rab pasar parungpung

Upload: endah-susanti

Post on 04-Jun-2018

234 views

Category:

Documents


3 download

TRANSCRIPT

  • 8/13/2019 RAB Pasar Parungpung

    1/62

    PEMERINTAH KABUPATEN BOGOR

    PERUSAHAAN DAERAH PASAR TOHAGA

    PASAR PARUNGPUNG - KABUPATEN BOGOR

    REKAPITULASI AKHIR

  • 8/13/2019 RAB Pasar Parungpung

    2/62

    PASAR PARUNGPUNG - KABUPATEN BOGOR

    I. PEKERJAAN PERSIAPAN

    PERUSAHAAN DAERAH PASAR TOHAGA

    PEMERINTAH KABUPATEN BOGOR

  • 8/13/2019 RAB Pasar Parungpung

    3/62

    PERUSAHAAN DAERAH PASAR TOHAGA

    PEMERINTAH KABUPATEN BOGOR

    II. BANGUNAN UTAMA

    PASAR PARUNGPUNG - KABUPATEN BOGOR

  • 8/13/2019 RAB Pasar Parungpung

    4/62

    PEMERINTAH KABUPATEN BOGOR

    IV. PEKERJAAN GARDU LISTRIK DAN ME

    PERUSAHAAN DAERAH PASAR TOHAGA

    PASAR PARUNGPUNG - KABUPATEN BOGOR

  • 8/13/2019 RAB Pasar Parungpung

    5/62

    PEMERINTAH KABUPATEN BOGOR

    V. PEKERJAAN HYDRANT

    PASAR PARUNGPUNG - KABUPATEN BOGOR

    PERUSAHAAN DAERAH PASAR TOHAGA

  • 8/13/2019 RAB Pasar Parungpung

    6/62

    PEMERINTAH KABUPATEN BOGOR

    PERUSAHAAN DAERAH PASAR TOHAGA

    PASAR PARUNGPUNG - KABUPATEN BOGOR

    III. PEKERJAAN JALAN PARKIR TAMAN DAN POS JAGA

  • 8/13/2019 RAB Pasar Parungpung

    7/62

    ANALISA HARGA SATUAN BAHAN UPAH

    PERUSAHAAN DAERAH PASAR TOHAGA

    PASAR PARUNGPUNG - KABUPATEN BOGOR

    PEMERINTAH KABUPATEN BOGOR

  • 8/13/2019 RAB Pasar Parungpung

    8/62

    PEMERINTAH KABUPATEN BOGOR

    PERUSAHAAN DAERAH PASAR TOHAGA

    PASAR PARUNGPUNG - KABUPATEN BOGOR

    HARGA SATUAN BAHAN DAN UPAH

  • 8/13/2019 RAB Pasar Parungpung

    9/62

    PASAR PARUNGPUNG - KABUPATEN BOGOR

    SPESIFIKASI TEKNIK

    PEMERINTAH KABUPATEN BOGOR

    PERUSAHAAN DAERAH PASAR TOHAGA

  • 8/13/2019 RAB Pasar Parungpung

    10/62

    Halaman : 10

    RENCANA ANGGARAN BIAYA (RAB)Kegiatan : Revitalisasi Pasar Parungpung Kabupaten Bogor

    Pekerjaan : Pembangunan Pasar dan Sarana Pendukungnya

    Lokasi : Parungpung - Kabupaten Bogor

    Tahun : 2012

    U R A I A N P E K E R J A A N J U M L A H

    REKAPITULASI AKHIR

    I. PEKERJAAN PERSIAPAN 1,048,207,150.00

    II. PEKERJAAN BANGUNAN UTAMA 5,826,349,991.29

    III. PEKERJAAN JALAN, PARKIR, TAMAN DAN POS JAGA 1,607,348,914.30

    IV. PEKERJAAN MUSHOLLA, GARDU LISTRIK DAN ME 802,029,184.00

    V. PEKERJAAN HYDRANT 915,384,070.17

    SUB TOTAL 10,199,319,309.76

    Terbilang : #. Sepuluh Milyar Seratus Sembilan Puluh Sembilan Juta Tiga Ratus Sembilan Belas Ribu Tiga Ratus Sembilan Rupiah

    #

    Jakarta, 23 April 2012

    PT. BUKIT KIARA LESTARI

    U L D I NSDirekturUtama

    Page 10 of 62

  • 8/13/2019 RAB Pasar Parungpung

    11/62

    Halaman : 11

    RENCANA ANGGARAN BIAYA (RAB)Kegiatan : Revitalisasi Pasar Parungpung Kabupaten Bogor

    Pekerjaan : Pembangunan Pasar dan Sarana Pendukungnya

    Lokasi : Parungpung - Kabupaten Bogor

    Tahun : 2012

    No. URAIAN PEKERJAAN VOLUME HARGA SATUAN HRG SAT MATRL

    I. PEKERJAAN PERSIAPAN

    1 Pembuatan direksi keet 18.00 m 1,598,721.00 28,776,978.00

    2 Pembuatan gudang sementara 24.00 m 1,357,888.00 32,589,312.00

    3 Pembuatan bedeng pekerja 30.00 m 1,292,950.00 38,788,500.00

    4 Pagar pengaman proyek termasuk pintu 70.00 m 476,708.00 33,369,560.00

    5 Temporary drainage 1.00 ls 6,500,000.00 6,500,000.00

    6 Air kerja dan penerangan proyek 1.00 ls 20,000,000.00 20,000,000.00

    7 Papan nama proyek 1.00 unit 500,000.00 500,000.00

    8 Dokumentasi proyek 1.00 ls 5,000,000.00 5,000,000.00

    9 Pemeliharaan jalan masuk proyek 1.00 ls 28,500,000.00 28,500,000.00

    10 Keamanan proyek 1.00 ls 80,000,000.00 80,000,000.00

    11 Safety requirement 1.00 ls 15,000,000.00 15,000,000.00

    12 Test material 1.00 ls 6,000,000.00 6,000,000.00

    13 Mobilisasi dan demobilisasi 1.00 ls 50,000,000.00 50,000,000.00

    14 Telekomunikasi 1.00 lot 2,000,000.00 2,000,000.00

    15 Penampungan sementara 1.00 ls 515,182,800.00 515,182,800.00

    15 Asuransi 1.00 ls 70,000,000.00 70,000,000.00

    16 Biaya penyambungan listrik (PLN) : 1.00 lot 116,000,000.00 116,000,000.00

    ~ Biaya penyambungan 80 kVA

    ~ Instalatir

    ~ SLO

    Sub total Pekerjaan Persiapan 1,048,207,150.00

    Page 11 of 62

  • 8/13/2019 RAB Pasar Parungpung

    12/62

    RENCANA ANGGARAN BIAYA (RAB)Kegiatan : Revitalisasi Pasar Parungpung Kabupaten Bogor

    Pekerjaan : Pembangunan Pasar dan Sarana Pendukungnya

    Lokasi : Parungpung - Kabupaten Bogor

    Tahun : 2012

    U R A I A N P E K E R J A A N J U M L A H (Rp)

    SUB REKAPITULASI

    II. BANGUNAN UTAMA

    DIVISI A.1.0. PEKERJAAN STRUKTUR 2,886,894,278.24

    DIVISI A.2.0. PEKERJAAN ARSITEKTUR 2,253,603,803.55

    DIVISI A.3.0. PEKERJAAN PLUMBING 141,133,442.50

    DIVISI A.4.0. PEKERJAAN ELEKTRIKAL 544,718,467.00

    TOTAL BANGUNAN PASAR BLOK A 5,826,349,991.29

    SUB PEMBANGUNAN PASAR

    Page 12 of 62

  • 8/13/2019 RAB Pasar Parungpung

    13/62

    RENCANA ANGGARAN BIAYA (RAB)Kegiatan : Revitalisasi Pasar Parungpung Kabupaten Bogor

    Pekerjaan : Pembangunan Pasar dan Sarana Pendukungnya

    Lokasi : Parungpung - Kabupaten Bogor

    Tahun : 2012

    SUB PEMBANGUNAN PASAR

    U R A I A N P E K E R J A A N J U M L A H (Rp)

    SUB REKAPITULASI PEKERJAAN STRUKTUR

    DIVISI A.1.0. PEKERJAAN STRUKTUR

    Section A.1.1. Pekerjaan Tanah 35,188,748.64

    Section A.1.2. Pekerjaan Pondasi 554,735,377.96

    Section A.1.3. Pekerjaan Struktur Lantai 1 716,657,022.48

    Section A.1.5. Pekerjaan Struktur Lantai Atap 359,053,134.38

    Section A.1.6. Pekerjaan Struktur Atap 1,221,259,994.79

    TOTAL PEKERJAAN STRUKTUR 2,886,894,278.24

    Page 13 of 62

  • 8/13/2019 RAB Pasar Parungpung

    14/62

    RENCANA ANGGARAN BIAYA (RAB)Kegiatan : Revitalisasi Pasar Parungpung Kabupaten Bogor

    Pekerjaan : Pembangunan Pasar dan Sarana Pendukungnya

    Lokasi : Parungpung - Kabupaten Bogor

    Tahun : 2012

    SUB PEMBANGUNAN PASAR

    No.HARGA SATUAN

    J U M L A H (Rp)

    DIVISI A.1.0. PEKERJAAN STRUKTUR

    Section A.1.1. Pekerjaan Tanah

    1 Pekerjaan bouwplank 232.20 m 99,036.00 22,996,159.20

    2 Galian tanah pondasi 276.29 m 33,600.00 9,283,276.80

    3 Urug tanah kembali & perataan 179.59 m 16,200.00 2,909,312.64

    Sub total section A.1.1. 35,188,748.64

    Section A.1.2. Pekerjaan Pondasi

    1 Urug pasir 25.44 m 226,400.00 5,759,163.20

    2 Lantai kerja 15.69 m 924,742.50 14,512,908.80

    3 Aanstamping batu belah 53.68 m 429,720.00 23,068,658.76

    4 Pondasi batu belah 1 pc : 4 psr 182.80 m 716,250.00 130,929,067.50

    5 Pondasi setempat :

    Type P1

    - Besi 2,008.50 kg 15,880.00 31,895,027.64

    - Begisting 229.81 m2 92,800.00 21,325,996.80

    - Beton K 250 23.04 m3 954,800.00 22,000,310.64

    Type P2

    - Besi 1,011.89 kg 15,880.00 16,068,781.44

    - Begisting 81.69 m2 92,800.00 7,581,110.40

    - Beton K 250 9.36 m3 954,800.00 8,933,920.38

    Type TB1

    - Besi 3,736.55 kg 15,880.00 59,336,382.24

    - Begisting 484.85 m2 136,400.00 66,133,267.20

    - Beton K 250 44.32 m3 954,800.00 42,319,791.36

    Type TB2

    - Besi 4,902.80 kg 14,800.00 72,561,366.00

    - Begisting 151.20 m2 156,400.00 23,647,680.00

    - Beton K 250 9.07 m3 954,800.00 8,661,945.60

    Sub total section A.1.2. 554,735,377.96

    Section A.1.3. Pekerjaan Struktur Lantai 1

    1 Kolom beton type K1

    - Besi 3,180.54 kg 14,800.00 47,071,947.60

    - Begisting 204.12 m2 156,400.00 31,924,368.00

    - Beton K 250 17.50 m3 954,800.00 16,705,180.80

    2 Kolom beton type K2

    - Besi 5,949.46 kg 14,800.00 88,051,993.20

    - Begisting 189.54 m2 156,400.00 29,644,056.00- Beton K 250 14.22 m3 954,800.00 13,572,959.40

    3 Plat beton lantai - 1, t = 15 cm (Elv. 0,00)

    - Besi wire mass M7 single 2,330.75 m2 45,369.40 105,744,638.31

    - Relat 176.27 m1 23,460.00 4,135,176.90

    - Beton K 250 349.61 m3 954,800.00 333,809,728.56

    4 Struktur tangga type A & B :

    - Besi 1,950.90 kg 14,800.00 28,873,364.40

    - Begisting 139.13 m2 156,400.00 21,760,088.40

    - Beton K 250 60.13 m3 954,800.00 57,411,169.20

    Sub total section A.1.3. 778,704,670.77

    No.HARGA SATUAN

    J U M L A H (Rp)URAIAN PEKERJAAN VOLUME

    URAIAN PEKERJAAN VOLUME

  • 8/13/2019 RAB Pasar Parungpung

    15/62

    RENCANA ANGGARAN BIAYA (RAB)Kegiatan : Revitalisasi Pasar Parungpung Kabupaten Bogor

    Pekerjaan : Pembangunan Pasar dan Sarana Pendukungnya

    Lokasi : Parungpung - Kabupaten Bogor

    Tahun : 2012

    SUB PEMBANGUNAN PASAR

    Section A.1.4. Pekerjaan Struktur Lantai - 2

    1 Balok beton type B1

    - Besi 4,390.85 kg 14,800.00 64,984,550.40- Begisting 494.84 m2 156,400.00 77,393,226.24

    - Beton K 250 49.49 m3 954,800.00 47,252,288.16

    2 Balok beton type B2

    - Besi 6,283.41 kg 14,800.00 92,994,512.40

    - Begisting 315.32 m2 156,400.00 49,315,266.00

    - Beton K 250 20.07 m3 954,800.00 19,158,539.40

    3 Balok beton type B3

    - Besi 4,905.59 kg 15,880.00 77,900,832.72

    - Begisting 35.94 m2 136,400.00 4,902,666.12

    - Beton K 250 11.14 m3 954,800.00 10,634,085.00

    4 Balok beton type BL1

    - Besi 1,323.80 kg 15,880.00 21,021,959.88

    - Begisting 61.72 m2 136,400.00 8,418,880.80

    - Beton K 250 3.09 m3 954,800.00 2,945,748.96

    5 Plat beton lantai - 2, t : 15 cm (Elv. +3,500)

    - Wiremesh M-6mm(double) 1,363.92 m2 45,369.40 61,880,368.16

    - Begisting 308.59 m2 136,400.00 42,091,335.00

    - Beton K 250 46.38 m3 954,800.00 44,281,618.92

    6 Kolom beton type K1a

    - Besi 944.34 kg 15,880.00 14,996,182.72

    - Begisting 75.60 m2 136,400.00 10,311,840.00

    - Beton K 250 6.48 m3 954,800.00 6,187,104.00

    7 Kolom beton type K2

    - Besi 1,570.56 kg 15,880.00 24,940,492.80

    - Begisting 168.48 m2 136,400.00 22,980,672.00

    - Beton K 250 12.64 m3 954,800.00 12,064,852.80

    716,657,022.48

    Section A.1.5. Pekerjaan Struktur Lantai Atap

    8 Balok beton type B1a

    - Besi 4,952.49 kg 15,880.00 78,645,509.44

    - Begisting 97.50 m2 136,400.00 13,299,000.00

    - Beton K 250 10.55 m3 954,800.00 10,072,758.08

    9 Balok beton type B2

    - Besi 2,955.19 kg 15,880.00 46,928,448.96

    - Begisting 113.94 m2 136,400.00 15,541,416.00

    - Beton K 250 8.86 m3 954,800.00 8,461,437.60

  • 8/13/2019 RAB Pasar Parungpung

    16/62

    RENCANA ANGGARAN BIAYA (RAB)Kegiatan : Revitalisasi Pasar Parungpung Kabupaten Bogor

