mass curve cikukang

6
No Rencana Waduk K Vi 1 Waduk Cikukang 0.25 25900 6475 No Rencana Waduk Vu Ve Vi Vs 1 Waduk Cikukang 1717 1194.66 6475 40170.00 Volume Untuk Melayani Kebutuhan (Vu)

Upload: jherwindo895

Post on 31-Jan-2016

219 views

Category:

Documents


0 download

DESCRIPTION

m

TRANSCRIPT

Page 1: Mass Curve Cikukang

No Rencana Waduk K Vi

1 Waduk Cikukang 0.25 25900 6475

No Rencana WadukVu Ve Vi Vs

1 Waduk Cikukang 1717 1194.66 6475 40170.00

Volume Untuk Melayani

Kebutuhan (Vu)

Page 2: Mass Curve Cikukang

49556.66

Volume Tampungan Mati Waduk (Vn)

Page 3: Mass Curve Cikukang

NO BULANAIR IRIGASI AIR BAKU

VOLUMEKebutuhan Air (Outflow) Debit Andalan (Inflow)

1 Jan 0.092 0.208 0.300 32374.828 0.1032 Feb 1.404 0.208 1.612 87045.937 0.0753 Mar 1.371 0.208 1.579 85251.065 0.0524 April 0.475 0.208 0.683 36868.355 0.1155 Mei 0.563 0.208 0.771 41629.722 0.0806 Juni 0.000 0.208 0.208 11232.000 0.0447 Juli 0.000 0.208 0.208 11232.000 0.0498 Agustus 0.000 0.208 0.208 11232.000 0.0539 September 0.000 0.208 0.208 11232.000 0.037

10 Oktober 1.261 0.208 1.469 79321.869 0.07411 November 1.190 0.208 1.398 75514.979 0.07812 Desember 0.436 0.208 0.644 34788.999 0.080

TOTAL DEFISIT

NO BULANAIR IRIGASI AIR BAKU

VOLUMEKebutuhan Air (Outflow) Debit Andalan (Inflow)

1 Jan 0.000 0.208 0.208 11232.000 0.1032 Feb 0.000 0.208 0.208 11232.000 0.0753 Mar 0.000 0.208 0.208 11232.000 0.0524 April 0.000 0.208 0.208 11232.000 0.1155 Mei 0.000 0.208 0.208 11232.000 0.0806 Juni 0.000 0.208 0.208 11232.000 0.0447 Juli 0.000 0.208 0.208 11232.000 0.0498 Agustus 0.000 0.208 0.208 11232.000 0.0539 September 0.000 0.208 0.208 11232.000 0.037

10 Oktober 0.000 0.208 0.208 11232.000 0.07411 November 0.000 0.208 0.208 11232.000 0.07812 Desember 0.000 0.208 0.208 11232.000 0.080

TOTAL DEFISIT

m3/dtk m3/dtk m3/dtk m3 m3/dtk

m3/dtk m3/dtk m3/dtk m3 m3/dtk

Page 4: Mass Curve Cikukang

VOLUME SELISIH VOLUME KOMULATIFSELISIH KOMULATIF

Debit Andalan (Inflow) Inflow-Outflow Komulatif Outflow ( Komulatif Inflow

11077.301 -0.0213 0.0032 0.0011 -0.0021 0.00294070.017 -0.0830 0.0087 0.0004 -0.0104 0.00222784.972 -0.0825 0.0085 0.0003 -0.0187 0.00216214.104 -0.0307 0.0037 0.0006 -0.0217 0.00244338.186 -0.0373 0.0042 0.0004 -0.0255 0.00222363.682 -0.0089 0.0011 0.0002 -0.0264 0.00202669.758 -0.0086 0.0011 0.0003 -0.0272 0.00212875.309 -0.0084 0.0011 0.0003 -0.0280 0.00212010.523 -0.0092 0.0011 0.0002 -0.0290 0.00203985.285 -0.0753 0.0079 0.0004 -0.0365 0.00224196.238 -0.0713 0.0076 0.0004 -0.0436 0.00224321.393 -0.0305 0.0035 0.0004 -0.0467 0.0022

TOTAL DEFISIT -0.4668

VOLUME SELISIH VOLUME KOMULATIFSELISIH KOMULATIF

Debit Andalan (Inflow) Inflow-Outflow Komulatif Outflow Komulatif Inflow

5538.651 -0.0057 11232.000 5538.651 -5693.3494070.017 -0.0072 22464.000 9608.667 -12855.3332784.972 -0.0084 33696.000 12393.639 -21302.3616214.104 -0.0050 44928.000 18607.743 -26320.2574338.186 -0.0069 56160.000 22945.930 -33214.0702363.682 -0.0089 67392.000 25309.611 -42082.3892669.758 -0.0086 78624.000 27979.370 -50644.6302875.309 -0.0084 89856.000 30854.679 -59001.3212010.523 -0.0092 101088.000 32865.202 -68222.7983985.285 -0.0072 112320.000 36850.487 -75469.5134196.238 -0.0070 123552.000 41046.725 -82505.2754321.393 -0.0069 134784.000 45368.118 -89415.882

TOTAL DEFISIT -0.0894

m3 Juta m3 Juta m3 Juta m3 Juta m3

m3 Juta m3 m3 m3 m3

Page 5: Mass Curve Cikukang

-46681.702918

Jan Feb

MarApril Mei

JuniJuli

Agustu

s

Septem

ber

Oktober

November

Desember

0.0000

0.0020

0.0040

0.0060

0.0080

0.0100

Neraca Air (Tanpa Waduk)

Komulatif Outflow (Juta m3) Komulatif Inflow (Juta m3)

Jan Feb

MarApril

MeiJuni

Juli

Agustu

s

Septem

ber

Oktober

November

Desember

0.00000.00200.00400.00600.00800.0100

Neraca Air (Sesudah Ada Waduk)Komulatif Outflow (Juta m3) Komulatif Inflow (Juta m3)

Page 6: Mass Curve Cikukang

Jan Feb

MarApril Mei

JuniJuli

Agustu

s

Septem

ber

Oktober

November

Desember

0.0000

0.0020

0.0040

0.0060

0.0080

0.0100

Neraca Air (Tanpa Waduk)

Komulatif Outflow (Juta m3) Komulatif Inflow (Juta m3)

Jan Feb

MarApril

MeiJuni

Juli

Agustu

s

Septem

ber

Oktober

November

Desember

0.00000.00200.00400.00600.00800.0100

Neraca Air (Sesudah Ada Waduk)Komulatif Outflow (Juta m3) Komulatif Inflow (Juta m3)