PERHITUNGAN QUANTITY PEKERJAAN : PEMBANGUNAN MESJID DAN FASILITAS PENDUKUNG LOKASI :  No. Uraian Pekerjaan Stn Volume A BANGUNAN MESJID I PEKERJAAN PERSIAPAN 1 Mobilisasi dan Demobilisasi ls 1.00 2 Papan Nama Proyek bh 1.00 3 Direksi Keet ls 1.00 4 Pembersihan HASIL m2 288.63 UKURAN BANGUNAN : P1 = 18 m L1 = 15.000 m JLH = 1 Unit = 270 m2 P1 = 2.5 m L1 = 2.625 m JLH = 2 Unit = 13.125 m2 P1 = 2 m L1 = 2.750 m JLH = 1 Unit = 5.5 m2 288.625 m2 5 Pe ngukur an La pa ngan HASIL m2 288.63 UKURAN BANGUNAN : P1 = 18 m L1 = 15.000 m JLH = 1 Unit = 270 m2 P1 = 2.5 m L1 = 2.625 m JLH = 2 Unit = 13.125 m2 P1 = 2 m L1 = 2.750 m JLH = 1 Unit = 5.5 m2 288.625 m2 6 Foto Dokumentasi ls 1.00 II PEKERJAAN TANAH 1 Pembe rs iha n Site HASIL m2 288.63  UKURAN BANGUNAN : P1 = 18 m L1 = 15.000 m JLH = 1 Unit = 270 m2 P2 = 2.5 m L2 = 2.625 m JLH = 2 Unit = 13.125 m2 P3 = 2 m L3 = 2.750 m JLH = 1 Unit = 5.5 m2 288.625 m2 2 Pe mbuata n Bouplank HASIL m' 72.00  UKURAN BANGUNAN : P1 = 18 m L1 = 15.000 m JLH = 1 Unit = 66 m' P2 = 2.5 m L2 = 2.625 m JLH = 2 Unit = 6 m' P3 = 2 m L3 = 2.750 m JLH = 1 Unit = 0.000 m' 72 m' 3 Ga li an Tanah Pondasi da n Selasar /Te ras HASIL m 3 192.52  a Pondasi Menerus P1 = 17 m L1 = 13.000 m JLH = 1 Unit = 60 m' Uk. Pondasi lebar = 1 m H = 1.050 m +lebar = 0.8 m = 113.4 m3 P2 = 2.5 m L2 = 2.625 m JLH = 2 Unit = 15.25 m' P3 = 2 m L3 = 2.750 m JLH = 1 Unit = 2.750 m' 18 m'

Upload: andysafends

Post on 09-Oct-2015

11.412 views

Category:

Documents


4.551 download

TRANSCRIPT

  • 5/19/2018 RAB MESJID.xls

    1/31

    PERHITUNGAN QUANTITY

    PEKERJAAN : PEMBANGUNAN MESJID DAN FASILITAS PENDUKUNG

    LOKASI :

    No. Uraian Pekerjaan

    A BANGUNAN MESJID

    I PEKERJAAN PERSIAPAN

    1 Mobilisasi dan Demobilisasi

    2 Papan Nama Proyek

    3 Direksi Keet

    4 Pembersihan HASI

    UKURAN BANGUNAN : P1 = 18 m L1 = 15.000 m JLH = 1 Unit = 270

    P1 = 2.5 m L1 = 2.625 m JLH = 2 Unit = 13.12

    P1 = 2 m L1 = 2.750 m JLH = 1 Unit = 5.5

    288.62

    5 Pengukuran Lapangan HASI

    UKURAN BANGUNAN : P1 = 18 m L1 = 15.000 m JLH = 1 Unit = 270P1 = 2.5 m L1 = 2.625 m JLH = 2 Unit = 13.12

    P1 = 2 m L1 = 2.750 m JLH = 1 Unit = 5.5

    288.62

    6 Foto Dokumentasi

    II PEKERJAAN TANAH

    1 Pembersihan Site HASI

    UKURAN BANGUNAN : P1 = 18 m L1 = 15.000 m JLH = 1 Unit = 270

    P2 = 2.5 m L2 = 2.625 m JLH = 2 Unit = 13.12

    P3 = 2 m L3 = 2.750 m JLH = 1 Unit = 5.5

    288.62

    2 Pembuatan Bouplank HASI

    UKURAN BANGUNAN : P1 = 18 m L1 = 15.000 m JLH = 1 Unit = 66

    P2 = 2.5 m L2 = 2.625 m JLH = 2 Unit = 6P3 = 2 m L3 = 2.750 m JLH = 1 Unit = 0.000

    72

    3 Galian Tanah Pondasi dan Selasar/Teras

    a Pondasi Menerus P1 = 17 m L1 = 13.000 m JLH = 1 Unit = 60

    Uk. Pondasi lebar = 1 m H = 1.050 m +lebar = 0.8 m

    P2 = 2.5 m L2 = 2.625 m JLH = 2 Unit = 15.25

    P3 = 2 m L3 = 2.750 m JLH = 1 Unit = 2.750

    18

  • 5/19/2018 RAB MESJID.xls

    2/31

    Uk. Pondasi lebar = 0.8 m H = 1.050 m +lebar = 0.8 m

    a Pondasi Pas.Batu kali La = 0.25 m Lb = 0.700 m Ltot = 52.00 M

    H = 0.750 +lebar = 0.4 m

    d Pas. Batu Bata Teras L1 = 0.925 m L2 = 2.480 m jlh = 2.00 unit

    H = 0.400 +lebar = 0.2 m

    L1 = 0.900 m L2 = 5.800 m jlh = 1.00 unit

    H = 0.400 +lebar = 0.2 m

    L1 = 0.900 m L2 = 0.850 m jlh = 2.00 unit

    H = 0.400 +lebar = 0.2 m

    TOTA

    4 Timbunan Kembali Tanah Pondasi = 0.25x Vol.galian

    5 Timbunan Tanah dalam Bangunan P1 = 17 m L1 = 13.000 m JLH = 1 Unit = 221

    P1 = 2.5 m L1 = 2.625 m JLH = 2 Unit = 13.12

    P1 = 2 m L1 = 2.750 m JLH = 1 Unit = 5.5

    239.62

    Tinggi Timbunan = 0.600 m HASI

    6 Timbunan Tanah Teras P1 = 19 m L1 = 1.000 m JLH = 2 Unit = 38

    P1 = 13 m L1 = 1.000 m JLH = 2 Unit = 26

    P1 = 2 m L1 = 2.750 m JLH = 1 Unit = 5.5

    69.5

    Tinggi Timbunan = 0.600 m HASI

    L1 = 0.925 m L2 = 2.480 m jlh = 2 unit = 4.588

    L1 = 0.900 m L2 = 5.800 m jlh = 1 unit = 5.22

    L1 = 0.900 m L2 = 0.850 m jlh = 2 unit = 1.53

    11.33

    Tinggi Timbunan = 0.200 m s/d 0.6 m HASI

    TOTA

    7 Timbunan Pasir Urug dalam Banguna T = 0.07 m hasil = 16.774 m38 Timbunan Pasir Urug Teras T = 0.07 m hasil = 5.659 m3

    9 Timbunan Pasir Urug Pondasi Pas.bat T = 0.05 m hasil = 2.080 m3

    III PEKERJAAN PONDASI

    1 Lantai Kerja Pondasi Menerus Beton Cor 1 : 3 : 5

    a Pondasi Menerus P1 = 17 m L1 = 13.000 m Ltot = 60 m'

    Ukuran Pondasi p = 1 m t = 0.050 m + p = 0.1 m' HASI

    b Pondasi Menerus P1 = 17 m L1 = 13.000 m Ltot = 60 m'

    Sub Total II

  • 5/19/2018 RAB MESJID.xls

    3/31

    P1 = 2.5 m L1 = 2.625 m JLH = 2 Unit = 13.12

    P1 = 2 m L1 = 2.750 m JLH = 1 Unit = 5.5

    tot 18.62

    Ukuran Pondasi p = 0.8 m t = 0.050 m + p = 0.1 m' HASI

    TOTA

    2 Pondasi Menerus Beton Bertulang 1 : 2 : 3

    a Pondasi Menerus P1 P1 = 17 m L1 = 13.000 m Ltot = 60 m'

    Ukuran Pondasi p = 1 m t = 0.250 m + p = 0 m' HASI

    b Pondasi Menerus P2

    P1 = 2.5 m L1 = 2.625 m JLH = 2 Unit = 13.12

    P1 = 2 m L1 = 2.750 m JLH = 1 Unit = 5.5

    tot 18.62

    Ukuran Pondasi p = 1 m t = 0.200 m + p = 0 m' HASI

    TOTA

    c Pembesian Lbesi = 1.2 m jarak = 0.150 m Jlh = 9 bh = 540

    Lbesi = 60 m jarak = 0.150 m Jlh = 401 bh = 481.2

    Lbesi = 1 m jarak = 0.150 m Jlh = 7 bh = 130.37

    Lbesi = 18.625 m jarak = 0.150 m Jlh = 125 bh = 125

    1276.5

    Tot. Berat = 1133.29

    HASI3 Pondasi Pasangan Batu kali 1 : 4

    a Pondasi Batu Kali La = 0.25 m Lb = 0.700 m H = 0.7 m'

    Panjang Total = 52.00 m' HASI

    4 Cerucuk Kayu Laut dia 4"

    a Pondasi Menerus Ltot = 78.625 m Jarak = 0.600 m JLH = 133 bh

    Baris = 2 bh Panjang Kayu Cerocok = 4 M HASI

    a Pondasi Pas.batu kali Ltot = 52.00 m Jarak = 0.600 m JLH = 88 bh

    Baris = 2 bh Panjang Kayu Cerocok = 4 M HASI

    TOTA

    5 Sloof Beton Bertulang 1 : 2 : 3

    a Sloof b = 0.2 M l = 0.300 M Ltot = 130.63 M HASI

    b Pembesian 4 12 522.5 M Bera

    Beuge= 6 - 0.15 Ls = 0.9 m

    Jumlah sengkang = 871 Bh Bera

    Tot. Berat

    HASI

    IV. PEKERJAAN LANTAI KERAMIK

    1 Lantai Kerja Beton Cor 1 : 3 : 5

  • 5/19/2018 RAB MESJID.xls

    4/31

    UKURAN BANGUNAN : P1 = 17 m L1 = 13.000 m JLH = 1 Unit = 221

    P1 = 2.5 m L1 = 2.625 m JLH = 2 Unit = 13.12

    P1 = 2 m L1 = 2.750 m JLH = 1 Unit = 5.5

    239.62

    Tebal lt.kerja = 0.070 m HASI

    P1 = 19 m L1 = 1.000 m JLH = 2 Unit = 38

    P1 = 13 m L1 = 1.000 m JLH = 2 Unit = 26

    P1 = 2 m L1 = 2.750 m JLH = 1 Unit = 5.5

    69.5

    Tebal lt.kerja = 0.070 m HASI

    L1 = 0.925 m L2 = 2.480 m jlh = 2 unit = 4.588L1 = 0.900 m L2 = 5.800 m jlh = 1 unit = 5.22

