  • 8/12/2019 Cipularang II Summary

    1/23

    CIPULARANG II

    TOLL ROAD

    PROJECT

    C. Willy Hartono

    Sales Manager

    West Java

    Admixture System

  • 8/12/2019 Cipularang II Summary

    2/23

    04.11.2004 2

    1. Section I : Purwakarta

    2. Section II : South PurwakartaPlered

    3. Section III. 1 : Plered Cikalong Wetan

    4. Section III. 2 : Darangdan

    Cikalong Wetan

    5. Section III. 3 : Cisomang Bridge

    6. Section IV. 1 : Cikalong Wetan Cikubang

    7. Section IV. 2 : Cikubang Bridge

    8. Section IV. 3 : Cikalong WetanCikamuning

    9. Section IV. 4 : Cipada Cikamuning

    10.Summarize

  • 8/12/2019 Cipularang II Summary

    3/23

    04.11.2004 3

    1. General Overview

    1. Total Length is 40 km

    2. Divided by 9 Sections

    3. Starting in March 2004 & done before April 25, 2005 (The 50th

    Anniversary of Asia

    Africa Conference in Bandung, West Java)

    4. Starting with earthworks in March 2004 & continuing with concrete

    works in July 2004

    5. Girder produce insitu & by precaster (Adhi Precast, Wika Beton, &

    Saeti)

  • 8/12/2019 Cipularang II Summary

    4/23

    04.11.2004 4

    2. Section I : Purwakarta

    1. Main Contractor is Mawatindo

    2. Supervision Consultant is Virama Karya

    3. Total Length is 9 km

    4. Concrete supplied by Farika Duta Agung (2 BP).

    5. Concrete Volume 100,000 m3

    6. We supplied 100 % (Pozzolith 101 Ri & Rheobuild 1100) to Farika

    Duta Agung

    7. Wet Mix for Rigid Pavement

  • 8/12/2019 Cipularang II Summary

    5/23

    04.11.2004 5

    2. Section I : Purwakarta

  • 8/12/2019 Cipularang II Summary

    6/23

    04.11.2004 6

    3. Section II : South Purwakarta - Plered

    1. Main Contractor is Adhi Karya Division III

    2. Supervision Consultants are Cipta Strada, Saka Adhi Prada &

    Amythas Expert

    3. Total Length is 8 km

    4. Concrete supplied by Adhimix

    5. Concrete Volume 80,000 m3 for Rigid Pavement only

    6. We supplied 100 % (Pozzolith 100 Ri & Rheobuild 1100)

    7. Wet Mix & low slump for Rigid Pavement & concrete barrier

    8. Girder Supplied by Adhi Precast

  • 8/12/2019 Cipularang II Summary

    7/2304.11.2004 7

    3. Section II : South Purwakarta - Plered

  • 8/12/2019 Cipularang II Summary

    8/2304.11.2004 8

    4. Section III. 1 : Plered Cikalong Wetan

    1. Main Contractor is Waskita Yasa J.O.

    2. Supervision Consultants are Delta Tama Waja, Buana Archicon &

    Prosys

    3. Total Length is 6.3 km include 500 m long bridge

    4. Concrete supplied by Yasa Readymix & Multi Structure

    5. Total Concrete Volume is 40,000 m3

    6. Admixture supplied by Fosroc (SP 337 & RP 264 M) to YasaReadymix & Grace to Multi Structure

    7. Girder produced in situ with total 153 pieces using Yasa Readymix

  • 8/12/2019 Cipularang II Summary

    9/2304.11.2004 9

    4. Section III. 1 : Plered Cikalong Wetan

  • 8/12/2019 Cipularang II Summary

    10/2304.11.2004 10

    5. Section III. 2 : Darangdan - Cikalong

    Wetan

    1. Main Contractor is Nindya Karya

    2. Supervision Consultants are Multi Phi Beta, Tata Guna Patria &

    Indra Karya

    3. Total Length is 4 km

    4. Concrete supplied by Dwi Dinamika

    5. Concrete Volume 40,000 m3

    6. Admixture supplied by Fosroc (SP 337 & RP 264 M)

    7. Girder Supplied by Wika Beton (Glenium 317 from BASF & M 21N

    from KAO)

