DAFTAR HARGA SATUAN UPAH DAN BAHAN SURVEY PER JANUARI 2008 NO U R A I A N SATUAN HARGA DASAR (Rp) A U P A H 1 Kepala Tukang Oh 2 Tukang Oh 3 Mandor Oh 4 Pekerja Tidak Terlatih Oh 5 Pekerja Terlatih Oh 6 Masinis Oh 7 Operator Oh 8 Sopir Oh 9 Pembantu Masinis Oh 10 Supervisor Oh 11 Pemasak Aspal Oh 12 Penjaga Oh 13 Pembantu Sopir Oh 14 Mekanik Oh 15 Surveyor Oh B B A H A N / M A T E R I A L 1 Agregat Halus 2 Agregat Kasar 3 Agregat Kelas A 4 Agregat Kelas B 5 Agregat Kelas C 6 Aluminium Foil 7 Amplas Biasa Lbr 8 Amplas Niken Lbr 9 Atap Aluminium Zink Coated (seng) tebal 0,25 mm Lbr 10 Atap Aluminium Zink Coated (seng) tebal 0,3 mm Lbr 11 Atap Aluminium Zink Coated (seng) tebal 0,4 mm Lbr 12 Atap Aluminium Zincalume, tebal 0,25 mm Lbr 13 Atap Aluminium Zincalume, tebal 0,3 mm Lbr 14 Atap Aluminium Zincalume, tebal 0,4 mm Lbr 15 Atap Aluminium Gelombang tebal 0,5 mm Lbr 16 Atap Fiber warna"Polycarbon" tbl. 5 mm 17 Atap Genteng Beton Lokal buah 18 Atap Genteng Beton buah 19 Atap Genteng Buleleng buah 20 Atap Genteng Keramik biasa berglazur buah 21 Atap Genteng Keramik KIA Berglazur Natural buah 22 Atap Genteng Keramik KIA/sejenis Berglazur warna buah 23 Atap Genteng Metal Zincalume 1x6 (38,5cm X 100cm) 23 Atap Genteng Metal Zincalume 1x4 (38,5 cm X 80cm) 24 Atap Genteng Metal Zincalume berpasir (77cmX100cm 25 Atap Genteng Kodok buah 26 Atap Genteng Palentong buah 27 Atap Genteng Palentong Super buah 28 Asbes polos 100 x 100 tbl = 4 mm Lbr 29 Asbes Gelombang Kecil, lebar 80 cm Kaki 30 Asbes Gelombang Kecil, lebar 105 cm Kaki 31 Asbes Gelombang Besar, lebar 105 cm Kaki 32 Asbes Gelombang motif genteng 33 Aspal curah kg 34 Aspal drum kg 35 Aquaproof kg 36 Bak Cuci Stainless Steel buah 37 Bak Cuci Teraso buah 38 Bak Fibreglass buah 39 Bak Teraso buah 40 Bambu dia. 6-8 cm/6m Btg 41 Batako buah m 3 m 3 m 3 m 3 m 3 m 2 m 2 m 2 m 2 m 2 m 2

Upload: wellson-lumbantoruan

Post on 26-Oct-2015

160 views

Category:

Documents


5 download

DESCRIPTION

harga

TRANSCRIPT

Page 1: DrfatAnalisa2010 Smt Iok Palembang

DAFTAR HARGA SATUAN UPAH DAN BAHANSURVEY PER JANUARI 2008

NO U R A I A N SATUANHARGA HG. PASAR/

DASAR (Rp) AKTUAL (Rp)

A U P A H1 Kepala Tukang Oh2 Tukang Oh3 Mandor Oh4 Pekerja Tidak Terlatih Oh5 Pekerja Terlatih Oh6 Masinis Oh7 Operator Oh8 Sopir Oh9 Pembantu Masinis Oh10 Supervisor Oh11 Pemasak Aspal Oh12 Penjaga Oh13 Pembantu Sopir Oh14 Mekanik Oh15 Surveyor Oh

B B A H A N / M A T E R I A L1 Agregat Halus2 Agregat Kasar3 Agregat Kelas A4 Agregat Kelas B5 Agregat Kelas C6 Aluminium Foil7 Amplas Biasa Lbr8 Amplas Niken Lbr9 Atap Aluminium Zink Coated (seng) tebal 0,25 mm Lbr10 Atap Aluminium Zink Coated (seng) tebal 0,3 mm Lbr11 Atap Aluminium Zink Coated (seng) tebal 0,4 mm Lbr12 Atap Aluminium Zincalume, tebal 0,25 mm Lbr13 Atap Aluminium Zincalume, tebal 0,3 mm Lbr14 Atap Aluminium Zincalume, tebal 0,4 mm Lbr15 Atap Aluminium Gelombang tebal 0,5 mm Lbr16 Atap Fiber warna"Polycarbon" tbl. 5 mm17 Atap Genteng Beton Lokal buah18 Atap Genteng Beton buah19 Atap Genteng Buleleng buah20 Atap Genteng Keramik biasa berglazur buah21 Atap Genteng Keramik KIA Berglazur Natural buah22 Atap Genteng Keramik KIA/sejenis Berglazur warna buah23 Atap Genteng Metal Zincalume 1x6 (38,5cm X 100cm)23 Atap Genteng Metal Zincalume 1x4 (38,5 cm X 80cm)24 Atap Genteng Metal Zincalume berpasir (77cmX100c25 Atap Genteng Kodok buah26 Atap Genteng Palentong buah27 Atap Genteng Palentong Super buah28 Asbes polos 100 x 100 tbl = 4 mm Lbr29 Asbes Gelombang Kecil, lebar 80 cm Kaki30 Asbes Gelombang Kecil, lebar 105 cm Kaki31 Asbes Gelombang Besar, lebar 105 cm Kaki32 Asbes Gelombang motif genteng33 Aspal curah kg34 Aspal drum kg35 Aquaproof kg36 Bak Cuci Stainless Steel buah37 Bak Cuci Teraso buah38 Bak Fibreglass buah39 Bak Teraso buah40 Bambu dia. 6-8 cm/6m Btg41 Batako buah

m3

m3

m3

m3

m3

m2

m2

m2

m2

m2

m2

Page 2: DrfatAnalisa2010 Smt Iok Palembang

42 Batu Andesit hitam kecoklatan43 Batu Bata lobang44 Batu Bata Kecil buah45 Batu Bata Lobang buah46 Batu Candi hitam 47 Batu Kali48 Batu Kali tempel49 Batu Karang Pilang50 Batu Kerikil51 Batu Koral beton52 Batu Koral Jagung53 Batu Krokos54 Batu Palimanan kuning/hijau55 Batu Palimanan kuning/hijau + bevel56 Batu Pecah 0.5 - 1 (screen)57 Batu Abu 0.00 - 0.5 (filter)58 Batu Pecah 1.3 - 1.9 (spilt)59 Batu Pecah 2/360 Batu Pecah 3/561 Batu Pecah 5/762 Batu Marmer63 Batu Roster / Terawang buah64 Besi dia. 5 mm Batang65 Besi dia. 6 mm KS Batang66 Besi dia. 8 mm KS Batang67 Besi dia. 10 mm KS Batang68 Besi dia. 12 mm KS Batang69 Besi dia. 14 mm KS Batang70 Besi dia. 16 mm KS Batang71 Besi dia. 19 mm KS Batang72 Besi Beton Polos kg73 Besi Baja Profil WF, I dan H kg74 Besi Baja Konstruksi ( CNP, INP,dan besi L) kg75 Besi Beam Clamp dan Plat Siku76 Besi Strip kg77 Besi Strip 2 X 3 M'78 Beton Ready Mix K - 17579 Beton Ready Mix K - 22580 Beton Ready Mix K - 25081 Beton Ready Mix K - 27582 Beton Ready Mix K - 30083 Beton Ready Mix K - 35084 Beton Ready Mix K - 40085 Bubungan Asbes Gelombang Besar m'86 Bubungan Asbes Gelombang Kecil m'87 Bubungan/Nok Genteng Beton Buah88 Bubungan Genteng Buleleng Buah89 Bubungan/ Nok genteng Keramik biasa berglazur Buah90 Bubungan/Nok gentengKeramik KIA/sejenis berglazur Buah91 Bubungan gtg Keramik KIA/sejenis warna berglazur Buah92 Bubungan/Nok Genteng Metal/aluminium M'93 Bubungan Genteng Kodok Buah94 Bubungan Genteng Palentong kecil Buah95 Bubungan Genteng Palentong besar Buah96 Cat Dasar kg97 Cat Antara kg98 Cat Kayu dan Besi Anti Rayap kg99 Cat Khusus Glossy dan Quick Drying kg