    L1 = 0.900 m L2 = 0.850 m jlh = 2 unit = 1.53

    11.33

    Tebal lt.kerja = 0.070 m HASI

    TOTA

    2 Keramik Lantai Dalam Bangunan 30 x 30 cm

    UKURAN BANGUNAN : P1 = 17 m L1 = 13.000 m JLH = 1 Unit = 221

    P1 = 2.5 m L1 = 2.625 m JLH = 2 Unit = 13.12

    P1 = 2 m L1 = 2.750 m JLH = 1 Unit = 5.5

    239.62

    3 Keramik Lantai Teras 30 x 30 cmUKURAN TERAS P1 = 19 m L1 = 1.000 m JLH = 2 Unit = 38

    P1 = 13 m L1 = 1.000 m JLH = 2 Unit = 26

    P1 = 2 m L1 = 2.750 m JLH = 1 Unit = 5.5

    69.5

    UKURAN LT. TANGGA L1 = 0.925 m L2 = 2.480 m jlh = 2 unit = 4.588

    L1 = 0.900 m L2 = 5.800 m jlh = 1 unit = 5.22

    L1 = 0.900 m L2 = 0.850 m jlh = 2 unit = 1.53

    11.33

    UKURAN KAKI TANGG L1 = 0.925 m L2 = 2.480 m jlh = 2 unit = 4.33

    L1 = 0.900 m L2 = 5.800 m jlh = 1 unit = 7.6

    L1 = 0.900 m L2 = 0.850 m jlh = 2 unit = 2.65

    14.58

    Tebal Kaki tangga = 0.150 m HASI

    L1 = 0.625 m L2 = 2.480 m jlh = 2 unit = 3.73

    L1 = 0.600 m L2 = 5.200 m jlh = 1 unit = 6.4

    L1 = 0.600 m L2 = 0.850 m jlh = 2 unit = 2.05

    12.18

    Tebal Kaki tangga = 0.200 m HASI

    L1 = 0.325 m L2 = 2.480 m jlh = 2 unit = 3.13

    L1 = 0.300 m L2 = 4.600 m jlh = 1 unit = 5.2

  • 5/19/2018 RAB MESJID.xls

    5/31

    L1 = 0.300 m L2 = 0.850 m jlh = 2 unit = 1.45

    L1 = m L2 = 4.600 m jlh = 2 unit = 4.6

    14.38

    Tebal Kaki tangga = 0.200 m HASI

    TOTA

    4 Plin dinding keramik10 x 30 cm Dinding dalam = 63.7 m'

    Dinding luar = 49.1 m'

    Pengurangan = -4.4 m'hasil = 108.4 m'

    V. PEKERJAAN PASANGAN DAN PLESTERAN

    1 Pasangan Bata 1: 2

    Panjang #### m' H = 1.37 M' Luas = 175.189 M2

    Panjang #### m' H = 0.65 M' Luas = 33.800 M2

    Panjang 7.6 m' H = 0.25 M' Luas = 1.900 M2

    Panjang 6.4 m' H = 0.45 M' Luas = 2.880 M2

    Panjang 5.2 m' H = 0.65 M' Luas = 3.380 M2

    Panjang #### m' H = 0.25 M' Luas = 2.165 M2

    Panjang 7.46 m' H = 0.2 M' Luas = 1.492 M2Panjang 6.26 m' H = 0.2 M' Luas = 1.252 M2

    Panjang 5.3 m' H = 0.25 M' Luas = 1.325 M2

    Panjang 4.1 m' H = 0.2 M' Luas = 0.820 M2

    Panjang 2.9 m' H = 0.2 M' Luas = 0.580 M2

    #### Hasil = 224.783 M2

    2 Pasangan Bata 1: 4

    Panjang #### m' H = 4.25 M' 1 unit Luas = 543.469 M2

    Panjang 7.9 m' H = 2.58 M' 1 unit Luas = 20.382 M2

    Panjang 8.1 m' H = 3.082 M' 1 unit Luas = 24.964 M2

    Pengurangan Pintu 2.83 m' H = 2 M' -3 unit Luas = -16.980 M2

    Pengurangan Pintu 0.9 m' H = 2.1 M' -2 unit Luas = -3.780 M2

    Pengurangan Jendela 2.08 m' H = 1.9 M' -4 unit Luas = -15.770 M2

    Pengurangan Jendela 2.08 m' H = 0.7 M' -12 unit Luas = -17.430 M2

    Pengurangan Jendela 0.3 m' H = 0.3 M' -40 unit Luas = -3.600 M2

    Pengurangan Jendela 1.38 m' H = 0.6 M' -2 unit Luas = -1.656 M2

    Pengurangan Jendela 0.3 m' H = 0.15 M' -15 unit Luas = -0.675 M2

    Pengurangan Jendela 1.6 m' H = 0.15 M' -20 unit Luas = -4.800 M2

    Pengurangan Jendela 0.22 m' H = 0.22 M' -96 unit Luas = -4.646 M2

    Hasil = 524.124 M2

    3 Plesteran Trasram 1 : 2 =2 x Luasan Pasangan Batu Bata Luas = 449.566 M2

    4 Plesteran 1 : 4 =2 x Luasan Pasangan Batu Bata Luas = 1,082.123 M2

    1 Pasangan Ventilasi block 1: 4

    Sub Total IV

  • 5/19/2018 RAB MESJID.xls

    6/31

    5 Sponengan/tali air lebar = 10 cm,tebal 1.5 cm Panjang = 123.360 M2

    6 Plesteran/Acian Kolom 1 : 4 Luas = 61.700 M2

    7 Plesteran/Acian Balok Luas = 76.050 M2

    8 Plesteran/Acian Dak 1 : 4 Luas = 27.450 M2

    VI. PEKERJAAN KOLOM, BALOK, PELAT DAN LEUVEL

    1 Kolom 20 x 40 cm Beton Bertulang 1 : 2 : 3 l 0.2 m' b = 0.400 m

    Tinggi H= 5.65 m' 20 ttk Vol = 9.04

    2 Kolom 15 x 20 cm Beton Bertulang 1 : 2 : 3 l 0.2 m' b = 0.150 m

    Tinggi H= 3.6 m' 20 ttk Vol = 2.16

    3 Kolom Praktis 15 x 15 cm Beton Bertulang 1l 0.15 m' b = 0.150 m

    Dinding H= 3.97 m' 6 ttk Vol = 0.53595

    Pintu H= 3.8 m' 8 ttk Vol = 0.684

    Pintu H= 5.62 m' 2 ttk Vol = 0.2529

    TOTAL = 1.47285

    4 Balok 15 x 60 cm Beton Bertulang 1 : 2 : 3 l 0.15 m' b = 0.600 m

    Panjang L= 50.7 m' Vol = 4.563

    5 Balok Praktis 15 x 20 cm Beton Bertulang 1 l 0.15 m' b = 0.200 m

    Panjang L= 213.24 m' Vol = 6.3972

    6 Balok 15 x 30 cm Beton Bertulang 1 : 2 : 3 l 0.15 m' b = 0.300 m

    Panjang L= 18 m' Vol = 0.54

    7 Pelat Dak Lantai Beton Bertulang 1 : 2 : 3 T = 0.12 m

    Luasan L= 27.45 m2 Vol = 3.294

    VII. PEKERJAAN KUDA - KUDA DAN ATAP

    1 Kuda-kuda Kuda- 0.08 x 0.1 L= 122.6 Vol = 0.9195

    Kuda- 0.05 x 0.075 L= 38.7 Vol = 0.145125

    Gapit 0.2 x 0.0375 L= 245.88 Vol = 1.8441

    Gapit 0.15 x 0.0375 L= 186 Vol = 1.04625

    Gapit 0.1 x 0.05 L= 69 Vol = 0.345

    sekur 0.08 x 0.125 L= 152.4 Vol = 1.42875

    Gordi 0.08 x 0.05 L= 580.875 Vol = 2.17828125

    total 7.90700625

    2 Rangka Atap Genteng Metal 0.87 A = 350.26 m2 323

    0.91 A = 70.64 m2 6.483 1.1033

    total = 420.9 m2 0.90637179

    Sub Total V

    Sub Total VI

  • 5/19/2018 RAB MESJID.xls

    7/31

    3 Atap Genteng Metal 420.9

    4 Rabung Genteng 63.271

    5 Lisplank Kayu Dowble 159.47

    VIII. PEKERJAAN PINTU DAN JENDELA

    1 Kusen Pintu Uk. 215 x 80 cm Uk 2.15 x 0.8

    Dimensi Kayu 0.05 m x 0.15 m

    Panjang Kayu 5.3 m 2 unit Vol = 0.080

    2 Pintu Sliding Bingkai kaca rangka Aluminium uk.200 x 260 cm Komplit Kunci dan alat penggantung ( 2 daun Ventilasi lengkung )

    3 Pintu Panel P1 Uk. 210 x 80 cm (1 daun)

    4 Jendela Kaca Rangka Aluminium uk.196 x 2230 cm Komplit Kunci dan alat penggantung ( 3 daun dengan Ventilasi lengkung )

    5 Jendela Kaca Rangka Aluminium uk.70 x 2230 cm Komplit Kunci dan alat penggantung ( 1 daun dengan Ventilasi lengkung )

    6 Jendela Kaca Rangka Aluminium uk.60 x 138 cm Komplit Kunci dan alat penggantung ( 1 Daun )

    7 Ventilasi Kaca mati Rangka Aluminium uk 30 x 30 cm

    8 Ventilasi V2 Kayu Uk. 22 x 22 cm (1 daun)

    IX PEKERJAAN KUNCI DAN ALAT PENGGANTUNG

    1 Kunci & Hendel Pintu

    2 Engsel Pintu 4"

    3 Engsel Jendela & Ventilasi 3"

    4 Hak Angin Lipat Besar

    5 Grendel Pintu 10 "

    6 Grendel Kodok Jendela

    IX PEKERJAAN PLAFOND

    1 Plafond Gypsum 9 mm + rangka

    X PEKERJAAN LISTRIK

    1 Instalasi Listrik

    2 Lampu Down Light

    3 Saklar Ganda Tanam

    4 Stop Kontak Tanam

    5 Sekering Box Dua Group

    XIII PEKERJAAN CAT

    1 Cat Tembok

    2 Cat Plafond

    3 Cat Ventilasi Block

    4 Cat Dak Lantai

    5 Cat Lisplank

    6 Pengecatan Kolom

    Sub Total IX

    Sub Total XII

    Sub Total IX

    Sub Total VII

    Sub Total VIII

  • 5/19/2018 RAB MESJID.xls

    8/31

    7 Pengecatan Ventilasi Kayu

    8 Pengecatan Pintu Kayu

    Sub Total XIII

    TOTAL

  • 5/19/2018 RAB MESJID.xls

    9/31

    SATUAN KERJA :

    KEGIATAN :

    PEKERJAAN : PEMBANGUNAN MESJID DAN FASILITAS PENDUKUNG

    LOKASI :

    Jumlah

    No. Harga

    (Rp.)

