PT.SENTRA INSAN GARUDA

SUMMARY PROJECT PEMBANGUNAN KANDANG AYAM,PRODUKSI DAN MARKET

AYAM BROILER DI TASIKMALAYA DAN CIAMIS

Page 2: SUMMARY PROJECT

UNIT KONTRUKSI PRODUKSI TOTAL

1 Desa Sarimanggu Kec Karangnunggal Tasikmalaya 110 39,222,000,000 8,773,016,250 47,995,016,250 2 Desa Cijulang Kec Cineam Tasikmalaya 110 41,159,500,000 8,583,016,250 49,742,516,250

3 Desa Kawasen Kec Banjarsari Ciamis 220 70,559,500,000 15,303,672,500 85,863,172,500

440 150,941,000,000 32,659,705,000 183,600,705,000

UNIT EKOR RESIKO MATI 15% TOTAL1 Desa Sarimanggu Kec Karangnunggal Tasikmalaya 110 325,000 48,750 276,250 2 Desa Cijulang Kec Cineam Tasikmalaya 110 325,000 48,750 276,250 3 Desa Kawasen Kec Banjarsari Ciamis 220 650,000 97,500 552,500

440 1,300,000 195,000 1,105,000

EKOR PRODUKSI1 Desa Sarimanggu Kec Karangnunggal Tasikmalaya 276,250 16,210 2 Desa Cijulang Kec Cineam Tasikmalaya 276,250 16,250 3 Desa Kawasen Kec Banjarsari Ciamis 552,500 15,778

1,105,000 48,238

EKOR HARGA JUAL1 Desa Sarimanggu Kec Karangnunggal Tasikmalaya 276,250 17,800 2 Desa Cijulang Kec Cineam Tasikmalaya 276,250 17,800 3 Desa Kawasen Kec Banjarsari Ciamis 552,500 17,800

1,105,000

PANEN KREDIT1 MODAL INVESTOR2 PENGEMBALIAN MODAL 1 1,666,666,667 3 PROFIT MARGIN 120 19,669,000,000

PRODUKSI PROFIT1 Desa Sarimanggu Kec Karangnunggal Tasikmalaya 4,071,016,250 846,233,750 2 Desa Cijulang Kec Cineam Tasikmalaya 4,081,016,250 836,233,750 3 Desa Kawasen Kec Banjarsari Ciamis 7,924,672,500 1,909,827,500

16,076,705,000 3,592,295,000

KREDIT SALDO1 Pengembalian modal 1,666,666,667 1,925,628,333 2 Bunga 1.00% 35,922,950

1,889,705,383 1 Pengembangan usaha 10%2 Social work 2.50%

I INVESTORII OWNER

TOTAL

661,396,884.17

-

JUMLAH

1,653,492,210 JUMLAH PROFIT

992,095,326.25

188,970,538 47,242,635

1,889,705,383

236,213,173 JUMLAH

NETT PROFIT

1,653,492,210.42

URAIAN

JUMLAH

40%

4,917,250,000

19,669,000,000

4,917,250,000 9,834,500,000

LOKASI PROJECT INTAN

LOKASI PROJECT INTAN

JUMLAH

LOKASI PROJECT INTAN

JUMLAH

LOKASI PROJECT INTAN

60%

TOTAL4,917,250,000 4,917,250,000 9,834,500,000

19,669,000,000

PROFIT3,592,295,000

TOTAL4,478,117,875 4,489,117,875 8,717,139,750

17,684,375,500

JUMLAH

JUMLAH

3,592,295,000

URAIAN JUMLAH200,000,000,000 200,000,000,000

MARGIN

2,360,280,000,000 PROFIT MARGIN

LOKASI PROJECT INTAN

SUMMARY PROJECT : PEMBANGUNAN INDUSTRI TERNAK AYAM,PRODUKSI DAN DISTRIBUSI AYAM BROILER LOKASI : KARANGNUNGGAL,CINEAM KAB TASIKMALAYA DAN BANJARSARI KAB CIAMIS PT.SENTRA INSAN GARUDA

Page 3: SUMMARY PROJECT

NO LOKASI PEKERJAAN SATUAN VOLUME JUMLAH TOTAL JUMLAH

I DESA SARIMANGGU,KARANGNUNGGAL TASIKMALAYA1 Pek.Persiapan I Item 6 1,343,500,000 2 Pek.Persiapan II Item 6 918,500,000 3 Pek.Tahap 1 Pematangan lahan & Infrastruktur Item 4 4,110,000,000 4 Pek.Tahap 2 Pembangunan kandang ayam Item 5 24,970,000,000 5 Pek.Tahap 3 Electrical Item 4 2,160,000,000 6 Pek.Tahap 4 Mekanical Item 4 870,000,000 7 Pek.Tahap 5 Sarana penunjang Item 6 4,850,000,000 8 Biaya oprasional produksi I Item 5 2,795,000,000 9 Biaya oprasional produksi II Item 6 2,340,000,000

10 Biaya oprasional produksi III Item 9 2,362,000,000 11 Biaya oprasional produksi IV Item 4 212,016,250 12 Biaya oprasional kantor Item 4 1,064,000,000 13 Biaya pajak dan lain-lain Item 5 4,196,000,000

52,191,016,250 52,191,016,250 II DESA CIJULANG,CINEAM TASIKMALAYA1 Pek.Persiapan I Item 6 1,366,000,000 2 Pek.Persiapan II Item 6 918,500,000 3 Pek.Tahap 1 Pematangan lahan & Infrastruktur Item 4 5,840,000,000 4 Pek.Tahap 2 Pembangunan kandang ayam Item 5 24,970,000,000 5 Pek.Tahap 3 Electrical Item 4 2,160,000,000 6 Pek.Tahap 4 Mekanical Item 4 1,005,000,000 7 Pek.Tahap 5 Sarana penunjang Item 6 4,900,000,000 8 Biaya oprasional produksi I Item 5 2,795,000,000 9 Biaya oprasional produksi II Item 6 2,340,000,000

10 Biaya oprasional produksi III Item 9 2,162,000,000 11 Biaya oprasional produksi IV Item 4 212,016,250 12 Biaya oprasional kantor Item 4 1,074,000,000 13 Biaya pajak dan lain-lain Item 5 4,387,500,000

54,130,016,250 54,130,016,250 III DESA KAWASEN,BANJARSARI CIAMIS1 Pek.Persiapan I Item 6 1,591,000,000 2 Pek.Persiapan II Item 6 918,500,000 3 Pek.Tahap 1 Pematangan lahan & Infrastruktur Item 4 8,140,000,000 4 Pek.Tahap 2 Pembangunan kandang ayam Item 5 49,940,000,000 5 Pek.Tahap 3 Electrical Item 4 3,205,000,000 6 Pek.Tahap 4 Mekanical Item 4 1,365,000,000 7 Pek.Tahap 5 Sarana penunjang Item 6 5,400,000,000 8 Biaya oprasional produksi I Item 5 5,590,000,000 9 Biaya oprasional produksi II Item 6 4,680,000,000

