contoh rab untuk bangunan kantin

TRANSCRIPT

Harga SatuanDAFTAR HARGA UPAH DAN BAHAN

NoURAIANHARGA SATUAN Rp.SATUANA.UPAH1Pekerja45,000.00Orang/Hari2Tukang55,000.00Orang/Hari3Kepala Tukang70,000.00Orang/Hari4Mandor58,000.00Orang/Hari

B.BAHANPasangan dan betonHARGA AWAL25%HARGA SEKARANG1Tanah urug96,408.00/M380,340.0016,068.0096,408.002Timbunan pilihan111,240.00/M92,700.0018,540.00111,240.003Pasir urug74,160.00/M61,800.0012,360.0074,160.004Pasir pasang108,000.00/M108,000.0016,200.00124,200.005Pasir beton129,600.00/M108,000.0021,600.00129,600.006Kerikil beton150,000.00/M125,000.0025,000.00150,000.007Batu kali/batu belah (sungai/gunung)279,600.00/M233,000.0046,600.00279,600.008Bata merah960.00/Buah800.00160.00960.009Paving Block2,100.00/Buah1,750.00350.002,100.0010Semen PC @ 50 Kg88,800.00/Zak74,000.0014,800.0088,800.0011Semen PC1,480.00/Kg1,480.00296.001,776.0012Semen warna1,780.00/Kg1,780.00356.002,136.0013Semen putih @ 50 Kg106,800.00/Zak89,000.0017,800.00106,800.0014Semen putih1,780.00/Kg1,780.00356.002,136.0015Sirtu240,000.00/M200,000.0040,000.00240,000.0016Plywood 9 mm162,000.00/Lbr135,000.0027,000.00162,000.0017Air150.00/Liter150.0030.00180.0018Besi beton polos11,280.00/Kg9,400.001,880.0011,280.0019Besi beton ulir12,480.00/Kg10,400.002,080.0012,480.0020Kawat beton14,400.00/Kg12,000.002,400.0014,400.0021Paku kayu 14,160.00/Kg11,800.002,360.0014,160.0022Minyak bekisting12,000.00/Liter10,000.002,000.0012,000.00Kayu0.00.01Kayu kelas I3,048,000.00/M2,540,000.00508,000.003,048,000.002Kayu kelas II2,916,000.00/M2,430,000.00486,000.002,916,000.003Kayu kelas III1,830,000.00/M1,525,000.00305,000.001,830,000.004Kayu Perancah2,440,800.00/M2,034,000.00406,800.002,440,800.005Kayu/Papan Bekisting2,440,800.00/M2,034,000.00406,800.002,440,800.006Dolken kayu galam (8-10) cm, panjang 4 m24,720.00/Btg20,600.004,120.0024,720.007Lem Kayu18,000.00/Kg15,000.003,000.0018,000.00Atap dan plafond0.00.01Konstruksi kuda-kuda baja ringan 150,000.00/M2125,000.0025,000.00150,000.002Multiplek / plywood 4 mm65,000.00/Lbr72,100.007,210.0079,310.003Eternit Uk. 120x240 cm t=3,5 mm (setara Kalsi Board)102,000.00/Lbr85,000.0017,000.00102,000.004Genteng metal 0,375,000.00/M275,000.007,500.0082,500.005Rabung seng genteng metal30,000.00/M'25,000.005,000.0030,000.006List Profil12,000.00/M'10,000.002,000.0012,000.007Paku Skrup300.00/Bh250.0050.00300.008Seng Plat108,000.00/Lbr90,000.0018,000.00108,000.00Keramik0.00.01Keramik sisi kulit jeruk 20x20 cm5,280.00/Bh4,400.00880.005,280.002Keramik 20 x 20 cm5,280.00/Bh4,400.00880.005,280.003Keramik 20 x 256,240.00/Bh5,200.001,040.006,240.004Keramik 30x30 cm Polished7,200.00/Bh6,000.001,200.007,200.005Keramik 30x30 cm Unpolished7,560.00/Bh6,300.001,260.007,560.006Keramik 40x40 cm (polished)8,400.00/Bh7,000.001,400.008,400.007Keramik 40x40 cm (unpolished)8,760.00/Bh7,300.001,460.008,760.00Cat dan Residu0.00.01Dempul