rab fathun

82
DAFTAR HARGA BAHAN DAN UPAH No. Kode Nama Item Satuan 1 TK001 Tukang Kayu Oh 2 TK002 Tukang Cat Oh 3 TK003 Tukang Besi Oh 4 TK004 Tukang Batu Oh 5 TK005 Kepala Tukang Oh 6 TK006 Pekerja Oh 7 TK007 Mandor Oh 8 MT001 Kayu Kelas II 9 MT002 Papan Kelas II 10 MT003 Kayu Kelas III 11 MT004 Papan Kelas III 12 MT005 Papan Untuk Bowplank 13 MT006 Tripleks Lembar 14 MT007 Pasir Urug 15 MT008 Pasir Pasangan 16 MT009 Kerikil 17 MT010 Batu Kali 18 MT011 Besi Beton Kg 19 MT012 Kawat Ikat Kg 20 MT013 Semen PC Zak 21 MT014 Kapur Ayak 22 MT015 Batu Bata Buah 23 MT016 Tegel 20/20 Buah 24 MT017 Kaca 3 mm 25 MT018 Kaca 5 mm 26 MT019 Seng Gelombang (7 kaki) Lembar 27 MT020 Seng Plat Bubungan Lembar 28 MT021 Seng Plat BJLS 20 Lembar 29 MT022 Paku Kg 30 MT023 Paku Asbes Buah 31 MT024 Paku Seng Kg 32 MT025 Paku Tripleks Kg 33 MT026 Cat Meni Kg 34 MT027 Cat Kayu Kg 35 MT028 Minyak Cat Liter 36 MT029 Plamur Kg 37 MT030 Cat Tembok Kg 38 MT031 Teer Kg 39 MT032 Kunci Tanam Lengkap Buah 40 MT033 Engsel Pintu Buah m 3 m 3 m 3 m 3 m 3 m 3 m 3 m 3 m 3 m 3 m 2 m 2

Upload: sri-nurwahyuni-umar

Post on 22-Nov-2015

17 views

Category:

Documents


1 download

TRANSCRIPT

Harga Bahan & UpahDAFTAR HARGA BAHAN DAN UPAH

No.KodeNama ItemSatuan Harga SatuanHarga 8 jamLembur1TK001Tukang KayuOhRp32,500.00Rp4,062.50Rp8,125.002TK002Tukang CatOhRp32,500.00Rp4,062.50Rp8,125.003TK003Tukang BesiOhRp32,500.00Rp4,062.50Rp8,125.004TK004Tukang BatuOhRp32,500.00Rp4,062.50Rp8,125.005TK005Kepala TukangOhRp40,000.00Rp5,000.00Rp10,000.006TK006PekerjaOhRp22,500.00Rp2,812.50Rp5,625.007TK007MandorOhRp30,000.00Rp3,750.00Rp7,500.008MT001Kayu Kelas IIm3Rp1,200,000.009MT002Papan Kelas IIm3Rp1,200,000.0010MT003Kayu Kelas IIIm3Rp750,000.0011MT004Papan Kelas IIIm3Rp750,000.0012MT005Papan Untuk Bowplankm3Rp750,000.0013MT006TripleksLembarRp27,500.0014MT007Pasir Urugm3Rp40,000.0015MT008Pasir Pasanganm3Rp50,000.0016MT009Kerikilm3Rp70,000.0017MT010Batu Kalim3Rp60,000.0018MT011Besi BetonKgRp7,750.0019MT012Kawat IkatKgRp8,000.0020MT013Semen PCZakRp30,000.0021MT014Kapur Ayakm3Rp100,000.0022MT015Batu BataBuahRp220.0023MT016Tegel 20/20BuahRp3,000.0024MT017Kaca 3 mmm2Rp80,000.0025MT018Kaca 5 mmm2Rp100,000.0026MT019Seng Gelombang (7 kaki)LembarRp50,000.0027MT020Seng Plat BubunganLembarRp40,000.0028MT021Seng Plat BJLS 20LembarRp40,000.0029MT022PakuKgRp7,500.0030MT023Paku AsbesBuahRp2,000.0031MT024Paku SengKgRp7,500.0032MT025Paku Tripleks KgRp6,000.0033MT026Cat MeniKgRp10,000.0034MT027Cat KayuKgRp25,000.0035MT028Minyak CatLiterRp3,500.0036MT029PlamurKgRp15,000.0037MT030Cat TembokKgRp22,000.0038MT031TeerKgRp3,500.0039MT032Kunci Tanam LengkapBuahRp23,000.0040MT033Engsel PintuBuahRp12,500.0041MT034Engsel JendelaBuahRp12,500.0042MT035Grendel PintuBuahRp12,500.0043MT036Grendel JendelaBuahRp6,000.0044MT037Angkur/Baut/SengkangBuahRp4,500.0045MT038Kait AnginBuahRp12,500.0046MT039Kloset JongkokBuahRp100,000.0047MT040Bak AirBuahRp120,000.0048MT041Septick Tank LengkapmRp20,000.0049MT042Saluran Air BersihmRp10,000.0050MT043Saluran Air KotormRp10,000.0051MT044Titik LampuBuahRp5,000.0052MT045Stop KontakBuahRp15,000.0053MT046SaklarBuahRp10,000.0054MT047Sekring Kast LokalBuahRp15,000.0055MT048Ubin WafelBuahRp2,200.0056MT049Pasir Beton m3Rp60,000.0057MT050AmplasLembarRp2,000.0058MT051DempulKgRp10,000.0059MT052Kawat Rangm2Rp8,000.00

ASPANALISA SATUAN PEKERJAAN BANGUNAN FASILITAS UMUM & RUMAH PETUGAS

KODE ANALISASATUANURAIAN PEKERJAANHARGA SATUANJUMLAH HARGAIndeks/Koef.SatuanNama Item

A0m2Pembersihan LapanganRp682.500.029OhPekerjaRp22,500.00Rp652.500.001OhMandorRp30,000.00Rp30.00

1/3E7mPengukuran BouwplankRp17,137.500.004m3Papan Untuk BowplankRp750,000.00Rp3,000.000.005m3Kayu Kelas IIRp1,200,000.00Rp6,000.000.039KgPakuRp7,500.00Rp292.500.200OhTukang KayuRp32,500.00Rp6,500.000.004OhKepala TukangRp40,000.00Rp160.000.050OhPekerjaRp22,500.00Rp1,125.000.002OhMandorRp30,000.00Rp60.00

A.1m3Galian TanahRp17,670.000.752OhPekerjaRp22,500.00Rp16,920.000.025OhMandorRp30,000.00Rp750.00

1/2A.1m3Urugan KembaliRp6,397.500.251OhPekerjaRp22,500.00Rp5,647.500.025OhMandorRp30,000.00Rp750.00

A.18m3Urugan Pasir Bawah Lantai/Bawah PondasiRp56,797.501.200m3Pasir UrugRp40,000.00Rp48,000.000.375OhPekerjaRp22,500.00Rp8,437.500.012OhMandorRp30,000.00Rp360.00

G.2m3Pasangan Batu KosongRp108,000.001.200m3Batu KaliRp60,000.00Rp72,000.001.500OhPekerjaRp22,500.00Rp33,750.000.075OhMandorRp30,000.00Rp2,250.00

G.32.hm3Pasangan Batu KaliRp358,560.001.200m3Batu KaliRp60,000.00Rp72,000.000.522m3Pasir PasanganRp50,000.00Rp26,100.003.257ZakSemen PCRp30,000.00Rp97,710.001.500OhTukang BatuRp32,500.00Rp48,750.000.150OhKepala TukangRp40,000.00Rp6,000.004.500OhPekerjaRp22,500.00Rp101,250.000.225OhMandorRp30,000.00Rp6,750.00