    Pekerjaan : Pembangunan Pasar dan Sarana Pendukungnya

    Lokasi : Parungpung - Kabupaten Bogor

    Tahun : 2012

    SUB PEMBANGUNAN PASAR

    No.HARGA SATUAN

    J U M L A H (Rp)

    10 Balok beton type B3 -

    - Besi 3,359.59 kg 15,880.00 53,350,320.96

    - Begisting 35.70 m2 136,400.00 4,869,370.88

    - Beton K 250 4.81 m3 954,800.00 4,596,789.12

    Balok beton type BL1

    - Besi 767.25 kg 15,880.00 12,183,898.24

    - Begisting 54.86 m2 136,400.00 7,482,904.00

    - Beton K 250 2.74 m3 954,800.00 2,618,443.52

    11 Plat beton dak, t : 15 cm (Elv. +6,500)

    - Wiremesh M-6mm single 705.36 m2 45,369.40 32,001,759.98

    - Begisting 17.20 m2 75,250.00 1,294,300.00

    - Beton K 250 70.91 m3 954,800.00 67,706,777.60

    Sub total section A.1.5. 359,053,134.38

    Section A.1.6. Pekerjaan Struktur Atap

    A Bangunan Utama

    1 Kolom 2 CNP 200x75 9,314.15 kg 16,000.00 149,026,464.00

    2 Balok CNP 200x75 1,062.68 kg 16,000.00 17,002,944.00

    3 Base Plate t=12mm 412.76 kg 15,500.00 6,397,780.00

    4 Angkur M14x60cm 272.00 kg 50,000.00 13,600,000.00

    5 Kuda-kuda baja ringan chanel C+reng 2,279.37 kg 166,050.00 378,490,036.10

    6 Atap penutup Zinc Alumn t=4 2,279.37 kg 92,510.00 210,864,879.49

    7 Nok Atap Zinc Alumn t=4 88.02 kg 73,200.00 6,443,421.02

    8 Lisplank zinc alumn t=4 118.34 kg 42,620.00 5,043,650.80

    9 Talang Datar zinc alumn+Hak besi strip 121.10 kg 98,550.00 11,934,405.00

    10 Flashing zinc alumn t=0.4 228.20 kg 42,700.00 9,744,140.0011 Grill Ventilasi pipa dia.2 1/2+wiremesh 22.00 set 425,000.00 9,350,000.00

    12 Talang Tegak PVC 4"+klem 105.00 m' 134,875.00 14,161,875.00

    13 Canopy Carbonat+Rangka 51.00 m2 450,000.00 22,950,000.00

    14 Top plat kolom t= 8mm 275.95 kg 14,500.00 4,001,275.00

    15 Cat Zincromate 304.38 m2 10,500.00 3,195,990.00

    Sub total, A. 862,206,860.40

    Sub Total Section A.1.5. 1,221,259,994.79

    URAIAN PEKERJAAN VOLUME

  • 8/13/2019 RAB Pasar Parungpung

    17/62

    RENCANA ANGGARAN BIAYA (RAB)Kegiatan : Revitalisasi Pasar Parungpung Kabupaten Bogor

    Pekerjaan : Pembangunan Pasar dan Sarana Pendukungnya

    Lokasi : Parungpung - Kabupaten Bogor

    Tahun : 2012

    SUB PEMBANGUNAN PASAR

    U R A I A N P E K E R J A A N J U M L A H (Rp)

    SUB REKAPITULASI PEKERJAAN ARSITEKTUR

    DIVISI A.2.0. PEKERJAAN ARSITEKTUR

    Section A.2.1. Finishing Lantai - 1 1,781,229,345.56

    Section A.2.2. Finishing Lantai - 2 472,374,457.99

    TOTAL PEKERJAAN ARSITEKTUR 2,253,603,803.55

    Page 17 of 62

  • 8/13/2019 RAB Pasar Parungpung

    18/62

    RENCANA ANGGARAN BIAYA (RAB)Kegiatan : Revitalisasi Pasar Parungpung Kabupaten Bogor

    Pekerjaan : Pembangunan Pasar dan Sarana Pendukungnya

    Lokasi : Parungpung - Kabupaten Bogor

    Tahun : 2012

    SUB PEMBANGUNAN PASAR

    No. URAIAN PEKERJAAN VOLUMEHARGA SATUAN

    J U M L A H (Rp)

    DIVISI A.2.0. PEKERJAAN ARSITEKTUR

    Section A.2.1. Finishing Lantai - 1

    A Pekerjaan Dinding & Plesteran

    1 Dinding bata 1 pc : 2 psr 126.72 m 86,840.00 11,004,364.80

    2 Plester kasar (berapen) 253.44 m 23,695.80 6,005,463.55

    3 Pasangan dinding bata merah 1 pc : 4 psr 1,911.99 m 73,650.00 140,818,210.80

    4 Kolom praktis 13/15 3.83 m1 120,505.68 461,777.77

    5 Ring balok praktis 13/15 4.58 m1 120,505.68 552,398.04

    6 Kolom 15/25 pada setiap kios HUK 5.80 m1 111,581.75 647,174.13

    7 Balok Gantung 15/25 dudukan rolingdoor / Polding Gate 1.50 m1 214,198.41 320,440.83

    8 Plester dinding 3,823.98 m 38,088.00 145,647,902.59

    9 Acian dinding 3,823.98 m 21,900.00 83,745,249.60

    10 Plester aci kolom struktur 20.52 m 68,400.00 1,403,568.0011 Plesteran Lisplank Beton 20.52 m 46,536.00 954,918.72

    12 Acian Lisplang beton 20.52 m 21,900.00 449,388.00

    13 Ban-banan / List Minimalis keliling Lisplank 87.20 m1 40,000.00 3,488,000.00

    Sub total A. 395,498,856.83

    B Pekerjaan Pintu, Jendela & Accessories

    1 Kusen type BV (Almunium) 1 Pada Toilet 6.00 unit 255,000.00 1,530,000.00

    2 Kusen dan Daun Pintu PVC untuk Toilet 6.00 unit 350,000.00 2,100,000.00

    3 Kusen type J1 66.00 unit 650,000.00 42,900,000.00

    4 Roling door kios 733.60 m 550,000.00 403,480,000.00

    5 Polding Gate toko 106.70 m 385,000.00 41,081,040.00

    6 Polding Gate pintu masuk 41.70 m 410,000.00 17,095,360.00

    Sub total B. 508,186,400.00

    C Pekerjaan Plafond

    1 Plafond gypsum, t : 9 mm + rangka hollow 955.20 m 80,940.00 77,313,888.00

    2 Plafond kalsiboard, t : 6 mm + rangka hollow 14.00 m 79,848.00 1,117,872.00

    3 List Plafon Gypsum 5/5 1,276.80 m 8,865.00 11,318,832.00

    4 List Plafon kayu 3/3 33.44 m 4,000.00 133,760.00

    Sub total C. 89,884,352.00

    D Pekerjaan Penutup Dinding & Lantai

    1 Lantai keramik 30 x 30 cm 1,525.36 m 95,713.00 145,996,781.68

    2 Lantai keramik Teras 38.40 m 122,685.00 4,711,104.00

    3 Dinding keramik 20 x 25 cm 191.52 m 53,000.00 10,150,560.004 Dinding keramik los 20 x 25 cm 134.40 m 53,000.00 7,123,200.00

    5 Lantai keramik 20 x 20 cm Kamar mandi 18.18 m 91,713.00 1,667,709.19

    6 Plint keramik 10 x 30 cm 143.26 m 21,703.00 3,109,258.59

    7 Keramik Tangga 20 x 25 51.07 m 119,260.00 6,090,846.72

    8 Anti slip keramik (tangga) 12.77 m 119,260.00 1,522,711.68

    Sub total D. 180,372,171.86

  • 8/13/2019 RAB Pasar Parungpung

    19/62

    RENCANA ANGGARAN BIAYA (RAB)Kegiatan : Revitalisasi Pasar Parungpung Kabupaten Bogor

    Pekerjaan : Pembangunan Pasar dan Sarana Pendukungnya

    Lokasi : Parungpung - Kabupaten Bogor

    Tahun : 2012

    SUB PEMBANGUNAN PASAR

    No. URAIAN PEKERJAAN VOLUMEHARGA SATUAN

    J U M L A H (Rp)

    E Pekerjaan Raill ing

    1 Railling tangga & bordes :

    Pipa hitam 2" 52.71 15,500.00 817,005.00

    Besi hollow 40 x 40 mm 105.42 40,000.00 4,216,800.00

    Besi hollow 20 x 30 mm 88.20 40,000.00 3,528,000.00

    Dyna bolt 8 mm + ring penutup 25.20 50,000.00 1,260,000.00

    Pengelasan 2,553.60 70,000.00 178,752,000.00

    Zinkchromate 2,553.60 40,370.00 103,088,832.00

    Finishing acrylic lacquer paint 2,553.60 40,370.00 103,088,832.00

    Sub total E. 394,751,469.00

    F Pekerjaan Pengecatan

    1 Pengecatan dinding interior (emulsi) 2,166.40 m 39,474.00 85,516,552.55

    2 Pengecatan dinding exterior (weathershield) 328.38 m 44,333.00 14,558,247.873 Pengecatan plafond (emulsi) 848.05 m 39,474.00 33,475,925.70

    4 List Plafon 1,146.46 m 28,967.50 33,210,080.05

    5 Pengecatan listplank (weathershield) 829.71 m 44,333.00 36,783,533.43

    Sub total F. 203,544,339.60

    G Pekerjaan Lain - lain

    1 Rabat beton keliling bangunan termasuk trap tangga :

    Pasangan bata 1 pc : 4 psr 27.67 m 73,650.00 2,037,969.15

    Plester kasar (berapen) 55.34 m 23,695.80 1,311,207.09

    Pasir urug, t : 10 cm 6.85 m 226,400.00 1,551,519.20

    Lantai kerja, t : 8 cm 4.42 m 924,742.50 4,091,060.82

    Sub total G. 8,991,756.26

    Sub total section A.2.1. 1,781,229,345.56

    Section A.2.2. Finishing Lantai - 2

    A Pekerjaan Dinding & Plesteran

    * Dinding Luar dan dinding kios

    1 Dinding bata 1 pc : 2 psr 29.74 m2 86,840.00 2,582,274.24

    2 Plester kasar (berapen) 59.48 m2 23,695.80 1,409,402.49

    3 Pasangan dinding bata merah 1 pc : 4 psr 536.40 m2 73,650.00 39,505,565.40

    4 Kolom praktis 15/15 12.68 m1 120,505.68 1,527,650.51

    5 Ring balok praktis 15/15 4.63 m1 120,505.68 557,579.78

    6 Plester dinding 1,072.79 m 38,088.00 40,860,501.70

    7 Acian dinding 1,072.79 m 21,900.00 23,494,144.80

    8 Plester aci kolom struktur 80.95 m 32,000.00 2,590,336.00

    9 Plesteran Lisplank Beton 14.34 m 46,536.00 667,140.1010 Acian Lisplang beton 14.34 m 21,900.00 313,958.40

    13 Pilar pilar variasi batas ruko 7.00 unit 500,000.00 3,500,000.00

    14 Pariasi Sirip Beton pembatas ruko 7.00 unit 450,000.00 3,150,000.00

  • 8/13/2019 RAB Pasar Parungpung

    20/62

    RENCANA ANGGARAN BIAYA (RAB)Kegiatan : Revitalisasi Pasar Parungpung Kabupaten Bogor

    Pekerjaan : Pembangunan Pasar dan Sarana Pendukungnya

    Lokasi : Parungpung - Kabupaten Bogor

    Tahun : 2012

    SUB PEMBANGUNAN PASAR

    No. URAIAN PEKERJAAN VOLUMEHARGA SATUAN

    J U M L A H (Rp)

    * Dinding sopi -sopi -15 Pasangan dinding bata merah 1 pc : 4 psr 91.62 m 73,650.00 6,747,518.40

    16 Kolom praktis 15/15 0.79 m1 120,505.68 95,319.99

    17 Ring balok praktis 15/15 1.31 m1 120,505.68 157,741.94

    18 Plester dinding 91.62 m 38,088.00 3,489,470.21

    19 Acian dinding 91.62 m 21,900.00 2,006,390.40

    Sub total A. 132,654,994.36

    B Pekerjaan Pintu, Jendela & Accessories

    1 Kusen Type BV (alumunium)1 pada toilet 12.00 Unit 255,000.00 3,060,000.00

    2 Kusen dan daun pintu PVC untuk toilet 12.00 Unit 350,000.00 4,200,000.00

    3 Kusen type J1 40.00 Unit 2,560,253.00 102,410,120.00

    Sub total B. 109,670,120.00

    C Pekerjaan Plafond

    1 Plafond gypsum, t : 9 mm + rangka hollow 148.79 m 80,940.00 12,042,900.72

    2 Plafond kalsiboard, t : 6 mm + rangka hollow 13.10 m 79,848.00 1,046,328.19

    3 List Plafon 5/5 143.88 m 8,865.00 1,275,496.20

    4 List Plafon 3/3 38.88 m 4,000.00 155,520.00

    Sub total C. 14,520,245.11

    D Pekerjaan Penutup Dinding & Lantai

    1 Lantai keramik 30 x 30 cm 232.05 m 95,713.00 22,210,201.65

    2 Lantai keramik Teras 29.95 m 132,685.00 3,974,181.12

    3 Lantai keramik 20 x 20 cm Kamar mandi 13.64 m 91,713.00 1,250,781.89

    4 Plint keramik 10 x 30 cm 107.45 m 21,703.00 2,331,943.94

    Sub total D. 29,767,108.61

    E Pekerjaan Raill ing

    1 Railling void : 63.00 m 550,000.00 34,650,000.00

    Pipa hitam 2"

    Besi hollow 40 x 40 mm

    Besi hollow 20 x 40 mm

    Dyna bolt 8 mm + ring penutup

    Pengelasan

    Zinkchromate

    Sub total E. 34,650,000.00

    F Pekerjaan Pengecatan

    1 Pengecatan dinding interior (emulsi) 536.40 m 39,474.00 21,173,695.70

    2 Pengecatan dinding exterior (weathershield) 657.75 m 44,333.00 29,159,942.08

    3 Pengecatan plafond (emulsi) 188.87 m 39,474.00 7,455,612.284 Cat List Plafon 213.22 m1 4,000.00 852,880.00

    Sub total F. 58,642,130.06

    G Pekerjaan Waterproofing

    1 Waterproofing coating (toilet) 9.31 m 57,500.00 535,440.00

    2 Waterproofing (membran)dak beton :

    Waterproofing 270.73 m 251,650.00 68,127,946.25

    Ram kawat proteksi waterprofing 270.73 m 19,500.00 5,279,137.50

    Plesteran 1pc : 2psr 270.73 m 46,536.00 12,598,458.60

    Acian 270.73 m 21,900.00 5,928,877.50

    Sub total G. 92,469,859.85

    Sub total section A.2.2. 472,374,457.99

  • 8/13/2019 RAB Pasar Parungpung

    21/62

    RENCANA ANGGARAN BIAYA (RAB)Kegiatan : Revitalisasi Pasar Parungpung Kabupaten Bogor