10 Biaya oprasional produksi III Item 9 2,699,000,000 11 Biaya oprasional produksi IV Item 4 384,672,500 12 Biaya oprasional kantor Item 4 1,950,000,000 13 Biaya pajak dan lain-lain Item 5 7,705,000,000

93,568,172,500 93,568,172,500

199,889,205,000

Dibulatkan 200,000,000,000

TOTAL JUMLAHRp.200,000,000,000,00Terbilang

Tasikmalaya,....Nopember 2013

Managemen

RENCANA ANGGARAN BIAYA : PEMBANGUNAN INDUSTRI TERNAK AYAM,PRODUKSI DAN DISTRIBUSI AYAM BROILER LOKASI : KARANGNUNGGAL,CINEAM KAB TASIKMALAYA DAN BANJARSARI KAB CIAMIS PT.SENTRA INSAN GARUDA

JUMLAH I

JUMLAH II

JUMLAH III

( Dua ratus milyar rupiah )

JUMLAH I+II+III

Page 4: SUMMARY PROJECT

NO LOKASI PEKERJAAN SATUAN VOLUME JUMLAH TOTAL JUMLAH

I1 Pek.Persiapan I Item 6 1,343,500,000 2 Pek.Persiapan II Item 6 918,500,000 3 Pek.Tahap 1 Pematangan lahan & Infrastruktur Item 4 4,110,000,000 4 Pek.Tahap 2 Pembangunan kandang ayam Item 5 24,970,000,000 5 Pek.Tahap 3 Electrical Item 4 2,160,000,000 6 Pek.Tahap 4 Mekanical Item 4 870,000,000 7 Pek.Tahap 5 Sarana penunjang Item 6 4,850,000,000

39,222,000,000 39,222,000,000 II1 Pek.Persiapan I Item 6 1,366,000,000 2 Pek.Persiapan II Item 6 918,500,000 3 Pek.Tahap 1 Pematangan lahan & Infrastruktur Item 4 5,840,000,000 4 Pek.Tahap 2 Pembangunan kandang ayam Item 5 24,970,000,000 5 Pek.Tahap 3 Electrical Item 4 2,160,000,000 6 Pek.Tahap 4 Mekanical Item 4 1,005,000,000 7 Pek.Tahap 5 Sarana penunjang Item 6 4,900,000,000

41,159,500,000 III DESA KAWASEN,BANJARSARI CIAMIS1 Pek.Persiapan I Item 6 1,591,000,000 2 Pek.Persiapan II Item 6 918,500,000 3 Pek.Tahap 1 Pematangan lahan & Infrastruktur Item 4 8,140,000,000 4 Pek.Tahap 2 Pembangunan kandang ayam Item 5 49,940,000,000 5 Pek.Tahap 3 Electrical Item 4 3,205,000,000 6 Pek.Tahap 4 Mekanical Item 4 1,365,000,000 7 Pek.Tahap 5 Sarana penunjang Item 6 5,400,000,000

70,559,500,000 150,941,000,000

TOTAL 150,941,000,000

TOTAL JUMLAHRp.150,941,000,000,00Terbilang

RENCANA ANGGARAN BIAYA : PEMBANGUNAN INFRASTUKTUR,KANDANG AYAM,FASILITAS,MEKANIKAL,ELEKTRIKAL &PENUNJANG LOKASI : KARANGNUNGGAL,CINEAM KAB TASIKMALAYA DAN BANJARSARI KAB CIAMIS PT.SENTRA INSAN GARUDA

( Seratus lima puluh milyar sembilan ratus empat puluh satu juta rupiah )

Tasikmalaya,....Nopember2013

70,559,500,000

Management

JUMLAH I+II+III

DESA SARIMANGGU,KARANGNUNGGAL TASIKMALAYA

JUMLAH IDESA CIJULANG,CINEAM TASIKMALAYA

JUMLAH II 41,159,500,000

JUMLAH III

Page 5: SUMMARY PROJECT

NO LOKASI PEKERJAAN SATUAN VOLUME JUMLAH TOTAL JUMLAH

I1 Biaya oprasional produksi I Item 5 2,795,000,000 2 Biaya oprasional produksi II Item 6 2,340,000,000 3 Biaya oprasional produksi III Item 9 2,362,000,000 4 Biaya oprasional produksi IV Item 4 212,016,250 5 Biaya oprasional kantor Item 4 1,064,000,000

8,773,016,250 8,773,016,250 8,773,016,250 I1 Biaya oprasional produksi I Item 5 2,795,000,000 2 Biaya oprasional produksi II Item 6 2,340,000,000 3 Biaya oprasional produksi III Item 9 2,162,000,000 4 Biaya oprasional produksi IV Item 4 212,016,250 5 Biaya oprasional kantor Item 4 1,074,000,000

############ 8,583,016,250 8,583,016,250 II DESA KAWASEN,BANJARSARI CIAMIS1 Biaya oprasional produksi I Item 5 5,590,000,000 2 Biaya oprasional produksi II Item 6 4,680,000,000 3 Biaya oprasional produksi III Item 9 2,699,000,000 4 Biaya oprasional produksi IV Item 4 384,672,500 5 Biaya oprasional kantor Item 4 1,950,000,000

############ 15,303,672,500 15,303,672,500 32,659,705,000

TOTAL 32,659,705,000

TOTAL JUMLAHRp. 32,659,705,000 Terbilang

JUMLAH II

RENCANA ANGGARAN BIAYA : PRODUKSI,DISTRIBUSI DAN MARKET AYAM BROILER LOKASI : KARANGNUNGGAL,CINEAM KAB TASIKMALAYA DAN BANJARSARI KAB CIAMIS PT.SENTRA INSAN GARUDA

DESA SARIMANGGU,KARANGNUNGGAL TASIKMALAYA

JUMLAH II

Management

Tasikmalaya,....Nopember 2013

JUMLAH III

( Tiga puluh dua milyar seratus enam puluh juta sembilan ratus lima ribu rupiah )

JUMLAH I+II+III

DESA CIJULANG,CINEAM TASIKMALAYA

Page 6: SUMMARY PROJECT

NO URAIAN PEKERJAAN JUMLAH BULAN 1 BULAN 2 BULAN 3

I1 Pek.Persiapan I 1,343,500,000 1,343,500,000 2 Pek.Persiapan II 918,500,000 918,500,000 3 Pek.Tahap 1 Pematangan lahan & Infrastruktur 4,110,000,000 2,055,000,000 2,055,000,000 4 Pek.Tahap 2 Pembangunan kandang ayam 24,970,000,000 7,491,000,000 5 Pek.Tahap 3 Electrical 2,160,000,000 1,296,000,000 6 Pek.Tahap 4 Mekanical 870,000,000 261,000,000 7 Pek.Tahap 5 Sarana penunjang 4,850,000,000 2,425,000,000 8 Biaya oprasional produksi I 2,795,000,000 9 Biaya oprasional produksi II 2,340,000,000

