LAPORAN OPERASIONAL MATERIAL + Upah kerja PT. Larisa Propertindo Larisa Residence Kavling : B 7 Luas bangunan : 45 Pelaksana : Tarsiman Periode : Tambahan No Tanggal URAIAN JUMLAH HARGA TOTAL SAT 30/09/2015 Bata merah bh 2050 560 1,148,000 Pasir pasang m3 4 155,000 620,000 semen sak 23 57,000 1,311,000 hollo meni 4x4 btg 10 20,000 200,000 hollo meni 2x4 btg 7 17,000 119,000 plamir tembok gln 1 120,000 120,000 roll cat bsr bh 2 25,000 50,000 kuas bh 3 10,000 30,000 genteng kaca bh 6 125,000 750,000 genteng beton bh 150 6,500 975,000 skrap bh 2 10,000 20,000 besi cincin 6 bh 120 1,500 180,000 kawat beton kg 1 15,000 15,000 cat sanlex putih pail 1 500,000 500,000 cat sanlex cream pail 1 500,000 500,000 baja ringan C 075 btg 6 75,000 450,000 reng baja ringan btg 9 36,000 324,000 skrup bh 500 500 250,000 besi 8 btg 4 40,000 160,000 multi 9mm lbr 1 135,000 135,000 GRC lbr 6 55,000 330,000 paku GRC kg 1.5 15,000 22,500 list gypsum btg 7 12,500 87,500 kaso 4x6 btg 6 15,400 92,400 03/10/2015 besi 8 btg 7 40,000 280,000 multi 9mm lbr 1 135,000 135,000 GRC lbr 2 55,000 110,000 09/10/2015 Pasir pasang colt 2 200,000 400,000 12/10/2015 Pasir pasang colt 3 200,000 600,000 13/10/2015 semen sak 15 57,000 855,000 paku 7 kg 5 15,000 75,000 15/10/2015 tepung gypsum kg 5 5,000 25,000 mill sak 3 15,000 45,000 21/10/2015 multi 9mm lbr 1 135,000 135,000 kaso 4x6 btg 4 15,400 61,600 semen sak 5 57,000 285,000 kuas 3" bh 3 10,000 30,000 waterproof gln 1 170,000 170,000 keramik asiatile 30*30 dus 13 55,000 715,000 Total Material 12,311,000 Total Upah kerja 6,670,000 - Jumlah 18,981,000 SAT

Upload: bambang-erawan

Post on 31-Jan-2016

215 views

Category:

Documents


0 download

DESCRIPTION

RAB

TRANSCRIPT

Page 1: kerja tambah B7

LAPORAN OPERASIONAL MATERIAL + Upah kerjaPT. Larisa Propertindo

Larisa Residence

Kavling : B 7Luas bangunan : 45Pelaksana : TarsimanPeriode : Tambahan

No Tanggal URAIAN JUMLAHHARGA

TOTAL KeteranganSAT

30/09/2015 Bata merah bh 2050 560 1,148,000 Pasir pasang m3 4 155,000 620,000 semen sak 23 57,000 1,311,000 hollo meni 4x4 btg 10 20,000 200,000 hollo meni 2x4 btg 7 17,000 119,000 plamir tembok gln 1 120,000 120,000 roll cat bsr bh 2 25,000 50,000 kuas bh 3 10,000 30,000 genteng kaca bh 6 125,000 750,000 belum masuk RABgenteng beton bh 150 6,500 975,000 skrap bh 2 10,000 20,000 besi cincin 6 bh 120 1,500 180,000 kawat beton kg 1 15,000 15,000 cat sanlex putih pail 1 500,000 500,000 cat sanlex cream pail 1 500,000 500,000 baja ringan C 075 btg 6 75,000 450,000 reng baja ringan btg 9 36,000 324,000 skrup bh 500 500 250,000 besi 8 btg 4 40,000 160,000 multi 9mm lbr 1 135,000 135,000 GRC lbr 6 55,000 330,000 paku GRC kg 1.5 15,000 22,500 list gypsum btg 7 12,500 87,500 kaso 4x6 btg 6 15,400 92,400

03/10/2015 besi 8 btg 7 40,000 280,000 multi 9mm lbr 1 135,000 135,000 GRC lbr 2 55,000 110,000

09/10/2015 Pasir pasang colt 2 200,000 400,000 12/10/2015 Pasir pasang colt 3 200,000 600,000 13/10/2015 semen sak 15 57,000 855,000

paku 7 kg 5 15,000 75,000 15/10/2015 tepung gypsum kg 5 5,000 25,000

mill sak 3 15,000 45,000 21/10/2015 multi 9mm lbr 1 135,000 135,000

kaso 4x6 btg 4 15,400 61,600 semen sak 5 57,000 285,000 kuas 3" bh 3 10,000 30,000 waterproof gln 1 170,000 170,000 keramik asiatile 30*30 dus 13 55,000 715,000

Total Material 12,311,000 Total Upah kerja 6,670,000

-

Jumlah 18,981,000