    Pekerjaan : Pembangunan Pasar dan Sarana Pendukungnya

    Lokasi : Parungpung - Kabupaten Bogor

    Tahun : 2012

    SUB PEMBANGUNAN PASAR

    U R A I A N P E K E R J A A N J U M L A H (Rp)

    SUB REKAPITULASI PEKERJAAN PLUMBING

    DIVISI A.3.0. PEKERJAAN PLUMBING

    Section A.3.1. Pemipaan Air Kotor, Buangan & Vent 111,223,837.50

    Section B.3.2. Pemipaan Air Bersih 14,965,525.00

    Section A.3.3. Sanitary 14,944,080.00

    TOTAL PEKERJAAN PLUMBING 141,133,442.50

    Page 21 of 62

  • 8/13/2019 RAB Pasar Parungpung

    22/62

    RENCANA ANGGARAN BIAYA (RAB)Kegiatan : Revitalisasi Pasar Parungpung Kabupaten Bogor

    Pekerjaan : Pembangunan Pasar dan Sarana Pendukungnya

    Lokasi : Parungpung - Kabupaten Bogor

    Tahun : 2012

    SUB PEMBANGUNAN PASAR

    No. URAIAN PEKERJAAN VOLUMEHARGA SATUAN

    J U M L A H (Rp)

    DIVISI A.3.0. PEKERJAAN PLUMBINGSection A.3.1. Pemipaan Air Kotor, Buangan & Vent

    A Lantai - 1 -

    1 Sistem pemipaan : -

    Pipa PVC tekanan nominal 5 BAR (SNI), 100 mm 209.00 m 82,550.00 17,252,950.00

    Pipa PVC tekanan nominal 5 BAR (SNI), 75 mm 101.50 m 62,725.00 6,366,587.50

    Pipa PVC tekanan nominal 5 BAR (SNI), 50 mm 52.00 m 26,750.00 1,391,000.00

    Pipa PVC tekanan nominal 5 BAR (SNI), 40 mm 65.00 m 54,340.00 3,532,100.00

    2 Clean out (CO 50 mm) 3.00 bh 5,000.00 15,000.00

    3 Fitting, accessories & material support 1.00 ls 2,000,000.00 2,000,000.00

    4 Testing & commissioning 1.00 ls 1,000,000.00 1,000,000.00

    5 Septiktank dan Rembesan Kav 6 M3 3.00 unit 20,000,000.00 60,000,000.00

    Sub total, A. 91,557,637.50

    B Lantai - 2

    1 Sistem pemipaan :

    Pipa PVC tekanan nominal 5 BAR (SNI), 100 mm 94.50 m 82,550.00 7,800,975.00

    Pipa PVC tekanan nominal 5 BAR (SNI), 75 mm 33.00 m 62,725.00 2,069,925.00

    Pipa PVC tekanan nominal 5 BAR (SNI), 40 mm 45.00 m 54,340.00 2,445,300.00

    2 Roopf Drain 75 mm 5 bh 75,000.00 4,350,000.00

    3 Fitting, accessories & material support 1.00 ls 2,000,000.00 2,000,000.00

    4 Testing & commissioning 1.00 ls 1,000,000.00 1,000,000.00

    Sub total, B. 19,666,200.00

    Sub total section A.3.1. 111,223,837.50

    Section B.3.2. Pemipaan Air Bersih

    A Lantai - 11 Sistem pemipaan :

    PVC ex AW , 32 mm 78.00 m 16,200.00 1,263,600.00

    PVC ex AW , 25 mm 56.00 m 15,750.00 882,000.00

    PVC ex AW , 20 mm 68.40 m 12,500.00 855,000.00

    PVC ex AW , 15 mm 19.20 m 9,650.00 185,280.00

    2 Valve : -

    Gate valve 25 mm 5.00 bh 110,000.00 550,000.00

    Gate valve 20 mm 4.00 bh 75,000.00 300,000.00

    3 Water meter bh -

    4 Kran Dinding 6.00 bh 60,000.00 360,000.00

    5 Fitting, accessories & material support 1.00 ls 1,500,000.00 1,500,000.00

    6 Testing & commissioning 1.00 ls 1,000,000.00 1,000,000.00

    Sub total, A. 6,895,880.00

    B Lantai - 2

    1 Sistem pemipaan :

    PVC ex AW , 32 mm 68.25 m 16,200.00 1,105,650.00

    PVC ex AW , 25 mm 49.00 m 15,750.00 771,750.00

    PVC ex AW , 20 mm 59.85 m 12,500.00 748,125.00

    PVC ex AW , 15 mm 16.80 m 9,650.00 162,120.00

  • 8/13/2019 RAB Pasar Parungpung

    23/62

    RENCANA ANGGARAN BIAYA (RAB)Kegiatan : Revitalisasi Pasar Parungpung Kabupaten Bogor

    Pekerjaan : Pembangunan Pasar dan Sarana Pendukungnya

    Lokasi : Parungpung - Kabupaten Bogor

    Tahun : 2012

    SUB PEMBANGUNAN PASAR

    No. URAIAN PEKERJAAN VOLUMEHARGA SATUAN

    J U M L A H (Rp)

    2 Valve : - Gate valve 25 mm 5.00 bh 110,000.00 550,000.00

    Gate valve 20 mm 4.00 bh 75,000.00 300,000.00

    3 Water meter 2.00 bh 856,000.00 1,712,000.00

    4 Kran Dinding 12.00 bh 60,000.00 720,000.00

    5 Fitting, accessories & material support 1.00 ls 1,500,000.00 1,500,000.00

    6 Testing & commissioning 1.00 ls 1,000,000.00 500,000.00

    Sub total, B. 8,069,645.00

    Sub total section A.3.2 14,965,525.00

    Section A.3.3. Sanitary

    A Lantai - 1

    1 Kloset jongkok setara TOTO type CE 7 6.00 unit 240,435.00 1,442,610.00

    2 Kran dinding setara TOTO type T23 BQ 13N 6.00 bh 194,625.00 1,167,750.00

    3 Kaca cermin, t : 6 mm (100 x 65) cm 1.00 bh 138,500.00 138,500.00

    4 Floor drain setara TOTO type TX 1 BN 6.00 bh 326,250.00 1,957,500.00

    Sub total, A. 4,706,360.00

    B Lantai - 2

    1 Kloset jongkok setara TOTO type CE 7 12.00 unit 240,435.00 2,885,220.00

    2 Kran dinding setara TOTO type T23 BQ 13N 12.00 bh 194,625.00 2,335,500.00

    3 Kaca cermin, t : 6 mm (100 x 65) cm 2.00 bh 138,500.00 277,000.00

    4 Floor drain setara TOTO type TX 1 BN 12.00 bh 326,250.00 3,915,000.00

    B Lantai - 2

    1 Roof Drain 11.00 bh 75,000.00 825,000.00

    Sub total, B 10,237,720.00

    Sub total section A.3.3. 14,944,080.00

  • 8/13/2019 RAB Pasar Parungpung

    24/62

    RENCANA ANGGARAN BIAYA (RAB)Kegiatan : Revitalisasi Pasar Parungpung Kabupaten Bogor

    Pekerjaan : Pembangunan Pasar dan Sarana Pendukungnya

    Lokasi : Parungpung - Kabupaten Bogor

    Tahun : 2012

    SUB PEMBANGUNAN PASAR

    U R A I A N P E K E R J A A N J U M L A H (Rp)

    SUB REKAPITULASI PEKERJAAN ELEKTRIKAL

    DIVISI A.4.0. PEKERJAAN ELEKTRIKAL

    Section A.4.1. Pekerjaan Elektrikal 544,718,467.00

    TOTAL PEKERJAAN ELEKTRIKAL 544,718,467.00

    Page 24 of 62

  • 8/13/2019 RAB Pasar Parungpung

    25/62

    RENCANA ANGGARAN BIAYA (RAB)Kegiatan : Revitalisasi Pasar Parungpung Kabupaten Bogor

    Pekerjaan : Pembangunan Pasar dan Sarana Pendukungnya

    Lokasi : Parungpung - Kabupaten Bogor

    Tahun : 2012

    SUB PEMBANGUNAN PASAR

    No. URAIAN PEKERJAAN VOLUMEHARGA SATUAN

    J U M L A H (Rp)

    DIVISI A.4.0. PEKERJAAN ELEKTRIKAL

    Section A.4.1. Pekerjaan Elektrikal -

    A Distribusi -

    1a Panel Distribusi (lengkap asesoris) 1.00 unit 10,000,000.00 10,000,000.00

    1b Panel Sub Distribusi (lengkap asesoris) 6.00 unit 6,500,000.00 39,000,000.00

    1c Instalasi (wiring & diagram) 2.00 ls 1,500,000.00 3,000,000.00

    1d Peralatan & material bantu 1.00 ls 1,000,000.00 1,000,000.00

    2a Box Zikering 2A 2.00 unit 60,000.00 120,000.00

    2b Instalasi (wiring & diagram) 1.00 ls 1,500,000.00 1,500,000.00

    2c Peralatan & material bantu 1.00 ls 1,000,000.00 1,000,000.00

    Sub total, A. 55,620,000.00

    B Instalasi & Fixtures -1 TLD 2 x 36W, out bow 220.00 bh 210,000.00 46,200,000.00

    2 TLD 1 x 36W, out bow 222.00 bh 175,000.00 38,850,000.00

    3 TLD 1 x 18W, Out bow 77.00 bh 185,000.00 14,245,000.00

    4 SLD 1 x 7W, 45.00 bh 245,000.00 11,025,000.00

    5 Saklar tunggal rating 10A 168.00 bh 22,500.00 3,780,000.00

    6 Saklar ganda rating 10A 12.00 bh 22,500.00 270,000.00

    7 Stok Kontak 10A 220.00 bh 225,000.00 49,500,000.00

    8 Instalasi titik lampu rating 10A 192.00 ttk 100,000.00 19,200,000.00

    9 Instalasi titik stop kontak 10A 192.00 ttk 100,000.00 19,200,000.00

    10 KWH meter 1.00 Pcs 12,500,000.00 12,500,000.00

    11 MCB 4A,MCB 6A,MCB 16A 1.00 ls 2,500,000.00 2,500,000.00

    Sub total, B. 217,270,000.00

    C KABEL FEEDER

    1 NYY 4 x 16mm2 + BC 10mm2 200.00 m 126,000.00 25,200,000.00

    2 NYY 4 x 10mm2 + BC 6mm2 490.00 m 105,000.00 51,450,000.00

    3 NYY 3 x 4mm2 1,711.57 m 27,600.00 47,239,332.00

    4 Accessories & material support 1.00 lot 2,000,000.00 2,000,000.00

    Sub total, C. 125,889,332.00

    D Rak kabel & Tangga kabel -

    1 Rak kabel (300 x 50) mm 233.63 m 341,920.00 79,881,060.00

    2 Rak kabel (200 x 50) mm 233.63 m 193,400.00 45,183,075.00

    3 Tangga kabel (300 x 100) mm 22.50 m 350,000.00 7,875,000.00

    4 Accessories & material support 1.00 ls 1,000,000.00 1,000,000.00

    Sub total, D. 133,939,135.00

    E Grounding System -

    1 Outlet grounding 1.00 bh 10,000,000.00 10,000,000.00

    Sub total, E. 10,000,000.00

    F Testing & Commissioning 1.00 ls 2,000,000.00 2,000,000.00

    Sub total, F. 2,000,000.00

    Sub total section A.4.1. 544,718,467.00

  • 8/13/2019 RAB Pasar Parungpung

    26/62

    Kegiatan : Revitalisasi Pasar Parungpung Kabupaten Bogor

    Pekerjaan : Pembangunan Pasar dan Sarana Pendukungnya

    Lokasi : Parungpung - Kabupaten Bogor

    Tahun : 2012

    SUB. PEKERJAAN NON STANDAR

    J U M L A H (Rp)

    SUB REKAPITULASI PEKERJAAN NON STANDAR

    V. PEKERJAAN HYDRANT

    Section B.1.1. Sistem Distribusi Air Bersih 112,070,522.65

    Section E.1.2. Pekerjaan Deep Well (Sumur dalam) 253,774,667.52

    Section E.1.3. Pekerjaan Hydrant 476,232,700.00

    Section E.1.4. Pemipaan air kotor & bak kontrol 49,786,180.00

    Section E.1.5. Sistem Pemadam Kebakaran (lantai : 1 & 2) 23,520,000.00

    TOTAL PEKERJAAN MEKANIKAL NON STANDAR 915,384,070.17

    RENCANA ANGGARAN BIAYA (RAB)

    U R A I A N P E K E R J A A N

    Page 26 of 62

  • 8/13/2019 RAB Pasar Parungpung

    27/62

    Kegiatan : Revitalisasi Pasar Parungpung Kabupaten Bogor

    Pekerjaan : Pembangunan Pasar dan Sarana Pendukungnya

    Lokasi : Parungpung - Kabupaten Bogor

    Tahun : 2012

    SUB. PEKERJAAN NON STANDAR

    RENCANA ANGGARAN BIAYA (RAB)

    No. HARGA SATUAN J U M L A H (Rp)

    DIVISI B.1.0. PEKERJAAN MEKANIKAL

    Section B.1.1. Sistem Distribusi Air Bersih

    1a Pompa transfer 2 pump (single Alternate operation) : 1.00 set 35,000,000.00 35,000,000.00

    ~ Kapasitas : 140 ltr/mnt -

    ~ Head : 20 m' -

    ~ Motor output : 2(1.50kW) -

    ~ Type : Vertikal -

    ~ Termasuk pressure tank -

    1b Piping system (Ground tank, pompa s/d elevated tank) -

    Pipa PVC AW 50 mm 102.00 m 18,400.00 1,876,800.00

    Header GSP 100 mm (L = 200 cm) 1.00 unit 3,500,000.00 3,500,000.00

    1c Valve : -

    Gate valve 50 mm 4.00 bh 1,000,000.00 4,000,000.00

    Check valve 50 mm 4.00 bh 1,000,000.00 4,000,000.00

    Foot valve 50 mm 2.00 bh 850,000.00 1,700,000.00 Strainer 50 mm 4.00 bh 750,000.00 3,000,000.00

    Flexible connection 50 mm 4.00 bh 350,000.00 1,400,000.00

    Pressure gauge 15 mm 1.00 bh 255,000.00 255,000.00

    1d Pekerjaan sipil base ground tank : -

    Bouwplank (3 x 2 x 2.50) m 15.00 m 99,036.00 1,485,540.00

    Galian tanah 35.00 m 33,600.00 1,176,000.00

    Urug tanah kembali & perataan 8.75 m 16,200.00 141,750.00

    Pasir urug 0.88 m 226,400.00 198,100.00

    Lantai kerja 0.61 m 924,742.50 561,503.65

    Besi beton - kg -

    Bekisting bata (sisi luar) 28.00 m 92,800.00 2,598,400.00

    Bekisting struktur praktis (sisi dalam) 25.00 m 75,250.00 1,881,250.00

    Beton site mix K-225 5.55 m 780,000.00 4,329,000.00-

    2a Elevated tank type cilynder kapasitas : 5 m 1.00 unit 6,500,000.00 6,500,000.00

