 Perhitungan Volume  Jalan Lingkar Kota Mranggen No. Jenis Pekerjaan Satuan Jumlah 1 3994.8 Galian Drainase Dimensi Saluran : Luas Galian = ((0.96 + 1.89) x 0.7) / 2 = 0.998 Volume Galian = 2 x (2000 x 0.9987) = 3994.8 2 2604 Pasangan Batu Panjang Saluran = 2 x 2000 m Luas I = III= (1/2 x ( 1.32 + 1.08) x 0.2) x 2 = 0.4 Luas II = (1/2 x (0.96 + 0.75) x 0.2) = 0.171 m2 Luas Total = 0.48 + 0.171 = 0.651 m2 Volume = 2 x 2000 x 0.651 = 2604 m3 3 m2 28000 Penyiapan Badan Jalan Volume = 3.5 x 4 x 2000  = 28000 m2 4 6000 Penyiapan Bahu Jalan Lebar Bahu Jalan = 1.5 m Panjang Jalan = 2000 m Volume = (2 x 1.5) x 2000  = 6000 m2 m 3 m 3 m 2

Upload: jegdis83

Post on 05-Oct-2015

10 views

Category:

Documents


1 download

DESCRIPTION

anggaran

TRANSCRIPT

  • Perhitungan VolumeProyek : Perencanaan Jalan Lingkar Kota Mranggen

    No. Jenis Pekerjaan Satuan Jumlah

    1 3994.8

    Galian Drainase

    Dimensi Saluran :Luas Galian = ((0.96 + 1.89) x 0.7) / 2 = 0.9987 m2Volume Galian = 2 x (2000 x 0.9987) = 3994.8 m3

    2 2604

    Pasangan BatuPanjang Saluran = 2 x 2000 mLuas I = III= (1/2 x (1.32 + 1.08) x 0.2) x 2 = 0.48 m2Luas II = (1/2 x (0.96 + 0.75) x 0.2) = 0.171 m2Luas Total = 0.48 + 0.171 = 0.651 m2Volume = 2 x 2000 x 0.651 = 2604 m3

    3 m2 28000Penyiapan Badan JalanVolume = 3.5 x 4 x 2000 = 28000 m2

    4 6000

    Penyiapan Bahu JalanLebar Bahu Jalan = 1.5 mPanjang Jalan = 2000 m Volume = (2 x 1.5) x 2000 = 6000 m2

    m3

    m3

    m2

  • 5Bahu Jalan, Batu Pecah Kelas B

    1200Pekerjaan Agregat Kelas B CBR 70%Panjang Jalan = 2000 mLebar Bahu Jalan = 2 x 1.5 = 3 mTebal jalan = 0.2 mVolume = 2000 x 3 x 0.2 = 1200 m3

    6 22120

    Lapis Pondasi Bawah, Sirtu Kelas B

    Bahan Agregat Kelas B CBR 70%Lebar = 14 mTebal = 0.79 m Volume = 14 x 0.79 x 2000 = 22120 m3

    7 7000

    Lapis Pondasi Atas, Batu Pecah Kelas A

    Bahan Agregat Kelas A CBR 80%Lebar = 14 mTebal = 0.25 m Volume = 14 x 0.25 x 2000 = 7000 m3

    8 2800

    Lapis PermukaanLebar = 14 mTebal = 0.10 m Volume = 14 x 0.10 x 2000 = 2800 m3

    9 L 36400

    Prime CoatLebar = 14 mLuas = 2000 x 14 = 28000 m2Kebutuhan tiap m2 adalah 1.3 literVolume = 28000 x 1.3

    m3

    m3

    Lapisan Pondasi Bawah (Sub Base)

    m3

    Lpais Pondasi Atas (Base Course)

    m3

    Laston (Surface)

  • 9 = 36400 liter

    L 36400

    10

    Tack Coat

    L 9800

    Lebar = 14 mLuas = 2000 x 14 = 28000 m2Kebutuhan tiap m2 adalah 0.35 literVolume = 28000 x 0.35 = 9800 liter

    11

    Pelengkap Jalan

    0.86

    - Marka Jalan Jarak antara : 5 m Lebar : 0.12 m Panjang : 3 m Tebal cat : 0.003 m Jumlah : 2 marka sepanjang ruas jalan Volume = 0.12 x 3 x 0.003 x 2000 x 2 / 5 = 0.864 m3

    - Rambu Buah 19 - Patok Kilometer Buah 2 - Patok Hektometer Buah 20 - Penerangan Jalan Lengan Tunggal Buah 40

    12

    Galian dan TimbunanDihitung tiap 100 m berdasarkan

    contoh :

    STA 0+000 s.d. STA 0+200

    m3

    m3

    Galian 1247.55

    Luas Galian = LG 600Luas Timbunan = LT 600

  • 12

    Volume Galian =

    Volume Timbunan =

    Total Galian = 1247.55Total Timbunan = 40402.11

    Volume Galian dan Timbunan

    STA

    0

    100

    200

    300

    400

    500

    600

    700

    800

    900

    1000

    1100

    1200

    m3

    Galian 1247.55

    Luas Galian = LG 700

    m3Timbunan

    40402.11

    Luas Timbunan = LT 700

  • 1300

    1400

    1500

    1600

    1700

    1800

    1900

    2000

  • Volume Galian dan Timbunan

    Pekerjaan STA Pekerjaan

    galian 6.98 0-100 galian 368.55timbunan 0 timbunan 1030galian 0.39 100-200 galian 38.8timbunan 20.6 timbunan 2060galian 0.39 200-300 galian 38.8timbunan 20.6 timbunan 2060galian 0.39 300-400 galian 38.8timbunan 20.6 timbunan 2060galian 0.39 400-500 galian 38.8timbunan 20.6 timbunan 2060galian 0.39 500-600 galian 38.8timbunan 20.6 timbunan 2060galian 0.39 600-700 galian 74.45timbunan 20.6 timbunan 2110.05galian 1.1 700-800 galian 110.1timbunan 21.6 timbunan 2160.1galian 1.1 800-900 galian 74.45timbunan 21.6 timbunan 2110.05galian 0.39 900-1000 galian 38.8timbunan 20.6 timbunan 2060galian 0.39 1000-1100galian 38.8timbunan 20.6 timbunan 2060galian 0.39 1100-1200galian 38.8timbunan 20.6 timbunan 2060galian 0.39 1200-1300galian 38.15

