DAFTAR HARGA SATUAN UPAH DAN BAHAN A. HARGA SATUAN UPAH NO U R A I A N HARI UPAH / HARI 1 Mandor Rp. 63,600.00 2 Kepala tukang Rp. 67,000.00 3 Pekerja Rp. 35,200.00 4 Tukang Rp. 60,200.00 B. HARGA SATUAN BAHAN NO BAHAN/MATERIAL SATUAN HARGA 1 Pasir batu (sirtu) / pasir kerikil M3 Rp. 28,400.00 2 Balok ulin 4m kebawah M3 Rp. ### 3 Balok Ulin 4 m keatas M3 Rp. #REF! 4 Papan ulin M3 Rp. ### 5 Alat - alat bantu Set Rp. 2,000.00 6 Paku jembatan Kg Rp. 25,000.00 7 Paku biasa Kg Rp. 18,100.00 8 Baut 3/8 '' Bj Rp. 1,600.00 9 Beugel 3.30.300 Bh Rp. 2,600.00 10 Ampelas Lb Rp. 4,500.00 11 Dempul Kg Rp. 14,800.00 12 Cat dasar Kg Rp. 14,800.00 13 Cat kilap Kg Rp. 32,300.00 14 Tanah Urug ( sungai raya) M3 Rp. 55,500.00 15 Tanah Urug (daha Selatan) M3 Rp. 103,900.00 16 Minyak cat Ltr Rp. 4,500.00 Disetujui Oleh : Dibuat oleh Panitia Lelang Disetujui Oleh : Dibuat oleh Panitia Lelang

Upload: rizki-sri-ratmulia

Post on 06-Aug-2015

2.057 views

Category:

Documents


225 download

TRANSCRIPT

Page 1: Rab Jembatan Ulin Karangan 1

DAFTAR HARGA SATUAN UPAH DAN BAHAN

A. HARGA SATUAN UPAH

NO U R A I A N HARI UPAH / HARI

1 Mandor Rp. 63,600.00

2 Kepala tukang Rp. 67,000.00

3 Pekerja Rp. 35,200.00

4 Tukang Rp. 60,200.00

B. HARGA SATUAN BAHAN

NO BAHAN/MATERIAL SATUAN HARGA

1 Pasir batu (sirtu) / pasir kerikil M3 Rp. 28,400.00 2 Balok ulin 4m kebawah M3 Rp. 8,167,600.00 3 Balok Ulin 4 m keatas M3 Rp. #REF!4 Papan ulin M3 Rp. 6,945,700.00 5 Alat - alat bantu Set Rp. 2,000.00 6 Paku jembatan Kg Rp. 25,000.00 7 Paku biasa Kg Rp. 18,100.00 8 Baut 3/8 '' Bj Rp. 1,600.00 9 Beugel 3.30.300 Bh Rp. 2,600.00

10 Ampelas Lb Rp. 4,500.00 11 Dempul Kg Rp. 14,800.00 12 Cat dasar Kg Rp. 14,800.00 13 Cat kilap Kg Rp. 32,300.00 14 Tanah Urug ( sungai raya) M3 Rp. 55,500.00 15 Tanah Urug (daha Selatan) M3 Rp. 103,900.00 16 Minyak cat Ltr Rp. 4,500.00

Disetujui Oleh :Pemimpin Proyek

BOYKE W. TRIESTIYANTO, BENIP. 110 041 536

Dibuat oleh Panitia Lelang

Ketua,

M. MUHYAR, SHNIP. 540 011 598

Disetujui Oleh :Pemimpin Proyek

BOYKE W. TRIESTIYANTO, BENIP. 110 041 536

Dibuat oleh Panitia Lelang

Ketua,

M. MUHYAR, SHNIP. 540 011 598

Page 2: Rab Jembatan Ulin Karangan 1

Disetujui Oleh :Pemimpin Proyek

BOYKE W. TRIESTIYANTO, BENIP. 110 041 536

Dibuat oleh Panitia Lelang

Ketua,

M. MUHYAR, SHNIP. 540 011 598

Disetujui Oleh :Pemimpin Proyek

BOYKE W. TRIESTIYANTO, BENIP. 110 041 536

Dibuat oleh Panitia Lelang

Ketua,

M. MUHYAR, SHNIP. 540 011 598

Page 3: Rab Jembatan Ulin Karangan 1

70,000 63636.364

73,800 67090.909

38,800 35272.727

66,300 60272.727

31,300 28454.545 0.04 25 8,984,375.00 8167614 0.04 25

#REF! #REF! 0.04 25 7,640,312.50 6945739 0.016 62.5 2,200.00 2000 27,500.00 25000 20,000.00 18181.818 1,771.00 1610 2,948.00 2680 5,000.00 4545.4545 16,300.00 14818.182 16,300.00 14818.182 35,600.00 32363.636 61,100.00 55545.455 114,300.00 103909.09 5,000.00 4545.4545