    2b Sistem pemipaan Watrer tank -

    Supply ke Blok A Basement, AW 40 mm 22.00 m 16,500.00 363,000.00

    Supply ke blok B dan C lantai 1 AW 80 mm 149.00 m 65,896.00 9,818,504.00

    Supply ke mushola, AW 65 mm 67.00 m 53,625.00 3,592,875.00

    Supply ke tiap Ruko lantai 1 & 2, AW 100 mm 76.00 m 111,475.00 8,472,100.00

    Supply ke tiap Ruko lantai 1 & 2, AW 25 mm 88.00 m 15,750.00 1,386,000.00

    Header PVC AW 150 mm (L = 200 cm) 1.00 unit 784,000.00 784,000.00

    2c Asesoris -

    Gate valve 40 mm 1.00 bh 85,000.00 85,000.00

    Gate valve 65 mm 1.00 bh 121,000.00 121,000.00

    Gate valve 80 mm 1.00 bh 146,700.00 146,700.00 Gate valve 100 mm 1.00 bh 198,000.00 198,000.00

    2d Fiting, klem dsan alat bantu 1.00 lot 3,000,000.00 3,000,000.00

    2e Water level control (WLC), ground ke elevated tank 1.00 set 2,500,000.00 2,500,000.00

    3 Fitting, accessories & material support 1.00 ls 3,000,000.00 3,000,000.00

    4 Testing & commissioning 1.00 ls 5,000,000.00 5,000,000.00

    Sub total section E.1.1. 112,070,522.65

    VOLUMEURAIAN PEKERJAAN

  • 8/13/2019 RAB Pasar Parungpung

    28/62

    Kegiatan : Revitalisasi Pasar Parungpung Kabupaten Bogor

    Pekerjaan : Pembangunan Pasar dan Sarana Pendukungnya

    Lokasi : Parungpung - Kabupaten Bogor

    Tahun : 2012

    SUB. PEKERJAAN NON STANDAR

    RENCANA ANGGARAN BIAYA (RAB)

    No. URAIAN PEKERJAAN HARGA SATUAN J U M L A H (Rp)

    Section E.1.2. Pekerjaan Deep Well (Sumur dalam)1 Pekerjaan persiapan : 1.00 lot 28,000,000.00 28,000,000.00

    ~ Transportasi & akomodasi -

    ~ Mobilisasi & demobilisasi alat pemboran / rig -

    ~ Pemasangan/pembongkaran drilling rig & alat bantu -

    ~ Pit lumpur, landasan rig, laporan & dokumentasi -

    2 a. Pekerjaan pemboran kedalaman 100 meter : 1.00 lot 225,774,667.52 225,774,667.52

    Pengeboran pilot hole 8" -

    Reaming 12" -

    Pemasangan pipa casing GSP medium class 6" -

    Pemasangan pipa casing GSP medium class 4" -

    Pemasangan screen -

    Geophysical logging -

    Pumping test / draw down & recovery -b. Perijinan : -

    Perijinan Dinas Pertambangan -

    Pengawasan pemasangan screen -

    Bahan utama : -

    Pipa casing GSP medium class 6" -

    Pipa casing GSP medium class 4" -

    Screen stainless steel 4" -

    c. Supporting material : -

    Dop 4" -

    Flange 6" -

    Reducer 6 x 4" -

    Gravel pack -

    Cementation -d. Bahan bakar & analisa laboratorium : -

    Fuel. Oli & grease -

    Analisa laboratorium -

    Pompa & perlengkapan : -

    Pompa submersible -

    Panel kontrol pompa -

    Pipa GSP medium class 2" -

    Accessories pompa (kabel kontrol & kabel power, -

    valve & material support -

    Bak kontrol 80 x 120 x 80 cm -

    Sub total section E.1.2. 253,774,667.52

    VOLUME

  • 8/13/2019 RAB Pasar Parungpung

    29/62

    Kegiatan : Revitalisasi Pasar Parungpung Kabupaten Bogor

    Pekerjaan : Pembangunan Pasar dan Sarana Pendukungnya

    Lokasi : Parungpung - Kabupaten Bogor

    Tahun : 2012

    SUB. PEKERJAAN NON STANDAR

    RENCANA ANGGARAN BIAYA (RAB)

    No. URAIAN PEKERJAAN HARGA SATUAN J U M L A H (Rp)

    Section E.1.3. Pekerjaan Hydrant

    1 Electric joky pump 2 Bh 47,500,000.00 95,000,000.00

    Brad Gae sero -

    Type SRH 225 / GE -

    Kapasitas 60 L / min -

    Total head 70 m -

    Elektro motor 55 KW / 1450 Rpm,3 ph 380 V -

    2 Electric hydrant pump 2 Bh 53,400,000.00 106,800,000.00

    Brand Torishima -

    Type ETA-N 125X100-250.1/GE -

    Kapasitas 200 liter/menit -

    Total head 70 m -

    Putaran 2900 Rpm -

    Elektro motor 55 KW / 1450 Rpm,3 ph 380 V -

    -

    3 Diesel hydrant pump 4 Bh 32,500,000.00 130,000,000.00

    Brand Torishima -

    Type ETA-N 125X100-250.1/GE -

    Kapasitas 200 liter/menit -

    Total head 70 m -

    Putaran 2900 Rpm -

    Diesel isuzu 4 BDI 60 HV -

    4 Presure tank -

    Kapasitas 5000 Lt 4 Bh 10,000,000.00 40,000,000.00

    5 Panel kontrol -

    6 Pompa hydrant standart NFPA 20 -7 Pipa Header 250mm BS mediu dia 6" 1 lot -

    8 Pipa BS medium dia 6" 49.50 Btg 1,250,000.00 61,875,000.00

    9 Pipa BS medium dia 4" 16.50 Btg 1,025,000.00 16,912,500.00

    10 Pipa BS medium dia 2.5" 3.00 Btg 856,000.00 2,568,000.00

    11 Pipa BS medium dia 1.5" 3.00 Btg 735,000.00 2,205,000.00

    12 Strainer dia 4" 6.00 Bh 165,000.00 990,000.00

    13 Flexible joint dia 4" 6.00 Bh 235,000.00 1,410,000.00

    14 Check valve dia 4" 6.00 Bh 135,000.00 810,000.00

    15 Gate valve dia 4" 6.00 Bh 576,000.00 3,456,000.00

    16 Gate valve dia 2.5" 6.00 Bh 345,000.00 2,070,000.00

    17 Foot valve dia 4" 6.00 Bh 435,000.00 2,610,000.00

    18 Knee dia 6" 18.00 Bh 44,000.00 792,000.00

    19 Knee dia 4" 21.00 Bh 20,500.00 430,500.0020 Knee dia 2.5" 3.00 Bh 12,400.00 37,200.00

    21 Tee dia 6" x 4" 6.00 Bh 75,000.00 450,000.00

    22 Tee dia 4" x 2,5" 3.00 Bh 67,000.00 201,000.00

    23 Tee dia 2.5" x 1.5" 3.00 Bh 38,500.00 115,500.00

    24 Testing comisioning 1.00 Ls 5,000,000.00 5,000,000.00

    25 Material bantu 1.00 Ls 2,500,000.00 2,500,000.00

    Sub total section E.1.3. 476,232,700.00

    VOLUME

  • 8/13/2019 RAB Pasar Parungpung

    30/62

    Kegiatan : Revitalisasi Pasar Parungpung Kabupaten Bogor

    Pekerjaan : Pembangunan Pasar dan Sarana Pendukungnya

    Lokasi : Parungpung - Kabupaten Bogor

    Tahun : 2012

    SUB. PEKERJAAN NON STANDAR

    RENCANA ANGGARAN BIAYA (RAB)

    No. URAIAN PEKERJAAN HARGA SATUAN J U M L A H (Rp)

    Section E.1.4. Pemipaan air kotor & bak kontrol

    1 Sistem pemipaan : PVC AW class 150 mm (inc. galian & urugan) 87.00 m 173,800.00 15,120,600.00

    PVC AW class 100 mm (inc. galian & urugan) 156.00 m 90,805.00 14,165,580.00

    2 Bak kontrol :

    Bak kontrol (60 x 60) cm, kedalaman variable 6.00 unit 850,000.00 5,100,000.00

    Bak kontrol (60 x 80) cm, kedalaman variable 4.00 unit 975,000.00 3,900,000.00

    Bak resapan kapasitas : 16 m 1.00 unit 3,500,000.00 3,500,000.00

    3 Clean out (CO) 100 mm 2.00 bh 500,000.00 1,000,000.00

    4 Fitting, accessories & material support 1.00 ls 2,000,000.00 2,000,000.00

    5 Testing & commissioning 1.00 ls 5,000,000.00 5,000,000.00

    Sub total section E.1.4. 49,786,180.00

    Section E.1.5. Sistem Pemadam Kebakaran (lantai : 1 & 2) -

    1 Fire extinguisher (ABC type 3 kg) 20.00 unit 540,000.00 10,800,000.00

    2 Bracket dudukan fire extinguisher 20.00 bh 236,000.00 4,720,000.00

    3 Fitting, accessories & material support 1.00 ls 3,000,000.00 3,000,000.00

    4 Testing & commissioning 1.00 ls 5,000,000.00 5,000,000.00

    Sub total section E.1.5 23,520,000.00

    VOLUME

  • 8/13/2019 RAB Pasar Parungpung

    31/62

    RENCANA ANGGARAN BIAYA (RAB)Kegiatan : Revitalisasi Pasar Parungpung Kabupaten Bogor

    Pekerjaan : Pembangunan Pasar dan Sarana Pendukungnya

    Lokasi : Parungpung - Kabupaten Bogor

    Tahun : 2012

    SUB. PEKERJAAN NON STANDAR

    J U M L A H (Rp)

    SUB REKAPITULASI PEKERJAAN NON STANDAR

    IV. PEKERJAAN GARDU LISTRIK, DAN ME

    Section F.1.2. Pengadaan dan Pemasangan trafo induk 517,076,153.00

    Section F.1.3. Distribusi Tegangan Rendah 21,125,000.00

    Section F.1.4. Telecomunication System 70,475,000.00

    Section F.1.5. Installation Television System 18,000,000.00

    Section F.1.6. Penangkal Petir 149,575,000.00

    Section F.1.7. Grounding System 25,778,031.00

    TOTAL PEKERJAAN ELEKTRIKAL NON STANDAR 802,029,184.00

    U R A I A N P E K E R J A A N

    Page 31 of 62

  • 8/13/2019 RAB Pasar Parungpung

    32/62

    RENCANA ANGGARAN BIAYA (RAB)Kegiatan : Revitalisasi Pasar Parungpung Kabupaten Bogor

    Pekerjaan : Pembangunan Pasar dan Sarana Pendukungnya

    Lokasi : Parungpung - Kabupaten Bogor

    No. URAIAN PEKERJAAN HARGA SATUAN J U M L A H (Rp)

    DIVISI F.1.0. PEKERJAAN ELEKTRIKAL

    Section F.1.2. Pengadaan dan Pemasangan trafo induk

    1 Penyedian Trafo induk 400 KVA 1.00 bh 509,311,153.00 509,311,153.00

    2 Elektrikal system :

    Kabel power NYY 4 x 95 mm 22.00 m 57,500.00 1,265,000.00

    Sistem pentanahan untuk trafo 1.00 lot 1,500,000.00 1,500,000.00

    3 Transportasi material ke proyek & akomodasi 1.00 lot 2,000,000.00 2,000,000.00

    4 Testing & commissioning terdiri dari : 1.00 lot 3,000,000.00 3,000,000.00

    ~ Shop drawing dan as built drawing

    ~ Test load dgn actual load di lapangan

    Sub total section F.1.2. 517,076,153.00

    Section F.1.3. Distribusi Tegangan Rendah

    1a Panel induk Kavasitas 121A lengkap termasuk asesories 1.00 unit 125,000,000.00 125,000,000.00

    1b Panel Deep Well Termasuk asesoris 1.00 Unit 3,750,000.00 3,750,000.00

    1c Panel Air Bersih Termasuk asesoris 1.00 Unit 3,500,000.00 3,500,000.00

    1d Panel Hydrant Termasuk asesoris 1.00 Unit 4,500,000.00 4,500,000.00

    1e Testing & Comisioning 1.00 ls 3,000,000.00 3,000,000.00

    2 Kabel distribusi dari panel utama ke :

    2a Ke Panel pembagi blok A lantai Besement

    NYFGbY 4 x 4 mm + NYA 16 mm 45.00 m 32,500.00 1,462,500.00

    2b Ke Panel pembagi blok A lantai 1 -

    NYFGbY 4 x 4 mm + NYA 16 mm 49.00 m 32,500.00 1,592,500.00

    2c Ke Panel pembagi blok B lantai 1 -

    NYFGbY 4 x 4 mm + NYA 16 mm 87.00 m 32,500.00 2,827,500.00

    2d Ke Panel pembagi blok A lantai 2 -

    NYFGbY 4 x 4 mm + NYA 16 mm 98.00 m 32,500.00 3,185,000.00

    2e Ke Panel pembagi blok C -

    NYFGbY 4 x 4 mm + NYA 16 mm 132.00 m 32,500.00 4,290,000.00

    2f Ke Panel pembagi Penerangan luar -

    NYFGbY 4 x 4 mm + NYA 16 mm 66.00 m 32,500.00 2,145,000.00

    2g Ke Panel PP-DEEPWELL -

    NYY 4 x 4 mm + NYA 16 mm 54.00 m 32,500.00 1,755,000.00

    2h Ke Panel Air Bersih -

    NYY 4 x 4 mm + NYA 16 mm 54.00 m 32,500.00 1,755,000.00

    2i Ke Panel Hydrant -

    NYY 4 x 4 mm + NYA 16 mm 65.00 m 32,500.00 2,112,500.00

    Sub total section F.1.3. 21,125,000.00

    VOLUME

  • 8/13/2019 RAB Pasar Parungpung

    33/62

  • 8/13/2019 RAB Pasar Parungpung

    34/62

    RENCANA ANGGARAN BIAYA (RAB)Kegiatan : Revitalisasi Pasar Parungpung Kabupaten Bogor

    Pekerjaan : Pembangunan Pasar dan Sarana Pendukungnya

    Lokasi : Parungpung - Kabupaten Bogor

    No. HARGA SATUAN J U M L A H (Rp)

    4 Test box 4.00 bh 1,000,000.00 4,000,000.00

    5 Klem dan asecories 100.00 bh 10,000.00 1,000,000.00

    6 Control box (50 x 50 x 50) cm 4.00 bh 325,000.00 1,300,000.00

    7 Arde grounding spit 1" (max. resistance 2 ohm) 4.00 bh 1,500,000.00 6,000,000.008 Material support 1.00 ls 1,000,000.00 1,000,000.00

