayu Klas I tiap 1m² 599,300

10. Pasang pintu panel Kayu Klas I tiap 1m² 599,30011. Pasang pintu panel Kayu Klas I tiap 1m² 599,3005. Pasang pintu panel Kayu Klas II tiap 1m² 496,300

13. Pasang pintu panel Kayu Klas II tiap 1m² 496,30014. Pasang pintu panel Kayu Klas II tiap 1m² 496,3006. Pasang pintu panel Kayu Klas III tiap 1m² 372,700

16. Pasang pintu panel Kayu Klas III tiap 1m² 372,70017. Pasang pintu dan jendela kaca Kayu Klas I tiap 1m² 507,25018. Pasang pintu dan jendela kaca Kayu Klas I tiap 1m² 507,2507. Pasang pintu dan jendela kaca Kayu Klas I tiap 1m² 507,2508. Pasang pintu dan jendela kaca Kayu Klas II tiap 1m² 417,120

21. Pasang pintu dan jendela kaca Kayu Klas II tiap 1m² 417,12022. Pasang pintu dan jendela kaca Kayu Klas II tiap 1m² 417,12023. Pasang pintu dan jendela kaca Kayu Klas III tiap 1m² 308,9709. Pasang pintu dan jendela kaca Kayu Klas III tiap 1m² 308,970

10. Pasang pintu dan jendela jalusi Kayu Klas I tiap 1m² 857,78026. Pasang pintu dan jendela jalusi Kayu Klas I tiap 1m² 857,78027. Pasang pintu dan jendela jalusi Kayu Klas I tiap 1m² 857,78028. Pasang pintu dan jendela jalusi Kayu Klas II tiap 1m² 692,98029. Pasang pintu dan jendela jalusi Kayu Klas II tiap 1m² 692,98011. Pasang pintu dan jendela jalusi Kayu Klas II tiap 1m² 692,98012. Pasang pintu dan jendela jalusi Kayu Klas III tiap 1m² 495,22032. Pasang pintu dan jendela jalusi Kayu Klas III tiap 1m² 495,22033. Pasang jalusi mati Kayu Klas I tiap 1m² 725,93034. Pasang jalusi mati Kayu Klas I tiap 1m² 725,93013. Pasang jalusi mati Kayu Klas I tiap 1m² 725,93014. Pasang jalusi mati Kayu Klas II tiap 1m² 571,43037. Pasang jalusi mati Kayu Klas II tiap 1m² 571,43038. Pasang pintu teakwood rangkap, rangka Kayu Klas I tiap 1m² 392,51039. Pasang pintu teakwood rangkap, rangka Kayu Klas I tiap 1m² 392,51040. Pasang pintu teakwood rangkap, rangka Kayu Klas I tiap 1m² 392,510

Page 16: RAB 2009

16

document.xls - 1-RekHSP Hal - 16

NO. URAIAN HSP (Rp)

41. Pasang pintu teakwood rangkap, rangka Kayu Klas II tiap 1m² 342,04042. Pasang pintu teakwood rangkap, rangka Kayu Klas II tiap 1m² 342,04043. Pasang pintu triplek rangkap, rangka Kayu Klas I tiap 1m² 407,06044. Pasang pintu triplek rangkap, rangka Kayu Klas II tiap 1m² 356,59045. Pasang pintu teakwood dan formika, rangka Kayu Klas I tiap 1m² 473,02046. Pasang pintu teakwood dan formika, rangka Kayu Klas I tiap 1m² 473,02047. Pasang pintu teakwood dan formika, rangka Kayu Klas II tiap 1m² 422,55048. Pasang pintu teakwood dan formika, rangka Kayu Klas II tiap 1m² 422,55049. Pasang pintu teakwood dan formika, rangka Kayu Klas II tiap 1m² 422,55050. Pasang pintu triplek dan formika, rangka Kayu Klas III tiap 1m² 369,26051. Pasang pintu triplek dan formika, rangka Kayu Klas III tiap 1m² 369,260

G PEKERJAAN KONSTRUKSI ATAP KAYU

1. Pasang konstruksi kuda-kuda Kayu Klas I tiap 1m³ 10,247,5002. Pasang konstruksi kuda-kuda Kayu Klas I tiap 1m³ 10,247,5003. Pasang konstruksi kuda-kuda Kayu Klas I tiap 1m³ 10,247,5004. Pasang konstruksi kuda-kuda Kayu Klas II tiap 1m³ 7,981,5002. Pasang konstruksi kuda-kuda Kayu Klas II tiap 1m³ 7,981,5003. Pasang konstruksi kuda-kuda Kayu Klas III tiap 1m³ 4,582,5007. Pasang konstruksi kuda-kuda Kayu Klas III tiap 1m³ 4,582,5008. Pasang kaso + reng genteng kodok Kayu Klas I tiap 1m² 112,4109. Pasang kaso + reng genteng kodok Kayu Klas II tiap 1m² 87,690

10. Pasang kaso + reng genteng monier Kayu Klas I tiap 1m² 128,89011. Pasang kaso + reng genteng monier Kayu Klas II tiap 1m² 100,05012. Pasang kaso + reng genteng beton Kayu Klas I tiap 1m² 128,89013. Pasang kaso + reng genteng beton Kayu Klas II tiap 1m² 100,05014. Pasang kaso + reng atap sirap kayu Klas II tiap 1m² 1,081,79015. Pasang lisplang (3 x 20) cm Kayu Klas I tiap 1m' 86,84016. Pasang lisplang (3 x 20) cm Kayu Klas II tiap 1m' 68,30017. Pasang lisplang (3 x 20) cm Kayu Klas III tiap 1m' 46,0504. Pasang lisplang (3 x 30) cm Kayu Klas I tiap 1m' 123,6005. Pasang lisplang (3 x 30) cm Kayu Klas II tiap 1m' 95,2806. Pasang lisplang (3 x 30) cm Kayu Klas III tiap 1m' 61,2907. Pasang lisplang 2 x (2 x 20) cm Kayu Klas I tiap 1m' 94,2208. Pasang lisplang 2 x (2 x 20) cm Kayu Klas II tiap 1m' 71,5609. Pasang lisplang 2 x (2 x 20) cm Kayu Klas III tiap 1m' 44,360

H PEKERJAAN KONSTRUKSI LANGIT-LANGIT/PLAFON DAN PENUTUP

1. Pasang rangka plafon (1,00 x 1,00) m Kayu Klas I tiap 1m² 125,1402. Pasang rangka plafon (1,00 x 1,00) m Kayu Klas II tiap 1m² 106,6003. Pasang rangka plafon (1,00 x 1,00) m Kayu Klas III tiap 1m² 63,3404. Pasang rangka plafon (50 x 100) cm Kayu Klas I tiap 1m² 160,8705. Pasang rangka plafon (50 x 100) cm Kayu Klas II tiap 1m² 127,9106. Pasang rangka plafon (50 x 100) cm Kayu Klas III tiap 1m² 78,4707. Pasang rangka plafon (60 x 120) cm Kayu Klas I tiap 1m² 134,5908. Pasang rangka plafon (60 x 120) cm Kayu Klas II tiap 1m² 107,8109. Pasang rangka plafon (60 x 120) cm Kayu Klas III tiap 1m² 67,640

10. Pasang rangka plafon (60 x 60) cm Kayu Klas I tiap 1m² 162,80011. Pasang rangka plafon (60 x 60) cm Kayu Klas II tiap 1m² 129,43012. Pasang rangka plafon (60 x 60) cm Kayu Klas III tiap 1m² 79,37013. Pasang rangka plafon (30 x 60) cm Kayu Klas I tiap 1m² 222,30014. Pasang rangka plafon (30 x 60) cm Kayu Klas II tiap 1m² 174,92015. Pasang rangka plafon (30 x 60) cm Kayu Klas III tiap 1m² 103,85016. Plafon asbes (1,00 x 1,00) m tebal 2,7 mm tiap 1m² 15,69017. Plafon akustik (30 x 30) cm tiap 1m² 12,04018. Plafon akustik (30 x 60) cm tiap 1m² 10,60019. Plafon akustik (60 x 120) cm tiap 1m² 10,60020. Plafon teakwood (30 x 60) cm tebal 3 mm tiap 1m² 26,33021. Plafon teakwood (60 x 120) cm tebal 3 mm tiap 1m² 26,98022. Pasang list Plafon kayu profil tiap 1m' 7,60023. List plafon bahan Kayu Klas II papan 1x5 cm tiap 1 m' 14,75024. List plafon bahan triplek 0,3x5 cm tiap 1 m' 13,000

Page 17: RAB 2009

17

document.xls - 1-RekHSP Hal - 17

NO. URAIAN HSP (Rp)

25. Plafon asbes (1,00 x 1,00) m tebal 2,7 mm rangka Klas II tiap 1m² 115,62026. Plafon akustik (30 x 60) cm rangka Klas II tiap 1m² 184,14027. Plafon akustik (30 x 30) cm rangka Klas II tiap 1m² 216,33028. Plafon gypsum board 9 mm tiap 1m² 29,06029. Plafon GRC-board 4 mm tiap 1m² 25,97030. Plafon Calsiboard 4 mm tiap 1m² 30,75025. Plafon triplek 4 mm tiap 1m² 34,25026. Plafon triplek 6 mm tiap 1m² 40,91033. Penutup plafon Gypsumboard 9 mm lengkap dgn rangka hollow tiap (6mx6m) = 36 m² 2,830,42034. Penutup plafon Gypsumboard 9 mm lengkap dgn rangka hollow tiap 1 m² 78,64035. Penutup plafon GRC-board 4 mm lengkap dgn rangka hollow tiap 1 m² 76,21036. Penutup plafon Calsiboard 4 mm lengkap dgn rangka hollow tiap 1 m² 80,330

Page 18: RAB 2009

18

document.xls - 1-RekHSP Hal - 18

NO. URAIAN HSP (Rp)

I PEKERJAAN KONSTRUKSI DINDING KAYU DAN PENUTUP

1. Pasang rangka dinding pemisah Kayu Klas I tiap 1m² 266,2302. Pasang rangka dinding pemisah Kayu Klas II tiap 1m² 208,0403. Pasang dinding pemisah teakwood rangkap rangka Kayu Klas I tiap 1m² 325,0204. Pasang dinding pemisah teakwood rangkap rangka Kayu Klas I tiap 1m² 325,0205. Pasang teakwood tebal 3 mm untuk dinding tiap 1m² 24,2606. Pasang triplek tebal 4 mm untuk dinding tiap 1m² 34,8007. Pasang triplek tebal 6 mm untuk dinding tiap 1m² 42,1208. Pasang gypsum tebal 12 mm untuk dinding tiap 1m² 34,1709. Dinding partisi gypsum 12 mm lkp rk metal Studs 2 muka tiap 1 m² 139,290

10. Dinding partisi gypsum 12 mm lkp rk hollow tiap 1 m² 156,07011. Dinding partisi double GRC-board 6 mm rk Kayu Klas I tiap 1 m² 342,96012. Dinding partisi double GRC-board 6 mm rk hollow tiap 1 m² 171,210

J PEKERJAAN BETON

1. Beton Non Struktur - BO (1Pc : 3Ps : 5Kr) (1 : 8) untuk rabatan tiap 1m³ 576,6502. Beton K-125 (1Pc : 3Ps : 4Kr) (1 : 7) tiap 1m³ 604,7803. Beton K-175 (2Pc : 5Ps : 7Kr) (1Pc : 2,5Ps : 3,5Kr) (1 : 6) tiap 1m³ 675,8504. Beton Struktur K-225 (1Pc : 2Ps : 3Kr) (1 : 5) tiap 1m³ 755,9105. Beton Struktur K-275 (2Pc : 3Ps : 6Kr) (1Pc : 1,5Ps : 3Kr) (1 : 4,5) tiap 1m³ 832,7406. Beton Struktur K-350 (4Pc : 6Ps : 11Kr) (1Pc : 1,5Ps : 2,75Kr) (1 : 5,25) tiap 1m³ 861,7907. Pembesian dengan besi polos tiap 1 kg 11,4708. Pembesian dengan besi ulir tiap 1 kg 11,8109. Pasang bekisting untuk pondasi 1 m² 74,240

10. Pasang bekisting untuk sloof 1 m² 78,99011. Pasang bekisting untuk kolom 1 m² 126,20012. Pasang bekisting untuk balok 1 m² 129,95013. Pasang bekisting untuk pelat lantai 1 m² 188,90014. Pasang bekisting untuk dinding 1 m² 184,15015. Pasang bekisting untuk tangga 1 m² 117,25016. Membuat pondasi beton bertulang (150 kg besi + bekisting) tiap 1m³ 2,705,37017. Membuat sloof beton bertulang (200 kg besi + bekisting) tiap 1m³ 3,390,61018. Membuat kolom beton bertulang (300 kg besi + bekisting) tiap 1m³ 6,597,98019. Membuat balok beton bertulang (200 kg besi + bekisting) tiap 1m³ 5,108,91020. Membuat balok beton bertulang (150 kg besi + bekisting) tiap 1m³ 3,666,59021. Membuat dinding beton bertulang (150 kg besi + bekisting) tiap 1m³ 4,652,65022. Membuat tangga beton bertulang (200 kg besi + bekisting) tiap 1m³ 4,635,83023. Membuat 1 unit pelat pondasi beton bertulang (100 x 100 x 30) cm 643,62024. Membuat sloof beton bertulang (15 x 20) cm tiap 1 m' 91,47025. Membuat sloof beton bertulang (15 x 30) cm tiap 1 m' 135,75026. Membuat sloof beton bertulang (20 x 40) cm tiap 1 m' 288,78027. Membuat kolom penguat/praktis beton bertulang (11 x 11) cm tiap 1m' 52,64028. Membuat kolom beton bertulang (11 x 20) cm tiap 1 m' 73,71029. Membuat kolom beton bertulang (11 x 30) cm tiap 1 m' 119,80030. Membuat kolom beton bertulang (30 x 30) cm tiap 1 m' 545,91031. Membuat ring balok beton bertulang (10 x 15) cm tiap 1m' 62,29032. Membuat pelat lantai beton bertulang tebal 12 cm tiap 1 m² 541,00033. Membuat pelat atap beton bertulang tebal 10 cm tiap 1 m² 480,57034. Membuat pelat meja beton bertulang tebal 8 cm tiap 1 m² 171,950

K PEKERJAAN PENUTUP ATAP

1. Pasang atap genteng pelentong kecil / morando tiap 1m² 55,2402. Pasang atap genteng kodok tiap 1m² 54,1703. Pasang atap genteng pelentong besar/super tiap 1m² 38,6304. Pasang genteng bubung pelentong / morando tiap 1m' 68,4805. Pasang bubung genteng kodok tiap 1m' 59,7306. Pasang genteng bubung pelentong besar tiap 1m' 73,9807. Pasang atap asbes gelombang 2,5 x 0,92 m x 5 mm tiap 1m² 49,0408. Pasang atap asbes gelombang 2,25 x 0,92 m x 5 mm tiap 1m² 51,4909. Pasang atap asbes gelombang 2,00 x 0,92 m x 5 mm tiap 1m² 47,640

Page 19: RAB 2009

19

document.xls - 1-RekHSP Hal - 19

NO. URAIAN HSP (Rp)

10. Pasang atap asbes gelombang 1,80 x 0,92 m x 5 mm tiap 1m² 53,06011. Pasang nok/bubung stel gelombang 0,92 m tiap 1m' 108,57012. Pasang nok paten 0,92 m tiap 1m' 62,97013. Pasang nok stel rata 0,92 m tiap 1m' 60,22014. Pasang atap genteng beton tiap 1m² 69,44015. Pasang atap genteng metal tiap 1m² 178,19016. Pasang atap sirap tiap 1m² 28,01017. Pasang nok genteng beton tiap 1m' 90,48018. Pasang nok genteng metal tiap 1m' 135,6501. Pasang atap seng gelombang BJLS 25 (0,25 mm) tiap 1m² 38,5802. Pasang atap nok seng tiap 1m' 22,260

21. Pasang nok sirap tiap 1m' 65,84022. Pasang alumunium foil tiap 1m² 10,91016. Pasang atap sirap tiap 1m² 28,01021. Pasang nok sirap tiap 1m' 22,260

Page 20: RAB 2009

20

document.xls - 1-RekHSP Hal - 20

NO. URAIAN HSP (Rp)

L PEKERJAAN SANITASI

1. Memasang 1 buah kloset duduk/monoblok (sederhana) 840,7702. Memasang 1 buah kloset duduk/monoblok setara INA (sedang) 1,410,5203. Memasang 1 buah kloset duduk/monoblok (tidak sederhana) 1,662,2701. Memasang 1 buah kloset jongkok sederhana 387,7405. Memasang 1 buah kloset jongkok sedang 481,7406. Memasang 1 buah kloset jongkok tdk sederhana 584,0907. Memasang 1 buah urinoir 1,901,0608. Memasang 1 buah wastafel 1,713,8909. Memasang 1 buah bak mandi fibreglass volume 0,3 m³ 526,200

10. Memasang 1 buah bak mandi batu bata volume 0,3 m³ 1,104,38011. Memasang 1 buah bak mandi batu bata volume 0,3 m³ (60x60x80 cm) 464,2002. Memasang pipa galvanis dia 1/2" tiap m' 23,2003. Memasang pipa galvanis dia 3/4" tiap m' 26,0204. Memasang pipa galvanis dia 1" tiap m' 30,2605. Memasang pipa galvanis dia 1 ¼" tiap m' 9,0906. Memasang pipa galvanis dia 1 ½" tiap m' 50,6407. Memasang pipa galvanis dia 2" tiap m' 64,7508. Memasang pipa galvanis dia 2 ½" tiap m' 95,0809. Memasang pipa galvanis dia 3" tiap m' 106,360

10. Memasang pipa galvanis dia 4" tiap m' 153,95011. Memasang pipa PVC tipe AW dia 1/2" tiap m' 9,45012. Memasang pipa PVC tipe AW dia 3/4" tiap m' 10,86013. Memasang pipa PVC tipe AW dia 1" tiap m' 12,55014. Memasang pipa PVC tipe AW dia 1 ¼" tiap m' 6,06015. Memasang pipa PVC tipe D dia 1 ¼" tiap m' 6,06016. Memasang pipa PVC tipe AW dia 1 ½" tiap m' 18,05017. Memasang pipa PVC tipe D dia 1 ½" tiap m' 6,06018. Memasang pipa PVC tipe AW dia 2" tiap m' 25,32019. Memasang pipa PVC tipe D dia 2" tiap m' 9,09020. Memasang pipa PVC tipe AW dia 2 ½" tiap m' 5,95021. Memasang pipa PVC tipe D dia 2 ½" tiap m' 5,95022. Memasang pipa PVC tipe AW dia 3" cm tiap m' 42,00023. Memasang pipa PVC tipe D dia 3" cm tiap m' 13,65024. Memasang pipa PVC tipe AW dia 4" tiap m' 57,38025. Memasang pipa PVC tipe D dia 4" tiap m' 57,38026. Memasang 1 buah bak cuci piring stainless steel 379,59027. Memasang 1 buah kran dia 3/4" atau 1/2" sederhana 55,59028. Memasang 1 buah kran dia 3/4" atau 1/2" stainless 137,76029. Memasang 1 floor drain sederhana 90,17030. Memasang 1 floor drain stainless 171,59031. Membuat 1 unit sumur air tanah bor manual dalam 12 m' + pompa air listrik 376,34032. Membuat 1 unit tanki septik sederhana kapasitas Ø 1,2 m dalam 1,2 m 1,154,71033. Membuat 1 unit tanki septik kapasitas 1,7x0,85 m dalam 1,3 m (vol. 1,88 m³ u/ 5 pemakai) 2,087,28034. Membuat tanki septik kapasitas tiap 1 m³ 1,112,22035. Membuat 1 unit resapan Ø 0,8 m (digali 1 m) dalam 1 m (digali 1,9 m) kap. 0,5 m³ 182,160

M PEKERJAAN BESI DAN ALUMINIUM

1. Pasang rangka atap baja tiap kg 19,0302. Pasang pintu besi baja tiap m² 980,7903. Pasang jendela besi tiap m² 123,2104. Pasang jendela besi tahan api tiap m² 132,8105. Pasang pintu lipat tiap m² 123,2106. Pasang rolling door tiap m² 623,2107. Pasang pintu aluminium tiap m² 223,2108. Pasang terali besi tiap m² 173,2109. Pasang kawat harmonika tiap m² 23,980

10. Pasang kawat kasa nyamuk (parabola) tiap m² 23,98011. Pasang jendela nako dan teralis tiap m² 183,7401. Pasang talang datar, seng BJLS 25 (0,25 mm) tiap 1 m' 118,5502. Pasang talang miring, seng BJLS 25 (0,25 mm) tiap 1 m' 177,2503. Pasang talang 1/2 lingkaran D-10 cm, seng BJLS 25 (0,25 mm) tiap 1 m' 166,540

Page 21: RAB 2009

21

document.xls - 1-RekHSP Hal - 21

NO. URAIAN HSP (Rp)

N PEKERJAAN KUNCI DAN KACA

1. Pasang 1 buah kunci tanam antik 224,2302. Pasang 1 buah kunci tanam sederhana 118,9303. Pasang 1 buah kunci tanam biasa 162,4304. Pasang 1 buah kunci tanam KM 90,0905. Pasang 1 buah kunci silinder 398,8406. Pasang 1 buah engsel pintu biasa/sederhana 22,2107. Pasang 1 buah engsel pintu kuningan/stainless 40,0208. Pasang 1 buah engsel jendela kupu-kupu 20,2709. Pasang 1 buah engsel angin 27,870

10. Pasang 1 buah spring knip 21,52011. Pasang 1 buah kait angin 25,77012. Pasang 1 buah door closer 275,92013. Pasang 1 buah kunci selot 24,15014. Pasang 1 buah pegangan pintu/door holder 138,42015. Pasang 1 buah door stop 52,68016. Pasang 1 buah rel pintu dorong 1,296,11017. Pasang kaca tebal 3 mm tiap 1 m² 204,13018. Pasang kaca es tebal 3 mm tiap 1 m² 76,42019. Pasang kaca tebal 5 mm tiap 1 m² 226,79020. Pasang kaca es tebal 5 mm tiap 1 m² 99,52021. Pasang kaca rayben tebal 5 mm tiap 1 m² 112,72022. Pasang kaca tebal 8 mm tiap 1 m² 141,74023. Pasang kaca rayben tebal 8 mm tiap 1 m² 249,91024. Pasang kaca rayben tebal 10 mm tiap 1 m² 338,27025. Pasang kaca rayben tebal 12 mm tiap 1 m² 412,460

Page 22: RAB 2009

22

document.xls - 1-RekHSP Hal - 22

NO. URAIAN HSP (Rp)

O PEKERJAAN PENUTUP LANTAI DAN DINDING

1. Pasang lantai ubin pc abu-abu ukuran 40 x 40 cm tiap 1m² 35,2802. Pasang lantai ubin pc abu-abu ukuran 30 x 30 cm tiap 1m² 36,3703. Pasang lantai ubin pc abu-abu ukuran 20 x 20 cm tiap 1m² 37,7104. Pasang lantai ubin pc warna ukuran 40 x 40 cm tiap 1m² 35,6805. Pasang lantai ubin pc warna ukuran 30 x 30 cm tiap 1m² 36,7706. Pasang lantai ubin pc warna ukuran 20 x 20 cm tiap 1m² 38,1107. Pasang plint ubin pc abu-abu ukuran 10 x 40 cm tiap 1m' 7,3308. Pasang plint ubin pc abu-abu ukuran 10 x 30 cm tiap 1m' 7,3309. Pasang plint ubin pc abu-abu ukuran 15 x 20 cm tiap 1m' 7,440

10. Pasang plint ubin pc warna ukuran 10 x 40 cm tiap 1m' 8,83011. Pasang plint ubin pc warna ukuran 10 x 30 cm tiap 1m' 7,72012. Pasang plint ubin pc warna ukuran 10 x 20 cm tiap 1m' 7,3601. Pasang lantai keramik ukuran 40 x 40 cm granito tile tiap 1m² 77,7102. Pasang lantai keramik ukuran 40 x 40 cm Roman tiap 1m² 138,7803. Pasang lantai keramik ukuran 40 x 40 cm KW 2 tiap 1m² 131,2804. Pasang lantai keramik ukuran 30 x 30 cm granito tile tiap 1m² 236,1705. Pasang lantai keramik ukuran 30 x 30 cm Roman tiap 1m² 138,2106. Pasang lantai keramik ukuran 30 x 30 cm KW 2 tiap 1m² 128,0007. Pasang lantai keramik ukuran 20 x 20 cm Roman tiap 1m² 137,5608. Pasang lantai keramik ukuran 20 x 20 cm KW 2 tiap 1m² 128,7109. Pasang lantai keramik ukuran 10 x 20 cm Roman tiap 1 m² 137,090

10. Pasang lantai keramik ukuran 10 x 20 cm KW 2 tiap 1 m² 127,71011. Pasang lantai keramik ukuran 5 x 20 cm Roman tiap 1 m² 1,265,21012. Pasang lantai keramik ukuran 5 x 20 cm KW 2 tiap 1 m² 977,71025. Pasang plint keramik ukuran 10 x 40 cm granito tile tiap 1m' 13,49026. Pasang plint keramik ukuran 10 x 40 cm Roman tiap 1m' 20,82027. Pasang plint keramik ukuran 10 x 40 cm KW 2 tiap 1m' 19,92028. Pasang plint keramik ukuran 10 x 30 cm granito tile tiap 1m' 32,44029. Pasang plint keramik ukuran 10 x 30 cm Roman tiap 1m' 20,73030. Pasang plint keramik ukuran 10 x 30 cm KW 2 tiap 1m' 19,50031. Pasang plint keramik ukuran 10 x 20 cm Roman tiap 1m' 19,43032. Pasang plint keramik ukuran 10 x 20 cm KW 2 tiap 1m' 18,49033. Pasang plint keramik ukuran 5 x 20 cm Roman tiap 1m' 71,71034. Pasang plint keramik ukuran 5 x 20 cm KW 2 tiap 1m' 57,34035. Pasang lantai marmer tiap 1m² 82,08036. Pasang plint ubin marmer ukuran 10 x 60 cm tiap 1m' 13,49037. Pasang plint ubin marmer ukuran 10 x 40 cm tiap 1m' 13,49038. Pasang plint ubin marmer ukuran 10 x 30 cm tiap 1m' 13,49039. Pasang plint vinyil 1m² 9,64040. Pasang lantai parquet jati tiap 1m² 56,72041. Pasang dinding keramik 40 x 40 cm granito tile tiap 1m² 78,79042. Pasang dinding keramik 40 x 40 cm Roman tiap 1m² 139,86043. Pasang dinding keramik 40 x 40 cm KW 2 tiap 1m² 132,36044. Pasang dinding keramik 30 x 30 cm granito tile tiap 1m² 237,25045. Pasang dinding keramik 30 x 30 cm Roman tiap 1m² 139,29046. Pasang dinding keramik 30 x 30 cm KW 2 tiap 1m² 129,08047. Pasang dinding keramik 20 x 20 cm Roman tiap 1m² 115,89048. Pasang dinding keramik 20 x 20 cm KW 2 tiap 1m² 129,79013. Pasang dinding keramik 20 x 25 cm Roman tiap 1m² 127,24014. Pasang dinding keramik 20 x 25 cm KW 2 tiap 1m² 126,79051. Pasang dinding keramik 10 x 20 cm Roman tiap 1m² 138,17052. Pasang dinding keramik 10 x 20 cm KW 2 tiap 1m² 128,79053. Pasang dinding keramik 5 x 20 cm Roman tiap 1m² 1,266,29054. Pasang dinding keramik 5 x 20 cm KW 2 tiap 1m² 978,79055. Pasang dinding marmer tiap 1m² 104,86056. Pasang dinding batu tempel palimanan tiap 1m² 73,62057. Pasang lantai vinyl karet kl 1 tiap 1m² 18,07058. Pasang lantai vinyl karet kl 2 tiap 1m² 18,07059. Pasang plint kayu 2 x 10 cm tiap 1m' 38,250

P PEKERJAAN PENGECATAN

Page 23: RAB 2009

23

document.xls - 1-RekHSP Hal - 23

NO. URAIAN HSP (Rp)

1. Mengikis/mengerok permukaan tembok lama tiap 1 m² 6,9202. Mendempul dan menggosok kayu 1 m² 6,7603. Pengecatan dengan cat KW 2 bidang kayu lama 1 m² 17,6004. Pengecatan dengan cat Mowilex bidang kayu lama 1 m² 22,0801. Pengecatan bidang kayu baru dg plamir 1 m² + 1 lps dsr + 2 lps penutup KW 2 26,1902. Pengecatan bidang kayu baru dg plamir 1 m² + 1 lps dsr + 2 lps penutup Mowilex 32,1003. Pengecatan bidang kayu baru dg plamir 1 m² + 1 lps dsr + 3 lps penutup KW 2 29,5904. Pengecatan bidang kayu baru dg plamir 1 m² + 1 lps dsr + 3 lps penutup Mowilex 36,9309. Pelaburan bidang kayu dgn politur 1 m² 25,140

10. Pengecatan bidang kayu dengan politur Ultran tiap 1 m² 53,07011. Pengecatan bidang kayu dengan melamik Impra tiap 1 m² 87,81012. Pengecatan bidang kayu dengan melamik Impra tiap 1 m' kusen 45,82013. Pelaburan bidang kayu dgn residu dan ter 1 m² 7,37014. Pelaburan bidang kayu dgn vernis 1 m² 25,0105. Pengecatan tembok baru dg plamir 1 m² + 1 lps dsr + 2 lps penutup KW 2 10,4806. Pengecatan tembok baru dg plamir 1 m² + 1 lps dsr + 2 lps Catylac 10,4807. Pengecatan tembok baru dg wall sealer 1 m² + 1 lps dsr + 2 lps Dulux/ICI 21,7908. Pengecatan tembok baru dg wall sealer 1 m² + 1 lps dsr + 2 lps Dulux/ICI Weathershield 24,4409. Pengecatan bidang tembok lama 1 m² dg 1 lps dsr + 2 lps penutup KW 2 7,530

10. Pengecatan bidang tembok lama 1 m² dg 1 lps dsr + 2 lps penutup Catylac 7,53011. Pengecatan bidang tembok lama 1 m² dg 1 lps dsr + 2 lps penutup Dulux/ICI 15,94012. Pengecatan permukaan baja 1 m² dgn meni besi 16,86013. Pengecatan permukaan baja 1 m² dgn meni besi & perancah 31,37014. Pengecatan permukaan baja tiap 1 m² dengan zinchromate 17,78015. Pengecatan permukaan baja tiap 1 m² dengan Cat KW 2 22,46016. Pengecatan permukaan baja tiap 1 m² dengan Cat Mowilex 28,38017. Pengecatan waterproofing (coating) tiap 1 m² 14,730

Q PEKERJAAN BONGKARAN1. Bongkar beton bertulang tiap 1m³ 323,3202. Bongkar dinding tembok bata merah tiap 1m³ 32,3203. Bongkar dinding ½ bata tiap 1m² 3,5304. Bongkar pelat beton bertulang tiap 1m² 38,8005. Bongkar batu kali tebal < 50 cm tiap 1 m³ 72,7506. Bongkar batu kali tebal > 50 cm tiap 1 m³ 145,5007. Bongkar lantai tiap 1 m² 2,6008. Bongkar paving block tiap 1 m² 2,6009. Bongkar plesteran tiap 1 m² 2,420

10. Bongkar atap genteng tiap 1 m² 1,60011. Bongkar karpusan atap genteng tiap 1 m' 2,40012. Bongkar atap seng/asbes tiap 1 m² 3,87013. Bongkar kaso dan reng kayu (kayu akan dipakai lagi) tiap 1 m² 6,65014. Bongkar kaso dan reng kayu (kayu tidak akan dipakai lagi) tiap 1 m² 4,85015. Bongkar balok kuda-kuda & loteng (kayu akan dipakai lagi) tiap 1 m³ 417,28016. Bongkar balok kuda-kuda & loteng (kayu tidak akan dipakai lagi) tiap 1 m³ 288,00017. Bongkar rangka plafon tiap 1 m² 4,85018. Bongkar penutup plafon tiap 1 m² 2,160

Q PEKERJAAN INSTALASI LISTRIK

1. Pasang instalasi lampu dg NYM 2x2,5 mm² tiap 1 titik (tidak termasuk fitting, sakelar & lampu) 170,3302. Pasang instalasi lampu dg NYM 2x1,5 mm² tiap 1 titik (tidak termasuk fitting, sakelar & lampu) 147,1903. Pasang instalasi lampu untuk gedung pertemuan & gudang tiap 1 titik (tidak termasuk fitting, sakelar & lampu) 373,9504. Pasang instalasi stop kontak tiap 1 titik (tidak termasuk stop kontak) 189,2605. Pasang instalasi listrik + outlet AC tiap 1 titik (tidak termasuk AC) 250,3606. Pasang instalasi + tiang antena TV tiap 1 titik (tidak termasuk socket & antena) 193,1807. Pasang instalasi telepon tiap 1 titik (tidak termasuk outlet, pesawat telepon & sambungan Telkom) 158,8808. Pasang instalasi telepon paralel/extension line tiap 1 titik (tidak termasuk outlet, pesawat telepon) 108,4409. Pasang Panel Pembagi Daya 1300 VA / 6 A (3 grup @ 6 A) tiap 1 unit 840,580

10. Pasang Panel Pembagi Daya 2200 VA / 10 A (3 grup @ 10 A) tiap 1 unit 840,58011. Pasang pentanahan (grounding) tiap 1 titik 69,330

S PEKERJAAN PRASARANA LINGKUNGAN - DRAINASE

Page 24: RAB 2009

24

document.xls - 1-RekHSP Hal - 24

NO. URAIAN HSP (Rp)

1. Memasang pipa beton, dia 15-20 cm tiap m' 69,7902. Memasang pipa beton, dia 30 cm tiap m' 276,3303. Memasang pipa beton, dia 40 cm tiap m' 298,8804. Memasang pipa beton, dia 50 cm tiap m' 316,3705. Memasang pipa beton, dia 60 cm tiap m' 344,1506. Memasang pipa beton, dia 80 cm tiap m' 410,1507. Memasang pipa beton, dia 100 cm tiap m' 437,6508. Memasang 1 buah bak kontrol pas.batu bata 30 x 30 cm tinggi 35 cm 291,3909. Memasang 1 buah bak kontrol pas.batu bata 45 x 45 cm tinggi 50 cm 331,190

10. Memasang 1 buah bak kontrol pas.batu bata 60 x 60 cm tinggi 65 cm 509,83011. Membuat saluran air buis beton ½ Ø 20 cm dinding bata dalam 15-25 cm tiap 1 m' 108,72012. Membuat saluran air buis beton ½ Ø 30 cm dinding bata dalam 30-45 cm tiap 1 m' 123,93013. Membuat saluran air dari batu kali lebar bawah 30 cm tinggi 60 cm tiap 1 m' 341,25014. Membuat saluran air dari batu kali lebar bawah 60 cm tinggi 80 cm tiap 1 m' 501,76015. Membuat saluran air dari batu kali lebar bawah 80 cm tinggi 100 cm tiap 1 m' 723,12016. Membuat saluran air dari batu kali lebar bawah 100 cm tinggi 120 cm tiap 1 m' 932,520

T PEKERJAAN PRASARANA LINGKUNGAN - PAGAR1. Pasang pagar beton pracetak tinggi 1,6 m tiap 1 m' 37,8102. Pasang pagar beton pracetak tinggi 2 m tiap 1 m' 37,8103. Membuat pagar dinding tinggi 2 m bata merah + plesteran + cat tembok tiap 1 m' 763,4004. Membuat pagar dinding tinggi 3 m bata merah + plesteran + cat tembok tiap 1 m' 962,5805. Membuat pagar dinding tinggi 2 m bata hollow ekspos + kolom/ringbalk diplester & dicat tiap 1 m' 607,8906. Membuat pagar dinding tinggi 1,5 m bata hollow ekspos + kolom/ringbalk diplester & dicat tiap 1 m' 458,7707. Membuat pagar BRC 1,2 m tinggi jadi 1,5 m (pondasi batu kali + sloof 15/20 + ½ bata 30 cm + plester + cat) tiap 1 m' 308,0208. Membuat pagar BRC 0,9 m tinggi jadi 1,2 m (pondasi batu kali + sloof 15/20 + ½ bata 30 cm + plester + cat) tiap 1 m' 308,020

R PEKERJAAN PRASARANA LINGKUNGAN - JALAN, LAPANGAN PARKIR, LAPANGAN UPACARA/APEL

1. Galian dengan excavator (skala besar) tiap 1m³ 28,2302. Galian dengan tenaga manusia tiap 1m³ 61,7203. Urugan tanah merah dipadatkan alat berat tiap 1m³ 76,1301. Penyiapan badan jalan / tanah dasar (Subgrade) tiap 1m² 3,8605. Urugan sirtu (agregat kelas C) dipadatkan tiap 1m³ 153,4706. Lapis Pondasi Bawah (LPB / Subbase Course) Kelas C Sirtu tebal 10 cm tiap 1m² 15,9607. Lapis Pondasi Jalan Tanpa Penutup Aspal jenis Waterbound Macadam tiap 1m³ 279,7902. Lapis Pondasi Atas (LPA / Base Course) Agregat Kelas A tiap 1m³ 248,9909. Lapis Resap Ikat (Prime Coat) tiap 1 Liter 2,830

10. Lapis Perekat (Tack Coat) tiap 1 Liter 2,36011. Aspal untuk Pelaburan tiap 1 Liter 91012. Lapisan Penetrasi (LAPEN) / Lapisan Permukaan (Surface Course) Macadam tebal 5 cm tiap 1m² 25,72013. Lapisan Tipis Aspal Beton (LATASTON / HRS-Hot Rolled Sheet) tebal 3 cm tiap 1m² 88,51014. Lapisan Permukaan Aspal Beton (LASTON / AC-Asphalt Concrete) tebal 5 cm tiap 1m² 98,37015. Pembuatan jalan aspal biasa (Sirtu t=10 cm, Agregat Kelas A t=20 cm, Permukaan Macadam t=5 cm) tiap m² 95,34016. Pembuatan jalan aspal biasa lebar 3 m' tiap 1 m' 286,02017. Pembuatan jalan aspal biasa lebar 4 m' tiap 1 m' 381,36018. Pembuatan jalan aspal biasa lebar 5 m' tiap 1 m' 476,70019. Pembuatan jalan aspal biasa lebar 6 m' tiap 1 m' 572,04020. Pembuatan jalan aspal biasa lebar 8 m' tiap 1 m' 762,72021. Pembuatan jalan aspal beton t=3 cm (Sirtu = 10 cm, Agregat Kelas A t=20 cm, LATASTON HRS-WC = 3 cm) tiap m² 88,51022. Pembuatan jalan aspal beton t=3 cm lebar 3 m' tiap 1 m' 265,53023. Pembuatan jalan aspal beton t=3 cm lebar 4 m' tiap 1 m' 354,04024. Pembuatan jalan aspal beton t=3 cm lebar 5 m' tiap 1 m' 442,55025. Pembuatan jalan aspal beton t=3 cm lebar 6 m' tiap 1 m' 531,06026. Pembuatan jalan aspal beton t=3 cm lebar 8 m' tiap 1 m' 708,08027. Pembuatan jalan aspal beton t=5 cm (Sirtu = 10 cm, Agregat Kelas A t=20 cm, LASTON AC-WC = 5 cm) tiap m² 98,37028. Pembuatan jalan aspal beton t=5 cm lebar 3 m' tiap 1 m' 295,11029. Pembuatan jalan aspal beton t=5 cm lebar 4 m' tiap 1 m' 393,48030. Pembuatan jalan aspal beton t=5 cm lebar 5 m' tiap 1 m' 491,85031. Pembuatan jalan aspal beton t=5 cm lebar 6 m' tiap 1 m' 590,22032. Pembuatan jalan aspal beton t=5 cm lebar 8 m' tiap 1 m' 786,9603. Pekerjaan paving parkir kendaraan (warna abu T-16 uk. 8x10,5x21) + urugan sirtu 20 cm + urugan pasir 5 cm tiap m² 117,740

Page 25: RAB 2009

25

document.xls - 1-RekHSP Hal - 25

NO. URAIAN HSP (Rp)

4. Pekerjaan paving jalan setapak (warna abu T-16 uk. 8x10,5x21) + urugan sirtu 10 cm + urugan pasir 5 cm tiap m² 100,3305. Pekerjaan kanstin tiap 1 m' 29,5806. Pekerjaan tiang pancang kayu tanpa pengawet 1 btg 76,610V ANALISA TAMBAHAN

1. Memasang 1 buah kran leher angsa dia 3/4" atau 1/2" stainless 174,3402. Analisa pekerjaan beton kolom 15/15 4,344,7203. Analisa pekerjaan beton sloof, ring balk 15/20 4,346,2804. Listrik Kerja dengan penyambungan daya sementara utk ± 4 bln 05. Listrik Kerja (Sewa Genset) 1,172,9706. Foto Dokumentasi 356,2507. Urugan tanah tiap 20 cm (tanah didatangkan) 160,2008. Pasang Gording Kayu Kamper Medan/Kruing tiap 1m³ 7,223,5309. Air Kerja dan Tangki PDAM dalam rit 1,451,120

10. Pemasangan AC Split 279,000

Page 26: RAB 2009

26

document.xls - 2-AHSP Hal - 26

BANGUNAN GEDUNG, PERUMAHAN DAN PRASARANAUNTUK DAERAH KABUPATEN LUWU TIMUR

NO. URAIAN SAT KUANTITAS SUB TOTAL (Rp)

1 2 3 4 5 6

A PEKERJAAN PENDAHULUAN

1. Pagar sementara dari kayu tinggi 2 meter tiap 1 m'

Harga bahan:- Kayu dolken Ø 8-10/400 cm btg 1.25 15,450 19,312.50- Semen portland kg 2.5 1,240 3,100.00- Pasir beton m³ 0.005 103,000 515.00- Batu pecah/split 2/3 m³ 0.009 206,000 1,854.00- Kayu Balok Kelas III m³ 0.072 3,090,000 222,480.00- Paku biasa 2"-5" kg 0.06 9,928 595.65- Residu lt 0.4 7,000 2,800.00

Jumlah Harga BahanUpah tenaga:- Tukang kayu Oh 0.2 65,000 13,000.00- Pekerja Oh 0.4 45,000 18,000.00- Kepala tukang Oh 0.02 70,000 1,400.00- Mandor Oh 0.02 70,000 1,400.00

Jumlah Upah TenagaJumlah Total

Dibulatkan

2. Pagar sementara dari seng gelombang tinggi 2 meter tiap 1 m'

Harga bahan:- Kayu dolken Ø 8-10/400 cm btg 1.25 15,450 19,312.50- Semen portland kg 2.5 1,240 3,100.00- Pasir beton m³ 0.005 103,000 515.00- Batu pecah/split 2/3 m³ 0.009 206,000 1,854.00- Kayu Balok Kelas III m³ 0.072 3,090,000 222,480.00- Paku biasa 2"-5" kg 0.06 9,928 595.65- Seng gelombang 3x6 ft BJLS 20 (0,2 mm) Lbr 1.2 35,625 42,750.00- Cat meni besi kg 0.45 14,250 6,412.50

Jumlah Harga BahanUpah tenaga:- Tukang kayu Oh 0.2 65,000 13,000.00- Pekerja Oh 0.4 45,000 18,000.00- Kepala tukang Oh 0.02 70,000 1,400.00- Mandor Oh 0.02 70,000 1,400.00

Jumlah Upah TenagaJumlah Total

Dibulatkan

3. Pagar sementara dari kawat duri tinggi 1,8 meter tiap 1 m'

Harga bahan:- Kayu dolken Ø 8-10/400 cm btg 1 15,450 15,450.00- Semen portland kg 2 1,240 2,480.00- Pasir beton m³ 0.005 103,000 515.00- Batu pecah/split 2/3 m³ 0.009 206,000 1,854.00- Paku biasa 2"-5" kg 0.06 9,928 595.65- Kawat duri (10kg/60m/rol) kg 2.5 0.00

Jumlah Harga BahanUpah tenaga:- Tukang kayu Oh 0.2 65,000 13,000.00- Pekerja Oh 0.3 45,000 13,500.00- Kepala tukang Oh 0.02 70,000 1,400.00- Mandor Oh 0.02 70,000 1,400.00

Jumlah Upah TenagaJumlah Total

Dibulatkan

URAIAN ANALISIS HARGA SATUAN PEKERJAAN (UNIT PRICE)

HARGA SAT. DASAR (Rp)

Page 27: RAB 2009

27

document.xls - 2-AHSP Hal - 27

NO. URAIAN SAT KUANTITAS SUB TOTAL (Rp)

1 2 3 4 5 6

HARGA SAT. DASAR (Rp)

4. Pembuatan kantor sementara, dengan lantai plesteran tiap 1 m²

Harga bahan:- Kayu dolken Ø 8-10/400 cm btg 1.25 15,450 19,312.50- Kayu Balok Kelas III m³ 0.18 3,090,000 556,200.00- Paku biasa 2"-5" kg 0.85 9,928 8,438.38- Besi pelat strip kg 1.1 7,838 8,621.25- Semen portland kg 35 1,240 43,400.00- Pasir pasang m³ 0.15 110,000 16,500.00- Pasir beton m³ 0.1 103,000 10,300.00- Batu pecah/split 2/3 m³ 0.15 206,000 30,900.00- Bata merah bh 30 567 16,995.00- Seng gelombang 3x6 ft BJLS 20 (0,2 mm) Lbr 0.25 35,625 8,906.25- Jendela nako (rangka) daun 2 24,000 48,000.00- Kaca 3 mm m² 0.08 175,100 14,008.00- Kunci tanam sederhana bh 0.15 85,250 12,787.50- Teakwood 4x8 ft 3 mm lbr 0.06 42,900 2,574.00

Jumlah Harga BahanUpah tenaga:- Tukang kayu Oh 2 65,000 130,000.00- Pekerja Oh 1 45,000 45,000.00- Kepala tukang Oh 0.3 70,000 21,000.00- Mandor Oh 0.05 70,000 3,500.00

Jumlah Upah TenagaJumlah Total

Dibulatkan

5. Pembuatan kantor sementara (3,6x3,6) m² dengan lantai plesteran + meja & bangku kayu tiap 1 unit

Harga bahan:- Semen portland kg 246.4 1,240 305,536.00- Pasir beton m³ 0.5175 103,000 53,302.50- Batu pecah/split 2/3 m³ 0.862 206,000 177,572.00- Kayu Balok Kelas III m³ 0.6206 3,090,000 1,917,654.00- Paku biasa 2"-5" kg 3.5065 9,928 34,810.78- Paku biasa 1/2"- 1" kg 1.0126 9,928 10,052.59- Triplek 4x8 ft 4 mm lbr 15.4 69,250 1,066,450.00- Seng gelombang 3x6 ft BJLS 20 (0,2 mm) Lbr 15 35,625 534,375.00- Jendela nako (rangka) daun 7 24,000 168,000.00- Besi segi empat 3/8"x3/8" (0,83kg/m') kg 3.486 0.00- Kaca 5 mm m² 0.63 195,700 123,291.00- Engsel pintu biasa/sederhana set 1 10,688 10,687.50- Kunci tanam sederhana bh 1 85,250 85,250.00Harga bahan untuk meja & kursi sederhana:- Triplek 4x8 ft 6 mm lbr 0.66 87,550 57,783.00- Kayu Balok Kelas III m³ 0.1167 3,090,000 360,603.00- Kayu Papan Kelas III m³ 0.0396 3,605,000 142,758.00- Paku biasa 2"-5" kg 0.952 9,928 9,450.98- Paku biasa 1/2"- 1" kg 0.086 9,928 853.77

Jumlah Harga BahanUpah tenaga:- Pekerja Oh 12.06235 45,000 542,805.75- Tukang kayu Oh 17.09105 65,000 1,110,918.25- Tukang batu Oh 0.28 65,000 18,200.00- Kepala tukang Oh 1.737105 70,000 121,597.35- Mandor Oh 0.5146475 70,000 36,025.33

Jumlah Upah TenagaJumlah Total

Dibulatkan

Page 28: RAB 2009

28

document.xls - 2-AHSP Hal - 28

NO. URAIAN SAT KUANTITAS SUB TOTAL (Rp)

1 2 3 4 5 6

HARGA SAT. DASAR (Rp)

6. Pembuatan kantor sementara dengan lantai plesteran + meja & bangku kayu tiap 1 m²

Harga bahan:- Semen portland kg 20 1,240 24,800.00- Pasir beton m³ 0.04 103,000 4,120.00- Batu pecah/split 2/3 m³ 0.0666 206,000 13,719.60- Kayu Balok Kelas III m³ 0.0479 3,090,000 148,011.00- Paku biasa 2"-5" kg 0.271 9,928 2,690.35- Paku biasa 1/2"- 1" kg 0.079 9,928 784.27- Triplek 4x8 ft 4 mm lbr 1.189 69,250 82,338.25- Seng gelombang 3x6 ft BJLS 20 (0,2 mm) Lbr 1.158 35,625 41,253.75- Jendela nako (rangka) daun 0.541 24,000 12,984.00- Besi segi empat 3/8"x3/8" (0,83kg/m') kg 0.269 0.00- Kaca 5 mm m² 0.049 195,700 9,589.30- Engsel pintu biasa/sederhana set 0.078 10,688 833.63- Kunci tanam sederhana bh 0.078 85,250 6,649.50Harga bahan untuk meja & kursi sederhana:- Triplek 4x8 ft 6 mm lbr 0.051 87,550 4,465.05- Kayu Balok Kelas III m³ 0.01 3,090,000 30,900.00- Kayu Papan Kelas III m³ 0.004 3,605,000 14,420.00- Paku biasa 2"-5" kg 0.074 9,928 734.64- Paku biasa 1/2"- 1" kg 0.007 9,928 69.49

Jumlah Harga BahanUpah tenaga:- Pekerja Oh 0.931 45,000 41,895.00- Tukang kayu Oh 1.319 65,000 85,735.00- Tukang batu Oh 0.022 65,000 1,430.00- Kepala tukang Oh 0.135 70,000 9,450.00- Mandor Oh 0.04 70,000 2,800.00

Jumlah Upah TenagaJumlah Total

Dibulatkan

7. Pembuatan gudang semen dan peralatan tiap 1 m²

Harga bahan:- Kayu dolken Ø 8-10/400 cm btg 1.7 15,450 26,265.00- Kayu Balok Kelas III m³ 0.21 3,090,000 648,900.00- Paku biasa 2"-5" kg 0.3 9,928 2,978.25- Semen portland kg 10.5 1,240 13,020.00- Pasir beton m³ 0.03 103,000 3,090.00- Batu pecah/split 2/3 m³ 0.05 206,000 10,300.00- Seng gelombang 3x6 ft BJLS 20 (0,2 mm) Lbr 1.5 35,625 53,437.50

Jumlah Harga BahanUpah tenaga:- Tukang kayu Oh 2 65,000 130,000.00- Pekerja Oh 1 45,000 45,000.00- Kepala tukang Oh 0.2 70,000 14,000.00- Mandor Oh 0.05 70,000 3,500.00

Jumlah Upah TenagaJumlah Total

Dibulatkan

8. Pembuatan rumah jaga/konstruksi kayu tiap 1 m²

Harga bahan:- Kayu dolken Ø 8-10/400 cm btg 3 15,450 46,350.00- Kayu Balok Kelas III m³ 0.276 3,090,000 852,840.00- Paku biasa 2"-5" kg 0.7 9,928 6,949.25- Seng gelombang 3x6 ft BJLS 20 (0,2 mm) Lbr 1.5 35,625 53,437.50

Jumlah Harga Bahan

Upah tenaga:- Tukang kayu Oh 1.5 65,000 97,500.00- Pekerja Oh 1 45,000 45,000.00- Kepala tukang Oh 0.15 70,000 10,500.00- Mandor Oh 0.05 70,000 3,500.00

Jumlah Upah Tenaga

Page 29: RAB 2009

29

document.xls - 2-AHSP Hal - 29

NO. URAIAN SAT KUANTITAS SUB TOTAL (Rp)

1 2 3 4 5 6

HARGA SAT. DASAR (Rp)

Jumlah TotalDibulatkan

Page 30: RAB 2009

30

document.xls - 2-AHSP Hal - 30

NO. URAIAN SAT KUANTITAS SUB TOTAL (Rp)

1 2 3 4 5 6

HARGA SAT. DASAR (Rp)

9. Pembuatan bedeng buruh tiap 1 m²

Harga bahan:- Kayu dolken Ø 8-10/400 cm btg 1.25 15,450 19,312.50- Kayu Balok Kelas III m³ 0.186 3,090,000 574,740.00- Paku biasa 2"-5" kg 0.3 9,928 2,978.25- Semen portland kg 18 1,240 22,320.00- Pasir beton m³ 0.03 103,000 3,090.00- Batu pecah/split 2/3 m³ 0.05 206,000 10,300.00- Seng gelombang 3x6 ft BJLS 20 (0,2 mm) Lbr 1.5 35,625 53,437.50- Teakwood 4x8 ft 3 mm lbr 1.35 42,900 57,915.00

Jumlah Harga BahanUpah tenaga:- Tukang kayu Oh 2 65,000 130,000.00- Pekerja Oh 1 45,000 45,000.00- Kepala tukang Oh 0.2 70,000 14,000.00- Mandor Oh 0.05 70,000 3,500.00

Jumlah Upah TenagaJumlah Total

Dibulatkan

10.

Harga bahan:- Batu belah 15/20 m³ 0.15 226,600 33,990.00- Batu pecah 5/7 m³ 0.09 224,200 20,178.00- Pasir pasang m³ 0.01 110,000 1,100.00

Jumlah Harga BahanUpah tenaga:- Pekerja Oh 1 45,000 45,000.00- Mandor Oh 0.05 70,000 3,500.00

Jumlah Upah TenagaJumlah Total

Dibulatkan

11. Pembuatan jalan sementara tebal 25 cm tiap 1 m²

Harga bahan:- Batu belah 15/20 m³ 0.275 226,600 62,315.00- Batu pecah/split 3/5 m³ 0.03 180,250 5,407.50- Pasir pasang m³ 0.05 110,000 5,500.00

Jumlah Harga BahanUpah tenaga:- Pekerja Oh 1 45,000 45,000.00- Mandor Oh 0.1 70,000 7,000.00

Jumlah Upah TenagaJumlah Total

Dibulatkan

12. Pasang bouwplank tiap 1 m'

Harga bahan:- Kayu Kelas III papan m³ 0.007 3,605,000 25,235.00- Kayu Kelas III Kaso m³ 0.012 3,605,000 43,260.00- Paku biasa 2"-5" kg 0.02 9,928 198.55

Jumlah Harga BahanUpah tenaga:- Tukang kayu Oh 0.1 65,000 6,500.00- Pekerja Oh 0.1 45,000 4,500.00- Kepala tukang Oh 0.01 70,000 700.00- Mandor Oh 0.005 70,000 350.00

Jumlah Upah TenagaJumlah Total

Dibulatkan

B PEKERJAAN TANAH

1. Pembersihan lapangan dan perataan tiap 1 m²

Upah tenaga:- Pekerja Oh 0.1 45,000 4,500.00- Mandor Oh 0.05 70,000 3,500.00

Jumlah Upah TenagaJumlah Total

Pembuatan jalan sementara (tebal 20 cm) tiap 1 m²

Page 31: RAB 2009

31

document.xls - 2-AHSP Hal - 31

NO. URAIAN SAT KUANTITAS SUB TOTAL (Rp)

1 2 3 4 5 6

HARGA SAT. DASAR (Rp)

Dibulatkan

Page 32: RAB 2009

32

document.xls - 2-AHSP Hal - 32

NO. URAIAN SAT KUANTITAS SUB TOTAL (Rp)

1 2 3 4 5 6

HARGA SAT. DASAR (Rp)

2. Pekerjaan stripping setinggi 1 meter (pembersihan lahan skala besar) tiap 1 m²

Upah tenaga:- Pekerja Oh 0.05 45,000 2,250.00- Mandor Oh 0.005 70,000 350.00

Jumlah Upah TenagaJumlah Total

Dibulatkan

3. Galian tanah biasa sedalam 1 meter tiap 1 m³

Upah tenaga:- Pekerja Oh 0.4 45,000 18,000.00- Mandor Oh 0.04 70,000 2,800.00

Jumlah Upah TenagaJumlah Total

Dibulatkan

4. Galian tanah biasa sedalam 2 meter tiap 1 m³

Upah tenaga:- Pekerja Oh 0.526 45,000 23,670.00- Mandor Oh 0.052 70,000 3,640.00

Jumlah Upah TenagaJumlah Total

Dibulatkan

5. Galian tanah biasa sedalam 3 meter tiap 1 m³

Upah tenaga:- Pekerja Oh 0.735 45,000 33,075.00- Mandor Oh 0.073 70,000 5,110.00

Jumlah Upah TenagaJumlah Total

Dibulatkan

6. Galian tanah keras sedalam 1 meter tiap 1 m³

Upah tenaga:- Pekerja Oh 0.625 45,000 28,125.00- Mandor Oh 0.062 70,000 4,340.00

Jumlah Upah TenagaJumlah Total

Dibulatkan

7. Galian tanah cadas sedalam 1 meter tiap 1 m³

Upah tenaga:- Pekerja Oh 1.25 45,000 56,250.00- Mandor Oh 0.125 70,000 8,750.00

Jumlah Upah TenagaJumlah Total

Dibulatkan

8. Galian tanah lumpur sedalam 1 meter tiap 1 m³

Upah tenaga:- Pekerja Oh 0.823 45,000 37,035.00- Mandor Oh 0.083 70,000 5,810.00

Jumlah Upah TenagaJumlah Total

Dibulatkan

9. Pembuangan tanah sejauh 150 m tiap 1 m³

Upah tenaga:- Pekerja Oh 0.516 45,000 23,220.00- Mandor Oh 0.05 70,000 3,500.00

Jumlah Upah TenagaJumlah Total

Dibulatkan

10. Urugan tanah kembali tiap 1 m³

Upah tenaga:- Pekerja Oh 0.192 45,000 8,640.00- Mandor Oh 0.019 70,000 1,330.00

Jumlah Upah TenagaJumlah Total

Dibulatkan

Page 33: RAB 2009

33

document.xls - 2-AHSP Hal - 33

NO. URAIAN SAT KUANTITAS SUB TOTAL (Rp)

1 2 3 4 5 6

HARGA SAT. DASAR (Rp)

11. Pemadatan tanah (tenaga manusia) tiap 1 m³

Upah tenaga:- Pekerja Oh 0.5 45,000 22,500.00- Mandor Oh 0.05 70,000 3,500.00

Jumlah Upah TenagaJumlah Total

Dibulatkan

12.

Upah tenaga:- Pekerja Oh 0.1 45,000 4,500.00- Mandor Oh 0.01 70,000 700.00

Jumlah Upah TenagaJumlah Total

Dibulatkan

13.

Kecepatan alat v 0.5 km/jamEfisiensi alat Fa 0.83Lebar pemadatan b 0.25 m'Banyak lintasan (pass) n 6 lintasan 3 kali bolak-balikTebal lapis hamparan t 0.2 m'

Qj 3.45833333333333 n

Qt 0.2892 jam

Harga pemakaian alat:- TAMPER / HAND COMPACTOR jam 0.2892 38,042 11,001.62

Jumlah Bahan & Tenaga & AlatJumlah Total

Dibulatkan

14.

Harga pemakaian alat:- TAMPER / HAND COMPACTOR jam 0.0579 38,042 2,202.61

Jumlah Bahan & Tenaga & AlatJumlah Total

Dibulatkan

15.

Kecepatan alat v 0.5 km/jamEfisiensi alat Fa 0.83Lebar pemadatan b 0.25 m'Banyak lintasan (pass) n 10 lintasan 5 kali bolak-balikTebal lapis hamparan t 0.2 m'

Qj 2.075 n

Qt 0.482 jam

Harga pemakaian alat:- TAMPER / HAND COMPACTOR jam 0.482 38,042 18,336.04

Jumlah Bahan & Tenaga & AlatJumlah Total

Dibulatkan

16.

Harga pemakaian alat:- TAMPER / HAND COMPACTOR jam 0.0964 38,042 3,667.21

Jumlah Bahan & Tenaga & AlatJumlah Total

Dibulatkan

17.

Kecepatan alat v 4 km/jam

Pemadatan tanah (tenaga manusia) tebal 20 cm tiap 1 m²

Pemadatan tanah dengan tamper/hand compactor 6 lintasan / tebal 20cm tiap 1 m³

Kap. prod / jam = (v x 1000) x b x t x Fa m³/jam

Koefisien Alat / m³ = 1 : Qj

Pemadatan tanah tebal 20 cm dengan tamper/hand compactor 6 lintasan / tebal 20cm tiap 1 m²

Pemadatan tanah dengan tamper/hand compactor 10 lintasan / tebal 20cm tiap 1 m³

Kap. prod / jam = (v x 1000) x b x t x Fa m³/jam

Koefisien Alat / m³ = 1 : Qj

Pemadatan tanah tebal 20 cm dengan tamper/hand compactor 10 lintasan / tebal 20cm tiap 1 m²

Pemadatan tanah dengan Vibrating Roller tiap 1 m³

Page 34: RAB 2009

34

document.xls - 2-AHSP Hal - 34

NO. URAIAN SAT KUANTITAS SUB TOTAL (Rp)

1 2 3 4 5 6

HARGA SAT. DASAR (Rp)

Efisiensi alat Fa 0.83Lebar pemadatan b 1.2 m'Banyak lintasan (pass) n 6 lintasan 3 kali bolak-balikTebal lapis hamparan t 0.2 m'

Qj 132.8 n

Qt 0.0076 jam

Harga pemakaian alat:- VIBRATING ROLLER 6-8 TON jam 0.0076 99,000 752.40

Jumlah Bahan & Tenaga & AlatJumlah Total

Dibulatkan

18. Pemadatan tanah tebal 20 cm dengan Vibrating Roller tiap 1 m²

Harga pemakaian alat:- VIBRATING ROLLER 6-8 TON jam 0.0016 99,000 158.40

Jumlah Bahan & Tenaga & AlatJumlah Total

Dibulatkan

19. Urugan sirtu tiap 1 m³

Harga bahan:- Sirtu m³ 1.2 113,300 135,960.00

Jumlah Harga BahanUpah tenaga:- Pekerja Oh 0.25 45,000 11,250.00- Mandor Oh 0.025 70,000 1,750.00

Jumlah Upah TenagaJumlah Total

Dibulatkan

20. Urugan pasir urug tiap 1 m³

Harga bahan:- Pasir urug m³ 1.2 77,250 92,700.00

Jumlah Harga BahanUpah tenaga:- Pekerja Oh 0.25 45,000 11,250.00- Mandor Oh 0.025 70,000 1,750.00

Jumlah Upah TenagaJumlah Total

Dibulatkan

Kap. prod / jam = (v x 1000) x b x t x Fa m³/jam

Koefisien Alat / m³ = 1 : Qj

Page 35: RAB 2009

35

document.xls - 2-AHSP Hal - 35

NO. URAIAN SAT KUANTITAS SUB TOTAL (Rp)

1 2 3 4 5 6

HARGA SAT. DASAR (Rp)

21. Urugan tanah merah tiap 1 m³

Harga bahan:- Tanah merah m³ 1.2 50,000 60,000.00

Jumlah Harga BahanUpah tenaga:- Pekerja Oh 0.25 45,000 11,250.00- Mandor Oh 0.025 70,000 1,750.00

Jumlah Upah TenagaJumlah Total

Dibulatkan

22. Urugan pasir pasang tiap 1 m³

Harga bahan:- Pasir pasang m³ 1.2 110,000 132,000.00

Jumlah Harga BahanUpah tenaga:- Pekerja Oh 0.25 45,000 11,250.00- Mandor Oh 0.025 70,000 1,750.00

Jumlah Upah TenagaJumlah Total

Dibulatkan

23. Pemancangan tiang/cerucuk dolken kecil dalam 2 m' tiap 1 titik

Harga bahan:- Kayu dolken Ø 5-7/400 cm btg 0.55 3,325 1,828.75

Jumlah Harga BahanUpah tenaga:- Pekerja Oh 0.1 45,000 4,500.00- Mandor Oh 0.01 70,000 700.00

Jumlah Upah TenagaJumlah Total

Dibulatkan

24. Pemancangan tiang/cerucuk dolken besar dalam 2 m' tiap 1 titik

Harga bahan:- Kayu dolken Ø 8-10/400 cm btg 0.55 15,450 8,497.50

Jumlah Harga BahanUpah tenaga:- Pekerja Oh 0.1 45,000 4,500.00- Mandor Oh 0.01 70,000 700.00

Jumlah Upah TenagaJumlah Total

Dibulatkan

Per m1

25. Pemasangan lapisan ijuk tiap 1 m³

Harga bahan:- Ijuk m³ 1.2 0.00

Jumlah Harga BahanUpah tenaga:- Pekerja Oh 0.15 45,000 6,750.00- Mandor Oh 0.015 70,000 1,050.00

Jumlah Upah TenagaJumlah Total

Dibulatkan

C PEKERJAAN PASANGAN BATU KALI/BELAH

1. Pasang pondasi/pasangan batu kali/belah 1 Pc : 2 Ps tiap 1 m³

Harga bahan:- Batu belah 15/20 m³ 1.1 226,600 249,260.00- Semen portland kg 267 1,240 331,080.00- Pasir pasang m³ 0.427 110,000 46,970.00

Jumlah Harga BahanUpah tenaga:- Pekerja Oh 1.5 45,000 67,500.00- Tukang batu Oh 0.6 65,000 39,000.00- Kepala tukang Oh 0.06 70,000 4,200.00- Mandor Oh 0.075 70,000 5,250.00

Jumlah Upah TenagaJumlah Total

Page 36: RAB 2009

36

document.xls - 2-AHSP Hal - 36

NO. URAIAN SAT KUANTITAS SUB TOTAL (Rp)

1 2 3 4 5 6

HARGA SAT. DASAR (Rp)

Dibulatkan

2. Pasang pondasi/pasangan batu kali/belah 1 Pc : 3 Ps tiap 1 m³

Harga bahan:- Batu belah 15/20 m³ 1.1 226,600 249,260.00- Semen portland kg 202 1,240 250,480.00- Pasir pasang m³ 0.485 110,000 53,350.00

Jumlah Harga BahanUpah tenaga:- Pekerja Oh 1.5 45,000 67,500.00- Tukang batu Oh 0.6 65,000 39,000.00- Kepala tukang Oh 0.06 70,000 4,200.00- Mandor Oh 0.075 70,000 5,250.00

Jumlah Upah TenagaJumlah Total

Dibulatkan

3. Pasang pondasi/pasangan batu kali/belah 1 Pc : 4 Ps tiap 1 m³

Harga bahan:- Batu belah 15/20 m³ 1.1 226,600 249,260.00- Semen portland kg 163 1,240 202,120.00- Pasir pasang m³ 0.52 110,000 57,200.00

Jumlah Harga BahanUpah tenaga:- Pekerja Oh 1.5 45,000 67,500.00- Tukang batu Oh 0.6 65,000 39,000.00- Kepala tukang Oh 0.06 70,000 4,200.00- Mandor Oh 0.075 70,000 5,250.00

Jumlah Upah TenagaJumlah Total

Dibulatkan

Page 37: RAB 2009

37

document.xls - 2-AHSP Hal - 37

NO. URAIAN SAT KUANTITAS SUB TOTAL (Rp)

1 2 3 4 5 6

HARGA SAT. DASAR (Rp)

4. Pasang pondasi/pasangan batu kali/belah 1 Pc : 5 Ps tiap 1 m³

Harga bahan:- Batu belah 15/20 m³ 1.1 226,600 249,260.00- Semen portland kg 136 1,240 168,640.00- Pasir pasang m³ 0.544 110,000 59,840.00

Jumlah Harga BahanUpah tenaga:- Pekerja Oh 1.5 45,000 67,500.00- Tukang batu Oh 0.6 65,000 39,000.00- Kepala tukang Oh 0.06 70,000 4,200.00- Mandor Oh 0.075 70,000 5,250.00

Jumlah Upah TenagaJumlah Total

Dibulatkan

5. Pasang pondasi/pasangan batu kali/belah 1 Pc : 6 Ps tiap 1 m³

Harga bahan:- Batu belah 15/20 m³ 1.1 226,600 249,260.00- Semen portland kg 117 1,240 145,080.00- Pasir pasang m³ 0.561 110,000 61,710.00

Jumlah Harga BahanUpah tenaga:- Pekerja Oh 1.5 45,000 67,500.00- Tukang batu Oh 0.6 65,000 39,000.00- Kepala tukang Oh 0.06 70,000 4,200.00- Mandor Oh 0.075 70,000 5,250.00

Jumlah Upah TenagaJumlah Total

Dibulatkan

6. Pasang pondasi batu kosong (aanstamping) tiap 1 m³

Harga bahan:- Batu belah 15/20 m³ 1.2 226,600 271,920.00- Pasir urug m³ 0.3 77,250 23,175.00

Jumlah Harga BahanUpah tenaga:- Pekerja Oh 0.78 45,000 35,100.00- Tukang batu Oh 0.39 65,000 25,350.00- Kepala tukang Oh 0.039 70,000 2,730.00- Mandor Oh 0.039 70,000 2,730.00

Jumlah Upah TenagaJumlah Total

Dibulatkan

7 Pasang pondasi siklop 40% batu kali tiap 1 m³

Harga bahan:- Besi beton ulir kg 75 10,260 769,500.00- Semen portland kg 202 1,240 250,480.00- Pasir beton kg 0.32 103,000 32,960.00- Koral beton m³ 0.49 128,750 63,087.50- Kawat beton kg 0.8 13,775 11,020.00

Page 38: RAB 2009

38

document.xls - 2-AHSP Hal - 38

NO. URAIAN SAT KUANTITAS SUB TOTAL (Rp)

1 2 3 4 5 6

HARGA SAT. DASAR (Rp)

Jumlah Harga BahanUpah tenaga:- Pekerja Oh 3 45,000 135,000.00- Tukang batu Oh 0.85 65,000 55,250.00- Kepala tukang Oh 0.085 70,000 5,950.00- Mandor Oh 0.15 70,000 10,500.00

Jumlah Upah TenagaJumlah Total

Dibulatkan

8 Pasang pondasi sumuran diameter 100 cm tiap 1 m³

Harga bahan:- Batu belah 15/20 m³ 0.45 226,600 101,970.00- Semen portland kg 280 1,240 347,200.00- Pasir beton m³ 0.45 103,000 46,350.00- Koral beton m³ 0.67 128,750 86,262.50

Jumlah Harga BahanUpah tenaga:- Pekerja Oh 2.38 45,000 107,100.00- Tukang batu Oh 0.3 65,000 19,500.00- Kepala tukang Oh 0.03 70,000 2,100.00- Mandor Oh 0.08 70,000 5,600.00

Jumlah Upah TenagaJumlah Total

Dibulatkan

D PEKERJAAN DINDING

1. Pasangan bata merah tebal 1 bata, 1 Pc : 2 Ps tiap 1m²

Catatan: Ukuran bata 22 x 11 x 5 cm.Harga bahan:- Bata merah bh 140 567 79,310.00- Semen portland kg 43.5 1,240 53,940.00- Pasir pasang m³ 0.08 110,000 8,800.00

Jumlah Harga BahanUpah tenaga:- Pekerja Oh 0.65 45,000 29,250.00- Tukang batu Oh 0.2 65,000 13,000.00- Kepala tukang Oh 0.02 70,000 1,400.00- Mandor Oh 0.03 70,000 2,100.00

Jumlah Upah TenagaJumlah Total

Dibulatkan

2. Pasangan bata merah tebal 1 bata, 1 Pc : 3 Ps tiap 1m²

Harga bahan:- Bata merah bh 140 567 79,310.00- Semen portland kg 32.95 1,240 40,858.00- Pasir pasang m³ 0.091 110,000 10,010.00

Jumlah Harga BahanUpah tenaga:- Pekerja Oh 0.65 45,000 29,250.00- Tukang batu Oh 0.2 65,000 13,000.00- Kepala tukang Oh 0.02 70,000 1,400.00- Mandor Oh 0.03 70,000 2,100.00

Jumlah Upah TenagaJumlah Total

Dibulatkan

3. Pasangan bata merah tebal 1 bata, 1 Pc : 4 Ps tiap 1m²

Harga bahan:- Bata merah bh 140 567 79,310.00- Semen portland kg 26.55 1,240 32,922.00- Pasir pasang m³ 0.093 110,000 10,230.00

Jumlah Harga BahanUpah tenaga:- Pekerja Oh 0.65 45,000 29,250.00- Tukang batu Oh 0.2 65,000 13,000.00- Kepala tukang Oh 0.02 70,000 1,400.00- Mandor Oh 0.03 70,000 2,100.00

Page 39: RAB 2009

39

document.xls - 2-AHSP Hal - 39

NO. URAIAN SAT KUANTITAS SUB TOTAL (Rp)

1 2 3 4 5 6

HARGA SAT. DASAR (Rp)

Jumlah Upah TenagaJumlah Total

Dibulatkan

4. Pasangan bata merah tebal 1 bata, 1 Pc : 5 Ps tiap 1m²

Harga bahan:- Bata merah bh 140 567 79,310.00- Semen portland kg 22.2 1,240 27,528.00- Pasir pasang m³ 0.102 110,000 11,220.00

Jumlah Harga BahanUpah tenaga:- Pekerja Oh 0.65 45,000 29,250.00- Tukang batu Oh 0.2 65,000 13,000.00- Kepala tukang Oh 0.02 70,000 1,400.00- Mandor Oh 0.03 70,000 2,100.00

Jumlah Upah TenagaJumlah Total

Dibulatkan

5. Pasangan bata merah tebal 1/2 bata, 1 Pc : 2 Ps tiap 1m²

Harga bahan:- Bata merah bh 70 567 39,655.00- Semen portland kg 18.95 1,240 23,498.00- Pasir pasang m³ 0.038 110,000 4,180.00

Jumlah Harga BahanUpah tenaga:- Pekerja Oh 0.32 45,000 14,400.00- Tukang batu Oh 0.1 65,000 6,500.00- Kepala tukang Oh 0.01 70,000 700.00- Mandor Oh 0.015 70,000 1,050.00

Jumlah Upah TenagaJumlah Total

Dibulatkan

6. Pasangan bata merah tebal 1/2 bata, 1 Pc : 3 Ps tiap 1m²

Harga bahan:- Bata merah bh 70 567 39,655.00- Semen portland kg 14.37 1,240 17,818.80- Pasir pasang m³ 0.04 110,000 4,400.00

Jumlah Harga BahanUpah tenaga:- Pekerja Oh 0.32 45,000 14,400.00- Tukang batu Oh 0.1 65,000 6,500.00- Kepala tukang Oh 0.01 70,000 700.00- Mandor Oh 0.015 70,000 1,050.00

Jumlah Upah TenagaJumlah Total

Dibulatkan

7. Pasangan bata merah tebal 1/2 bata, 1 Pc : 4 Ps tiap 1m²

Harga bahan:- Bata merah bh 70 567 39,655.00- Semen portland kg 11.5 1,240 14,260.00- Pasir pasang m³ 0.043 110,000 4,730.00

Jumlah Harga BahanUpah tenaga:- Pekerja Oh 0.32 45,000 14,400.00- Tukang batu Oh 0.1 65,000 6,500.00- Kepala tukang Oh 0.01 70,000 700.00- Mandor Oh 0.015 70,000 1,050.00

Jumlah Upah TenagaJumlah Total

Dibulatkan

8. Pasangan bata merah tebal 1/2 bata, 1 Pc : 5 Ps tiap 1m²

Harga bahan:- Bata merah bh 70 567 39,655.00- Semen portland kg 9.68 1,240 12,003.20- Pasir pasang m³ 0.045 110,000 4,950.00

Jumlah Harga Bahan

Page 40: RAB 2009

40

document.xls - 2-AHSP Hal - 40

NO. URAIAN SAT KUANTITAS SUB TOTAL (Rp)

1 2 3 4 5 6

HARGA SAT. DASAR (Rp)

Upah tenaga:- Pekerja Oh 0.32 45,000 14,400.00- Tukang batu Oh 0.1 65,000 6,500.00- Kepala tukang Oh 0.01 70,000 700.00- Mandor Oh 0.015 70,000 1,050.00

Jumlah Upah TenagaJumlah Total

Dibulatkan

Page 41: RAB 2009

41

document.xls - 2-AHSP Hal - 41

NO. URAIAN SAT KUANTITAS SUB TOTAL (Rp)

1 2 3 4 5 6

HARGA SAT. DASAR (Rp)

9. Pasangan bata merah tebal 1/2 bata, 1 Pc : 6 Ps tiap 1m²

Harga bahan:- Bata merah bh 70 567 39,655.00- Semen portland kg 8.32 1,240 10,316.80- Pasir pasang m³ 0.049 110,000 5,390.00

Jumlah Harga BahanUpah tenaga:- Pekerja Oh 0.32 45,000 14,400.00- Tukang batu Oh 0.1 65,000 6,500.00- Kepala tukang Oh 0.01 70,000 700.00- Mandor Oh 0.015 70,000 1,050.00

Jumlah Upah TenagaJumlah Total

Dibulatkan

10.

