REKAPITULASI BIAYA ( ENGINEER ESTIMATE ) KEGIATAN : Pembangunan Gapura LOKASI : Jalan M. Said Gang. 4 NO U R A I A N P E K E R J A A N A PEKERJAAN PERSIAPAN B PEKERJAAN TANAH DAN PASIR C PEKERJAAN PANCANGAN D PEKERJAAN PASANGAN DAN PLESTERAN E PEKERJAAN BETON BERTULANG F PEKERJAAN CAT CATAN a J U M L A H b PPN 10 % c TOTAL d DIBULATKAN Terbilang : Tujuh Juta Lima Ratus Dua Puluh Tiga Ribu NIP. 110 048 077 Samari Marce

Upload: marcekal-hilyan

Post on 25-Jul-2015

6.505 views

Category:

Documents


1.035 download

TRANSCRIPT

Page 1: Gapura RAB

REKAPITULASI BIAYA( ENGINEER ESTIMATE )

KEGIATAN : Pembangunan GapuraLOKASI : Jalan M. Said Gang. 4

NO U R A I A N P E K E R J A A NJUMLAHHARGA

(RP)

A PEKERJAAN PERSIAPAN Rp 4,452.50 B PEKERJAAN TANAH DAN PASIR Rp 46,370.00 C PEKERJAAN PANCANGAN Rp 825,825.00 D PEKERJAAN PASANGAN DAN PLESTERAN Rp 2,197,524.28 E PEKERJAAN BETON BERTULANG Rp 3,669,806.70 F PEKERJAAN CAT CATAN Rp 95,320.90

a J U M L A H Rp 6,839,299.38 b PPN 10 % Rp 683,929.94 c TOTAL Rp 7,523,229.32 d DIBULATKAN Rp 7,523,000.00

Terbilang :

Tujuh Juta Lima Ratus Dua Puluh Tiga Ribu Rupiah

NIP. 110 048 077

Samarinda, 22 Juli 2012Dibuat

Marcekal Hilyan Bernae

Page 2: Gapura RAB

RENCANA ANGGARAN BIAYA[ ENGGINER ESTIMATE ]

KEGIATAN : Pembangunan GapuraLOKASI : Jalan M. Said Gang. 4

NO. URAIAN PEKERJAAN SAT. VOLUME HARGA SAT. JML.HARGA

A PEKERJAAN PERSIAPAN1 Pembersihan Lapangan dan Perataan M² 0.650 6,850.00 4,452.50

PEKERJAAN PERSIAPAN 4,452.50 B PEKERJAAN TANAH DAN PASIR1 Galian tanah pondasi M³ 0.882 28,800.00 25,401.60 2 Pemadatan tanah M³ 0.650 31,000.00 20,150.00 3 Urugan pasir bawah pondasi dan lantai M³ 0.044 18,600.00 818.40

PEKERJAAN TANAH DAN PASIR 46,370.00 C PEKERJAAN PANCANGAN 1 Pancang ulin 10/10x 1 m' Ttk 5.000 88,065.00 440,325.00 2 Kalang ulin 5/10 M³ 0.150 2,500,000.00 375,000.00 3 Papan ulin 5/20 M³ 0.004 2,500,000.00 10,500.00

PEKERJAAN PANCANGAN 825,825.00 D PEKERJAAN PASANGAN DAN PLESTERAN1 Pasang batu gunung 1 : 4 M³ 1.180 498,650.00 588,407.00 3 Pasang batu bata tebal ½ bata 1 : 4 M² 0.936 67,518.00 63,196.85 5 Plesteran 1 : 4 M² 0.683 29,627.00 20,220.43 7 Pasangan batu alam dinding M² 4.250 150,000.00 637,500.00 8 Tanam rumput + tanaman M² 8.882 100,000.00 888,200.00 I PEKERJAAN PASANGAN DAN PLESTERAN 2,197,524.28 E PEKERJAAN BETON BERTULANG2 Cor sloof 25/30 M³ 0.158 5,341,555 841,294.91 3 Cor kolom praktis 20/20 M³ 0.520 5,341,555.00 2,777,608.60 4 cor beton sirip 5cm M³ 0.078 652,605.00 50,903.19

PEKERJAAN BETON BERTULANG 3,669,806.70 F PEKERJAAN CAT CATAN1 Cat dinding M² 8.200 11,624.50 95,320.90

PEKERJAAN CAT CATAN 95,320.90

Page 3: Gapura RAB

DAFTAR ANALISA PEKERJAAN

KEGIATAN : Pembangunan Gapura LOKASI : Jalan M. Said Gang. 4

HARGA JUMLAH NO URAIAN PEKERJAAN KOEFISIEN SATUAN SATUAN HARGA

(RP) (RP)

A PEKERJAAN PERSIAPAN1 Pembersihan Lapangan dan Perataan 1.000 M¹

Pekerja 0.100 OH 65,000.00 6,500.00 Mandor 0.005 OH 70,000.00 350.00

6,850.00

B PEKERJAAN TANAH DAN PASIR

1 Galian tanah biasa sedalam 1m 1 M³Pekerja 0.400 M³ 65,000.00 26,000.00 Mandor 0.040 M³ 70,000.00 2,800.00

28,800.00 2 Urugan tanah 1 M³

Tanah urug 1.200 M³ 50,000.00 60,000.00 Pekerja 0.300 OH 55,000.00 16,500.00 Mandor 0.010 OH 70,000.00 700.00

77,200.00 3 Urugan tanah kembali 1.000 M³

Pekerja 0.192 OH 55,000.00 10,560.00 Mandor 0.019 OH 70,000.00 1,330.00

11,890.00 4 Pemadatan tanah 1.000 M³

Pekerja 0.500 OH 55,000.00 27,500.00 Mandor 0.050 OH 70,000.00 3,500.00

31,000.00 5 Urugan pasir 1.000 M³

Pasir Urug 1.200 70,000.00 84,000.00 Pekerja 0.300 OH 55,000.00 16,500.00 Mandor 0.030 OH 70,000.00 2,100.00

18,600.00

Page 4: Gapura RAB

HARGA JUMLAH NO URAIAN PEKERJAAN KOEFISIEN SATUAN SATUAN HARGA

(RP) (RP)

C PEKERJAAN PONDASI1 Pas.pondasi batu gunung camp. 1 : 4 1.000 M³

Batu gunung 1.100 M³ 120,000.00 132,000.00 Semen 163.000 Kg 1,160.00 189,080.00 Pasir pasang 0.520 M³ 96,000.00 49,920.00 Pekerja 1.500 Oh 55,000.00 82,500.00 Mandor 0.075 Oh 70,000.00 5,250.00 Tukang batu 0.600 Oh 60,000.00 36,000.00 Kepala tukang batu 0.060 Oh 65,000.00 3,900.00 498,650.00

2 Pas. Batu Kosong 1.000 M³Batu gunung 0.270 M³ 120,000.00 32,400.00 Pasir pasang 2.000 bh 96,000.00 192,000.00 Pekerja 0.500 Jam 55,000.00 27,500.00 Mandor 3.000 Org/hari 70,000.00 210,000.00 Tukang batu 0.150 Org/hari 60,000.00 9,000.00 Kepala tukang batu 0.015 Org/hari 70,000.00 1,050.00

