complete tugas 1

18
7/23/2019 Complete Tugas 1 http://slidepdf.com/reader/full/complete-tugas-1 1/18 Location: Engineer: Study Case: LF 6.0.0 Page: 1 SN: 12345678 Filename: tugas1 Project:  ETAP Contract:  Date: 10-29-2015 Revision: Base Config.:  Normal Electrical Transient Analyzer Program Load Flow Analysis  Number of Buses: Swing V-Control Load Total  Number of Branches: XFMR2 Reactor Line/Cable Impedance Tie PD XFMR3 Total 1 0 38 39  17 0 0 21 0 0 38 Loading Category (1): Design Generation Category (1): Design Load Diversity Factor:  None Maximum No. of Iteration: 99 System Frequency: 50 Hz Unit System: English Project Filename: tugas1 Output Filename: C:\ETAP 600\tugas1\tugas1.lfr Precision of Solution: 0.0001000 Method of Solution:  Newton-Raphson Method

Upload: heningputri

Post on 17-Feb-2018

221 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Complete Tugas 1

7/23/2019 Complete Tugas 1

http://slidepdf.com/reader/full/complete-tugas-1 1/18

Location:

Engineer:Study Case:  LF

6.0.0

Page: 1

SN: 12345678

Filename: tugas1

Project:  ETAP

Contract:  

Date: 10-29-2015 

Revision: Base

Config.:  Normal

Electrical Transient Analyzer Program

Load Flow Analysis

 Number of Buses:

Swing V-Control Load Total

 Number of Branches:

XFMR2 Reactor Line/Cable Impedance Tie PDXFMR3 Total

1 0 38 39

 17 0 0 21 0 0 38

Loading Category (1): Design

Generation Category (1): Design

Load Diversity Factor:  None

Maximum No. of Iteration: 99

System Frequency: 50 Hz

Unit System: English

Project Filename: tugas1

Output Filename: C:\ETAP 600\tugas1\tugas1.lfr 

Precision of Solution: 0.0001000

Method of Solution:  Newton-Raphson Method

Page 2: Complete Tugas 1

7/23/2019 Complete Tugas 1

http://slidepdf.com/reader/full/complete-tugas-1 2/18

Location:

Engineer:Study Case:  LF

6.0.0

Page: 2

SN: 12345678

Filename: tugas1

Project:  ETAP

Contract:  

Date: 10-29-2015 

Revision: Base

Config.:  Normal

Adjustments

Transformer Impedance:

Reactor Impedance:

Adjustments

Apply

/Global

Individual

PercentTolerance

Overload Heater Resistance:

Transmission Line Length:

Cable Length:

Temperature Correction

Transmission Line Resistance:

Cable Resistance:

Apply

Adjustments

Individual

/Global Degree C

Individual

Individual

Individual

Individual

Yes

Yes

 No

 No

 No

Yes

Yes

Page 3: Complete Tugas 1

7/23/2019 Complete Tugas 1

http://slidepdf.com/reader/full/complete-tugas-1 3/18

Location:

Engineer:Study Case:  LF

6.0.0

Page: 3

SN: 12345678

Filename: tugas1

Project:  ETAP

Contract:  