Catatan: Analisis ini digunakan untuk menghitung pasangan bata dengan ketebalan dinding selain 1/2 bata & 1 bata.Harga bahan:- Bata merah bh 637 567 360,860.50- Semen portland kg 172.27 1,240 213,614.80- Pasir pasang m³ 0.345 110,000 37,950.00

Jumlah Harga BahanUpah tenaga:- Pekerja Oh 2.9 45,000 130,500.00- Tukang batu Oh 0.9 65,000 58,500.00- Kepala tukang Oh 0.09 70,000 6,300.00- Mandor Oh 0.136 70,000 9,520.00

Jumlah Upah TenagaJumlah Total

Dibulatkan

11.

Catatan: Analisis ini digunakan untuk menghitung pasangan bata dengan ketebalan dinding selain 1/2 bata & 1 bata.Harga bahan:- Bata merah bh 637 567 360,860.50- Semen portland kg 130.64 1,240 161,993.60- Pasir pasang m³ 0.364 110,000 40,040.00

Jumlah Harga BahanUpah tenaga:- Pekerja Oh 2.9 45,000 130,500.00- Tukang batu Oh 0.9 65,000 58,500.00- Kepala tukang Oh 0.09 70,000 6,300.00- Mandor Oh 0.136 70,000 9,520.00

Jumlah Upah TenagaJumlah Total

Dibulatkan

12.

Catatan: Analisis ini digunakan untuk menghitung pasangan bata dengan ketebalan dinding selain 1/2 bata & 1 bata.Harga bahan:- Bata merah bh 637 567 360,860.50- Semen portland kg 104.55 1,240 129,642.00- Pasir pasang m³ 0.391 110,000 43,010.00

Jumlah Harga BahanUpah tenaga:- Pekerja Oh 2.9 45,000 130,500.00- Tukang batu Oh 0.9 65,000 58,500.00- Kepala tukang Oh 0.09 70,000 6,300.00- Mandor Oh 0.136 70,000 9,520.00

Jumlah Upah TenagaJumlah Total

Dibulatkan

13.

Catatan: Analisis ini digunakan untuk menghitung pasangan bata dengan ketebalan dinding selain 1/2 bata & 1 bata.Harga bahan:- Bata merah bh 637 567 360,860.50- Semen portland kg 88 1,240 109,120.00- Pasir pasang m³ 0.409 110,000 44,990.00

Pasangan bata merah 1 Pc : 2 Ps tiap 1m³ (dibagi tebal bata 11 cm)

Pasangan bata merah 1 Pc : 3 Ps tiap 1m³ (dibagi tebal bata 11 cm)

Pasangan bata merah 1 Pc : 4 Ps tiap 1m³ (dibagi tebal bata 11 cm)

Pasangan bata merah 1 Pc : 5 Ps tiap 1m³ (dibagi tebal bata 11 cm)

Page 42: RAB 2009

42

document.xls - 2-AHSP Hal - 42

NO. URAIAN SAT KUANTITAS SUB TOTAL (Rp)

1 2 3 4 5 6

HARGA SAT. DASAR (Rp)

Jumlah Harga BahanUpah tenaga:- Pekerja Oh 2.9 45,000 130,500.00- Tukang batu Oh 0.9 65,000 58,500.00- Kepala tukang Oh 0.09 70,000 6,300.00- Mandor Oh 0.136 70,000 9,520.00

Jumlah Upah TenagaJumlah Total

Dibulatkan

14.

Catatan: Analisis ini digunakan untuk menghitung pasangan bata dengan ketebalan dinding selain 1/2 bata & 1 bata.Harga bahan:- Bata merah bh 637 567 360,860.50- Semen portland kg 75.64 1,240 93,793.60- Pasir pasang m³ 0.445 110,000 48,950.00

Jumlah Harga BahanUpah tenaga:- Pekerja Oh 2.9 45,000 130,500.00- Tukang batu Oh 0.9 65,000 58,500.00- Kepala tukang Oh 0.09 70,000 6,300.00- Mandor Oh 0.136 70,000 9,520.00

Jumlah Upah TenagaJumlah Total

Dibulatkan

15. Pasangan rolag bata merah 1 Pc : 5 Ps tiap 1m'

Harga bahan:- Bata merah bh 16 567 9,064.00- Semen portland kg 2.442 1,240 3,028.08- Pasir pasang m³ 0.01122 110,000 1,234.20

Jumlah Harga BahanUpah tenaga:- Pekerja Oh 0.0715 45,000 3,217.50- Tukang batu Oh 0.022 65,000 1,430.00- Kepala tukang Oh 0.0022 70,000 154.00- Mandor Oh 0.0033 70,000 231.00

Jumlah Upah TenagaJumlah Total

Dibulatkan

16. Pasangan dinding hollowblock (batako pres lubang) HB 20 tiap 1m²

Harga bahan:- Hollow block HB. 20 bh 12.5 0.00- Semen portland kg 13.5 1,240 16,740.00- Pasir pasang m³ 0.048 110,000 5,280.00- Besi beton polos kg 1.95 9,928 19,358.63

Jumlah Harga BahanUpah tenaga:- Pekerja Oh 0.35 45,000 15,750.00- Tukang batu Oh 0.15 65,000 9,750.00- Kepala tukang Oh 0.015 70,000 1,050.00- Mandor Oh 0.017 70,000 1,190.00

Jumlah Upah TenagaJumlah Total

Dibulatkan

17. Pasangan dinding hollowblock (batako pres lubang) HB 15 tiap 1m²

Harga bahan:- Hollow block HB. 15 bh 12.5 0.00- Semen portland kg 10.45 1,240 12,958.00- Pasir pasang m³ 0.038 110,000 4,180.00- Besi beton polos kg 1.95 9,928 19,358.63

Jumlah Harga BahanUpah tenaga:- Pekerja Oh 0.32 45,000 14,400.00- Tukang batu Oh 0.12 65,000 7,800.00- Kepala tukang Oh 0.012 70,000 840.00- Mandor Oh 0.015 70,000 1,050.00

Pasangan bata merah 1 Pc : 6 Ps tiap 1m³ (dibagi tebal bata 11 cm)

Page 43: RAB 2009

43

document.xls - 2-AHSP Hal - 43

NO. URAIAN SAT KUANTITAS SUB TOTAL (Rp)

1 2 3 4 5 6

HARGA SAT. DASAR (Rp)

Jumlah Upah TenagaJumlah Total

Dibulatkan

18. Pasangan dinding hollowblock (batako pres lubang) HB 10 tiap 1m²

Harga bahan:- Hollow block HB. 10 bh 12.5 0.00- Semen portland kg 7.5 1,240 9,300.00- Pasir pasang m³ 0.027 110,000 2,970.00- Besi beton polos kg 1.95 9,928 19,358.63

Jumlah Harga BahanUpah tenaga:- Pekerja Oh 0.32 45,000 14,400.00- Tukang batu Oh 0.1 65,000 6,500.00- Kepala tukang Oh 0.01 70,000 700.00- Mandor Oh 0.015 70,000 1,050.00

Jumlah Upah TenagaJumlah Total

Dibulatkan

19. Pasangan dinding Roster bata merah 12 x 24 x 10 tiap 1m²

Harga bahan:- Roster bata merah 12 x 24 x 10 bh 36 0.00- Semen portland kg 12.8 1,240 15,872.00- Pasir pasang m³ 0.035 110,000 3,850.00

Jumlah Harga BahanUpah tenaga:- Pekerja Oh 0.3 45,000 13,500.00- Tukang batu Oh 0.1 65,000 6,500.00- Kepala tukang Oh 0.01 70,000 700.00- Mandor Oh 0.015 70,000 1,050.00

Jumlah Upah TenagaJumlah Total

Dibulatkan

20. Pasangan dinding Roster beton 20 x 20 x 7 tiap 1m²

Harga bahan:- Roster beton 20 x 20 x 7 bh 23 0.00- Semen portland kg 3.55 1,240 4,402.00- Pasir pasang m³ 0.009 110,000 990.00

Jumlah Harga BahanUpah tenaga:- Pekerja Oh 0.3 45,000 13,500.00- Tukang batu Oh 0.1 65,000 6,500.00- Kepala tukang Oh 0.01 70,000 700.00- Mandor Oh 0.015 70,000 1,050.00

Jumlah Upah TenagaJumlah Total

Dibulatkan

Page 44: RAB 2009

44

document.xls - 2-AHSP Hal - 44

NO. URAIAN SAT KUANTITAS SUB TOTAL (Rp)

1 2 3 4 5 6

HARGA SAT. DASAR (Rp)

21. Pasangan dinding Glass block 20 x 20 x 10 tiap 1m²

Harga bahan:- Glass block 20 x 20 x 10 bh 23 0.00- Semen portland kg 5.05 1,240 6,262.00- Pasir pasang m³ 0.013 110,000 1,430.00

Jumlah Harga BahanUpah tenaga:- Pekerja Oh 0.3 45,000 13,500.00- Tukang batu Oh 0.1 65,000 6,500.00- Kepala tukang Oh 0.01 70,000 700.00- Mandor Oh 0.015 70,000 1,050.00

Jumlah Upah TenagaJumlah Total

Dibulatkan

E PEKERJAAN PLESTERAN

1. Plesteran 1 Pc : 2 Ps tebal 15 mm tiap 1m²

Catatan: Analisis E1 s/d E14 pekerjaan plesteran sudah termasuk acian & benangan/ tali air untuk sudut & siku bangunan, kecuali benangan/ tali air untuk

ornamen/ variasi/ skoning dihitung tersendiri. Plesteran tebal 15 mm untuk bangunan gedung & rumah; plesteran 20-30 mm untuk bangunan air, saluran, dll.

Harga bahan:- Semen portland kg 8.52 1,240 10,564.80- Pasir pasang m³ 0.017 110,000 1,870.00

Jumlah Harga BahanUpah tenaga:- Pekerja Oh 0.2 45,000 9,000.00- Tukang batu Oh 0.15 65,000 9,750.00- Kepala tukang Oh 0.015 70,000 1,050.00- Mandor Oh 0.01 70,000 700.00

Jumlah Upah TenagaJumlah Total

Dibulatkan

Page 45: RAB 2009

45

document.xls - 2-AHSP Hal - 45

NO. URAIAN SAT KUANTITAS SUB TOTAL (Rp)

1 2 3 4 5 6

HARGA SAT. DASAR (Rp)

2. Plesteran 1 Pc : 3 Ps tebal 15 mm tiap 1m²

Harga bahan:- Semen portland kg 6.48 1,240 8,035.20- Pasir pasang m³ 0.019 110,000 2,090.00

Jumlah Harga BahanUpah tenaga:- Pekerja Oh 0.2 45,000 9,000.00- Tukang batu Oh 0.15 65,000 9,750.00- Kepala tukang Oh 0.015 70,000 1,050.00- Mandor Oh 0.01 70,000 700.00

Jumlah Upah TenagaJumlah Total

Dibulatkan

3. Plesteran 1 Pc : 4 Ps tebal 15 mm tiap 1m²

Harga bahan:- Semen portland kg 5.2 1,240 6,448.00- Pasir pasang m³ 0.02 110,000 2,200.00

Jumlah Harga BahanUpah tenaga:- Pekerja Oh 0.2 45,000 9,000.00- Tukang batu Oh 0.15 65,000 9,750.00- Kepala tukang Oh 0.015 70,000 1,050.00- Mandor Oh 0.01 70,000 700.00

Jumlah Upah TenagaJumlah Total

Dibulatkan

4. Plesteran 1 Pc : 5 Ps tebal 15 mm tiap 1m²

Harga bahan:- Semen portland kg 4.32 1,240 5,356.80- Pasir pasang m³ 0.022 110,000 2,420.00

Jumlah Harga BahanUpah tenaga:- Pekerja Oh 0.2 45,000 9,000.00- Tukang batu Oh 0.15 65,000 9,750.00- Kepala tukang Oh 0.015 70,000 1,050.00- Mandor Oh 0.01 70,000 700.00

Jumlah Upah TenagaJumlah Total

Dibulatkan

5. Plesteran 1 Pc : 6 Ps tebal 15 mm tiap 1m²

Harga bahan:- Semen portland kg 3.68 1,240 4,563.20- Pasir pasang m³ 0.023 110,000 2,530.00

Jumlah Harga BahanUpah tenaga:- Pekerja Oh 0.2 45,000 9,000.00- Tukang batu Oh 0.15 65,000 9,750.00- Kepala tukang Oh 0.015 70,000 1,050.00- Mandor Oh 0.01 70,000 700.00

Jumlah Upah TenagaJumlah Total

Dibulatkan

6. Plesteran 1 Pc : 2 Ps tebal 20 mm tiap 1m²

Harga bahan:- Semen portland kg 14.28 1,240 17,707.20- Pasir pasang m³ 0.023 110,000 2,530.00

Jumlah Harga BahanUpah tenaga:- Pekerja Oh 0.25 45,000 11,250.00- Tukang batu Oh 0.2 65,000 13,000.00- Kepala tukang Oh 0.02 70,000 1,400.00- Mandor Oh 0.0125 70,000 875.00

Jumlah Upah TenagaJumlah Total

Dibulatkan

Page 46: RAB 2009

46

document.xls - 2-AHSP Hal - 46

NO. URAIAN SAT KUANTITAS SUB TOTAL (Rp)

1 2 3 4 5 6

HARGA SAT. DASAR (Rp)

7. Plesteran 1 Pc : 3 Ps tebal 20 mm tiap 1m²

Harga bahan:- Semen portland kg 10.8 1,240 13,392.00- Pasir pasang m³ 0.026 110,000 2,860.00

Jumlah Harga BahanUpah tenaga:- Pekerja Oh 0.25 45,000 11,250.00- Tukang batu Oh 0.2 65,000 13,000.00- Kepala tukang Oh 0.02 70,000 1,400.00- Mandor Oh 0.0125 70,000 875.00

Jumlah Upah TenagaJumlah Total

Dibulatkan

8. Plesteran 1 Pc : 4 Ps tebal 20 mm tiap 1m²

Harga bahan:- Semen portland kg 8.68 1,240 10,763.20- Pasir pasang m³ 0.028 110,000 3,080.00

Jumlah Harga BahanUpah tenaga:- Pekerja Oh 0.25 45,000 11,250.00- Tukang batu Oh 0.2 65,000 13,000.00- Kepala tukang Oh 0.02 70,000 1,400.00- Mandor Oh 0.0125 70,000 875.00

Jumlah Upah TenagaJumlah Total

Dibulatkan

9. Plesteran 1 Pc : 5 Ps tebal 20 mm tiap 1m²

Harga bahan:- Semen portland kg 7.29 1,240 9,039.60- Pasir pasang m³ 0.028 110,000 3,080.00

Jumlah Harga BahanUpah tenaga:- Pekerja Oh 0.25 45,000 11,250.00- Tukang batu Oh 0.2 65,000 13,000.00- Kepala tukang Oh 0.02 70,000 1,400.00- Mandor Oh 0.0125 70,000 875.00

Jumlah Upah TenagaJumlah Total

Dibulatkan

10. Plesteran 1 Pc : 6 Ps tebal 20 mm tiap 1m²

Harga bahan:- Semen portland kg 6.24 1,240 7,737.60- Pasir pasang m³ 0.03 110,000 3,300.00

Jumlah Harga BahanUpah tenaga:- Pekerja Oh 0.25 45,000 11,250.00- Tukang batu Oh 0.2 65,000 13,000.00- Kepala tukang Oh 0.02 70,000 1,400.00- Mandor Oh 0.0125 70,000 875.00

Jumlah Upah TenagaJumlah Total

Dibulatkan

11. Plesteran 1 Pc : 2 Ps tebal 25 mm tiap 1m²

Harga bahan:- Semen portland kg 15.5 1,240 19,220.00- Pasir pasang m³ 0.013 110,000 1,430.00

Jumlah Harga BahanUpah tenaga:- Pekerja Oh 0.3 45,000 13,500.00- Tukang batu Oh 0.2 65,000 13,000.00- Kepala tukang Oh 0.02 70,000 1,400.00- Mandor Oh 0.013 70,000 910.00

Jumlah Upah TenagaJumlah Total

Dibulatkan

Page 47: RAB 2009

47

document.xls - 2-AHSP Hal - 47

NO. URAIAN SAT KUANTITAS SUB TOTAL (Rp)

1 2 3 4 5 6

HARGA SAT. DASAR (Rp)

12. Plesteran 1 Pc : 3 Ps tebal 25 mm tiap 1m²

Harga bahan:- Semen portland kg 11.75 1,240 14,570.00- Pasir pasang m³ 0.035 110,000 3,850.00

Jumlah Harga BahanUpah tenaga:- Pekerja Oh 0.3 45,000 13,500.00- Tukang batu Oh 0.2 65,000 13,000.00- Kepala tukang Oh 0.02 70,000 1,400.00- Mandor Oh 0.013 70,000 910.00

Jumlah Upah TenagaJumlah Total

Dibulatkan

13. Plesteran 1 Pc : 2 Ps tebal 30 mm tiap 1m²

Harga bahan:- Semen portland kg 18.65 1,240 23,126.00- Pasir pasang m³ 0.035 110,000 3,850.00

Jumlah Harga BahanUpah tenaga:- Pekerja Oh 0.32 45,000 14,400.00- Tukang batu Oh 0.25 65,000 16,250.00- Kepala tukang Oh 0.025 70,000 1,750.00- Mandor Oh 0.015 70,000 1,050.00

Jumlah Upah TenagaJumlah Total

Dibulatkan

14. Plesteran 1 Pc : 3 Ps tebal 30 mm tiap 1m²

Harga bahan:- Semen portland kg 14.15 1,240 17,546.00- Pasir pasang m³ 0.039 110,000 4,290.00

Jumlah Harga BahanUpah tenaga:- Pekerja Oh 0.32 45,000 14,400.00- Tukang batu Oh 0.25 65,000 16,250.00- Kepala tukang Oh 0.025 70,000 1,750.00- Mandor Oh 0.015 70,000 1,050.00

Jumlah Upah TenagaJumlah Total

Dibulatkan

15. Plesteran Berapen 1 Pc : 3 Ps tebal 15 mm tiap 1m²

Harga bahan:- Semen portland kg 7.07 1,240 8,766.80- Pasir pasang m³ 0.021 110,000 2,310.00

Jumlah Harga BahanUpah tenaga:- Pekerja Oh 0.15 45,000 6,750.00- Tukang batu Oh 0.07 65,000 4,550.00- Kepala tukang Oh 0.007 70,000 490.00- Mandor Oh 0.008 70,000 560.00

Jumlah Upah TenagaJumlah Total

Dibulatkan

16. Plesteran Berapen 1 Pc : 5 Ps tebal 15 mm tiap 1m²

Harga bahan:- Semen portland kg 5.67 1,240 7,030.80- Pasir pasang m³ 0.023 110,000 2,530.00

Jumlah Harga BahanUpah tenaga:- Pekerja Oh 0.15 45,000 6,750.00- Tukang batu Oh 0.07 65,000 4,550.00- Kepala tukang Oh 0.007 70,000 490.00- Mandor Oh 0.008 70,000 560.00

Jumlah Upah TenagaJumlah Total

Dibulatkan

Page 48: RAB 2009

48

document.xls - 2-AHSP Hal - 48

NO. URAIAN SAT KUANTITAS SUB TOTAL (Rp)

1 2 3 4 5 6

HARGA SAT. DASAR (Rp)

17.

Harga bahan:- Semen portland kg 0.5 1,240 620.00- Pasir pasang m³ 0.002 110,000 220.00

Jumlah Harga BahanUpah tenaga:- Pekerja Oh 0.057 45,000 2,565.00- Tukang batu Oh 0.038 65,000 2,470.00- Kepala tukang Oh 0.038 70,000 2,660.00- Mandor Oh 0.002 70,000 140.00

Jumlah Upah TenagaJumlah Total

Dibulatkan

18. Plesteran Ciprat 1 Pc : 2 Ps tiap 1m²

Harga bahan:- Semen portland kg 4.32 1,240 5,356.80- Pasir pasang m³ 0.016 110,000 1,760.00

Jumlah Harga BahanUpah tenaga:- Pekerja Oh 0.25 45,000 11,250.00- Tukang batu Oh 0.1 65,000 6,500.00- Kepala tukang Oh 0.01 70,000 700.00- Mandor Oh 0.015 70,000 1,050.00

Jumlah Upah TenagaJumlah Total

Dibulatkan

19. Plesteran Siar 1 Pc : 2 Ps untuk dinding batu kali/belah tiap 1m²

Harga bahan:- Semen portland kg 4.32 1,240 5,356.80- Pasir pasang m³ 0.016 110,000 1,760.00

Jumlah Harga BahanUpah tenaga:- Pekerja Oh 0.15 45,000 6,750.00- Tukang batu Oh 0.07 65,000 4,550.00- Kepala tukang Oh 0.007 70,000 490.00- Mandor Oh 0.008 70,000 560.00

Jumlah Upah TenagaJumlah Total

Dibulatkan

Plesteran Skoning (Benangan/Tali Air) 1 Pc : 2 Ps tiap 1m'

Page 49: RAB 2009

49

document.xls - 2-AHSP Hal - 49

NO. URAIAN SAT KUANTITAS SUB TOTAL (Rp)

1 2 3 4 5 6

HARGA SAT. DASAR (Rp)

F PEKERJAAN KUSEN DAN DAUN PINTU/JENDELA KAYU

1. Pasang kusen pintu dan jendela Kayu Klas I tiap 1m³

Harga bahan:- Kayu Kelas I Balok m³ 1.1 8,240,000 9,064,000.00

Jumlah Harga BahanUpah tenaga:- Pekerja Oh 6 45,000 270,000.00- Tukang kayu Oh 20 65,000 1,300,000.00- Kepala tukang Oh 2 70,000 140,000.00- Mandor Oh 0.3 70,000 21,000.00

Jumlah Upah TenagaJumlah Total

Dibulatkan

2. Pasang kusen pintu dan jendela Kayu Klas I tiap 1m³

Harga bahan:- Kayu Kelas I Balok m³ 1.2 8,240,000 9,888,000.00

Jumlah Harga BahanUpah tenaga:- Pekerja Oh 6 45,000 270,000.00- Tukang kayu Oh 18 65,000 1,170,000.00- Kepala tukang Oh 2 70,000 140,000.00- Mandor Oh 0.3 70,000 21,000.00

Jumlah Upah TenagaJumlah Total

Dibulatkan

3. Pasang kusen pintu dan jendela Kayu Klas I tiap 1m³

Harga bahan:- Kayu Kelas I Balok m³ 1.2 8,240,000 9,888,000.00

Jumlah Harga BahanUpah tenaga:- Pekerja Oh 6 45,000 270,000.00- Tukang kayu Oh 18 65,000 1,170,000.00- Kepala tukang Oh 2 70,000 140,000.00- Mandor Oh 0.3 70,000 21,000.00

Jumlah Upah TenagaJumlah Total

Dibulatkan

4. Pasang kusen pintu dan jendela Kayu Klas II tiap 1m³

Harga bahan:- Kayu Kelas II Balok m³ 1.2 6,180,000 7,416,000.00

Jumlah Harga BahanUpah tenaga:- Pekerja Oh 6 45,000 270,000.00- Tukang kayu Oh 18 65,000 1,170,000.00- Kepala tukang Oh 2 70,000 140,000.00- Mandor Oh 0.3 70,000 21,000.00

Jumlah Upah TenagaJumlah Total

Dibulatkan

5. Pasang kusen pintu dan jendela Kayu Klas II tiap 1m³

Harga bahan:- Kayu Kelas II Balok m³ 1.2 6,180,000 7,416,000.00

Jumlah Harga BahanUpah tenaga:- Pekerja Oh 6 45,000 270,000.00- Tukang kayu Oh 18 65,000 1,170,000.00- Kepala tukang Oh 2 70,000 140,000.00- Mandor Oh 0.3 70,000 21,000.00

Jumlah Upah TenagaJumlah Total

Dibulatkan

6. Pasang kusen pintu dan jendela Kayu Klas III tiap 1m³

Harga bahan:- Kayu Balok Kelas III m³ 1.2 3,090,000 3,708,000.00

Jumlah Harga Bahan

Page 50: RAB 2009

50

document.xls - 2-AHSP Hal - 50

NO. URAIAN SAT KUANTITAS SUB TOTAL (Rp)

1 2 3 4 5 6

HARGA SAT. DASAR (Rp)

Upah tenaga:- Pekerja Oh 6 45,000 270,000.00- Tukang kayu Oh 18 65,000 1,170,000.00- Kepala tukang Oh 2 70,000 140,000.00- Mandor Oh 0.3 70,000 21,000.00

Jumlah Upah TenagaJumlah Total

Dibulatkan

7. Pasang kusen pintu dan jendela Kayu Klas III tiap 1m³

Harga bahan:- Kayu Balok Kelas III m³ 1.2 3,090,000 3,708,000.00

Jumlah Harga BahanUpah tenaga:- Pekerja Oh 6 45,000 270,000.00- Tukang kayu Oh 18 65,000 1,170,000.00- Kepala tukang Oh 2 70,000 140,000.00- Mandor Oh 0.3 70,000 21,000.00

Jumlah Upah TenagaJumlah Total

Dibulatkan

8. Pasang kusen pintu dan jendela Kayu Klas III tiap 1m³

Harga bahan:- Kayu Balok Kelas III m³ 1.2 3,090,000 3,708,000.00

Jumlah Harga BahanUpah tenaga:- Pekerja Oh 6 45,000 270,000.00- Tukang kayu Oh 18 65,000 1,170,000.00- Kepala tukang Oh 2 70,000 140,000.00- Mandor Oh 0.3 70,000 21,000.00

Jumlah Upah TenagaJumlah Total

Dibulatkan

9. Pasang pintu panel Kayu Klas I tiap 1m²

Harga bahan:- Kayu Kelas I Papan m³ 0.04 9,270,000 370,800.00

Jumlah Harga BahanUpah tenaga:- Pekerja Oh 1 45,000 45,000.00- Tukang kayu Oh 2.5 65,000 162,500.00- Kepala tukang Oh 0.25 70,000 17,500.00- Mandor Oh 0.05 70,000 3,500.00

Jumlah Upah TenagaJumlah Total

Dibulatkan

10. Pasang pintu panel Kayu Klas I tiap 1m²

Harga bahan:- Kayu Kelas I Papan m³ 0.04 9,270,000 370,800.00

Jumlah Harga BahanUpah tenaga:- Pekerja Oh 1 45,000 45,000.00- Tukang kayu Oh 2.5 65,000 162,500.00- Kepala tukang Oh 0.25 70,000 17,500.00- Mandor Oh 0.05 70,000 3,500.00

Jumlah Upah TenagaJumlah Total

Dibulatkan

11. Pasang pintu panel Kayu Klas I 1m²

Harga bahan:- Kayu Kelas I Papan m³ 0.04 9,270,000 370,800.00

Jumlah Harga BahanUpah tenaga:- Pekerja Oh 1 45,000 45,000.00- Tukang kayu Oh 2.5 65,000 162,500.00- Kepala tukang Oh 0.25 70,000 17,500.00- Mandor Oh 0.05 70,000 3,500.00

Page 51: RAB 2009

51

document.xls - 2-AHSP Hal - 51

NO. URAIAN SAT KUANTITAS SUB TOTAL (Rp)

1 2 3 4 5 6

HARGA SAT. DASAR (Rp)

Jumlah Upah TenagaJumlah Total

Dibulatkan

12. Pasang pintu panel Kayu Klas II tiap 1m²

Harga bahan:- Kayu Kelas II Papan m³ 0.04 6,695,000 267,800.00

Jumlah Harga BahanUpah tenaga:- Pekerja Oh 1 45,000 45,000.00- Tukang kayu Oh 2.5 65,000 162,500.00- Kepala tukang Oh 0.25 70,000 17,500.00- Mandor Oh 0.05 70,000 3,500.00

Jumlah Upah TenagaJumlah Total

Dibulatkan

Page 52: RAB 2009

52

document.xls - 2-AHSP Hal - 52

NO. URAIAN SAT KUANTITAS SUB TOTAL (Rp)

1 2 3 4 5 6

HARGA SAT. DASAR (Rp)

13. Pasang pintu panel Kayu Klas II tiap 1m²

Harga bahan:- Kayu Kelas II Papan m³ 0.04 6,695,000 267,800.00

Jumlah Harga BahanUpah tenaga:- Pekerja Oh 1 45,000 45,000.00- Tukang kayu Oh 2.5 65,000 162,500.00- Kepala tukang Oh 0.25 70,000 17,500.00- Mandor Oh 0.05 70,000 3,500.00

Jumlah Upah TenagaJumlah Total

Dibulatkan

14. Pasang pintu panel Kayu Klas II tiap 1m²

Harga bahan:- Kayu Kelas II Papan m³ 0.04 6,695,000 267,800.00

Jumlah Harga BahanUpah tenaga:- Pekerja Oh 1 45,000 45,000.00- Tukang kayu Oh 2.5 65,000 162,500.00- Kepala tukang Oh 0.25 70,000 17,500.00- Mandor Oh 0.05 70,000 3,500.00

Jumlah Upah TenagaJumlah Total

Dibulatkan

15. Pasang pintu panel Kayu Klas III tiap 1m²

Harga bahan:- Kayu Papan Kelas III m³ 0.04 3,605,000 144,200.00

Jumlah Harga BahanUpah tenaga:- Pekerja Oh 1 45,000 45,000.00- Tukang kayu Oh 2.5 65,000 162,500.00- Kepala tukang Oh 0.25 70,000 17,500.00- Mandor Oh 0.05 70,000 3,500.00

Jumlah Upah TenagaJumlah Total

Dibulatkan

16. Pasang pintu panel Kayu Klas III tiap 1m²

Harga bahan:- Kayu Papan Kelas III m³ 0.04 3,605,000 144,200.00

Jumlah Harga BahanUpah tenaga:- Pekerja Oh 1 45,000 45,000.00- Tukang kayu Oh 2.5 65,000 162,500.00- Kepala tukang Oh 0.25 70,000 17,500.00- Mandor Oh 0.05 70,000 3,500.00

Jumlah Upah TenagaJumlah Total

Dibulatkan

17. Pasang pintu dan jendela kaca Kayu Klas I tiap 1m²

Harga bahan:- Kayu Kelas I Papan m³ 0.035 9,270,000 324,450.00

Jumlah Harga BahanUpah tenaga:- Pekerja Oh 0.8 45,000 36,000.00- Tukang kayu Oh 2 65,000 130,000.00- Kepala tukang Oh 0.2 70,000 14,000.00- Mandor Oh 0.04 70,000 2,800.00

Jumlah Upah TenagaJumlah Total

Dibulatkan

18. Pasang pintu dan jendela kaca Kayu Klas I tiap 1m²

Harga bahan:- Kayu Kelas I Papan m³ 0.035 9,270,000 324,450.00

Jumlah Harga BahanUpah tenaga:

Page 53: RAB 2009

53

document.xls - 2-AHSP Hal - 53

NO. URAIAN SAT KUANTITAS SUB TOTAL (Rp)

1 2 3 4 5 6

HARGA SAT. DASAR (Rp)

- Pekerja Oh 0.8 45,000 36,000.00- Tukang kayu Oh 2 65,000 130,000.00- Kepala tukang Oh 0.2 70,000 14,000.00- Mandor Oh 0.04 70,000 2,800.00

Jumlah Upah TenagaJumlah Total

Dibulatkan

19. Pasang pintu dan jendela kaca Kayu Klas I tiap 1m²

Harga bahan:- Kayu Kelas I Papan m³ 0.035 9,270,000 324,450.00

Jumlah Harga BahanUpah tenaga:- Pekerja Oh 0.8 45,000 36,000.00- Tukang kayu Oh 2 65,000 130,000.00- Kepala tukang Oh 0.2 70,000 14,000.00- Mandor Oh 0.04 70,000 2,800.00

Jumlah Upah TenagaJumlah Total

Dibulatkan

20. Pasang pintu dan jendela kaca Kayu Klas II tiap 1m²

Harga bahan:- Kayu Kelas II Papan m³ 0.035 6,695,000 234,325.00

Jumlah Harga BahanUpah tenaga:- Pekerja Oh 0.8 45,000 36,000.00- Tukang kayu Oh 2 65,000 130,000.00- Kepala tukang Oh 0.2 70,000 14,000.00- Mandor Oh 0.04 70,000 2,800.00

Jumlah Upah TenagaJumlah Total

Dibulatkan

21. Pasang pintu dan jendela kaca Kayu Klas II tiap 1m²

Harga bahan:- Kayu Kelas II Papan m³ 0.035 6,695,000 234,325.00

Jumlah Harga BahanUpah tenaga:- Pekerja Oh 0.8 45,000 36,000.00- Tukang kayu Oh 2 65,000 130,000.00- Kepala tukang Oh 0.2 70,000 14,000.00- Mandor Oh 0.04 70,000 2,800.00

Jumlah Upah TenagaJumlah Total

Dibulatkan

22. Pasang pintu dan jendela kaca Kayu Klas II tiap 1m²

Harga bahan:- Kayu Kelas II Papan m³ 0.035 6,695,000 234,325.00

Jumlah Harga BahanUpah tenaga:- Pekerja Oh 0.8 45,000 36,000.00- Tukang kayu Oh 2 65,000 130,000.00- Kepala tukang Oh 0.2 70,000 14,000.00- Mandor Oh 0.04 70,000 2,800.00

Jumlah Upah TenagaJumlah Total

Dibulatkan

23. Pasang pintu dan jendela kaca Kayu Klas III tiap 1m²

Harga bahan:- Kayu Papan Kelas III m³ 0.035 3,605,000 126,175.00

Jumlah Harga BahanUpah tenaga:- Pekerja Oh 0.8 45,000 36,000.00- Tukang kayu Oh 2 65,000 130,000.00- Kepala tukang Oh 0.2 70,000 14,000.00- Mandor Oh 0.04 70,000 2,800.00

Jumlah Upah Tenaga

Page 54: RAB 2009

54

document.xls - 2-AHSP Hal - 54

NO. URAIAN SAT KUANTITAS SUB TOTAL (Rp)

1 2 3 4 5 6

HARGA SAT. DASAR (Rp)

Jumlah TotalDibulatkan

24. Pasang pintu dan jendela kaca Kayu Klas III tiap 1m²

Harga bahan:- Kayu Papan Kelas III m³ 0.035 3,605,000 126,175.00

Jumlah Harga BahanUpah tenaga:- Pekerja Oh 0.8 45,000 36,000.00- Tukang kayu Oh 2 65,000 130,000.00- Kepala tukang Oh 0.2 70,000 14,000.00- Mandor Oh 0.04 70,000 2,800.00

Jumlah Upah TenagaJumlah Total

Dibulatkan

25. Pasang pintu dan jendela jalusi Kayu Klas I tiap 1m²

Harga bahan:- Kayu Kelas I Papan m³ 0.064 9,270,000 593,280.00

Jumlah Harga BahanUpah tenaga:- Pekerja Oh 1 45,000 45,000.00- Tukang kayu Oh 3 65,000 195,000.00- Kepala tukang Oh 0.3 70,000 21,000.00- Mandor Oh 0.05 70,000 3,500.00

Jumlah Upah TenagaJumlah Total

Dibulatkan

26. Pasang pintu dan jendela jalusi Kayu Klas I tiap 1m²

Harga bahan:- Kayu Kelas I Papan m³ 0.064 9,270,000 593,280.00

Jumlah Harga BahanUpah tenaga:- Pekerja Oh 1 45,000 45,000.00- Tukang kayu Oh 3 65,000 195,000.00- Kepala tukang Oh 0.3 70,000 21,000.00- Mandor Oh 0.05 70,000 3,500.00

Jumlah Upah TenagaJumlah Total

Dibulatkan

27. Pasang pintu dan jendela jalusi Kayu Klas I tiap 1m²

Harga bahan:- Kayu Kelas I Papan m³ 0.064 9,270,000 593,280.00

Jumlah Harga BahanUpah tenaga:- Pekerja Oh 1 45,000 45,000.00- Tukang kayu Oh 3 65,000 195,000.00- Kepala tukang Oh 0.3 70,000 21,000.00- Mandor Oh 0.05 70,000 3,500.00

Jumlah Upah TenagaJumlah Total

Dibulatkan

28. Pasang pintu dan jendela jalusi Kayu Klas II tiap 1m²

Harga bahan:- Kayu Kelas II Papan m³ 0.064 6,695,000 428,480.00

Jumlah Harga BahanUpah tenaga:- Pekerja Oh 1 45,000 45,000.00- Tukang kayu Oh 3 65,000 195,000.00- Kepala tukang Oh 0.3 70,000 21,000.00- Mandor Oh 0.05 70,000 3,500.00

Jumlah Upah TenagaJumlah Total

Dibulatkan

29. Pasang pintu dan jendela jalusi Kayu Klas II tiap 1m²

Harga bahan:- Kayu Kelas II Papan m³ 0.064 6,695,000 428,480.00

Page 55: RAB 2009

55

document.xls - 2-AHSP Hal - 55

NO. URAIAN SAT KUANTITAS SUB TOTAL (Rp)

1 2 3 4 5 6

HARGA SAT. DASAR (Rp)

Jumlah Harga BahanUpah tenaga:- Pekerja Oh 1 45,000 45,000.00- Tukang kayu Oh 3 65,000 195,000.00- Kepala tukang Oh 0.3 70,000 21,000.00- Mandor Oh 0.05 70,000 3,500.00

Jumlah Upah TenagaJumlah Total

Dibulatkan

30. Pasang pintu dan jendela jalusi Kayu Klas II tiap 1m²

Harga bahan:- Kayu Kelas II Papan m³ 0.064 6,695,000 428,480.00

Jumlah Harga BahanUpah tenaga:- Pekerja Oh 1 45,000 45,000.00- Tukang kayu Oh 3 65,000 195,000.00- Kepala tukang Oh 0.3 70,000 21,000.00- Mandor Oh 0.05 70,000 3,500.00

Jumlah Upah TenagaJumlah Total

Dibulatkan

Page 56: RAB 2009

56

document.xls - 2-AHSP Hal - 56

NO. URAIAN SAT KUANTITAS SUB TOTAL (Rp)

1 2 3 4 5 6

HARGA SAT. DASAR (Rp)

31. Pasang pintu dan jendela jalusi Kayu Klas III tiap 1m²

Harga bahan:- Kayu Papan Kelas III m³ 0.064 3,605,000 230,720.00

Jumlah Harga BahanUpah tenaga:- Pekerja Oh 1 45,000 45,000.00- Tukang kayu Oh 3 65,000 195,000.00- Kepala tukang Oh 0.3 70,000 21,000.00- Mandor Oh 0.05 70,000 3,500.00

Jumlah Upah TenagaJumlah Total

Dibulatkan

32. Pasang pintu dan jendela jalusi Kayu Klas III tiap 1m²

Harga bahan:- Kayu Papan Kelas III m³ 0.064 3,605,000 230,720.00

Jumlah Harga BahanUpah tenaga:- Pekerja Oh 1 45,000 45,000.00- Tukang kayu Oh 3 65,000 195,000.00- Kepala tukang Oh 0.3 70,000 21,000.00- Mandor Oh 0.05 70,000 3,500.00

Jumlah Upah TenagaJumlah Total

Dibulatkan

33. Pasang jalusi mati Kayu Klas I tiap 1m²

Harga bahan:- Kayu Kelas I Papan m³ 0.06 9,270,000 556,200.00- Paku biasa 1/2"- 1" kg 0.15 9,928 1,489.13

Jumlah Harga BahanUpah tenaga:- Pekerja Oh 0.5 45,000 22,500.00- Tukang kayu Oh 2 65,000 130,000.00- Kepala tukang Oh 0.2 70,000 14,000.00- Mandor Oh 0.025 70,000 1,750.00

Jumlah Upah TenagaJumlah Total

Dibulatkan

34. Pasang jalusi mati Kayu Klas I tiap 1m²

Harga bahan:- Kayu Kelas I Papan m³ 0.06 9,270,000 556,200.00- Paku biasa 1/2"- 1" kg 0.15 9,928 1,489.13

Jumlah Harga BahanUpah tenaga:- Pekerja Oh 0.5 45,000 22,500.00- Tukang kayu Oh 2 65,000 130,000.00- Kepala tukang Oh 0.2 70,000 14,000.00- Mandor Oh 0.025 70,000 1,750.00

Jumlah Upah TenagaJumlah Total

Dibulatkan

35. Pasang jalusi mati Kayu Klas I tiap 1m²

Harga bahan:- Kayu Kelas I Papan m³ 0.06 9,270,000 556,200.00- Paku biasa 1/2"- 1" kg 0.15 9,928 1,489.13

Jumlah Harga BahanUpah tenaga:- Pekerja Oh 0.5 45,000 22,500.00- Tukang kayu Oh 2 65,000 130,000.00- Kepala tukang Oh 0.2 70,000 14,000.00- Mandor Oh 0.025 70,000 1,750.00

Jumlah Upah TenagaJumlah Total

Dibulatkan

36. Pasang jalusi mati Kayu Klas II tiap 1m²

Harga bahan:

Page 57: RAB 2009

57

document.xls - 2-AHSP Hal - 57

NO. URAIAN SAT KUANTITAS SUB TOTAL (Rp)

1 2 3 4 5 6

HARGA SAT. DASAR (Rp)

- Kayu Kelas II Papan m³ 0.06 6,695,000 401,700.00- Paku biasa 1/2"- 1" kg 0.15 9,928 1,489.13

Jumlah Harga BahanUpah tenaga:- Pekerja Oh 0.5 45,000 22,500.00- Tukang kayu Oh 2 65,000 130,000.00- Kepala tukang Oh 0.2 70,000 14,000.00- Mandor Oh 0.025 70,000 1,750.00

Jumlah Upah TenagaJumlah Total

Dibulatkan

37. Pasang jalusi mati Kayu Klas II tiap 1m²

Harga bahan:- Kayu Kelas II Papan m³ 0.06 6,695,000 401,700.00- Paku biasa 1/2"- 1" kg 0.15 9,928 1,489.13

Jumlah Harga BahanUpah tenaga:- Pekerja Oh 0.5 45,000 22,500.00- Tukang kayu Oh 2 65,000 130,000.00- Kepala tukang Oh 0.2 70,000 14,000.00- Mandor Oh 0.025 70,000 1,750.00

Jumlah Upah TenagaJumlah Total

Dibulatkan

38. Pasang pintu teakwood rangkap, rangka Kayu Klas I tiap 1m²

Harga bahan:- Kayu Kelas I Papan m³ 0.0196 9,270,000 181,692.00- Paku biasa 1/2"- 1" kg 0.03 9,928 297.83- Lem kayu lt 0.3 4,750 1,425.00- Teakwood 3x7 ft 3 mm lbr 1 36,000 36,000.00

Jumlah Harga BahanUpah tenaga:- Pekerja Oh 0.6 45,000 27,000.00- Tukang kayu Oh 2 65,000 130,000.00- Kepala tukang Oh 0.2 70,000 14,000.00- Mandor Oh 0.03 70,000 2,100.00

Jumlah Upah TenagaJumlah Total

Dibulatkan

39. Pasang pintu teakwood rangkap, rangka Kayu Klas I tiap 1m²

Harga bahan:- Kayu Kelas I Papan m³ 0.0196 9,270,000 181,692.00- Paku biasa 1/2"- 1" kg 0.03 9,928 297.83- Lem kayu lt 0.3 4,750 1,425.00- Teakwood 3x7 ft 3 mm lbr 1 36,000 36,000.00

Jumlah Harga BahanUpah tenaga:- Pekerja Oh 0.6 45,000 27,000.00- Tukang kayu Oh 2 65,000 130,000.00- Kepala tukang Oh 0.2 70,000 14,000.00- Mandor Oh 0.03 70,000 2,100.00

Jumlah Upah TenagaJumlah Total

Dibulatkan

40. Pasang pintu teakwood rangkap, rangka Kayu Klas I tiap 1m²

Harga bahan:- Kayu Kelas I Papan m³ 0.0196 9,270,000 181,692.00- Paku biasa 1/2"- 1" kg 0.03 9,928 297.83- Lem kayu lt 0.3 4,750 1,425.00- Teakwood 3x7 ft 3 mm lbr 1 36,000 36,000.00

Jumlah Harga BahanUpah tenaga:- Pekerja Oh 0.6 45,000 27,000.00- Tukang kayu Oh 2 65,000 130,000.00- Kepala tukang Oh 0.2 70,000 14,000.00

Page 58: RAB 2009

58

document.xls - 2-AHSP Hal - 58

NO. URAIAN SAT KUANTITAS SUB TOTAL (Rp)

1 2 3 4 5 6

HARGA SAT. DASAR (Rp)

- Mandor Oh 0.03 70,000 2,100.00Jumlah Upah Tenaga

Jumlah TotalDibulatkan

41. Pasang pintu teakwood rangkap, rangka Kayu Klas II tiap 1m²

Harga bahan:- Kayu Kelas II Papan m³ 0.0196 6,695,000 131,222.00- Paku biasa 1/2"- 1" kg 0.03 9,928 297.83- Lem kayu lt 0.3 4,750 1,425.00- Teakwood 3x7 ft 3 mm lbr 1 36,000 36,000.00

Jumlah Harga BahanUpah tenaga:- Pekerja Oh 0.6 45,000 27,000.00- Tukang kayu Oh 2 65,000 130,000.00- Kepala tukang Oh 0.2 70,000 14,000.00- Mandor Oh 0.03 70,000 2,100.00

Jumlah Upah TenagaJumlah Total

Dibulatkan

42. Pasang pintu teakwood rangkap, rangka Kayu Klas II tiap 1m²

Harga bahan:- Kayu Kelas II Papan m³ 0.0196 6,695,000 131,222.00- Paku biasa 1/2"- 1" kg 0.03 9,928 297.83- Lem kayu lt 0.3 4,750 1,425.00- Teakwood 3x7 ft 3 mm lbr 1 36,000 36,000.00

Page 59: RAB 2009

59

document.xls - 2-AHSP Hal - 59

NO. URAIAN SAT KUANTITAS SUB TOTAL (Rp)

1 2 3 4 5 6

HARGA SAT. DASAR (Rp)

Jumlah Harga BahanUpah tenaga:- Pekerja Oh 0.6 45,000 27,000.00- Tukang kayu Oh 2 65,000 130,000.00- Kepala tukang Oh 0.2 70,000 14,000.00- Mandor Oh 0.03 70,000 2,100.00

Jumlah Upah TenagaJumlah Total

Dibulatkan

43. Pasang pintu triplek rangkap, rangka Kayu Klas I tiap 1m²

Harga bahan:- Kayu Kelas I Papan m³ 0.0196 9,270,000 181,692.00- Paku biasa 1/2"- 1" kg 0.03 9,928 297.83- Lem kayu lt 0.3 4,750 1,425.00- Triplek 4x8 ft 4 mm lbr 0.73 69,250 50,552.50

Jumlah Harga BahanUpah tenaga:- Pekerja Oh 0.6 45,000 27,000.00- Tukang kayu Oh 2 65,000 130,000.00- Kepala tukang Oh 0.2 70,000 14,000.00- Mandor Oh 0.03 70,000 2,100.00

Jumlah Upah TenagaJumlah Total

Dibulatkan

44. Pasang pintu triplek rangkap, rangka Kayu Klas II tiap 1m²

Harga bahan:- Kayu Kelas II Papan m³ 0.0196 6,695,000 131,222.00- Paku biasa 1/2"- 1" kg 0.03 9,928 297.83- Lem kayu lt 0.3 4,750 1,425.00- Triplek 4x8 ft 4 mm lbr 0.73 69,250 50,552.50

Jumlah Harga BahanUpah tenaga:- Pekerja Oh 0.6 45,000 27,000.00- Tukang kayu Oh 2 65,000 130,000.00- Kepala tukang Oh 0.2 70,000 14,000.00- Mandor Oh 0.03 70,000 2,100.00

Jumlah Upah TenagaJumlah Total

Dibulatkan

45. Pasang pintu teakwood dan formika, rangka Kayu Klas I tiap 1m²

Harga bahan:- Kayu Kelas I Papan m³ 0.0196 9,270,000 181,692.00- Paku biasa 1/2"- 1" kg 0.3 9,928 2,978.25- Lem kayu lt 0.8 4,750 3,800.00- Teakwood 3x7 ft 3 mm lbr 0.5 36,000 18,000.00- Formika 3x7 ft 3 mm lbr 0.5 95,500 47,750.00

Jumlah Harga BahanUpah tenaga:- Pekerja Oh 0.8 45,000 36,000.00- Tukang kayu Oh 2.5 65,000 162,500.00- Kepala tukang Oh 0.25 70,000 17,500.00- Mandor Oh 0.04 70,000 2,800.00

Jumlah Upah TenagaJumlah Total

Dibulatkan

46. Pasang pintu teakwood dan formika, rangka Kayu Klas I tiap 1m²

Harga bahan:- Kayu Kelas I Papan m³ 0.0196 9,270,000 181,692.00- Paku biasa 1/2"- 1" kg 0.3 9,928 2,978.25- Lem kayu lt 0.8 4,750 3,800.00- Teakwood 3x7 ft 3 mm lbr 0.5 36,000 18,000.00- Formika 3x7 ft 3 mm lbr 0.5 95,500 47,750.00

Jumlah Harga BahanUpah tenaga:- Pekerja Oh 0.8 45,000 36,000.00

Page 60: RAB 2009

60

document.xls - 2-AHSP Hal - 60

NO. URAIAN SAT KUANTITAS SUB TOTAL (Rp)

1 2 3 4 5 6

HARGA SAT. DASAR (Rp)

- Tukang kayu Oh 2.5 65,000 162,500.00- Kepala tukang Oh 0.25 70,000 17,500.00- Mandor Oh 0.04 70,000 2,800.00

Jumlah Upah TenagaJumlah Total

Dibulatkan

47. Pasang pintu teakwood dan formika, rangka Kayu Klas II tiap 1m²

Harga bahan:- Kayu Kelas II Papan m³ 0.0196 6,695,000 131,222.00- Paku biasa 1/2"- 1" kg 0.3 9,928 2,978.25- Lem kayu lt 0.8 4,750 3,800.00- Teakwood 3x7 ft 3 mm lbr 0.5 36,000 18,000.00- Formika 3x7 ft 3 mm lbr 0.5 95,500 47,750.00

Jumlah Harga BahanUpah tenaga:- Pekerja Oh 0.8 45,000 36,000.00- Tukang kayu Oh 2.5 65,000 162,500.00- Kepala tukang Oh 0.25 70,000 17,500.00- Mandor Oh 0.04 70,000 2,800.00

Jumlah Upah TenagaJumlah Total

Dibulatkan

48. Pasang pintu teakwood dan formika, rangka Kayu Klas II tiap 1m²

Harga bahan:- Kayu Kelas II Papan m³ 0.0196 6,695,000 131,222.00- Paku biasa 1/2"- 1" kg 0.3 9,928 2,978.25- Lem kayu lt 0.8 4,750 3,800.00- Teakwood 3x7 ft 3 mm lbr 0.5 36,000 18,000.00- Formika 3x7 ft 3 mm lbr 0.5 95,500 47,750.00

Jumlah Harga BahanUpah tenaga:- Pekerja Oh 0.8 45,000 36,000.00- Tukang kayu Oh 2.5 65,000 162,500.00- Kepala tukang Oh 0.25 70,000 17,500.00- Mandor Oh 0.04 70,000 2,800.00

Jumlah Upah TenagaJumlah Total

Dibulatkan

49. Pasang pintu teakwood dan formika, rangka Kayu Klas II tiap 1m²

Harga bahan:- Kayu Kelas II Papan m³ 0.0196 6,695,000 131,222.00- Paku biasa 1/2"- 1" kg 0.3 9,928 2,978.25- Lem kayu lt 0.8 4,750 3,800.00- Teakwood 3x7 ft 3 mm lbr 0.5 36,000 18,000.00- Formika 3x7 ft 3 mm lbr 0.5 95,500 47,750.00

Jumlah Harga BahanUpah tenaga:- Pekerja Oh 0.8 45,000 36,000.00- Tukang kayu Oh 2.5 65,000 162,500.00- Kepala tukang Oh 0.25 70,000 17,500.00- Mandor Oh 0.04 70,000 2,800.00

Jumlah Upah TenagaJumlah Total

Dibulatkan

50. Pasang pintu triplek dan formika, rangka Kayu Klas III tiap 1m²

Harga bahan:- Kayu Papan Kelas III m³ 0.0196 3,605,000 70,658.00- Paku biasa 1/2"- 1" kg 0.3 9,928 2,978.25- Lem kayu lt 0.8 4,750 3,800.00- Triplek 4x8 ft 4 mm lbr 0.365 69,250 25,276.25- Formika 3x7 ft 3 mm lbr 0.5 95,500 47,750.00

Jumlah Harga BahanUpah tenaga:- Pekerja Oh 0.8 45,000 36,000.00- Tukang kayu Oh 2.5 65,000 162,500.00

Page 61: RAB 2009

61

document.xls - 2-AHSP Hal - 61

NO. URAIAN SAT KUANTITAS SUB TOTAL (Rp)

1 2 3 4 5 6

HARGA SAT. DASAR (Rp)

- Kepala tukang Oh 0.25 70,000 17,500.00- Mandor Oh 0.04 70,000 2,800.00

Jumlah Upah TenagaJumlah Total

Dibulatkan

51. Pasang pintu triplek dan formika, rangka Kayu Klas III tiap 1m²

Harga bahan:- Kayu Papan Kelas III m³ 0.0196 3,605,000 70,658.00- Paku biasa 1/2"- 1" kg 0.3 9,928 2,978.25- Lem kayu lt 0.8 4,750 3,800.00- Triplek 4x8 ft 4 mm lbr 0.365 69,250 25,276.25- Formika 3x7 ft 3 mm lbr 0.5 95,500 47,750.00

Jumlah Harga BahanUpah tenaga:- Pekerja Oh 0.8 45,000 36,000.00- Tukang kayu Oh 2.5 65,000 162,500.00- Kepala tukang Oh 0.25 70,000 17,500.00- Mandor Oh 0.04 70,000 2,800.00

Jumlah Upah TenagaJumlah Total

Dibulatkan

G PEKERJAAN KONSTRUKSI ATAP KAYU

1. Pasang konstruksi kuda-kuda Kayu Klas I tiap 1m³

Harga bahan:- Kayu Kelas I Balok m³ 1.1 8,240,000 9,064,000.00- Besi pelat strip kg 15 7,838 117,562.50- Paku biasa 2"-5" kg 0.8 9,928 7,942.00

Jumlah Harga BahanUpah tenaga:- Pekerja Oh 4 45,000 180,000.00- Tukang kayu Oh 12 65,000 780,000.00- Kepala tukang Oh 1.2 70,000 84,000.00- Mandor Oh 0.2 70,000 14,000.00

Jumlah Upah TenagaJumlah Total

Dibulatkan

2. Pasang konstruksi kuda-kuda Kayu Klas I tiap 1m³

Harga bahan:- Kayu Kelas I Balok m³ 1.1 8,240,000 9,064,000.00- Besi pelat strip kg 15 7,838 117,562.50- Paku biasa 2"-5" kg 0.8 9,928 7,942.00

Jumlah Harga BahanUpah tenaga:- Pekerja Oh 4 45,000 180,000.00- Tukang kayu Oh 12 65,000 780,000.00- Kepala tukang Oh 1.2 70,000 84,000.00- Mandor Oh 0.2 70,000 14,000.00

Jumlah Upah TenagaJumlah Total

Dibulatkan

3. Pasang konstruksi kuda-kuda Kayu Klas I tiap 1m³

Harga bahan:- Kayu Kelas I Balok m³ 1.1 8,240,000 9,064,000.00- Besi pelat strip kg 15 7,838 117,562.50- Paku biasa 2"-5" kg 0.8 9,928 7,942.00

Jumlah Harga BahanUpah tenaga:- Pekerja Oh 4 45,000 180,000.00- Tukang kayu Oh 12 65,000 780,000.00- Kepala tukang Oh 1.2 70,000 84,000.00- Mandor Oh 0.2 70,000 14,000.00

Jumlah Upah TenagaJumlah Total

Dibulatkan

4. Pasang konstruksi kuda-kuda Kayu Klas II tiap 1m³

Page 62: RAB 2009

62

document.xls - 2-AHSP Hal - 62

NO. URAIAN SAT KUANTITAS SUB TOTAL (Rp)

1 2 3 4 5 6

HARGA SAT. DASAR (Rp)

Harga bahan:- Kayu Kelas II Balok m³ 1.1 6,180,000 6,798,000.00- Besi pelat strip kg 15 7,838 117,562.50- Paku biasa 2"-5" kg 0.8 9,928 7,942.00

Jumlah Harga BahanUpah tenaga:- Pekerja Oh 4 45,000 180,000.00- Tukang kayu Oh 12 65,000 780,000.00- Kepala tukang Oh 1.2 70,000 84,000.00- Mandor Oh 0.2 70,000 14,000.00

Jumlah Upah TenagaJumlah Total

Dibulatkan

5. Pasang konstruksi kuda-kuda Kayu Klas II tiap 1m³

Harga bahan:- Kayu Kelas II Balok m³ 1.1 6,180,000 6,798,000.00- Besi pelat strip kg 15 7,838 117,562.50- Paku biasa 2"-5" kg 0.8 9,928 7,942.00

Jumlah Harga BahanUpah tenaga:- Pekerja Oh 4 45,000 180,000.00- Tukang kayu Oh 12 65,000 780,000.00- Kepala tukang Oh 1.2 70,000 84,000.00- Mandor Oh 0.2 70,000 14,000.00

Jumlah Upah TenagaJumlah Total

Dibulatkan

6. Pasang konstruksi kuda-kuda Kayu Klas III tiap 1m³

Harga bahan:- Kayu Balok Kelas III m³ 1.1 3,090,000 3,399,000.00- Besi pelat strip kg 15 7,838 117,562.50- Paku biasa 2"-5" kg 0.8 9,928 7,942.00

Jumlah Harga BahanUpah tenaga:- Pekerja Oh 4 45,000 180,000.00- Tukang kayu Oh 12 65,000 780,000.00- Kepala tukang Oh 1.2 70,000 84,000.00- Mandor Oh 0.2 70,000 14,000.00

Jumlah Upah TenagaJumlah Total

Dibulatkan

7. Pasang konstruksi kuda-kuda Kayu Klas III tiap 1m³

Harga bahan:- Kayu Balok Kelas III m³ 1.1 3,090,000 3,399,000.00- Besi pelat strip kg 15 7,838 117,562.50- Paku biasa 2"-5" kg 0.8 9,928 7,942.00

Jumlah Harga BahanUpah tenaga:- Pekerja Oh 4 45,000 180,000.00- Tukang kayu Oh 12 65,000 780,000.00- Kepala tukang Oh 1.2 70,000 84,000.00- Mandor Oh 0.2 70,000 14,000.00

Jumlah Upah TenagaJumlah Total

Dibulatkan

8. Pasang kaso + reng genteng kodok Kayu Klas I tiap 1m²

Harga bahan:- Kayu Kelas I Balok m³ 0.012 8,240,000 98,880.00- Paku biasa 2"-5" kg 0.15 9,928 1,489.13

Jumlah Harga BahanUpah tenaga:- Pekerja Oh 0.1 45,000 4,500.00- Tukang kayu Oh 0.1 65,000 6,500.00- Kepala tukang Oh 0.01 70,000 700.00- Mandor Oh 0.005 70,000 350.00

Page 63: RAB 2009

63

document.xls - 2-AHSP Hal - 63

NO. URAIAN SAT KUANTITAS SUB TOTAL (Rp)

1 2 3 4 5 6

HARGA SAT. DASAR (Rp)

Jumlah Upah TenagaJumlah Total

Dibulatkan

9. Pasang kaso + reng genteng kodok Kayu Klas II tiap 1m²

Harga bahan:- Kayu Kelas II Balok m³ 0.012 6,180,000 74,160.00- Paku biasa 2"-5" kg 0.15 9,928 1,489.13

Jumlah Harga BahanUpah tenaga:- Pekerja Oh 0.1 45,000 4,500.00- Tukang kayu Oh 0.1 65,000 6,500.00- Kepala tukang Oh 0.01 70,000 700.00- Mandor Oh 0.005 70,000 350.00

Jumlah Upah TenagaJumlah Total

Dibulatkan

10. Pasang kaso + reng genteng monier Kayu Klas I tiap 1m²

Harga bahan:- Kayu Kelas I Balok m³ 0.014 8,240,000 115,360.00- Paku biasa 2"-5" kg 0.15 9,928 1,489.13

Jumlah Harga BahanUpah tenaga:- Pekerja Oh 0.1 45,000 4,500.00- Tukang kayu Oh 0.1 65,000 6,500.00- Kepala tukang Oh 0.01 70,000 700.00- Mandor Oh 0.005 70,000 350.00

Jumlah Upah TenagaJumlah Total

Dibulatkan

11. Pasang kaso + reng genteng monier Kayu Klas II tiap 1m²

Harga bahan:- Kayu Kelas II Balok m³ 0.014 6,180,000 86,520.00- Paku biasa 2"-5" kg 0.15 9,928 1,489.13

Jumlah Harga BahanUpah tenaga:- Pekerja Oh 0.1 45,000 4,500.00- Tukang kayu Oh 0.1 65,000 6,500.00- Kepala tukang Oh 0.01 70,000 700.00- Mandor Oh 0.005 70,000 350.00

Jumlah Upah TenagaJumlah Total

Dibulatkan

12. Pasang kaso + reng genteng beton Kayu Klas I tiap 1m²

Harga bahan:- Kayu Kelas I Balok m³ 0.014 8,240,000 115,360.00- Paku biasa 2"-5" kg 0.15 9,928 1,489.13

Jumlah Harga BahanUpah tenaga:- Pekerja Oh 0.1 45,000 4,500.00- Tukang kayu Oh 0.1 65,000 6,500.00- Kepala tukang Oh 0.01 70,000 700.00- Mandor Oh 0.005 70,000 350.00

Jumlah Upah TenagaJumlah Total

Dibulatkan

13. Pasang kaso + reng genteng beton Kayu Klas II tiap 1m²

Harga bahan:- Kayu Kelas II Balok m³ 0.014 6,180,000 86,520.00- Paku biasa 2"-5" kg 0.15 9,928 1,489.13

Jumlah Harga BahanUpah tenaga:- Pekerja Oh 0.1 45,000 4,500.00- Tukang kayu Oh 0.1 65,000 6,500.00- Kepala tukang Oh 0.01 70,000 700.00- Mandor Oh 0.005 70,000 350.00

Page 64: RAB 2009

64

document.xls - 2-AHSP Hal - 64

NO. URAIAN SAT KUANTITAS SUB TOTAL (Rp)

1 2 3 4 5 6

HARGA SAT. DASAR (Rp)

Jumlah Upah TenagaJumlah Total

Dibulatkan

14. Pasang kaso + reng atap sirap kayu Klas II tiap 1m²

Harga bahan:- Kayu Kamper Samarinda Balok m³ 0.165 6,456,666 1,065,349.89- Paku biasa 2"-5" kg 0.2 9,928 1,985.50

Jumlah Harga BahanUpah tenaga:- Pekerja Oh 0.12 45,000 5,400.00- Tukang kayu Oh 0.12 65,000 7,800.00- Kepala tukang Oh 0.012 70,000 840.00- Mandor Oh 0.006 70,000 420.00

Jumlah Upah TenagaJumlah Total

Dibulatkan

15. Pasang lisplang (3 x 20) cm Kayu Klas I tiap 1m'

Harga bahan:- Kayu Kelas I Papan m³ 0.0072 9,270,000 66,744.00- Paku biasa 2"-5" kg 0.05 9,928 496.38

Jumlah Harga BahanUpah tenaga:- Pekerja Oh 0.1 45,000 4,500.00- Tukang kayu Oh 0.2 65,000 13,000.00- Kepala tukang Oh 0.025 70,000 1,750.00- Mandor Oh 0.005 70,000 350.00

Jumlah Upah TenagaJumlah Total

Dibulatkan

16. Pasang lisplang (3 x 20) cm Kayu Klas II tiap 1m'

Harga bahan:- Kayu Kelas II Papan m³ 0.0072 6,695,000 48,204.00- Paku biasa 2"-5" kg 0.05 9,928 496.38

Jumlah Harga BahanUpah tenaga:- Pekerja Oh 0.1 45,000 4,500.00- Tukang kayu Oh 0.2 65,000 13,000.00- Kepala tukang Oh 0.025 70,000 1,750.00- Mandor Oh 0.005 70,000 350.00

Jumlah Upah TenagaJumlah Total

Dibulatkan

17. Pasang lisplang (3 x 20) cm Kayu Klas III tiap 1m'

Harga bahan:- Kayu Papan Kelas III m³ 0.0072 3,605,000 25,956.00- Paku biasa 2"-5" kg 0.05 9,928 496.38

Jumlah Harga BahanUpah tenaga:- Pekerja Oh 0.1 45,000 4,500.00- Tukang kayu Oh 0.2 65,000 13,000.00- Kepala tukang Oh 0.025 70,000 1,750.00- Mandor Oh 0.005 70,000 350.00

Jumlah Upah TenagaJumlah Total

Dibulatkan

18. Pasang lisplang (3 x 30) cm Kayu Klas I tiap 1m'

Harga bahan:- Kayu Kelas I Papan m³ 0.011 9,270,000 101,970.00- Paku biasa 2"-5" kg 0.05 9,928 496.38

Jumlah Harga BahanUpah tenaga:- Pekerja Oh 0.11 45,000 4,950.00- Tukang kayu Oh 0.22 65,000 14,300.00- Kepala tukang Oh 0.022 70,000 1,540.00- Mandor Oh 0.005 70,000 350.00

Page 65: RAB 2009

65

document.xls - 2-AHSP Hal - 65

NO. URAIAN SAT KUANTITAS SUB TOTAL (Rp)

1 2 3 4 5 6

HARGA SAT. DASAR (Rp)

Jumlah Upah TenagaJumlah Total

Dibulatkan

19. Pasang lisplang (3 x 30) cm Kayu Klas II tiap 1m'

Harga bahan:- Kayu Kelas II Papan m³ 0.011 6,695,000 73,645.00- Paku biasa 2"-5" kg 0.05 9,928 496.38

Jumlah Harga BahanUpah tenaga:- Pekerja Oh 0.11 45,000 4,950.00- Tukang kayu Oh 0.22 65,000 14,300.00- Kepala tukang Oh 0.022 70,000 1,540.00- Mandor Oh 0.005 70,000 350.00

Jumlah Upah TenagaJumlah Total

Dibulatkan

Page 66: RAB 2009

66

document.xls - 2-AHSP Hal - 66

NO. URAIAN SAT KUANTITAS SUB TOTAL (Rp)

1 2 3 4 5 6

HARGA SAT. DASAR (Rp)

20. Pasang lisplang (3 x 30) cm Kayu Klas III tiap 1m'

Harga bahan:- Kayu Papan Kelas III m³ 0.011 3,605,000 39,655.00- Paku biasa 2"-5" kg 0.05 9,928 496.38

Jumlah Harga BahanUpah tenaga:- Pekerja Oh 0.11 45,000 4,950.00- Tukang kayu Oh 0.22 65,000 14,300.00- Kepala tukang Oh 0.022 70,000 1,540.00- Mandor Oh 0.005 70,000 350.00

Jumlah Upah TenagaJumlah Total

Dibulatkan

21. Pasang lisplang 2 x (2 x 20) cm Kayu Klas I tiap 1m'

Harga bahan:- Kayu Kelas I Papan m³ 0.0088 9,270,000 81,576.00- Paku biasa 2"-5" kg 0.06 9,928 595.65

Jumlah Harga BahanUpah tenaga:- Pekerja Oh 0.1 45,000 4,500.00- Tukang kayu Oh 0.1 65,000 6,500.00- Kepala tukang Oh 0.01 70,000 700.00- Mandor Oh 0.005 70,000 350.00

Jumlah Upah TenagaJumlah Total

Dibulatkan

22. Pasang lisplang 2 x (2 x 20) cm Kayu Klas II tiap 1m'

Harga bahan:- Kayu Kelas II Papan m³ 0.0088 6,695,000 58,916.00- Paku biasa 2"-5" kg 0.06 9,928 595.65

Jumlah Harga BahanUpah tenaga:- Pekerja Oh 0.1 45,000 4,500.00- Tukang kayu Oh 0.1 65,000 6,500.00- Kepala tukang Oh 0.01 70,000 700.00- Mandor Oh 0.005 70,000 350.00

Jumlah Upah TenagaJumlah Total

Dibulatkan

23. Pasang lisplang 2 x (2 x 20) cm Kayu Klas III tiap 1m'

Harga bahan:- Kayu Papan Kelas III m³ 0.0088 3,605,000 31,724.00- Paku biasa 2"-5" kg 0.06 9,928 595.65

Jumlah Harga BahanUpah tenaga:- Pekerja Oh 0.1 45,000 4,500.00- Tukang kayu Oh 0.1 65,000 6,500.00- Kepala tukang Oh 0.01 70,000 700.00- Mandor Oh 0.005 70,000 350.00

