RENCANA ANGGARAN BIAYA PEMBANGUNAN RUMAH TINGGAL TIDAK BERTINGKAT TYPE 36 : BARITO KUALA : SEMANGAT KARYA - HANDIL BAKTINo. I
Kab Lokasi
1. 2. 3. 4.II
URAIAN PEKERJAAN PERSIAPAN Pembersihan Lokasi Pengukuran & pemasangan bowplank Pasang Patok Pengupasan lokasiTOTAL
JENIS
VOLUME
HARGA SATUAN (Rp) 350,000 50,000 100,000 150,000
JUMLAH (Rp) 350,000 50,000 100,000 150,000 650,000 378,000 1,350,000 270,000 570,000 338,000 200,000 3,106,000 800,000 120,000 600,000 4,450,000 1,960,000 7,930,000 400,000 600,000 300,000 180,000 1,250,000 267,000 140,000 3,137,000 285,000 300,000 100,000 35,000 40,000 50,000 750,000 60,000 78,000 78,000 33,000 1,809,000 55,000 250,000 5,000 50,000 15,000 25,000 270,000 118,000 20,000 600,000 1,408,000
1. 2. 3. 4. 5. 6.III
RANGKA BAWAH Galam Cerucuk Tongkat Ulin Sunduk Ulin Slof (susuk) kayu Gelagar (kayu) SuaiTOTAL
3 meter 2 meter (5/10) 50 cm (5/7) 3 meter (4/9) 3 meter (3/5) 3 meter (4/6)
108 btg 54 btg 54 btg 19 btg 52 btg 10 btg
3,500 25,000 5,000 30,000 6,500 20,000
1. 2. 3. 4. 5.IV
RANGKA BADAN, DINDING, LANTAI Tiang Guntung (kayu) Kusen Rangka Dinding Kalsiboard Dinding Kalsiboard Lantai kayuTOTAL
3 meter (4/6) 4 meter (4/6) 3 meter (3/5) 6 mm 3 meter (2/20)
40 btg 4 btg 10 pak 50 keping 98 btg
20,000 30,000 60,000 89,000 20,000
1. 2. 3. 4. 5. 6. 7.V
RANGKA ATAS, ATAP Sampaian (kayu) Kuda - kuda (kayu MC) Kasau (kayu MC) Reng (kayu MC) Atap Asbes Listplank (potongan kalsiboard) Puung (seng Talang)TOTAL
3 meter (4/6) 3 meter (4/9) 3 meter (3/5) 3 meter (3/5) 180 x 80 x 0,35 6 mm 30 cm
20 btg 20 btg 5 pak 3 pak 50 lbr 3 keping 7 meter
20,000 30,000 60,000 60,000 25,000 89,000 20,000
1. 2. 3. 4. 5. 6. 7. 8. 9. 10. 11.VI
PINTU, JENDELA Panel Utama (pabrikasi) Pintu double plywood ( kamar) Pintu Kalsiboard (WC) Kunci tanam u/ pintu depan Kunci Grendel Engsel pintu Jendela ( plus kaca ) Engsel Jendela Hak Angin Grendel Jendela Handle JendelaTOTAL
Lanan Rakitan Rakitan NAPOLI std AGE 4" 120 x 50 2,5" KZK KZK
1 bh 3 bh 1 bh 1 bh 4 bh 5 psg 6 bh 6 psg 12 psg 12 psg 6 bh
285,000 100,000 100,000 35,000 10,000 10,000 125,000 10,000 6,500 6,500 5,500
1. 2. 3. 4. 5. 6. 7. 8. 9. 10.
SANITAIR Kloset Jongkok Septictank Buangan Air di WC Elbow Pipa T Pipa Kloset Pasir Semen Bata Papan lantai ( ulin )TOTAL
ENA std rakitan 4" 2" PVC 2" pasir COR Gresik 50kg bata merah 2 meter (2/20)
1 bh 1 bh 1 bh 2 bh 1 bh 1 bh 2 kubik 2 sak 40 bh 40 kpg
55,000 250,000 5,000 25,000 15,000 25,000 135,000 59,000 500 15,000
VII
1. 2. 3. 4.VIII
CAT - CATAN Cat Luar Cat Minyak Kuas Rol Kuas Cat minyakTOTAL
Aries 20 kg 5 kg
1 fail 1 kaleng 2 bh 2 bh
150,000 70,000 15,000 7,500
150,000 70,000 30,000 15,000 265,000 650,000 260,000 150,000 750,000 750,000 2,560,000 400,000 75,000 120,000 32,000 627,000 1,800,000 500,000 324,000 2,624,000 7,500,000 750,000 1,500,000 5,000,000 1,450,000 1,000,000 17,200,000 41,316,000
1. 2. 3. 4. 5.IX
INSTALASI LISTRIK Titik Lampu Titik Stopkontak MCB Kabel Pipa u/ kabelTOTAL
Inerca Maspion 5 / 8
5 titik 2 titik 1 titik 25 meter 10 buah
130,000 130,000 150,000 30,000 75,000
1. 2. 3. 4.X
PAKU - PAKUAN Paku Ulin ( segala ukuran 1,5 - 3 inch ) Paku Atap (asbes) Paku Kalsiboard BautTOTAL
20 kg 3 kg 4 kg 4 bh
20,000 25,000 30,000 8,000
UPAH 1. Rumah 2. CAT 3. GalamTOTAL
tipe 36 Tumbukan
1 unit 108
1,800,000 500,000 3,000
XI
1. 2. 3. 4. 5. 6.
LAIN-LAIN Harga Tanah Izin - izin Pembuatan & pemecahan sertifikat Jaringan PLN Pemasangan meter PLN JalanTOTAL
1 kapling
104 m2
7,500,000 750,000 1,500,000 5,000,000 1,450,000 1,000,000
RENCANA ANGGARAN BIAYA PEMBANGUNAN RUMAH TINGGAL TIDAK BERTINGKAT TYPE 45 (permanent)No. I
URAIAN PEKERJAAN PERSIAPAN 1. Pembersihan Lokasi + galianTOTAL
JENIS
VOLUME
II
1. 2. 3. 4. 5. 6.III
RANGKA BAWAH Galam Cerucuk Tongkat Ulin Sunduk + lapak ulin Slof (susuk) ulin Gelagar ulin Suai UlinTOTAL
3 meter 2 meter (5/10) 50 cm (5/10) 4 meter (5/10) 4 meter (5/7) 4 meter (5/10)
272 btg 68 btg 204 btg 18 btg 68 btg 15 btg
1. 2. 3. 4. 5. 6. 7. 8. 9. 10. 11. 12. 13.
