rab pagar.xls

Download RAB PAGAR.xls

Post on 12-Jan-2016

228 views

Category:

Documents

25 download

Embed Size (px)

TRANSCRIPT

rekapRENCANA REHABILITASIRUANG KELAS SEKOLAH DASARDANA ALOKASI KHUSUS (DAK) TAHUN 2011 (LUNCURAN)NOKABUPATENNAMA SEKOLAHKECAMATANNPSNKOORDINATKERUSAKANNILAIBIAYA MEBEULAIRJUMLAH TOTALJUMLAH TOTALREALISASISELISIHREALISASIDAKSE%(Rp)(Rp)(Rp)(Rp)(Rp)(Rp)(Rp)1PANDEGLANGSDN BANJARMASIN 1CARITA773,500,0000.0514,500,000514,500,0000.00.0514,500,000.002PANDEGLANGSDN SINDANGLAUT 1CARITA373,500,0000.0220,500,000220,500,0000.00.0220,500,000.003PANDEGLANGSDN SUKARAME 1CARITA773,500,0000.0514,500,000514,500,0000.00.0434,000,000.004PANDEGLANGSDN TEMBONG 1CARITA273,500,0000.0147,000,000147,000,0000.00.0147,000,000.005PANDEGLANGSDN BABAKANLOR 3CIKEDAL373,500,0000.0220,500,000220,500,0000.00.0220,500,000.006PANDEGLANGSDN CENING 1CIKEDAL873,500,0000.0588,000,000588,000,0000.00.0455,000,000.007PANDEGLANGSDN DAHU 1CIKEDAL673,500,0000.0441,000,000441,000,0000.00.0441,000,000.008PANDEGLANGSDN DAHU 2CIKEDAL473,500,0000.0294,000,000294,000,0000.00.0281,000,000.009PANDEGLANGSDN KARYASARI 3CIKEDAL373,500,0000.0220,500,000220,500,0000.00.0220,500,000.0010PANDEGLANGSDN KARYA UTAMA 1CIKEDAL673,500,0000.0441,000,000441,000,0000.00.0305,000,000.0011PANDEGLANGSDN KARYA UTAMA 2CIKEDAL473,500,0000.0294,000,000294,000,0000.00.0294,000,000.0012PANDEGLANGSDN TEGAL 1CIKEDAL273,500,0000.0147,000,000147,000,0000.00.0147,000,000.00Jumlah554,042,500,0004,042,500,0000.00.03,680,000,000.004,031,000,000.0021.0521.0532.464.820.5520.559277.57.5292933172.958.859574468135.3157446809