Page 4: Rab Jembatan Ulin Karangan 1

Disetujui oleh:Pemimpin Proyek

BOYKE W.TRIESTIYANTONIP.110 041 536

Dibuat oleh,Panitia LelangKetua

M.MUHYAR,SHNIP. 540 011 598

Page 5: Rab Jembatan Ulin Karangan 1

Disetujui oleh:Pemimpin Proyek

BOYKE W.TRIESTIYANTONIP.110 041 536

Dibuat oleh,Panitia LelangKetua

M.MUHYAR,SHNIP. 540 011 598Disetujui oleh:Pemimpin Proyek

BOYKE W.TRIESTIYANTONIP.110 041 536

Dibuat oleh,Panitia LelangKetua

M.MUHYAR,SHNIP. 540 011 598

Page 6: Rab Jembatan Ulin Karangan 1

Disetujui oleh:Pemimpin Proyek

BOYKE W.TRIESTIYANTONIP.110 041 536

Dibuat oleh,Panitia LelangKetua

M.MUHYAR,SHNIP. 540 011 598Disetujui oleh:Pemimpin Proyek

BOYKE W.TRIESTIYANTONIP.110 041 536

Dibuat oleh,Panitia LelangKetua

M.MUHYAR,SHNIP. 540 011 598

Page 7: Rab Jembatan Ulin Karangan 1

Disetujui oleh:Pemimpin Proyek

BOYKE W.TRIESTIYANTONIP.110 041 536

Disetujui oleh:Pemimpin Proyek

BOYKE W.TRIESTIYANTONIP.110 041 536

Dibuat oleh,Panitia LelangKetua

M.MUHYAR,SHNIP. 540 011 598Disetujui oleh:Pemimpin Proyek

BOYKE W.TRIESTIYANTONIP.110 041 536

Dibuat oleh,Panitia LelangKetua

M.MUHYAR,SHNIP. 540 011 598

Page 8: Rab Jembatan Ulin Karangan 1

Disetujui oleh:Pemimpin Proyek

BOYKE W.TRIESTIYANTONIP.110 041 536

Disetujui oleh:Pemimpin Proyek

BOYKE W.TRIESTIYANTONIP.110 041 536

Dibuat oleh,Panitia LelangKetua

M.MUHYAR,SHNIP. 540 011 598

Disetujui oleh:Pemimpin Proyek

BOYKE W.TRIESTIYANTONIP.110 041 536

Dibuat oleh,Panitia LelangKetua

M.MUHYAR,SHNIP. 540 011 598

Page 9: Rab Jembatan Ulin Karangan 1

Disetujui oleh:Pemimpin Proyek

BOYKE W.TRIESTIYANTONIP.110 041 536

Disetujui oleh:Pemimpin Proyek

BOYKE W.TRIESTIYANTONIP.110 041 536

Dibuat oleh,Panitia LelangKetua

M.MUHYAR,SHNIP. 540 011 598

Page 10: Rab Jembatan Ulin Karangan 1

Disetujui oleh:Pemimpin Proyek

BOYKE W.TRIESTIYANTONIP.110 041 536

Dibuat oleh,Panitia LelangKetua

M.MUHYAR,SHNIP. 540 011 598

Page 11: Rab Jembatan Ulin Karangan 1

Disetujui oleh:Pemimpin Proyek

BOYKE W.TRIESTIYANTONIP.110 041 536

Dibuat oleh,Panitia LelangKetua

M.MUHYAR,SHNIP. 540 011 598

Disetujui oleh:Pemimpin Proyek

BOYKE W.TRIESTIYANTONIP.110 041 536

Dibuat oleh,Panitia LelangKetua

M.MUHYAR,SHNIP. 540 011 598

Page 12: Rab Jembatan Ulin Karangan 1

Disetujui oleh:Pemimpin Proyek

BOYKE W.TRIESTIYANTONIP.110 041 536

Dibuat oleh,Panitia LelangKetua

M.MUHYAR,SHNIP. 540 011 598

Disetujui oleh:Pemimpin Proyek

BOYKE W.TRIESTIYANTONIP.110 041 536

Dibuat oleh,Panitia LelangKetua

M.MUHYAR,SHNIP. 540 011 598

Disetujui oleh:Pemimpin Proyek

BOYKE W.TRIESTIYANTONIP.110 041 536

Dibuat oleh,Panitia LelangKetua

M.MUHYAR,SHNIP. 540 011 598

Page 13: Rab Jembatan Ulin Karangan 1

Disetujui oleh:Pemimpin Proyek

BOYKE W.TRIESTIYANTONIP.110 041 536

Dibuat oleh,Panitia LelangKetua

M.MUHYAR,SHNIP. 540 011 598

Disetujui oleh:Pemimpin Proyek

BOYKE W.TRIESTIYANTONIP.110 041 536

Dibuat oleh,Panitia LelangKetua

M.MUHYAR,SHNIP. 540 011 598

Disetujui oleh:Pemimpin Proyek

BOYKE W.TRIESTIYANTONIP.110 041 536

Dibuat oleh,Panitia LelangKetua

M.MUHYAR,SHNIP. 540 011 598

Page 14: Rab Jembatan Ulin Karangan 1

Disetujui oleh:Pemimpin Proyek

BOYKE W.TRIESTIYANTONIP.110 041 536

Disetujui oleh:Pemimpin Proyek

BOYKE W.TRIESTIYANTONIP.110 041 536

Dibuat oleh,Panitia LelangKetua

M.MUHYAR,SHNIP. 540 011 598

Disetujui oleh:Pemimpin Proyek

BOYKE W.TRIESTIYANTONIP.110 041 536

Dibuat oleh,Panitia LelangKetua

M.MUHYAR,SHNIP. 540 011 598

Page 15: Rab Jembatan Ulin Karangan 1

Disetujui oleh:Pemimpin Proyek

BOYKE W.TRIESTIYANTONIP.110 041 536

Dibuat oleh,Panitia LelangKetua

M.MUHYAR,SHNIP. 540 011 598

Disetujui oleh:Pemimpin Proyek

BOYKE W.TRIESTIYANTONIP.110 041 536

Dibuat oleh,Panitia LelangKetua

M.MUHYAR,SHNIP. 540 011 598

Page 16: Rab Jembatan Ulin Karangan 1

Disetujui oleh:Pemimpin Proyek

BOYKE W.TRIESTIYANTONIP.110 041 536

Dibuat oleh,Panitia LelangKetua

M.MUHYAR,SHNIP. 540 011 598

Diketahui oleh :Plt.Kasubdin Prasarana Transportasi

Ir.G.Khairul SalehNIP.110 048 070

Diperiksa oleh :Kasi Pemeliharaan Jalan dan Jembatan

SunyotoNIP. 540 007 178

Dihitung oleh :Staf Prasarana Transportasi

Wahid . RNIP. 540 011 865

Page 17: Rab Jembatan Ulin Karangan 1

Diketahui oleh :Plt.Kasubdin Prasarana Transportasi

Ir.G.Khairul SalehNIP.110 048 070

Diperiksa oleh :Kasi Pemeliharaan Jalan dan Jembatan

SunyotoNIP. 540 007 178

Dihitung oleh :Staf Prasarana Transportasi

Wahid . RNIP. 540 011 865

Page 18: Rab Jembatan Ulin Karangan 1

Diketahui Oleh :PLt. Kasubdin Prasarana Transportasi,

Ir. G. KHAIRUL SALEHNIP. 110 048 070

Diperiksa Oleh :Kasi Pemeliharaan Jalan & Jembatan

S U N Y O T O NIP. 540 007 178

Dibuat Oleh :Staf Konstruksi Jalan & Jembatan

ABDUL MAJID NIP. 540 008 262

Page 19: Rab Jembatan Ulin Karangan 1

Diketahui Oleh :PLt. Kasubdin Prasarana Transportasi,

Ir. G. KHAIRUL SALEHNIP. 110 048 070

Diperiksa Oleh :Kasi Pemeliharaan Jalan & Jembatan

S U N Y O T O NIP. 540 007 178

Dibuat Oleh :Staf Konstruksi Jalan & Jembatan

ABDUL MAJID NIP. 540 008 262

Page 20: Rab Jembatan Ulin Karangan 1
Page 21: Rab Jembatan Ulin Karangan 1
Page 22: Rab Jembatan Ulin Karangan 1
Page 23: Rab Jembatan Ulin Karangan 1
Page 24: Rab Jembatan Ulin Karangan 1
Page 25: Rab Jembatan Ulin Karangan 1
Page 26: Rab Jembatan Ulin Karangan 1
Page 27: Rab Jembatan Ulin Karangan 1
Page 28: Rab Jembatan Ulin Karangan 1
Page 29: Rab Jembatan Ulin Karangan 1
Page 30: Rab Jembatan Ulin Karangan 1

Diketahui Oleh :PLt. Kasubdin Prasarana Transportasi,

Ir. G. KHAIRUL SALEHNIP. 110 048 070

Diperiksa Oleh :Kasi Pemeliharaan Jalan & Jembatan

S U N Y O T O NIP. 540 007 178

Dibuat Oleh :Staf Konstruksi Jalan & Jembatan

ABDUL MAJID NIP. 540 008 262

Page 31: Rab Jembatan Ulin Karangan 1

Diketahui Oleh :PLt. Kasubdin Prasarana Transportasi,

Ir. G. KHAIRUL SALEHNIP. 110 048 070

Diperiksa Oleh :Kasi Pemeliharaan Jalan & Jembatan

S U N Y O T O NIP. 540 007 178

Dibuat Oleh :Staf Konstruksi Jalan & Jembatan

ABDUL MAJID NIP. 540 008 262

Diketahui Oleh :PLt. Kasubdin Prasarana Transportasi,

Ir. G. KHAIRUL SALEHNIP. 110 048 070

Diperiksa Oleh :Kasi Pemeliharaan Jalan & Jembatan

S U N Y O T O NIP. 540 007 178

Dibuat Oleh :Staf Konstruksi Jalan & Jembatan

ABDUL MAJID NIP. 540 008 262

Page 32: Rab Jembatan Ulin Karangan 1

Diketahui Oleh :Plt. Kasubdin Prasarana Transportasi,

Ir. G. KHAIRUL SALEHNIP. 110 048 070

Diperiksa Oleh :Kasi Pemeliharaan Jalan & Jembatan

S U N Y O T O NIP. 540 007 178

Dibuat Oleh :Staf Konstruksi Jalan & Jembatan

ABDUL MAJID NIP. 540 008 262

Diketahui Oleh :PLt. Kasubdin Prasarana Transportasi,

Ir. G. KHAIRUL SALEHNIP. 110 048 070

Diperiksa Oleh :Kasi Pemeliharaan Jalan & Jembatan

S U N Y O T O NIP. 540 007 178

Dibuat Oleh :Staf Konstruksi Jalan & Jembatan

ABDUL MAJID NIP. 540 008 262

Page 33: Rab Jembatan Ulin Karangan 1

Diketahui Oleh :Plt. Kasubdin Prasarana Transportasi,

Ir. G. KHAIRUL SALEHNIP. 110 048 070

Diperiksa Oleh :Kasi Pemeliharaan Jalan & Jembatan

S U N Y O T O NIP. 540 007 178

Dibuat Oleh :Staf Konstruksi Jalan & Jembatan

ABDUL MAJID NIP. 540 008 262

Diketahui Oleh :PLt. Kasubdin Prasarana Transportasi,

Ir. G. KHAIRUL SALEHNIP. 110 048 070

Diperiksa Oleh :Kasi Pemeliharaan Jalan & Jembatan

S U N Y O T O NIP. 540 007 178

Dibuat Oleh :Staf Konstruksi Jalan & Jembatan

ABDUL MAJID NIP. 540 008 262

Diketahui Oleh :Plt. Kasubdin Prasarana Transportasi,

Ir. G. KHAIRUL SALEHNIP. 110 048 070

Diperiksa Oleh :Kasi Pemeliharaan Jalan & Jembatan

S U N Y O T O NIP. 540 007 178

Dibuat Oleh :Staf Prasarana Transportasi

W A H I D . RNIP. 540 011 865

Page 34: Rab Jembatan Ulin Karangan 1

Diketahui Oleh :Plt. Kasubdin Prasarana Transportasi,

Ir. G. KHAIRUL SALEHNIP. 110 048 070

Diperiksa Oleh :Kasi Pemeliharaan Jalan & Jembatan

S U N Y O T O NIP. 540 007 178

Diketahui Oleh :Plt. Kasubdin Prasarana Transportasi,

Ir. G. KHAIRUL SALEHNIP. 110 048 070

Diperiksa Oleh :Kasi Pemeliharaan Jalan & Jembatan

S U N Y O T O NIP. 540 007 178

Dibuat Oleh :Staf Prasarana Transportasi

W A H I D . RNIP. 540 011 865

Diketahui Oleh :Plt. Kasubdin Prasarana Transportasi,

Ir. G. KHAIRUL SALEHNIP. 110 048 070

Diperiksa Oleh :Kasi Pemeliharaan Jalan & Jembatan

S U N Y O T O NIP. 540 007 178

Dibuat Oleh :Staf Prasarana Transportasi

W A H I D . RNIP. 540 011 865

Page 35: Rab Jembatan Ulin Karangan 1

Diketahui Oleh :Plt. Kasubdin Prasarana Transportasi,

Ir. G. KHAIRUL SALEHNIP. 110 048 070

Diperiksa Oleh :Kasi Pemeliharaan Jalan & Jembatan

S U N Y O T O NIP. 540 007 178

Dibuat Oleh :Staf Prasarana Transportasi

W A H I D . RNIP. 540 011 865

Diketahui Oleh :Plt. Kasubdin Prasarana Transportasi,

Ir. G. KHAIRUL SALEHNIP. 110 048 070

Diperiksa Oleh :Kasi Pemeliharaan Jalan & Jembatan

S U N Y O T O NIP. 540 007 178

Dibuat Oleh :Staf Prasarana Transportasi

W A H I D . RNIP. 540 011 865

Diketahui Oleh :Plt. Kasubdin Prasarana Transportasi,

Ir. G. KHAIRUL SALEHNIP. 110 048 070

Diperiksa Oleh :Kasi Pemeliharaan Jalan & Jembatan

S U N Y O T O NIP. 540 007 178

Dibuat Oleh :Staf Prasarana Transportasi

W A H I D . RNIP. 540 011 865

Page 36: Rab Jembatan Ulin Karangan 1

Diketahui Oleh :Plt. Kasubdin Prasarana Transportasi,

Ir. G. KHAIRUL SALEHNIP. 110 048 070

Diperiksa Oleh :Kasi Pemeliharaan Jalan & Jembatan

S U N Y O T O NIP. 540 007 178

Diketahui Oleh :Plt. Kasubdin Prasarana Transportasi,

Ir. G. KHAIRUL SALEHNIP. 110 048 070

Diperiksa Oleh :Kasi Pemeliharaan Jalan & Jembatan

S U N Y O T O NIP. 540 007 178

Dibuat Oleh :Staf Prasarana Transportasi

W A H I D . RNIP. 540 011 865

Page 37: Rab Jembatan Ulin Karangan 1

Diketahui Oleh :Plt. Kasubdin Prasarana Transportasi,

Ir. G. KHAIRUL SALEHNIP. 110 048 070

Page 38: Rab Jembatan Ulin Karangan 1

TABELONGKOS ANGKUTAN BAHAN /MATERIAL

NO. LOKASI PEKERJAAN

JARAKANGKUT

RATA-RATA(Km.)

I. Galian C Quary Muara Banta Kandangan(Dump Truck % Ton / 5 M3)

1 Kecamatan Kandangan 22 Kecamatan Angkinang 103 Kecamatan Sungai Raya 94 Kecamatan Padang Batung 65 Kecamatan Telaga Langsat 166 Kecamatan Simpur 97 Kecamatan Kalumpang 158 Kecamatan Daha Selatan 329 Kecamatan Daha Utara 33

10 Kecamatan Loksado 4011 Kecamatan Daha Barat 47

II. Galian C Quary Malutu Padang Batung (Dump Truck % Ton / 5 M3)

1 Kecamatan Kandangan 142 Kecamatan Angkinang 223 Kecamatan Sungai Raya 214 Kecamatan Padang Batung 75 Kecamatan Telaga Langsat 286 Kecamatan Simpur 217 Kecamatan Kalumpang 298 Kecamatan Daha Selatan 449 Kecamatan Daha Utara 45

10 Kecamatan Loksado 4211 Kecamatan Daha Barat 61

Material/Semen(Dump Truck % Ton / 5 M3)

1 Kecamatan Kandangan 152 Kecamatan Angkinang 243 Kecamatan Sungai Raya 224 Kecamatan Padang Batung 85 Kecamatan Telaga Langsat 296 Kecamatan Simpur 237 Kecamatan Kalumpang 308 Kecamatan Daha Selatan 459 Kecamatan Daha Utara 46

10 Kecamatan Loksado 43

11 Kecamatan Daha Barat 62

Page 39: Rab Jembatan Ulin Karangan 1

TABELDAFTAR HARGA BIDANG PEKERJAAN UMUM

No. Nama Barang Satuan

(1) (2) (3)

A. UPAHPekerjaan Bangunan

1 Tukang kayu oh2 Tukang besi oh3 Tukang cat oh4 Tukang dempul oh5 Tukang pelitur oh6 Tukang tebas oh7 Tukang listrik oh8 Tukang rumah oh9 Tukang las oh