100 Cat Minyak warna (biasa) mutu C kg101 Cat Minyak mutu B kg102 Cat Minyak Semprot kg103 Cat Meni Besi kg104 Cat Meni Besi /kayu/ Flincote kg105 Cat Penutup kg106 Cat Tembok mutu C (Vinotex,Q-Luc, dan sejenis) kg107 Cat Tembok mutu B (Catylax,vinilex, dan sejenis) kg

m2

m3

m2

m3

m2

m2

m3

m3

m3

m4

m2

m2

m3

m3

m3

m3

m3

m3

m2

m2

m3

m3

m3

m3

m3

m3

m3

Page 3: DrfatAnalisa2010 Smt Iok Palembang

108 Cat Tembok mutu B, Anti Lumut dan Jamur kg109 Cat Tembok mutu A (mowilex,kemtone,Dulux,dll) kg110 Closed Duduk Setara KIA unit111 Closed Duduk Ex TOTO C 721 FV 1 Standar unit112 Closed Duduk Halmar unit113 Closed Duduk Toto C 704 unit114 Closed Duduk Toto C 406 unit115 Closed Duduk Toto CW 867 J unit116 Closed Duduk TV 150 NS unit117 Closet Duduk / Monoblok bh118 Closet Jongkok Porselen / biasa buah119 Closet Jongkok Teraso buah120 Closed Jongkok KIA Standart / sejenis unit121 Closed Jongkok KIA Amerika Unit122 Shower Spray TX 403 SV 3 buah123 Coneblock biasa tebal 6 cm buah124 Coneblock warna tebal 6 cm buah125 Coneblock biasa tebal 8 cm buah126 Coneblock warna tebal 8 cm buah127 Cornes (bubuk Semen putih utk gypsum) kg128 Dempul Jadi kg129 Dempul Ross Polac kg130 Dempul Isamu kg131 Dolken Kayu dia. 8 - 10/400 cm btg132 Dolken Kayu dia. 8 - 10/400 cm133 Dolken Kayu dia 5 - 8/400 cm btg134 Dolken Kayu dia. 10 - 12/400 cm btg135 Door Closer buah136 Door Holder buah137 Door Stoper buah138 Door Stop buah139 Engsel Biasa buah140 Engsel Kuningan 4" buah141 Engsel Pintu buah142 Epoxi kg143 Eternit 100 x 100 tebal 2,7 mm144 Eternit 100 x 100 tebal 3,5 mm145 Filler146 Glass Block buah147 Grendel/Slot Tanam 4" buah148 Grendel biasa buah149 Gypsum Board ( 120 x 240 x 9 ) mm lbr150 Hordeng Vertikal Blind151 Ijuk152 Jendela Aluminium + Kaca Reyband 5 mm153 Jendela Besi154 Jendela Bingkai Nako 100 cm X 70 cm Unit155 Jendela Bingkai Nako156 Kaca Cermin 3 mm157 Kaca Cermin 5 mm158 Kaca Patri159 Kaca Bening 3 mm160 Kaca Bening 4 mm161 Kaca Bening 5 mm162 Kaca Bening 8 mm163 Kaca Buram 12 mm164 Kaca Rayband 5 mm165 Kaca Buram/Es 5 mm166 Bingkai Kaca Nako Set167 Kaca Naco 6 daun Set168 Kaca Naco 8 daun Set169 Kaca Naco Rayben 5 mm, 8 daun Set170 Kait angin Jendela Buah171 Kalsiboard 3,5 mm (120 cm X 240 cm) Kpg172 Kalsiboard 4,5 mm (120 cm X 240 cm) Kpg

m3

m2

m2

m3

m2

m3

m2

m2

m2

m2

m2

m2

m2

m2

m2

m2

m2

m2

m2

Page 4: DrfatAnalisa2010 Smt Iok Palembang

173 Kapur kg

174 Karpet tebal 6 mm175 Kawat Beton kg176 Kawat Burung177 Kawat Duri m'178 Kawat Harmonika179 Kawat Jaring pagar lbr180 Kawat Kassa181 Kawat Las Dos182 Kawat Nyamuk183 Kawat Seng Polos kg184 Kayu Gelam dia. 6-8 btg185 Kayu Lis 1/3 m'186 Kayu Lis 1/4 m'187 Kayu Lis Profil kecil m'188 Kayu Lis Profil sedang m'189 Kayu Lis Profil besar m'190 Kayu Mosaik 30 x 30 cm Buah191 Kayu Kaso 5/7 kelas III Buah192 Kayu Kelas I (Unglen, Jati)193 Kayu Kelas II 194 Kayu Kelas III195 Kayu Papan 3/20 Kls. III196 Kayu Kelas IV 197 Kayu Papan kelas IV keping198 Kayu Racuk199 Keramik lantai 20 x 20 cm putih Kotak

Keramik lantai 20 x 20 cm putih buah200 Keramik lantai 20 x 20 cm warna Kotak

Keramik lantai 20 x 20 cm warna buah201 Keramik dinding 20 x 25 cm warna Kotak

Keramik dinding 20 x 25 cm warna buah202 Keramik lantai 30 x 30 cm warna Kotak

Keramik lantai 30 x 30 cm warna buah203 Keramik lantai 30 x 30 cm putih polos Kotak

Keramik lantai 30 x 30 cm putih polos buah204 Keramik lantai 40 x 40 cm warna mutu C Kotak

Keramik lantai 40 x 40 cm warna mutu C buah205 Keramik lantai 40 x 40 cm warna mutu B Kotak

Keramik lantai 40 x 40 cm warna mutu B buah206 Keramik lantai motif kayu (kasar) mutu A Kotak207 Klem Talang Paralon Buah208 Korosin Ltr209 Kran Air buah210 Kuas 3"-4" buah211 Kunci Gembok buah212 Kunci Lemari buah213 Kunci Pintu Kamar Tidur (Hotel) buah214 Kunci Pintu KM/WC (lux) buah215 Kunci Selot buah216 Kunci Tanam biasa mutu C buah217 Kunci Tanam 2 slaag biasa buah218 Kunci Tanam 2 slaag mutu B buah219 Kunci Tanam Kamar Mandi buah220 Lampu Down Light buah221 Lampu TL 10 Watt buah222 Lampu TL 20 Watt buah223 Lampu TL 40 Watt (bambu) buah224 Lampu Pijar 25 Watt Putih buah225 Lampu Pijar 40 Watt Putih buah226 Lantai Granit 30/30227 Lantai Granit 40/40228 Lantai Granit 60/60229 Lantai Kayu Panil Gracewood230 Lem Kayu ltr

m2

m2

m2

m2

m2

m3

m3

m3

m3

m3

m3

m2

m2

m2

m2

Page 5: DrfatAnalisa2010 Smt Iok Palembang

231 Lem Vinyl Kg232 List Gypsum Besar m'

233 List Gypsum Kecil m'234 Melamic Clear kg235 Melamic Gloss/dop (Finishing) kg236 Mill kg237 Minyak Bekisting liter238 Minyak Cat liter239 Minyak solar untuk industri liter240 Minyak Gardan liter241 Minyak Hidrolik liter242 Minyak Selinder liter243 Mozaik kayu lantai Uk. 30 x 30 cm buah244 Paku Biasa bermacam ukuran 2" - 5" kg245 kg246 Paku Sumbat buah247 Paku Beton buah248 Paku Gypsum kg249 Paku Seng,Asbes kg250 Paku Asbes buah251 Paku Sekrup 3,5" kg252 Paku Sekrup 3,5" buah253 Parquet Jati254 Pasir Beton / Pasang255 Pasir Urug256 Pewarna nat Bks257 Pintu Alluminium258 Pintu Besi Baja259 Pintu Lipat260 Pintu PVC lengkap + pemasangan Unit261 Btg262 Btg263 Btg264 Btg265 Btg266 Btg267 Btg268 Btg269 Pipa paralon PVC & 1/2", Btg270 Btg271 Btg272 Btg273 Btg274 Btg275 Btg276 Btg277 Plamir Tembok kg278 Plamir Kayu kg279 Plint keramik 10 x 30 cm warna buah280 Plint keramik 10 x 40 cm warna buah281 Plint Ubin PC Abu-abu 15 x 20 cm buah282 Plint Ubin PC Abu-abu 10 x 30 cm buah283 Plint Ubin PC Abu-abu 10 x 40 cm buah284 Polyester/Jabarwood/Plywood hias Lbr285 Plywood Jati 3 mm Lbr286 Plywood Sungkay 3 mm Lbr287 Plywood 3 mm Lbr288 Plywood 4 mm Lbr289 Plywood 6 mm Lbr290 Plywood 9 mm Lbr291 Plywood 12 mm Lbr292 Plywood 20 mm Lbr293 Politur dasar ltr294 Politur Jadi ltr295 Porselin Putih Uk. 10 x 10 cm buah

Paku Biasa 1/2" - 1"

m2

m3

m3

m2

m2

m2

Pipa besi medium 2 mm & 1/2", pjg 6 mPipa besi medium 2 mm & 3/4", pjg 6 mPipa besi medium 2 mm & 1", pjg 6 mPipa besi medium 2 mm & 1,5", pjg 6 mPipa besi medium 2 mm & 2", pjg 6 mPipa besi medium 2 mm & 2,5", pjg 6 mPipa besi medium 2 mm & 3", pjg 6 mPipa besi medium 2 mm & 4", pjg 6 m

