DAFTAR HARGA SATUAN UPAH, BAHAN DAN ALAT

DESA KECAMATAN KABUPATEN PROPINSI PROGRAM TAHUN ANGGARAN

: : : : : :

MARGO REJO TEGINENENG PESAWARAN LAMPUNG RIS-PNPM 2011 HARGA SATUAN (Rp.) Hasil Survey Supl. II Supl. III

NO.

URAIAN

SATUAN Supl. I

Realisasi Pelaksanaan

KETERANGAN

I 1 2 3 4 5 II 1 2 3 4 5 6 7 8 9 9 10 11 12

UPAH Tukang Kepala Tukang Pekerja Mandor Operator Terampil BAHAN Batu Belah Semen PC Pasir Beton Pasir Pasang Pasir Urug Batu Pecah 15 - 20 cm Batu Pecah 10 - 15 cm Batu Pecah 5 - 7 cm Batu 1 - 2 cm Besi Beton Kawat Ikat Paku Kayu Klas III

HOK HOK HOK HOK HOK

54,500.00 57,500.00 41,000.00 61,000.00 54,500.00

53,500.00 56,500.00 40,000.00 60,000.00 53,500.00

52,000.00 55,000.00 38,500.00 58,500.00 52,000.00

52,000.00 55,000.00 38,500.00 58,500.00 52,000.00

M3 Kg M3 M3 M3 M3 M3 M3 M3 Kg Kg Kg M3

117,500.00 1,250.00 162,500.00 157,500.00 99,500.00 117,500.00 146,500.00 156,500.00 262,500.00 16,500.00 15,500.00 17,500.00 1,425,000.00

116,500.00 1,350.00 161,500.00 156,500.00 98,500.00 116,500.00 145,500.00 155,500.00 261,500.00 15,500.00 14,500.00 16,500.00 1,415,000.00

115,000.00 1,200.00 160,000.00 155,000.00 97,000.00 115,000.00 144,000.00 154,000.00 260,000.00 14,000.00 13,000.00 15,000.00 1,400,000.00

115,000.00 1,200.00 160,000.00 155,000.00 97,000.00 115,000.00 144,000.00 154,000.00 260,000.00 14,000.00 13,000.00 15,000.00 1,400,000.00

III ALAT 1 Mesin Gilas 3 Roda 6-8 T 2 Alat Bantu

Jam Set

127,500.00 102,500.00

126,500.00 101,500.00

125,000.00 100,000.00

125,000.00 100,000.00

DIVERIFIKASI OLEH: TAMK

DIPERIKSA OLEH :

DIBUAT OLEH ; OMS

JANTUAHMAN SARAGIH ST

RUDY SARMANTO ST

PONIDI

DIREKTORAT JENDRAL BINA MARGA DIREKTORAT BNA PROGRAM JALAN SUB DIT. PERENCANAAN JALAN LOKAL & KABUPATEN

ANALISA BIAYA PEKERJAANKONSTRUKSI LAPIS PONDASI ATAS ( L P B ) TELFORD ( MENGGUNAKAN BURUH ) KODE DISIAPKAN OLEH

PROPINSI

KODE

KABUPATEN

PROSES : 1. Material disiapkan di lokasi pekerjaan. 2. Menghampar pasir setebal 5 cm. 3. Batu pecah berukuran besar ( 10-15 cm ) disusun berdiri. 4. Batu pecah yang lebih kecil mengisi rongga-rongga diatasnya kemudian dipadatkan/digilas mesin gilas

ANGGAPAN / ASUMSI : 1. Menggunakan tenaga manusia 400 m2/hari 2. Material dikirim ke lokasi pekerjaan oleh supplier. 3. Material sudah di pecah/batu pecah. 4. Tanah Dasar sudah dipersiapkan. 5. Dipadatkan sampai tebal 15 cm

P E K E R J A

VOL

HARI

KODE

JUMLAH HARI-ORANG

UPAH (Rp./org/hr)

BIAYA ( Rp. )

P Mandor Lapangan E Operator Terlatih K Pekerja E R J A

3 1 99

1 1 1

3.00 1.00 99.00

58,500.00 52,000.00 38,500.00

175,500.00 52,000.00 3,811,500.00

PEKERJAM A T E R I A L JUMLAH VOLUME SATUAN KODE HARGA Rp./Unit BIAYA ( Rp. )

M A T E R I A L

Batu Pecah 10 - 15 cm Batu Pecah 5 - 7 cm Pasir Urug Alat bantu

50 20 30 4

m3 m3 m3 set

144,000.00 154,000.00 97,000.00 100,000.00

7,200,000.00 3,080,000.00 2,910,000.00 400,000.00

MATERIALPERALATAN JUMLAH ALAT HARI KERJA KODE JAM KERJA HARGA (Rp./JAM) BIAYA ( Rp. )