    A BANGUNAN MESJID

    I PEKERJAAN PERSIAPAN 6,264,346.88

    II PEKERJAAN TANAH 29,944,508.26

    III PEKERJAAN PONDASI 151,105,676.39

    IV PEKERJAAN LANTAI KERAMIK 61,055,974.68

    V PEKERJAAN PASANGAN DAN PLESTERAN 137,551,899.08

    VI PEKERJAAN KOLOM, BALOK DAN PELAT LANTAI 124,464,836.63

    VII PEKERJAAN KUDA - KUDA DAN ATAP 152,949,009.46

    VIII PEKERJAAN PINTU DAN JENDELA 70,633,775.20

    IX PEKERJAAN KUNCI DAN ALAT PENGGANTUNG 358,100.00

    X PEKERJAAN PLAFOND 30,944,287.74

    XI PEKERJAAN LISTRIK 5,840,950.00

    XII PEKERJAAN CAT 46,031,267.52

    TOTAL - A 817,144,631.84

    B BANGUNAN TEMPAT WUDHU PRIA

    I PEKERJAAN PERSIAPAN 18,562.50

    II PEKERJAAN TANAH 576,253.38

    III PEKERJAAN PONDASI 7,044,190.47

    IV PEKERJAAN LANTAI KERAMIK 4,899,844.89

    V PEKERJAAN PASANGAN DAN PLESTERAN 8,899,907.12

    VI PEKERJAAN KOLOM, BALOK DAN PELAT LANTAI 10,078,138.21

    VII PEKERJAAN VENTILASI 300,000.00

    VIII PEKERJAAN LISTRIK 312,150.00

    IX PEKERJAAN INSTALASI AIR 1,574,850.00

    X PEKERJAAN CAT 2,420,397.90

    TOTAL - B 36,124,294.47

    C BANGUNAN TEMPAT WUDHU WANITA

    I PEKERJAAN PERSIAPAN 18,562.50

    II PEKERJAAN TANAH 576,253.38

    III PEKERJAAN PONDASI 7,044,190.47

    IV PEKERJAAN LANTAI KERAMIK 4,899,844.89

    V PEKERJAAN PASANGAN DAN PLESTERAN 8,899,907.12

    VI PEKERJAAN KOLOM, BALOK DAN PELAT LANTAI 10,078,138.21

    VII PEKERJAAN VENTILASI 300,000.00

    VIII PEKERJAAN LISTRIK 312,150.00

    IX PEKERJAAN INSTALASI AIR 1,574,850.00

    X PEKERJAAN CAT 2,420,397.90

    TOTAL - C 36,124,294.47

    D BANGUNAN PAGAR DEPAN

    REKAPITULASI RENCANA ANGGARAN BIAYA

    Uraian Pekerjaan

  • 5/19/2018 RAB MESJID.xls

    10/31

    I PEKERJAAN PERSIAPAN 142,500.00

    II PEKERJAAN TANAH 741,712.50

    III PEKERJAAN PONDASI 10,655,145.57

    IV PEKERJAAN PASANGAN DAN PLESTERAN 3,218,461.54

    V PEKERJAAN KOLOM 41,472.00

    VI PEKERJAAN PAGAR PIPA BESI DAN PINTU GERBANG 19,920,000.00

    VII PEKERJAAN CAT 918,331.93TOTAL - D 35,637,623.54

    E BANGUNAN PAGAR KIRI DAN KANAN

    I PEKERJAAN PERSIAPAN 330,000.00

    II PEKERJAAN TANAH 1,717,650.00

    III PEKERJAAN PONDASI 24,581,389.73

    IV PEKERJAAN PASANGAN DAN PLESTERAN 4,175,879.56

    V PEKERJAAN KOLOM 4,736,016.00

    VI PEKERJAAN PAGAR PIPA BESI 39,600,000.00

    VII PEKERJAAN CAT 2,625,461.48

    TOTAL - E 77,766,396.76

    F BANGUNAN PAGAR KIRI DAN KANAN

    I PEKERJAAN PERSIAPAN 88,875.00

    II PEKERJAAN TANAH 462,594.38

    III PEKERJAAN PONDASI 6,672,239.74

    IV PEKERJAAN PASANGAN DAN PLESTERAN 4,042,153.28

    V PEKERJAAN KOLOM 1,184,004.00

    VI PEKERJAAN CAT 1,235,720.53

    TOTAL - F 13,685,586.92

    G HALAMAN

    I PEKERJAAN PERSIAPAN 256,558.50

    II PEKERJAAN PAVING BLOCK 16,642,613.00TOTAL - G 16,899,171.50

    G SALURAN TERBUKA PASANGAN BATU BATA

    I PEKERJAAN PERSIAPAN 196,600.00

    II PEKERJAAN TANAH 591,297.54

    III PEKERJAAN SALURAN 7,116,344.80

    TOTAL - G 7,904,242.34

    JUMLAH 1,041,286,241.82

    PPN 10 % 104,128,624.18

    TOTAL 1,145,414,866.01

    DIBULATKAN 1,145,414,000.00

    Medan , Agustus 2006

    Terbilang : Tiga ratus empat puluh juta enam ratus tiga puluh enam ribu r upiah

  • 5/19/2018 RAB MESJID.xls

    11/31

    RENCANA ANGGARAN BIAYA

    PEKERJAAN : PEMBANGUNAN MESJID DAN FASILITAS PENDUKUNG

    SUB PEKERJAAN : SALURAN

    Harga Jumlah

    No. Uraian Pekerjaan ANL Stn Volume Satuan Harga

    (Rp.) (Rp).

    G SALURAN TERBUKA PASANGAN BATU BATA

    I PEKERJAAN PERSIAPAN

    1 Pembersihan - m' 49.15 2,500.00 12

    2 Pengukuran Lapangan - m' 49.15 1,500.00 7

    19

    II PEKERJAAN TANAH

    1 Pembersihan Site - m' 49.15 2,500.00 12

    2 Pembuatan Bouplank - m' 49.15 2,000.00 9

    3 Galian tanah A.1. m3 10.32 33,750.00 34

    4 Timbunan kembali tanah bekas galian 1/4A.1. m3 2.58 8,437.50 2

    59

    III PEKERJAAN SALURAN

    1 Pasangan Batu Bata 1 : 2 G.32.M. m3 1.77 948,055.00 1,67

    2 Plesteran 1 : 2 G.50.H.a m3 20.74 37,712.50 78

    3 Cor Lantai Bawah 1 : 2 : 3 Supl. V. m3 4.36 1,069,100.00 4,65

    7,11

    7,90

    Total I

    Sub Total II

    TOTAL BIAYA -SALURAN TERBUKA PASANGAN BATU BATA

    Sub Total III

  • 5/19/2018 RAB MESJID.xls

    12/31

    RENCANA ANGGARAN BIAYA

    PEKERJAAN : PEMBANGUNAN MESJID DAN FASILITAS PENDUKUNG

    SUB PEKERJAAN : HALAMAN

    Harga Jumlah

    No. Uraian Pekerjaan ANL Stn Volume Satuan Harga

    (Rp.) (Rp).

    G HALAMAN

    I PEKERJAAN PERSIAPAN

    1 Pembersihan - m2 103.66 1,425.00 14

    2 Pengukuran Lapangan - m2 103.66 1,050.00 10

    25

    II PEKERJAAN PAVING BLOCK

    1 Pembersihan Site - m2 103.66 1,500.00 15

    2 Pembuatan Bouplank - m2 103.66 1,000.00 10

    3 Timbunan sirtu t = 18 cm A.18 m3 18.66 165,000.00 3,07

    4 Timbunan Pasir urug t = 5cm A.17. m3 5.18 195,000.00 1,01

    5 Paving Block Tamb .1 m3 103.66 118,600.00 12,29

    16,64

    16,89

    Total I

    Sub Total II

    TOTAL BIAYA - HALAMAN

  • 5/19/2018 RAB MESJID.xls

    13/31

    RENCANA ANGGARAN BIAYA

    PEKERJAAN : PEMBANGUNAN MESJID DAN FASILITAS PENDUKUNG

    SUB PEKERJAAN : PAGAR BELAKANG

    Harga Jumlah

    No. Uraian Pekerjaan ANL Stn Volume Satuan Harga

    (Rp.) (Rp).

    F BANGUNAN PAGAR KIRI DAN KANAN

    I PEKERJAAN PERSIAPAN

    1 Pembersihan - m' 11.85 2,500.00 2

    2 Pengukuran Lapangan - m' 11.85 5,000.00 5

    8

    II PEKERJAAN TANAH

    1 Pembersihan Site - m' 11.85 5,000.00 5

    2 Pembuatan Bouplank - m' 11.85 10,000.00 1

    3 Galian Tanah Pondasi A.1. m3 5.69 33,750.00 19

    4 Timbunan Kembali Tanah Pondasi A.1. m3 1.42 8,437.50 15 Timbunan Pasir Urug Pondasi Pas.batu kali A.17. m3 0.41 195,000.00 8

    46

    III PEKERJAAN PONDASI

    1 Pondasi Pasangan Batu kali 1 : 4 G.32. m3 3.20 654,730.00 2,09

    2 Cerucuk Kayu Laut dia 4" E.13 m' 83.00 17,800.00 1,47

    3 Sloof Beton Bertulang 1 : 2 : 3 Supl. V. m3 0.71 4,360,100.00 3,10

    6,67

    IV PEKERJAAN PASANGAN DAN PLESTERAN

    1 Pasangan Bata 1: 4 G.32.H. m3 2.70 819,309.50 2,2

    2 Plesteran 1 : 4 G.50.H. m2 48.38 34,415.00 1,66

    3 Plesteran Kolom G.50.H. m2 4.80 34,415.00 16

    4,04

    V PEKERJAAN KOLOM

    1 Kolom 20 x 20 cm Beton Bertulang 1 : 2 : 3 Supl. V. m3 0.24 4,933,350.00 1,18

    1,18

    VI PEKERJAAN CAT

    1 Cat Tembok K23 m2 48.38 23,238.75 1,12

    2 Cat Kolom K23 m2 4.80 23,238.75 1

    1,23

    13,68

    Sub Total V

    Sub Total VITOTAL BIAYA PAGAR DEPAN

    Total I

    Sub Total II

    Sub Total III

    Sub Total IV

  • 5/19/2018 RAB MESJID.xls

    14/31

    RENCANA ANGGARAN BIAYA

    PEKERJAAN : PEMBANGUNAN MESJID DAN FASILITAS PENDUKUNG

    SUB PEKERJAAN : PAGAR KIRI DAN KANAN

    Harga Jumlah

    No. Uraian Pekerjaan ANL Stn Volume Satuan Harga

    (Rp.) (Rp).

