DAFTAR HARGA SATUAN UPAH, BAHAN DAN ALAT DESA : MARGO REJO KECAMATAN : TEGINENENG KABUPATEN : PESAWARAN PROPINSI : LAMPUNG PROGRAM : RIS-PNPM TAHUN ANGGARAN : 2011 NO. URAIAN SATUAN HARGA SATUAN (Rp.) Hasil Survey Supl. I Supl. II Supl. III I UPAH 1 Tukang HOK 54,500.00 53,500.00 52,000.00 52,000.00 2 Kepala Tukang HOK 57,500.00 56,500.00 55,000.00 55,000.00 3 Pekerja HOK 41,000.00 40,000.00 38,500.00 38,500.00 4 Mandor HOK 61,000.00 60,000.00 58,500.00 58,500.00 5 Operator Terampil HOK 54,500.00 53,500.00 52,000.00 52,000.00 II BAHAN 1 Batu Belah M3 117,500.00 116,500.00 115,000.00 115,000.00 2 Semen PC Kg 1,250.00 1,350.00 1,200.00 1,200.00 3 Pasir Beton M3 162,500.00 161,500.00 160,000.00 160,000.00 4 Pasir Pasang M3 157,500.00 156,500.00 155,000.00 155,000.00 5 Pasir Urug M3 99,500.00 98,500.00 97,000.00 97,000.00 6 Batu Pecah 15 - 20 cm M3 117,500.00 116,500.00 115,000.00 115,000.00 7 Batu Pecah 10 - 15 cm M3 146,500.00 145,500.00 144,000.00 144,000.00 8 Batu Pecah 5 - 7 cm M3 156,500.00 155,500.00 154,000.00 154,000.00 9 Batu 1 - 2 cm M3 262,500.00 261,500.00 260,000.00 260,000.00 9 Besi Beton Kg 16,500.00 15,500.00 14,000.00 14,000.00 10 Kawat Ikat Kg 15,500.00 14,500.00 13,000.00 13,000.00 11 Paku Kg 17,500.00 16,500.00 15,000.00 15,000.00 12 Kayu Klas III M3 1,425,000.00 ### ### ### III ALAT 1 Mesin Gilas 3 Roda 6-8 Jam 127,500.00 126,500.00 125,000.00 125,000.00 2 Alat Bantu Set 102,500.00 101,500.00 100,000.00 100,000.00 DIVERIFIKASI OLEH: DIPERIKSA OLEH : DIBUAT OLEH ; TAMK OMS JANTUAHMAN SARAGIH ST RUDY SARMANTO ST PONIDI Realisasi Pelaksanaan

Author: ben-hattamullah

Post on 07-Aug-2015

496 views

Category:

Documents


52 download

Embed Size (px)

TRANSCRIPT

DAFTAR HARGA SATUAN UPAH, BAHAN DAN ALAT

DESA KECAMATAN KABUPATEN PROPINSI PROGRAM TAHUN ANGGARAN

: : : : : :

MARGO REJO TEGINENENG PESAWARAN LAMPUNG RIS-PNPM 2011 HARGA SATUAN (Rp.) Hasil Survey Supl. II Supl. III

NO.

URAIAN

SATUAN Supl. I

Realisasi Pelaksanaan

KETERANGAN

I 1 2 3 4 5 II 1 2 3 4 5 6 7 8 9 9 10 11 12

UPAH Tukang Kepala Tukang Pekerja Mandor Operator Terampil BAHAN Batu Belah Semen PC Pasir Beton Pasir Pasang Pasir Urug Batu Pecah 15 - 20 cm Batu Pecah 10 - 15 cm Batu Pecah 5 - 7 cm Batu 1 - 2 cm Besi Beton Kawat Ikat Paku Kayu Klas III

HOK HOK HOK HOK HOK

54,500.00 57,500.00 41,000.00 61,000.00 54,500.00

53,500.00 56,500.00 40,000.00 60,000.00 53,500.00

52,000.00 55,000.00 38,500.00 58,500.00 52,000.00

52,000.00 55,000.00 38,500.00 58,500.00 52,000.00

M3 Kg M3 M3 M3 M3 M3 M3 M3 Kg Kg Kg M3

117,500.00 1,250.00 162,500.00 157,500.00 99,500.00 117,500.00 146,500.00 156,500.00 262,500.00 16,500.00 15,500.00 17,500.00 1,425,000.00

116,500.00 1,350.00 161,500.00 156,500.00 98,500.00 116,500.00 145,500.00 155,500.00 261,500.00 15,500.00 14,500.00 16,500.00 1,415,000.00

115,000.00 1,200.00 160,000.00 155,000.00 97,000.00 115,000.00 144,000.00 154,000.00 260,000.00 14,000.00 13,000.00 15,000.00 1,400,000.00

115,000.00 1,200.00 160,000.00 155,000.00 97,000.00 115,000.00 144,000.00 154,000.00 260,000.00 14,000.00 13,000.00 15,000.00 1,400,000.00

III ALAT 1 Mesin Gilas 3 Roda 6-8 T 2 Alat Bantu

Jam Set

127,500.00 102,500.00

126,500.00 101,500.00

125,000.00 100,000.00

125,000.00 100,000.00

DIVERIFIKASI OLEH: TAMK

DIPERIKSA OLEH :

DIBUAT OLEH ; OMS

JANTUAHMAN SARAGIH ST

RUDY SARMANTO ST

PONIDI

DIREKTORAT JENDRAL BINA MARGA DIREKTORAT BNA PROGRAM JALAN SUB DIT. PERENCANAAN JALAN LOKAL & KABUPATEN

ANALISA BIAYA PEKERJAANKONSTRUKSI LAPIS PONDASI ATAS ( L P B ) TELFORD ( MENGGUNAKAN BURUH ) KODE DISIAPKAN OLEH

PROPINSI

KODE

KABUPATEN

PROSES : 1. Material disiapkan di lokasi pekerjaan. 2. Menghampar pasir setebal 5 cm. 3. Batu pecah berukuran besar ( 10-15 cm ) disusun berdiri. 4. Batu pecah yang lebih kecil mengisi rongga-rongga diatasnya kemudian dipadatkan/digilas mesin gilas