    Luas m2 Volume m2

  • timbunan 20.6 timbunan 2100.75galian 0.38 1300-1400galian 38.15timbunan 21.42 timbunan 2100.75galian 0.39 1400-1500galian 38.8timbunan 20.6 timbunan 2060galian 0.39 1500-1600galian 38.8timbunan 20.6 timbunan 2060galian 0.39 1600-1700galian 38.8timbunan 20.6 timbunan 2060galian 0.39 1700-1800galian 38.8timbunan 20.6 timbunan 2060galian 0.39 1800-1900galian 39.05timbunan 20.6 timbunan 2035.21galian 0.39 1900-2000galian 39.05timbunan 20.1 timbunan 2035.21galian 0.39timbunan 20.6 Total

    Galian 1247.55Timbunan 40402.11

  • DAFTAR ANALISA PEKERJAAN

    Proyek : Perencanaan Jalan Lingkar Kota Mranggen

    No. Koef. Satuan Uraian Pekerjaan Analisa Satuan (Hrg satuan ) (Upah Kerja )

    1 Persiapan dan Mobilisasi

    Persiapan (Ls)1 Ls Administrasi dan dokumentasi 1,000,000.00 1 Ls 1,500,000.00 1 Ls Pembuatan kantor lapangan 3,000,000.00 1 Ls Pembuatan gudang 2,500,000.00 2 buah Sewa kendaraan roda 4 4,000,000.00 4 buah Sewa kendaraan roda 2 500,000.00 1 Ls Biaya Laboratorium 2,000,000.00 1 Ls Perabot dan peralatan proyek 3,500,000.00 2 buah Papan nama proyek 273,602.00

    Mobilisasi (Ls)2 unit Asphalt sprayer 45,000.00 6 unit Dump truck 200,000.00 2 unit Generator set 75,000.00 2 unit Compresor 50,000.00 1 unit Asphalt finisher 382,000.00 1 unit Tandem roller 171,000.00 1 unit Tyre roller 226,800.00 1 unit Pick up 84,000.00

    2 Pekerjaan Drainase

    Pekerjaan Galian per m30.02 hari Mandor 37,000.00 666.00 0.65 hari Pekerja 25,000.00 16,200.00 0.12 jam Dump truck 200,000.00 0.03 set Alat bantu 6,000.00

    16,866.00

    Pasangan Batu Kali per m30.2 hari Mandor 37,000.00 7,400.00

    Pembuatan Basecamp

  • 0.8 hari Tukang batu 37,000.00 29,600.00 2.4 hari Buruh tak terlatih 22,500.00 54,000.00

    0.14 set Alat bantu 6,000.00 3.8 sak Semen 33,000.00

    1 m3 Batu Gunung 100,000.00 0.24 m3 Pasir 150,000.00

    91,000.00

    3 Pekerjaan Tanah

    Galian per m30.02 hari Mandor 37,000.00 740.00 0.04 hari Buruh terlatih 32,000.00 1,280.00

    0.6 hari Buruh tak terlatih 22,500.00 13,500.00 0.2 set Alat Bantu 6,000.00

    15,520.00

    Urugan per m30.02 hari Mandor 37,000.00 740.00

    0.5 hari Pekerja 25,000.00 12,500.00 0.2 set Alat Bantu 6,000.00

    13,240.00

    Penyiapan Tanah Badan Jalan per m2

    0 hari Mandor 37,000.00 37.00 0.04 hari Buruh tak terlatih 25,000.00 1,000.00

    0 set Alat bantu 6,000.00 1,037.00

    4 Pekerjaan Bahu Jalan

    Penyiapan Tanah Badan Jalan per m20 hari Mandor 37,000.00 37.00

    0.04 hari Buruh tak terlatih 25,000.00 1,000.00 0 set Alat bantu 6,000.00

    1,037.00

    Batu Pecah Kelas B per m30.03 hari Mandor 37,000.00 1,221.00 0.02 hari Operator terlatih 32,000.00 544.00

    1.1 hari Buruh tak terlatih 22,500.00 24,750.00 0.02 hari Sopir 30,000.00 510.00 0.17 m3 Batu pecah 3-5 cm 155,000.00 0.18 m3 Batu pecah 2-3 cm 160,000.00

  • 0.13 m3 Batu pecah 1-2 cm 160,000.00 0.18 m3 Batu pecah 0.5-1 cm 180,000.00 0.54 m3 Pasir urug 80,000.00 0.02 set Alat bantu 6,000.00 0.08 jam Mesin gilas 3 roda 8-10 T 100,000.00 0.07 jam Truk tangki air 68 HP 175,000.00 0.08 jam Mesin gilas roda karet 8-15 T 150,000.00

    27,025.00

    5 Perkerasan Berbutir

    Lapis Pondasi Atas (Batu Pecah Kelas A) per m30.033 hari Mandor 37,000.00 1,221.00 0.017 hari Operator terlatih 32,000.00 528.00 0.017 hari Sopir 30,000.00 495.00 1.100 hari Buruh tak terlatih 22,500.00 24,750.00 0.125 m3 Pasir urug 80,000.00 0.046 set Alat bantu 6,000.00 1.250 m3 Kerikil pecah tersaring 30,000.00 0.083 jam Mesin gilas 3 roda 8-10 T 100,000.00 0.083 jam Truk tangki air 68 HP 175,000.00

    26,994.00

    Lapisan Pondasi Bawah per m30.05 hari Mandor 37,000.00 1,850.00 0.02 hari Operator terlatih 32,000.00 544.00 0.02 hari Sopir 30,000.00 510.00

    1 hari Buruh tak terlatih 22,500.00 22,500.00 0.04 set Alat bantu 6,000.00 1.25 m3 Sirtu 80,000.00 0.08 jam Mesin gilas 3 roda 8-10 T 100,000.00 0.08 jam Truk tangki air 68 HP 175,000.00