    E BANGUNAN PAGAR KIRI DAN KANAN

    I PEKERJAAN PERSIAPAN

    1 Pembersihan - m' 44.00 2,500.00 1

    2 Pengukuran Lapangan - m' 44.00 5,000.00 22

    33

    II PEKERJAAN TANAH

    1 Pembersihan Site - m' 44.00 5,000.00 22

    2 Pembuatan Bouplank - m' 44.00 10,000.00 44

    3 Galian Tanah Pondasi A.1. m3 21.12 33,750.00 7

    4 Timbunan Kembali Tanah Pondasi A.1. m3 5.28 8,437.50 45 Timbunan Pasir Urug Pondasi Pas.batu kali A.17. m3 1.54 195,000.00 30

    1,7

    III PEKERJAAN PONDASI

    1 Pondasi Pasangan Batu kali 1 : 4 G.32. m3 11.88 654,730.00 7,77

    2 Cerucuk Kayu Laut dia 4" E.13 m' 297.33 17,800.00 5,29

    3 Sloof Beton Bertulang 1 : 2 : 3 Supl. V. m3 2.64 4,360,100.00 11,5

    24,5

    IV PEKERJAAN PASANGAN DAN PLESTERAN

    1 Pasangan Bata 1: 4 G.32.H. m3 2.45 819,309.50 2,00

    2 Plesteran 1 : 4 G.50.H. m2 43.86 34,415.00 1,50

    3 Plesteran Kolom G.50.H. m2 19.20 34,415.00 66

    4,17

    V PEKERJAAN KOLOM

    1 Kolom 20 x 20 cm Beton Bertulang 1 : 2 : 3 Supl. V. m3 0.96 4,933,350.00 4,73

    4,73

    VI PEKERJAAN PAGAR PIPA BESI

    1 Pipa Besi Hitam dia. 4", tebal = 2.4 mm Upah+bahan M' 132.00 300,000.00 39,60

    39,6

    VII PEKERJAAN CAT

    1 Cat Tembok K23 m2 43.86 23,238.75 1,0

    2 Cat Kolom K23 m2 19.20 23,238.75 44

    3 Pengecatan Pagar Pipa K23 m2 41.45 27,987.50 1,16

    2,62

    77,7

    Sub Total V

    Sub Total VI

    Sub Total VII

    TOTAL BIAYA PAGAR DEPAN

    Total I

    Sub Total II

    Sub Total III

    Sub Total IV

  • 5/19/2018 RAB MESJID.xls

    15/31

    RENCANA ANGGARAN BIAYA

    PEKERJAAN : PEMBANGUNAN MESJID DAN FASILITAS PENDUKUNG

    SUB PEKERJAAN : PAGAR DEPAN

    Harga Jumlah

    No. Uraian Pekerjaan ANL Stn Volume Satuan Harga

    (Rp.) (Rp).

    D BANGUNAN PAGAR DEPAN

    I PEKERJAAN PERSIAPAN

    1 Pembersihan - m' 19.00 2,500.00

    2 Pengukuran Lapangan - m' 19.00 5,000.00

    1

    II PEKERJAAN TANAH

    1 Pembersihan Site - m' 19.00 5,000.00

    2 Pembuatan Bouplank - m' 19.00 10,000.00 1

    3 Galian Tanah Pondasi A.1. m3 9.12 33,750.00 3

    4 Timbunan Kembali Tanah Pondasi A.1. m3 2.28 8,437.505 Timbunan Pasir Urug Pondasi Pas.batu kali A.17. m3 0.67 195,000.00 1

    7

    III PEKERJAAN PONDASI

    1 Pondasi Pasangan Batu kali 1 : 4 G.32. m3 5.13 654,730.00 3,3

    2 Cerucuk Kayu Laut dia 4" E.13 m' 130.67 17,800.00 2,3

    3 Sloof Beton Bertulang 1 : 2 : 3 Supl. V. m3 1.14 4,360,100.00 4,9

    10,6

    IV PEKERJAAN PASANGAN DAN PLESTERAN

    1 Pasangan Bata 1: 4 G.32.H. m3 0.73 819,309.50 5

    2 Plesteran 1 : 4 G.50.H. m2 13.06 34,415.00 4

    3 Plesteran Kolom G.50.H. m2 10.80 34,415.00 3

    4 Pembuatan Kepala Kolom ( Bola ) Upah+bahan bh 6.00 300,000.00 1,8

    3,2

    V PEKERJAAN KOLOM

    1 Kolom 30 x 30 cm Beton Bertulang 1 : 2 : 3 Supl. V. m3 0.81 51,200.00

    VI PEKERJAAN PAGAR PIPA BESI DAN PINTU GERBANG

    1 Pipa Besi Hitam dia. 4", tebal = 2.4 mm Upah+bahan M' 41.40 300,000.00 12,4

    2 Pintu Gerbang Lebar = 5.2 M Upah+bahan unit 1.00 7,500,000.00 7,5

    19,9

    VII PEKERJAAN CAT

    1 Cat Tembok K23 m2 13.06 23,238.75 3

    2 Cat Kolom K23 m2 10.80 23,238.75 2

    3 Pengecatan Pagar Pipa K23 m2 13.00 27,987.50 3

    9

    35,6

    Sub Total XII

    TOTAL BIAYA PAGAR DEPAN

    Total I

    Sub Total II

    Sub Total III

    Sub Total IV

    Sub Total V

    Sub Total VI

  • 5/19/2018 RAB MESJID.xls

    16/31

    RENCANA ANGGARAN BIAYA

    PEKERJAAN : PEMBANGUNAN MESJID DAN FASILITAS PENDUKUNG

    SUB PEKERJAAN : TEMPAT WUDHU WANITA

    Harga Jumlah

    No. Uraian Pekerjaan ANL Stn Volume Satuan Harga

    (Rp.) (Rp).

    C BANGUNAN TEMPAT WUDHU WANITA

    I PEKERJAAN PERSIAPAN

    1 Pembersihan - m2 7.50 1,425.00

    2 Pengukuran Lapangan - m2 7.50 1,050.00

    II PEKERJAAN TANAH

    1 Pembersihan Site - m2 7.50 1,500.00

    2 Pembuatan Bouplank - m' 11.09 2,500.00

    3 Galian Tanah Pondasi A.1. m3 6.58 33,750.00 2

    4 Timbunan Kembali Tanah Pondasi A.1. m3 1.65 8,437.505 Timbunan Tanah dalam Bangunan t = 0.13 m A.20. m3 1.11 92,880.00 1

    6 Timbunan Pasir Urug dalam Bangunan T = 0.07 m A.17. m3 0.60 195,000.00 1

    7 Timbunan Pasir Urug Pondasi Pas.batu kali A.17. m3 0.42 195,000.00

    5

    III PEKERJAAN PONDASI

    1 Pondasi Pasangan Batu kali 1 : 4 G.32. m3 3.08 654,730.00 2,0

    2 Cerucuk Kayu Laut dia 4" E.13 m' 104.70 17,800.00 1,8

    3 Sloof Beton Bertulang 1 : 2 : 3 Supl. V. m3 0.73 4,360,100.00 3,1

    7,0

    IV PEKERJAAN LANTAI KERAMIK

    1 Lantai Kerja Beton Cor 1 : 3 : 5 G.43. m3 0.58 781,500.00 4

    2 Keramik Lantai 20 x 20 cm G.72.D m2 8.93 137,849.40 1,2

    3 Keramik Dinding 20 x 25 cm ( H = 1.75 m ) Supl. IV m2 20.70 155,349.40 3,2

    4,8

    V PEKERJAAN PASANGAN DAN PLESTERAN

    1 Pasangan Bata 1: 2 G.32.M. m3 2.48 948,055.00 2,3

    2 Pasangan Bata 1: 4 G.32.H. m3 3.61 819,309.50 2,9

    3 Plesteran Trasram 1 : 2 G.50.H.a m2 20.70 37,712.50 7

    4 Plesteran 1 : 4 G.50.H. m2 59.82 34,415.00 2,0

    5 Plesteran/Acian Balok G.50.H. m2 7.91 34,415.00 2

    6 Plesteran/Acian Dak 1 : 4 G.50.H. m2 8.99 34,415.00 3

    7 Plesteran/Acian Dak 1 : 4 G.50.H. m2 4.95 34,415.00 1

    8,8

    VI PEKERJAAN KOLOM, BALOK DAN PELAT LANTAI

    1 Kolom 15 x 20 cm Beton Bertulang 1 : 2 : 3 Supl. V. m3 0.31 4,933,350.00 1,5

    2 Kolom Praktis 15 x 15 cm Beton Bertulang 1 : 2 : 3 Supl. V. m3 0.18 5,506,600.00 9

    3 Balok 15 x 30 cm Beton Bertulang 1 : 2 : 3 Supl. V. m3 0.53 4,360,100.00 2,2

    4 Pelat Dak Lantai Beton Bertulang 1 : 2 : 3 Supl. V. m3 1.18 3,786,850.00 4,4

    5 Listplank (10/30) Beton Bertulang 1 : 2 : 3 Supl. V. m3 0.21 3,786,850.00 8

    10,0

    VII PEKERJAAN VENTILASI

    1 Ventilasi V2 Kayu Uk. 22 x 110 cm Upah+bahan Unit 1.00 300,000.00 3

    Total I

    Sub Total II

    Sub Total III

    Sub Total IV

    Sub Total V

    Sub Total VI

  • 5/19/2018 RAB MESJID.xls

    17/31

    y

    VIII PEKERJAAN LISTRIK

    1 Instalasi Listrik Upah+bahan Ttk 3.00 75,000.00

    2 Lampu Pijar 20 Watt Upah+bahan Bh 2.00 20,000.00

    3 Saklar Ganda Tanam Upah+bahan Bh 1.00 21,950.00

    4 Stop Kontak Tanam Upah+bahan Bh 1.00 25,200.00

    IX PEKERJAAN INSTALASI AIR

    1 Instalasi Air Buangan Pipa PVC 4" Upah+bahan Bh 6.00 74,316.67

    2 Instalasi Air Bersih Pipa PVC 1" ( sampai ke meteran air) Upah+bahan Bh 30.00 31,641.67

    3 Kran Air Upah+bahan Bh 4.00 29,550.00

    4 Floor drain Upah+bahan Bh 2.00 30,750.00

    X PEKERJAAN CAT

    1 Cat Tembok K23 m2 80.52 23,238.75

    2 Cat Dak Lantai ,Balok dan Balok K23 m2 21.85 23,238.75

    3 Pengecatan Ventilasi Kayu K23 m2 1.48 27,987.50

    Sub Total X

    TOTAL BIAYA TEMPAT WUDHU WANITA

    Sub Total XIII

    Sub Total IX

  • 5/19/2018 RAB MESJID.xls

    18/31

    RENCANA ANGGARAN BIAYA

    PEKERJAAN : PEMBANGUNAN MESJID DAN FASILITAS PENDUKUNG

    SUB PEKERJAAN : TEMPAT WUDHU PRIA

    Harga Jumlah

    No. Uraian Pekerjaan ANL Stn Volume Satuan Harga

    (Rp.) (Rp).