    9 Perijinan, testing & commissioning 1.00 ls 5,000,000.00 5,000,000.00

    Sub total section F.1.6. 149,575,000.00

    Section F.1.7. Grounding System -

    1 Kabel BC 50 mm Yang ditannam ke dalam tanah 53.00 m 120,000.00 6,360,000.00

    2 Pipa GIP medium class 32 mm 53.00 m 85,000.00 4,505,000.00

    3 Galian tanah (lebar : 15 cm, kedalaman : 50 cm) 13.52 m 33,600.00 454,104.00

    4 Urug kembali dan perataan tanah 13.52 m 16,200.00 218,943.00

    5 Pasir urug 1.06 m 226,400.00 239,984.00

    6 Pentanahan c/w : 4.00 set 3,500,000.00 14,000,000.00

    ~ Bak kontrol 50 x 50 x 50 cm dgn penutup -

    ~ Batang tembaga SPIT 25 mm~ Plat bar connection + accessories

    ~ Resistance max 2 ohm

    Sub total section F.1.7. 25,778,031.00

    URAIAN PEKERJAAN VOLUME

  • 8/13/2019 RAB Pasar Parungpung

    35/62

    Kegiatan : Revitalisasi Pasar Parungpung Kabupaten Bogor

    Pekerjaan : Pembangunan Pasar dan Sarana Pendukungnya

    Lokasi : Parungpung - Kabupaten Bogor

    Tahun : 2012

    JUMLAH (Rp)

    SUB REKAPITULASI PEKERJAAN SITE

    III. PEKERJAAN JALAN, PARKIR, TAMAN DAN POS JAGA

    Section G.1.2. Pekerjaan Jalan & Parkir 1,271,415,181.21

    Section G.1.3. Pekerjaan Saluran 201,413,959.10

    Section G.1.4. Pekerjaan Tower Air & Penangkal Petir 4,974,223.00

    Section G.1.5. Penerangan Luar 6,500,000.00

    Section G.1.6. Pekerjaan Keliling Pasar 76,090,874.20

    Section G.1.7. Pekerjaan Rumah Panel Induk 3 x 3 46,954,676.79

    1,607,348,914.30

    RENCANA ANGGARAN BIAYA (RAB)

    U R A I A N P E K E R J A A N

    TOTAL PEKERJAAN SITE

    Page 35 of 62

  • 8/13/2019 RAB Pasar Parungpung

    36/62

    Kegiatan : Revitalisasi Pasar Parungpung Kabupaten Bogor

    Pekerjaan : Pembangunan Pasar dan Sarana Pendukungnya

    Lokasi : Parungpung - Kabupaten Bogor

    Tahun : 2012

    RENCANA ANGGARAN BIAYA (RAB)

    No. URAIAN PEKERJAAN VOLUMEHARGA SATUAN

    JUMLAH (Rp)

    DIVISI, G.1.0. PEKERJAAN SARANA LUAR

    Section G.1.2. Pekerjaan Jalan & Parkir1 Perkerasan dengan Beton Bertulang

    Sub base batu belah (CBR 60%), t = 20 cm 2,080.51 m 106,820.00 222,239,811.15

    Base course (CBR 90%) 5/7 & 2/3, t = 15 cm 2,080.51 m 56,000.00 116,508,420.00

    Lantai kerja , t = 7 cm 121.64 m 924,742.50 112,488,815.64

    Beton Tebal 20 cm termasuk relat dan alat bantu 2,080.51 m 310,960.00 646,954,612.20

    Wire Mess M6 Satu lapis 2,080.51 m 45,369.40 94,391,376.97

    Acian Beton dan Curing 2,080.51 m 21,900.00 45,563,114.25

    2 Kansteen (28 x 15 x 60 cm) 155.70 m 95,330.00 14,842,881.00

    3 Joging trak (Paving)masuk ke pasar 2 sisi L= 100 cm 135.00 m 136,490.00 18,426,150.00

    Sub total section G.1.2. 1,271,415,181.21

    Section G.1.3. Pekerjaan Saluran

    A Saluran : 18,487,573.84

    1 39.00 m 787,289.50 30,704,290.50

    2 82.06 m 731,289.50 60,008,261.50

    3 36.50 m 512,995.13 18,724,322.06

    4 141.60 m 500,138.78 70,819,651.25

    5 Buis beton 80 cm 15.60 m 156,704.68 2,444,592.93

    6 Buis beton 60 cm 6.40 m 148,238.68 948,727.52

    7 Buis beton 40 cm 12.40 m 134,294.68 1,665,253.97

    8 Plat Duiker penutup Saluran 4.80 m 218,488.69 1,048,745.71

    9 Bak kontrol type CB1 2.00 unit 1,156,720.38 2,313,440.76

    10 Bak kontrol type CB2 4.00 unit 1,467,696.51 5,870,786.0411 Resapan air type BR1 3.00 unit 1,962,784.91 5,888,354.72

    12 Resapan air type BR2 2.00 unit 488,766.07 977,532.14

    Sub total section G.1.3. 201,413,959.10

    Section G.1.4. Pekerjaan Tower Air & Penangkal Petir

    A Tower Air -

    1 Anchore M16 8.00 bh 70,000.00 560,000.00

    2 Pipa besi : -

    5.5", t : 6 mm 61.06 kg 15,500.00 946,430.00

    3", t : 4 mm 46.92 kg 15,500.00 727,260.00

    2", t : 3.2 mm 31.00 kg 15,500.00 480,500.00

    1", t : 2 mm 19.89 kg 15,500.00 308,295.00

    3 Plat besi, t : 10, 6, 5 & 3 mm 24.48 kg 16,500.00 403,920.00

    4 Erection 188.64 kg 2,000.00 377,280.005 Pengelasan 196.50 kg 1,500.00 294,750.00

    6 Zinkchromate 196.50 kg 1,500.00 294,750.00

    Saluran Beton ukuran 120 x 120 cm termasuk Galian dan perapihannya

    Saluran Beton ukuran 100 x 100 cm termasuk Galian dan perapihannya

    Saluran Beton ukuran 80x 80 cm termasuk Galian dan perapihannya

    Saluran Bata ukuran 40 x 40 cm keliling bangunan termasuk Galian dan

    perapihannya

    Page 36 of 62

  • 8/13/2019 RAB Pasar Parungpung

    37/62

    Kegiatan : Revitalisasi Pasar Parungpung Kabupaten Bogor

    Pekerjaan : Pembangunan Pasar dan Sarana Pendukungnya

    Lokasi : Parungpung - Kabupaten Bogor

    Tahun : 2012

    RENCANA ANGGARAN BIAYA (RAB)

    No. URAIAN PEKERJAAN VOLUMEHARGA SATUAN

    JUMLAH (Rp)

    -

    B Tower Penangkal Petir -1 Pipa besi 21.50 kg 15,500.00 333,250.00

    2 Plat besi, t : 10 mm & 6 mm 4.47 kg 16,500.00 73,788.00

    3 Bolt M16 + ring 6.00 bh 7,500.00 45,000.00

    4 Erection 25.80 kg 2,000.00 51,600.00

    5 Pengelasan 25.80 kg 1,500.00 38,700.00

    6 Zinkchromate 25.80 kg 1,500.00 38,700.00

    Sub total section G.1.4. 4,974,223.00

    Section G.1.5. Penerangan Luar

    A Sub Distribusi

    1a Panel LP - OU 1.00 unit 4,500,000.00 4,500,000.00

    ~ Panel box -

    ~ MCB 3 pole 16A, 6kA -

    ~ MCB 1 pole 6A, 6kA -~ LDR 10A -

    ~ Fuse control, 2A -

    ~ Pilot lamp 220 VAC c/w : LED -

    ~ Busbar & accessories -

    1b Instalasi (wiring & diagram) 1.00 ls 1,000,000.00 1,000,000.00

    1c Peralatan & material bantu 1.00 ls 1,000,000.00 1,000,000.00

    Sub total A. 6,500,000.00

    B Instalasi & Fixtures -

    1 Lampu jalan (per 1 unit), total : 12 unit -

    Pole light CDMT 70W clear 1.00 bh 2,500,000.00 2,500,000.00

    Instalasi & material support 1.00 ls 500,000.00 500,000.00

    Harga 1 unit (1) 3,000,000.00

    Harga 6 unit (1) 15,000,000.00

    2 Pondasi & tiang lampu (per 1 unit), total : 12 unit

    Galian tanah 0.36 m 33,600.00 12,096.00

    Urug kembali & perataan tanah 0.36 m 16,200.00 5,832.00

    Pasir urug tebal 10 cm 0.02 m 226,400.00 4,075.20

    Lantai kerja tebal 5 cm 0.01 m 924,742.50 8,322.68

    Beton praktis 0.07 m 3,637,200.00 245,511.00

    Tiang H : 3 m, galvanized 3 & 2" 1.00 unit 1,000,000.00 1,000,000.00

    Besi angkur mur baut 16 mm, pjg = 50cm 4.00 bh 70,000.00 280,000.00

    Besi plat t : 20 & 8 mm 6.28 kg 16,500.00 103,620.00

    Pengelasan 6.28 kg 1,500.00 9,420.00

    Cat besi tiang (warna disamakan dgn rumah lampu) 47.50 kg 28,967.50 1,375,956.25

    Harga 1 unit (2) 3,044,833.13Harga 5 unit (2) 15,224,165.66

    3 Instalasi titik lampu NYFGbY 4 x 16 mm 277.00 m1 129,600.00 35,899,200.00

    termasuk GSP 2" untuk penyeberangan jalan

    Sub total B. 66,123,365.66

    Sub total section G.1.5. 102,847,531.33

    Page 37 of 62

  • 8/13/2019 RAB Pasar Parungpung

    38/62

    Kegiatan : Revitalisasi Pasar Parungpung Kabupaten Bogor

    Pekerjaan : Pembangunan Pasar dan Sarana Pendukungnya

    Lokasi : Parungpung - Kabupaten Bogor

    Tahun : 2012

    RENCANA ANGGARAN BIAYA (RAB)

    No. URAIAN PEKERJAAN VOLUMEHARGA SATUAN

    JUMLAH (Rp)

    Section G.1.6. Pekerjaan Keliling Pasar

    1 Pagar dengan Precas

    Galian tanah 36.96 m 33,600.00 1,241,856.00

    Urug tanah kembali & perataan 16.63 m 16,200.00 269,438.40

    Pasir urug 5.28 m 226,400.00 1,195,392.00

    Aanstamping batu belah 9.24 m 429,720.00 3,970,612.80

    Pondasi batu belah, 1 pc : 4 psr 17.82 m 716,250.00 12,763,575.00

    Panel precas kolom dan panel T= 240 cm 66.00 m1 275,000.00 18,150,000.00

    2 Portal pintu Gerbang 1.00 unit 1,000,000.00 1,000,000.00

    3 Pagar Besi pipa 3" sepanjang trotoar pintu masuk 150.00 m1 250,000.00 37,500,000.00

    Sub total section G.1.6. 76,090,874.20

    Section G.1.7. Pekerjaan Rumah Panel Induk 3 x 3

    A Pekerjaan Struktur

    1 Pekerjaan bouwplank 18.00 m 99,036.00 1,782,648.00

    2 Galian tanah pondasi 5.76 m 33,600.00 193,536.00

    3 Urug tanah kembali & perataan 4.75 m 16,200.00 76,982.40

    4 Pasir urug 0 .42 m 226,400.00 95,088.00

    5 Lantai kerja - m -

    6 Aanstamping batu belah 1.44 m 429,720.00 618,796.80

    7 Pondasi batu belah, 1pc : 4psr 2.88 m 716,250.00 2,062,800.00

    8 Tie beam praktis type TBG 0.36 m 5,422,755.63 1,952,192.03

    9 Kolom praktis 0.41 m 5,422,755.63 2,199,469.68

    10 Ring balok praktis 0.20 m 5,422,755.63 1,099,734.84

    11 Kuda-kuda baja ringan : 30.00 m 166,050.00 4,981,500.00

    ~ Pekerjaan rangka atap & reng (Zincalume) -

    ~ Rangka utama kuda-kuda (C.75.75 & C.75.100) -~ Tebal rangka : 0.75 mm & 1 mm -

    ~ Reng (U type), t : 0.45 mm -

    ~ Screw 12 - 14 x 20 -

    ~ Screw 10 - 16 x 16 -

    ~ Erection -

    B Pekerjaan Finishing -

    1 Dinding bata 1 pc : 2 psr (dibawah 0.00) 3.60 m 86,840.00 312,624.00

    2 Dinding bata 1 pc : 4 psr 24.00 m 73,650.00 1,767,600.00

    3 Plesteran kasar (berapen) 10.80 m 23,695.80 255,914.64

    4 Plesteran 1 pc : 4 psr 72.00 m 38,088.00 2,742,336.00

    5 Acian dinding 72.00 m 21,900.00 1,576,800.00

    6 Kusen : - -

    3.00 unit 650,000.00 1,950,000.00

    3.00 unit 650,000.00 1,950,000.00

    7 Plafond kalsiboard, t : 6.00 mm + rangka hollow 23.33 m 79,848.00 1,862,694.14

    - -

    Kusen Almunium + Daun pintu Double Triplek Finish Cat minyak

    Kusen Almunium + Daun jendela Frame Almunium lengkapkaca

    Page 38 of 62

  • 8/13/2019 RAB Pasar Parungpung

    39/62

    Kegiatan : Revitalisasi Pasar Parungpung Kabupaten Bogor

    Pekerjaan : Pembangunan Pasar dan Sarana Pendukungnya

    Lokasi : Parungpung - Kabupaten Bogor

    Tahun : 2012

    RENCANA ANGGARAN BIAYA (RAB)

    No. URAIAN PEKERJAAN VOLUMEHARGA SATUAN

    JUMLAH (Rp)

    8 Pekerjaan lantai : - -

    Lantai keramik 30 x 30 cm 9.00 m 95,713.00 861,417.00

    Plint keramik 10 x 40 cm 12.00 m 21,703.00 260,436.00

    9 Rabat beton : - -

    Pasangan bata 1 pc : 4 psr 4.50 m 73,650.00 331,425.00

    Plester kasar (berapen) 13.50 m 23,695.80 319,893.30

    Pasir urug, t : 10 cm 0.45 m 226,400.00 101,880.00

    Lantai kerja, t : 8 cm 4.00 m 924,742.50 3,698,970.00

    - -

    10 Penutup atap : - -

    Atap genteng metal 30.00 m 176,700.00 5,301,000.00

    Bubungan 21.00 m 120,000.00 2,520,000.00

    Lisplank (kalsiplank 8/200 mm) 22.40 m 85,000.00 1,904,000.00

    11 Pengecatan : - -

    Dinding & plafond interior (emulsi) 72.00 m 39,474.00 2,842,128.00 Dinding, plafond & listplank exterior (weathershield) 17.15 m 44,333.00 760,310.95