10 Biaya oprasional produksi III 2,362,000,000 11 Biaya oprasional produksi IV 212,016,250 12 Biaya oprasional kantor 1,064,000,000 13 Biaya pajak dan lain-lain 4,196,000,000 4,196,000,000

52,191,016,250 8,513,000,000 9,807,000,000 3,721,000,000 II1 Pek.Persiapan I 1,366,000,000 1,366,000,000 2 Pek.Persiapan II 918,500,000 918,500,000 3 Pek.Tahap 1 Pematangan lahan & Infrastruktur 5,840,000,000 2,920,000,000 2,920,000,000 4 Pek.Tahap 2 Pembangunan kandang ayam 24,970,000,000 7,491,000,000 5 Pek.Tahap 3 Electrical 2,160,000,000 1,296,000,000 6 Pek.Tahap 4 Mekanical 1,005,000,000 301,500,000 7 Pek.Tahap 5 Sarana penunjang 4,900,000,000 2,450,000,000 8 Biaya oprasional produksi I 2,795,000,000 9 Biaya oprasional produksi II 2,340,000,000

10 Biaya oprasional produksi III 2,162,000,000 11 Biaya oprasional produksi IV 212,016,250 12 Biaya oprasional kantor 1,074,000,000 13 Biaya pajak dan lain-lain 4,387,500,000 4,387,500,000

54,130,016,250 9,592,000,000 10,712,500,000 3,746,000,000 III1 Pek.Persiapan I 1,591,000,000 1,591,000,000 2 Pek.Persiapan II 918,500,000 918,500,000 3 Pek.Tahap 1 Pematangan lahan & Infrastruktur 8,140,000,000 4,070,000,000 4,070,000,000 4 Pek.Tahap 2 Pembangunan kandang ayam 49,940,000,000 14,982,000,000 5 Pek.Tahap 3 Electrical 3,205,000,000 1,923,000,000 6 Pek.Tahap 4 Mekanical 1,365,000,000 409,500,000 7 Pek.Tahap 5 Sarana penunjang 5,400,000,000 2,700,000,000

8 Biaya oprasional produksi I 5,590,000,000 9 Biaya oprasional produksi II 4,680,000,000

10 Biaya oprasional produksi III 2,699,000,000 11 Biaya oprasional produksi IV 384,672,500 12 Biaya oprasional kantor 1,950,000,000 13 Biaya pajak dan lain-lain 7,705,000,000 7,705,000,000

93,568,172,500 14,284,500,000 19,461,500,000 4,623,000,000

199,889,205,000 32,389,500,000 39,981,000,000 12,090,000,000

1 PEK PERSIAPAN 2 PEK INFRASTRUKTUR DAN KONTRUKSI KANDANG 3 PEK PEMBANGUNAN GUDANG DAN KANTOR4 PRODUKSI BERJALAN5 PERALATAN PRODUKSI6 PAJAK DAN BIAYA LAIN-LAIN

KETERANGAN WARNA DALAM KOLOM

CASH FLOW :PEMBANGUNAN INDUSTRI TERNAK AYAM,PRODUKSI DAN DISTRIBUSI AYAM BROILER LOKASI :KEC CINEAM,KARANGNUNGGAL KAB TASIKMALAYA & KEC BANJARSARI KAB CIAMIS PT.SENTRA INSAN GARUDA

JUMLAH I

JUMLAH II

JUMLAH III

JUMLAH TOTAL

DESA SARIMANGGU,KARANGNUNGGAL TASIKMALAYA

DESA CIJULANG,CINEAM TASIKMALAYA

DESA KAWASEN,BANJARSARI CIAMIS

Page 7: SUMMARY PROJECT

BULAN 4 BULAN 5 BULAN 6 BULAN 7 BULAN 8 BULAN 9 BULAN 10 BULAN 11 BULAN 12

8,739,500,000 7,491,000,000 1,248,500,000 864,000,000

435,000,000 174,000,000 1,455,000,000 970,000,000 2,795,000,000

2,340,000,000 2,362,000,000

212,016,250 1,064,000,000

13,876,500,000 6,390,016,250 7,665,000,000 2,218,500,000 -

8,739,500,000 7,491,000,000 1,248,500,000 864,000,000

502,500,000 201,000,000 1,470,000,000 980,000,000 2,795,000,000

2,340,000,000 2,162,000,000

212,016,250 1,074,000,000

13,744,000,000 6,415,016,250 7,692,000,000 2,228,500,000 -

17,479,000,000 14,982,000,000 2,497,000,000 1,282,000,000

682,500,000 273,000,000 1,620,000,000 1,080,000,000

5,590,000,000 4,680,000,000

2,699,000,000 384,672,500

1,950,000,000

25,540,500,000 10,826,672,500 15,255,000,000 3,577,000,000

53,161,000,000 23,631,705,000 30,612,000,000 8,024,000,000

Managemen

Tasikmalaya,.......Nopember 2013

Page 8: SUMMARY PROJECT

NO URAIAN SATUAN VOLUME ASUMSI HARGA JUMLAH TOTAL JUMLAH

1 2 3 4 5 6 7I1 Sosialisasi Masyarakat List 3 1 10,000,000 30,000,000 2 Pengukuran Lahan M2 150,000 1 450 67,500,000 3 Pengukuran jalan akses M2 40,000 1 400 16,000,000 4 Land Clearing Lahan/Ganti rugi pohon M2 150,000 1 1,000 150,000,000 5 Pembebasan Jalan akses M2 16,000 1 60,000 960,000,000 6 Perijinan Proyek & usaha peternakan M2 150,000 1 800 120,000,000

1,343,500,000 II1 Direksi kit Unit 2 1 10,000,000 20,000,000 2 Peralatan kantor List 10 1 5,000,000 50,000,000 3 Peralatan rumah tangga kantor Unit 25 1 2,500,000 62,500,000 4 Mobilisasi Kantor Unit 1 1 156,000,000 156,000,000 5 Motoris Kantor Unit 2 1 15,000,000 30,000,000 6 Biaya oprasional kantor Bulan 6 20 5,000,000 600,000,000

918,500,000 III1 Cut and fill M2 75,000 1 18,000 1,350,000,000 2 Pematangan lahan/land clearing M2 75,000 1 2,000 150,000,000 3 Infrastruktur jalan akses ke lokasi M2 16,000 1 100,000 1,600,000,000 4 Drainase M2 8,000 1 70,000 560,000,000 5 Overhead M2 150,000 1 3,000 450,000,000