Jumlah Upah TenagaJumlah Total

Dibulatkan

H PEKERJAAN KONSTRUKSI LANGIT-LANGIT/PLAFON DAN PENUTUP

1. Pasang rangka plafon (1,00 x 1,00) m Kayu Klas I tiap 1m²

Harga bahan:- Kayu Kelas I Balok m³ 0.012 8,240,000 98,880.00- Paku biasa 2"-5" kg 0.1 9,928 992.75

Jumlah Harga BahanUpah tenaga:- Pekerja Oh 0.15 45,000 6,750.00- Tukang kayu Oh 0.25 65,000 16,250.00- Kepala tukang Oh 0.025 70,000 1,750.00- Mandor Oh 0.0075 70,000 525.00

Jumlah Upah TenagaJumlah Total

Page 67: RAB 2009

67

document.xls - 2-AHSP Hal - 67

NO. URAIAN SAT KUANTITAS SUB TOTAL (Rp)

1 2 3 4 5 6

HARGA SAT. DASAR (Rp)

Dibulatkan

Page 68: RAB 2009

68

document.xls - 2-AHSP Hal - 68

NO. URAIAN SAT KUANTITAS SUB TOTAL (Rp)

1 2 3 4 5 6

HARGA SAT. DASAR (Rp)

2. Pasang rangka plafon (1,00 x 1,00) m Kayu Klas II tiap 1m²

Harga bahan:- Kayu Kelas II Papan m³ 0.012 6,695,000 80,340.00- Paku biasa 2"-5" kg 0.1 9,928 992.75

Jumlah Harga BahanUpah tenaga:- Pekerja Oh 0.15 45,000 6,750.00- Tukang kayu Oh 0.25 65,000 16,250.00- Kepala tukang Oh 0.025 70,000 1,750.00- Mandor Oh 0.0075 70,000 525.00

Jumlah Upah TenagaJumlah Total

Dibulatkan

3. Pasang rangka plafon (1,00 x 1,00) m Kayu Klas III tiap 1m²

Harga bahan:- Kayu Balok Kelas III m³ 0.012 3,090,000 37,080.00- Paku biasa 2"-5" kg 0.1 9,928 992.75

Jumlah Harga BahanUpah tenaga:- Pekerja Oh 0.15 45,000 6,750.00- Tukang kayu Oh 0.25 65,000 16,250.00- Kepala tukang Oh 0.025 70,000 1,750.00- Mandor Oh 0.0075 70,000 525.00

Jumlah Upah TenagaJumlah Total

Dibulatkan

4. Pasang rangka plafon (50 x 100) cm Kayu Klas I tiap 1m²

Harga bahan:- Kayu Kelas I Balok m³ 0.016 8,240,000 131,840.00- Paku biasa 2"-5" kg 0.132 9,928 1,310.43

Jumlah Harga BahanUpah tenaga:- Pekerja Oh 0.17 45,000 7,650.00- Tukang kayu Oh 0.27 65,000 17,550.00- Kepala tukang Oh 0.027 70,000 1,890.00- Mandor Oh 0.009 70,000 630.00

Jumlah Upah TenagaJumlah Total

Dibulatkan

5. Pasang rangka plafon (50 x 100) cm Kayu Klas II tiap 1m²

Harga bahan:- Kayu Kelas II Balok m³ 0.016 6,180,000 98,880.00- Paku biasa 2"-5" kg 0.132 9,928 1,310.43

Jumlah Harga BahanUpah tenaga:- Pekerja Oh 0.17 45,000 7,650.00- Tukang kayu Oh 0.27 65,000 17,550.00- Kepala tukang Oh 0.027 70,000 1,890.00- Mandor Oh 0.009 70,000 630.00

Jumlah Upah TenagaJumlah Total

Dibulatkan

6. Pasang rangka plafon (50 x 100) cm Kayu Klas III tiap 1m²

Harga bahan:- Kayu Balok Kelas III m³ 0.016 3,090,000 49,440.00- Paku biasa 2"-5" kg 0.132 9,928 1,310.43

Jumlah Harga BahanUpah tenaga:- Pekerja Oh 0.17 45,000 7,650.00- Tukang kayu Oh 0.27 65,000 17,550.00- Kepala tukang Oh 0.027 70,000 1,890.00- Mandor Oh 0.009 70,000 630.00

Jumlah Upah TenagaJumlah Total

Dibulatkan

Page 69: RAB 2009

69

document.xls - 2-AHSP Hal - 69

NO. URAIAN SAT KUANTITAS SUB TOTAL (Rp)

1 2 3 4 5 6

HARGA SAT. DASAR (Rp)

7. Pasang rangka plafon (60 x 120) cm Kayu Klas I tiap 1m²

Harga bahan:- Kayu Kelas I Balok m³ 0.013 8,240,000 107,120.00- Paku biasa 2"-5" kg 0.1 9,928 992.75

Jumlah Harga BahanUpah tenaga:- Pekerja Oh 0.16 45,000 7,200.00- Tukang kayu Oh 0.26 65,000 16,900.00- Kepala tukang Oh 0.026 70,000 1,820.00- Mandor Oh 0.008 70,000 560.00

Jumlah Upah TenagaJumlah Total

Dibulatkan

8. Pasang rangka plafon (60 x 120) cm Kayu Klas II tiap 1m²

Harga bahan:- Kayu Kelas II Balok m³ 0.013 6,180,000 80,340.00- Paku biasa 2"-5" kg 0.1 9,928 992.75

Jumlah Harga BahanUpah tenaga:- Pekerja Oh 0.16 45,000 7,200.00- Tukang kayu Oh 0.26 65,000 16,900.00- Kepala tukang Oh 0.026 70,000 1,820.00- Mandor Oh 0.008 70,000 560.00

Jumlah Upah TenagaJumlah Total

Dibulatkan

9. Pasang rangka plafon (60 x 120) cm Kayu Klas III tiap 1m²

Harga bahan:- Kayu Balok Kelas III m³ 0.013 3,090,000 40,170.00- Paku biasa 2"-5" kg 0.1 9,928 992.75

Jumlah Harga BahanUpah tenaga:- Pekerja Oh 0.16 45,000 7,200.00- Tukang kayu Oh 0.26 65,000 16,900.00- Kepala tukang Oh 0.026 70,000 1,820.00- Mandor Oh 0.008 70,000 560.00

Jumlah Upah TenagaJumlah Total

Dibulatkan

10. Pasang rangka plafon (60 x 60) cm Kayu Klas I tiap 1m²

Harga bahan:- Kayu Kelas I Balok m³ 0.0162 8,240,000 133,488.00- Paku biasa 2"-5" kg 0.161 9,928 1,598.33

Jumlah Harga BahanUpah tenaga:- Pekerja Oh 0.17 45,000 7,650.00- Tukang kayu Oh 0.27 65,000 17,550.00- Kepala tukang Oh 0.027 70,000 1,890.00- Mandor Oh 0.009 70,000 630.00

Jumlah Upah TenagaJumlah Total

Dibulatkan

11. Pasang rangka plafon (60 x 60) cm Kayu Klas II tiap 1m²

Harga bahan:- Kayu Kelas II Balok m³ 0.0162 6,180,000 100,116.00- Paku biasa 2"-5" kg 0.161 9,928 1,598.33

Jumlah Harga BahanUpah tenaga:- Pekerja Oh 0.17 45,000 7,650.00- Tukang kayu Oh 0.27 65,000 17,550.00- Kepala tukang Oh 0.027 70,000 1,890.00- Mandor Oh 0.009 70,000 630.00

Jumlah Upah TenagaJumlah Total

Dibulatkan

Page 70: RAB 2009

70

document.xls - 2-AHSP Hal - 70

NO. URAIAN SAT KUANTITAS SUB TOTAL (Rp)

1 2 3 4 5 6

HARGA SAT. DASAR (Rp)

12. Pasang rangka plafon (60 x 60) cm Kayu Klas III tiap 1m²

Harga bahan:- Kayu Balok Kelas III m³ 0.0162 3,090,000 50,058.00- Paku biasa 2"-5" kg 0.161 9,928 1,598.33

Jumlah Harga BahanUpah tenaga:- Pekerja Oh 0.17 45,000 7,650.00- Tukang kayu Oh 0.27 65,000 17,550.00- Kepala tukang Oh 0.027 70,000 1,890.00- Mandor Oh 0.009 70,000 630.00

Jumlah Upah TenagaJumlah Total

Dibulatkan

13. Pasang rangka plafon (30 x 60) cm Kayu Klas I tiap 1m²

Harga bahan:- Kayu Kelas I Balok m³ 0.023 8,240,000 189,520.00- Paku biasa 2"-5" kg 0.15 9,928 1,489.13

Jumlah Harga BahanUpah tenaga:- Pekerja Oh 0.2 45,000 9,000.00- Tukang kayu Oh 0.3 65,000 19,500.00- Kepala tukang Oh 0.03 70,000 2,100.00- Mandor Oh 0.01 70,000 700.00

Jumlah Upah TenagaJumlah Total

Dibulatkan

14. Pasang rangka plafon (30 x 60) cm Kayu Klas II tiap 1m²

Harga bahan:- Kayu Kelas II Balok m³ 0.023 6,180,000 142,140.00- Paku biasa 2"-5" kg 0.15 9,928 1,489.13

Jumlah Harga BahanUpah tenaga:- Pekerja Oh 0.2 45,000 9,000.00- Tukang kayu Oh 0.3 65,000 19,500.00- Kepala tukang Oh 0.03 70,000 2,100.00- Mandor Oh 0.01 70,000 700.00

Jumlah Upah TenagaJumlah Total

Dibulatkan

15. Pasang rangka plafon (30 x 60) cm Kayu Klas III tiap 1m²

Harga bahan:- Kayu Balok Kelas III m³ 0.023 3,090,000 71,070.00- Paku biasa 2"-5" kg 0.15 9,928 1,489.13

Jumlah Harga BahanUpah tenaga:- Pekerja Oh 0.2 45,000 9,000.00- Tukang kayu Oh 0.3 65,000 19,500.00- Kepala tukang Oh 0.03 70,000 2,100.00- Mandor Oh 0.01 70,000 700.00

Jumlah Upah TenagaJumlah Total

Dibulatkan

16. Plafon asbes (1,00 x 1,00) m tebal 2,7 mm tiap 1m²

Harga bahan:- Plat asbes 100x100 cm 2,7 mm lbr 1.1 8,275 9,102.50- Paku biasa 1/2"- 1" kg 0.01 9,928 99.28

Jumlah Harga BahanUpah tenaga:- Pekerja Oh 0.03 45,000 1,350.00- Tukang kayu Oh 0.07 65,000 4,550.00- Kepala tukang Oh 0.007 70,000 490.00- Mandor Oh 0.0015 70,000 105.00

Jumlah Upah TenagaJumlah Total

Dibulatkan

Page 71: RAB 2009

71

document.xls - 2-AHSP Hal - 71

NO. URAIAN SAT KUANTITAS SUB TOTAL (Rp)

1 2 3 4 5 6

HARGA SAT. DASAR (Rp)

17. Plafon akustik (30 x 30) cm tiap 1m²

Harga bahan:- Akustik 30 x 30 cm lbr 11.5 0.00- Paku biasa 1/2"- 1" kg 0.05 9,928 496.38

Jumlah Harga BahanUpah tenaga:- Pekerja Oh 0.06 45,000 2,700.00- Tukang kayu Oh 0.12 65,000 7,800.00- Kepala tukang Oh 0.012 70,000 840.00- Mandor Oh 0.003 70,000 210.00

Jumlah Upah TenagaJumlah Total

Dibulatkan

18. Plafon akustik (30 x 60) cm tiap 1m²

Harga bahan:- Akustik 30 x 60 cm lbr 5.8 0.00- Paku biasa 1/2"- 1" kg 0.05 9,928 496.38

Jumlah Harga BahanUpah tenaga:- Pekerja Oh 0.06 45,000 2,700.00- Tukang kayu Oh 0.1 65,000 6,500.00- Kepala tukang Oh 0.01 70,000 700.00- Mandor Oh 0.003 70,000 210.00

Jumlah Upah TenagaJumlah Total

Dibulatkan

19. Plafon akustik (60 x 120) cm tiap 1m²

Harga bahan:- Akustik 60 x 120 cm lbr 1.5 0.00- Paku biasa 1/2"- 1" kg 0.05 9,928 496.38

Jumlah Harga BahanUpah tenaga:- Pekerja Oh 0.06 45,000 2,700.00- Tukang kayu Oh 0.1 65,000 6,500.00- Kepala tukang Oh 0.01 70,000 700.00- Mandor Oh 0.003 70,000 210.00

Jumlah Upah TenagaJumlah Total

Dibulatkan

20. Plafon teakwood (30 x 60) cm tebal 3 mm tiap 1m²

Harga bahan:- Teakwood 4x8 ft 3 mm lbr 0.36 42,900 15,444.00- Paku biasa 1/2"- 1" kg 0.03 9,928 297.83

Jumlah Harga BahanUpah tenaga:- Pekerja Oh 0.07 45,000 3,150.00- Tukang kayu Oh 0.1 65,000 6,500.00- Kepala tukang Oh 0.01 70,000 700.00- Mandor Oh 0.0035 70,000 245.00

Jumlah Upah TenagaJumlah Total

Dibulatkan

21. Plafon teakwood (60 x 120) cm tebal 3 mm tiap 1m²

Harga bahan:- Teakwood 4x8 ft 3 mm lbr 0.375 42,900 16,087.50- Paku biasa 1/2"- 1" kg 0.03 9,928 297.83

Jumlah Harga BahanUpah tenaga:- Pekerja Oh 0.07 45,000 3,150.00- Tukang kayu Oh 0.1 65,000 6,500.00- Kepala tukang Oh 0.01 70,000 700.00- Mandor Oh 0.0035 70,000 245.00

Jumlah Upah TenagaJumlah Total

Dibulatkan

Page 72: RAB 2009

72

document.xls - 2-AHSP Hal - 72

NO. URAIAN SAT KUANTITAS SUB TOTAL (Rp)

1 2 3 4 5 6

HARGA SAT. DASAR (Rp)

22. Pasang list Plafon kayu profil tiap 1m'

Harga bahan:- Kayu list profil m' 1.05 4,750 4,987.50- Paku biasa 1/2"- 1" kg 0.01 9,928 99.28

Jumlah Harga BahanUpah tenaga:- Pekerja Oh 0.021 45,000 945.00- Tukang kayu Oh 0.021 65,000 1,365.00- Kepala tukang Oh 0.002 70,000 140.00- Mandor Oh 0.001 70,000 70.00

Jumlah Upah TenagaJumlah Total

Dibulatkan

23. List plafon bahan Kayu Klas II papan 1x5 cm tiap 1 m'

Harga bahan:- Kayu Kelas II Papan m³ 0.00055 6,695,000 3,682.25- Paku biasa 1/2"- 1" kg 0.05 9,928 496.38

Jumlah Harga BahanUpah tenaga:- Pekerja Oh 0.04 45,000 1,800.00- Tukang kayu Oh 0.12 65,000 7,800.00- Kepala tukang Oh 0.012 70,000 840.00- Mandor Oh 0.002 70,000 140.00

Jumlah Upah TenagaJumlah Total

Dibulatkan

24. List plafon bahan triplek 0,3x5 cm tiap 1 m'

Harga bahan:- Triplek 4x8 ft 6 mm lbr 0.022 87,550 1,926.10- Paku biasa 1/2"- 1" kg 0.05 9,928 496.38

Jumlah Harga BahanUpah tenaga:- Pekerja Oh 0.04 45,000 1,800.00- Tukang kayu Oh 0.12 65,000 7,800.00- Kepala tukang Oh 0.012 70,000 840.00- Mandor Oh 0.002 70,000 140.00

Jumlah Upah TenagaJumlah Total

Dibulatkan

25. Plafon asbes (1,00 x 1,00) m tebal 2,7 mm rangka Klas II tiap 1m²

Harga bahan:- Kayu Kelas II Balok m³ 0.012 6,180,000 74,160.00- Paku biasa 1/2"- 1" kg 0.06 9,928 595.65- Plat asbes 100x100 cm 2,7 mm lbr 1.1 8,275 9,102.50

Jumlah Harga BahanUpah tenaga:- Pekerja Oh 0.18 45,000 8,100.00- Tukang kayu Oh 0.32 65,000 20,800.00- Kepala tukang Oh 0.032 70,000 2,240.00- Mandor Oh 0.009 70,000 630.00

Jumlah Upah TenagaJumlah Total

Dibulatkan

26. Plafon akustik (30 x 60) cm rangka Klas II tiap 1m²

Harga bahan:- Kayu Kelas II Balok m³ 0.023 6,180,000 142,140.00- Paku biasa 1/2"- 1" kg 0.06 9,928 595.65- Akustik 30 x 60 cm lbr 5.8 0.00

Jumlah Harga BahanUpah tenaga:- Pekerja Oh 0.26 45,000 11,700.00- Tukang kayu Oh 0.4 65,000 26,000.00- Kepala tukang Oh 0.04 70,000 2,800.00- Mandor Oh 0.013 70,000 910.00

Jumlah Upah Tenaga

Page 73: RAB 2009

73

document.xls - 2-AHSP Hal - 73

NO. URAIAN SAT KUANTITAS SUB TOTAL (Rp)

1 2 3 4 5 6

HARGA SAT. DASAR (Rp)

Jumlah TotalDibulatkan

27. Plafon akustik (30 x 30) cm rangka Klas II tiap 1m²

Harga bahan:- Kayu Kelas II Balok m³ 0.027 6,180,000 166,860.00- Paku biasa 1/2"- 1" kg 0.06 9,928 595.65- Akustik 30 x 30 cm lbr 11.5 0.00

Jumlah Harga BahanUpah tenaga:- Pekerja Oh 0.31 45,000 13,950.00- Tukang kayu Oh 0.47 65,000 30,550.00- Kepala tukang Oh 0.047 70,000 3,290.00- Mandor Oh 0.0155 70,000 1,085.00

Jumlah Upah TenagaJumlah Total

Dibulatkan

28. Plafon gypsum board 9 mm tiap 1m²

Harga bahan:- Sekrup gypsum bh 21 63 1,323.00- Gypsumboard 120x240 cm 9 mm lbr 0.364 53,000 19,292.00

Jumlah Harga BahanUpah tenaga:- Pekerja Oh 0.1 45,000 4,500.00- Tukang gypsum Oh 0.05 65,000 3,250.00- Kepala tukang Oh 0.005 70,000 350.00- Mandor Oh 0.005 70,000 350.00

Jumlah Upah TenagaJumlah Total

Dibulatkan

29. Plafon GRC-board 4 mm tiap 1m²

Harga bahan:- Sekrup gypsum bh 21 63 1,323.00- GRC-board 120x240 cm 4 mm lbr 0.364 44,500 16,198.00

Jumlah Harga BahanUpah tenaga:- Pekerja Oh 0.1 45,000 4,500.00- Tukang gypsum Oh 0.05 65,000 3,250.00- Kepala tukang Oh 0.005 70,000 350.00- Mandor Oh 0.005 70,000 350.00

Jumlah Upah TenagaJumlah Total

Dibulatkan

30. Plafon Calsiboard 4 mm tiap 1m²

Harga bahan:- Sekrup gypsum bh 21 63 1,323.00- Calsiboard 120x240 cm 4 mm lbr 0.364 57,650 20,984.60

Jumlah Harga BahanUpah tenaga:- Pekerja Oh 0.1 45,000 4,500.00- Tukang gypsum Oh 0.05 65,000 3,250.00- Kepala tukang Oh 0.005 70,000 350.00- Mandor Oh 0.005 70,000 350.00

Jumlah Upah TenagaJumlah Total

Dibulatkan

31. Plafon triplek 4 mm tiap 1m²

Harga bahan:- Paku biasa 1/2"- 1" kg 0.06 9,928 595.65- Triplek 4x8 ft 4 mm lbr 0.364 69,250 25,207.00

Jumlah Harga BahanUpah tenaga:- Pekerja Oh 0.1 45,000 4,500.00- Tukang kayu Oh 0.05 65,000 3,250.00- Kepala tukang Oh 0.005 70,000 350.00- Mandor Oh 0.005 70,000 350.00

Page 74: RAB 2009

74

document.xls - 2-AHSP Hal - 74

NO. URAIAN SAT KUANTITAS SUB TOTAL (Rp)

1 2 3 4 5 6

HARGA SAT. DASAR (Rp)

Jumlah Upah TenagaJumlah Total

Dibulatkan

Page 75: RAB 2009

75

document.xls - 2-AHSP Hal - 75

NO. URAIAN SAT KUANTITAS SUB TOTAL (Rp)

1 2 3 4 5 6

HARGA SAT. DASAR (Rp)

32. Plafon triplek 6 mm tiap 1m²

Harga bahan:- Paku biasa 1/2"- 1" kg 0.06 9,928 595.65- Triplek 4x8 ft 6 mm lbr 0.364 87,550 31,868.20

Jumlah Harga BahanUpah tenaga:- Pekerja Oh 0.1 45,000 4,500.00- Tukang kayu Oh 0.05 65,000 3,250.00- Kepala tukang Oh 0.005 70,000 350.00- Mandor Oh 0.005 70,000 350.00

Jumlah Upah TenagaJumlah Total

Dibulatkan

33. Penutup plafon Gypsumboard 9 mm lengkap dgn rangka hollow tiap (6mx6m) = 36 m²

Harga bahan:- Paku peluru ramset bh 14 1,775 24,850.00- Hollow 4x4 cm btg 16.5 23,000 379,500.00- Hollow 2x4 cm btg 15.51 18,000 279,180.00- Paku beton kg 0.357 90,250 32,219.25- Sekrup 6x1-1,5 bh 502 55 27,610.00- Gypsumboard 120x240 cm 9 mm lbr 13.125 53,000 695,625.00- Sekrup gypsum bh 745 63 46,935.00- Textile tape rol 0.864 33,625 29,052.00- Compound gypsum zak 0.72 62,500 45,000.00- Amplas lbr 3.6 3,605 12,978.00

Jumlah Harga BahanUpah tenaga:- Pekerja Oh 9.36 45,000 421,200.00- Tukang alumunium Oh 9.36 65,000 608,400.00- Tukang gypsum Oh 1.8 65,000 117,000.00- Kepala tukang Oh 1.116 70,000 78,120.00- Mandor Oh 0.468 70,000 32,760.00

Jumlah Upah TenagaJumlah Total

Dibulatkan

34. Penutup plafon Gypsumboard 9 mm lengkap dgn rangka hollow tiap 1 m²

Harga bahan:- Paku peluru ramset bh 0.39 1,775 692.25- Hollow 4x4 cm btg 0.459 23,000 10,557.00- Hollow 2x4 cm btg 0.431 18,000 7,758.00- Paku beton kg 0.01 90,250 902.50- Sekrup 6x1-1,5 bh 14 55 770.00- Gypsumboard 120x240 cm 9 mm lbr 0.364 53,000 19,292.00- Sekrup gypsum bh 21 63 1,323.00- Textile tape rol 0.024 33,625 807.00- Compound gypsum zak 0.02 62,500 1,250.00- Amplas lbr 0.1 3,605 360.50

Jumlah Harga BahanUpah tenaga:- Pekerja Oh 0.26 45,000 11,700.00- Tukang alumunium Oh 0.26 65,000 16,900.00- Tukang gypsum Oh 0.05 65,000 3,250.00- Kepala tukang Oh 0.031 70,000 2,170.00- Mandor Oh 0.013 70,000 910.00

Jumlah Upah TenagaJumlah Total

Dibulatkan

35. Penutup plafon GRC-board 4 mm lengkap dgn rangka hollow tiap 1 m²

Harga bahan:- Paku peluru ramset bh 0.39 1,775 692.25- Hollow 4x4 cm btg 0.459 23,000 10,557.00- Hollow 2x4 cm btg 0.431 18,000 7,758.00- Paku beton kg 0.01 90,250 902.50- Sekrup 6x1-1,5 bh 14 55 770.00- GRC-board 120x240 cm 4 mm lbr 0.364 44,500 16,198.00

Page 76: RAB 2009

76

document.xls - 2-AHSP Hal - 76

NO. URAIAN SAT KUANTITAS SUB TOTAL (Rp)

1 2 3 4 5 6

HARGA SAT. DASAR (Rp)

- Sekrup gypsum bh 21 63 1,323.00- Textile tape rol 0.024 33,625 807.00- Compound GRC zak 0.02 96,000 1,920.00- Amplas lbr 0.1 3,605 360.50

Jumlah Harga BahanUpah tenaga:- Pekerja Oh 0.26 45,000 11,700.00- Tukang alumunium Oh 0.26 65,000 16,900.00- Tukang gypsum Oh 0.05 65,000 3,250.00- Kepala tukang Oh 0.031 70,000 2,170.00- Mandor Oh 0.013 70,000 910.00

Jumlah Upah TenagaJumlah Total

Dibulatkan

36. Penutup plafon Calsiboard 4 mm lengkap dgn rangka hollow tiap 1 m²

Harga bahan:- Paku peluru ramset bh 0.39 1,775 692.25- Hollow 4x4 cm btg 0.459 23,000 10,557.00- Hollow 2x4 cm btg 0.431 18,000 7,758.00- Paku beton kg 0.01 90,250 902.50- Sekrup 6x1-1,5 bh 14 55 770.00- Calsiboard 120x240 cm 4 mm lbr 0.364 57,650 20,984.60- Sekrup gypsum bh 21 63 1,323.00- Textile tape rol 0.024 33,625 807.00- Compound gypsum zak 0.02 62,500 1,250.00- Amplas lbr 0.1 3,605 360.50

Jumlah Harga BahanUpah tenaga:- Pekerja Oh 0.26 45,000 11,700.00- Tukang alumunium Oh 0.26 65,000 16,900.00- Tukang gypsum Oh 0.05 65,000 3,250.00- Kepala tukang Oh 0.031 70,000 2,170.00- Mandor Oh 0.013 70,000 910.00

Jumlah Upah TenagaJumlah Total

Dibulatkan

I PEKERJAAN KONSTRUKSI DINDING KAYU DAN PENUTUP

1. Pasang rangka dinding pemisah Kayu Klas I tiap 1m²

Harga bahan:- Kayu Kelas I Balok m³ 0.0195 8,240,000 160,680.00- Kayu Kelas I Papan m³ 0.007 9,270,000 64,890.00- Paku biasa 2"-5" kg 0.1 9,928 992.75

Jumlah Harga BahanUpah tenaga:- Pekerja Oh 0.15 45,000 6,750.00- Tukang kayu Oh 0.45 65,000 29,250.00- Kepala tukang Oh 0.045 70,000 3,150.00- Mandor Oh 0.0075 70,000 525.00

Jumlah Upah TenagaJumlah Total

Dibulatkan

2. Pasang rangka dinding pemisah Kayu Klas II tiap 1m²

Harga bahan:- Kayu Kelas II Balok m³ 0.0195 6,180,000 120,510.00- Kayu Kelas II Papan m³ 0.007 6,695,000 46,865.00- Paku biasa 2"-5" kg 0.1 9,928 992.75

Jumlah Harga BahanUpah tenaga:- Pekerja Oh 0.15 45,000 6,750.00- Tukang kayu Oh 0.45 65,000 29,250.00- Kepala tukang Oh 0.045 70,000 3,150.00- Mandor Oh 0.0075 70,000 525.00

Jumlah Upah TenagaJumlah Total

Dibulatkan

Page 77: RAB 2009

77

document.xls - 2-AHSP Hal - 77

NO. URAIAN SAT KUANTITAS SUB TOTAL (Rp)

1 2 3 4 5 6

HARGA SAT. DASAR (Rp)

3. Pasang dinding pemisah teakwood rangkap rangka Kayu Klas I tiap 1m²

Harga bahan:- Kayu Kelas I Balok m³ 0.0195 8,240,000 160,680.00- Kayu Kelas I Papan m³ 0.007 9,270,000 64,890.00- Paku biasa 2"-5" kg 0.1 9,928 992.75- Lem kayu lt 0.56 4,750 2,660.00- Teakwood 4x8 ft 3 mm lbr 1 42,900 42,900.00

Jumlah Harga BahanUpah tenaga:- Pekerja Oh 0.2 45,000 9,000.00- Tukang kayu Oh 0.6 65,000 39,000.00- Kepala tukang Oh 0.06 70,000 4,200.00- Mandor Oh 0.01 70,000 700.00

Jumlah Upah TenagaJumlah Total

Dibulatkan

4. Pasang dinding pemisah teakwood rangkap rangka Kayu Klas I tiap 1m²

Harga bahan:- Kayu Kelas I Balok m³ 0.0195 8,240,000 160,680.00- Kayu Kelas I Papan m³ 0.007 9,270,000 64,890.00- Paku biasa 2"-5" kg 0.1 9,928 992.75- Lem kayu lt 0.56 4,750 2,660.00- Teakwood 4x8 ft 3 mm lbr 1 42,900 42,900.00

Jumlah Harga BahanUpah tenaga:- Pekerja Oh 0.2 45,000 9,000.00- Tukang kayu Oh 0.6 65,000 39,000.00- Kepala tukang Oh 0.06 70,000 4,200.00- Mandor Oh 0.01 70,000 700.00

Jumlah Upah TenagaJumlah Total

Dibulatkan

Page 78: RAB 2009

78

document.xls - 2-AHSP Hal - 78

NO. URAIAN SAT KUANTITAS SUB TOTAL (Rp)

1 2 3 4 5 6

HARGA SAT. DASAR (Rp)

5. Pasang teakwood tebal 3 mm untuk dinding tiap 1m²

Harga bahan:- Paku biasa 1/2"- 1" kg 0.05 9,928 496.38- Teakwood 4x8 ft 3 mm lbr 0.4 42,900 17,160.00

Jumlah Harga BahanUpah tenaga:- Pekerja Oh 0.025 45,000 1,125.00- Tukang kayu Oh 0.075 65,000 4,875.00- Kepala tukang Oh 0.0075 70,000 525.00- Mandor Oh 0.00125 70,000 87.50

Jumlah Upah TenagaJumlah Total

Dibulatkan

6. Pasang triplek tebal 4 mm untuk dinding tiap 1m²

Harga bahan:- Paku biasa 1/2"- 1" kg 0.05 9,928 496.38- Triplek 4x8 ft 4 mm lbr 0.4 69,250 27,700.00

Jumlah Harga BahanUpah tenaga:- Pekerja Oh 0.025 45,000 1,125.00- Tukang kayu Oh 0.075 65,000 4,875.00- Kepala tukang Oh 0.0075 70,000 525.00- Mandor Oh 0.00125 70,000 87.50

Jumlah Upah TenagaJumlah Total

Dibulatkan

7. Pasang triplek tebal 6 mm untuk dinding tiap 1m²

Harga bahan:- Paku biasa 1/2"- 1" kg 0.05 9,928 496.38- Triplek 4x8 ft 6 mm lbr 0.4 87,550 35,020.00

Jumlah Harga BahanUpah tenaga:- Pekerja Oh 0.025 45,000 1,125.00- Tukang kayu Oh 0.075 65,000 4,875.00- Kepala tukang Oh 0.0075 70,000 525.00- Mandor Oh 0.00125 70,000 87.50

Jumlah Upah TenagaJumlah Total

Dibulatkan

8. Pasang gypsum tebal 12 mm untuk dinding tiap 1m²

Harga bahan:- Paku biasa 1/2"- 1" kg 0.05 9,928 496.38- Gypsumboard 120x240 cm 12 mm lbr 0.4 67,666 27,066.40

Jumlah Harga BahanUpah tenaga:- Pekerja Oh 0.025 45,000 1,125.00- Tukang kayu Oh 0.075 65,000 4,875.00- Kepala tukang Oh 0.0075 70,000 525.00- Mandor Oh 0.00125 70,000 87.50

Jumlah Upah TenagaJumlah Total

Dibulatkan

9. Dinding partisi gypsum 12 mm lkp rk metal Studs 2 muka tiap 1 m²

Harga bahan:- Metal wall stud 35mm x 40mm m' 2 10,000 20,000.00- Metal wall track 30mm x 40mm m' 0.75 8,500 6,375.00- Paku rivet bh 4 75 300.00- Sekrup 6x1-1,5 bh 8 55 440.00- Gypsumboard 120x240 cm 12 mm lbr 0.75 67,666 50,749.50- Textile tape roll 0.24 33,625 8,070.00- Compound gypsum zak 0.12 62,500 7,500.00- Sekrup gypsum bh 24 63 1,512.00- Amplas lbr 0.5 3,605 1,802.50

Jumlah Harga BahanUpah tenaga:

Page 79: RAB 2009

79

document.xls - 2-AHSP Hal - 79

NO. URAIAN SAT KUANTITAS SUB TOTAL (Rp)

1 2 3 4 5 6

HARGA SAT. DASAR (Rp)

- Pekerja Oh 0.2 45,000 9,000.00- Tukang gypsum Oh 0.3 65,000 19,500.00- Tukang alumunium Oh 0.2 65,000 13,000.00- Mandor Oh 0.015 70,000 1,050.00

Jumlah Upah TenagaJumlah Total

Dibulatkan

10. Dinding partisi gypsum 12 mm lkp rk hollow tiap 1 m²

Harga bahan:- Hollow 4x4 cm btg 1.25 23,000 28,750.00- Hollow 2x4 cm btg 0.8 18,000 14,400.00- Paku rivet bh 4 75 300.00- Sekrup 6x1-1,5 bh 8 55 440.00- Gypsumboard 120x240 cm 12 mm lbr 0.75 67,666 50,749.50- Textile tape roll 0.24 33,625 8,070.00- Compound gypsum zak 0.12 62,500 7,500.00- Sekrup gypsum bh 24 63 1,512.00- Amplas lbr 0.5 3,605 1,802.50

Jumlah Harga BahanUpah tenaga:- Pekerja Oh 0.2 45,000 9,000.00- Tukang gypsum Oh 0.3 65,000 19,500.00- Tukang alumunium Oh 0.2 65,000 13,000.00- Mandor Oh 0.015 70,000 1,050.00

Jumlah Upah TenagaJumlah Total

Dibulatkan

11. Dinding partisi double GRC-board 6 mm rk Kayu Klas I tiap 1 m²

Harga bahan:- Kayu Kelas I Balok m³ 0.025 8,240,000 206,000.00- Paku biasa 2"-5" kg 0.3 9,928 2,978.25- GRC-board 120x240 cm 6 mm lbr 0.75 82,500 61,875.00- Textile tape roll 0.24 33,625 8,070.00- Compound GRC zak 0.12 96,000 11,520.00- Sekrup gypsum bh 32 63 2,016.00- Amplas lbr 0.5 3,605 1,802.50

Jumlah Harga BahanUpah tenaga:- Pekerja Oh 0.2 45,000 9,000.00- Tukang kayu Oh 0.6 65,000 39,000.00- Mandor Oh 0.01 70,000 700.00

Jumlah Upah TenagaJumlah Total

Dibulatkan

12. Dinding partisi double GRC-board 6 mm rk hollow tiap 1 m²

Harga bahan:- Hollow 4x4 cm btg 1.25 23,000 28,750.00- Hollow 2x4 cm btg 0.8 18,000 14,400.00- Paku rivet bh 4 75 300.00- Sekrup 6x1-1,5 bh 8 55 440.00- GRC-board 120x240 cm 6 mm lbr 0.75 82,500 61,875.00- Textile tape roll 0.24 33,625 8,070.00- Compound GRC zak 0.12 96,000 11,520.00- Sekrup gypsum bh 24 63 1,512.00- Amplas lbr 0.5 3,605 1,802.50

Jumlah Harga BahanUpah tenaga:- Pekerja Oh 0.2 45,000 9,000.00- Tukang kayu Oh 0.3 65,000 19,500.00- Tukang alumunium Oh 0.2 65,000 13,000.00- Mandor Oh 0.015 70,000 1,050.00

Jumlah Upah TenagaJumlah Total

Dibulatkan

J PEKERJAAN BETON

Page 80: RAB 2009

80

document.xls - 2-AHSP Hal - 80

NO. URAIAN SAT KUANTITAS SUB TOTAL (Rp)

1 2 3 4 5 6

HARGA SAT. DASAR (Rp)

1. Beton Non Struktur - BO (1Pc : 3Ps : 5Kr) (1 : 8) untuk rabatan tiap 1m³

Harga bahan:- Semen portland kg 220 1,240 272,800.00- Pasir beton m³ 0.462 103,000 47,586.00- Batu pecah/split 2/3 m³ 0.769 206,000 158,414.00

Jumlah Harga BahanUpah tenaga:- Pekerja Oh 1.65 45,000 74,250.00- Tukang batu Oh 0.25 65,000 16,250.00- Kepala tukang Oh 0.025 70,000 1,750.00- Mandor Oh 0.08 70,000 5,600.00

Jumlah Upah TenagaJumlah Total

Dibulatkan

2. Beton K-125 (1Pc : 3Ps : 4Kr) (1 : 7) tiap 1m³

Harga bahan:- Semen portland kg 250 1,240 310,000.00- Pasir beton m³ 0.522 103,000 53,766.00- Batu pecah/split 2/3 m³ 0.695 206,000 143,170.00

Jumlah Harga BahanUpah tenaga:- Pekerja Oh 1.65 45,000 74,250.00- Tukang batu Oh 0.25 65,000 16,250.00- Kepala tukang Oh 0.025 70,000 1,750.00- Mandor Oh 0.08 70,000 5,600.00

Jumlah Upah TenagaJumlah Total

Dibulatkan

3. Beton K-175 (2Pc : 5Ps : 7Kr) (1Pc : 2,5Ps : 3,5Kr) (1 : 6) tiap 1m³

Harga bahan:- Semen portland kg 300 1,240 372,000.00- Pasir beton m³ 0.526 103,000 54,178.00- Batu pecah/split 2/3 m³ 0.737 206,000 151,822.00

Jumlah Harga BahanUpah tenaga:- Pekerja Oh 1.65 45,000 74,250.00- Tukang batu Oh 0.25 65,000 16,250.00- Kepala tukang Oh 0.025 70,000 1,750.00- Mandor Oh 0.08 70,000 5,600.00

Jumlah Upah TenagaJumlah Total

Dibulatkan

Page 81: RAB 2009

81

document.xls - 2-AHSP Hal - 81

NO. URAIAN SAT KUANTITAS SUB TOTAL (Rp)

1 2 3 4 5 6

HARGA SAT. DASAR (Rp)

4. Beton Struktur K-225 (1Pc : 2Ps : 3Kr) (1 : 5) tiap 1m³

Dasar: RSNI T-13-2002 An 6.13. untuk upah tenaga & Juknik Analisa Biaya & HSP Jalan Kabupaten No. 015/T/Bt/1995 untuk komposisi bahan.Harga bahan:- Semen portland kg 350 1,240 434,000.00- Pasir beton m³ 0.485 103,000 49,955.00- Batu pecah/split 2/3 m³ 0.727 206,000 149,762.00

Jumlah Harga BahanUpah tenaga:- Pekerja Oh 2 45,000 90,000.00- Tukang batu Oh 0.35 65,000 22,750.00- Kepala tukang Oh 0.035 70,000 2,450.00- Mandor Oh 0.1 70,000 7,000.00

Jumlah Upah TenagaJumlah Total

Dibulatkan

5. Beton Struktur K-275 (2Pc : 3Ps : 6Kr) (1Pc : 1,5Ps : 3Kr) (1 : 4,5) tiap 1m³

Harga bahan:- Semen portland kg 400 1,240 496,000.00- Pasir beton m³ 0.417 103,000 42,951.00- Batu pecah/split 2/3 m³ 0.833 206,000 171,598.00

Jumlah Harga BahanUpah tenaga:- Pekerja Oh 2 45,000 90,000.00- Tukang batu Oh 0.35 65,000 22,750.00- Kepala tukang Oh 0.035 70,000 2,450.00- Mandor Oh 0.1 70,000 7,000.00

Jumlah Upah TenagaJumlah Total

Dibulatkan

6. Beton Struktur K-350 (4Pc : 6Ps : 11Kr) (1Pc : 1,5Ps : 2,75Kr) (1 : 5,25) tiap 1m³

Harga bahan:- Semen portland kg 425 1,240 527,000.00- Pasir beton m³ 0.442 103,000 45,526.00- Batu pecah/split 2/3 m³ 0.811 206,000 167,066.00

Jumlah Harga BahanUpah tenaga:- Pekerja Oh 2 45,000 90,000.00- Tukang batu Oh 0.35 65,000 22,750.00- Kepala tukang Oh 0.035 70,000 2,450.00- Mandor Oh 0.1 70,000 7,000.00

Jumlah Upah TenagaJumlah Total

Dibulatkan

7. Pembesian dengan besi polos tiap 1 kg

Harga bahan:- Besi beton polos kg 1.05 9,928 10,423.88- Kawat beton kg 0.015 13,775 206.63

Jumlah Harga BahanUpah tenaga:- Pekerja Oh 0.007 45,000 315.00- Tukang besi Oh 0.007 65,000 455.00- Kepala tukang Oh 0.0007 70,000 49.00- Mandor Oh 0.0003 70,000 21.00

Jumlah Upah TenagaJumlah Total

Dibulatkan

8. Pembesian dengan besi ulir tiap 1 kg

Harga bahan:- Besi beton ulir kg 1.05 10,260 10,773.00- Kawat beton kg 0.015 13,775 206.63

Jumlah Harga BahanUpah tenaga:- Pekerja Oh 0.007 45,000 315.00- Tukang besi Oh 0.007 65,000 455.00- Kepala tukang Oh 0.0007 70,000 49.00

Page 82: RAB 2009

82

document.xls - 2-AHSP Hal - 82

NO. URAIAN SAT KUANTITAS SUB TOTAL (Rp)

1 2 3 4 5 6

HARGA SAT. DASAR (Rp)

- Mandor Oh 0.0003 70,000 21.00Jumlah Upah Tenaga

Jumlah TotalDibulatkan

2 Pekerjaan baja WF

Harga bahan:- baja WF kg 1.025 13,063 13,062.50- kawat las kg 0.025 18,000 450.00- solar ltr 0.02 5,500 110.00- oli/ pelumas ltr 0.0025 32,500 81.25- sewa alat unit 0.0025 250,000 625.00Harga bahan: Jumlah Harga Bahan- tukang las org/hr 0.01 65,000 650.00- kepala tukang besi org/hr 0.002 70,000 140.00- pekerja org/hr 0.06 45,000 2,700.00- mandor org/hr 0.001 70,000 70.00

Jumlah Upah TenagaJumlah Total

Dibulatkan

Page 83: RAB 2009

83

document.xls - 2-AHSP Hal - 83

NO. URAIAN SAT KUANTITAS SUB TOTAL (Rp)

1 2 3 4 5 6

HARGA SAT. DASAR (Rp)

9. Pasang bekisting untuk pondasi 1 m²

Harga bahan:- Kayu Terentang balok m³ 0.04 950,000 38,000.00- Paku biasa 2"-5" kg 0.3 9,928 2,978.25- Residu lt 0.1 7,000 700.00

Jumlah Harga BahanUpah tenaga:- Pekerja Oh 0.3 45,000 13,500.00- Tukang kayu Oh 0.26 65,000 16,900.00- Kepala tukang Oh 0.026 70,000 1,820.00- Mandor Oh 0.005 70,000 350.00

Jumlah Upah TenagaJumlah Total

Dibulatkan

10. Pasang bekisting untuk sloof 1 m²

Harga bahan:- Kayu Terentang balok m³ 0.045 950,000 42,750.00- Paku biasa 2"-5" kg 0.3 9,928 2,978.25- Residu lt 0.1 7,000 700.00

Jumlah Harga BahanUpah tenaga:- Pekerja Oh 0.3 45,000 13,500.00- Tukang kayu Oh 0.26 65,000 16,900.00- Kepala tukang Oh 0.026 70,000 1,820.00- Mandor Oh 0.005 70,000 350.00

Jumlah Upah TenagaJumlah Total

Dibulatkan

11. Pasang bekisting untuk kolom 1 m²

Harga bahan:- Papan Terentang m³ 0.04 950,000 38,000.00- Paku biasa 2"-5" kg 0.4 9,928 3,971.00- Residu lt 0.2 7,000 1,400.00- Balok kelas IV m³ 0.015 950,000 14,250.00- Triplek 4x8 ft 9 mm lbr 118,250 0.00- Kayu dolken Ø 8-10/400 cm btg 2 15,450 30,900.00

Jumlah Harga BahanUpah tenaga:- Pekerja Oh 0.3 45,000 13,500.00- Tukang kayu Oh 0.33 65,000 21,450.00- Kepala tukang Oh 0.033 70,000 2,310.00- Mandor Oh 0.006 70,000 420.00

Jumlah Upah TenagaJumlah Total

Dibulatkan

12. Pasang bekisting untuk balok 1 m²

Harga bahan:- Papan Terentang m³ 0.04 950,000 38,000.00- Paku biasa 2"-5" kg 0.4 9,928 3,971.00- Residu lt 0.2 7,000 1,400.00- Balok kelas IV m³ 0.018 950,000 17,100.00- Triplek 4x8 ft 9 mm lbr 0 118,250 0.00- Kayu dolken Ø 8-10/400 cm btg 2 15,450 30,900.00

Jumlah Harga BahanUpah tenaga:- Pekerja Oh 0.32 45,000 14,400.00- Tukang kayu Oh 0.33 65,000 21,450.00- Kepala tukang Oh 0.033 70,000 2,310.00- Mandor Oh 0.006 70,000 420.00

Jumlah Upah TenagaJumlah Total

Dibulatkan

Page 84: RAB 2009

84

document.xls - 2-AHSP Hal - 84

NO. URAIAN SAT KUANTITAS SUB TOTAL (Rp)

1 2 3 4 5 6

HARGA SAT. DASAR (Rp)

13. Pasang bekisting untuk pelat lantai 1 m²

Harga bahan:- Papan Terentang m³ 0.04 950,000 38,000.00- Paku biasa 2"-5" kg 0.4 9,928 3,971.00- Residu lt 0.2 7,000 1,400.00- Balok kelas IV m³ 0.015 950,000 14,250.00- Triplek 4x8 ft 9 mm lbr 118,250 0.00- Kayu dolken Ø 8-10/400 cm btg 6 15,450 92,700.00

Jumlah Harga BahanUpah tenaga:- Pekerja Oh 0.32 45,000 14,400.00- Tukang kayu Oh 0.33 65,000 21,450.00- Kepala tukang Oh 0.033 70,000 2,310.00- Mandor Oh 0.006 70,000 420.00

Jumlah Upah TenagaJumlah Total

Dibulatkan

14. Pasang bekisting untuk dinding 1 m²

Harga bahan:- Papan Terentang m³ 0.03 950,000 28,500.00- Paku biasa 2"-5" kg 0.4 9,928 3,971.00- Residu lt 0.2 7,000 1,400.00- Balok kelas IV m³ 0.02 950,000 19,000.00- Triplek 4x8 ft 9 mm lbr 118,250 0.00- Kayu dolken Ø 8-10/400 cm btg 6 15,450 92,700.00

Jumlah Harga BahanUpah tenaga:- Pekerja Oh 0.32 45,000 14,400.00- Tukang kayu Oh 0.33 65,000 21,450.00- Kepala tukang Oh 0.033 70,000 2,310.00- Mandor Oh 0.006 70,000 420.00

Jumlah Upah TenagaJumlah Total

Dibulatkan

15. Pasang bekisting untuk tangga 1 m²

Harga bahan:- Papan Terentang m³ 0.03 950,000 28,500.00- Paku biasa 2"-5" kg 0.4 9,928 3,971.00- Residu lt 0.15 7,000 1,050.00- Balok kelas IV m³ 0.015 950,000 14,250.00- Triplek 4x8 ft 9 mm lbr 118,250 0.00- Kayu dolken Ø 8-10/400 cm btg 2 15,450 30,900.00

Jumlah Harga BahanUpah tenaga:- Pekerja Oh 0.32 45,000 14,400.00- Tukang kayu Oh 0.33 65,000 21,450.00- Kepala tukang Oh 0.033 70,000 2,310.00- Mandor Oh 0.006 70,000 420.00

Jumlah Upah TenagaJumlah Total

Dibulatkan

16. Membuat pondasi beton bertulang (150 kg besi + bekisting) tiap 1m³

Harga bahan:- Kayu Terentang balok m³ 0.2 950,000 190,000.00- Paku biasa 2"-5" kg 1.5 9,928 14,891.25- Residu lt 0.4 7,000 2,800.00- Besi beton polos kg 150 9,928 1,489,125.00- Kawat beton kg 2.25 13,775 30,993.75- Semen portland kg 323 1,240 400,520.00- Pasir beton m³ 0.52 103,000 53,560.00- Batu pecah/split 2/3 m³ 0.78 206,000 160,680.00

Jumlah Harga BahanUpah tenaga:- Pekerja Oh 3.9 45,000 175,500.00- Tukang batu Oh 0.35 65,000 22,750.00

Page 85: RAB 2009

85

document.xls - 2-AHSP Hal - 85

NO. URAIAN SAT KUANTITAS SUB TOTAL (Rp)

1 2 3 4 5 6

HARGA SAT. DASAR (Rp)

- Tukang kayu Oh 1.04 65,000 67,600.00- Tukang besi Oh 1.05 65,000 68,250.00- Kepala tukang Oh 0.245 70,000 17,150.00- Mandor Oh 0.165 70,000 11,550.00

Jumlah Upah TenagaJumlah Total

Dibulatkan

Page 86: RAB 2009

86

document.xls - 2-AHSP Hal - 86

NO. URAIAN SAT KUANTITAS SUB TOTAL (Rp)

1 2 3 4 5 6

HARGA SAT. DASAR (Rp)

17. Membuat sloof beton bertulang (200 kg besi + bekisting) tiap 1m³

Harga bahan:- Kayu Terentang balok m³ 0.27 950,000 256,500.00- Paku biasa 2"-5" kg 2 9,928 19,855.00- Residu lt 0.6 7,000 4,200.00- Besi beton polos kg 200 9,928 1,985,500.00- Kawat beton kg 3 13,775 41,325.00- Semen portland kg 323 1,240 400,520.00- Pasir beton m³ 0.52 103,000 53,560.00- Batu pecah/split 2/3 m³ 0.78 206,000 160,680.00

Jumlah Harga BahanUpah tenaga:- Pekerja Oh 4.85 45,000 218,250.00- Tukang batu Oh 0.35 65,000 22,750.00- Tukang kayu Oh 1.56 65,000 101,400.00- Tukang besi Oh 1.4 65,000 91,000.00- Kepala tukang Oh 0.331 70,000 23,170.00- Mandor Oh 0.17 70,000 11,900.00

Jumlah Upah TenagaJumlah Total

Dibulatkan

18. Membuat kolom beton bertulang (300 kg besi + bekisting) tiap 1m³

Harga bahan:- Kayu Terentang balok m³ 0.4 950,000 380,000.00- Paku biasa 2"-5" kg 4 9,928 39,710.00- Residu lt 2 7,000 14,000.00- Besi beton ulir kg 300 10,260 3,078,000.00- Kawat beton kg 4.5 13,775 61,987.50- Semen portland kg 323 1,240 400,520.00- Pasir beton m³ 0.52 103,000 53,560.00- Batu pecah/split 2/3 m³ 0.78 206,000 160,680.00- Kayu Kelas II Balok m³ 0.15 6,180,000 927,000.00- Triplek 4x8 ft 9 mm lbr 3.5 118,250 413,875.00- Kayu dolken Ø 8-10/400 cm btg 20 15,450 309,000.00

Jumlah Harga BahanUpah tenaga:- Pekerja Oh 7.3 45,000 328,500.00- Tukang batu Oh 0.35 65,000 22,750.00- Tukang kayu Oh 3.3 65,000 214,500.00- Tukang besi Oh 2.1 65,000 136,500.00- Kepala tukang Oh 0.57 70,000 39,900.00- Mandor Oh 0.25 70,000 17,500.00

Jumlah Upah TenagaJumlah Total

Dibulatkan

19. Membuat balok beton bertulang (200 kg besi + bekisting) tiap 1m³

Harga bahan:- Kayu Terentang balok m³ 0.32 950,000 304,000.00- Paku biasa 2"-5" kg 3.2 9,928 31,768.00- Residu lt 1.6 7,000 11,200.00- Besi beton ulir kg 200 10,260 2,052,000.00- Kawat beton kg 3 13,775 41,325.00- Semen portland kg 323 1,240 400,520.00- Pasir beton m³ 0.52 103,000 53,560.00- Batu pecah/split 2/3 m³ 0.78 206,000 160,680.00- Kayu Kelas II Balok m³ 0.14 6,180,000 865,200.00- Triplek 4x8 ft 9 mm lbr 2.8 118,250 331,100.00- Kayu dolken Ø 8-10/400 cm btg 16 15,450 247,200.00

Jumlah Harga BahanUpah tenaga:- Pekerja Oh 5.96 45,000 268,200.00- Tukang batu Oh 0.35 65,000 22,750.00- Tukang kayu Oh 2.8 65,000 182,000.00- Tukang besi Oh 1.4 65,000 91,000.00- Kepala tukang Oh 0.455 70,000 31,850.00

Page 87: RAB 2009

87

document.xls - 2-AHSP Hal - 87

NO. URAIAN SAT KUANTITAS SUB TOTAL (Rp)

1 2 3 4 5 6

HARGA SAT. DASAR (Rp)

- Mandor Oh 0.208 70,000 14,560.00Jumlah Upah Tenaga

Jumlah TotalDibulatkan

Page 88: RAB 2009

88

document.xls - 2-AHSP Hal - 88

NO. URAIAN SAT KUANTITAS SUB TOTAL (Rp)

1 2 3 4 5 6

HARGA SAT. DASAR (Rp)

20. Membuat balok beton bertulang (150 kg besi + bekisting) tiap 1m³

Harga bahan:- Papan Terentang m³ 0.32 950,000 304,000.00- Paku biasa 2"-5" kg 3.2 9,928 31,768.00- Residu lt 1.6 7,000 11,200.00- Besi beton polos kg 150 9,928 1,489,125.00- Kawat beton kg 2.25 13,775 30,993.75- Semen portland kg 323 1,240 400,520.00- Pasir beton m³ 0.52 103,000 53,560.00- Batu pecah/split 2/3 m³ 0.78 206,000 160,680.00- Kayu Meranti Palembang balok m³ 0.12 950,000 114,000.00- Triplek 4x8 ft 9 mm lbr 118,250 0.00- Kayu dolken Ø 8-10/400 cm btg 32 15,450 494,400.00

Jumlah Harga BahanUpah tenaga:- Pekerja Oh 5.8 45,000 261,000.00- Tukang batu Oh 0.35 65,000 22,750.00- Tukang kayu Oh 2.8 65,000 182,000.00- Tukang besi Oh 1.05 65,000 68,250.00- Kepala tukang Oh 0.42 70,000 29,400.00- Mandor Oh 0.185 70,000 12,950.00

Jumlah Upah TenagaJumlah Total

Dibulatkan

21. Membuat dinding beton bertulang (150 kg besi + bekisting) tiap 1m³

Harga bahan:- Kayu Terentang balok m³ 0.24 950,000 228,000.00- Paku biasa 2"-5" kg 3.2 9,928 31,768.00- Residu lt 1.6 7,000 11,200.00- Besi beton polos kg 150 9,928 1,489,125.00- Kawat beton kg 2.25 13,775 30,993.75- Semen portland kg 323 1,240 400,520.00- Pasir beton m³ 0.52 103,000 53,560.00- Batu pecah/split 2/3 m³ 0.78 206,000 160,680.00- Kayu Kelas II Balok m³ 0.16 6,180,000 988,800.00- Triplek 4x8 ft 9 mm lbr 2.8 118,250 331,100.00- Kayu dolken Ø 8-10/400 cm btg 24 15,450 370,800.00

Jumlah Harga BahanUpah tenaga:- Pekerja Oh 5.6 45,000 252,000.00- Tukang batu Oh 0.35 65,000 22,750.00- Tukang kayu Oh 2.64 65,000 171,600.00- Tukang besi Oh 1.05 65,000 68,250.00- Kepala tukang Oh 0.4 70,000 28,000.00- Mandor Oh 0.193 70,000 13,510.00

Jumlah Upah TenagaJumlah Total

Dibulatkan

22. Membuat tangga beton bertulang (200 kg besi + bekisting) tiap 1m³

Harga bahan:- Kayu Terentang balok m³ 0.25 950,000 237,500.00- Paku biasa 2"-5" kg 3 9,928 29,782.50- Residu lt 1.2 7,000 8,400.00- Besi beton polos kg 200 9,928 1,985,500.00- Kawat beton kg 3 13,775 41,325.00- Semen portland kg 323 1,240 400,520.00- Pasir beton m³ 0.52 103,000 53,560.00- Batu pecah/split 2/3 m³ 0.78 206,000 160,680.00- Kayu Kelas II Balok m³ 0.105 6,180,000 648,900.00- Triplek 4x8 ft 9 mm lbr 2.5 118,250 295,625.00- Kayu dolken Ø 8-10/400 cm btg 14 15,450 216,300.00

Jumlah Harga BahanUpah tenaga:- Pekerja Oh 5.6 45,000 252,000.00- Tukang batu Oh 0.35 65,000 22,750.00

Page 89: RAB 2009

89

document.xls - 2-AHSP Hal - 89

NO. URAIAN SAT KUANTITAS SUB TOTAL (Rp)

1 2 3 4 5 6

HARGA SAT. DASAR (Rp)

- Tukang kayu Oh 2.3 65,000 149,500.00- Tukang besi Oh 1.4 65,000 91,000.00- Kepala tukang Oh 0.405 70,000 28,350.00- Mandor Oh 0.202 70,000 14,140.00

Jumlah Upah TenagaJumlah Total

Dibulatkan

Page 90: RAB 2009

90

document.xls - 2-AHSP Hal - 90

NO. URAIAN SAT KUANTITAS SUB TOTAL (Rp)

1 2 3 4 5 6

HARGA SAT. DASAR (Rp)

23. Membuat 1 unit pelat pondasi beton bertulang (100 x 100 x 30) cm

Harga bahan:- Kayu Terentang balok m³ 0.048 950,000 45,600.00- Paku biasa 2"-5" kg 0.36 9,928 3,573.90- Residu lt 0.12 7,000 840.00- Besi beton polos kg 30 9,928 297,825.00- Kawat beton kg 0.43 13,775 5,923.25- Semen portland kg 105 1,240 130,200.00- Pasir beton m³ 0.1455 103,000 14,986.50- Batu pecah/split 2/3 m³ 0.2181 206,000 44,928.60

Jumlah Harga BahanUpah tenaga:- Pekerja Oh 1.16 45,000 52,200.00- Tukang batu Oh 0.105 65,000 6,825.00- Tukang kayu Oh 0.312 65,000 20,280.00- Tukang besi Oh 0.2 65,000 13,000.00- Kepala tukang Oh 0.0617 70,000 4,319.00- Mandor Oh 0.0446 70,000 3,122.00

Jumlah Upah TenagaJumlah Total

Dibulatkan

24. Membuat sloof beton bertulang (15 x 20) cm tiap 1 m'

Harga bahan:- Kayu Terentang balok m³ 0.006 950,000 5,700.00- Paku biasa 2"-5" kg 0.12 9,928 1,191.30- Residu lt 0.04 7,000 280.00- Besi beton polos kg 4.44 9,928 44,078.10- Kawat beton kg 0.064 13,775 881.60- Semen portland kg 10.5 1,240 13,020.00- Pasir beton m³ 0.0146 103,000 1,503.80- Batu pecah/split 2/3 m³ 0.022 206,000 4,532.00

Jumlah Harga BahanUpah tenaga:- Pekerja Oh 0.21 45,000 9,450.00- Tukang kayu Oh 0.104 65,000 6,760.00- Tukang besi Oh 0.03 65,000 1,950.00- Tukang batu Oh 0.0105 65,000 682.50- Kepala tukang Oh 0.01445 70,000 1,011.50- Mandor Oh 0.00627 70,000 438.90

Jumlah Upah TenagaJumlah Total

Dibulatkan

25. Membuat sloof beton bertulang (15 x 30) cm tiap 1 m'

Harga bahan:- Kayu Terentang balok m³ 0.009 950,000 8,550.00- Paku biasa 2"-5" kg 0.18 9,928 1,786.95- Residu lt 0.06 7,000 420.00- Besi beton polos kg 6.53 9,928 64,826.58- Kawat beton kg 0.094 13,775 1,294.85- Semen portland kg 15.75 1,240 19,530.00- Pasir beton m³ 0.022 103,000 2,266.00- Batu pecah/split 2/3 m³ 0.033 206,000 6,798.00

Jumlah Harga BahanUpah tenaga:- Pekerja Oh 0.3136 45,000 14,112.00- Tukang kayu Oh 0.156 65,000 10,140.00- Tukang besi Oh 0.0436 65,000 2,834.00- Tukang batu Oh 0.0158 65,000 1,027.00- Kepala tukang Oh 0.02154 70,000 1,507.80- Mandor Oh 0.0094 70,000 658.00

Jumlah Upah TenagaJumlah Total

Dibulatkan

26. Membuat sloof beton bertulang (20 x 40) cm tiap 1 m'

Harga bahan:

Page 91: RAB 2009

91

document.xls - 2-AHSP Hal - 91

NO. URAIAN SAT KUANTITAS SUB TOTAL (Rp)

1 2 3 4 5 6

HARGA SAT. DASAR (Rp)

- Kayu Terentang balok m³ 0.036 950,000 34,200.00- Paku biasa 2"-5" kg 0.24 9,928 2,382.60- Residu lt 0.08 7,000 560.00- Besi beton ulir kg 14.65 10,260 150,309.00- Kawat beton kg 0.21 13,775 2,892.75- Semen portland kg 28 1,240 34,720.00- Pasir beton m³ 0.039 103,000 4,017.00- Batu pecah/split 2/3 m³ 0.059 206,000 12,154.00

Jumlah Harga BahanUpah tenaga:- Pekerja Oh 0.4976 45,000 22,392.00- Tukang kayu Oh 0.208 65,000 13,520.00- Tukang besi Oh 0.0976 65,000 6,344.00- Tukang batu Oh 0.028 65,000 1,820.00- Kepala tukang Oh 0.03336 70,000 2,335.20- Mandor Oh 0.0162 70,000 1,134.00

Jumlah Upah TenagaJumlah Total

Dibulatkan

Page 92: RAB 2009

92

document.xls - 2-AHSP Hal - 92

NO. URAIAN SAT KUANTITAS SUB TOTAL (Rp)

1 2 3 4 5 6

HARGA SAT. DASAR (Rp)

27. Membuat kolom penguat/praktis beton bertulang (11 x 11) cm tiap 1m'

Harga bahan:- Kayu Terentang balok m³ 0.002 950,000 1,900.00- Paku biasa 2"-5" kg 0.01 9,928 99.28- Besi beton polos kg 3 9,928 29,782.50- Kawat beton kg 0.45 13,775 6,198.75- Semen portland kg 4 1,240 4,960.00- Pasir beton m³ 0.006 103,000 618.00- Batu pecah/split 2/3 m³ 0.009 206,000 1,854.00

Jumlah Harga BahanUpah tenaga:- Pekerja Oh 0.06 45,000 2,700.00- Tukang batu Oh 0.02 65,000 1,300.00- Tukang kayu Oh 0.02 65,000 1,300.00- Tukang besi Oh 0.02 65,000 1,300.00- Kepala tukang Oh 0.006 70,000 420.00- Mandor Oh 0.003 70,000 210.00

Jumlah Upah TenagaJumlah Total

Dibulatkan

28. Membuat kolom beton bertulang (11 x 20) cm tiap 1 m'

Harga bahan:- Kayu Terentang balok m³ 0.003 950,000 2,850.00- Paku biasa 2"-5" kg 0.02 9,928 198.55- Besi beton polos kg 4.4 9,928 43,681.00- Kawat beton kg 0.063 13,775 867.83- Semen portland kg 7.7 1,240 9,548.00- Pasir beton m³ 0.011 103,000 1,133.00- Batu pecah/split 2/3 m³ 0.016 206,000 3,296.00

Jumlah Harga BahanUpah tenaga:- Pekerja Oh 0.1273 45,000 5,728.50- Tukang kayu Oh 0.047 65,000 3,055.00- Tukang besi Oh 0.03 65,000 1,950.00- Tukang batu Oh 0.0077 65,000 500.50- Kepala tukang Oh 0.0085 70,000 595.00- Mandor Oh 0.0044 70,000 308.00

Jumlah Upah TenagaJumlah Total

Dibulatkan

29. Membuat kolom beton bertulang (11 x 30) cm tiap 1 m'

Harga bahan:- Kayu Terentang balok m³ 0.008 950,000 7,600.00- Paku biasa 2"-5" kg 0.05 9,928 496.38- Besi beton polos kg 6.49 9,928 64,429.48- Kawat beton kg 0.1 13,775 1,377.50- Semen portland kg 11.55 1,240 14,322.00- Pasir beton m³ 0.016 103,000 1,648.00- Batu pecah/split 2/3 m³ 0.024 206,000 4,944.00

Jumlah Harga BahanUpah tenaga:- Pekerja Oh 0.254 45,000 11,430.00- Tukang kayu Oh 0.125 65,000 8,125.00- Tukang besi Oh 0.044 65,000 2,860.00- Tukang batu Oh 0.0116 65,000 754.00- Kepala tukang Oh 0.018 70,000 1,260.00- Mandor Oh 0.008 70,000 560.00

Jumlah Upah TenagaJumlah Total

Dibulatkan

30. Membuat kolom beton bertulang (30 x 30) cm tiap 1 m'

Harga bahan:- Kayu Terentang balok m³ 0.048 950,000 45,600.00- Paku biasa 2"-5" kg 0.48 9,928 4,765.20- Residu lt 0.24 7,000 1,680.00

Page 93: RAB 2009

93

document.xls - 2-AHSP Hal - 93

NO. URAIAN SAT KUANTITAS SUB TOTAL (Rp)

1 2 3 4 5 6

HARGA SAT. DASAR (Rp)

- Kayu Kelas II Balok m³ 0.018 6,180,000 111,240.00- Triplek 4x8 ft 9 mm lbr 0.42 118,250 49,665.00- Kayu dolken Ø 8-10/400 cm btg 2.4 15,450 37,080.00- Besi beton ulir kg 16.2 10,260 166,212.00- Kawat beton kg 0.24 13,775 3,306.00- Semen portland kg 31.5 1,240 39,060.00- Pasir beton m³ 0.044 103,000 4,532.00- Batu pecah/split 2/3 m³ 0.066 206,000 13,596.00

Jumlah Harga BahanUpah tenaga:- Pekerja Oh 0.648 45,000 29,160.00- Tukang kayu Oh 0.396 65,000 25,740.00- Tukang besi Oh 0.108 65,000 7,020.00- Tukang batu Oh 0.0315 65,000 2,047.50- Kepala tukang Oh 0.05355 70,000 3,748.50- Mandor Oh 0.0209 70,000 1,463.00

Jumlah Upah TenagaJumlah Total

Dibulatkan

Page 94: RAB 2009

94

document.xls - 2-AHSP Hal - 94

NO. URAIAN SAT KUANTITAS SUB TOTAL (Rp)

1 2 3 4 5 6

HARGA SAT. DASAR (Rp)

31. Membuat ring balok beton bertulang (10 x 15) cm tiap 1m'

Harga bahan:- Kayu Terentang balok m³ 0.003 950,000 2,850.00- Paku biasa 2"-5" kg 0.02 9,928 198.55- Besi beton polos kg 3.6 9,928 35,739.00- Kawat beton kg 0.05 13,775 688.75- Semen portland kg 5.5 1,240 6,820.00- Pasir beton m³ 0.009 103,000 927.00- Batu pecah/split 2/3 m³ 0.015 206,000 3,090.00

Jumlah Harga BahanUpah tenaga:- Pekerja Oh 0.1 45,000 4,500.00- Tukang batu Oh 0.033 65,000 2,145.00- Tukang kayu Oh 0.033 65,000 2,145.00- Tukang besi Oh 0.033 65,000 2,145.00- Kepala tukang Oh 0.01 70,000 700.00- Mandor Oh 0.005 70,000 350.00

Jumlah Upah TenagaJumlah Total

Dibulatkan

32.

Harga bahan:- Kayu Terentang balok m³ 0.04 950,000 38,000.00- Paku biasa 2"-5" kg 0.4 9,928 3,971.00- Residu lt 0.2 7,000 1,400.00- Kayu Kelas II Balok m³ 0.015 6,180,000 92,700.00- Triplek 4x8 ft 9 mm lbr 0.35 118,250 41,387.50- Kayu dolken Ø 8-10/400 cm btg 6 15,450 92,700.00- Besi beton polos kg 12.95 9,928 128,561.13- Kawat beton kg 0.185 13,775 2,548.38- Semen portland kg 42 1,240 52,080.00- Pasir beton m³ 0.0582 103,000 5,994.60- Batu pecah/split 2/3 m³ 0.0873 206,000 17,983.80

Jumlah Harga BahanUpah tenaga:- Pekerja Oh 0.647 45,000 29,115.00- Tukang kayu Oh 0.33 65,000 21,450.00- Tukang besi Oh 0.087 65,000 5,655.00- Tukang batu Oh 0.042 65,000 2,730.00- Kepala tukang Oh 0.0459 70,000 3,213.00- Mandor Oh 0.0217 70,000 1,519.00

Jumlah Upah TenagaJumlah Total

Dibulatkan

33.

Harga bahan:- Kayu Terentang balok m³ 0.04 950,000 38,000.00- Paku biasa 2"-5" kg 0.4 9,928 3,971.00- Residu lt 0.2 7,000 1,400.00- Kayu Kelas II Balok m³ 0.015 6,180,000 92,700.00- Triplek 4x8 ft 9 mm lbr 0.35 118,250 41,387.50- Kayu dolken Ø 8-10/400 cm btg 6 15,450 92,700.00- Besi beton polos kg 8.81 9,928 87,461.28- Kawat beton kg 0.126 13,775 1,735.65- Semen portland kg 35 1,240 43,400.00- Pasir beton m³ 0.0485 103,000 4,995.50- Batu pecah/split 2/3 m³ 0.0727 206,000 14,976.20

Jumlah Harga BahanUpah tenaga:- Pekerja Oh 0.5787 45,000 26,041.50- Tukang kayu Oh 0.33 65,000 21,450.00- Tukang besi Oh 0.0587 65,000 3,815.50- Tukang batu Oh 0.035 65,000 2,275.00- Kepala tukang Oh 0.04237 70,000 2,965.90- Mandor Oh 0.0185 70,000 1,295.00

Membuat pelat lantai beton bertulang tebal 12 cm tiap 1 m²

Membuat pelat atap beton bertulang tebal 10 cm tiap 1 m²

Page 95: RAB 2009

95

document.xls - 2-AHSP Hal - 95

NO. URAIAN SAT KUANTITAS SUB TOTAL (Rp)

1 2 3 4 5 6

HARGA SAT. DASAR (Rp)

Jumlah Upah TenagaJumlah Total

Dibulatkan

34.