(2)REKAPITULASI RINCIAN ANGGARAN BIAYA0.0Program: Manajemen Pelayanan PendidikanKegiatan: Bantuan Dana Alokasi Khusus (DAK) Bidang PendidikanPekerjaan: Rehabilitasi Gedung SDN Sindanglaut 1 Kecamatan CaritaLokasi: Kabupaten PandeglangAnggaran: DAK Tahun Anggaran 2011NO.URAIAN PEKERJAANJUMLAH (Rp.)A.REHABILITASI 3 (TIGA) RUANG KELAS0.0I.PEKERJAAN PERSIAPAN3,615,680.000.0II.PEKERJAAN TANAH DAN URUGAN1,393,249.600.0III.PEKERJAAN BETON0.00.0IV.PEKERJAAN DINDING DAN PLESTERAN0.00.0V.PEKERJAAN LANTAI0.00.0VI.PEKERJAAN KUSEN PINTU DAN JENDELA0.00.0VII.PEKERJAAN ATAP DAN PLAFOND0.00.0VIII.PEKERJAAN PENGECATAN74,261,914.330.0IX.PEKERJAAN INSTALASI LISTRIK DAN ARMATURE0.00.0REAL COST0.00.0PPN 10%0.0JUMLAH TOTAL0.073,500,000.00220,500,000.00DIBULATKAN0.0220,500,000.00250,500,000.00Terbilang : " Dua Ratus Dua Puluh Juta Lima Ratus Ribu Rupiah "0.00.0Pandeglang, Juni 2012Konsultan PerencanaPT. SAKHA MULTITAMATB. EKA NUGRAHA, K.E.R, S.KomD i r e k t u rRINCIAN ANGGARAN BIAYA (RAB)Program: Manajemen Pelayanan PendidikanKegiatan: Bantuan Dana Alokasi Khusus (DAK) Bidang PendidikanPekerjaan: Rehabilitasi Gedung SDN Sindanglaut 1 Kecamatan CaritaLokasi: Kabupaten PandeglangAnggaran: DAK Tahun Anggaran 2011NO.URAIAN PEKERJAANVOLUMEHARGA SATUAN(Rp.)J U M L A H(Rp.)VOLUMEVOLUME AWAL1234533A.REHABILITASI 3 (TIGA) RUANG KELASI.PEKERJAAN PERSIAPAN1Pek. Papan nama proyek1.00bh365,680.00365,680.0050.00m'49.00112.00111.002Pek. Bongkaran1.00ls1,500,000.001,500,000.0071.00m'70.00112.00111.003Biaya Dokumentasi dan Pelaporan1.00ls1,750,000.001,750,000.00Jumlah I3,615,680.003,615,680.000.00.0II.PEKERJAAN TANAH DAN URUGAN0.00.01Pek. Galian tanah pondasi terasm317,600.000.0m30.013.5169.07169.072Pek. Urugan tanah kembalim38,430.000.0m30.01151.9551.953Pek. Urugan pasir dibawah pondasi terasm3130,900.000.0m30.09.959.951Pek. Urugan pasir dibawah lantai9.44m3147,590.001,393,249.609.44m3(0.00)26.4016.96Jumlah II1,393,249.601,393,249.600.00.0III.PEKERJAAN BETON0.00.01Pas. Pondasi batu kali ad. 1:5 terasm3554,250.000.0m30.077.3577.350.092Pas. Rollag batu bata ad. 1:5 terasm3597,565.300.0m30.03Pek. Sloof 15/20 beton Site Mix K.175 terasm33,185,300.000.0m30.06.636.630.360.451Pek. Kolom struktur 15/20 beton Site Mix K.1752.10m30.00.02.10m30.03.331.230.1352Pek. Kolom teras 15/20 beton Site Mix K.175m30.00.00.75m30.752.082.080.273Pek. Kolom praktis 12/12 beton Site Mix K.175m34,237,140.000.00.20m30.201.171.172Pek. Balok teras 15/20 beton Site Mix K.1750.88m30.00.00.88m30.001.620.743Pek. Ringbalok & ampig 12/20 beton