4,110,000,000 IV1 Pembangunan Kandang ayam Unit 110 1 170,000,000 18,700,000,000 2 Pembangunan fasilitas pendukung Unit 11 1 10,000,000 110,000,000 3 Infrastruktur jalan kandang ayam List 11 1 215,000,000 2,365,000,000 4 Pemagaran per 10 unit kandang List 11 1 120,000,000 1,320,000,000 5 Pekerjaan tambahan Unit 11 1 125,000,000 1,375,000,000 6 Overhead Unit 110 1 10,000,000 1,100,000,000

24,970,000,000 V1 Pemasangan Listrik dari PLN Unit 82 1 7,500,000 615,000,000 2 Beli Genset Unit 2 1 250,000,000 500,000,000 3 Instalasi listrik kandang ayam Unit 1100 1 300,000 330,000,000 4 Pekerjaan tambahan Unit 110 1 4,000,000 440,000,000 5 Overhead Unit 110 1 2,500,000 275,000,000

2,160,000,000 VI1 Pengeboran air bersih Unit 5 1 75,000,000 375,000,000 2 instalisasi air bersih Unit 11 1 20,000,000 220,000,000 3 Pemasangan water pump Unit 11 1 15,000,000 165,000,000 4 Overhead Unit 11 1 10,000,000 110,000,000

870,000,000 VII1 Tanah & bangunan kantor Unit 1 1 400,000,000 400,000,000 2 Tanah & bangunan work shop Unit 1 1 150,000,000 150,000,000 3 Pembangunan gapura Unit 2 1 75,000,000 150,000,000 4 Pembangunan pos satpam dan musolah Unit 13 1 50,000,000 650,000,000 5 Tanah & bangunan gudang utama Unit 3 1 1,000,000,000 3,000,000,000 6 Overhead Unit 1 1 500,000,000 500,000,000

4,850,000,000 VIII

1 Beli DOC Ekor 325,000 1 4,500 1,462,500,000 2 Beli Pakan ayam Kilo gram 9,750,000 1 100 975,000,000 3 Beli Vaksin ayam Kilo gram 650,000 1 250 162,500,000 4 Beli Vitamin ayam Kilo gram 4,875,000 1 25 121,875,000 5 Biaya Lain-lain Kilo gram 4,875,000 1 15 73,125,000

2,795,000,000

JUMLAH IVPEK.TAHAP 4 MEKANICAL

JUMLAH IIPEK.TAHAP 1 PEMATANGAN LAHAN & INFRASTRUKTUR

JUMLAH IIIPEK.TAHAP 2 PEMBANGUNAN KANDANG & FASILITASNYA

SUMMARY PROJECT PEMBANGUNAN KANDANG AYAM,PRODUKSI DAN MARKET AYAM BROILER DI DESA SARIMANGGU KARANGNUNGGAL - TASIKMALAYA

PEK.PERSIAPAN I

JUMLAH IPEK.PERSIAPAN II

JUMLAH IVPEK.TAHAP 3 ELECTRIKAL

JUMLAH VIII

JUMLAH VPEK.TAHAP 5 SARANA PENUNJANG

JUMLAH VIIBIAYA OPERASIONAL PRODUKSI 1

Page 9: SUMMARY PROJECT

IX1 Peralatan Makan dan minum ayam Unit 110 1 8,000,000 880,000,000 2 Keranjang ayam kecil Pcs 1,000 1 240,000 240,000,000 3 Keranjang ayam besar Pcs 1,000 1 290,000 290,000,000 4 Pemanas LPG kap.1000+kelengkapannya Pcs 1,000 1 600,000 600,000,000 5 Peralatan obat dan vaksin Unit 110 1 2,000,000 220,000,000 6 Peralatan pendukung fasilitas 10 unit Unit 110 1 1,000,000 110,000,000

2,340,000,000 X1 Beli Mesin peghangat C-50AT Set 2,000 1 200,000 400,000,000 2 Beli perlengkapan kantor Unit 20 1 5,000,000 100,000,000 3 Beli truck FE 74 HD 125 PS Unit 5 1 232,200,000 1,161,000,000 4 Beli mobil ALL NEW AVANZA 1.3 E A/T Unit 1 1 156,000,000 156,000,000 5 Beli mobil Panter pick up Unit 1 1 145,000,000 145,000,000 6 Beli motor roda 3 viar Unit 4 1 17,500,000 70,000,000 7 Beli motor roda 2 Honda Supra New Unit 4 1 15,000,000 60,000,000 8 Perawatan kendaraan inventaris Unit 15 12 500,000 90,000,000 9 Perbaikan kendaraan inventaris Unit 15 12 1,000,000 180,000,000

2,362,000,000 XI1 Biaya Marketing List 30 2 500,000 30,000,000 2 Biaya Trucking Unit 69 1 2,500,000 172,656,250 3 Biaya Mobilisasi oprasional Unit 2 26 100,000 5,200,000 4 Biaya Motoris oprasional Unit 8 26 20,000 4,160,000

212,016,250 XII1 Gaji karyawan kantor Orang 20 1 5,000,000 100,000,000 2 Gaji karyawan kandang Orang 457 1 2,000,000 914,000,000 3 Biaya alat-alat dan ATK Kantor List 25 1 1,000,000 25,000,000 4 Biaya Lain-lain List 25 1 1,000,000 25,000,000

1,064,000,000 XIII PAJAK DAN BIAYA LAINNYA1 Pajak kontruksi kandang ayam Persen 10 1 24,970,000,000 2,497,000,000 2 Pajak infrastruktur Persen 10 1 4,110,000,000 411,000,000 3 Pajak mekanikal & elektrikal Persen 10 1 3,030,000,000 303,000,000 4 Pajak kontruksi gudang Persen 10 1 4,850,000,000 485,000,000 5 Biaya tambahan List 5 1 100,000,000 500,000,000

JUMLAH XII 4,196,000,000

52,191,016,250

48,120,000,000

I BIAYA OPRASIONAL PRODUKSI 2,795,000,000 II BIAYA OPRASIONAL KANTOR 1,276,016,250

52,191,016,250

1 VOLUME AYAM Ekor 325,000 2 RESIKO KEMATIAN 15% Ekor 48,750 3 JUMLAH AYAM BERSIH Ekor 276,250 4 MODAL DASAR AYAM/EKOR JUMLAH 14,737