471,950.00 3 Pancang ulin 10/10-2m+sunduk ulin 5/10 1.000 Ttk

kayu ulin 10/10-200 0.025 M³ 3,000,000.00 75,000.00 Kayu ulin 5/10 0.003 M³ 2,500,000.00 6,250.00 Pekerja 0.040 Org/hari 55,000.00 2,200.00 Mandor 0.004 Org/hari 70,000.00 280.00 Tukang kayu 0.030 Org/hari 60,000.00 1,800.00 Kepala tukang kayu 0.039 Org/hari 65,000.00 2,535.00

88,065.00 D PEKERJAAN PASANGAN DINDING1 Pas.batu bata camp. 1pc:2ps 1.000

Batu bata 45.000 Bh 550.00 24,750.00 Semen 13.370 Kg 1,160.00 15,509.20 Pasir pasang 0.040 96,000.00 3,840.00 Pekerja 0.320 Org/hari 55,000.00 17,600.00 Mandor 0.015 Org/hari 70,000.00 1,050.00 Tukang batu 0.100 Org/hari 60,000.00 6,000.00 Kepala tukang batu 0.010 Org/hari 65,000.00 650.00

69,399.20 2 Pas.batu bata camp. 1pc:4ps 1.000

Batu bata 45.000 Bh 550.00 24,750.00 Semen 11.500 Kg 1,160.00 13,340.00 Pasir pasang 0.043 96,000.00 4,128.00 Pekerja 0.320 Org/hari 55,000.00 17,600.00 Mandor 0.015 Org/hari 70,000.00 1,050.00 Tukang batu 0.100 Org/hari 60,000.00 6,000.00 Kepala tukang batu 0.010 Org/hari 65,000.00 650.00

67,518.00 3 Pas.parit batu bata camp. 1pc:4ps 1.000

Batu bata 45.000 Bh 550.00 24,750.00 Semen 4.780 Kg 1,160.00 5,544.80 Pasir pasang 0.080 96,000.00 7,680.00 Pekerja 0.320 Org/hari 55,000.00 17,600.00 Mandor 0.015 Org/hari 70,000.00 1,050.00 Tukang batu 0.100 Org/hari 60,000.00 6,000.00 kepala tukang batu 0.010 Org/hari 65,000.00 650.00

63,274.80

Page 5: Gapura RAB

HARGA JUMLAH NO URAIAN PEKERJAAN KOEFISIEN SATUAN SATUAN HARGA

(RP) (RP)E PEKERJAAN PLESTERAN1 Plesteran tebal 15 mm camp. 1pc:2ps 1.000

Semen 8.520 Kg 1,160.00 9,883.20 Pasir pasang 0.017 96,000.00 1,632.00 Pekerja 0.200 OH 55,000.00 11,000.00 Mandor 0.010 OH 70,000.00 700.00 Tukang batu 0.150 OH 60,000.00 9,000.00 Kepala tukang batu 0.015 OH 65,000.00 975.00

33,190.20 2 Plesteran tebal 15 mm camp. 1pc:4ps 1.000

Semen 5.200 Kg 1,160.00 6,032.00 Pasir pasang 0.020 96,000.00 1,920.00 Pekerja 0.200 OH 55,000.00 11,000.00 Mandor 0.010 OH 70,000.00 700.00 Tukang batu 0.150 OH 60,000.00 9,000.00 Kepala tukang batu 0.015 OH 65,000.00 975.00

29,627.00 F PEKERJAAN BETON1 Membuat rabat beton camp. 1Pc: 2Ps :5Kr 1.000

Semen 218.000 Kg 1,160.00 252,880.00 Pasir Beton 0.520 175,000.00 91,000.00 Koral Beton 0.870 M³ 225,000.00 195,750.00 Pekerja 1.650 OH 55,000.00 90,750.00 Mandor 0.080 OH 70,000.00 5,600.00 Tukang batu 0.250 OH 60,000.00 15,000.00 Kepala tukang bat 0.025 OH 65,000.00 1,625.00

652,605.00 2 Membuat Beton Bertulang camp. 1Pc: 2Ps :3kr 1.000

Semen 336.000 Kg 1,160.00 389,760.00 Pasir Beton 0.540 175,000.00 94,500.00 Koral Beton 0.810 225,000.00 182,250.00 Pekerja 2.000 OH 55,000.00 110,000.00 Mandor 1.000 OH 70,000.00 70,000.00 Tukang batu 0.350 OH 60,000.00 21,000.00 Kepala tukang bat 0.035 OH 65,000.00 2,275.00

869,785.00 3 Membuat pembesian dengan besi polos 1.000 Kg

Besi beton polos 1.050 Kg 12,000.00 12,600.00 Kawat beton 0.015 Kg 17,000.00 255.00 Pekerja 0.007 OH 55,000.00 385.00 Mandor 0.0030 OH 70,000.00 210.00 Tukang besi 0.0070 OH 60,000.00 420.00 Kepala tukang besi 0.0007 OH 65,000.00 45.50

13,915.50 4 Membuat bekisting untuk sloof & kolom 1

Kayu Meranti 0.015 1,600,000.00 24,000.00 Paku Biasa 0.300 Kg 17,000.00 5,100.00 Pekerja 0.300 OH 55,000.00 16,500.00 Mandor 0.005 OH 70,000.00 350.00 Tukang besi 0.260 OH 60,000.00 15,600.00 Kepala tukang besi 0.026 OH 65,000.00 1,690.00

63,240.00 5 Membuat beton praktis bertulang 1

Beton bertulang 1Pc : 2Ps :3Kr 1.000 M³ 869,785.00 869,785.00 Besi dengan besi polos 260.000 Kg 13,915.50 3,618,030.00 Pas. Bekisting untuk sloof 13.500 63,240.00 853,740.00

5,341,555.00

M³M³

M²M³

Page 6: Gapura RAB

HARGA JUMLAH

NO URAIAN PEKERJAAN KOEFISIEN SATUAN SATUAN HARGA (RP) (RP)

6 Membuat beton induk bertulang 1Beton bertulang 1Pc : 2Ps :3Kr 1.000 M³ 869,785.00 869,785.00 Besi dengan besi polos 280.000 Kg 13,915.50 3,896,340.00 Pas. Bekisting untuk sloof 15.500 63,240.00 980,220.00

5,746,345.00 G PEKERJAAN PENUTUP ATAP1 Pasang atap genteng metal 1

Genteng metal setara super roof 1.620 Lbr 49,000.00 79,380.00 Paku genteng metal 8.000 Bh 1,000.00 8,000.00 Pekerja 0.100 OH 55,000.00 5,500.00 Mandor 0.005 OH 70,000.00 350.00 Tukang kayu 0.200 OH 60,000.00 12,000.00 Kepala tukang kayu 0.020 OH 65,000.00 1,300.00

106,530.00 HARGA JUMLAH

NO URAIAN PEKERJAAN KOEFISIEN SATUAN SATUAN HARGA (RP) (RP)

2 Pasang bubungan genteng metal 1 M¹Bubungan genteng metal 1.000 Lbr 25,000.00 25,000.00 Paku genteng metal 6.000 Bh 1,000.00 6,000.00 Pekerja 0.250 OH 55,000.00 13,750.00 Tukang kayu 0.250 OH 60,000.00 15,000.00 Kepala tukang kayu 0.025 OH 65,000.00 1,625.00

