rab baru.xlsx

Download RAB BARU.xlsx

Post on 19-Dec-2015

74 views

Category:

Documents

28 download

Embed Size (px)

DESCRIPTION

Contoh perhitungan RAB gedung

TRANSCRIPT

rabRENCANA ANGGARAN BIAYA

HARGA JUMLAHNO.URAIAN PEKERJAANVOLUMESTNANALISASATUANHARGA(Rp.)(Rp.)1234567IPEKERJAAN PERSIAPAN1Pembersihan Lapangan/Pembongkaran Bangunan Lama 1.000LsTaksir5,000,000.005,000,000.002Pengukuran dan Pemasangan Bowplank 1.000LsTaksir800,000.00800,000.003Direksikeet/Pondok Kerja (Sewa) 1.000LsTaksir2,500,000.002,500,000.004Papan Nama Proyek1.000LsTaksir550,000.00550,000.00Sub Jumlah8,850,000.00IIPEKERJAAN STRUKTUR BAWAH APEKERJAAN TANAH DAN PONDASI1Pondasi Tapak Type K1 = 13 Unit- Galian Tanah Pondasi 58.800m3SNI-2835-2008-6.247,700.002,804,760.00- Urugan Kembali Bekas Galian 14.700m3SNI-2835-2008-6.912,998.00191,070.60- Urugan Pasir Alas Pondasi t = 5 cm 0.980m3SNI-2835-2008-6.11129,600.00127,008.00- Pasangan Batu Kosong t = 10 cm 1.960m3SNI-2836-2008-6.9268,605.00526,465.80- Beton Bertulang Cincin Sumuran T = 8 cm 11.394m3SNI-7394-2008-a3,600,981.0041,031,133.14- Beton Cyclopen Pengisi Sumuran 12.736m3SNI-2836-2008-6.10431,506.005,495,591.38- Plat Pondasi Tapak Ukuran 120 x 120 cm 4.320m3SNI-7394-2008-b3,193,751.0013,797,004.32- Stik Kolom 30/40 cm dari Pondasi Tapak ke sloof 1.740m3SNI-7394-2008-c4,983,766.008,671,752.842Pondasi Tapak Type P2 = 8 Unit- Galian Tanah Pondasi 47.040m3SNI-2835-2008-6.247,700.002,243,808.00- Urugan Kembali Bekas Galian 11.760m3SNI-2835-2008-6.912,998.00152,856.48- Urugan Pasir Alas Pondasi t = 5 cm 0.784m3SNI-2835-2008-6.11129,600.00101,606.40- Pasangan Batu Kosong t = 10 cm 1.568m3SNI-2836-2008-6.9268,605.00421,172.64- Beton Bertulang Cincin Sumuran T = 8 cm 1.266m3SNI-7394-2008-a3,600,981.004,559,014.79- Beton Cyclopen Pengisi Sumuran 10.189m3SNI-2836-2008-6.10431,506.004,396,473.10- Plat Pondasi Tapak Ukuran 120 x 120 cm 3.456m3SNI-7394-2008-b3,193,751.0011,037,603.46- Stik Kolom 30/30 cm dari Pondasi Tapak ke sloof 1.044m3SNI-7394-2008-d5,475,610.005,716,536.843Pondasi Tapak Type PT3 = 11 Unit- Galian Tanah Pondasi 32.340m3SNI-2835-2008-6.247,700.001,542,618.00- Urugan Kembali Bekas Galian 8.085m3SNI-2835-2008-6.912,998.00105,088.83- Urugan Pasir Alas Pondasi t = 5 cm 1.078m3SNI-2835-2008-6.11129,600.00139,708.80- Pasangan Batu Kosong