Pipa paralon PVC & 3/4"Pipa paralon PVC & 1"Pipa paralon PVC & 1.5"Pipa paralon PVC & 2" Pipa paralon PVC & 3" Pipa paralon PVC & 4"Pipa paralon PVC & 6" (15 cm)

Page 6: DrfatAnalisa2010 Smt Iok Palembang

296 Porselin Warna Uk. 10 x 10 cm buah297 Rangka Atap baja ringan untuk atap genteng, genten

keramik, beton, dll + pemasangan

298 Rangka Atap baja ringan untuk atap seng metal, atapasbes, aluminium, sirap, dll + pemasangan

299 Rangka Atap baja ringan bentuk joglo/bertumpuk/khusus + pemasangan

300 Rel Pintu Dorong Unit301 Rolling Door Standar, t=4 mm, (minimal pas. 7 M2)302 Rolling Door Standar, t=5 mm, (minimal pas. 7 M2)303 Sanding Sealer (Cat dasar) Kg304 Seal Tape buah305 Semen Baturaja ( 50 kg ) Zak306 Semen Portland ( PC ) kg307 Semen Putih (40 kg) Zak308 Semen Putih Kg309 Semen Merah310 Semen Nat kg311 Seng Gelombang , lebar 70 cm312 Seng Plat 120 cm X 240 cm lbr313 Seng Plat 33 cm M'314 Seng Plat 38 cm M'315 Seng Plat 45 cm M'316 Seng Plat 55 cm M'317 Seng Plat 88 cm M'318 Seng Plat 92 cm M'319 Sabun Kg320 Soda Api Kg321 Soft Board ( 120 x 240 ) mm lbr322 Sunscreen Aluminium M2323 Talang Paralon, pjg 4 m btg324 Tali Ijuk Kg325 Ijuk326 Tanah Liat/Urug327 Tanah Puru328 Tanah Sirtu329 Taekwood 3 mm330 Taekwood 4 mm biasa331 Ter / Residu liter332 Textil Tape m'333 Thinner biasa Liter334 Thinner Cat Glossy (Cobra dan sejenis) Liter335 Urinoir buah336 Urinoir Toto U57M unit337 Vernis ltr338 Vernis Batu Kg339 Wastafel biasa buah340 Wastafel Halmar unit341 Wastafel Ex Toto L 521 VI A unit342 Wood Filler (dempul) kg343 Wood Stain (cat pewarna) kg

Palembang, Januari 2008

"Mengetahui" Tim Survey,

Nama Tanda Tangan

1 ………………………………

m2

m2

m2

m2

m2

m3

m2

m3

m3

m3

m3

m2

m2

Page 7: DrfatAnalisa2010 Smt Iok Palembang

2 ………………………………

3 ………………………………

C P E R A L A T A N1 Asphalt Finisher jam2 Asphalt Mixing Plan jam3 Asphalt Sprayer jam4 Compresor jam5 Concrete Mixer jam6 Concrete Pump jam7 Concrete Vibrator jam8 Dump Truck jam9 Excavator jam10 Filter jam11 Genset jam12 Grader jam13 Loader jam14 Pneumatic Tired Roller jam15 Tandem Roller jam16 Flatbed Truck 3,5 ton jam17 Water Tank jam18 Generator jam19 Alat Bantu jam20 Roller 3 roda jam21 Sprayer, Selfprof jam22 Buldozer jam23 Scaffolding 120cm X 180 cm, Tg. 170 cm Set/Bulan24 Scaffolding 120cm X 180 cm, Tg. 190 cm Set/Bulan25 Stone Crusher (Pemecah batu) jam26 Pengaduk beton jam27 Stemper jam28 Roller, Vibrator Pneu jam29 Concrete Pump jam30 Water Pump jam

Palembang, Januari 2008

"Mengetahui" Tim Survey,

Nama Tanda Tangan

1 ………………………………

2 ………………………………

3 ………………………………

Page 8: DrfatAnalisa2010 Smt Iok Palembang

DAFTAR HARGA SATUAN UPAH DAN BAHANSURVEY PER JANUARI 2008

NO U R A I A N SATUANHARGA HG. PASAR/

DASAR (Rp) AKTUAL (Rp)

A B A H A N / M A T E R I A L

Palembang, Januari 2008

"Mengetahui" Tim Survey,

Nama Tanda Tangan

1 ………………………………

Page 9: DrfatAnalisa2010 Smt Iok Palembang

2 ………………………………

3 ………………………………

Page 10: DrfatAnalisa2010 Smt Iok Palembang

………………………………

Page 11: DrfatAnalisa2010 Smt Iok Palembang

………………………………

………………………………

………………………………

………………………………

………………………………

Page 12: DrfatAnalisa2010 Smt Iok Palembang

………………………………

Page 13: DrfatAnalisa2010 Smt Iok Palembang

………………………………

………………………………

Page 14: DrfatAnalisa2010 Smt Iok Palembang

DAFTAR HARGA SATUAN UPAH DAN BAHANSURVEY PER FEBRUARI 2010

NO U R A I A N SATUANHARGA HG. PASAR/

DASAR (Rp) AKTUAL (Rp)

A U P A H1 Kepala Tukang Oh 90,000.00 85000-95000/ Oh2 Tukang Oh 70,000.00 70000-70000/ Oh3 Mandor Oh 95,000.00 90000-100000/ Oh4 Pekerja Tidak Terlatih Oh 40,000.00 40000-40000/ Oh5 Pekerja Terlatih Oh 60,000.00 60000-60000/ Oh6 Masinis Oh 75,000.00 75000-75000/ Oh7 Operator Oh 75,000.00 75000-75000/ Oh8 Sopir Oh 55,000.00 50000-60000/ Oh9 Pembantu Masinis/Operator Oh 60,000.00 60000-60000/ Oh

10 Supervisor Oh 75,000.00 75000-75000/ Oh11 Pemasak Aspal Oh 45,000.00 40000-40000/ Oh12 Penjaga Oh 40,000.00 30000-40000/ Oh13 Pembantu Sopir Oh 50,000.00 50000-50000/ Oh14 Mekanik Oh 80,000.00 80000-85000/ Oh15 Surveyor Oh 75,000.00 75000-75000/ Oh

B B A H A N / M A T E R I A L1 Agregat Halus 271,000.00 270.000-272.000/ M32 Agregat Kasar 265,000.00 260.000-270.000/ M33 Agregat Kelas A 255,000.00 250.000-260.000/ M34 Agregat Kelas B 225,000.00 220.000-230.000/ M35 Agregat Kelas C 215,000.00 210.000-220.000/ M36 Aluminium Foil 15,000.00 15.000/M27 Alcubond 1,250,000.00 1.250.000/M28 Amplas Biasa Lbr 3,000.00 3.000 / Lbr9 Amplas Niken Lbr 6,000.00 6.000 / Lbr

10 Atap Aluminium Zink Coated (seng) tebal 0,25 mm Lbr 39,000.00 38.000-40.000/Lbr11 Atap Aluminium Zink Coated (seng) tebal 0,3 mm Lbr 50,000.00 50.000/Lbr12 Atap Aluminium Zink Coated (seng) tebal 0,4 mm Lbr 76,000.00 76.000/Lbr13 Atap Aluminium Zincalume, tebal 0,25 mm Lbr 56,000.00 56.000/Lbr14 Atap Aluminium Zincalume, tebal 0,3 mm Lbr 78,000.00 78.000/Lbr15 Atap Aluminium Zincalume, tebal 0,4 mm Lbr 88,000.00 88.000/Lbr16 Atap Aluminium Gelombang tebal 0,5 mm Lbr 105,000.00 105.000/Lbr17 Atap Fiber warna"Polycarbonat" tbl. 4-5 mm 37,037.04 1.000.000/Lbr18 Atap Genteng Beton Lokal buah 2,250.00 2000-2500/ buah19 Atap Genteng Beton buah 3,750.00 3500-4000/ buah20 Atap Genteng Beton Cisangkan buah 6,000.00 5500-6500/ buah21 Atap Genteng Buleleng buah 1,100.00 1000-1200/ buah22 Atap Genteng Keramik biasa berglazur buah 6,000.00 6000-6000/ buah23 Atap Genteng Keramik Berglazur Natural buah 7,500.00 7500-7500/ buah24 Atap Genteng Keramik sejenis Berglazur warna buah 13,500.00 12000-15000/ buah25 Atap Genteng Metal Biasa (88 cm X 77 cm) 53,571.43 32.000-34.000/Lbr26 Atap Genteng Metal Warna (120 cm X 76 cm) 71,052.63 64.700-64.900/Lbr27 Atap Genteng Metal Zincalume 2x4 (38,5 cm X 80cm) 137,987.01 40.000-45.000/Lbr28 Atap Genteng Metal Zincalume berpasir (77cmX100cm) 159,740.26 123.000/Lbr29 Atap Genteng Metal Zincalume berpasir biasa 71,428.57 58.000/Lbr30 Atap Genteng Kodok buah 2,500.00 2500-2500/ Buah31 Atap Genteng Palentong buah 1,000.00 1000-1000/ Buah31 Atap Genteng Palentong Super buah 1,225.00 1200-1250/ Buah32 Atap Onduline 79,000.00 79.000/ M232 Asbes polos 100 x 100 tbl = 4 mm Lbr 18,500.00 18.000-19.000 / Lbr33 Asbes Gelombang Kecil, lebar 80 cm 29,166.67 7500 / kaki34 Asbes Gelombang Kecil, lebar 105 cm 30,232.50 7000-7500/ kaki35 Asbes Gelombang Besar, lebar 105 cm 33,360.00 8000-8000/ kaki36 Asbes Gelombang motif genteng 24,000.00 23.000-25000/ M237 Aquaproof kg 44,000.00 44.000/ Kg38 Bak Cuci Stainless Steel buah 180,000.00 180.000/ Buah