kayu29,700.00/Kg27,000.002,700.0029,700.002Plamur / dempul tembok16,500.00/Kg15,000.001,500.0016,500.003Cat dasar22,000.00/Kg20,000.002,000.0022,000.004Cat manie17,561.50/Kg15,965.001,596.5017,561.505Cat synthetik enamel (cat kayu mengkilap)34,650.00/Kg31,500.003,150.0034,650.006Cat acrylic emultion paint (cat tembok) / waterprofing30,800.00/Kg28,000.002,800.0030,800.007Minyak cat45,100.00/Liter41,000.004,100.0045,100.008Kertas amplas3,690.00/Lembar3,000.00690.003,690.00Instalasi listrik0.00.01Instalasi Tititk lampu 120,000.00/Ttk100,000.0020,000.00120,000.002Instalasi Stop kontak108,000.00/Ttk90,000.0018,000.00108,000.003Lampu Hemat Energi 24 watt 42,000.00/Bh35,000.007,000.0042,000.004Lampu Hemat Energi 12 watt 30,000.00/Bh25,000.005,000.0030,000.005Box Sekering + MCB60,000.00/Bh50,000.0010,000.0060,000.006Stop Kontak18,000.00/Bh15,000.003,000.0018,000.007Schakelar tunggal30,000.00/Bh25,000.005,000.0030,000.008Schakelar ganda32,400.00/Bh27,000.005,400.0032,400.009Schakelar Triple 36,000.00/Bh30,000.006,000.0036,000.00Sanitair0.00.01Tempat sabun keramik30,000.00/Bh25,000.005,000.0030,000.002Kran air biasa24,000.00/Bh20,000.004,000.0024,000.003Kran air sink/leher angsa60,000.00/Bh50,000.0010,000.0060,000.004Bak air fiber kapasitas 0,3 M3720,000.00/Bh600,000.00120,000.00720,000.005Closet jongkok (setara TOTO)390,000.00/Bh325,000.0065,000.00390,000.006Floor drain15,000.00/Bh12,500.002,500.0015,000.007Pembuangan bak air21,600.00/Bh18,000.003,600.0021,600.008Wastafel + Accessories861,000.00/Unit700,000.00161,000.00861,000.009Tempat Cuci Stainless Stell 2 Sink492,000.00/Unit400,000.0092,000.00492,000.0010Tempat Cuci Stainless Stell 1 Sink344,400.00/Unit280,000.0064,400.00344,400.0011Septictank + Resapan + Bak Kontrol3,690,000.00/Pkt3,000,000.00690,000.003,690,000.0012Pipa PVC 1/2"3,478.44/M'2,828.00650.443,478.4413Pipa PVC 3/4"5,150.01/M'4,187.00963.015,150.0114Pipa PVC 1 1/2"20,677.53/M'16,811.003,866.5320,677.5315Pipa PVC 2"23,370.00/M'19,000.004,370.0023,370.0016Pipa PVC 2 1/2"35,670.00/M'29,000.006,670.0035,670.0017Pipa PVC 3"69,955.02/M'56,874.0013,081.0269,955.0218Pipa PVC 4"86,100.00/M'70,000.0016,100.0086,100.0019Seal tape9,225.00/Bh7,500.001,725.009,225.00Kunci-Kunci dan Kaca0.00.01Kunci tanam 2 slaag136,800.00/Bh114,000.0022,800.00136,800.002Kunci tanam biasa108,000.00/Bh90,000.0018,000.00108,000.003Engsel pintu30,000.00/Psg25,000.005,000.0030,000.005Engsel jendela / ventilasi20,400.00/Psg17,000.003,400.0020,400.006Grendel jendela12,000.00/Bh10,000.002,000.0012,000.007Hak angin jendela10,800.00/Bh9,000.001,800.0010,800.008Pegengan jendela13,200.00/Bh11,000.002,200.0013,200.009Pacok pintu (untuk pintu double)48,000.00/Bh40,000.008,000.0048,000.0010Kaca Bening, t = 3 mm108,000.00/M290,000.0018,000.00108,000.0011Kaca Bening, t = 5 mm165,000.00/M2150,000.0015,000.00165,000.0012Kaca Rayband, t = 5 mm201,600.00/M2168,000.0033,600.00201,600.00