    B BANGUNAN TEMPAT WUDHU PRIA

    I PEKERJAAN PERSIAPAN

    1 Pembersihan - m2 7.50 1,425.00

    2 Pengukuran Lapangan - m2 7.50 1,050.00

    II PEKERJAAN TANAH

    1 Pembersihan Site - m2 7.50 1,500.00

    2 Pembuatan Bouplank - m' 11.09 2,500.00

    3 Galian Tanah Pondasi A.1. m3 6.58 33,750.00 2

    4 Timbunan Kembali Tanah Pondasi A.1. m3 1.65 8,437.505 Timbunan Tanah dalam Bangunan t = 0.13 m A.20. m3 1.11 92,880.00 1

    6 Timbunan Pasir Urug dalam Bangunan T = 0.07 m A.17. m3 0.60 195,000.00 1

    7 Timbunan Pasir Urug Pondasi Pas.batu kali A.17. m3 0.42 195,000.00

    5

    III PEKERJAAN PONDASI

    1 Pondasi Pasangan Batu kali 1 : 4 G.32. m3 3.08 654,730.00 2,0

    2 Cerucuk Kayu Laut dia 4" E.13 m' 104.70 17,800.00 1,8

    3 Sloof Beton Bertulang 1 : 2 : 3 Supl. V. m3 0.73 4,360,100.00 3,1

    7,0

    IV PEKERJAAN LANTAI KERAMIK

    1 Lantai Kerja Beton Cor 1 : 3 : 5 G.43. m3 0.58 781,500.00 4

    2 Keramik Lantai 20 x 20 cm G.72.D m2 8.93 137,849.40 1,2

    3 Keramik Dinding 20 x 25 cm ( H = 1.75 m ) Supl. IV m2 20.70 155,349.40 3,2

    4,8

    V PEKERJAAN PASANGAN DAN PLESTERAN

    1 Pasangan Bata 1: 2 G.32.M. m3 2.48 948,055.00 2,3

    2 Pasangan Bata 1: 4 G.32.H. m3 3.61 819,309.50 2,9

    3 Plesteran Trasram 1 : 2 G.50.H.a m2 20.70 37,712.50 7

    4 Plesteran 1 : 4 G.50.H. m2 59.82 34,415.00 2,0

    5 Plesteran/Acian Balok G.50.H. m2 7.91 34,415.00 2

    6 Plesteran/Acian Dak 1 : 4 G.50.H. m2 8.99 34,415.00 3

    7 Plesteran/Acian Dak 1 : 4 G.50.H. m2 4.95 34,415.00 1

    8,8

    VI PEKERJAAN KOLOM, BALOK DAN PELAT LANTAI

    1 Kolom 15 x 20 cm Beton Bertulang 1 : 2 : 3 Supl. V. m3 0.31 4,933,350.00 1,5

    2 Kolom Praktis 15 x 15 cm Beton Bertulang 1 : 2 : 3 Supl. V. m3 0.18 5,506,600.00 9

    3 Balok 15 x 30 cm Beton Bertulang 1 : 2 : 3 Supl. V. m3 0.53 4,360,100.00 2,2

    4 Pelat Dak Lantai Beton Bertulang 1 : 2 : 3 Supl. V. m3 1.18 3,786,850.00 4,4

    5 Listplank (10/30) Beton Bertulang 1 : 2 : 3 Supl. V. m3 0.21 3,786,850.00 8

    10,0

    VII PEKERJAAN VENTILASI

    1 Ventilasi V2 Kayu Uk. 22 x 110 cm Upah+bahan Unit 1.00 300,000.00 3

    Total I

    Sub Total II

    Sub Total III

    Sub Total IV

    Sub Total V

    Sub Total VI

  • 5/19/2018 RAB MESJID.xls

    19/31

    y

    VIII PEKERJAAN LISTRIK

    1 Instalasi Listrik Upah+bahan Ttk 3.00 75,000.00

    2 Lampu Pijar 20 Watt Upah+bahan Bh 2.00 20,000.00

    3 Saklar Ganda Tanam Upah+bahan Bh 1.00 21,950.00

    4 Stop Kontak Tanam Upah+bahan Bh 1.00 25,200.00

    IX PEKERJAAN INSTALASI AIR

    1 Instalasi Air Buangan Pipa PVC 4" klas D setara Vinilex Upah+bahan Bh 6.00 74,316.67

    2 Instalasi Air Bersih Pipa PVC 1" ( sampai ke meteran air) Upah+bahan Bh 30.00 31,641.67

    3 Kran Air Upah+bahan Bh 4.00 29,550.00

    4 Floor drain Upah+bahan Bh 2.00 30,750.00

    X PEKERJAAN CAT

    1 Cat Tembok K23 m2 80.52 23,238.75

    2 Cat Dak Lantai ,Balok dan Balok K23 m2 21.85 23,238.75

    3 Pengecatan Ventilasi Kayu K23 m2 1.48 27,987.50

    Sub Total X

    TOTAL BIAYA TEMPAT PRIA

    Sub Total XIII

    Sub Total IX

  • 5/19/2018 RAB MESJID.xls

    20/31

    RENCANA ANGGARAN BIAYA

    PEKERJAAN : PEMBANGUNAN MESJID DAN FASILITAS PENDUKUNG

    LOKASI :

    Harga Jumlah

    No. Uraian Pekerjaan ANL Stn Volume Satuan Harga

    (Rp.) (Rp).