PPN 10% 1,474 TOTAL 16,210

Ekor 276,250 17,800 4,917,250,000 TOTAL 4,917,250,000

Ekor 276,250 1,590 439,132,125

Per panen 1 4,917,250,000 Per panen 1 4,071,016,250 Per panen 1 846,233,750

JUMLAH XBIAYA OPERASIONAL KANTOR

JUMLAH XI

JUMLAH TOTAL

ASUMSI I

JUMLAH VIIIBIAYA OPERASIONAL PRODUKSI 3

JUMLAH IXBIAYA OPERASIONAL PRODUKSI 4

BIAYA OPERASIONAL PRODUKSI 2

TOTAL PENGELUARAN PRODUKSI BERJALAN 4,071,016,250 TOTAL

RENCANA PENDAPATAN

BIAYA PENGELUARAN PEMBANGUNAN 48,120,000,000 BIAYA PENGELUARAN PRODUKSI

KEUNTUNGAN JUAL AYAM PER EKOR

ASUMSI PROFIT PER PANENPROFIT MARGINBIAYA PRODUKSI

HARGA JUAL AYAM PER EKOR

PROFIT

Page 10: SUMMARY PROJECT

Bulan 120 434,925,135.42 Persen 1% 2,174,625.68

437,099,761.09

409,133,988.91

1 PENGEMBANGAN USAHA Per panen 1 10% 40,913,398.89 2 SOCIAL WORK Per panen 1 2.50% 10,228,349.72

51,141,748.61 357,992,240.29

1 INVESTOR Per panen 1 60% 214,795,344.18 2 OWNER Per panen 1 40% 143,196,896.12

I BIAYA OPRASIONAL PRODUKSI 2,795,000,000 120 335,400,000,000 II BIAYA OPRASIONAL KANTOR 1,276,016,250 120 153,121,950,000

488,521,950,000

1 VOLUME AYAM Ekor 39,000,000 2 RESIKO KEMATIAN 15% Ekor 5,850,000 3 JUMLAH AYAM BERSIH Ekor 33,150,000 4 MODAL DASAR AYAM/EKOR JUMLAH 14,737

PPN 10% 1,474 TOTAL 16,210

Ekor 33,150,000 17,800 590,070,000,000 TOTAL 590,070,000,000

Ekor 33,150,000 1,590 52,695,855,000

Panen 120 590,070,000,000 Panen 120 488,521,950,000 Panen 120 101,548,050,000

Bulan 120 52,191,016,250 434,925,135.42 52,191,016,250.00 Persen 1% 260,955,081.25

52,451,971,331.25

49,096,078,668.75

1 PENGEMBANGAN USAHA Panen 120 10% 4,909,607,866.88 2 SOCIAL WORK Panen 120 2.50% 1,227,401,966.72

6,137,009,833.59 42,959,068,835.16

JUMLAHNETT PROFIT

ASUMSI BUNGAJUMLAH

TOTAL PROFIT

PROFIT 120 KALI PANEN

ASUMSI PENGEMBALIAN MODAL

HARGA JUAL AYAM PER EKOR

KEUNTUNGAN JUAL AYAM PER EKOR

ASUMSI PROFIT PANENPROFIT MARGINBIAYA PRODUKSI

PROFIT

TOTAL PENGELUARAN PRODUKSI 488,521,950,000 TOTAL

RENCANA PENDAPATAN

SHARING PROFIT

ASUMSI IIBIAYA PENGELUARAN PRODUKSI

JUMLAH

TOTAL PROFIT PER PANEN

PROFIT PER 1 KALI PANEN

JUMLAH

ASUMSI PENGEMBALIAN MODAL 52,191,016,250

ASUMSI BUNGA

Page 11: SUMMARY PROJECT

NO URAIAN SATUAN VOLUME ASUMSI HARGA JUMLAH TOTAL JUMLAH

1 2 3 4 5 6 7I1 Sosialisasi Masyarakat List 3 1 10,000,000 30,000,000 2 Pengukuran Lahan M2 160,000 1 450 72,000,000 3 Pengukuran jalan akses M2 40,000 1 400 16,000,000 4 Land Clearing Lahan/Ganti rugi pohon M2 160,000 1 1,000 160,000,000 5 Pembebasan Jalan akses M2 16,000 1 60,000 960,000,000 6 Perijinan Proyek & usaha peternakan M2 160,000 1 800 128,000,000

1,366,000,000 II1 Direksikeet Unit 2 1 10,000,000 20,000,000 2 Peralatan kantor List 10 1 5,000,000 50,000,000 3 Peralatan rumah tangga kantor Unit 25 1 2,500,000 62,500,000 4 Mobilisasi Kantor Unit 1 1 156,000,000 156,000,000 5 Motoris Kantor Unit 2 1 15,000,000 30,000,000 6 Biaya oprasional kantor Bulan 6 20 5,000,000 600,000,000

918,500,000 III1 Cut and fill M2 160,000 1 18,000 2,880,000,000 2 Pematangan lahan/Land clearing M2 160,000 1 2,000 320,000,000 3 Infrastruktur jalan akses ke lokasi M2 16,000 1 100,000 1,600,000,000 4 Drainase M2 8,000 1 70,000 560,000,000 5 Overhead M2 160,000 1 3,000 480,000,000

5,840,000,000 IV1 Pembangunan Kandang ayam Unit 110 1 170,000,000 18,700,000,000 2 Pembangunan fasilitas pendukung Unit 11 1 10,000,000 110,000,000 3 Infrastruktur jalan kandang ayam List 11 1 215,000,000 2,365,000,000 4 Pemagaran per 10 unit kandang List 11 1 120,000,000 1,320,000,000 5 Pekerjaan tambahan Unit 11 1 125,000,000 1,375,000,000 6 Overhead Unit 110 1 10,000,000 1,100,000,000

24,970,000,000 V1 Pemasangan Listrik dari PLN Unit 82 1 7,500,000 615,000,000 2 Beli Genset Unit 2 1 250,000,000 500,000,000 3 Instalasi listrik kandang ayam Unit 1100 1 300,000 330,000,000 4 Pekerjaan tambahan Unit 110 1 4,000,000 440,000,000 5 Overhead Unit 110 1 2,500,000 275,000,000

2,160,000,000 VI1 Pengeboran air bersih Unit 5 1 75,000,000 375,000,000 2 instalisasi air bersih Unit 14 1 20,000,000 280,000,000 3 Pemasangan water pump Unit 14 1 15,000,000 210,000,000 4 Overhead Unit 14 1 10,000,000 140,000,000

1,005,000,000 VII1 Tanah & bangunan kantor Unit 1 1 400,000,000 400,000,000 2 Tanah & bangunan work shop Unit 1 1 150,000,000 150,000,000 3 Pembangunan gapura Unit 2 1 75,000,000 150,000,000 4 Pembangunan pos satpam dan musolah Unit 14 1 50,000,000 700,000,000 5 Tanah & bangunan gudang utama Unit 3 1 1,000,000,000 3,000,000,000 6 Overhead Unit 1 1 500,000,000 500,000,000