14.IV
RANGKA BADAN, DINDING, LANTAI, PLAFON Tiang Sudut ( ulin) Tiang Rangka ( ulin) Kusen Papan lantai Ulin Papan Siring no.3 Rangka plafon (kayu) Plafon Gypsum Lis Plafon Kisi-Kisi (kayu) Batu Bata Semen Pasir Keramik Lantai WC Dinding WC RAM AnginTOTAL
3 meter (5/10) 3 meter (6/8) 4 meter (6/8) 3 meter (2/20) 4 meter (2/20) 4 meter (4/6) Gypsum Gypsum 2 meter (2/20) Bata merah 50 kg Pasir cor 30 x 30 20 x 20 20 x 25 15 x 15
6 btg 29 btg 20 btg 200 kpg 25 keping 55 btg 45 lbr 60 m2 40 keping 6000 bj 75 sak 5 ret 48 kotak 3 kotak 12 kotak 12 bh
1. 2. 3. 4. 5. 6. 7. 8.V
RANGKA ATAS, ATAP Sampaian (Reng Balk) (kayu) Kuda - kuda (kayu ) Kasau (kayu) Reng (kayu) Atap metal Listplank Papan ulin no.1 Listplank Papan ulin no.1 Puung (NOK)TOTAL
4 meter (6/8) 4 meter (5/10) 4 meter (4/6) 4 meter (3/5) Spyro (1 x 7) 4 meter (2/20) 4 meter (2/10) metal segi 4
12 btg 30 btg 65 btg 120 btg 165 lb 14 keping 14 keping 10 bh
1. 2. 3. 4. 5. 6. 7.
PINTU, JENDELA Pintu Panel depan Pintu Panel dalam Kaca Jendela Kunci tanam Slag Engsel pintu Daun Jendela panel Engsel Jendela
Ulin Lanan 5 mm 4" Lanan 2,5"
1 bh 4 bh 8 bh 5 bh 5 psg 8 bh 7 psg
8. Hak Angin 9. Grendel Jendela 10. Handle JendelaTOTAL VI
14 psg 14 bh 7 bh
1. 2. 3. 4. 5. 6. 7. 8.VII
SANITAIR Kloset Jongkok Septictank Buangan Air di WC Elbow Pipa T Pipa Kloset Pipa Air bersih Keran StainlessTOTAL
rakitan 4" 2" PVC 2"
1 bh 1 bh 1 bh 2 bh 1 bh 1 bh 2 btg 3 bh
1. 2. 3. 4.VIII
CAT - CATAN Cat Tembok Cat Minyak Kuas Rol Kuas Cat minyakTOTAL
4 bh 4 bh
1. 2. 3. 4. 5. 6. 7.IX
INSTALASI LISTRIK dan AIR Titik Lampu Titik Stopkontak MCB Arde Penyambungan + KWH Titik AIR Penyambungan baru PDAMTOTAL
8 titik 4 titik
3 titik
1. 2. 3. 4. 5.X
PAKU - PAKUAN dan BAHAN PELENGKAP lainnya Paku Segala ukuran Kawat HAS Kawat loket Sekop Urugan halaman dan garasiTOTAL
6 dos 8 rol 2 rol 2 bh 5 ret
1. 2. 3. 4. 5.XI
UPAH Rumah (sampai terima kunci ) CAT Galam Plafon Gypsum Upah Urugan halamanTOTAL
tipe 45 Tumbukan
45 m2 1 Ls 272 1 Ls 5 ret
1. 2. 3. 4.
LAIN-LAIN Harga Tanah Izin - izin Bea Balik nama sertifikat Biaya OperasionalTOTAL
1 kapling tipe 45
190 m2 45 m2
GRAND TOTAL
HARGA SATUAN (Rp) 300,000
JUMLAH (Rp) 300,000 300,000 816,000 3,060,000 816,000 1,296,000 3,944,000 750,000 10,682,000 348,000 1,160,000 1,440,000 4,000,000 600,000 880,000 2,250,000 1,200,000 800,000 3,600,000 4,350,000 1,800,000 2,304,000 150,000 600,000 270,000 25,752,000 696,000 1,110,000 1,300,000 1,260,000 5,032,500 910,000 490,000 200,000 10,998,500 450,000 1,000,000 320,000 300,000 100,000 960,000 84,000
3,000 45,000 4,000 72,000 58,000 50,000
58,000 40,000 72,000 20,000 24,000 16,000 50,000 20,000 20,000 600 58,000 360,000 48,000 50,000 50,000 22,500
58,000 37,000 20,000 10,500 30,500 65,000 35,000 20,000
450,000 250,000 40,000 60,000 20,000 120,000 12,000
5,000 5,000 4,000
70,000 70,000 28,000 3,382,000 85,000 350,000 15,000 55,000 15,000 35,000 52,000 90,000 697,000 2,000,000 500,000 80,000 26,000 2,606,000 1,040,000 520,000 130,000 130,000 5,400,000 390,000 1,400,000 9,010,000 1,380,000 240,000 230,000 130,000 1,500,000 3,480,000 9,225,000 1,000,000 952,000 1,100,000 325,000 12,602,000 57,000,000 2,000,000 5,000,000 7,500,000 71,500,000
85,000 200,000 15,000 27,500 15,000 35,000 26,000 30,000
2,000,000 500,000 20,000 6,500
130,000 130,000 130,000 130,000 5,400,000 130,000 1,400,000
230,000 30,000 115,000 65,000 300,000
205,000 1,000,000 3,500 1,100,000 65,000
300,000 2,000,000 5,000,000 7,500,000
151,009,500