61,375.00 3 Pasang lisplank kayu 1 x 3/20 1 M¹

Kayu bengkirai 0.007 3,000,000.00 21,600.00 Paku 0.050 Kg 17,000.00 850.00 Pekerja 0.150 OH 55,000.00 8,250.00 Mandor 0.050 OH 70,000.00 3,500.00 Tukang kayu 0.150 OH 60,000.00 9,000.00 Kepala tukang kayu 0.020 OH 65,000.00 1,300.00

44,500.00 4 Konstruksi kuda-kuda Kayu Ulin 1 M¹

Kayu Ulin 1.100 2,500,000.00 2,750,000.00 Paku 0.800 Kg 10,000.00 8,000.00 Pekerja 0.150 OH 55,000.00 8,250.00 Mandor 0.050 OH 70,000.00 3,500.00 Tukang kayu 0.150 OH 60,000.00 9,000.00 Kepala tukang kayu 0.020 OH 65,000.00 1,300.00

2,780,050.00 5 Pasang Kasau + Reng 1

Kayu Ulin 0.014 2,500,000.00 35,000.00 Paku 0.800 Kg 50,000.00 40,000.00 Pekerja 0.150 OH 55,000.00 8,250.00 Mandor 0.050 OH 70,000.00 3,500.00 Tukang kayu 0.150 OH 60,000.00 9,000.00 Kepala tukang kayu 0.020 OH 65,000.00 1,300.00

97,050.00 H PEKERJAAN LANGIT-LANGIT1 Pasang plafond gypsum 1

Gypsum 9 mm 0.364 Lbr 65,000.00 23,660.00 Paku gypsum 0.110 Kg 0.00 Pekerja 0.100 Oh 55,000.00 5,500.00 Mandor 0.050 Oh 70,000.00 3,500.00 Tukang kayu 0.050 Oh 60,000.00 3,000.00 Kepala tukang kayu 0.050 Oh 65,000.00 3,250.00

38,910.00

M²M³

Page 7: Gapura RAB

HARGA JUMLAH NO URAIAN PEKERJAAN KOEFISIEN SATUAN SATUAN HARGA

(RP) (RP)2 Pasang plafond GRC 1

GRC 4 mm 0.364 Lbr 0.00 Paku GRC 0.110 Kg 0.00 Pekerja 0.100 Oh 55,000.00 5,500.00 Mandor 0.050 Oh 70,000.00 3,500.00 Tukang kayu 0.050 Oh 60,000.00 3,000.00 Kepala tukang kayu 0.050 Oh 65,000.00 3,250.00

15,250.00 3 Pasangan rangka Plafond 1 M³

Kayu meranti 1.100 M³ 1,600,000.00 1,760,000.00 Paku 3.000 Kg 17,000.00 51,000.00 Pekerja 0.070 Oh 55,000.00 3,850.00 Mandor 0.004 Oh 70,000.00 245.00 Tukang kayu 0.100 Oh 60,000.00 6,000.00 Kepala tukang kayu 0.010 Oh 65,000.00 650.00

1,821,745.00 4 Pasangan Plafond gypsum12 mm 1

Pasangan Plafond gypsum 1.000 38,910.00 38,910.00 Pasangan rangka Plafond 0.017 M³ 1,821,745.00 30,605.32

69,515.32 6 Pasang list gypsum/cornice Plafond 1 M¹

List gypsum 1.000 M¹ 55,000.00 55,000.00 Lem gypsum 0.200 Kg 0.00 Pekerja 0.200 Oh 55,000.00 11,000.00 Mandor 0.010 Oh 70,000.00 700.00 Tukang kayu 0.060 Oh 60,000.00 3,600.00 Kepala tukang kayu 0.010 Oh 65,000.00 650.00

70,950.00 HARGA JUMLAH

NO URAIAN PEKERJAAN KOEFISIEN SATUAN SATUAN HARGA (RP) (RP)

I PEKERJAAN PENUTUP LANTAI & DINDING1 Pasang lantai keramik 40x40 cm 1

Keramik 40 x 40 cm 6.000 Bh 7,500.00 45,000.00 Semen 14.150 Kg 1,160.00 16,414.00 Pasir pasang 0.039 96,000.00 3,744.00 Semen warna 2.000 Kg 1,500.00 3,000.00 Pekerja 0.620 oh 55,000.00 34,100.00 Mandor 0.030 oh 70,000.00 2,100.00 Tukang batu 0.350 oh 60,000.00 21,000.00 Kepala tukang batu 0.035 oh 65,000.00 2,275.00

127,633.00 2 Pasang lantai keramik 30 x 30 cm 1

keramik 20 x 20 cm 20.000 Bh 5,000.00 100,000.00 Semen 14.150 Kg 1,160.00 16,414.00 Pasir pasang 0.039 96,000.00 3,744.00 Semen warna 2.000 Kg 1,500.00 3,000.00 Pekerja 0.620 OH 55,000.00 34,100.00 Mandor 0.030 OH 70,000.00 2,100.00 Tukang batu 0.350 OH 60,000.00 21,000.00 kepala tukang batu 0.035 OH 65,000.00 2,275.00

182,633.00

M²M²

Page 8: Gapura RAB

HARGA JUMLAH NO URAIAN PEKERJAAN KOEFISIEN SATUAN SATUAN HARGA

(RP) (RP)3 Pasang lantai keramik 25 x 25 cm 1

keramik 25 x 25 cm 16.000 Bh 2,250.00 36,000.00 Semen 9.300 Kg 1,160.00 10,788.00 Pasir pasang 0.018 96,000.00 1,728.00 Semen warna 1.500 Kg 1,500.00 2,250.00 Pekerja 0.600 OH 55,000.00 33,000.00 Mandor 0.030 OH 70,000.00 2,100.00 Tukang batu 0.100 OH 60,000.00 6,000.00 kepala tukang batu 0.045 OH 65,000.00 2,925.00

94,791.00 4 Pasang lantai keramik km/wc 20 x 20 cm 1

keramik 20 x 20 cm 25.000 Bh 2,250.00 56,250.00 Semen 11.380 Kg 1,160.00 13,200.80 Pasir pasang 0.042 96,000.00 4,032.00 Semen warna 1.500 Kg 1,500.00 2,250.00 Pekerja 0.600 OH 55,000.00 33,000.00 Mandor 0.030 OH 70,000.00 2,100.00 Tukang batu 0.100 OH 60,000.00 6,000.00 kepala tukang batu 0.045 OH 65,000.00 2,925.00

119,757.80 5 Pasang dinding keramik km/wc 10 x 10 cm 1

keramik 10 x 10 cm 100.000 Bh 1,250.00 125,000.00 Semen 11.380 Kg 1,160.00 13,200.80 Pasir pasang 0.042 96,000.00 4,032.00 Semen warna 2.000 Kg 1,500.00 3,000.00 Pekerja 0.600 OH 55,000.00 33,000.00 Mandor 0.030 OH 70,000.00 2,100.00 Tukang batu 0.100 OH 60,000.00 6,000.00 kepala tukang batu 0.045 OH 65,000.00 2,925.00