P E Mesin Gilas 6 - 8 T R A L A T A N

1

1

5

125,000.00

625,000.00

PERALATAN TOTAL (Rp.) VOLUME : 60 SATUAN : m3 HARGA SATUAN Rp. 304,233.33 304,233.33

KODE

K 516

TAHUN 2011

SUB.TOTAL ( Rp. )

4,039,000.00SUB.TOTAL ( Rp. )

13,590,000.00SUB.TOTAL ( Rp. )

625,000.00 18,254,000.00

per m3

ANALISA HARGA SATUANPENGUPASAN TANAH DAN PEMBERSIHAN BADAN JALAN (MENGGUNAKAN BURUH)PROPINSI : AMPUNG L KODE KABUPATEN KODE DISIAPKAN OLEH :

KODE K - 210Tahun 2011

URAIAN 1. Mengupas dan membuang semak dengan tenaga manusia pada DAMIJA ( Daerah Milik Jalan ) 2. Lebar pengupasan dan pembersihan = DAMIJA minus lebar badan jalan

ANGGAPAN / ASUMSI 1. Menggunakan tenaga manusia ( 1200 m2 / hari = 12 Are / hari ) 2. Tidak ada pohon besar pada DAMIJA (Hanya Semak) 3. DAMIJA 12 m 4. Pembersihan DAMIJA 100m per hari 5. Bakar sampah dilokasi pekerjaan 6. Hasil kerja 25 m2/orang/hari 7. Umur alat bantu rata-rata 1 bulan/orang/set @ 3 alat JUMLAH ORANG HARI KODE TOTAL VOL (Orang-hari) UPAH (Rp/Org/Hari) BIAYA (Rp) SUB TOTAL (Rp)

PEKERJA

P Pekerja E Mandor K E R J A

48 1

1 1

48.00 1.00

38,500.00 58,500.00

1,848,000.00 58,500.00

MATERIAL

JUMLAH BIAYA UNTUK PEKERJA SATUAN

KODE

TOTAL VOL

HARGA SATUAN (Rp)

PEKERJA (I+II) BIAYA (Rp)

1,906,500.00 SUB TOTAL (Rp)

M Alat Bantu @ 3 alat A T E R I A L

Ls

1.92

100,000.00

192,000.00

PERALATAN

JUMLAH BIAYA UNTUK MATERIAL JUMLAH HARI ALAT KERJA

KODE

JAM KERJA

HARGA (Rp/Jam)

MATERIAL (I+II) BIAYA (Rp)

192,000.00 SUB TOTAL (Rp)

P E R A L A T A N

JUMLAH BIAYA UNTUK PERALATAN

PERALATAN (I+II) T O T A L (Rp) HARGA SATUAN : 1,748.75 per m2

0.00 2,098,500.00

VOLUME :

1,200.00

SATUAN :

m2

ANALISA HARGA SATUANGALIAN TANAH UNTUK PEMBENTUKAN DRAINASE (MENGGUNAKAN BURUH)PROPINSI : AMPUNG L KODE KABUPATEN KODE DISIAPKAN OLEH :

KODE K - 224Tahun 2011

URAIAN 1. Digali dengan tenaga masnusia 2. Membuang tanah galian sejauh 30 meter dari lubang galian

ANGGAPAN / ASUMSI 1. Menggunakan Tenaga Manusia (40m3/hari) 2. Kapasitas Kerja /orang 1,3 m3/hari 3. Kedalaman rata-rata galian sampai dengan 3,00 meter 4. Umur alat bantu rata-rata 1 bulan/orang/set @ 3 alat

PEKERJA

JUMLAH ORANG

HARI

KODE

TOTAL VOL (Orang hari)

UPAH (Rp/Org/Hari)

BIAYA (Rp)

SUB TOTAL (Rp)

P Buruh tak terampil E Mandor K E R J A

30 1

1 1

30.00 1.00

38,500.00 58,500.00

1,155,000.00 58,500.00

MATERIAL

JUMLAH BIAYA UNTUK PEKERJA JUMLAH SATUAN MATERIAL

KODE

TOTAL VOL

HARGA SATUAN (Rp)

PEKERJA (I+II) BIAYA (Rp)

1,213,500.00 SUB TOTAL (Rp)

M A T E R I A L

Alat bantu (set @ 3 set)