4,900,000,000 VIII1 Beli DOC Ekor 325,000 1 4,500 1,462,500,000 2 Beli Pakan ayam Kilo gram 9,750,000 1 100 975,000,000 3 Beli Vaksin ayam Kilo gram 650,000 1 250 162,500,000 4 Beli Vitamin ayam Kilo gram 4,875,000 1 25 121,875,000 5 Biaya Lain-lain Kilo gram 4,875,000 1 15 73,125,000

2,795,000,000

BIAYA OPERASIONAL PRODUKSI 1

PEK.TAHAP 5 SARANA PENUNJANGJUMLAH V

JUMLAH VII

JUMLAH VIII

RENCANA ANGGARAN BIAYA PROJECT INDUSTRI TERNAK AYAM NUSANTARA"INTAN" DESA CIJULANG KEC CINEAM KAB TASIKMALAYA

PEK.TAHAP 4 MEKANIKAL

PEK.TAHAP 3 ELECTRIKAL

PEK.TAHAP 2 PEMBANGUNAN KANDANG & FASILITASNYA

PEK.TAHAP 1 PEMATANGAN LAHAN & INFRASTRUKTUR

JUMLAH IV

JUMLAH IV

PEK.PERSIAPAN II

PEK.PERSIAPAN I

JUMLAH I

JUMLAH II

JUMLAH III

Page 12: SUMMARY PROJECT

IX1 Peralatan Makan dan minum ayam Unit 110 1 8,000,000 880,000,000 2 Keranjang ayam kecil Pcs 1,000 1 240,000 240,000,000 3 Keranjang ayam besar Pcs 1,000 1 290,000 290,000,000 4 Pemanas LPG kap.1000+kelengkapannya Pcs 1,000 1 600,000 600,000,000 5 Peralatan obat dan vaksin Unit 110 1 2,000,000 220,000,000 6 Peralatan pendukung fasilitas 10 unit Unit 110 1 1,000,000 110,000,000

2,340,000,000 X1 Beli Mesin peghangat C-50AT Set 1,000 1 200,000 200,000,000 2 Beli perlengkapan kantor Unit 20 1 5,000,000 100,000,000 3 Beli truck FE 74 HD 125 PS Unit 5 1 232,200,000 1,161,000,000 4 Beli mobil ALL NEW AVANZA 1.3 E A/T Unit 1 1 156,000,000 156,000,000 5 Beli mobil Panter pick up Unit 1 1 145,000,000 145,000,000 6 Beli motor roda 3 viar Unit 4 1 17,500,000 70,000,000 7 Beli motor roda 2 Honda Supra New Unit 4 1 15,000,000 60,000,000 8 Perawatan kendaraan inventaris Unit 15 12 500,000 90,000,000 9 Perbaikan kendaraan inventaris Unit 15 12 1,000,000 180,000,000

2,162,000,000 XI1 Biaya Marketing List 30 2 500,000 30,000,000 2 Biaya Trucking Unit 69 1 2,500,000 172,656,250 3 Biaya Mobilisasi oprasional Unit 2 26 100,000 5,200,000 4 Biaya Motoris oprasional Unit 8 26 20,000 4,160,000

212,016,250 XII1 Gaji karyawan kantor Orang 20 1 5,000,000 100,000,000 2 Gaji karyawan kandang Orang 462 1 2,000,000 924,000,000 3 Biaya alat-alat dan ATK Kantor List 25 1 1,000,000 25,000,000 4 Biaya Lain-lain List 25 1 1,000,000 25,000,000

1,074,000,000 XIII PAJAK DAN BIAYA LAINNYA1 Pajak kontruksi kandang ayam Persen 10 1 24,970,000,000 2,497,000,000 2 Pajak infrastruktur Persen 10 1 5,840,000,000 584,000,000 3 Pajak mekanikal & elektrikal Persen 10 1 3,165,000,000 316,500,000 4 Pajak kontruksi gudang Persen 10 1 4,900,000,000 490,000,000 5 Biaya tambahan List 5 1 100,000,000 500,000,000

JUMLAH XIII 4,387,500,000

54,130,016,250

50,049,000,000

I BIAYA OPRASIONAL PRODUKSI 2,795,000,000 II BIAYA OPRASIONAL KANTOR 1,286,016,250

54,130,016,250

1 VOLUME AYAM Ekor 325,000 2 RESIKO KEMATIAN 15% Ekor 48,750 3 JUMLAH AYAM BERSIH Ekor 276,250 4 MODAL DASAR AYAM/EKOR JUMLAH 14,773

PPN 10% 1,477 TOTAL 16,250

Kilogram 276,250 17,800 4,917,250,000 TOTAL 4,917,250,000

Kilogram 276,250 1,550 428,132,125

Per panen 1 4,917,250,000 Per panen 1 4,081,016,250 Per panen 1 836,233,750

JUMLAH IX

BIAYA OPERASIONAL PRODUKSI 2

BIAYA OPERASIONAL PRODUKSI 4

BIAYA OPERASIONAL PRODUKSI 3

50,049,000,000

JUMLAH TOTAL

BIAYA OPERASIONAL KANTORJUMLAH XI

JUMLAH XII

ASUMSI I

JUMLAH X

BIAYA PENGELUARAN PEMBANGUNAN

TOTAL

RENCANA PENDAPATAN

BIAYA PENGELUARAN PRODUKSI

4,081,016,250 TOTAL PENGELUARAN PRODUKSI BERJALAN

HARGA JUAL AYAM PER KILOGRAM

KEUNTUNGAN JUAL AYAM PER KILOGRAM

ASUMSI PROFIT PER PANENPROFIT MARGINBIAYA PRODUKSI

PROFIT

Page 13: SUMMARY PROJECT

Bulan 120 451,083,468.75 Persen 1% 2,255,417.34

453,338,886.09

382,894,863.91

1 PENGEMBANGAN USAHA Per panen 1 10% 38,289,486.39 2 SOCIAL WORK Per panen 1 2.50% 9,572,371.60

47,861,857.99 335,033,005.92

1 INVESTOR Per panen 1 60% 201,019,803.55 2 OWNER Per panen 1 40% 134,013,202.37

I BIAYA OPRASIONAL PRODUKSI 2,795,000,000 120 335,400,000,000 II BIAYA OPRASIONAL KANTOR 1,286,016,250 120 154,321,950,000

489,721,950,000

1 VOLUME AYAM Ekor 39,000,000 2 RESIKO KEMATIAN 15% Ekor 5,850,000 3 JUMLAH AYAM BERSIH Ekor 33,150,000 4 MODAL DASAR AYAM/EKOR JUMLAH 14,773