t = 10 cm 2.156m3SNI-2836-2008-6.9268,605.00579,112.38- Plat Pondasi Tapak Ukuran 120 x 120 cm 4.752m3SNI-7394-2008-b3,193,751.0015,176,704.75- Stik Kolom 30/30 cm dari Pondasi Tapak ke sloof 2.393m3SNI-7394-2008-c4,983,766.0011,923,660.164Pondasi Menerus (sloof 25/40 cm)- Galian Tanah Pondasi Menerus26.208m3SNI-2835-2008-6.139,000.001,022,112.00- Urugan Kembali Bekas Galian 6.552m3SNI-2835-2008-6.9RpERROR:#VALUE!- Urugan Pasir Alas Pondasi T = 5 cm 2.417m3SNI-2835-2008-6.11129,600.00313,178.40- Pasangan Batu Kosong Pondasi T =10 cm 4.833m3SNI-2836-2008-6.9268,605.001,298,167.97- Pasangan Batu Gunung 1 : 4 17.721m3SNI-2836-2008-6.3552,665.009,793,776.475Sloof Gantung (Sloof 25/40 cm) - Galian Tanah Pondasi Menerus0.540m3SNI-2835-2008-6.139,000.0021,060.00- Urugan Kembali Bekas Galian 0.135m3SNI-2835-2008-6.9RpERROR:#VALUE!- Urugan Pasir Alas Pondasi T = 5 cm 0.180m3SNI-2835-2008-6.11129,600.0023,328.00- Pasangan Batu Kosong Pondasi T =10 cm 0.360m3SNI-2836-2008-6.9268,605.0096,697.80Sub JumlahERROR:#VALUE!IIIPEKERJAAN LANTAI IAPEKERJAAN SELASAR DAN TRAP TANGGAPekerjaan Selasar Depan 1Galian Tanah Pondasi Menerus5.544m3SNI-2835-2008-6.139,000.00216,216.002Urugan Kembali Bekas Galian 1.386m3SNI-2835-2008-6.9RpERROR:#VALUE!3Urugan Pasir Alas Pondasi T = 5 cm 0.846m3SNI-2835-2008-6.11129,600.00109,641.604Pasangan Batu Kosong Pondasi T =10 cm 1.692m3SNI-2836-2008-6.9268,605.00454,479.665Pasangan Batu Gunung 1 : 4 6.204m3SNI-2836-2008-6.3552,665.003,428,733.666Pasangan Trasram Bata 1 : 2 8.460m2SNI-6897-2008-6.795,026.00803,919.967Plesteran 1 : 214.060m2SNI-2837-2008-6.242,234.00593,810.04Pekerjaan Trap Tangga Pada Selasar 2 Unit1Galian Tanah 0.840m3SNI-2835-2008-6.139,000.0032,760.002Urugan Kembali Bekas Galian 0.210m3SNI-2835-2008-6.9RpERROR:#VALUE!3Urugan Pasir Alas Pondasi t = 5 cm 0.180m3SNI-2835-2008-6.11129,600.0023,328.004Pasangan Batu Kosong Pondasi T =10 cm 0.360m3SNI-2836-2008-6.9268,605.0096,697.805Pasangan Trasram Bata 1 : 24.000m2SNI-6897-2008-6.795,026.00380,104.006Plesteran Bata 1 : 24.000m2SNI-2837-2008-6.242,234.00168,936.00Sub JumlahERROR:#VALUE!BPEKERJAAN PASANGAN DAN PLESTERAN 1Pasangan Trasram Bata 1 : 2 dibawah Lantai 29.535m2SNI-6897-2008-6.795,026.002,806,592.912Plesteran Trasram Bata 1 : 2 dibawah Lantai 59.070m2SNI-2837-2008-6.242,234.002,494,762.383Pasangan