G.41m3Sloof/Kolom Beton BertulangRp1,997,692.50Rp365,020.000.716m3KerikilRp70,000.00Rp50,120.000.540m3Pasir Beton Rp60,000.00Rp32,400.006.400ZakSemen PCRp30,000.00Rp192,000.001.000OhTukang BatuRp32,500.00Rp32,500.000.100OhKepala TukangRp40,000.00Rp4,000.002.000OhPekerjaRp22,500.00Rp45,000.000.300OhMandorRp30,000.00Rp9,000.00

Besi Beton :Rp1,127,850.00110.000KgBesi BetonRp7,750.00Rp852,500.002.300KgKawat IkatRp8,000.00Rp18,400.003.645OhTukang BesiRp32,500.00Rp118,462.504.535OhPekerjaRp22,500.00Rp102,037.501.215OhMandorRp30,000.00Rp36,450.00

BekistingRp504,822.500.400m3Papan Kelas IIRp1,200,000.00Rp480,000.000.250KgPakuRp7,500.00Rp1,875.000.375OhTukang KayuRp32,500.00Rp12,187.500.038OhKepala TukangRp40,000.00Rp1,520.000.400OhPekerjaRp22,500.00Rp9,000.000.008OhMandorRp30,000.00Rp240.00

D+G.27m3Pasangan TransramRp468,250.00600.000BuahBatu BataRp220.00Rp132,000.005.150ZakSemen PCRp30,000.00Rp154,500.000.380m3Pasir PasanganRp50,000.00Rp19,000.001.500OhTukang BatuRp32,500.00Rp48,750.000.150OhKepala TukangRp40,000.00Rp6,000.004.500OhPekerjaRp22,500.00Rp101,250.000.225OhMandorRp30,000.00Rp6,750.00

G.50h+G.47m2Plesteran TransramRp22,440.000.163ZakSemen PCRp30,000.00Rp4,890.000.013m3Pasir PasanganRp50,000.00Rp650.000.200OhTukang BatuRp32,500.00Rp6,500.000.020OhKepala TukangRp40,000.00Rp800.000.400OhPekerjaRp22,500.00Rp9,000.000.020OhMandorRp30,000.00Rp600.00

G.33+G.27m3Pasangan Dinding Batu BataRp334,700.00600.000BuahBatu BataRp220.00Rp132,000.002.530ZakSemen PCRp30,000.00Rp75,900.000.406m3Pasir PasanganRp50,000.00Rp20,300.001.500OhTukang BatuRp32,500.00Rp48,750.000.150OhKepala TukangRp40,000.00Rp6,000.002.000OhPekerjaRp22,500.00Rp45,000.000.225OhMandorRp30,000.00Rp6,750.00

G.50q+G.47m2Plesteran Dinding Batu BataRp21,850.000.130ZakSemen PCRp30,000.00Rp3,900.000.021m3Pasir PasanganRp50,000.00Rp1,050.000.200OhTukang BatuRp32,500.00Rp6,500.000.020OhKepala TukangRp40,000.00Rp800.000.400OhPekerjaRp22,500.00Rp9,000.000.020OhMandorRp30,000.00Rp600.00

G.69am2Lantai TegelRp99,925.0025.000BuahTegel 20/20Rp3,000.00Rp75,000.000.016m3Kapur AyakRp100,000.00Rp1,600.000.032m3Pasir PasanganRp50,000.00Rp1,600.000.020ZakSemen PCRp30,000.00Rp600.000.250OhTukang BatuRp32,500.00Rp8,125.000.025OhKepala TukangRp40,000.00Rp1,000.000.500OhPekerjaRp22,500.00Rp11,250.000.025OhMandorRp30,000.00Rp750.00

F.27m3Kusen Pintu/JendelaRp2,521,500.001.100m3Kayu Kelas IIRp1,200,000.00Rp1,320,000.0027.000OhTukang KayuRp32,500.00Rp877,500.009.000OhPekerjaRp22,500.00Rp202,500.002.700OhKepala TukangRp40,000.00Rp108,000.000.450OhMandorRp30,000.00Rp13,500.00

F.22m3Kap Kuda-KudaRp2,121,000.001.100m3Kayu Kelas IIRp1,200,000.00Rp1,320,000.0018.000OhTukang KayuRp32,500.00Rp585,000.001.800OhKepala TukangRp40,000.00Rp72,000.006.000OhPekerjaRp22,500.00Rp135,000.000.300OhMandorRp30,000.00Rp9,000.00

F.1a+F.37m2Plafond TripleksRp60,845.000.350LembarTripleksRp27,500.00Rp9,625.000.150KgPaku Tripleks Rp6,000.00Rp900.000.012m3Kayu Kelas IIRp1,200,000.00Rp14,400.000.800OhTukang KayuRp32,500.00Rp26,000.000.080OhKepala TukangRp40,000.00Rp3,200.000.280OhPekerjaRp22,500.00Rp6,300.000.014OhMandorRp30,000.00Rp420.00

F.36.am2Pintu Dobel TripleksRp197,615.000.700LembarTripleksRp27,500.00Rp19,250.000.035m3Kayu Kelas IIRp1,200,000.00Rp42,000.000.150KgPakuRp7,500.00Rp1,125.000.040KgPaku Tripleks Rp6,000.00Rp240.003.000OhTukang KayuRp32,500.00Rp97,500.000.300OhKepala TukangRp40,000.00Rp12,000.001.000OhPekerjaRp22,500.00Rp22,500.000.100OhMandorRp30,000.00Rp3,000.00

G.69bm2Tegel Ubin WafelRp68,925.0020.000BuahUbin WafelRp2,200.00Rp44,000.000.016m3Kapur AyakRp100,000.00Rp1,600.000.032m3Pasir PasanganRp50,000.00Rp1,600.000.020ZakSemen PCRp30,000.00Rp600.000.250OhTukang BatuRp32,500.00Rp8,125.000.025OhKepala TukangRp40,000.00Rp1,000.000.500OhPekerjaRp22,500.00Rp11,250.000.025OhMandorRp30,000.00Rp750.00

F.36.bm2Pintu Dobel Tripleks Lapis SengRp225,615.000.700LembarTripleksRp27,500.00Rp19,250.000.035m3Kayu Kelas IIRp1,200,000.00Rp42,000.001.000LembarSeng Plat BJLS 20Rp40,000.00Rp40,000.000.150KgPakuRp7,500.00Rp1,125.000.040KgPaku Tripleks Rp6,000.00Rp240.003.000OhTukang KayuRp32,500.00Rp97,500.001.000OhPekerjaRp22,500.00Rp22,500.000.100OhMandorRp30,000.00Rp3,000.00

F.36.c(1)m2Jendela Kaca Rangka Kayu (Kaca Mati)Rp257,000.001.000m2Kaca 3 mmRp80,000.00Rp80,000.000.035m3Papan Kelas IIRp1,200,000.00Rp42,000.003.000OhTukang KayuRp32,500.00Rp97,500.000.300OhKepala TukangRp40,000.00Rp12,000.001.000OhPekerjaRp22,500.00Rp22,500.000.100OhMandorRp30,000.00Rp3,000.00

H.8.am2Atap Seng GelombangRp50,000.000.780LembarSeng Gelombang (7 kaki)Rp50,000.00Rp39,000.000.100KgPaku SengRp7,500.00Rp750.000.200OhTukang KayuRp32,500.00Rp6,500.000.100OhPekerjaRp22,500.00Rp2,250.000.050OhMandorRp30,000.00Rp1,500.00