RENCANA ANGGARAN BIAYA KOMPLEK PERUMAHAN "RESTU MADANI"Kab Lokasi PEMBANGUNAN RUMAH TINGGAL TIDAK BERTINGKAT TYPE 36 : BARITO KUALA : ALALAK - BERANGAS TIMUR No. I URAIAN PEKERJAAN PERSIAPAN 1. Pembersihan Lokasi 2. Pengukuran & pemasangan bowplank TOTAL II RANGKA BAWAH 1. Galam Cerucuk 2. Tongkat Ulin 3. Lapik ulin 4. Sunduk Ulin 5. Slof (susuk) ulin 6. Gelagar ulin 7 Suai Ulin III 1. 2. 3. 4. 5. 6 7 8 9 TOTAL RANGKA BADAN, DINDING, LANTAI Tiang Guntung ( Ulin ) Kusen Ulin Lantai Papan Ulin Pas. Kawat Harmonika Semen Pasir Cor Batu Bata Plywood ( sekat Kamar ) Kawat Loket Keramik TOTAL IV 1. 2. 3. 4. 5. 6. 7. V 1. 2. 3. 4. 5. 6. 7. 8. 9. 10. 11. VI RANGKA ATAS, ATAP Sampaian (kayu) Kuda - kuda (kayu MC) Kasau (kayu MC) Reng (kayu MC) Atap Soka Jempol Listplank Puung (seng Talang) TOTAL PINTU, JENDELA Panel Utama (pabrikasi) Pintu double plywood ( kamar) Pintu Kalsiboard (WC) Kunci tanam Kunci Grendel Engsel pintu Jendela ( plus kaca ) Jendela ( plus kaca ) Engsel Jendela Hak Angin Grendel Jendela Handle Jendela TOTAL PLAFOND 1 Plywood 2 Les Plafond 3 Rangka Plafond - Balok MC TOTAL VII 1. 2. 3. 4. 5. 6. 7. 8. 9. VIII 1. 2. 3 4 3. 4. IX 1. 2. 3. 4. 5. SANITAIR Kloset Jongkok Septictank Buangan Air di WC Elbow Pipa T Pipa Kloset Pasir Semen Bata TOTAL CAT - CATAN Cat Luar Cat Minyak Semen putih Lem putih Kuas Rol Kuas Cat minyak TOTAL INSTALASI LISTRIK Titik Lampu Titik Stopkontak MCB Kabel Pipa u/ kabel Std Std Etna NYM & NYA 0.5 " 6 4 1 30 20 titik titik bh meter meter Rp Rp Rp Rp Rp 25,000 25,000 65,000 15,000 5,000 Aries 20 kg 5 kg Gresik 50 kg Rajawali 0,8 kg 1 1 1 5 2 2 fail kaleng sak bungkus buah buah Rp Rp Rp Rp Rp Rp 145,000 85,000 95,000 25,000 15,000 5,000 ENA std rakitan 4" 2" PVC 2" pasir COR Tonasa 50kg bata merah 1 1 1 2 1 1 1 2 35 buah buah buah buah buah buah kubik (m3) sak buah Rp Rp Rp Rp Rp Rp Rp Rp Rp 75,000 275,000 6,500 25,000 15,000 27,500 135,000 63,000 600 3 mm 15 lembar 16 batang 10 pak Rp Rp Rp 41,000 37,500 50,000 Lanan Rakitan Rakitan NAPOLI std AGE 4" 120 x 50 150 x 50 2,5" KZK KZK 1 3 1 4 1 5 2 4 6 12 12 6 buah buah buah buah buah pasang buah buah pasang pasang pasang buah Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp 200,000 100,000 120,000 26,500 15,000 12,500 135,000 165,000 7,500 2,250 2,500 1,750 3 meter (4/6) 4 meter (4/9) 3 meter (3/5) 3 meter (3/5) 1200 x 2400 mm NusaPlank 30 cm 13 15 5 3 50 10 7 batang batang pak pak lembar lembar meter Rp Rp Rp Rp Rp Rp Rp 11,000 45,000 50,000 50,000 40,500 41,500 10,000 3 meter (5/7) 1.5 meter (5/7) 1 meter (2/20) 4 mm Tonasa 50kg Pasir halus bata merah 3 x 1220 x 2440 mm 30 x 30 putih 35 10 200 10 25 5 5000 10 2 6 batang batang keping rol zak kubik (m3) biji lembar rol kotak Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp 35,000 10,000 6,500 26,000 63,000 135,000 600 41,000 105,000 36,000 3 meter ( 6-7) 2 meter (5/10) 2 meter (4/9 ) 50 cm (5/10) 50 cm (5/7) 2 meter (4/9) 1.5 meter (4/9) 2 meter (4/6) 3 meter (4/6) 232 28 30 116 58 22 8 75 10 batang batang batang batang batang batang batang batang batang Rp Rp Rp Rp Rp Rp Rp Rp Rp 3,500 28,000 20,000 3,000 2,000 20,000 14,000 9,000 20,000 Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp 812,000 784,000 600,000 348,000 116,000 440,000 112,000 675,000 200,000 4,087,000 JENIS VOLUME SATUAN Rp Rp HARGA SATUAN (Rp) 350,000 50,000 Rp Rp Rp JUMLAH (Rp) 350,000 50,000 400,000
Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp
1,225,000 100,000 1,300,000 260,000 1,575,000 675,000 3,000,000 410,000 210,000 216,000 8,971,000 143,000 675,000 250,000 150,000 2,025,000 415,000 70,000 3,728,000 200,000 300,000 120,000 106,000 15,000 62,500 270,000 660,000 45,000 27,000 30,000 10,500 1,846,000 615,000 600,000 500,000 1,715,000 75,000 275,000 6,500 50,000 15,000 27,500 135,000 126,000 21,000 731,000 145,000 85,000 95,000 125,000 30,000 10,000 490,000 150,000 100,000 65,000 450,000 100,000
3 meter (3/5)
TOTAL
Rp
865,000
X 1. 2. 3. 4. XI
PAKU - PAKUAN Paku Ulin ( segala ukuran 1,5 - 3 inch ) Paku Atap (paku payung) Paku Plywood Baut TOTAL
10 3 2 20
kg kg kg buah
Rp Rp Rp Rp
15,000 22,500 20,000 5,000
Rp Rp Rp Rp Rp Rp Rp Rp Rp
150,000 67,500 40,000 100,000 357,500 4,800,000 450,000 696,000 5,946,000
UPAH 1. Rumah 2. CAT 3. Galam TOTAL LAIN-LAIN Harga Tanah Izin - izin Pembuatan & pemecahan sertifikat Jaringan PLN Pemasangan meter PLN Jalan PDAM TOTAL
tipe 36 Tumbukan
1 unit 1 unit 232 batang
Rp Rp Rp
4,800,000 450,000 3,000
XII 1. 2. 3. 4. 5. 6. 7
1 kapling