ANGGAPAN / ASUMSI : 1. Menggunakan tenaga manusia 400 m2/hari 2. Material dikirim ke lokasi pekerjaan oleh supplier. 3. Material sudah di pecah/batu pecah. 4. Tanah Dasar sudah dipersiapkan. 5. Dipadatkan sampai tebal 15 cm

P E K E R J A

VOL

HARI

KODE

JUMLAH HARI-ORANG

UPAH (Rp./org/hr)

BIAYA ( Rp. )

P Mandor Lapangan E Operator Terlatih K Pekerja E R J A

3 1 99

1 1 1

3.00 1.00 99.00

58,500.00 52,000.00 38,500.00

175,500.00 52,000.00 3,811,500.00

PEKERJAM A T E R I A L JUMLAH VOLUME SATUAN KODE HARGA Rp./Unit BIAYA ( Rp. )

M A T E R I A L

Batu Pecah 10 - 15 cm Batu Pecah 5 - 7 cm Pasir Urug Alat bantu

50 20 30 4

m3 m3 m3 set

144,000.00 154,000.00 97,000.00 100,000.00

7,200,000.00 3,080,000.00 2,910,000.00 400,000.00

MATERIALPERALATAN JUMLAH ALAT HARI KERJA KODE JAM KERJA HARGA (Rp./JAM) BIAYA ( Rp. )

P E Mesin Gilas 6 - 8 T R A L A T A N

1

1

5

125,000.00

625,000.00

PERALATAN TOTAL (Rp.) VOLUME : 60 SATUAN : m3 HARGA SATUAN Rp. 304,233.33 304,233.33

KODE

K 516

TAHUN 2011

SUB.TOTAL ( Rp. )

4,039,000.00SUB.TOTAL ( Rp. )

13,590,000.00SUB.TOTAL ( Rp. )

625,000.00 18,254,000.00

per m3

ANALISA HARGA SATUANPENGUPASAN TANAH DAN PEMBERSIHAN BADAN JALAN (MENGGUNAKAN BURUH)PROPINSI : AMPUNG L KODE KABUPATEN KODE DISIAPKAN OLEH :

KODE K - 210Tahun 2011

URAIAN 1. Mengupas dan membuang semak dengan tenaga manusia pada DAMIJA ( Daerah Milik Jalan ) 2. Lebar pengupasan dan pembersihan = DAMIJA minus lebar badan jalan

ANGGAPAN / ASUMSI 1. Menggunakan tenaga manusia ( 1200 m2 / hari = 12 Are / hari ) 2. Tidak ada pohon besar pada DAMIJA (Hanya Semak) 3. DAMIJA 12 m 4. Pembersihan DAMIJA 100m per hari 5. Bakar sampah dilokasi pekerjaan 6. Hasil kerja 25 m2/orang/hari 7. Umur alat bantu rata-rata 1 bulan/orang/set @ 3 alat JUMLAH ORANG HARI KODE TOTAL VOL (Orang-hari) UPAH (Rp/Org/Hari) BIAYA (Rp) SUB TOTAL (Rp)

PEKERJA

P Pekerja E Mandor K E R J A

48 1

1 1

48.00 1.00

38,500.00 58,500.00

1,848,000.00 58,500.00

MATERIAL

JUMLAH BIAYA UNTUK PEKERJA SATUAN

KODE

TOTAL VOL

HARGA SATUAN (Rp)

PEKERJA (I+II) BIAYA (Rp)

1,906,500.00 SUB TOTAL (Rp)

M Alat Bantu @ 3 alat A T E R I A L

Ls

1.92

100,000.00

192,000.00

PERALATAN

JUMLAH BIAYA UNTUK MATERIAL JUMLAH HARI ALAT KERJA

KODE

JAM KERJA

HARGA (Rp/Jam)

MATERIAL (I+II) BIAYA (Rp)

192,000.00 SUB TOTAL (Rp)

P E R A L A T A N

JUMLAH BIAYA UNTUK PERALATAN

PERALATAN (I+II) T O T A L (Rp) HARGA SATUAN : 1,748.75 per m2

0.00 2,098,500.00

VOLUME :

1,200.00

SATUAN :

m2

ANALISA HARGA SATUANGALIAN TANAH UNTUK PEMBENTUKAN DRAINASE (MENGGUNAKAN BURUH)PROPINSI : AMPUNG L KODE KABUPATEN KODE DISIAPKAN OLEH :

KODE K - 224Tahun 2011

URAIAN 1. Digali dengan tenaga masnusia 2. Membuang tanah galian sejauh 30 meter dari lubang galian

ANGGAPAN / ASUMSI 1. Menggunakan Tenaga Manusia (40m3/hari) 2. Kapasitas Kerja /orang 1,3 m3/hari 3. Kedalaman rata-rata galian sampai dengan 3,00 meter 4. Umur alat bantu rata-rata 1 bulan/orang/set @ 3 alat

PEKERJA

JUMLAH ORANG

HARI

KODE

TOTAL VOL (Orang hari)

UPAH (Rp/Org/Hari)

BIAYA (Rp)

SUB TOTAL (Rp)

P Buruh tak terampil E Mandor K E R J A

30 1

1 1

30.00 1.00

38,500.00 58,500.00

1,155,000.00 58,500.00

MATERIAL

JUMLAH BIAYA UNTUK PEKERJA JUMLAH SATUAN MATERIAL

KODE

TOTAL VOL

HARGA SATUAN (Rp)

PEKERJA (I+II) BIAYA (Rp)

1,213,500.00 SUB TOTAL (Rp)

M A T E R I A L

Alat bantu (set @ 3 set)