m3

m3

m3

m3

m3

m2

m2

m2

m2

m2

m2

m2

m2

m2

m2

m2

m2

m2

Page 15: DrfatAnalisa2010 Smt Iok Palembang

NO U R A I A N SATUANHARGA HG. PASAR/

DASAR (Rp) AKTUAL (Rp)39 Bak Cuci Teraso buah 100,000.00 100.000/ Buah40 Bak Fibreglass buah 185,000.00 185.000/ Buah41 Bak Teraso buah 75,000.00 75.000/ Buah42 Bambu dia. 6-8 cm/6m Btg 40,000.00 40.000/ Btg43 Batako buah 2,500.00 2500-2500/ Buah44 Batu Andesit hitam kecoklatan 250,000.00 250.000/ M245 Batu alam kecoklatan (Sangarong) 177,500.00 175.000-180.000/ M246 Batu Bata lobang 429,000.00 452.400/M347 Batu Bata Kecil buah 470.00 440-500/ Buah48 Batu Bata Lobang buah 550.00 550-600/ Buah49 Batu Candi hitam 210,000.00 210.000/ M250 Batu Kali 280,000.00 280.000/ M351 Batu Kali tempel 62,500.00 60.000-65.000/ M252 Batu Karang Pilang 275,000.00 275.000/ M253 Batu Kerikil 225,000.00 200.000-250.000/ M354 Batu Koral beton 200,000.00 190.000-210.000/ M355 Batu Koral Jagung 270,000.00 270.000/ M356 Batu Krokos 215,000.00 210.000-220.000/ M357 Batu Palimanan kuning/hijau 180,000.00 180.000/ M258 Batu Palimanan kuning/hijau + bevel 200,000.00 200.000/ M259 Batu Pecah 0.5 - 1 (screen) 275,000.00 265.000-285.000/ M360 Batu Abu 0.00 - 0.5 (filler) 275,000.00 265.000-285.000/ M361 Batu Pecah 1.3 - 1.9 (spilt) 325,000.00 325.000/ M362 Batu Pecah 2/3 235,000.00 230.000-240.000/ M363 Batu Pecah 3/5 225,000.00 220.000-230.000/ M364 Batu Pecah 5/7 215,000.00 210.000-220.000/ M365 Batu Marmer 257,500.00 283.250/ M266 Batu Roster / Terawang keramik buah 40,000.00 40.000/ Buah67 Besi dia. 5 mm Batang 12,000.00 11.000-13.000/ Batang68 Besi dia. 6 mm KS Batang 16,500.00 16.000-17.000/ Batang69 Besi dia. 8 mm KS TI Batang 40,000.00 39.000-41.000/ Batang70 Besi dia. 10 mm KS TI Batang 61,000.00 60.000-62.000/ Batang71 Besi dia. 12 mm KS TI Batang 86,000.00 85.000-87.000/ Batang72 Besi dia. 14 mm KS TI Batang 145,000.00 140.000-150.000/ Batang73 Besi dia. 16 mm KS TI Batang 152,500.00 145.000-160.000/ Batang74 Besi dia. 19 mm KS TI Batang 312,500.00 310.000-315.000/ Batang75 Besi Beton Polos kg 10,500.00 10.000-11.000/ kg76 Besi Baja Profil WF, I dan H kg 14,500.00 14.000-15.000/ kg77 Besi Baja Konstruksi ( CNP, INP,dan besi L) kg 12,500.00 12.000-13.000/ kg78 Besi Beam Clamp dan Plat Siku 22,500.00 21.000-24.000/ kg79 Besi Hollow baja 20 X 40, tb. 2mm Batang 162,500.00 160.000-165.000/ Btg80 Besi Hollow baja 40 X 40, tb. 2mm Batang 182,500.00 180.000-185.000/ Btg81 Besi Hollow baja 30 X 60, tb. 2mm Batang 195,000.00 190.000-200.000/ Btg82 Besi Hollow Plafond 2 X 4 Batang 21,500.00 21.000-22.000/ Btg83 Besi Strip kg 7,500.00 7.000-8.000/ kg84 Besi Strip 2 X 3 M' 3,000.00 3.000/ M'85 Beton Ready Mix K - 125 605,000.00 605.000/ M386 Beton Ready Mix K - 175 626,666.67 595.000-650.000/ M387 Beton Ready Mix K - 225 657,500.00 620.000-675.000/ M388 Beton Ready Mix K - 250 677,500.00 650.000-720.000/ M389 Beton Ready Mix K - 275 708,333.33 690.000-735.000/ M390 Beton Ready Mix K - 300 727,500.00 685.000-775.000/ M391 Beton Ready Mix K - 350 757,500.00 710.000-810.000/ M392 Beton Ready Mix K - 400 760,000.00 750.000-770.000/ M493 Bubungan Asbes Gelombang Besar m' 15,000.00 5.000-5.000/Buah94 Bubungan Asbes Gelombang Kecil m' 12,750.00 4.000-4.500/Buah95 Bubungan/Nok Genteng Beton Buah 5,000.00 5.000/Buah96 Bubungan Genteng Buleleng Buah 2,500.00 2500-2500/ buah97 Bubungan/ Nok genteng Keramik biasa berglazur Buah 6,500.00 6.000-7.000/Buah98 Bubungan/Nok genteng Keramik sejenis berglazur Buah 12,500.00 12.000-13.000/Buah99 Bubungan gtg Keramik sejenis warna berglazur Buah 17,500.00 17.000-18.000/Buah