10 Tukang potong rumput oh11 Kepala tukang kayu oh12 Pekerja kasar oh13 Pekerja oh14 Pekerja terampil oh15 Pekerja semi terampil oh16 Operator buldozer oh17 Operator exavator oh18 Operator stoom wals oh19 Mekanik terampil oh20 Mekanik semi terampil oh21 Operator semi terampil oh22 Operator terampil oh23 Pembantu operator oh24 Sopir truk bangunan/material oh25 Pembantu sopir oh26 Pembersih jalan oh27 Pembantu jalan oh28 Buruh bongkar muat angkutan darat Kali29 Buruh bongkar muat angkutan sungai Kali30 Buruh bongkar muatan angkutan laut Ton/M3

31 Juru ukur tanah oh32 Juru gambar konstruksi Peta

33 Buruh lepas oh34 Mandor lapangan oh35 Jaga malam proyek oh36 Satpam proyek oh

Page 40: Rab Jembatan Ulin Karangan 1

37 Sopir pribadi oh38 Upah Minimum Provinsi (UMP) ob

Pekerja Pemboran Tanah39 Tool pusher oh40 Driller oh41 Asisten Driller oh42 Penanggung jawab pompa uji oh43 Driver/operator oh44 Helper/pitler pekerja lokal oh

No. Nama Barang Satuan

(1) (2) (3)

Jasa Konsultan45 Ahli Kepala ( Pembina ) OB46 Ahli Kepala OB47 Ahli Utama OB48 Ahli OB49 Ahli Muda OB50 Asisten Muda OB51 Teknisi OB52 Surveyor OB53 Sekretaris OB54 Drafter OB55 Operator Komputer OB56 Administrasi OB57 Penjaga Pesuruh OB

B. Sewa Peralatan58 Hidraulic axcavator 80-140 hp Jam59 Buldozer 95-150 hp Jam60 Loader 95-120 hp Jam61 Dump truk 6 ton Jam62 Dump truk 8 ton Jam63 Truck 3-4 ton Jam64 Greder 75-125 hp Jam65 Three weel roller 6-10 ton Jam66 Generator set 100 KVA Jam67 Compresor 125 CFM Hari68 Asphalt distributor sprayer 80 hp Hari69 Concrete mixer 600 liter Hari70 Stone chruser 20 ton Hari71 Hand vibrator Jam72 Flat bed truk 3-4 kubik Hari

C. BAHAN BANGUNANBahan Pengisi

86 Tanah Biasa m387 Tanah urug m388 Tanah laterit m389 Urugan pilihan m3

Page 41: Rab Jembatan Ulin Karangan 1

90 Pasir urug m391 Pasir Pasang m392 Sirtu m393 Kerikil besar m394 Kerikil halus m395 Kerikil sirtu m396 Kerikil beton m397 Kerikil berpasir alami m398 Kerikil cor beton m399 Split m3100 Batu pecah 1/5 - 1 cm m3101 Batu pecah 1 - 2 cm m3102 batu pecah 2 - 3cm m3103 Batu pecah 3 - 5 cm m3104 Batu koral m3105 Batu gunung/kali utuh m3106 Batu gunung/kali belah m3

107 Geotextile non woven m2

No. Nama Barang Satuan

(1) (2) (3)

Bata / Beton108 Bata merah (kwalitet I) Buah109 Bata pres segi enam Buah110 Bata pres persegi panjang Buah111 Bata pres segi empat Buah112 Bataco Buah113 Asbes gelombang (105 x 150 cm) Lembar114 Asbes gelombang (80 x 180 cm) Lembar115 Tegel keramik putih (30x30) (Platinum) Pak116 Tegel Keramik warna (30x30) (Platinum) Pak117 Tegel Keramik warna (20x20) (Platinum) Pak118 Tegel keramik warna 10x20 (Platinum) Pak119 Tegel keramik warna 20x25 (Platinum) Pak120 Tegel keramik warna 40x40 Pak121 Tegel PC abu-abu 20 x 20 Buah122 Gresik 50 Kg Zak123 Tonasa 50 Kg Zak124 Tiga Roda 50 Kg Zak125 Holcim 50 Kg Zak126 Besi diameter 4 batang127 Besi diameter 6A batang128 Besi diameter 6 T batang129 Besi diameter 8A batang130 Besi diameter 8T batang131 Besi diameter 10T batang132 Besi diameter 12T batang

133 Besi diameter 16T batang134 Keramik mulia Pak135 Kawat beton Kg136 Gorong-gorong beton pipa 60 cm M lari137 Gorong-gorong beton pipa 80 cm M lari138 Gorong-gorong beton pipa 100 cm M lari

Page 42: Rab Jembatan Ulin Karangan 1

Kayu / BambuPapan Ukuran (2cmx 20cm x 4m)

138 - Kruing Batang139 - Meranti Batang

140 - Ulin Batang

No. Nama Barang Satuan

(1) (2) (3)

Kaso Ukuran (5cm x 7cm x 4m)141 - Kruing Batang142 - Kamper Batang143 - Meranti Batang144 - Ulin Batang

Balok Ukuran (6cm x 12cm x 4m)145 - Kruing Batang146 - Kamper Batang147 - Meranti Batang148 - Ulin Batang

Reng Ukuran (2cm x 3cm x 4m)149 - Kruing Batang150 - Kamper Batang151 - Meranti Batang152 - Ulin Batang

Bambu 153 - Kecil Batang154 - Sedang Batang155 - Besar Batang

Galam156 - Ukuran 10/12cm x 7m Batang157 - Ukuran 10/12cm x 4m Batang158 - Ukuran 10/12cm x 3m Batang

Sirap159 - Sirap kelas I Lembar160 - Sirap VIP Lembar161 - Sirap Super VIP Lembar

Kayu Lapis Tripleks (122 x 244cm)162 - Ukuran 3 mm Lembar163 - Ukuran 6 mm Lembar164 - Ukuran 9 mm Lembar165 Softboard Lembar166 Hardbroad Lembar

Bahan Bangunan dari Kayu167 1. Kusen pintu uk (90 x 210)cm168 a.Kamper bh169 b.Meranti bh170 c.Borneo bh

2. Daun Pintu uk (90 x 210)cm171 a.Kamper bh172 b.Meranti bh173 c.Borneo bh174 d.Sungkai /MC bh

Besi175 Engsel Buah

Page 43: Rab Jembatan Ulin Karangan 1

176 Engsel nylon 3" Pasang177 Engsel nylon 4" Pasang178 Engsel patrum besar (pintu) Pasang179 Engsel patrum besar (jendela) Pasang180 Engsel kupu-kupu besar Buah181 Engsel kupu-kupu kecil Buah182 Engsel kupu-kupu besar Pasang183 Engsel kupu-kupu kecil Pasang184 Besi tralis plat/siku (sedang) Meter185 Besi tralis plat/siku (baik) Meter186 Sekrup ulin 1 inci Biji187 Sekrup ulin 1,5 inci Biji

188 Mur dan baut 10 cm Biji

No. Nama Barang Satuan

(1) (2) (3)

189 Mur dan baut 15 cm Biji190 Mur dan baut 20 cm Biji191 Kait angin (Tj) Pasang192 Grendel (Barrel bolt) Buah193 Kunci tanam biasa (union 1 slg) Buah194 Kunci tanam biasa (union 2 slg) Buah195 Kunci tanam biasa (yale) Buah196 Kunci tanam biasa (iseo) Buah197 Kunci tanam biasa (vaness) Buah198 Kunci tanam biasa (cavel) Buah199 Kunci tanam biasa (pioneer) Buah200 Kunci pintu Buah201 Espagnolet tanam (ses) Batang202 Gembok besar Buah203 gembok kecil Buah204 Grendel Buah205 Isolasi Buah206 Kawat duri Rol207 Kawat kassa m2208 Kawat ayam m2209 Kawat harmonika Rol210 Kawat beton 25 Kg211 Besi siku 20x20x3 mm (6m) Batang212 Besi siku 30x30x3 mm (6m) Batang213 Besi siku 40x40x3 mm (6m) Batang214 Seng plat BJL 18 Lembar215 Seng plat BJL 27 Lembar216 Seng plat BJL 30 Lembar217 Seng gelombang Lembar218 seng biasa Lembar219 Seng super sheet BJL 30 (jangkar) Lembar220 Genting metal biasa (multiroof) Lembar221 Genting metal biasa (sakura) Lembar222 Genting metal pakai serbuk (multiroof) Lembar223 Genting metal pakai serbuk (sakura) Lembar224 Genting beton monier Lembar225 Genting kodok mayong (tanah) Lembar226 genting karang pilang Lembar

Page 44: Rab Jembatan Ulin Karangan 1

227 Plastik gelombang (maspion) Lembar228 Paku asbes Biji229 Paku biasa (surabaya) Kg230 Paku sirap (biasa) Kg231 Paku payung (biasa) Kg232 Paku plywood (biasa) Kg

233 Paku rupa-rupa Kg

No. Nama Barang Satuan

(1) (2) (3)

234 Paku sirap Kg235 Panjang 5 cm Kg236 Panjang 7 cm Kg237 Genteng asbes gelombang besar Lembar238 Pemuung metal Buah239 Bronjong pabrikasi Uk.2 x 1 0,50 Unit240 Bronjong pabrikasi Uk.2 x 1 x 1 Unit241 Bronjong pabrikasi Uk.3 x 1 x 0,5 Unit242 Bronjong pabrikasi Uk.3 x 1 x 1 Unit243 Bronjong pabrikasi Uk.1,5 x 1 x 1 Unit244 Pintu sorong besi lbr 0,4 m x tinggi o,90 m Buah245 Pintu sorong besi lbr 0,3 m x tinggi o,70 m Buah246 Pintu besi ulir lbr 1,0 m x tinggi 2,00 m Buah247 Pintu besi ulir lbr 0,5 m x tinggi 1,50 m Buah

D. SANITAIR239 Buis beton ukuran 10 cm (biasa) Batang240 Buis beton ukuran 20 cm Batang241 Busi beton ukuran 30 cm Batang242 Pipa PVC ukuran 1/2" (4m) (Maspion) Batang243 Pipa PVC ukuran 3/4" (4m) (Maspion) Batang244 Pipa PVC ukuran 1" (4m) (Maspion) Batang245 Pipa PVC ukuran 1 1/2" (4m) (Maspion) Batang246 Pipa PVC ukuran 2" (4m) (Maspion) Batang247 Pipa PVC ukuran 2 1/2" (4m) (Maspion) Batang248 Pipa Ledeng o 1/2 inc MB249 Talang PVC M2250 Closeed duduk Buah251 Closed jongkok keramik Buah252 Bak mandi teraso (60 x 60) Buah253 Closet jongkok putih (toto) Buah254 Closet jongkok putih (toho) Buah255 Closet jongkok warna (toto) Buah256 Closet jongkok warna (toho) Buah257 Closet jongkok warna (Toto) Buah258 Closet duduk putih (Toto) Set259 Closet duduk warna (kia) Set260 Wasthafel putih (kia) Buah261 Wasthafel warna (kia) Buah262 Urinior Putih (kia) Buah

Listrik263 Kabel listrik 1x1 1/2 mm (LMK) Rol264 Kabel listrik 2x1 1/2 mm (LMK) Rol