    25,404.00

    6 Perkerasan Aspal

    Lapis Resap Pengikat (Prime Coat) per m20.01 hari Mandor 37,000.00 222.00 0.03 hari Pekerja 25,000.00 750.00 0.64 Kg Aspal 6,500.00 0.49 L Minyak bakar 5,750.00

    0 jam Asphalt Sprayer 75,000.00 0 jam Dump truck 200,000.00 0 jam Compresor 210 m3/jam 100,000.00

  • Lapis Permukaan (Laston) per m30 hari Mandor 37,000.00 148.00

    0.02 hari Operator terlatih 32,000.00 544.00 0.05 hari Buruh tak terlatih 22,500.00 1,170.00 0.04 hari Buruh terlatih 32,000.00 1,120.00 1.52 Kg Aspal 6,500.00

    1.3 L Minyak bakar 5,750.00 0 set Alat bantu 6,000.00

    0.44 ton Campuran laston 300,000.00 0 m3 Pasir beton 150,000.00

    0.02 jam Mesin gilas 3 roda 8-10 T 100,000.00 0.02 jam Mesin gilas tandem 6-10 T 125,000.00 0.02 jam Mesin gilas roda karet 8-15 T 150,000.00 0.01 jam Mesin penyemprot aspal 1000L 50,000.00 0.02 jam Mesin penghampar 1.82 m 175,000.00 0.02 jam Compresor 210 m3/jam 100,000.00 0.05 jam Dump truck 200,000.00

    2,982.00

    Lapis Resap Pengikat (Tack Coat) per m20.01 hari Mandor 37,000.00 259.00 0.03 hari Pekerja 25,000.00 750.00 0.89 Kg Aspal 6,500.00 0.25 L Minyak bakar 5,750.00

    0 jam Asphalt Sprayer 75,000.00 0 jam Dump truck 200,000.00

    0.01 jam Compresor 210 m3/jam 100,000.00

    7 Pekerjaan lain - lain

    Marka jalan per m30.08 hari Mandor 37,000.00 2,775.00

    0.6 hari Pekerja 25,000.00 15,000.00 0.23 hari Tukang cat 37,000.00 8,325.00 1.66 Kg Cat marka 65,000.00 1.05 L Thinner 17,500.00 0.45 Kg Glassbit 4,500.00 0.08 jam Compresor 100,000.00 0.08 jam Dump truck 200,000.00 0.03 set Alat bantu 6,000.00

    26,100.00

    Rambu jalan per buah0.2 hari Mandor 37,000.00 7,400.00

    1 hari Pekerja 25,000.00 25,000.00

  • 0.6 hari Tukang cat 37,000.00 22,200.00 1 Kg Cat besi 33,750.00 1 buah Pelat bambu 455,000.00 1 batang Pipa galvanis 15,000.00

    0.2 jam Dump truck 200,000.00 0.01 m3 Beton K - 175 487,500.00 0.03 set Alat bantu 6,000.00

    54,600.00

    Patok kilometer per buah0.03 hari Mandor 37,000.00 1,073.00 0.83 hari Pekerja 25,000.00 20,825.00 0.33 hari Tukang cat 37,000.00 12,321.00 0.14 m3 Beton K - 175 487,500.00

    20.67 Kg Baja tulangan 8,450.00 1 Kg Cat tembok 21,010.00

    0.08 jam Dump truck 200,000.00 0.03 set Alat bantu 6,000.00

    34,219.00

    Patok hektometer per buah0.03 jam Mandor 37,000.00 1,073.00 0.83 jam Pekerja 25,000.00 20,825.00 0.33 jam Tukang cat 37,000.00 12,321.00 0.14 m3 Beton K - 175 487,500.00

    20.67 Kg Baja tulangan 8,450.00 1 Kg Cat tembok 21,010.00

    0.08 jam Dump truck 200,000.00 0.03 set Alat bantu 6,000.00

    34,219.00

    Penerangan jalan lengan ganda0.08 hari Mandor 37,000.00 2,775.00

    0.6 hari Pekerja 25,000.00 15,000.00 0.23 hari Tukang cat 37,000.00 8,325.00

    1 buah Tiang PJU H-11 2,275,000.00 1 Ls Pondasi 650,000.00 1 buah Armature Lamp 2,600,000.00

    13 m Kabel instalasi NYM 13,000.00 35 m Kabel tanah NYFGB 125,000.00

    1 Ls Panel penerangan 325,000.00 1 Ls Pelindung kabel 58,500.00 1 Ls Ground 162,500.00 1 Ls Peralatan listrik 33,150.00

    0.03 set Alat bantu 6,000.00 0.5 jam Lift Car 97,500.00

    26,100.00

  • DAFTAR ANALISA PEKERJAAN

    (Hrg Bahan ) (Jumlah )

    1,000,000.00 1,500,000.00 3,000,000.00 2,500,000.00 8,000,000.00 2,000,000.00 2,000,000.00 3,500,000.00