100 Bubungan/Nok Genteng Metal/aluminium M' 23,500.00 21.000-26.000/M'

m2

m2

m3

m2

m3

m2

m2

m3

m3

m3

m3

m2

m2

m3

m3

m3

m3

m3

m3

m2

m2

m3

m3

m3

m3

m3

m3

m3

m3

Page 16: DrfatAnalisa2010 Smt Iok Palembang

NO U R A I A N SATUANHARGA HG. PASAR/

DASAR (Rp) AKTUAL (Rp)101 Bubungan Genteng Kodok Buah 1,875.00 1.750-2.000/Buah102 Bubungan Genteng Palentong kecil Buah 1,900.00 1.800-2.000/Buah103 Bubungan Genteng Palentong besar Buah 2,500.00 2.500-2500/Buah104 Cat Dasar kg 19,500.00 19.000-20.000/ Kg105 Cat Antara kg 19,000.00 18.000-20.000/ Kg106 Cat Kayu dan Besi Anti Rayap kg 20,500.00 20.000-21.000/ Kg107 Cat Khusus Glossy dan Quick Drying kg 20,500.00 20.000-21.000/ Kg108 Cat Minyak warna (biasa) mutu C kg 26,000.00 26.000/ Kg109 Cat Minyak mutu B kg 37,000.00 36.000-38.000/ Kg110 Cat Minyak Semprot kg 50,000.00 50.000/ Kg111 Cat Meni Besi kg 28,000.00 28.000/ Kg112 Cat Meni Besi /kayu/ Flincote kg 32,000.00 32.000/ Kg113 Cat Penutup kg 72,500.00 70.000-75.000/ Kg114 Cat Tembok mutu C (Vinotex,Q-Luc, dan sejenis) kg 9,500.00 9.000-10.000/ Kg115 Cat Tembok mutu B (Catylax,vinilex, dan sejenis) kg 14,000.00 13.000-15.000/ Kg116 Cat Tembok mutu B, Anti Lumut dan Jamur kg 17,500.00 17000-18000/ Kg117 Cat Tembok mutu A (Mowilex,Kemtone,Dulux,dll) kg 59,400.00 55.000-60.000/ Kg118 Closed Duduk Setara (sejenis standar KIA) unit 1,250,000.00 1250.000-1250.000/ Unit119 Closed Duduk Standar (sejenis Ex.TOTOC721FV1) unit 2,094,000.00 2.094.000/ Unit120 Closed Duduk Halmar unit 3,062,000.00 70000-75000/ Unit121 Closed Duduk mutu C unit 1,715,000.00 70000-75000/ Unit122 Closed Duduk mutu A unit 4,270,000.00 70000-75000/ Unit123 Closed Duduk mutu B unit 2,593,000.00 70000-75000/ Unit124 Closed Duduk standar unit 2,151,000.00 70000-75000/ Unit125 Closet Duduk / Monoblok bh 395,000.00 395.000/ Buah126 Closet Jongkok Porselen / biasa buah 80,000.00 75.000-85.000/ Buah127 Closet Jongkok Teraso buah 25,000.00 25.000/ Buah128 Closed Jongkok Standart / sejenis (mutu B) unit 150,000.00 150.000/ Unit129 Closed Jongkok sejenis ( mutu A) Unit 175,000.00 175.000/ Unit130 Shower Spray TX 403 SV 3 buah 325,000.00 305.000/ Buah131 Coneblock biasa tebal 6 cm buah 900.00 800-1.000/ Buah132 Coneblock warna tebal 6 cm buah 1,300.00 1.200-1.500/ Buah133 Coneblock biasa tebal 8 cm buah 1,200.00 1.100-1.300/ Buah134 Coneblock warna tebal 8 cm buah 1,800.00 1.600-2.000/ Buah135 Cornice (bubuk Semen putih utk gypsum) kg 6,000.00 6.000/ Kg136 Dempul Jadi kg 12,000.00 12000-12000/ Kg137 Dempul Ross Polac kg 13,000.00 60000-70000/ 5 Kg138 Dempul Isamu kg 38,000.00 38.000/Kg139 Dolken Kayu dia. 8 - 10/400 cm 225,000.00 225.000/M3140 Door Closer buah 380,000.00 380.000/ Buah141 Door Holder buah 30,000.00 20.000-40.000/ Buah142 Door Stoper buah 300,000.00 300.000/ Buah143 Door Stop buah 22,000.00 22.000/ Buah144 Ember hitam buah 5,000.00 5.000/ Buah145 Engsel Biasa buah 3,500.00 4.000-5.000/ Buah146 Engsel Kuningan 4" buah 5,500.00 6.000-5.000/ Buah147 Engsel Pintu buah 4,500.00 4.000-5.000/ Buah148 Epoxi kg 42,500.00 40.000-45.000/ Kg149 Eternit 100 x 100 tebal 2,7 mm Lbr 11,000.00 11.000-12.000/ Lbr150 Eternit 100 x 100 tebal 3,5 mm Lbr 13,500.00 13.500/ Lbr151 Filler 172,500.00 170.000-175.000/M3152 Fitting plafond listrik buah 5,000.00 5000/Buah153 Glass Block buah 22,500.00 20.000-25.000/Buah154 Grendel/Slot Tanam 4" buah 72,500.00 70.000-75.000/Buah155 Grendel biasa buah 13,500.00 12.000-15.000/Buah156 Gypsum Board ( 120 x 240 x 9 ) mm lbr 145,000.00 140.000-150.000/ Lbr157 Hordeng Horizontal Blind (aluminium) 87,500.00 85000-90000/ M2158 Hordeng Vertikal Blind 90,000.00 85000-90000/ M2159 Ijuk Kg 7,000.00 7000/ Kg160 Jendela Aluminium + Kaca Reyband 5 mm 2,775,000.00 2.750.000-2.800.000/ M2161 Jendela Besi 250,000.00 200.000-300.000/ M2162 Jendela Bingkai Nako 100 cm X 70 cm Unit 60,000.00 60.000/ M2

m3

m3

m2

m3

m2

m2

Page 17: DrfatAnalisa2010 Smt Iok Palembang

NO U R A I A N SATUANHARGA HG. PASAR/

DASAR (Rp) AKTUAL (Rp)163 Jendela Bingkai Nako 95,000.00 95.000/ M2164 Kabel NYA 1,5 mm m' 2,000.00 2.000/ M'165 Kabel NYA 2,5 mm m' 3,000.00 3.000/ M'166 Kabel NYA 4.0 mm m' 4,000.00 4.000/ M'167 Kabel NYM 2 X 1,5 mm m' 4,500.00 4.000-5.000/ M'168 Kabel NYM 2 X 2,5 mm m' 7,000.00 6.000-8.000/ M'169 Kabel NYM 2 X 4,0 mm m' 14,500.00 14.000-15.000/ M'170 Kaca Cermin 3 mm 120,000.00 120.000-120.000/ M2171 Kaca Cermin 5 mm 337,500.00 325.000-350.000/ M2172 Kaca Patri 1,200,000.00 1.150.000-1.250.000/ M2173 Kaca Bening 3 mm 72,500.00 70.000-75.000/ M2174 Kaca Bening 4 mm 95,000.00 90.000-100.000/ M2175 Kaca Bening 5 mm 122,500.00 120.000-125.000/ M2176 Kaca Bening 8 mm 142,500.00 140.000-145.000/ M2177 Kaca Bening 10 mm m2 350,000.00 350.000/ M3178 Kaca Buram 12 mm 200,000.00 200.000/ M2179 Kaca Rayband 5 mm 142,500.00 140.000-145.000/ M2180 Kaca Buram/Es 5 mm 75,000.00 75.000/ M2181 Bingkai Kaca Nako Set 25,000.00 25.000/ M2182 Kaca Naco 6 daun Set 127,500.00 125.000-130.000/ Set183 Kaca Naco 8 daun Set 142,500.00 140.000-145.000/Set184 Kaca Naco Rayben 5 mm, 6 daun Set 167,500.00 165.000-170.000/Set185 Kaca Naco Rayben 5 mm, 8 daun Set 177,500.00 175.000-180.000/Set186 Kait angin Jendela Buah 5,000.00 5.000/Buah187 Kalsiboard 3,5 mm (120 cm X 240 cm) Kpg 53,000.00 50.000-56.000/ Kpg188 Kalsiboard 4,5 mm (120 cm X 240 cm) Kpg 62,500.00 60.000-65.000/ Kpg189 Kapur kg 3,000.00 3.000-3.000/ Kg190 Karpet tebal 6 mm 68,750.00 250.000-300.000/ Roll191 Kawat Beton kg 17,000.00 16.000-18.000/ Kg192 Kawat Burung 10,000.00 9.000-11.000/ M2193 Kawat Duri m' 2,400.00 2.300-2.500/ M'194 Kawat Harmonika 35,000.00 35.000/ M2195 Kawat Jaring pagar lbr 25,000.00 25.000/ lbr196 Kawat Kassa 10,000.00 10.000/ M2197 Kawat Las Dos 52,500.00 50.000-55.000/ Dos198 Kawat Nyamuk 17,000.00 17.000/ M2199 Kawat Seng Polos kg 15,500.00 15.000 - 16.000/ Kg200 Kayu Gelam dia. 6-8 btg 5,000.00 5.000/ Batang201 Kayu Gelam dia. 10-12 btg 6,500.00 6000-7000/ Batang202 Kayu Hek btg 8,500.00 8000-9000/ Batang203 Kayu Lis 1/3 m' 1,125.00 4.000-5.000/ Btg204 Kayu Lis 1/4 m' 1,375.00 5.000-6.000/ Btg205 Kayu Lis Profil kecil m' 1,500.00 5.000-7.000/ Btg206 Kayu Lis Profil sedang m' 3,000.00 9.000-15.000/ Btg207 Kayu Lis Profil besar m' 6,500.00 25.000-27.000/ Btg208 Kayu Mosaik 30 x 30 cm Buah 5,500.00 5.000-6.000/Buah209 Kayu Kaso 5/7 kelas III (Meranti dan sejenis) Btg 49,000.00 49.000/Btg210 Kayu Kelas I (Unglen, Jati) 5,500,000.00 5.400.000-5.600.000/ M3211 Kayu Kelas II (Petanang dan sejenis) 3,900,000.00 3.800.000-4.000.000/ M3212 Kayu Kelas III (Meranti dan sejenis) 2,950,000.00 2.900.000-3.000.000/ M3213 Kayu Papan 3/20 Kls. III 1,875,000.00 1.750.000-2.000.000/ M3214 Kayu Kelas IV (Racuk dan sejenis) 1,100,000.00 1.000.000-1.200.000/ M3215 Kayu Papan kelas IV keping 15,000.00 15.000/ Kpg216 Kayu Racuk 850,000.00 800.000-900.000/ M3217 Kayu Reng btg 12,000.00 11000-13000/ Batang218 Keramik lantai/dinding 20 x 20/25 cm putih polos Kotak 46,000.00 46.000/ ktk

Keramik lantai/dinding 20 x 20/25 cm putih polos buah 1,840.00 1.200-1.400/ Buah219 Keramik lantai 20 x 20 cm warna, mutu C Kotak 42,500.00 40.000-45.000/ ktk

Keramik lantai 20 x 20 cm warna, mutu C buah 1,700.00 1.400-1.600/ Buah220 Keramik lantai 20 x 20 cm warna, mutu B Kotak 62,000.00 60.000-64.000/ ktk