Page 45: Rab Jembatan Ulin Karangan 1

265 Kebel Listrik 1 x 1 1/2 mm (TYN) Meter266 Kabel listrik 2x1 1/2 mm (TYN) Meter267 Kabel NYM 2 x 2,5 mm268 Isolator Rolling269 Sekring biasa 3A (biasa) Buah270 Sekring otomatis 25 A (biasa) Buah271 Sakelar Tunggal (Broco) Buah272 sakelar ganda (broco) Buah

273 Stop kontak bahan malin (broco) Buah

No. Nama Barang Satuan

(1) (2) (3)

274 Stop kontak bahan plastik (voltama) Buah275 Bola lampu pijar 10W (philip) Biji276 Bola lampu pijar 15W (philip) Biji277 Bola lampu pijar 25W (philip) Biji278 Bola lampu pijar 40/60W (philip) Biji279 Lampu TL 32 watt (chiyoda) Biji280 Lampu TL 20 watt (chiyoda) Biji281 Lampu TL 40 watt (chiyoda) Biji282 Lampu pijar Buah283 Lampu TL double Buah284 Lampu TL Tunggal Buah285 L. Mercury Iwata HPL-N250 w Set286 L. Mercury Iwata SON-H250 w Set287 L. mercury HSRC 511/25 watt Set288 Stop kontak Titik

Finishing289 Ampelas kayu (sikens) Lembar290 Ampelas besi (ATR) Lembar291 Cat minyak Pujatex Kg292 Cat tembok centro Galon293 Cat tembok dulux Galon294 Pelitur Liter295 Cat kilap setara Platon Kg296 Cat tembok sejenis matek Kg297 Cat dasar Kg298 Minyak cat Liter299 Ampelas Lembar300 Dempul Kg301 Plitur Liter

No. Nama Barang Satuan

(1) (2) (3)

Kaca302 Kaca Bening 3mm m2303 Keca bening 5 mm m2304 Kaca buram / es 3 mm m2305 Kaca buram / es 4 mm m2306 Kaca buram / es 5 mm m2307 Kaca raybend 3 mm m2308 kaca raybend 5 mm m2

Page 46: Rab Jembatan Ulin Karangan 1

309 Kaca nako + rangka 5 mm m2310 Kaca rayban 5 mm m2311 Kaca rayban 3 mm m2312 Kaca bening 5 mm m2313 Kaca Bening 3mm m2314 Kaca mako 55 mm rangka m2

E. LAIN-LAINAspal1. Lokal

315 a. Curah grade 60/70 155 kg Ton316 b.Coating Ton

2. Impor317 a.Curah grade 60/70 exs singapore Ton

Barang dari karetKarpet Talang

318 a. Lebar 55 cm 4mx15x10 m319 b. Lebar 90 cm m320 c. Lebar 110 cm m

Seng Buah321 Besi diameter 4 batang322 Besi diameter 6A batang323 Besi diameter 6 T batang324 Besi diameter 8A batang325 Besi diameter 8T batang326 Besi diameter 10T batang327 Besi diameter 12T batang328 Keramik mulia Pak329 h Pompa Air Bh330 Bh331 i. Plastik fiberglas polos lebar 1 m m

Bahan Bangunan Penutup Dinding dan Atapa Batu Bata

332 1) Bata merah kwalitet I bh333 2) Bata merah kwalitet II bh

b Bata Press334 1) Segi Enam bh335 2) Persegi Panjang bh336 c Bataco 10 X 20 X 40 cm bh

d Asbes Semen337 Gel Mini 180 X 80 X 0,5 bh

e Kapur 338 1) Kapur Aduk 5 kg339 2) Kapur Bubuk blek340 f Penutup Atap341 1)Sirap342 a) Sirap kelas I Lbr343 b) Sirap VIP Lbr344 c) Sirap super VIP Lbr345 2)Genteng346 a) Kodok Keping

No. Nama Barang Satuan

(1) (2) (3)

347 b) Karang Pilang Keping

Page 47: Rab Jembatan Ulin Karangan 1

348 c) Beton Keping349 d) Pemu'ung Keping350 3)Genteng Metal351 a) Metal Biasa Lbr352 Lbr353 b) Metal Pakai Serbuk Lbr354 Lbr355 c) Pemu'ung per buah356 per buah

g Engsel /Alat GantungEngsel Nylon

357 a) Engsel Nylon 3" Psg358 b) Engsel Nylon 4" Psg

Engsel Patrum359 a) Engsel Besar (Pintu) Psg360 b) Engsel Kecil (Jendela) Psg

Engsel Kupu-kupu361 a) Engsel Besar 5" Bh362 b) Engsel Kecil 3" Bh363 Engsel Pintu Besar 5" Psg364 Engsel Pintu Biasa 3" Psg365 Kunci Pembuka Alfalfa valve Unit366 Kunci Gembok Besar 60 mm Buah367 Kunci Gembok kecil Unit368 Kunci Pintu Tanam (Koday) Buah369 Kecil

h Sekrup370 1) Sekrup Ulin Kotak371 kotak372 2) Paku Asbes Bj373 I Mur & Baut 10 cm374 15 cm375 20 cm376 j Kait Angin Psg377 k - Alat-alat pertukangan manual378 1.Cangkul,merk BUAYA (sebutkan) bh379 2.Gergaji kayu,merk Diamond bh380 Gergaji kayu,merk Hiu bh381 3.Kikir,ukuran 4 inch,merk Kepala Indian bh382 4.Palu,Ukuran 1 1/2 inch,merk PUKUDA bh

l - Barang-barang dari logam dasar bukan besi1. Seng plat

383 a.Ukuran (0,03x90x180)cm m384 b.Lainnya......... m385 2. Seng gelombang,ukuran..(0,02x90x180)cm lbr

m - Bahan bangunan dari logam pagar besi BRC

386 a.Tinggi 96 cm panjang 120 cm bh387 b.Tinggi 175 cm panjang 240 cm bh

n - Barang-barang dari logam lainnya1.Pipa Besi

388 a.Diameter 3/4(inchi) panjang 6 m btg389 b.Diameter 1 1/2(inchi) panjang 6 m btg

Page 48: Rab Jembatan Ulin Karangan 1

No. Nama Barang Satuan

(1) (2) (3)

Mesin dan pelengkapannya1. Pompa air listrik, tanpa tutup tabung dengan daya 125 watt

390 1.Merk Panasonic Unit391 2.Merk Uchida Unit392 3.Merk Simizu Unit393 4.Merk DAB Unit394 5.Merk Daito Unit395 6.Merk Saproni (Otomatis) Unit

2.Pompa air tangan kualitas Korea396 1.Merk Dragon DN (biasa) Unit397 2.Merk Dragon B (sedang) Unit398 3.Merk Dragon Asli Unit

3.Mesin Las Listrik399 1.Yanmar TS 155 R+ :400 250 Amper Denyo Unit401 250 Amper Shundaiwa Unit402 250 Amper Yamakoyo Unit403 250 Amper Daiho Unit404 2.General Unit

Page 49: Rab Jembatan Ulin Karangan 1

TabelDaftar Harga Alat Berat

No. Nama Barang Satuan

(1) (2) (3)

C HARGA ALAT BERAT 1 Hidraulic excavator

Hidraulic excavator 80-140 HP unitunit

2 Bulldozer Bulldozer, 95 - 150 HP unit

unit3 Loader unit

unit4 Grader

Grader, 75 - 125 HP unit5 Tandem roller 6-10 Ton unit

unit

6 Dump Truk unit

Page 50: Rab Jembatan Ulin Karangan 1

TABELONGKOS ANGKUTAN BAHAN /MATERIAL

ONGKOSANGKUT KET.

(M3)

4,400 3,500 4,375.00 21,900 17,500 21,875.00 19,700 15,750 19,687.50 13,100 10,500 13,125.00 35,000 28,000 35,000.00 19,700 15,750 19,687.50 54,700 43,750 54,687.50 70,000 56,000 70,000.00 72,200 57,750 72,187.50 92,500 74,000 92,500.00 114,600 91,650 114,562.50

32,400 25,900 32,375.00 50,900 40,700 50,875.00 48,600 38,850 48,562.50 16,200 12,950 16,187.50 64,800 51,800 64,750.00 48,600 38,850 48,562.50 67,100 53,650 67,062.50 101,800 81,400 101,750.00 104,100 83,250 104,062.50 97,100 77,700 97,125.00 138,700 110,950 138,687.50

34,700 27,750 34,687.50 55,500 44,400 55,500.00 50,900 40,700 50,875.00 17,500 14,000 17,500.00 67,100 53,650 67,062.50 53,200 42,550 53,187.50 69,400 55,500 69,375.00 104,100 83,250 104,062.50 106,400 85,100 106,375.00 104,800 83,850 104,812.50 162,800 130,200 162,750.00

Page 51: Rab Jembatan Ulin Karangan 1

TABELDAFTAR HARGA BIDANG PEKERJAAN UMUM

Harga 2009 Ket.

(5) (6)

20%20%

66,300 20%66,300 20%66,300 20%66,300 20%66,300 20%66,300 20%62,500 20%66,300 20%66,300 20%66,300 20%73,800 20%38,800 20%38,800 20%55,000 20%46,300 20%93,800 20%93,800 20%93,800 20%78,800 20%62,500 20%78,800 20%93,800 20%62,500 20%78,800 20%46,300 20%46,300 20%46,300 20%1,500 20%2,300 20%

46,300 20%

93,800 20%55,000 20%

46,300 20%70,000 20%55,000 20%62,500 20%

Page 52: Rab Jembatan Ulin Karangan 1

62,500 20%1,056,300 20%

20%55,000 20%93,800 20%62,500 20%62,500 20%78,800 20%78,800 20%

Harga 2009 Ket.

(5) (6)

14,500,000 11,600,000 17-20 TAHUN 12,125,000 9,700,000 13-16 TAHUN9,625,000 7,700,000 9-12 TAHUN7,250,000 5,800,000 5-8 TAHUN5,875,000 4,700,000 1-4 TAHUN3,125,000 2,500,000 2,000,000 1,600,000 2,000,000 1,600,000 1,875,000 1,500,000 1,625,000 1,300,000 1,625,000 1,300,000 1,375,000 1,100,000 1,125,000 900,000

375,000375,000366,30034,400150,00013,40049,500325,00015,60085,00065,00046,300988,80060,600156,300

20%Belum

Termasuk12,500 Ongkos 13333.3333333312,500 Angkut15,60019,400 16666.66666667

Page 53: Rab Jembatan Ulin Karangan 1

18,80021,30031,300 23333.33333333100,000 60000106,300 8000031,300 83333.3333333378,10075,00075,00090,600206,300187,500150,000100,000100,000106,300106,300

18,800 15000 18750

Harga 2009 Ket.

(5) (6)

4001,6001,3001,3002,500

90,00032,50063,80063,80057,50057,50057,500850,00063,80073,80068,80072,50070,00012,50016,30034,40032,50059,400108,100150,000

208,800 16 1.578240 43,800 11,024.939173 18,000162,500300,000250,000

Page 54: Rab Jembatan Ulin Karangan 1

37,50034,400

106,300 62.5 6,643,750.00 Ulin

Harga 2009 Ket.