H.10.a10 mBubungan Seng PlatRp116,250.002.500LembarSeng Plat BubunganRp40,000.00Rp100,000.000.200KgPaku SengRp7,500.00Rp1,500.000.250OhTukang KayuRp32,500.00Rp8,125.000.025OhKepala TukangRp40,000.00Rp1,000.000.250OhPekerjaRp22,500.00Rp5,625.00

H.1710 mPekerjaan TalangRp454,250.002.500LembarSeng Plat BJLS 20Rp40,000.00Rp100,000.000.080m3Papan Kelas IIRp1,200,000.00Rp96,000.000.500KgPakuRp7,500.00Rp3,750.005.000OhTukang KayuRp32,500.00Rp162,500.000.500OhKepala TukangRp40,000.00Rp20,000.003.000OhPekerjaRp22,500.00Rp67,500.000.150OhMandorRp30,000.00Rp4,500.00

F.21m2List PlankRp76,270.000.033m3Papan Kelas IIRp1,200,000.00Rp39,600.000.100KgPakuRp7,500.00Rp750.000.800OhTukang KayuRp32,500.00Rp26,000.000.080OhKepala TukangRp40,000.00Rp3,200.000.280OhPekerjaRp22,500.00Rp6,300.000.014OhMandorRp30,000.00Rp420.00

K.23+K.30m2Pengecatan Kosen dan List PlankRp23,465.000.350KgCat KayuRp25,000.00Rp8,750.000.350LiterMinyak CatRp3,500.00Rp1,225.000.110KgPlamurRp15,000.00Rp1,650.000.075KgDempulRp10,000.00Rp750.000.100LembarAmplasRp2,000.00Rp200.000.180OhTukang CatRp32,500.00Rp5,850.000.018OhKepala TukangRp40,000.00Rp720.000.180OhPekerjaRp22,500.00Rp4,050.000.009OhMandorRp30,000.00Rp270.00

K.23+K.30 (1)m2Pengecatan Dinding/PlafondRp20,440.000.350KgCat TembokRp22,000.00Rp7,700.000.110KgPlamurRp15,000.00Rp1,650.000.100LembarAmplasRp2,000.00Rp200.000.180OhTukang CatRp32,500.00Rp5,850.000.018OhKepala TukangRp40,000.00Rp720.000.180OhPekerjaRp22,500.00Rp4,050.000.009OhMandorRp30,000.00Rp270.00

K.35m2Pengetaran/ResiduRp4,975.000.350KgTeerRp3,500.00Rp1,225.000.100OhPekerjaRp22,500.00Rp2,250.000.050OhMandorRp30,000.00Rp1,500.00

G.41 Am3Lantai Beton TumbukRp426,500.001.000m3KerikilRp70,000.00Rp70,000.001.000m3Pasir PasanganRp50,000.00Rp50,000.004.200ZakSemen PCRp30,000.00Rp126,000.001.000OhTukang BatuRp32,500.00Rp32,500.000.100OhKepala TukangRp40,000.00Rp4,000.006.000OhPekerjaRp22,500.00Rp135,000.000.300OhMandorRp30,000.00Rp9,000.00

F.36c (2)m2Jendela Kaca Rangka Kayu Rp35,725.001.000m2Kawat RangRp8,000.00Rp8,000.000.008m3Papan Kelas IIRp1,200,000.00Rp9,600.000.300OhTukang KayuRp32,500.00Rp9,750.000.050OhKepala TukangRp40,000.00Rp2,000.000.250OhPekerjaRp22,500.00Rp5,625.000.025OhMandorRp30,000.00Rp750.00

RABRENCANA ANGGARAN BIAYA (RAB)BANGUNAN FASILITAS UMUM & RUMAH PETUGAS

NO.NAMA KEGIATANKODE ANALISASATUANVOLUMEHSPJUMLAH BIAYAI.PEKERJAAN PERSIAPANRp2,585,130.00Pembuatan Direksi KeetLsLs1.00Rp1,500,000.00Rp1,500,000.00A0m2Pembersihan LapanganA0m2234.00Rp682.50Rp159,705.001/3E7mPengukuran Bouwplank1/3E7m54.00Rp17,137.50Rp925,425.00

II.PEKERJAAN TANAHRp1,691,203.43Galian TanahA.1m341.50Rp17,670.00Rp733,305.00Urugan Kembali1/2A.1m337.60Rp6,397.50Rp240,546.00Urugan Pasir Bawah Lantai/Bawah PondasiA.18m312.63Rp56,797.50Rp717,352.43

III.PEKERJAAN BATU/BETONRp32,475,913.40Pasangan Batu KosongG.2m36.22Rp108,000.00Rp671,760.00Pasangan Batu KaliG.32.hm315.20Rp358,560.00Rp5,450,112.00Sloof/Kolom Beton BertulangG.41m33.28Rp1,997,692.50Rp6,552,431.40Pasangan TransramD+G.27m32.40Rp468,250.00Rp1,123,800.00Plesteran TransramG.50h+G.47m234.00Rp22,440.00Rp762,960.00Pasangan Dinding Batu BataG.33+G.27m36.60Rp334,700.00Rp2,209,020.00Plesteran Dinding Batu BataG.50q+G.47m2110.00Rp21,850.00Rp2,403,500.00Lantai TegelG.69am2118.00Rp99,925.00Rp11,791,150.00Tegel Ubin WafelG.69bm22.00Rp68,925.00Rp137,850.00Lantai Beton TumbukG.41 Am33.22Rp426,500.00Rp1,373,330.00

IV.PEKERJAAN KAYURp31,444,942.50Kolom KayuF.22m31.50Rp2,121,000.00Rp3,181,500.00Kusen Pintu/JendelaF.27m30.67Rp2,521,500.00Rp1,689,405.00Kap Kuda-KudaF.22m33.78Rp2,121,000.00Rp8,017,380.00Jendela Kaca Rangka Kayu (Kaca Mati)F.36.c(1)m21.13Rp257,000.00Rp290,410.00Plafond TripleksF.1a+F.37m2240.00Rp60,845.00Rp14,602,800.00Pintu Dobel TripleksF.36.am23.30Rp197,615.00Rp652,129.50Pintu Dobel Tripleks Lapis SengF.36.bm23.40Rp225,615.00Rp767,091.00Jendela Kaca Rangka Kayu F.36c (2)m22.12Rp35,725.00Rp75,737.00Pagar Jalusi, Papan dan AsesorisF.27m20.86Rp2,521,500.00Rp2,168,490.00

V.PEKERJAAN ATAPRp39,469,700.00Atap Seng GelombangH.8.am2238.80Rp50,000.00Rp11,940,000.00Bubungan Seng PlatH.10.a10 m46.60Rp116,250.00Rp5,417,250.00Pekerjaan TalangH.1710 m47.00Rp454,250.00Rp21,349,750.00List PlankF.21m210.00Rp76,270.00Rp762,700.00

VI.PEKERJAAN KUNCI/PENGGANTUNGRp545,000.00Kunci Tanam LengkapBuah4Rp23,000.00Rp92,000.00Engsel PintuBuah8Rp12,500.00Rp100,000.00Engsel JendelaBuah4Rp12,500.00Rp50,000.00Grendel PintuBuah4Rp12,500.00Rp50,000.00Grendel JendelaBuah2Rp6,000.00Rp12,000.00Angkur/Baut/SengkangBuah48Rp4,500.00Rp216,000.00Kait AnginBuah2Rp12,500.00Rp25,000.00