189,257.80

J PEKERJAAN CAT-CATAN1

1 M³

Plamir 0.1000 Kg 22,000.00 2,200.00 Cat dasar 0.1000 Kg 11,000.00 1,100.00 Cat penutup 2 kali 0.2600 Kg 11,000.00 2,860.00 Pekerja 0.0200 Org/hari 55,000.00 1,100.00 Mandor 0.0025 Org/hari 70,000.00 175.00 Tukang cat 0.0630 Org/hari 60,000.00 3,780.00 kepala tukang cat 0.0063 Org/hari 65,000.00 409.50

11,624.50 2

1 M³

Cat meni 0.2000 Kg 25,000.00 5,000.00 Dempul kayu 0.1500 Kg 15,000.00 2,250.00 Cat dasar kayu / kilap 0.1700 Kg 36,500.00 6,205.00 Cat kilap penutup 2 kali 0.2600 Kg 36,500.00 9,490.00 Pekerja 0.0700 Org/hari 55,000.00 3,850.00 Mandor 0.0250 Org/hari 70,000.00 1,750.00 Tukang batu 0.0900 Org/hari 60,000.00 5,400.00 kepala tukang batu 0.0060 Org/hari 65,000.00 390.00

34,335.00

Mengecat tembok baru ( 1 lapis plamir, 1 lapis cat dasar, 2 lapis cat penutup)

Mengecat bidang kayu baru ( 1 lapis plamir, 1 lapis cat dasar, 2 lapis cat penutup)

Page 9: Gapura RAB

HARGA JUMLAH NO URAIAN PEKERJAAN KOEFISIEN SATUAN SATUAN HARGA

(RP) (RP)K PPEKERJAAN SANITASI1 Memasang kloset jongkok 1 M³

Kloset jongkok 1.0000 Bh 150,000.00 150,000.00 Semen 6.0000 Kg 1,160.00 6,960.00 Pasir pasang 0.0100 96,000.00 960.00 Pekerja 1.0000 Org/hari 55,000.00 55,000.00 Mandor 0.0160 Org/hari 70,000.00 1,120.00 Tukang batu 1.5000 Org/hari 60,000.00 90,000.00 Kepala tukang batu 0.3000 Org/hari 65,000.00 19,500.00

323,540.00

HARGA JUMLAH NO URAIAN PEKERJAAN KOEFISIEN SATUAN SATUAN HARGA

(RP) (RP)2 1 Buah

Batu bata 200.0000 Bh 550.00 110,000.00 Semen 120.0000 Kg 1,160.00 139,200.00 Pasir pasang 0.3000 M³ 96,000.00 28,800.00 Keramik 20 x 20 cm 28.0000 Bh 2,250.00 63,000.00 Semen putih 6.0000 Kg 1,500.00 9,000.00 Pekerja 6.0000 OH 55,000.00 330,000.00 Mandor 0.3000 OH 70,000.00 21,000.00 Tukang batu 3.0000 OH 60,000.00 180,000.00 Kepala tukang bat 0.3000 OH 65,000.00 19,500.00

900,500.00 3 Memasang pipa PVC AW ½" 1 M¹

Pipa PVC AW ½" 1.2000 M¹ 3,500.00 4,200.00 Perlengkapan 1.0000 Ls 15,000.00 15,000.00 Pekerja 0.0360 OH 55,000.00 1,980.00 Mandor 0.0018 OH 70,000.00 126.00 Tukang batu 0.0600 OH 60,000.00 3,600.00 Kepala tukang batu 0.0060 OH 65,000.00 390.00

25,296.00 4 1 M¹

1.2000 M¹ 15,000.00 18,000.00 Perlengkapan 1.0000 Ls 15,000.00 15,000.00 Pekerja 0.0360 OH 55,000.00 1,980.00 Mandor 0.0018 OH 70,000.00 126.00 Tukang batu 0.0600 OH 60,000.00 3,600.00 Kepala tukang batu 0.0060 OH 65,000.00 390.00

39,096.00

Membuat bak mandi batu bata 0,3 m³

Memasang pipa PVC Ø 2"Pipa PVC Ø 2"

Page 10: Gapura RAB

HARGA JUMLAH NO URAIAN PEKERJAAN KOEFISIEN SATUAN SATUAN HARGA

(RP) (RP)5 1 M¹

1.2000 M¹ 20,000.00 24,000.00 Perlengkapan 1.0000 Ls 15,000.00 15,000.00 Pekerja 0.0360 OH 55,000.00 1,980.00 Mandor 0.0018 OH 70,000.00 126.00 Tukang batu 0.0600 OH 60,000.00 3,600.00 Kepala tukang batu 0.0060 OH 65,000.00 390.00

45,096.00 6 Memasang kran diameter ½" 1 Ttk

Kran 1.0000 Bh 12,500.00 12,500.00 Seal tape 0.0250 Set 1,000.00 25.00 Pekerja 0.0100 OH 55,000.00 550.00 Mandor 0.0050 OH 70,000.00 350.00 Tukang batu 0.0600 OH 60,000.00 3,600.00 Kepala tukang batu 0.0100 OH 65,000.00 650.00

17,675.00 7 Memasang floor drain 1 Buah

Floor drain 1.0000 Bh 20,000.00 20,000.00 Pekerja 0.0100 OH 55,000.00 550.00 Mandor 0.0050 OH 70,000.00 350.00 Tukang batu 0.1000 OH 60,000.00 6,000.00 Kepala tukang batu 0.0100 OH 65,000.00 650.00

27,550.00

Memasang pipa PVC Ø 4"Pipa PVC Ø 4"

Page 11: Gapura RAB

HARGA SATUAN UPAH DAN BAHAN

KEGIATAN :

LOKASI : Jalan Jakarta

1. U P A H

NO JENIS U R A I A N SATUAN HARGA

(Rp.)

PEKERJAAN TANAH1 Tenaga Pekerja Biasa Orang 55,000.002 Tenaga Mandor Orang 70,000.00

PEKERJAAN BATU1 Tenaga Pekerja Biasa Orang 55,000.002 Tenaga Tukang Batu Orang 60,000.003 Tenaga Kepala Tukang Batu Orang 65,000.004 Tenaga Mandor Orang 70,000.005 Tenaga Tukang GRC Orang 60,000.00

PEKERJAAN KAYU1 Tenaga Pekerja Biasa Orang 55,000.002 Tenaga Tukang Kayu Orang 60,000.003 Tenaga Kepala Tukang Kayu Orang 65,000.004 Tenaga Mandor Orang 70,000.00

PEKERJAAN BESI1 Tenaga Pekerja Biasa Orang 55,000.002 Tenaga Tukang Besi Orang 60,000.003 Tenaga Kepala Tukang Besi Orang 65,000.004 Tenaga Mandor Orang 70,000.00

PEKERJAAN LAS1 Tenaga Pekerja Biasa Orang 55,000.002 Tenaga Tukang Las Orang 60,000.003 Tenaga Kepala Tukang Las Orang 65,000.004 Tenaga Mandor Orang 70,000.00

PEKERJAAN CAT1 Tenaga Pekerja Biasa Orang 55,000.002 Tenaga Tukang Cat Orang 60,000.003 Tenaga Kepala Tukang Cat Orang 65,000.004 Tenaga Mandor Orang 70,000.00

Pembangunan Rumah Tinggal Type 135m² / 300 m²

Page 12: Gapura RAB

2. B A H A N

HARGA SATUANNO J E N I S B A H A N SATUAN BAHAN KETERANGAN

( Rp )