Keramik lantai 20 x 20 cm warna, mutu B buah 2,480.00 1.400-1.600/ Buah221 Keramik dinding 20 x 25 cm warna Kotak 48,500.00 47.000-50.000/ ktk

m2

m2

m2

m2

m2

m2

m2

m2

m2

m2

m2

m2

m2

m2

m2

m2

m3

m3

m3

m3

m3

m3

Page 18: DrfatAnalisa2010 Smt Iok Palembang

NO U R A I A N SATUANHARGA HG. PASAR/

DASAR (Rp) AKTUAL (Rp)Keramik dinding 20 x 25 cm warna buah 2,425.00 2.375/ Buah

222 Keramik lantai 20 x 25 cm warna, mutu B Kotak 68,000.00 68.000/ ktkKeramik lantai 20 x 25 cm warna, mutu B buah 2,720.00 1.400-1.600/ Buah

223 Keramik lantai 30 x 30 cm warna Kotak 48,500.00 47.000-50.000/ ktkKeramik lantai 30 x 30 cm warna buah 4,365.00 4.275/ Buah

224 Keramik lantai 30 x 30 cm putih polos Kotak 34,000.00 33.000-35.000/ ktkKeramik lantai 30 x 30 cm putih polos buah 3,060.00 2.835/ Buah

225 Keramik lantai 40 x 40 cm warna mutu C Kotak 51,000.00 51.000/ ktkKeramik lantai 40 x 40 cm warna mutu C buah 8,160.00 7.600/ Buah

226 Keramik lantai 40 x 40 cm warna mutu B Kotak 93,000.00 93.000/ ktkKeramik lantai 40 x 40 cm warna mutu B buah 14,880.00 8.000/ Buah

227 Keramik lantai motif kayu (kasar) mutu A Kotak 116,000.00 115.000-117.000/ ktk228 Klem Talang Paralon Buah 2,250.00 2.000 - 2.500/ Buah229 Klem kabel listrik biasa Buah 75.00 50 - 100/ Buah230 Klem kabel listrik Buah 2,750.00 2.500 - 3.000/ Buah231 Korosin Ltr 2,000.00 2.000 - 2.000/ Ltr232 Kran Air buah 8,500.00 7.000 - 10.000/ Buah233 Kuas 3"-4" buah 6,000.00 5.000 - 7.000/ Buah234 Kunci Gembok buah 9,000.00 8.000 - 10.000/ Buah235 Kunci Lemari buah 12,000.00 12.000/ Buah236 Kunci Pintu Kamar Tidur (Hotel) buah 450,000.00 450.000/ Buah237 Kunci Pintu KM/WC (lux) buah 360,000.00 360.000/ Buah238 Kunci Selot buah 3,500.00 3.500/ Buah239 Kunci Tanam biasa mutu C buah 22,500.00 20.000-25.000/ Buah240 Kunci Tanam 2 slaag biasa buah 72,500.00 70.000-75.000/ Buah241 Kunci Tanam 2 slaag mutu B buah 122,500.00 20.000-25.000/ Buah242 Kunci Tanam Kamar Mandi buah 22,500.00 20.000-25.000/ Buah243 L.bow listrik buah 500.00 500/ Buah244 Lampu Down Light buah 37,500.00 25.000-50.000/ Buah245 Lampu Hologen 50 watt buah 9,000.00 8.000-10.000/ Buah246 Lampu Hologen 150 watt buah 37,500.00 35.000-40.000/ Buah247 Lampu Hologen Box buah 30,000.00 25.000-35.000/ Buah248 Lampu TL 10 Watt buah 45,000.00 45.000-45.000/ Buah249 Lampu TL 20 Watt buah 65,000.00 60.000-70.000/ Buah250 Lampu TL 40 Watt (bambu) buah 75,000.00 70.000-80.000/ Buah251 Lampu Pijar 25 Watt Putih buah 11,000.00 10.000-12.000/ Buah252 Lampu Pijar 40 Watt Putih buah 12,000.00 12.000/ Buah253 Lantai Granit 30/30 Buah 17,100.00 180.000-200.000/ M2254 Lantai Granit 40/40 Buah 36,800.00 225.000-235.000/ M2255 Lantai Granit 60/60 Buah 104,400.00 285.000-295.000/ M2256 Lantai Kayu Panil Gracewood 352,500.00 350.000-355.000/ M2257 Las dop listrik Buah 1,000.00 1.000/ buah258 Lem Kayu ltr 31,000.00 30.000-32.000/ Buah259 Lem Vinyl Kg 4,500.00 4.000-5.000/ Kg260 List Gypsum Besar m' 19,000.00 18.000-20.000/ Buah261 List Gypsum Kecil m' 14,000.00 13.000-15.000/ Buah262 Mangkok Saklar listrik Buah 900.00 800 - 1.000/ buah263 MCB Buah 15,000.00 15.000-15.000/ Buah264 MCB Box isi 4 grup Buah 17,500.00 15.000-20.000/ Buah265 MCB Box isi 8 grup Buah 32,500.00 30.000-35.000/ Buah266 Melamic Clear kg 31,000.00 30.000-32.000/Kg267 Melamic Gloss/dop (Finishing) kg 50,000.00 50.000/Kg268 Mill kg 29,500.00 29.000-30.000/Kg269 Minyak Bekisting liter 10,000.00 9.000-10.000/ Ltr270 Minyak Cat liter 4,000.00 4.000/ Ltr271 Minyak solar untuk industri / Minyak aspal liter 4,200.00 4.200/Ltr272 Minyak Gardan liter 15,500.00 15.000-16.000/Ltr273 Minyak Hidrolik liter 23,500.00 23.000-24.000/Ltr274 Minyak Selinder liter 15,500.00 15.000-16.000/Ltr275 Mozaik kayu lantai Uk. 30 x 30 cm buah 7,500.00 7.000-8.000/Buah276 Pagar BRC, uk. 240 cm X 120 cm, dia. 5,5 mm Unit 310,000.00 310.000-310.000/Unit277 Pagar BRC, uk. 240 cm X 90 cm, dia. 6 mm Unit 340,000.00 310.000-310.000/Unit

m2

Page 19: DrfatAnalisa2010 Smt Iok Palembang

NO U R A I A N SATUANHARGA HG. PASAR/

DASAR (Rp) AKTUAL (Rp)278 Paku Biasa bermacam ukuran 2" - 5" kg 16,500.00 16.500/Kg279 kg 16,500.00 16.500/Kg280 Paku Sumbat buah 475.00 450-500/Buah281 Paku Beton buah 550.00 400-600/Buah282 Paku Gypsum kg 62,500.00 60.000-65.000/Kg283 Paku Seng,Asbes kg 18,000.00 18.000-18.000/Kg284 Paku Asbes buah 475.00 450-500/Kg285 Paku Sekrup 3,5" Kg 37,500.00 37.000-38.000/Kg286 Paku Sekrup 3,5" buah 375.00 375/Buah287 Parquet Jati 385,000.00 375.000-395.000/M2288 Pasir Beton / Pasang 75,000.00 70.000- 80.000/M3289 Pasir Urug 65,000.00 60.000- 70.000/M3290 Pewarna nat Bks 1,500.00 1.500/Bks291 Pintu Alluminium 450,000.00 400.000-500.000/M2292 Pintu Besi Baja 1,750,000.00 1.500.000-2.000.000/M2293 Pintu Lipat 337,500.00 275.000-400.000/M2294 Pintu PVC lengkap + pemasangan Unit 450,000.00 400.000- 500.000/Unit295 M' 8,333.33 50.000/Btg296 M' 10,000.00 60.000- 60.000/Btg297 M' 12,500.00 70.000- 75.000/Btg298 M' 19,166.67 115.000/Btg299 M' 27,500.00 160.000- 170.000/Btg300 M' 45,416.67 270.000- 275.000/Btg301 M' 52,083.33 300.000- 325.000/Btg