Harga bahan:- Kayu Terentang balok m³ 0.004 950,000 3,800.00- Paku biasa 2"-5" kg 0.18 9,928 1,786.95- Triplek 4x8 ft 9 mm lbr 0.35 118,250 41,387.50- Besi beton polos kg 4.15 9,928 41,199.13- Kawat beton kg 0.06 13,775 826.50- Semen portland kg 28 1,240 34,720.00- Pasir beton m³ 0.039 103,000 4,017.00- Batu pecah/split 2/3 m³ 0.058 206,000 11,948.00

Jumlah Harga BahanUpah tenaga:- Pekerja Oh 0.347 45,000 15,615.00- Tukang kayu Oh 0.165 65,000 10,725.00- Tukang besi Oh 0.027 65,000 1,755.00- Tukang batu Oh 0.028 65,000 1,820.00- Kepala tukang Oh 0.0215 70,000 1,505.00- Mandor Oh 0.0122 70,000 854.00

Jumlah Upah TenagaJumlah Total

Dibulatkan

K PEKERJAAN PENUTUP ATAP

1. Pasang atap genteng pelentong kecil / morando tiap 1m²

Harga bahan:- Genteng pelentong / morando bh 25 1,700 42,500.00

Jumlah Harga BahanUpah tenaga:- Pekerja Oh 0.15 45,000 6,750.00- Tukang kayu Oh 0.075 65,000 4,875.00- Kepala tukang Oh 0.008 70,000 560.00- Mandor Oh 0.008 70,000 560.00

Jumlah Upah TenagaJumlah Total

Dibulatkan

2. Pasang atap genteng kodok tiap 1m²

Harga bahan:- Genteng kodok bh 25 1,657 41,425.00

Jumlah Harga BahanUpah tenaga:- Pekerja Oh 0.15 45,000 6,750.00- Tukang kayu Oh 0.075 65,000 4,875.00- Kepala tukang Oh 0.008 70,000 560.00- Mandor Oh 0.008 70,000 560.00

Jumlah Upah TenagaJumlah Total

Dibulatkan

3. Pasang atap genteng pelentong besar/super tiap 1m²

Harga bahan:- Genteng pelentong super/besar bh 12 2,250 27,000.00

Jumlah Harga BahanUpah tenaga:- Pekerja Oh 0.15 45,000 6,750.00- Tukang kayu Oh 0.06 65,000 3,900.00- Kepala tukang Oh 0.006 70,000 420.00- Mandor Oh 0.008 70,000 560.00

Jumlah Upah TenagaJumlah Total

Dibulatkan

4. Pasang genteng bubung pelentong / morando tiap 1m'

Harga bahan:- Genteng bubung pelentong / morando bh 5 4,500 22,500.00- Semen portland kg 8 1,240 9,920.00

Membuat pelat meja beton bertulang tebal 8 cm tiap 1 m²

Page 96: RAB 2009

96

document.xls - 2-AHSP Hal - 96

NO. URAIAN SAT KUANTITAS SUB TOTAL (Rp)

1 2 3 4 5 6

HARGA SAT. DASAR (Rp)

- Pasir pasang m³ 0.032 110,000 3,520.00Jumlah Harga Bahan

Upah tenaga:- Pekerja Oh 0.4 45,000 18,000.00- Tukang kayu Oh 0.2 65,000 13,000.00- Kepala tukang Oh 0.02 70,000 1,400.00- Mandor Oh 0.002 70,000 140.00

Jumlah Upah TenagaJumlah Total

Dibulatkan

5. Pasang bubung genteng kodok tiap 1m'

Harga bahan:- Genteng bubung kodok bh 5 2,750 13,750.00- Semen portland kg 8 1,240 9,920.00- Pasir pasang m³ 0.032 110,000 3,520.00

Jumlah Harga BahanUpah tenaga:- Pekerja Oh 0.4 45,000 18,000.00- Tukang kayu Oh 0.2 65,000 13,000.00- Kepala tukang Oh 0.02 70,000 1,400.00- Mandor Oh 0.002 70,000 140.00

Jumlah Upah TenagaJumlah Total

Dibulatkan

6. Pasang genteng bubung pelentong besar tiap 1m'

Harga bahan:- Genteng bubung pelentong super/besar bh 4 7,000 28,000.00- Semen portland kg 8 1,240 9,920.00- Pasir pasang m³ 0.032 110,000 3,520.00

Jumlah Harga BahanUpah tenaga:- Pekerja Oh 0.4 45,000 18,000.00- Tukang kayu Oh 0.2 65,000 13,000.00- Kepala tukang Oh 0.02 70,000 1,400.00- Mandor Oh 0.002 70,000 140.00

Jumlah Upah TenagaJumlah Total

Dibulatkan

7. Pasang atap asbes gelombang 2,5 x 0,92 m x 5 mm tiap 1m²

Harga bahan:- Asbes gelombang 2,5x,92 m 5 mm lbr 0.5 71,000 35,500.00- Paku sekrup 3,5" bh 4 314 1,254.00

Jumlah Harga BahanUpah tenaga:- Pekerja Oh 0.14 45,000 6,300.00- Tukang kayu Oh 0.075 65,000 4,875.00- Kepala tukang Oh 0.008 70,000 560.00- Mandor Oh 0.008 70,000 560.00

Jumlah Upah TenagaJumlah Total

Dibulatkan

8. Pasang atap asbes gelombang 2,25 x 0,92 m x 5 mm tiap 1m²

Harga bahan:- Asbes gelombang 2,25x,92 m 5 mm lbr 0.6 63,250 37,950.00- Paku sekrup 3,5" bh 4 314 1,254.00

Jumlah Harga BahanUpah tenaga:- Pekerja Oh 0.14 45,000 6,300.00- Tukang kayu Oh 0.075 65,000 4,875.00- Kepala tukang Oh 0.008 70,000 560.00- Mandor Oh 0.008 70,000 560.00

Jumlah Upah TenagaJumlah Total

Dibulatkan

9. Pasang atap asbes gelombang 2,00 x 0,92 m x 5 mm tiap 1m²

Page 97: RAB 2009

97

document.xls - 2-AHSP Hal - 97

NO. URAIAN SAT KUANTITAS SUB TOTAL (Rp)

1 2 3 4 5 6

HARGA SAT. DASAR (Rp)

Harga bahan:- Asbes gelombang 2,00x,92 m 5 mm lbr 0.6 57,600 34,560.00- Paku sekrup 3,5" bh 4 314 1,254.00

Jumlah Harga BahanUpah tenaga:- Pekerja Oh 0.14 45,000 6,300.00- Tukang kayu Oh 0.07 65,000 4,550.00- Kepala tukang Oh 0.007 70,000 490.00- Mandor Oh 0.007 70,000 490.00

Jumlah Upah TenagaJumlah Bahan & Tenaga

Dibulatkan

10. Pasang atap asbes gelombang 1,80 x 0,92 m x 5 mm tiap 1m²

Harga bahan:- Asbes gelombang 1,80x,92 m 5 mm lbr 0.75 53,310 39,982.50- Paku sekrup 3,5" bh 4 314 1,254.00

Jumlah Harga BahanUpah tenaga:- Pekerja Oh 0.14 45,000 6,300.00- Tukang kayu Oh 0.07 65,000 4,550.00- Kepala tukang Oh 0.007 70,000 490.00- Mandor Oh 0.007 70,000 490.00

Jumlah Upah TenagaJumlah Total

Dibulatkan

11. Pasang nok/bubung stel gelombang 0,92 m tiap 1m'

Harga bahan:- Nok stel gelombang lbr 2.4 39,000 93,600.00- Paku sekrup 3,5" bh 6 314 1,881.00

Jumlah Harga BahanUpah tenaga:- Pekerja Oh 0.084 45,000 3,780.00- Tukang kayu Oh 0.125 65,000 8,125.00- Kepala tukang Oh 0.013 70,000 910.00- Mandor Oh 0.004 70,000 280.00

Jumlah Upah TenagaJumlah Total

Dibulatkan

12. Pasang nok paten 0,92 m tiap 1m'

Harga bahan:- Nok paten lbr 1.2 40,000 48,000.00- Paku sekrup 3,5" bh 6 314 1,881.00

Jumlah Harga BahanUpah tenaga:- Pekerja Oh 0.084 45,000 3,780.00- Tukang kayu Oh 0.125 65,000 8,125.00- Kepala tukang Oh 0.013 70,000 910.00- Mandor Oh 0.004 70,000 280.00

Jumlah Upah TenagaJumlah Total

Dibulatkan

13. Pasang nok stel rata 0,92 m tiap 1m'

Harga bahan:- Nok stel rata lbr 1.1 39,000 42,900.00- Paku sekrup 3,5" bh 6 314 1,881.00

Jumlah Harga BahanUpah tenaga:- Pekerja Oh 0.1 45,000 4,500.00- Tukang kayu Oh 0.15 65,000 9,750.00- Kepala tukang Oh 0.013 70,000 910.00- Mandor Oh 0.004 70,000 280.00

Jumlah Upah TenagaJumlah Total

Dibulatkan

Page 98: RAB 2009

98

document.xls - 2-AHSP Hal - 98

NO. URAIAN SAT KUANTITAS SUB TOTAL (Rp)

1 2 3 4 5 6

HARGA SAT. DASAR (Rp)

14. Pasang atap genteng beton tiap 1m²

Harga bahan:- Genteng beton bh 11 4,750 52,250.00- Paku biasa 2"-5" kg 0.03 9,928 297.83

Jumlah Harga BahanUpah tenaga:- Pekerja Oh 0.2 45,000 9,000.00- Tukang kayu Oh 0.1 65,000 6,500.00- Kepala tukang Oh 0.01 70,000 700.00- Mandor Oh 0.01 70,000 700.00

Jumlah Upah TenagaJumlah Total

Dibulatkan

15. Pasang atap genteng metal tiap 1m²

Harga bahan:- Genteng metal m² 1.02 156,800 159,936.00- Paku biasa 2"-5" kg 0.2 9,928 1,985.50

Jumlah Harga BahanUpah tenaga:- Pekerja Oh 0.2 45,000 9,000.00- Tukang kayu Oh 0.1 65,000 6,500.00- Kepala tukang Oh 0.01 70,000 700.00- Mandor Oh 0.001 70,000 70.00

Jumlah Upah TenagaJumlah Total

Dibulatkan

16. Pasang atap sirap tiap 1m²

Harga bahan:- Genteng sirap bh 60 0.00- Paku biasa 1/2"- 1" kg 0.2 9,928 1,985.50

Jumlah Harga BahanUpah tenaga:- Pekerja Oh 0.166 45,000 7,470.00- Tukang kayu Oh 0.25 65,000 16,250.00- Kepala tukang Oh 0.025 70,000 1,750.00- Mandor Oh 0.008 70,000 560.00

Jumlah Upah TenagaJumlah Total

Dibulatkan

17. Pasang nok genteng beton tiap 1m'

Harga bahan:- Nok genteng beton bh 3.5 10,500 36,750.00- Paku biasa 2"-5" kg 0.05 9,928 496.38- Semen portland kg 10.8 1,240 13,392.00- Pasir pasang m³ 0.032 110,000 3,520.00- Semen portland warna kg 1 2,525 2,525.00

Jumlah Harga BahanUpah tenaga:- Pekerja Oh 0.4 45,000 18,000.00- Tukang kayu Oh 0.2 65,000 13,000.00- Kepala tukang Oh 0.02 70,000 1,400.00- Mandor Oh 0.02 70,000 1,400.00

Jumlah Upah TenagaJumlah Total

Dibulatkan

18. Pasang nok genteng metal tiap 1m'

Harga bahan:- Nok genteng metal bh 1.1 102,000 112,200.00- Paku biasa 1/2"- 1" kg 0.05 9,928 496.38

Jumlah Harga BahanUpah tenaga:- Pekerja Oh 0.25 45,000 11,250.00- Tukang kayu Oh 0.15 65,000 9,750.00- Kepala tukang Oh 0.015 70,000 1,050.00- Mandor Oh 0.013 70,000 910.00

Page 99: RAB 2009

99

document.xls - 2-AHSP Hal - 99

NO. URAIAN SAT KUANTITAS SUB TOTAL (Rp)

1 2 3 4 5 6

HARGA SAT. DASAR (Rp)

Jumlah Upah TenagaJumlah Total

Dibulatkan

19. Pasang atap seng gelombang BJLS 25 (0,25 mm) tiap 1m²

Harga bahan:- Seng gelombang 3x6 ft BJLS 25 (0,25 mm) Lbr 0.7 40,356 28,249.20- Paku biasa 1/2"- 1" kg 0.02 9,928 198.55

Jumlah Harga BahanUpah tenaga:- Pekerja Oh 0.12 45,000 5,400.00- Tukang kayu Oh 0.06 65,000 3,900.00- Kepala tukang Oh 0.006 70,000 420.00- Mandor Oh 0.006 70,000 420.00

Jumlah Upah TenagaJumlah Total

Dibulatkan

Page 100: RAB 2009

100

document.xls - 2-AHSP Hal - 100

NO. URAIAN SAT KUANTITAS SUB TOTAL (Rp)

1 2 3 4 5 6

HARGA SAT. DASAR (Rp)

20. Pasang atap nok seng tiap 1m'

Harga bahan:- Seng plat 3x6 ft BJLS 25 (0,25 mm) Lbr 0.3 31,968 9,590.25- Paku biasa 1/2"- 1" kg 0.04 9,928 397.10

Jumlah Harga BahanUpah tenaga:- Pekerja Oh 0.15 45,000 6,750.00- Tukang kayu Oh 0.07 65,000 4,550.00- Kepala tukang Oh 0.008 70,000 560.00- Mandor Oh 0.006 70,000 420.00

Jumlah Upah TenagaJumlah Total

Dibulatkan

21. Pasang nok sirap tiap 1m'

Harga bahan:- Seng plat 3x6 ft BJLS 28 (0,28 mm) Lbr 0.4 34,818 13,927.00- Paku biasa 1/2"- 1" kg 0.06 9,928 595.65- Paku biasa 2"-5" kg 0.05 9,928 496.38- Kayu Kelas II Papan m³ 0.004 6,695,000 26,780.00

Jumlah Harga BahanUpah tenaga:- Pekerja Oh 0.125 45,000 5,625.00- Tukang kayu Oh 0.25 65,000 16,250.00- Kepala tukang Oh 0.025 70,000 1,750.00- Mandor Oh 0.006 70,000 420.00

Jumlah Upah TenagaJumlah Total

Dibulatkan

22. Pasang alumunium foil tiap 1m²

Harga bahan:- Aluminium foil m² 1.05 0.00

Jumlah Harga BahanUpah tenaga:- Pekerja Oh 0.15 45,000 6,750.00- Tukang kayu Oh 0.05 65,000 3,250.00- Kepala tukang Oh 0.005 70,000 350.00- Mandor Oh 0.008 70,000 560.00

Jumlah Upah TenagaJumlah Total

Dibulatkan

Page 101: RAB 2009

101

document.xls - 2-AHSP Hal - 101

NO. URAIAN SAT KUANTITAS SUB TOTAL (Rp)

1 2 3 4 5 6

HARGA SAT. DASAR (Rp)

L PEKERJAAN SANITASI

1. Memasang 1 buah kloset duduk/monoblok (sederhana)

Harga bahan:- Kloset duduk ex RRC (sederhana) bh 1 575,000 575,000.00- Perlengkapan (6% harga kloset) % 6 575,000 34,500.00

Jumlah Harga BahanUpah tenaga:- Pekerja Oh 3.3 45,000 148,500.00- Tukang batu Oh 1.1 65,000 71,500.00- Kepala tukang Oh 0.001 70,000 70.00- Mandor Oh 0.16 70,000 11,200.00

Jumlah Upah TenagaJumlah Total

Dibulatkan

2. Memasang 1 buah kloset duduk/monoblok setara INA (sedang)

Harga bahan:- Kloset duduk setara INA (sedang) bh 1 1,112,500 1,112,500.00- Perlengkapan (6% harga kloset) % 6 1,112,500 66,750.00

Jumlah Harga BahanUpah tenaga:- Pekerja Oh 3.3 45,000 148,500.00- Tukang batu Oh 1.1 65,000 71,500.00- Kepala tukang Oh 0.001 70,000 70.00- Mandor Oh 0.16 70,000 11,200.00

Jumlah Upah TenagaJumlah Total

Dibulatkan

3. Memasang 1 buah kloset duduk/monoblok (tidak sederhana)

Harga bahan:- Kloset duduk setara Toto (tdk sederhana) bh 1 1,350,000 1,350,000.00- Perlengkapan (6% harga kloset) % 6 1,350,000 81,000.00

Jumlah Harga BahanUpah tenaga:- Pekerja Oh 3.3 45,000 148,500.00- Tukang batu Oh 1.1 65,000 71,500.00- Kepala tukang Oh 0.001 70,000 70.00- Mandor Oh 0.16 70,000 11,200.00

Jumlah Upah TenagaJumlah Total

Dibulatkan

4. Memasang 1 buah kloset jongkok sederhana

Harga bahan:- Kloset jongkok sederhana bh 1 215,000 215,000.00- Semen portland kg 6 1,240 7,440.00- Pasir pasang m³ 0.01 110,000 1,100.00

Jumlah Harga BahanUpah tenaga:- Pekerja Oh 1 45,000 45,000.00- Tukang batu Oh 1.5 65,000 97,500.00- Kepala tukang Oh 0.15 70,000 10,500.00- Mandor Oh 0.16 70,000 11,200.00

Jumlah Upah TenagaJumlah Total

Dibulatkan

Page 102: RAB 2009

102

document.xls - 2-AHSP Hal - 102

NO. URAIAN SAT KUANTITAS SUB TOTAL (Rp)

1 2 3 4 5 6

HARGA SAT. DASAR (Rp)

5. Memasang 1 buah kloset jongkok sedang

Harga bahan:- Kloset jongkok sedang bh 1 309,000 309,000.00- Semen portland kg 6 1,240 7,440.00- Pasir pasang m³ 0.01 110,000 1,100.00

Jumlah Harga BahanUpah tenaga:- Pekerja Oh 1 45,000 45,000.00- Tukang batu Oh 1.5 65,000 97,500.00- Kepala tukang Oh 0.15 70,000 10,500.00- Mandor Oh 0.16 70,000 11,200.00

Jumlah Upah TenagaJumlah Total

Dibulatkan

6. Memasang 1 buah kloset jongkok tdk sederhana

Harga bahan:- Kloset jongkok setara Toto (tdk sederhana) bh 1 411,350 411,350.00- Semen portland kg 6 1,240 7,440.00- Pasir pasang m³ 0.01 110,000 1,100.00

Jumlah Harga BahanUpah tenaga:- Pekerja Oh 1 45,000 45,000.00- Tukang batu Oh 1.5 65,000 97,500.00- Kepala tukang Oh 0.15 70,000 10,500.00- Mandor Oh 0.16 70,000 11,200.00

Jumlah Upah TenagaJumlah Total

Dibulatkan

7. Memasang 1 buah urinoir

Harga bahan:- Urinoir bh 1 1,360,400 1,360,400.00- Perlengkapan (30% harga urinoir) % 30 1,360,400 408,120.00- Semen portland kg 6 1,240 7,440.00- Pasir pasang m³ 0.01 110,000 1,100.00

Jumlah Harga BahanUpah tenaga:- Pekerja Oh 1 45,000 45,000.00- Tukang batu Oh 1 65,000 65,000.00- Kepala tukang Oh 0.1 70,000 7,000.00- Mandor Oh 0.1 70,000 7,000.00

Jumlah Upah TenagaJumlah Total

Dibulatkan

8. Memasang 1 buah wastafel

Harga bahan:- Wastafel bh 1 1,374,650 1,374,650.00- Perlengkapan (12% harga wastafel) % 12 1,374,650 164,958.00- Semen portland kg 6 1,240 7,440.00- Pasir pasang m³ 0.01 110,000 1,100.00

Jumlah Harga BahanUpah tenaga:- Pekerja Oh 1.2 45,000 54,000.00- Tukang batu Oh 1.45 65,000 94,250.00- Kepala tukang Oh 0.15 70,000 10,500.00- Mandor Oh 0.1 70,000 7,000.00

Jumlah Upah TenagaJumlah Total

Dibulatkan

9. Memasang 1 buah bak mandi fibreglass volume 0,3 m³

Harga bahan:- Bak fibreglass 0.3 m³ bh 1 190,000 190,000.00- Perlengkapan (18% harga bak) % 18 190,000 34,200.00

Jumlah Harga BahanUpah tenaga:- Pekerja Oh 1.8 45,000 81,000.00

Page 103: RAB 2009

103

document.xls - 2-AHSP Hal - 103

NO. URAIAN SAT KUANTITAS SUB TOTAL (Rp)

1 2 3 4 5 6

HARGA SAT. DASAR (Rp)

- Tukang batu Oh 2.7 65,000 175,500.00- Kepala tukang Oh 0.54 70,000 37,800.00- Mandor Oh 0.11 70,000 7,700.00

Jumlah Upah TenagaJumlah Total

Dibulatkan

10. Memasang 1 buah bak mandi batu bata volume 0,3 m³

Harga bahan:- Bata merah bh 242 567 137,093.00- Semen portland kg 120 1,240 148,800.00- Pasir pasang m³ 0.3 110,000 33,000.00- Ubin keramik 20 x 20 cm Roman bh 110 2,394 263,340.00- Semen portland warna kg 6 2,525 15,150.00

Jumlah Harga BahanUpah tenaga:- Pekerja Oh 6 45,000 270,000.00- Tukang batu Oh 3 65,000 195,000.00- Kepala tukang Oh 0.3 70,000 21,000.00- Mandor Oh 0.3 70,000 21,000.00

Jumlah Upah TenagaJumlah Total

Dibulatkan

Page 104: RAB 2009

104

document.xls - 2-AHSP Hal - 104

NO. URAIAN SAT KUANTITAS SUB TOTAL (Rp)

1 2 3 4 5 6

HARGA SAT. DASAR (Rp)

11. Memasang 1 buah bak mandi batu bata volume 0,3 m³ (60x60x80 cm)

Harga bahan:- Bata merah bh 72 567 40,788.00- Semen portland kg 40.06 1,240 49,674.40- Pasir pasang m³ 0.09 110,000 9,900.00- Ubin keramik 20 x 20 cm Roman bh 68 2,394 162,792.00- Semen portland warna kg 4.08 2,525 10,302.00

Jumlah Harga BahanUpah tenaga:- Pekerja Oh 1.96 45,000 88,200.00- Tukang batu Oh 1.33 65,000 86,450.00- Kepala tukang Oh 0.133 70,000 9,310.00- Mandor Oh 0.097 70,000 6,790.00

Jumlah Upah TenagaJumlah Total

Dibulatkan

12. Memasang pipa galvanis dia 1/2" tiap m'

Harga bahan:- Pipa galvanis dia 1/2" m' 1.2 8,708 10,450.00- Perlengkapan (35% harga pipa) % 35 10,450 3,657.50

Jumlah Harga BahanUpah tenaga:- Pekerja Oh 0.054 45,000 2,430.00- Tukang pasang pipa Oh 0.09 65,000 5,850.00- Kepala tukang Oh 0.009 70,000 630.00- Mandor Oh 0.0027 70,000 189.00

Jumlah Upah TenagaJumlah Total

Dibulatkan

13. Memasang pipa galvanis dia 3/4" tiap m'

Harga bahan:- Pipa galvanis dia 3/4" m' 1.2 10,450 12,540.00- Perlengkapan (35% harga pipa) % 35 12,540 4,389.00

Jumlah Harga BahanUpah tenaga:- Pekerja Oh 0.054 45,000 2,430.00- Tukang pasang pipa Oh 0.09 65,000 5,850.00- Kepala tukang Oh 0.009 70,000 630.00- Mandor Oh 0.0027 70,000 189.00

Jumlah Upah TenagaJumlah Total

Dibulatkan

14. Memasang pipa galvanis dia 1" tiap m'

Harga bahan:- Pipa galvanis dia 1" m' 1.2 13,063 15,675.00- Perlengkapan (35% harga pipa) % 35 15,675 5,486.25

Jumlah Harga BahanUpah tenaga:- Pekerja Oh 0.054 45,000 2,430.00- Tukang pasang pipa Oh 0.09 65,000 5,850.00- Kepala tukang Oh 0.009 70,000 630.00- Mandor Oh 0.0027 70,000 189.00

Jumlah Upah TenagaJumlah Total

Dibulatkan

15. Memasang pipa galvanis dia 1 ¼" tiap m'

Harga bahan:- Pipa galvanis dia 1 ¼" m' 1.2 0.00- Perlengkapan (35% harga pipa) % 35 0 0.00

Jumlah Harga BahanUpah tenaga:- Pekerja Oh 0.054 45,000 2,430.00- Tukang pasang pipa Oh 0.09 65,000 5,850.00- Kepala tukang Oh 0.009 70,000 630.00- Mandor Oh 0.0027 70,000 189.00

Page 105: RAB 2009

105

document.xls - 2-AHSP Hal - 105

NO. URAIAN SAT KUANTITAS SUB TOTAL (Rp)

1 2 3 4 5 6

HARGA SAT. DASAR (Rp)

Jumlah Upah TenagaJumlah Total

Dibulatkan

Page 106: RAB 2009

106

document.xls - 2-AHSP Hal - 106

NO. URAIAN SAT KUANTITAS SUB TOTAL (Rp)

1 2 3 4 5 6

HARGA SAT. DASAR (Rp)

16. Memasang pipa galvanis dia 1 ½" tiap m'

Harga bahan:- Pipa galvanis dia 1 ½" m' 1.2 20,029 24,034.62- Perlengkapan (35% harga pipa) % 35 24,035 8,412.12

Jumlah Harga BahanUpah tenaga:- Pekerja Oh 0.108 45,000 4,860.00- Tukang pasang pipa Oh 0.18 65,000 11,700.00- Kepala tukang Oh 0.018 70,000 1,260.00- Mandor Oh 0.0054 70,000 378.00

Jumlah Upah TenagaJumlah Total

Dibulatkan

17. Memasang pipa galvanis dia 2" tiap m'

Harga bahan:- Pipa galvanis dia 2" m' 1.2 28,738 34,485.00- Perlengkapan (35% harga pipa) % 35 34,485 12,069.75

Jumlah Harga BahanUpah tenaga:- Pekerja Oh 0.108 45,000 4,860.00- Tukang pasang pipa Oh 0.18 65,000 11,700.00- Kepala tukang Oh 0.018 70,000 1,260.00- Mandor Oh 0.0054 70,000 378.00

Jumlah Upah TenagaJumlah Total

Dibulatkan

18. Memasang pipa galvanis dia 2 ½" tiap m'

Harga bahan:- Pipa galvanis dia 2 ½" m' 1.2 47,460 56,952.12- Perlengkapan (35% harga pipa) % 35 56,952 19,933.24

Jumlah Harga BahanUpah tenaga:- Pekerja Oh 0.108 45,000 4,860.00- Tukang pasang pipa Oh 0.18 65,000 11,700.00- Kepala tukang Oh 0.018 70,000 1,260.00- Mandor Oh 0.0054 70,000 378.00

Jumlah Upah TenagaJumlah Total

Dibulatkan

19. Memasang pipa galvanis dia 3" tiap m'

Harga bahan:- Pipa galvanis dia 3" m' 1.2 54,426 65,310.60- Perlengkapan (35% harga pipa) % 35 65,311 22,858.71

Jumlah Harga BahanUpah tenaga:- Pekerja Oh 0.108 45,000 4,860.00- Tukang pasang pipa Oh 0.18 65,000 11,700.00- Kepala tukang Oh 0.018 70,000 1,260.00- Mandor Oh 0.0054 70,000 378.00

Jumlah Upah TenagaJumlah Total

Dibulatkan

20. Memasang pipa galvanis dia 4" tiap m'

Harga bahan:- Pipa galvanis dia 4" m' 1.2 80,988 97,185.00- Perlengkapan (35% harga pipa) % 35 97,185 34,014.75

Jumlah Harga BahanUpah tenaga:- Pekerja Oh 0.135 45,000 6,075.00- Tukang pasang pipa Oh 0.225 65,000 14,625.00- Kepala tukang Oh 0.0225 70,000 1,575.00- Mandor Oh 0.0068 70,000 476.00

Jumlah Upah TenagaJumlah Total

Dibulatkan

Page 107: RAB 2009

107

document.xls - 2-AHSP Hal - 107

NO. URAIAN SAT KUANTITAS SUB TOTAL (Rp)

1 2 3 4 5 6

HARGA SAT. DASAR (Rp)

21. Memasang pipa PVC tipe AW dia 1/2" tiap m'

Harga bahan:- Pipa PVC dia 1/2" AW m' 1.2 2,090 2,508.00- Perlengkapan (35% harga pipa) % 35 2,508 877.80

Jumlah Harga BahanUpah tenaga:- Pekerja Oh 0.036 45,000 1,620.00- Tukang pasang pipa Oh 0.06 65,000 3,900.00- Kepala tukang Oh 0.006 70,000 420.00- Mandor Oh 0.0018 70,000 126.00

Jumlah Upah TenagaJumlah Total

Dibulatkan

22. Memasang pipa PVC tipe AW dia 3/4" tiap m'

Harga bahan:- Pipa PVC dia 3/4" AW m' 1.2 2,960 3,552.24- Perlengkapan (35% harga pipa) % 35 3,552 1,243.28

Jumlah Harga BahanUpah tenaga:- Pekerja Oh 0.036 45,000 1,620.00- Tukang pasang pipa Oh 0.06 65,000 3,900.00- Kepala tukang Oh 0.006 70,000 420.00- Mandor Oh 0.0018 70,000 126.00

Jumlah Upah TenagaJumlah Total

Dibulatkan

Page 108: RAB 2009

108

document.xls - 2-AHSP Hal - 108

NO. URAIAN SAT KUANTITAS SUB TOTAL (Rp)

1 2 3 4 5 6

HARGA SAT. DASAR (Rp)

23. Memasang pipa PVC tipe AW dia 1" tiap m'

Harga bahan:- Pipa PVC dia 1" AW m' 1.2 4,005 4,806.24- Perlengkapan (35% harga pipa) % 35 4,806 1,682.18

Jumlah Harga BahanUpah tenaga:- Pekerja Oh 0.036 45,000 1,620.00- Tukang pasang pipa Oh 0.06 65,000 3,900.00- Kepala tukang Oh 0.006 70,000 420.00- Mandor Oh 0.0018 70,000 126.00

Jumlah Upah TenagaJumlah Total

Dibulatkan

24. Memasang pipa PVC tipe AW dia 1 ¼" tiap m'

Harga bahan:- Pipa PVC dia 1 ¼" AW m' 1.2 0.00- Perlengkapan (35% harga pipa) % 35 0 0.00

Jumlah Harga BahanUpah tenaga:- Pekerja Oh 0.036 45,000 1,620.00- Tukang pasang pipa Oh 0.06 65,000 3,900.00- Kepala tukang Oh 0.006 70,000 420.00- Mandor Oh 0.0018 70,000 126.00

Jumlah Upah TenagaJumlah Total

Dibulatkan

25. Memasang pipa PVC tipe D dia 1 ¼" tiap m'

Harga bahan:- Pipa PVC dia 1 ¼" D m' 1.2 0.00- Perlengkapan (35% harga pipa) % 35 0 0.00

Jumlah Harga BahanUpah tenaga:- Pekerja Oh 0.036 45,000 1,620.00- Tukang pasang pipa Oh 0.06 65,000 3,900.00- Kepala tukang Oh 0.006 70,000 420.00- Mandor Oh 0.0018 70,000 126.00

Jumlah Upah TenagaJumlah Total

Dibulatkan

26. Memasang pipa PVC tipe AW dia 1 ½" tiap m'

Harga bahan:- Pipa PVC dia 1 ½" AW m' 1.2 7,401 8,880.60- Perlengkapan (35% harga pipa) % 35 8,881 3,108.21

Jumlah Harga BahanUpah tenaga:- Pekerja Oh 0.036 45,000 1,620.00- Tukang pasang pipa Oh 0.06 65,000 3,900.00- Kepala tukang Oh 0.006 70,000 420.00- Mandor Oh 0.0018 70,000 126.00

Jumlah Upah TenagaJumlah Total

Dibulatkan

Page 109: RAB 2009

109

document.xls - 2-AHSP Hal - 109

NO. URAIAN SAT KUANTITAS SUB TOTAL (Rp)

1 2 3 4 5 6

HARGA SAT. DASAR (Rp)

27. Memasang pipa PVC tipe D dia 1 ½" tiap m'

Harga bahan:- Pipa PVC dia 1 ½" D m' 1.2 0.00- Perlengkapan (35% harga pipa) % 35 0 0.00

Jumlah Harga BahanUpah tenaga:- Pekerja Oh 0.036 45,000 1,620.00- Tukang pasang pipa Oh 0.06 65,000 3,900.00- Kepala tukang Oh 0.006 70,000 420.00- Mandor Oh 0.0018 70,000 126.00

Jumlah Upah TenagaJumlah Total

Dibulatkan

28. Memasang pipa PVC tipe AW dia 2" tiap m'

Harga bahan:- Pipa PVC dia 2" AW m' 1.2 10,013 12,015.60- Perlengkapan (35% harga pipa) % 35 12,016 4,205.46

Jumlah Harga BahanUpah tenaga:- Pekerja Oh 0.054 45,000 2,430.00- Tukang pasang pipa Oh 0.09 65,000 5,850.00- Kepala tukang Oh 0.009 70,000 630.00- Mandor Oh 0.0027 70,000 189.00

Jumlah Upah TenagaJumlah Total

Dibulatkan

29. Memasang pipa PVC tipe D dia 2" tiap m'

Harga bahan:- Pipa PVC dia 2" D m' 1.2 0.00- Perlengkapan (35% harga pipa) % 35 0 0.00

Jumlah Harga BahanUpah tenaga:- Pekerja Oh 0.054 45,000 2,430.00- Tukang pasang pipa Oh 0.09 65,000 5,850.00- Kepala tukang Oh 0.009 70,000 630.00- Mandor Oh 0.0027 70,000 189.00

Jumlah Upah TenagaJumlah Total

Dibulatkan

30. Memasang pipa PVC tipe AW dia 2 ½" tiap m'

Harga bahan:- Pipa PVC dia 2 ½" AW m' 1.2 0.00- Perlengkapan (35% harga pipa) % 35 0 0.00

Jumlah Harga BahanUpah tenaga:- Pekerja Oh 0.036 45,000 1,620.00- Tukang pasang pipa Oh 0.06 65,000 3,900.00- Kepala tukang Oh 0.006 70,000 420.00- Mandor Oh 0.00018 70,000 12.60

Jumlah Upah Tenaga0.054 Jumlah Total

0.0027 Dibulatkan

31. Memasang pipa PVC tipe D dia 2 ½" tiap m'

Harga bahan:- Pipa PVC dia 2 ½" D m' 1.2 0.00- Perlengkapan (35% harga pipa) % 35 0 0.00

Jumlah Harga BahanUpah tenaga:- Pekerja Oh 0.036 45,000 1,620.00- Tukang pasang pipa Oh 0.06 65,000 3,900.00- Kepala tukang Oh 0.006 70,000 420.00- Mandor Oh 0.00018 70,000 12.60

Jumlah Upah Tenaga0.054 Jumlah Total

0.0027 Dibulatkan

Page 110: RAB 2009

110

document.xls - 2-AHSP Hal - 110

NO. URAIAN SAT KUANTITAS SUB TOTAL (Rp)

1 2 3 4 5 6

HARGA SAT. DASAR (Rp)

32. Memasang pipa PVC tipe AW dia 3" cm tiap m'

Harga bahan:- Pipa PVC dia 3" AW m' 1.2 17,504 21,004.50- Perlengkapan (35% harga pipa) % 35 21,005 7,351.58

Jumlah Harga BahanUpah tenaga:- Pekerja Oh 0.081 45,000 3,645.00- Tukang pasang pipa Oh 0.135 65,000 8,775.00- Kepala tukang Oh 0.0135 70,000 945.00- Mandor Oh 0.0041 70,000 287.00

Jumlah Upah TenagaJumlah Total

Dibulatkan

33. Memasang pipa PVC tipe D dia 3" cm tiap m'

Harga bahan:- Pipa PVC dia 3" D m' 1.2 0.00- Perlengkapan (35% harga pipa) % 35 0 0.00

Jumlah Harga BahanUpah tenaga:- Pekerja Oh 0.081 45,000 3,645.00- Tukang pasang pipa Oh 0.135 65,000 8,775.00- Kepala tukang Oh 0.0135 70,000 945.00- Mandor Oh 0.0041 70,000 287.00

Jumlah Upah TenagaJumlah Total

Dibulatkan

34. Memasang pipa PVC tipe AW dia 4" tiap m'

Harga bahan:- Pipa PVC dia 4" AW m' 1.2 26,995 32,394.24- Perlengkapan (35% harga pipa) % 35 32,394 11,337.98

Jumlah Harga BahanUpah tenaga:- Pekerja Oh 0.081 45,000 3,645.00- Tukang pasang pipa Oh 0.135 65,000 8,775.00- Kepala tukang Oh 0.0135 70,000 945.00- Mandor Oh 0.0041 70,000 287.00

Jumlah Upah TenagaJumlah Total

Dibulatkan

Page 111: RAB 2009

111

document.xls - 2-AHSP Hal - 111

NO. URAIAN SAT KUANTITAS SUB TOTAL (Rp)

1 2 3 4 5 6

HARGA SAT. DASAR (Rp)

35. Memasang pipa PVC tipe D dia 4" tiap m'

Harga bahan:- Pipa PVC dia 4" D m' 1.2 26,995 32,394.24- Perlengkapan (35% harga pipa) % 35 32,394 11,337.98

Jumlah Harga BahanUpah tenaga:- Pekerja Oh 0.081 45,000 3,645.00- Tukang pasang pipa Oh 0.135 65,000 8,775.00- Kepala tukang Oh 0.0135 70,000 945.00- Mandor Oh 0.0041 70,000 287.00

Jumlah Upah TenagaJumlah Total

Dibulatkan

36. Memasang 1 buah bak cuci piring stainless steel

Harga bahan:- Bak cuci stainless steel bh 1 296,875 296,875.00- Water drain + asesoris set 1 59,660 59,660.00

Jumlah Harga BahanUpah tenaga:- Pekerja Oh 0.03 45,000 1,350.00- Tukang batu Oh 0.3 65,000 19,500.00- Kepala tukang Oh 0.03 70,000 2,100.00- Mandor Oh 0.0015 70,000 105.00

Jumlah Upah TenagaJumlah Total

Dibulatkan

37. Memasang 1 buah kran dia 3/4" atau 1/2" sederhana

Harga bahan:- Kran air lokal (sederhana) bh 1 47,500 47,500.00- Seal tape bh 0.025 3,895 97.38

Jumlah Harga BahanUpah tenaga:- Pekerja Oh 0.01 45,000 450.00- Tukang pasang pipa Oh 0.1 65,000 6,500.00- Kepala tukang Oh 0.01 70,000 700.00- Mandor Oh 0.005 70,000 350.00

Jumlah Upah TenagaJumlah Total

Dibulatkan

38. Memasang 1 buah kran dia 3/4" atau 1/2" stainless

Harga bahan:- Kran air stainless bh 1 129,666 129,665.50- Seal tape bh 0.025 3,895 97.38

Jumlah Harga BahanUpah tenaga:- Pekerja Oh 0.01 45,000 450.00- Tukang pasang pipa Oh 0.1 65,000 6,500.00- Kepala tukang Oh 0.01 70,000 700.00- Mandor Oh 0.005 70,000 350.00

Jumlah Upah TenagaJumlah Total

Dibulatkan

39. Memasang 1 floor drain sederhana

Harga bahan:- Floor drain sederhana bh 1 82,175 82,175.00

Jumlah Harga BahanUpah tenaga:- Pekerja Oh 0.01 45,000 450.00- Tukang batu Oh 0.1 65,000 6,500.00- Kepala tukang Oh 0.01 70,000 700.00- Mandor Oh 0.005 70,000 350.00

Jumlah Upah TenagaJumlah Total

Dibulatkan

Page 112: RAB 2009

112

document.xls - 2-AHSP Hal - 112

NO. URAIAN SAT KUANTITAS SUB TOTAL (Rp)

1 2 3 4 5 6

HARGA SAT. DASAR (Rp)

40. Memasang 1 floor drain stainless

Harga bahan:- Floor drain stainless bh 1 163,590 163,590.00

Jumlah Harga BahanUpah tenaga:- Pekerja Oh 0.01 45,000 450.00- Tukang batu Oh 0.1 65,000 6,500.00- Kepala tukang Oh 0.01 70,000 700.00- Mandor Oh 0.005 70,000 350.00

Jumlah Upah TenagaJumlah Total

Dibulatkan

41. Membuat 1 unit sumur air tanah bor manual dalam 12 m' + pompa air listrik

Harga bahan:- Pipa PVC dia 3/4" AW m' 14 2,960 41,442.80- Pipa PVC dia 2" D m' 12 0.00- Pompa air listrik Shimizu 125 W unit 1 0.00- Perlengkapan (35% harga pipa+pompa) % 35 41,443 14,504.98

Jumlah Harga BahanUpah tenaga:- Pekerja Oh 3.162 45,000 142,290.00- Tukang pasang pipa Oh 2.32 65,000 150,800.00- Kepala tukang Oh 0.232 70,000 16,240.00- Mandor Oh 0.1581 70,000 11,067.00

Jumlah Upah TenagaJumlah Total

Dibulatkan

42.

Harga bahan:- Bata merah bh 441 567 249,826.50- Semen portland kg 126.17 1,240 156,450.80- Pasir pasang m³ 0.439 110,000 48,290.00- Batu pecah/split 2/3 m³ 0.13 206,000 26,780.00- Besi beton polos kg 11.44 9,928 113,570.60- Kawat beton kg 0.164 13,775 2,259.10- Pasir beton m³ 0.093 103,000 9,579.00- Pasir urug m³ 0.106 77,250 8,188.50- Kayu Terentang balok m³ 0.007 950,000 6,650.00- Triplek 4x8 ft 9 mm lbr 0.675 118,250 79,818.75- Paku biasa 2"-5" kg 0.71 9,928 7,048.53- Pipa PVC dia 2" D m' 1 0.00- Pipa PVC dia 4" D m' 1.7 0.00- Perlengkapan (35% harga pipa) % 35 0 0.00

Jumlah Harga BahanUpah tenaga:- Pekerja Oh 5.44 45,000 244,800.00- Tukang batu Oh 2.181 65,000 141,765.00- Tukang pasang pipa Oh 0.32 65,000 20,800.00- Kepala tukang Oh 0.25 70,000 17,500.00- Mandor Oh 0.3055 70,000 21,385.00

Jumlah Upah TenagaJumlah Total

Dibulatkan

43.

Harga bahan:- Bata merah bh 722 567 409,013.00- Semen portland kg 304.86 1,240 378,026.40- Pasir pasang m³ 0.589 110,000 64,790.00- Batu pecah/split 2/3 m³ 0.2 206,000 41,200.00- Besi beton polos m³ 31.17 9,928 309,440.18- Kawat beton kg 0.445 13,775 6,129.88- Pasir beton m³ 0.134 103,000 13,802.00- Pasir urug m³ 0.138 77,250 10,660.50- Kayu Terentang balok m³ 0.0427 950,000 40,565.00- Triplek 4x8 ft 9 mm lbr 0.8 118,250 94,600.00

Membuat 1 unit tanki septik sederhana kapasitas Ø 1,2 m dalam 1,2 m

Membuat 1 unit tanki septik kapasitas 1,7x0,85 m dalam 1,3 m (vol. 1,88 m³ u/ 5 pemakai)

Page 113: RAB 2009

113

document.xls - 2-AHSP Hal - 113

NO. URAIAN SAT KUANTITAS SUB TOTAL (Rp)

1 2 3 4 5 6

HARGA SAT. DASAR (Rp)

- Paku biasa 2"-5" kg 0.92 9,928 9,133.30- Pipa PVC dia 2" D m' 3 0.00- Pipa PVC dia 4" D m' 1.7 0.00- Perlengkapan (35% harga pipa) % 35 0 0.00

Jumlah Harga BahanUpah tenaga:- Pekerja Oh 8.648 45,000 389,160.00- Tukang batu Oh 3.486 65,000 226,590.00- Tukang pasang pipa Oh 0.5 65,000 32,500.00- Kepala tukang Oh 0.399 70,000 27,930.00- Mandor Oh 0.482 70,000 33,740.00

Jumlah Upah TenagaJumlah Total

Dibulatkan

Page 114: RAB 2009

114

document.xls - 2-AHSP Hal - 114

NO. URAIAN SAT KUANTITAS SUB TOTAL (Rp)

1 2 3 4 5 6

HARGA SAT. DASAR (Rp)

44.

Harga bahan:- Bata merah bh 385 567 218,102.50- Semen portland kg 162.29 1,240 201,239.60- Pasir pasang m³ 0.314 110,000 34,540.00- Batu pecah/split 2/3 m³ 0.107 206,000 22,042.00- Besi beton polos m³ 16.594 9,928 164,736.94- Kawat beton kg 0.237 13,775 3,264.68- Pasir beton m³ 0.072 103,000 7,416.00- Pasir urug m³ 0.074 77,250 5,716.50- Kayu Terentang balok m³ 0.023 950,000 21,850.00- Triplek 4x8 ft 9 mm lbr 0.426 118,250 50,374.50- Paku biasa 2"-5" kg 0.49 9,928 4,864.48- Pipa PVC dia 2" D m' 1.6 0.00- Pipa PVC dia 4" D m' 0.91 0.00- Perlengkapan (35% harga pipa) % 35 0 0.00

Jumlah Harga BahanUpah tenaga:- Pekerja Oh 4.604 45,000 207,180.00- Tukang batu Oh 1.856 65,000 120,640.00- Tukang pasang pipa Oh 0.267 65,000 17,355.00- Kepala tukang Oh 0.213 70,000 14,910.00- Mandor Oh 0.257 70,000 17,990.00

Jumlah Upah TenagaJumlah Total

Dibulatkan

45.

Harga bahan:- Batu pecah/split 3/5 m³ 0.603 180,250 108,690.75- Ijuk kg 0.716 0.00- Pipa PVC dia 4" D m' 2 0.00

Jumlah Harga BahanUpah tenaga:- Pekerja Oh 1.05 45,000 47,250.00- Tukang pasang pipa Oh 0.27 65,000 17,550.00- Kepala tukang Oh 0.027 70,000 1,890.00- Mandor Oh 0.0969 70,000 6,783.00

Jumlah Upah TenagaJumlah Total

Dibulatkan

M PEKERJAAN BESI DAN ALUMINIUM

1. Pasang rangka atap baja tiap kg

Harga bahan:- Besi profil WF kg 1.1 13,063 14,368.75- Cat meni besi kg 0.08 14,250 1,140.00

Jumlah Harga BahanUpah tenaga:- Pekerja Oh 0.06 45,000 2,700.00- Tukang besi Oh 0.006 65,000 390.00- Kepala tukang Oh 0.006 70,000 420.00- Mandor Oh 0.0003 70,000 21.00

Jumlah Upah TenagaJumlah Total

Dibulatkan

2. Pasang pintu besi baja tiap m²

Harga bahan:- Pintu besi baja m² 1 902,500 902,500.00

Jumlah Harga BahanUpah tenaga:- Pekerja Oh 0.65 45,000 29,250.00- Tukang besi Oh 0.65 65,000 42,250.00- Kepala tukang Oh 0.065 70,000 4,550.00- Mandor Oh 0.032 70,000 2,240.00

Jumlah Upah TenagaJumlah Total

Membuat tanki septik kapasitas tiap 1 m³

Membuat 1 unit resapan Ø 0,8 m (digali 1 m) dalam 1 m (digali 1,9 m) kap. 0,5 m³

Page 115: RAB 2009

115

document.xls - 2-AHSP Hal - 115

NO. URAIAN SAT KUANTITAS SUB TOTAL (Rp)

1 2 3 4 5 6

HARGA SAT. DASAR (Rp)

Dibulatkan

3. Pasang jendela besi tiap m²

Harga bahan:- Jendela besi m² 1 0.00

Jumlah Harga BahanUpah tenaga:- Pekerja Oh 1.05 45,000 47,250.00- Tukang besi Oh 1.05 65,000 68,250.00- Kepala tukang Oh 0.105 70,000 7,350.00- Mandor Oh 0.00525 70,000 367.50

Jumlah Upah TenagaJumlah Total

Dibulatkan

4. Pasang jendela besi tahan api tiap m²

Harga bahan:- Jendela besi m² 1 0.00

Jumlah Harga BahanUpah tenaga:- Pekerja Oh 1.022 45,000 45,990.00- Tukang besi Oh 1.2 65,000 78,000.00- Kepala tukang Oh 0.12 70,000 8,400.00- Mandor Oh 0.006 70,000 420.00

Jumlah Upah TenagaJumlah Total

Dibulatkan

5. Pasang pintu lipat tiap m²

Harga bahan:- Pintu lipat m² 1 0.00

Jumlah Harga BahanUpah tenaga:- Pekerja Oh 1.05 45,000 47,250.00- Tukang besi Oh 1.05 65,000 68,250.00- Kepala tukang Oh 0.105 70,000 7,350.00- Mandor Oh 0.0052 70,000 364.00

Jumlah Upah TenagaJumlah Total

Dibulatkan

6. Pasang rolling door tiap m²

Harga bahan:- Roll door m² 1 500,000 500,000.00

Jumlah Harga BahanUpah tenaga:- Pekerja Oh 1.05 45,000 47,250.00- Tukang besi Oh 1.05 65,000 68,250.00- Kepala tukang Oh 0.105 70,000 7,350.00- Mandor Oh 0.0052 70,000 364.00

Jumlah Upah TenagaJumlah Total

Dibulatkan

7. Pasang pintu aluminium tiap m²

Harga bahan:- Pintu aluminium m² 1 100,000 100,000.00

Jumlah Harga BahanUpah tenaga:- Pekerja Oh 1.05 45,000 47,250.00- Tukang besi Oh 1.05 65,000 68,250.00- Kepala tukang Oh 0.105 70,000 7,350.00- Mandor Oh 0.0052 70,000 364.00

Jumlah Upah TenagaJumlah Total

Dibulatkan

8. Pasang terali besi tiap m²

Pelat strip (3 x 19) mm x 6 m = 2,68 kg = 0,44745 kg/m'; 11,5 m besi plat strip = 5,146 kg.Harga bahan:- Besi pelat strip kg 5.146 7,838 40,331.78

Page 116: RAB 2009

116

document.xls - 2-AHSP Hal - 116

NO. URAIAN SAT KUANTITAS SUB TOTAL (Rp)

1 2 3 4 5 6

HARGA SAT. DASAR (Rp)

Jumlah Harga BahanUpah tenaga:- Pekerja Oh 1.2 45,000 54,000.00- Tukang las Oh 1.2 65,000 78,000.00- Kepala tukang Oh 0.012 70,000 840.00- Mandor Oh 0.0006 70,000 42.00

Jumlah Upah TenagaJumlah Total

Dibulatkan

9. Pasang kawat harmonika tiap m²

Harga bahan:- Kawat harmonika Ø 2 mm spasi 40x40 mm m² 1.1 0.00- Paku biasa 1/2"- 1" kg 0.02 9,928 198.55- Kayu Kelas II Papan m³ 0.0018 6,695,000 12,051.00

Jumlah Harga BahanUpah tenaga:- Pekerja Oh 0.1 45,000 4,500.00- Tukang kayu Oh 0.1 65,000 6,500.00- Kepala tukang Oh 0.01 70,000 700.00- Mandor Oh 0.0005 70,000 35.00

Jumlah Upah TenagaJumlah Total

Dibulatkan

10. Pasang kawat kasa nyamuk (parabola) tiap m²

Harga bahan:- Kawat kasa (parabola) m² 1.1 0.00- Paku biasa 1/2"- 1" kg 0.02 9,928 198.55- Kayu Kelas II Papan m³ 0.0018 6,695,000 12,051.00

Jumlah Harga BahanUpah tenaga:- Pekerja Oh 0.1 45,000 4,500.00- Tukang kayu Oh 0.1 65,000 6,500.00- Kepala tukang Oh 0.01 70,000 700.00- Mandor Oh 0.0005 70,000 35.00

Jumlah Upah TenagaJumlah Total

Dibulatkan

11. Pasang jendela nako dan teralis tiap m²

Harga bahan:- Jendela nako (rangka) daun 6.67 24,000 160,080.00- Paku biasa 1/2"- 1" kg 0.02 9,928 198.55- Besi segi empat 3/8"x3/8" (0,83kg/m') kg 5.56 0.00

Jumlah Harga BahanUpah tenaga:- Pekerja Oh 0.2 45,000 9,000.00- Tukang kayu Oh 0.2 65,000 13,000.00- Kepala tukang Oh 0.02 70,000 1,400.00- Mandor Oh 0.001 70,000 70.00

Jumlah Upah TenagaJumlah Total

Dibulatkan

12. Pasang talang datar, seng BJLS 25 (0,25 mm) tiap 1 m'

Harga bahan:- Seng plat 3x6 ft BJLS 25 (0,25 mm) Lbr 0.5 31,968 15,983.75- Paku biasa 1/2"- 1" kg 0.015 9,928 148.91- Kayu Kelas II Papan m³ 0.0096 6,695,000 64,272.00- Cat meni besi kg 0.25 14,250 3,562.50

Jumlah Harga BahanUpah tenaga:- Pekerja Oh 0.15 45,000 6,750.00- Tukang kayu Oh 0.4 65,000 26,000.00- Kepala tukang Oh 0.025 70,000 1,750.00- Mandor Oh 0.00125 70,000 87.50

Jumlah Upah TenagaJumlah Total

Page 117: RAB 2009

117

document.xls - 2-AHSP Hal - 117

NO. URAIAN SAT KUANTITAS SUB TOTAL (Rp)

1 2 3 4 5 6

HARGA SAT. DASAR (Rp)

Dibulatkan

13. Pasang talang miring, seng BJLS 25 (0,25 mm) tiap 1 m'

Harga bahan:- Seng plat 3x6 ft BJLS 25 (0,25 mm) Lbr 0.5 31,968 15,983.75- Paku biasa 1/2"- 1" kg 0.015 9,928 148.91- Kayu Kelas II Papan m³ 0.019 6,695,000 127,205.00- Cat meni besi kg 0.3 14,250 4,275.00

Jumlah Harga BahanUpah tenaga:- Pekerja Oh 0.04 45,000 1,800.00- Tukang kayu Oh 0.4 65,000 26,000.00- Kepala tukang Oh 0.025 70,000 1,750.00- Mandor Oh 0.00125 70,000 87.50

Jumlah Upah TenagaJumlah Total

Dibulatkan

14. Pasang talang 1/2 lingkaran D-10 cm, seng BJLS 25 (0,25 mm) tiap 1 m'

Harga bahan:- Seng plat 3x6 ft BJLS 25 (0,25 mm) Lbr 0.3 31,968 9,590.25- Paku biasa 1/2"- 1" kg 0.1 9,928 992.75- Kayu Kelas II Papan m³ 0.019 6,695,000 127,205.00- Besi pelat strip kg 0.5 7,838 3,918.75

Jumlah Harga BahanUpah tenaga:- Pekerja Oh 0.15 45,000 6,750.00- Tukang kayu Oh 0.25 65,000 16,250.00- Kepala tukang Oh 0.025 70,000 1,750.00- Mandor Oh 0.00125 70,000 87.50

Jumlah Upah TenagaJumlah Total

Dibulatkan

N PEKERJAAN KUNCI DAN KACA

1. Pasang 1 buah kunci tanam antik

Harga bahan:- Kunci tanam antik bh 1 178,125 178,125.00

Jumlah Harga BahanUpah tenaga:- Pekerja Oh 0.06 45,000 2,700.00- Tukang kayu Oh 0.6 65,000 39,000.00- Kepala tukang Oh 0.06 70,000 4,200.00- Mandor Oh 0.003 70,000 210.00

Jumlah Upah TenagaJumlah Total

Dibulatkan

Page 118: RAB 2009

118

document.xls - 2-AHSP Hal - 118

NO. URAIAN SAT KUANTITAS SUB TOTAL (Rp)

1 2 3 4 5 6

HARGA SAT. DASAR (Rp)

2. Pasang 1 buah kunci tanam sederhana

Harga bahan:- Kunci tanam sederhana bh 1 85,250 85,250.00

Jumlah Harga BahanUpah tenaga:- Pekerja Oh 0.01 45,000 450.00- Tukang kayu Oh 0.5 65,000 32,500.00- Kepala tukang Oh 0.01 70,000 700.00- Mandor Oh 0.0005 70,000 35.00

Jumlah Upah TenagaJumlah Total

Dibulatkan

3. Pasang 1 buah kunci tanam biasa

Harga bahan:- Kunci tanam biasa bh 1 128,750 128,750.00

Jumlah Harga BahanUpah tenaga:- Pekerja Oh 0.01 45,000 450.00- Tukang kayu Oh 0.5 65,000 32,500.00- Kepala tukang Oh 0.01 70,000 700.00- Mandor Oh 0.0005 70,000 35.00

Jumlah Upah TenagaJumlah Total

Dibulatkan

4. Pasang 1 buah kunci tanam KM

Harga bahan:- Kunci tanam KM bh 1 57,000 57,000.00

Jumlah Harga BahanUpah tenaga:- Pekerja Oh 0.005 45,000 225.00- Tukang kayu Oh 0.5 65,000 32,500.00- Kepala tukang Oh 0.005 70,000 350.00- Mandor Oh 0.00025 70,000 17.50

Jumlah Upah TenagaJumlah Total

Dibulatkan

5. Pasang 1 buah kunci silinder

Harga bahan:- Kunci silinder bh 1 365,750 365,750.00

Jumlah Harga BahanUpah tenaga:- Pekerja Oh 0.005 45,000 225.00- Tukang kayu Oh 0.5 65,000 32,500.00- Kepala tukang Oh 0.005 70,000 350.00- Mandor Oh 0.00025 70,000 17.50

Jumlah Upah TenagaJumlah Total

Dibulatkan

6. Pasang 1 buah engsel pintu biasa/sederhana

Harga bahan:- Engsel pintu biasa/sederhana bh 1 10,688 10,687.50

Jumlah Harga BahanUpah tenaga:- Pekerja Oh 0.015 45,000 675.00- Tukang kayu Oh 0.15 65,000 9,750.00- Kepala tukang Oh 0.015 70,000 1,050.00- Mandor Oh 0.00075 70,000 52.50

Jumlah Upah TenagaJumlah Total

Dibulatkan

7. Pasang 1 buah engsel pintu kuningan/stainless

Harga bahan:- Engsel pintu kuningan/stainless bh 1 28,500 28,500.00

Jumlah Harga BahanUpah tenaga:

Page 119: RAB 2009

119

document.xls - 2-AHSP Hal - 119

NO. URAIAN SAT KUANTITAS SUB TOTAL (Rp)

1 2 3 4 5 6

HARGA SAT. DASAR (Rp)

- Pekerja Oh 0.015 45,000 675.00- Tukang kayu Oh 0.15 65,000 9,750.00- Kepala tukang Oh 0.015 70,000 1,050.00- Mandor Oh 0.00075 70,000 52.50

Jumlah Upah TenagaJumlah Total

Dibulatkan

8. Pasang 1 buah engsel jendela kupu-kupu

Harga bahan:- Engsel jendela bh 1 12,588 12,587.50

Jumlah Harga BahanUpah tenaga:- Pekerja Oh 0.01 45,000 450.00- Tukang kayu Oh 0.1 65,000 6,500.00- Kepala tukang Oh 0.01 70,000 700.00- Mandor Oh 0.0005 70,000 35.00

Jumlah Upah TenagaJumlah Total

Dibulatkan

9. Pasang 1 buah engsel angin

Harga bahan:- Engsel angin bh 1 12,500 12,500.00

Jumlah Harga BahanUpah tenaga:- Pekerja Oh 0.02 45,000 900.00- Tukang kayu Oh 0.2 65,000 13,000.00- Kepala tukang Oh 0.02 70,000 1,400.00- Mandor Oh 0.001 70,000 70.00

Jumlah Upah TenagaJumlah Total

Dibulatkan

10. Pasang 1 buah spring knip

Harga bahan:- Spring knip bh 1 10,000 10,000.00

Jumlah Harga BahanUpah tenaga:- Pekerja Oh 0.015 45,000 675.00- Tukang kayu Oh 0.15 65,000 9,750.00- Kepala tukang Oh 0.015 70,000 1,050.00- Mandor Oh 0.00075 70,000 52.50

Jumlah Upah TenagaJumlah Total

Dibulatkan

Page 120: RAB 2009

120

document.xls - 2-AHSP Hal - 120

NO. URAIAN SAT KUANTITAS SUB TOTAL (Rp)

1 2 3 4 5 6

HARGA SAT. DASAR (Rp)

11. Pasang 1 buah kait angin

Harga bahan:- Kait angin bh 1 14,250 14,250.00

Jumlah Harga BahanUpah tenaga:- Pekerja Oh 0.015 45,000 675.00- Tukang kayu Oh 0.15 65,000 9,750.00- Kepala tukang Oh 0.015 70,000 1,050.00- Mandor Oh 0.00075 70,000 52.50

Jumlah Upah TenagaJumlah Total

Dibulatkan

12. Pasang 1 buah door closer

Harga bahan:- Door closer bh 1 237,500 237,500.00

Jumlah Harga BahanUpah tenaga:- Pekerja Oh 0.05 45,000 2,250.00- Tukang kayu Oh 0.5 65,000 32,500.00- Kepala tukang Oh 0.05 70,000 3,500.00- Mandor Oh 0.0025 70,000 175.00

Jumlah Upah TenagaJumlah Total

Dibulatkan

13. Pasang 1 buah kunci selot

Harga bahan:- Kunci selot bh 1 8,788 8,787.50

Jumlah Harga BahanUpah tenaga:- Pekerja Oh 0.02 45,000 900.00- Tukang kayu Oh 0.2 65,000 13,000.00- Kepala tukang Oh 0.02 70,000 1,400.00- Mandor Oh 0.001 70,000 70.00

Jumlah Upah TenagaJumlah Total

Dibulatkan

14. Pasang 1 buah pegangan pintu/door holder

Harga bahan:- Door holder bh 1 100,000 100,000.00

Jumlah Harga BahanUpah tenaga:- Pekerja Oh 0.05 45,000 2,250.00- Tukang kayu Oh 0.5 65,000 32,500.00- Kepala tukang Oh 0.05 70,000 3,500.00- Mandor Oh 0.0025 70,000 175.00

Jumlah Upah TenagaJumlah Total

Dibulatkan

15. Pasang 1 buah door stop

Harga bahan:- Door stop bh 1 45,000 45,000.00

Jumlah Harga BahanUpah tenaga:- Pekerja Oh 0.01 45,000 450.00- Tukang kayu Oh 0.1 65,000 6,500.00- Kepala tukang Oh 0.01 70,000 700.00- Mandor Oh 0.0005 70,000 35.00

Jumlah Upah TenagaJumlah Total

Dibulatkan

16. Pasang 1 buah rel pintu dorong

Harga bahan:- Rel pintu dorong bh 1 1,250,000 1,250,000.00

Jumlah Harga BahanUpah tenaga:

Page 121: RAB 2009

121

document.xls - 2-AHSP Hal - 121

NO. URAIAN SAT KUANTITAS SUB TOTAL (Rp)

1 2 3 4 5 6

HARGA SAT. DASAR (Rp)

- Pekerja Oh 0.06 45,000 2,700.00- Tukang kayu Oh 0.6 65,000 39,000.00- Kepala tukang Oh 0.06 70,000 4,200.00- Mandor Oh 0.003 70,000 210.00

Jumlah Upah TenagaJumlah Total

Dibulatkan

Page 122: RAB 2009

122

document.xls - 2-AHSP Hal - 122

NO. URAIAN SAT KUANTITAS SUB TOTAL (Rp)

1 2 3 4 5 6

HARGA SAT. DASAR (Rp)

17. Pasang kaca tebal 3 mm tiap 1 m²

Harga bahan:- Kaca 3 mm m² 1.1 175,100 192,610.00

Jumlah Harga BahanUpah tenaga:- Pekerja Oh 0.015 45,000 675.00- Tukang kayu Oh 0.15 65,000 9,750.00- Kepala tukang Oh 0.015 70,000 1,050.00- Mandor Oh 0.00075 70,000 52.50

Jumlah Upah TenagaJumlah Total

Dibulatkan

18. Pasang kaca es tebal 3 mm tiap 1 m²

Harga bahan:- Kaca es 3 mm m² 1.1 59,000 64,900.00

Jumlah Harga BahanUpah tenaga:- Pekerja Oh 0.015 45,000 675.00- Tukang kayu Oh 0.15 65,000 9,750.00- Kepala tukang Oh 0.015 70,000 1,050.00- Mandor Oh 0.00075 70,000 52.50

Jumlah Upah TenagaJumlah Total

Dibulatkan

19. Pasang kaca tebal 5 mm tiap 1 m²

Harga bahan:- Kaca 5 mm m² 1.1 195,700 215,270.00

Jumlah Harga BahanUpah tenaga:- Pekerja Oh 0.015 45,000 675.00- Tukang kayu Oh 0.15 65,000 9,750.00- Kepala tukang Oh 0.015 70,000 1,050.00- Mandor Oh 0.00075 70,000 52.50

Jumlah Upah TenagaJumlah Total

Dibulatkan

20. Pasang kaca es tebal 5 mm tiap 1 m²

Harga bahan:- Kaca es 5 mm m² 1.1 80,000 88,000.00

Jumlah Harga BahanUpah tenaga:- Pekerja Oh 0.015 45,000 675.00- Tukang kayu Oh 0.15 65,000 9,750.00- Kepala tukang Oh 0.015 70,000 1,050.00- Mandor Oh 0.00075 70,000 52.50

Jumlah Upah TenagaJumlah Total

Dibulatkan

21. Pasang kaca rayben tebal 5 mm tiap 1 m²

Harga bahan:- Kaca rayben 5 mm m² 1.1 92,000 101,200.00

Jumlah Harga BahanUpah tenaga:- Pekerja Oh 0.015 45,000 675.00- Tukang kayu Oh 0.15 65,000 9,750.00- Kepala tukang Oh 0.015 70,000 1,050.00- Mandor Oh 0.00075 70,000 52.50

Jumlah Upah TenagaJumlah Total

Dibulatkan

22. Pasang kaca tebal 8 mm tiap 1 m²

Harga bahan:- Kaca 8 mm m² 1.1 117,333 129,066.30

Jumlah Harga BahanUpah tenaga:

Page 123: RAB 2009

123

document.xls - 2-AHSP Hal - 123

NO. URAIAN SAT KUANTITAS SUB TOTAL (Rp)

1 2 3 4 5 6

HARGA SAT. DASAR (Rp)

- Pekerja Oh 0.0165 45,000 742.50- Tukang kayu Oh 0.165 65,000 10,725.00- Kepala tukang Oh 0.0165 70,000 1,155.00- Mandor Oh 0.0008 70,000 56.00

Jumlah Upah TenagaJumlah Total

Dibulatkan

23. Pasang kaca rayben tebal 8 mm tiap 1 m²

Harga bahan:- Kaca rayben 8 mm m² 1.1 215,666 237,232.60

Jumlah Harga BahanUpah tenaga:- Pekerja Oh 0.0165 45,000 742.50- Tukang kayu Oh 0.165 65,000 10,725.00- Kepala tukang Oh 0.0165 70,000 1,155.00- Mandor Oh 0.0008 70,000 56.00

Jumlah Upah TenagaJumlah Total

Dibulatkan

24. Pasang kaca rayben tebal 10 mm tiap 1 m²

Harga bahan:- Kaca rayben 10 mm m² 1.1 296,000 325,600.00

Jumlah Harga BahanUpah tenaga:- Pekerja Oh 0.0165 45,000 742.50- Tukang kayu Oh 0.165 65,000 10,725.00- Kepala tukang Oh 0.0165 70,000 1,155.00- Mandor Oh 0.0008 70,000 56.00

Jumlah Upah TenagaJumlah Total

Dibulatkan

25. Pasang kaca rayben tebal 12 mm tiap 1 m²

Harga bahan:- Kaca rayben 12 mm m² 1.1 357,500 393,250.00

Jumlah Harga BahanUpah tenaga:- Pekerja Oh 0.025 45,000 1,125.00- Tukang kayu Oh 0.25 65,000 16,250.00- Kepala tukang Oh 0.025 70,000 1,750.00- Mandor Oh 0.00125 70,000 87.50

Jumlah Upah TenagaJumlah Total

Dibulatkan

O PEKERJAAN PENUTUP LANTAI DAN DINDING

1. Pasang lantai ubin pc abu-abu ukuran 40 x 40 cm tiap 1m²

Harga bahan:- Ubin pc abu-abu 40 x 40 bh 6.625 0.00- Semen portland kg 9.8 1,240 12,152.00- Pasir pasang m³ 0.0215 110,000 2,365.00

Jumlah Harga BahanUpah tenaga:- Pekerja Oh 0.25 45,000 11,250.00- Tukang batu Oh 0.12 65,000 7,800.00- Kepala tukang Oh 0.012 70,000 840.00- Mandor Oh 0.0125 70,000 875.00

Jumlah Upah TenagaJumlah Total

Dibulatkan

2. Pasang lantai ubin pc abu-abu ukuran 30 x 30 cm tiap 1m²

Harga bahan:- Ubin pc abu-abu 30 x 30 bh 11.778 0.00- Semen portland kg 10 1,240 12,400.00- Pasir pasang m³ 0.0215 110,000 2,365.00

Jumlah Harga Bahan

Page 124: RAB 2009

124

document.xls - 2-AHSP Hal - 124

NO. URAIAN SAT KUANTITAS SUB TOTAL (Rp)

1 2 3 4 5 6

HARGA SAT. DASAR (Rp)

Upah tenaga:- Pekerja Oh 0.26 45,000 11,700.00- Tukang batu Oh 0.125 65,000 8,125.00- Kepala tukang Oh 0.0125 70,000 875.00- Mandor Oh 0.013 70,000 910.00

Jumlah Upah TenagaJumlah Total

Dibulatkan

3. Pasang lantai ubin pc abu-abu ukuran 20 x 20 cm tiap 1m²

Harga bahan:- Ubin pc abu-abu 20 x 20 bh 26.5 0.00- Semen portland kg 10.4 1,240 12,896.00- Pasir pasang m³ 0.0215 110,000 2,365.00

Jumlah Harga BahanUpah tenaga:- Pekerja Oh 0.27 45,000 12,150.00- Tukang batu Oh 0.13 65,000 8,450.00- Kepala tukang Oh 0.013 70,000 910.00- Mandor Oh 0.0135 70,000 945.00

Jumlah Upah TenagaJumlah Total

Dibulatkan

4. Pasang lantai ubin pc warna ukuran 40 x 40 cm tiap 1m²

Harga bahan:- Ubin pc warna 40 x 40 bh 6.625 0.00- Semen portland kg 8.16 1,240 10,118.40- Pasir pasang m³ 0.023 110,000 2,530.00- Semen portland warna kg 0.9 2,525 2,272.50

Jumlah Harga BahanUpah tenaga:- Pekerja Oh 0.25 45,000 11,250.00- Tukang batu Oh 0.12 65,000 7,800.00- Kepala tukang Oh 0.012 70,000 840.00- Mandor Oh 0.0125 70,000 875.00

Jumlah Upah TenagaJumlah Total

Dibulatkan

5. Pasang lantai ubin pc warna ukuran 30 x 30 cm tiap 1m²

Harga bahan:- Ubin pc warna 30 x 30 bh 11.778 0.00- Semen portland kg 8.36 1,240 10,366.40- Pasir pasang m³ 0.023 110,000 2,530.00- Semen portland warna kg 0.9 2,525 2,272.50

Jumlah Harga BahanUpah tenaga:- Pekerja Oh 0.26 45,000 11,700.00- Tukang batu Oh 0.125 65,000 8,125.00- Kepala tukang Oh 0.0125 70,000 875.00- Mandor Oh 0.013 70,000 910.00

Jumlah Upah TenagaJumlah Total

Dibulatkan

6. Pasang lantai ubin pc warna ukuran 20 x 20 cm tiap 1m²

Harga bahan:- Ubin pc warna 20 x 20 bh 26.5 0.00- Semen portland kg 8.76 1,240 10,862.40- Pasir pasang m³ 0.023 110,000 2,530.00- Semen portland warna kg 0.9 2,525 2,272.50

Jumlah Harga BahanUpah tenaga:- Pekerja Oh 0.27 45,000 12,150.00- Tukang batu Oh 0.13 65,000 8,450.00- Kepala tukang Oh 0.013 70,000 910.00- Mandor Oh 0.0135 70,000 945.00

Jumlah Upah Tenaga

Page 125: RAB 2009

125

document.xls - 2-AHSP Hal - 125

NO. URAIAN SAT KUANTITAS SUB TOTAL (Rp)

1 2 3 4 5 6

HARGA SAT. DASAR (Rp)

Jumlah TotalDibulatkan

7. Pasang plint ubin pc abu-abu ukuran 10 x 40 cm tiap 1m'

Harga bahan:- Plint ubin pc 10 x 40 bh 2.65 0.00- Semen portland kg 1.56 1,240 1,934.40- Pasir pasang m³ 0.003 110,000 330.00

Jumlah Harga BahanUpah tenaga:- Pekerja Oh 0.06 45,000 2,700.00- Tukang batu Oh 0.03 65,000 1,950.00- Kepala tukang Oh 0.003 70,000 210.00- Mandor Oh 0.003 70,000 210.00

Jumlah Upah TenagaJumlah Total

Dibulatkan

8. Pasang plint ubin pc abu-abu ukuran 10 x 30 cm tiap 1m'

Harga bahan:- Plint ubin pc 10 x 30 bh 3.53 0.00- Semen portland kg 1.56 1,240 1,934.40- Pasir pasang m³ 0.003 110,000 330.00

Jumlah Harga BahanUpah tenaga:- Pekerja Oh 0.06 45,000 2,700.00- Tukang batu Oh 0.03 65,000 1,950.00- Kepala tukang Oh 0.003 70,000 210.00- Mandor Oh 0.003 70,000 210.00

Jumlah Upah TenagaJumlah Bahan & Tenaga

Dibulatkan

9. Pasang plint ubin pc abu-abu ukuran 15 x 20 cm tiap 1m'

Harga bahan:- Plint ubin pc 15 x 20 bh 5.3 0.00- Semen portland kg 1.56 1,240 1,934.40- Pasir pasang m³ 0.004 110,000 440.00

Jumlah Harga BahanUpah tenaga:- Pekerja Oh 0.06 45,000 2,700.00- Tukang batu Oh 0.03 65,000 1,950.00- Kepala tukang Oh 0.003 70,000 210.00- Mandor Oh 0.003 70,000 210.00

Jumlah Upah TenagaJumlah Total

Dibulatkan

10. Pasang plint ubin pc warna ukuran 10 x 40 cm tiap 1m'

Harga bahan:- Plint ubin pc warna 10 x 40 bh 2.65 0.00- Semen portland kg 1.2 1,240 1,488.00- Pasir pasang m³ 0.003 110,000 330.00- Semen portland warna kg 0.1 2,525 252.50

Jumlah Harga BahanUpah tenaga:- Pekerja Oh 0.08 45,000 3,600.00- Tukang batu Oh 0.04 65,000 2,600.00- Kepala tukang Oh 0.004 70,000 280.00- Mandor Oh 0.004 70,000 280.00