A. AGREGAT KASAR, BAHAN PEREKAT DAN BAHAN JADINYA

1 Tanah urug M³ Rp 50,000.00 Di Proyek2 Pasir urug M³ Rp 79,000.00 Di Proyek3 Pasir Beton M³ Rp 175,000.00 Di Proyek4 Pasir pasang M³ Rp 96,000.00 Di Proyek5 Batu kerikil / koral M³ Rp 225,000.00 Di Proyek6 Batu gunung M³ Rp 120,000.00 Di Proyek7 Bata merah bh Rp 550.00 Di Proyek8 Semen 50 kg/zak Zak Rp 58,000.00 Di Proyek9 Semen warna 50 kg/zak Zak Rp 75,000.00 Di Proyek

10 Semen Kiloan Kg Rp 1,160.00 Di Proyek11 Semen warna kiloan Kg Rp 1,500.00 Di Proyek

B. BAHAN KAYU BERIKUT BAHAN JADINYA1 Papan Bengkirai M³ Rp 3,000,000.00 Di Proyek2 Papan Meranti ( Begesting ) M³ Rp 1,600,000.00 Di Proyek3 Papan sejenis kayu Kapur M³ Rp 2,800,000.00 Di Proyek4 Papan Ulin 5/20 - 400 cm M³ Rp 2,500,000.00 Di Proyek5 Balok Meranti M³ Rp 2,000,000.00 Di Proyek6 Balok Bengkirai M³ Rp 2,700,000.00 Di Proyek7 Balok Ulin Kuzen M³ Rp 2,500,000.00 Di Proyek8 Balok Ulin Pancang M³ Rp 3,000,000.00 Di Proyek9 Balok sejenis kayu Kapur M³ Rp 2,500,000.00 Di Proyek

10 lbr Rp 48,000.00 Di Proyek11 List Plafond kayu M Rp 7,500.00 Di Proyek12 Gypsump Board 9 mm Knauf lbr Rp 65,000.00 Di Proyek14 List gypsump Cornise trap M Rp 55,000.00 Di Proyek

C BAHAN LOGAM DAN PAKU1 Paku segala ukuran kg Rp 17,000.00 Di Proyek2 Paku atap bh Rp 1,000.00 Di Proyek3 Paku seng kg Rp 20,000.00 Di Proyek4 Paku ulin kg Rp 18,000.00 Di Proyek5 Paku kecil plywood kg Rp 20,000.00 Di Proyek7 Sekrup fixer bh Rp 1,500.00 Di Proyek8 Kawat ikat kg Rp 17,000.00 Di Proyek

Plywood ukuran + 3,6 mm

Page 13: Gapura RAB

HARGA SATUANNO J E N I S B A H A N SATUAN BAHAN KETERANGAN

( Rp )9 Kawat Las kg Rp 17,000.00 Di Proyek

10 Besi beton kg Rp 12,000.00 Di Proyek11 Paku rivet kg Rp 15,000.00 Di Proyek12 Besi Plat Strip kg Rp 18,000.00 Di Proyek

D BAHAN PENUTUP ATAP1 Penutup Atap Metal Lbr Rp 49,000.00 Di Proyek2 Bubungan Atap Metal Bh Rp 25,000.00 Di Proyek3 Seng Gelombang Lbr Rp 30,000.00 Dipasang

E BAHAN LANTAI DAN PELAPIS DINDING1 Keramik 40/40 ( Roman ) bh Rp 7,500.00 Dipasang2 Keramik 30/30 ( Roman ) bh Rp 5,000.00 Dipasang3 Keramik 25 x 25 cm bh Rp 2,250.00 Dipasang4 Keramik 20 x 20 cm bh Rp 2,250.00 Dipasang5 Keramik 10 x 10 cm list dinding bh Rp 1,250.00 Dipasang

F BAHAN ELEKTRIKAL1 Lampu Phillips 13 watt bh Rp 75,000.00 Dipasang2 Lampu Phillips 21 watt bh Rp 150,000.00 Dipasang3 Lampu Phillips 18 watt bh Rp 75,000.00 Dipasang4 Pasang Saklar tunggal bh Rp 15,000.00 Dipasang5 Pasang saklar doubel bh Rp 20,000.00 Dipasang6 Pasang saklar triple bh Rp 30,000.00 Dipasang7 Pasang Stop kontak bh Rp 15,000.00 Dipasang8 Pasang MCB Box Unit Rp 200,000.00 Dipasang9 Pasang Instalasi Listrik Titik Rp 81,900.00 Dipasang

Page 14: Gapura RAB

HARGA SATUANNO J E N I S B A H A N SATUAN BAHAN KETERANGAN

( Rp )G BAHAN PINTU,JENDELA DAN BV1 Daun pintu panil ulin ( 72 x 230 ) bh Rp 600,000.00 Dipasang2 Daun jendela (132 x 82 ) bh Rp 500,000.00 Dipasang3 Daun bouvenlight bh Rp 100,000.00 Dipasang

H BAHAN PENGGANTUNG DAN KUNCI1 Engsel Pintu 4" bh Rp 30,000.00 Di Proyek2 Engsel Jendela 3 " bh Rp 20,000.00 Di Proyek3 Kunci Pintu KM/WC bh Rp 40,000.00 Di Proyek4 Grendel pintu KM/WC. bh Rp 8,000.00 Di Proyek5 Grendel Jendela bh Rp 7,000.00 Di Proyek6 Wind Hak bh Rp 20,000.00 Di Proyek7 Handel jendela bh Rp 6,000.00 Di Proyek8 Stop door bh Rp 20,000.00 Di Proyek9 Kaca bening tebal 5 mm M² Rp 80,000.00 Dipasang

I BAHAN SANITASI DAN PERPIPAAN1 Bak Mandi 100/75 tinggi 80 cm lapis keramik Unit Rp 500,000.00 Dipasang2 Kloset Jongkok setara Toto" Unit Rp 150,000.00 Di Proyek3 Floor drain bh Rp 20,000.00 Di Proyek4 Kran air Ø 1/2 inchi bh Rp 12,500.00 Di Proyek5 Gate valve Ø 3/4 inchi bh Rp 20,000.00 Di Proyek6 Gate valve Ø 1/2 inchi bh Rp 86,000.00 Di Proyek7 Shower Kran bh Rp 190,000.00 Di Proyek8 Pipa PVC Ø 1/2 " AW M Rp 3,500.00 Di Proyek

9 Pipa PVC diameter 2 M Rp 15,000.00 Di Proyek

10 Pipa PVC diameter 4 M Rp 20,000.00 Di Proyek11 Septictank dan peresapan Unit Rp 4,305,000.00 Dipasang12 Bak kontrol Unit Rp 200,000.00 Dipasang13 Perlengkapan Ls Rp 15,000.00 Dipasang

HARGA SATUANNO J E N I S B A H A N SATUAN BAHAN KETERANGAN

( Rp )J BAHAN FINISHING

1 Amplas lbr Rp 3,000.00 Di Proyek2 Plamur kg Rp 22,000.00 Di Proyek3 Dempul kayu kg Rp 15,000.00 Di Proyek4 Meni kayu Kg Rp 25,000.00 Di Proyek5 Cat Tembok Kg Rp 11,000.00 Di Proyek6 Dempul kayu Kg Rp 55,000.00 Di Proyek7 Cat kayu Kg Rp 36,500.00 Di Proyek8 Tinner A Kg Rp 19,000.00 Di Proyek9 Tinner B Kg Rp 7,000.00 Di Proyek