VII.PEKERJAAN SANITAIRRp810,000.00Kloset JongkokBuah2Rp100,000.00Rp200,000.00Bak AirBuah2Rp120,000.00Rp240,000.00Septick Tank Lengkapm1Rp20,000.00Rp20,000.00Saluran Air Bersihm20Rp10,000.00Rp200,000.00Saluran Air Kotorm15Rp10,000.00Rp150,000.00

VIII.PEKERJAAN PENGECATANRp10,595,260.00Pengecatan Dinding/PlafondK.23+K.30 (1)m2329.00Rp20,440.00Rp6,724,760.00Pengecatan Kosen dan List PlankK.23+K.30m2120.00Rp23,465.00Rp2,815,800.00Pengetaran/ResiduK.35m2212.00Rp4,975.00Rp1,054,700.00

IX.PEKERJAAN LISTRIKRp160,000.00Titik LampuBuah12Rp5,000.00Rp60,000.00Stop KontakBuah3Rp15,000.00Rp45,000.00SaklarBuah4Rp10,000.00Rp40,000.00Sekring Kast LokalBuah1Rp15,000.00Rp15,000.00

REKAPITULASI :I.PEKERJAAN PERSIAPANRp2,585,130.00II.PEKERJAAN TANAHRp1,691,203.43III.PEKERJAAN BATU/BETONRp32,475,913.40IV.PEKERJAAN KAYURp31,444,942.50V.PEKERJAAN ATAPRp39,469,700.00VI.PEKERJAAN KUNCI/PENGGANTUNGRp545,000.00VII.PEKERJAAN SANITAIRRp810,000.00VIII.PEKERJAAN PENGECATANRp10,595,260.00IX.PEKERJAAN LISTRIKRp160,000.00JUMLAH (I+II+III+IV+V+VI+VII+VIII+IX)Rp119,777,149.33PPN 10 %Rp11,977,714.93TOTAL (JUMLAH + PPN)Rp131,754,864.26DIBULATKANRp131,755,000.00Terbilang :Seratus Tiga Puluh Satu Juta Tujuh Ratus Lima Puluh Lima Ribu RupiahRp119,788,165Rp(11,015.7)

Tabel LogikaDAFTAR LOGIKA KETERGANTUNGANRENCANA ANGGARAN BIAYA (RAB)BANGUNAN FASILITAS UMUM & RUMAH PETUGAS

NO.URAIAN PEKERJAANDURASI (HARI)PREDECESSORSUCCESSORAPembersihan Lapangan1-B,CBPembuatan Direksi Keet3AD,JCPengukuran Bouwplank2AD,J,ODGalian Tanah5B,CEEPasangan Batu Kosong Bawah Pondasi3DFFPasangan Pondasi Batu Kali4EG,HGPembuatan Sloof dan Kolom Beton Bertulang28FK,LHUrugan Tanah Bawah Lantai & Urugan Pondasi2FIIUrugan Pasir Bawah Lantai & Urugan Pondasi2HNJPembuatan Kolom Kayu2B,CP,QKPasangan Transram Batu Bata3GMLPasangan Dinding Batu Bata7GMMPembuatan dan Pemasangan Kusen Pintu & Jendela5K,LWNLantai Beton Tumbuk3ISOPekerjaan Kuda-kuda dan Gording4CP,QPPekerjaan Pintu Dobel Tripleks1J,OSQPekerjaan Jendela Kaca1J,ORRPekerjaan Kunci/Penggantung3QSSPekerjaan Plesteran2N,P,QTTPekerjaan Atap5SUUPekerjaan Sanitair2TVVPekerjaan Lantai Tegel dan Ubin Wafel6UXWPekerjaan Listrik4M-XPekerjaan Plafond2VYYPagar Jalusi, Papan Assesories3XZZPekerjaan Pengecatan 2Y-

Dengan Catatan :1. Pekerjaan galian tanah dapat dilakukan dua hari sebelum selesainya pekerjaan direksi keet dan 1 hari sebelum selesainya pengukuran bouwplank2. Pekerjaan pasangan dinding batu bata dapat diselesaikan bersamaan dengan pembuatan dan pemasangan kusen pintu dan jendela.

CPMCRITICAL PATH METHOD (CPM)PROYEK PEMBANGUNAN FASILITAS UMUM & RUMAH PETUGASK2151M2256W3515564G19442844E812F916L2051312416751D79H1018I1120N1223S1325T1430U1532V1638X1740Y1843Z236059233235338240545247653255358260B4434P1

J57234

10A21Q68R011O41353C3324KETERANGAN :: Jalur Normal: Dummy: Jalur KritisiEstxjEftLstDLfti, j=Peristiwa i, jx=Nama KegiatanD=DurasiEST=Earliest Start TimeLST=Latest Start TimeEFT=Earliest Finish TimeLFT=Latest Finish Time

FLOATTABEL FLOAT TIME ANALYSISBANGUNAN FASILITAS UMUM & RUMAH PETUGAS

NO.URAIAN PEKERJAANDURASI (HARI)AKTIFITASEARLIESTLATESTFLOATKETERANGANPREDECESSORSUCCESSORESEFLSLFFFTFAPembersihan Lapangan1-B,C010100KRITISBPembuatan Direksi Keet3AD,J141400KRITISCPengukuran Bouwplank2AD,J,O131401NON KRITISDGalian Tanah5B,CE494900KRITISEPasangan Batu Kosong Bawah Pondasi3DF91291200KRITISFPasangan Pondasi Batu Kali4EG,H1216121600KRITISGPembuatan Sloof dan Kolom Beton Bertulang28FK,L1644164400KRITISHUrugan Tanah Bawah Lantai & Urugan Pondasi2FI16181633015NON KRITISIUrugan Pasir Bawah Lantai & Urugan Pondasi2HN18203335015NON KRITISJPembuatan Kolom Kayu2B,CP,Q47434128NON KRITISKPasangan Transram Batu Bata3GM4451445144NON KRITISLPasangan Dinding Batu Bata7GM4451445100KRITISMPembuatan dan Pemasangan Kusen Pintu & Jendela5K,LW5156515600KRITISNLantai Beton Tumbuk3IS20233538015NON KRITISOPekerjaan Kuda-kuda dan Gording4CP,Q37434027NON KRITISPPekerjaan Pintu Dobel Tripleks1J,OS72334381530NON KRITISQPekerjaan Jendela Kaca1J,OR783435027NON KRITISRPekerjaan Kunci/Penggantung3QS82335381227NON KRITISSPekerjaan Plesteran2N,P,QT23253840015NON KRITISTPekerjaan Atap5SU25304045015NON KRITISUPekerjaan Sanitair2TV30324547015NON KRITISVPekerjaan Lantai Tegel dan Ubin Wafel6UX32384753015NON KRITISWPekerjaan Listrik4M-5660566000KRITISXPekerjaan Plafond2VY38405355015NON KRITISYPagar Jalusi, Papan Assesories3XZ40435558015NON KRITISZPekerjaan Pengecatan 2Y-436058601515NON KRITIS

Dengan Catatan :1. Pekerjaan galian tanah dapat dilakukan dua hari sebelum selesainya pekerjaan direksi keet dan 1 hari sebelum selesainya pengukuran bouwplank2. Pekerjaan pasangan dinding batu bata dapat diselesaikan bersamaan dengan pembuatan dan pemasangan kusen pintu dan jendela.Lama Waktu Pekerjaan =60 Hari