    12 Penerangan : - -

    TLD 1 x 18W, V-shafe type 2.00 bh 175,000.00 350,000.00

    Saklar seri rating 6A 1.00 bh 22,500.00 22,500.00

    Instalasi titik lampu 6A 2.00 ttk 100,000.00 200,000.00

    Sub total section G1.7. 46,954,676.79

    Page 39 of 62

  • 8/13/2019 RAB Pasar Parungpung

    40/62

    Kegiatan : Revitalisasi Pasar Parungpung Kabupaten

    Pekerjaan : Pembangunan Pasar dan Sarana Penduku

    Lokasi : Parungpung - Kabupaten Bogor

    Tahun : 2012

    HARGA

    SATUAN

    1 Pengukuran site /m

    Pekerja 0.0100 oh 50,000.00

    Tukang 0.0200 oh 65,000.00

    Peralatan 1.0000 m2 200.00

    2 Pembersihan site /m (RSNI T-12-2000, B.8)

    Pekerja 0.0150 oh 50,000.00

    Mandor 0.0020 oh 80,000.00

    3 Bouwplank /m (RSNI T-12-2000, B.4)

    Kayu 5/7 kelas III 0.0120 m 4,500,000.00 54,

    Paku 2 - 5 0.0200 kg 14,300.00

    Kayu papan 3/20 kelas III 0.0070 m 4,650,000.00 32,

    Pekerja 0.1000 oh 50,000.00

    Tukang kayu 0.1000 oh 65,000.00

    Kepala tukang 0.0100 oh 70,000.00

    Mandor 0.0050 oh 80,000.00

    4 Direksi keet (Kantor sementara) /m (RSNI T-12-2000, B.5)

    Dolken kayu 8 ~ 10 / 400 cm 1.2500 btng 20,940.00 26,

    Kayu balok kelas III 0.1800 m 4,650,000.00 837

    Paku biasa 0.8500 kg 14,300.00 12,

    Besi strip 1.1000 kg 7,850.00 8,

    Portlant cement 35.0000 kg 1,500.00 52,

    Pasir pasang 0.1500 m 210,000.00 31,

    Pasir beton 0.1000 m 250,000.00 25,

    Koral beton 0.1500 m 275,000.00 41,

    Bata merah kelas II 30.0000 bh 800.00 24,

    Seng plat 0.2500 lbr 25,000.00 6,

    Jendela nako 2.0000 bh 165,000.00 330

    Kaca polos 3 mm 0.0800 m 82,500.00 6,

    Kunci tanam 0.1500 bh 50,000.00 7,

    Triplex 4 mm 0.0600 lbr 52,600.00 3,

    Tukang kayu 1.0000 oh 65,000.00

    Tukang batu 0.5000 oh 65,000.00

    Pekerja 1.5000 oh 50,000.00

    Kepala tukang 0.1500 oh 70,000.00

    Mandor 0.0500 oh 80,000.00

    5 Gudang sementara /m (RSNI T-12-2000, B.6)

    Dolken kayu 8 ~ 10 / 400 cm 1.7000 btng 20,940.00 35,

    Kayu balok kelas III 0.2100 m 4,650,000.00 976

    Paku biasa 0.3000 kg 14,300.00 4,

    Portlant cement 10 5000 kg 1 500 00 15

    ANALISA HARGA SATUAN PEKERJAA

    NO. URAIAN PEKERJAAN Koep MATER

  • 8/13/2019 RAB Pasar Parungpung

    41/62

    HARGA

    SATUANNO. URAIAN PEKERJAAN Koep MATER

    6 Pembuatan bedeng buruh /m (RSNI T-12-2000, B.9)

    Dolken kayu 8 ~ 10 / 400 cm 1.2500 btng 20,940.00 26

    Kayu balok kelas III 0.1860 m 4,650,000.00 864

    Paku biasa 0.3000 kg 14,300.00 4

    Portlant cement 18.0000 kg 1,500.00 27

    Pasir beton 0.0300 m 250,000.00 7

    Koral beton 0.0500 m 275,000.00 13

    Seng gelombang BJLS 32 1.5000 lbr 65,000.00 97

    Triplex 4 mm 1.3500 lbr 52,600.00 71

    Tukang kayu 1.0000 oh 65,000.00

    Pekerja 0.5000 oh 50,000.00

    Kepala tukang 1.5000 oh 70,000.00

    Mandor 0.1500 oh 80,000.00

    7 Pagar sementara dari seng gelombang t : 200 cm /m (RSNI T-12-2000, B.2)

    Dolken kayu 8 ~ 10 / 400 cm 1.2500 btng 20,940.00 26

    Kayu balok kelas III 0.0720 m 4,650,000.00 334

    Paku biasa 0.0600 kg 14,300.00

    Portlant cement 2.5000 kg 1,500.00 3

    Seng gelombang BJLS 32 1.2000 lbr 65,000.00 78

    Pasir beton 0.0050 m 250,000.00 1

    Koral beton 0.0090 m 275,000.00 2

    Meni biasa 0.4500 kg 43,500.00 19

    Tukang kayu 0.2000 oh 65,000.00

    Pekerja 0.4000 oh 50,000.00

    Kepala tukang 0.0200 oh 70,000.00

    Mandor 0.0200 oh 80,000.00

    8 Galian tanah biasa kedalaman 1-2 m /m (SNI DT 91-0006-2007, 6.2)

    Pekerja 0.6000 oh 50,000.00

    Mandor 0.0450 oh 80,000.00

    9 Urug tanah kembali & perataan /m (Revisi SNI 03-2835-2002, 6.9)

    Pekerja 0.3000 oh 50,000.00

    Mandor 0.0150 oh 80,000.00

    10 Urug tanah & pemadatan (tanah ex luar site) / m

    Tanah urug (ex luar) 1.2000 m 40,000.00 48

    Pekerja 0.3000 oh 50,000.00

    Mandor 0.0100 oh 80,000.00

    Alat bantu & material support 1.0000 ls 10,000.00 10

    11 Urugan pasir /m (SNI DT 91-0006-2007, 6.11)

    Pasir urug 1.2000 m 175,500.00 210

    Pekerja 0.3000 oh 50,000.00

    Mandor 0.0100 oh 80,000.00

    12 Lantai kerja 1pc : 3psr : 5krl /m (Revisi SNI T-13-2002, 6.4)

    Portlant cement 230.0000 kg 1,500.00 345

    Pasir beton 0.7654 m 250,000.00 191

    Koral beton (maksimum 30 mm) 0 7607 m 275 000 00 209

  • 8/13/2019 RAB Pasar Parungpung

    42/62

    HARGA

    SATUANNO. URAIAN PEKERJAAN Koep MATE

    13 Bekisting untuk sloof /m (SNI DT 91-0008-2007, 6.21)

    Kayu kelas III 0.0450 m 4,500,000.00 20

    Paku 5 - 10 0.3000 kg 14,300.00 4

    Minyak bekisting 0.1000 ltr 35,000.00

    Pekerja 0.5200 oh 50,000.00 Tukang kayu 0.2600 oh 65,000.00

    Kepala tukang 0.0260 oh 70,000.00

    Mandor 0.0260 oh 80,000.00

    14 Bekisting untuk kolom /m (SNI DT 91-0008-2007, 6.22)

    Kayu kelas III 0.0400 m 4,500,000.00 18

    Paku 5 - 10 0.4000 kg 14,300.00

    Minyak bekisting 0.2000 ltr 35,000.00

    Balok kayu kelas II 0.0150 m 5,500,000.00 8

    Multipleks tebal 9 mm 0.3500 lbr 98,900.00 34

    Dolken kayu galam 8 ~ 10 / 400 cm 2.0000 btng 20,940.00 4

    Pekerja 0.6600 oh 50,000.00

    Tukang kayu 0.3300 oh 65,000.00

    Kepala tukang 0.0330 oh 70,000.00

    Mandor 0.0330 oh 80,000.00

    15 Bekisting untuk balok /m (SNI DT 91-0008-2007, 6.23)

    Kayu kelas III 0.0400 m 4,500,000.00 18

    Paku 5 - 10 0.4000 kg 14,300.00

    Minyak bekisting 0.2000 ltr 35,000.00

    Balok kayu kelas II 0.0180 m 5,500,000.00 9

    Multipleks tebal 9 mm 0.3500 lbr 98,900.00 34

    Dolken kayu galam 8 ~ 10 / 400 cm 2.0000 btng 20,940.00 4

    Pekerja 0.6600 oh 50,000.00

    Tukang kayu 0.3300 oh 65,000.00

    Kepala tukang 0.0330 oh 70,000.00

    Mandor 0.0330 oh 80,000.00

    16 Bekisting untuk lantai /m (SNI DT 91-0008-2007, 6.24)

    Kayu kelas III 0.0400 m 4,500,000.00 18

    Paku 5 - 10 0.4000 kg 14,300.00

    Minyak bekisting 0.2000 ltr 35,000.00

    Balok kayu kelas II 0.0150 m 5,500,000.00 8

    Multipleks tebal 9 mm 0.3500 lbr 98,900.00 34

    Dolken kayu galam 8 ~ 10 / 400 cm 6.0000 btng 20,940.00 12

    Pekerja 0.4400 oh 50,000.00

    Tukang kayu 0.3300 oh 65,000.00

    Kepala tukang 0.0330 oh 70,000.00

    Mandor 0.0330 oh 80,000.00

    17 Bekisting untuk dinding /m (SNI DT 91-0008-2007, 6.25)

    Kayu kelas III 0.0300 m 4,500,000.00 13

    Paku 5 - 12 0.4000 kg 14,300.00

    Minyak bekisting 0.2000 ltr 35,000.00

    Balok kayu kelas II 0.0200 m 5,500,000.00 11

    Multipleks tebal 9 mm 0.3500 lbr 98,900.00 34

  • 8/13/2019 RAB Pasar Parungpung

    43/62

    HARGA

    SATUANNO. URAIAN PEKERJAAN Koep MATER

    18 Bekisting untuk tangga /m (SNI DT 91-0008-2007, 6.26)

    Kayu kelas III 0.0300 m 4,500,000.00 135

    Paku 5 - 10 0.4000 kg 14,300.00 5

    Minyak bekisting 0.1500 ltr 35,000.00 5

    Balok kayu kelas II 0.0150 m 5,500,000.00 82

    Multipleks tebal 9 mm 0.3500 lbr 98,900.00 34

    Dolken kayu galam 8 ~ 10 / 400 cm 2.0000 btng 20,940.00 41

    Pekerja 0.6600 oh 50,000.00

    Tukang kayu 0.3300 oh 65,000.00

    Kepala tukang 0.0330 oh 70,000.00

    Mandor 0.0330 oh 80,000.00

    19 Bekisting pasangan bata 1pc : 4psr /m

    Bata merah kelas II 70.0000 bh 800.00 56

    Portland cement 20.9600 kg 1,500.00 31

    Pasir pasang 0.0470 m 210,000.00 9

    Pekerja 0.4290 oh 50,000.00

    Tukang batu 0.2140 oh 65,000.00

    Kepala tukang batu 0.0210 oh 70,000.00

    Mandor 0.0110 oh 80,000.00

    20 Bekisting untuk beton praktis /m

    Kayu papan Kls III (2xpakai) 50% 0.0170 m 4,500,000.00 76

    Multiplex 9 mm (2xpakai) 75% 0.3470 lbr 98,900.00 34

    Paku 0.4000 kg 14,300.00 5

    Pekerja 0.1200 oh 50,000.00

    Tukang kayu 0.1500 oh 65,000.00

    Kepala tukang 0.1500 oh 70,000.00

    Mandor 0.0500 oh 80,000.00

    Bongkar bekisting 0.1200 oh 75,000.00

    21 Besi beton polos & ulir / 10 kg (SNI DT 91-0008-2007, 6.17)

    Besi beton 10.5000 kg 15,880.00 166

    Kawat beton 0.1500 kg 22,000.00 3

    Pekerja 0.7000 oh 50,000.00

    Tukang besi terampil 0.0700 oh 65,000.00

    Kepala tukang 0.0070 oh 70,000.00

    Mandor 0.0040 oh 80,000.00

    22 Besi WF, Plat / 10 kg (SNI DT 91-0008-2007, 6.17)

    Besi plat 10.5000 kg 15,200.00 159

    Pekerja 0.7000 oh 50,000.00

    Tukang terampil 0.0700 oh 65,000.00

    Kepala tukang 0.0070 oh 70,000.00

    Mandor 0.0040 oh 80,000.00

    23 Konstruksi baja & channel / kg (SNI DT 91-0014-2007, 6.1)

    Baja 1.1000 kg 15,200.00 16

    Pekerja 0.0300 oh 50,000.00

    T k l 0 0300 h 65 000 00

  • 8/13/2019 RAB Pasar Parungpung

    44/62

    HARGA

    SATUANNO. URAIAN PEKERJAAN Koep MATER

    24 Perakitan / Erection baja / 100 kg (SNI DT 91-0014-2007, 6.3)

    Solar 1.0000 ltr 6,000.00 6

    Minyak pelumas 0.1000 ltr 35,000.00 3

    Sewa alat 0.0080 jam 1,050,000.00 8

    Pekerja 0.1000 oh 50,000.00 Tukang besi 0.1000 oh 65,000.00

    Kepala tukang 0.0010 oh 70,000.00

    Mandor 0.0050 oh 80,000.00

    25 Pengelasan / 10 cm (SNI DT 91-0014-2007, 6.5)

    Kawat las listrik 0.4000 kg 23,650.00 9

    Solar 0.3000 ltr 6,000.00 1

    Minyak pelumas 0.0400 ltr 35,000.00 1

    Sewa alat 0.1700 jam 1,050,000.00 178

    Pekerja 0.0400 oh 50,000.00

    Tukang besi 0.0200 oh 65,000.00

    Kepala tukang 0.0020 oh 70,000.00

    Mandor 0.0020 oh 80,000.00

    26 Beton site mix K-175 / m (SNI DT 91-0014-2007, 6.5)

    Portland cement 326.0000 kg 1,500.00 489

    Pasir beton 0.5428 m 250,000.00 135

    Kerikil (batu pecah) 0.7622 m 275,000.00 209

    Air 215.0000 ltr 500.00 107

    Pekerja 1.6500 oh 50,000.00

    Tukang batu 0.2750 oh 65,000.00

    Kepala tukang 0.0280 oh 70,000.00

    Mandor 0.0830 oh 80,000.00

    27 Beton site mix K-225 / m (SNI DT 91-0014-2007, 6.7)

    Portland cement 371.0000 kg 1,500.00 556

    Pasir beton 0.4986 m 250,000.00 124

    Kerikil (batu pecah) 0.7756 m 275,000.00 213

    Air 215.0000 ltr 500.00 107

    Pekerja 1.6500 oh 50,000.00

    Tukang batu 0.2750 oh 65,000.00

    Kepala tukang 0.0280 oh 70,000.00

    Mandor 0.0830 oh 80,000.00

    28 Beton site mix K-250 / m (SNI DT 91-0014-2007, 6.8)

    Portland cement 384.0000 kg 1,500.00 576

    Pasir beton 0.5931 m 250,000.00 148

    Kerikil (batu pecah) 0.7696 m 275,000.00 211

    Air 215.0000 ltr 500.00 107

    Pekerja 1.6500 oh 50,000.00

    Tukang batu 0.2750 oh 65,000.00

    Kepala tukang 0.0280 oh 70,000.00

    Mandor 0.0830 oh 80,000.00

    29 B t d i K 250 /