    A BANGUNAN MESJID

    I PEKERJAAN PERSIAPAN

    1 Mobilisasi dan Demobilisasi - ls 1.00 1,500,000.00 1,5

    2 Papan Nama Proyek - bh 1.00 200,000.00 2

    3 Direksi Keet - ls 1.00 3,500,000.00 3,5

    4 Pembersihan - m2 288.63 1,425.00 4

    5 Pengukuran Lapangan - m2 288.63 1,050.00 3

    6 Foto Dokumentasi - ls 1.00 350,000.00 3

    6,2

    II PEKERJAAN TANAH

    1 Pembersihan Site - m2 288.63 1,500.00 4

    2 Pembuatan Bouplank - m' 72.00 2,500.00

    3 Galian Tanah Pondasi dan Selasar/Teras A.1. m3 192.52 33,750.00 6,4

    4 Timbunan Kembali Tanah Pondasi 1/4A.1. m3 48.13 8,437.50 4

    5 Timbunan Tanah dalam Bangunan A.20. m3 143.78 92,880.00 13,3

    6 Timbunan Tanah Teras A.20. m3 46.24 92,880.00 4,2

    7 Timbunan Pasir Urug dalam Bangunan A.17. m3 16.77 195,000.00 3,2

    8 Timbunan Pasir Urug Teras A.17. m3 5.66 195,000.00 1,

    9 Timbunan Pasir Urug Pondasi Pas.batu kali A.17. m3 2.08 195,000.00 4

    29,9

    III PEKERJAAN PONDASI

    1 Lantai Kerja Pondasi Menerus Beton Cor 1 : 3 : 5 G.43. m3 4.14 781,500.00 3,2

    2 Pondasi Menerus Beton Bertulang 1 : 2 : 3 G.32. m3 18.73 3,786,850.00 70,9

    3 Pondasi Pasangan Batu kali 1 : 4 Supl. V. m3 17.29 654,730.00 11,3

    4 Cerucuk Kayu Laut dia 4" E.13 m' 1,768.00 17,800.00 31,4

    5 Sloof Beton Bertulang 1 : 2 : 3 Supl. V. m3 7.84 4,360,100.00 34,

    151,1

    IV PEKERJAAN LANTAI KERAMIK

    1 Lantai Kerja Beton Cor 1 : 3 : 5 G.43. m3 22.43 781,500.00 17,5

    2 Keramik Lantai Dalam Bangunan 30 x 30 cm G.72.C m2 239.63 120,422.00 28,8

    3 Keramik Lantai Teras 30 x 30 cm G.72.C m2 88.34 120,422.00 10,6

    4 Plin dinding keramik10 x 30 cm G.72.D m' 108.40 37,188.25 4,0

    61,0

    V PEKERJAAN PASANGAN DAN PLESTERAN

    1 Pasangan Bata 1: 2 G.32.M. m3 26.97 948,055.00 25,5

    2 Pasangan Bata 1: 4 G.32.H. m3 62.89 819,309.50 51,5

    3 Plesteran Trasram 1 : 2 G.50.H.a m2 449.57 37,712.50 16,9

    4 Plesteran 1 : 4 G.50.H. m2 1,082.12 34,415.00 37,2

    5 Pasangan Ventilasi block 1: 4 G.50.H. m2 0.68 212,362.87

    5 Sponengan/tali air lebar = 10 cm,tebal 1.5 cm G.50.H. m2 12.34 34,415.00 4

    6 Plesteran/Acian Kolom 1 : 4 G.50.H. m2 61.70 34,415.00 2,

    7 Plesteran/Acian Balok G.50.H. m2 76.05 34,415.00 2,6

    8 Plesteran/Acian Dak 1 : 4 G.50.H. m2 27.45 34,415.00 9

    137,5

    VI PEKERJAAN KOLOM, BALOK DAN PELAT LANTAI

    Sub Total V

    Total I

    Sub Total II

    Sub Total III

    Sub Total IV

  • 5/19/2018 RAB MESJID.xls

    21/31

    VI PEKERJAAN KOLOM, BALOK DAN PELAT LANTAI

    2 Kolom 15 x 20 cm Beton Bertulang 1 : 2 : 3 Supl. V. m3 2.16 4,933,350.00

    3 Kolom Praktis 15 x 15 cm Beton Bertulang 1 : 2 : 3 Supl. V. m3 1.47 5,506,600.00

    4 Balok 15 x 60 cm Beton Bertulang 1 : 2 : 3 Supl. V. m3 4.56 4,360,100.00

    5 Balok Praktis 15 x 20 cm Beton Bertulang 1 : 2 : 3 Supl. V. m3 6.40 4,933,350.00

    6 Balok 15 x 30 cm Beton Bertulang 1 : 2 : 3 Supl. V. m3 0.54 4,360,100.00

    7 Pelat Dak Lantai Beton Bertulang 1 : 2 : 3 Supl. V. m3 3.29 3,786,850.00

    VII PEKERJAAN KUDA - KUDA DAN ATAP

    1 Kuda-kuda F.22 m3 7.91 7,015,884.89

    2 Rangka Atap Genteng Metal F.19 m2 420.90 41,000.00

    3 Atap Genteng Metal H.8b m2 420.90 159,350.00

    4 Rabung Genteng H.10.A m2 63.27 93,579.55

    5 Lisplank Kayu Dowble F 21 m' 159.47 45,311.15

    VIII PEKERJAAN PINTU DAN JENDELA

    1 Kusen Pintu Uk. 215 x 80 cm F.27 m3 0.08 8,263,884.89

    2 Upah+bahan unit 3.00 6,240,000.00

    3 Pintu Panel P1 Uk. 210 x 80 cm (1 daun) F.33 m2 3.44 450,940.804 Upah+bahan Unit 6.00 4,152,260.00

    5 Upah+bahan Unit 2.00 1,561,000.00

    6 Upah+bahan Unit 2.00 1,035,000.00

    7 Ventilasi Kaca mati Rangka Aluminium uk 30 x 30 cm Upah+bahan Unit 40.00 250,000.00

    8 Ventilasi V2 Kayu Uk. 22 x 22 cm (1 daun) Upah+bahan Unit 96.00 100,000.00

    IX PEKERJAAN KUNCI DAN ALAT PENGGANTUNG

    1 Kunci & Hendel Pintu Upah+bahan bh 2.00 113,650.00

    2 Engsel Pintu 4" Upah+bahan bh 6.00 15,500.003 Grendel Pintu 10 " Upah+bahan bh 4.00 9,450.00

    X PEKERJAAN PLAFOND

    1 Plafond Gypsum 9 mm + rangka F.37 A m2 416.64 74,270.83

    XI PEKERJAAN LISTRIK

    1 Instalasi Listrik Upah+bahan Ttk 36.00 75,000.00

    2 Lampu Down Light Upah+bahan Bh 30.00 85,000.00

    3 Saklar Ganda Tanam Upah+bahan Bh 15.00 21,950.00

    4 Stop Kontak Tanam Upah+bahan Bh 6.00 25,200.00

    5 Sekering Box Dua Group Upah+bahan Set 1.00 110,500.00

    XII PEKERJAAN CAT

    (Cat setara Vinilex )

    1 Cat Tembok K23 m2 1,082.12 23,238.75

    2 Cat Plafond K23 m2 416.64 23,238.75

    3 Cat Ventilasi Block K23 m2 3.38 23,238.75

    4 Cat Dak Lantai K23 m2 27.45 23,238.75

    5 Cat Lisplank K23 m2 71.76 27,987.50

    6 Pengecatan Kolom K23 m2 137.75 23,238.75

    7 Pengecatan Ventilasi Kayu K23 m2 181.63 27,987.50

    8 Pengecatan Pintu Kayu K23 m2 6.88 27,987.50

    Jendela Kaca Rangka Aluminium uk.196 x 2230 cm Komplit Kunci dan

    alat penggantung ( 3 daun dengan Ventilasi lengkung )

    Jendela Kaca Rangka Aluminium uk.70 x 2230 cm Komplit Kunci dan

    alat penggantung ( 1 daun dengan Ventilasi lengkung )

    Sub Total XII

    Sub Total IX

    Sub Total X

    Sub Total XI

    Sub Total VI

    Sub Total VIII

    Jendela Kaca Rangka Aluminium uk.60 x 138 cm Komplit Kunci dan alat

    penggantung ( 1 Daun )

    Sub Total VII

    Pintu Sliding Bingkai kaca rangka Aluminium uk.200 x 260 cm Komplit

    Kunci dan alat penggantung ( 2 daun Ventilasi lengkung )

  • 5/19/2018 RAB MESJID.xls

    22/31

    DAFTAR SATUAN UPAH DAN BAHAN

    PEKERJAAN : 0

    SATKER : PEMBANGUNAN MESJID DAN FASILITAS PENDUKUNG

    #REF! : 0

    No. Jenis Tenaga Kerja dan Bahan Satuan Harga Satuan

    (Rp.)

    I. DAFTAR SATUAN UPAH

    1 Pekerja Hari 50,000.00

    2 Mandor Hari

    3 Tukang Hari 70,000.00

    4 Kepala Tukang Hari

    II. DAFTAR SATUAN BAHAN

    1 Tanah Timbun m3

    64,900.00

    2 Pasir Timbun/Urug m3

    150,000.00

    3 Pasir Pasang m3

    150,000.00

    4 Sirtu m3

    125,000.00

    5 Ventilasi Block bh 6,000.00

    5 Batu Bata Mesin bh 550.00

    6 Batu Kerikil (A) Cor m3

    80,000.00

    7 Batu Koral 15 - 20 cm m3

    80,000.00

    8 Batu Koral 10 - 12.5 cm m3

    80,000.00

    9 Paving Block K 175 Holand Disk Warna Merah t = 6 cm bh 1,600.00

    10 Kanstin K 175 Uk. 15 x 30 x 40 cm bh 19,950.00

    11 Semen PC @ 50 kg Zak 65,000.00

    12 Semen Putih @ 40 kg Zak 84,700.00

    13 Broti/Papan Kayu Sembarang m

    3

    1,500,000.0014 Broti Kayu Meranti m

    34,676,258.99

    15 Broti Kayu Damar Laut m3

    4,485,800.00

    16 Papan Kayu Meranti m3

    3,203,200.00

    17 Papan Kayu Meranti Batu m3

    4,676,258.99

    18 Papan Kayu Damar Laut m3

    4,869,700.00

    19 Kayu Laut 4" Btg 44,000.00

    20 Kayu Lat Asbest Btg 6,650.00

    21 Gypsum Board tebal 9 mm Lbr 85,800.00

    22 Asbes Lokal 1 x 1 m Lbr 11,000.00

    23 Magnesium Board 4mm Uk. 120x240 cm Lbr 75,000.00

    23 Triplex Jati # 3 mm Uk. 120 x 240 cm Lbr 121,000.00

    24 Triplex # 6 mm Uk. 120 x 240 cm Lbr 85,250.00

    25 Triplex # 9 mm Uk. 120 x 240 cm Lbr 200,000.0026 Triplex # 12 mm Uk. 120 x 240 cm Lbr 250,000.00

    27 Paku Biasa Kg 12,000.00

    28 Paku Seng Bh 350.00

    29 Besi Beton Kg 17,000.00

    30 Besi Propil Kg 15,000.00

    31 Paku/Sekrup Bh 400.00

    32 Baut dia 12 mm Bh 1,250.00

    33 Kawat Beton Kg 9,000.00

    upahbahan - 22

  • 5/19/2018 RAB MESJID.xls

    23/31

    No. Jenis Tenaga Kerja dan Bahan Satuan Harga Satuan

    (Rp.)

    34 Atap Galvalum m2

    53,289.47

    35 Rabung Asbes Gelombang m' 19,950.00

    37 Seng Plat BJLS 35 Lbr 40,000.00

    38 Atap Genteng Metal m2 90,000.00

    36 Rabung Genteng Bh 25,000.00

    39 Cat Minyak/Perak (Setara Kuda Terbang) Kg 38,500.00

    40 Minyak Cat Kg 11,850.00

    41 Cat Tembok Setara Vinilex Kg 13,650.00

    42 Cat Vernis Jadi Kg 33,600.00

    43 Cat Meni Kg 33,000.00

    44 Residu (Colter) Kg 3,300.00

    45 Kaca Bening # 5 mm m2

    119,800.00

    46 Kaca Rybent # 5 mm m2

    146,450.00

    47 Kaca Blok # 5 mm m2

    19,950.00

    48 Kaca Nako Bening # 5 mm Lbr 8,800.00

    49 Kaca Nako Rybent # 5 mm Lbr 9,950.00

    50 Plint Keamik 15 x 30 cm Bh 2,750.00

    51 Keramik 10 x 20 cm Roman Bh 1,500.00

    52 Keramik 20 x 20 cm Roman Bh 3,300.00

    53 Keramik 20 x 25 cm Roman Bh 4,125.00

    54 Keramik 30 x 30 cm Roman Bh 5,909.09

    55 Keramik 40 x 40 cm Roman Bh 10,450.00

    56 Granito 40 x 40 cm Bh 35,400.00

    57 Pipa PVC (Paralon) Kwalited D dia 1/2" Btg 34,950.00

    58 Pipa PVC (Paralon) Kwalited AW dia 3/4" Btg 36,850.00

    59 Pipa PVC (Paralon) Kwalited AW dia 1" Btg 40,920.00

    60 Pipa PVC (Paralon) Kwalited AW dia 3" Btg 148,500.00

    61 Pipa PVC (Paralon) Kwalited AW dia 4" Btg 355,900.00

    62 Pipa Besi GIP dia 3/4" Btg 99,850.00

    63 Pipa Besi GIP dia 1/2" Btg 73,250.0064 Pipa Besi GIP dia 1" Btg 146,400.00

    65 Keran Air dia 1/2 " Bh 14,550.00

    66 Floor Drain 3" Bh 15,750.00

    67 Closed Duduk Bh 1,270,500.00

    68 Closed Jongkok Bh 159,750.00

    69 Bak Cuci Stainless Steel 1 Lobang Bh 408,375.00

    70 Bak Air Fibre Bh 300,000.00

    70 Shoapholder Bh 60,000.00

    70 Riol Beton dia 15 cm Bh 20,600.00

    71 Riol Beton dia 20 cm Bh 27,500.00

    72 Riol Beton dia 30 cm Bh 33,000.00

    73 Kunci Tanam Besar Union (Sejenis) Bh 78,650.00

    74 Kunci Tanam Kecil Union (Sejenis) Bh 48,400.00

    75 Engsel Pintu Cabut Uk 5" Set 10,300.00

    76 Engsel Pintu Nilon Uk 4" Set 11,500.00

    77 Engsel Jendela Cabut Uk 3" Set 7,900.00

    78 Engsel Jendela Nilon Uk 3" Set 10,300.00

    79 Ensel Millano 18 " Set 75,050.00

    80 Ensel Millano 16 " Set 66,550.00

    81 Engsel Pintu Lipat (Gudang) Set 38,750.00

    82 Grendel Pintu Bh 5,450.00

    upahbahan - 23

  • 5/19/2018 RAB MESJID.xls

    24/31

    No. Jenis Tenaga Kerja dan Bahan Satuan Harga Satuan

    (Rp.)