AKSDANALISA KEBUTUHAN SUMBER DAYABANGUNAN FASILITAS UMUM & RUMAH PETUGAS

KODE ANALISASATUANURAIAN PEKERJAANHARGA SATUANJUMLAH HARGAVOLUMEDURASI (HARI)KEBUTUHAN SUMBER DAYAKONTROL TENAGA KERJAKONTROL BIAYAIndeks/Koef.SatuanNama Item

A0m2Pembersihan LapanganRp682.50234.001Rp159,705.00Rp159,705.000.029OhPekerjaRp22,500.00Rp652.506.7954.288Rp152,685.000.001OhMandorRp30,000.00Rp30.000.231.872Rp7,020.00

1/3E7mPengukuran BouwplankRp17,137.5054.002Rp925,425.00Rp925,425.000.004m3Papan Untuk BowplankRp750,000.00Rp3,000.000.22Rp162,000.000.005m3Kayu Kelas IIRp1,200,000.00Rp6,000.000.27Rp324,000.000.039KgPakuRp7,500.00Rp292.502.11Rp15,795.000.200OhTukang KayuRp32,500.00Rp6,500.005.4086.4Rp351,000.000.004OhKepala TukangRp40,000.00Rp160.000.111.728Rp8,640.000.050OhPekerjaRp22,500.00Rp1,125.001.3521.6Rp60,750.000.002OhMandorRp30,000.00Rp60.000.050.864Rp3,240.00

A.1m3Galian TanahRp17,670.0041.505Rp733,305.00Rp733,305.000.752OhPekerjaRp22,500.00Rp16,920.006.24249.664Rp702,180.000.025OhMandorRp30,000.00Rp750.000.218.3Rp31,125.00

1/2A.1m3Urugan KembaliRp6,397.5037.602Rp240,546.00Rp240,546.000.251OhPekerjaRp22,500.00Rp5,647.504.7275.5008Rp212,346.000.025OhMandorRp30,000.00Rp750.000.477.52Rp28,200.00

A.18m3Urugan Pasir Bawah Lantai/Bawah PondasiRp56,797.5012.632Rp717,352.43Rp717,352.431.200m3Pasir UrugRp40,000.00Rp48,000.0015.16Rp606,240.000.375OhPekerjaRp22,500.00Rp8,437.502.3737.89Rp106,565.630.012OhMandorRp30,000.00Rp360.000.081.21248Rp4,546.80

G.2m3Pasangan Batu KosongRp108,000.006.223Rp671,760.00Rp671,760.001.200m3Batu KaliRp60,000.00Rp72,000.007.46Rp447,840.001.500OhPekerjaRp22,500.00Rp33,750.003.1174.64Rp209,925.000.075OhMandorRp30,000.00Rp2,250.000.163.732Rp13,995.00

G.32.hm3Pasangan Batu KaliRp358,560.0015.204Rp5,450,112.00Rp5,450,112.001.200m3Batu KaliRp60,000.00Rp72,000.0018.24Rp1,094,400.000.522m3Pasir PasanganRp50,000.00Rp26,100.007.93Rp396,720.003.257ZakSemen PCRp30,000.00Rp97,710.0049.51Rp1,485,192.001.500OhTukang BatuRp32,500.00Rp48,750.005.70182.4Rp741,000.000.150OhKepala TukangRp40,000.00Rp6,000.000.5718.24Rp91,200.004.500OhPekerjaRp22,500.00Rp101,250.0017.10547.2Rp1,539,000.000.225OhMandorRp30,000.00Rp6,750.000.8627.36Rp102,600.00

G.41m3Sloof/Kolom Beton BertulangRp1,997,692.503.2828Rp6,552,431.40Rp6,552,431.40Rp365,020.00Rp1,197,265.60Rp1,197,265.600.716m3KerikilRp70,000.00Rp50,120.002.35Rp164,393.600.540m3Pasir Beton Rp60,000.00Rp32,400.001.77Rp106,272.006.400ZakSemen PCRp30,000.00Rp192,000.0020.99Rp629,760.001.000OhTukang BatuRp32,500.00Rp32,500.000.1226.24Rp106,600.000.100OhKepala TukangRp40,000.00Rp4,000.000.012.624Rp13,120.002.000OhPekerjaRp22,500.00Rp45,000.000.2352.48Rp147,600.000.300OhMandorRp30,000.00Rp9,000.000.047.872Rp29,520.00

Besi Beton :Rp1,127,850.00Rp3,699,348.00Rp3,699,348.00110.000KgBesi BetonRp7,750.00Rp852,500.00360.80Rp2,796,200.002.300KgKawat IkatRp8,000.00Rp18,400.007.54Rp60,352.003.645OhTukang BesiRp32,500.00Rp118,462.500.4395.64Rp388,557.004.535OhPekerjaRp22,500.00Rp102,037.500.53119.00Rp334,683.001.215OhMandorRp30,000.00Rp36,450.000.1431.88Rp119,556.00

BekistingRp504,822.50Rp1,655,817.80Rp1,655,817.800.400m3Papan Kelas IIRp1,200,000.00Rp480,000.001.31Rp1,574,400.000.250KgPakuRp7,500.00Rp1,875.000.82Rp6,150.000.375OhTukang KayuRp32,500.00Rp12,187.500.049.84Rp39,975.000.038OhKepala TukangRp40,000.00Rp1,520.000.001.00Rp4,985.600.400OhPekerjaRp22,500.00Rp9,000.000.0510.50Rp29,520.000.008OhMandorRp30,000.00Rp240.000.000.21Rp787.20

D+G.27m3Pasangan TransramRp468,250.002.403Rp1,123,800.00Rp1,123,800.00600.000BuahBatu BataRp220.00Rp132,000.001440.00Rp316,800.005.150ZakSemen PCRp30,000.00Rp154,500.0012.36Rp370,800.000.380m3Pasir PasanganRp50,000.00Rp19,000.000.91Rp45,600.001.500OhTukang BatuRp32,500.00Rp48,750.001.2028.80Rp117,000.000.150OhKepala TukangRp40,000.00Rp6,000.000.122.88Rp14,400.004.500OhPekerjaRp22,500.00Rp101,250.003.6086.40Rp243,000.000.225OhMandorRp30,000.00Rp6,750.000.184.32Rp16,200.00

G.50h+G.47m2Plesteran TransramRp22,440.0034.002Rp762,960.00Rp762,960.000.163ZakSemen PCRp30,000.00Rp4,890.005.54Rp166,260.000.013m3Pasir PasanganRp50,000.00Rp650.000.44Rp22,100.000.200OhTukang BatuRp32,500.00Rp6,500.003.4054.40Rp221,000.000.020OhKepala TukangRp40,000.00Rp800.000.345.44Rp27,200.000.400OhPekerjaRp22,500.00Rp9,000.006.80108.80Rp306,000.000.020OhMandorRp30,000.00Rp600.000.345.44Rp20,400.00

G.33+G.27m3Pasangan Dinding Batu BataRp334,700.006.607Rp2,209,020.00Rp2,209,020.00600.000BuahBatu BataRp220.00Rp132,000.003960.00Rp871,200.002.530ZakSemen PCRp30,000.00Rp75,900.0016.70Rp500,940.000.406m3Pasir PasanganRp50,000.00Rp20,300.002.68Rp133,980.001.500OhTukang BatuRp32,500.00Rp48,750.001.4179.20Rp321,750.000.150OhKepala TukangRp40,000.00Rp6,000.000.147.92Rp39,600.002.000OhPekerjaRp22,500.00Rp45,000.001.89105.60Rp297,000.000.225OhMandorRp30,000.00Rp6,750.000.2111.88Rp44,550.00