  • 8/13/2019 RAB Pasar Parungpung

    45/62

    HARGA

    SATUANNO. URAIAN PEKERJAAN Koep MATER

    30 Kolom, sloof & balok praktis / m

    Beton site mix K - 175 1.0000 m 673,950.00 673

    Besi 125.0000 kg 15,880.00 1,985

    Bekisting praktis 13.0000 m 75,250.00 978

    31 Aanstamping batu belah / m (SNI DT 91-0007-2007, 6.9)

    Batu belah 15 - 20 cm 1.0500 m 256,000.00 268

    Pasir pasang 0.4320 m 210,000.00 90

    Pekerja 0.7800 oh 50,000.00

    Tukang batu 0.3900 oh 65,000.00

    Kepala tukang 0.0390 oh 70,000.00

    Mandor 0.0390 oh 80,000.00

    32 Pondasi batu belah, 1pc : 4psr / m (SNI DT 91-0007-2007, 6.2)

    Batu belah 15 - 20 cm 1.0500 m 256,000.00 268

    Portlant cement 163.0000 kg 1,500.00 244

    Pasir pasang 0.5200 m 210,000.00 109

    Pekerja 1.0000 oh 50,000.00

    Tukang batu 0.5000 oh 65,000.00

    Kepala tukang 0.0750 oh 70,000.00

    Mandor 0.0750 oh 80,000.00

    33 Pondasi type P1 /m

    Beton ready mix K-250 1.0000 m 954,800.00 954

    Besi 146.4440 kg 15,880.00 2,325

    Bekisting pas. Batako 2.1053 m 135,020.00 284

    34 Pondasi type P2 /m

    Beton ready mix K-250 1.0000 m 954,800.00 954

    Besi 150.5388 kg 15,880.00 2,390

    Bekisting pas. Batako 2.3529 m 135,020.00 317

    35 Pondasi type P3 /m

    Beton ready mix K-250 1.0000 m 954,800.00 954

    Besi 144.0780 kg 15,880.00 2,287

    Bekisting pas. Batako 2.6667 m 135,020.00 360

    36 Pondasi type P5 /m

    Beton ready mix K-250 1.0000 m 954,800.00 954

    Besi 165.3686 kg 15,880.00 2,626

    Bekisting pas. Batako 3.6364 m 135,020.00 490

    37 Pondasi telapak type P6 / m

    Beton ready mix K-250 1.0000 m 954,800.00 954

    Besi 184 0427 kg 15 880 00 2 922

  • 8/13/2019 RAB Pasar Parungpung

    46/62

    HARGA

    SATUANNO. URAIAN PEKERJAAN Koep MATER

    40 Tie Beam type TB3 /m

    Beton ready mix K-250 1.0000 m 954,800.00 954

    Besi 135.0559 kg 15,880.00 2,144

    Bekisting pas. Batako 14.2857 m 92,800.00 1,325

    41 Kolom type K1 /m

    Beton ready mix K-250 1.0000 m 954,800.00 954

    Besi 194.2369 kg 15,880.00 3,084

    Bekisting struktur kolom 13.0000 m 92,800.00 1,206

    42 Kolom type K2 /m

    Beton ready mix K-250 1.0000 m 954,800.00 954

    Besi 176.5077 kg 15,880.00 2,802

    Bekisting struktur kolom 15.0000 m 136,400.00 2,046

    43 Kolom type K3 /m

    Beton ready mix K-250 1.0000 m 954,800.00 954

    Besi 149.5493 kg 15,880.00 2,374

    Bekisting struktur kolom 14.0000 m 136,400.00 1,909

    44 Kolom type K4 /m

    Beton ready mix K-250 1.0000 m 954,800.00 954

    Besi 191.5167 kg 15,880.00 3,041

    Bekisting struktur kolom 17.5000 m 136,400.00 2,387

    45 Kolom type 15x25cm/m1

    Beton Site mix K-175 1.0000 m 673,950.00 673

    Besi 147.2769 kg 15,880.00 2,338

    Bekisting struktur kolom 21.6000 m 136,400.00 2,946

    46 Balok type B1 & B1A /m

    Beton ready mix K-250 1.0000 m 954,800.00 954

    Besi 120.7851 kg 15,880.00 1,918

    Bekisting struktur balok 8.4848 m 136,400.00 1,157

    47 Balok type B2 /m

    Beton ready mix K-250 1.0000 m 954,800.00 954

    Besi 93.5786 kg 15,880.00 1,486

    Bekisting struktur balok 8.4848 m 136,400.00 1,157

    48 Balok type B3 /m

    Beton ready mix K-250 1.0000 m 954,800.00 954

    Besi 89.5480 kg 15,880.00 1,422

    Bekisting struktur balok 8.4848 m 136,400.00 1,157

    49 Balok type B4 /m

    B t d i K 250 1 0000 954 800 00 954

  • 8/13/2019 RAB Pasar Parungpung

    47/62

    HARGA

    SATUANNO. URAIAN PEKERJAAN Koep MATERI

    51 Balok type B6 /m

    Beton ready mix K-250 1.0000 m 954,800.00 954,8

    Besi 133.5503 kg 15,880.00 2,120,7

    Bekisting struktur balok 9.8182 m 136,400.00 1,339,2

    52 Ring Balok type RB1 /m

    Beton ready mix K-250 1.0000 m 954,800.00 954,8

    Besi 205.3298 kg 15,880.00 3,260,6

    Bekisting struktur balok 15.0000 m 136,400.00 2,046,0

    53 Ring Balok type RB2 /m

    Beton ready mix K-250 1.0000 m 954,800.00 954,8

    Besi 158.1426 kg 15,880.00 2,511,3

    Bekisting struktur balok 17.1429 m 136,400.00 2,338,2

    54 Ring Balok type RB3 15x25cm/m1

    Beton Site mix K-175 1.0000 m 1,050,780.00 1,050,7

    Besi 147.2769 kg 15,880.00 2,338,7

    Bekisting struktur balok 17.5500 m 136,400.00 2,393,8

    55 Kolom & Ring Balok Paraktis /m1

    Beton Site mix K-175 1.0000 m 673,950.00 673,9

    Besi 166.6035 kg 15,880.00 2,645,6

    Bekisting praktis 13.5000 m 155,788.30 2,103,1

    56 Plat beton, t : 12 cm /m

    Beton ready mix K-250 1.0000 m 954,800.00 954,8

    wiremesh M6double 13.3400 m2 45,369.40 605,2

    Bekisting struktur plat 8.3333 m 155,788.30 1,298,2

    57 Plat beton atap, t : 10 cm /m

    Beton ready mix K-250 1.0000 m 954,800.00 954,8

    wiremesh M6 single 6.6700 kg 45,369.40 302,6

    Bekisting struktur plat 8.3330 m 155,788.30 1,298,1

    58 Plat lantai dasar t : 15 cm /m

    Beton site mix K-175 1.0000 m 673,950.00 673,9

    kg 45,369.40

    59 Plat bordes, plat & anak tangga /m

    Beton ready mix K-250 1.0000 m 954,800.00 954,8

    Besi 135.0000 kg 15,880.00 2,143,8

    Bekisting struktur tangga 6.1700 m 136,400.00 841,5

    Sarana Luar

  • 8/13/2019 RAB Pasar Parungpung

    48/62

    HARGA

    SATUANNO. URAIAN PEKERJAAN Koep MATE

    61 Lapisan batu 5/7 & 2/3 cm, tebal = 15 cm / m

    Batu pecah 5/7 & 2/3 cm 0.1800 m 200,000.00 3

    Peralatan bantu 1.0000 ls 7,500.00

    Pekerja 0.2500 oh 50,000.00

    Mandor 0.0100 oh 80,000.00

    62 Paving block /m

    Paving block, t : 8 cm (type true pave) 1.0000 m2 70,000.00 7

    Pasir beton 0.0500 m 190,000.00

    Peralatan 1.0000 ls 10,000.00 1

    Pekerja 0.2500 oh 50,000.00

    Tukang batu 0.5000 oh 65,000.00

    Kepala tukang batu 0.0250 oh 70,000.00

    Mandor 0.0030 oh 80,000.00

    63 Kansteen / m (Beton K-300)

    Kansteen (28 x 15 x 60) cm 1.2500 pcs 60,000.00 7

    urugan pasir pasang 0.0180 m3 210,000.00

    adukan 0.0150 m3 350,000.00

    semen 0.1000 zak 59,000.00

    Pekerja 0.1000 oh 50,000.00

    Mandor 0.0050 oh 80,000.00

    64 Saluaran 40 x 40 cm Dari Pasangan bata

    Galian tanah 0.3600 m 33,600.00 1

    Urug tanah kembali & perataan 0.3600 m 16,200.00 Pasir urug 0.0060 m 175,500.00

    Pasangan 1 bata 1pc : 2psr 1.0000 m 286,850.00 28

    Plesteran & adukan kemiringan 1pc : 2psr 2.3000 m 46,536.00 10

    Acian 2.3000 m 22,875.00 5

    Lantai kerja t= 10 cm (Site Mix K 175) 0.0400 m3 748,437.00 2

    Pipa PVC 1" (tekanan nominal 5 BAR) 0.3000 m 15,750.00

    65 Pipa 3" /m

    Galian tanah 0.2100 m 33,600.00

    Urug tanah kembali & perataan 0.2100 m 16,200.00

    Pasir urug 0.0250 m 175,500.00 Pipa PVC (5 BAR) 3" (75 mm) 1.0000 m 62,725.00 6

    Pasangan bata setiap 20 cm, 1pc : 4psr 0.0437 m 286,850.00 1

    66 Pipa 4" /m

    Galian tanah 0.2400 m 33,600.00

    Urug tanah kembali & perataan 0.2400 m 16,200.00

    Pasir urug 0.0300 m 175,500.00

    Pipa PVC (5 BAR) 4" (100 mm) 1.0000 m 82,550.00 8

    Pasangan bata setiap 20 cm, 1pc : 4psr 0.0750 m 286,850.00 2

    67 Buis beton 40 cm /m

    Galian tanah 0.6500 m 33,600.00 2

  • 8/13/2019 RAB Pasar Parungpung

    49/62

    HARGA

    SATUANNO. URAIAN PEKERJAAN Koep MATE

    69 Buis beton 80 cm /m

    Galian tanah 1.1000 m 33,600.00 36

    Urug tanah kembali & perataan 1.1000 m 16,200.00 17

    Pasir urug 0.0400 m 175,500.00 7 Buis beton 30 cm (dengan Tulang) 1.0500 m 56,100.00 58

    Pasangan bata setiap 20 cm, 1pc : 4psr 0.1255 m 286,850.00 35

    70 Plat Beton penutup Saluran / unit (ukuran 20 x 120 x 100 cm)

    Beton site mix K-225 0.0240 m 780,000.00 18

    Besi beton 2.2800 kg 14,800.00 33

    Bekisting praktis 0.4880 m 155,788.30 76

    Upah pemasangan 1.0000 bh 90,000.00 90

    71 Saluran beton / m (ukuran 80 x 80 cm)

    Galian tanah 1.2000 m 33,600.00 40

    Urug tanah kembali & perataan 0.2400 m 16,200.00 3

    Pasir urug 0.1000 m 175,500.00 17

    Lantai kerja t= 5 cm 0.0500 m 924,742.50 46

    Saluran precas ukuran 80 x 80 cm 1.0000 m1 300,000.00 300

    Upah pasang 1.0000 m1 50,000.00 50

    Alat Bantu 1.0000 oh 10,000.00 10

    Plesteran sambungan 1.0000 oh 45,000.00 45

    72 Saluran beton / m (ukuran 100 x 100 cm) Galian tanah 1.4760 m 33,600.00 49

    Urug tanah kembali & perataan 1.4760 m 16,200.00 23

    Pasir urug 0.0900 m 175,500.00 15

    Lantai kerja t= 5 cm 0.0400 m 924,742.50 36

    Saluran precas ukuran 100 x 100 cm 1.0000 m1 500,000.00 500

    Upah pasang 1.0000 m1 50,000.00 50

    Alat Bantu 1.0000 oh 10,000.00 10

    Plesteran sambungan 1.0000 oh 45,000.00 45

    73 Saluran beton / m (ukuran120 x 120 cm)

    Galian tanah 1.4760 m 33,600.00 49

    Urug tanah kembali & perataan 1.4760 m 16,200.00 23

    Pasir urug 0.0900 m 175,500.00 15

    Lantai kerja t= 5 cm 0.0400 m 924,742.50 36

    Saluran precas ukuran 120 x 120 cm 1.0000 m1 556,000.00 556

    Upah pasang 1.0000 m1 50,000.00 50

    Alat Bantu 1.0000 oh 10,000.00 10

    Plesteran sambungan 1.0000 oh 45,000.00 45

    74 Bak kontrol type CB1 /unit (ke dalaman rata-rata : 65 cm)

    Galian tanah 1.0890 m 33,600.00 36

    Urug tanah kembali & perataan 1.0890 m 16,200.00 17

    Pasir urug 0.0640 m 175,500.00 1

    Lantai kerja 0.0245 m 924,742.50 22

  • 8/13/2019 RAB Pasar Parungpung

    50/62

    HARGA

    SATUANNO. URAIAN PEKERJAAN Koep MATE

    75 Bak kontrol type CB2 /unit (ke dalaman rata-rata : 70 cm)

    Galian tanah 1.6900 m 33,600.00 5

    Urug tanah kembali & perataan 1.6900 m 16,200.00 2

    Pasir urug 0.0810 m 175,500.00 1 Lantai kerja 0.0320 m 924,742.50 2

    Beton site mix K-225 0.3205 m 780,000.00 24

    Besi beton 34.9715 kg 14,800.00 51

    Bekisting praktis 3.5000 m 155,788.30 54

    Plesteran kemiringan 1pc : 4psr 0.1600 m 90,000.00 1

    Handle besi 12 mm 1.0000 bh 12,500.00 1

    76 Resapan air BR1 /unit

    Galian tanah 6.2690 m 33,600.00 21

    Urug tanah kembali & perataan 6.2690 m 16,200.00 10

    Pasir urug 0.0957 m 175,500.00 1

    Buis beton 100 cm 1.5000 m 830,000.00 1,24

    Beton praktis penutup 0.1130 m 1,110,895.63 12

    Batu kali 0.1962 m 716,250.00 14

    Sirtu 0.1177 m 187,000.00 2

    Lapisan ijuk 0.0785 m 264,000.00 2

    Handle besi 16 mm 4.0000 bh 20,000.00 8

    77 Resapan air BR2 /unit

    Galian tanah 2.5387 m 33,600.00 8

    Urug tanah kembali & perataan 2.5387 m 16,200.00 4

    Pasir urug 0.0392 m 175,500.00

    Buis beton 60 cm 1.5000 m 129,150.00 19 Beton praktis penutup 0.0502 m 1,110,895.63 5