Site Mix K.1751.99m30.00.01.99m3(0.00)5.303.314Pek. Pasangan bata pondasi rabat ad. 1:527.50m289,590.002,463,725.0027.12(0.38)5Pek. Rabat beton tumbuk ad. 1:3:52.76m3373,360.001,030,473.602.76m30.07.424.66Jumlah III0.00.00.00.0IV.PEKERJAAN DINDING DAN PLESTERAN71.3071.300.01Pek. Dinding bata ad. 1:596.69m289,590.008,662,457.10220.25m2123.56456.00359.312Pek. Plesteran dinding ad. 1:5 + acian410.20m246,330.0019,004,566.00410.20m20.0846.96436.763Pek. Plesteran beton ad 1:3 + acian33.63m20.00.051.20m217.5655.5021.874Pek. Dinding dan kolom teras keramik 20/2530.30m226,260.00795,678.0030.30m20.055.5025.20Jumlah IV0.00.00.00.00.0V.PEKERJAAN LANTAI0.00.00.01Pek. Lantai keramik 30x30 cm setara KW II180.45m20.00.0180.45m20.0456.76276.31Jumlah V0.00.00.00.0VI.PEKERJAAN KUSEN PINTU DAN JENDELA0.00.01Pek. Kusen pintu P13.00bh0.00.01.22m3(1.78)4.001.002Pek. Kusen jendela J112.00bh0.00.012.48m20.4820.008.003Pek. Kusen bouvenlight BV13.00bh0.00.08.56m25.56Jumlah VI0.00.00.00.0VII.PEKERJAAN ATAP DAN PLAFOND0.00.01Pek. Rangka atap baja ringan279.50m20.00.0279.47m2(0.03)681.10401.602Pek. Genteng metal lapis pasir279.50m20.00.0279.47m2(0.03)0.00.03Pek. Nok genteng metal lapis pasir23.50m'0.00.023.50m'0.069.1545.654Pek. Flashing listplank metal lapis pasir24.60m'0.00.024.60m'5Pek. Plafond GRC 1x1 m + rangka kayu klas III242.65m25,565,210.001,350,398,206.50242.65m20.0528.00285.356Pek. Listplang tumpang sari 3/20+2/8 kayu kelas II+penguat71.50m'0.00.071.50m'0.0112.0040.507Pek. List plafond profil kayu273.80m'0.00.0273.80m'0.0437.00163.20Jumlah VII0.00.00.00.0VIII.PEKERJAAN PENGECATAN0.00.01Pek. Pengecatan dinding & beton sek. Decoplus461.40m253,710.0024,781,659.73461.40m20.0846.96385.562Pek. Pengecatan plafond sek. Decoplus242.65m2143,920.0034,922,188.00242.65m20.0528.00285.353Pek. Pengecatan listplank sek. Glotex21.45m2122,770.002,633,416.5021.45m20.033.6012.154Pek. Pengecatan kusen pintu/jendela sek. Glotex97.13m2122,770.0011,924,650.100.0m20.033.60(63.53)Jumlah VIII74,261,914.3374,261,914.330.00.0IX.PEKERJAAN INSTALASI LISTRIK DAN ARMATURE0.00.01Pas. Instalasi titik lampu15.00titik0.00.015.00titik0.00.00.02Pas. Instalasi titik stop kontak3.00titik0.00.03.00titik0.04.001.003Pas. Saklar tunggal broco1.00bh0.00.01.00bh0.02.001.004Pas. Saklar ganda broco3.00bh0.00.03.00bh0.05.002.005Pas. Stop kontak broco3.00bh0.00.03.00bh0.04.001.006Pas. Lampu PLC 8 watt philips15.00bh0.00.015.00bh0.010.00(5.00)7Pas. Panel MCB 5x10 A1.00bh0.00.01.00bh0.01.000.0Jumlah IX0.00.00.00.0Jumlah Total0.00.00.00.000