(5) (6)

37,500 7,592,857 71.428571428571

34,400 0.014106,300

93,800

87,500 34.72222222222 7,812,500.00 Ulin225,000 0.0288

16,300

12,50031,300

11,30015,00022,500

5,6003,1001,900

62,50093,80012,500

46,30075,000112,500

305,000562,500

562,500966,300966,300

Page 55: Rab Jembatan Ulin Karangan 1

6,30011,30010,0005,0003,8002,5003,8002,500

600900

1,300

Harga 2009 Ket.

(5) (6)

1,3001,900

12,500106,300208,800106,30073,80031,30031,30031,300106,30048,80034,40018,8006,3002,500

85,000106,30015,00012,500325,00068,80088,800111,30073,80086,300112,50056,30053,80057,50081,30037,50093,80083,80098,80040,0002,500

Page 56: Rab Jembatan Ulin Karangan 1

21,30031,30020,00031,30031,30031,300

20,000

Harga 2009 Ket.

(5) (6)

31,30018,80021,30031,30023,800583,800 467000 583750899,300 719400 899250867,700 694100 867625

1,262,200 1009700 1262125646,700 517400 646750

6,310,900 5048700 63108754,733,200 3786500 473312513,410,700 10728500 134106257,888,700 6310900 7888625

67,500201,300283,80025,00031,30034,40038,10041,30045,60083,80062,50018,80093,800283,800218,800106,300231,300125,000192,500

3,665,0001,500,000250,000281,300533,800

87,500312,500

Page 57: Rab Jembatan Ulin Karangan 1

1,3003,800

437,50025,0005,000

10,00012,50016,300

22,500

Harga 2009 Ket.

(5) (6)

8,8003,8003,8003,8003,800

11,3008,800

11,3005,000

93,80050,000250,000250,00062,50018,800

6,3003,800

35,600175,000437,50043,80035,60033,80016,3005,0002,500

16,30043,800

Harga 2009 Ket.

(5) (6)

62,50081,30093,800116,300140,00075,00093,800

Page 58: Rab Jembatan Ulin Karangan 1

53,80093,80075,00081,30062,5008,800

9,176,3009,176,300

9,602,500

28,80032,50040,00056,30012,50016,30034,40032,50059,400108,100150,00043,800443,800 Dragon451,300 Sanyo (PH100)40,000

Sei.TabukSei.Tabuk

1,3003,8003,800 1 zak 60 biji

36,300 Gresik

16,30025,000 Biasa

57,500 Kotabaru58,800 Kotabaru61,300 Kotabaru

40,000 Jawa

Harga 2009 Ket.

(5) (6)

2,500 Jawa

Page 59: Rab Jembatan Ulin Karangan 1

98,800 Jawa25,000 Jawa

45,000 Sakura Roof40,000 sejenis83,800 Terbaik83,800 Terbaik21,300 Metal28,800 Metal

10,000 Nylon15,000 Nylon

8,800 Biasa5,000 Biasa

70,000 Baik57,500 Biasa32,500 Baik25,000 Sedang63,800 Biasa202,500 Terbaik88,800 Baik233,800 Baik73,800 Sedang

10,000 1 inchi17,500 1,5 inchi28,800 Lengkap5,0008,8008,800

21,300 Tj Baik

11,30025,0005,000 Baut

25,000

58,800

56,300

402,5001,127,500

177,500338,800

Page 60: Rab Jembatan Ulin Karangan 1

Harga 2009 Ket.

(5) (6)

411,300378,800411,300443,800402,500562,500

353,800411,300443,800

46,683,80036,221,30035,415,00033,001,300

7,245,000

Page 61: Rab Jembatan Ulin Karangan 1

TabelDaftar Harga Alat Berat

Harga 2009 Ket.

(5) (6)

140,000 US $ Komatsu 160,000 US $ Cartipiller

245,000 US $ Komatsu 267,500 US $ Cartipiller227,500 US $ Komatsu 337,500 US $ Cartipiller

186,300 US $ 120 H200,000 US $ Komatsu 307,500 US $ Cartipiller

15,160,000 Yen Jepang Nissan

Page 62: Rab Jembatan Ulin Karangan 1

ANALISA HARGA SATUAN BOW

Kode Harga satuan Harga Harga Total No. Uraian Analis & Koefisien Analis / Upah/Bahan Upah Bahan Harga

Satuan (Rp.) (Rp.) (Rp.) (Rp.) I. JALAN

1 Galian tanah biasa A.1 / M30.750 Pekerja tak Terampil 35,200.00 26,400.00 - 0.025 Mandor 63,600.00 1,590.00 -

27,990.00 - 27,990.00

2 Urugan Tanah A.1 / M30.300 Pekerja 35,200.00 10,560.00 - 0.010 Mandor 63,600.00 636.00 - 1.250 Tanah Urug (Sungai Raya) 55,500.00

11,196.00 - 11,196.00

3 Urugan Tanah A.1 / M30.300 Pekerja 35,200.00 10,560.00 - 0.010 Mandor 63,600.00 636.00 - 1.250 Tanah Urug (Daha Selatan) 103,900.00

11,196.00 - 11,196.00 II. PEK. KAYU / JEMBATAN KAYU

4 Meruncing tiang kayu ulin E.2 / Pot.0.040 Kepala tukang 67,000.00 2,680.00 - 0.400 Tukang 60,200.00 24,080.00 - 0.200 Pekerja 35,200.00 7,040.00 - 0.010 Mandor 63,600.00 636.00 -

34,436.00 - 34,436.00 Untuk tiang 20/20 cm 1,25 x E.2 43,045.00 - 43,045.00 Untuk tiang 15/15 cm 1 x E.2 34,436.00 34,436.00 Untuk tiang 10/10 cm 0,5 x E.2 17,218.00 - 17,218.00 Untuk tiang 5/10 cm 0.39 x E.2 13,739.96 13,739.96 Untuk tiang galam 1/12 x E.2 2,869.67 - 2,869.67

5 Membuat pen & lubang pada tiang/balok E.4 / Psg.0.060 Kepala tukang 67,000.00 4,020.00 - 0.600 Tukang 60,200.00 36,120.00 -

40,140.00 - 40,140.00

6 Papan bendung lidah & alur 2/7 E.7/ M'0.600 Kepala tukang 67,000.00 40,200.00 - 0.060 Tukang 60,200.00 3,612.00 - 0.300 Pekerja 35,200.00 10,560.00 - 0.015 Mandor 63,600.00 954.00 -

55,326.00 - 55,326.00 2/3 E.7 36,884.00 - 36,884.00

7 Meratakan dan memaku papan bendung E.10 / M'0.200 Pekerja 35,200.00 7,040.00 - 0.020 Mandor 63,600.00 1,272.00 - 0.000 Kayu perancah - - -

8,312.00 - 8,312.00

8 Memancang tiang ulin di tanah biasa E.13 / M'untuk ukuran penampang > 10/10 cm

0.004 Kepala tukang 67,000.00 268.00 - 0.040 Tukang 60,200.00 2,408.00 - 1.800 Pekerja 35,200.00 63,360.00 - 0.045 Mandor 63,600.00 2,862.00 -

68,898.00 - 68,898.00 Memancang tiang di tanah keras 1,5xE.13/M' 103,347.00 - 103,347.00 Memancang tiang di tanah pasir 2xE.13/M' 137,796.00 - 137,796.00 Untuk ukuran penampang 10/10 cm 0,5xE.13/M' 34,449.00 - 34,449.00 Untuk ukuran penampang 5/10 cm 0,39xE.13/M' 26,870.22 - 26,870.22 Untuk kayu galam 1/12xE.13/M' 5,741.50 - 5,741.50

Page 63: Rab Jembatan Ulin Karangan 1

ANALISA HARGA SATUAN BOW

Kode Harga satuan Harga Harga Total No. Uraian Analis & Koefisien Analis / Upah/Bahan Upah Bahan Harga

Satuan (Rp.) (Rp.) (Rp.) (Rp.) 9 Memasang papan bendung pada E.17 / M'

tanah lunak0.008 Kepala tukang 67,000.00 536.00 - 0.080 Tukang 60,200.00 4,816.00 - 1.000 Pekerja 35,200.00 35,200.00 - 0.025 Mandor 63,600.00 1,590.00 -

42,142.00 - 42,142.00 Pada tanah biasa x 1,25 52,677.50 - 52,677.50 Pada tanah keras x 1,50 63,213.00 - 63,213.00

10 Leger dan balok tumbuk (tdk termasuk F.1 / M3baut mur, paku beugel)

0.150 Kepala tukang 67,000.00 10,050.00 - 1.500 Tukang 60,200.00 90,300.00 - 5.000 Pekerja 35,200.00 176,000.00 - 0.250 Mandor 63,600.00 15,900.00 - 1.100 Kayu Ulin 8,167,600.00 8,984,360.00

292,250.00 8,984,360.00 9,276,610.00

11 Kayu sandaran pemikul, pelancar F.3 / M3(tdk termasuk baut, paku & beugel)

2.400 Kepala tukang 67,000.00 160,800.00 - 24.000 Tukang 60,200.00 1,444,800.00 -

8.000 Pekerja 35,200.00 281,600.00 - 0.400 Mandor 63,600.00 25,440.00 - 1.100 Kayu Ulin 8,167,600.00 8,984,360.00

1,912,640.00 8,984,360.00 10,897,000.00

12 Memasang papan lantai ulin F.8 / M20.050 Kepala tukang 67,000.00 3,350.00 - 0.500 Tukang 60,200.00 30,100.00 - 0.200 Pekerja 35,200.00 7,040.00 - 0.010 Mandor 63,600.00 636.00 -

a 41,126.00 - 41,126.00

13 Mengerjakan papan siring / turap ulin F.37 / M20.080 Kepala tukang 67,000.00 5,360.00 - 0.800 Tukang 60,200.00 48,160.00 - 0.280 Pekerja 35,200.00 9,856.00 - 0.010 Mandor 63,600.00 636.00 -

64,012.00 - 64,012.00

Page 64: Rab Jembatan Ulin Karangan 1

DAFTAR KUANTITAS DAN HARGA

Kegiatan : REHABILITASI JEMBATAN KAYU ULIN Panjang : 3.50 M' Lebar : 4.00 M'

NO URAIAN PEKERJAAN SAT.