Date: 10-29-2015 

Revision: Base

Config.:  Normal

Bus Input Data

Sub-sys

GenericConstant IConstant ZConstant kVAInitial VoltageBus

Mvar MWMvarMWMvar MWMvar MWAng.% Mag.kVID

Load

 150.000Bus1 1 100.0 0.0

 0.048 0.0000.400Bus2 1 100.0 0.0

 0.029 0.0000.400Bus3 1 100.0 0.0

 0.034 0.0000.400Bus4 1 100.0 0.0

 0.038 0.0000.400Bus5 1 100.0 0.0

 0.030 0.0000.400Bus6 1 100.0 0.0

 0.031 0.0000.400Bus7 1 100.0 0.0

 0.012 0.0000.400Bus8 1 100.0 0.0

 0.028 0.0000.400Bus9 1 100.0 0.0

 0.036 0.0000.400Bus10 1 100.0 0.0

 0.029 0.0000.400Bus11 1 100.0 0.0

 0.027 0.0000.400Bus12 1 100.0 0.0

 0.030 0.0000.400Bus13 1 100.0 0.0

 0.010 0.0000.400Bus14 1 100.0 0.0

 0.036 0.0000.400Bus15 1 100.0 0.0

 0.024 0.0000.400Bus16 1 100.0 0.0

 20.000Bus18 1 100.0 0.0

 20.000Bus19 1 100.0 0.0

 0.023 0.0000.400Bus20 1 100.0 0.0

 20.000SR2-01 1 100.0 0.0

 20.000SR2-06 1 100.0 0.0

 20.000SR2-06-S5 1 100.0 0.0

 20.000SR2-08 1 100.0 0.0

 20.000SR2-09 1 100.0 0.0

 20.000SR2-09-U01 1 100.0 0.0

 20.000SR2-11 1 100.0 0.0

 20.000SR2-12 1 100.0 0.0

 20.000SR2-23 1 100.0 0.0

 20.000SR2-25 1 100.0 0.0

 20.000SR2-25-T01 1 100.0 0.0

 20.000SR2-63 1 100.0 0.0

 20.000SR2-64 1 100.0 0.0

 20.000T02 1 100.0 0.0

 20.000T02-B02 1 100.0 0.0

Page 4: Complete Tugas 1

7/23/2019 Complete Tugas 1

http://slidepdf.com/reader/full/complete-tugas-1 4/18

Location:

Engineer:Study Case:  LF

6.0.0

Page: 4

SN: 12345678

Filename: tugas1

Project:  ETAP

Contract:  

Date: 10-29-2015 

Revision: Base

Config.:  Normal

Sub-sys

GenericConstant IConstant ZConstant kVAInitial VoltageBus

Mvar MWMvarMWMvar MWMvar MWAng.% Mag.kVID

Load

 20.000T02-B04 1 100.0 0.0

 20.000T02-B09 1 100.0 0.0

 20.000T03 1 100.0 0.0

 20.000T 12 1 100.0 0.0

 20.000T 16 1 100.0 0.0

 0.0000.000 0.464Total Number of Buses:  39  0.000 0.000 0.000 0.000 0.000

ID kV

Generation Bus

Sub-sysType

Voltage

 % Mag. Angle MW Mvar Max Min

Generation Mvar Limits

% PF

Bus1 1150.000 Swing 100.0 0.0

 0.000 0.000

Page 5: Complete Tugas 1

7/23/2019 Complete Tugas 1

http://slidepdf.com/reader/full/complete-tugas-1 5/18

Location:

Engineer:Study Case:  LF

6.0.0

Page: 5

SN: 12345678

Filename: tugas1

Project:  ETAP

Contract:  

Date: 10-29-2015 

Revision: Base

Config.:  Normal

Line/Cable Input Data

ID Library Size T (°C)

Line/Cable

Ohms or Siemens/1000 ft per Conductor (Cable) or per Phase (Line)

Adj. (ft) #/Phase% Tol.

Length

YR X

Cable1 23OALN3 240 787.4 1 0.037338 0.096225750.0

Cable2 23OALN3 70 984.3 1 0.128077 0.108875750.0

Cable3 23OALN3 240 360.9 1 0.037338 0.096225750.0

Cable4 23OALN3 240 180.4 1 0.037338 0.096225750.0

Cable5 23OALN3 35 196.9 1 0.256123 0.115550750.0

Cable6 23OALN3 240 360.9 1 0.037338 0.096225750.0

Cable7 23OALN3 240 180.4 1 0.037338 0.096225750.0

Cable8 23OALN3 240 1984.9 1 0.037338 0.096225750.0

Cable9 23OALN3 240 360.9 1 0.037338 0.096225750.0

Cable10 23OALN3 35 196.9 1 0.256123 0.115550750.0

Cable11 23OALN3 240 6857.0 1 0.037338 0.096225750.0

Cable12 23OALN3 240 180.4 1 0.037338 0.096225750.0

Cable13 23OALN3 70 393.7 1 0.128077 0.108875750.0

Cable14 23OALN3 70 787.4 1 0.128077 0.108875750.0

Cable15 23OALN3 70 393.7 1 0.128077 0.108875750.0

Cable16 23OALN3 70 984.3 1 0.128077 0.108875750.0

Cable17 23OALN3 70 196.9 1 0.128077 0.108875750.0

Cable18 23OALN3 70 1771.7 1 0.128077 0.108875750.0

Cable19 23OALN3 70 1181.1 1 0.128077 0.108875750.0

Cable22 23OALN3 70 1378.0 1 0.128077 0.108875750.0

Cable23 23OALN3 70 1574.8 1 0.128077 0.108875750.0

Line / Cable resistances are listed at the specified temperatures.

Page 6: Complete Tugas 1

7/23/2019 Complete Tugas 1

http://slidepdf.com/reader/full/complete-tugas-1 6/18

Location:

Engineer:Study Case:  LF

6.0.0

Page: 6

SN: 12345678

Filename: tugas1

Project:  ETAP

Contract:  

Date: 10-29-2015 

Revision: Base

Config.:  Normal

 2-Winding Transformer Input Data

ID MVA Prim. kV Sec. kV % Z X/R Prim. Sec.

Transformer % Tap Setting

% Tol.