  • 8/12/2019 Cipularang II Summary

    11/2304.11.2004 11

    5. Section III. 2 : Darangdan - Cikalong

    Wetan

  • 8/12/2019 Cipularang II Summary

    12/2304.11.2004 12

    6. Section III. 3 : Cisomang Bridge

    1. Main Contractor is L & M System

    2. Supervision Consultant is Global Profex Synergy

    3. Concrete supplied by Pionir Beton

    4. Concrete Volume 25,000 m3

    5. Admixture supplied by Sika (Plastiment RMC)

    6. Girder produced insitu (Sikament NN) & supplied by Saeti

    Concretindo Wahana (Rheobuild 893)

  • 8/12/2019 Cipularang II Summary

    13/2304.11.2004 13

    6. Section III. 3 : Cisomang Bridge

  • 8/12/2019 Cipularang II Summary

    14/2304.11.2004 14

    7. Section IV. 1 : Cikalong Wetan - Cikubang

    1. Main Contractor is Daya Mulya Turangga

    2. Supervision Consultants are Bina Karya, Eskapindo Matra &

    Hasfarm Dian Consultant

    3. Total Length is 5 km

    4. Concrete supplied by Focon Indo Beton

    5. Total Concrete Volume is 30,000 m3

    6. Admixture supplied by BASF (Pozz. 101 Ri & Rheobuild 1100) &Sika (Plastiment R & Sikament NN )

    7. Girder supplied by Wika Beton ( Glenium 317 from BASF & M 21 N

    from KAO)

  • 8/12/2019 Cipularang II Summary

    15/2304.11.2004 15

    7. Section IV. 1 : Cikalong Wetan - Cikubang

  • 8/12/2019 Cipularang II Summary

    16/2304.11.2004 16

    8. Section IV. 2 : Cikubang Bridge

    1. Main Contractor is Propelat Wika J.O.

    2. Supervision Consultant is Yodya Karya

    3. Total Length is 4 km including 400 m long bridge

    4. Concrete supplied by Focon Indo Beton

    5. Total Concrete Volume is 30,000 m3

    6. Admixture supplied by BASF (Pozz. 101 Ri & Rheobuild 1100) &

    Sika (Plastiment R & Sikament NN)7. Girder supplied by Wika Beton ( Glenium 317 from BASF &

    M21N from KAO)

  • 8/12/2019 Cipularang II Summary

    17/2304.11.2004 17

    8. Section IV. 2 : Cikubang Bridge

  • 8/12/2019 Cipularang II Summary

    18/2304.11.2004 18

    9. Section IV. 3 : Cikalong Wetan -

    Cikamuning

    1. Main Contractor is Hutama Karya

    2. Supervision Consultant is Indec & Ass Ltd.

    3. Bridge with 750 m long (The longest bridge in Cipularang II project)

    4. Concrete supplied by Farika Duta Agung

    5. Total Concrete Volume is 50,000 m3

    6. We supplied 100 % (Pozzolith 101 Ri & Rheobuild 1100)

    7. Girder produced in situ with total 183 pieces

  • 8/12/2019 Cipularang II Summary

    19/2304.11.2004 19

    9. Section IV. 3 : Cikalong Wetan

    Cikamuning

  • 8/12/2019 Cipularang II Summary

    20/2304.11.2004 20

    10. Section IV. 4 : Cipada - Cikamuning

    1. Main Contractor is Sumber Mitra Jaya Ircon Int. J.O.

    2. Supervision Consultants are Indah Karya, Widya Graha Angsana &

    Tribina

    3. Total Length is 4 km

    4. Concrete supplied by Beton Indotama Surya

    5. Total Concrete Volume is 30,000 m3

    6. Admixture supplied by Sika (Plastiment R & Sikament NN7. Girder supplied by Wika Beton ( Glenium 317 from BASF & M 21 N

    from KAO)

  • 8/12/2019 Cipularang II Summary

    21/2304.11.2004 21

    10. Section IV. 4 : Cipada - Cikamuning

  • 8/12/2019 Cipularang II Summary

    22/23

    04.11.2004 22

    11. Summarize

    1. We got about 50 % share of the project

    2. We supply to Adhimix Citapen (1 BP), Focon Indo Beton (1 BP) &

    Farika Duta Agung (2 BP in Purwakarta & 1 BP in Padalarang)

    3. Sales value more than 500 million in 6 months (July to December2004)

    4. Farika Duta Agung Padalarang gave the biggest contribution for our

    sales value

  • 8/12/2019 Cipularang II Summary

    23/23

    THANK YOU