Page 15: Gapura RAB

RENCANA ANGGARAN BIAYA[ ENGGINER ESTIMATE ]

KEGIATAN :LOKASI :

### ###### ###

NO. URAIAN PEKERJAAN SAT. VOLUMEPROSENTASE MINGGU LALU PROSENTASE MINGGU INI

% % % %A PEKERJAAN PERSIAPAN1 Pasang pagar keliling M¹ Err:509 Err:5092 Pasang bouwplank M¹ 0.650 0.065

Err:509B PEKERJAAN TANAH DAN PASIR1 Galian tanah pondasi M³ 0.882 0.371 2 Urugan tanah dalam bangunan + pemadatan M³ Err:509 Err:5093 Pemadatan tanah M³ 0.650 0.295 4 Urugan pasir bawah pondasi dan lantai M³ 0.044 0.012

Err:509C PEKERJAAN PANCANGAN 1 Pancang ulin 10/10x 2 m' Ttk 5.000 6.438 2 Kalang ulin 3/20 M³ 0.150 5.483 3 Papan ulin 5/20 M³ 0.004 0.154

12.075 D PEKERJAAN PASANGAN DAN PLESTERAN1 Pasang batu gunung 1 : 4 M³ 1.180 8.603 2 Pasang batu bata tebal ½ bata 1 : 2 M² Err:509 Err:5093 Pasang batu bata tebal ½ bata 1 : 4 M² 0.936 0.924 4 Plesteran 1 : 2 M² Err:509 Err:5095 Plesteran 1 : 4 M² 0.683 0.296 6 Pasang parit keliling M¹ Err:509 Err:5097 Benangan dinding M¹ Err:509 Err:5098 Benangan kolom M¹ Err:509 Err:5099 Pasangan batu alam dinding dan kolom M² 4.250 9.321 10 Tanam rumput + tanaman M² 8.882 12.987

Err:509E PEKERJAAN BETON BERTULANG1 Cor sloof 20/25 M³ 4.050 Err:5092 Cor sloof 15/20 M³ 2.880 Err:5093 Cor sloof 30/30 M³ 7.560 Err:5094 Cor sloof 20/20 M³ 3.230 12.30 5 Cor kolom praktis 13/13 M³ 0.340 40.61 6 Cor ring balk 20/25 M³ 2.500 Err:5097 Cor ring balk 15/20 M³ 3.120 Err:5098 Cor ring balk praktis 13/15 M³ 0.078 Err:5099 Cor balok latai praktis 13/15 M³ 1.151 Err:50910 Cor plat lantai 25 cm M³ 36.000 Err:509

Err:509F PEKERJAAN BETON TAK BERTULANG1 Cor rabat teras dan tangga tebal 5 cm M³ 5.690 Err:509

Err:509

G PEKERJAAN LANTAI + DINDING1 Pas. Keramik lantai km /wc 20 x 20 M² Err:509 Err:5092 Pas. Keramik dinding km /wc 20 x 20 M² Err:509 Err:509

Err:509

H PEKERJAAN ATAP1 Kuda-kuda dan rangka atap zincalum Err:509 Err:5092 Pasang atap genteng metal Err:509 Err:5093 Bubungan atap genteng metal M¹ Err:509 Err:5094 Pas. Listplank kayu 1 x 3/20 M¹ Err:509 Err:509

Err:509

I PEKERJAAN PLAFOND1 Pasang plafond GRC 4 mm + rangka kayu Err:509 Err:5092 Pasang List profil 5/5 plafond M¹ Err:509 Err:5093 Pasang List profil 1/4 plafond M¹ Err:509 Err:509

Err:509J PEKERJAAN KUSEN1 Kusen pintu + jendela aluminium M¹ Err:509 Err:5092 Daun pintu aluminium km/wc + grendel + engsel Bh Err:509 Err:5093 Daun pintu plywood 12 mm Bh Err:509 Err:5094 Daun jendela aluminium besar Bh Err:509 Err:5095 Daun jendela aluminium kecil Bh Err:509 Err:5096 Kaca bening 5 mm Err:509 Err:5097 Folding gate (2.75 x 3.7 m) unit Err:509 Err:5098 Jalusi atap aluminium lengkap unit Err:509 Err:509

Err:509K PEKERJAAN PENGGANTUNG DAN KUNCI1 Kunci tanam 2 slaag Set Err:509 Err:5092 Engsel pintu 4" Bh Err:509 Err:5093 Engsel jendela 3" Bh Err:509 Err:5094 Hak angin Bh Err:509 Err:5095 Handle jendela Bh Err:509 Err:5096 Grendel jendela Bh Err:509 Err:509

Err:509

NILAI BOBOT

(%)

M²M²

Page 16: Gapura RAB

RENCANA ANGGARAN BIAYA[ ENGGINER ESTIMATE ]

KEGIATAN :PEKERJAAN :LOKASI :TAHUN ANGGARAN :

NO. URAIAN PEKERJAAN SAT. VOLUMEPROSENTASE MINGGU LALU PROSENTASE MINGGU INI

% % % %L PEKERJAAN INSTALASI LISTRIK1 Lampu RMI 2x36 watt+aksesoris unit Err:509 Err:5092 Lampu downlight + SL 18 watt + aksesoris unit Err:509 Err:5093 Lampu downlight + SL 5 watt + aksesoris unit Err:509 Err:5094 Instalasi lampu listrik Ttk Err:509 Err:5095 Stop kontak Ttk Err:509 Err:5096 Saklar tunggal bh Err:509 Err:5097 Saklar ganda bh Err:509 Err:5098 Box sekering + MCB unit Err:509 Err:5099 Penangkal petir 2 split + 1 arde lengkap 2 mainan unit Err:509 Err:509

Err:509M PEKERJAAN SANITASI1 Bak mandi lapis keramik Unit Err:509 Err:5092 Kloset jongkok Unit Err:509 Err:5093 Kran air bh Err:509 Err:5094 Floor drain bh Err:509 Err:5095 Septick tank + resapan lengkap Unit Err:509 Err:5096 Pipa PVC diameter ½" M¹ Err:509 Err:5097 Pipa PVC diameter 2" M¹ Err:509 Err:5098 Pipa PVC diameter 4" M¹ Err:509 Err:509

Err:509N PEKERJAAN CAT CATAN1 Cat dinding M² 8.200 1.39 2 Cat plafond dan list plafond M² Err:509 Err:5093 Cat kilap pintu + listplank M² Err:509 Err:509

Err:509

A JUMLAH Err:509

B JUMLAH BOBOT REALISASI

C JUMLAH BOBOT RENCANA

D KEMAJUAN

E MENGALAMI KETERLAMBATAN

NILAI BOBOT

Page 17: Gapura RAB

TIME SCHEDULLE

PROGRAM : 0

PEKERJAAN : 0

LOKASI : JALAN A.W. SYAHRANIE, SAMARINDA

JANGKA WAKTU PELAKSANAAN : 90 HARI KERJA ( 12 MINGGU )