120 luas (m2) Rp Rp Rp Rp Rp Rp 500,000 1,500,000 3,500,000 9,500,000 1,000,000 1,500,000 Rp Rp Rp Rp Rp Rp Rp Rp 500,000 1,500,000 3,500,000 1,500,000 1,000,000 1,500,000 9,500,000 38,636,500
RENCANA ANGGARAN BIAYA KOMPLEK PERUMAHAN "RESTU MADANI"Kab Lokasi PEMBANGUNAN RUMAH TINGGAL TIDAK BERTINGKAT TYPE 36 ( semi Permanent ) : BARITO KUALA : ALALAK - BERANGAS TIMUR No. I URAIAN PEKERJAAN PERSIAPAN 1. Pembersihan Lokasi 2. Pengukuran & pemasangan bowplank TOTAL II RANGKA BAWAH 1. Galam Cerucuk 2. Tongkat Ulin 3. Lapik ulin 4. Sunduk Ulin 5. Slof (susuk) ulin 6. Gelagar ulin 7 Suai Ulin III 1. 2. 3. 4. 5. 6 7 8 9 IV 1. 2. 3. 4. 5. 6. 7. V 1. 2. 3. 4. 5. 6. 7. 8. 9. 10. 11. VI TOTAL RANGKA BADAN, DINDING, LANTAI Tiang Guntung ( Ulin ) Kusen Ulin Lantai Papan Ulin Pas. Kawat Harmonika Semen Pasir Cor Batu Bata Kawat Loket Keramik TOTAL RANGKA ATAS, ATAP Sampaian (kayu) Kuda - kuda (kayu MC) Kasau (kayu MC) Reng (kayu MC) Atap Sakura roof Listplank Pemuung Sakura TOTAL PINTU, JENDELA Panel Utama (pabrikasi) Pintu lain nya Pintu Fiber(WC) Kunci tanam Kunci Grendel Engsel pintu Jendela ( plus kaca ) Jendela ( plus kaca ) Engsel Jendela Hak Angin Grendel Jendela Handle Jendela TOTAL PLAFOND 1 Nusaboard 2 Les Plafond 3 Rangka Plafond - Balok MC TOTAL VI 1. 2. 3. 4. 5. 6. 7. 8. 9. 10 SANITAIR Kloset Jongkok Septictank Buangan Air di WC Elbow Pipa T Pipa Kloset Pasir Semen Bata Keramik TOTAL VII 1. 2. 3. 4. CAT - CATAN Cat Luar Cat Minyak Kuas Rol Kuas Cat minyak TOTAL Danabrite 20 kg 5 kg 2 1 2 2 fail kaleng buah buah Rp Rp Rp Rp 465,000 165,000 35,000 15,000 ENA std rakitan 4" 2" PVC 2" pasir COR Tonasa 50kg bata merah 20 x 20 20 x 25 1 1 1 2 1 1 1 2 35 3 10 buah Rp buah Rp buah Rp buah Rp buah Rp buah Rp kubik (m3) Rp sak Rp buah Rp kotak Rp kotak Rp 75,000 275,000 6,500 25,000 15,000 27,500 135,000 63,000 600 51,000 55,000 3 mm 15 lembar 16 batang 10 pak Rp Rp Rp 43,000 37,500 50,000 Lanan Lanan Yale AGE 4" 120 x 50 150 x 50 2,5" KZK KZK 1 3 1 4 1 5 2 4 6 12 12 6 buah buah buah buah buah pasang buah buah pasang pasang pasang buah Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp 250,000 200,000 235,000 45,500 15,000 22,500 135,000 165,000 8,500 2,750 3,000 2,500 3 meter (4/6) 4 meter (4/9) 3 meter (3/5) 3 meter (3/5) 2 sisir NusaPlank 13 15 5 3 200 10 7 batang batang pak pak lembar lembar bh Rp Rp Rp Rp Rp Rp Rp 11,000 45,000 50,000 50,000 29,500 41,500 16,500 3 meter (5/7) 1.5 meter (5/7) 1 meter (2/20) 4 mm Tonasa 50kg Pasir halus bata merah 30 x 30 putih 35 10 200 10 40 8 8000 2 40 batang Rp batang Rp keping Rp rol Rp zak Rp kubik (m3) Rp biji Rp rol Rp kotak Rp 35,000 10,000 6,500 26,000 63,000 135,000 600 105,000 38,000 3 meter ( 6-7) 2 meter (5/10) 2 meter (4/9 ) 50 cm (5/10) 50 cm (5/7) 2 meter (4/9) 1.5 meter (4/9) 2 meter (4/6) 3 meter (4/6) 232 28 30 116 58 22 8 75 20 batang batang batang batang batang batang batang batang batang Rp Rp Rp Rp Rp Rp Rp Rp Rp 3,500 28,000 20,000 3,000 2,000 20,000 14,000 9,000 20,000 Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp 450,000 784,000 600,000 348,000 116,000 440,000 112,000 675,000 400,000 3,925,000 JENIS VOLUME Jumlah SATUAN HARGA SATUAN (Rp) Rp Rp 350,000 50,000 Rp Rp Rp JUMLAH (Rp) 350,000 50,000 400,000
Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp
1,225,000 100,000 1,300,000 260,000 2,520,000 1,080,000 4,800,000 210,000 1,520,000 13,015,000 143,000 675,000 250,000 150,000 5,900,000 415,000 115,500 7,648,500 250,000 600,000 235,000 182,000 15,000 112,500 270,000 660,000 51,000 33,000 36,000 15,000 2,459,500 645,000 600,000 500,000 1,745,000 75,000 275,000 6,500 50,000 15,000 27,500 135,000 126,000 21,000 153,000 550,000 1,434,000 930,000 165,000 70,000 30,000 1,195,000
3 meter (3/5)
VIII 1. 2. 3. 4. 5. IX 1. 2. 3. 4. X
INSTALASI LISTRIK Titik Lampu Titik Stopkontak MCB Kabel Pipa u/ kabel TOTAL PAKU - PAKUAN Paku Ulin ( segala ukuran 1,5 - 3 inch ) Paku Atap (paku payung) Paku Plywood Baut TOTAL
Std Std Etna NYM & NYA 0.5 "
6 4 1 30 20