    547,204.00 24,047,204.00

    90,000.00 1,200,000.00

    150,000.00 100,000.00 382,000.00 171,000.00 226,800.00

    84,000.00 2,403,800.00

    666.00 16,200.00

    23,000.00 15,000.00 168.00 168.00

    17,034.00 17,034.00

    7,400.00

  • 29,600.00 54,000.00

    840.00 840.00 125,400.00 125,400.00 100,000.00 100,000.00

    36,000.00 36,000.00 262,240.00 353,240.00

    740.00 1,280.00

    13,500.00 1,200.00 1,200.00 1,200.00 16,720.00

    740.00 12,500.00

    1,200.00 1,200.00 1,200.00 14,440.00

    37.00 1,000.00

    12.00 12.00 12.00 1,049.00

    37.00 1,000.00

    12.00 12.00 12.00 1,049.00

    1,221.00 544.00

    24,750.00 510.00

    25,885.00 25,885.00 29,280.00 29,280.00

  • 20,000.00 20,000.00 32,940.00 32,940.00 43,360.00 43,360.00

    120.00 120.00 8,300.00 8,300.00

    11,725.00 11,725.00 12,450.00 12,450.00

    184,060.00 211,085.00

    1,221.00 528.00 495.00

    24,750.00 10,000.00 10,000.00

    276.00 276.00 37,500.00 37,500.00

    8,300.00 8,300.00 14,525.00 14,525.00 70,601.00 97,595.00

    1,850.00 544.00 510.00

    22,500.00 252.00 252.00

    100,000.00 100,000.00 8,300.00 8,300.00

    14,525.00 14,525.00 123,077.00 148,481.00

    222.00 750.00

    4,173.00 4,173.00 2,811.75 2,811.75

    225.00 225.00 600.00 600.00 300.00 300.00

    9,081.75

  • 148.00 544.00

    1,170.00 1,120.00

    9,893.00 9,893.00 7,498.00 7,498.00

    18.00 18.00 130,500.00 130,500.00

    600.00 540.00 2,200.00 2,200.00 2,750.00 2,750.00 3,300.00 3,300.00

    650.00 650.00 3,850.00 3,850.00 1,700.00 1,700.00

    10,200.00 10,200.00 162,959.00 165,881.00

    259.00 750.00

    5,772.00 5,772.00 1,454.75 1,454.75

    225.00 225.00 600.00 600.00 600.00 600.00

    9,660.75

    2,775.00 15,000.00

    8,325.00 107,770.00 107,770.00

    18,375.00 18,375.00 2,025.00 2,025.00 7,500.00 7,500.00

    15,000.00 15,000.00 180.00 180.00

    150,850.00 176,950.00

    7,400.00 25,000.00

  • 22,200.00 33,750.00 33,750.00

    455,000.00 455,000.00 15,000.00 15,000.00 40,000.00 40,000.00

    3,412.50 3,412.50 180.00 6,000.00

    547,342.50 607,762.50

    1,073.00 20,825.00 12,321.00

    70,200.00 70,200.00 174,661.50 174,661.50

    21,010.00 21,010.00 15,000.00 15,000.00

    180.00 180.00 281,051.50 315,270.50

    1,073.00 20,825.00 12,321.00

    70,200.00 70,200.00 174,661.50 174,661.50

    21,010.00 21,010.00 15,000.00 15,000.00

    180.00 180.00 281,051.50 315,270.50

    1,073.00 20,825.00

    8,325.00 2,275,000.00 2,275,000.00

    650,000.00 650,000.00 2,600,000.00 2,600,000.00

    169,000.00 169,000.00 4,375,000.00 4,375,000.00

    325,000.00 325,000.00 58,500.00 58,500.00

    162,500.00 162,500.00 33,150.00 33,150.00

    180.00 180.00 48,750.00 48,750.00

    10,697,080.00 10,727,303.00

  • HARGA SATUAN PEKERJAAN BAHAN & UPAH

    Proyek : Perencanaan Jalan Lingkar Kota Mranggen

    No. Jenis Pekerjaan Satuan (Harga Satuan )

    1 Mandor hari 37,000 2 Pekerja hari 25,000 3 Tukang batu hari 37,000 4 Tukang listrik hari 37,000 5 Tukang cat hari 32,000 6 Buruh tak terlatih hari 22,500 7 Buruh terlatih hari 32,000 8 Operator terlatih hari 32,000 9 Sopir hari 30,000

    No. Jenis Alat dan Bahan Satuan (Harga Satuan )

    1 Semen sak 33,000 2 Batu Gunung m3 100,000 3 Pasir beton m3 150,000 4 Batu pecah 3-5 cm m3 155,000 5 Batu pecah 2-3 cm m3 160,000 6 Batu pecah 1-2 cm m3 160,000 7 Batu pecah 0.5-1 cm m3 180,000 8 Pasir urug m3 80,000 9 Kerikil pecah tersaring m3 30,000

    10 Kerikil sungai tanpa disaring m3 90,000 11 Aspal Kg 6,500 12 Minyak bakar L 5,750 13 Thinner L 17,500.00 14 Prime Coat L 4,150 15 Tack Coat L 2,800 16 Alat bantu set 6,000 17 Mesin Gilas 3 roda 8-10 T jam 100,000 18 Truk tangki air 68 HP jam 175,000 19 Mesin gila roda karet 8-15 T jam 150,000 20 Mesin gilas tandem 6-10 T jam 125,000 21 Mesin penyemprot aspal 1000L jam 50,000 22 Mesin penghampar 1.82 m jam 175,000 23 Compresor 210m3/jam jam 75,000 24 Lift Car jam 97,500.00 25 Tiang PJU H-11 buah 2,275,000 26 Armature Lamp buah 2,600,000.00 27 Kabel instalasi NYM m 13,000.00 28 Kabel tanah NYFGB m 125,000.00

  • 29 Panel penerangan Ls 325,000.00 30 Pelindung kabel Ls 58,500.00 31 Ground Ls 162,500.00 32 Peralatan listrik Ls 33,150.00 33 Beton K - 175 m3 487,500.00 34 Baja tulangan Kg 8,450.00 35 Cat tembok Kg 21,010.00 36 Cat besi Kg 33,750.00 37 Cat marka Kg 65,000.00 38 Glassbit Kg 4,500.00 39 Campuran laston ton 300,000 40

  • RENCANA ANGGARAN BIAYA TERUKUR

    Proyek : Perencanaan Jalan Lingkar Kota Mranggen

    No. Uraian Pekerjaan Satuan Volume (Harga Satuan )

    I PERSIAPAN DAN MOBILISASI1 Persiapan Ls 1 24,047,204.00 2 Mobilisasi Ls 1 2,403,800.00

    II PEKERJAAN DRAINASE1 Pekerjaan Galian 2796.4 17,034.00 2 Pas. Batu Kali 1822.8 353,240.00

    III PEKERJAAN TANAH1 Pekerjaan Galian 2766.4 16,720.00 2 Urugan 29978.6 14,440.00 3 Penyiapan Tanah Dasar Badan Jalan 19600 1,049.00

    IV PEKERJAAN BAHU JALAN1 Penyiapan Tanah Dasar Bahu Jalan 4200 1,049.00 2 Batu Pecah Kelas B 840 211,085.00