NO URAIAN PEKERJAAN

BULAN 1 BULAN 2 BULAN 3KETERANGAN

1 2 3 4 5 6 7 8 9 10 11 12 13

01 s/d 07 feb 08 s/d 14 feb 15 s/d 21 feb 22 s/d 28 feb 01 s/d 07 Mar 08 s/d 14 Mar 15 s/d 21 Mar 22 s/d 28 Mar 29 Mar s/d 04 Apr 05 s/d 11 Apr 12 s/d 18 Apr 19 S/d 25 Apr 26 Apr s/d 01 Mei

1 PEKERJAAN PERSIAPAN Err:509 Err:509 Err:509

2 PEKERJAAN TANAH DAN PASIR Err:509 Err:509 Err:509

3 PEKERJAAN PANCANGAN 12.075 6.037 6.037

4 PEKERJAAN PASANGAN DAN PLESTERAN Err:509 Err:509 Err:509 Err:509

5 PEKERJAAN BETON BERTULANG Err:509 Err:509 Err:509 Err:509 Err:509

6 #NAME? Err:509 Err:509 Err:509

7 #NAME? Err:509 Err:509

8 #NAME? Err:509 Err:509 Err:509 Err:509 Err:509 Err:509

9 #NAME? Err:509 Err:509 Err:509

10 #NAME? Err:509 Err:509 Err:509 Err:509 Err:509

11 #NAME? Err:509 Err:509

12 #NAME? Err:509

13 #NAME? Err:509 Err:509

14 PEKERJAAN CAT CATAN Err:509 Err:509 Err:509

JUMLAH Err:509

BOBOT YANG DIRENCANAKAN Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509

JUMLAH BOBOT YANG DIRENCANAKAN Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509

JUMLAH REALISASI BOBOT Err:509

KEMAJUAN

KETERLAMBATAN Err:509

Samarinda, 27 Juni 2007Dibuat

PT. SARI BUMI MAKMUR

Drs. H.A. FERRY USMANDirektur Utama

NILAI BOBOT

Page 18: Gapura RAB

TIME SCHEDULLE

PROGRAM : 0

PEKERJAAN : 0

LOKASI : JALAN A.W. SYAHRANIE, SAMARINDA

JANGKA WAKTU PELAKSANAAN : 90 HARI KERJA ( 12 MINGGU )

NO URAIAN PEKERJAANMINGGU

KETERANGAN1 2 3 4 5 6 7 8 9 10 11 12

1 PEKERJAAN PERSIAPAN Err:509

-

2 PEKERJAAN TANAH DAN PASIR Err:509

3 PEKERJAAN PANCANGAN 12.075

4 PEKERJAAN PASANGAN DAN PLESTERAN Err:509

5 PEKERJAAN BETON BERTULANG Err:509

6 #NAME? Err:509

7 #NAME? Err:509

8 #NAME? Err:509

9 #NAME? Err:509

10 #NAME? Err:509

11 #NAME? Err:509

12 #NAME? Err:509

13 #NAME? Err:509

14 PEKERJAAN CAT CATAN Err:509

NILAI BOBOT

Page 19: Gapura RAB

DAFTAR SATUAN UPAH DAN TENAGA

PROGRAM : PENDIDIKAN MENENGAHKEGIATAN : REHABILITASI SEDANG/BERAT BANGUNAN SEKOLAHPEKERJAAN : REHAB BENGKEL SMK NEGERI 2LOKASI : JL. A.W. SYAHRANIE SAMARINDATAHUN ANGGARAN : 2008