titik titik bh meter meter
Rp Rp Rp Rp Rp
55,000 45,000 95,000 15,000 5,000
Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp
330,000 180,000 95,000 450,000 100,000 1,155,000 165,000 90,000 40,000 175,000 470,000 7,200,000 600,000 696,000 8,496,000
11 4 2 35
kg kg kg buah
Rp Rp Rp Rp
15,000 22,500 20,000 5,000
UPAH 1. Rumah 2. CAT 3. Galam TOTAL LAIN-LAIN Harga Tanah Izin - izin Pembuatan & pemecahan sertifikat Jaringan PLN Pemasangan meter PLN Jalan PDAM TOTAL
tipe 36 Tumbukan
1 unit 1 unit 232 batang
Rp Rp Rp
7,200,000 600,000 3,000
XI 1. 2. 3. 4. 5. 6. 7
1 kapling
120 luas (m2) Rp Rp Rp Rp Rp Rp 500,000 1,500,000 3,500,000 1,500,000 9,500,000 1,500,000 Rp Rp Rp Rp Rp Rp Rp Rp 500,000 1,500,000 3,500,000 1,500,000 1,000,000 1,500,000 9,500,000 51,443,000
RENCANA ANGGARAN BIAYA KOMPLEK PERUMAHAN "RESTU MADANI"Kab Lokasi PEMBANGUNAN RUMAH TINGGAL TIDAK BERTINGKAT TYPE 45 ( Semi Permanent ) : BARITO KUALA : ALALAK - BERANGAS TIMUR No. I URAIAN PEKERJAAN PERSIAPAN 1. Pembersihan Lokasi 2. Pengukuran & pemasangan bowplank TOTAL RANGKA BAWAH 1. 2. 3 4 5 6 7 III 1. 2. 3. 4. 5. 6 8 9 10 IV 1. 2. 3. 4. 5. 6. 7 9 10 11 12 13 14 15 16 17 V 1. 2. 3. 4. 5. 6. 7 8 9 10 11 12 13 VI 1 2 3 Galam Cerucuk Tongkat Ulin Tongkat Ulin Sunduk Ulin Slof (susuk) ulin Gelagar ulin Suai Ulin TOTAL RANGKA BADAN, DINDING, LANTAI Tiang Guntung ( Ulin ) Kusen Lantai papan ulin Pas.Kawat Harmonika Semen Pasir Cor Keramik teras keramik lantai Pas. Bata Berdiri TOTAL RANGKA ATAS, ATAP,DAK BETON Sampaian ( Kayu MC ) Kuda - kuda (kayu MC) Kasau (kayu MC) Reng (kayu MC) Atap Sakura roof Listplank Nok Persegi Pilar depan Pipa Air Corong talang Rangka DAK (ulin) NusaBoard Semen Pasir Cor Pas. Bata Berdiri Papan ulin TOTAL PINTU, JENDELA Panel Utama Pintu Kamar Pintu Fiber(WC) Kunci tanam Kunci Grendel Engsel pintu Jendela ( plus kaca ) Jendela ( plus kaca ) Engsel Jendela Hak Angin Grendel Jendela Handle Jendela Handle Pintu TOTAL PLAFOND Nusaboard Les Plafond Rangka Plafond - Balok MC TOTAL SANITAIR Kloset Jongkok Septictank Buangan Air di WC Elbow Pipa T Pipa Kloset Pasir Semen Bata Keramik dinding Keramik lantai TOTAL 3 meter (5/7) 1 meter (4/6) 2 meter (2/10) 1 x 4 meter Tonasa 50kg Pasir halus 40 x 40 Accura ( setara ) 40 x 40 Accura ( setara ) 60 25 250 23 55 12 5 40 8000 batang batang keping rol sak kubik (m3) kotak kotak buah Rp Rp Rp Rp Rp Rp Rp Rp Rp 35,000 5,000 14,000 26,000 63,000 135,000 63,000 63,000 600 JENIS VOLUME SATUAN HARGA SATUAN (Rp) Rp Rp 350,000 50,000 Rp Rp Rp JUMLAH (Rp) 350,000 50,000 400,000
II
3 meter (6-7) 2 meter (5/10) 2 meter (10/10) 50 cm (5/10) 2 meter (4/9) 3 meter (4/6) 3 meter (4/6)
268 34 33 201 32 52 20
batang batang batang batang batang batang batang
Rp Rp Rp Rp Rp Rp Rp
3,500 28,000 89,500 4,000 20,000 20,000 20,000
Rp Rp Rp Rp Rp Rp Rp Rp
450,000 952,000 2,953,500 804,000 640,000 1,040,000 400,000 7,239,500
Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp
2,100,000 125,000 3,500,000 598,000 3,465,000 1,620,000 315,000 2,520,000 4,800,000 19,043,000 165,000 585,000 350,000 300,000 8,850,000 622,500 247,500 70,000 70,000 50,000 300,000 129,000 228,000 270,000 78,000 180,000 12,495,000 275,700 940,000 235,000 238,750 220,500 405,000 330,000 810,000 273,900 300,000 237,000 285,900 563,750 5,115,500 1,118,000 600,000 750,000 2,468,000 190,000 250,000 35,000 46,000 11,250 25,650 405,000 252,000 66,000 660,000 204,000 2,144,900
3 meter (4/6) 4 meter (4/9) 3 meter (3/5) 3 meter (2/3) 2 sisir NusaPlank Spyro 60mm 3 meter (5/7) PVC 2" (4 meter) Maspion 3 meter (4/6) 3 mm Tonasa 50kg Pasir halus 2 meter (2/20)
15 13 7 6 300 15 11 2 2 2 15 3 4 2 120 18
batang batang pak pak lembar lembar buah batang buah buah batang lembar sak kubik (m3) buah keping
Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp
11,000 45,000 50,000 50,000 29,500 41,500 22,500 35,000 35,000 25,000 20,000 43,000 57,000 135,000 650 10,000