Set

1.20

100,000.00

120,000.00

PERALATAN

JUMLAH BIAYA UNTUK MATERIAL JUMLAH HARI ALAT KERJA

KODE

JAM KERJA

HARGA (Rp/Jam)

MATERIAL (I+II) BIAYA (Rp)

120,000.00 SUB TOTAL (Rp)

P E R A L A T A N

JUMLAH BIAYA UNTUK PERALATAN

PERALATAN (I+II) T O T A L (Rp) HARGA SATUAN : 33,337.50 per M3

0.00 1,333,500.00

VOLUME :

40.00

SATUAN :

M3

ANALISA HARGA SATUANKONSTRUKSI PASANGAN BATU HITAM (MENGGUNAKAN BURUH)PROPINSI : AMPUNG L KODE KABUPATEN KODE DISIAPKAN OLEH :

KODE K - 705Tahun 2011

URAIAN 1. Material disiapkan ke lokasi oleh pekerjaan oleh Pemasok 2. Pekerja membawa batu belah ketempat tukang batu bekerja 3. Tukang batu memasang batu belah dengan adukan pasir dan semen.

ANGGAPAN / ASUMSI 1. Dilakukan untuk pekerjaan gorong-gorong, jembatan, dinding penahan tanah dan struktur lainnya, yang menggunakan konstruksi pasangan batu 2. Material-material dikirim ketempat pekerjaan oleh pemasok 3. Tidak termasuk galian/Timbunan 4. Biaya alat bantu tambahan sudah termasuk biaya kira-kira ekivalen dari bambu untuk lubang drainase

PEKERJA

JUMLAH ORANG

HARI

KODE

TOTAL VOL (Orang hari)

UPAH (Rp/Org/Hari)

BIAYA (Rp)

SUB TOTAL (Rp)

P Buruh tak terampil E Kepala Tukang K Tukang Batu E R J A

12 1 4

1 1 1

12.00 1.00 4.00

38,500.00 55,000.00 52,000.00

462,000.00 55,000.00 208,000.00

MATERIAL

JUMLAH BIAYA UNTUK PEKERJA JUMLAH SATUAN MATERIAL

KODE

TOTAL VOL

HARGA SATUAN (Rp)

PEKERJA (I+II) BIAYA (Rp)

725,000.00 SUB TOTAL (Rp)

M A T E R I A L

Batu Belah Hitam Pasir ayak untuk beton Semen Alat Bantu (set @ 3 alat)

M3 M3 50 kg Set

5.00 1.25 15.20 0.75

115,000.00 155,000.00 1,200.00 100,000.00

575,000.00 193,750.00 18,240.00 75,000.00

PERALATAN

JUMLAH BIAYA UNTUK MATERIAL JUMLAH HARI ALAT KERJA

KODE

JAM KERJA

HARGA (Rp/Jam)

MATERIAL (I+II) BIAYA (Rp)

861,990.00 SUB TOTAL (Rp)

P E R A L A T A N

Pompa air diameter 5 cm/ 30 m3 perjam

1

1

2.00

JUMLAH BIAYA UNTUK PERALATAN

PERALATAN (I+II) T O T A L (Rp) HARGA SATUAN : 317,398.00 per M3

1,586,990.00

VOLUME :

5.00

SATUAN :

M3

RENCANA JADWAL PELAKSANAAN DAN KURVA-SPROPINSI KABUPATEN KECAMATAN DESA : : : : LAMPUNG PESAWARAN TEGINENENG MARGO REJO Program Jenis Kegiatan Ukuran/Dimensi : RIS-PNPM : 1. PEKERJAAN PERKERASAN JALAN TELFORD 2. PEKERJAAN GORONG-GORONG PLAT : 1. Telford ( 1615 M x 3 M ) 2. Gorong2 Plat (Uk 0,8 x 0,8 M) P. 4 M ( 3 Buah)

Harga Satuan No. Uraian Kegiatan Volume Satuan (Rp.) I BIAYA OPERASIONAL OMS 1 Pengukuran dan Pematokan 2 ATK dan Pelaporan 3 Transportasi OMS 1.000 1.000 1.000 Ls Ls Ls 500,000.00 3,500,000.00 1,000,000.00

Jumlah Harga (Rp.)

Bobot 1 %

Bulan 1 2 3 4

Bulan 2 5

Jangka Waktu Pelaksanaan Pekerjaan Bulan 3 6 7 8 9

10

11

12

Bulan 4 13

14

Ket. (%)

500,000.00 3,500,000.00 1,000,000.00

0.193 1.354 0.387

0.097 0.226 0.097

0.097 0.226 0.097 0.226 0.226 0.097 0.097 0.226 0.226

100

II

PEKERJAAN PEMBERSIHAN DAN PEKERJAAN TANAH 1 Pengupasan Tanah dan Pembersihan Badan Jalan 4,835.000 M2 1,748.75 8,455,206.25 3.271 1.090 1.090 1.090

III

PEKERJAAN PERKERASAN JALAN 1 Lapis Pondasi Bawah (LPB) / Telford 726.751 M3 304,233.33 221,101,848.81 85.547 8.555 8.555 8.555 8.555 8.555 8.555 8.555 8.555 8.555 8.555 50

IV

PEKERJAAN PASANGAN Pas. Gorong2 Plat ( uk 0,8 x 0,8 m ) P 5 m. 3 buah

1 Pas. Batu Belah Hitam 2 Pembuatan Plat Beton ( P = 5 M; L = 1,4 M ; T = 0,20 M ) - Plat Beton bertulang 3 V - Plesteran PEKERJAAN LAIN-LAIN 1 Mobilisasi dan Demobilisasi Alat Berat 2 Prasasti JUMLAH SUMBER DANA