Jumlah Upah Tenaga0.06 Jumlah Total

0.003 Dibulatkan

11. Pasang plint ubin pc warna ukuran 10 x 30 cm tiap 1m'

Harga bahan:- Plint ubin pc warna 10 x 30 bh 3.53 0.00- Semen portland kg 1.65 1,240 2,046.00- Pasir pasang m³ 0.0032 110,000 352.00- Semen portland warna kg 0.1 2,525 252.50

Page 126: RAB 2009

126

document.xls - 2-AHSP Hal - 126

NO. URAIAN SAT KUANTITAS SUB TOTAL (Rp)

1 2 3 4 5 6

HARGA SAT. DASAR (Rp)

Jumlah Harga BahanUpah tenaga:- Pekerja Oh 0.06 45,000 2,700.00- Tukang batu Oh 0.03 65,000 1,950.00- Kepala tukang Oh 0.003 70,000 210.00- Mandor Oh 0.003 70,000 210.00

Jumlah Upah TenagaJumlah Total

Dibulatkan

12. Pasang plint ubin pc warna ukuran 10 x 20 cm tiap 1m'

Harga bahan:- Plint ubin pc warna 10 x 20 bh 5.3 0.00- Semen portland kg 1.2 1,240 1,488.00- Pasir pasang m³ 0.003 110,000 330.00- Semen portland warna kg 0.19 2,525 479.75

Jumlah Harga BahanUpah tenaga:- Pekerja Oh 0.06 45,000 2,700.00- Tukang batu Oh 0.03 65,000 1,950.00- Kepala tukang Oh 0.003 70,000 210.00- Mandor Oh 0.003 70,000 210.00

Jumlah Upah TenagaJumlah Total

Dibulatkan

13. Pasang lantai keramik ukuran 40 x 40 cm granito tile tiap 1m²

Harga bahan:- Ubin keramik 40 x 40 cm granito tile bh 6.25 0.00- Semen portland kg 11.38 1,240 14,111.20- Pasir pasang m³ 0.042 110,000 4,620.00- Semen portland warna kg 1.5 2,525 3,787.50

Jumlah Harga BahanUpah tenaga:- Pekerja Oh 0.62 45,000 27,900.00- Tukang batu Oh 0.35 65,000 22,750.00- Kepala tukang Oh 0.035 70,000 2,450.00- Mandor Oh 0.03 70,000 2,100.00

Jumlah Upah TenagaJumlah Total

Dibulatkan

14. Pasang lantai keramik ukuran 40 x 40 cm Roman tiap 1m²

Harga bahan:- Ubin keramik 40 x 40 cm Roman bh 6.25 9,771 61,067.19- Semen portland kg 11.38 1,240 14,111.20- Pasir pasang m³ 0.042 110,000 4,620.00- Semen portland warna kg 1.5 2,525 3,787.50

Jumlah Harga BahanUpah tenaga:- Pekerja Oh 0.62 45,000 27,900.00- Tukang batu Oh 0.35 65,000 22,750.00- Kepala tukang Oh 0.035 70,000 2,450.00- Mandor Oh 0.03 70,000 2,100.00

Jumlah Upah TenagaJumlah Total

Dibulatkan

15. Pasang lantai keramik ukuran 40 x 40 cm KW 2 tiap 1m²

Harga bahan:- Ubin keramik 40 x 40 cm KW 2 bh 6.25 8,571 53,568.75- Semen portland kg 11.38 1,240 14,111.20- Pasir pasang m³ 0.042 110,000 4,620.00- Semen portland warna kg 1.5 2,525 3,787.50

Jumlah Harga BahanUpah tenaga:- Pekerja Oh 0.62 45,000 27,900.00- Tukang batu Oh 0.35 65,000 22,750.00- Kepala tukang Oh 0.035 70,000 2,450.00

Page 127: RAB 2009

127

document.xls - 2-AHSP Hal - 127

NO. URAIAN SAT KUANTITAS SUB TOTAL (Rp)

1 2 3 4 5 6

HARGA SAT. DASAR (Rp)

- Mandor Oh 0.03 70,000 2,100.00Jumlah Upah Tenaga

Jumlah TotalDibulatkan

16. Pasang lantai keramik ukuran 30 x 30 cm granito tile tiap 1m²

Harga bahan:- Ubin keramik 30 x 30 cm granito tile bh 11.12 14,250 158,460.00- Semen portland kg 11.38 1,240 14,111.20- Pasir pasang m³ 0.042 110,000 4,620.00- Semen portland warna kg 1.5 2,525 3,787.50

Jumlah Harga BahanUpah tenaga:- Pekerja Oh 0.62 45,000 27,900.00- Tukang batu Oh 0.35 65,000 22,750.00- Kepala tukang Oh 0.035 70,000 2,450.00- Mandor Oh 0.03 70,000 2,100.00

Jumlah Upah TenagaJumlah Total

Dibulatkan

17. Pasang lantai keramik ukuran 30 x 30 cm Roman tiap 1m²

Harga bahan:- Ubin keramik 30 x 30 cm Roman bh 11.12 5,441 60,500.03- Semen portland kg 11.38 1,240 14,111.20- Pasir pasang m³ 0.042 110,000 4,620.00- Semen portland warna kg 1.5 2,525 3,787.50

Jumlah Harga BahanUpah tenaga:- Pekerja Oh 0.62 45,000 27,900.00- Tukang batu Oh 0.35 65,000 22,750.00- Kepala tukang Oh 0.035 70,000 2,450.00- Mandor Oh 0.03 70,000 2,100.00

Jumlah Upah TenagaJumlah Total

Dibulatkan

Page 128: RAB 2009

128

document.xls - 2-AHSP Hal - 128

NO. URAIAN SAT KUANTITAS SUB TOTAL (Rp)

1 2 3 4 5 6

HARGA SAT. DASAR (Rp)

18. Pasang lantai keramik ukuran 30 x 30 cm KW 2 tiap 1m²

Harga bahan:- Ubin keramik 30 x 30 cm KW 2 bh 11.12 4,522 50,284.64- Semen portland kg 11.38 1,240 14,111.20- Pasir pasang m³ 0.042 110,000 4,620.00- Semen portland warna kg 1.5 2,525 3,787.50

Jumlah Harga BahanUpah tenaga:- Pekerja Oh 0.62 45,000 27,900.00- Tukang batu Oh 0.35 65,000 22,750.00- Kepala tukang Oh 0.035 70,000 2,450.00- Mandor Oh 0.03 70,000 2,100.00

Jumlah Upah TenagaJumlah Total

Dibulatkan

19. Pasang lantai keramik ukuran 20 x 20 cm Roman tiap 1m²

Harga bahan:- Ubin keramik 20 x 20 cm Roman bh 25 2,394 59,850.00- Semen portland kg 11.38 1,240 14,111.20- Pasir pasang m³ 0.042 110,000 4,620.00- Semen portland warna kg 1.5 2,525 3,787.50

Jumlah Harga BahanUpah tenaga:- Pekerja Oh 0.62 45,000 27,900.00- Tukang batu Oh 0.35 65,000 22,750.00- Kepala tukang Oh 0.035 70,000 2,450.00- Mandor Oh 0.03 70,000 2,100.00

Jumlah Upah TenagaJumlah Total

Dibulatkan

20. Pasang lantai keramik ukuran 20 x 20 cm KW 2 tiap 1m²

Harga bahan:- Ubin keramik 20 x 20 cm KW 2 bh 25 2,040 51,000.00- Semen portland kg 11.38 1,240 14,111.20- Pasir pasang m³ 0.042 110,000 4,620.00- Semen portland warna kg 1.5 2,525 3,787.50

Jumlah Harga BahanUpah tenaga:- Pekerja Oh 0.62 45,000 27,900.00- Tukang batu Oh 0.35 65,000 22,750.00- Kepala tukang Oh 0.035 70,000 2,450.00- Mandor Oh 0.03 70,000 2,100.00

Jumlah Upah TenagaJumlah Total

Dibulatkan

21. Pasang lantai keramik ukuran 10 x 20 cm Roman tiap 1 m²

Harga bahan:- Ubin keramik 10 x 20 cm Roman bh 50 1,188 59,375.00- Semen portland kg 11.38 1,240 14,111.20- Pasir pasang m³ 0.042 110,000 4,620.00- Semen portland warna kg 1.5 2,525 3,787.50

Jumlah Harga BahanUpah tenaga:- Pekerja Oh 0.62 45,000 27,900.00- Tukang batu Oh 0.35 65,000 22,750.00- Kepala tukang Oh 0.035 70,000 2,450.00- Mandor Oh 0.03 70,000 2,100.00

Jumlah Upah TenagaJumlah Total

Dibulatkan

22. Pasang lantai keramik ukuran 10 x 20 cm KW 2 tiap 1 m²

Harga bahan:- Ubin keramik 10 x 20 cm KW 2 bh 50 1,000 50,000.00- Semen portland kg 11.38 1,240 14,111.20- Pasir pasang m³ 0.042 110,000 4,620.00

Page 129: RAB 2009

129

document.xls - 2-AHSP Hal - 129

NO. URAIAN SAT KUANTITAS SUB TOTAL (Rp)

1 2 3 4 5 6

HARGA SAT. DASAR (Rp)

- Semen portland warna kg 1.5 2,525 3,787.50Jumlah Harga Bahan

Upah tenaga:- Pekerja Oh 0.62 45,000 27,900.00- Tukang batu Oh 0.35 65,000 22,750.00- Kepala tukang Oh 0.035 70,000 2,450.00- Mandor Oh 0.03 70,000 2,100.00

Jumlah Upah TenagaJumlah Total

Dibulatkan

23. Pasang lantai keramik ukuran 5 x 20 cm Roman tiap 1 m²

Harga bahan:- Ubin keramik 5 x 20 cm Roman bh 100 11,875 1,187,500.00- Semen portland kg 11.38 1,240 14,111.20- Pasir pasang m³ 0.042 110,000 4,620.00- Semen portland warna kg 1.5 2,525 3,787.50

Jumlah Harga BahanUpah tenaga:- Pekerja Oh 0.62 45,000 27,900.00- Tukang batu Oh 0.35 65,000 22,750.00- Kepala tukang Oh 0.035 70,000 2,450.00- Mandor Oh 0.03 70,000 2,100.00

Jumlah Upah TenagaJumlah Total

Dibulatkan

24. Pasang lantai keramik ukuran 5 x 20 cm KW 2 tiap 1 m²

Harga bahan:- Ubin keramik 5 x 20 cm KW 2 bh 100 9,000 900,000.00- Semen portland kg 11.38 1,240 14,111.20- Pasir pasang m³ 0.042 110,000 4,620.00- Semen portland warna kg 1.5 2,525 3,787.50

Jumlah Harga BahanUpah tenaga:- Pekerja Oh 0.62 45,000 27,900.00- Tukang batu Oh 0.35 65,000 22,750.00- Kepala tukang Oh 0.035 70,000 2,450.00- Mandor Oh 0.03 70,000 2,100.00

Jumlah Upah TenagaJumlah Total

Dibulatkan

25. Pasang plint keramik ukuran 10 x 40 cm granito tile tiap 1m'

Harga bahan:- Ubin keramik 40 x 40 cm granito tile bh 0.75 0.00- Semen portland kg 1.65 1,240 2,046.00- Pasir pasang m³ 0.0032 110,000 352.00- Semen portland warna kg 0.1 2,525 252.50

Jumlah Harga BahanUpah tenaga:- Pekerja Oh 0.09 45,000 4,050.00- Tukang batu Oh 0.09 65,000 5,850.00- Kepala tukang Oh 0.009 70,000 630.00- Mandor Oh 0.0045 70,000 315.00

Jumlah Upah TenagaJumlah Total

Dibulatkan

26. Pasang plint keramik ukuran 10 x 40 cm Roman tiap 1m'

Harga bahan:- Ubin keramik 40 x 40 cm Roman bh 0.75 9,771 7,328.06- Semen portland kg 1.65 1,240 2,046.00- Pasir pasang m³ 0.0032 110,000 352.00- Semen portland warna kg 0.1 2,525 252.50

Jumlah Harga BahanUpah tenaga:- Pekerja Oh 0.09 45,000 4,050.00- Tukang batu Oh 0.09 65,000 5,850.00

Page 130: RAB 2009

130

document.xls - 2-AHSP Hal - 130

NO. URAIAN SAT KUANTITAS SUB TOTAL (Rp)

1 2 3 4 5 6

HARGA SAT. DASAR (Rp)

- Kepala tukang Oh 0.009 70,000 630.00- Mandor Oh 0.0045 70,000 315.00

Jumlah Upah TenagaJumlah Total

Dibulatkan

27. Pasang plint keramik ukuran 10 x 40 cm KW 2 tiap 1m'

Harga bahan:- Ubin keramik 40 x 40 cm KW 2 bh 0.75 8,571 6,428.25- Semen portland kg 1.65 1,240 2,046.00- Pasir pasang m³ 0.0032 110,000 352.00- Semen portland warna kg 0.1 2,525 252.50

Jumlah Harga BahanUpah tenaga:- Pekerja Oh 0.09 45,000 4,050.00- Tukang batu Oh 0.09 65,000 5,850.00- Kepala tukang Oh 0.009 70,000 630.00- Mandor Oh 0.0045 70,000 315.00

Jumlah Upah TenagaJumlah Total

Dibulatkan

28. Pasang plint keramik ukuran 10 x 30 cm granito tile tiap 1m'

Harga bahan:- Ubin keramik 30 x 30 cm granito tile bh 1.33 14,250 18,952.50- Semen portland kg 1.65 1,240 2,046.00- Pasir pasang m³ 0.0032 110,000 352.00- Semen portland warna kg 0.1 2,525 252.50

Jumlah Harga BahanUpah tenaga:- Pekerja Oh 0.09 45,000 4,050.00- Tukang batu Oh 0.09 65,000 5,850.00- Kepala tukang Oh 0.009 70,000 630.00- Mandor Oh 0.0045 70,000 315.00

Jumlah Upah TenagaJumlah Total

Dibulatkan

29. Pasang plint keramik ukuran 10 x 30 cm Roman tiap 1m'

Harga bahan:- Ubin keramik 30 x 30 cm Roman bh 1.33 5,441 7,236.06- Semen portland kg 1.65 1,240 2,046.00- Pasir pasang m³ 0.0032 110,000 352.00- Semen portland warna kg 0.1 2,525 252.50

Jumlah Harga BahanUpah tenaga:- Pekerja Oh 0.09 45,000 4,050.00- Tukang batu Oh 0.09 65,000 5,850.00- Kepala tukang Oh 0.009 70,000 630.00- Mandor Oh 0.0045 70,000 315.00

Jumlah Upah TenagaJumlah Total

Dibulatkan

30. Pasang plint keramik ukuran 10 x 30 cm KW 2 tiap 1m'

Harga bahan:- Ubin keramik 30 x 30 cm KW 2 bh 1.33 4,522 6,014.26- Semen portland kg 1.65 1,240 2,046.00- Pasir pasang m³ 0.0032 110,000 352.00- Semen portland warna kg 0.1 2,525 252.50

Jumlah Harga BahanUpah tenaga:- Pekerja Oh 0.09 45,000 4,050.00- Tukang batu Oh 0.09 65,000 5,850.00- Kepala tukang Oh 0.009 70,000 630.00- Mandor Oh 0.0045 70,000 315.00

Jumlah Upah TenagaJumlah Total

Dibulatkan

Page 131: RAB 2009

131

document.xls - 2-AHSP Hal - 131

NO. URAIAN SAT KUANTITAS SUB TOTAL (Rp)

1 2 3 4 5 6

HARGA SAT. DASAR (Rp)

31. Pasang plint keramik ukuran 10 x 20 cm Roman tiap 1m'

Harga bahan:- Ubin keramik 10 x 20 cm Roman bh 5 1,188 5,937.50- Semen portland kg 1.65 1,240 2,046.00- Pasir pasang m³ 0.0032 110,000 352.00- Semen portland warna kg 0.1 2,525 252.50

Jumlah Harga BahanUpah tenaga:- Pekerja Oh 0.09 45,000 4,050.00- Tukang batu Oh 0.09 65,000 5,850.00- Kepala tukang Oh 0.009 70,000 630.00- Mandor Oh 0.0045 70,000 315.00

Jumlah Upah TenagaJumlah Total

Dibulatkan

32. Pasang plint keramik ukuran 10 x 20 cm KW 2 tiap 1m'

Harga bahan:- Ubin keramik 10 x 20 cm KW 2 bh 5 1,000 5,000.00- Semen portland kg 1.65 1,240 2,046.00- Pasir pasang m³ 0.0032 110,000 352.00- Semen portland warna kg 0.1 2,525 252.50

Jumlah Harga BahanUpah tenaga:- Pekerja Oh 0.09 45,000 4,050.00- Tukang batu Oh 0.09 65,000 5,850.00- Kepala tukang Oh 0.009 70,000 630.00- Mandor Oh 0.0045 70,000 315.00

Jumlah Upah TenagaJumlah Total

Dibulatkan

33. Pasang plint keramik ukuran 5 x 20 cm Roman tiap 1m'

Harga bahan:- Ubin keramik 5 x 20 cm Roman bh 5 11,875 59,375.00- Semen portland kg 0.85 1,240 1,054.00- Pasir pasang m³ 0.0022 110,000 242.00- Semen portland warna kg 0.08 2,525 202.00

Jumlah Harga BahanUpah tenaga:- Pekerja Oh 0.09 45,000 4,050.00- Tukang batu Oh 0.09 65,000 5,850.00- Kepala tukang Oh 0.009 70,000 630.00- Mandor Oh 0.0045 70,000 315.00

Jumlah Upah TenagaJumlah Total

Dibulatkan

34. Pasang plint keramik ukuran 5 x 20 cm KW 2 tiap 1m'

Harga bahan:- Ubin keramik 5 x 20 cm KW 2 bh 5 9,000 45,000.00- Semen portland kg 0.85 1,240 1,054.00- Pasir pasang m³ 0.0022 110,000 242.00- Semen portland warna kg 0.08 2,525 202.00

Jumlah Harga BahanUpah tenaga:- Pekerja Oh 0.09 45,000 4,050.00- Tukang batu Oh 0.09 65,000 5,850.00- Kepala tukang Oh 0.009 70,000 630.00- Mandor Oh 0.0045 70,000 315.00

Jumlah Upah TenagaJumlah Total

Dibulatkan

35. Pasang lantai marmer tiap 1m²

Harga bahan:- Marmer m² 1.052 0.00- Semen portland kg 14.15 1,240 17,546.00- Pasir pasang m³ 0.039 110,000 4,290.00

Page 132: RAB 2009

132

document.xls - 2-AHSP Hal - 132

NO. URAIAN SAT KUANTITAS SUB TOTAL (Rp)

1 2 3 4 5 6

HARGA SAT. DASAR (Rp)

- Semen portland warna kg 2 2,525 5,050.00Jumlah Harga Bahan

Upah tenaga:- Pekerja Oh 0.62 45,000 27,900.00- Tukang batu Oh 0.35 65,000 22,750.00- Kepala tukang Oh 0.035 70,000 2,450.00- Mandor Oh 0.03 70,000 2,100.00

Jumlah Upah TenagaJumlah Total

Dibulatkan

36. Pasang plint ubin marmer ukuran 10 x 60 cm tiap 1m'

Harga bahan:- Plint ubin marmer 10 x 60 bh 1.7 0.00- Semen portland kg 1.65 1,240 2,046.00- Pasir pasang m³ 0.0032 110,000 352.00- Semen portland warna kg 0.1 2,525 252.50

Jumlah Harga BahanUpah tenaga:- Pekerja Oh 0.09 45,000 4,050.00- Tukang batu Oh 0.09 65,000 5,850.00- Kepala tukang Oh 0.009 70,000 630.00- Mandor Oh 0.0045 70,000 315.00

Jumlah Upah TenagaJumlah Total

Dibulatkan

37. Pasang plint ubin marmer ukuran 10 x 40 cm tiap 1m'

Harga bahan:- Plint ubin marmer 10 x 40 bh 2.5 0.00- Semen portland kg 1.65 1,240 2,046.00- Pasir pasang m³ 0.0032 110,000 352.00- Semen portland warna kg 0.1 2,525 252.50

Jumlah Harga BahanUpah tenaga:- Pekerja Oh 0.09 45,000 4,050.00- Tukang batu Oh 0.09 65,000 5,850.00- Kepala tukang Oh 0.009 70,000 630.00- Mandor Oh 0.0045 70,000 315.00

Jumlah Upah TenagaJumlah Total

Dibulatkan

38. Pasang plint ubin marmer ukuran 10 x 30 cm tiap 1m'

Harga bahan:- Plint ubin marmer 10 x 30 bh 3.33 0.00- Semen portland kg 1.65 1,240 2,046.00- Pasir pasang m³ 0.0032 110,000 352.00- Semen portland warna kg 0.1 2,525 252.50

Jumlah Harga BahanUpah tenaga:- Pekerja Oh 0.09 45,000 4,050.00- Tukang batu Oh 0.09 65,000 5,850.00- Kepala tukang Oh 0.009 70,000 630.00- Mandor Oh 0.0045 70,000 315.00

Jumlah Upah TenagaJumlah Total

Dibulatkan

39. Pasang plint vinyil 1m²

Harga bahan:- Vinyl karet 30 x 30 cm kl 1 bh 3.5 0.00- Lem vinyl kg 0.08 0.00

Jumlah Harga BahanUpah tenaga:- Pekerja Oh 0.08 45,000 3,600.00- Tukang batu Oh 0.08 65,000 5,200.00- Kepala tukang Oh 0.008 70,000 560.00- Mandor Oh 0.004 70,000 280.00

Page 133: RAB 2009

133

document.xls - 2-AHSP Hal - 133

NO. URAIAN SAT KUANTITAS SUB TOTAL (Rp)

1 2 3 4 5 6

HARGA SAT. DASAR (Rp)

Jumlah Upah TenagaJumlah Total

Dibulatkan

40. Pasang lantai parquet jati tiap 1m²

Harga bahan:- Parquet jati m² 1.05 0.00- Lem vinyl kg 0.6 0.00

Jumlah Harga BahanUpah tenaga:- Pekerja Oh 0.65 45,000 29,250.00- Tukang batu Oh 0.35 65,000 22,750.00- Kepala tukang Oh 0.035 70,000 2,450.00- Mandor Oh 0.0325 70,000 2,275.00

Jumlah Upah TenagaJumlah Total

Dibulatkan

41. Pasang dinding keramik 40 x 40 cm granito tile tiap 1m²

Harga bahan:- Ubin keramik 40 x 40 cm granito tile bh 6.25 0.00- Semen portland kg 9.3 1,240 11,532.00- Pasir pasang m³ 0.018 110,000 1,980.00- Semen portland warna kg 1.5 2,525 3,787.50

Page 134: RAB 2009

134

document.xls - 2-AHSP Hal - 134

NO. URAIAN SAT KUANTITAS SUB TOTAL (Rp)

1 2 3 4 5 6

HARGA SAT. DASAR (Rp)

Jumlah Harga BahanUpah tenaga:- Pekerja Oh 0.6 45,000 27,000.00- Tukang batu Oh 0.45 65,000 29,250.00- Kepala tukang Oh 0.045 70,000 3,150.00- Mandor Oh 0.03 70,000 2,100.00

Jumlah Upah TenagaJumlah Total

Dibulatkan

42. Pasang dinding keramik 40 x 40 cm Roman tiap 1m²

Harga bahan:- Ubin keramik 40 x 40 cm Roman bh 6.25 9,771 61,067.19- Semen portland kg 9.3 1,240 11,532.00- Pasir pasang m³ 0.018 110,000 1,980.00- Semen portland warna kg 1.5 2,525 3,787.50

Jumlah Harga BahanUpah tenaga:- Pekerja Oh 0.6 45,000 27,000.00- Tukang batu Oh 0.45 65,000 29,250.00- Kepala tukang Oh 0.045 70,000 3,150.00- Mandor Oh 0.03 70,000 2,100.00

Jumlah Upah TenagaJumlah Total

Dibulatkan

43. Pasang dinding keramik 40 x 40 cm KW 2 tiap 1m²

Harga bahan:- Ubin keramik 40 x 40 cm KW 2 bh 6.25 8,571 53,568.75- Semen portland kg 9.3 1,240 11,532.00- Pasir pasang m³ 0.018 110,000 1,980.00- Semen portland warna kg 1.5 2,525 3,787.50

Jumlah Harga BahanUpah tenaga:- Pekerja Oh 0.6 45,000 27,000.00- Tukang batu Oh 0.45 65,000 29,250.00- Kepala tukang Oh 0.045 70,000 3,150.00- Mandor Oh 0.03 70,000 2,100.00

Jumlah Upah TenagaJumlah Total

Dibulatkan

44. Pasang dinding keramik 30 x 30 cm granito tile tiap 1m²

Harga bahan:- Ubin keramik 30 x 30 cm granito tile bh 11.12 14,250 158,460.00- Semen portland kg 9.3 1,240 11,532.00- Pasir pasang m³ 0.018 110,000 1,980.00- Semen portland warna kg 1.5 2,525 3,787.50

Jumlah Harga BahanUpah tenaga:- Pekerja Oh 0.6 45,000 27,000.00- Tukang batu Oh 0.45 65,000 29,250.00- Kepala tukang Oh 0.045 70,000 3,150.00- Mandor Oh 0.03 70,000 2,100.00

Jumlah Upah TenagaJumlah Total

Dibulatkan

45. Pasang dinding keramik 30 x 30 cm Roman tiap 1m²

Harga bahan:- Ubin keramik 30 x 30 cm Roman bh 11.12 5,441 60,500.03- Semen portland kg 9.3 1,240 11,532.00- Pasir pasang m³ 0.018 110,000 1,980.00- Semen portland warna kg 1.5 2,525 3,787.50

Jumlah Harga BahanUpah tenaga:- Pekerja Oh 0.6 45,000 27,000.00- Tukang batu Oh 0.45 65,000 29,250.00- Kepala tukang Oh 0.045 70,000 3,150.00

Page 135: RAB 2009

135

document.xls - 2-AHSP Hal - 135

NO. URAIAN SAT KUANTITAS SUB TOTAL (Rp)

1 2 3 4 5 6

HARGA SAT. DASAR (Rp)

- Mandor Oh 0.03 70,000 2,100.00Jumlah Upah Tenaga

Jumlah TotalDibulatkan

46. Pasang dinding keramik 30 x 30 cm KW 2 tiap 1m²

Harga bahan:- Ubin keramik 30 x 30 cm KW 2 bh 11.12 4,522 50,284.64- Semen portland kg 9.3 1,240 11,532.00- Pasir pasang m³ 0.018 110,000 1,980.00- Semen portland warna kg 1.5 2,525 3,787.50

Jumlah Harga BahanUpah tenaga:- Pekerja Oh 0.6 45,000 27,000.00- Tukang batu Oh 0.45 65,000 29,250.00- Kepala tukang Oh 0.045 70,000 3,150.00- Mandor Oh 0.03 70,000 2,100.00

Jumlah Upah TenagaJumlah Total

Dibulatkan

47. Pasang dinding keramik 20 x 20 cm Roman tiap 1m²

Harga bahan:- Ubin keramik 20 x 20 cm Roman bh 25 2,394 59,850.00- Semen portland kg 9.3 1,240 11,532.00- Pasir pasang m³ 0.018 110,000 1,980.00- Semen portland warna kg 1.5 2,525 3,787.50

Jumlah Harga BahanUpah tenaga:- Pekerja Oh 0.6 45,000 27,000.00- Tukang batu Oh 0.10 65,000 6,500.00- Kepala tukang Oh 0.045 70,000 3,150.00- Mandor Oh 0.03 70,000 2,100.00

Jumlah Upah Tenaga0.45 Jumlah Total

Dibulatkan

48. Pasang dinding keramik 20 x 20 cm KW 2 tiap 1m²

Harga bahan:- Ubin keramik 20 x 20 cm KW 2 bh 25 2,040 51,000.00- Semen portland kg 9.3 1,240 11,532.00- Pasir pasang m³ 0.018 110,000 1,980.00- Semen portland warna kg 1.5 2,525 3,787.50

Jumlah Harga BahanUpah tenaga:- Pekerja Oh 0.6 45,000 27,000.00- Tukang batu Oh 0.10 65,000 29,250.00- Kepala tukang Oh 0.045 70,000 3,150.00- Mandor Oh 0.03 70,000 2,100.00

Jumlah Upah Tenaga0.45 Jumlah Total

Dibulatkan

49. Pasang dinding keramik 20 x 25 cm Roman tiap 1m²

Harga bahan:- Ubin keramik 20 x 25 cm Roman bh 20 2,423 48,450.00- Semen portland kg 9.3 1,240 11,532.00- Pasir pasang m³ 0.018 110,000 1,980.00- Semen portland warna kg 1.5 2,525 3,787.50

Jumlah Harga BahanUpah tenaga:- Pekerja Oh 0.6 45,000 27,000.00- Tukang batu Oh 0.45 65,000 29,250.00- Kepala tukang Oh 0.045 70,000 3,150.00- Mandor Oh 0.03 70,000 2,100.00

Jumlah Upah TenagaJumlah Total

Dibulatkan

50. Pasang dinding keramik 20 x 25 cm KW 2 tiap 1m²

Page 136: RAB 2009

136

document.xls - 2-AHSP Hal - 136

NO. URAIAN SAT KUANTITAS SUB TOTAL (Rp)

1 2 3 4 5 6

HARGA SAT. DASAR (Rp)

Harga bahan:- Ubin keramik 20 x 25 cm KW 2 bh 20 2,400 48,000.00- Semen portland kg 9.3 1,240 11,532.00- Pasir pasang m³ 0.018 110,000 1,980.00- Semen portland warna kg 1.5 2,525 3,787.50

Jumlah Harga BahanUpah tenaga:- Pekerja Oh 0.6 45,000 27,000.00- Tukang batu Oh 0.45 65,000 29,250.00- Kepala tukang Oh 0.045 70,000 3,150.00- Mandor Oh 0.03 70,000 2,100.00

Jumlah Upah TenagaJumlah Total

Dibulatkan

51. Pasang dinding keramik 10 x 20 cm Roman tiap 1m²

Harga bahan:- Ubin keramik 10 x 20 cm Roman bh 50 1,188 59,375.00- Semen portland kg 9.3 1,240 11,532.00- Pasir pasang m³ 0.018 110,000 1,980.00- Semen portland warna kg 1.5 2,525 3,787.50

Jumlah Harga BahanUpah tenaga:- Pekerja Oh 0.6 45,000 27,000.00- Tukang batu Oh 0.45 65,000 29,250.00- Kepala tukang Oh 0.045 70,000 3,150.00- Mandor Oh 0.03 70,000 2,100.00

Jumlah Upah TenagaJumlah Total

Dibulatkan

52. Pasang dinding keramik 10 x 20 cm KW 2 tiap 1m²

Harga bahan:- Ubin keramik 10 x 20 cm KW 2 bh 50 1,000 50,000.00- Semen portland kg 9.3 1,240 11,532.00- Pasir pasang m³ 0.018 110,000 1,980.00- Semen portland warna kg 1.5 2,525 3,787.50

Jumlah Harga BahanUpah tenaga:- Pekerja Oh 0.6 45,000 27,000.00- Tukang batu Oh 0.45 65,000 29,250.00- Kepala tukang Oh 0.045 70,000 3,150.00- Mandor Oh 0.03 70,000 2,100.00

Jumlah Upah TenagaJumlah Total

Dibulatkan

53. Pasang dinding keramik 5 x 20 cm Roman tiap 1m²

Harga bahan:- Ubin keramik 5 x 20 cm Roman bh 100 11,875 1,187,500.00- Semen portland kg 9.3 1,240 11,532.00- Pasir pasang m³ 0.018 110,000 1,980.00- Semen portland warna kg 1.5 2,525 3,787.50

Jumlah Harga BahanUpah tenaga:- Pekerja Oh 0.6 45,000 27,000.00- Tukang batu Oh 0.45 65,000 29,250.00- Kepala tukang Oh 0.045 70,000 3,150.00- Mandor Oh 0.03 70,000 2,100.00

Jumlah Upah TenagaJumlah Total

Dibulatkan

54. Pasang dinding keramik 5 x 20 cm KW 2 tiap 1m²

Harga bahan:- Ubin keramik 5 x 20 cm KW 2 bh 100 9,000 900,000.00- Semen portland kg 9.3 1,240 11,532.00- Pasir pasang m³ 0.018 110,000 1,980.00- Semen portland warna kg 1.5 2,525 3,787.50

Page 137: RAB 2009

137

document.xls - 2-AHSP Hal - 137

NO. URAIAN SAT KUANTITAS SUB TOTAL (Rp)

1 2 3 4 5 6

HARGA SAT. DASAR (Rp)

Jumlah Harga BahanUpah tenaga:- Pekerja Oh 0.6 45,000 27,000.00- Tukang batu Oh 0.45 65,000 29,250.00- Kepala tukang Oh 0.045 70,000 3,150.00- Mandor Oh 0.03 70,000 2,100.00

Jumlah Upah TenagaJumlah Total

Dibulatkan

55. Pasang dinding marmer tiap 1m²

Harga bahan:- Marmer m² 1.02 0.00- Paku sekrup 3,5" bh 4 314 1,254.00- Semen portland kg 12.44 1,240 15,425.60- Pasir pasang m³ 0.025 110,000 2,750.00- Semen portland warna kg 1.5 2,525 3,787.50

Jumlah Harga BahanUpah tenaga:- Pekerja Oh 0.72 45,000 32,400.00- Tukang batu Oh 0.65 65,000 42,250.00- Kepala tukang Oh 0.065 70,000 4,550.00- Mandor Oh 0.035 70,000 2,450.00

Jumlah Upah TenagaJumlah Total

Dibulatkan

56. Pasang dinding batu tempel palimanan tiap 1m²

Harga bahan:- Batu palimanan m² 1.05 0.00- Pasir pasang m³ 0.035 110,000 3,850.00- Semen portland kg 11.75 1,240 14,570.00

Jumlah Harga BahanUpah tenaga:- Pekerja Oh 0.62 45,000 27,900.00- Tukang batu Oh 0.35 65,000 22,750.00- Kepala tukang Oh 0.035 70,000 2,450.00- Mandor Oh 0.03 70,000 2,100.00

Jumlah Upah TenagaJumlah Total

Dibulatkan

57. Pasang lantai vinyl karet kl 1 tiap 1m²

Harga bahan:- Vinyl karet 30 x 30 cm kl 1 bh 11.05 0.00- Lem Vinyl kg 0.35 0.00

Jumlah Harga BahanUpah tenaga:- Pekerja Oh 0.15 45,000 6,750.00- Tukang batu Oh 0.15 65,000 9,750.00- Kepala tukang Oh 0.015 70,000 1,050.00- Mandor Oh 0.0075 70,000 525.00

Jumlah Upah TenagaJumlah Total

Dibulatkan

58. Pasang lantai vinyl karet kl 2 tiap 1m²

Harga bahan:- Vinyl karet 30 x 30 cm kl 2 bh 11.05 0.00- Lem Vinyl kg 0.35 0.00

Jumlah Harga BahanUpah tenaga:- Pekerja Oh 0.15 45,000 6,750.00- Tukang batu Oh 0.15 65,000 9,750.00- Kepala tukang Oh 0.015 70,000 1,050.00- Mandor Oh 0.0075 70,000 525.00

Jumlah Upah TenagaJumlah Total

Dibulatkan

Page 138: RAB 2009

138

document.xls - 2-AHSP Hal - 138

NO. URAIAN SAT KUANTITAS SUB TOTAL (Rp)

1 2 3 4 5 6

HARGA SAT. DASAR (Rp)

59. Pasang plint kayu 2 x 10 cm tiap 1m'

Harga bahan:- Kayu Kelas I Papan m³ 0.0024 9,270,000 22,248.00- Paku sekrup kg 0.05 30,875 1,543.75

Jumlah Harga BahanUpah tenaga:- Pekerja Oh 0.12 45,000 5,400.00- Tukang kayu Oh 0.12 65,000 7,800.00- Kepala tukang Oh 0.012 70,000 840.00- Mandor Oh 0.006 70,000 420.00

Jumlah Upah TenagaJumlah Total

Dibulatkan

P PEKERJAAN PENGECATAN

1. Mengikis/mengerok permukaan tembok lama tiap 1 m²

Upah tenaga:- Pekerja Oh 0.15 45,000 6,750.00- Mandor Oh 0.0025 70,000 175.00

Jumlah Upah TenagaJumlah Total

Dibulatkan

2. Mendempul dan menggosok kayu 1 m²

Harga bahan:- Dempul kayu kg 0.08 15,450 1,236.00- Minyak cat/ thinner Ltr 0.02 15,450 309.00- Amplas Lbr 0.1 3,605 360.50

Jumlah Harga BahanUpah tenaga:- Pekerja Oh 0.04 45,000 1,800.00- Tukang cat Oh 0.04 65,000 2,600.00- Kepala tukang Oh 0.004 70,000 280.00- Mandor Oh 0.0025 70,000 175.00

Jumlah Upah TenagaJumlah Total

Dibulatkan

3. Pengecatan dengan cat KW 2 bidang kayu lama 1 m²

Harga bahan:- Plamir kayu kg 0.15 0.00- Cat kayu/besi KW 2 (cat dasar) kg 0.17 23,750 4,037.50- Cat kayu/besi KW 2 (cat penutup) kg 0.17 28,500 4,845.00

Jumlah Harga BahanUpah tenaga:- Pekerja Oh 0.07 45,000 3,150.00- Tukang cat Oh 0.075 65,000 4,875.00- Kepala tukang Oh 0.0075 70,000 525.00- Mandor Oh 0.0025 70,000 175.00

Jumlah Upah TenagaJumlah Total

Dibulatkan

4. Pengecatan dengan cat Mowilex bidang kayu lama 1 m²

Harga bahan:- Plamir kayu kg 0.15 0.00- Cat kayu/besi Mowilex (cat dasar) kg 0.17 34,200 5,814.00- Cat kayu/besi Mowilex (cat penutup) kg 0.17 44,413 7,550.13

Jumlah Harga BahanUpah tenaga:- Pekerja Oh 0.07 45,000 3,150.00- Tukang cat Oh 0.075 65,000 4,875.00- Kepala tukang Oh 0.0075 70,000 525.00- Mandor Oh 0.0025 70,000 175.00

Jumlah Upah TenagaJumlah Total

Dibulatkan

5. Pengecatan bidang kayu baru dg plamir 1 m² + 1 lps dsr + 2 lps penutup KW 2

Harga bahan:

Page 139: RAB 2009

139

document.xls - 2-AHSP Hal - 139

NO. URAIAN SAT KUANTITAS SUB TOTAL (Rp)

1 2 3 4 5 6

HARGA SAT. DASAR (Rp)

- Cat meni kayu kg 0.2 25,750 5,150.00- Plamir kayu kg 0.15 0.00- Cat kayu/besi KW 2 (cat dasar) kg 0.17 23,750 4,037.50- Cat kayu/besi KW 2 (cat penutup) kg 0.26 28,500 7,410.00

Jumlah Harga BahanUpah tenaga:- Pekerja Oh 0.07 45,000 3,150.00- Tukang cat Oh 0.09 65,000 5,850.00- Kepala tukang Oh 0.006 70,000 420.00- Mandor Oh 0.0025 70,000 175.00

Jumlah Upah TenagaJumlah Total

Dibulatkan

6. Pengecatan bidang kayu baru dg plamir 1 m² + 1 lps dsr + 2 lps penutup Mowilex

Harga bahan:- Cat meni kayu kg 0.2 25,750 5,150.00- Plamir kayu kg 0.15 0.00- Cat kayu/besi Mowilex (cat dasar) kg 0.17 34,200 5,814.00- Cat kayu/besi Mowilex (cat penutup) kg 0.26 44,413 11,547.25

Jumlah Harga BahanUpah tenaga:- Pekerja Oh 0.07 45,000 3,150.00- Tukang cat Oh 0.09 65,000 5,850.00- Kepala tukang Oh 0.006 70,000 420.00- Mandor Oh 0.0025 70,000 175.00

Jumlah Upah TenagaJumlah Total

Dibulatkan

7. Pengecatan bidang kayu baru dg plamir 1 m² + 1 lps dsr + 3 lps penutup KW 2

Harga bahan:- Cat meni kayu kg 0.2 25,750 5,150.00- Plamir kayu kg 0.15 0.00- Cat kayu/besi KW 2 (cat dasar) kg 0.17 23,750 4,037.50- Cat kayu/besi KW 2 (cat penutup) kg 0.35 28,500 9,975.00

Jumlah Harga BahanUpah tenaga:- Pekerja Oh 0.07 45,000 3,150.00- Tukang cat Oh 0.105 65,000 6,825.00- Kepala tukang Oh 0.004 70,000 280.00- Mandor Oh 0.0025 70,000 175.00

Jumlah Upah TenagaJumlah Total

Dibulatkan

8. Pengecatan bidang kayu baru dg plamir 1 m² + 1 lps dsr + 3 lps penutup Mowilex

Harga bahan:- Cat meni kayu kg 0.2 25,750 5,150.00- Plamir kayu kg 0.15 0.00- Cat kayu/besi Mowilex (cat dasar) kg 0.17 34,200 5,814.00- Cat kayu/besi Mowilex (cat penutup) kg 0.35 44,413 15,544.37

Jumlah Harga BahanUpah tenaga:- Pekerja Oh 0.07 45,000 3,150.00- Tukang cat Oh 0.105 65,000 6,825.00- Kepala tukang Oh 0.004 70,000 280.00- Mandor Oh 0.0025 70,000 175.00

Jumlah Upah TenagaJumlah Total

Dibulatkan

9. Pelaburan bidang kayu dgn politur 1 m²

Harga bahan:- Politur Ltr 0.15 14,250 2,137.50- Politur jadi Ltr 0.372 28,500 10,602.00- Amplas Lbr 2 3,605 7,210.00

Jumlah Harga BahanUpah tenaga:

Page 140: RAB 2009

140

document.xls - 2-AHSP Hal - 140

NO. URAIAN SAT KUANTITAS SUB TOTAL (Rp)

1 2 3 4 5 6

HARGA SAT. DASAR (Rp)

- Tukang cat Oh 0.06 65,000 3,900.00- Kepala tukang Oh 0.016 70,000 1,120.00- Mandor Oh 0.0025 70,000 175.00

Jumlah Upah TenagaJumlah Total

Dibulatkan

10. Pengecatan bidang kayu dengan politur Ultran tiap 1 m²

Harga bahan:- Wood filler Ultran kg 0.2 29,500 5,900.00- Politur Ultran kg 0.3 32,750 9,825.00- Minyak cat/ thinner Ltr 0.1 15,450 1,545.00- Amplas Lbr 0.5 3,605 1,802.50- Kuas bh 0.05 7,125 356.25

Jumlah Harga BahanUpah tenaga:- Pekerja Oh 0.25 45,000 11,250.00- Tukang cat Oh 0.28 65,000 18,200.00- Kepala tukang Oh 0.04 70,000 2,800.00- Mandor Oh 0.02 70,000 1,400.00

Jumlah Upah TenagaJumlah Total

Dibulatkan

11. Pengecatan bidang kayu dengan melamik Impra tiap 1 m²

Harga bahan:- Wood filler Ultran kg 0.25 29,500 7,375.00- Wall sealer Dulux/ICI kg 0.35 28,500 9,975.00- Cat warna Ultran kg 0.25 32,000 8,000.00- Melamic Impra kg 0.3 31,266 9,379.80- Minyak cat/ thinner Ltr 0.5 15,450 7,725.00- Amplas Lbr 0.6 3,605 2,163.00

Jumlah Harga BahanUpah tenaga:- Tukang cat Oh 0.6 65,000 39,000.00- Kepala tukang Oh 0.06 70,000 4,200.00

Jumlah Upah TenagaJumlah Total

Dibulatkan

12. Pengecatan bidang kayu dengan melamik Impra tiap 1 m' kusen

Harga bahan:- Wood filler Ultran kg 0.12 29,500 3,540.00- Wall sealer Dulux/ICI kg 0.18 28,500 5,130.00- Cat warna Ultran kg 0.125 32,000 4,000.00- Melamic Impra kg 0.2 31,266 6,253.20- Minyak cat/ thinner Ltr 0.25 15,450 3,862.50- Amplas Lbr 0.4 3,605 1,442.00

Jumlah Harga BahanUpah tenaga:- Tukang cat Oh 0.3 65,000 19,500.00- Kepala tukang Oh 0.03 70,000 2,100.00

Jumlah Upah TenagaJumlah Bahan & Tenaga

Dibulatkan

13. Pelaburan bidang kayu dgn residu dan ter 1 m²

Harga bahan:- Residu Ltr 0.35 7,000 2,450.00

Jumlah Harga BahanUpah tenaga:- Pekerja Oh 0.1 45,000 4,500.00- Mandor Oh 0.006 70,000 420.00

Jumlah Upah TenagaJumlah Total

Dibulatkan

14. Pelaburan bidang kayu dgn vernis 1 m²

Harga bahan:- Vernis Ltr 0.15 32,750 4,912.50

Page 141: RAB 2009

141

document.xls - 2-AHSP Hal - 141

NO. URAIAN SAT KUANTITAS SUB TOTAL (Rp)

1 2 3 4 5 6

HARGA SAT. DASAR (Rp)

- Dempul kayu Kg 0.05 15,450 772.50- Amplas Lbr 0.1 3,605 360.50- Kuas Bh 0.01 7,125 71.25

Jumlah Harga BahanUpah tenaga:- Pekerja Oh 0.16 45,000 7,200.00- Tukang cat Oh 0.16 65,000 10,400.00- Kepala tukang Oh 0.016 70,000 1,120.00- Mandor Oh 0.0025 70,000 175.00

Jumlah Upah TenagaJumlah Total

Dibulatkan

15. Pengecatan tembok baru dg plamir 1 m² + 1 lps dsr + 2 lps penutup KW 2

Harga bahan:- Plamir tembok kg 0.1 9,500 950.00- Cat tembok KW 2 (cat dasar) kg 0.1 7,125 712.50- Cat tembok KW 2 (cat penutup) kg 0.26 12,350 3,211.00

Jumlah Harga BahanUpah tenaga:- Pekerja Oh 0.02 45,000 900.00- Tukang cat Oh 0.063 65,000 4,095.00- Kepala tukang Oh 0.0063 70,000 441.00- Mandor Oh 0.0025 70,000 175.00

Jumlah Upah TenagaJumlah Total

Dibulatkan

16. Pengecatan tembok baru dg plamir 1 m² + 1 lps dsr + 2 lps Catylac

Harga bahan:- Plamir tembok kg 0.1 9,500 950.00- Cat tembok Catylac (cat dasar) kg 0.1 7,125 712.50- Cat tembok Catylac (cat penutup) kg 0.26 12,350 3,211.00

Jumlah Harga BahanUpah tenaga:- Pekerja Oh 0.02 45,000 900.00- Tukang cat Oh 0.063 65,000 4,095.00- Kepala tukang Oh 0.0063 70,000 441.00- Mandor Oh 0.0025 70,000 175.00

Jumlah Upah TenagaJumlah Total

Dibulatkan

Page 142: RAB 2009

142

document.xls - 2-AHSP Hal - 142

NO. URAIAN SAT KUANTITAS SUB TOTAL (Rp)

1 2 3 4 5 6

HARGA SAT. DASAR (Rp)

17. Pengecatan tembok baru dg wall sealer 1 m² + 1 lps dsr + 2 lps Dulux/ICI

Harga bahan:- Wall sealer Dulux/ICI kg 0.1 28,500 2,850.00- Cat tembok Dulux/ICI (cat dasar) kg 0.1 44,413 4,441.25- Cat tembok Dulux/ICI (cat penutup) kg 0.26 34,200 8,892.00

Jumlah Harga BahanUpah tenaga:- Pekerja Oh 0.02 45,000 900.00- Tukang cat Oh 0.063 65,000 4,095.00- Kepala tukang Oh 0.0063 70,000 441.00- Mandor Oh 0.0025 70,000 175.00

Jumlah Upah TenagaJumlah Total

Dibulatkan

18. Pengecatan tembok baru dg wall sealer 1 m² + 1 lps dsr + 2 lps Dulux/ICI Weathershield

Harga bahan:- Wall sealer Dulux/ICI kg 0.1 28,500 2,850.00- Cat tembok Dulux/ICI Weathershield kg 0.36 44,413 15,988.50

Jumlah Harga BahanUpah tenaga:- Pekerja Oh 0.02 45,000 900.00- Tukang cat Oh 0.063 65,000 4,095.00- Kepala tukang Oh 0.0063 70,000 441.00- Mandor Oh 0.0025 70,000 175.00

Jumlah Upah TenagaJumlah Total

Dibulatkan

19. Pengecatan bidang tembok lama 1 m² dg 1 lps dsr + 2 lps penutup KW 2

Harga bahan:- Cat tembok KW 2 (cat dasar) kg 0.12 7,125 855.00- Cat tembok KW 2 (cat penutup) kg 0.18 12,350 2,223.00

Jumlah Harga BahanUpah tenaga:- Pekerja Oh 0.028 45,000 1,260.00- Tukang cat Oh 0.042 65,000 2,730.00- Kepala tukang Oh 0.0042 70,000 294.00- Mandor Oh 0.0025 70,000 175.00

Jumlah Upah TenagaJumlah Total

Dibulatkan

20. Pengecatan bidang tembok lama 1 m² dg 1 lps dsr + 2 lps penutup Catylac

Harga bahan:- Cat tembok Catylac (cat dasar) kg 0.12 7,125 855.00- Cat tembok Catylac (cat penutup) kg 0.18 12,350 2,223.00

Jumlah Harga BahanUpah tenaga:- Pekerja Oh 0.028 45,000 1,260.00- Tukang cat Oh 0.042 65,000 2,730.00- Kepala tukang Oh 0.0042 70,000 294.00- Mandor Oh 0.0025 70,000 175.00

Jumlah Upah TenagaJumlah Total

Dibulatkan

21. Pengecatan bidang tembok lama 1 m² dg 1 lps dsr + 2 lps penutup Dulux/ICI

Harga bahan:- Cat tembok Dulux/ICI (cat dasar) kg 0.12 44,413 5,329.50- Cat tembok Dulux/ICI (cat penutup) kg 0.18 34,200 6,156.00

Jumlah Harga BahanUpah tenaga:- Pekerja Oh 0.028 45,000 1,260.00- Tukang cat Oh 0.042 65,000 2,730.00- Kepala tukang Oh 0.0042 70,000 294.00- Mandor Oh 0.0025 70,000 175.00

Jumlah Upah TenagaJumlah Total

Page 143: RAB 2009

143

document.xls - 2-AHSP Hal - 143

NO. URAIAN SAT KUANTITAS SUB TOTAL (Rp)

1 2 3 4 5 6

HARGA SAT. DASAR (Rp)

Dibulatkan

22. Pengecatan permukaan baja 1 m² dgn meni besi

Harga bahan:- Cat meni besi kg 0.1 14,250 1,425.00- Kuas bh 0.01 7,125 71.25

Jumlah Harga BahanUpah tenaga:- Pekerja Oh 0.02 45,000 900.00- Tukang cat Oh 0.20 65,000 13,000.00- Kepala tukang Oh 0.02 70,000 1,400.00- Mandor Oh 0.001 70,000 70.00

Jumlah Upah TenagaJumlah Total

Dibulatkan

23. Pengecatan permukaan baja 1 m² dgn meni besi & perancah

Harga bahan:- Cat meni besi kg 0.1 14,250 1,425.00- Kuas bh 0.01 7,125 71.25- Kayu Terentang balok m³ 0.002 950,000 1,900.00

Jumlah Harga BahanUpah tenaga:- Pekerja Oh 0.25 45,000 11,250.00- Tukang cat Oh 0.225 65,000 14,625.00- Kepala tukang Oh 0.0225 70,000 1,575.00- Mandor Oh 0.0075 70,000 525.00

Jumlah Upah TenagaJumlah Total

Dibulatkan

24. Pengecatan permukaan baja tiap 1 m² dengan zinchromate

Harga bahan:- Cat zinchromate kg 0.3 27,313 8,193.75

Jumlah Harga BahanUpah tenaga:- Pekerja Oh 0.07 45,000 3,150.00- Tukang cat Oh 0.09 65,000 5,850.00- Kepala tukang Oh 0.006 70,000 420.00- Mandor Oh 0.0025 70,000 175.00

Jumlah Upah TenagaJumlah Total

Dibulatkan

25. Pengecatan permukaan baja tiap 1 m² dengan Cat KW 2

Harga bahan:- Cat meni besi kg 0.1 14,250 1,425.00- Cat kayu/besi KW 2 (cat dasar) kg 0.17 23,750 4,037.50- Cat kayu/besi KW 2 (cat penutup) kg 0.26 28,500 7,410.00

Jumlah Harga BahanUpah tenaga:- Pekerja Oh 0.07 45,000 3,150.00- Tukang cat Oh 0.09 65,000 5,850.00- Kepala tukang Oh 0.006 70,000 420.00- Mandor Oh 0.0025 70,000 175.00

Jumlah Upah TenagaJumlah Total

Dibulatkan

26. Pengecatan permukaan baja tiap 1 m² dengan Cat Mowilex

Harga bahan:- Cat meni besi kg 0.1 14,250 1,425.00- Cat kayu/besi Mowilex (cat dasar) kg 0.17 34,200 5,814.00- Cat kayu/besi Mowilex (cat penutup) kg 0.26 44,413 11,547.25

Jumlah Harga BahanUpah tenaga:- Pekerja Oh 0.07 45,000 3,150.00- Tukang cat Oh 0.09 65,000 5,850.00- Kepala tukang Oh 0.006 70,000 420.00- Mandor Oh 0.0025 70,000 175.00

Page 144: RAB 2009

144

document.xls - 2-AHSP Hal - 144

NO. URAIAN SAT KUANTITAS SUB TOTAL (Rp)

1 2 3 4 5 6

HARGA SAT. DASAR (Rp)

Jumlah Upah TenagaJumlah Total

Dibulatkan

27. Pengecatan waterproofing (coating) tiap 1 m²

Harga bahan:- Waterproofing coating kg 0.3 30,400 9,120.00

Jumlah Harga BahanUpah tenaga:- Pekerja Oh 0.02 45,000 900.00- Tukang cat Oh 0.063 65,000 4,095.00- Kepala tukang Oh 0.0063 70,000 441.00- Mandor Oh 0.0025 70,000 175.00

Jumlah Upah TenagaJumlah Total

Dibulatkan

Page 145: RAB 2009

145

document.xls - 2-AHSP Hal - 145

NO. URAIAN SAT KUANTITAS SUB TOTAL (Rp)

1 2 3 4 5 6

HARGA SAT. DASAR (Rp)

Q PEKERJAAN BONGKARAN

1. Bongkar beton bertulang tiap 1m³

Upah tenaga:- Pekerja Oh 6.667 45,000 300,015.00- Mandor Oh 0.333 70,000 23,310.00

Jumlah Upah TenagaJumlah Total

Dibulatkan

2. Bongkar dinding tembok bata merah tiap 1m³

Upah tenaga:- Pekerja Oh 0.667 45,000 30,015.00- Mandor Oh 0.033 70,000 2,310.00

Jumlah Upah TenagaJumlah Total

Dibulatkan

3.

Upah tenaga:- Pekerja Oh 0.073 45,000 3,285.00- Mandor Oh 0.0036 70,000 252.00

Jumlah Upah TenagaJumlah Total

Dibulatkan

4.

Upah tenaga:- Pekerja Oh 0.8 45,000 36,000.00- Mandor Oh 0.04 70,000 2,800.00

Jumlah Upah TenagaJumlah Total

Dibulatkan

5. Bongkar batu kali tebal < 50 cm tiap 1 m³

Upah tenaga:- Pekerja Oh 1.5 45,000 67,500.00- Mandor Oh 0.075 70,000 5,250.00

Jumlah Upah TenagaJumlah Total

Dibulatkan

6. Bongkar batu kali tebal > 50 cm tiap 1 m³

Upah tenaga:- Pekerja Oh 3 45,000 135,000.00- Mandor Oh 0.15 70,000 10,500.00

Jumlah Upah TenagaJumlah Total

Dibulatkan

7. Bongkar lantai tiap 1 m²

Upah tenaga:- Pekerja Oh 0.05 45,000 2,250.00- Mandor Oh 0.005 70,000 350.00

Jumlah Upah TenagaJumlah Total

Dibulatkan

8. Bongkar paving block tiap 1 m²

Upah tenaga:- Pekerja Oh 0.05 45,000 2,250.00- Mandor Oh 0.005 70,000 350.00

Jumlah Upah TenagaJumlah Total

Dibulatkan

9. Bongkar plesteran tiap 1 m²

Upah tenaga:- Pekerja Oh 0.05 45,000 2,250.00- Mandor Oh 0.0025 70,000 175.00

Jumlah Upah TenagaJumlah Total

Dibulatkan

10. Bongkar atap genteng tiap 1 m²

Bongkar dinding ½ bata tiap 1m²

Bongkar pelat beton bertulang tiap 1m²

Page 146: RAB 2009

146

document.xls - 2-AHSP Hal - 146

NO. URAIAN SAT KUANTITAS SUB TOTAL (Rp)

1 2 3 4 5 6

HARGA SAT. DASAR (Rp)

Upah tenaga:- Pekerja Oh 0.02 45,000 900.00- Mandor Oh 0.01 70,000 700.00

Jumlah Upah TenagaJumlah Total

Dibulatkan

11. Bongkar karpusan atap genteng tiap 1 m'

Upah tenaga:- Pekerja Oh 0.03 45,000 1,350.00- Mandor Oh 0.015 70,000 1,050.00

Jumlah Upah TenagaJumlah Total

Dibulatkan

12. Bongkar atap seng/asbes tiap 1 m²

Upah tenaga:- Pekerja Oh 0.05 45,000 2,250.00- Tukang besi Oh 0.025 65,000 1,625.00

Jumlah Upah TenagaJumlah Total

Dibulatkan

13. Bongkar kaso dan reng kayu (kayu akan dipakai lagi) tiap 1 m²

Upah tenaga:- Pekerja Oh 0.1 45,000 4,500.00- Tukang kayu Oh 0.025 65,000 1,625.00- Kepala tukang Oh 0.0025 70,000 175.00- Mandor Oh 0.005 70,000 350.00

Jumlah Upah TenagaJumlah Total

Dibulatkan

14. Bongkar kaso dan reng kayu (kayu tidak akan dipakai lagi) tiap 1 m²

Upah tenaga:- Pekerja Oh 0.1 45,000 4,500.00- Mandor Oh 0.005 70,000 350.00

Jumlah Upah TenagaJumlah Total

Dibulatkan

15.

Upah tenaga:- Pekerja Oh 2.666 45,000 119,970.00- Tukang kayu Oh 4 65,000 260,000.00- Kepala tukang Oh 0.4 70,000 28,000.00- Mandor Oh 0.133 70,000 9,310.00

Jumlah Upah TenagaJumlah Total

Dibulatkan

16.

Upah tenaga:- Tukang kayu Oh 4 65,000 260,000.00- Kepala tukang Oh 0.4 70,000 28,000.00

Jumlah Upah TenagaJumlah Total

Dibulatkan

17. Bongkar rangka plafon tiap 1 m²

Upah tenaga:- Pekerja Oh 0.1 45,000 4,500.00- Mandor Oh 0.005 70,000 350.00

Jumlah Upah TenagaJumlah Total

Dibulatkan

18. Bongkar penutup plafon tiap 1 m²

Upah tenaga:- Tukang kayu Oh 0.03 65,000 1,950.00- Kepala tukang Oh 0.003 70,000 210.00

Jumlah Upah TenagaJumlah Total

Bongkar balok kuda-kuda & loteng (kayu akan dipakai lagi) tiap 1 m³

Bongkar balok kuda-kuda & loteng (kayu tidak akan dipakai lagi) tiap 1 m³

Page 147: RAB 2009

147

document.xls - 2-AHSP Hal - 147

NO. URAIAN SAT KUANTITAS SUB TOTAL (Rp)

1 2 3 4 5 6

HARGA SAT. DASAR (Rp)

Dibulatkan

R PEKERJAAN INSTALASI LISTRIK

1.

Catatan: Fitting lampu, sakelar & lampu tidak dimasukkan dalam analisis, tergantung spesifikasi teknis dan merek yang diinginkan.Asumsi tinggi plafon maksimal 4 m', bentang ruang maksimal 8 m', ukuran kabel standar PUIL 2000.Harga bahan:- Kabel NYM 2x2,5 mm² m' 12 6,878 82,536.00- Conduit pipa PVC dia ⅝" C m' 12 2,850 34,200.00- Tee dos bh 1 3,420 3,420.00- Inbow doos bh 1 863 862.60- Sock bh 3 855 2,565.00- Klem conduit bh 9 570 5,130.00- Lastdop bh 3 855 2,565.00- Flexible pipe m' 1 4,560 4,560.00- Elbow bh 2 1,140 2,280.00- Paku, sekrup, fisher (10% harga conduit) % 10 34,200 3,420.00

Jumlah Harga BahanUpah tenaga:- Instalator Oh 0.3 70,000 21,000.00- Pekerja Oh 0.15 45,000 6,750.00- Mandor Oh 0.015 70,000 1,050.00

Jumlah Upah TenagaJumlah Total

Dibulatkan

2. Pasang instalasi lampu dg NYM 2x1,5 mm² tiap 1 titik (tidak termasuk fitting, sakelar & lampu)

Catatan: Fitting lampu, sakelar & lampu tidak dimasukkan dalam analisis, tergantung spesifikasi teknis dan merek yang diinginkan.

Harga bahan:- Kabel NYM 2x1,5 mm² m' 12 4,950 59,394.00- Conduit pipa PVC dia ⅝" C m' 12 2,850 34,200.00- Tee dos bh 1 3,420 3,420.00- Inbow doos bh 1 863 862.60- Sock bh 3 855 2,565.00- Klem conduit bh 9 570 5,130.00- Lastdop bh 3 855 2,565.00- Flexible pipe m' 1 4,560 4,560.00- Elbow bh 2 1,140 2,280.00- Paku, sekrup, fisher (10% harga conduit) % 10 34,200 3,420.00

Jumlah Harga BahanUpah tenaga:- Instalator Oh 0.3 70,000 21,000.00- Pekerja Oh 0.15 45,000 6,750.00- Mandor Oh 0.015 70,000 1,050.00

Jumlah Upah TenagaJumlah Total

Dibulatkan

3. Pasang instalasi lampu untuk gedung pertemuan & gudang tiap 1 titik (tidak termasuk fitting, sakelar & lampu)

Catatan: Fitting lampu, sakelar & lampu tidak dimasukkan dalam analisis, tergantung spesifikasi teknis dan merek yang diinginkan.Asumsi tinggi plafon 4-10 m', analisis tersebut dipakai untuk ruangan seperti gudang, gedung pertemuan, aula, rumah ibadat, bengkel.Harga bahan:- Kabel NYM 3x2,5 mm² m' 24 8,835 212,040.00- Conduit pipa PVC dia ⅝" C m' 24 2,850 68,400.00- Tee dos bh 1 3,420 3,420.00- Inbow doos bh 1 863 862.60- Sock bh 6 855 5,130.00- Klem conduit bh 18 570 10,260.00- Lastdop bh 3 855 2,565.00- Flexible pipe m' 1 4,560 4,560.00- Elbow bh 2 1,140 2,280.00- Paku, sekrup, fisher (10% harga conduit) % 10 68,400 6,840.00

Jumlah Harga BahanUpah tenaga:- Instalator Oh 0.6 70,000 42,000.00- Pekerja Oh 0.3 45,000 13,500.00- Mandor Oh 0.03 70,000 2,100.00

Pasang instalasi lampu dg NYM 2x2,5 mm² tiap 1 titik (tidak termasuk fitting, sakelar & lampu)

Analisis dibuat untuk rumah & gedung sederhana, kabel yang dipakai NYM 2x1,5 mm².

Page 148: RAB 2009

148

document.xls - 2-AHSP Hal - 148

NO. URAIAN SAT KUANTITAS SUB TOTAL (Rp)

1 2 3 4 5 6

HARGA SAT. DASAR (Rp)

Jumlah Upah TenagaJumlah Total

Dibulatkan

4. Pasang instalasi stop kontak tiap 1 titik (tidak termasuk stop kontak)

Catatan: Stop kontak tidak dimasukkan dalam analisis, tergantung spesifikasi teknis dan merek yang diinginkan.Harga bahan:- Kabel NYM 3x2,5 mm² m' 12.00 8,835 106,020.00- Conduit pipa PVC dia ⅝" C m' 12.00 2,850 34,200.00- Tee dos bh 1.00 3,420 3,420.00- Inbow doos bh 1.00 863 862.60- Sock bh 3.00 855 2,565.00- Klem conduit bh 9.00 570 5,130.00- Lastdop bh 3.00 855 2,565.00- Elbow bh 2.00 1,140 2,280.00- Paku, sekrup, fisher (10% harga conduit) % 10.00 34,200 3,420.00

Jumlah Harga BahanUpah tenaga:- Instalator Oh 0.30 70,000 21,000.00- Pekerja Oh 0.15 45,000 6,750.00- Mandor Oh 0.02 70,000 1,050.00

Jumlah Upah TenagaJumlah Total

Dibulatkan

5. Pasang instalasi listrik + outlet AC tiap 1 titik (tidak termasuk AC)

Catatan: Unit AC tidak dimasukkan dalam analisis, tergantung spesifikasi teknis dan merek yang diinginkan.Harga bahan:- Kabel NYM 3x2,5 mm² m' 12 8,835 106,020.00- Conduit pipa PVC dia ⅝" C m' 12 2,850 34,200.00- Kotak kontak khusus (KKK) bh 1 61,104 61,104.00- Tee dos bh 1 3,420 3,420.00- Inbow doos bh 1 863 862.60- Sock bh 3 855 2,565.00- Klem conduit bh 9 570 5,130.00- Lastdop bh 3 855 2,565.00- Elbow bh 2 1,140 2,280.00- Paku, sekrup, fisher (10% harga conduit) % 10 34,200 3,420.00

Jumlah Harga BahanUpah tenaga:- Instalator Oh 0.3 70,000 21,000.00- Pekerja Oh 0.15 45,000 6,750.00- Mandor Oh 0.015 70,000 1,050.00

Jumlah Upah TenagaJumlah Total

Dibulatkan

6. Pasang instalasi + tiang antena TV tiap 1 titik (tidak termasuk socket & antena)

Catatan: Socket & antena tidak dimasukkan dalam analisis, tergantung spesifikasi teknis dan merek yang diinginkan.Harga bahan:- Kabel antena TV m' 20 3,242 64,847.00- Conduit pipa PVC dia ⅝" C m' 20 2,850 57,000.00- Inbow doos bh 1 863 862.60- Sock bh 5 855 4,275.00- Klem conduit bh 14 570 7,980.00- Klem pipa besi 3/4" bh 2 1,409 2,817.70- Pipa galvanis dia 3/4" m' 2 10,450 20,900.00- Paku, sekrup, fisher (10% harga conduit) % 10 57,000 5,700.00

Jumlah Harga BahanUpah tenaga:- Instalator Oh 0.3 70,000 21,000.00- Pekerja Oh 0.15 45,000 6,750.00- Mandor Oh 0.015 70,000 1,050.00

Jumlah Upah TenagaJumlah Total

Dibulatkan

7. Pasang instalasi telepon tiap 1 titik (tidak termasuk outlet, pesawat telepon & sambungan Telkom)

Catatan: Outlet & pesawat telepon tidak dimasukkan dalam analisis, tergantung spesifikasi teknis dan merek yang diinginkan.