Lanan Lanan SOLID ( setara ) Dekson ( setara ) Dekson stainless 4" (setara) 150 x 50 120 x 50 Dekson stainless 2,5" (setara) SOLID ( setara ) SOLID ( setara ) SOLID ( setara ) SOLID ( setara )
1 4 1 5 6 6 2 6 6 12 12 6 5
buah buah buah buah buah pasang buah buah pasang pasang pasang buah buah
Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp
275,700 235,000 235,000 47,750 36,750 67,500 165,000 135,000 45,650 25,000 19,750 47,650 112,750
3 mm
26 lembar 16 batang 15 pak
Rp Rp Rp
43,000 37,500 50,000
3 meter (3/5)
VII 1. 2. 3. 4. 5. 6. 7. 8. 9. 10 11
American Standart (setara) rakitan PVC 4" PVC 2" PVC 2" pasir COR Tonasa 50kg bata merah 20 x 25 20 x 20
1 1 1 2 1 1 3 4 110 12 4
buah buah buah buah buah buah kubik (m3) sak buah kotak kotak
Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp
190,000 250,000 35,000 23,000 11,250 25,650 135,000 63,000 600 55,000 51,000
VIII 1. 2. 3 4 5 6 IX 1. 2. 3. 4. 5. 6 X 1. 2. 3. XI 1. 2. 3. XII 1. 2. 3. 4. 5. 6. 8
CAT - CATAN Cat Luar Cat Minyak Semen putih Lem putih Kuas Rol Kuas Cat minyak TOTAL INSTALASI LISTRIK Titik Lampu Titik Stopkontak MCB Kabel Pipa u/ kabel Arde
DanaBrite (setara) 5 kg Gresik 50 kg Rajawali 0,8 kg
3 3 3 15 3 3
fail kaleng sak bungkus buah buah
Rp Rp Rp Rp Rp Rp
465,000 165,000 95,000 25,000 35,000 15,000
Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp
1,395,000 495,000 285,000 375,000 105,000 45,000 2,700,000 680,000 405,000 125,000 65,000 135,000 25,000 1,435,000 300,000 112,500 80,000 492,500 9,500,000 1,000,000 804,000 11,304,000
0,5 " 4 meter
8 6 1 1 12 1
titik titik bh rol btg bh
Rp Rp Rp Rp Rp Rp
85,000 67,500 125,000 65,000 11,250 25,000
TOTAL PAKU - PAKUAN Paku Ulin ( segala ukuran 1,5 - 3 inch ) Paku Atap Paku Kalsiboard TOTAL UPAH Rumah tipe 45 CAT Galam Tumbukan TOTAL LAIN-LAIN Harga Tanah Kavling ( 10 x 12 ) Izin - izin Pembuatan & pemecahan sertifikat Jaringan PLN Instalasi meter PLN Jalan Instalasi Meter PDAM TOTAL
20 kg 5 kg 4 kg
Rp Rp Rp
15,000 22,500 20,000
1 unit 1 unit 268 batang
Rp Rp Rp
9,500,000 1,000,000 3,000
1 1 1 1 1 1 1
kavling unit unit unit unit unit unit
Rp Rp Rp Rp Rp Rp
500,000 1,500,000 3,500,000 1,500,000 1,000,000 1,500,000
Rp Rp Rp Rp Rp Rp Rp Rp
64,837,400
PRAKIRAAN PERHITUNGAN PROFIT KOMPLEK PERUMAHAN "RESTU MADANI"
Kab Lokasi
: :
BARITO KUALA ALALAK - BERANGAS TIMUR a TYPE RUMAH Type 36 Type 36 ( Semi Permanen ) Type 45 ( Semi Permanen ) b Luas Tanah 120 m 120 m 120 m c Jumlah Unit 18 Unit 12 Unit 10 Unit 40 Unit Rp Rp Rp d Cost produksi 38,636,500.0 51,443,000.0 74,337,400.0 e Harga Jual Rp Rp Rp 70,000,000.0 90,000,000.0 120,000,000.0
No.
Total Cost Produksi d*c Rp 695,457,000.0 Rp 617,316,000.0 Rp 743,374,000.0 Rp 2,056,147,000.00
Total Harga Jual e*c Rp 1,260,000,000.0 Rp 1,080,000,000.0 Rp 1,200,000,000.0 Rp 3,540,000,000.00
Rp Rp Rp Rp
f JUMLAH (Rp) ( e-d)*c 564,543,000.0 462,684,000.0 456,626,000.0 1,483,853,000.0
RENCANA ANGGARAN BIAYA KOMPLEK PERUMAHAN "RESTU MKab Lokasi PEMBANGUNAN RUMAH TINGGAL TIDAK BERTINGKAT TYPE 36 RSH : BARITO KUALA : ALALAK - BERANGAS TIMUR No. I URAIAN PEKERJAAN PERSIAPAN 1. Pembersihan Lokasi 2. Pengukuran & pemasangan bowplank TOTAL II RANGKA BAWAH 1. Galam Cerucuk 2. Tongkat Ulin 3. Lapik ulin 4. Sunduk Ulin 5. Slof (susuk) ulin 3 meter ( 6-7) 2 meter (5/10) 2 meter (4/9 ) 50 cm (5/10) 50 cm (5/7) 2 meter (4/9) 3 meter (4/9) 3 meter (5/7) 3 meter (4/6) 3 meter (5/7) 4 meter (4/6) 224 28 28 112 56 9 6 8 70 5 9 batang batang batang batang batang batang batang batang batang batang batang JENIS VOLUME SATUAN
6. Gelagar ulin 7 Suai Ulin III TOTAL RANGKA BADAN, DINDING, LANTAI 1. Tiang Guntung ( Ulin ) Tiang Teras 2. Kusen Ulin 3. 4. 5. 6 7 8 Lantai Papan Ulin Pas. Kawat Harmonika Semen Pasir Cor Batu Bata Plywood ( sekat Kamar ) Rangka Sekat kamar 9 Kawat Loket Keramik TOTAL IV RANGKA ATAS, ATAP 1. Sampaian (kayu) 2. Kuda - kuda (kayu MC) 3. 4. 5. 6. 7. V 1. 2. 3. 4. 5. 6. Kasau (kayu MC) Reng (kayu MC) Atap Soka Jempol Listplank Puung (seng Talang) TOTAL PINTU, JENDELA Panel Utama (pabrikasi) Pintu double plywood ( kamar) Pintu Kalsiboard (WC) Kunci tanam Kunci Grendel Engsel pintu