302 M' 77,500.00 460.000- 470.000/Btg303 Pipa paralon listrik 5/8" Btg 4,500.00 4.000 - 5.000/Btg304 M' 2,500.00 11.000-15.000/Btg305 M' 1,250.00 7.500- 8.000/Btg306 M' 3,333.33 20.000- 20.000/Btg307 M' 1,666.67 10.000- 10.000/Btg308 M' 4,000.00 23.000- 25.000/Btg309 M' 2,500.00 14.000- 16.000/Btg310 M' 7,083.33 40.000- 45.000/Btg311 M' 2,833.33 40.000- 45.000/Btg312 M' 9,583.33 55.000- 60.000/Btg313 M' 4,500.00 27.000- 27.000/Btg314 M' 18,500.00 110.000- 112.000/Btg315 M' 6,666.67 40.000- 40.000/Btg316 M' 33,000.00 198.000- 198.000/Btg317 M' 10,416.67 60.000- 65.000/Btg318 M' 87,500.00 350.000- 350.000/Btg319 Pipa Stainless 2", tebal 1 mm M' 49,166.67 280.000- 300.000/Btg320 Pipa Stainless 2", tebal 0.8 mm M' 40,833.33 240.000-250.000/Btg321 Pipa Stainless 2,5", tebal 1 mm M' 60,416.67 360.000- 360.000/Btg322 Pipa Stainless 2,5", tebal 1.2 mm M' 71,666.67 430.000- 430.000/Btg323 Plamir Tembok kg 22,500.00 22.000- 23.000/Kg324 Plamir Kayu kg 24,000.00 23.000- 25.000/Kg325 Plat stainless, tebal 1 mm, uk. 244 cm X 122 cm Lbr 1,550,000.00 1.550.000/Lbr326 Plint keramik 10 x 30 cm warna buah 3,000.00 3.000/Buah327 Plint keramik 10 x 40 cm warna buah 3,500.00 3.500/Buah328 Plint Ubin PC Abu-abu 15 x 20 cm buah 725.00 700-750/Buah329 Plint Ubin PC Abu-abu 10 x 30 cm buah 775.00 750-800/Buah330 Plint Ubin PC Abu-abu 10 x 40 cm buah 825.00 800-850/Buah331 Plywood warna/Jabarwood Lbr 62,500.00 60.000-65.000/Lbr332 Plywood Jati 3 mm Lbr 110,000.00 100.000-110.000/Lbr333 Plywood Sungkay 3 mm/ megatick Lbr 110,000.00 110.000/Lbr334 Plywood 3 mm Lbr 41,000.00 40.000-42.000/Lbr335 Plywood 4 mm Lbr 56,000.00 55.000-57.000/Lbr336 Plywood 6 mm Lbr 75,000.00 75.000-75.000/Lbr337 Plywood 9 mm Lbr 115,000.00 115.000-115.000/Lbr338 Plywood 12 mm Lbr 147,500.00 145.000-150.000/Lbr339 Plywood 20 mm Lbr 177,500.00 175.000-180.000/Lbr

Paku Biasa 1/2" - 1"

m2

m3

m3

m2

m2

m2

Pipa besi medium 2 mm & 1/2", pjg 6 mPipa besi medium 2 mm & 3/4", pjg 6 mPipa besi medium 2 mm & 1", pjg 6 mPipa besi medium 2 mm & 1,5", pjg 6 mPipa besi medium 2 mm & 2", pjg 6 mPipa besi medium 2 mm & 2,5", pjg 6 mPipa besi medium 2 mm & 3", pjg 6 m

Pipa besi medium 2 mm & 4", pjg 6 m

Pipa PVC & 1/2" mutu A (Wavin dan sejenis)Pipa PVC biasa & 1/2" mutu BPipa PVC & 3/4" mutu A (Wavin dan sejenis)Pipa PVC & 3/4" mutu BPipa PVC & 1" mutu A (Wavin dan sejenis)Pipa PVC & 1" mutu BPipa PVC & 1.5" mutu A (Wavin dan sejenis)Pipa PVC & 1.5" mutu BPipa PVC & 2" mutu A ( Wavin dan sejenis)Pipa PVC & 2" mutu BPipa PVC & 3" mutu A (Wavin dan sejenis)Pipa PVC & 3" mutu BPipa PVC & 4" mutu A ( Wavin dan sejenis)Pipa PVC & 4" mutu BPipa PVC & 6" (15 cm) mutu A (Wavin dan sejenis)

Page 20: DrfatAnalisa2010 Smt Iok Palembang

NO U R A I A N SATUANHARGA HG. PASAR/

DASAR (Rp) AKTUAL (Rp)340 Politur dasar ltr 27,000.00 26.000-28.000/Ltr341 Politur Jadi ltr 39,000.00 39.000/Ltr342 Porselin Putih Uk. 10 x 10 cm buah 400.00 300-500/Buah343 Porselin Warna Uk. 10 x 10 cm buah 775.00 750-800/Buah344 Rangka Atap baja ringan untuk atap genteng, genteng 182,500.00 180.000-185.000/M2

keramik, beton, dll + pemasangan345 Rangka Atap baja ringan untuk atap seng metal, atap 175,000.00 170.000-180.000/M2

asbes, aluminium, sirap, dll + pemasangan346 Rangka Atap baja ringan bentuk joglo/bertumpuk/ 215,000.00 200.000-230.000/M2

khusus + pemasangan347 Rangka Atap baja ringan "Pryda" untuk atap Pelana, 243,000.00 236.000-250.000/M2

Metal dan keramik + pemasangan348 Rangka Atap baja ringan "Pryda" untuk atap Perisai, 261,500.00 255.000-268.000/M2

Metal dan keramik + pemasangan349 Rangka Atap baja ringan "Pryda" untuk atap Joglo, 276,000.00 265.000-287.000/M2

Metal dan keramik + pemasangan350 Rel Pintu Dorong Unit 195,000.00 190.000-200.000/M2351 Rolling Door Standar, t=4 mm, (minimal pas. 7 M2) 245,000.00 240.000-250.000/M2352 Rolling Door Standar, t=5 mm, (minimal pas. 7 M2) 270,000.00 270.000/M2353 Sanding Sealer Impra (Cat dasar) Kg 35,000.00 35.000-35.000/Kg354 Seal Tape buah 2,000.00 2.000/Buah355 Semen ( 50 kg ) Zak 52,000.00 51.000 - 53.000 / Zak356 Semen Portland ( PC ) kg 2,000.00 2.000 /Kg357 Semen Putih (40 kg) Zak 90,000.00 90.000 / Zak358 Semen Putih Kg 4,000.00 4.000 /Kg359 Semen Merah 35,000.00 35.000 / M3360 Semen Nat kg 9,000.00 9.000 / Kg361 Seng Gelombang, lebar 70 cm 6,750.00 6.500 - 7.000 / kaki362 Seng Plat 120 cm X 240 cm lbr 87,500.00 85.000 - 90.000 / Lbr363 Seng Plat 33 cm M' 9,500.00 8.000 - 11.000 / M'364 Seng Plat 38 cm M' 12,500.00 12.000 - 13.000 / M'365 Seng Plat 45 cm M' 15,000.00 15.000 - 15.000 / M'366 Seng Plat 55 cm M' 18,250.00 18.000 - 18.000 / M'367 Seng Plat 88 cm M' 28,000.00 28.000 / M'368 Seng Plat 92 cm M' 27,500.00 19.000 - 20.000 / M'369 Sabun Kg 10,000.00 10.000 - 10.000 / Kg370 Soda Api Kg 28,000.00 28.000 / Kg371 Soft Board ( 120 x 240 ) mm lbr 55,000.00 55.000-55.000/ Lbr372 Saklar Tunggal biasa Buah 5,500.00 5.000-6.000/ Buah373 Saklar Ganda biasa Buah 8,000.00 7.000-9.000/ Buah374 Saklar Tunggal National Buah 17,000.00 16.000-18.000/ Buah375 Saklar Ganda National Buah 34,000.00 32.000-35.000/ Buah376 Scafolding tg 1,77 m X 1,77 m Unit 650,000.00 650.000/Unit377 Roda Scafolding 4 buah Unit 350,000.00 350.000/Unit378 Smartruss Aluminium Magnesium

- Lysaght Smartruss C 75.100 M' 22,000.00 22.000/M'- Lysaght Smartruss C 75.75 M' 17,500.00 17.500/M'- Reng U T S 40 M' 13,000.00 13.000/M'- Screw / Dynabolt Buah 1,200.00 1.200/Buah- Valery Gutter Talang Jurai M' 100,000.00 100.000/M'- Strap Bracing M' 6,000.00 6.000/M'

379 Stop Kontak biasa Buah 6,000.00 5.000-7.000/ Buah380 Stop kontak AC Buah 47,500.00 45.000-50.000/ Buah381 Sunscreen Aluminium M2 325,000.00 300.000-350.000/ M2382 T.Duss listrik Buah 750.00 750 /buah383 Talang Paralon, pjg 4 m btg 41,500.00 41.000 - 42.000 /btg384 Tali Ijuk Kg 9,000.00 9.000 - 9.000 /Kg385 Ijuk 6,000.00 6.000 - 6.000 /M3386 Tanah Liat/Urug 34,000.00 33.000 - 35.000 / M3387 Tanah Puru 50,000.00 50.000 / M3388 Tanah Sirtu 65,000.00 65.000 / M3389 Taekwood 3 mm 26,500.00 26.000 - 27.000 / M2

m2

m2

m2

m2

m2

m2

m2

m2

m3

m2

m3

m3

m3

m3

m2

Page 21: DrfatAnalisa2010 Smt Iok Palembang

NO U R A I A N SATUANHARGA HG. PASAR/

DASAR (Rp) AKTUAL (Rp)390 Taekwood 4 mm biasa 31,500.00 31.000 - 32.000 / M2391 Ter / Residu liter 2,250.00 2.000 - 2.500 / Ltr392 Textil Tape roll 6,000.00 6.000 - 6.000 /roll393 Thinner biasa Liter 11,000.00 10.000 - 12.000 /Ltr394 Thinner Cat Glossy (Cobra dan sejenis) Liter 23,000.00 22.000 - 24.000 /Ltr395 Urinoir buah 1,217,000.00 1.217.000 /Unit396 Urinoir mutu A unit 1,400,000.00 1.400.000 /Unit397 Vernis ltr 40,000.00 40.000 /Ltr398 Vernis Batu Kg 59,000.00 59.000 /Kg399 Wallpaper 45,000.00 200.000-250.000 /roll400 Wastafel biasa buah 150,000.00 150.000 /Buah401 Wastafel Halmar unit 225,000.00 225.000 /Buah402 Wastafel mutu A unit 1,700,000.00 1.700.000 /Buah403 Wood Filler Impra (dempul) Klg 25,000.00 25.000-25.000 /Klg404 Wood Stain Impra (cat pewarna) Klg 50,000.00 50.000/Klg