Rating Z Variation

+ 5% - 5%

Phase Shift

Type Angle% Z

Adjusted

T2 0.100 20.000 0.400 4.00 2.47 0 000 0 Std Pos. Seq. 0.04.0000

T3 0.050 20.000 0.400 4.00 2.47 0 000 0 Std Pos. Seq. 0.04.0000

T4 0.050 20.000 0.400 4.00 2.47 0 000 0 Std Pos. Seq. 0.04.0000

T5 0.050 20.000 0.400 4.00 2.47 0 000 0 Std Pos. Seq. 0.04.0000

T6 0.050 20.000 0.400 4.00 2.47 0 000 0 Std Pos. Seq. 0.04.0000

T7 0.050 20.000 0.400 4.00 2.47 0 000 0 Std Pos. Seq. 0.04.0000

T8 0.025 20.000 0.400 4.00 2.47 0 000 0 Std Pos. Seq. 0.04.0000

T9 0.050 20.000 0.400 4.00 2.47 0 000 0 Std Pos. Seq. 0.04.0000

T10 0.050 20.000 0.400 4.00 2.47 0 000 0 Std Pos. Seq. 0.04.0000

T11 0.050 20.000 0.400 4.00 2.47 0 000 0 Std Pos. Seq. 0.04.0000

T12 0.050 20.000 0.400 4.00 2.47 0 000 0 Std Pos. Seq. 0.04.0000

T13 0.050 20.000 0.400 4.00 2.47 0 000 0 Std Pos. Seq. 0.04.0000

T14 0.025 20.000 0.400 4.00 2.47 0 000 0 Std Pos. Seq. 0.04.0000

T15 0.050 20.000 0.400 4.00 2.47 0 000 0 Std Pos. Seq. 0.04.0000

T16 0.050 20.000 0.400 4.00 2.47 0 000 0 Std Pos. Seq. 0.04.0000

T18 0.050 20.000 0.400 4.00 2.47 0 000 0 Std Pos. Seq. 0.04.0000

T19 40.000 150.000 20.000 4.00 27.30 0 000 0 Std Pos. Seq. 0.04.0000

2-Winding Transformer Load Tap Changer (LTC) Settings

ID Secondary Bus IDPrimary Bus ID Tap % Step Regulated Bus ID

Transformer Connected Buses ("*" LTC Side)

Tap % V kV

Transformer Load Tap Changer Setting

% Min. % Max.

Page 7: Complete Tugas 1

7/23/2019 Complete Tugas 1

http://slidepdf.com/reader/full/complete-tugas-1 7/18

Location:

Engineer:Study Case:  LF

6.0.0

Page: 7

SN: 12345678

Filename: tugas1

Project:  ETAP

Contract:  