    V PERKERASAN BERBUTIR1 Lap. Pondasi Atas (Batu Pecah Kelas A) 4900 97,595.00 2 Lap. Pondasi Bawah (Sirtu Kelas B) 15484 148,481.00

    VI PERKERASAN ASPAL1 Lapis Resap Pengikat (Prime Coat) L 25480 9,081.75 2 Lapis Permukaan (Laston) 1960 165,881.00 3 Lapis Perekat (Tack Coat) L 6860 9,660.75

    VII PEMELIHARAAN JALAN SELAMA KONSTRUKSI1 Pemeliharaan Rutin Perkerasan Ls 1 5,200,000.00 2 Pemeliharaan Rutin Bahu Jalan Ls 1 4,750,000.00 3 Pemeliharaan Rutin Drainase Ls 1 1,500,000.00

    VIII PEKERJAAN LAIN-LAIN1 Marka jalan 0.61 176,950.00

    m3m3

    m3m3m2

    m2m3

    m3m3

    m3

    m3

  • 2 Rambu jalan Buah 13 607,762.50 3 Patok hektometer Buah 14 315,270.50 4 Patok kilometer Buah 1 315,270.50 5 Penerangan jalan lengan tunggal Buah 28 10,727,303.00

    TOTAL KESELURUHAN

  • RENCANA ANGGARAN BIAYA TERUKUR

    (Sub Total ) (Total )

    24,047,204.00 2,403,800.00

    26,451,004.00

    47,633,877.60 643,885,872.00

    691,519,749.60

    46,254,208.00 432,890,984.00

    20,560,400.00 499,705,592.00

    4,405,800.00 177,311,400.00

    181,717,200.00

    478,215,500.00 2,299,079,804.00

    2,777,295,304.00

    231,402,990.00 325,126,760.00

    66,272,745.00 622,802,495.00

    5,200,000.00 4,750,000.00 1,500,000.00

    11,450,000.00

    107,054.75

  • 7,900,912.50 4,413,787.00

    315,270.50 300,364,484.00

    313,101,508.75

    TOTAL KESELURUHAN 5,124,042,853.35

  • REKAPITULASI RENCANA ANGGARAN BIAYA ( RAB )

    Proyek : Perencanaan Jalan Lingkar Kota Mranggen

    No. PEKERJAAN (REKAPITULASI BIAYA )

    1 PERSIAPAN DAN MOBILISASI 26,451,004.00 2 PEKERJAAN DRAINASE 691,519,749.60 3 PEKERJAAN TANAH 499,705,592.00 4 PEKERJAAN BAHU JALAN 181,717,200.00 5 PERKERASAN BERBUTIR 2,777,295,304.00 6 PERKERASAN ASPAL 622,802,495.00 7 PEMELIHARAAN JALAN SELAMA KONSTRUKSI 11,450,000.00 8 PEKERJAAN LAIN-LAIN 313,101,508.75

    (Jumlah ) 5,124,042,853.35

    Jasa Pemborong 10 % 512,404,285.34 Jumlah 5,636,447,138.69

    Pajak PPN 10 % 563,644,713.87 Jumlah 6,200,091,852.55

    TOTAL 6,200,092,000.00

  • REKAPITULASI RENCANA ANGGARAN BIAYA ( RAB )

  • PROSENTASE BOBOT PEKERJAAN

    Proyek : Perencanaan Jalan Lingkar Kota Mranggen

    No. Uraian Pekerjaan (Jumlah Harga ) Bobot ( % )

    I PERSIAPAN DAN MOBILISASI1 Persiapan 24,047,204.00 0.4692 Mobilisasi 2,403,800.00 0.047

    II PEKERJAAN DRAINASE1 Pekerjaan Galian 47,633,877.60 0.9302 Pas. Batu Kali 643,885,872.00 12.566

    III PEKERJAAN TANAH1 Pekerjaan Galian 46,254,208.00 0.9032 Urugan 432,890,984.00 8.4483 Penyiapan Tanah Dasar Badan Jalan 20,560,400.00 0.401

    IV PEKERJAAN BAHU JALAN1 Penyiapan Tanah Dasar Bahu Jalan 4,405,800.00 0.0862 Batu Pecah Kelas B 177,311,400.00 3.460

    V PERKERASAN BERBUTIR1 Lap. Pondasi Atas (Batu Pecah Kelas A) 478,215,500.00 9.3332 Lap. Pondasi Bawah (Sirtu Kelas B) 2,299,079,804.00 44.868

    VI PERKERASAN ASPAL1 Lapis Resap Pengikat (Prime Coat) 231,402,990.00 4.5162 Lapis Permukaan (Laston) 325,126,760.00 6.3453 Lapis Perekat (Tack Coat) 66,272,745.00 1.293

    VII PEMELIHARAAN JALAN SELAMA KONSTRUKSI1 Pemeliharaan Rutin Perkerasan 5,200,000.00 0.1012 Pemeliharaan Rutin Bahu Jalan 4,750,000.00 0.0933 Pemeliharaan Rutin Drainase 1,500,000.00 0.029

    VIII PEKERJAAN LAIN-LAIN1 Marka jalan 107,054.75 0.002

  • 2 Rambu jalan 7,900,912.50 0.1543 Patok hektometer 4,413,787.00 0.0864 Patok kilometer 315,270.50 0.0065 Penerangan jalan lengan tunggal 300,364,484.00 5.862

    TOTAL 5,124,042,853.35 100

  • Bobot ( % )

  • RENCANA JADWAL PELAKSANAAN

    Proyek : Perencanaan Jalan Lingkar Kota Mranggen

    No. Uraian Pekerjaan Satuan Volume (Jumlah Harga ) Bobot Waktu (( Rp. ) ) ( % ) ( Minggu )

    I PERSIAPAN DAN MOBILISASI1 Persiapan Ls 1.00 24,047,204.00 0.469 202 Mobilisasi Ls 1.00 2,403,800.00 0.047 4

    II PEKERJAAN DRAINASE1 Pekerjaan Galian 2796.4 47,633,877.60 0.930 22 Pas. Batu Kali 1822.8 643,885,872.00 12.566 4