8.230

M3

519,462.50

4,275,176.38

1.654

0.551

0.551

0.551

3.360 31.440

M3 M2

4,383,742.50 28,430.50

14,729,374.80 893,854.92

5.699 0.346 0.043

2.849 0.043

2.849 0.043 0.043 0.043 0.043 0.043 0.043

1.000 5.000

Ls Bh

3,000,000.00 200,000.00

3,000,000.00 1,000,000.00 258,455,461.16

1.161 0.387 100.00

0.580

0.580 0.387 0

DANA BLM RIS-PNPM DANA SWADAYA

250,000,000.00 8,455,000.00 (%) (%) (%) (%) (%) 1.510 1.510 1.510 3.019 1.090 4.110 8.555 12.664 9.106 21.771 9.149 30.920 12.225 43.144 11.673 54.818 8.695 63.512 8.695 72.207 8.824 81.031 9.404 90.435 8.598 99.033 0.967 100.00 -

RENCANA FISIK REALISASI DEVIASI

BOBOT/MINGGU BOBOT KUMULATIF BOBOT/MINGGU BOBOT KUMULATIF

Diperiksa Oleh: Fasilitator

Dibuat Oleh : OMS Kader Desa

RUDY SARMANTO.ST

PONIDI

PAIMAN

REKAPITULASI RENCANA ANGGARAN BIAYAPROPINSI KABUPATEN KECAMATAN DESA : : : : LAMPUNG PESAWARAN TEGINENENG MARGO REJO

Program Jenis Kegiatan

: RIS-PNPM : 1. PEKERJAAN PERKERASAN JALAN TELFORD 2. PEKERJAAN GORONG-GORONG PLAT Ukuran/Dimensi : 1. Telford ( 1615 M x 3 M ) 2. Gorong2 Plat (Uk 0,8 x 0,8 M) P. 4 M ( 3 Buah) URAIAN PEKERJAAN JUMLAH HARGA Rp. Rp. Rp. Rp. Rp. Rp. Rp. 5,000,000.00 8,455,206.25 221,101,848.81 19,898,406.10 4,000,000.00 258,455,461.16 258,455,000.00 250,000,000.00 8,455,000.00

NO I. II. III. IV. V. JUMLAH DIBULATKAN SUMBER DANA BIAYA OPERASIONAL OMS

PEKERJAAN PEMBERSIHAN DAN PEKERJAAN TANAH PEKERJAAN PERKERASAN JALAN PEKERJAAN PASANGAN PEKERJAAN LAIN-LAIN

DANA BLM RIS PNPM DANA SWADAYA

Rp. Rp.

DIPERIKSA OLEH: FASILITATOR

KETUA OMS

DIBUAT OLEH : KADER DESA

RUDY SARMANTO. ST

PONIDI

PAIMAN

MENGETAHUI : TAMK

JANTUAHMAN SARAGIH ST

A.1.P

RENCANA ANGGARAN BIAYAPROPINSI KABUPATEN KECAMATAN DESA : : : : LAMPUNG PESAWARAN TEGINENENG MARGO REJO

Program Jenis Kegiatan Ukuran/Dimensi

: RIS-PNPM : 1. PEKERJAAN PERKERASAN JALAN TELFORD 2. PEKERJAAN GORONG-GORONG PLAT : 1. Telford ( 1615 M x 3 M ) 2. Gorong2 Plat (Uk 0,8 x 0,8 M) P. 4 M ( 3 Buah) HARGA SATUAN (Rp) JUMLAH HARGA (Rp)

VOLUME No. URAIAN PEKERJAAN TOTAL DARI SWADAYA DARI DANA SATUAN BLM

I. 1 2 3

BIAYA OPERASIONAL OMS Pengukuran dan Pematokan ATK dan Pelaporan Transportasi OMS SUB TOTAL I.

1.00 1.00 1.00

1.00 1.00 1.00

Ls Ls Ls

500,000.00 3,500,000.00 1,000,000.00

500,000.00 3,500,000.00 1,000,000.00 5,000,000.00

II. 1

PEKERJAAN PEMBERSIHAN DAN PEKERJAAN TANAH Pengupasan Tanah dan Pembersihan Badan Jalan K 210 SUB TOTAL II.

4835.00

4835.00

M2

1,748.75

8,455,206.25 8,455,206.25

III. 1

PEKERJAAN PERKERASAN JALAN Lapis Pondasi Bawah (LPB) / Telford SUB TOTAL III. K 516 726.75 726.75 M3 304,233.33 221,101,848.81 221,101,848.81

IV.

PEKERJAAN PASANGAN Pas. Gorong2 Plat ( uk 0,8 x 0,8 m ) P 5 m. 3 buah Pas. Batu Belah Hitam Pembuatan Plat Beton ( P = 5 M; L = 1,4 M ; T = 0,20 M ) - Plat Beton bertulang Plesteran SUB TOTAL IV.

1 2

C.4

8.23

8.23

M3

519,462.50

4,275,176.38

3

G,29 E.27

3.36 31.44

3.36 31.44

M3 M2

4,383,742.50 28,430.50

14,729,374.80 893,854.92 19,898,406.10

V. 1 2

PEKERJAAN LAIN-LAIN Mobilisasi dan Demobilisasi Alat Berat Prasasti SUB TOTAL V.

1.00 5.00

1.00 5.00

Ls Bh

3,000,000.00 200,000.00

3,000,000.00 1,000,000.00 4,000,000.00 258,455,461.16 258,455,000.00

TOTAL BIAYA DIBULATKAN SUMBER DANA DANA BLM RIS-PNPM DANA SWADAYA

250,000,000.00 8,455,000.00

DIPERIKSA OLEH: FASILITATOR

DIBUAT OLEH : KETUA OMS KADER DESA

RUDY SARMANTO. ST

PONIDI

PAIMAN

A.1.P

REKAPITULASI RENCANA ANGGARAN BIAYA SWADAYA MASYARAKATPropinsi Kabupaten Kecamatan Desa Pekerjaan Lokasi : : : : : : Lampung Pesawaran Tegineneng Margo Rejo Pembersihan dan Pengupasan Tanah Dusun V VOLUME NO. URAIAN VOLUME SATUAN

Program

: RIS-PNPM

HARGA SATUAN (Rp.)