    83 Grendel Jendela Bh 4,850.00

    84 Hak Angin Set 4,250.00

    85 Hak Angin lipat besar Set 7,250.00

    77 Lampu TL 2 x 20 Watt (Komplit) Tanam Double Set 205,000.00

    78 Lampu TL 1 x 20 Watt (Komplit) set 75,000.00

    79 Lampu Down Light Bh 45,000.00

    80 Lampu Neon Tabung Bh 40,000.00

    81 Stop Kontak Timbul Bh 7,250.00

    82 Stop Kontak Tanam Bh 15,200.00

    83 Saklar Tunggal Tanam Bh 9,000.00

    84 Saklar Seri Tanam Bh 16,950.00

    85 Saklar Triple Tanam Bh 21,200.00

    86 Saklar Triple Timbul Bh 13,050.00

    87 Saklar Seri Timbul Bh 10,300.00

    88 Saklar Enkle Timbul Bh 7,250.00

    89 Box Sekering 1 Group Set 48,500.00

    90 Box Sekering 2 Group Set 60,500.00

    upahbahan - 24

  • 5/19/2018 RAB MESJID.xls

    25/31

    PEKERJAAN : PEMBANGUNAN MESJID DAN FASILITAS PENDUKUNG

    LOKASI :

    Harga JumlahAnalisa Uraian Satuan Volume Satuan Harga

    (Rp.) (Rp.)

    A.1. 1 m3 Galian Tanah Biasa

    Pekerja Orang 0.7500 50,000.00 37,500.00

    Mandor Orang 0.0250 0.00 0.00Jumlah 37,500.00

    Upah diambil Galian 90 % 33,750.00

    A3/A4. 1 m3 Galian Tanah Berbatu / Lumpur

    Pekerja Orang 1.5000 50,000.00 75,000.00

    Mandor Orang 0.0500 0.00 0.00

    Jumlah 75,000.00

    A.17. 1 m3 Pasir Urug

    Pasir urug m3 1.2000 150,000.00 180,000.00

    Pekerja Orang 0.3000 50,000.00 15,000.00

    Mandor Orang 0.0100 0.00 0.00Jumlah 195,000.00

    A.20. 1 m3 Urugan Tanah

    Tanah m3 1.2000 64,900.00 77,880.00

    Pekerja Orang 0.3000 50,000.00 15,000.00

    Mandor Orang 0.0100 0.00 0.00Jumlah 92,880.00

    A.18 1 m3 Timbunan SirtuSirtu m3 1.2000 125,000.00 150,000.00

    Pekerja Orang 0.3000 50,000.00 15,000.00

    Mandor Orang 0.0100 0.00 0.00Jumlah 165,000.00

    G.32. 1 m3 Pas. Batu Kali 1 : 4

    Batu Kali m3 1.2000 80,000.00 96,000.00

    Pasir Pasang m3 0.5522 150,000.00 82,830.00

    Semen Zak 3.2600 65,000.00 211,900.00

    Pekerja Orang 3.6000 50,000.00 180,000.00

    Mandor Orang 0.1800 0.00 0.00

    Tukang Batu Orang 1.2000 70,000.00 84,000.00

    Kepala Tukang Orang 0.1200 0.00 0.00

    Jumlah 654,730.00

    G.32.H. a 1 m2 Pas. Ventilasi Block 1 : 4

    Ventilasi Block bh 185.0000 6,000.00 1,110,000.00

    Pasir Pasang m3 2.1160 150,000.00 317,398.33

    Semen Zak 0.1891 65,000.00 12,292.22

    Pekerja Orang 4.5000 50,000.00 225,000.00

    Mandor Orang 0.2550 0.00 0.00

    Tukang Batu Orang 1.5000 70,000.00 105,000.00

    Kepala Tukang Orang 0.1500 0.00 0.00Jumlah 1,769,690.55

    Harga / m2 212,362.87

    G.32.M. 1 m3 Pas. Batu Bata 1 : 2

    DAFTAR ANALISA HARGA SATUAN

  • 5/19/2018 RAB MESJID.xls

    26/31

    Batu Bata bh 450.0000 550.00 247,500.00

    Semen zak 5.1470 65,000.00 334,555.00

    Pasir Pasang m3 0.4600 150,000.00 69,000.00

    Jumlah Bahan 651,055.00

    Pekerja Orang 4.5000 50,000.00 225,000.00

    Mandor Orang 0.2550 0.00 0.00

    Tukang Batu Orang 1.5000 70,000.00 105,000.00

    Kepala Tukang Orang 0.1500 0.00 0.00

    Jumlah Upah 330,000.00Upah diambil 90 % 297,000.00

    Jumlah 948,055.00

    G.32.H. 1 m3 Pas. Batu Bata 1 : 4

    Batu Bata bh 450.0000 550.00 247,500.00

    Semen zak 3.1663 65,000.00 205,809.50

    Pasir Pasang m3 0.4600 150,000.00 69,000.00

    Jumlah Bahan 522,309.50

    Pekerja Orang 4.5000 50,000.00 225,000.00

    Mandor Orang 0.2550 0.00 0.00

    Tukang Batu Orang 1.5000 70,000.00 105,000.00

    Kepala Tukang Orang 0.1500 0.00 0.00

    Jumlah Upah 330,000.00

    Upah diambil 90 % 297,000.00Jumlah 819,309.50

    G.43. 1 m3 Beton Campuran 1 : 3 : 5

    Kerikil m3 1.0000 80,000.00 80,000.00

    Semen zak 5.0000 65,000.00 325,000.00

    Pasir Pasang m3 0.5000 150,000.00 75,000.00

    Jumlah Bahan 480,000.00

    Pekerja Orang 6.0000 50,000.00 300,000.00

    Mandor Orang 0.3000 0.00 0.00

    Tukang Batu Orang 0.5000 70,000.00 35,000.00

    Kepala Tukang Orang 0.0500 0.00 0.00

    Jumlah Upah 335,000.00

    Upah diambil 90 % 301,500.00

    Jumlah 781,500.00

    Supl. V. 1 M3 Beton Campuran 1 : 2 : 3

    Pasir Pasang m3 0.5400 150,000.00 81,000.00

    Batu. Kerikil m3 0.8200 80,000.00 65,600.00

    Semen zak 8.5000 65,000.00 552,500.00

    Pekerja Orang 6.0000 50,000.00 300,000.00

    Mandor Orang 0.3000 0.00 0.00

    Tukang Batu Orang 1.0000 70,000.00 70,000.00

    Kepala Tukang Orang 0.1000 0.00 0.00Jumlah = A 1,069,100.00

    Bahan Besi Beton

    Untuk 100 kg besi diperlukan 110 kg besi

    Besi kg 110.0000 17,000.00 1,870,000.00

    Kawat ikat kg 2.0000 9,000.00 18,000.00Jumlah Bahan 1,888,000.00

    Pekerja Orang 6.7500 50,000.00 337,500.00

    Tukang Besi Orang 6.7500 70,000.00 472,500.00

    Kepala Tukang Orang 2.2500 0.00 0.00

    Jumlah Upah 810,000.00

    Upah diambil 50 % 405,000.00Jumlah = B 2,293,000.00

    Untuk besi 75 kg = 0.75 x B 1,719,750.00

    Untuk besi 75 kg =1.0 x B 2,293,000.00

    Untuk besi 125 kg = 1.25 x B 2,866,250.00

    Untuk besi 150 kg = 1.50 x B 3,439,500.00

    Untuk besi 175 kg = 1.75 x B 4,012,750.00

  • 5/19/2018 RAB MESJID.xls

    27/31

    Untuk besi 200 kg = 2.00 x B 4,586,000.00

    Bahan Begesting (Cetakan)

    Kayu Bekesting (dipakai 2 kali) m3 0.4000 750,000.00 300,000.00

    Paku kg 4.0000 12,000.00 48,000.00

    Jumlah Bahan 348,000.00

    Pekerja Orang 2.0000 50,000.00 100,000.00

    Mandor Orang 0.1000 0.00 0.00

    Tukang Kayu Orang 5.0000 70,000.00 350,000.00Kepala Tukang Orang 0.5000 0.00 0.00