NO. BAHAN BAHAN SATUAN HARGA

1 2 3 4

1 Tanah urug pilihan m3 Rp. 50,000.00

2 Pasir urug m3 Rp. 70,000.00

3 Batu bata Bh Rp. 500.00

4 Batu gunung M3 Rp. 100,000.00

5 Pasir pasang / pasir tenggarong M3 Rp. 80,000.00

6 Pasir beton / pasir palu M3 Rp. 100,000.00

7 Koral beton / kerikil palu M3 Rp. 150,000.00

8 Semen (50kg) Kg Rp. 1,040.00

9 Semen warna Kg Rp. 7,000.00

10 Keramik 20 x 20 Bh Rp. 3,500.00

11 Keramik 45 x 45 Bh Rp. 15,000.00

12 Kayu bekisting M3 Rp. 1,600,000.00

13 Kayu meranti M3 Rp. 1,800,000.00

14 Kayu bengkirai M3 Rp. 2,500,000.00

15 Kayu kapur M3 Rp. 2,500,000.00

16 Kayu ulin M3 Rp. 2,500,000.00

17 Besi beton Kg Rp. 12,000.00

18 Kawat bendrat Kg Rp. 25,000.00

19 Gypsum 9mm Lbr Rp. 80,000.00

21 Seng gelombang M1 Rp. 30,000.00

22 List gypsum kg Rp. 40,000.00

23 Lem gypsum Kg Rp. 50,000.00

24 Paku gypsum Kg Rp. 50,000.00

25 Paku GRC Lbr Rp. 40,000.00

26 Plywood 9mm Kg Rp. 80,000.00

27 Paku Kg Rp. 10,000.00

28 Paku plywood Kg Rp. 15,000.00

29 Paku genteng metal Bh Rp. 200.00

30 Cat dasar kayu/kilap Kg Rp. 25,000.00

31 Cat tembok Kg Rp. 20,000.00

32 Cat meny aftelak Ltr Rp. 25,000.00

33 Minyak begesting Kg Rp. 10,000.00

34 Dempul kayu Gln Rp. 15,000.00

35 Plamir tembok Lbr Rp. 50,000.00

36 Kertas gosok Lbr Rp. 2,000.00

37 Genteng metal setara super roof Lbr Rp. 49,000.00

38 Bubungan genteng metal setara super roo M1 Rp. 35,000.00

39 Benangan dinding M1 Rp. 40,000.00

40 Benangan kolom M2 Rp. 40,000.00

41 Pasangan batu alam dinding dan kolom M2 Rp. 150,000.00

42 Unit Rp. 500,000.00

43 Unit Rp. 500,000.00

44 Unit Rp. 500,000.00

45 Pasang list profil 5/5 plafon M1 Rp. 7,000.00

Page 20: Gapura RAB

46 Pasang list profil 1/4 plafon M1 Rp. 5,000.00

47 Kloset jongkok unit Rp. 200,000.00

48 Kran air Bh Rp. 15,000.00

49 Seal tape set Rp. 5,000.00

50 Kitchen zink unit Rp. 400,000.00

51 Floor drain Bh Rp. 20,000.00

52 Septictang tank + resapan lengkap unit Rp. 1,000,000.00

53 Pipa PVC diameter 1/2 M1 Rp. 10,000.00

54 Pipa PVC diameter 2 M1 Rp. 15,000.00

55 Pipa PVC diameter 4 M1 Rp. 20,000.00

56 Tanah rumput dan tanaman M2 Rp. 100,000.00

57 Kusen pintu + jendela aluminium m1 Rp. 150,000.00

58 Daun pintu aluminium km/wc + grendel + Bh Rp. 500,000.00

59 Daun pintu plywood 12 mm Bh Rp. 300,000.00

60 Daun jendela alumunium besar Bh Rp. 300,000.00

61 Daun jendela alumunium kecil Bh Rp. 200,000.00

62 Kaca bening 5 mm M2 Rp. 80,000.00

63 Folding gate (2.75 x 3,2m) unit Rp. 1,000,000.00

64 Folding gate (2.75 x 3,7m) unit Rp. 1,000,000.00

65 Kunci tnam 2 slang set Rp. 150,000.00

66 Engsel 4" Bh Rp. 30,000.00

67 Engsel 3" Bh Rp. 20,000.00

68 Hak angin Bh Rp. 10,000.00

69 Handle jendela Jumlah Rp. 10,000.00

70 Grendel jendela Bh Rp. 10,000.00

71 Lampu RMI 2 X 36 watt + aksesoris unit Rp. 200,000.00

72 Lampu RMI 1 X 18 watt + aksesoris unit Rp. 200,000.00

73 Lampu downlight + SL 18 watt + aksesor unit Rp. 150,000.00

74 Lampu downlight + SL 5 watt + aksesoris unit Rp. 150,000.00

75 Stop kontak gantung +pipa +aksesoris Ttk Rp. 100,000.00

76 Stop kontak Ttk Rp. 100,000.00

77 Saklar tunggal bh Rp. 50,000.00

78 Saklar ganda Bh Rp. 50,000.00

79 Kabel NYA 2,5 X 3mm Roll Rp. 200,000.00

80 Pipa listrik plastik Btg Rp. 50,000.00

81 T Dos Bh Rp. 50,000.00

82 Box sekering + MCB unit Rp. 200,000.00

83 Penangkal petir 6 split + 3 arde lengkap unit Rp. 1,000,000.00

84 Penangkal petir 2 split + 1 arde lengkap unit Rp. 1,000,000.00

Page 21: Gapura RAB

DAFTAR SATUAN UPAH DAN TENAGA

PROGRAM : PENDIDIKAN MENENGAHKEGIATAN : REHABILITASI SEDANG/BERAT BANGUNAN SEKOLAHPEKERJAAN : REHAB BENGKEL SMK NEGERI 2LOKASI : JL. A.W. SYAHRANIE SAMARINDATAHUN ANGGARAN : 2008

NO. BAHAN BAHAN SATUAN HARGA

1 2 3 4

1 Tanah urug pilihan m3 Rp. 50,000.00

2 Pasir urug m3 Rp. 70,000.00

3 Batu bata Bh Rp. 550.00

4 Batu gunung M3 Rp. 120,000.00

5 Pasir pasang / pasir tenggarong M3 Rp. 80,000.00

6 Pasir beton / pasir palu M3 Rp. 100,000.00

7 Koral beton / kerikil palu M3 Rp. 150,000.00

8 Semen (50kg) Kg Rp. 1,040.00

9 Semen warna Kg Rp. 7,000.00

10 Keramik 20 x 20 Bh Rp. 3,500.00

11 Keramik 45 x 45 Bh Rp. 15,000.00

12 Kayu bekisting M3 Rp. 1,600,000.00

13 Kayu meranti M3 Rp. 1,800,000.00

14 Kayu bengkirai M3 Rp. 2,500,000.00

15 Kayu kapur M3 Rp. 2,500,000.00

16 Kayu ulin M3 Rp. 2,500,000.00

17 Besi beton Kg Rp. 12,000.00

18 Kawat bendrat Kg Rp. 25,000.00

19 Gypsum 9mm Lbr Rp. 80,000.00

21 Seng gelombang M1 Rp. 30,000.00

22 List gypsum kg Rp. 40,000.00

23 Lem gypsum Kg Rp. 50,000.00

24 Paku gypsum Kg Rp. 50,000.00

25 Paku GRC Lbr Rp. 40,000.00

26 Plywood 9mm Kg Rp. 80,000.00

27 Paku Kg Rp. 10,000.00

28 Paku plywood Kg Rp. 15,000.00

29 Paku genteng metal Bh Rp. 200.00

30 Cat dasar kayu/kilap Kg Rp. 25,000.00

31 Cat tembok Kg Rp. 20,000.00

32 Cat meny aftelak Ltr Rp. 25,000.00

33 Minyak begesting Kg Rp. 10,000.00

34 Dempul kayu Gln Rp. 15,000.00

35 Plamir tembok Lbr Rp. 50,000.00

36 Kertas gosok Lbr Rp. 2,000.00

37 Genteng metal setara super roof Lbr Rp. 30,000.00

38 Bubungan genteng metal setara super roo M1 Rp. 25,000.00

43 Pasang list profil 5/5 plafon M1 Rp. 7,000.00

Page 22: Gapura RAB

46 Pasang list profil 1/4 plafon M1 Rp. 5,000.00

47 Kloset jongkok unit Rp. 200,000.00

48 Kran air Bh Rp. 15,000.00

49 Seal tape set Rp. 5,000.00

50 Kitchen zink unit Rp. 400,000.00

51 Floor drain Bh Rp. 20,000.00

52 Septictang tank + resapan lengkap unit Rp. 4,300,500.00

53 Pipa PVC diameter 1/2 M1 Rp. 10,000.00

54 Pipa PVC diameter 2 M1 Rp. 15,000.00

55 Pipa PVC diameter 4 M1 Rp. 20,000.00

56 Tanah rumput dan tanaman M2 Rp. 100,000.00

57 Kusen pintu + jendela aluminium m1 Rp. 150,000.00

58 Daun pintu aluminium km/wc + grendel + Bh Rp. 500,000.00

59 Daun pintu plywood 12 mm Bh Rp. 300,000.00

60 Daun jendela alumunium besar Bh Rp. 300,000.00

61 Daun jendela alumunium kecil Bh Rp. 200,000.00

62 Kaca bening 5 mm M2 Rp. 80,000.00

63 Kunci tnam 2 slang set Rp. 100,000.00

64 Engsel 4" Bh Rp. 30,000.00

65 Engsel 3" Bh Rp. 20,000.00

66 Hak angin Bh Rp. 10,000.00

67 Handle jendela Jumlah Rp. 10,000.00

68 Grendel jendela Bh Rp. 10,000.00

69 Lampu RMI 2 X 36 watt + aksesoris unit Rp. 200,000.00

70 Lampu RMI 1 X 18 watt + aksesoris unit Rp. 200,000.00

71 Lampu downlight + SL 18 watt + aksesor unit Rp. 150,000.00

72 Lampu downlight + SL 5 watt + aksesoris unit Rp. 150,000.00

73 Stop kontak gantung +pipa +aksesoris Ttk Rp. 100,000.00

74 Stop kontak Ttk Rp. 100,000.00

75 Saklar tunggal bh Rp. 50,000.00

76 Saklar ganda Bh Rp. 50,000.00

77 Kabel NYA 2,5 X 3mm Roll Rp. 200,000.00

78 Pipa listrik plastik Btg Rp. 50,000.00

79 Box sekering + MCB unit Rp. 200,000.00

NO. URAIAN SATUAN HARGA

1 Pekerja OH Rp. 45,000.00

2 Tukang kayu OH Rp. 60,000.00

3 Tukang batu OH Rp. 60,000.00

4 Tukang besi OH Rp. 60,000.00

5 Tukang cat OH Rp. 60,000.00

6 Tukang listrik OH Rp. 60,000.00

7 Kepala tukang kayu OH Rp. 65,000.00

8 Kepala tukang batu OH Rp. 65,000.00

9 Kepala tukang besi OH Rp. 65,000.00

10 Kepala tukang cat OH Rp. 65,000.00

11 Kepala tukang listrik OH Rp. 65,000.00

12 Mandor OH Rp. 70,000.00