JUMLAH HARGA (Rp.)

I

BAHAN -

SUB TOTAL I II 1 2 UPAH Pekerja Mandor 193.40 4.03 HOK HOK 38,500.00 58,500.00

-

7,445,900.00 235,706.25

SUB TOTAL II III 1 ALAT Alat bantu 7.74 Set 100,000.00

7,681,606.25

773,600.00

SUB TOTAL III TOTAL BIAYA

773,600.00 8,455,206.25

DIPERIKSA OLEH: FASILITATOR KETUA OMS

DIBUAT OLEH: KADER DESA

RUDY SARMANTO.ST

PONIDI

PAIMAN

RENCANA ANGGARAN BIAYA SWADAYA MASYARAKATPropinsi Kabupaten Kecamatan Desa Pekerjaan Lokasi : : : : : : Lampung Pesawaran Tegineneng Margo Rejo Pengupasan Tanah dan Pembersihan Badan Jalan Dusun V VOLUME NO. URAIAN VOLUME SATUAN No. RAB Program : : RIS-PNPM

4,835.00

M2

HARGA SATUAN (Rp.)

JUMLAH HARGA (Rp.)

I

BAHAN -

SUB TOTAL I II 1 2 UPAH Pekerja Mandor 193.40 4.03 HOK HOK 38,500.00 58,500.00

-

7,445,900.00 235,706.25

SUB TOTAL II III 1 ALAT Alat bantu 7.74 Set 100,000.00

7,681,606.25

773,600.00

SUB TOTAL III TOTAL BIAYA

773,600.00 8,455,206.25

DIPERIKSA OLEH: FASILITATOR KETUA OMS

DIBUAT OLEH: KADER DESA

RUDY SARMANTO.ST

PONIDI

PAIMAN

REKAPITULASI RENCANA ANGGARAN BIAYA BANTUAN LANGSUNG MASYARAKAT (BLM)Propinsi Kabupaten Kecamatan Desa Pekerjaan Lokasi : : : : : : Lampung Pesawaran Tegineneng Margo Rejo Perkerasan Jalan Telford dan Gorong2 Plat Dusun V VOLUME NO. URAIAN VOLUME SATUAN Program : RIS-PNPM

HARGA SATUAN (Rp.) 500,000.00 3,500,000.00 1,000,000.00 SUB TOTAL

JUMLAH HARGA (Rp.) 500,000.00 3,500,000.00 1,000,000.00 5,000,000.00

A. BIAYA OPERASIONAL OMS 1 Pengukuran Pematokan 2 ATK dan Pelaporan 3 Transportasi OMS B. PEKERJAAN PERKERASAN JALAN I BAHAN 1 Batu belah 10 - 15 cm 2 Batu pecah 5 - 7 cm 3 Pasir Urug / Timbun 4 Alat bantu II 1 2 3 III 1 UPAH Pekerja Mandor Operator terlatih ALAT Mesin Gilas 3 Roda 6 - 8 ton

1.00 1.00 1.00

Ls Ls Ls

606.00 242.00 363.00 49.00

M3 M3 M3 Set

144,000.00 154,000.00 97,000.00 100,000.00 SUB TOTAL 38,500.00 58,500.00 52,000.00 SUB TOTAL 125,000.00

87,264,000.00 37,268,000.00 35,211,000.00 4,900,000.00 164,643,000.00 46,161,500.00 2,106,000.00 624,000.00 48,891,500.00 7,625,000.00 7,625,000.00

1,199.00 36.00 12.00

HOK HOK HOK

61.00

Jam

C. PEKERJAAN PASANGAN GORONG-GORONG PLAT I BAHAN 1 Pasir pasang 5.00 2 Pasir Beton 2.00 3 Semen 2,640.00 4 Batu belah hitam 10.00 5 Kawat Ikat 8.00 6 Paku 11.00 7 Kayu Klas III 1.00 8 Batu pecah 1 - 2 cm 3.00 9 Baja Tulangan 504.00 II 1 2 3 4 III 1 UPAH Mandor Kepala tukang Pekerja Tukang batu ALAT Alat bantu

M3 M3 Kg M3 Kg Kg M3 M3 Kg

155,000.00 160,000.00 1,200.00 115,000.00 13,000.00 15,000.00 1,400,000.00 260,000.00 14,000.00 SUB TOTAL 58,500.00 55,000.00 38,500.00 52,000.00 SUB TOTAL 100,000.00 SUB TOTAL 3,000,000.00 200,000.00 SUB TOTAL

775,000.00 320,000.00 3,168,000.00 1,150,000.00 104,000.00 165,000.00 1,400,000.00 780,000.00 7,056,000.00 14,918,000.00 117,000.00 495,000.00 2,387,000.00 1,924,000.00 4,923,000.00 3,000,000.00 1,000,000.00 4,000,000.00 250,000,000.00

2.00 9.00 62.00 37.00

HOK HOK HOK HOK

-

Set

D PEKERJAAN LAIN-LAIN 1 Mobilisasi dan Demobilisasi Alat Berat 2 Prasasti

1.00 5.00

Ls Bh

TOTAL BIAYA DIPERIKSA OLEH: FASILITATOR DIBUAT OLEH: KETUA OMS

KADER DESA

RUDY SARMANTO.ST

PONIDI

PAIMAN

RENCANA PENGGUNAAN DANA I BANTUAN LANGSUNG MASYARAKAT (BLM)Propinsi Kabupaten Kecamatan Desa Pekerjaan Lokasi : : : : : : Lampung Pesawaran Tegineneng Margo Rejo Perkerasan Jalan Telford dan Gorong2 Plat Dusun V VOLUME NO. URAIAN VOLUME SATUAN Program : RIS-PNPM