    Pekerja (bongkar bekesting) Orang 4.0000 50,000.00 200,000.00

    Jumlah Upah 650,000.00

    Upah 650,000.00Bekesting dipakai 2 kali Jumlah = C 998,000.00

    Untuk 1 m3 beton bertulang besi 75 kg 3,786,850.00

    Untuk 1 m3 beton bertulang besi 100 kg 4,360,100.00

    Untuk 1 m3 beton bertulang besi 125 kg 4,933,350.00

    Untuk 1 m3 beton bertulang besi 150 kg 5,506,600.00

    Untuk 1 m3 beton bertulang besi 175 kg 6,079,850.00

    Untuk 1 m3 beton bertulang besi 200 kg 6,653,100.00

    G.50.H. 1 M2 Plesteran 1 : 4 tebal 10Semen zak 0.1220 65,000.00 7,930.00

    Pasir Pasang m3 0.0139 150,000.00 2,085.00

    Jumlah Bahan 10,015.00

    Pekerja Orang 0.4000 50,000.00 20,000.00

    Mandor Orang 0.0200 0.00 0.00

    Tukang Batu Orang 0.1500 70,000.00 10,500.00

    Kepala Tukang Orang 0.0150 0.00 0.00

    Jumlah Upah 30,500.00

    Upah diambil 80 % 24,400.00Jumlah 34,415.00

    G.50.H.a 1 M2 Plesteran 1 : 2 tebal 10

    Semen zak 0.1785 65,000.00 11,602.50

    Pasir Pasang m3 0.0114 150,000.00 1,710.00Jumlah Bahan 13,312.50

    Pekerja Orang 0.4000 50,000.00 20,000.00

    Mandor Orang 0.0200 0.00 0.00

    Tukang Batu Orang 0.1500 70,000.00 10,500.00

    Kepala Tukang Orang 0.0150 0.00 0.00

    Jumlah Upah 30,500.00

    Upah diambil 80 % 24,400.00Jumlah 37,712.50

    E.13 1 M' Cerucuk dia 4 " cm

    Upah

    Pekerja Orang 0.2000 50,000.00 10,000.00

    Mandor Orang 0.0215 0.00 0.00

    Tukang Kayu Orang 0.0200 70,000.00 1,400.00Kepala Tukang Orang 0.0020 0.00 0.00

    Jumlah Upah 11,400.00

    Upah diambil 50 % 5,700.00Bahan

    Kayu dia 4" m 1.1000 11,000.00 12,100.00

    Jumlah Bahan 12,100.00

    Jumlah 17,800.00

    G.68.A 1 m' Plint Keramik 10 x 30 cm

    Plint Keramik 15 x 30 cm bh 3.3330 2,750.00 9,165.75

    Semen zak 0.0765 65,000.00 4,972.50

    Pasir m3 0.0070 150,000.00 1,050.00

  • 5/19/2018 RAB MESJID.xls

    28/31

    Pekerja Orang 0.3000 50,000.00 15,000.00

    Mandor Orang 0.0150 0.00 0.00

    Tukang Orang 0.1000 70,000.00 7,000.00

    Kepala Tukang Orang 0.0100 0.00 0.00Jumlah 37,188.25

    G.72.B 1 m2 Lantai Keramik 40 x 40 cm

    Keramik (Roman) bh 6.2500 10,450.00 65,312.50

    Semen zak 0.1420 65,000.00 9,230.00Semen Putih zak 0.0020 84,700.00 169.40

    Pasir Pasang m3 0.0230 150,000.00 3,450.00

    Pekerja Orang 0.5000 50,000.00 25,000.00

    Mandor Orang 0.0250 0.00 0.00

    Tukang Orang 0.2500 70,000.00 17,500.00

    Kepala Tukang Orang 0.0250 0.00 0.00Jumlah 120,661.90

    G.72.C 1 m2 Lantai Keramik 30 x 30 cm

    Keramik (Roman) bh 11.0000 5,909.09 65,000.00

    Semen zak 0.1420 65,000.00 9,230.00

    Semen Putih zak 0.0020 121,000.00 242.00

    Pasir Pasang m3 0.0230 150,000.00 3,450.00

    Pekerja Orang 0.5000 50,000.00 25,000.00Mandor Orang 0.0250 0.00 0.00

    Tukang Orang 0.2500 70,000.00 17,500.00

    Kepala Tukang Orang 0.0250 0.00 0.00Jumlah 120,422.00

    G.72.D 1 m2 Lantai Keramik 20 x 20 cm

    Keramik (Roman) bh 25.0000 3,300.00 82,500.00

    Semen zak 0.1420 65,000.00 9,230.00

    Semen Putih m3 0.0020 84,700.00 169.40

    Pasir m3 0.0230 150,000.00 3,450.00

    Pekerja Orang 0.5000 50,000.00 25,000.00

    Mandor Orang 0.0250 0.00 0.00

    Tukang Orang 0.2500 70,000.00 17,500.00

    Kepala Tukang Orang 0.0250 0.00 0.00Jumlah 137,849.40

    Supl. IV 1 m2 Dinding Keramik 20 x 25 cm

    Keramik (Roman) bh 20.0000 4,125.00 82,500.00

    Semen zak 0.1420 65,000.00 9,230.00

    Semen Putih m3 0.0020 84,700.00 169.40

    Pasir m3 0.0230 150,000.00 3,450.00

    Pekerja Orang 0.5000 50,000.00 25,000.00

    Mandor Orang 0.0500 0.00 0.00

    Tukang Orang 0.5000 70,000.00 35,000.00

    Kepala Tukang Orang 0.0500 0.00 0.00Jumlah 155,349.40

    F.22 1 M3 Kuda-Kuda KayuKayu Meranti m3 1.1000 4,676,258.99 5,143,884.89

    Jumlah Bahan 5,143,884.89

    Pekerja Orang 8.0000 50,000.00 400,000.00

    Mandor Orang 0.4000 0.00 0.00

    Tukang Orang 24.0000 70,000.00 1,680,000.00

    Kepala Tukang Orang 2.4000 0.00 0.00

    Jumlah Upah 2,080,000.00

    Upah diambil 90 % 1,872,000.00Jumlah 7,015,884.89

    F.19 1 m2 Pasang Rangka Atap Genteng Metal

    Rangka :

    Kayu Meranti m3 0.0110 4,676,258.99 51,438.84

  • 5/19/2018 RAB MESJID.xls

    29/31

    Paku Biasa Kg 0.1000 12,000.00 1,200.00

    Pekerja Orang 0.0150 50,000.00 750.00

    Mandor Orang 0.0075 0.00 0.00

    Tukang Orang 0.1000 70,000.00 7,000.00

    Kepala Tukang Orang 0.0100 0.00 0.00

    Jumlah bahan /Upah 60,388.84Dibulatkan 41,000.00

    H.8b 1 m2 Atap Genteng MetalAtap Genteng metal m2 1.1000 90,000.00 99,000.00

    Paku Seng bh 4.0000 12,000.00 48,000.00

    Jumalah Bahan 147,000.00

    Pekerja Orang 0.1000 50,000.00 5,000.00

    Mandor Orang 0.0050 0.00 0.00

    Tukang Orang 0.2000 70,000.00 14,000.00

    Kepala Tukang Orang 0.0200 0.00 0.00

    Jumlah Upah 19,000.00

    Upah diambil 65 % 12,350.00Jumlah 159,350.00

    H.10.A 1 m' Rabung Genteng

    Rabung Genteng Bh 3.5000 25,000.00 87,500.00

    Semen Zak 0.033747 65,000.00 2,193.55

    Pasir Pasang m3 0.00324 150,000.00 486.00Pekerja Orang 0.0400 50,000.00 2,000.00

    Mandor Orang 0.0020 0.00 0.00

    Tukang Orang 0.0200 70,000.00 1,400.00

    Kepala Tukang Orang 0.0020 0.00 0.00Jumlah 93,579.55

    F.27 1 M3 Kosen Kayu

    Kayu Meranti m3 1.1000 4,676,258.99 5,143,884.89

    Pekerja Orang 12.0000 50,000.00 600,000.00

    Mandor Orang 0.6000 0.00 0.00

    Tukang Orang 36.0000 70,000.00 2,520,000.00

    Kepala Tukang Orang 3.6000 0.00 0.00Jumlah 8,263,884.89

    F.33 1 M2 Pintu Panel

    Papan Meranti m' 0.0440 3,203,200.00 140,940.80

    Pekerja Orang 2.0000 50,000.00 100,000.00

    Mandor Orang 0.0200 0.00 0.00

    Tukang Orang 3.0000 70,000.00 210,000.00

    Kepala Tukang Orang 0.0300 0.00 0.00Jumlah 450,940.80

    F.36. A 1 M2 Pintu Kaca

    Kaca tebal 5 mm m' 1.0000 119,800.00 119,800.00

    Pekerja Orang 0.2000 50,000.00 10,000.00

    Mandor Orang 0.1000 0.00 0.00

    Tukang Orang 0.6000 70,000.00 42,000.00

    Kepala Tukang Orang 0.0600 0.00 0.00Jumlah 171,800.00

    F.36. B 1 M2 Jendela Kaca

    Kaca tebal 5 mm m2 1.0000 119,800.00 119,800.00

    Jumlah Bahan 119,800.00

    Pekerja Orang 0.2000 50,000.00 10,000.00

    Mandor Orang 0.0100 0.00 0.00

    Tukang Orang 0.6000 70,000.00 42,000.00

    Kepala Tukang Orang 0.0600 0.00 0.00

    Jumlah Upah 52,000.00

    Upah diambil 60 % 31,200.00Jumlah 151,000.00

  • 5/19/2018 RAB MESJID.xls

    30/31

    F.36. C 1 M2 Jendela Kaca

    Kaca tebal 5 mm m2 1.0000 119,800.00 119,800.00

    Kayu Meranti m3 0.0350 4,676,258.99 163,669.06

    Jumlah Bahan 283,469.06

    Pekerja Orang 0.2000 50,000.00 10,000.00

    Mandor Orang 0.0100 0.00 0.00

    Tukang Orang 0.6000 70,000.00 42,000.00

    Kepala Tukang Orang 0.0600 0.00 0.00

    Jumlah Upah 52,000.00Upah diambil 60 % 31,200.00

    Jumlah 314,669.06

    F.19 1 m2 Pasang Rangka Atap Genteng Metal

    Rangka :

    Kayu Meranti m3 0.0110 4,676,258.99 51,438.84

    Paku Biasa Kg 0.1000 12,000.00 1,200.00

    Pekerja Orang 0.0150 50,000.00 750.00

    Mandor Orang 0.0075 0.00 0.00

    Tukang Orang 0.1000 70,000.00 7,000.00

    Kepala Tukang Orang 0.0100 0.00 0.00

    Jumlah bahan /Upah 60,388.84

    Dibulatkan 41,000.00

    K23 100 m2 Mengecat

    Pekerja Orang 5.0000 50,000.00 250,000.00

    Mandor Orang 0.2500 0.00 0.00

    Tukang Orang 7.5000 70,000.00 525,000.00

    Kepala Tukang Orang 0.7500 0.00 0.00Jumlah 775,000.00

    Untuk 1 m2 7,750.00

    Upah diambil 75 % 5,812.50

    Cat Tembok

    Upah kali 3.0000 5,812.50 17,437.50

    Cat Tembok Setara Vinilex kg 0.4250 13,650.00 5,801.25Jumlah 23,238.75

    Cat Minyak

    Upah kali 2.0000 5,812.50 11,625.00

    Cat kg 0.4250 38,500.00 16,362.50Jumlah 27,987.50

    Cat Menie

    Upah kali 1.0000 5,812.50 5,812.50

    Cat kg 0.2833 33,000.00 9,348.90Jumlah 15,161.40

    Cat Residu (Colter)

    Upah kali 1.0000 5,812.50 5,812.50Cat kg 0.2833 3,300.00 934.89

    Jumlah 6,747.39

    F.37 A 1 m2 Rangka dan Plafon Gymsum

    Gypsum boar m2 1.1000 29,791.67 32,770.83

    Rangka alunium, Besi Siku, dan lain -lain Ls 1.0000 22,500.00 22,500.00

    Jumlah bahan 55,270.83

    Pekerja Orang 0.1000 50,000.00 5,000.00

    Mandor Orang 0.0100 0.00 0.00

    Tukang Orang 0.2000 70,000.00 14,000.00

    Kepala Tukang Orang 0.0800 0.00 0.00

    Jumlah Upah 19,000.00

    Jumlah 74,270.83

  • 5/19/2018 RAB MESJID.xls

    31/31

    F 21 1 m' Lisplank

    Papan Damat Laut m3 0.0045 4,869,700.00 21,913.65

    Paku kg 0.0500 19,950.00 997.50

    Jumlah Bahan 22,911.15

    Pekerja Orang 0.1120 50,000.00 5,600.00

    Mandor Orang 0.0560 0.00 0.00

    Tukang Orang 0.3200 70,000.00 22,400.00Kepala Tukang Orang 0.0320 0.00 0.00

    Jumlah Upah 28,000.00Upah diambil 80 % 22,400.00

    Jumlah 45,311.15

    Tamb .1 1 M2 Pemasangan Paving Block

    Paving Block K 175 bh 46.0000 1,600.00 73,600.00

    Pasir Urug m3 0.1200 150,000.00 18,000.00

    Jumlah Bahan 91,600.00

    Pekerja Orang 0.4000 50,000.00 20,000.00

    Mandor Orang 0.0200 0.00 0.00

    Tukang Batu Orang 0.1000 70,000.00 7,000.00

    Kepala Tukang Orang 0.0100 0.00 0.00

    Jumlah Upah 27,000.00Jumlah 118,600.00