G.50q+G.47m2Plesteran Dinding Batu BataRp21,850.00110.002Rp2,403,500.00Rp2,403,500.000.130ZakSemen PCRp30,000.00Rp3,900.0014.30Rp429,000.000.021m3Pasir PasanganRp50,000.00Rp1,050.002.31Rp115,500.000.200OhTukang BatuRp32,500.00Rp6,500.0011.00176.00Rp715,000.000.020OhKepala TukangRp40,000.00Rp800.001.1017.60Rp88,000.000.400OhPekerjaRp22,500.00Rp9,000.0022.00352.00Rp990,000.000.020OhMandorRp30,000.00Rp600.001.1017.60Rp66,000.00

G.69am2Lantai TegelRp99,925.00118.006Rp11,791,150.00Rp11,791,150.00Rp3,166,460.0025.000BuahTegel 20/20Rp3,000.00Rp75,000.002950.00Rp8,850,000.000.016m3Kapur AyakRp100,000.00Rp1,600.001.89Rp188,800.000.032m3Pasir PasanganRp50,000.00Rp1,600.003.78Rp188,800.000.020ZakSemen PCRp30,000.00Rp600.002.36Rp70,800.000.250OhTukang BatuRp32,500.00Rp8,125.004.92236.00Rp958,750.000.025OhKepala TukangRp40,000.00Rp1,000.000.4923.60Rp118,000.000.500OhPekerjaRp22,500.00Rp11,250.009.83472.00Rp1,327,500.000.025OhMandorRp30,000.00Rp750.000.4923.60Rp88,500.00

F.27m3Kusen Pintu/JendelaRp2,521,500.000.675Rp1,689,405.00Rp1,689,405.001.100m3Kayu Kelas IIRp1,200,000.00Rp1,320,000.000.74Rp884,400.0027.000OhTukang KayuRp32,500.00Rp877,500.003.62144.72Rp587,925.009.000OhPekerjaRp22,500.00Rp202,500.001.2148.24Rp135,675.002.700OhKepala TukangRp40,000.00Rp108,000.000.3614.47Rp72,360.000.450OhMandorRp30,000.00Rp13,500.000.062.41Rp9,045.00

F.22m3Kap Kuda-KudaRp2,121,000.003.784Rp8,017,380.00Rp8,017,380.001.100m3Kayu Kelas IIRp1,200,000.00Rp1,320,000.004.16Rp4,989,600.0018.000OhTukang KayuRp32,500.00Rp585,000.0017.01544.32Rp2,211,300.001.800OhKepala TukangRp40,000.00Rp72,000.001.7054.43Rp272,160.006.000OhPekerjaRp22,500.00Rp135,000.005.67181.44Rp510,300.000.300OhMandorRp30,000.00Rp9,000.000.289.07Rp34,020.00

F.1a+F.37m2Plafond TripleksRp60,845.00240.002Rp14,602,800.00Rp14,602,800.000.350LembarTripleksRp27,500.00Rp9,625.0084.00Rp2,310,000.000.150KgPaku Tripleks Rp6,000.00Rp900.0036.00Rp216,000.000.012m3Kayu Kelas IIRp1,200,000.00Rp14,400.002.88Rp3,456,000.000.800OhTukang KayuRp32,500.00Rp26,000.0096.001536.00Rp6,240,000.000.080OhKepala TukangRp40,000.00Rp3,200.009.60153.60Rp768,000.000.280OhPekerjaRp22,500.00Rp6,300.0033.60537.60Rp1,512,000.000.014OhMandorRp30,000.00Rp420.001.6826.88Rp100,800.00

F.36.am2Pintu Dobel TripleksRp197,615.003.301Rp652,129.50Rp652,129.500.700LembarTripleksRp27,500.00Rp19,250.002.31Rp63,525.000.035m3Kayu Kelas IIRp1,200,000.00Rp42,000.000.12Rp138,600.000.150KgPakuRp7,500.00Rp1,125.000.50Rp3,712.500.040KgPaku Tripleks Rp6,000.00Rp240.000.13Rp792.003.000OhTukang KayuRp32,500.00Rp97,500.009.9079.20Rp321,750.000.300OhKepala TukangRp40,000.00Rp12,000.000.997.92Rp39,600.001.000OhPekerjaRp22,500.00Rp22,500.003.3026.40Rp74,250.000.100OhMandorRp30,000.00Rp3,000.000.332.64Rp9,900.00

G.69bm2Tegel Ubin WafelRp68,925.002.006Rp137,850.00Rp137,850.0020.000BuahUbin WafelRp2,200.00Rp44,000.0040.00Rp88,000.000.016m3Kapur AyakRp100,000.00Rp1,600.000.03Rp3,200.000.032m3Pasir PasanganRp50,000.00Rp1,600.000.06Rp3,200.000.020ZakSemen PCRp30,000.00Rp600.000.04Rp1,200.000.250OhTukang BatuRp32,500.00Rp8,125.000.084.00Rp16,250.000.025OhKepala TukangRp40,000.00Rp1,000.000.010.40Rp2,000.000.500OhPekerjaRp22,500.00Rp11,250.000.178.00Rp22,500.000.025OhMandorRp30,000.00Rp750.000.010.40Rp1,500.00

F.36.bm2Pintu Dobel Tripleks Lapis SengRp225,615.003.401Rp767,091.00Rp767,091.000.700LembarTripleksRp27,500.00Rp19,250.002.38Rp65,450.000.035m3Kayu Kelas IIRp1,200,000.00Rp42,000.000.12Rp142,800.001.000LembarSeng Plat BJLS 20Rp40,000.00Rp40,000.003.40Rp136,000.000.150KgPakuRp7,500.00Rp1,125.000.51Rp3,825.000.040KgPaku Tripleks Rp6,000.00Rp240.000.14Rp816.003.000OhTukang KayuRp32,500.00Rp97,500.0010.2081.60Rp331,500.001.000OhPekerjaRp22,500.00Rp22,500.003.4027.20Rp76,500.000.100OhMandorRp30,000.00Rp3,000.000.342.72Rp10,200.00

F.36.c(1)m2Jendela Kaca Rangka Kayu (Kaca Mati)Rp257,000.001.131Rp290,410.00Rp290,410.001.000m2Kaca 3 mmRp80,000.00Rp80,000.001.13Rp90,400.000.035m3Papan Kelas IIRp1,200,000.00Rp42,000.000.04Rp47,460.003.000OhTukang KayuRp32,500.00Rp97,500.003.3927.12Rp110,175.000.300OhKepala TukangRp40,000.00Rp12,000.000.342.71Rp13,560.001.000OhPekerjaRp22,500.00Rp22,500.001.139.04Rp25,425.000.100OhMandorRp30,000.00Rp3,000.000.110.90Rp3,390.00

H.8.am2Atap Seng GelombangRp50,000.00238.805Rp11,940,000.00Rp11,940,000.000.780LembarSeng Gelombang (7 kaki)Rp50,000.00Rp39,000.00186.26Rp9,313,200.000.100KgPaku SengRp7,500.00Rp750.0023.88Rp179,100.000.200OhTukang KayuRp32,500.00Rp6,500.009.55382.08Rp1,552,200.000.100OhPekerjaRp22,500.00Rp2,250.004.78191.04Rp537,300.000.050OhMandorRp30,000.00Rp1,500.002.3995.52Rp358,200.00