    III PEKERJAAN TANAH1 Pekerjaan Galian 2766.4 46,254,208.00 0.903 22 Urugan 29978.6 432,890,984.00 8.448 63 Peny. Tanah Dasar Badan Jalan 19600 20,560,400.00 0.401 2

    IV PEKERJAAN BAHU JALAN1 Peny. Tanah Dasar Bahu Jalan 4200 4,405,800.00 0.086 12 Batu Pecah Kelas B 840 177,311,400.00 3.460 2

    V PERKERASAN BERBUTIR1 Lap. Pondasi Atas 4900 478,215,500.00 9.333 5

    (Batu Pecah Kelas A)2 Lap. Pondasi Bawah 15484 ### 44.868 6

    (Sirtu Kelas B)

    VI PERKERASAN ASPAL1 Lapis Resap Pengikat (Prime Coat) L 25480 231,402,990.00 4.516 42 Lapis Permukaan (Laston) 1960 325,126,760.00 6.345 53 Lapis Perekat (Tack Coat) L 6860 66,272,745.00 1.293 3

    VII PEMELIHARAAN JALAN SELAMA KONSTRUKSI1 Pemeliharaan Rutin Perkerasan Ls 1.00 5,200,000.00 0.101 12 Pemeliharaan Rutin Bahu Jalan Ls 1.00 4,750,000.00 0.093 13 Pemeliharaan Rutin Drainase Ls 1.00 1,500,000.00 0.029 1

    m3m3

    m3m3m2

    m2m3

    m3

    m3

    m3

    1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20

    10

    20

    30

    40

    50

    60

    70

    80

    90

    100

    24

    6

    11

    23

    37

    51

    61

    70

    80

    8385

    8891

    9496

    9899

  • VIII PEKERJAAN LAIN-LAIN1 Marka jalan 0.61 107,054.75 0.002 12 Rambu jalan Buah 13 7,900,912.50 0.154 13 Patok hektometer Buah 14 4,413,787.00 0.086 14 Patok kilometer Buah 1 315,270.50 0.006 15 Penerangan jalan lengan tunggal Buah 28 300,364,484.00 5.862 5

    Jumlah

    Komulatif

    m3

    1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20

    10

    20

    30

    40

    50

    60

    70

    80

    90

    100

    24

    6

    11

    23

    37

    51

    61

    70

    80

    8385

    8891

    9496

    9899

  • RENCANA JADWAL PELAKSANAAN

    Bulan 1 Bulan 2 Bulan 31 2 3 4 1 2 3 4 1 2

    0.023 0.023 0.023 0.023 0.023 0.023 0.023 0.023 0.023 0.0230.012 0.012 0.012 0.012

    0.465 0.4653.141 3.141 3.141 3.141

    0.451 0.4511.408 1.408 1.408 1.408 1.408 1.408

    0.201 0.201

    0.0861.730 1.730

    1.867 1.867 1.867

    7.478 7.478 7.478 7.478 7.478

    0.0930.029

    1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20

    10

    20

    30

    40

    50

    60

    70

    80

    90

    100

    24

    6

    11

    23

    37

    51

    61

    70

    80

    8385

    8891

    9496

    9899

  • 0.035 1.895 1.895 2.109 5.238 12.166 13.781 14.240 9.461 9.368

    0.035 1.930 3.824 5.933 11.171 23.338 37.119 51.359 60.820 70.188

    1 2 3 4 5 6 7 8 9 10

    1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20

    10

    20

    30

    40

    50

    60

    70

    80

    90

    100

    24

    6

    11

    23

    37

    51

    61

    70

    80

    8385

    8891

    9496

    9899

  • RENCANA JADWAL PELAKSANAAN

    Bulan 3 Bulan 4 Bulan 53 4 1 2 3 4 1 2 3 4

    0.023 0.023 0.023 0.023 0.023 0.023 0.023 0.023 0.023 0.023

    1.867 1.867

    7.478

    1.129 1.129 1.129 1.1291.269 1.269 1.269 1.269 1.2690.431 0.431 0.431

    0.101

    1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20

    10

    20

    30

    40

    50

    60

    70

    80

    90

    100

    24

    6

    11

    23

    37

    51

    61

    70

    80

    8385

    8891

    9496

    9899

  • 0.0020.1540.0860.006

    1.172 1.172 1.172 1.172 1.172

    9.368 3.019 2.853 2.853 2.954 2.465 2.465 1.444 1.196 1.196

    79.556 82.575 85.427 88.280 91.234 93.699 96.164 97.608 98.804 100.000

    11 12 13 14 15 16 17 18 19 20

    1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20

    10

    20

    30

    40

    50

    60

    70

    80

    90

    100

    24

    6

    11

    23

    37

    51

    61

    70

    80

    8385

    8891

    9496

    9899

  • RENCANA JADWAL PELAKSANAAN

    Prosentase( % )

    1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20

    10

    20

    30

    40

    50

    60

    70

    80

    90

    100

    24

    6

    11

    23

    37

    51

    61

    70

    80

    8385

    8891

    9496

    9899

  • 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20

    10

    20

    30

    40

    50

    60

    70

    80

    90

    100

    24

    6

    11

    23

    37

    51

    61

    70

    80

    8385

    8891

    9496

    9899

  • GRAFIK MAN POWER

    Proyek : Perencanaan Jalan Lingkar Kota Mranggen

    No. Uraian Pekerjaan Volume

    1 Persiapan dan MobilisasiPersiapan (Ls) 0 22 132Mobilisasi (Ls) 0 5 30

    2 Pekerjaan DrainaseGalian per m3 2796.4 2 12

    0.02 Mandor0.65 Pekerja

    Pas. Batu per m3 1822.8 3 180.02 Mandor

    0.5 Pekerja

    3 Pekerjaan TanahGalian per m3 2766.4 3 18

    0.02 Mandor0.04 Buruh terlatih

    0.6 Buruh tak terlatih

    Urugan per m3 29978.6 4 240.02 Mandor

    0.5 Pekerja

    Penyiapan Tanah Badan Jalan per m2 19600 1 60 Mandor

    0.04 Buruh tak terlatih

    4 Pekerjaan Bahu JalanPenyiapan Tanah Bahu Jalan per m2 4200 2 12

    0 Mandor0.04 Buruh tak terlatih

    Batu Pecah Kelas B per m3 840 3 180.03 Mandor0.02 Operator terlatih

    1.1 Buruh tak terlatih

    Durasi (Minggu)