Page 149: RAB 2009

149

document.xls - 2-AHSP Hal - 149

NO. URAIAN SAT KUANTITAS SUB TOTAL (Rp)

1 2 3 4 5 6

HARGA SAT. DASAR (Rp)

Harga bahan:- Kabel telepon m' 20 2,599 51,984.00- Conduit pipa PVC dia ⅝" C m' 20 2,850 57,000.00- Inbow doos bh 1 863 862.60- Sock bh 5 855 4,275.00- Klem conduit bh 14 570 7,980.00- Elbow bh 2 1,140 2,280.00- Paku, sekrup, fisher (10% harga conduit) % 10 57,000 5,700.00

Jumlah Harga BahanUpah tenaga:- Instalator Oh 0.3 70,000 21,000.00- Pekerja Oh 0.15 45,000 6,750.00- Mandor Oh 0.015 70,000 1,050.00

Jumlah Upah TenagaJumlah Total

Dibulatkan

8. Pasang instalasi telepon paralel/extension line tiap 1 titik (tidak termasuk outlet, pesawat telepon)

Catatan: Outlet & pesawat telepon tidak dimasukkan dalam analisis, tergantung spesifikasi teknis dan merek yang diinginkan.Harga bahan:- Kabel telepon m' 12 2,599 31,190.40- Conduit pipa PVC dia ⅝" C m' 12 2,850 34,200.00- Inbow doos bh 1 863 862.60- Sock bh 3 855 2,565.00- Klem conduit bh 9 570 5,130.00- Elbow bh 2 1,140 2,280.00- Paku, sekrup, fisher (10% harga conduit) % 10 34,200 3,420.00

Jumlah Harga BahanUpah tenaga:- Instalator Oh 0.3 70,000 21,000.00- Pekerja Oh 0.15 45,000 6,750.00- Mandor Oh 0.015 70,000 1,050.00

Jumlah Upah TenagaJumlah Total

Dibulatkan

9. Pasang Panel Pembagi Daya 1300 VA / 6 A (3 grup @ 6 A) tiap 1 unit

Catatan: Belum termasuk penyambungan daya listrik PLNHarga bahan:- Kabel NYM 3x4 mm² m' 10 13,205 132,050.00- Kabel NYM 3x2,5 mm² m' 30 8,835 265,050.00- Conduit pipa PVC dia ⅝" C m' 40 2,850 114,000.00- MCB box isi 4 bh 1 60,752 60,751.55- MCB 6 A bh 4 32,595 130,378.00- Tee dos bh 4 3,420 13,680.00- Sock bh 10 855 8,550.00- Klem conduit bh 27 570 15,390.00- Lastdop bh 12 855 10,260.00- Elbow bh 2 1,140 2,280.00- Paku, sekrup, fisher (10% harga conduit) % 10 114,000 11,400.00

Jumlah Harga BahanUpah tenaga:- Instalator Oh 0.8 70,000 56,000.00- Pekerja Oh 0.4 45,000 18,000.00- Mandor Oh 0.04 70,000 2,800.00

Jumlah Upah TenagaJumlah Total

Dibulatkan

Page 150: RAB 2009

150

document.xls - 2-AHSP Hal - 150

NO. URAIAN SAT KUANTITAS SUB TOTAL (Rp)

1 2 3 4 5 6

HARGA SAT. DASAR (Rp)

10. Pasang Panel Pembagi Daya 2200 VA / 10 A (3 grup @ 10 A) tiap 1 unit

Catatan: Belum termasuk penyambungan daya listrik PLNHarga bahan:- Kabel NYM 3x4 mm² m' 10 13,205 132,050.00- Kabel NYM 3x2,5 mm² m' 30 8,835 265,050.00- Conduit pipa PVC dia ⅝" C m' 40 2,850 114,000.00- MCB box isi 4 bh 1 60,752 60,751.55- MCB 10 A bh 4 32,595 130,378.00- Tee dos bh 4 3,420 13,680.00- Sock bh 10 855 8,550.00- Klem conduit bh 27 570 15,390.00- Lastdop bh 12 855 10,260.00- Elbow bh 2 1,140 2,280.00- Paku, sekrup, fisher (10% harga conduit) % 10 114,000 11,400.00

Jumlah Harga BahanUpah tenaga:- Instalator Oh 0.8 70,000 56,000.00- Pekerja Oh 0.4 45,000 18,000.00- Mandor Oh 0.04 70,000 2,800.00

Jumlah Upah TenagaJumlah Total

Dibulatkan

11. Pasang pentanahan (grounding) tiap 1 titik

Harga bahan:- Kabel BC 10 mm untuk grounding m' 5 7,632 38,161.50- Conduit pipa PVC dia ⅝" C m' 3 2,850 8,550.00- Klem conduit bh 3 570 1,710.00- Lastdop bh 1 855 855.00- Paku, sekrup, fisher (10% harga conduit) % 10 8,550 855.00

Jumlah Harga BahanUpah tenaga:- Instalator Oh 0.2 70,000 14,000.00- Pekerja Oh 0.1 45,000 4,500.00- Mandor Oh 0.01 70,000 700.00

Jumlah Upah TenagaJumlah Total

Dibulatkan

S PEKERJAAN PRASARANA LINGKUNGAN - DRAINASE

1. Memasang pipa beton, dia 15-20 cm tiap m'

Harga bahan:- Buis beton dia 20 panj. 100 cm bh 1.1 32,750 36,025.00- Bata merah bh 16 567 9,064.00- Semen portland kg 3.92 1,240 4,860.80- Pasir pasang m³ 0.056 110,000 6,160.00- Pasir urug m³ 0.024 77,250 1,854.00

Jumlah Harga BahanUpah tenaga:- Pekerja Oh 0.14 45,000 6,300.00- Tukang batu Oh 0.07 65,000 4,550.00- Kepala tukang Oh 0.007 70,000 490.00- Mandor Oh 0.007 70,000 490.00

Jumlah Upah TenagaJumlah Total

Dibulatkan

2. Memasang pipa beton, dia 30 cm tiap m'

Harga bahan:- Buis beton dia 30 panj. 100 cm bh 1.1 40,850 44,935.00- Bata merah bh 308 567 174,482.00- Semen portland kg 10.3 1,240 12,772.00- Pasir pasang m³ 0.061 110,000 6,710.00- Pasir urug m³ 0.069 77,250 5,330.25

Jumlah Harga BahanUpah tenaga:- Pekerja Oh 0.38 45,000 17,100.00- Tukang batu Oh 0.19 65,000 12,350.00

Page 151: RAB 2009

151

document.xls - 2-AHSP Hal - 151

NO. URAIAN SAT KUANTITAS SUB TOTAL (Rp)

1 2 3 4 5 6

HARGA SAT. DASAR (Rp)

- Kepala tukang Oh 0.019 70,000 1,330.00- Mandor Oh 0.019 70,000 1,330.00

Jumlah Upah TenagaJumlah Total

Dibulatkan

3. Memasang pipa beton, dia 40 cm tiap m'

Harga bahan:- Buis beton dia 40 panj. 100 cm bh 1.1 61,350 67,485.00- Bata merah bh 308 567 174,482.00- Semen portland kg 10.3 1,240 12,772.00- Pasir pasang m³ 0.061 110,000 6,710.00- Pasir urug m³ 0.069 77,250 5,330.25

Jumlah Harga BahanUpah tenaga:- Pekerja Oh 0.38 45,000 17,100.00- Tukang batu Oh 0.19 65,000 12,350.00- Kepala tukang Oh 0.019 70,000 1,330.00- Mandor Oh 0.019 70,000 1,330.00

Jumlah Upah TenagaJumlah Total

Dibulatkan

4. Memasang pipa beton, dia 50 cm tiap m'

Harga bahan:- Buis beton dia 50 panj. 100 cm bh 1.1 77,250 84,975.00- Bata merah bh 308 567 174,482.00- Semen portland kg 10.3 1,240 12,772.00- Pasir pasang m³ 0.061 110,000 6,710.00- Pasir urug m³ 0.069 77,250 5,330.25

Jumlah Harga BahanUpah tenaga:- Pekerja Oh 0.38 45,000 17,100.00- Tukang batu Oh 0.19 65,000 12,350.00- Kepala tukang Oh 0.019 70,000 1,330.00- Mandor Oh 0.019 70,000 1,330.00

Jumlah Upah TenagaJumlah Total

Dibulatkan

5. Memasang pipa beton, dia 60 cm tiap m'

Harga bahan:- Buis beton dia 60 panj. 100 cm bh 1.1 102,500 112,750.00- Bata merah bh 308 567 174,482.00- Semen portland kg 10.3 1,240 12,772.00- Pasir pasang m³ 0.061 110,000 6,710.00- Pasir urug m³ 0.069 77,250 5,330.25

Jumlah Harga BahanUpah tenaga:- Pekerja Oh 0.38 45,000 17,100.00- Tukang batu Oh 0.19 65,000 12,350.00- Kepala tukang Oh 0.019 70,000 1,330.00- Mandor Oh 0.019 70,000 1,330.00

Jumlah Upah TenagaJumlah Total

Dibulatkan

6. Memasang pipa beton, dia 80 cm tiap m'

Harga bahan:- Buis beton dia 80 panj. 100 cm bh 1.1 162,500 178,750.00- Bata merah bh 308 567 174,482.00- Semen portland kg 10.3 1,240 12,772.00- Pasir pasang m³ 0.061 110,000 6,710.00- Pasir urug m³ 0.069 77,250 5,330.25

Jumlah Harga BahanUpah tenaga:- Pekerja Oh 0.38 45,000 17,100.00- Tukang batu Oh 0.19 65,000 12,350.00- Kepala tukang Oh 0.019 70,000 1,330.00

Page 152: RAB 2009

152

document.xls - 2-AHSP Hal - 152

NO. URAIAN SAT KUANTITAS SUB TOTAL (Rp)

1 2 3 4 5 6

HARGA SAT. DASAR (Rp)

- Mandor Oh 0.019 70,000 1,330.00Jumlah Upah Tenaga

Jumlah TotalDibulatkan

7. Memasang pipa beton, dia 100 cm tiap m'

Harga bahan:- Buis beton dia 100 panj. 100 cm bh 1.1 187,500 206,250.00- Bata merah bh 308 567 174,482.00- Semen portland kg 10.3 1,240 12,772.00- Pasir pasang m³ 0.061 110,000 6,710.00- Pasir urug m³ 0.069 77,250 5,330.25

Jumlah Harga BahanUpah tenaga:- Pekerja Oh 0.38 45,000 17,100.00- Tukang batu Oh 0.19 65,000 12,350.00- Kepala tukang Oh 0.019 70,000 1,330.00- Mandor Oh 0.019 70,000 1,330.00

Jumlah Upah TenagaJumlah Total

Dibulatkan

8. Memasang 1 buah bak kontrol pas.batu bata 30 x 30 cm tinggi 35 cm

Harga bahan:- Bata merah bh 82 567 46,453.00- Semen portland kg 44 1,240 54,560.00- Pasir pasang m³ 0.07 110,000 7,700.00- Batu pecah/split 2/3 m³ 0.07 206,000 14,420.00- Besi beton polos m³ 1.6 9,928 15,884.00- Pasir beton m³ 0.06 103,000 6,180.00

Jumlah Harga BahanUpah tenaga:- Pekerja Oh 3.2 45,000 144,000.00- Tukang batu Oh 0.015 65,000 975.00- Kepala tukang Oh 0.0015 70,000 105.00- Mandor Oh 0.016 70,000 1,120.00

Jumlah Upah TenagaJumlah Total

Dibulatkan

9. Memasang 1 buah bak kontrol pas.batu bata 45 x 45 cm tinggi 50 cm

Harga bahan:- Bata merah bh 140 567 79,310.00- Semen portland kg 77 1,240 95,480.00- Pasir pasang m³ 0.13 110,000 14,300.00- Batu pecah/split 2/3 m³ 0.02 206,000 4,120.00- Besi beton polos m³ 2.6 9,928 25,811.50- Pasir beton m³ 0.09 103,000 9,270.00

Jumlah Harga BahanUpah tenaga:- Pekerja Oh 1.42 45,000 63,900.00- Tukang batu Oh 0.473 65,000 30,745.00- Kepala tukang Oh 0.047 70,000 3,290.00- Mandor Oh 0.071 70,000 4,970.00

Jumlah Upah TenagaJumlah Total

Dibulatkan

10. Memasang 1 buah bak kontrol pas.batu bata 60 x 60 cm tinggi 65 cm

Harga bahan:- Bata merah bh 208 567 117,832.00- Semen portland kg 114 1,240 141,360.00- Pasir pasang m³ 0.184 110,000 20,240.00- Batu pecah/split 2/3 m³ 0.033 206,000 6,798.00- Besi beton polos m³ 4.85 9,928 48,148.38- Pasir beton m³ 0.12 103,000 12,360.00

Jumlah Harga BahanUpah tenaga:- Pekerja Oh 2.16 45,000 97,200.00

Page 153: RAB 2009

153

document.xls - 2-AHSP Hal - 153

NO. URAIAN SAT KUANTITAS SUB TOTAL (Rp)

1 2 3 4 5 6

HARGA SAT. DASAR (Rp)

- Tukang batu Oh 0.72 65,000 46,800.00- Kepala tukang Oh 0.072 70,000 5,040.00- Mandor Oh 0.108 70,000 7,560.00- Tukang gali Oh 0.1 65,000 6,500.00

Jumlah Upah TenagaJumlah Total

Dibulatkan

11.

Harga bahan:- Bata merah bh 42 567 23,793.00- Semen portland kg 14.79 1,240 18,333.40- Pasir pasang m³ 0.042 110,000 4,620.00- Pasir urug m³ 0.00828 77,250 639.63- Buis beton 1/2 dia 20 panj. 100 cm bh 1.1 22,250 24,475.00

Jumlah Harga BahanUpah tenaga:- Pekerja Oh 0.46 45,000 20,700.00- Tukang batu Oh 0.198 65,000 12,870.00- Kepala tukang Oh 0.02 70,000 1,400.00- Mandor Oh 0.027 70,000 1,890.00

Jumlah Upah TenagaJumlah Total

Dibulatkan

12.

Harga bahan:- Bata merah bh 77 567 43,620.50- Semen portland kg 23.11 1,240 28,660.12- Pasir pasang m³ 0.066 110,000 7,260.00- Pasir urug m³ 0.03384 77,250 2,614.14- Buis beton 1/2 dia 20 panj. 100 cm bh 1.1 22,250 24,475.00

Jumlah Harga BahanUpah tenaga:- Pekerja Oh 0.2313 45,000 10,408.50- Tukang batu Oh 0.0816 65,000 5,304.00- Kepala tukang Oh 0.0084 70,000 588.00- Mandor Oh 0.0144 70,000 1,008.00

Jumlah Upah TenagaJumlah Total

Dibulatkan

13. Membuat saluran air dari batu kali lebar bawah 30 cm tinggi 60 cm tiap 1 m'

Harga bahan:- Batu belah 15/20 m³ 0.473 226,600 107,181.80- Semen portland kg 94.42 1,240 117,080.80- Pasir pasang m³ 0.22675 110,000 24,942.50

Jumlah Harga BahanHarga pemakaian alat:- TAMPER / HAND COMPACTOR jam 0.04632 38,042 1,762.09

Jumlah Harga AlatUpah tenaga:- Pekerja Oh 1.24112 45,000 55,850.40- Tukang batu Oh 0.398 65,000 25,870.00- Kepala tukang Oh 0.0398 70,000 2,786.00- Mandor Oh 0.0826 70,000 5,782.00

Jumlah Upah TenagaJumlah Total

Dibulatkan

14. Membuat saluran air dari batu kali lebar bawah 60 cm tinggi 80 cm tiap 1 m'

Harga bahan:- Batu belah 15/20 m³ 0.704 226,600 159,526.40- Semen portland kg 136.84 1,240 169,681.60- Pasir pasang m³ 0.3286 110,000 36,146.00

Jumlah Harga BahanHarga pemakaian alat:- TAMPER / HAND COMPACTOR jam 0.06948 38,042 2,643.13

Jumlah Harga Alat

Membuat saluran air buis beton ½ Ø 20 cm dinding bata dalam 15-25 cm tiap 1 m'

Membuat saluran air buis beton ½ Ø 30 cm dinding bata dalam 30-45 cm tiap 1 m'

Page 154: RAB 2009

154

document.xls - 2-AHSP Hal - 154

NO. URAIAN SAT KUANTITAS SUB TOTAL (Rp)

1 2 3 4 5 6

HARGA SAT. DASAR (Rp)

Upah tenaga:- Pekerja Oh 1.9246 45,000 86,607.00- Tukang batu Oh 0.524 65,000 34,060.00- Kepala tukang Oh 0.0524 70,000 3,668.00- Mandor Oh 0.13475 70,000 9,432.50

Jumlah Upah TenagaJumlah Total

Dibulatkan

15. Membuat saluran air dari batu kali lebar bawah 80 cm tinggi 100 cm tiap 1 m'

Harga bahan:- Batu belah 15/20 m³ 1.012 226,600 229,319.20- Semen portland kg 193.4 1,240 239,816.00- Pasir pasang m³ 0.4644 110,000 51,084.00

Jumlah Harga BahanHarga pemakaian alat:- TAMPER / HAND COMPACTOR jam 0.09264 38,042 3,524.17

Jumlah Harga AlatUpah tenaga:- Pekerja Oh 2.98348 45,000 134,256.60- Tukang batu Oh 0.692 65,000 44,980.00- Kepala tukang Oh 0.0692 70,000 4,844.00- Mandor Oh 0.21855 70,000 15,298.50

Jumlah Upah TenagaJumlah Total

Dibulatkan

16. Membuat saluran air dari batu kali lebar bawah 100 cm tinggi 120 cm tiap 1 m'

Harga bahan:- Batu belah 15/20 m³ 1.287 226,600 291,634.20- Semen portland kg 244.98 1,240 303,775.20- Pasir pasang m³ 0.58825 110,000 64,707.50

Jumlah Harga BahanHarga pemakaian alat:- TAMPER / HAND COMPACTOR jam 0.10422 38,042 3,964.69

Jumlah Harga AlatUpah tenaga:- Pekerja Oh 4.1048 45,000 184,716.00- Tukang batu Oh 0.862 65,000 56,030.00- Kepala tukang Oh 0.0862 70,000 6,034.00- Mandor Oh 0.30945 70,000 21,661.50

Jumlah Upah TenagaJumlah Total

Dibulatkan

T PEKERJAAN PRASARANA LINGKUNGAN - PAGAR

1. Pasang pagar beton pracetak tinggi 1,6 m tiap 1 m'

Harga bahan:- Panel beton pracetak 50x400x2130 Lbr 1.778 0.00- Kolom beton pracetak 160x200x2750 btg 0.445 0.00- Pasir beton m³ 0.0103 103,000 1,060.90- Batu pecah/split 2/3 m³ 0.0171 206,000 3,522.60- Semen portland kg 4.89 1,240 6,063.60

Jumlah Harga BahanUpah tenaga:- Tukang batu Oh 0.125 65,000 8,125.00- Pekerja Oh 0.375 45,000 16,875.00- Kepala tukang Oh 0.012 70,000 840.00- Mandor Oh 0.019 70,000 1,330.00

Jumlah Upah TenagaJumlah Total

Dibulatkan

2. Pasang pagar beton pracetak tinggi 2 m tiap 1 m'

Harga bahan:- Panel beton pracetak 50x400x2130 Lbr 2.223 0.00- Kolom beton pracetak 160x200x2750 btg 0.445 0.00- Pasir beton m³ 0.0103 103,000 1,060.90- Batu pecah/split 2/3 m³ 0.0171 206,000 3,522.60

Page 155: RAB 2009

155

document.xls - 2-AHSP Hal - 155

NO. URAIAN SAT KUANTITAS SUB TOTAL (Rp)

1 2 3 4 5 6

HARGA SAT. DASAR (Rp)

- Semen portland kg 4.89 1,240 6,063.60Jumlah Harga Bahan

Upah tenaga:- Tukang batu Oh 0.125 65,000 8,125.00- Pekerja Oh 0.375 45,000 16,875.00- Kepala tukang Oh 0.012 70,000 840.00- Mandor Oh 0.019 70,000 1,330.00

Jumlah Upah TenagaJumlah Total

Dibulatkan

3. Membuat pagar dinding tinggi 2 m bata merah + plesteran + cat tembok tiap 1 m'

Harga bahan:- Batu belah 15/20 m³ 0.36 226,600 81,576.00- Batu pecah/split 2/3 m³ 0.06 206,000 12,360.00- Bata merah bh 115.5 567 65,430.75- Semen portland kg 105.47 1,240 130,782.80- Pasir urug m³ 0.028 77,250 2,163.00- Pasir pasang m³ 0.265 110,000 29,150.00- Pasir beton m³ 0.038 103,000 3,914.00- Kayu Terentang balok m³ 0.014 950,000 13,300.00- Paku biasa 2"-5" kg 0.167 9,928 1,657.89- Residu lt 0.04 7,000 280.00- Besi beton polos kg 14.7 9,928 145,934.25- Kawat beton kg 0.868 13,775 11,956.70- Plamir tembok kg 0.4 9,500 3,800.00- Cat tembok Catylac (cat dasar) kg 0.4 7,125 2,850.00- Cat tembok Catylac (cat penutup) kg 1.04 12,350 12,844.00

Jumlah Harga BahanHarga pemakaian alat:- TAMPER / HAND COMPACTOR jam 0.03474 38,042 1,321.56

Jumlah Harga AlatUpah tenaga:- Pekerja Oh 2.661 45,000 119,745.00- Tukang kayu Oh 0.186 65,000 12,090.00- Tukang besi Oh 0.112 65,000 7,280.00- Tukang batu Oh 1.029 65,000 66,885.00- Tukang cat Oh 0.252 65,000 16,380.00- Kepala tukang Oh 0.158 70,000 11,060.00- Mandor Oh 0.152 70,000 10,640.00

Jumlah Upah TenagaJumlah Total

Dibulatkan

4. Membuat pagar dinding tinggi 3 m bata merah + plesteran + cat tembok tiap 1 m'

Harga bahan:- Batu belah 15/20 m³ 0.36 226,600 81,576.00- Batu pecah/split 2/3 m³ 0.065 206,000 13,390.00- Bata merah bh 185.5 567 105,085.75- Semen portland kg 135.28 1,240 167,747.20- Pasir urug m³ 0.028 77,250 2,163.00- Pasir pasang m³ 0.343 110,000 37,730.00- Pasir beton m³ 0.042 103,000 4,326.00- Kayu Terentang balok m³ 0.015 950,000 14,250.00- Paku biasa 2"-5" kg 0.173 9,928 1,717.46- Residu lt 0.04 7,000 280.00- Besi beton polos kg 16.56 9,928 164,399.40- Kawat beton kg 1.147 13,775 15,799.93- Plamir tembok kg 0.6 9,500 5,700.00- Cat tembok Catylac (cat dasar) kg 0.6 7,125 4,275.00- Cat tembok Catylac (cat penutup) kg 1.56 12,350 19,266.00

Jumlah Harga BahanHarga pemakaian alat:- TAMPER / HAND COMPACTOR jam 0.03474 38,042 1,321.56

Jumlah Harga AlatUpah tenaga:- Pekerja Oh 3.458 45,000 155,610.00

Page 156: RAB 2009

156

document.xls - 2-AHSP Hal - 156

NO. URAIAN SAT KUANTITAS SUB TOTAL (Rp)

1 2 3 4 5 6

HARGA SAT. DASAR (Rp)

- Tukang kayu Oh 0.199 65,000 12,935.00- Tukang besi Oh 0.1243 65,000 8,079.50- Tukang batu Oh 1.442 65,000 93,730.00- Tukang cat Oh 0.378 65,000 24,570.00- Kepala tukang Oh 0.215 70,000 15,050.00- Mandor Oh 0.194 70,000 13,580.00

Jumlah Upah TenagaJumlah Total

Dibulatkan

5. Membuat pagar dinding tinggi 2 m bata hollow ekspos + kolom/ringbalk diplester & dicat tiap 1 m'

Harga bahan:- Batu belah 15/20 m³ 0.36 226,600 81,576.00- Batu pecah/split 2/3 m³ 0.06 206,000 12,360.00- Hollow block HB. 10 bh 20.625 0.00- Semen portland kg 77.46 1,240 96,050.40- Pasir urug m³ 0.028 77,250 2,163.00- Pasir pasang m³ 0.195 110,000 21,450.00- Pasir beton m³ 0.038 103,000 3,914.00- Kayu Terentang balok m³ 0.014 950,000 13,300.00- Paku biasa 2"-5" kg 0.167 9,928 1,657.89- Residu lt 0.04 7,000 280.00- Besi beton polos kg 17.92 9,928 177,900.80- Kawat beton kg 0.868 13,775 11,956.70- Plamir tembok kg 0.143 9,500 1,358.50- Cat tembok Catylac (cat dasar) kg 0.143 7,125 1,018.87- Cat tembok Catylac (cat penutup) kg 0.371 12,350 4,581.85

Jumlah Harga BahanHarga pemakaian alat:- TAMPER / HAND COMPACTOR jam 0.03474 38,042 1,321.56

Jumlah Harga AlatUpah tenaga:- Pekerja Oh 2.096 45,000 94,320.00- Tukang kayu Oh 0.186 65,000 12,090.00- Tukang besi Oh 0.1119 65,000 7,273.50- Tukang batu Oh 0.643 65,000 41,795.00- Tukang cat Oh 0.09 65,000 5,850.00- Kepala tukang Oh 0.104 70,000 7,280.00- Mandor Oh 0.12 70,000 8,400.00

Jumlah Upah TenagaJumlah Total

Dibulatkan

6. Membuat pagar dinding tinggi 1,5 m bata hollow ekspos + kolom/ringbalk diplester & dicat tiap 1 m'

Harga bahan:- Batu belah 15/20 m³ 0.174 226,600 39,428.40- Batu pecah/split 2/3 m³ 0.053 206,000 10,918.00- Hollow block HB. 10 bh 14.375 0.00- Semen portland kg 61.27 1,240 75,974.80- Pasir pasang m³ 0.143 110,000 15,730.00- Pasir beton m³ 0.034 103,000 3,502.00- Kayu Terentang balok m³ 0.013 950,000 12,350.00- Paku biasa 2"-5" kg 0.16 9,928 1,588.40- Residu lt 0.04 7,000 280.00- Besi beton polos kg 14.8725 9,928 147,646.74- Kawat beton kg 0.5575 13,775 7,679.56- Plamir tembok kg 0.134 9,500 1,273.00- Cat tembok Catylac (cat dasar) kg 0.134 7,125 954.75- Cat tembok Catylac (cat penutup) kg 0.3484 12,350 4,302.74

Jumlah Harga BahanHarga pemakaian alat:- TAMPER / HAND COMPACTOR jam 0.031845 38,042 1,211.43

Jumlah Harga AlatUpah tenaga:- Pekerja Oh 1.535 45,000 69,075.00- Tukang kayu Oh 0.173 65,000 11,245.00- Tukang besi Oh 0.0981 65,000 6,376.50

Page 157: RAB 2009

157

document.xls - 2-AHSP Hal - 157

NO. URAIAN SAT KUANTITAS SUB TOTAL (Rp)

1 2 3 4 5 6

HARGA SAT. DASAR (Rp)

- Tukang batu Oh 0.49 65,000 31,850.00- Tukang cat Oh 0.08442 65,000 5,487.30- Kepala tukang Oh 0.085 70,000 5,950.00- Mandor Oh 0.085 70,000 5,950.00

Jumlah Upah TenagaJumlah Total

Dibulatkan

7.

Harga bahan:- Batu belah 15/20 m³ 0.274 226,600 62,088.40- Batu pecah/split 2/3 m³ 0.022 206,000 4,532.00- Bata merah bh 21 567 11,896.50- Semen portland kg 43.76 1,240 54,262.40- Pasir urug m³ 0.025 77,250 1,931.25- Pasir pasang m³ 0.12 110,000 13,200.00- Pasir beton m³ 0.0146 103,000 1,503.80- Kayu Terentang balok m³ 0.006 950,000 5,700.00- Paku biasa 2"-5" kg 0.12 9,928 1,191.30- Residu lt 0.04 7,000 280.00- Besi beton polos kg 4.44 9,928 44,078.10- Kawat beton kg 0.064 13,775 881.60- Pagar BRC tinggi 1,2 m' m' 1 0.00- Tiang pagar BRC tinggi 1,2 m' bh 0.555 0.00- Plamir tembok kg 0.115 9,500 1,092.50- Cat tembok Catylac (cat dasar) kg 0.115 7,125 819.37- Cat tembok Catylac (cat penutup) kg 0.299 12,350 3,692.65

Jumlah Harga BahanUpah tenaga:- Pekerja Oh 1.188 45,000 53,460.00- Tukang kayu Oh 0.104 65,000 6,760.00- Tukang besi Oh 0.072 65,000 4,680.00- Tukang batu Oh 0.341 65,000 22,165.00- Tukang cat Oh 0.07245 65,000 4,709.25- Kepala tukang Oh 0.059 70,000 4,130.00- Mandor Oh 0.071 70,000 4,970.00

Jumlah Upah TenagaJumlah Total

Dibulatkan

8.

Harga bahan:- Batu belah 15/20 m³ 0.274 226,600 62,088.40- Batu pecah/split 2/3 m³ 0.022 206,000 4,532.00- Bata merah bh 21 567 11,896.50- Semen portland kg 43.76 1,240 54,262.40- Pasir urug m³ 0.025 77,250 1,931.25- Pasir pasang m³ 0.12 110,000 13,200.00- Pasir beton m³ 0.0146 103,000 1,503.80- Kayu Terentang balok m³ 0.006 950,000 5,700.00- Paku biasa 2"-5" kg 0.12 9,928 1,191.30- Residu lt 0.04 7,000 280.00- Besi beton polos kg 4.44 9,928 44,078.10- Kawat beton kg 0.064 13,775 881.60- Pagar BRC tinggi 0,9 m' m' 1 0.00- Tiang pagar BRC tinggi 0,9 m' bh 0.555 0.00- Plamir tembok kg 0.115 9,500 1,092.50- Cat tembok Catylac (cat dasar) kg 0.115 7,125 819.37- Cat tembok Catylac (cat penutup) kg 0.299 12,350 3,692.65

Jumlah Harga BahanUpah tenaga:- Pekerja Oh 1.188 45,000 53,460.00- Tukang kayu Oh 0.104 65,000 6,760.00- Tukang besi Oh 0.072 65,000 4,680.00- Tukang batu Oh 0.341 65,000 22,165.00- Tukang cat Oh 0.07245 65,000 4,709.25- Kepala tukang Oh 0.059 70,000 4,130.00

Membuat pagar BRC 1,2 m tinggi jadi 1,5 m (pondasi batu kali + sloof 15/20 + ½ bata 30 cm + plester + cat) tiap 1 m'

Membuat pagar BRC 0,9 m tinggi jadi 1,2 m (pondasi batu kali + sloof 15/20 + ½ bata 30 cm + plester + cat) tiap 1 m'

Page 158: RAB 2009

158

document.xls - 2-AHSP Hal - 158

NO. URAIAN SAT KUANTITAS SUB TOTAL (Rp)

1 2 3 4 5 6

HARGA SAT. DASAR (Rp)

- Mandor Oh 0.071 70,000 4,970.00Jumlah Upah Tenaga

Jumlah TotalDibulatkan

1.

Asumsi:

Faktor pengembangan bahan Fk 1.2Jarak lokasi ke pembuangan L 1 KmJam kerja efektif Tk 7 jam

EXCAVATOR 150 HP Kobelco SK200

Kapasitas bucket v 0.9Faktor bucket Fb 0.9Efisiensi alat Fa 0.83Waktu siklus Ts1- Menggali / memuat T1 0.5 menit- Lain-lain T2 0.5 menit

Ts1 1 menit

Q1 33.615 Ts1 x Fk

Qt1 0.0298 jam

DUMP TRUCK 3-4 M³ / 6 TON

Kapasitas bak V 6 Efisiensi alat Fa 0.83Kecepatan rata-rata bermuatan v1 45 Km/jamKecepatan rata-rata kosong v2 60 Km/jamWaktu siklus Ts2- Waktu tempuh isi = (L : v1) x 60 T1 1.33333333333333 menit- Waktu tempuh kosong = (L : v2) x 60 T2 1 menit- Memuat = (V : Q1) x 60 T3 10.7095046854083 menit- Lain-lain T2 1 menit

Ts2 14.0428380187416 menit

Q2 17.7314585319352 Ts2 x Fk

Qt2 0.0564 jam

TENAGA

Produksi menentukan: EXCAVATOR Q1 33.615Produksi galian / hari = Tk x Q1 Qt 235.305Kebutuhan tenaga:- Pekerja P 2 orang- Mandor M 1 orang

- Pekerja = P : Qt 0.0085 Oh- Mandor = M : Qt 0.0043 Oh

Harga pemakaian alat:- EXCAVATOR 150 HP Kobelco SK200 jam 0.0298 654,500 19,504.10- DUMP TRUCK 3-4 M³ / 6 TON jam 0.0564 142,611 8,043.26

Jumlah Harga PeralatanUpah tenaga:- Pekerja Oh 0.0085 45,000 382.50- Mandor Oh 0.0043 70,000 301.00

Jumlah Upah TenagaJumlah Total

Dibulatkan

2.

Galian dengan excavator (skala besar) tiap 1m³

Kap. prod / jam = v x Fb x Fa x 60 m³/jam

Koefisien Alat / m³ = 1 : Q1

Kap. prod / jam = v x Fa x 60 m³/jam

Koefisien Alat / m³ = 1 : Q2

m³/jamm³/hari

Koefisien tenaga / m³

Galian dengan tenaga manusia tiap 1m³

Page 159: RAB 2009

159

document.xls - 2-AHSP Hal - 159

NO. URAIAN SAT KUANTITAS SUB TOTAL (Rp)

1 2 3 4 5 6

HARGA SAT. DASAR (Rp)

Harga pemakaian alat:- DUMP TRUCK 3-4 M³ / 6 TON jam 0.0625 142,611 8,913.18

Jumlah Harga PeralatanUpah tenaga:- Pekerja Oh 1.125 45,000 50,625.00- Mandor Oh 0.03125 70,000 2,187.50

Jumlah Upah TenagaJumlah Total

Dibulatkan

Page 160: RAB 2009

160

document.xls - 2-AHSP Hal - 160

NO. URAIAN SAT KUANTITAS SUB TOTAL (Rp)

1 2 3 4 5 6

HARGA SAT. DASAR (Rp)

3.

VIBRATING ROLLER 6-8 TON

Kecepatan alat v 4 km/jamEfisiensi alat Fa 0.83Lebar pemadatan b 1.2 m'Banyak lintasan (pass) n 6 lintasan 3 kali bolak-balikTebal lapis hamparan t 0.2 m'

Qj 132.8 n

Qt 0.0076 jam

WATER TANK TRUCK 3000-4500 L

Volume tangki air V 4 Efisiensi alat Fa 0.83

Wc 0.07Pengisian tangki / jam n 3 kali

Qj 142.285714285714 Wc

Qt 0.0071 jam

Harga bahan:- Tanah merah m³ 1.2 50,000 60,000.00

Jumlah Harga BahanHarga pemakaian alat:- VIBRATING ROLLER 6-8 TON jam 0.0076 99,000 752.40- WATER TANK TRUCK 3000-4500 L jam 0.0071 336,000 2,385.60

Jumlah Harga PeralatanUpah tenaga:- Pekerja Oh 0.25 45,000 11,250.00- Mandor Oh 0.025 70,000 1,750.00

Jumlah Upah TenagaJumlah Total

Dibulatkan

R PEKERJAAN PRASARANA LINGKUNGAN - JALAN, LAPANGAN PARKIR, LAPANGAN UPACARA/APEL

4.

VIBRATING ROLLER 6-8 TON

Kecepatan alat v 2.5 km/jamEfisiensi alat Fa 0.83Lebar pemadatan b 1.2 m'Banyak lintasan (pass) n 8 lintasan 4 kali bolak-balik

Qj 311.25 n

Qt 0.0033 jam

WATER TANK TRUCK 3000-4500 L

Volume tangki air V 4 Efisiensi alat Fa 0.83

Wc 0.07Pengisian tangki / jam n 3 kali

Qj 142.285714285714 Wc

Qt 0.0071 jam

Harga pemakaian alat:- VIBRATING ROLLER 6-8 TON jam 0.0033 99,000 326.70

Urugan tanah merah dipadatkan alat berat tiap 1m³

Kap. prod / jam = (v x 1000) x b x t x Fa m³/jam

Koefisien Alat / m³ = 1 : Qj

Kebutuhan air / m³ material padat m³

Kap. prod / jam = V x n x Fa m³/jam

Koefisien Alat / m³ = 1 : Qj

Penyiapan badan jalan / tanah dasar (Subgrade) tiap 1m²

Kap. prod / jam = (v x 1000) x b x Fa m²/jam

Koefisien Alat / m² = 1 : Qj

Kebutuhan air / m² tanah m³

Kap. prod / jam = V x n x Fa m²/jam

Koefisien Alat / m² = 1 : Qj

Page 161: RAB 2009

161

document.xls - 2-AHSP Hal - 161

NO. URAIAN SAT KUANTITAS SUB TOTAL (Rp)

1 2 3 4 5 6

HARGA SAT. DASAR (Rp)

- WATER TANK TRUCK 3000-4500 L jam 0.0071 336,000 2,385.60Jumlah Harga Peralatan

Upah tenaga:- Pekerja Oh 0.025 45,000 1,125.00- Mandor Oh 0.0004 70,000 28.00

Jumlah Upah TenagaJumlah Total

Dibulatkan

5.

VIBRATING ROLLER 6-8 TON

Kecepatan alat v 2.5 km/jamEfisiensi alat Fa 0.83Lebar pemadatan b 1.2 m'Banyak lintasan (pass) n 8 lintasan 4 kali bolak-balikTebal lapis hamparan t 0.15 m'

Qj 46.6875 n

Qt 0.0215 jam

WATER TANK TRUCK 3000-4500 L

Volume tangki air V 4 Efisiensi alat Fa 0.83

Wc 0.07Pengisian tangki / jam n 3 kali

Qj 142.285714285714 Wc

Qt 0.0071 jam

Harga bahan:- Sirtu m³ 1.2 113,300 135,960.00

Jumlah Harga BahanHarga pemakaian alat:- VIBRATING ROLLER 6-8 TON jam 0.0215 99,000 2,128.50- WATER TANK TRUCK 3000-4500 L jam 0.0071 336,000 2,385.60

Jumlah Harga PeralatanUpah tenaga:- Pekerja Oh 0.25 45,000 11,250.00- Mandor Oh 0.025 70,000 1,750.00

Jumlah Upah TenagaJumlah Total

Dibulatkan

6.

VIBRATING ROLLER 6-8 TON

Kecepatan alat v 2.5 km/jamEfisiensi alat Fa 0.83Lebar pemadatan b 1.2 m'Banyak lintasan (pass) n 8 lintasan 4 kali bolak-balik

Qj 311.25 n

Qt 0.0033 jam

WATER TANK TRUCK 3000-4500 L

Volume tangki air V 4 Efisiensi alat Fa 0.83

Wc 0.007Pengisian tangki / jam n 1 kali

Urugan sirtu (agregat kelas C) dipadatkan tiap 1m³

Kap. prod / jam = (v x 1000) x b x t x Fa m³/jam

Koefisien Alat / m³ = 1 : Qj

Kebutuhan air / m³ material padat m³

Kap. prod / jam = V x n x Fa m³/jam

Koefisien Alat / m³ = 1 : Qj

Lapis Pondasi Bawah (LPB / Subbase Course) Kelas C Sirtu tebal 10 cm tiap 1m²

Kap. prod / jam = (v x 1000) x b x Fa m²/jam

Koefisien Alat / m² = 1 : Qj

Kebutuhan air / m² material padat m³

Page 162: RAB 2009

162

document.xls - 2-AHSP Hal - 162

NO. URAIAN SAT KUANTITAS SUB TOTAL (Rp)

1 2 3 4 5 6

HARGA SAT. DASAR (Rp)

Qj 474.285714285714 Wc

Qt 0.0022 jam

Harga bahan:- Sirtu m³ 0.12 113,300 13,596.00

Jumlah Harga BahanHarga pemakaian alat:- VIBRATING ROLLER 6-8 TON jam 0.0033 99,000 326.70- WATER TANK TRUCK 3000-4500 L jam 0.0022 336,000 739.20

Jumlah Harga PeralatanUpah tenaga:- Pekerja Oh 0.025 45,000 1,125.00- Mandor Oh 0.0025 70,000 175.00

Jumlah Upah TenagaJumlah Total

Dibulatkan

7.

THREE WHEEL ROLLER 8-10 TON

Kecepatan alat v 3 km/jamEfisiensi alat Fa 0.83Lebar pemadatan b 1.2 m'Banyak lintasan (pass) n 8 lintasan 4 kali bolak-balikTebal lapis hamparan t 0.1 m' 6 lintasan u/ agregat kasar; 2 lintasan u/ agregat halus.

Qj 37.35 n

Qt 0.0268 jam

WATER TANK TRUCK 3000-4500 L

Volume tangki air V 4 Efisiensi alat Fa 0.83

Wc 0.07Pengisian tangki / jam n 1 kali

Qj 47.4285714285714 Wc

Qt 0.0211 jam

Harga bahan:- Batu pecah 5/7 m³ 0.935 224,200 209,627.00- Pasir urug m³ 0.165 77,250 12,746.25

Jumlah Harga BahanHarga pemakaian alat:- THREE WHEEL ROLLER 8-10 TON jam 0.0268 109,972 2,947.26- WATER TANK TRUCK 3000-4500 L jam 0.0211 336,000 7,089.60

Jumlah Harga PeralatanUpah tenaga:- Pekerja Oh 1 45,000 45,000.00- Mandor Oh 0.034 70,000 2,380.00

Jumlah Upah TenagaJumlah Total

Dibulatkan

Kap. prod / jam = V x n x Fa m³/jam

Koefisien Alat / m³ = 1 : Qj

Lapis Pondasi Jalan Tanpa Penutup Aspal jenis Waterbound Macadam tiap 1m³

Kap. prod / jam = (v x 1000) x b x t x Fa m³/jam

Koefisien Alat / m³ = 1 : Qj

Kebutuhan air / m² material padat m³

Kap. prod / jam = V x n x Fa m³/jam

Koefisien Alat / m³ = 1 : Qj

Page 163: RAB 2009

163

document.xls - 2-AHSP Hal - 163

NO. URAIAN SAT KUANTITAS SUB TOTAL (Rp)

1 2 3 4 5 6

HARGA SAT. DASAR (Rp)

8.

THREE WHEEL ROLLER 8-10 TON

Kecepatan alat v 3 km/jamEfisiensi alat Fa 0.83Lebar pemadatan b 1.2 m'Banyak lintasan (pass) n 12 lintasan 6 kali bolak-balikTebal lapis hamparan t 0.15 m'

Qj 37.35 n

Qt 0.0268 jam

WATER TANK TRUCK 3000-4500 L

Volume tangki air V 4 Efisiensi alat Fa 0.83

Wc 0.07Pengisian tangki / jam n 1 kali

Qj 47.4285714285714 Wc

Qt 0.0211 jam

Harga bahan:- Batu pecah/split 2/3 m³ 0.768 206,000 158,208.00- Pasir urug m³ 0.432 77,250 33,372.00

Jumlah Harga BahanHarga pemakaian alat:- THREE WHEEL ROLLER 8-10 TON jam 0.0268 109,972 2,947.26- WATER TANK TRUCK 3000-4500 L jam 0.0211 336,000 7,089.60

Jumlah Harga PeralatanUpah tenaga:- Pekerja Oh 1 45,000 45,000.00- Mandor Oh 0.034 70,000 2,380.00

Jumlah Upah TenagaJumlah Total

Dibulatkan

9. Lapis Resap Ikat (Prime Coat) tiap 1 Liter

Harga bahan:- Aspal kg 0.6417 0.00- Minyak Tanah Ltr 0.4889 3,325 1,625.59

Jumlah Harga BahanHarga pemakaian alat:- ASPHALT SPRAYER jam 0.003 71,500 214.50- AIR COMPRESSOR jam 0.0031 99,544 308.59- DUMP TRUCK 3-4 M³ / 6 TON jam 0.003 142,611 427.83

Jumlah Harga PeralatanUpah tenaga:- Pekerja Oh 0.0043 45,000 193.50- Mandor Oh 0.0009 70,000 63.00

Jumlah Upah TenagaJumlah Total

Dibulatkan

10. Lapis Perekat (Tack Coat) tiap 1 Liter

Harga bahan:- Aspal kg 0.888 0.00- Minyak Tanah Ltr 0.253 3,325 841.23

Jumlah Harga BahanHarga pemakaian alat:- ASPHALT SPRAYER jam 0.003 71,500 214.50- AIR COMPRESSOR jam 0.0063 99,544 627.13- DUMP TRUCK 3-4 M³ / 6 TON jam 0.003 142,611 427.83

Jumlah Harga Peralatan

Lapis Pondasi Atas (LPA / Base Course) Agregat Kelas A tiap 1m³

Kap. prod / jam = (v x 1000) x b x t x Fa m³/jam

Koefisien Alat / m³ = 1 : Qj

Kebutuhan air / m² material padat m³

Kap. prod / jam = V x n x Fa m³/jam

Koefisien Alat / m³ = 1 : Qj

Page 164: RAB 2009

164

document.xls - 2-AHSP Hal - 164

NO. URAIAN SAT KUANTITAS SUB TOTAL (Rp)

1 2 3 4 5 6

HARGA SAT. DASAR (Rp)

Upah tenaga:- Pekerja Oh 0.0043 45,000 193.50- Mandor Oh 0.0009 70,000 63.00

Jumlah Upah TenagaJumlah Total

Dibulatkan

11. Aspal untuk Pelaburan tiap 1 Liter

Harga bahan:- Aspal kg 1.1 0.00- Minyak Tanah Ltr 0.052 3,325 172.90

Jumlah Harga BahanHarga pemakaian alat:- ASPHALT SPRAYER jam 0.0015 71,500 107.25- AIR COMPRESSOR jam 0.0031 99,544 308.59- DUMP TRUCK 3-4 M³ / 6 TON jam 0.0015 142,611 213.92

Jumlah Harga PeralatanUpah tenaga:- Pekerja Oh 0.0022 45,000 99.00- Mandor Oh 0.00022 70,000 15.40

Jumlah Upah TenagaJumlah Total

Dibulatkan

12.

THREE WHEEL ROLLER 8-10 TON

Kecepatan alat v 3 km/jam 6 lintasan u/ batu 3/5 & 2/3Efisiensi alat Fa 0.83 2 lintasan u/ batu 1/2; 2 lintasan u/ pasirLebar pemadatan b 1.2 m'Banyak lintasan (pass) n 8 lintasan 4 kali bolak-balik

Qj 373.5 n

Qt 0.0027 jam

ASPHALT SPRAYER

Berat jenis bahan aspal Da 1.01As 4.8

Kapasitas alat V 800 LiterEfisiensi alat Fa 0.83Waktu siklus (termasuk proses pemanasan) Ts 2 Jam

Qj 69.8583333333333 Ts x As

Qt 0.0144 jam

Harga bahan:- Batu pecah/split 3/5 m³ 0.04 180,250 7,210.00- Batu pecah/split 2/3 m³ 0.022 206,000 4,532.00- Batu pecah/split 1/2 m³ 0.011 220,000 2,420.00- Abu batu m³ 0.0025 269,500 673.75- Aspal kg 4.8 0.00- Minyak tanah Ltr 0.322 3,325 1,070.65

Jumlah Harga BahanHarga pemakaian alat:- THREE WHEEL ROLLER 8-10 TON jam 0.0027 109,972 296.92- ASPHALT SPRAYER jam 0.0144 71,500 1,029.60- DUMP TRUCK 3-4 M³ / 6 TON jam 0.0108 142,611 1,540.20

Jumlah Harga PeralatanUpah tenaga:- Pekerja Oh 0.1415 45,000 6,367.50- Tukang aspal Oh 0.0043 65,000 279.50- Mandor Oh 0.0043 70,000 301.00

Jumlah Upah Tenaga

Lapisan Penetrasi (LAPEN) / Lapisan Permukaan (Surface Course) Macadam tebal 5 cm tiap 1m²

Kap. prod / jam = (v x 1000) x b x Fa m²/jam

Koefisien Alat / m² = 1 : Qj

ton/m³

Pemakaian aspal / m² kg/m²

Kap. prod / jam = V x Fa x Da m²/jam

Koefisien Alat / m² = 1 : Qj

Page 165: RAB 2009

165

document.xls - 2-AHSP Hal - 165

NO. URAIAN SAT KUANTITAS SUB TOTAL (Rp)

1 2 3 4 5 6

HARGA SAT. DASAR (Rp)

Jumlah TotalDibulatkan

13.

Jam kerja efektif rata-rata Tk 7 jamJarak lokasi pengolahan AMP ke proyek L 20 kmTebal Lapis jalan padat t 0.03 mFaktor kehilangan material : - Agregat Fh1 1.1 - Aspal Fh2 1.05Komposisi campuran AC : - Coarse Agregat CA 29.5 % 20-40% - Fine Agregat FA 56.5 % 46-67% - Fraksi Filler FF 6.49 % 5-9% - Asphalt AS 7.51 % minimum 7,3%Berat jenis bahan: - HRS D1 2.24 - Coarse agregat & Fine agrega D2 1.8 - Fraksi Filler D3 2 - Asphalt D4 1.03

BAHAN

- Agregat kasar = (CA x (D1 x t m3) x Fh1) : D2 (M03) 0.0121

- Agregat halus = (FA x (D1 x t m3) x Fh1) : D2 (M04) 0.0232

- Filler = (FF x (D1 x t m3) x Fh1) (M05) 4.7974 kg- Asphalt = (AS x (D1 x t m3) x Fh2) (M06) 5.2991 kg

WHEEL LOADER 1,0-1,6 M3

Kapasitas bucket V 1.8Faktor bucket Fb 0.9Efisiensi alat Fa 0.83Waktu siklus Ts1- Memuat T1 1.5 menit- Lain-lain T2 0.5 menit

Ts1 2 menit

Q1 1080.48214285714 D1 x Ts1 x t

Qt1 0.001 jam

ASPHALT MIXING PLANT (AMP)

Kapasitas produksi alat V 50 Ton/jamEfisiensi alat Fa 0.83

Q2 617.56 D1 x t

Qt2 0.0017 jam

GENERATOR SET 125 KVA

Kap. prod / jam = SAMA DENGAN AMP Q3 617.56Qt3 0.0017 jam

DUMP TRUCK 3-4 M³ / 6 TON

Kapasitas bak V 6 tonEfisiensi alat Fa 0.83Kecepatan rata-rata bermuatan v1 40 Km/jamKecepatan rata-rata kosong v2 50 Km/jamKapasitas AMP / batch Q2b 0.5 tonWaktu menyiapkan 1 batch HRS Tb 1 menitWaktu siklus Ts2- Mengisi bak = (V : Q2b) x Tb T1 12 menit- Waktu tempuh isi = (L : v1) x 60 T2 30 menit- Waktu tempuh kosong = (L : v2) x 60 T3 24 menit- Lain-lain (tunggu + dump + putar) T4 15 menit

Ts2 81 menit

Lapisan Tipis Aspal Beton (LATASTON / HRS-Hot Rolled Sheet) tebal 3 cm tiap 1m²

ton/m³

ton/m³

ton/m³

ton/m³

Kap. prod / jam = D2 x V x Fb x Fa x 60 m³/jam

Koefisien Alat / m³ = 1 : Q1

Kap. prod / jam = V x Fa m²/jam

Koefisien Alat / m² = 1 : Q2

m²/jamKoefisien Alat / m² = 1 : Q3

Page 166: RAB 2009

166

document.xls - 2-AHSP Hal - 166

NO. URAIAN SAT KUANTITAS SUB TOTAL (Rp)

1 2 3 4 5 6

HARGA SAT. DASAR (Rp)

Q4 54.8941798941799 D1 x Ts2 x t

Qt4 0.0183 jam

ASPHALT FINISHER

Kapasitas produksi alat V 40 Ton/jamEfisiensi alat Fa 0.83

Q5 494.05 D1 x t

Qt5 0.0021 jam

TANDEM ROLLER 6-8 TON

Kecepatan alat v 3.5 km/jamEfisiensi alat Fa 0.83Lebar pemadatan b 1.2 m'Banyak lintasan (pass) n 6 lintasan 3 kali bolak-balik

Q6 581 n

Qt6 0.0018 jam

PNEUMATIC TYRE ROLLER 8-12 TON

Kecepatan alat v 5 km/jamEfisiensi alat Fa 0.83Lebar pemadatan b 1.5 m'Banyak lintasan (pass) n 8 lintasan 4 kali bolak-balik

Qj 778.125 n

Qt 0.0013 jam

TENAGA

Produksi menentukan: AMP Q2 617.56Produksi HRS / hari = Tk x Q2 Qt 4,322.92 Kebutuhan tenaga:- Pekerja P 10 orang- Mandor M 1 orang

- Pekerja = P : Qt 0.0024 Oh- Mandor = M : Qt 0.0003 Oh

Harga bahan:- Batu pecah/split 1/2 0.0122 220,000 2,684.00- Abu batu 0.0233 269,500 6,279.35- Filler untuk hotmix (semen) kg 4.7975 0.00- Aspal kg 5.2991 0.00

Jumlah Harga BahanHarga pemakaian alat:- WHEEL LOADER 1,0-1,6 M3 jam 0.001 213,609 213.61- ASPHALT MIXING PLANT (AMP) jam 0.0017 1,760,000 2,992.00- GENERATOR SET 125 KVA jam 0.0017 173,318 294.64- DUMP TRUCK 3-4 M³ / 6 TON jam 0.0183 142,611 2,609.78- ASPHALT FINISHER jam 0.0021 240,800 505.68- TANDEM ROLLER 6-8 TON jam 0.0018 264,000 475.20- PNEUMATIC TYRE ROLLER 8-12 TON jam 0.0013 330,000 429.00

Jumlah Harga PeralatanUpah tenaga:- Pekerja Oh 0.0024 45,000 108.00- Mandor Oh 0.0003 70,000 21.00

Jumlah Upah Tenaga

Kap. prod / jam = v x Fa x 60 m³/jam

Koefisien Alat / m³ = 1 : Q4

Kap. prod / jam = V x Fa m²/jam

Koefisien Alat / m² = 1 : Q5

Kap. prod / jam = (v x 1000) x b x Fa m²/jam

Koefisien Alat / m² = 1 : Q6

Kap. prod / jam = (v x 1000) x b x Fa m²/jam

Koefisien Alat / m² = 1 : Qj

m²/jamm²/hari

Koefisien tenaga / m³

Page 167: RAB 2009

167

document.xls - 2-AHSP Hal - 167

NO. URAIAN SAT KUANTITAS SUB TOTAL (Rp)

1 2 3 4 5 6

HARGA SAT. DASAR (Rp)

Jumlah TotalDibulatkan

14.

Jam kerja efektif rata-rata Tk 7 jamJarak lokasi pengolahan AMP ke proyek L 20 kmTebal Lapis jalan padat t 0.05 mFaktor kehilangan material : - Agregat Fh1 1.1 - Aspal Fh2 1.05Komposisi campuran AC : - Coarse Agregat CA 61.15 % 30-50% - Fine Agregat FA 27 % 39-59% - Fraksi Filler FF 4.85 % 4,5-7,5% - Asphalt AS 7 % minimum 5,7%Berat jenis bahan: - Asphalt Concrete (AC) D1 2.25 - Coarse agregat & Fine agrega D2 1.8 - Fraksi Filler D3 2 - Asphalt D4 1.03

BAHAN

- Agregat kasar = (CA x (D1 x t m3) x Fh1) : D2 (M03) 0.0420

- Agregat halus = (FA x (D1 x t m3) x Fh1) : D2 (M04) 0.0186

- Filler = (FF x (D1 x t m3) x Fh1) (M05) 6.0019 kg- Asphalt = (AS x (D1 x t m3) x Fh2) (M06) 8.2688 kg

WHEEL LOADER 1,0-1,6 M3

Kapasitas bucket V 1.8Faktor bucket Fb 0.9Efisiensi alat Fa 0.83Waktu siklus Ts1- Memuat T1 1.5 menit- Lain-lain T2 0.5 menit

Ts1 2 menit

Q1 645.408 D1 x Ts1 x t

Qt1 0.0016 jam

ASPHALT MIXING PLANT (AMP)

Kapasitas produksi alat V 50 Ton/jamEfisiensi alat Fa 0.83

Q2 368.89 D1 x t

Qt2 0.0028 jam

GENERATOR SET 125 KVA

Kap. prod / jam = SAMA DENGAN AMP Q3 368.89Qt3 0.0028 jam

DUMP TRUCK 3-4 M³ / 6 TON

Kapasitas bak V 6 tonEfisiensi alat Fa 0.83Kecepatan rata-rata bermuatan v1 40 Km/jamKecepatan rata-rata kosong v2 50 Km/jamKapasitas AMP / batch Q2b 0.5 tonWaktu menyiapkan 1 batch HRS Tb 1 menitWaktu siklus Ts2- Mengisi bak = (V : Q2b) x Tb T1 12 menit- Waktu tempuh isi = (L : v1) x 60 T2 30 menit- Waktu tempuh kosong = (L : v2) x 60 T3 24 menit- Lain-lain (tunggu + dump + putar) T4 15 menit

Ts2 81 menit

Lapisan Permukaan Aspal Beton (LASTON / AC-Asphalt Concrete) tebal 5 cm tiap 1m²

ton/m³

ton/m³

ton/m³

ton/m³

Kap. prod / jam = D2 x V x Fb x Fa x 60 m³/jam

Koefisien Alat / m³ = 1 : Q1

Kap. prod / jam = V x Fa m²/jam

Koefisien Alat / m² = 1 : Q2

m²/jamKoefisien Alat / m² = 1 : Q3

Page 168: RAB 2009

168

document.xls - 2-AHSP Hal - 168

NO. URAIAN SAT KUANTITAS SUB TOTAL (Rp)

1 2 3 4 5 6

HARGA SAT. DASAR (Rp)

Q4 32.7901234567901 D1 x Ts2 x t

Qt4 0.0305 jam

ASPHALT FINISHER

Kapasitas produksi alat V 40 Ton/jamEfisiensi alat Fa 0.83

Q5 295.11 D1 x t

Qt5 0.0034 jam

TANDEM ROLLER 6-8 TON

Kecepatan alat v 2.5 km/jamEfisiensi alat Fa 0.83Lebar pemadatan b 1.2 m'Banyak lintasan (pass) n 4 lintasan 2 kali bolak-balik

Q6 622.5 n

Qt6 0.0017 jam

PNEUMATIC TYRE ROLLER 8-12 TON

Kecepatan alat v 3.5 km/jamEfisiensi alat Fa 0.83Lebar pemadatan b 1.5 m'Banyak lintasan (pass) n 8 lintasan 4 kali bolak-balik

Qj 544.6875 n

Qt 0.0019 jam

TENAGA

Produksi menentukan: AMP Q2 368.89Produksi HRS / hari = Tk x Q2 Qt 2,582.22 Kebutuhan tenaga:- Pekerja P 10 orang- Mandor M 1 orang

- Pekerja = P : Qt 0.0039 Oh- Mandor = M : Qt 0.0004 Oh

Harga bahan:- Batu pecah/split 1/2 0.0421 220,000 9,262.00- Abu batu 0.0186 269,500 5,012.70- Filler untuk hotmix (semen) kg 6.0019 0.00- Aspal kg 8.2688 0.00

Jumlah Harga BahanHarga pemakaian alat:- WHEEL LOADER 1,0-1,6 M3 jam 0.0016 213,609 341.77- ASPHALT MIXING PLANT (AMP) jam 0.0028 1,760,000 4,928.00- GENERATOR SET 125 KVA jam 0.0028 173,318 485.29- DUMP TRUCK 3-4 M³ / 6 TON jam 0.0305 142,611 4,349.63- ASPHALT FINISHER jam 0.0034 240,800 818.72- TANDEM ROLLER 6-8 TON jam 0.0017 264,000 448.80- PNEUMATIC TYRE ROLLER 8-12 TON jam 0.0019 330,000 627.00

Jumlah Harga PeralatanUpah tenaga:- Pekerja Oh 0.0039 45,000 175.50- Mandor Oh 0.0004 70,000 28.00

Jumlah Upah Tenaga

Kap. prod / jam = v x Fa x 60 m³/jam

Koefisien Alat / m³ = 1 : Q4

Kap. prod / jam = V x Fa m²/jam

Koefisien Alat / m² = 1 : Q5

Kap. prod / jam = (v x 1000) x b x Fa m²/jam

Koefisien Alat / m² = 1 : Q6

Kap. prod / jam = (v x 1000) x b x Fa m²/jam

Koefisien Alat / m² = 1 : Qj

m²/jamm²/hari

Koefisien tenaga / m³

Page 169: RAB 2009

169

document.xls - 2-AHSP Hal - 169

NO. URAIAN SAT KUANTITAS SUB TOTAL (Rp)

1 2 3 4 5 6

HARGA SAT. DASAR (Rp)

Jumlah TotalDibulatkan

15.

Harga bahan:- Sirtu m³ 0.12 113,300 13,596.00- Batu pecah/split 3/5 m³ 0.04 180,250 7,210.00- Batu pecah/split 2/3 m³ 0.1756 206,000 36,173.60- Batu pecah/split 1/2 m³ 0.011 220,000 2,420.00- Abu batu m³ 0.0025 269,500 673.75- Aspal kg 4.8 0.00- Minyak tanah Ltr 0.322 3,325 1,070.65- Pasir urug m³ 0.0864 77,250 6,674.40

Jumlah Harga BahanHarga pemakaian alat:- VIBRATING ROLLER 6-8 TON jam 0.0066 99,000 653.40- WATER TANK TRUCK 3000-4500 L jam 0.01352 336,000 4,542.72- THREE WHEEL ROLLER 8-10 TON jam 0.00806 109,972 886.38- ASPHALT SPRAYER jam 0.0144 71,500 1,029.60- DUMP TRUCK 3-4 M³ / 6 TON jam 0.0108 142,611 1,540.20

Jumlah Harga PeralatanUpah tenaga:- Pekerja Oh 0.3915 45,000 17,617.50- Tukang aspal Oh 0.0043 65,000 279.50- Mandor Oh 0.014 70,000 980.00

Jumlah Upah TenagaJumlah Total

Dibulatkan

16.

17.

18.

19.

20.

21.

Harga bahan:- Sirtu m³ 0.12 113,300 13,596.00- Batu pecah/split 2/3 m³ 0.1536 206,000 31,641.60- Pasir urug m³ 0.0864 77,250 6,674.40- Aspal kg 5.81246 0.00- Minyak Tanah Ltr 0.39112 3,325 1,300.47- Batu pecah/split 1/2 0.0122 220,000 2,684.00- Abu batu 0.0233 269,500 6,279.35- Filler untuk hotmix (semen) kg 4.7975 0.00

Jumlah Harga BahanHarga pemakaian alat:- VIBRATING ROLLER 6-8 TON jam 0.0066 99,000 653.40- WATER TANK TRUCK 3000-4500 L jam 0.01352 336,000 4,542.72- THREE WHEEL ROLLER 8-10 TON jam 0.00536 109,972 589.45- ASPHALT SPRAYER jam 0.0024 71,500 171.60- AIR COMPRESSOR jam 0.00248 99,544 246.87- DUMP TRUCK 3-4 M³ / 6 TON jam 0.0207 142,611 2,952.05- WHEEL LOADER 1,0-1,6 M3 jam 0.001 213,609 213.61- ASPHALT MIXING PLANT (AMP) jam 0.0017 1,760,000 2,992.00- GENERATOR SET 125 KVA jam 0.0017 173,318 294.64- ASPHALT FINISHER jam 0.0021 240,800 505.68- TANDEM ROLLER 6-8 TON jam 0.0018 264,000 475.20- PNEUMATIC TYRE ROLLER 8-12 TON jam 0.0013 330,000 429.00

Jumlah Harga PeralatanUpah tenaga:- Pekerja Oh 0.25584 45,000 11,512.80- Mandor Oh 0.0108 70,000 756.00

Jumlah Upah TenagaJumlah Total

Dibulatkan

Pembuatan jalan aspal biasa (Sirtu t=10 cm, Agregat Kelas A t=20 cm, Permukaan Macadam t=5 cm) tiap m²

Pembuatan jalan aspal biasa lebar 3 m' tiap 1 m'

Pembuatan jalan aspal biasa lebar 4 m' tiap 1 m'

Pembuatan jalan aspal biasa lebar 5 m' tiap 1 m'

Pembuatan jalan aspal biasa lebar 6 m' tiap 1 m'

Pembuatan jalan aspal biasa lebar 8 m' tiap 1 m'

Pembuatan jalan aspal beton t=3 cm (Sirtu = 10 cm, Agregat Kelas A t=20 cm, LATASTON HRS-WC = 3 cm) tiap m²

Page 170: RAB 2009

170

document.xls - 2-AHSP Hal - 170

NO. URAIAN SAT KUANTITAS SUB TOTAL (Rp)

1 2 3 4 5 6

HARGA SAT. DASAR (Rp)

22.

23.

24.

25.

26.

27.

Harga bahan:- Sirtu m³ 0.12 113,300 13,596.00- Batu pecah/split 2/3 m³ 0.1536 206,000 31,641.60- Pasir urug m³ 0.0864 77,250 6,674.40- Aspal kg 8.78216 0.00- Minyak Tanah Ltr 0.39112 3,325 1,300.47- Batu pecah/split 1/2 0.0421 220,000 9,262.00- Abu batu 0.0186 269,500 5,012.70- Filler untuk hotmix (semen) kg 6.0019 0.00

Jumlah Harga BahanHarga pemakaian alat:- VIBRATING ROLLER 6-8 TON jam 0.0066 99,000 653.40- WATER TANK TRUCK 3000-4500 L jam 0.01352 336,000 4,542.72- THREE WHEEL ROLLER 8-10 TON jam 0.00536 109,972 589.45- ASPHALT SPRAYER jam 0.0024 71,500 171.60- AIR COMPRESSOR jam 0.00248 99,544 246.87- DUMP TRUCK 3-4 M³ / 6 TON jam 0.0329 142,611 4,691.90- WHEEL LOADER 1,0-1,6 M3 jam 0.0016 213,609 341.77- ASPHALT MIXING PLANT (AMP) jam 0.0028 1,760,000 4,928.00- GENERATOR SET 125 KVA jam 0.0028 173,318 485.29- ASPHALT FINISHER jam 0.0034 240,800 818.72- TANDEM ROLLER 6-8 TON jam 0.0017 264,000 448.80- PNEUMATIC TYRE ROLLER 8-12 TON jam 0.0019 330,000 627.00

Jumlah Harga PeralatanUpah tenaga:- Pekerja Oh 0.25734 45,000 11,580.30- Mandor Oh 0.0109 70,000 763.00

Jumlah Upah TenagaJumlah Total

Dibulatkan

28.

29.

30.

31.

32.

33. Pekerjaan paving parkir kendaraan (warna abu T-16 uk. 8x10,5x21) + urugan sirtu 20 cm + urugan pasir 5 cm tiap m²

TAMPER / HAND COMPACTOR

Kecepatan alat v 0.5 km/jamEfisiensi alat Fa 0.83Lebar pemadatan b 0.25 m'Banyak lintasan (pass) n 14 lintasan 7 kali bolak-balik

Qj 7.41071428571429 n

Qt 0.135 jam

PLATE COMPACTOR

Kecepatan alat v 0.5 km/jamEfisiensi alat Fa 0.83Lebar pemadatan b 0.43 m'Banyak lintasan (pass) n 6 lintasan 3 kali bolak-balik

Pembuatan jalan aspal beton t=3 cm lebar 3 m' tiap 1 m'

Pembuatan jalan aspal beton t=3 cm lebar 4 m' tiap 1 m'

Pembuatan jalan aspal beton t=3 cm lebar 5 m' tiap 1 m'

Pembuatan jalan aspal beton t=3 cm lebar 6 m' tiap 1 m'

Pembuatan jalan aspal beton t=3 cm lebar 8 m' tiap 1 m'

Pembuatan jalan aspal beton t=5 cm (Sirtu = 10 cm, Agregat Kelas A t=20 cm, LASTON AC-WC = 5 cm) tiap m²

Pembuatan jalan aspal beton t=5 cm lebar 3 m' tiap 1 m'

Pembuatan jalan aspal beton t=5 cm lebar 4 m' tiap 1 m'

Pembuatan jalan aspal beton t=5 cm lebar 5 m' tiap 1 m'

Pembuatan jalan aspal beton t=5 cm lebar 6 m' tiap 1 m'

Pembuatan jalan aspal beton t=5 cm lebar 8 m' tiap 1 m'

Kap. prod / jam = (v x 1000) x b x Fa m²/jam

Koefisien Alat / m² = 1 : Qj

Page 171: RAB 2009

171

document.xls - 2-AHSP Hal - 171

NO. URAIAN SAT KUANTITAS SUB TOTAL (Rp)

1 2 3 4 5 6

HARGA SAT. DASAR (Rp)

Qj 29.7416666666667 n

Qt 0.0337 jam

Harga bahan:- Sirtu m³ 0.24 113,300 27,192.00- Pasir urug m³ 0.06 77,250 4,635.00- Paving abu-abu segi enam, tebal 8 cm m² 1.1 50,255 55,280.50- Abu batu 0.018 269,500 4,851.00

Jumlah Harga BahanHarga pemakaian alat:- TAMPER / HAND COMPACTOR jam 0.135 38,042 5,135.61- PLATE COMPACTOR jam 0.0337 38,870 1,309.92

Jumlah Harga PeralatanUpah tenaga:- Pekerja Oh 0.2125 45,000 9,562.50- Tukang batu Oh 0.12 65,000 7,800.00- Kepala tukang Oh 0.012 70,000 840.00- Mandor Oh 0.01625 70,000 1,137.50

Jumlah Upah TenagaJumlah Total

Dibulatkan

34. Pekerjaan paving jalan setapak (warna abu T-16 uk. 8x10,5x21) + urugan sirtu 10 cm + urugan pasir 5 cm tiap m²

TAMPER / HAND COMPACTOR

Kecepatan alat v 0.5 km/jamEfisiensi alat Fa 0.83Lebar pemadatan b 0.25 m'Banyak lintasan (pass) n 14 lintasan 7 kali bolak-balik

Qj 7.41071428571429 n

Qt 0.135 jam

PLATE COMPACTOR

Kecepatan alat v 0.5 km/jamEfisiensi alat Fa 0.83Lebar pemadatan b 0.43 m'Banyak lintasan (pass) n 6 lintasan 3 kali bolak-balik

Qj 29.7416666666667 n

Qt 0.0337 jam

Harga bahan:- Sirtu m³ 0.12 113,300 13,596.00- Pasir urug m³ 0.06 77,250 4,635.00- Paving abu-abu segi enam, tebal 8 cm m² 1.05 50,255 52,767.75- Abu batu 0.018 269,500 4,851.00

Jumlah Harga BahanHarga pemakaian alat:- TAMPER / HAND COMPACTOR jam 0.135 38,042 5,135.61- PLATE COMPACTOR jam 0.0337 38,870 1,309.92

Jumlah Harga PeralatanUpah tenaga:- Pekerja Oh 0.1875 45,000 8,437.50- Tukang batu Oh 0.12 65,000 7,800.00- Kepala tukang Oh 0.012 70,000 840.00- Mandor Oh 0.01375 70,000 962.50

Jumlah Upah TenagaJumlah Total

Dibulatkan

Kap. prod / jam = (v x 1000) x b x Fa m²/jam

Koefisien Alat / m² = 1 : Qj

Kap. prod / jam = (v x 1000) x b x Fa m²/jam

Koefisien Alat / m² = 1 : Qj

Kap. prod / jam = (v x 1000) x b x Fa m²/jam

Koefisien Alat / m² = 1 : Qj

Page 172: RAB 2009

172

document.xls - 2-AHSP Hal - 172

NO. URAIAN SAT KUANTITAS SUB TOTAL (Rp)

1 2 3 4 5 6

HARGA SAT. DASAR (Rp)

35. Pekerjaan kanstin tiap 1 m'

Harga bahan:- Kayu Kelas II Papan m³ 0.0007 6,695,000 4,686.50- Kayu Kelas II Balok m³ 0.0012 6,180,000 7,416.00- Paku biasa 2"-5" kg 0.002 9,928 19.86- Pasir urug m³ 0.015 77,250 1,158.75- Kanstin abu-abu 15 x 25 x 40 bh 2.625 0.00- Semen portland kg 7.075 1,240 8,773.00- Pasir pasang m³ 0.0195 110,000 2,145.00

Jumlah Harga BahanUpah tenaga:- Pekerja Oh 0.076 45,000 3,420.00- Tukang batu Oh 0.0225 65,000 1,462.50- Kepala tukang Oh 0.00225 70,000 157.50- Mandor Oh 0.005 70,000 350.00

Jumlah Upah TenagaJumlah Total

Dibulatkan

V ANALISA TAMBAHAN

1. Memasang 1 buah kran leher angsa dia 3/4" atau 1/2" stainless

Harga bahan:- Kran air leher angsa stainless bh 1 166,250 166,250.00- Seal tape bh 0.025 3,895 97.38

Jumlah Harga BahanUpah tenaga:- Pekerja Oh 0.01 45,000 450.00- Tukang pasang pipa Oh 0.1 65,000 6,500.00- Kepala tukang Oh 0.01 70,000 700.00- Mandor Oh 0.005 70,000 350.00

Jumlah Upah TenagaJumlah Total

Dibulatkan

2 Analisa pekerjaan beton kolom 15/15

- Pekerjaan beton 1:2:3 m3 1 755,910 755,910.00- Pelerjaan besi beton 10 mm kg 109.689 11,470 1,258,132.83- Pekerjaan besi beton 8 mm kg 56.533 11,470 648,433.51- Pekerjaan bekesting kolom m2 13.33 126,200 1,682,246.00

Jumlah TotalDibulatkan

3 Analisa pekerjaan beton sloof, ring balk 15/20

- Pekerjaan beton 1:2:3 m3 1 755,910 755,910.00- Pelerjaan besi beton 10 mm kg 82.667 11,470 948,190.49- Pekerjaan besi beton 8 mm kg 79.333 11,470 909,949.51- Pekerjaan bekesting sloof m2 13.33 129,950 1,732,233.50

Jumlah TotalDibulatkan

4 Listrik Kerja dengan penyambungan daya sementara utk ± 4 bln

- Penyambungan daya unit 1 0.00- pengabelan titik lampu unit 3 0.00- pengabelan stop kontak tenaga 500 watt unit 2 0.00- pengabelan stop Kontak tenaga 1000 watt unit 1 0.00- MCB 3 phase 6 A bh 1 0.00- MCB 1 phase 6 A bh 1 0.00- Box MCB 3 group set 1 0.00- pemakaian selama 4 bulan bln 4 0.00

Jumlah TotalDibulatkan

5 Listrik Kerja (Sewa Genset)

- sewa generator 1 KVA unit/bln 1 173,318 173,318.01- solar ltr/bln 40 5,225 209,000.00- pelumas ltr/bln 2 0.00- Operator Genset org/hr 10 45,000 450,000.00- instalasi penerangan ttk 2 170,330 340,660.00

Jumlah Total

Page 173: RAB 2009

173

document.xls - 2-AHSP Hal - 173

NO. URAIAN SAT KUANTITAS SUB TOTAL (Rp)

1 2 3 4 5 6

HARGA SAT. DASAR (Rp)

Dibulatkan

6 Foto Dokumentasi

- Cetak foto pada kertas lbr 20 14,250 285,000.00- CD bh 1 23,750 23,750.00- Jilid bh 2 23,750 47,500.00

Jumlah TotalDibulatkan

7. Urugan tanah tiap 20 cm (tanah didatangkan)

Harga bahan:- Tanah merah m³ 1.2 50,000 60,000.00- sewa tamper unit 1 11,001 11,001.00- Ongkos angkut truk kap. 6 m3 jarak s/d 20 km m3 1.2 57,000 68,400.00

Jumlah Harga BahanUpah tenaga:- Pekerja Oh 0.4 45,000 18,000.00- Mandor Oh 0.04 70,000 2,800.00

Jumlah Upah TenagaJumlah Total

Dibulatkan

8. Pasang Gording Kayu Kamper Medan/Kruing tiap 1m³

Harga bahan:- Kayu Kelas II Balok m³ 1.1 6,180,000 6,798,000.00- Paku biasa 2"-5" kg 2.9 9,928 28,789.75

Jumlah Harga BahanUpah tenaga:- Pekerja Oh 1.5 45,000 67,500.00- Tukang kayu Oh 4.5 65,000 292,500.00- Kepala tukang Oh 0.45 70,000 31,500.00- Mandor Oh 0.075 70,000 5,250.00

Jumlah Upah TenagaJumlah Total

Dibulatkan

9. Air Kerja dan Tangki PDAM dalam rit

Harga bahan:- Air Kapasitas 300 ltr unit 1 26,125 26,125.00- Bak Penampungan 200 ltr unit 10 142,500 1,425,000.00

Jumlah TotalDibulatkan

10 Pemasangan AC Split

Harga bahan:- Material Bantu unit 1 237,500 237,500.00

Jumlah Harga BahanUpah tenaga:- Pekerja Oh 0.3 45,000 13,500.00- Instalator Oh 0.4 70,000 28,000.00

Jumlah Upah TenagaJumlah Total

Dibulatkan

10 Kolom Praktis/ringbalk praktis

- besi beton m3 1.00 675,850.00 675,850.00- Pembesian 145 kg/m3 kg 145.00 11,470.00 1,663,150.00

begesting m2 13.00 126,200.00 1,640,600.00Jumlah Total

Dibulatkan

10 Pekerjaan Tiang Pancang

- Tiang Pancang m1 1.10 154,346.40 169,781.04- Pemancangan kg 1.00 75,000.00 75,000.00

Jumlah TotalDibulatkan

Page 174: RAB 2009

174

document.xls - 2-AHSP Hal - 174

NO. URAIAN SAT KUANTITAS SUB TOTAL (Rp)

1 2 3 4 5 6

HARGA SAT. DASAR (Rp)

36. Pekerjaan tiang pancang kayu tanpa pengawet 1 btg

Harga bahan:- Cerucuk btg 1.00 37,500 37,500.00- Alat Bantu ls 1.00 7,500 7,500.00

Jumlah Harga BahanUpah tenaga:- Pekerja Oh 0.476 45,000 21,426.43- Tukang kayu Oh 0.095 65,000 6,193.57- Kepala tukang Oh 0.010 70,000 667.00- Mandor Oh 0.048 70,000 3,330.00

Jumlah Upah TenagaJumlah Total

Dibulatkan

Page 175: RAB 2009

175

document.xls - 2-AHSP Hal - 175

BANGUNAN GEDUNG, PERUMAHAN DAN PRASARANAUNTUK DAERAH KABUPATEN LUWU TIMUR

HSP (Rp)