H.10.a10 mBubungan Seng PlatRp116,250.0046.605Rp5,417,250.00Rp5,417,250.002.500LembarSeng Plat BubunganRp40,000.00Rp100,000.00116.50Rp4,660,000.000.200KgPaku SengRp7,500.00Rp1,500.009.32Rp69,900.000.250OhTukang KayuRp32,500.00Rp8,125.002.3393.20Rp378,625.000.025OhKepala TukangRp40,000.00Rp1,000.000.239.32Rp46,600.000.250OhPekerjaRp22,500.00Rp5,625.002.3393.20Rp262,125.00

H.1710 mPekerjaan TalangRp454,250.0047.005Rp21,349,750.00Rp21,349,750.002.500LembarSeng Plat BJLS 20Rp40,000.00Rp100,000.00117.50Rp4,700,000.000.080m3Papan Kelas IIRp1,200,000.00Rp96,000.003.76Rp4,512,000.000.500KgPakuRp7,500.00Rp3,750.0023.50Rp176,250.005.000OhTukang KayuRp32,500.00Rp162,500.0047.001880.00Rp7,637,500.000.500OhKepala TukangRp40,000.00Rp20,000.004.70188.00Rp940,000.003.000OhPekerjaRp22,500.00Rp67,500.0028.201128.00Rp3,172,500.000.150OhMandorRp30,000.00Rp4,500.001.4156.40Rp211,500.00

F.21m2List PlankRp76,270.0010.005Rp762,700.00Rp762,700.000.033m3Papan Kelas IIRp1,200,000.00Rp39,600.000.33Rp396,000.000.100KgPakuRp7,500.00Rp750.001.00Rp7,500.000.800OhTukang KayuRp32,500.00Rp26,000.001.6064.00Rp260,000.000.080OhKepala TukangRp40,000.00Rp3,200.000.166.40Rp32,000.000.280OhPekerjaRp22,500.00Rp6,300.000.5622.40Rp63,000.000.014OhMandorRp30,000.00Rp420.000.031.12Rp4,200.00

K.23+K.30m2Pengecatan Kosen dan List PlankRp23,465.00120.002Rp2,815,800.00Rp2,815,800.000.350KgCat KayuRp25,000.00Rp8,750.0042.00Rp1,050,000.000.350LiterMinyak CatRp3,500.00Rp1,225.0042.00Rp147,000.000.110KgPlamurRp15,000.00Rp1,650.0013.20Rp198,000.000.075KgDempulRp10,000.00Rp750.009.00Rp90,000.000.100LembarAmplasRp2,000.00Rp200.0012.00Rp24,000.000.180OhTukang CatRp32,500.00Rp5,850.0010.80172.80Rp702,000.000.018OhKepala TukangRp40,000.00Rp720.001.0817.28Rp86,400.000.180OhPekerjaRp22,500.00Rp4,050.0010.80172.80Rp486,000.000.009OhMandorRp30,000.00Rp270.000.548.64Rp32,400.00

K.23+K.30 (1)m2Pengecatan Dinding/PlafondRp20,440.00329.002Rp6,724,760.00Rp6,724,760.000.350KgCat TembokRp22,000.00Rp7,700.00115.15Rp2,533,300.000.110KgPlamurRp15,000.00Rp1,650.0036.19Rp542,850.000.100LembarAmplasRp2,000.00Rp200.0032.90Rp65,800.000.180OhTukang CatRp32,500.00Rp5,850.0029.61473.76Rp1,924,650.000.018OhKepala TukangRp40,000.00Rp720.002.9647.38Rp236,880.000.180OhPekerjaRp22,500.00Rp4,050.0029.61473.76Rp1,332,450.000.009OhMandorRp30,000.00Rp270.001.4823.69Rp88,830.00

K.35m2Pengetaran/ResiduRp4,975.00212.002Rp1,054,700.00Rp1,054,700.000.350KgTeerRp3,500.00Rp1,225.0074.20Rp259,700.000.100OhPekerjaRp22,500.00Rp2,250.0010.60169.60Rp477,000.000.050OhMandorRp30,000.00Rp1,500.005.3084.80Rp318,000.00

G.41 Am3Lantai Beton TumbukRp426,500.003.223Rp1,373,330.00Rp1,373,330.001.000m3KerikilRp70,000.00Rp70,000.003.22Rp225,400.001.000m3Pasir PasanganRp50,000.00Rp50,000.003.22Rp161,000.004.200ZakSemen PCRp30,000.00Rp126,000.0013.52Rp405,720.001.000OhTukang BatuRp32,500.00Rp32,500.001.0725.76Rp104,650.000.100OhKepala TukangRp40,000.00Rp4,000.000.112.58Rp12,880.006.000OhPekerjaRp22,500.00Rp135,000.006.44154.56Rp434,700.000.300OhMandorRp30,000.00Rp9,000.000.327.73Rp28,980.00

F.36c (2)m2Jendela Kaca Rangka Kayu Rp35,725.002.121Rp75,737.00Rp75,737.001.000m2Kawat RangRp8,000.00Rp8,000.002.12Rp16,960.000.008m3Papan Kelas IIRp1,200,000.00Rp9,600.000.02Rp20,352.000.300OhTukang KayuRp32,500.00Rp9,750.000.645.09Rp20,670.000.050OhKepala TukangRp40,000.00Rp2,000.000.110.85Rp4,240.000.250OhPekerjaRp22,500.00Rp5,625.000.534.24Rp11,925.000.025OhMandorRp30,000.00Rp750.000.050.42Rp1,590.00