Date: 10-29-2015 

Revision: Base

Config.:  Normal

Branch Connections

ID From Bus To Bus R X ZType

CKT/Branch % Impedance, Pos. Seq., 100 MVA BaseConnected Bus ID

 Y

T2 SR2-06 1501.08 3707.66 4000.00Bus22W XFMR 

T3 SR2-06-S5 3002.16 7415.33 8000.00Bus32W XFMR 

T4 SR2-08 3002.16 7415.33 8000.00Bus42W XFMR 

T5 SR2-09-U01 3002.16 7415.33 8000.00Bus52W XFMR 

T6 SR2-11 3002.16 7415.33 8000.00Bus62W XFMR 

T7 SR2-12 3002.16 7415.33 8000.00Bus72W XFMR 

T8 SR2-23 6004.31 14830.65 16000.00Bus82W XFMR 

T9 SR2-25-T01 3002.16 7415.33 8000.00Bus92W XFMR 

T10 SR2-64 3002.16 7415.33 8000.00Bus102W XFMR 

T11 T02-B02 3002.16 7415.33 8000.00Bus112W XFMR 

T12 T02-B04 3002.16 7415.33 8000.00Bus122W XFMR 

T13 T02-B09 3002.16 7415.33 8000.00Bus132W XFMR 

T14 T03 6004.31 14830.65 16000.00Bus142W XFMR 

T15 T 12 3002.16 7415.33 8000.00Bus152W XFMR 

T16 T 16 3002.16 7415.33 8000.00Bus162W XFMR 

T18 Bus19 3002.16 7415.33 8000.00Bus202W XFMR 

T19 Bus1 0.37 9.99 10.00SR2-012W XFMR 

Cable1 SR2-06 0.74 1.89 2.03SR2-01Cable

Cable2 SR2-06 3.15 2.68 4.14SR2-06-S5Cable

Cable3 SR2-08 0.34 0.87 0.93SR2-06Cable

Cable4 SR2-09 0.17 0.43 0.47SR2-08Cable

Cable5 SR2-09-U01 1.26 0.57 1.38SR2-09Cable

Cable6 SR2-09 0.34 0.87 0.93SR2-11Cable

Cable7 SR2-12 0.17 0.43 0.47SR2-11Cable

Cable8 SR2-23 1.85 4.77 5.12SR2-12Cable

Cable9 SR2-25 0.34 0.87 0.93SR2-23Cable

Cable10 SR2-25-T01 1.26 0.57 1.38SR2-25Cable

Cable11 SR2-63 6.40 16.50 17.69SR2-25Cable

Cable12 SR2-64 0.17 0.43 0.47SR2-63Cable

Cable13 T02 1.26 1.07 1.65SR2-63Cable

Cable14 T02-B02 2.52 2.14 3.31T02Cable

Cable15 T02-B04 1.26 1.07 1.65T02-B02Cable

Cable16 T02-B09 3.15 2.68 4.14T02-B04Cable

Cable17 T02 0.63 0.54 0.83T03Cable

Cable18 T 12 5.67 4.82 7.45T03Cable

Cable19 T 16 3.78 3.21 4.96T 12Cable

Cable22 Bus18 4.41 3.75 5.79T 16Cable

Page 8: Complete Tugas 1

7/23/2019 Complete Tugas 1

http://slidepdf.com/reader/full/complete-tugas-1 8/18

Location:

Engineer:Study Case:  LF

6.0.0

Page: 8

SN: 12345678

Filename: tugas1

Project:  ETAP

Contract:  

Date: 10-29-2015 

Revision: Base

Config.:  Normal

ID From Bus To Bus R X ZType

CKT/Branch % Impedance, Pos. Seq., 100 MVA BaseConnected Bus ID

 Y

Cable23 Bus19 5.04 4.29 6.62Bus18Cable

Page 9: Complete Tugas 1

7/23/2019 Complete Tugas 1

http://slidepdf.com/reader/full/complete-tugas-1 9/18

Location:

Engineer:Study Case:  LF

6.0.0

Page: 9

SN: 12345678

Filename: tugas1

Project:  ETAP

Contract:  

Date: 10-29-2015 

Revision: Base

Config.:  Normal

LOAD FLOW REPORT

Bus

ID kV

Voltage

Ang.% Mag.