Trasram Bata 1 : 2 diatas Lantai T = 20 cm 10.200m2SNI-6897-2008-6.795,026.00969,265.204Plesteran Trasram Bata 1 : 2 diatas Lantai T = 20 cm 20.400m2SNI-2837-2008-6.242,234.00861,573.605Pasangan Dinding Bata 1 : 4121.864m2SNI-6897-2008-6.986,696.0010,565,086.676Plesteran Dinding Bata 1 : 4257.507m2SNI-2837-2008-6.437,941.009,770,080.687Pasangan Dinding Bata 1 : 4 (diatas balok 15/18)7.252m2SNI-6897-2008-6.986,696.00628,719.398Plesteran Dinding Bata 1 : 4 (diatas balok 15/18)14.504m2SNI-2837-2008-6.437,941.00550,296.269Plesteran 1 : 3 (Kolom dan Balok)143.530m2SNI-2837-2008-6.339,662.005,692,686.86Sub Jumlah34,339,063.95CPEKERJAAN BETON BERTULANG 1Sloof Beton 25/40 cm (Pondasi Menerus) p = 57 m5.700m3SNI-7394-2008-e3,862,619.0022,016,928.302Sloof Beton 25/40 cm (Sloof Gantung) P = 20 m2.000m3SNI-7394-2008-e3,862,619.007,725,238.003Sloof Beton 25/40 cm (Selasar Depan) P = 20 m2.000m3SNI-7394-2008-e3,862,619.007,725,238.004Kolom Beton 30/40 cm = 10 Kolom 5.340m3SNI-7394-2008-g4,983,766.0026,613,310.445Kolom Beton 30/30 cm = 8 Kolom 3.204m3SNI-7394-2008-h5,475,610.0017,543,854.446Balok Lantai 25/40 cm P = 99 m9.100m30.00RpERROR:#VALUE!7Balok Lantai 30/60 cm p = 14 m2.520m3SNI-7394-2008-l4,497,955.0011,334,846.608Plat Lantai T = 12 cm 13.890m3SNI-7394-2008-m4,247,801.0059,001,955.899Balok Diatas Kosen 13/13 cm p = 32 m0.541m3SNI-7394-2008-i5,789,270.003,130,837.2210Balok Pinggang 13/13 cm p = 21 m0.355m3SNI-7394-2008-i5,789,270.002,054,611.92 Sub JumlahERROR:#VALUE!DPEKERJAAN RAMP/TANJAKAN PLAT BETON1Galian Tanah 38.220m3SNI-2835-2008-6.136,937.501,411,751.252Urugan Kembali Bekas Galian 9.555m3SNI-2835-2008-6.9ERROR:#REF!ERROR:#REF!3Urugan Pasir Alas Pondasi T = 5 cm 12.740m3SNI-2835-2008-6.11150,375.001,915,777.504Pasangan Batu Kosong Pondasi T =10 cm 2.548m3SNI-2836-2008-6.9294,869.00751,326.215Plat Pondasi Tapak Ukuran 120 x 120 cm 5.616m3SNI-7394-2008-b3,193,751.0017,936,105.626Stik Kolom 30/40 cm dari Pondasi Tapak ke sloof 2.246m3SNI-7394-2008-c4,983,766.0011,195,531.947Kolom 30/40 cm 3.888m3SNI-7394-2008-g4,983,766.0019,376,882.218Balok Beton 30/50 cm 2.925m3SNI-7394-2008-l4,497,955.0013,156,518.389Plat Lantai Tebal 12 cm 7.817m3SNI-7394-2008-m4,247,801.0033,202,936.5210Realling Besi Hollow 42.300m2Taksir420,000.0017,766,000.00 Sub JumlahERROR:#REF!