HARGA SATUAN (Rp.) 500,000.00 3,500,000.00 1,000,000.00 SUB TOTAL

JUMLAH HARGA (Rp.) 200,000.00 1,400,000.00 400,000.00 2,000,000.00

A. BIAYA OPERASIONAL OMS 1 Pengukuran Pematokan 2 ATK dan Pelaporan 3 Transportasi OMS

0.40 0.40 0.40

Ls Ls Ls

B. PEKERJAAN PERKERASAN JALAN TELFORD I BAHAN 1 Batu belah 10 - 15 cm 242.00 2 Batu pecah 5 - 7 cm 52.00 3 Pasir Urug / Timbun 145.00 4 Alat bantu 19.00 II 1 2 3 III 1 UPAH Pekerja Mandor Operator terlatih ALAT Roller 3 wheel 6 - 8 ton

M3 M3 M3 Set

144,000.00 154,000.00 97,000.00 100,000.00 SUB TOTAL 38,500.00 58,500.00 52,000.00 SUB TOTAL 125,000.00 SUB TOTAL

34,848,000.00 8,008,000.00 14,065,000.00 1,900,000.00 58,821,000.00 18,518,500.00 877,500.00 19,396,000.00 -

481.00 15.00 -

HOK HOK HOK

-

Jam

C. PEKERJAAN PASANGAN GORONG-GORONG PLAT I BAHAN 1 Pasir pasang 5.00 2 Pasir beton 2.00 3 Semen 2,600.00 4 Batu belah hitam 10.00 5 Kawat Ikat 8.00 6 Paku 11.00 7 Kayu Klas III 1.00 8 Batu pecah 1 - 2 cm 3.00 9 Baja Tulangan 504.00 II 1 2 3 4 UPAH Mandor Kepala tukang Pekerja Tukang batu

M3 M3 Kg M3 Kg Kg M3 M3 Kg

155,000.00 160,000.00 1,200.00 115,000.00 13,000.00 15,000.00 1,400,000.00 260,000.00 14,000.00 SUB TOTAL 58,500.00 55,000.00 38,500.00 52,000.00 SUB TOTAL 3,000,000.00 200,000.00 SUB TOTAL

775,000.00 320,000.00 3,120,000.00 1,150,000.00 104,000.00 165,000.00 1,400,000.00 780,000.00 7,056,000.00 14,870,000.00 117,000.00 495,000.00 2,387,000.00 1,924,000.00 4,923,000.00 100,000,000.00

2.00 9.00 62.00 37.00

HOK HOK HOK HOK

D PEKERJAAN LAIN-LAIN 1 Mobilisasi dan Demobilisasi Alat Berat 2 Prasasti

-

Ls Bh

TOTAL BIAYA

DIPERIKSA OLEH: FASILITATOR

DIBUAT OLEH: KETUA OMS BENDAHARA

RUDY SARMANTO.ST

PONIDI

WAGIRAN

RENCANA PENGGUNAAN DANA II BANTUAN LANGSUNG MASYARAKAT (BLM)Propinsi Kabupaten Kecamatan Desa Pekerjaan Lokasi : : : : : : Lampung Pesawaran Tegineneng Margo Rejo Perkerasan Jalan Telford dan Gorong2 Plat Dusun V VOLUME NO. URAIAN VOLUME SATUAN Program : RIS-PNPM

HARGA SATUAN (Rp.) 500,000.00 3,500,000.00 1,000,000.00 SUB TOTAL

JUMLAH HARGA (Rp.) 150,000.00 1,050,000.00 300,000.00 1,500,000.00

A. BIAYA OPERASIONAL OMS 1 Pengukuran Pematokan 2 ATK dan Pelaporan 3 Transportasi OMS B. PEKERJAAN PERKERASAN JALAN I 1 2 3 4 II 1 2 3 III 1 BAHAN Batu belah 10 - 15 cm Batu pecah 5 - 7 cm Pasir Urug / Timbun Alat bantu UPAH Pekerja Mandor Operator terlatih ALAT Roller 3 wheel 6 - 8 ton

0.30 0.30 0.30

Ls Ls Ls

182.00 95.00 157.00 30.00

M3 M3 M3 Set

144,000.00 154,000.00 97,000.00 100,000.00 SUB TOTAL 38,500.00 58,500.00 52,000.00 SUB TOTAL 125,000.00 SUB TOTAL

26,208,000.00 14,630,000.00 15,229,000.00 3,000,000.00 59,067,000.00 13,744,500.00 643,500.00 14,388,000.00 -

357.00 11.00 -

HOK HOK HOK

-

Jam

C. PEKERJAAN PASANGAN GORONG-GORONG PLAT I BAHAN 1 Pasir pasang 2 Semen 40.00 3 Batu belah hitam 4 Kawat Ikat 5 Paku 6 Kayu Klas III 7 Batu pecah 1 - 2 cm 8 Baja Tulangan II 1 2 3 4 III 1 UPAH Mandor Kepala tukang Pekerja Tukang batu ALAT Alat bantu

M3 Kg M3 Kg Kg M3 M3 Kg

155,000.00 1,200.00 115,000.00 13,000.00 15,000.00 1,400,000.00 260,000.00 14,000.00 SUB TOTAL 58,500.00 55,000.00 38,500.00 52,000.00 SUB TOTAL SUB TOTAL 3,000,000.00 200,000.00 SUB TOTAL

48,000.00 48,000.00 75,000,000.00

-

HOK HOK HOK HOK

-

Set

D PEKERJAAN LAIN-LAIN 1 Mobilisasi dan Demobilisasi Alat Berat 2 Prasasti TOTAL BIAYA DIPERIKSA OLEH: FASILITATOR

-

Ls Bh

DIBUAT OLEH: KETUA OMS BENDAHARA

RUDY SARMANTO.ST

PONIDI

WAGIRAN

RENCANA PENGGUNAAN DANA III BANTUAN LANGSUNG MASYARAKAT (BLM)Propinsi Kabupaten Kecamatan Desa Pekerjaan Lokasi : : : : : : Lampung Pesawaran Tegineneng Margo Rejo Perkerasan Jalan Telford dan Gorong2 Plat Dusun V VOLUME NO. URAIAN VOLUME SATUAN Program : RIS-PNPM