Singkil, 2013Konsultan Perencana :CV. HIKMAH CONSULTANT

HILDA FAZLIANADirektris

AHSDAFTAR ANALISA HARGA SATUAN

RSNI T-12-2002.6.41m'Pengukuran dan Pemasangan BouwplankBahanKayu 5/7 Kelas III0.012MxRp.1,830,000.00=Rp.21,960.00Paku biasa 2" - 5"0.020KgxRp.14,160.00=Rp.283.20Kayu papan 3/200.007MxRp.2,440,800.00=Rp.17,085.60Jumlah (1)=Rp.39,328.80TenagaPekerja0.100OHxRp.45,000.00=Rp.4,500.00Tukang kayu0.100OHxRp.55,000.00=Rp.5,500.00Kepala tukang0.010OHxRp.70,000.00=Rp.700.00Mandor0.005OHxRp.58,000.00=Rp.290.00Jumlah (2)=Rp.10,990.00Jumlah (1) + (2)=Rp.50,318.80Diambil 1/2 dari Jumlah (1) + (2)=Rp.25,159.40

RSNI T-12-2002.6.81 m Membersihkan lapangan dan perataanTenagaPekerja0.100OHxRp.45,000.00=Rp4,500.00Mandor0.050OHxRp.58,000.00=Rp2,900.00Jumlah=Rp7,400.00

SNI 2835:2008.6.11 mGalian tanah biasa sedalam 1 meterTenagaPekerja0.750OHxRp.45,000.00=Rp.33,750.00Mandor0.025OHxRp.58,000.00=Rp.1,450.00Jumlah=Rp35,200.00SNI 2835:2008.6.91 mUrugan kembali(dihitung 1/3 dari indeks pekerjaan galian)Tenaga Pekerja0.250OHxRp.45,000.00=Rp.11,250.00Mandor0.008OHxRp.58,000.00=Rp.483.33Jumlah=Rp.11,733.33SNI 2835:2008.6.101 mMemadatkan tanah (per 20 cm)Tenaga Pekerja0.500OHxRp.45,000.00=Rp.22,500.00Mandor0.050OHxRp.58,000.00=Rp.2,900.00Jumlah=Rp.25,400.00SNI 2835:2008.6.111 mUrugan pasirBahan Pasir urug1.200MxRp.74,160.00=Rp.88,992.00Jumlah (1)=Rp.88,992.00TenagaPekerja0.300OHxRp.45,000.00=Rp.13,500.00Mandor0.010OHxRp.58,000.00=Rp.580.00Jumlah (2)=Rp.14,080.00Jumlah (1) + (2)=Rp.103,072.00SNI 2835:2008.6.151 mMengurug sirtu padat Bahan Sirtu1.200MxRp.240,000.00=Rp.288,000.00Jumlah (1)=Rp.288,000.00TenagaPekerja0.250OhxRp.45,000.00=Rp.11,250.00Mandor0.025OhxRp.58,000.00=Rp.1,450.00Jumlah (2)=Rp.12,700.00Jumlah (1) + (2)=Rp.300,700.00SNI 2835:2008.6.161 mUrugan tanah urugBahan Tanah urug1.200MxRp.96,408.00=Rp.115,689.60Jumlah (1)=Rp.115,689.60TenagaPekerja0.300OHxRp.45,000.00=Rp.13,500.00Mandor0.010OHxRp.58,000.00=Rp.580.00Jumlah (2)=Rp.14,080.00Jumlah (1) + (2)=Rp.129,769.60