3 meter (5/7) 4 meter (6/8) 1.5 meter (5/7) 2 meter (5/7) 1 meter (2/12) 4 mm Tonasa 50kg Pasir halus bata merah 3 x 1220 x 2440 mm 3 meter (4/6) 30 x 30 putih
35 2 20 15 350 10 30 6 3500 10 20 2 6
batang batang batang batang keping rol zak ret biji lembar batang rol kotak
3 meter (4/6) 4 meter (5/7) 3 meter (5/7) 4 meter (3/5) 4 meter (3/5) 1200 x 2400 mm 2 x 15 4meter 30 cm
13 6 10 15 4 55 12 7
batang batang batang pak pak lembar lembar meter
Lanan Rakitan Rakitan NAPOLI std AGE 4"
1 3 1 4 1 5
buah buah buah buah buah pasang
7. Jendela ( plus kaca ) Jendela ( plus kaca ) 8. Engsel Jendela 9. Hak Angin 10. Grendel Jendela 11. Handle Jendela TOTAL VI PLAFOND 1 Plywood 2 Les Plafond 3 Rangka Plafond - Balok MC TOTAL VII 1. 2. 3. 4. 5. 6. 7. 8. 9. VIII 1. 2. 3 4 3. 4. IX 1. 2. 3. 4. 5. X 1. 2. 3. 4. XI SANITAIR Kloset Jongkok Septictank Buangan Air di WC Elbow Pipa T Pipa Kloset Pasir Semen Bata TOTAL CAT - CATAN Cat Luar Cat Minyak Semen putih Lem putih Kuas Rol Kuas Cat minyak TOTAL INSTALASI LISTRIK Titik Lampu Titik Stopkontak MCB Kabel Pipa u/ kabel TOTAL PAKU - PAKUAN Paku Ulin ( segala ukuran 1,5 - 3 inch ) Paku Atap (paku payung) Paku Plywood Baut TOTAL UPAH 1. Rumah 2. CAT 3. Galam TOTAL XII 1. 2. 3. 4. 5. 6. 7 LAIN-LAIN Harga Tanah Izin - izin Pembuatan & pemecahan sertifikat Jaringan PLN Pemasangan meter PLN Jalan PDAM
90 x 50 150 x 50 2,5" KZK KZK
6 0 6 12 12 6
buah buah pasang pasang pasang buah
3 mm
15 lembar 16 batang 10 pak
3 meter (3/5)
ENA std rakitan 4" 2" PVC 2" pasir COR Tonasa 50kg bata merah
0 0 0 0 0 0 0 0 0
buah buah buah buah buah buah kubik (m3) sak buah
Aries 20 kg 5 kg Gresik 50 kg Rajawali 0,8 kg
0 0 0 0 0 0
fail kaleng sak bungkus buah buah
Std Std Etna NYM & NYA 0.5 "
0 0 0 0 0
titik titik bh meter meter
0 0 0 0
kg kg kg buah
tipe 36 Tumbukan
1 unit 0 unit 0 batang
1 kapling
120 luas (m2)
TOTAL
RUMAHAN "RESTU MADANI"
HARGA SATUAN (Rp) Rp Rp 350,000 50,000 Rp Rp Rp
JUMLAH (Rp) 350,000 50,000 400,000
Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp
3,500 40,000 20,000 5,500 3,000 20,000 58,000 38,000 30,000 38,000 30,000
Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp
784,000 1,120,000 560,000 616,000 168,000 180,000 348,000 304,000 2,100,000 190,000 270,000 6,640,000
Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp
38,000 75,000 12,000 20,000 6,500 25,000 65,000 300,000 650 48,000 11,000 105,000 35,000
Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp
1,330,000 150,000 240,000 300,000 2,275,000 250,000 1,950,000 1,800,000 2,275,000 480,000 220,000 210,000 210,000 11,690,000 143,000 180,000 220,000 975,000 260,000 2,915,000 300,000 70,000 5,063,000 400,000 300,000 120,000 106,000 15,000 62,500
Rp Rp Rp Rp Rp Rp Rp Rp
11,000 30,000 22,000 65,000 65,000 53,000 25,000 10,000
Rp Rp Rp Rp Rp Rp
400,000 100,000 120,000 26,500 15,000 12,500
Rp Rp Rp Rp Rp Rp
170,000 165,000 7,500 2,250 2,500 1,750
Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp
1,020,000 45,000 27,000 30,000 10,500 2,136,000 720,000 600,000 650,000 1,970,000 4,800,000 4,800,000
Rp Rp Rp
48,000 37,500 65,000
Rp Rp Rp Rp Rp Rp Rp Rp Rp
75,000 275,000 6,500 25,000 15,000 27,500 135,000 63,000 600
Rp Rp Rp Rp Rp Rp
145,000 85,000 95,000 25,000 15,000 5,000
Rp Rp Rp Rp Rp
25,000 25,000 65,000 15,000 5,000
Rp Rp Rp Rp
15,000 22,500 20,000 5,000
Rp Rp Rp
4,800,000 450,000 3,000
Rp Rp Rp Rp Rp Rp
-
Rp Rp Rp Rp Rp Rp
-
Rp Rp
32,699,000
RENCANA ANGGARAN BIAYA KOMPLEK PERUMAHAN "RESTU MADANI"Kab Lokasi PEMBANGUNAN RUMAH TINGGAL TIDAK BERTINGKAT TYPE 36 ( semi Permanent ) : BARITO KUALA : ALALAK - BERANGAS TIMUR No. I URAIAN PEKERJAAN PERSIAPAN 1. Pembersihan Lokasi 2. Pengukuran & pemasangan bowplank TOTAL II RANGKA BAWAH 1. Galam Cerucuk 2. Tongkat Ulin 3. Lapik ulin 4. Sunduk Ulin 5. Slof (susuk) ulin 3 meter ( 6-7) 2 meter (5/10) 1.5 meter (4/9 ) 50 cm (4/9) 50 cm (5/7) 2 meter (4/9) 3 meter (4/9) 3 meter (5/7) 3meter (4/6) 3 meter (5/7) 4 meter (4/6) 232 56 0 174 0 9 6 8 70 5 9 batang batang batang batang batang batang batang batang batang batang batang JENIS VOLUME Jumlah SATUAN