HARGA SATUAN (Rp.) 500,000.00 3,500,000.00 1,000,000.00 SUB TOTAL

JUMLAH HARGA (Rp.) 150,000.00 1,050,000.00 300,000.00 1,500,000.00

A. BIAYA OPERASIONAL OMS 1 Pengukuran Pematokan 2 ATK dan Pelaporan 3 Transportasi OMS B. PEKERJAAN PERKERASAN JALAN I BAHAN 1 Batu belah 10 - 15 cm 2 Batu pecah 5 - 7 cm 3 Pasir Urug / Timbun 4 Alat bantu II 1 2 3 III 1 UPAH Pekerja Mandor Operator terlatih ALAT Roller 3 wheel 6 - 8 ton

0.30 0.30 0.30

Ls Ls Ls

182.00 95.00 61.00 -

M3 M3 M3 Set

144,000.00 154,000.00 97,000.00 100,000.00 SUB TOTAL 38,500.00 58,500.00 52,000.00 SUB TOTAL 125,000.00 SUB TOTAL

26,208,000.00 14,630,000.00 5,917,000.00 46,755,000.00 13,898,500.00 643,500.00 624,000.00 15,166,000.00 7,625,000.00 7,625,000.00

361.00 11.00 12.00

HOK HOK HOK

61.00

Jam

C. PEKERJAAN PASANGAN GORONG-GORONG PLAT I BAHAN 1 Pasir pasang 2 Semen 3 Batu belah hitam 4 Kawat Ikat 5 Paku 6 Kayu Klas III 7 Batu pecah 1 - 2 cm 8 Baja Tulangan II 1 2 3 4 III 1 UPAH Mandor Kepala tukang Pekerja Tukang batu ALAT Alat bantu

M3 Kg M3 Kg Kg M3 M3 Kg

155,000.00 1,200.00 115,000.00 13,000.00 15,000.00 1,400,000.00 260,000.00 14,000.00 SUB TOTAL 58,500.00 55,000.00 38,500.00 52,000.00 SUB TOTAL SUB TOTAL 3,000,000.00 200,000.00 SUB TOTAL

3,000,000.00 1,000,000.00 4,000,000.00 75,000,000.00

-

HOK HOK HOK HOK

-

Set

D PEKERJAAN LAIN-LAIN 1 Mobilisasi dan Demobilisasi Alat Berat 2 Prasasti

1.00 5.00

Ls Bh

TOTAL BIAYA DIPERIKSA OLEH: FASILITATOR DIBUAT OLEH: KETUA OMS

BENDAHARA

RUDY SARMANTO.ST

PONIDI

WAGIRAN

RENCANA ANGGARAN BIAYA BANTUAN LANGSUNG MASYARAKAT (BLM)Propinsi Kabupaten Kecamatan Desa Pekerjaan Lokasi : : : : : : Lampung Pesawaran Tegineneng Margo Rejo Lapis Pondasi Bawah (LPB) / Telford Dusun V VOLUME NO. URAIAN VOLUME SATUAN No. RAB Program : : RIS-PNPM

726.75

M3

HARGA SATUAN (Rp.)

JUMLAH HARGA (Rp.)

I 1 2 3 4

BAHAN Batu belah 10 - 15 cm Batu pecah 5 - 7 cm Pasir Urug / Timbun Alat bantu 605.63 242.25 363.38 48.45 M3 M3 M3 Set 144,000.00 154,000.00 97,000.00 100,000.00 87,210,108.00 37,306,546.20 35,247,418.65 4,845,006.00

SUB TOTAL I II 1 2 3 UPAH Pekerja Mandor Operator terlatih 1,199.14 36.34 12.11 HOK HOK HOK 38,500.00 58,500.00 52,000.00

164,609,078.85

46,166,850.92 2,125,746.38 629,850.78

SUB TOTAL II III 1 ALAT Mesin Gilas 3 Roda 6 - 8 T 60.56 Jam 125,000.00

48,922,448.09

7,570,321.88

SUB TOTAL III TOTAL BIAYA

7,570,321.88 221,101,848.81

DIPERIKSA OLEH: FASILITATOR KETUA OMS

DIBUAT OLEH: KADER DESA

RUDY SARMANTO.ST

PONIDI

PAIMAN

RENCANA ANGGARAN BIAYA BANTUAN LANGSUNG MASYARAKAT (BLM)Propinsi Kabupaten Kecamatan Desa Pekerjaan Lokasi : : : : : : Lampung Pesawaran Tegineneng Margo Rejo Pas. Batu Belah Hitam Dusun V No. RAB Program : : RIS-PNPM

8.23

M3

VOLUME NO. URAIAN VOLUME SATUAN

HARGA SATUAN (Rp.)

JUMLAH HARGA (Rp.)

I 1 2 3

BAHAN Batu belah hitam Pasir pasang Semen 9.88 4.28 1,341.49 M3 M3 Kg 115,000.00 155,000.00 1,200.00 1,135,740.00 663,338.00 1,609,788.00

SUB TOTAL I II 1 2 3 4 UPAH Pekerja Kepala tukang Tukang Batu Mandor 12.35 0.62 6.17 0.62 HOK HOK HOK HOK 38,500.00 55,000.00 52,000.00 58,500.00

3,408,866.00

475,282.50 33,948.75 320,970.00 36,109.13

SUB TOTAL II III 1 ALAT Alat bantu Set 100,000.00

866,310.38

SUB TOTAL III TOTAL BIAYA

4,275,176.38

DIPERIKSA OLEH: FASILITATOR KETUA OMS

DIBUAT OLEH: KADER DESA

RUDY SARMANTO.ST

PONIDI

PAIMAN

RENCANA ANGGARAN BIAYA BANTUAN LANGSUNG MASYARAKAT (BLM)Propinsi Kabupaten Kecamatan Desa Pekerjaan Lokasi : : : : : : Lampung Pesawaran Tegineneng Margo Rejo Beton Bertulang Dusun V No. RAB Program : : RIS-PNPM

3.36

M3

VOLUME NO. URAIAN VOLUME SATUAN

HARGA SATUAN (Rp.)