SNI 2835:2008.6.171 mUrugan timbunan pilihanBahan Timbunan pilihan1.200MxRp.111,240.00=Rp.133,488.00Jumlah (1)=Rp.133,488.00TenagaPekerja0.300OHxRp.45,000.00=Rp.13,500.00Mandor0.010OHxRp.58,000.00=Rp.580.00Jumlah (2)=Rp.14,080.00Jumlah (1) + (2)=Rp.147,568.00

SNI 2836:2008.6.21 mPasang pondasi batu belah/gunung/kali, 1 Pc : 4 PpBahanBatu kali/batu belah (sungai/gunung)1.200MxRp.279,600.00=Rp.335,520.00Semen portland163.000KgxRp.1,480.00=Rp.241,240.00Pasir pasang0.520MxRp.108,000.00=Rp.56,160.00Jumlah (1)=Rp.632,920.00TenagaPekerja1.500OHxRp.45,000.00=Rp.67,500.00Tukang batu0.750OHxRp.55,000.00=Rp.41,250.00Kepala tukang0.075OHxRp.70,000.00=Rp.5,250.00Mandor0.075OHxRp.58,000.00=Rp.4,350.00Jumlah (2)=Rp.118,350.00Jumlah (1) +(2)=Rp.751,270.00SNI 2836:2008.6.91 mPasang pondasi batu kosongBahanBatu kali 1.200MxRp.279,600.00=Rp.335,520.00Pasir urug0.432MxRp.74,160.00=Rp.32,037.12Jumlah (1)=Rp.367,557.12TenagaPekerja0.780OHxRp.45,000.00=Rp.35,100.00Tukang batu0.390OHxRp.55,000.00=Rp.21,450.00Kepala tukang0.039OHxRp.70,000.00=Rp.2,730.00Mandor0.039OHxRp.58,000.00=Rp.2,262.00Jumlah (2)=Rp.61,542.00Jumlah (1) +(2)=Rp.429,099.12

SNI 2836:2008.6.101 mPasang pondasi Cyclope 60% Beton Adukan 1Pc : 2Ps : 3Kr + 40% Batu Kali/Belah/Gunung BahanBatu kali/belah/gunung 0.480MxRp.279,600.00=Rp.134,208.00Semen Pc194.000KgxRp.1,480.00=Rp.287,120.00Pasir beton0.312MxRp.129,600.00=Rp.40,435.20Kerikil beton0.468MxRp.150,000.00=Rp.70,200.00Jumlah (1)=Rp.531,963.20TenagaPekerja3.400OHxRp.45,000.00=Rp.153,000.00Tukang batu0.850OHxRp.55,000.00=Rp.46,750.00Kepala tukang0.085OHxRp.70,000.00=Rp.5,950.00Mandor0.170OHxRp.58,000.00=Rp.9,860.00Jumlah (2)=Rp.215,560.00Jumlah (1) +(2)=Rp.747,523.20

SNI 6897:2008.6.71 m Pasangan bata merah tebal 1/2 bata, 1Pc : 2 Ps BahanBata merah 5 x 10 x 20 cm70.000BhxRp.960.00=Rp.67,200.00Semen portland18.950KgxRp.1,480.00=Rp.28,046.00Pasir pasang0.038MxRp.108,000.00=Rp.4,104.00Jumlah (1)=Rp.99,350.00TenagaPekerja0.300OHxRp.45,000.00=Rp.13,500.00Tukang batu0.100OHxRp.55,000.00=Rp.5,500.00Kepala tukang0.010OHxRp.70,000.00=Rp.700.00Mandor0.015OHxRp.58,000.00=Rp.870.00Jumlah (2)=Rp.20