 Generation

MW Mvar  

Load

MW Mvar  

Load Flow

MW Mvar AmpID % PF

XFMR 

% Tap

Bus1*  150.000 0.0100.000 0.0100.460 SR2-01 0.460 0.010 1.8 100.00 0

Bus2 0.400 -1.199.255 0.0000.048 SR2-06 -0.048 0.000 69.5 100.00 0

Bus3 0.400 -1.299.110 0.0000.028 SR2-06-S5 -0.028 0.000 41.3 100.00 0

Bus4 0.400 -1.498.967 0.0000.033 SR2-08 -0.033 0.000 47.9 100.00 0

Bus5 0.400 -1.698.822 0.0000.037 SR2-09-U01 -0.037 0.000 54.3 100.00 0

Bus6 0.400 -1.399.074 0.0000.029 SR2-11 -0.029 0.000 42.9 100.00 0

Bus7 0.400 -1.399.036 0.0000.031 SR2-12 -0.031 0.000 44.6 100.00 0

Bus8 0.400 -1.099.279 0.0000.011 SR2-23 -0.011 0.000 16.6 100.00 0

Bus9 0.400 -1.299.139 0.0000.027 SR2-25-T01 -0.027 0.000 39.6 100.00 0

Bus10 0.400 -1.698.873 0.0000.035 SR2-64 -0.035 0.000 51.1 100.00 0

Bus11 0.400 -1.399.083 0.0000.028 T02-B02 -0.028 0.000 41.3 100.00 0

Bus12 0.400 -1.299.154 0.0000.026 T02-B04 -0.026 0.000 38.1 100.00 0

Bus13 0.400 -1.399.047 0.0000.029 T02-B09 -0.029 0.000 42.9 100.00 0

Bus14 0.400 -0.999.335 0.0000.010 T03 -0.010 0.000 14.9 100.00 0

Bus15 0.400 -1.698.865 0.0000.035 T 12 -0.035 0.000 51.1 100.00 0

Bus16 0.400 -1.199.221 0.0000.024 T 16 -0.024 0.000 34.8 100.00 0

Bus18 20.000 -0.199.959 T 16 -0.023 0.000 0.7 100.00 0 0 0

Bus19 0.023 0.000 0.7 100.0

Bus19 20.000 -0.199.958 Bus18 -0.023 0.000 0.7 100.00 0 0 0

Bus20 0.023 0.000 0.7 100.0

Bus20 0.400 -1.099.255 0.0000.023 Bus19 -0.023 0.000 33.1 100.00 0

SR2-01 20.000 0.099.997 SR2-06 0.460 0.010 13.3 100.00 0 0 0

Bus1 -0.460 -0.010 13.3 100.0

SR2-06 20.000 0.099.994 SR2-01 -0.460 -0.010 13.3 100.00 0 0 0

SR2-06-S5 0.029 0.001 0.8 100.0

SR2-08 0.383 0.009 11.1 100.0

Bus2 0.048 0.001 1.4 100.0

SR2-06-S5 20.000 0.099.993 SR2-06 -0.029 -0.001 0.8 100.00 0 0 0

Bus3 0.029 0.001 0.8 100.0

SR2-08 20.000 0.099.992 SR2-06 -0.383 -0.009 11.1 100.00 0 0 0

SR2-09 0.350 0.008 10.1 100.0

Bus4 0.033 0.001 1.0 100.0

SR2-09 20.000 0.099.992 SR2-08 -0.350 -0.008 10.1 100.00 0 0 0

SR2-09-U01 0.038 0.001 1.1 100.0

SR2-11 0.312 0.007 9.0 100.0

SR2-09-U01 20.000 0.099.991 SR2-09 -0.038 -0.001 1.1 100.00 0 0 0

Page 10: Complete Tugas 1

7/23/2019 Complete Tugas 1

http://slidepdf.com/reader/full/complete-tugas-1 10/18

Location:

Engineer:Study Case:  LF

6.0.0

Page: 10

SN: 12345678

Filename: tugas1

Project:  ETAP

Contract:  

Date: 10-29-2015 

Revision: Base

Config.:  Normal

Bus

ID kV

Voltage

Ang.% Mag.

 Generation

MW Mvar  

Load

MW Mvar  

Load Flow

MW Mvar AmpID % PF

XFMR 

% Tap

Bus5 0.038 0.001 1.1 100.0

SR2-11 20.000 0.099.991 SR2-09 -0.312 -0.007 9.0 100.00 0 0 0

SR2-12 0.283 0.006 8.2 100.0

Bus6 0.030 0.001 0.9 100.0

SR2-12 20.000 0.099.990 SR2-11 -0.283 -0.006 8.2 100.00 0 0 0

SR2-23 0.252 0.005 7.3 100.0

Bus7 0.031 0.001 0.9 100.0

SR2-23 20.000 0.099.985 SR2-12 -0.252 -0.005 7.3 100.00 0 0 0

SR2-25 0.240 0.005 6.9 100.0

Bus8 0.012 0.000 0.3 100.0

SR2-25 20.000 0.099.984 SR2-23 -0.240 -0.005 6.9 100.00 0 0 0

SR2-25-T01 0.027 0.001 0.8 100.0

SR2-63 0.213 0.005 6.1 100.0

SR2-25-T01 20.000 0.099.984 SR2-25 -0.027 -0.001 0.8 100.00 0 0 0

Bus9 0.027 0.001 0.8 100.0

SR2-63 20.000 -0.199.970 SR2-25 -0.213 -0.005 6.1 100.00 0 0 0

SR2-64 0.035 0.001 1.0 100.0

T02 0.177 0.004 5.1 100.0

SR2-64 20.000 -0.199.970 SR2-63 -0.035 -0.001 1.0 100.00 0 0 0

Bus10 0.035 0.001 1.0 100.0

T02 20.000 -0.199.968 SR2-63 -0.177 -0.004 5.1 100.00 0 0 0

T02-B02 0.085 0.002 2.4 100.0

T03 0.093 0.002 2.7 100.0

T02-B02 20.000 -0.199.965 T02 -0.085 -0.002 2.4 100.00 0 0 0

T02-B04 0.056 0.001 1.6 100.0

Bus11 0.029 0.001 0.8 100.0

T02-B04 20.000 -0.199.965 T02-B02 -0.056 -0.001 1.6 100.00 0 0 0

T02-B09 0.030 0.001 0.9 100.0

Bus12 0.026 0.001 0.8 100.0

T02-B09 20.000 -0.199.964 T02-B04 -0.030 -0.001 0.9 100.00 0 0 0

Bus13 0.030 0.001 0.9 100.0

T03 20.000 -0.199.967 T02 -0.093 -0.002 2.7 100.00 0 0 0

T 12 0.082 0.002 2.4 100.0

Bus14 0.010 0.000 0.3 100.0

T 12 20.000 -0.199.962 T03 -0.082 -0.002 2.4 100.00 0 0 0

T 16 0.047 0.001 1.4 100.0

Bus15 0.035 0.001 1.0 100.0

T 16 20.000 -0.199.960 T 12 -0.047 -0.001 1.4 100.00 0 0 0

Bus18 0.023 0.000 0.7 100.0

Page 11: Complete Tugas 1

7/23/2019 Complete Tugas 1

http://slidepdf.com/reader/full/complete-tugas-1 11/18

Page 12: Complete Tugas 1

7/23/2019 Complete Tugas 1

http://slidepdf.com/reader/full/complete-tugas-1 12/18

Location:

Engineer:Study Case:  LF

6.0.0

Page: 12

SN: 12345678

Filename: tugas1

Project:  ETAP

Contract:  

Date: 10-29-2015 

Revision: Base

Config.:  Normal

Bus Loading Summary Report

ID

Bus

kV

Directly Connected Load

MW Mvar MVA % PF AmpRated Amp LoadingMW Mvar MW Mvar  

Constant kVA Constant Z Constant IPercent

Generic

MW Mvar  

Total Bus Load

Bus1 150.000 0.460 1.8100.00 0 0 0 0 0 0 0

Bus2 0.400 0.048 69.5100.00 0 0.048 0 0 0 0 0

Bus3 0.400 0.028 41.3100.00 0 0.028 0 0 0 0 0

Bus4 0.400 0.033 47.9100.00 0 0.033 0 0 0 0 0

Bus5 0.400 0.037 54.3100.00 0 0.037 0 0 0 0 0

Bus6 0.400 0.029 42.9100.00 0 0.029 0 0 0 0 0

Bus7 0.400 0.031 44.6100.00 0 0.031 0 0 0 0 0

Bus8 0.400 0.011 16.6100.00 0 0.011 0 0 0 0 0

Bus9 0.400 0.027 39.6100.00 0 0.027 0 0 0 0 0

Bus10 0.400 0.035 51.1100.00 0 0.035 0 0 0 0 0

Bus11 0.400 0.028 41.3100.00 0 0.028 0 0 0 0 0

Bus12 0.400 0.026 38.1100.00 0 0.026 0 0 0 0 0

Bus13 0.400 0.029 42.9100.00 0 0.029 0 0 0 0 0

Bus14 0.400 0.010 14.9100.00 0 0.010 0 0 0 0 0

Bus15 0.400 0.035 51.1100.00 0 0.035 0 0 0 0 0

Bus16 0.400 0.024 34.8100.00 0 0.024 0 0 0 0 0

Bus18 20.000 0.023 0.7100.00 0 0 0 0 0 0 0

Bus19 20.000 0.023 0.7100.00 0 0 0 0 0 0 0

Bus20 0.400 0.023 33.1100.00 0 0.023 0 0 0 0 0

SR2-01 20.000 0.460 13.3100.00 0 0 0 0 0 0 0

SR2-06 20.000 0.460 13.3100.00 0 0 0 0 0 0 0

SR2-06-S5 20.000 0.029 0.8100.00 0 0 0 0 0 0 0

SR2-08 20.000 0.383 11.1100.00 0 0 0 0 0 0 0

SR2-09 20.000 0.350 10.1100.00 0 0 0 0 0 0 0

SR2-09-U01 20.000 0.038 1.1100.00 0 0 0 0 0 0 0

SR2-11 20.000 0.312 9.0100.00 0 0 0 0 0 0 0

SR2-12 20.000 0.283 8.2100.00 0 0 0 0 0 0 0

SR2-23 20.000 0.252 7.3100.00 0 0 0 0 0 0 0

SR2-25 20.000 0.240 6.9100.00 0 0 0 0 0 0 0

SR2-25-T01 20.000 0.027 0.8100.00 0 0 0 0 0 0 0

SR2-63 20.000 0.213 6.1100.00 0 0 0 0 0 0 0

SR2-64 20.000 0.035 1.0100.00 0 0 0 0 0 0 0

T02 20.000 0.177 5.1100.00 0 0 0 0 0 0 0

T02-B02 20.000 0.085 2.4100.00 0 0 0 0 0 0 0

T02-B04 20.000 0.056 1.6100.00 0 0 0 0 0 0 0

T02-B09 20.000 0.030 0.9100.00 0 0 0 0 0 0 0

Page 13: Complete Tugas 1

7/23/2019 Complete Tugas 1

http://slidepdf.com/reader/full/complete-tugas-1 13/18

Location:

Engineer:Study Case:  LF

6.0.0

Page: 13

SN: 12345678

Filename: tugas1

Project:  ETAP

Contract:  

Date: 10-29-2015 

Revision: Base

Config.:  Normal

ID

Bus

kV

Directly Connected Load

MW Mvar MVA % PF AmpRated Amp LoadingMW Mvar MW Mvar  

Constant kVA Constant Z Constant IPercent

Generic

MW Mvar  

Total Bus Load

T03 20.000 0.093 2.7100.00 0 0 0 0 0 0 0

T 12 20.000 0.082 2.4100.00 0 0 0 0 0 0 0

T 16 20.000 0.047 1.4100.00 0 0 0 0 0 0 0

* Indicates operating load of a bus exceeds the bus critical limit ( 100.0% of the Continuous Ampere rating).