EPEKERJAAN LANTAI Ruangan 1Timbunan Tanah Bawah Lantai T = 80 cm 89.600m3SNI. 2835 : 2008. 6.1082,000.007,347,200.002Timbunan Pasir Bawah Lantai T = 10 cm 11.200m3SNI-2835-2008-6.11129,600.001,451,520.003Beton Tumbuk Dibawah Lantai Keramik = 5 cm 5.600m3SNI-7394-2008-6.4528,699.002,960,714.404Lantai Keramik 40 x 40 cm (Polished)112.000m2SNI-7395-2008-6.34139,449.0015,618,288.00Selasar Depan 1Timbunan Tanah Bawah Lantai T = 75 cm 24.000m3SNI. 2835 : 2008. 6.1082,000.001,968,000.002Timbunan Pasir Bawah Lantai T = 10 cm 3.200m3SNI-2835-2008-6.11129,600.00414,720.003Timbunan Pasir Bawah Lantai bawah Ramp T = 10 cm 6.270m3SNI-2835-2008-6.11129,600.00812,592.004Beton Tumbuk Dibawah Lantai Keramik = 5 cm 1.600m3SNI-7394-2008-6.4528,699.00845,918.405Beton Tumbuk Dibawah Ramp = 7 cm 13.167m3SNI-7394-2008-6.4528,699.006,961,379.736Lantai Keramik 40 x 40 cm (Unpolished)32.000m2SNI-7395-2008-6.34a140,509.004,496,288.007Lantai Keramik 40 x 40 cm (Unpolished) Dibawah Ramp62.700m2SNI-7395-2008-6.34a140,509.008,809,914.30Trap Tangga1Timbunan Pasir T = 10 cm 0.180m3SNI-2835-2008-6.11129,600.0023,328.002Beton Tumbuk Dibawah Lantai Keramik = 5 cm 0.180m3SNI-7394-2008-6.4528,699.0095,165.823Lantai Keramik 40 x 40 cm (Unpolished)6.600m2SNI-7395-2008-6.34a140,509.00927,359.40 Sub Jumlah52,732,388.05FPEKERJAAN KOSEN PINTU DAN JENDELA KOSEN1Kosen Pintu/Ventilasi Type P1 (2 UNIT)0.134m3SNI-3434-2008-6.2RpERROR:#VALUE!2Kosen Jendela Type J1 (6 UNIT)0.738m3SNI-3434-2008-6.2RpERROR:#VALUE!DAUN PINTU DAN JENDELA1Pintu Type P1 (3 Unit)- Daun Pintu Panel Ukuran 55 x 210 cm 4.000UnitTaksir700,000.002,800,000.00- Pasangan Jalusi Papan 1.872m2Taksir100,000.00187,200.002Jendela Type J1 (6 Unit)- Daun Jendela Kaca 5 mm Ukuran 60 x 80 cm 24.000UnitTaksir280,000.006,720,000.00- Pasangan Jalusi Papan 9.734m2Taksir100,000.00973,440.00 Sub JumlahERROR:#VALUE!GPEKERJAAN PENGUNCI DAN PENGGANTUNG1Kunci Tanam 2 Slaag 2.000BhTaksirRp.ERROR:#VALUE!2Engsel Pintu 4 Inchi 12.000BhTaksirRp.ERROR:#VALUE!3Engsel Jendela 3 Inchi 48.000BhTaksirRp.ERROR:#VALUE!4Grendel Jendela48.000BhTaksirRp.ERROR:#VALUE!5Hak Angin Jendela48.000BhTaksirRp.ERROR:#VALUE!6Tarikan/Pegangan Jendela24.000BhTaksirRp.ERROR:#VALUE!7Kunci Pacok Untuk Pintu Double (Atas & Bawah)2.000BhTaksir22,000.0044,000.00 Sub JumlahERROR:#VALUE!HPEKERJAAN PENGECATAN 1Cat Tembok 3 x (L/D)557.805M2SNI-03-Cat-6.14.N17,183.009,584,759.882Cat Langit- Langit Plat Beton 115.750M2SNI-03-Cat-6.14a.N14,188.001,642,261.003Cat Mengkilat Kosen Pintu/Jendela0.218M2SNI-03-Cat-6.8.N24,720.005,388.964Cat Mengkilat Daun Pintu/Jendela/Jalusi 44.707M2SNI-03-Cat-6.8.N24,720.001,105,161.98 Sub Jumlah12,337,571.82IPEKERJAAN INSTALASI LISTRIK1Box Zekering/Panel MCB 1.000UnitTaksir110,000.00110,000.002Armatur- Lampu SL 18 Watt Setara Philips (Komplit)10.000BhTaksirRp.ERROR:#VALUE!3Instalasi titik penerangan, instalasi termasuk 10.000TtkTaksirRp.ERROR:#VALUE!kabel NYA 2,5 mm dalam pipa PVC fitting lampu dan kelengkapan instalasi terpasang.4Instalasi titik kontak, instalasi termasuk 2.000BhTaksirRp.ERROR:#VALUE!kabel NYA 2,5 mm dalam pipa PVC, kotak kontak dan kelengkapan instalasi terpasang.5Saklar Tunggal 1.000BhTaksirRp.ERROR:#VALUE!6Saklar Ganda