Set

1.20

100,000.00

120,000.00

PERALATAN

JUMLAH BIAYA UNTUK MATERIAL JUMLAH HARI ALAT KERJA

KODE

JAM KERJA

HARGA (Rp/Jam)

MATERIAL (I+II) BIAYA (Rp)

120,000.00 SUB TOTAL (Rp)

P E R A L A T A N

JUMLAH BIAYA UNTUK PERALATAN

PERALATAN (I+II) T O T A L (Rp) HARGA SATUAN : 33,337.50 per M3

0.00 1,333,500.00

VOLUME :

40.00

SATUAN :

M3

ANALISA HARGA SATUANKONSTRUKSI PASANGAN BATU HITAM (MENGGUNAKAN BURUH)PROPINSI : AMPUNG L KODE KABUPATEN KODE DISIAPKAN OLEH :

KODE K - 705Tahun 2011

URAIAN 1. Material disiapkan ke lokasi oleh pekerjaan oleh Pemasok 2. Pekerja membawa batu belah ketempat tukang batu bekerja 3. Tukang batu memasang batu belah dengan adukan pasir dan semen.

ANGGAPAN / ASUMSI 1. Dilakukan untuk pekerjaan gorong-gorong, jembatan, dinding penahan tanah dan struktur lainnya, yang menggunakan konstruksi pasangan batu 2. Material-material dikirim ketempat pekerjaan oleh pemasok 3. Tidak termasuk galian/Timbunan 4. Biaya alat bantu tambahan sudah termasuk biaya kira-kira ekivalen dari bambu untuk lubang drainase

PEKERJA

JUMLAH ORANG

HARI

KODE

TOTAL VOL (Orang hari)

UPAH (Rp/Org/Hari)

BIAYA (Rp)

SUB TOTAL (Rp)

P Buruh tak terampil E Kepala Tukang K Tukang Batu E R J A

12 1 4

1 1 1

12.00 1.00 4.00

38,500.00 55,000.00 52,000.00

462,000.00 55,000.00 208,000.00

MATERIAL

JUMLAH BIAYA UNTUK PEKERJA JUMLAH SATUAN MATERIAL

KODE

TOTAL VOL

HARGA SATUAN (Rp)

PEKERJA (I+II) BIAYA (Rp)

725,000.00 SUB TOTAL (Rp)

M A T E R I A L

Batu Belah Hitam Pasir ayak untuk beton Semen Alat Bantu (set @ 3 alat)

M3 M3 50 kg Set

5.00 1.25 15.20 0.75

115,000.00 155,000.00 1,200.00 100,000.00

575,000.00 193,750.00 18,240.00 75,000.00

PERALATAN

JUMLAH BIAYA UNTUK MATERIAL JUMLAH HARI ALAT KERJA

KODE

JAM KERJA

HARGA (Rp/Jam)

MATERIAL (I+II) BIAYA (Rp)

861,990.00 SUB TOTAL (Rp)

P E R A L A T A N

Pompa air diameter 5 cm/ 30 m3 perjam

1

1

2.00

JUMLAH BIAYA UNTUK PERALATAN

PERALATAN (I+II) T O T A L (Rp) HARGA SATUAN : 317,398.00 per M3

1,586,990.00

VOLUME :

5.00

SATUAN :

M3

RENCANA JADWAL PELAKSANAAN DAN KURVA-SPROPINSI KABUPATEN KECAMATAN DESA : : : : LAMPUNG PESAWARAN TEGINENENG MARGO REJO Program Jenis Kegiatan Ukuran/Dimensi : RIS-PNPM : 1. PEKERJAAN PERKERASAN JALAN TELFORD 2. PEKERJAAN GORONG-GORONG PLAT : 1. Telford ( 1615 M x 3 M ) 2. Gorong2 Plat (Uk 0,8 x 0,8 M) P. 4 M ( 3 Buah)

Harga Satuan No. Uraian Kegiatan Volume Satuan (Rp.) I BIAYA OPERASIONAL OMS 1 Pengukuran dan Pematokan 2 ATK dan Pelaporan 3 Transportasi OMS 1.000 1.000 1.000 Ls Ls Ls 500,000.00 3,500,000.00 1,000,000.00

Jumlah Harga (Rp.)

Bobot 1 %

Bulan 1 2 3 4

Bulan 2 5

Jangka Waktu Pelaksanaan Pekerjaan Bulan 3 6 7 8 9

10

11

12

Bulan 4 13

14

Ket. (%)

500,000.00 3,500,000.00 1,000,000.00

0.193 1.354 0.387

0.097 0.226 0.097

0.097 0.226 0.097 0.226 0.226 0.097 0.097 0.226 0.226

100

II