7

250,657.15

33,800.00284,457.15

284,450

297,019.65

33,800.00330,819.65

330,810

20,894.65

29,300.0050,194.65

50,190

URAIAN ANALISIS HARGA SATUAN PEKERJAAN (UNIT PRICE)

Page 176: RAB 2009

176

document.xls - 2-AHSP Hal - 176

HSP (Rp)

7

796,942.88

199,500.00996,442.88

996,440

5,058,430.11

1,829,546.686,887,976.79

6,887,970

Page 177: RAB 2009

177

document.xls - 2-AHSP Hal - 177

HSP (Rp)

7

398,362.83

141,310.00539,672.83

539,670

757,990.75

192,500.00950,490.75

950,490

959,576.75

156,500.00

Page 178: RAB 2009

178

document.xls - 2-AHSP Hal - 178

HSP (Rp)

7

1,116,076.751,116,070

Page 179: RAB 2009

179

document.xls - 2-AHSP Hal - 179

HSP (Rp)

7

744,093.25

192,500.00936,593.25

936,590

55,268.00

48,500.00103,768.00

103,760

73,222.50

52,000.00125,222.50

125,220

68,693.55

12,050.0080,743.55

80,740

0.0058,000.008,000.00

Page 180: RAB 2009

180

document.xls - 2-AHSP Hal - 180

HSP (Rp)

7

8,000

Page 181: RAB 2009

181

document.xls - 2-AHSP Hal - 181

HSP (Rp)

7

2,600.002,600.00

2,600

20,800.0020,800.00

20,800

27,310.0027,310.00

27,310

38,185.0038,185.00

38,180

32,465.0032,465.00

32,460

65,000.0065,000.00

65,000

42,845.0042,845.00

42,840

26,720.0026,720.00

26,720

9,970.009,970.00

9,970

Page 182: RAB 2009

182

document.xls - 2-AHSP Hal - 182

HSP (Rp)

7

26,000.0026,000.00

26,000

5,200.005,200.00

5,200

11,001.6211,001.62

11,001

2,202.612,202.61

2,203

18,336.0418,336.04

18,336

3,667.213,667.21

3,668

Page 183: RAB 2009

183

document.xls - 2-AHSP Hal - 183

HSP (Rp)

7

752.40752.40

753

158.40158.40

159

135,960.00

13,000.00148,960.00

148,960

92,700.00

13,000.00105,700.00

105,700

Page 184: RAB 2009

184

document.xls - 2-AHSP Hal - 184

HSP (Rp)

7

60,000.00

13,000.0073,000.00

73,000

132,000.00

13,000.00145,000.00

145,000

1,828.75

5,200.007,028.75

7,020

8,497.50

5,200.0013,697.50

13,690

6,845

0.00

7,800.007,800.00

7,800

627,310.00

115,950.00743,260.00

Page 185: RAB 2009

185

document.xls - 2-AHSP Hal - 185

HSP (Rp)

7

743,260

553,090.00

115,950.00669,040.00

669,040

508,580.00

115,950.00624,530.00

624,530

Page 186: RAB 2009

186

document.xls - 2-AHSP Hal - 186

HSP (Rp)

7

477,740.00

115,950.00593,690.00

593,690

456,050.00

115,950.00572,000.00

572,000

295,095.00

65,910.00361,005.00

361,000

Page 187: RAB 2009

187

document.xls - 2-AHSP Hal - 187

HSP (Rp)

7

1,127,047.50

206,700.001,333,747.50

1,333,740

581,782.50

134,300.00716,082.50

716,080

142,050.00

45,750.00187,800.00

187,800

130,178.00

45,750.00175,928.00

175,920

122,462.00

Page 188: RAB 2009

188

document.xls - 2-AHSP Hal - 188

HSP (Rp)

7

45,750.00168,212.00

168,210

118,058.00

45,750.00163,808.00

163,800

67,333.00

22,650.0089,983.00

89,980

61,873.80

22,650.0084,523.80

84,520

58,645.00

22,650.0081,295.00

81,290

56,608.20

Page 189: RAB 2009

189

document.xls - 2-AHSP Hal - 189

HSP (Rp)

7

22,650.0079,258.20

79,250

Page 190: RAB 2009

190

document.xls - 2-AHSP Hal - 190

HSP (Rp)

7

55,361.80

22,650.0078,011.80

78,010

612,425.30

204,820.00817,245.30

817,240

562,894.10

204,820.00767,714.10

767,710

533,512.50

204,820.00738,332.50

738,330

Page 191: RAB 2009

191

document.xls - 2-AHSP Hal - 191

HSP (Rp)

7

514,970.50

204,820.00719,790.50

719,790

503,604.10

204,820.00708,424.10

708,420

13,326.28

5,032.5018,358.78

18,350

41,378.63

27,740.0069,118.63

69,110

36,496.63

Page 192: RAB 2009

192

document.xls - 2-AHSP Hal - 192

HSP (Rp)

7

24,090.0060,586.63

60,580

31,628.63

22,650.0054,278.63

54,270

19,722.00

21,750.0041,472.00

41,470

5,392.00

21,750.0027,142.00

27,140

Page 193: RAB 2009

193

document.xls - 2-AHSP Hal - 193

HSP (Rp)

7

7,692.00

21,750.0029,442.00

29,440

12,434.80

20,500.0032,934.80

32,930

Page 194: RAB 2009

194

document.xls - 2-AHSP Hal - 194

HSP (Rp)

7

10,125.20

20,500.0030,625.20

30,620

8,648.00

20,500.0029,148.00

29,140

7,776.80

20,500.0028,276.80

28,270

7,093.20

20,500.0027,593.20

27,590

20,237.20

26,525.0046,762.20

46,760

Page 195: RAB 2009

195

document.xls - 2-AHSP Hal - 195

HSP (Rp)

7

16,252.00

26,525.0042,777.00

42,770

13,843.20

26,525.0040,368.20

40,360

12,119.60

26,525.0038,644.60

38,640

11,037.60

26,525.0037,562.60

37,560

20,650.00

28,810.0049,460.00

49,460

Page 196: RAB 2009

196

document.xls - 2-AHSP Hal - 196

HSP (Rp)

7

18,420.00

28,810.0047,230.00

47,230

26,976.00

33,450.0060,426.00

60,420

21,836.00

33,450.0055,286.00

55,280

11,076.80

12,350.0023,426.80

23,420

9,560.80

12,350.0021,910.80

21,910

Page 197: RAB 2009

197

document.xls - 2-AHSP Hal - 197

HSP (Rp)

7

840.00

7,835.008,675.00

8,670

7,116.80

19,500.0026,616.80

26,610

7,116.80

12,350.0019,466.80

19,460

Page 198: RAB 2009

198

document.xls - 2-AHSP Hal - 198

HSP (Rp)

7

9,064,000.00

1,731,000.0010,795,000.00

10,795,000

9,888,000.00

1,601,000.0011,489,000.00

11,489,000

9,888,000.00

1,601,000.0011,489,000.00

11,489,000

7,416,000.00

1,601,000.009,017,000.00

9,017,000

7,416,000.00

1,601,000.009,017,000.00

9,017,000

3,708,000.00

Page 199: RAB 2009

199

document.xls - 2-AHSP Hal - 199

HSP (Rp)

7

1,601,000.005,309,000.00

5,309,000

3,708,000.00

1,601,000.005,309,000.00

5,309,000

3,708,000.00

1,601,000.005,309,000.00

5,309,000

370,800.00

228,500.00599,300.00

599,300

370,800.00

228,500.00599,300.00

599,300

370,800.00

Page 200: RAB 2009

200

document.xls - 2-AHSP Hal - 200

HSP (Rp)

7

228,500.00599,300.00

599,300

267,800.00

228,500.00496,300.00

496,300

Page 201: RAB 2009

201

document.xls - 2-AHSP Hal - 201

HSP (Rp)

7

267,800.00

228,500.00496,300.00

496,300

267,800.00

228,500.00496,300.00

496,300

144,200.00

228,500.00372,700.00

372,700

144,200.00

228,500.00372,700.00

372,700

324,450.00

182,800.00507,250.00

507,250

324,450.00

Page 202: RAB 2009

202

document.xls - 2-AHSP Hal - 202

HSP (Rp)

7

182,800.00507,250.00

507,250

324,450.00

182,800.00507,250.00

507,250

234,325.00

182,800.00417,125.00

417,120

234,325.00

182,800.00417,125.00

417,120

234,325.00

182,800.00417,125.00

417,120

126,175.00

182,800.00

Page 203: RAB 2009

203

document.xls - 2-AHSP Hal - 203

HSP (Rp)

7

308,975.00308,970

126,175.00

182,800.00308,975.00

308,970

593,280.00

264,500.00857,780.00

857,780

593,280.00

264,500.00857,780.00

857,780

593,280.00

264,500.00857,780.00

857,780

428,480.00

264,500.00692,980.00

692,980

Page 204: RAB 2009

204

document.xls - 2-AHSP Hal - 204

HSP (Rp)

7

428,480.00

264,500.00692,980.00

692,980

428,480.00

264,500.00692,980.00

692,980

Page 205: RAB 2009

205

document.xls - 2-AHSP Hal - 205

HSP (Rp)

7

230,720.00

264,500.00495,220.00

495,220

230,720.00

264,500.00495,220.00

495,220

557,689.13

168,250.00725,939.13

725,930

557,689.13

168,250.00725,939.13

725,930

557,689.13

168,250.00725,939.13

725,930

Page 206: RAB 2009

206

document.xls - 2-AHSP Hal - 206

HSP (Rp)

7

403,189.13

168,250.00571,439.13

571,430

403,189.13

168,250.00571,439.13

571,430

219,414.83

173,100.00392,514.83

392,510

219,414.83

173,100.00392,514.83

392,510

219,414.83

Page 207: RAB 2009

207

document.xls - 2-AHSP Hal - 207

HSP (Rp)

7

173,100.00392,514.83

392,510

168,944.83

173,100.00342,044.83

342,040

Page 208: RAB 2009

208

document.xls - 2-AHSP Hal - 208

HSP (Rp)

7

168,944.83

173,100.00342,044.83

342,040

233,967.33

173,100.00407,067.33

407,060

183,497.33

173,100.00356,597.33

356,590

254,220.25

218,800.00473,020.25

473,020

254,220.25

Page 209: RAB 2009

209

document.xls - 2-AHSP Hal - 209

HSP (Rp)

7

218,800.00473,020.25

473,020

203,750.25

218,800.00422,550.25

422,550

203,750.25

218,800.00422,550.25

422,550

203,750.25

218,800.00422,550.25

422,550

150,462.50

Page 210: RAB 2009

210

document.xls - 2-AHSP Hal - 210

HSP (Rp)

7

218,800.00369,262.50

369,260

150,462.50

218,800.00369,262.50

369,260

9,189,504.50

1,058,000.0010,247,504.50

10,247,500

9,189,504.50

1,058,000.0010,247,504.50

10,247,500

9,189,504.50

1,058,000.0010,247,504.50

10,247,500

Page 211: RAB 2009

211

document.xls - 2-AHSP Hal - 211

HSP (Rp)

7

6,923,504.50

1,058,000.007,981,504.50

7,981,500

6,923,504.50

1,058,000.007,981,504.50

7,981,500

3,524,504.50

1,058,000.004,582,504.50

4,582,500

3,524,504.50

1,058,000.004,582,504.50

4,582,500

100,369.13

Page 212: RAB 2009

212

document.xls - 2-AHSP Hal - 212

HSP (Rp)

7

12,050.00112,419.13

112,410

75,649.13

12,050.0087,699.13

87,690

116,849.13

12,050.00128,899.13

128,890

88,009.13

12,050.00100,059.13

100,050

116,849.13

12,050.00128,899.13

128,890

88,009.13

Page 213: RAB 2009

213

document.xls - 2-AHSP Hal - 213

HSP (Rp)

7

12,050.00100,059.13

100,050

1,067,335.39

14,460.001,081,795.39

1,081,790

67,240.38

19,600.0086,840.38

86,840

48,700.38

19,600.0068,300.38

68,300

26,452.38

19,600.0046,052.38

46,050

102,466.38

Page 214: RAB 2009

214

document.xls - 2-AHSP Hal - 214

HSP (Rp)

7

21,140.00123,606.38

123,600

74,141.38

21,140.0095,281.38

95,280

Page 215: RAB 2009

215

document.xls - 2-AHSP Hal - 215

HSP (Rp)

7

40,151.38

21,140.0061,291.38

61,290

82,171.65

12,050.0094,221.65

94,220

59,511.65

12,050.0071,561.65

71,560

32,319.65

12,050.0044,369.65

44,360

99,872.75

25,275.00125,147.75

Page 216: RAB 2009

216

document.xls - 2-AHSP Hal - 216

HSP (Rp)

7

125,140

Page 217: RAB 2009

217

document.xls - 2-AHSP Hal - 217

HSP (Rp)

7

81,332.75

25,275.00106,607.75

106,600

38,072.75

25,275.0063,347.75

63,340

133,150.43

27,720.00160,870.43

160,870

100,190.43

27,720.00127,910.43

127,910

50,750.43

27,720.0078,470.43

78,470

Page 218: RAB 2009

218

document.xls - 2-AHSP Hal - 218

HSP (Rp)

7

108,112.75

26,480.00134,592.75

134,590

81,332.75

26,480.00107,812.75

107,810

41,162.75

26,480.0067,642.75

67,640

135,086.33

27,720.00162,806.33

162,800

101,714.33

27,720.00129,434.33

129,430

Page 219: RAB 2009

219

document.xls - 2-AHSP Hal - 219

HSP (Rp)

7

51,656.33

27,720.0079,376.33

79,370

191,009.13

31,300.00222,309.13

222,300

143,629.13

31,300.00174,929.13

174,920

72,559.13

31,300.00103,859.13

103,850

9,201.78

6,495.0015,696.78

15,690

Page 220: RAB 2009

220

document.xls - 2-AHSP Hal - 220

HSP (Rp)

7

496.38

11,550.0012,046.38

12,040

496.38

10,110.0010,606.38

10,600

496.38

10,110.0010,606.38

10,600

15,741.83

10,595.0026,336.83

26,330

16,385.33

10,595.0026,980.33

26,980

Page 221: RAB 2009

221

document.xls - 2-AHSP Hal - 221

HSP (Rp)

7

5,086.78

2,520.007,606.78

7,600

4,178.63

10,580.0014,758.63

14,750

2,422.48

10,580.0013,002.48

13,000

83,858.15

31,770.00115,628.15

115,620

142,735.65

41,410.00

Page 222: RAB 2009

222

document.xls - 2-AHSP Hal - 222

HSP (Rp)

7

184,145.65184,140

167,455.65

48,875.00216,330.65

216,330

20,615.00

8,450.0029,065.00

29,060

17,521.00

8,450.0025,971.00

25,970

22,307.60

8,450.0030,757.60

30,750

25,802.65

Page 223: RAB 2009

223

document.xls - 2-AHSP Hal - 223

HSP (Rp)

7

8,450.0034,252.65

34,250

Page 224: RAB 2009

224

document.xls - 2-AHSP Hal - 224

HSP (Rp)

7

32,463.85

8,450.0040,913.85

40,910

1,572,949.25

1,257,480.002,830,429.25

2,830,420

43,712.25

34,930.0078,642.25

78,640

Page 225: RAB 2009

225

document.xls - 2-AHSP Hal - 225

HSP (Rp)

7

41,288.25

34,930.0076,218.25

76,210

45,404.85

34,930.0080,334.85

80,330

226,562.75

39,675.00266,237.75

266,230

168,367.75

39,675.00208,042.75

208,040

Page 226: RAB 2009

226

document.xls - 2-AHSP Hal - 226

HSP (Rp)

7

272,122.75

52,900.00325,022.75

325,020

272,122.75

52,900.00325,022.75

325,020

Page 227: RAB 2009

227

document.xls - 2-AHSP Hal - 227

HSP (Rp)

7

17,656.38

6,612.5024,268.88

24,260

28,196.38

6,612.5034,808.88

34,800

35,516.38

6,612.5042,128.88

42,120

27,562.78

6,612.5034,175.28

34,170

96,749.00

Page 228: RAB 2009

228

document.xls - 2-AHSP Hal - 228

HSP (Rp)

7

42,550.00139,299.00

139,290

113,524.00

42,550.00156,074.00

156,070

294,261.75

48,700.00342,961.75

342,960

128,669.50

42,550.00171,219.50

171,210

Page 229: RAB 2009

229

document.xls - 2-AHSP Hal - 229

HSP (Rp)

7

478,800.00

97,850.00576,650.00

576,650

506,936.00

97,850.00604,786.00

604,780

578,000.00

97,850.00675,850.00

675,850

Page 230: RAB 2009

230

document.xls - 2-AHSP Hal - 230

HSP (Rp)

7

633,717.00

122,200.00755,917.00

755,910

710,549.00

122,200.00832,749.00

832,740

739,592.00

122,200.00861,792.00

861,790

10,630.50

840.0011,470.50

11,470

10,979.63

Page 231: RAB 2009

231

document.xls - 2-AHSP Hal - 231

HSP (Rp)

7

840.0011,819.63

11,810

14,328.75

3,560.0017,888.75

17,880

Page 232: RAB 2009

232

document.xls - 2-AHSP Hal - 232

HSP (Rp)

7

41,678.25

32,570.0074,248.25

74,240

46,428.25

32,570.0078,998.25

78,990

88,521.00

37,680.00126,201.00

126,200

91,371.00

38,580.00129,951.00

129,950

Page 233: RAB 2009

233

document.xls - 2-AHSP Hal - 233

HSP (Rp)

7

150,321.00

38,580.00188,901.00

188,900

145,571.00

38,580.00184,151.00

184,150

78,671.00

38,580.00117,251.00

117,250

2,342,570.00

Page 234: RAB 2009

234

document.xls - 2-AHSP Hal - 234

HSP (Rp)

7

362,800.002,705,370.00

2,705,370

Page 235: RAB 2009

235

document.xls - 2-AHSP Hal - 235

HSP (Rp)

7

2,922,140.00

468,470.003,390,610.00

3,390,610

5,838,332.50

759,650.006,597,982.50

6,597,980

4,498,553.00

Page 236: RAB 2009

236

document.xls - 2-AHSP Hal - 236

HSP (Rp)

7

610,360.005,108,913.00

5,108,910

Page 237: RAB 2009

237

document.xls - 2-AHSP Hal - 237

HSP (Rp)

7

3,090,246.75

576,350.003,666,596.75

3,666,590

4,096,546.75

556,110.004,652,656.75

4,652,650

4,078,092.50

Page 238: RAB 2009

238

document.xls - 2-AHSP Hal - 238

HSP (Rp)

7

557,740.004,635,832.50

4,635,830

Page 239: RAB 2009

239

document.xls - 2-AHSP Hal - 239

HSP (Rp)

7

543,877.25

99,746.00643,623.25

643,620

71,186.80

20,292.9091,479.70

91,470

105,472.38

30,278.80135,751.18

135,750

Page 240: RAB 2009

240

document.xls - 2-AHSP Hal - 240

HSP (Rp)

7

241,235.35

47,545.20288,780.55

288,780

Page 241: RAB 2009

241

document.xls - 2-AHSP Hal - 241

HSP (Rp)

7

45,412.53

7,230.0052,642.53

52,640

61,574.38

12,137.0073,711.38

73,710

94,817.35

24,989.00119,806.35

119,800

Page 242: RAB 2009

242

document.xls - 2-AHSP Hal - 242

HSP (Rp)

7

476,736.20

69,179.00545,915.20

545,910

Page 243: RAB 2009

243

document.xls - 2-AHSP Hal - 243

HSP (Rp)

7

50,313.30

11,985.0062,298.30

62,290

477,326.40

63,682.00541,008.40

541,000

422,727.13

Page 244: RAB 2009

244

document.xls - 2-AHSP Hal - 244

HSP (Rp)

7

57,842.90480,570.03

480,570

139,685.08

32,274.00171,959.08

171,950

42,500.00

12,745.0055,245.00

55,240

41,425.00

12,745.0054,170.00

54,170

27,000.00

11,630.0038,630.00

38,630

Page 245: RAB 2009

245

document.xls - 2-AHSP Hal - 245

HSP (Rp)

7

35,940.00

32,540.0068,480.00

68,480

27,190.00

32,540.0059,730.00

59,730

41,440.00

32,540.0073,980.00

73,980

36,754.00

12,295.0049,049.00

49,040

39,204.00

12,295.0051,499.00

51,490

Page 246: RAB 2009

246

document.xls - 2-AHSP Hal - 246

HSP (Rp)

7

35,814.00

11,830.0047,644.00

47,640

41,236.50

11,830.0053,066.50

53,060

95,481.00

13,095.00108,576.00

108,570

49,881.00

13,095.0062,976.00

62,970

44,781.00

15,440.0060,221.00

60,220

Page 247: RAB 2009

247

document.xls - 2-AHSP Hal - 247

HSP (Rp)

7

52,547.83

16,900.0069,447.83

69,440

161,921.50

16,270.00178,191.50

178,190

1,985.50

26,030.0028,015.50

28,010

56,683.38

33,800.0090,483.38

90,480

112,696.38

Page 248: RAB 2009

248

document.xls - 2-AHSP Hal - 248

HSP (Rp)

7

22,960.00135,656.38

135,650

28,447.75

10,140.0038,587.75

38,580

Page 249: RAB 2009

249

document.xls - 2-AHSP Hal - 249

HSP (Rp)

7

9,987.35

12,280.0022,267.35

22,260

41,799.03

24,045.0065,844.03

65,840

0.00

10,910.0010,910.00

10,910

Page 250: RAB 2009

250

document.xls - 2-AHSP Hal - 250

HSP (Rp)

7

609,500.00

231,270.00840,770.00

840,770

1,179,250.00

231,270.001,410,520.00

1,410,520

1,431,000.00

231,270.001,662,270.00

1,662,270

223,540.00

164,200.00387,740.00

387,740

Page 251: RAB 2009

251

document.xls - 2-AHSP Hal - 251

HSP (Rp)

7

317,540.00

164,200.00481,740.00

481,740

419,890.00

164,200.00584,090.00

584,090

1,777,060.00

124,000.001,901,060.00

1,901,060

1,548,148.00

165,750.001,713,898.00

1,713,890

224,200.00

Page 252: RAB 2009

252

document.xls - 2-AHSP Hal - 252

HSP (Rp)

7

302,000.00526,200.00

526,200

597,383.00

507,000.001,104,383.00

1,104,380

Page 253: RAB 2009

253

document.xls - 2-AHSP Hal - 253

HSP (Rp)

7

273,456.40

190,750.00464,206.40

464,200

14,107.51

9,099.0023,206.51

23,200

16,929.00

9,099.0026,028.00

26,020

21,161.25

9,099.0030,260.25

30,260

0.00

Page 254: RAB 2009

254

document.xls - 2-AHSP Hal - 254

HSP (Rp)

7

9,099.009,099.00

9,090

Page 255: RAB 2009

255

document.xls - 2-AHSP Hal - 255

HSP (Rp)

7

32,446.74

18,198.0050,644.74

50,640

46,554.75

18,198.0064,752.75

64,750

76,885.36

18,198.0095,083.36

95,080

88,169.31

18,198.00106,367.31

106,360

131,199.75

22,751.00153,950.75

153,950

Page 256: RAB 2009

256

document.xls - 2-AHSP Hal - 256

HSP (Rp)

7

3,385.80

6,066.009,451.80

9,450

4,795.52

6,066.0010,861.52

10,860

Page 257: RAB 2009

257

document.xls - 2-AHSP Hal - 257

HSP (Rp)

7

6,488.42

6,066.0012,554.42

12,550

0.00

6,066.006,066.00

6,060

0.00

6,066.006,066.00

6,060

11,988.81

6,066.0018,054.81

18,050

Page 258: RAB 2009

258

document.xls - 2-AHSP Hal - 258

HSP (Rp)

7

0.00

6,066.006,066.00

6,060

16,221.06

9,099.0025,320.06

25,320

0.00

9,099.009,099.00

9,090

0.00

5,952.605,952.60

5,950

0.00

5,952.605,952.60

5,950

Page 259: RAB 2009

259

document.xls - 2-AHSP Hal - 259

HSP (Rp)

7

28,356.08

13,652.0042,008.08

42,000

0.00

13,652.0013,652.00

13,650

43,732.22

13,652.0057,384.22

57,380

Page 260: RAB 2009

260

document.xls - 2-AHSP Hal - 260

HSP (Rp)

7

43,732.22

13,652.0057,384.22

57,380

356,535.00

23,055.00379,590.00

379,590

47,597.38

8,000.0055,597.38

55,590

129,762.88

8,000.00137,762.88

137,760

82,175.00

8,000.0090,175.00

90,170

Page 261: RAB 2009

261

document.xls - 2-AHSP Hal - 261

HSP (Rp)

7

163,590.00

8,000.00171,590.00

171,590

55,947.78

320,397.00376,344.78

376,340

708,461.78

446,250.001,154,711.78

1,154,710

Page 262: RAB 2009

262

document.xls - 2-AHSP Hal - 262

HSP (Rp)

7

1,377,360.25

709,920.002,087,280.25

2,087,280

Page 263: RAB 2009

263

document.xls - 2-AHSP Hal - 263

HSP (Rp)

7

734,147.18

378,075.001,112,222.19

1,112,220

108,690.75

73,473.00182,163.75

182,160

15,508.75

3,531.0019,039.75

19,030

902,500.00

78,290.00980,790.00

Page 264: RAB 2009

264

document.xls - 2-AHSP Hal - 264

HSP (Rp)

7

980,790

0.00

123,217.50123,217.50

123,210

0.00

132,810.00132,810.00

132,810

0.00

123,214.00123,214.00

123,210

500,000.00

123,214.00623,214.00

623,210

100,000.00

123,214.00223,214.00

223,210

Page 265: RAB 2009

265

document.xls - 2-AHSP Hal - 265

HSP (Rp)

7

40,331.78

132,882.00173,213.78

173,210

12,249.55

11,735.0023,984.55

23,980

12,249.55

11,735.0023,984.55

23,980

160,278.55

23,470.00183,748.55

183,740

83,967.16

34,587.50118,554.66

Page 266: RAB 2009

266

document.xls - 2-AHSP Hal - 266

HSP (Rp)

7

118,550

147,612.66

29,637.50177,250.16

177,250

141,706.75

24,837.50166,544.25

166,540

178,125.00

46,110.00224,235.00

224,230

Page 267: RAB 2009

267

document.xls - 2-AHSP Hal - 267

HSP (Rp)

7

85,250.00

33,685.00118,935.00

118,930

128,750.00

33,685.00162,435.00

162,430

57,000.00

33,092.5090,092.50

90,090

365,750.00

33,092.50398,842.50

398,840

10,687.50

11,527.5022,215.00

22,210

28,500.00

Page 268: RAB 2009

268

document.xls - 2-AHSP Hal - 268

HSP (Rp)

7

11,527.5040,027.50

40,020

12,587.50

7,685.0020,272.50

20,270

12,500.00

15,370.0027,870.00

27,870

10,000.00

11,527.5021,527.50

21,520

Page 269: RAB 2009

269

document.xls - 2-AHSP Hal - 269

HSP (Rp)

7

14,250.00

11,527.5025,777.50

25,770

237,500.00

38,425.00275,925.00

275,920

8,787.50

15,370.0024,157.50

24,150

100,000.00

38,425.00138,425.00

138,420

45,000.00

7,685.0052,685.00

52,680

1,250,000.00

Page 270: RAB 2009

270

document.xls - 2-AHSP Hal - 270

HSP (Rp)

7

46,110.001,296,110.00

1,296,110

Page 271: RAB 2009

271

document.xls - 2-AHSP Hal - 271

HSP (Rp)

7

192,610.00

11,527.50204,137.50

204,130

64,900.00

11,527.5076,427.50

76,420

215,270.00

11,527.50226,797.50

226,790

88,000.00

11,527.5099,527.50

99,520

101,200.00

11,527.50112,727.50

112,720

129,066.30

Page 272: RAB 2009

272

document.xls - 2-AHSP Hal - 272

HSP (Rp)

7

12,678.50141,744.80

141,740

237,232.60

12,678.50249,911.10

249,910

325,600.00

12,678.50338,278.50

338,270

393,250.00

19,212.50412,462.50

412,460

14,517.00

20,765.0035,282.00

35,280

14,765.00

Page 273: RAB 2009

273

document.xls - 2-AHSP Hal - 273

HSP (Rp)

7

21,610.0036,375.00

36,370

15,261.00

22,455.0037,716.00

37,710

14,920.90

20,765.0035,685.90

35,680

15,168.90

21,610.0036,778.90

36,770

15,664.90

22,455.00

Page 274: RAB 2009

274

document.xls - 2-AHSP Hal - 274

HSP (Rp)

7

38,119.9038,110

2,264.40

5,070.007,334.40

7,330

2,264.40

5,070.007,334.40

7,330

2,374.40

5,070.007,444.40

7,440

2,070.50

6,760.008,830.50

8,830

Page 275: RAB 2009

275

document.xls - 2-AHSP Hal - 275

HSP (Rp)

7

2,650.50

5,070.007,720.50

7,720

2,297.75

5,070.007,367.75

7,360

22,518.70

55,200.0077,718.70

77,710

83,585.89

55,200.00138,785.89

138,780

76,087.45

Page 276: RAB 2009

276

document.xls - 2-AHSP Hal - 276

HSP (Rp)

7

55,200.00131,287.45

131,280

180,978.70

55,200.00236,178.70

236,170

83,018.73

55,200.00138,218.73

138,210

Page 277: RAB 2009

277

document.xls - 2-AHSP Hal - 277

HSP (Rp)

7

72,803.34

55,200.00128,003.34

128,000

82,368.70

55,200.00137,568.70

137,560

73,518.70

55,200.00128,718.70

128,710

81,893.70

55,200.00137,093.70

137,090

Page 278: RAB 2009

278

document.xls - 2-AHSP Hal - 278

HSP (Rp)

7

72,518.70

55,200.00127,718.70

127,710

1,210,018.70

55,200.001,265,218.70

1,265,210

922,518.70

55,200.00977,718.70

977,710

2,650.50

10,845.0013,495.50

13,490

9,978.56

Page 279: RAB 2009

279

document.xls - 2-AHSP Hal - 279

HSP (Rp)

7

10,845.0020,823.56

20,820

9,078.75

10,845.0019,923.75

19,920

21,603.00

10,845.0032,448.00

32,440

9,886.56

10,845.0020,731.56

20,730

8,664.76

10,845.0019,509.76

19,500

Page 280: RAB 2009

280

document.xls - 2-AHSP Hal - 280

HSP (Rp)

7

8,588.00

10,845.0019,433.00

19,430

7,650.50

10,845.0018,495.50

18,490

60,873.00

10,845.0071,718.00

71,710

46,498.00

10,845.0057,343.00

57,340

Page 281: RAB 2009

281

document.xls - 2-AHSP Hal - 281

HSP (Rp)

7

26,886.00

55,200.0082,086.00

82,080

2,650.50

10,845.0013,495.50

13,490

2,650.50

10,845.0013,495.50

13,490

2,650.50

10,845.0013,495.50

13,490

0.00

Page 282: RAB 2009

282

document.xls - 2-AHSP Hal - 282

HSP (Rp)

7

9,640.009,640.00

9,640

0.00

56,725.0056,725.00

56,720

Page 283: RAB 2009

283

document.xls - 2-AHSP Hal - 283

HSP (Rp)

7

17,299.50

61,500.0078,799.50

78,790

78,366.69

61,500.00139,866.69

139,860

70,868.25

61,500.00132,368.25

132,360

175,759.50

61,500.00237,259.50

237,250

77,799.53

Page 284: RAB 2009

284

document.xls - 2-AHSP Hal - 284

HSP (Rp)

7

61,500.00139,299.53

139,290

67,584.14

61,500.00129,084.14

129,080

77,149.50

38,750.00115,899.50

115,890

68,299.50

61,500.00129,799.50

129,790

65,749.50

61,500.00127,249.50

127,240

Page 285: RAB 2009

285

document.xls - 2-AHSP Hal - 285

HSP (Rp)

7

65,299.50

61,500.00126,799.50

126,790

76,674.50

61,500.00138,174.50

138,170

67,299.50

61,500.00128,799.50

128,790

1,204,799.50

61,500.001,266,299.50

1,266,290

Page 286: RAB 2009

286

document.xls - 2-AHSP Hal - 286

HSP (Rp)

7

917,299.50

61,500.00978,799.50

978,790

23,217.10

81,650.00104,867.10

104,860

18,420.00

55,200.0073,620.00

73,620

0.00

18,075.0018,075.00

18,070

0.00

18,075.0018,075.00

18,070

Page 287: RAB 2009

287

document.xls - 2-AHSP Hal - 287

HSP (Rp)

7

23,791.75

14,460.0038,251.75

38,250

6,925.006,925.00

6,920

1,905.50

4,855.006,760.50

6,760

8,882.50

8,725.0017,607.50

17,600

13,364.13

8,725.0022,089.13

22,080

Page 288: RAB 2009

288

document.xls - 2-AHSP Hal - 288

HSP (Rp)

7

16,597.50

9,595.0026,192.50

26,190

22,511.25

9,595.0032,106.25

32,100

19,162.50

10,430.0029,592.50

29,590

26,508.38

10,430.0036,938.38

36,930

19,949.50

Page 289: RAB 2009

289

document.xls - 2-AHSP Hal - 289

HSP (Rp)

7

5,195.0025,144.50

25,140

19,428.75

33,650.0053,078.75

53,070

44,617.80

43,200.0087,817.80

87,810

24,227.70

21,600.0045,827.70

45,820

2,450.00

4,920.007,370.00

7,370

Page 290: RAB 2009

290

document.xls - 2-AHSP Hal - 290

HSP (Rp)

7

6,116.75

18,895.0025,011.75

25,010

4,873.50

5,611.0010,484.50

10,480

4,873.50

5,611.0010,484.50

10,480

Page 291: RAB 2009

291

document.xls - 2-AHSP Hal - 291

HSP (Rp)

7

16,183.25

5,611.0021,794.25

21,790

18,838.50

5,611.0024,449.50

24,440

3,078.00

4,459.007,537.00

7,530

3,078.00

4,459.007,537.00

7,530

11,485.50

4,459.0015,944.50

Page 292: RAB 2009

292

document.xls - 2-AHSP Hal - 292

HSP (Rp)

7

15,940

1,496.25

15,370.0016,866.25

16,860

3,396.25

27,975.0031,371.25

31,370

8,193.75

9,595.0017,788.75

17,780

12,872.50

9,595.0022,467.50

22,460

18,786.25

Page 293: RAB 2009

293

document.xls - 2-AHSP Hal - 293

HSP (Rp)

7

9,595.0028,381.25

28,380

9,120.00

5,611.0014,731.00

14,730

Page 294: RAB 2009

294

document.xls - 2-AHSP Hal - 294

HSP (Rp)

7

323,325.00323,325.00

323,320

32,325.0032,325.00

32,320

3,537.003,537.00

3,530

38,800.0038,800.00

38,800

72,750.0072,750.00

72,750

145,500.00145,500.00

145,500

2,600.002,600.00

2,600

2,600.002,600.00

2,600

2,425.002,425.00

2,420

Page 295: RAB 2009

295

document.xls - 2-AHSP Hal - 295

HSP (Rp)

7

1,600.001,600.00

1,600

2,400.002,400.00

2,400

3,875.003,875.00

3,870

6,650.006,650.00

6,650

4,850.004,850.00

4,850

417,280.00417,280.00

417,280

288,000.00288,000.00

288,000

4,850.004,850.00

4,850

2,160.002,160.00

Page 296: RAB 2009

296

document.xls - 2-AHSP Hal - 296

HSP (Rp)

7

2,160

141,538.60

28,800.00170,338.60

170,330

118,396.60

28,800.00147,196.60

147,190

316,357.60

Page 297: RAB 2009

297

document.xls - 2-AHSP Hal - 297

HSP (Rp)

7

57,600.00373,957.60

373,950

160,462.60

28,800.00189,262.60

189,260

221,566.60

28,800.00250,366.60

250,360

164,382.30

28,800.00193,182.30

193,180

Page 298: RAB 2009

298

document.xls - 2-AHSP Hal - 298

HSP (Rp)

7

130,081.60

28,800.00158,881.60

158,880

79,648.00

28,800.00108,448.00

108,440

763,789.55

76,800.00840,589.55

840,580

Page 299: RAB 2009

299

document.xls - 2-AHSP Hal - 299

HSP (Rp)

7

763,789.55

76,800.00840,589.55

840,580

50,131.50

19,200.0069,331.50

69,330

57,963.80

11,830.0069,793.80

69,790

244,229.25

Page 300: RAB 2009

300

document.xls - 2-AHSP Hal - 300

HSP (Rp)

7

32,110.00276,339.25

276,330

266,779.25

32,110.00298,889.25

298,880

284,269.25

32,110.00316,379.25

316,370

312,044.25

32,110.00344,154.25

344,150

378,044.25

Page 301: RAB 2009

301

document.xls - 2-AHSP Hal - 301

HSP (Rp)

7

32,110.00410,154.25

410,150

405,544.25

32,110.00437,654.25

437,650

145,197.00

146,200.00291,397.00

291,390

228,291.50

102,905.00331,196.50

331,190

346,738.38

Page 302: RAB 2009

302

document.xls - 2-AHSP Hal - 302

HSP (Rp)

7

163,100.00509,838.38

509,830

71,861.03

36,860.00108,721.03

108,720

106,629.76

17,308.50123,938.26

123,930.00

249,205.10

1,762.09

90,288.40341,255.59

341,250

365,354.00

2,643.13

Page 303: RAB 2009

303

document.xls - 2-AHSP Hal - 303

HSP (Rp)

7

133,767.50501,764.63

501,760

520,219.20

3,524.17

199,379.10723,122.47

723,120

660,116.90

3,964.69

268,441.50932,523.09

932,520

10,647.10

27,170.0037,817.10

37,810

Page 304: RAB 2009

304

document.xls - 2-AHSP Hal - 304

HSP (Rp)

7

10,647.10

27,170.0037,817.10

37,810

517,999.39

1,321.56

244,080.00763,400.96

763,400

637,705.73

1,321.56

Page 305: RAB 2009

305

document.xls - 2-AHSP Hal - 305

HSP (Rp)

7

323,554.50962,581.80

962,580

429,568.02

1,321.56

177,008.50607,898.08

607,890

321,628.40

1,211.43

Page 306: RAB 2009

306

document.xls - 2-AHSP Hal - 306

HSP (Rp)

7

135,933.80458,773.63

458,770

207,149.88

100,874.25308,024.13

308,020

207,149.88

Page 307: RAB 2009

307

document.xls - 2-AHSP Hal - 307

HSP (Rp)

7

100,874.25308,024.13

308,020

27,547.36

683.5028,230.86

28,230

Page 308: RAB 2009

308

document.xls - 2-AHSP Hal - 308

HSP (Rp)

7

8,913.18

52,812.5061,725.68

61,720

Page 309: RAB 2009

309

document.xls - 2-AHSP Hal - 309

HSP (Rp)

7

60,000.00

3,138.00

13,000.0076,138.00

76,130

Page 310: RAB 2009

310

document.xls - 2-AHSP Hal - 310

HSP (Rp)

7

2,712.30

1,153.003,865.30

3,860

135,960.00

4,514.10

13,000.00153,474.10

153,470

Page 311: RAB 2009

311

document.xls - 2-AHSP Hal - 311

HSP (Rp)

7

13,596.00

1,065.90

1,300.0015,961.90

15,960

6 lintasan u/ agregat kasar; 2 lintasan u/ agregat halus.

222,373.25

10,036.86

47,380.00279,790.11

279,790

Page 312: RAB 2009

312

document.xls - 2-AHSP Hal - 312

HSP (Rp)

7

191,580.00

10,036.86

47,380.00248,996.86

248,990

1,625.59

950.92

256.502,833.01

2,830

841.23

1,269.46

Page 313: RAB 2009

313

document.xls - 2-AHSP Hal - 313

HSP (Rp)

7

256.502,367.19

2,360

172.90

629.75

114.40917.05

910

2 lintasan u/ batu 1/2; 2 lintasan u/ pasir

15,906.40

2,866.72

6,948.00

Page 314: RAB 2009

314

document.xls - 2-AHSP Hal - 314

HSP (Rp)

7

25,721.1225,720

Page 315: RAB 2009

315

document.xls - 2-AHSP Hal - 315

HSP (Rp)

7

8,963.35

7,519.91

129.00

Page 316: RAB 2009

316

document.xls - 2-AHSP Hal - 316

HSP (Rp)

7

16,612.2616,610

Page 317: RAB 2009

317

document.xls - 2-AHSP Hal - 317

HSP (Rp)

7

14,274.70

11,999.22

203.50

Page 318: RAB 2009

318

document.xls - 2-AHSP Hal - 318

HSP (Rp)

7

26,477.4226,470

67,818.40

8,652.29

18,877.0095,347.69

95,340

286,020

381,360

476,700

572,040

762,720

62,175.82

14,066.22

12,268.8088,510.84

88,510

Page 319: RAB 2009

319

document.xls - 2-AHSP Hal - 319

HSP (Rp)

7

265,530

354,040

442,550

531,060

708,080

67,487.17

18,545.53

12,343.3098,376.00

98,370

295,110

393,480

491,850

590,220

786,960

Page 320: RAB 2009

320

document.xls - 2-AHSP Hal - 320

HSP (Rp)

7

91,958.50

6,445.53

19,340.00117,744.03

117,740

75,849.75

6,445.53

18,040.00100,335.28

100,330

Page 321: RAB 2009

321

document.xls - 2-AHSP Hal - 321

HSP (Rp)

7

24,199.11

5,390.0029,589.11

29,580

166,347.38

8,000.00174,347.38

174,340

4,344,722.344,344,720

4,346,283.504,346,280

0.000

1,172,978.01

Page 322: RAB 2009

322

document.xls - 2-AHSP Hal - 322

HSP (Rp)

7

1,172,970

356,250.00356,250

139,401.00

20,800.00160,201.00

160,200

6,826,789.75

396,750.007,223,539.75

7,223,530

1,451,125.001,451,120

237,500.00

41,500.00279,000.00

279,000

3,979,600.00 3,979,600.00

244,781.04 244,780.00

Page 323: RAB 2009

323

document.xls - 2-AHSP Hal - 323

HSP (Rp)

7

45,000.00

31,617.0076,617.00

76,610

Page 324: RAB 2009

document.xls - 4-Bahan&Upah Hal - 324

DAFTAR HARGA SATUAN DASAR BAHAN, PERALATAN DAN UPAH TENAGA

DAERAH KABUPATEN LUWU TIMUR

NO. URAIAN SAT

1 2 3

I. URAIAN BAHANA PASIR, BATU DAN SEMEN

1. Pasir pasang m³2. Pasir beton m³3. Pasir urug m³4. Sirtu m³5. Tanah merah m³6. Abu batu m³7. Batu belah 15/20 m³8. Batu pecah 5/7 m³9. Batu pecah/split 3/5 m³

10. Batu pecah/split 2/3 m³11. Batu pecah/split 1/2 m³12. Batu pecah/split 0,5/1 m³12. Bata merah bh13. Hollow block HB. 20 bh14. Hollow block HB. 15 bh15. Hollow block HB. 10 bh16. Roster beton 20 x 20 x 7 bh17. Roster bata merah 12 x 24 x 10 bh18. Glass block 20 x 20 x 10 bh13. Paving abu-abu segi enam, tebal 8 cm m²14. Paving merah/hitam segi enam, tebal 8 cm m²15. Kanstin abu-abu 15 x 25 x 40 bh16. Kanstin abu-abu saluran 15 x 30 x 40 bh17. Batu palimanan m² 18. Semen portland kg19. Semen putih Tiga Roda kg20. Semen portland warna kg21. Koral beton m³

B BAHAN KAYU

1. Kayu Jati balok m³2. Kayu Jati balok kelas II m³3. Kayu Merbau balok m³4. Kayu Kamper Samarinda Oven balok m³5. Kayu Kamper Samarinda balok m³6. Kayu Kamper Singkil balok m³1. Kayu Kelas I Balok m³2. Kayu Kelas I Papan m³3. Kayu Kelas II Balok m³4. Kayu Kelas II Papan m³5. Kayu Terentang balok m³6. Kayu Kamper Samarinda kaso m³6. Kayu Balok Kelas III m³7. Kayu Papan Kelas III m³

Page 325: RAB 2009

document.xls - 4-Bahan&Upah Hal - 325

NO. URAIAN SAT

1 2 3

8. Kayu Tarentang papan 3 cm (kayu Kelas IV) m³9. Kayu dolken Ø 8-10/400 cm btg

10. Kayu dolken Ø 5-7/400 cm btg11. Kayu list profil m'12. Kayu cerucuk untuk pancang btg

C KAYU LAPIS DAN LEMBARAN

1. Teakwood 3x7 ft 3 mm Lbr2. Teakwood 4x8 ft 3 mm Lbr1. Triplek 4x8 ft 4 mm Lbr2. Triplek 4x8 ft 6 mm Lbr3. Triplek 4x8 ft 9 mm Lbr4. Triplek 4x8 ft 12 mm Lbr5. Formika 3x7 ft 3 mm Lbr6. Formika 4x8 ft 3 mm Lbr7. Plat asbes 100x100 cm 2,7 mm Lbr8. Gypsumboard 120x240 cm 9 mm Lbr9. Gypsumboard 120x240 cm 12 mm Lbr

10. GRC-board 120x240 cm 4 mm Lbr11. GRC-board 120x240 cm 6 mm Lbr12. Calsiboard 120x240 cm 4 mm Lbr13. Hollow 4x4 cm btg14. Hollow 2x4 cm btg15. Metal wall stud 35mm x 40mm m'16. Metal wall track 30mm x 40mm m'17. Paku peluru ramset bh18. Paku rivet btg19. Sekrup 6x1-1,5 bh20. Sekrup gypsum bh21. Compound gypsum 20kg/zak22. Compound GRC 20kg/zak23. Textile tape 50m/rol

Page 326: RAB 2009

document.xls - 4-Bahan&Upah Hal - 326

NO. URAIAN SAT

1 2 3

1 2 3

D BAHAN BESI

1. Besi beton polos kg2. Besi beton ulir kg3. Kawat beton 10kg/rol4. Kawat duri (10kg/60m/rol) kg5. Kawat harmonika Ø 2 mm spasi 40x40 mm m²4. Kawat kasa (parabola) m²5. Besi pelat strip kg6. Besi segi empat 3/8"x3/8" (0,83kg/m') kg7. Besi profil WF kg8. Baja Siku kg9. Baja Canal kg

10. Plat Bordes kg11. Pintu besi baja m²12. Jendela besi m²

E BAHAN KERAMIK DAN PENUTUP LAIN

1. Ubin pc abu-abu 40 x 40 bh2. Ubin pc abu-abu 30 x 30 bh3. Ubin pc abu-abu 20 x 20 bh4. Ubin pc warna 40 x 40 bh5. Ubin pc warna 30 x 30 bh6. Ubin pc warna 20 x 20 bh7. Plint ubin pc 10 x 40 bh8. Plint ubin pc 10 x 30 bh9. Plint ubin pc 15 x 20 bh

10. Plint ubin pc warna 10 x 40 bh11. Plint ubin pc warna 10 x 30 bh12. Plint ubin pc warna 10 x 20 bh13. Marmer m²14. Plint ubin marmer 10 x 60 bh15. Plint ubin marmer 10 x 40 bh16. Plint ubin marmer 10 x 30 bh17. Ubin keramik 40 x 40 cm granito tile bh1. Ubin keramik 30 x 30 cm granito tile bh2. Ubin keramik 40 x 40 cm Roman bh3. Ubin keramik 30 x 30 cm Roman bh4. Ubin keramik 20 x 20 cm Roman bh5. Ubin keramik 20 x 25 cm Roman bh6. Ubin keramik 10 x 20 cm Roman bh7. Ubin keramik 5 x 20 cm Roman bh

25. Ubin keramik 40 x 40 cm KW 2 bh26. Ubin keramik 30 x 30 cm KW 2 bh27. Ubin keramik 20 x 20 cm KW 2 bh28. Ubin keramik 20 x 25 cm KW 2 bh29. Ubin keramik 10 x 20 cm KW 2 bh30. Ubin keramik 5 x 20 cm KW 2 bh31. Vinyl karet 30 x 30 cm kl 1 bh32. Vinyl karet 30 x 30 cm kl 2 bh

Page 327: RAB 2009

document.xls - 4-Bahan&Upah Hal - 327

NO. URAIAN SAT

1 2 3

33. Parquet jati m²

F BAHAN PENUTUP ATAP

1. Seng gelombang 3x6 ft BJLS 20 (0,2 mm) Lbr2. Seng gelombang 3x6 ft BJLS 25 (0,25 mm) Lbr3. Seng gelomb.Galvanish 3x6 ft (0,30 mm) Lbr4. Seng gelomb.Zincalume 3x6 ft (0,30 mm) Lbr5. Seng plat 3x6 ft BJLS 20 (0,2 mm) Lbr6. Seng plat 3x6 ft BJLS 25 (0,25 mm) Lbr7. Seng plat 3x6 ft BJLS 28 (0,28 mm) Lbr8. Genteng pelentong / morando bh9. Genteng pelentong super/besar bh

10. Genteng kodok bh11. Genteng bubung pelentong / morando bh12. Genteng bubung pelentong super/besar bh13. Genteng bubung kodok bh14. Genteng sirap bh15. Asbes gelombang 2,5x,92 m 5 mm Lbr16. Asbes gelombang 2,25x,92 m 5 mm Lbr17. Asbes gelombang 2,00x,92 m 5 mm Lbr18. Asbes gelombang 1,80x,92 m 5 mm Lbr19. Nok stel gelombang Lbr20. Nok paten Lbr21. Nok stel rata Lbr

Page 328: RAB 2009

document.xls - 4-Bahan&Upah Hal - 328

NO. URAIAN SAT

1 2 3

22. Genteng beton bh23. Genteng metal m²24. Nok genteng beton bh25. Nok genteng metal m'26. Aluminium foil m²27. Akustik 30 x 30 cm Lbr28. Akustik 30 x 60 cm Lbr29. Akustik 60 x 120 cm Lbr

1 2 3

G BAHAN CAT KAYU DAN TEMBOK

1. Dempul kayu kg2. Dempul Duco kg3. Plamir kayu kg4. Plamir tembok kg5. Wall sealer Dulux/ICI kg6. Cat meni kayu kg7. Cat meni besi kg8. Cat zinchromate kg9. Cat kayu/besi KW 2 (cat dasar) kg

10. Cat kayu/besi KW 2 (cat penutup) kg11. Cat kayu/besi Mowilex (cat dasar) kg12. Cat kayu/besi Mowilex (cat penutup) kg13. Cat kayu/besi Glotex kg14. Cat tembok KW 2 (cat dasar) kg15. Cat tembok KW 2 (cat penutup) kg16. Cat tembok Metrolite kg17. Cat tembok Super Vinilex/ Decolith kg18. Cat tembok Catylac (cat dasar) kg19. Cat tembok Catylac (cat penutup) kg20. Cat tembok Mowilex kg21. Cat tembok Dulux/ICI (cat dasar) kg22. Cat tembok Dulux/ICI (cat penutup) kg23. Cat tembok Dulux/ICI Weathershield kg24. Cat tembok Mowiliex kg25. Cat Duco Nippe 2000 kg26. Minyak cat/ thinner Ltr27. Thinner (High Class) Ltr28. Politur Ltr29. Politur jadi Ltr30. Politur Ultran kg31. Wood filler Ultran kg32. Sanding Sealer Impra kg33. Cat warna Ultran kg34. Melamic Impra kg35. Vernis Ltr36. Residu Ltr37. Amplas Lbr38. Kuas bh39. Kuas Roll bh

Page 329: RAB 2009

document.xls - 4-Bahan&Upah Hal - 329

NO. URAIAN SAT

1 2 3

40. Cat genteng KW 2 kg41. Cat genteng Dulux/ICI kg42. Ijuk m³43. Lem kayu Ltr44. Lem Vinyl kg45. Waterproofing coating kg

H PAKU

1. Paku biasa 2"-5" kg2. Paku biasa 1/2"- 1" kg3. Paku sekrup 3,5" bh4. Paku sekrup kg5. Paku beton kg

Page 330: RAB 2009

document.xls - 4-Bahan&Upah Hal - 330

NO. URAIAN SAT

1 2 3

1 2 3I BAHAN PIPA

1. Pipa galvanis dia 1/2" m'2. Pipa galvanis dia 3/4" m'3. Pipa galvanis dia 1" m'4. Pipa galvanis dia 1 ¼" m'5. Pipa galvanis dia 1 ½" m'6. Pipa galvanis dia 2" m'7. Pipa galvanis hitam dia 2" untuk pagar m'8. Pipa galvanis dia 2 ½" m'9. Pipa galvanis dia 3" m'

10. Pipa galvanis dia 4" m'11. Pipa PVC dia 1/2" AW m'12. Pipa PVC dia 3/4" AW m'13. Pipa PVC dia 1" AW m'14. Pipa PVC dia 1 ¼" AW m'15. Pipa PVC dia 1 ¼" D m'14. Pipa PVC dia 1 ½" AW m'17. Pipa PVC dia 1 ½" D m'15. Pipa PVC dia 2" AW m'19. Pipa PVC dia 2" D m'20. Pipa PVC dia 2 ½" AW m'21. Pipa PVC dia 2 ½" D m'16. Pipa PVC dia 3" AW m'23. Pipa PVC dia 3" D m'17. Pipa PVC dia 4" AW m'25. Pipa PVC dia 4" D m'26. Buis beton dia 100 panj. 100 cm bh27. Buis beton dia 80 panj. 100 cm bh28. Buis beton dia 60 panj. 100 cm bh29. Buis beton dia 50 panj. 100 cm bh30. Buis beton dia 40 panj. 100 cm bh31. Buis beton dia 30 panj. 100 cm bh32. Buis beton dia 20 panj. 100 cm bh33. Buis beton 1/2 dia 60 panj. 100 cm bh34. Buis beton 1/2 dia 50 panj. 100 cm bh35. Buis beton 1/2 dia 40 panj. 100 cm bh36. Buis beton 1/2 dia 30 panj. 100 cm bh37. Buis beton 1/2 dia 20 panj. 100 cm bh

J BAHAN KACA

1. Jendela nako (rangka) daun2. Kaca nako polos 5 mm daun1. Kaca 3 mm m²2. Kaca 5 mm m²3. Kaca 8 mm m²4. Kaca rayben 5 mm m²5. Kaca rayben 8 mm m²6. Kaca rayben 10 mm m²7. Kaca rayben 12 mm m²8. Kaca es 3 mm m²

Page 331: RAB 2009

document.xls - 4-Bahan&Upah Hal - 331

NO. URAIAN SAT

1 2 3

9. Kaca es 5 mm m²10. Kaca Tempered polos 5 mm m²11. Kaca Tempered polos 8 mm m²

Page 332: RAB 2009

document.xls - 4-Bahan&Upah Hal - 332

NO. URAIAN SAT

1 2 3

1 2 3K BAHAN SANITASI

1. Kloset duduk ex RRC (sederhana) bh2. Kloset duduk setara INA (sedang) bh3. Kloset duduk setara Toto (tdk sederhana) bh1. Kloset jongkok sederhana bh2. Kloset jongkok sedang bh3. Kloset jongkok setara Toto (tdk sederhana) bh4. Urinoir bh5. Wastafel bh6. Bak fibreglass 0.3 m³ bh7. Bak cuci stainless steel bh8. Water drain + asesoris set9. Bak penampung drum 200 ltr bh

10. Kran air lokal (sederhana) bh11. Kran air stainless bh12. Seal tape bh13. Floor drain sederhana bh14. Floor drain stainless bh15. Bak reservoir fibreglass 1000 L bh

L BAHAN KUCI DAN ALAT PENGGANTUNG

1. Kunci tanam sederhana bh2. Kunci tanam biasa bh3. Kunci tanam antik bh4. Kunci tanam KM bh5. Kunci silinder bh6. Engsel pintu biasa/sederhana bh7. Engsel pintu kuningan/stainless bh8. Engsel jendela bh9. Engsel angin bh

10. Spring knip bh9. Kait angin bh

10. Door closer bh10. Kunci selot bh14. Roll door m²15. Pintu aluminium m²16. Door holder bh17. Door stop bh18. Rel pintu dorong bh

M BAHAN INSTALASI LISTRIK

1. Kabel NYM 3x4 mm² m'2. Kabel NYM 3x2,5 mm² m'3. Kabel NYM 2x2,5 mm² m'4. Kabel NYM 2x1,5 mm² m'5. Kabel antena TV m'6. Kabel telepon m'7. Kabel BC 10 mm untuk grounding m'8. MCB box isi 4 bh9. MCB 10 A bh

Page 333: RAB 2009

document.xls - 4-Bahan&Upah Hal - 333

NO. URAIAN SAT

1 2 3

10. MCB 6 A bh11. Kotak kontak khusus (KKK) bh12. Conduit pipa PVC dia ⅝" C m'13. Tee dos bh14. Inbow doos bh15. Sock bh16. Klem conduit bh17. Klem pipa besi 3/4" bh18. Lastdop bh19. Flexible pipe m'20. Elbow bh

Page 334: RAB 2009

document.xls - 4-Bahan&Upah Hal - 334

NO. URAIAN SAT

1 2 3

1 2 3N LAIN-LAIN

1. Panel beton pracetak 50x400x2130 Lbr2. Kolom beton pracetak 160x200x2400 btg3. Kolom beton pracetak 160x200x2750 btg4. Pintu lipat m²5. Pagar BRC tinggi 1,2 m' m'6. Pagar BRC tinggi 0,9 m' m'7. Tiang pagar BRC tinggi 1,2 m' bh8. Tiang pagar BRC tinggi 0,9 m' bh9. Bensin Ltr

10. Solar Ltr11. Minyak tanah Ltr12. Pelumas Ltr13. Aspal kg14. Aspal Emulsi (Teac Coat) kg15. Filler untuk hotmix (semen) kg16. Pompa air listrik Shimizu 125 W unit

O TAMBAHAN

1. Kran air leher angsa stainless bh2. Ongkos angkut truk kap. 6 m3 jarak s/d 20 km m33. Cetak foto pada kertas lbr4. CD bh5. Jilid bh6. Saklar tunggal bh7. Saklar seri bh8. Stop kontak bh9. Stop kontak AC bh

10. Lampu TKI 1x18 watt bh11. Lampu TKI 2x18 watt bh12. Lampu PL 8 watt bh13. Exhaust Fan bh14. Air Kapasitas 300 ltr unit15. Bak Penampungan 200 ltr unit16. Material Bantu lot

Page 335: RAB 2009

document.xls - 4-Bahan&Upah Hal - 335

NO. URAIAN SAT

1 2 3

1 2 3

II. HARGA PERALATAN BARU (sebagai dasar perhitungan sewa alat)1. ASPHALT MIXING PLANT (AMP) unit2. ASPHALT FINISHER unit3. ASPHALT SPRAYER unit4. BULLDOZER 140 HP unit5. AIR COMPRESSOR unit6. CONCRETE MIXER 0,3-0,6 M3 unit7. DUMP TRUCK 3-4 M³ / 6 TON unit8. DUMP TRUCK 8 TON unit9. EXCAVATOR 150 HP Kobelco SK200 unit

10. GENERATOR SET 125 KVA unit11. GENERATOR SET 2 KVA unit12. MOTOR GRADER 125 HP unit13. WHEEL LOADER 1,0-1,6 M3 unit14. THREE WHEEL ROLLER 8-10 TON unit15. TANDEM ROLLER 6-8 TON unit16. PNEUMATIC TYRE ROLLER 8-12 TON unit17. VIBRATING ROLLER 6-8 TON unit18. CONCRETE VIBRATOR unit19. WATER PUMP 70-100 mm unit20. WATER TANK TRUCK 3000-4500 L unit21. PEDESTERIAN ROLLER unit22. TAMPER / HAND COMPACTOR unit23. PLATE COMPACTOR unit

Page 336: RAB 2009

document.xls - 4-Bahan&Upah Hal - 336

NO. URAIAN SAT

1 2 3

III. PEKERJAAN LAPISAN HOTMIX LENGKAP PEMADATAN & QUALITY CONTROL1. Hotmix 97-100% 2,3 ton/m3 tebal 3 cm m²2. Hotmix 97-100% 2,3 ton/m3 tebal 5 cm m²

III. PEKERJAAN TIANG PANCANG JHS (TERPASANG)A TIANG PANCANG PERSEGI EMPAT JHS (TERPASANG)

1. Ukuran 20x20 cm² panjang s/d 12 m' m'2. Ukuran 25x25 cm² panjang 13 s/d 14 m' m'3. Ukuran 30x30 cm² panjang s/d 12 m' m'4. Ukuran 30x30 cm² panjang 13 s/d 14 m' m'5. Ukuran 30x30 cm² panjang 15 s/d 16 m' m'6. Ukuran 30x30 cm² panjang 17 s/d 18 m' m'B TIANG PANCANG SEGITIGA JHS (TERPASANG)

1. Ukuran 20x20 cm² panjang 3 s/d 6 m' m'2. Ukuran 28x28 cm² panjang 3 s/d 6 m' m'3. Ukuran 32x32 cm² panjang 3 s/d 6 m' m'C PENYAMBUNGAN SEPATU TIANG (JOINT SYSTEM)

1. set2. Ukuran 30x30 cm² setD LAS PENYAMBUNGAN TIANG (PER TIANG SAMBUNGAN)

1. sbg2. Ukuran 30x30 cm² sbg1 2 3

III. UPAH TENAGA1. Pekerja Oh2. Tukang gali Oh3. Tukang kayu Oh4. Tukang batu Oh5. Tukang besi Oh6. Kepala tukang Oh7. Tukang las Oh8. Tukang cat Oh9. Tukang pasang pipa Oh

10. Tukang aspal Oh11. Tukang gypsum Oh12. Tukang alumunium Oh13. Instalator Oh14. Operator alat berat Oh15. Pembantu operator alat berat Oh16. Mandor Oh17. Operator Genset Oh

Ukuran 25x25 cm²

Ukuran 25x25 cm²

Page 337: RAB 2009

document.xls - 4-Bahan&Upah Hal - 337

DAFTAR HARGA SATUAN DASAR BAHAN, PERALATAN DAN UPAH TENAGA

DAERAH KABUPATEN LUWU TIMUR

HARGA DASAR (Rp)

4

110,000.00 8) Daerah diarsir adalah daerah yg hrs diisi sebenar-benarnya, real cost, jika perlu di kolom keterangan cantumkan no. telp-nya. 103,000.00 Daerah tanpa diarsir adalah daerah yg di-protect, krn perubahan sedikit saja dapat merusak formula perhitungan di sheet lainnya. 77,250.00 ### 113,300.00 ### 50,000.00 ### 269,500.00 ### 226,600.00 ### 224,200.00 ### 180,250.00 ### 206,000.00 ### 220,000.00 ### 220,000.00 ### 566.50 ###

50,255.00 57,760.00

### 1,240.00 ### 1,240.00 ### 2,525.00 ### 128,750.00 ###

28,000,000.00 ### 17,500,000.00 ### 9,000,000.00 7,250,000.00 6,456,666.00 5,500,000.00 ### 8,240,000.00 ### 9,270,000.00 ### 6,180,000.00 ### 6,695,000.00 ### 950,000.00 ###

### 3,090,000.00 ### 3,605,000.00

Page 338: RAB 2009

document.xls - 4-Bahan&Upah Hal - 338

HARGA DASAR (Rp)

4

950,000.00 ### 15,450.00 ### 3,325.00 ### 4,750.00 ### 37,500.00

36,000.00 ### 42,900.00 ### 69,250.00 ### 87,550.00 ### 118,250.00 ### 162,000.00 ### 95,500.00 ### 117,500.00 ### 8,275.00 ### 53,000.00 ### 67,666.00 44,500.00 82,500.00 57,650.00 23,000.00 18,000.00 10,000.00 8,500.00 1,775.00 75.00 55.00 63.00 62,500.00 96,000.00 ### 33,625.00 ###

Page 339: RAB 2009

document.xls - 4-Bahan&Upah Hal - 339

HARGA DASAR (Rp)

4

4

### 9,927.50 ### 10,260.00 ### 13,775.00 ###

###

7,837.50 ######

13,062.50 ### 13,062.50 ### 13,062.50 ### 13,062.50 ### 902,500.00 ###

14,250.00 9,770.75 5,440.65 2,394.00 2,422.50 1,187.50 11,875.00 8,571.00 4,522.00 2,040.00 2,400.00 1,000.00 9,000.00

Page 340: RAB 2009

document.xls - 4-Bahan&Upah Hal - 340

HARGA DASAR (Rp)

4

35,625.00 ### 40,356.00 ### 52,962.50 ### 68,115.00 ### 24,747.50 ### 31,967.50 ### 34,817.50 ### 1,700.00 ### 2,250.00 ### 1,657.00 ### 4,500.00 ### 7,000.00 ### 2,750.00 ###

71,000.00 ### 63,250.00 ### 57,600.00 ### 53,310.00 ### 39,000.00 ### 40,000.00 ### 39,000.00 ###

Page 341: RAB 2009

document.xls - 4-Bahan&Upah Hal - 341

HARGA DASAR (Rp)

4

4,750.00 ### 156,800.00 ### 10,500.00 ### 102,000.00 ###

4

15,450.00 ### 25,650.00 ###

9,500.00 ### 28,500.00 ### 25,750.00 ### 14,250.00 ### 27,312.50 23,750.00 ### 28,500.00 ### 34,200.00 44,412.50 28,500.00 ### 7,125.00 ### 12,350.00 ### 12,350.00 ### 12,350.00 ### 7,125.00 ### 12,350.00 ### 34,200.00 44,412.50 34,200.00 44,412.50 34,200.00 44,412.50 15,450.00 ### 24,510.00 14,250.00 ### 28,500.00 ### 32,750.00 29,500.00 29,966.00 32,000.00 31,266.00 32,750.00 7,000.00 3,605.00 ### 7,125.00 ### 21,375.00 ###

Page 342: RAB 2009

document.xls - 4-Bahan&Upah Hal - 342

HARGA DASAR (Rp)

4

18,000.00 46,000.00

4,750.00 ###

30,400.00

9,927.50 ### 9,927.50 ### 313.50 ### 30,875.00 ### 90,250.00 ###

Page 343: RAB 2009

document.xls - 4-Bahan&Upah Hal - 343

HARGA DASAR (Rp)

4

4

8,708.34 ### 10,450.00 ### 13,062.50 ###

### 20,028.85 ### 28,737.50 ###

### 47,460.10 ### 54,425.50 ### 80,987.50 ### 2,090.00 ### 2,960.20 ### 4,005.20 ###

7,400.50 ###

10,013.00 ###

###

17,503.75 ###

26,995.20 ###

187,500.00 162,500.00 102,500.00 77,250.00 61,350.00 40,850.00 32,750.00 77,000.00 ### 64,500.00 ### 40,750.00 ### 28,750.00 ### 22,250.00 ###

24,000.00 13,000.00 175,100.00 195,700.00 117,333.00 92,000.00 215,666.00 296,000.00 357,500.00 59,000.00

Page 344: RAB 2009

document.xls - 4-Bahan&Upah Hal - 344

HARGA DASAR (Rp)

4

80,000.00 175,333.00 349,000.00

Page 345: RAB 2009

document.xls - 4-Bahan&Upah Hal - 345

HARGA DASAR (Rp)

4

4

575,000.00 1,112,500.00 1,350,000.00 215,000.00 309,000.00 411,350.00 1,360,400.00 1,374,650.00 190,000.00 296,875.00 59,660.00 166,250.00 47,500.00 129,665.50 3,895.00 82,175.00 163,590.00 356,250.00

85,250.00 128,750.00 178,125.00 57,000.00 365,750.00 10,687.50 28,500.00 12,587.50 12,500.00 10,000.00 14,250.00 237,500.00 8,787.50 500,000.00 100,000.00 100,000.00 45,000.00 1,250,000.00

13,205.00 8,835.00 6,878.00 4,949.50 3,242.35 2,599.20 7,632.30 60,751.55 32,594.50

Page 346: RAB 2009

document.xls - 4-Bahan&Upah Hal - 346

HARGA DASAR (Rp)

4

32,594.50 61,104.00 2,850.00 3,420.00 862.60 855.00 570.00 1,408.85 855.00 4,560.00 1,140.00

Page 347: RAB 2009

document.xls - 4-Bahan&Upah Hal - 347

HARGA DASAR (Rp)

4

4

57,000.00 ### 5,225.00 ### 3,325.00 ###

###############

166,250.00 57,000.00 14,250.00 23,750.00 23,750.00 37,050.00 57,000.00 27,930.00 136,800.00 234,612.00 317,262.00 48,450.00 342,000.00 26,125.00 142,500.00 237,500.00

Page 348: RAB 2009

document.xls - 4-Bahan&Upah Hal - 348

HARGA DASAR (Rp)

4

4

1,875,784,500.00 ### 393,944,100.00 ### 129,162,000.00 1,183,985,000.00 ### 83,955,300.00 ### 9,638,225.00 278,518,485.35 322,905,000.00 891,217,800.00 ### 150,506,932.50 ### 6,947,350.00 645,810,000.00 ### 699,627,500.00 ### 258,324,000.00 358,424,550.00 377,798,850.00 421,929,200.00 ### 4,927,016.35 10,053,532.70 142,078,200.00 ### 88,863,000.00 10,117,500.00 9,647,250.00

Page 349: RAB 2009

document.xls - 4-Bahan&Upah Hal - 349

HARGA DASAR (Rp)

4

PEKERJAAN LAPISAN HOTMIX LENGKAP PEMADATAN & QUALITY CONTROL 41,718.00 ### 68,785.00 ###

154,346.40 141,484.20 176,224.80 193,392.00 204,408.00 208,080.00

124,631.25 124,631.25 161,287.50

439,875.00 541,875.00

94,668.75 165,750.00

4

45,000.00 65,000.00 65,000.00 65,000.00 65,000.00 70,000.00 65,000.00 65,000.00 65,000.00 65,000.00 65,000.00 65,000.00 70,000.00 115,000.00 85,000.00 70,000.00 45,000.00

Page 350: RAB 2009

FASOS -_FASUMDIAMETER KG/M'

6 0.2220 8 0.3950

10 0.6170 12 0.8880 14 1.2080 16 1.5780 19 2.2260 22 2.9840 25 3.8530 28 4.8340 32 6.3130 36 7.9900 40 9.8650 45 12.4800 50 15.4100

BANGUNAN SEKOLAH Panggung

JALAN ROW 1,20 m

1 Pondasi Setempat 1 buahBesi 12 1.9 10 0.89 1.05 17.7156

196.842 Kolom Pondasi20x20

Besi 10 1 4 0.62 1.05 2.5914Besi 6 0.9 6 0.22 1.05 1.25874

96.25353 Balok Lantai 15x25

Besi 12 1 4 0.62 1.05 2.5914Besi 6 0.85 6 0.22 1.05 1.18881

100.8056

WORKSHOP 1Kolom BETON PONDASI SETEMPAT 0.3 0.3 1

Pjng Berat/m Jumlah Berat Koef JumlahBesi 12 8.00 1.00 0.89 7.10 1.05 7.46 Besi 6 6.00 1.30 0.22 1.73 1.05 1.82

Jumlah Berat 9.28 Berat per m3 103.08

Page 351: RAB 2009

Balok Lantai 20/40 0.2 0.4 1Besi 12 5.00 1.00 0.89 4.44 1.05 4.66 Besi 10 2.00 1.00 0.62 1.23 1.05 1.30 Besi 6 7.00 1.30 0.22 2.02 1.05 2.12

Jumlah Berat 8.08 Berat per m3 100.99

Balok Lantai 20/30 0.2 0.3 1Besi 12 5.00 1.00 0.89 4.44 1.05 4.66 Besi 10 2.00 1.00 0.62 1.23 1.05 1.30 Besi 6 7.00 1.10 0.22 1.71 1.05 1.79

Jumlah Berat 7.75 Berat per m3 129.21

Plat Lantai 0.12 1 1Besi 10 12.00 1.00 0.62 7.40 1.05 7.77 Besi 10 12.00 1.00 0.62 7.40 1.05 7.77

Jumlah Berat 15.55 Berat per m3 129.57

Kolom 20x20 0.2 0.2 1Besi 10 4.00 1.00 0.62 2.47 1.05 2.59 Besi 6 6.00 0.90 0.22 1.20 1.05 1.26

Jumlah Berat 3.85 Berat per m3 96.25

RB15/20 0.15 0.2 1Besi 10 4.00 1.00 0.62 2.47 1.05 2.59 Besi 6 6.00 0.70 0.22 0.93 1.05 0.98

Jumlah Berat 3.57 Berat per m3 119.01

SEKOLAH PANGGUNG BLOK 1Kolom Praktis 0.15 0.15 1Besi 10 4.00 1.00 0.62 2.47 1.00 2.47 besi 6 6.00 0.60 0.22 0.80 1.00 0.80