(3)revREKAPITULASI RENCANA ANGGARAN BIAYA0.0Program: Manajemen Pelayanan PendidikanKegiatan: Bantuan Dana Alokasi Khusus (DAK) Bidang PendidikanPekerjaan: Rehabilitasi Gedung SDN Sukarame 1 Kecamatan CaritaLokasi: Kecamatan Carita Kabupaten PandeglangAnggaran: DAK Tahun Anggaran 2011NO.URAIAN PEKERJAANJUMLAH (Rp.)A.REHABILITASI 6 (ENAM) RUANG KELAS + RUANG GURU0.0I.PEKERJAAN PERSIAPAN5,615,680.000.0II.PEKERJAAN TANAH DAN URUGAN712,544.800.0III.PEKERJAAN PONDASI DAN BETON0.00.0IV.PEKERJAAN DINDING DAN PLESTERAN0.00.0V.PEKERJAAN LANTAI0.00.0VI.PEKERJAAN KUSEN PINTU DAN JENDELA0.00.0VII.PEKERJAAN ATAP DAN PLAFOND0.00.0VIII.PEKERJAAN PENGECATAN153,323,261.250.0IX.PEKERJAAN INSTALASI LISTRIK DAN ARMATURE0.00.0REAL COST0.00.0PPN 10%0.0JUMLAH TOTAL0.0171,500,000.00514,500,000.00DIBULATKAN0.0514,500,000.00250,500,000.00Terbilang : " Empat Ratus Tiga Puluh Empat Juta Tujuh Ratus Tiga Belas Ribu Rupiah "0.00.0Pandeglang, Juni 2012Konsultan PerencanaPT. SAKHA MULTITAMATB. EKA NUGRAHA, K.E.R, S. KomD i r e k t u rRENCANA ANGGARAN BIAYA (RAB)Program: Manajemen Pelayanan PendidikanKegiatan: Bantuan Dana Alokasi Khusus (DAK) Bidang PendidikanPekerjaan: Rehabilitasi Gedung SDN Sukarame 1 Kecamatan CaritaLokasi: Kecamatan Carita Kabupaten PandeglangAnggaran: DAK Tahun Anggaran 2011NO.URAIAN PEKERJAANVOLUMEHARGA SATUAN(Rp.)J U M L A H(Rp.)VOLUMEVOLUME AWAL1234533A.REHABILITASI 6 (ENAM) RUANG KELAS + RUANG GURUI.PEKERJAAN PERSIAPAN1Pek. Papan nama proyek1.00bh365,680.00365,680.001.00m'0.0112.00111.002Pek. Bongkaran1.00ls3,500,000.003,500,000.001.00m'0.0112.00111.003Biaya Dokumentasi dan Pelaporan1.00ls1,750,000.001,750,000.001.00Jumlah I5,615,680.005,615,680.000.00.0II.PEKERJAAN TANAH DAN URUGAN0.00.01Pek. Galian tanah pondasi teras6.98m338,980.00272,080.406.98m30.0013.5169.07162.092Pek. Urugan tanah kembali4.14m312,990.0053,778.604.14m3(0.00)1151.9547.813Pek. Urugan pasir dibawah pondasi teras0.28m3147,590.0041,325.200.28m3(0.00)9.959.674Pek. Urugan pasir dibawah lantai2.34m3147,590.00345,360.602.34m3(0.00)26.4024.06Jumlah II712,544.80712,544.800.00.0III.PEKERJAAN PONDASI DAN BETON0.00.01Pas. Pondasi batu kali ad. 1:5 teras2.57m30.00.02.57m3(0.00)77.3574.780.092Pas. Rollag batu bata ad. 1:5 teras2.17m3597,565.301,296,716.702.17m3(0.00)3Pek. Sloof 15/20 beton Site Mix K.175 teras1.52m30.00.01.52m3(0.00)6.635.110.360.454Pek. Kolom struktur 15/20 beton Site Mix K.1754.62m30.00.04.62m30.03.33(1.29)0.1355Pek. Kolom teras 15/20 beton Site Mix K.1751.43m30.00.01.43m3(0.00)2.080.650.276Pek. Kolom praktis 12/12 beton Site Mix K.1750.45m30.00.00.45m30.001.170.727Pek. Balok teras 15/20 beton Site Mix K.1752.27m30.00.02.27m3(0.00)1.62(0.65)8Pek. Ringbalok & ampig 12/20 beton Site Mix K.1754.11m30.00.04.11m30.005.301.199Pek. Saluran air hujan L=20 cm123.00m'188,470.0023,181,810.00123.000.010Pek. Rabat beton tumbuk ad. 1:3:53.88m3373,360.001,448,636.804.88m31.007.423.54Jumlah III0.00.00.00.0IV.PEKERJAAN DINDING DAN PLESTERAN129.20129.200.01Pek. Dinding bata ad. 1:5131.10m289,590.0011,745,249.00442.18m2311.08456.00324.902Pek. Plesteran dinding ad. 1:5 + acian287.23m246,330.0013,307,347.37828.44m2541.21846.96559.733Pek. Plesteran beton ad 1:3 + acian113.48m20.00.0113.28m2(0.21)55.50(57.98)4Pek. Dinding dan kolom teras keramik 20/2555.92m226,260.001,468,459.2055.92m20.055.50(0.42)Jumlah IV0.00.00.00.00.0V.PEKERJAAN LANTAI0.00.00.01Perbaikan Lantai keramik 30x30 cm setara KW II171.20m20.00.081.18m2(90.02)456.76285.56Jumlah V0.00.00.00.0VI.PEK