# Indicates operating load of a bus exceeds the bus marginal limit ( 95.0% of the Continuous Ampere rating).

Page 14: Complete Tugas 1

7/23/2019 Complete Tugas 1

http://slidepdf.com/reader/full/complete-tugas-1 14/18

Location:

Engineer:Study Case:  LF

6.0.0

Page: 14

SN: 12345678

Filename: tugas1

Project:  ETAP

Contract:  

Date: 10-29-2015 

Revision: Base

Config.:  Normal

Branch Loading Summary Report

ID Type

Loading

Amp %

Capability

(MVA) MVA %

Loading (output)

CKT / Branch Cable & Reactor

Transformer

Loading (input)

%MVA

Ampacity

(Amp)

T2 Transformer 20.000 0.048 0.2 0.048 0.2

T3 Transformer 20.000 0.029 0.1 0.028 0.1

T4 Transformer 20.000 0.033 0.2 0.033 0.2

T5 Transformer 20.000 0.038 0.2 0.037 0.2

T6 Transformer 20.000 0.030 0.1 0.029 0.1

T7 Transformer 20.000 0.031 0.2 0.031 0.2

T8 Transformer 20.000 0.012 0.1 0.011 0.1

T9 Transformer 20.000 0.027 0.1 0.027 0.1

T10 Transformer 20.000 0.035 0.2 0.035 0.2

T11 Transformer 20.000 0.029 0.1 0.028 0.1

T12 Transformer 20.000 0.026 0.1 0.026 0.1

T13 Transformer 20.000 0.030 0.1 0.029 0.1

T14 Transformer 20.000 0.010 0.1 0.010 0.1

T15 Transformer 20.000 0.035 0.2 0.035 0.2

T16 Transformer 20.000 0.024 0.1 0.024 0.1

T18 Transformer 20.000 0.023 0.1 0.023 0.1

T19 Transformer 40.000 0.460 1.2 0.460 1.2

*  Indicates a branch with operating load exceeding the branch capability.

Page 15: Complete Tugas 1

7/23/2019 Complete Tugas 1

http://slidepdf.com/reader/full/complete-tugas-1 15/18

Location:

Engineer:Study Case:  LF

6.0.0

Page: 15

SN: 12345678

Filename: tugas1

Project:  ETAP

Contract:  