    Durasi (Hari)

  • 0.02 Sopir

    5 Perkerasan BerbutirLapis Pondasi Atas (Batu Pecah Kelas A) per m3 4900 3 18

    0.033 Mandor0.017 Operator terlatih0.017 Sopir1.100 Buruh tak terlatih

    Lapisan Pondasi Bawah per m3 15484 4 240.05 Mandor0.02 Operator terlatih0.02 Sopir

    1 Buruh tak terlatih

    6 Perkerasan AspalLapis Resap Pengikat (Prime Coat) per m2 25480 2 12

    0.01 Mandor0.03 Pekerja

    Lapis Permukaan (Laston) per m3 1960 2 120 Mandor

    0.02 Operator terlatih0.05 Buruh tak terlatih0.04 Buruh terlatih

    Lapis Resap Pengikat (Tack Coat) per m2 6860 2 120.01 Mandor0.03 Pekerja

    7 PEMELIHARAAN JALAN SELAMA KONSTRUKSIPemeliharaan Rutin Perkerasan (Ls) 0 1 6Pemeliharaan Rutin Bahu Jalan (Ls) 0 1 6Pemeliharaan Rutin Drainase (Ls) 0 1 6

    8 Pekerjaan lain - lainMarka jalan per m3 0.61 1 6

    0.08 Mandor0.6 Pekerja

    0.23 Tukang cat

    Rambu jalan per buah 13 2 120.2 Mandor

  • 1 Pekerja0.6 Tukang cat

    Patok kilometer per buah 1 1 60.03 Mandor0.83 Pekerja0.33 Tukang cat

    Patok hektometer per buah 14 2 120.03 Mandor0.83 Pekerja0.33 Tukang cat

    Penerangan jalan lengan ganda 28 3 180.08 Mandor

    0.6 Pekerja0.23 Tukang cat

    Jumlah

  • GRAFIK MAN POWER

    Bulan 1 Bulan 21 2 3 4 1

    0 0 0 0 0 000

    155 111.000 111.0004

    151

    752

    51

    101 33.812 33.812 33.81236

    92

    650 162.384 162.384 162.384 162.38425

    625

    134 133.9333

    131

    140

    14

    5421

    51

    Jumlah Pekerja

    Total (Orang)

  • 1317944

    299

    699321111

    645

    761364

    181386

    214

    17

    0 0 0 0 0 0000

    1.0000.0080.0610.023

    3.0000.217

    1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 180.000

    50.000

    100.000

    150.000

    200.000

    250.000

    300.000

    350.000

    400.000

    450.000

  • 1.0830.650

    1.0000.0050.1390.056

    2.0000.0340.9720.389

    1.4000.1170.9330.350

    Jumlah 33.812 196.196 196.196 273.384 407.3171 2 3 4 5

    1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 180.000

    50.000

    100.000

    150.000

    200.000

    250.000

    300.000

    350.000

    400.000

    450.000

  • GRAFIK MAN POWER

    Bulan 2 Bulan 32 3 4 1 2 3 4

    0 0 0 0 0 0 0

    25.000 25.000 25.000

    7.175 7.175

  • 105.804 105.804 105.804

    174.840 174.840 174.840 174.840

    0 0 0 0 0 0 0

    1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 180.000

    50.000

    100.000

    150.000

    200.000

    250.000

    300.000

    350.000

    400.000

    450.000

  • 174.840 174.840 174.840 174.840 137.979 137.979 130.804

    6 7 8 9 10 11 12

    1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 180.000

    50.000

    100.000

    150.000

    200.000

    250.000

    300.000

    350.000

    400.000

    450.000

  • GRAFIK MAN POWER

    Bulan 4 Bulan 51 2 3 4 1 2

    0 0 0 0 0 0

    18.153 18.153 18.153

  • 38.22 38.22

    8.82 8.82

    10.576 10.576

    0 0 0 0 0 0

    1

    1.5 1.5

    1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 180.000

    50.000

    100.000

    150.000

    200.000

    250.000

    300.000

    350.000

    400.000

    450.000

  • 11 1

    0.467 0.467 0.467

    56.373 56.373 31.696 13.543 10.287 9.820

    13 14 15 16 17 18

    1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 180.000

    50.000

    100.000

    150.000

    200.000

    250.000

    300.000

    350.000

    400.000

    450.000

  • MAN POWER

    Proyek : Perencanaan Jalan Lingkar Kota Mranggen

    No. Uraian Pekerjaan Volume

    1 Persiapan dan MobilisasiPersiapan (Ls) 1 20 120 1 1Mobilisasi (Ls) 1 4 24 1 1

    2 Pekerjaan DrainaseGalian per m3 2796.4 2 12 155

    0.02 Mandor 40.65 Pekerja 151

    Pas. Batu per m3 1822.8 4 24 400.02 Mandor 2

    0.5 Pekerja 38

    3 Pekerjaan TanahGalian per m3 2766.4 2 12 152

    0.02 Mandor 50.04 Buruh terlatih 9

    0.6 Buruh tak terlatih 138

    Urugan per m3 29978.6 5 30 5200.02 Mandor 20

    0.5 Pekerja 500

    Penyiapan Tanah Badan Jalan per m2 19600 2 12 670 Mandor 2

    0.04 Buruh tak terlatih 65

    4 Pekerjaan Bahu JalanPenyiapan Tanah Bahu Jalan per m2 4200 1 6 29

    0 Mandor 10.04 Buruh tak terlatih 28

    Batu Pecah Kelas B per m3 840 2 12 810.03 Mandor 20.02 Operator terlatih 1

    1.1 Buruh tak terlatih 770.02 Sopir 1

    Durasi

    (Minggu)

    Durasi

    (Hari)

    Jumlah

    Pekerja

    Total

    (Orang)

  • 5 Perkerasan BerbutirLapis Pondasi Atas (Batu Pecah Kelas A) per m34900 4 24 242