PPN 10% 1,477 TOTAL 16,250

Ekor 33,150,000 17,800 590,070,000,000 TOTAL 590,070,000,000

Ekor 33,150,000 1,550 51,375,855,000

Panen 120 590,070,000,000 Panen 120 489,721,950,000 Panen 120 100,348,050,000

Bulan 120 54,130,016,250 451,083,468.75 54,130,016,250.00 Persen 1% 270,650,081.25

54,400,666,331.25

45,947,383,668.75

1 PENGEMBANGAN USAHA Panen 120 10% 4,594,738,366.88 2 SOCIAL WORK Panen 120 2.50% 1,148,684,591.72

5,743,422,958.59 40,203,960,710.16

TOTAL PENGELUARAN PRODUKSI 489,721,950,000

TOTAL PROFIT PER PANEN

54,130,016,250

JUMLAH

PROFIT PER 1 KALI PANEN

ASUMSI PENGEMBALIAN MODAL

ASUMSI BUNGA

ASUMSI II

TOTAL

BIAYA PENGELUARAN PRODUKSI

RENCANA PENDAPATAN

SHARING PROFITJUMLAH

ASUMSI BUNGAJUMLAH

TOTAL PROFIT

PROFIT 120 KALI PANEN

PROFIT MARGINBIAYA PRODUKSI

PROFIT

ASUMSI PENGEMBALIAN MODAL

HARGA JUAL AYAM PER EKOR

KEUNTUNGAN JUAL AYAM PER EKOR

ASUMSI PROFIT PANEN

JUMLAHNETT PROFIT

Page 14: SUMMARY PROJECT

NO URAIAN SATUAN VOLUME ASUMSI HARGA JUMLAH TOTAL JUMLAH

1 2 3 4 5 6 7I1 Sosialisasi Masyarakat List 3 1 10,000,000 30,000,000 2 Pengukuran Lahan M2 260,000 1 450 117,000,000 3 Pengukuran jalan akses M2 40,000 1 400 16,000,000 4 Land Clearing Lahan/Ganti rugi pohon M2 260,000 1 1,000 260,000,000 5 Pembebasan Jalan akses M2 16,000 1 60,000 960,000,000 6 Perijinan Proyek & usaha peternakan M2 260,000 1 800 208,000,000

1,591,000,000 II1 Direksi kit Unit 2 1 10,000,000 20,000,000 2 Peralatan kantor List 10 1 5,000,000 50,000,000 3 Peralatan rumah tangga kantor Unit 25 1 2,500,000 62,500,000 4 Mobilisasi Kantor Unit 1 1 156,000,000 156,000,000 5 Motoris Kantor Unit 2 1 15,000,000 30,000,000 6 Biaya oprasional kantor Bulan 6 20 5,000,000 600,000,000

918,500,000 III1 Cut and fill M2 260,000 1 18,000 4,680,000,000 2 Pematangan lahan/Land clearing M2 260,000 1 2,000 520,000,000 3 infrastruktur jalan akses ke lokasi M2 16,000 1 100,000 1,600,000,000 4 Drainase M2 8,000 1 70,000 560,000,000 5 Overhead M2 260,000 1 3,000 780,000,000

8,140,000,000 IV1 Pembangunan Kandang ayam Unit 220 1 170,000,000 37,400,000,000 2 Pembangunan fasilitas pendukung Unit 22 1 10,000,000 220,000,000 3 infrastruktur jalan kandang ayam List 22 1 215,000,000 4,730,000,000 4 Pemagaran per 10 unit kandang List 22 1 120,000,000 2,640,000,000 5 Pekerjaan tambahan Unit 22 1 125,000,000 2,750,000,000 6 Overhead Unit 220 1 10,000,000 2,200,000,000

49,940,000,000 V1 Pemasangan Listrik dari PLN Unit 82 1 7,500,000 615,000,000 2 Beli Genset Unit 2 1 250,000,000 500,000,000 3 instalasi listrik kandang ayam Unit 2200 1 300,000 660,000,000 4 Pekerjaan tambahan Unit 220 1 4,000,000 880,000,000 5 Overhead Unit 220 1 2,500,000 550,000,000

3,205,000,000 VI1 Pengeboran air bersih Unit 5 1 75,000,000 375,000,000 2 instalisasi air bersih Unit 22 1 20,000,000 440,000,000 3 Pemasangan water pump Unit 22 1 15,000,000 330,000,000 4 Overhead Unit 22 1 10,000,000 220,000,000

1,365,000,000 VII1 Tanah & bangunan kantor Unit 1 1 400,000,000 400,000,000 2 Tanah & bangunan work shop Unit 1 1 150,000,000 150,000,000 3 Pembangunan gapura Unit 2 1 75,000,000 150,000,000 4 Pembangunan pos satpam dan musolah Unit 24 1 50,000,000 1,200,000,000 5 Tanah & bangunan gudang utama Unit 3 1 1,000,000,000 3,000,000,000 6 Overhead Unit 1 1 500,000,000 500,000,000

5,400,000,000 VIII

1 Beli DOC Ekor 650,000 1 4,500 2,925,000,000 2 Beli Pakan ayam Kilo gram 19,500,000 1 100 1,950,000,000 3 Beli Vaksin ayam Kilo gram 1,300,000 1 250 325,000,000 4 Beli Vitamin ayam Kilo gram 9,750,000 1 25 243,750,000 5 Biaya Lain-lain Kilo gram 9,750,000 1 15 146,250,000

5,590,000,000

SUMMARY PROJECT PEMBANGUNAN KANDANG AYAM,PRODUKSI DAN MARKET AYAM BROILER DI DESA KAWASEN BANJARSARI -CIAMIS

PEK.PERSIAPAN I

JUMLAH IPEK.PERSIAPAN II

JUMLAH IVPEK.TAHAP 3 ELECTRIKAL

JUMLAH IVPEK.TAHAP 4 MEKANICAL

JUMLAH IIPEK.TAHAP 1 PEMATANGAN LAHAN & INFRASTRUKTUR

JUMLAH IIIPEK.TAHAP 2 PEMBANGUNAN KANDANG & FASILITASNYA

JUMLAH VPEK.TAHAP 5 SARANA PENUNJANG

JUMLAH VIIBIAYA OPERASIONAL PRODUKSI 1

JUMLAH VIII

Page 15: SUMMARY PROJECT

IX1 Peralatan Makan dan minum ayam Unit 220 1 8,000,000 1,760,000,000 2 Keranjang ayam kecil Pcs 2,000 1 240,000 480,000,000 3 Keranjang ayam besar Pcs 2,000 1 290,000 580,000,000 4 Pemanas LPG kap.1000+kelengkapannya Pcs 2,000 1 600,000 1,200,000,000 5 Peralatan obat dan vaksin Unit 220 1 2,000,000 440,000,000 6 Peralatan pendukung fasilitas 10 unit Unit 220 1 1,000,000 220,000,000