Date: 10-29-2015 

Revision: Base

Config.:  Normal

Branch Losses Summary Report

ID MW Mvar MW Mvar kW kvar From To

CKT / Branch From-To Bus Flow To-From Bus Flow Losses % Bus Voltage% Drop

Vd

in Vmag

 0.460 0.010 -0.460 -0.010 0.0 0.2 100.0 100.0 0.00T19

-0.048 0.000 0.048 0.001 0.3 0.9 99.3 100.0 0.74T2

-0.028 0.000 0.029 0.001 0.2 0.6 99.1 100.0 0.88T3

-0.033 0.000 0.033 0.001 0.3 0.8 99.0 100.0 1.03T4

-0.037 0.000 0.038 0.001 0.4 1.1 98.8 100.0 1.17T5

-0.029 0.000 0.030 0.001 0.3 0.7 99.1 100.0 0.92T6

-0.031 0.000 0.031 0.001 0.3 0.7 99.0 100.0 0.95T7

-0.011 0.000 0.012 0.000 0.1 0.2 99.3 100.0 0.71T8

-0.027 0.000 0.027 0.001 0.2 0.6 99.1 100.0 0.85T9

-0.035 0.000 0.035 0.001 0.4 0.9 98.9 100.0 1.10T10

-0.028 0.000 0.029 0.001 0.2 0.6 99.1 100.0 0.88T11

-0.026 0.000 0.026 0.001 0.2 0.5 99.2 100.0 0.81T12

-0.029 0.000 0.030 0.001 0.3 0.7 99.0 100.0 0.92T13

-0.010 0.000 0.010 0.000 0.1 0.2 99.3 100.0 0.63T14

-0.035 0.000 0.035 0.001 0.4 0.9 98.9 100.0 1.10T15

-0.024 0.000 0.024 0.000 0.2 0.4 99.2 100.0 0.74T16

-0.023 0.000 0.023 0.000 0.0 0.0 100.0 100.0 0.00Cable22

 0.023 0.000 -0.023 0.000 0.0 0.0 100.0 100.0 0.00Cable23

 0.023 0.000 -0.023 0.000 0.2 0.4 100.0 99.3 0.70T18

 0.460 0.010 -0.460 -0.010 0.0 0.0 100.0 100.0 0.00Cable1

 0.029 0.001 -0.029 -0.001 0.0 0.0 100.0 100.0 0.00Cable2

 0.383 0.009 -0.383 -0.009 0.0 0.0 100.0 100.0 0.00Cable3

 0.350 0.008 -0.350 -0.008 0.0 0.0 100.0 100.0 0.00Cable4

 0.038 0.001 -0.038 -0.001 0.0 0.0 100.0 100.0 0.00Cable5

 0.312 0.007 -0.312 -0.007 0.0 0.0 100.0 100.0 0.00Cable6

 0.283 0.006 -0.283 -0.006 0.0 0.0 100.0 100.0 0.00Cable7

 0.252 0.005 -0.252 -0.005 0.0 0.0 100.0 100.0 0.00Cable8

 0.240 0.005 -0.240 -0.005 0.0 0.0 100.0 100.0 0.00Cable9

 0.027 0.001 -0.027 -0.001 0.0 0.0 100.0 100.0 0.00Cable10

 0.213 0.005 -0.213 -0.005 0.0 0.1 100.0 100.0 0.01Cable11

 0.035 0.001 -0.035 -0.001 0.0 0.0 100.0 100.0 0.00Cable12

 0.177 0.004 -0.177 -0.004 0.0 0.0 100.0 100.0 0.00Cable13

 0.085 0.002 -0.085 -0.002 0.0 0.0 100.0 100.0 0.00Cable14

 0.093 0.002 -0.093 -0.002 0.0 0.0 100.0 100.0 0.00Cable17

 0.056 0.001 -0.056 -0.001 0.0 0.0 100.0 100.0 0.00Cable15

Page 16: Complete Tugas 1

7/23/2019 Complete Tugas 1

http://slidepdf.com/reader/full/complete-tugas-1 16/18

Location:

Engineer:Study Case:  LF

6.0.0

Page: 16

SN: 12345678

Filename: tugas1

Project:  ETAP

Contract:  

Date: 10-29-2015 

Revision: Base

Config.:  Normal

ID MW Mvar MW Mvar kW kvar From To

CKT / Branch From-To Bus Flow To-From Bus Flow Losses % Bus Voltage% Drop

Vd

in Vmag

 0.030 0.001 -0.030 -0.001 0.0 0.0 100.0 100.0 0.00Cable16

 0.082 0.002 -0.082 -0.002 0.0 0.0 100.0 100.0 0.00Cable18

 0.047 0.001 -0.047 -0.001 0.0 0.0 100.0 100.0 0.00Cable19

 4.2 10.5

Page 17: Complete Tugas 1

7/23/2019 Complete Tugas 1

http://slidepdf.com/reader/full/complete-tugas-1 17/18

Location:

Engineer:Study Case:  LF

6.0.0

Page: 17

SN: 12345678

Filename: tugas1

Project:  ETAP

Contract:  

Date: 10-29-2015 

Revision: Base

Config.:  Normal

Alert Summary Report

Cable  95.0100.0

Bus

MarginalCritical

 95.0100.0

Loading

% Alert Settings

 95.0100.0 95.0100.0

 95.0100.0

LineTransformer 

Reactor 

Panel

 95.0100.0

 95.0 98.0

 102.0105.0

 95.0100.0

 95.0100.0

 95.0100.0

100.0

Generator Excitation

Bus Voltage

UnderExcited (Q Min.)

OverExcited (Q Max.)

UnderVoltage

OverVoltage

Protective Device

Generator 

Page 18: Complete Tugas 1

7/23/2019 Complete Tugas 1

http://slidepdf.com/reader/full/complete-tugas-1 18/18

Location:

Engineer:Study Case:  LF

6.0.0

Page: 18

SN: 12345678

Filename: tugas1

Project:  ETAP

Contract:  

Date: 10-29-2015 

Revision: Base

Config.:  Normal

 0.0000.0000.000

 0.0000.0000.000

Lagging100.000.456

Total Generic Load:

Total Constant I Load:

 0.0000.000

 0.0100.004

 Number of Iterations: 2

System Mismatch:

Apparent Losses:

SUMMARY OF TOTAL GENERATION , LOADING & DEMAND

 0.000

Lagging

Lagging

 0.0000.456

 0.0000.000

 99.970.4600.0100.460

 0.0000.0000.000

 99.970.4600.0100.460

% PFMVAMvarMW

Total Static Load:

Total Motor Load:

Total Demand:

Source (Non-Swing Buses):

Source (Swing Buses):