    0.033 Mandor 90.017 Operator terlatih 40.017 Sopir 41.100 Buruh tak terlatih 225

    Lapisan Pondasi Bawah per m3 15484 7 42 3990.05 Mandor 180.02 Operator terlatih 60.02 Sopir 6

    1 Buruh tak terlatih 369

    6 Perkerasan AspalLapis Resap Pengikat (Prime Coat) per m2 25480 2 4 229

    0.01 Mandor 380.03 Pekerja 191

    Lapis Permukaan (Laston) per m3 1960 2 5 420 Mandor 2

    0.02 Operator terlatih 70.05 Buruh tak terlatih 200.04 Buruh terlatih 14

    Lapis Resap Pengikat (Tack Coat) per m2 6860 2 3 850.01 Mandor 160.03 Pekerja 69

    7 PEMELIHARAAN JALAN SELAMA KONSTRUKSIPemeliharaan Rutin Perkerasan (Ls) 1 1 6 1 1Pemeliharaan Rutin Bahu Jalan (Ls) 1 1 6 1 1Pemeliharaan Rutin Drainase (Ls) 1 1 6 1 1

    8 Pekerjaan lain - lainMarka jalan per m3 0.61 1 6 1

    0.08 Mandor 0.0080.6 Pekerja 0.061

    0.23 Tukang cat 0.023

    Rambu jalan per buah 13 1 6 40.2 Mandor 0.433

    1 Pekerja 2.167

  • 0.6 Tukang cat 1.300

    Patok kilometer per buah 1 1 6 10.03 Mandor 0.0050.83 Pekerja 0.1390.33 Tukang cat 0.056

    Patok hektometer per buah 14 1 6 30.03 Mandor 0.0680.83 Pekerja 1.9440.33 Tukang cat 0.777

    Penerangan jalan lengan ganda 28 5 30 10.08 Mandor 0.070

    0.6 Pekerja 0.5600.23 Tukang cat 0.210

  • 66000

    931000

    24000000

    9130000

    3118000

    40200000

    172000

    4870000

  • 000

    145000000

    23950000000

    1376000

    25400000

    5080000066600060000

    2400

  • 0060000

    18000060000

  • No. Uraian Pekerjaan Tenaga kerja Waktu ( Minggu )

    I PERSIAPAN DAN MOBILISASI1 Persiapan 6 202 Mobilisasi 6 4

    II PEKERJAAN DRAINASE1 Pekerjaan Galian 930 22 Pas. Batu Kali 240 4

    III PEKERJAAN TANAH1 Pekerjaan Galian 912 22 Urugan 3120 63 Peny. Tanah Dasar Badan Jalan 402 2

    IV PEKERJAAN BAHU JALAN1 Peny. Tanah Dasar Bahu Jalan 174 12 Batu Pecah Kelas B 486 2

    V PERKERASAN BERBUTIR1 Lap. Pondasi Atas 1450 5

    (Batu Pecah Kelas A)2 Lap. Pondasi Bawah 2394 6

    (Sirtu Kelas B)

    VI PERKERASAN ASPAL1 Lapis Resap Pengikat (Prime Coat) 1374 42 Lapis Permukaan (Laston) 252 53 Lapis Perekat (Tack Coat) 510 3

    VII PEMELIHARAAN JALAN SELAMA KONSTRUKSI1 Pemeliharaan Rutin Perkerasan 6 12 Pemeliharaan Rutin Bahu Jalan 6 13 Pemeliharaan Rutin Drainase 6 1

    VIII PEKERJAAN LAIN-LAIN1 Marka jalan 6 12 Rambu jalan 24 1

    1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 200

    1000

    2000

    3000

    4000

    5000

    6000

    7000

    1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 200

    1000

    2000

    3000

    4000

    5000

    6000

    7000

  • 3 Patok hektometer 6 14 Patok kilometer 18 15 Penerangan jalan lengan tunggal 6 5

    Jumlah1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20

    0

    1000

    2000

    3000

    4000

    5000

    6000

    7000

    1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 200

    1000

    2000

    3000

    4000

    5000

    6000

    7000

  • Bulan 1 Bulan 2 Bulan 31 2 3 4 1 2 3 4 1

    6 6 6 6 6 6 6 6 66 6 6 6

    930 930240 240 240 240

    912 9123120 3120 3120 3120 3120 3120

    402 402

    174486 486

    1450 1450

    2394 2394 2394 2394

    66

    1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 200

    1000

    2000

    3000

    4000

    5000

    6000

    7000

    1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 200

    1000

    2000

    3000

    4000

    5000

    6000

    7000

  • 12 4044 4044 4464 4698 5940 6246 4576 3856

    1 2 3 4 5 6 7 8 9

    1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 200

    1000

    2000

    3000

    4000

    5000

    6000

    7000

    1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 200

    1000

    2000

    3000

    4000

    5000

    6000

    7000

  • Bulan 3 Bulan 4 Bulan 52 3 4 1 2 3 4 1 2

    6 6 6 6 6 6 6 6 6

    1450 1450 1450

    2394 2394

    1374 1374 1374 1374252 252 252 252 252510 510 510

    6

    624

    1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 200

    1000

    2000

    3000

    4000

    5000

    6000

    7000

    1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 200

    1000

    2000

    3000

    4000

    5000

    6000

    7000

  • 618

    6 6 6

    3850 3850 2830 2142 2142 2148 264 264 66

    10 11 12 13 14 15 16 17 18

    1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 200

    1000

    2000

    3000

    4000

    5000

    6000

    7000

    1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 200

    1000

    2000

    3000

    4000

    5000

    6000

    7000

  • Bulan 5 Prosentase3 4 ( % )

    6 6

    1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 200

    1000

    2000

    3000

    4000

    5000

    6000

    7000

    1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 200

    1000

    2000

    3000

    4000

    5000

    6000

    7000

  • 6 6

    12 12

    19 20

    1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 200

    1000

    2000

    3000

    4000

    5000

    6000

    7000

    1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 200

    1000

    2000

    3000

    4000

    5000

    6000

    7000

    volanalisa pekHrg satuanRABRekapBobotSGrafPowerpowerSheet1