1 UMUM- Pengukuran/pasang Patok Ls- Pembersihan Lap./jaga malam, dll. Ls

2 BAGIAN PEK. BALOK ULIN- Tiang 15/15 - 3 m' 0.15 x 0.15 x 3 x 2 x 2- Sloof 15/15 - 4 m' 0.15 x 0.15 x 4 x 2- Gelagar 10/10 - 3,5 m' 0.1 x 0.1 x 3.5 x 5- Sunduk 5/10 - 0,50 m' 0.05 x 0.1 x 0.5 x 2 x 2- Suai silang 5/10 - 4 m' 0.05 x 0.1 x 4 x 2- Balok tumbuk 6/8 - 4 m' 0.06 x 0.08 x 4 x 2

3 BAGIAN PEK. PAPAN ULIN- Lantai 5/18 - 4 m' m3 0.05 x 0.2 x 4 x 19 - Les 2/10 - 3.5 m' m3 0.02 x 0.1 x 3.5 x 2

4 Melancip Tiang Pot 4 + 125 Memancang Tiang M' 146 pen dan lubang Pas 4 + 127 Pek. Kayu Kasar 0.71 8 Memasang Papan Lantai/Rel ban/Les 3.50 x 4.00 + 0.8 x 3.50 9 Pek. Beugel 3.30.300 Bh 4 x 3

10 Pek. Baut dia. 3/8 " Bj 6 x 3 + 38 + 813 PAGAR

- Tiang pagar 6/8 0.06 x 0.08 x 8 x 1- Papan pagar 2/20 0.2 x 1 x 3.5 x 2- Papan pagar 2/10 0.1 x 1 x 3.5 x 2

14 SIRING SAYAP/SAMPING JEMBATAN- Ulin 10/10-3 0.1 x 0.1 x 3 x 2 x 4- Ulin 10/10-2 0.1 x 0.1 x 2 x 2 x 2- Ulin 5/10 0.05 x 0.1 x 0.6 x 4 + 4.00 x 2- Papan ulin 3/20 -2 M M3 0.03 x 0.2 x 2 x 3 x 4- Papan ulin 3/20 muka jembatan M3 0.03 x 0.2 x 2 x 4.00 x 2- Ulin 2 X 5/10 tarik 0.05 x 0.1 x 3 x 2 x 4- memasang papan 0.6 x 2 x 4 + 4.00 x 2 x 2

J U M L A HPPN 10%T O T A L

P E M B U L A T A N

Terbilang : Seratus delapan belas juta tiga ratus empat puluh empat ribu rupiah

M3

M3

M3

M3

M3

M3

M3

M2

M3

M2

M2

M3

M3

M3

M3

M2

Page 65: Rab Jembatan Ulin Karangan 1

DAFTAR KUANTITAS DAN HARGA

VOLUME

11

0.270 0.180 0.175 0.010 0.040 0.038

0.760 0.014

16.000 14.000 16.000 0.713 16.800 12.000 64.000

0.038 1.400 0.700

0.240 0.080 0.052 0.144 0.096 0.120 20.800

J U M L A HPPN 10%T O T A L

P E M B U L A T A N

Page 66: Rab Jembatan Ulin Karangan 1

DAFTAR KUANTITAS DAN HARGA

Kegiatan : REHABILITASI JEMBATAN KAYU ULIN Panjang : 3.50 M' Lebar : 4.00 M'

HARGA JUMLAHNO URAIAN PEKERJAAN SAT. VOLUME SATUAN HARGA

( Rp. ) ( Rp. )

1 UMUM- Pengukuran/pasang Patok/bongkaran Ls 1.000 2,500,000.00 2,500,000.00 - Pembersihan Lap./jaga malam, dll. Ls 1.000 1,000,000.00 1,000,000.00 - Pengecatan Pagar Ls 1.000 700,000.00 700,000.00 - Papan nama kegiatan Ls 1.000 300,000.00 300,000.00

2 BAGIAN PEK. BALOK ULIN- Tiang 15/15 - 3 m' 0.2700 8,167,600.00 2,205,252.00 - Sloof 15/15 - 4 m' 0.1800 8,167,600.00 1,470,168.00 - Gelagar 10/10 - 3,5 m' 0.1750 8,167,600.00 1,429,330.00 - Sunduk 5/10 - 0,50 m' 0.0100 8,167,600.00 81,676.00 - Suai 5/10 - 4 m' 0.0400 8,167,600.00 326,704.00 - Balok tumbuk 6/8-4 m 0.0384 8,167,600.00 313,635.84

3 BAGIAN PEK. PAPAN ULIN- Lantai 0.7600 6,945,700.00 5,278,732.00 - Les 0.0140 6,945,700.00 97,239.80

4 Melancip Tiang Pot 16.0000 17,218.00 275,488.00 5 Memancang Tiang M' 14.0000 34,449.00 482,286.00 6 pen dan lubang Pas 16.0000 40,140.00 642,240.00 7 Pek. Kayu Kasar 0.7134 1,116,400.00 796,439.76 8 Memasang Papan Lantai/Rel ban/Pagar/Siri 39.7000 41,126.00 1,632,702.20 9 Pengadaan Beugel 3.30.300 Bh 12.0000 7,200.00 86,400.00

10 Pengadaan Baut dia. 3/8 " Bj 64.0000 4,500.00 288,000.00 11 Memasang klam Bj 8.0000 22,700.00 181,600.00

PAGAR12 Tiang pagar 6/8 0.0384 8,167,600.00 313,635.84 13 Papan pagar 2/20 0.0280 6,945,700.00 194,479.60 14 Papan pagar 2/10 0.0140 6,945,700.00 97,239.80 15 Pek. Kayu Kasar 0.0384 1,116,400.00 42,869.76

SIRING SAYAP/SAMPING JEMBATAN16 Ulin 10/10-3 0.2400 8,167,600.00 1,960,224.00 17 Ulin 10/10-2 0.0800 8,167,600.00 653,408.00 18 Papan ulin 3/20 -2 M 0.2400 6,945,700.00 1,666,968.00 19 Ulin 2 X 5/10 tarik 0.1200 8,167,600.00 980,112.00 20 Pek. Kayu Kasar 0.4400 1,116,400.00 491,216.00 22 Pek Urugan Tanah Biasa M3 16.0000 55,500.00 888,000.00