CUM-COST

TABEL FLOAT TIME ANALYSISBANGUNAN FASILITAS UMUM & RUMAH PETUGAS

NO.URAIAN PEKERJAANDURASI (HARI)AKTIFITASEARLIESTLATESTFLOATVOLUMEBIAYA KEGIATANBOBOT BIAYAKRITERIAKALENDER PROYEK (HARI)PREDECESSORSUCCESSORESEFLSLFFFTF123456789101112131415161718192021222324252627282930313233343536373839404142434445464748495051525354555657585960APembersihan Lapangan1-B,C010100234.00Rp159,705.000.00133EST0.00133BCWSLST0.00133BPembuatan Direksi Keet3AD,J1414001.00Rp1,500,000.000.01252EST0.004170.004170.00417BCWSLST0.004170.004170.00417CPengukuran Bouwplank2AD,J,O13140154.00Rp925,425.000.00773EST0.003860.00386BCWSLST0.003860.00386DGalian Tanah5B,CE49490041.50Rp733,305.000.00612EST0.001220.001220.001220.001220.00122BCWSLST0.001220.001220.001220.001220.00122EPasangan Batu Kosong Bawah Pondasi3DF912912006.22Rp671,760.000.00561EST0.001870.001870.00187BCWSLST0.001870.001870.00187FPasangan Pondasi Batu Kali4EG,H121612160015.20Rp5,450,112.000.04550EST0.011380.011380.011380.01138BCWSLST0.011380.011380.011380.01138GPembuatan Sloof dan Kolom Beton Bertulang28FK,L16441644003.28Rp6,552,431.400.05471EST0.001950.001950.001950.001950.001950.001950.001950.001950.001950.001950.001950.001950.001950.001950.001950.001950.001950.001950.001950.001950.001950.001950.001950.001950.001950.001950.001950.00195BCWSLST0.001950.001950.001950.001950.001950.001950.001950.001950.001950.001950.001950.001950.001950.001950.001950.001950.001950.001950.001950.001950.001950.001950.001950.001950.001950.001950.001950.00195HUrugan Tanah Bawah Lantai & Urugan Pondasi2FI1618163301537.60Rp240,546.000.00201EST0.001000.00100BCWSLST0.001000.00100IUrugan Pasir Bawah Lantai & Urugan Pondasi2HN1820333501512.63Rp717,352.430.00599EST0.002990.00299BCWSLST0.002990.00299JPembuatan Kolom Kayu2B,CP,Q474341281.50Rp3,181,500.000.02656EST0.013280.01328BCWSLST0.013280.01328KPasangan Transram Batu Bata3GM44514451442.40Rp1,123,800.000.00938EST0.003130.003130.00313BCWSLST0.003130.003130.00313LPasangan Dinding Batu Bata7GM44514451006.60Rp2,209,020.000.01844EST0.002630.002630.002630.002630.002630.002630.00263BCWSLST0.002630.002630.002630.002630.002630.002630.00263MPembuatan dan Pemasangan Kusen Pintu & Jendela5K,LW51565156000.67Rp1,689,405.000.01410EST0.002820.002820.002820.002820.00282BCWSLST0.002820.002820.002820.002820.00282NLantai Beton Tumbuk3IS202335380153.22Rp1,373,330.000.01147EST0.003820.003820.00382BCWSLST0.003820.003820.00382OPekerjaan Kuda-kuda dan Gording4CP,Q374340273.78Rp8,017,380.000.06694EST0.016730.016730.016730.01673BCWSLST0.016730.016730.016730.01673PPekerjaan Pintu Dobel Tripleks1J,OS723343815306.70Rp1,419,220.500.01185EST0.01185BCWSLST0.01185QPekerjaan Jendela Kaca1J,OR7834350272.12Rp366,147.000.00306EST0.00306BCWSLST0.00306RPekerjaan Kunci/Penggantung3QS8233538122772.00Rp545,000.000.00455EST0.001520.001520.00152BCWSLST0.001520.001520.00152SPekerjaan Plesteran2N,P,QT23253840015144.00Rp3,166,460.000.02644EST0.013220.01322BCWSLST0.013220.01322TPekerjaan Atap5SU25304045015342.40Rp39,469,700.000.32953EST0.065910.065910.065910.065910.06591BCWSLST0.065910.065910.065910.065910.06591UPekerjaan Sanitair2TV3032454701540.00Rp810,000.000.00676EST0.003380.00338BCWSLST0.003380.00338VPekerjaan Lantai Tegel dan Ubin Wafel6UX32384753015120.00Rp11,929,000.000.09959EST0.016600.016600.016600.016600.016600.01660BCWSLST0.016600.016600.016600.016600.016600.01660WPekerjaan Listrik4M-566056600020.00Rp160,000.000.00134EST0.000330.000330.000330.00033BCWSLST0.000330.000330.000330.00033XPekerjaan Plafond2VY38405355015240.00Rp14,602,800.000.12192EST0.060960.06096BCWSLST0.060960.06096YPagar Jalusi, Papan Assesories3XZ404355580150.86Rp2,168,490.000.01810EST0.006030.006030.00603BCWSLST0.006030.006030.00603ZPekerjaan Pengecatan 2Y-436058601515661.00Rp10,595,260.000.08846EST0.044230.04423BCWSLST0.044230.04423TOTALRp119,777,149.33100.00%

RENCANAEST0.00133335120.00803753060.00803753060.02090837040.03123931420.03123931420.01795840030.01613019270.00274115450.00338617730.00338617730.00186947180.01137552540.01137552540.01137552540.01137552540.00295789650.00295789650.00494828620.00494828620.00577565990.00577565990.00577565990.01517188730.01517188730.06785898190.06785898190.06785898190.06785898190.06785898190.0053350360.0053350360.01855263780.01855263780.01855263780.01855263780.01855263780.01855263780.06291196150.06291196150.00798854720.00798854720.00798854720.04618281060.04999120720.00576215320.00576215320.00263467850.00263467850.00263467850.00263467850.00282091370.00282091370.00282091370.00282091370.00282091370.00033395350.00033395350.00033395350.0003339535CUMMULATIVE0.00133335120.00937088170.01740841230.03831678270.06955609690.1007954110.11875381140.13488400410.13762515860.14101133590.14439751320.1462669850.15764251030.16901803570.18039356110.19176908640.19472698290.19768487940.20263316560.20758145180.21335711170.21913277160.22490843140.24008031870.2552522060.32311118790.39097016970.45882915160.52668813350.59454711540.59988215150.60521718750.62376982530.64232246320.6608751010.67942773890.69798037670.71653301460.77944497610.84235693760.85034548470.85833403190.86632257910.91250538970.96249659690.96825875010.97402090330.97665558190.97929026040.9819249390.98455961750.98738053120.99020144490.99302235860.99584327230.99866418590.99899813950.9993320930.99966604651.00BCWS0.0013330.0080380.0080380.0125410.0312390.0312390.0179580.0170440.0019830.0026280.0026280.0018690.0113760.0113760.0113760.0113760.0029580.0029580.0034510.0034510.0038650.0038650.0038650.0085630.0085630.0349060.0349060.0349060.0349060.0349060.0036440.0036440.0102530.0117500.0192030.0129230.0129230.0129230.0390420.0390420.0379240.0379240.0379240.0570210.0608290.0074530.0074530.0109340.0109340.0109340.0109340.0111200.0111200.0333000.0333000.0058380.0033510.0033510.0224480.022448CUMMULATIVE0.00133335120.00937088170.01740841230.0299498070.06118912110.09242843530.11038683570.12743113220.12941393390.13204175840.1346695830.13653905480.14791458010.15929010550.17066563080.18204115620.18499905270.18795694910.19140797060.19485899210.19872370040.20258840860.20645311690.21501593890.22357876090.25848513020.29339149950.32829786870.3632042380.39811060730.40175500370.40539940010.41565259730.42740305940.44660639330.45952889490.47245139660.48537389820.52441582260.5634577470.60138151150.6393052760.67722904060.73424993680.79507922960.80253202250.80998481540.82091893450.83185305360.84278717270.85372129190.86484164610.87596200040.90926201650.94256203260.94840034150.95175169030.9551030390.97755151951.00LST0.00133335120.00803753060.00803753060.00417441890.03123931420.03123931420.01795840030.01795840030.00122444890.00186947180.00186947180.00186947180.01137552540.01137552540.01137552540.01137552540.00295789650.00295789650.00195375670.00195375670.00195375670.00195375670.00195375670.00195375670.00195375670.00195375670.00195375670.00195375670.00195375670.00195375670.00195375670.00195375670.00195375670.00494828620.019854030.00729236540.00729236540.00729236540.01517188730.01517188730.06785898190.06785898190.06785898190.06785898190.07166737840.00914343250.00914343250.01923355970.01923355970.01923355970.01923355970.01941979480.01941979480.06377911850.06377911850.00885570420.0063687440.0063687440.04456300750.0445630075CUMMULATIVE0.00133335120.00937088170.01740841230.02158283120.05282214540.08406145960.102019860.11997826030.12120270920.1230721810.12494165280.12681112450.13818664990.14956217530.16093770060.1723132260.17527112250.17822901890.18018277560.18213653230.1840902890.18604404570.18799780240.18995155910.19190531580.19385907250.19581282920.19776658590.19972034260.20167409920.20362785590.2055820.20753536930.21248365560.23233768560.2396300510.24692241640.25421478180.26938666910.28455855640.35241753820.42027652010.4881355020.55599448390.62766186230.63680529490.64594872740.66518228710.68441584680.70364940650.72288296620.74230276110.76172255590.82550167440.88928079290.89813649710.90450524110.91087398510.95543699251.00REALISASIESTCUMMULATIVEBCWSCUMMULATIVELSTCUMMULATIVE