Jumlah Berat 3.27 Berat per m3 145.21

JALAN JERAMBAH 1,2mdi BLOK 141.2

8242.947.726.862.8

9.39.3

Page 352: RAB 2009

32.580.580.537.438.436.137.2

664.6

JALAN JERAMBAH 1,5 M (KAWASAN)148

1050

9.820.68

911427

100113

6136485752912922

13

54153

633868244

3.432

7553824622

1,574.88

Page 353: RAB 2009

Tambahan Jalan 1,5 di Plaza Terbuka24.5

175514

12.516

11.516.521.8

188.80 Plaza Ycing

276330

120.00

664.6190147

Page 354: RAB 2009

kg/m3

kg/m3

kg/m3

Page 355: RAB 2009

355

DIAMETER KG/M'

6 0.2220 8 0.3950

10 0.6170 12 0.8880 14 1.2080 16 1.5780 19 2.2260 22 2.9840 25 3.8530 28 4.8340 32 6.3130 36 7.9900 40 9.8650 45 12.4800 50 15.4100

SITE PLAN 2GEDUNG SEKOLAH

1 PONDASI SETEMPATBeton 1.00 675,850 675,850.00 Besi 146.85 11,470 1,684,403.91 Begesting 6.25 74,240 464,000.00

2,824,253.91 2 Sloof 15/40

Beton 1.00 675,850 675,850.00 Besi 119.50 11,470 1,370,630.59 Begesting 13.33 78,990 1,053,200.00

3,099,680.59 3 KOLOM PRAKTIS

Beton 1.00 675,850 675,850.00 Besi 111.03 11,470 1,273,506.45 Begesting 13.33 63,100 841,333.33

2,790,689.79

3 KOLOM PRAKTISBeton 1.00 675,850 675,850.00 Besi 121.21 11,470 1,390,301.64 Begesting 20.00 63,100 1,262,000.00

3,328,151.64

PERHITUNGAN BESI GEDUNG BALAI WARGAPanjang jumlah berat Koef

1 Pondasi Setempat 1 buahBesi 10 2.3 10 0.617 1.05 14.90055

Page 356: RAB 2009

356

2 Kolom Pondasi 30x30Besi 10 1.5 8 0.617 1.05 7.7742Besi 6 1.25 7 0.222 1.05 2.039625

9.8138253 Balok Lantai 20x40

Besi 12 1 8 0.8880 1.05 7.4592Besi 8 1 2 0.3950 1.05 0.8295Besi 6 1.25 6 0.222 1.05 1.74825

125.46193 Balok Lantai 20x30

Besi 12 1 5 0.8880 1.05 4.662Besi 8 1 2 0.3950 1.05 0.8295Besi 6 1.05 6 0.2220 1.05 1.46853

116.00053 Plat Lantai t 12

Besi 8 1 24 0.3950 1.05 9.954Besi 6 0 6 0.2220 1.05 0

82.953 Kolom 20x20

Besi 10 1 4 0.6170 1.05 2.5914Besi 6 0.85 6 0.2220 1.05 1.18881

94.50525

PERHITUNGAN BESI GEDUNG SEKOLAHPanjang jumlah berat Koef

1 Pondasi Setempat 1 buahBesi 10 2.3 10 0.62 1.05 14.90055

2 Kolom Pondasi 30x30Besi 10 1.5 8 0.62 1.05 7.7742Besi 6 1.25 7 0.22 1.05 2.039625

- 9.8138253 Balok Lantai 15x40 -

Besi 12 1 8 0.89 1.05 7.4592Besi 8 1 2 0.40 1.05 0.8295Besi 6 1.25 6 0.22 1.05 1.74825

- 167.28253 Balok Lantai 15x30 -

Besi 12 1 5 0.89 1.05 4.662Besi 8 1 2 0.40 1.05 0.8295Besi 6 1.05 6 0.22 1.05 1.46853

- 154.66733 Plat Lantai t 12 -

Besi 8 1 24 0.40 1.05 9.954Besi 6 0 6 0.22 1.05 0

- 99.54

JALAN JERAMBAH 1.2m1 Pondasi Setempat 1 buah

Besi 12 1.9 10 0.89 1.05 17.7156196.84

2 Kolom Pondasi20x20Besi 10 1 4 0.62 1.05 2.5914

Page 357: RAB 2009

357

Besi 6 0.9 6 0.22 1.05 1.2587496.2535

3 Balok Lantai 15x25Besi 12 1 4 0.62 1.05 2.5914Besi 6 0.85 6 0.22 1.05 1.18881

100.80563 Balok Lantai 20x40

Besi 16 1 5 1.58 1.05 8.2845Besi 10 1 2 0.62 1.05 1.2957Besi 8 1.2 6 0.22 1.05 1.67832

140.7315

WISATA KULINER1 Balok Lantai 15x25

Besi 12 1 5 0.89 1.05 4.662Besi 6 0.85 6 0.22 1.05 1.18881

156.0216

GERBANGPondasi 100x200x100Besi 12 6 6 0.89 1.05 33.5664Besi 12 4.4 12 0.89 1.05 49.23072

41.39856KOLOM UTAMABesi 12 1 33 0.89 1.05 30.7692Besi 8 3.25 6 0.40 1.05 8.087625

69.0788

PARKIR BECAKPondasi 60x60x25Besi 10 1.8 8 0.62 1.05 9.32904Besi 12 1.05 0

103.656Kolom 20x20Besi 10 1 4 0.6170 1.05 2.5914Besi 6 0.85 6 0.2220 1.05 1.18881

94.50525

BANGUNAN IPALPlat Lantai Dasar

Besi 12 1 20 0.8880 1.05 18.648Besi 12 1 20 0.8880 1.05 18.648

186.48Kolom 20x20

Besi 12 1 4 0.8880 1.05 3.7296Besi 10 1 4 0.6170 1.05 2.5914Besi 6 0.8 6 0.2220 1.05 1.11888

185.997

Page 358: RAB 2009

358

Balok Lantai 20/30Besi 12 1 4 0.8880 1.05 3.7296Besi 8 1 4 0.3950 1.05 1.659Besi 6 0.8 6 0.2220 1.05 1.11888

108.458Plat Dinding

Besi 10 1 14 0.6170 1.05 9.0699Besi 10 1 14 0.6170 1.05 9.0699

120.932

Page 359: RAB 2009

359

kg/bh

Page 360: RAB 2009

360

kg/bh

kg/m3

kg/m3

per buah

per buah

kg/m3

Page 361: RAB 2009

361

kg/m3

kg/m3

kg/m3

kg/m3

kg/m3

kg/m3

kg/m3

kg/m3

kg/m3

Page 362: RAB 2009

362

kg/m3

kg/m3

Page 363: RAB 2009

DIAMETER KG/M'

6 0.2220 8 0.3950

10 0.6170 76,000.00 6,333.33

12 0.8880 14 1.2080 16 1.5780 19 2.2260 22 2.9840 25 3.8530 28 4.8340 32 6.3130 36 7.9900 40 9.8650 45 12.4800 50 15.4100

SITE PLAN 1GEDUNG SEKOLAH

Beton Sloof 15/40 0.15 0.4Pjng Berat Jumlah

Besi 12 5.00 0.89 4.44 Besi 8 2.00 0.40 0.79 Besi 6 7.20 0.22 1.60

Berat per mBerat per m3

BETON PONDASI SETEMPAT 0.8 0.8Pjng Berat Jumlah

Besi 10 25.20 0.89 22.38 Berat per mBerat per m3

Kolom Praktis 0.15 0.15Pjng Berat Jumlah

Besi 8 4.00 0.40 1.58 Besi 6 3.60 0.22 0.80

Berat per mBerat per m3

Kolom 20x20 0.2 0.2Pjng Berat Jumlah

Besi 10 4.00 0.89 3.55 Besi 6 4.80 0.22 1.07

Berat per mBerat per m3

Page 364: RAB 2009

Plat Lantai 1 0.12Pjng Berat Jumlah

Besi 8 28.00 0.40 11.06

Berat per mBerat per m3

PEKERJAAN KUSENQ Pjng panjng total V

P1 2 7.7 15.4 0.1386J2 7 11 77 0.693Pj1 1 10.9 10.9 0.0981P2 1 7 7 0.063P KM/WC 2 7 14 0.126BV 1 2 2 0.018

45.6 126.3 1.1367

PEKERJAAN KUSENBata 1;2 12 0.4 4.8

4 0.4 1.61.5 0.4 0.6

10.5 0.4 4.24 0.4 1.64 0.4 1.64 0.4 1.64 0.4 1.64 0.4 1.69 1 9

28.2

Bata 1;4 12 3.5 424 3.5 14

1.5 3.5 5.2510.5 3.5 36.75

4 3.5 144 3.5 144 3.5 144 3.5 144 3.5 14

Volume Kotor 168Luas Kusen 42.44Voluem bersih 97.36

Cat KusenPanjang Kusen 126.3 0.35 44.205Panjang Jendela 54 0.175 9.45

Page 365: RAB 2009

Luas Jalusi 7.88 3 23.6477.295

Page 366: RAB 2009

Koef Jumlah 1.05 4.66 1.05 0.83 1.05 1.68

7.17 Berat per m3 119.50

Koef Jumlah 1.05 23.50

23.50 Berat per m3 146.85

Koef Jumlah 1.05 1.66 1.05 0.84

2.50 Berat per m3 111.03

Koef Jumlah 1.05 3.73 1.05 1.12

4.85 Berat per m3 121.21

Page 367: RAB 2009

Koef Jumlah 1.05 11.61

11.61 Berat per m3 96.78

Luas Luas Pintu Luas Jendela Luas Kca Puntu FormJalusi

7 4.8 2.624.5 12.32 9.8 5.043.94 2 0.88 0.75 0.68

2.5 2 0 0 0.724 3.2 1.44

0.5 0.40542.44 8.8 13.2 10.955 3.2 7.88

Page 368: RAB 2009

368

ANALISIS BIAYA PERALATAN PER JAM KERJA

A. RINGKASAN

NO. URAIAN KODE HP KAPASITAS HARGA ALAT

1 2 3 4 5 6

A ASPHALT MIXING PLANT (AMP) E01 150 50 Ton/Jam 1,875,784,500 B ASPHALT FINISHER E02 47 40 Ton/Jam 393,944,100 C ASPHALT SPRAYER E03 15 800 Liter 129,162,000 D BULLDOZER 140 HP E04 140 - - 1,183,985,000 E AIR COMPRESSOR E05 80 - - 83,955,300 F CONCRETE MIXER 0,3-0,6 M3 E06 6 350 Liter 9,638,225 G DUMP TRUCK 3-4 M³ / 6 TON E08 100 6 Ton 278,518,485 H DUMP TRUCK 8 TON E09 125 8 Ton 322,905,000 I EXCAVATOR 150 HP Kobelco SK200 E10 150 0.9 M3 891,217,800 J GENERATOR SET 125 KVA E12 175 125 KVA 150,506,933 K GENERATOR SET 2 KVA E12.a 4 2 KVA 6,947,350 L MOTOR GRADER 125 HP E13 125 - - 645,810,000 M WHEEL LOADER 1,0-1,6 M3 E15 105 1.8 M3 699,627,500 N THREE WHEEL ROLLER 8-10 TON E16 55 8 Ton 258,324,000 O TANDEM ROLLER 6-8 TON E17 50 8 Ton 358,424,550 P PNEUMATIC TYRE ROLLER 8-12 TON E18 60 10 Ton 377,798,850 Q VIBRATING ROLLER 6-8 TON E19 75 7 Ton 421,929,200 R CONCRETE VIBRATOR E20 5 - - 4,927,016 S WATER PUMP 70-100 mm E22 8 - - 10,053,533 T WATER TANK TRUCK 3000-4500 L E23 100 4,000 Liter 142,078,200 U PEDESTERIAN ROLLER E24 11 0.980 Ton 88,863,000 V TAMPER / HAND COMPACTOR E25 4 0.082 Ton 10,117,500 W PLATE COMPACTOR E25.a 5.0 0.090 Ton 9,647,250

Referensi: Panduan Analisa Harga Satuan No. 028/T/BM/1995 Ditjen Bina Marga Departemen Pekerjaan UmumCatatan: 1. Tingkat suku bunga sesuai penetapan Bank Indonesia selanjutnya lihat www.bi.go.id - Dikeluarkan 1/2/2008 8.00% 2. Konversi upah orang hari ke upah orang jam sesuai SE Bappenas & DJA Depkeu Nomor 1203/D.II/03/2000 & SE-38/A/2000 tanggal 17 Maret 2000 dengan formula: SBOJ = (SBOH / 8) x 1,3 di mana SBOJ = Satuan Biaya Orang Jam; SBOH = Satuan Biaya Orang Hari. 3. Biaya sewa sudah termasuk bahan bakar & pelumas, operator & pembantu operator. 4. Biaya Umum & Keuntungan 10% diperhitungkan pada lembar Analisis Harga Satuan Pekerjaan. 4. PPN 10% diperhitungkan pada lembar Rekapitulasi Biaya Pekerjaan. 5. Upah Operator / Sopir U1 18,688.00 Rp / Jam 6. Upah Pembantu Operator / Sopir U2 13,813.00 Rp / Jam 7. Bahan Bakar Bensin Mb 57,000.00 Rp / Liter 8. Bahan Bakar Solar Ms 5,225.00 Rp / Liter 9. Minyak Pelumas Mp - Rp / Liter

B. URAIAN

NO. URAIAN KODE KOEF. SAT. KETERANGAN

1 2 3 4 5 6

A ASPHALT MIXING PLANT (AMP) E011. URAIAN PERALATANa. Tenaga Pw 150 HPb. Kapasitas Cp 50 Ton/Jamc. Alat Baru: 1) Umur Ekonomis A 10 Tahun

2) Jam Kerja dalam 1 Tahun W 1,500 Jam3) Harga Alat B 1,875,784,500 Rupiah

d. Alat yang Dipakai: 1) Umur Ekonomis A' 10 Tahun Alat baru2) Jam Kerja dalam 1 Tahun W' 1,500 Jam Alat baru3) Harga Alat B' 1,875,784,500 Rupiah Alat baru

2.a. Nilai Sisa Alat = 10% x B C 187,578,450 Rupiahb. Faktor Angsuran Modal = i x (1 + i) ^ A' D 0.14903

(1 + i) ^ A' - 1c. Biaya Pasti Per Jam:

1) Biaya Pengembalian Modal = (B' - C) x D E 167,728.32 Rupiah

BIAYA PASTI (INITIAL COST / CAPITAL COST) PER JAM KERJA

Page 369: RAB 2009

369

1 2 3 4 5 6

W'2) Asuransi, dll = 0,002 x B' F 2,501.05 Rupiah

W'Biaya Pasti Per Jam = (E + F) G 170,229.37 Rupiah

3.a. Bahan Bakar = (0,125-0,175 Ltr/HP/Jam) x Pw x Ms H1 97,968.75 Rupiah

B. Bakar Pemanasan Material = 12 x 0,7Cp x Ms H2 2,194,500.00 Rupiahb. Pelumas = (0,01-0,02 Ltr/HP/Jam) x Pw x Mp I - Rupiahc. Perawatan dan = (12,5%-17,5%) x B' K 156,315.38 Rupiah

Perbaikan W'd. Operator = (1 Orang / Jam) x U1 L 18,688.00 Rupiahe. Pembantu Operator = (3 Orang / Jam) x U2 M 41,439.00 Rupiah

Biaya Operasi Per Jam = (H + I + K + L + M) P 2,508,911.12 Rupiah

4. TOTAL BIAYA SEWA ALAT / JAM = (G + P) S 2,679,140.50 Rupiah

B ASPHALT FINISHER E021. URAIAN PERALATANa. Tenaga Pw 47 HPb. Kapasitas Cp 40 Ton/Jamc. Alat Baru: 1) Umur Ekonomis A 6 Tahun

2) Jam Kerja dalam 1 Tahun W 2,000 Jam3) Harga Alat B 393,944,100 Rupiah

d. Alat yang Dipakai: 1) Umur Ekonomis A' 6 Tahun Alat baru2) Jam Kerja dalam 1 Tahun W' 2,000 Jam Alat baru3) Harga Alat B' 393,944,100 Rupiah Alat baru

2.a. Nilai Sisa Alat = 10% x B C 39,394,410 Rupiahb. Faktor Angsuran Modal = i x (1 + i) ^ A' D 0.21632

(1 + i) ^ A' - 1c. Biaya Pasti Per Jam:

1) Biaya Pengembalian Modal = (B' - C) x D E 38,347.28 Rupiah W'

2) Asuransi, dll = 0,002 x B' F 393.94 Rupiah W'

Biaya Pasti Per Jam = (E + F) G 38,741.22 Rupiah

3.a. Bahan Bakar = (0,125-0,175 Ltr/HP/Jam) x Pw x Ms H 30,696.88 Rupiahb. Pelumas = (0,01-0,02 Ltr/HP/Jam) x Pw x Mp I - Rupiahc. Perawatan dan = (12,5%-17,5%) x B' K 24,621.51 Rupiah

Perbaikan W'd. Operator = (1 Orang / Jam) x U1 L 18,688.00 Rupiahe. Pembantu Operator = (1 Orang / Jam) x U2 M 13,813.00 Rupiah

Biaya Operasi Per Jam = (H + I + K + L + M) P 87,819.38 Rupiah

4. TOTAL BIAYA SEWA ALAT / JAM = (G + P) S 126,560.61 Rupiah

C ASPHALT SPRAYER E031. URAIAN PERALATANa. Tenaga Pw 15 HPb. Kapasitas Cp 800 Literc. Alat Baru: 1) Umur Ekonomis A 5 Tahun

2) Jam Kerja dalam 1 Tahun W 2,000 Jam3) Harga Alat B 129,162,000 Rupiah

d. Alat yang Dipakai: 1) Umur Ekonomis A' 5 Tahun Alat baru2) Jam Kerja dalam 1 Tahun W' 2,000 Jam Alat baru3) Harga Alat B' 129,162,000 Rupiah Alat baru

2.a. Nilai Sisa Alat = 10% x B C 12,916,200 Rupiahb. Faktor Angsuran Modal = i x (1 + i) ^ A' D 0.25046

(1 + i) ^ A' - 1c. Biaya Pasti Per Jam:

1) Biaya Pengembalian Modal = (B' - C) x D E 14,557.26 Rupiah W'

2) Asuransi, dll = 0,002 x B' F 129.16 Rupiah

BIAYA OPERASI & PEMELIHARAAN (DIRECT OPERATIONAL & MAINTENANCE COST) PER JAM KERJA

BIAYA PASTI (INITIAL COST / CAPITAL COST) PER JAM KERJA

BIAYA OPERASI & PEMELIHARAAN (DIRECT OPERATIONAL & MAINTENANCE COST) PER JAM KERJA

BIAYA PASTI (INITIAL COST / CAPITAL COST) PER JAM KERJA

Page 370: RAB 2009

370

1 2 3 4 5 6

W'Biaya Pasti Per Jam = (E + F) G 14,686.42 Rupiah

3.a. Bahan Bakar = (0,125-0,175 Ltr/HP/Jam) x Pw x Ms H 9,796.88 Rupiahb. Pelumas = (0,01-0,02 Ltr/HP/Jam) x Pw x Mp I - Rupiahc. Perawatan dan = (12,5%-17,5%) x B' K 8,072.63 Rupiah

Perbaikan W'd. Operator = (1 Orang / Jam) x U1 L 18,688.00 Rupiahe. Pembantu Operator = (1 Orang / Jam) x U2 M 13,813.00 Rupiah

Biaya Operasi Per Jam = (H + I + K + L + M) P 50,370.50 Rupiah

4. TOTAL BIAYA SEWA ALAT / JAM = (G + P) S 65,056.92 Rupiah

D BULLDOZER 140 HP E041. URAIAN PERALATANa. Tenaga Pw 140 HPb. Kapasitas Cp - -c. Alat Baru: 1) Umur Ekonomis A 5 Tahun

2) Jam Kerja dalam 1 Tahun W 2,000 Jam3) Harga Alat B 1,183,985,000 Rupiah

d. Alat yang Dipakai: 1) Umur Ekonomis A' 5 Tahun Alat baru2) Jam Kerja dalam 1 Tahun W' 2,000 Jam Alat baru3) Harga Alat B' 1,183,985,000 Rupiah Alat baru

2.a. Nilai Sisa Alat = 10% x B C 118,398,500 Rupiahb. Faktor Angsuran Modal = i x (1 + i) ^ A' D 0.25046

(1 + i) ^ A' - 1c. Biaya Pasti Per Jam:

1) Biaya Pengembalian Modal = (B' - C) x D E 133,441.51 Rupiah W'

2) Asuransi, dll = 0,002 x B' F 1,183.99 Rupiah W'

Biaya Pasti Per Jam = (E + F) G 134,625.49 Rupiah

3.a. Bahan Bakar = (0,125-0,175 Ltr/HP/Jam) x Pw x Ms H 91,437.50 Rupiahb. Pelumas = (0,01-0,02 Ltr/HP/Jam) x Pw x Mp I - Rupiahc. Perawatan dan = (12,5%-17,5%) x B' K 73,999.06 Rupiah

Perbaikan W'd. Operator = (1 Orang / Jam) x U1 L 18,688.00 Rupiahe. Pembantu Operator = (1 Orang / Jam) x U2 M 13,813.00 Rupiah

Biaya Operasi Per Jam = (H + I + K + L + M) P 197,937.56 Rupiah

4. TOTAL BIAYA SEWA ALAT / JAM = (G + P) S 332,563.06 Rupiah

E AIR COMPRESSOR E051. URAIAN PERALATANa. Tenaga Pw 80 HPb. Kapasitas Cp - -c. Alat Baru: 1) Umur Ekonomis A 5 Tahun

2) Jam Kerja dalam 1 Tahun W 2,000 Jam3) Harga Alat B 83,955,300 Rupiah

d. Alat yang Dipakai: 1) Umur Ekonomis A' 5 Tahun Alat baru2) Jam Kerja dalam 1 Tahun W' 2,000 Jam Alat baru3) Harga Alat B' 83,955,300 Rupiah Alat baru

2.a. Nilai Sisa Alat = 10% x B C 8,395,530 Rupiahb. Faktor Angsuran Modal = i x (1 + i) ^ A' D 0.25046

(1 + i) ^ A' - 1c. Biaya Pasti Per Jam:

1) Biaya Pengembalian Modal = (B' - C) x D E 9,462.22 Rupiah W'

2) Asuransi, dll = 0,002 x B' F 83.96 Rupiah W'

Biaya Pasti Per Jam = (E + F) G 9,546.17 Rupiah

BIAYA OPERASI & PEMELIHARAAN (DIRECT OPERATIONAL & MAINTENANCE COST) PER JAM KERJA

BIAYA PASTI (INITIAL COST / CAPITAL COST) PER JAM KERJA

BIAYA OPERASI & PEMELIHARAAN (DIRECT OPERATIONAL & MAINTENANCE COST) PER JAM KERJA

BIAYA PASTI (INITIAL COST / CAPITAL COST) PER JAM KERJA

Page 371: RAB 2009

371

1 2 3 4 5 6

3.a. Bahan Bakar = (0,125-0,175 Ltr/HP/Jam) x Pw x Ms H 52,250.00 Rupiahb. Pelumas = (0,01-0,02 Ltr/HP/Jam) x Pw x Mp I - Rupiahc. Perawatan dan = (12,5%-17,5%) x B' K 5,247.21 Rupiah

Perbaikan W'd. Operator = (1 Orang / Jam) x U1 L 18,688.00 Rupiahe. Pembantu Operator = (1 Orang / Jam) x U2 M 13,813.00 Rupiah

Biaya Operasi Per Jam = (H + I + K + L + M) P 89,998.21 Rupiah

4. TOTAL BIAYA SEWA ALAT / JAM = (G + P) S 99,544.38 Rupiah

F CONCRETE MIXER 0,3-0,6 M3 E061. URAIAN PERALATANa. Tenaga Pw 6 HPb. Kapasitas Cp 350 Literc. Alat Baru: 1) Umur Ekonomis A 4 Tahun

2) Jam Kerja dalam 1 Tahun W 2,000 Jam3) Harga Alat B 9,638,225 Rupiah

d. Alat yang Dipakai: 1) Umur Ekonomis A' 4 Tahun Alat baru2) Jam Kerja dalam 1 Tahun W' 2,000 Jam Alat baru3) Harga Alat B' 9,638,225 Rupiah Alat baru

2.a. Nilai Sisa Alat = 10% x B C 963,823 Rupiahb. Faktor Angsuran Modal = i x (1 + i) ^ A' D 0.30192

(1 + i) ^ A' - 1c. Biaya Pasti Per Jam:

1) Biaya Pengembalian Modal = (B' - C) x D E 1,309.49 Rupiah W'

2) Asuransi, dll = 0,002 x B' F 9.64 Rupiah W'

Biaya Pasti Per Jam = (E + F) G 1,319.13 Rupiah

3.a. Bahan Bakar = (0,125-0,175 Ltr/HP/Jam) x Pw x Ms H 3,592.19 Rupiahb. Pelumas = (0,01-0,02 Ltr/HP/Jam) x Pw x Mp I - Rupiahc. Perawatan dan = (12,5%-17,5%) x B' K 602.39 Rupiah

Perbaikan W'd. Operator = (1 Orang / Jam) x U1 L 18,688.00 Rupiahe. Pembantu Operator = (1 Orang / Jam) x U2 M 13,813.00 Rupiah

Biaya Operasi Per Jam = (H + I + K + L + M) P 36,695.58 Rupiah

4. TOTAL BIAYA SEWA ALAT / JAM = (G + P) S 38,014.71 Rupiah

G DUMP TRUCK 3-4 M³ / 6 TON E081. URAIAN PERALATANa. Tenaga Pw 100 HPb. Kapasitas Cp 6 Tonc. Alat Baru: 1) Umur Ekonomis A 6 Tahun

2) Jam Kerja dalam 1 Tahun W 2,000 Jam3) Harga Alat B 278,518,485 Rupiah

d. Alat yang Dipakai: 1) Umur Ekonomis A' 6 Tahun Alat baru2) Jam Kerja dalam 1 Tahun W' 2,000 Jam Alat baru3) Harga Alat B' 278,518,485 Rupiah Alat baru

2.a. Nilai Sisa Alat = 10% x B C 27,851,849 Rupiahb. Faktor Angsuran Modal = i x (1 + i) ^ A' D 0.21632

(1 + i) ^ A' - 1c. Biaya Pasti Per Jam:

1) Biaya Pengembalian Modal = (B' - C) x D E 27,111.53 Rupiah W'

2) Asuransi, dll = 0,002 x B' F 278.52 Rupiah W'

Biaya Pasti Per Jam = (E + F) G 27,390.04 Rupiah

3.a. Bahan Bakar = (0,125-0,175 Ltr/HP/Jam) x Pw x Ms H 65,312.50 Rupiahb. Pelumas = (0,01-0,02 Ltr/HP/Jam) x Pw x Mp I - Rupiah

BIAYA OPERASI & PEMELIHARAAN (DIRECT OPERATIONAL & MAINTENANCE COST) PER JAM KERJA

BIAYA PASTI (INITIAL COST / CAPITAL COST) PER JAM KERJA

BIAYA OPERASI & PEMELIHARAAN (DIRECT OPERATIONAL & MAINTENANCE COST) PER JAM KERJA

BIAYA PASTI (INITIAL COST / CAPITAL COST) PER JAM KERJA

BIAYA OPERASI & PEMELIHARAAN (DIRECT OPERATIONAL & MAINTENANCE COST) PER JAM KERJA

Page 372: RAB 2009

372

1 2 3 4 5 6

c. Perawatan dan = (12,5%-17,5%) x B' K 17,407.41 Rupiah Perbaikan W'

d. Operator = (1 Orang / Jam) x U1 L 18,688.00 Rupiahe. Pembantu Operator = (1 Orang / Jam) x U2 M 13,813.00 Rupiah

Biaya Operasi Per Jam = (H + I + K + L + M) P 115,220.91 Rupiah

4. TOTAL BIAYA SEWA ALAT / JAM = (G + P) S 142,610.95 Rupiah

H DUMP TRUCK 8 TON E091. URAIAN PERALATANa. Tenaga Pw 125 HPb. Kapasitas Cp 8 Tonc. Alat Baru: 1) Umur Ekonomis A 5 Tahun

2) Jam Kerja dalam 1 Tahun W 2,000 Jam3) Harga Alat B 322,905,000 Rupiah

d. Alat yang Dipakai: 1) Umur Ekonomis A' 5 Tahun Alat baru2) Jam Kerja dalam 1 Tahun W' 2,000 Jam Alat baru3) Harga Alat B' 322,905,000 Rupiah Alat baru

2.a. Nilai Sisa Alat = 10% x B C 32,290,500 Rupiahb. Faktor Angsuran Modal = i x (1 + i) ^ A' D 0.25046

(1 + i) ^ A' - 1c. Biaya Pasti Per Jam:

1) Biaya Pengembalian Modal = (B' - C) x D E 36,393.14 Rupiah W'

2) Asuransi, dll = 0,002 x B' F 322.91 Rupiah W'

Biaya Pasti Per Jam = (E + F) G 36,716.04 Rupiah

3.a. Bahan Bakar = (0,125-0,175 Ltr/HP/Jam) x Pw x Ms H 81,640.63 Rupiahb. Pelumas = (0,01-0,02 Ltr/HP/Jam) x Pw x Mp I - Rupiahc. Perawatan dan = (12,5%-17,5%) x B' K 20,181.56 Rupiah

Perbaikan W'd. Operator = (1 Orang / Jam) x U1 L 18,688.00 Rupiahe. Pembantu Operator = (1 Orang / Jam) x U2 M 13,813.00 Rupiah

Biaya Operasi Per Jam = (H + I + K + L + M) P 134,323.19 Rupiah

4. TOTAL BIAYA SEWA ALAT / JAM = (G + P) S 171,039.24 Rupiah

I EXCAVATOR 150 HP Kobelco SK200 E101. URAIAN PERALATANa. Tenaga Pw 150 HPb. Kapasitas Cp 0.9 M3c. Alat Baru: 1) Umur Ekonomis A 6 Tahun

2) Jam Kerja dalam 1 Tahun W 2,000 Jam3) Harga Alat B 891,217,800 Rupiah

d. Alat yang Dipakai: 1) Umur Ekonomis A' 6 Tahun Alat baru2) Jam Kerja dalam 1 Tahun W' 2,000 Jam Alat baru3) Harga Alat B' 891,217,800 Rupiah Alat baru

2.a. Nilai Sisa Alat = 10% x B C 89,121,780 Rupiahb. Faktor Angsuran Modal = i x (1 + i) ^ A' D 0.21632

(1 + i) ^ A' - 1c. Biaya Pasti Per Jam:

1) Biaya Pengembalian Modal = (B' - C) x D E 86,752.86 Rupiah W'

2) Asuransi, dll = 0,002 x B' F 891.22 Rupiah W'

Biaya Pasti Per Jam = (E + F) G 87,644.07 Rupiah

3.a. Bahan Bakar = (0,125-0,175 Ltr/HP/Jam) x Pw x Ms H 97,968.75 Rupiahb. Pelumas = (0,01-0,02 Ltr/HP/Jam) x Pw x Mp I - Rupiahc. Perawatan dan = (12,5%-17,5%) x B' K 55,701.11 Rupiah

Perbaikan W'd. Operator = (1 Orang / Jam) x U1 L 18,688.00 Rupiah

BIAYA PASTI (INITIAL COST / CAPITAL COST) PER JAM KERJA

BIAYA OPERASI & PEMELIHARAAN (DIRECT OPERATIONAL & MAINTENANCE COST) PER JAM KERJA

BIAYA PASTI (INITIAL COST / CAPITAL COST) PER JAM KERJA

BIAYA OPERASI & PEMELIHARAAN (DIRECT OPERATIONAL & MAINTENANCE COST) PER JAM KERJA

Page 373: RAB 2009

373

1 2 3 4 5 6

e. Pembantu Operator = (1 Orang / Jam) x U2 M 13,813.00 RupiahBiaya Operasi Per Jam = (H + I + K + L + M) P 186,170.86 Rupiah

4. TOTAL BIAYA SEWA ALAT / JAM = (G + P) S 273,814.94 Rupiah

J GENERATOR SET 125 KVA E121. URAIAN PERALATANa. Tenaga Pw 175 HPb. Kapasitas Cp 125 KVAc. Alat Baru: 1) Umur Ekonomis A 5 Tahun

2) Jam Kerja dalam 1 Tahun W 2,000 Jam3) Harga Alat B 150,506,933 Rupiah

d. Alat yang Dipakai: 1) Umur Ekonomis A' 5 Tahun Alat baru2) Jam Kerja dalam 1 Tahun W' 2,000 Jam Alat baru3) Harga Alat B' 150,506,933 Rupiah Alat baru

2.a. Nilai Sisa Alat = 10% x B C 15,050,693 Rupiahb. Faktor Angsuran Modal = i x (1 + i) ^ A' D 0.25046

(1 + i) ^ A' - 1c. Biaya Pasti Per Jam:

1) Biaya Pengembalian Modal = (B' - C) x D E 16,962.94 Rupiah W'

2) Asuransi, dll = 0,002 x B' F 150.51 Rupiah W'

Biaya Pasti Per Jam = (E + F) G 17,113.45 Rupiah

3.a. Bahan Bakar = (0,125-0,175 Ltr/HP/Jam) x Pw x Ms H 114,296.88 Rupiahb. Pelumas = (0,01-0,02 Ltr/HP/Jam) x Pw x Mp I - Rupiahc. Perawatan dan = (12,5%-17,5%) x B' K 9,406.68 Rupiah

Perbaikan W'd. Operator = (1 Orang / Jam) x U1 L 18,688.00 Rupiahe. Pembantu Operator = (1 Orang / Jam) x U2 M 13,813.00 Rupiah

Biaya Operasi Per Jam = (H + I + K + L + M) P 156,204.56 Rupiah

4. TOTAL BIAYA SEWA ALAT / JAM = (G + P) S 173,318.01 Rupiah

K GENERATOR SET 2 KVA E12.a1. URAIAN PERALATANa. Tenaga Pw 4 HPb. Kapasitas Cp 2 KVAc. Alat Baru: 1) Umur Ekonomis A 4 Tahun

2) Jam Kerja dalam 1 Tahun W 1,000 Jam3) Harga Alat B 6,947,350 Rupiah

d. Alat yang Dipakai: 1) Umur Ekonomis A' 4 Tahun Alat baru2) Jam Kerja dalam 1 Tahun W' 1,000 Jam Alat baru3) Harga Alat B' 6,947,350 Rupiah Alat baru

2.a. Nilai Sisa Alat = 10% x B C 694,735 Rupiahb. Faktor Angsuran Modal = i x (1 + i) ^ A' D 0.30192

(1 + i) ^ A' - 1c. Biaya Pasti Per Jam:

1) Biaya Pengembalian Modal = (B' - C) x D E 1,887.79 Rupiah W'

2) Asuransi, dll = 0,002 x B' F 13.89 Rupiah W'

Biaya Pasti Per Jam = (E + F) G 1,901.69 Rupiah

3.a. Bahan Bakar = (0,125-0,175 Ltr/HP/Jam) x Pw x Ms H 2,612.50 Rupiahb. Pelumas = (0,01-0,02 Ltr/HP/Jam) x Pw x Mp I - Rupiahc. Perawatan dan = (12,5%-17,5%) x B' K 868.42 Rupiah

Perbaikan W'd. Operator = (1 Orang / Jam) x U1 L 18,688.00 Rupiahe. Pembantu Operator = (1 Orang / Jam) x U2 M 13,813.00 Rupiah

Biaya Operasi Per Jam = (H + I + K + L + M) P 35,981.92 Rupiah

BIAYA PASTI (INITIAL COST / CAPITAL COST) PER JAM KERJA

BIAYA OPERASI & PEMELIHARAAN (DIRECT OPERATIONAL & MAINTENANCE COST) PER JAM KERJA

BIAYA PASTI (INITIAL COST / CAPITAL COST) PER JAM KERJA

BIAYA OPERASI & PEMELIHARAAN (DIRECT OPERATIONAL & MAINTENANCE COST) PER JAM KERJA

Page 374: RAB 2009

374

1 2 3 4 5 6

4. TOTAL BIAYA SEWA ALAT / JAM = (G + P) S 37,883.61 Rupiah

L MOTOR GRADER 125 HP E131. URAIAN PERALATANa. Tenaga Pw 125 HPb. Kapasitas Cp - -c. Alat Baru: 1) Umur Ekonomis A 5 Tahun

2) Jam Kerja dalam 1 Tahun W 2,000 Jam3) Harga Alat B 645,810,000 Rupiah

d. Alat yang Dipakai: 1) Umur Ekonomis A' 5 Tahun Alat baru2) Jam Kerja dalam 1 Tahun W' 2,000 Jam Alat baru3) Harga Alat B' 645,810,000 Rupiah Alat baru

2.a. Nilai Sisa Alat = 10% x B C 64,581,000 Rupiahb. Faktor Angsuran Modal = i x (1 + i) ^ A' D 0.25046

(1 + i) ^ A' - 1c. Biaya Pasti Per Jam:

1) Biaya Pengembalian Modal = (B' - C) x D E 72,786.28 Rupiah W'

2) Asuransi, dll = 0,002 x B' F 645.81 Rupiah W'

Biaya Pasti Per Jam = (E + F) G 73,432.09 Rupiah

3.a. Bahan Bakar = (0,125-0,175 Ltr/HP/Jam) x Pw x Ms H 81,640.63 Rupiahb. Pelumas = (0,01-0,02 Ltr/HP/Jam) x Pw x Mp I - Rupiahc. Perawatan dan = (12,5%-17,5%) x B' K 40,363.13 Rupiah

Perbaikan W'd. Operator = (1 Orang / Jam) x U1 L 18,688.00 Rupiahe. Pembantu Operator = (1 Orang / Jam) x U2 M 13,813.00 Rupiah

Biaya Operasi Per Jam = (H + I + K + L + M) P 154,504.75 Rupiah

4. TOTAL BIAYA SEWA ALAT / JAM = (G + P) S 227,936.84 Rupiah

M WHEEL LOADER 1,0-1,6 M3 E151. URAIAN PERALATANa. Tenaga Pw 105 HPb. Kapasitas Cp 1.8 M3c. Alat Baru: 1) Umur Ekonomis A 6 Tahun

2) Jam Kerja dalam 1 Tahun W 2,000 Jam3) Harga Alat B 699,627,500 Rupiah

d. Alat yang Dipakai: 1) Umur Ekonomis A' 6 Tahun Alat baru2) Jam Kerja dalam 1 Tahun W' 2,000 Jam Alat baru3) Harga Alat B' 699,627,500 Rupiah Alat baru

2.a. Nilai Sisa Alat = 10% x B C 69,962,750 Rupiahb. Faktor Angsuran Modal = i x (1 + i) ^ A' D 0.21632

(1 + i) ^ A' - 1c. Biaya Pasti Per Jam:

1) Biaya Pengembalian Modal = (B' - C) x D E 68,103.09 Rupiah W'

2) Asuransi, dll = 0,002 x B' F 699.63 Rupiah W'

Biaya Pasti Per Jam = (E + F) G 68,802.71 Rupiah

3.a. Bahan Bakar = (0,125-0,175 Ltr/HP/Jam) x Pw x Ms H 68,578.13 Rupiahb. Pelumas = (0,01-0,02 Ltr/HP/Jam) x Pw x Mp I - Rupiahc. Perawatan dan = (12,5%-17,5%) x B' K 43,726.72 Rupiah

Perbaikan W'd. Operator = (1 Orang / Jam) x U1 L 18,688.00 Rupiahe. Pembantu Operator = (1 Orang / Jam) x U2 M 13,813.00 Rupiah

Biaya Operasi Per Jam = (H + I + K + L + M) P 144,805.84 Rupiah

4. TOTAL BIAYA SEWA ALAT / JAM = (G + P) S 213,608.56 Rupiah

N THREE WHEEL ROLLER 8-10 TON E16

BIAYA PASTI (INITIAL COST / CAPITAL COST) PER JAM KERJA

BIAYA OPERASI & PEMELIHARAAN (DIRECT OPERATIONAL & MAINTENANCE COST) PER JAM KERJA

BIAYA PASTI (INITIAL COST / CAPITAL COST) PER JAM KERJA

BIAYA OPERASI & PEMELIHARAAN (DIRECT OPERATIONAL & MAINTENANCE COST) PER JAM KERJA

Page 375: RAB 2009

375

1 2 3 4 5 6

1. URAIAN PERALATANa. Tenaga Pw 55 HPb. Kapasitas Cp 8 Tonc. Alat Baru: 1) Umur Ekonomis A 6 Tahun

2) Jam Kerja dalam 1 Tahun W 2,000 Jam3) Harga Alat B 258,324,000 Rupiah

d. Alat yang Dipakai: 1) Umur Ekonomis A' 6 Tahun Alat baru2) Jam Kerja dalam 1 Tahun W' 2,000 Jam Alat baru3) Harga Alat B' 258,324,000 Rupiah Alat baru

2.a. Nilai Sisa Alat = 10% x B C 25,832,400 Rupiahb. Faktor Angsuran Modal = i x (1 + i) ^ A' D 0.21632

(1 + i) ^ A' - 1c. Biaya Pasti Per Jam:

1) Biaya Pengembalian Modal = (B' - C) x D E 25,145.76 Rupiah W'

2) Asuransi, dll = 0,002 x B' F 258.32 Rupiah W'

Biaya Pasti Per Jam = (E + F) G 25,404.08 Rupiah

3.a. Bahan Bakar = (0,125-0,175 Ltr/HP/Jam) x Pw x Ms H 35,921.88 Rupiahb. Pelumas = (0,01-0,02 Ltr/HP/Jam) x Pw x Mp I - Rupiahc. Perawatan dan = (12,5%-17,5%) x B' K 16,145.25 Rupiah

Perbaikan W'd. Operator = (1 Orang / Jam) x U1 L 18,688.00 Rupiahe. Pembantu Operator = (1 Orang / Jam) x U2 M 13,813.00 Rupiah

Biaya Operasi Per Jam = (H + I + K + L + M) P 84,568.13 Rupiah

4. TOTAL BIAYA SEWA ALAT / JAM = (G + P) S 109,972.21 Rupiah

O TANDEM ROLLER 6-8 TON E171. URAIAN PERALATANa. Tenaga Pw 50 HPb. Kapasitas Cp 8 Tonc. Alat Baru: 1) Umur Ekonomis A 5 Tahun

2) Jam Kerja dalam 1 Tahun W 2,000 Jam3) Harga Alat B 358,424,550 Rupiah

d. Alat yang Dipakai: 1) Umur Ekonomis A' 5 Tahun Alat baru2) Jam Kerja dalam 1 Tahun W' 2,000 Jam Alat baru3) Harga Alat B' 358,424,550 Rupiah Alat baru

2.a. Nilai Sisa Alat = 10% x B C 35,842,455 Rupiahb. Faktor Angsuran Modal = i x (1 + i) ^ A' D 0.25046

(1 + i) ^ A' - 1c. Biaya Pasti Per Jam:

1) Biaya Pengembalian Modal = (B' - C) x D E 40,396.38 Rupiah W'

2) Asuransi, dll = 0,002 x B' F 358.42 Rupiah W'

Biaya Pasti Per Jam = (E + F) G 40,754.81 Rupiah

3.a. Bahan Bakar = (0,125-0,175 Ltr/HP/Jam) x Pw x Ms H 32,656.25 Rupiahb. Pelumas = (0,01-0,02 Ltr/HP/Jam) x Pw x Mp I - Rupiahc. Perawatan dan = (12,5%-17,5%) x B' K 22,401.53 Rupiah

Perbaikan W'd. Operator = (1 Orang / Jam) x U1 L 18,688.00 Rupiahe. Pembantu Operator = (1 Orang / Jam) x U2 M 13,813.00 Rupiah

Biaya Operasi Per Jam = (H + I + K + L + M) P 87,558.78 Rupiah

4. TOTAL BIAYA SEWA ALAT / JAM = (G + P) S 128,313.60 Rupiah

P PNEUMATIC TYRE ROLLER 8-12 TON E181. URAIAN PERALATANa. Tenaga Pw 60 HPb. Kapasitas Cp 10 Ton

BIAYA PASTI (INITIAL COST / CAPITAL COST) PER JAM KERJA

BIAYA OPERASI & PEMELIHARAAN (DIRECT OPERATIONAL & MAINTENANCE COST) PER JAM KERJA

BIAYA PASTI (INITIAL COST / CAPITAL COST) PER JAM KERJA

BIAYA OPERASI & PEMELIHARAAN (DIRECT OPERATIONAL & MAINTENANCE COST) PER JAM KERJA

Page 376: RAB 2009

376

1 2 3 4 5 6

c. Alat Baru: 1) Umur Ekonomis A 6 Tahun2) Jam Kerja dalam 1 Tahun W 2,000 Jam3) Harga Alat B 377,798,850 Rupiah

d. Alat yang Dipakai: 1) Umur Ekonomis A' 6 Tahun Alat baru2) Jam Kerja dalam 1 Tahun W' 2,000 Jam Alat baru3) Harga Alat B' 377,798,850 Rupiah Alat baru

2.a. Nilai Sisa Alat = 10% x B C 37,779,885 Rupiahb. Faktor Angsuran Modal = i x (1 + i) ^ A' D 0.21632

(1 + i) ^ A' - 1c. Biaya Pasti Per Jam:

1) Biaya Pengembalian Modal = (B' - C) x D E 36,775.67 Rupiah W'

2) Asuransi, dll = 0,002 x B' F 377.80 Rupiah W'

Biaya Pasti Per Jam = (E + F) G 37,153.47 Rupiah

3.a. Bahan Bakar = (0,125-0,175 Ltr/HP/Jam) x Pw x Ms H 39,187.50 Rupiahb. Pelumas = (0,01-0,02 Ltr/HP/Jam) x Pw x Mp I - Rupiahc. Perawatan dan = (12,5%-17,5%) x B' K 23,612.43 Rupiah

Perbaikan W'd. Operator = (1 Orang / Jam) x U1 L 18,688.00 Rupiahe. Pembantu Operator = (1 Orang / Jam) x U2 M 13,813.00 Rupiah

Biaya Operasi Per Jam = (H + I + K + L + M) P 95,300.93 Rupiah

4. TOTAL BIAYA SEWA ALAT / JAM = (G + P) S 132,454.40 Rupiah

Q VIBRATING ROLLER 6-8 TON E191. URAIAN PERALATANa. Tenaga Pw 75 HPb. Kapasitas Cp 7 Tonc. Alat Baru: 1) Umur Ekonomis A 6 Tahun

2) Jam Kerja dalam 1 Tahun W 2,000 Jam3) Harga Alat B 421,929,200 Rupiah

d. Alat yang Dipakai: 1) Umur Ekonomis A' 6 Tahun Alat baru2) Jam Kerja dalam 1 Tahun W' 2,000 Jam Alat baru3) Harga Alat B' 421,929,200 Rupiah Alat baru

2. Lebar roda = 2,13 ma. Nilai Sisa Alat = 10% x B C 42,192,920 Rupiahb. Faktor Angsuran Modal = i x (1 + i) ^ A' D 0.21632

(1 + i) ^ A' - 1c. Biaya Pasti Per Jam:

1) Biaya Pengembalian Modal = (B' - C) x D E 41,071.40 Rupiah W'

2) Asuransi, dll = 0,002 x B' F 421.93 Rupiah W'

Biaya Pasti Per Jam = (E + F) G 41,493.33 Rupiah

3.a. Bahan Bakar = (0,125-0,175 Ltr/HP/Jam) x Pw x Ms H 48,984.38 Rupiahb. Pelumas = (0,01-0,02 Ltr/HP/Jam) x Pw x Mp I - Rupiahc. Perawatan dan = (12,5%-17,5%) x B' K 26,370.58 Rupiah

Perbaikan W'd. Operator = (1 Orang / Jam) x U1 L 18,688.00 Rupiahe. Pembantu Operator = (1 Orang / Jam) x U2 M 13,813.00 Rupiah

Biaya Operasi Per Jam = (H + I + K + L + M) P 107,855.95 Rupiah

4. TOTAL BIAYA SEWA ALAT / JAM = (G + P) S 149,349.28 Rupiah

R CONCRETE VIBRATOR E201. URAIAN PERALATANa. Tenaga Pw 5 HPb. Kapasitas Cp - -c. Alat Baru: 1) Umur Ekonomis A 4 Tahun

2) Jam Kerja dalam 1 Tahun W 1,000 Jam3) Harga Alat B 4,927,016 Rupiah

BIAYA PASTI (INITIAL COST / CAPITAL COST) PER JAM KERJA

BIAYA OPERASI & PEMELIHARAAN (DIRECT OPERATIONAL & MAINTENANCE COST) PER JAM KERJA

BIAYA PASTI (INITIAL COST / CAPITAL COST) PER JAM KERJA

BIAYA OPERASI & PEMELIHARAAN (DIRECT OPERATIONAL & MAINTENANCE COST) PER JAM KERJA

Page 377: RAB 2009

377

1 2 3 4 5 6

d. Alat yang Dipakai: 1) Umur Ekonomis A' 4 Tahun Alat baru2) Jam Kerja dalam 1 Tahun W' 1,000 Jam Alat baru3) Harga Alat B' 4,927,016 Rupiah Alat baru

2.a. Nilai Sisa Alat = 10% x B C 492,702 Rupiahb. Faktor Angsuran Modal = i x (1 + i) ^ A' D 0.30192

(1 + i) ^ A' - 1c. Biaya Pasti Per Jam:

1) Biaya Pengembalian Modal = (B' - C) x D E 1,338.81 Rupiah W'

2) Asuransi, dll = 0,002 x B' F 9.85 Rupiah W'

Biaya Pasti Per Jam = (E + F) G 1,348.67 Rupiah

3.a. Bahan Bakar = (0,125-0,175 Ltr/HP/Jam) x Pw x Ms H 3,265.63 Rupiahb. Pelumas = (0,01-0,02 Ltr/HP/Jam) x Pw x Mp I - Rupiahc. Perawatan dan = (12,5%-17,5%) x B' K 615.88 Rupiah

Perbaikan W'd. Operator = (1 Orang / Jam) x U1 L 18,688.00 Rupiahe. Pembantu Operator = (1 Orang / Jam) x U2 M 13,813.00 Rupiah

Biaya Operasi Per Jam = (H + I + K + L + M) P 36,382.50 Rupiah

4. TOTAL BIAYA SEWA ALAT / JAM = (G + P) S 37,731.17 Rupiah

S WATER PUMP 70-100 mm E221. URAIAN PERALATANa. Tenaga Pw 8 HPb. Kapasitas Cp - -c. Alat Baru: 1) Umur Ekonomis A 4 Tahun

2) Jam Kerja dalam 1 Tahun W 2,000 Jam3) Harga Alat B 10,053,533 Rupiah

d. Alat yang Dipakai: 1) Umur Ekonomis A' 4 Tahun Alat baru2) Jam Kerja dalam 1 Tahun W' 2,000 Jam Alat baru3) Harga Alat B' 10,053,533 Rupiah Alat baru

2.a. Nilai Sisa Alat = 10% x B C 1,005,353 Rupiahb. Faktor Angsuran Modal = i x (1 + i) ^ A' D 0.30192

(1 + i) ^ A' - 1c. Biaya Pasti Per Jam:

1) Biaya Pengembalian Modal = (B' - C) x D E 1,365.92 Rupiah W'

2) Asuransi, dll = 0,002 x B' F 10.05 Rupiah W'

Biaya Pasti Per Jam = (E + F) G 1,375.97 Rupiah

3.a. Bahan Bakar = (0,125-0,175 Ltr/HP/Jam) x Pw x Ms H 5,225.00 Rupiahb. Pelumas = (0,01-0,02 Ltr/HP/Jam) x Pw x Mp I - Rupiahc. Perawatan dan = (12,5%-17,5%) x B' K 628.35 Rupiah

Perbaikan W'd. Operator = (1 Orang / Jam) x U1 L 18,688.00 Rupiahe. Pembantu Operator = (1 Orang / Jam) x U2 M 13,813.00 Rupiah

Biaya Operasi Per Jam = (H + I + K + L + M) P 38,354.35 Rupiah

4. TOTAL BIAYA SEWA ALAT / JAM = (G + P) S 39,730.32 Rupiah

T WATER TANK TRUCK 3000-4500 L E231. URAIAN PERALATANa. Tenaga Pw 100 HPb. Kapasitas Cp 4,000 Literc. Alat Baru: 1) Umur Ekonomis A 6 Tahun

2) Jam Kerja dalam 1 Tahun W 2,000 Jam3) Harga Alat B 142,078,200 Rupiah

d. Alat yang Dipakai: 1) Umur Ekonomis A' 6 Tahun Alat baru2) Jam Kerja dalam 1 Tahun W' 2,000 Jam Alat baru3) Harga Alat B' 142,078,200 Rupiah Alat baru

BIAYA PASTI (INITIAL COST / CAPITAL COST) PER JAM KERJA

BIAYA OPERASI & PEMELIHARAAN (DIRECT OPERATIONAL & MAINTENANCE COST) PER JAM KERJA

BIAYA PASTI (INITIAL COST / CAPITAL COST) PER JAM KERJA

BIAYA OPERASI & PEMELIHARAAN (DIRECT OPERATIONAL & MAINTENANCE COST) PER JAM KERJA

Page 378: RAB 2009

378

1 2 3 4 5 6

2.a. Nilai Sisa Alat = 10% x B C 14,207,820 Rupiahb. Faktor Angsuran Modal = i x (1 + i) ^ A' D 0.21632

(1 + i) ^ A' - 1c. Biaya Pasti Per Jam:

1) Biaya Pengembalian Modal = (B' - C) x D E 13,830.17 Rupiah W'

2) Asuransi, dll = 0,002 x B' F 142.08 Rupiah W'

Biaya Pasti Per Jam = (E + F) G 13,972.24 Rupiah

3.a. Bahan Bakar = (0,125-0,175 Ltr/HP/Jam) x Pw x Ms H 65,312.50 Rupiahb. Pelumas = (0,01-0,02 Ltr/HP/Jam) x Pw x Mp I - Rupiahc. Perawatan dan = (12,5%-17,5%) x B' K 8,879.89 Rupiah

Perbaikan W'd. Operator = (1 Orang / Jam) x U1 L 18,688.00 Rupiahe. Pembantu Operator = (1 Orang / Jam) x U2 M 13,813.00 Rupiah

Biaya Operasi Per Jam = (H + I + K + L + M) P 106,693.39 Rupiah

4. TOTAL BIAYA SEWA ALAT / JAM = (G + P) S 120,665.64 Rupiah

U PEDESTERIAN ROLLER E241. URAIAN PERALATAN Istilah lain adalah baby roller, walk-behind rollera. Tenaga Pw 11 HPb. Kapasitas Cp 0.980 Tonc. Alat Baru: 1) Umur Ekonomis A 6 Tahun

2) Jam Kerja dalam 1 Tahun W 2,000 Jam3) Harga Alat B 88,863,000 Rupiah

d. Alat yang Dipakai: 1) Umur Ekonomis A' 6 Tahun Alat baru2) Jam Kerja dalam 1 Tahun W' 2,000 Jam Alat baru3) Harga Alat B' 88,863,000 Rupiah Alat baru

2.a. Nilai Sisa Alat = 10% x B C 8,886,300 Rupiahb. Faktor Angsuran Modal = i x (1 + i) ^ A' D 0.21632

(1 + i) ^ A' - 1c. Biaya Pasti Per Jam:

1) Biaya Pengembalian Modal = (B' - C) x D E 8,650.10 Rupiah W'

2) Asuransi, dll = 0,002 x B' F 88.86 Rupiah W'

Biaya Pasti Per Jam = (E + F) G 8,738.96 Rupiah

3.a. Bahan Bakar = (0,125-0,175 Ltr/HP/Jam) x Pw x Ms H 7,184.38 Rupiahb. Pelumas = (0,01-0,02 Ltr/HP/Jam) x Pw x Mp I - Rupiahc. Perawatan dan = (12,5%-17,5%) x B' K 5,553.94 Rupiah

Perbaikan W'd. Operator = (1 Orang / Jam) x U1 L 18,688.00 Rupiahe. Pembantu Operator = (1 Orang / Jam) x U2 M 13,813.00 Rupiah

Biaya Operasi Per Jam = (H + I + K + L + M) P 45,239.31 Rupiah

4. TOTAL BIAYA SEWA ALAT / JAM = (G + P) S 53,978.28 Rupiah

V TAMPER / HAND COMPACTOR E251. URAIAN PERALATAN Istilah lain adalah stamper, vibratory compactor, upright rammers,a. Tenaga Pw 3.5 HP hand compactorb. Kapasitas Cp 0.082 Tonc. Alat Baru: 1) Umur Ekonomis A 6 Tahun

2) Jam Kerja dalam 1 Tahun W 1,000 Jam3) Harga Alat B 10,117,500 Rupiah

d. Alat yang Dipakai: 1) Umur Ekonomis A' 6 Tahun Alat baru2) Jam Kerja dalam 1 Tahun W' 1,000 Jam Alat baru3) Harga Alat B' 10,117,500 Rupiah Alat baru

2.a. Nilai Sisa Alat = 10% x B C 1,011,750 Rupiah

BIAYA PASTI (INITIAL COST / CAPITAL COST) PER JAM KERJA

BIAYA OPERASI & PEMELIHARAAN (DIRECT OPERATIONAL & MAINTENANCE COST) PER JAM KERJA

BIAYA PASTI (INITIAL COST / CAPITAL COST) PER JAM KERJA

BIAYA OPERASI & PEMELIHARAAN (DIRECT OPERATIONAL & MAINTENANCE COST) PER JAM KERJA

BIAYA PASTI (INITIAL COST / CAPITAL COST) PER JAM KERJA

Page 379: RAB 2009

379

1 2 3 4 5 6

b. Faktor Angsuran Modal = i x (1 + i) ^ A' D 0.21632 (1 + i) ^ A' - 1

c. Biaya Pasti Per Jam:1) Biaya Pengembalian Modal = (B' - C) x D E 1,969.71 Rupiah Honda Gasoline Engine 4 HP or ROBIN Gasoline Engine 4 HP

W' Hit frequency:640-680/min Compact force:17kN jump height:50-60mm2) Asuransi, dll = 0,002 x B' F 20.24 Rupiah speed:12m/min N.W.:80kgs G.W.:100kgs

W'Biaya Pasti Per Jam = (E + F) G 1,989.95 Rupiah

3.a. Bahan Bakar = (0,125-0,175 Ltr/HP/Jam) x Pw x Ms H 2,285.94 Rupiahb. Pelumas = (0,01-0,02 Ltr/HP/Jam) x Pw x Mp I - Rupiahc. Perawatan dan = (12,5%-17,5%) x B' K 1,264.69 Rupiah

Perbaikan W'd. Operator = (1 Orang / Jam) x U1 L 18,688.00 Rupiahe. Pembantu Operator = (1 Orang / Jam) x U2 M 13,813.00 Rupiah

Biaya Operasi Per Jam = (H + I + K + L + M) P 36,051.63 Rupiah

4. TOTAL BIAYA SEWA ALAT / JAM = (G + P) S 38,041.58 Rupiah

W PLATE COMPACTOR E25.a1. URAIAN PERALATAN Istilah lain adalah vibratory plate compactor, stamper kodok.a. Tenaga Pw 5.0 HP Power: Gasoline engine ROBIN EY20/Honda copy 5.5 HPb. Kapasitas Cp 0.090 Ton C-77 Frequency: 5600 VPM Centrifugal Force: 13.5KNc. Alat Baru: 1) Umur Ekonomis A 6 Tahun Trav.Speed: 15~20 m/menit Plate Size: 57X43 cm NetWeight: 83 kg

2) Jam Kerja dalam 1 Tahun W 1,000 Jam3) Harga Alat B 9,647,250 Rupiah

d. Alat yang Dipakai: 1) Umur Ekonomis A' 6 Tahun Alat baru2) Jam Kerja dalam 1 Tahun W' 1,000 Jam Alat baru3) Harga Alat B' 9,647,250 Rupiah Alat baru

2.a. Nilai Sisa Alat = 10% x B C 964,725 Rupiahb. Faktor Angsuran Modal = i x (1 + i) ^ A' D 0.21632

(1 + i) ^ A' - 1c. Biaya Pasti Per Jam:

1) Biaya Pengembalian Modal = (B' - C) x D E 1,878.16 Rupiah W'

2) Asuransi, dll = 0,002 x B' F 19.29 Rupiah W'

Biaya Pasti Per Jam = (E + F) G 1,897.46 Rupiah

3.a. Bahan Bakar = (0,125-0,175 Ltr/HP/Jam) x Pw x Ms H 3,265.63 Rupiahb. Pelumas = (0,01-0,02 Ltr/HP/Jam) x Pw x Mp I - Rupiahc. Perawatan dan = (12,5%-17,5%) x B' K 1,205.91 Rupiah

Perbaikan W'd. Operator = (1 Orang / Jam) x U1 L 18,688.00 Rupiahe. Pembantu Operator = (1 Orang / Jam) x U2 M 13,813.00 Rupiah

Biaya Operasi Per Jam = (H + I + K + L + M) P 36,972.53 Rupiah

4. TOTAL BIAYA SEWA ALAT / JAM = (G + P) S 38,869.99 Rupiah

BIAYA OPERASI & PEMELIHARAAN (DIRECT OPERATIONAL & MAINTENANCE COST) PER JAM KERJA

BIAYA PASTI (INITIAL COST / CAPITAL COST) PER JAM KERJA

BIAYA OPERASI & PEMELIHARAAN (DIRECT OPERATIONAL & MAINTENANCE COST) PER JAM KERJA

Page 380: RAB 2009

380

ANALISIS BIAYA PERALATAN PER JAM KERJA

KET.

7 8

1,760,000.00 Alat baru 240,800.00 Alat baru 71,500.00 Alat baru 709,500.00 Alat baru 99,544.38 Alat baru 16,500.00 Alat baru 142,610.95 Alat baru 319,000.00 Alat baru 654,500.00 Alat baru 173,318.01 Alat baru 37,883.61 Alat baru 227,936.84 Alat baru 213,608.56 Alat baru 109,972.21 Alat baru 264,000.00 Alat baru 330,000.00 Alat baru 99,000.00 Alat baru 34,500.00 Alat baru 39,730.32 Alat baru 336,000.00 Alat baru 53,978.28 Alat baru 38,041.58 Alat baru 38,869.99 Alat baru

KETERANGAN

6

BIAYA ALAT/ JAM

Page 381: RAB 2009

381

6

Page 382: RAB 2009

382

6

Page 383: RAB 2009

383

6

Page 384: RAB 2009

384

6

Page 385: RAB 2009

385

6

Page 386: RAB 2009

386

6

Page 387: RAB 2009

387

6

Page 388: RAB 2009

388

6

Page 389: RAB 2009

389

6

Page 390: RAB 2009

390

6

Istilah lain adalah baby roller, walk-behind roller

Istilah lain adalah stamper, vibratory compactor, upright rammers,

Page 391: RAB 2009

391

6

Honda Gasoline Engine 4 HP or ROBIN Gasoline Engine 4 HPHit frequency:640-680/min Compact force:17kN jump height:50-60mmspeed:12m/min N.W.:80kgs G.W.:100kgs

Istilah lain adalah vibratory plate compactor, stamper kodok.Power: Gasoline engine ROBIN EY20/Honda copy 5.5 HPC-77 Frequency: 5600 VPM Centrifugal Force: 13.5KNTrav.Speed: 15~20 m/menit Plate Size: 57X43 cm NetWeight: 83 kg

Page 392: RAB 2009

2,180,562,000 DUA MILYAR SERATUS DELAPAN PULUH JUTA LIMA RATUS ENAM PULUH DUA RIBU

#REF! #REF!

#REF!

175,032,000 SERATUS TUJUH PULUH LIMA JUTA TIGA PULUH DUA RIBU 0 RUPIAH,-

DUA MILYAR SERATUS DELAPAN PULUH JUTA LIMA RATUS ENAM PULUH DUA RIBU 0 RUPIAH,-

SERATUS TUJUH PULUH LIMA JUTA TIGA PULUH DUA RIBU 0 RUPIAH,-

Page 393: RAB 2009

197,981,000 SERATUS SEMBILAN PULUH TUJUH JUTA SEMBILAN RATUS DELAPAN PULUH SATU

1,500,000,000 SATU MILYAR LIMA RATUS JUTA 0 RUPIAH,-

SERATUS SEMBILAN PULUH TUJUH JUTA SEMBILAN RATUS DELAPAN PULUH SATU RIBU 0 RUPIAH,-

SATU MILYAR LIMA RATUS JUTA 0 RUPIAH,-

Page 394: RAB 2009

220,899,000 DUA RATUS DUA PULUH JUTA DELAPAN RATUS SEMBILAN PULUH SEMBILAN RIBU

258,890,000 DUA RATUS LIMA PULUH DELAPAN JUTA DELAPAN RATUS SEMBILAN PULUH RIBU 0

DUA RATUS DUA PULUH JUTA DELAPAN RATUS SEMBILAN PULUH SEMBILAN RIBU 0 RUPIAH,-

DUA RATUS LIMA PULUH DELAPAN JUTA DELAPAN RATUS SEMBILAN PULUH RIBU 0 RUPIAH,-

Page 395: RAB 2009

114,080,000 SERATUS EMPAT BELAS JUTA DELAPAN PULUH RIBU 0 RUPIAH,-

#REF! #REF!

#REF!

SERATUS EMPAT BELAS JUTA DELAPAN PULUH RIBU 0 RUPIAH,-

Page 396: RAB 2009

104,562,000 SERATUS EMPAT JUTA LIMA RATUS ENAM PULUH DUA RIBU 0 RUPIAH,-

5,467,549,000 LIMA MILYAR EMPAT RATUS ENAM PULUH TUJUH JUTA LIMA RATUS EMPAT PULUH

SERATUS EMPAT JUTA LIMA RATUS ENAM PULUH DUA RIBU 0 RUPIAH,-

LIMA MILYAR EMPAT RATUS ENAM PULUH TUJUH JUTA LIMA RATUS EMPAT PULUH SEMBILAN RIBU 0 RUPIAH,-

Page 397: RAB 2009

#REF! #REF!

#REF!

715,543,000 TUJUH RATUS LIMA BELAS JUTA LIMA RATUS EMPAT PULUH TIGA RIBU 0 RUPIAH,-

#REF! #REF!

#REF!

TUJUH RATUS LIMA BELAS JUTA LIMA RATUS EMPAT PULUH TIGA RIBU 0 RUPIAH,-

Page 398: RAB 2009

DUA MILYAR SERATUS DELAPAN PULUH JUTA LIMA RATUS ENAM PULUH DUA RIBU 10 2

0 21805620001 SATU2 DUA 2 MILYARAN3 TIGA DUA RIBU 180 JUTAAN4 EMPAT ENAM PULUH 562 RIBUAAN5 LIMA LIMA RATUS 000 RATUSAN6 ENAM JUTA 7 TUJUH DELAPAN PULUH 8 DELAPAN SERATUS 9 SEMBILAN DUA MILYAR

#REF! #REF!

0 #REF! #REF!1 SATU #REF!2 DUA #REF! #REF! MILYARAN3 TIGA #REF! #REF! JUTAAN4 EMPAT #REF! #REF! RIBUAAN5 LIMA #REF! #REF! RATUSAN6 ENAM #REF!7 TUJUH #REF!8 DELAPAN #REF!9 SEMBILAN #REF!

#REF!#REF!

SERATUS TUJUH PULUH LIMA JUTA TIGA PULUH DUA RIBU 0 RUPIAH,- 9 3

0 175032000

Page 399: RAB 2009

1 SATU2 DUA MILYARAN3 TIGA DUA RIBU 175 JUTAAN4 EMPAT TIGA PULUH 032 RIBUAAN5 LIMA 000 RATUSAN6 ENAM LIMA JUTA 7 TUJUH TUJUH PULUH 8 DELAPAN SERATUS 9 SEMBILAN

SERATUS SEMBILAN PULUH TUJUH JUTA SEMBILAN RATUS DELAPAN PULUH SATU 9 3

0 1979810001 SATU2 DUA MILYARAN3 TIGA SATU RIBU 197 JUTAAN4 EMPAT DELAPAN PULUH 981 RIBUAAN5 LIMA SEMBILAN RATUS 000 RATUSAN6 ENAM TUJUH JUTA 7 TUJUH SEMBILAN PULUH 8 DELAPAN SERATUS 9 SEMBILAN

10 2

0 15000000001 SATU2 DUA 1 MILYARAN3 TIGA 500 JUTAAN4 EMPAT 000 RIBUAAN5 LIMA 000 RATUSAN

Page 400: RAB 2009

6 ENAM JUTA 7 TUJUH8 DELAPAN LIMA RATUS 9 SEMBILAN SATU MILYAR

DUA RATUS DUA PULUH JUTA DELAPAN RATUS SEMBILAN PULUH SEMBILAN RIBU 9 3

0 2208990001 SATU2 DUA MILYARAN3 TIGA SEMBILAN RIBU 220 JUTAAN4 EMPAT SEMBILAN PULUH 899 RIBUAAN5 LIMA DELAPAN RATUS 000 RATUSAN6 ENAM JUTA 7 TUJUH DUA PULUH 8 DELAPAN DUA RATUS 9 SEMBILAN

DUA RATUS LIMA PULUH DELAPAN JUTA DELAPAN RATUS SEMBILAN PULUH RIBU 0 9 3

0 2588900001 SATU2 DUA MILYARAN3 TIGA RIBU 258 JUTAAN4 EMPAT SEMBILAN PULUH 890 RIBUAAN5 LIMA DELAPAN RATUS 000 RATUSAN6 ENAM DELAPAN JUTA 7 TUJUH LIMA PULUH 8 DELAPAN DUA RATUS 9 SEMBILAN

Page 401: RAB 2009

9 3

0 1140800001 SATU2 DUA MILYARAN3 TIGA RIBU 114 JUTAAN4 EMPAT DELAPAN PULUH 080 RIBUAAN5 LIMA 000 RATUSAN6 ENAM JUTA 7 TUJUH EMPAT BELAS 8 DELAPAN SERATUS 9 SEMBILAN

#REF! #REF!

0 #REF! #REF!1 SATU #REF!2 DUA #REF! #REF! MILYARAN3 TIGA #REF! #REF! JUTAAN4 EMPAT #REF! #REF! RIBUAAN5 LIMA #REF! #REF! RATUSAN6 ENAM #REF!7 TUJUH #REF!8 DELAPAN #REF!9 SEMBILAN #REF!

#REF!#REF!

Page 402: RAB 2009

SERATUS EMPAT JUTA LIMA RATUS ENAM PULUH DUA RIBU 0 RUPIAH,- 9 3

0 1045620001 SATU2 DUA MILYARAN3 TIGA DUA RIBU 104 JUTAAN4 EMPAT ENAM PULUH 562 RIBUAAN5 LIMA LIMA RATUS 000 RATUSAN6 ENAM EMPAT JUTA 7 TUJUH8 DELAPAN SERATUS 9 SEMBILAN

LIMA MILYAR EMPAT RATUS ENAM PULUH TUJUH JUTA LIMA RATUS EMPAT PULUH 10 2

0 54675490001 SATU2 DUA 5 MILYARAN3 TIGA SEMBILAN RIBU 467 JUTAAN4 EMPAT EMPAT PULUH 549 RIBUAAN5 LIMA LIMA RATUS 000 RATUSAN6 ENAM TUJUH JUTA 7 TUJUH ENAM PULUH 8 DELAPAN EMPAT RATUS 9 SEMBILAN LIMA MILYAR

Page 403: RAB 2009

#REF! #REF!

0 #REF! #REF!1 SATU #REF!2 DUA #REF! #REF! MILYARAN3 TIGA #REF! #REF! JUTAAN4 EMPAT #REF! #REF! RIBUAAN5 LIMA #REF! #REF! RATUSAN6 ENAM #REF!7 TUJUH #REF!8 DELAPAN #REF!9 SEMBILAN #REF!

#REF!#REF!

TUJUH RATUS LIMA BELAS JUTA LIMA RATUS EMPAT PULUH TIGA RIBU 0 RUPIAH,- 9 3

0 7155430001 SATU2 DUA MILYARAN3 TIGA TIGA RIBU 715 JUTAAN4 EMPAT EMPAT PULUH 543 RIBUAAN5 LIMA LIMA RATUS 000 RATUSAN6 ENAM JUTA 7 TUJUH LIMA BELAS 8 DELAPAN TUJUH RATUS 9 SEMBILAN

#REF! #REF!

0 #REF! #REF!1 SATU #REF!2 DUA #REF! #REF! MILYARAN3 TIGA #REF! #REF! JUTAAN4 EMPAT #REF! #REF! RIBUAAN5 LIMA #REF! #REF! RATUSAN6 ENAM #REF!7 TUJUH #REF!8 DELAPAN #REF!9 SEMBILAN #REF!

Page 404: RAB 2009

#REF!#REF!

Page 405: RAB 2009

2.181E+09

#REF!

175032000

Page 406: RAB 2009

197981000

1.5E+09

Page 407: RAB 2009

220899000

258890000

Page 408: RAB 2009

114080000

#REF!

Page 409: RAB 2009

104562000

5.468E+09

Page 410: RAB 2009

#REF!

715543000

#REF!