J U M L A H 27,376,046.60 PPN 10% 2,737,604.66 T O T A L 30,113,651.26

P E M B U L A T A N 30,113,000.00

Terbilang : tiga puluh juta seratus tiga belas ribu rupiah

M3

M3

M3

M3

M3

M3

M3

M3

M3

M2

M3

M3

M3

M3

M3

M3

M3

M3

M3

Page 67: Rab Jembatan Ulin Karangan 1

Disetujui Oleh :Pemimpin Proyek

BOYKE W. TRIESTIYANTO, BENIP. 110 041 536

Disetujui Oleh :Pemimpin Proyek

BOYKE W. TRIESTIYANTO, BENIP. 110 041 536

Disetujui Oleh :Pemimpin Proyek

BOYKE W. TRIESTIYANTO, BENIP. 110 041 536

Disetujui Oleh :Pemimpin Proyek

BOYKE W. TRIESTIYANTO, BENIP. 110 041 536

Disetujui Oleh :Pemimpin Proyek

BOYKE W. TRIESTIYANTO, BENIP. 110 041 536

Disetujui Oleh :Pemimpin Proyek

BOYKE W. TRIESTIYANTO, BENIP. 110 041 536

Disetujui Oleh :Pemimpin Proyek

BOYKE W. TRIESTIYANTO, BENIP. 110 041 536

Disetujui Oleh :Pemimpin Proyek

BOYKE W. TRIESTIYANTO, BENIP. 110 041 536

Disetujui Oleh :Pemimpin Proyek

BOYKE W. TRIESTIYANTO, BENIP. 110 041 536

Disetujui Oleh :Pemimpin Proyek

BOYKE W. TRIESTIYANTO, BENIP. 110 041 536

Disetujui Oleh :Pemimpin Proyek

BOYKE W. TRIESTIYANTO, BENIP. 110 041 536

Disetujui Oleh :Pemimpin Proyek

BOYKE W. TRIESTIYANTO, BENIP. 110 041 536

Disetujui Oleh :Pemimpin Proyek

BOYKE W. TRIESTIYANTO, BENIP. 110 041 536

Disetujui Oleh :Pemimpin Proyek

BOYKE W. TRIESTIYANTO, BENIP. 110 041 536

Disetujui Oleh :Pemimpin Proyek

BOYKE W. TRIESTIYANTO, BENIP. 110 041 536

Disetujui Oleh :Pemimpin Proyek

BOYKE W. TRIESTIYANTO, BENIP. 110 041 536

Disetujui Oleh :Pemimpin Proyek

BOYKE W. TRIESTIYANTO, BENIP. 110 041 536

Disetujui Oleh :Pemimpin Proyek

BOYKE W. TRIESTIYANTO, BENIP. 110 041 536

Disetujui Oleh :Pemimpin Proyek

BOYKE W. TRIESTIYANTO, BENIP. 110 041 536

Disetujui Oleh :Pemimpin Proyek

BOYKE W. TRIESTIYANTO, BENIP. 110 041 536

Disetujui Oleh :Pemimpin Proyek

BOYKE W. TRIESTIYANTO, BENIP. 110 041 536

Disetujui Oleh :Pemimpin Proyek

BOYKE W. TRIESTIYANTO, BENIP. 110 041 536

Disetujui Oleh :Pemimpin Proyek

BOYKE W. TRIESTIYANTO, BENIP. 110 041 536

Disetujui Oleh :Pemimpin Proyek

BOYKE W. TRIESTIYANTO, BENIP. 110 041 536

Disetujui Oleh :Pemimpin Proyek

BOYKE W. TRIESTIYANTO, BENIP. 110 041 536

Disetujui Oleh :Pemimpin Proyek

BOYKE W. TRIESTIYANTO, BENIP. 110 041 536

Disetujui Oleh :Pemimpin Proyek

BOYKE W. TRIESTIYANTO, BENIP. 110 041 536

Disetujui Oleh :Pemimpin Proyek

BOYKE W. TRIESTIYANTO, BENIP. 110 041 536

Disetujui Oleh :Pemimpin Proyek

BOYKE W. TRIESTIYANTO, BENIP. 110 041 536

Disetujui Oleh :Pemimpin Proyek

BOYKE W. TRIESTIYANTO, BENIP. 110 041 536

Disetujui Oleh :Pemimpin Proyek

BOYKE W. TRIESTIYANTO, BENIP. 110 041 536

Disetujui Oleh :Pemimpin Proyek

BOYKE W. TRIESTIYANTO, BENIP. 110 041 536

Disetujui Oleh :Pemimpin Proyek

BOYKE W. TRIESTIYANTO, BENIP. 110 041 536

Disetujui Oleh :Pemimpin Proyek

BOYKE W. TRIESTIYANTO, BENIP. 110 041 536

Disetujui Oleh :Pemimpin Proyek

BOYKE W. TRIESTIYANTO, BENIP. 110 041 536

Disetujui Oleh :Pemimpin Proyek

BOYKE W. TRIESTIYANTO, BENIP. 110 041 536

Disetujui Oleh :Pemimpin Proyek

BOYKE W. TRIESTIYANTO, BENIP. 110 041 536

Disetujui Oleh :Pemimpin Proyek

BOYKE W. TRIESTIYANTO, BENIP. 110 041 536

Disetujui Oleh :Pemimpin Proyek

BOYKE W. TRIESTIYANTO, BENIP. 110 041 536

Disetujui Oleh :Pemimpin Proyek

BOYKE W. TRIESTIYANTO, BENIP. 110 041 536

Disetujui Oleh :Pemimpin Proyek

BOYKE W. TRIESTIYANTO, BENIP. 110 041 536

Disetujui Oleh :Pemimpin Proyek

BOYKE W. TRIESTIYANTO, BENIP. 110 041 536

Disetujui Oleh :Pemimpin Proyek

BOYKE W. TRIESTIYANTO, BENIP. 110 041 536

Disetujui Oleh :Pemimpin Proyek

BOYKE W. TRIESTIYANTO, BENIP. 110 041 536

Disetujui Oleh :Pemimpin Proyek

BOYKE W. TRIESTIYANTO, BENIP. 110 041 536

Disetujui Oleh :Pemimpin Proyek

BOYKE W. TRIESTIYANTO, BENIP. 110 041 536

Disetujui Oleh :Pemimpin Proyek

BOYKE W. TRIESTIYANTO, BENIP. 110 041 536

Disetujui Oleh :Pemimpin Proyek

BOYKE W. TRIESTIYANTO, BENIP. 110 041 536

Disetujui Oleh :Pemimpin Proyek

BOYKE W. TRIESTIYANTO, BENIP. 110 041 536

Disetujui Oleh :Pemimpin Proyek

BOYKE W. TRIESTIYANTO, BENIP. 110 041 536

Disetujui Oleh :Pemimpin Proyek

BOYKE W. TRIESTIYANTO, BENIP. 110 041 536

Disetujui Oleh :Pemimpin Proyek

BOYKE W. TRIESTIYANTO, BENIP. 110 041 536

Disetujui Oleh :Pemimpin Proyek

BOYKE W. TRIESTIYANTO, BENIP. 110 041 536

Disetujui Oleh :Pemimpin Proyek

BOYKE W. TRIESTIYANTO, BENIP. 110 041 536

Disetujui Oleh :Pemimpin Proyek

BOYKE W. TRIESTIYANTO, BENIP. 110 041 536

Disetujui Oleh :Pemimpin Proyek

BOYKE W. TRIESTIYANTO, BENIP. 110 041 536

Disetujui Oleh :Pemimpin Proyek

BOYKE W. TRIESTIYANTO, BENIP. 110 041 536

Disetujui Oleh :Pemimpin Proyek

BOYKE W. TRIESTIYANTO, BENIP. 110 041 536

Disetujui Oleh :Pemimpin Proyek

BOYKE W. TRIESTIYANTO, BENIP. 110 041 536

Disetujui Oleh :Pemimpin Proyek

BOYKE W. TRIESTIYANTO, BENIP. 110 041 536

Disetujui Oleh :Pemimpin Proyek

BOYKE W. TRIESTIYANTO, BENIP. 110 041 536

Disetujui Oleh :Pemimpin Proyek

BOYKE W. TRIESTIYANTO, BENIP. 110 041 536

Disetujui Oleh :Pemimpin Proyek

BOYKE W. TRIESTIYANTO, BENIP. 110 041 536

Disetujui Oleh :Pemimpin Proyek

BOYKE W. TRIESTIYANTO, BENIP. 110 041 536

Disetujui Oleh :Pemimpin Proyek

BOYKE W. TRIESTIYANTO, BENIP. 110 041 536

Disetujui Oleh :Pemimpin Proyek

BOYKE W. TRIESTIYANTO, BENIP. 110 041 536

Disetujui Oleh :Pemimpin Proyek

BOYKE W. TRIESTIYANTO, BENIP. 110 041 536

Disetujui Oleh :Pemimpin Proyek

BOYKE W. TRIESTIYANTO, BENIP. 110 041 536

Disetujui Oleh :Pemimpin Proyek

BOYKE W. TRIESTIYANTO, BENIP. 110 041 536

Disetujui Oleh :Pemimpin Proyek

BOYKE W. TRIESTIYANTO, BENIP. 110 041 536

Disetujui Oleh :Pemimpin Proyek

BOYKE W. TRIESTIYANTO, BENIP. 110 041 536

Disetujui Oleh :Pemimpin Proyek

BOYKE W. TRIESTIYANTO, BENIP. 110 041 536

Disetujui Oleh :Pemimpin Proyek

BOYKE W. TRIESTIYANTO, BENIP. 110 041 536

Disetujui Oleh :Pemimpin Proyek

BOYKE W. TRIESTIYANTO, BENIP. 110 041 536

Disetujui Oleh :Pemimpin Proyek

BOYKE W. TRIESTIYANTO, BENIP. 110 041 536

Disetujui Oleh :Pemimpin Proyek

BOYKE W. TRIESTIYANTO, BENIP. 110 041 536

Disetujui Oleh :Pemimpin Proyek

BOYKE W. TRIESTIYANTO, BENIP. 110 041 536

Disetujui Oleh :Pemimpin Proyek

BOYKE W. TRIESTIYANTO, BENIP. 110 041 536

Disetujui Oleh :Pemimpin Proyek

BOYKE W. TRIESTIYANTO, BENIP. 110 041 536

Disetujui Oleh :Pemimpin Proyek

BOYKE W. TRIESTIYANTO, BENIP. 110 041 536

Disetujui Oleh :Pemimpin Proyek

BOYKE W. TRIESTIYANTO, BENIP. 110 041 536

Disetujui Oleh :Pemimpin Proyek

BOYKE W. TRIESTIYANTO, BENIP. 110 041 536

Disetujui Oleh :Pemimpin Proyek

BOYKE W. TRIESTIYANTO, BENIP. 110 041 536

Disetujui Oleh :Pemimpin Proyek

BOYKE W. TRIESTIYANTO, BENIP. 110 041 536

Disetujui Oleh :Pemimpin Proyek

BOYKE W. TRIESTIYANTO, BENIP. 110 041 536

Disetujui Oleh :Pemimpin Proyek

BOYKE W. TRIESTIYANTO, BENIP. 110 041 536

Disetujui Oleh :Pemimpin Proyek

BOYKE W. TRIESTIYANTO, BENIP. 110 041 536

Disetujui Oleh :Pemimpin Proyek

BOYKE W. TRIESTIYANTO, BENIP. 110 041 536

Disetujui Oleh :Pemimpin Proyek

BOYKE W. TRIESTIYANTO, BENIP. 110 041 536

Disetujui Oleh :Pemimpin Proyek

BOYKE W. TRIESTIYANTO, BENIP. 110 041 536

Disetujui Oleh :Pemimpin Proyek

BOYKE W. TRIESTIYANTO, BENIP. 110 041 536

Disetujui Oleh :Pemimpin Proyek

BOYKE W. TRIESTIYANTO, BENIP. 110 041 536

Disetujui Oleh :Pemimpin Proyek

BOYKE W. TRIESTIYANTO, BENIP. 110 041 536

Disetujui Oleh :Pemimpin Proyek

BOYKE W. TRIESTIYANTO, BENIP. 110 041 536

Disetujui Oleh :Pemimpin Proyek

BOYKE W. TRIESTIYANTO, BENIP. 110 041 536

Disetujui Oleh :Pemimpin Proyek

BOYKE W. TRIESTIYANTO, BENIP. 110 041 536

Disetujui Oleh :Pemimpin Proyek

BOYKE W. TRIESTIYANTO, BENIP. 110 041 536

Disetujui Oleh :Pemimpin Proyek

BOYKE W. TRIESTIYANTO, BENIP. 110 041 536

Disetujui Oleh :Pemimpin Proyek

BOYKE W. TRIESTIYANTO, BENIP. 110 041 536

Disetujui Oleh :Pemimpin Proyek

BOYKE W. TRIESTIYANTO, BENIP. 110 041 536

Disetujui Oleh :Pemimpin Proyek

BOYKE W. TRIESTIYANTO, BENIP. 110 041 536

Disetujui Oleh :Pemimpin Proyek

BOYKE W. TRIESTIYANTO, BENIP. 110 041 536

Disetujui Oleh :Pemimpin Proyek

BOYKE W. TRIESTIYANTO, BENIP. 110 041 536

Disetujui Oleh :Pemimpin Proyek

BOYKE W. TRIESTIYANTO, BENIP. 110 041 536

Disetujui Oleh :Pemimpin Proyek

BOYKE W. TRIESTIYANTO, BENIP. 110 041 536

Disetujui Oleh :Pemimpin Proyek

BOYKE W. TRIESTIYANTO, BENIP. 110 041 536

Disetujui Oleh :Pemimpin Proyek

BOYKE W. TRIESTIYANTO, BENIP. 110 041 536

Disetujui Oleh :Pemimpin Proyek

BOYKE W. TRIESTIYANTO, BENIP. 110 041 536

Disetujui Oleh :Pemimpin Proyek

BOYKE W. TRIESTIYANTO, BENIP. 110 041 536

Disetujui Oleh :Pemimpin Proyek

BOYKE W. TRIESTIYANTO, BENIP. 110 041 536

Disetujui Oleh :Pemimpin Proyek

BOYKE W. TRIESTIYANTO, BENIP. 110 041 536

Disetujui Oleh :Pemimpin Proyek

BOYKE W. TRIESTIYANTO, BENIP. 110 041 536

Disetujui Oleh :Pemimpin Proyek

BOYKE W. TRIESTIYANTO, BENIP. 110 041 536

Disetujui Oleh :Pemimpin Proyek

BOYKE W. TRIESTIYANTO, BENIP. 110 041 536

Disetujui Oleh :Pemimpin Proyek

BOYKE W. TRIESTIYANTO, BENIP. 110 041 536

Disetujui Oleh :Pemimpin Proyek

BOYKE W. TRIESTIYANTO, BENIP. 110 041 536

Disetujui Oleh :Pemimpin Proyek