4,680,000,000 X1 Beli Mesin peghangat C-50AT Set 2,000 1 200,000 400,000,000 2 Beli perlengkapan kantor Unit 20 1 5,000,000 100,000,000 3 Beli truck FE 74 HD 125 PS Unit 5 1 232,200,000 1,161,000,000 4 Beli mobil ALL NEW AVANZA 1.3 E A/T Unit 2 1 156,000,000 312,000,000 5 Beli mobil Panter pick up Unit 2 1 145,000,000 290,000,000 6 Beli motor roda 3 viar Unit 4 1 17,500,000 70,000,000 7 Beli motor roda 2 Honda Supra New Unit 4 1 15,000,000 60,000,000 8 Perawatan kendaraan inventaris Unit 17 12 500,000 102,000,000 9 Perbaikan kendaraan inventaris Unit 17 12 1,000,000 204,000,000

2,699,000,000 XI1 Biaya Marketing List 30 2 500,000 30,000,000 2 Biaya Trucking Unit 138 1 2,500,000 345,312,500 3 Biaya Mobilisasi oprasional Unit 2 26 100,000 5,200,000 4 Biaya Motoris oprasional Unit 8 26 20,000 4,160,000

384,672,500 XII1 Gaji karyawan kantor Orang 20 1 5,000,000 100,000,000 2 Gaji karyawan kandang Orang 900 1 2,000,000 1,800,000,000 3 Biaya alat-alat dan ATK Kantor List 25 1 1,000,000 25,000,000 4 Biaya Lain-lain List 25 1 1,000,000 25,000,000

1,950,000,000 XIII PAJAK DAN BIAYA LAINNYA1 Pajak kontruksi kandang ayam Persen 10 1 49,940,000,000 4,994,000,000 2 Pajak infrastruktur Persen 10 1 8,140,000,000 814,000,000 3 Pajak mekanikal & elektrikal Persen 10 1 4,570,000,000 457,000,000 4 Pajak kontruksi gudang Persen 10 1 5,400,000,000 540,000,000 5 Biaya tambahan List 9 1 100,000,000 900,000,000 7,705,000,000

JUMLAH XIII93,568,172,500

85,643,500,000

I BIAYA OPRASIONAL PRODUKSI 5,590,000,000 II BIAYA OPRASIONAL KANTOR 2,334,672,500

93,568,172,500

1 VOLUME AYAM Ekor 650,000 2 RESIKO KEMATIAN 15% Ekor 97,500 3 JUMLAH AYAM BERSIH Ekor 552,500 4 MODAL DASAR AYAM/EKOR JUMLAH 14,343

PPN 10% 1,434 TOTAL 15,778

Ekor 552,500 17,800 9,834,500,000 TOTAL 9,834,500,000

Ekor 552,500 2,022 1,117,360,250

Per panen 1 9,834,500,000 Per panen 1 7,924,672,500 Per panen 1 1,909,827,500

BIAYA OPERASIONAL PRODUKSI 2

JUMLAH XIBIAYA OPERASIONAL KANTOR

JUMLAH XII

JUMLAH TOTAL

ASUMSI I

JUMLAH IXBIAYA OPERASIONAL PRODUKSI 3

JUMLAH XBIAYA OPERASIONAL PRODUKSI 4

TOTAL PENGELUARAN PRODUKSI BERJALAN 7,924,672,500 TOTAL

RENCANA PENDAPATAN

BIAYA PENGELUARAN PEMBANGUNAN 85,643,500,000 BIAYA PENGELUARAN PRODUKSI 1

KEUNTUNGAN JUAL AYAM PER EKOR

ASUMSI PROFIT PER PANENPROFIT MARGINBIAYA PRODUKSI

HARGA JUAL AYAM PER EKOR

PROFIT

Page 16: SUMMARY PROJECT

Bulan 120 779,734,770.83 Persen 1% 3,898,673.85

783,633,444.69

1,126,194,055.31

1 PENGEMBANGAN USAHA Per panen 1 10% 112,619,405.53 2 SOCIAL WORK Per panen 1 2.50% 28,154,851.38

140,774,256.91 985,419,798.40

1 INVESTOR Per panen 1 60% 591,251,879.04 2 OWNER Per panen 1 40% 394,167,919.36

I BIAYA OPRASIONAL PRODUKSI 5,590,000,000 120 670,800,000,000 II BIAYA OPRASIONAL KANTOR 2,334,672,500 120 280,160,700,000

950,960,700,000

1 VOLUME AYAM Ekor 78,000,000 2 RESIKO KEMATIAN 15% Ekor 11,700,000 3 JUMLAH AYAM BERSIH Ekor 66,300,000 4 MODAL DASAR AYAM/EKOR JUMLAH 14,343

PPN 10% 1,434 TOTAL 15,778

Ekor 66,300,000 17,800 1,180,140,000,000 TOTAL 1,180,140,000,000

Ekor 66,300,000 2,022 134,083,230,000

Panen 120 1,180,140,000,000 Panen 120 950,960,700,000 Panen 120 229,179,300,000

Bulan 120 93,568,172,500 779,734,770.83 93,568,172,500.00 Persen 1% 467,840,862.50

94,036,013,362.50

135,143,286,637.50

1 PENGEMBANGAN USAHA Panen 120 10% 13,514,328,663.75 2 SOCIAL WORK Panen 120 2.50% 3,378,582,165.94

16,892,910,829.69 118,250,375,807.81

1 INVESTOR Panen 120 60% 70,950,225,484.69 2 OWNER Panen 120 40% 47,300,150,323.13

Catatan

JUMLAH

TOTAL PROFIT PER PANEN

PROFIT PER 1 KALI PANEN

JUMLAH

ASUMSI PENGEMBALIAN MODAL 93,568,172,500

ASUMSI BUNGA

TOTAL PENGELUARAN PRODUKSI 950,960,700,000 TOTAL

RENCANA PENDAPATAN

SHARING PROFIT

ASUMSI IIBIAYA PENGELUARAN PRODUKSI

HARGA JUAL AYAM PER EKOR

KEUNTUNGAN JUAL AYAM PER EKOR

ASUMSI PROFIT PANENPROFIT MARGIN

Harga Kontruksi dan Produksi sewaktu-waktu dapat berubah mengikuti pasar,kebijakan pemerintah dan management.

JUMLAHNETT PROFIT

ASUMSI BUNGAJUMLAH

TOTAL PROFIT

PROFIT 120 KALI PANEN

BIAYA PRODUKSIPROFIT

ASUMSI PENGEMBALIAN MODAL

Page 17: SUMMARY PROJECT

TERIMA KASIH

PT.SENTRA INSAN GARUDA