    Batu kali 0.0706 m 716,250.00 5

    Sirtu 0.0424 m 187,000.00

    Lapisan ijuk 0.0283 m 264,000.00

    Handle besi 16 mm 2.0000 bh 20,000.00 4

    78 Bak Resapan kapasitas : 16 m /unit (air kotor)

    Galian tanah 28.4800 m 33,600.00 95

    Urug tanah kembali & perataan 28.4800 m 16,200.00 46

    Pasir urug 0.6720 m 175,500.00 11

    Pondasi batu belah, 1 pc : 4 psr 2.6800 m 525,520.00 1,40

    Besi beton 568.7640 kg 14,800.00 8,41

    Bekesting struktur dinding (sisi dalam) 16.0000 m 136,400.00 2,18

    Bekesting struktur plat 4.0000 m 136,400.00 54

    Bekesting praktis (sisi luar) 17.6000 m 136,400.00 2,40

    Beton site mix K-225 4.8800 m 780,000.00 3,80

    Batu koral 6.0000 m 170,500.00 1,02

    Besi siku L.100.100.10 169.1200 kg 12,500.00 2,11

    Zinkchromate 4.4800 m 40,370.00 18

    Handle besi 16 mm 2.0000 bh 20,000.00 4

    79 Bak kontrol 60 x 60 cm /unit, ke dalaman rata-rata : 95 cm (air kotor)

    Galian tanah 0.9700 m 33,600.00 3

    Urug tanah kembali & perataan 0.9700 m 16,200.00 1

    Pasir urug 0 0900 m 175 500 00 1

  • 8/13/2019 RAB Pasar Parungpung

    51/62

    HARGA

    SATUANNO. URAIAN PEKERJAAN Koep MATER

    80 Bak kontrol 60 x 80 cm /unit, ke dalaman rata-rata : 135 cm (air kotor)

    Galian tanah 1.9800 m 33,600.00 66

    Urug tanah kembali & perataan 1.9800 m 16,200.00 32

    Pasir urug 0.1200 m 175,500.00 21

    Lantai kerja 0.0600 m 924,742.50 55

    Beton site mix K-225 0.8850 m 780,000.00 690

    Besi beton 83.7900 kg 15,880.00 1,330

    Bekisting praktis 3.7800 m 145,000.00 548

    Plesteran kemiringan 1pc : 4psr 0.4800 m 38,088.00 18

    Besi siku 50.50.5 & 40.40.4 mm 23.1040 kg 12,500.00 288

    Zinkchromate 1.1520 m 30,000.00 34

    Handle besi 16 mm 1.0000 bh 20,000.00 20

    81 Pondasi telapak type TPM / m (Tower air)

    Beton site mix K-175 1.0000 m 673,950.00 673

    Besi 129.5415 kg 15,880.00 2,057

    Bekisting pasangan bata, 1pc : 4psr 11.7752 m 92,800.00 1,092

    82 Tie beam type TBM / m (Tower air)

    Beton site mix K-175 1.0000 m 673,950.00 673

    Besi 195.0000 kg 15,880.00 3,096

    Bekisting pasangan batako, 1pc : 4psr 19.2513 m 92,800.00 1,786

    83 Tie beam 15/20 cm / m (Pagar)

    Beton site mix K-175 1.0000 m 673,950.00 673

    Besi 120.0000 kg 15,880.00 1,905

    Bekisting praktis 13.3333 m 145,000.00 1,933

    84 Kolom & balok 15/15 cm / m (Pagar)

    Beton site mix K-175 1.0000 m 673,950.00 673

    Besi 165.0000 kg 15,880.00 2,620

    Bekisting praktis 13.3593 m 145,000.00 1,937

    85 Wire Mess M6 /m2

    Besi Wire Mess M6 (210 x 510) cm 1.0100 m2 45,369.40 45

    Kawat beton 0.0500 kg 22,000.00 1

    Alat Bantu 1.0000 ls 10,000.00 10

    Pekerja 0.1000 oh 50,000.00 5

    Tukang besi terampil 0.0750 oh 65,000.00 4

    Kepala tukang oh 70,000.00

    Mandor 0.0100 oh 80,000.00

    86 Pasangan 1 bata 1pc : 2pp /m (SNI DT 91-0009-2007, 6.1) Bata merah 140.0000 bh 1,200.00 168

    Portland cement 43.5000 kg 1,500.00 65

    Pasir pasang 0.0800 m 210,000.00 16

    Pekerja 0.4000 oh 50,000.00

    Tukang batu 0.2000 oh 65,000.00

    Kepala tukang batu 0.0200 oh 70,000.00 Mandor 0.0300 oh 80,000.00

  • 8/13/2019 RAB Pasar Parungpung

    52/62

    HARGA

    SATUANNO. URAIAN PEKERJAAN Koep MATER

    88 Pasangan bata 1pc : 2pp /m (SNI DT 91-0009-2007, 6.7) Bata merah 70.0000 bh 500.00 35

    Portland cement 18.9500 kg 1,200.00 22

    Pasir pasang 0.0380 m 150,000.00 5

    Pekerja 0.3000 oh 50,000.00

    Tukang batu 0.1000 oh 65,000.00 Kepala tukang batu 0.0100 oh 70,000.00

    Mandor 0.0150 oh 80,000.00

    89 Pasangan bata 1pc : 4pp /m (SNI DT 91-0009-2007, 6.9) Bata merah 70.0000 bh 500.00 35

    Portland cement 11.5000 kg 1,200.00 13

    Pasir pasang 0.0430 m 150,000.00 6

    Pekerja 0.2000 oh 50,000.00

    Tukang batu 0.1000 oh 65,000.00

    Kepala tukang batu 0.0100 oh 70,000.00

    Mandor 0.0150 oh 80,000.00

    90 Plesteran, t : 15 mm 1pc : 2pp /m (SNI DT 91-0010-2007, 6.2) Portland cement 10.2240 kg 1,500.00 15

    Pasir pasang 0.0200 m 210,000.00 4

    Pekerja 0.3000 oh 50,000.00

    Tukang batu 0.1500 oh 65,000.00

    Kepala tukang batu 0.0150 oh 70,000.00

    Mandor 0.0150 oh 80,000.00

    91 Plesteran, t : 15 mm 1pc : 4pp /m (SNI DT 91-0010-2007, 6.4) Portland cement 6.2400 kg 1,200.00 7

    Pasir pasang 0.0240 m 150,000.00 3

    Pekerja 0.3000 oh 50,000.00

    Tukang batu 0.1500 oh 65,000.00

    Kepala tukang batu 0.0150 oh 70,000.00 Mandor 0.0150 oh 80,000.00

    92 Acian /m (SNI DT 91-0010-2007, 6.27) Portlant cement 3.2500 kg 1,200.00 3

    Pekerja 0.2000 oh 50,000.00

    Tukang batu 0.1000 oh 65,000.00

    Kepala tukang batu 0.0100 oh 70,000.00

    Mandor 0.0100 oh 80,000.00

    93 Berapen, t : 15 mm 1pc : 5pp /m (SNI DT 91-0010-2007, 6.19) Portlant cement 5.1840 kg 1,200.00 6

    Pasir pasang 0.0260 m 150,000.00 3 Pekerja 0.1500 oh 50,000.00

    Tukang batu 0.0750 oh 65,000.00

    Kepala tukang batu 0.0080 oh 70,000.00

    Mandor 0.0080 oh 80,000.00

    94 Plafond gypsum + rangka hollow / m (SNI DT 91-0013-2007, 6.7) Gypsum, t : 9 mm 0.3640 lbr 55,000.00 20

    Compound (tidak termasuk dlm analisa) 0.8500 kg 2,000.00 1

    Rangka hollow (tidak termasuk dlm analisa) 1.5000 btg 25,000.00 37

    Paku skrup 0.1100 kg 12,000.00 1

    Pekerja 0.2000 oh 50,000.00

    Tukang kayu 0.1000 oh 65,000.00

    Kepala tukang kayu 0.0500 oh 70,000.00

    Mandor 0.0050 oh 80,000.00

  • 8/13/2019 RAB Pasar Parungpung

    53/62

    HARGA

    SATUANNO. URAIAN PEKERJAAN Koep MATE

    96 List plafond gypsum 2 x 5 cm / m List gypsum 1.0500 m 6,000.00

    Paku 0.0100 kg 12,000.00

    Pekerja 0.0500 oh 50,000.00

    Tukang kayu 0.0500 oh 65,000.00

    Kepala tukang kayu 0.0050 oh 70,000.00 Mandor 0.0030 oh 80,000.00

    97 Lantai keramik 40 x 40 cm /m Keramik 40 x 40 cm 1.0000 m2 75,000.00 7

    Portland cement 9.8000 kg 1,200.00 1

    Pasir pasang 0.0450 m 210,000.00

    Semen putih 1.3000 kg 3,000.00

    Pekerja 0.2500 oh 50,000.00

    Tukang batu 0.1250 oh 65,000.00

    Kepala tukang 0.0130 oh 70,000.00

    Mandor 0.0130 oh 80,000.00

    98 Lantai keramik 40 x 40 cm (Texture) /m Keramik 40 x 40 cm (texture) 1.0000 m2 85,000.00 8

    Portland cement 9.8000 kg 1,200.00 1

    Pasir pasang 0.0450 m 210,000.00

    Semen putih 1.3000 kg 3,000.00

    Pekerja 0.2500 oh 50,000.00

    Tukang batu 0.1250 oh 65,000.00

    Kepala tukang 0.0130 oh 70,000.00

    Mandor 0.0130 oh 80,000.00

    99 Lantai keramik 30 x 30cm /m Keramik 1.000 m2 49,000.00 4

    Portland cement 8.1900 kg 1,200.00

    Pasir pasang 0.0450 m 210,000.00

    Semen putih 1.6200 kg 3,000.00

    Pekerja 0.2500 oh 50,000.00

    Tukang batu 0.1250 oh 65,000.00

    Kepala tukang batu 0.0130 oh 70,000.00

    Mandor 0.0130 oh 80,000.00

    100 Lantai keramik 20 x 20cm /m

    Keramik 1.000 m2 45,000.00 4

    Portland cement 8.1900 kg 1,200.00

    Pasir pasang 0.0450 m 210,000.00

    Semen putih 1.6200 kg 3,000.00

    Pekerja 0.2500 oh 50,000.00

    Tukang batu 0.1250 oh 65,000.00

    Kepala tukang batu 0.0130 oh 70,000.00 Mandor 0.0130 oh 80,000.00

    101 Dinding keramik 20 x 25 cm /m Keramik 1.0000 m2 53,000.00 5

    Portland cement 9.3000 kg 1,200.00 1

    Pasir pasang 0.0180 m 210,000.00

    Semen putih 1.9400 kg 3,000.00

    Pekerja 0.4500 oh 50,000.00

    Tukang batu 0.2500 oh 65,000.00

    Kepala tukang 0.0450 oh 70,000.00

    Mandor 0.0450 oh 80,000.00

    102 Dinding keramik 40 x 40 cm /m Keramik 1.0000 m2 75,000.00 7

    Portland cement 9 3000 kg 1 200 00 1

  • 8/13/2019 RAB Pasar Parungpung

    54/62

    HARGA

    SATUANNO. URAIAN PEKERJAAN Koep MATE

    104 Cat dinding & plafond (Emulsi) / m

    Plamir 0.1000 kg 22,000.00

    Cat dasar (emulsi) 0.1000 kg 79,550.00

    Cat penutup (emulsi) 0.2600 kg 79,550.00 2

    Ampelas (tidak termasuk dlm analisa) 0.5000 lbr 4,400.00 Rol cat (tidak termasuk dlm analisa) 0.0100 bh 20,000.00

    Steger werk (tidak termasuk dlm analisa) 1.0000 ls 500.00

    Pekerja 0.0200 oh 50,000.00

    Tukang cat 0.0630 oh 65,000.00

    Kepala tukang cat 0.0063 oh 70,000.00

    Mandor 0.0025 oh 80,000.00

    105 Cat dinding (Acrylic) / m

    Plamir 0.1000 kg 22,000.00

    Cat dasar (acrylic) 0.1000 kg 25,000.00

    Cat penutup (acrylic) 0.2600 kg 25,000.00

    Ampelas (tidak termasuk dlm analisa) 0.5000 lbr 4,400.00

    Rol cat (tidak termasuk dlm analisa) 0.0100 bh 20,000.00

    Steger werk (tidak termasuk dlm analisa) 1.0000 ls 500.00

    Pekerja 0.0200 oh 50,000.00

    Tukang cat 0.0630 oh 65,000.00

    Kepala tukang cat 0.0063 oh 70,000.00

    Mandor 0.0025 oh 80,000.00

    106 Cat dinding & plafond (Weathershield) / m

    Plamir 0.1000 kg 22,000.00

    Cat dasar (weathershield) 0.1000 kg 59,500.00

    Cat penutup (weathershield) 0.2600 kg 105,950.00 2

    Ampelas (tidak termasuk dlm analisa) 0.5000 lbr 4,400.00

    Rol cat (tidak termasuk dlm analisa) 0.0100 bh 20,000.00

    Steger werk (tidak termasuk dlm analisa) 1.0000 ls 500.00

    Pekerja 0.0200 oh 50,000.00

    Tukang cat 0.0630 oh 65,000.00

    Kepala tukang cat 0.0063 oh 70,000.00

    Mandor 0.0025 oh 80,000.00

    107 Cat kayu /m Cat kayu 0.1500 ltr 46,750.00

    Dempul 0.0500 kg 31,900.00 Ampelas 0.1000 lbr 4,400.00

    Kuas 0.0100 bh 20,000.00

    Pekerja 0.1600 oh 50,000.00

    Tukang cat 0.1600 oh 65,000.00

    Kepala tukang cat 0.0160 oh 70,000.00

    Mandor 0.0025 oh 80,000.00

    108 Cat besi /m Cat besi 0.1500 ltr 46,750.00

    Dempul 0.0500 kg 31,900.00

    Ampelas 0.1000 lbr 4,400.00

    Kuas 0.0100 bh 20,000.00

    Pekerja 0.1600 oh 50,000.00

    Tukang cat 0.1600 oh 65,000.00

    Kepala tukang cat 0.0160 oh 70,000.00

    Mandor 0 0025 oh 80 000 00

  • 8/13/2019 RAB Pasar Parungpung

    55/62

    HARGA

    SATUANNO. URAIAN PEKERJAAN Koep MATER

    110 Penutup Atap Zinc Alumn t=0.3/m2

    Atap Zinc Alumn Natural 1.1000 m2 72,500.00 79

    sekrup baut atap 4.0000 bh 750.00 3

    tukang atap 0.0800 oh 65,000.00

    pekerja 0.0800 oh 50,000.00 Kepala tukang 0.0080 oh 70,000.00

    111 Lisplank zinc Alumn T=0.3/m'

    Atap Zinc Alumn 1.1000 m' 25,500.00 28

    sekrup baut 4.0000 bh 750.00 3

    pekerja 0.1000 lbr 50,000.00 5

    Tukang Atap 0.1000 oh 65,000.00 6

    Kepala Tukang 0.0010 oh 70,000.00

    112 Nok Atap Zinc Alumn/M'

    nok zinc alumn T=0.4 1.1000 l tr 50,000.00 55

    sekrup baut 8.0000 bh 750.00 6

    Pekerja 0.1000 oh 50,000.00 5