BOYKE W. TRIESTIYANTO, BENIP. 110 041 536

Disetujui Oleh :Pemimpin Proyek

BOYKE W. TRIESTIYANTO, BENIP. 110 041 536

Disetujui Oleh :Pemimpin Proyek

BOYKE W. TRIESTIYANTO, BENIP. 110 041 536

Disetujui Oleh :Pemimpin Proyek

BOYKE W. TRIESTIYANTO, BENIP. 110 041 536

Disetujui Oleh :Pemimpin Proyek

BOYKE W. TRIESTIYANTO, BENIP. 110 041 536

Disetujui Oleh :Pemimpin Proyek

BOYKE W. TRIESTIYANTO, BENIP. 110 041 536

Disetujui Oleh :Pemimpin Proyek

BOYKE W. TRIESTIYANTO, BENIP. 110 041 536

Disetujui Oleh :Pemimpin Proyek

BOYKE W. TRIESTIYANTO, BENIP. 110 041 536

Disetujui Oleh :Pemimpin Proyek

BOYKE W. TRIESTIYANTO, BENIP. 110 041 536

Disetujui Oleh :Pemimpin Proyek

BOYKE W. TRIESTIYANTO, BENIP. 110 041 536

Disetujui Oleh :Pemimpin Proyek

BOYKE W. TRIESTIYANTO, BENIP. 110 041 536

Disetujui Oleh :Pemimpin Proyek

BOYKE W. TRIESTIYANTO, BENIP. 110 041 536

Disetujui Oleh :Pemimpin Proyek

BOYKE W. TRIESTIYANTO, BENIP. 110 041 536

Disetujui Oleh :Pemimpin Proyek

BOYKE W. TRIESTIYANTO, BENIP. 110 041 536

Disetujui Oleh :Pemimpin Proyek

BOYKE W. TRIESTIYANTO, BENIP. 110 041 536

Disetujui Oleh :Pemimpin Proyek

BOYKE W. TRIESTIYANTO, BENIP. 110 041 536

Disetujui Oleh :Pemimpin Proyek

BOYKE W. TRIESTIYANTO, BENIP. 110 041 536

Disetujui Oleh :Pemimpin Proyek

BOYKE W. TRIESTIYANTO, BENIP. 110 041 536

Disetujui Oleh :Pemimpin Proyek

BOYKE W. TRIESTIYANTO, BENIP. 110 041 536

Disetujui Oleh :Pemimpin Proyek

BOYKE W. TRIESTIYANTO, BENIP. 110 041 536

Disetujui Oleh :Pemimpin Proyek

BOYKE W. TRIESTIYANTO, BENIP. 110 041 536

Disetujui Oleh :Pemimpin Proyek

BOYKE W. TRIESTIYANTO, BENIP. 110 041 536

Disetujui Oleh :Pemimpin Proyek

BOYKE W. TRIESTIYANTO, BENIP. 110 041 536

Disetujui Oleh :Pemimpin Proyek

BOYKE W. TRIESTIYANTO, BENIP. 110 041 536

Disetujui Oleh :Pemimpin Proyek

BOYKE W. TRIESTIYANTO, BENIP. 110 041 536

Disetujui Oleh :Pemimpin Proyek

BOYKE W. TRIESTIYANTO, BENIP. 110 041 536

Disetujui Oleh :Pemimpin Proyek

BOYKE W. TRIESTIYANTO, BENIP. 110 041 536

Disetujui Oleh :Pemimpin Proyek

BOYKE W. TRIESTIYANTO, BENIP. 110 041 536

Disetujui Oleh :Pemimpin Proyek

BOYKE W. TRIESTIYANTO, BENIP. 110 041 536

Disetujui Oleh :Pemimpin Proyek

BOYKE W. TRIESTIYANTO, BENIP. 110 041 536

Disetujui Oleh :Pemimpin Proyek

BOYKE W. TRIESTIYANTO, BENIP. 110 041 536

Disetujui Oleh :Pemimpin Proyek

BOYKE W. TRIESTIYANTO, BENIP. 110 041 536

Disetujui Oleh :Pemimpin Proyek

BOYKE W. TRIESTIYANTO, BENIP. 110 041 536

Disetujui Oleh :Pemimpin Proyek

BOYKE W. TRIESTIYANTO, BENIP. 110 041 536

Disetujui Oleh :Pemimpin Proyek

BOYKE W. TRIESTIYANTO, BENIP. 110 041 536

Disetujui Oleh :Pemimpin Proyek

BOYKE W. TRIESTIYANTO, BENIP. 110 041 536

Disetujui Oleh :Pemimpin Proyek

BOYKE W. TRIESTIYANTO, BENIP. 110 041 536

Disetujui Oleh :Pemimpin Proyek

BOYKE W. TRIESTIYANTO, BENIP. 110 041 536

Disetujui Oleh :Pemimpin Proyek

BOYKE W. TRIESTIYANTO, BENIP. 110 041 536

Disetujui Oleh :Pemimpin Proyek

BOYKE W. TRIESTIYANTO, BENIP. 110 041 536

Disetujui Oleh :Pemimpin Proyek

BOYKE W. TRIESTIYANTO, BENIP. 110 041 536

Disetujui Oleh :Pemimpin Proyek

BOYKE W. TRIESTIYANTO, BENIP. 110 041 536

Disetujui Oleh :Pemimpin Proyek

BOYKE W. TRIESTIYANTO, BENIP. 110 041 536

Disetujui Oleh :Pemimpin Proyek

BOYKE W. TRIESTIYANTO, BENIP. 110 041 536

Disetujui Oleh :Pemimpin Proyek

BOYKE W. TRIESTIYANTO, BENIP. 110 041 536

Disetujui Oleh :Pemimpin Proyek

BOYKE W. TRIESTIYANTO, BENIP. 110 041 536

Disetujui Oleh :Pemimpin Proyek

BOYKE W. TRIESTIYANTO, BENIP. 110 041 536

Disetujui Oleh :Pemimpin Proyek

BOYKE W. TRIESTIYANTO, BENIP. 110 041 536

Disetujui Oleh :Pemimpin Proyek

BOYKE W. TRIESTIYANTO, BENIP. 110 041 536

Disetujui Oleh :Pemimpin Proyek

BOYKE W. TRIESTIYANTO, BENIP. 110 041 536

Disetujui Oleh :Pemimpin Proyek

BOYKE W. TRIESTIYANTO, BENIP. 110 041 536

Disetujui Oleh :Pemimpin Proyek

BOYKE W. TRIESTIYANTO, BENIP. 110 041 536

Disetujui Oleh :Pemimpin Proyek

BOYKE W. TRIESTIYANTO, BENIP. 110 041 536

Disetujui Oleh :Pemimpin Proyek

BOYKE W. TRIESTIYANTO, BENIP. 110 041 536

Disetujui Oleh :Pemimpin Proyek

BOYKE W. TRIESTIYANTO, BENIP. 110 041 536

Disetujui Oleh :Pemimpin Proyek

BOYKE W. TRIESTIYANTO, BENIP. 110 041 536

Disetujui Oleh :Pemimpin Proyek

BOYKE W. TRIESTIYANTO, BENIP. 110 041 536

Disetujui Oleh :Pemimpin Proyek

BOYKE W. TRIESTIYANTO, BENIP. 110 041 536

Disetujui Oleh :Pemimpin Proyek

BOYKE W. TRIESTIYANTO, BENIP. 110 041 536

Disetujui Oleh :Pemimpin Proyek

BOYKE W. TRIESTIYANTO, BENIP. 110 041 536

Disetujui Oleh :Pemimpin Proyek

BOYKE W. TRIESTIYANTO, BENIP. 110 041 536

Disetujui Oleh :Pemimpin Proyek

BOYKE W. TRIESTIYANTO, BENIP. 110 041 536

Disetujui Oleh :Pemimpin Proyek

BOYKE W. TRIESTIYANTO, BENIP. 110 041 536

Disetujui Oleh :Pemimpin Proyek

BOYKE W. TRIESTIYANTO, BENIP. 110 041 536

Disetujui Oleh :Pemimpin Proyek

BOYKE W. TRIESTIYANTO, BENIP. 110 041 536

Disetujui Oleh :Pemimpin Proyek

BOYKE W. TRIESTIYANTO, BENIP. 110 041 536

Disetujui Oleh :Pemimpin Proyek

BOYKE W. TRIESTIYANTO, BENIP. 110 041 536

Disetujui Oleh :Pemimpin Proyek

BOYKE W. TRIESTIYANTO, BENIP. 110 041 536

Disetujui Oleh :Pemimpin Proyek

BOYKE W. TRIESTIYANTO, BENIP. 110 041 536

Disetujui Oleh :Pemimpin Proyek

BOYKE W. TRIESTIYANTO, BENIP. 110 041 536

Disetujui Oleh :Pemimpin Proyek

BOYKE W. TRIESTIYANTO, BENIP. 110 041 536

Disetujui Oleh :Pemimpin Proyek

BOYKE W. TRIESTIYANTO, BENIP. 110 041 536

Disetujui Oleh :Pemimpin Proyek

BOYKE W. TRIESTIYANTO, BENIP. 110 041 536

Disetujui Oleh :Pemimpin Proyek

BOYKE W. TRIESTIYANTO, BENIP. 110 041 536

Disetujui Oleh :Pemimpin Proyek

BOYKE W. TRIESTIYANTO, BENIP. 110 041 536

Disetujui Oleh :Pemimpin Proyek

BOYKE W. TRIESTIYANTO, BENIP. 110 041 536

Disetujui Oleh :Pemimpin Proyek

BOYKE W. TRIESTIYANTO, BENIP. 110 041 536

Disetujui Oleh :Pemimpin Proyek

BOYKE W. TRIESTIYANTO, BENIP. 110 041 536

Disetujui Oleh :Pemimpin Proyek

BOYKE W. TRIESTIYANTO, BENIP. 110 041 536

Disetujui Oleh :Pemimpin Proyek

BOYKE W. TRIESTIYANTO, BENIP. 110 041 536

Disetujui Oleh :Pemimpin Proyek

BOYKE W. TRIESTIYANTO, BENIP. 110 041 536

Disetujui Oleh :Pemimpin Proyek

BOYKE W. TRIESTIYANTO, BENIP. 110 041 536

Disetujui Oleh :Pemimpin Proyek

BOYKE W. TRIESTIYANTO, BENIP. 110 041 536

Disetujui Oleh :Pemimpin Proyek

BOYKE W. TRIESTIYANTO, BENIP. 110 041 536

Disetujui Oleh :Pemimpin Proyek

BOYKE W. TRIESTIYANTO, BENIP. 110 041 536

Disetujui Oleh :Pemimpin Proyek

BOYKE W. TRIESTIYANTO, BENIP. 110 041 536

Disetujui Oleh :Pemimpin Proyek

BOYKE W. TRIESTIYANTO, BENIP. 110 041 536

Disetujui Oleh :Pemimpin Proyek

BOYKE W. TRIESTIYANTO, BENIP. 110 041 536

Page 68: Rab Jembatan Ulin Karangan 1

7,812,500.00 7,102,200.00 7,812,500.00 7,102,200.00 7,812,500.00 7,102,200.00 7,812,500.00 7,102,200.00 7,812,500.00 7,102,200.00

- -

6,643,750.00 6,039,700.00 6,643,750.00 6,039,700.00

- 35,895.86 32,600.00 84,393.50 76,700.00 39,687.65 36,000.00 1,228,126.90 1,116,400.00 49,417.37 44,900.00 8,000.00 7,200.00 5,000.00 4,500.00 25,000.00 22,700.00

Page 69: Rab Jembatan Ulin Karangan 1

KALAU MAU MENGCOPY HARUS KE BAWAH

* ************. 30,113,000.00 ************ Model (1-3): 1. ************ ************ ************ ************Tiga puluh juta seratus tiga belas ribu rupiah.************ ****************************** ************ ************ ************ ************************ satu dua tiga empat lima enam tujuh delapan se *************** ribu juta milyar *************** 000030113000 *************** ****************************** ************ ************ ************ ************************ 000 1 *************** 0 *************** sepuluh *************** 0 *************** 0 *************** *************** *************** *************** *************** 113 2 *************** 1 *************** seratus tiga belas *************** 1 tiga *************** 3 tiga *************** tiga belas tiga belas *************** seratus tiga belas ribu *************** *************** *************** 030 3 *************** 0 tiga puluh *************** sepuluh *************** 3 *************** 0 tiga puluh *************** tiga puluh tiga puluh *************** tiga puluh juta *************** *************** *************** 000 4 *************** 0 *************** sepuluh *************** 0 *************** 0 *************** *************** ***

Page 70: Rab Jembatan Ulin Karangan 1

************ *************** 000 1 *************** 0 *************** sepuluh *************** 0 **************** 0 *************** *************** *************** 46 00 0 *************** 46 ************ ************ ************

46 00 tiga puluh juta seratus tiga belas ribu************ tiga puluh juta seratus tiga tiga puluh j * tiga puluh juta seratus tiga belas ribu************ tiga puluh juta seratus tiga tiga puluh j * tiga puluh juta seratus tiga belas ribu rupiah

1 Tiga puluh juta seratus tiga belas ribu rupiah.2 Tiga puluh juta seratus tiga belas ribu rupiah.3 Tiga puluh juta seratus tiga belas ribu rupiah.

************ ****************************** ************ ************ ************ ************