JUMLAH HARGA (Rp.)

I 1 2 3 4 5 6 7

BAHAN Besi Beton Semen Pasir Beton Split 1 - 2 Kawat Ikat Kayu Perancah Paku 504.00 1,128.96 1.81 2.76 7.56 1.08 10.75 Kg Kg M3 M3 Kg M3 Kg 14,000.00 1,200.00 160,000.00 260,000.00 13,000.00 1,400,000.00 15,000.00 SUB TOTAL I 7,056,000.00 1,354,752.00 290,304.00 716,352.00 98,280.00 1,505,280.00 161,280.00 11,182,248.00

II 1 2 3 4

UPAH Mandor Kepala tukang Tukang Pekerja 1.02 7.98 26.88 42.87 HOK HOK HOK HOK 58,500.00 55,000.00 52,000.00 38,500.00 59,950.80 438,900.00 1,397,760.00 1,650,633.60

SUB TOTAL II III 1 ALAT Alat bantu Set 100,000.00

3,547,244.40

-

SUB TOTAL III TOTAL BIAYA

14,729,374.80

DIPERIKSA OLEH: FASILITATOR KETUA OMS

DIBUAT OLEH: KADER DESA

RUDY SARMANTO.ST

PONIDI

PAIMAN

RENCANA ANGGARAN BIAYA BANTUAN LANGSUNG MASYARAKAT (BLM)Propinsi Kabupaten Kecamatan Desa Pekerjaan Lokasi : : : : : : Lampung Pesawaran Tegineneng Margo Rejo Plesteran Dusun V No. RAB Program : : RIS-PNPM

31.44

M2

VOLUME NO. URAIAN VOLUME SATUAN

HARGA SATUAN (Rp.)

JUMLAH HARGA (Rp.)

I 1 2

BAHAN Pasir Pasang Semen

0.88 169.78

M3 kg

155,000.00 1,200.00

136,449.60 203,731.20

SUB TOTAL I II 1 2 3 4 UPAH Mandor Pekerja Kepala Tukang Tukang

340,180.80

0.25 7.07 0.31 4.79

HOK HOK HOK HOK

58,500.00 38,500.00 55,000.00 52,000.00

14,713.92 272,349.00 17,292.00 249,319.20

SUB TOTAL II III 1 ALAT Alat bantu

553,674.12

-

Set

100,000.00

-

SUB TOTAL III TOTAL BIAYA

893,854.92

DIPERIKSA OLEH: FASILITATOR

DIBUAT OLEH: KETUA OMS KADER DESA

RUDY SARMANTO.ST

PONIDI

PAIMAN

ANALISA HARGA SATUANPROGRAM KEGIATAN LOKASI TAHUN : RIS - PNPM : PEMBANGUNAN GORONG2 : DESA MARGOREJO, KEC. TEGINENENG, KAB. PESAWARAN : 2011

ANALYSA

URAIAN PEKERJAAN

HARGA SATUAN (Rp)

JUMLAH HARGA (Rp)

C.2

1 M 3 PASANG BATU BELAH Adk. 1 : 4 163 Kg Semen 1.2 m3 Bt. Belah 0.52 m3 Pasir 1.5 HOK Pekerja 0.75 HOK Tukang 0.075 HOK Kep. Tukang 0.075 HOK Mandor Sub. Total

1,200.00 115,000.00 155,000.00 38,500.00 52,000.00 55,000.00 58,500.00

195,600.00 138,000.00 80,600.00 57,750.00 39,000.00 4,125.00 4,387.50 519,462.50

E.27

PEK. PLESTERAN adk. 1 : 5 + Acian 5.4 Kg Semen 0.028 m3 Pasir 0.225 HOK Pekerja 0.1525 HOK Tukang 0.01 HOK Kep. Tukang 0.008 HOK Mandor Sub. Total

1,200.00 155,000.00 38,500.00 52,000.00 55,000.00 58,500.00

6,480.00 4,340.00 8,662.50 7,930.00 550 468.00 28,430.50

G.29

1 M3 COR BETON TAK BERTULANG Adk. 1:2:3 0.82 M3 Batu Pecah 1/2 0.54 M3 Pasir Beton 336 Kg Semen (PC) 1 HOK Tukang 0.1 HOK Kepala Tukang 6 HOK Pekerja 0.3 HOK Mandor Sub. Total PENULANGAN BESI TIAP 1 M3 BETON: 6.75 HOK Tukang 2.25 HOK Kepala Tukang 6.75 HOK Pekerja BAHAN TIAP 1 M3 BETON : 150 Kg Besi beton 2.25 Kg Kawat beton Sub. Total CETAKAN BETON (BEKISTING ) UNTUK 1 M3 0.25 HOK Tukang 0.025 HOK Kepala Tukang 0.01 HOK Pekerja 0.005 HOK Mandor Bahan-bahan 0.32 M3 Kayu Kls.III (Papan) 3.2 Kg Paku Sub. Total

260,000.00 160,000.00 1,200.00 52,000.00 55,000.00 38,500.00 58,500.00

213,200.00 86,400.00 403,200.00 52,000.00 5,500.00 231,000.00 17,550.00 1,008,850.00

52,000.00 55,000.00 38,500.00 14,000.00 13,000.00

351,000.00 123,750.00 259,875.00 2,100,000.00 29,250.00 2,863,875.00

52,000.00 55,000.00 35,000.00 58,500.00 1,400,000.00 15,000.00

13,000.00 1,375.00 350 292.5 448,000.00 48,000.00 511,017.50 4,383,742.50

Total 1 m3 Beton Bertulang