6. Gelagar ulin 7 Suai Ulin III TOTAL RANGKA BADAN, DINDING, LANTAI 1. Tiang Guntung ( Ulin ) Tiang Teras 2. Kusen Ulin 3. 4. 5. 6 7 8 9 IV 1. 2. 3. 4. 5. 6. 7. V 1. 2. 3. 4. 5. 6. 7. 8. Lantai Papan Ulin Pas. Kawat Harmonika Semen Pasir Cor Batu Bata Kawat Loket Keramik TOTAL RANGKA ATAS, ATAP Sampaian (kayu) Kuda - kuda (kayu MC) Kasau (kayu MC) Reng (kayu MC) Atap Sakura roof Listplank Pemuung Sakura TOTAL PINTU, JENDELA Panel Utama (pabrikasi) Pintu lain nya Pintu Fiber(WC) Kunci tanam Kunci Grendel Engsel pintu Jendela ( plus kaca ) Jendela ( plus kaca ) Engsel Jendela
3 meter (5/7) 4 meter (6/8) 1.5 meter (5/7) 2 meter (5/7) 1 meter (2/12) 4 mm Tonasa 50kg Pasir halus bata merah 30 x 30 putih
45 2 20 15 350 10 35 7 4500 2 40
batang batang batang batang keping rol zak ret biji rol kotak
3 meter (4/6) 4 meter (4/9) 3 meter (3/5) 3 meter (3/5) 2 sisir NusaPlank
0 15 5 3 130 12 7
batang batang pak pak lembar lembar bh
Lanan Lanan Yale AGE 4" 120 x 50 150 x 50 2,5"
1 3 1 4 1 5 2 4 6
buah buah buah buah buah pasang buah buah pasang
9. Hak Angin 10. Grendel Jendela 11. Handle Jendela TOTAL VI PLAFOND 1 Nusaboard 2 Les Plafond 3 Rangka Plafond - Balok MC TOTAL VI 1. 2. 3. 4. 5. 6. 7. 8. 9. 10 SANITAIR Kloset Jongkok Septictank Buangan Air di WC Elbow Pipa T Pipa Kloset Pasir Semen Bata Keramik TOTAL VII 1. 2. 3. 4. VIII 1. 2. 3. 4. 5. IX 1. 2. 3. 4. X CAT - CATAN Cat Luar Cat Minyak Kuas Rol Kuas Cat minyak TOTAL INSTALASI LISTRIK Titik Lampu Titik Stopkontak MCB Kabel Pipa u/ kabel TOTAL PAKU - PAKUAN Paku Ulin ( segala ukuran 1,5 - 3 inch ) Paku Atap (paku payung) Paku Plywood Baut TOTAL UPAH 1. Rumah 2. CAT 3. Galam TOTAL XI 1. 2. 3. 4. 5. 6. 7 LAIN-LAIN Harga Tanah Izin - izin Pembuatan & pemecahan sertifikat Jaringan PLN Pemasangan meter PLN Jalan PDAM TOTAL
KZK KZK
12 pasang 12 pasang 6 buah
3 mm
15 lembar 16 batang 10 pak
3 meter (3/5)
ENA std rakitan 4" 2" PVC 2" pasir COR Tonasa 50kg bata merah 20 x 20 20 x 25
1 1 1 2 1 1 1 2 35 3 10
buah buah buah buah buah buah kubik (m3) sak buah kotak kotak
Danabrite 20 kg 5 kg
0 0 0 0
fail kaleng buah buah
Std Std Etna NYM & NYA 0.5 "
0 0 0 0 0
titik titik bh meter meter
0 0 0 0
kg kg kg buah
tipe 36 Tumbukan
1 unit 1 unit 232 batang
1 kapling
120 luas (m2)
AHAN "RESTU MADANI"
HARGA SATUAN (Rp) Rp Rp 350,000 50,000 Rp Rp Rp
JUMLAH (Rp) 350,000 50,000 400,000
Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp
3,500 40,000 20,000 5,500 2,000 20,000 58,000 38,000 30,000 38,000 30,000
Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp
450,000 2,240,000 957,000 180,000 348,000 304,000 2,100,000 190,000 270,000 7,039,000
Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp
38,000 75,000 12,000 20,000 6,500 25,000 65,000 300,000 650 105,000 40,000
Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp
1,710,000 150,000 240,000 300,000 2,275,000 250,000 2,275,000 2,100,000 2,925,000 210,000 1,600,000 14,035,000 675,000 250,000 150,000 3,380,000 498,000 98,000 5,051,000 400,000 1,200,000 235,000 182,000 15,000 112,500 270,000 660,000 51,000
Rp Rp Rp Rp Rp Rp Rp
11,000 45,000 50,000 50,000 26,000 41,500 14,000
Rp Rp Rp Rp Rp Rp Rp Rp Rp
400,000 400,000 235,000 45,500 15,000 22,500 135,000 165,000 8,500
Rp Rp Rp
2,750 3,000 2,500
Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp
33,000 36,000 15,000 3,209,500 645,000 600,000 500,000 1,745,000 75,000 275,000 6,500 50,000 15,000 27,500 135,000 126,000 21,000 153,000 550,000 1,434,000 5,500,000 5,500,000
Rp Rp Rp
43,000 37,500 50,000
Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp
75,000 275,000 6,500 25,000 15,000 27,500 135,000 63,000 600 51,000 55,000
Rp Rp Rp Rp
465,000 165,000 35,000 15,000
Rp Rp Rp Rp Rp
55,000 45,000 95,000 15,000 5,000
Rp Rp Rp Rp
15,000 22,500 20,000 5,000
Rp Rp Rp
5,500,000 -
Rp Rp Rp Rp Rp Rp
-
Rp Rp Rp Rp Rp Rp Rp Rp
38,413,500