C P E R A L A T A N1 Asphalt Finisher jam 215,000.00 215.000/Jam2 Asphalt Mixing Plan jam 1,600,000.00 1.600.000/Jam3 Asphalt Sprayer jam 65,000.00 65.000/Jam4 Compresor jam 130,000.00 130.000/Jam5 Concrete Mixer jam 15,000.00 15.000/Jam6 Concrete Pump jam 187,500.00 187.500 /jam7 Concrete Vibrator jam 22,000.00 22.000 /jam8 Dump Truck jam 290,000.00 290.000 /jam9 Excavator jam 595,000.00 595.000 /jam

10 Filter jam 40,000.00 40.000 /jam11 Genset jam 10,000.00 12.000 /jam12 Grader jam 470,000.00 470.000 /jam13 Loader jam 375,000.00 375.000 /jam14 Pneumatic Tired Roller jam 365,000.00 365.000 /jam15 Tandem Roller jam 240,000.00 240.000 /jam16 Flatbed Truck 3,5 ton jam 225,000.00 225.000 /jam17 Water Tank Truck jam 300,000.00 300.000 /jam18 Generator jam 35,000.00 35.000 /jam19 Alat Bantu jam 75,000.00 75.000 /jam20 Roller 3 roda jam 165,000.00 165.000 /jam21 Sprayer, Selfprof jam 140,000.00 140.000 /jam22 Buldozer jam 645,000.00 645.000 /jam23 Scaffolding 177cm X 177 cm, Tg. 177 cm Set/Bulan 47,500.00 45.000-50.000 /Set/Bulan24 Stone Crusher (Pemecah batu) jam 780,000.00 33.000 /Jam25 Pengaduk beton jam 100,000.00 100.000 /Jam26 Stemper jam 24,000.00 29.000 /Jam27 Roller, Vibrator Pneu jam 90,000.00 90.000 /Jam28 Water Pump jam 21,500.00 21.500 /Jam

D SERVICE1 AC Window/Split/Multi Ls 50,000.00 500002 Dispenser Ls 35,000.00 350003 Kulkas/Freezer Ls 35,000.00 350004 Kompor Gas 2T Ls 35,000.00 350005 Kompor Gas 4T Ls 55,000.00 550006 Mesin Cuci Ls 35,000.00 350007 Pompa Air Ls 35,000.00 350008 Instalasi listrik Ls 45,000.00 45000

Palembang, Februari 2010

Tim Survey,

m2

m2

Page 22: DrfatAnalisa2010 Smt Iok Palembang

NO U R A I A N SATUANHARGA HG. PASAR/

DASAR (Rp) AKTUAL (Rp)

Nama Tanda tangan

1 Tri Hidayat F, ST., MT ………………………………

2 Poppy Augustina L, ST., MT ………………………………

3 Isrok, ST ………………………………

4 Aditi Awarman ………………………………

Page 23: DrfatAnalisa2010 Smt Iok Palembang

Daftar Harga Satuan Upah, Bahan Bangunan dan Peralatan Tahun 2010 Semester I

- 23 -

DAFTAR HARGA SATUAN UPAH, BAHAN BANGUNAN DAN PERALATAN TAHUN 2010 SEMESTER I

NO U R A I A N SATUANHRG SATUAN HARGA

(RUPIAH) Swakelola (Rp)

A U P A H1 Kepala Tukang Oh 99,000.00 90,000.00 2 Tukang Oh 77,000.00 70,000.00 3 Mandor Oh 104,500.00 95,000.00 4 Pekerja Tidak Terlatih Oh 44,000.00 40,000.00 5 Pekerja Terlatih Oh 66,000.00 60,000.00 6 Masinis Oh 82,500.00 75,000.00 7 Operator Oh 82,500.00 75,000.00 8 Sopir Oh 60,500.00 55,000.00 9 Pembantu Masinis/Operator Oh 66,000.00 60,000.00 10 Supervisor Oh 82,500.00 75,000.00 11 Pemasak Aspal Oh 49,500.00 45,000.00 12 Penjaga Oh 44,000.00 40,000.00 13 Pembantu Sopir Oh 55,000.00 50,000.00 14 Mekanik Oh 88,000.00 80,000.00 15 Surveyor Oh 82,500.00 75,000.00

B B A H A N / M A T E R I A L1 Agregat Halus 298,100.00 303,520.00 2 Agregat Kasar 291,500.00 296,800.00 3 Agregat Kelas A 280,500.00 285,600.00 4 Agregat Kelas B 247,500.00 252,000.00 5 Agregat Kelas C 236,500.00 240,800.00 6 Aluminium Foil 16,500.00 16,800.00 7 Alcubond 1,375,000.00 1,400,000.00 8 Amplas Biasa Lbr 3,300.00 3,360.00 9 Amplas Niken Lbr 6,600.00 6,720.00 10 Atap Aluminium Zink Coated (seng) tebal 0,25 mm Lbr 42,900.00 43,680.00 11 Atap Aluminium Zink Coated (seng) tebal 0,3 mm Lbr 55,000.00 56,000.00 12 Atap Aluminium Zink Coated (seng) tebal 0,4 mm Lbr 83,600.00 85,120.00 13 Atap Aluminium Zincalume, tebal 0,25 mm Lbr 61,600.00 62,720.00 14 Atap Aluminium Zincalume, tebal 0,3 mm Lbr 85,800.00 87,360.00 15 Atap Aluminium Zincalume, tebal 0,4 mm Lbr 96,800.00 98,560.00 16 Atap Aluminium Gelombang tebal 0,5 mm Lbr 115,500.00 117,600.00 17 Atap Fiber warna"Polycarbonat" tbl. 4-5 mm 40,740.74 41,481.48 18 Atap Genteng Beton Lokal buah 2,475.00 2,520.00 19 Atap Genteng Beton buah 4,125.00 4,200.00 20 Atap Genteng Beton Cisangkan buah 6,600.00 6,720.00 21 Atap Genteng Buleleng buah 1,210.00 1,232.00 22 Atap Genteng Keramik biasa berglazur buah 6,600.00 6,720.00 23 Atap Genteng Keramik Berglazur Natural buah 8,250.00 8,400.00 24 Atap Genteng Keramik sejenis Berglazur warna buah 14,850.00 15,120.00 25 Atap Genteng Metal Biasa (88 cm X 77 cm) 58,928.57 60,000.00 26 Atap Genteng Metal Warna (120 cm X 76 cm) 78,157.89 79,578.95 27 Atap Genteng Metal Zincalume 2x4 (38,5 cm X 80cm) 151,785.71 154,545.45 28 Atap Genteng Metal Zincalume berpasir (77cmX100cm) 175,714.29 178,909.09 29 Atap Genteng Metal Zincalume berpasir biasa 78,571.43 80,000.00 30 Atap Genteng Kodok buah 2,750.00 2,800.00 31 Atap Genteng Palentong buah 1,100.00 1,120.00 31 Atap Genteng Palentong Super buah 1,347.50 1,372.00 32 Atap Onduline 86,900.00 88,480.00 32 Asbes polos 100 x 100 tbl = 4 mm Lbr 20,350.00 20,720.00 33 Asbes Gelombang Kecil, lebar 80 cm 32,083.33 32,666.67 34 Asbes Gelombang Kecil, lebar 105 cm 33,255.75 33,860.40 35 Asbes Gelombang Besar, lebar 105 cm 36,696.00 37,363.20 36 Asbes Gelombang motif genteng 26,400.00 26,880.00 37 Aquaproof kg 48,400.00 49,280.00 38 Bak Cuci Stainless Steel buah 198,000.00 201,600.00

m3

m3

m3

m3

m3

m2

m2

m2

m2

m2

m2

m2

m2

m2

m2

m2

m2

m2

Page 24: DrfatAnalisa2010 Smt Iok Palembang

Daftar Harga Satuan Upah, Bahan Bangunan dan Peralatan Tahun 2010 Semester I

- 24 -

NO U R A I A N SATUANHRG SATUAN HARGA

(RUPIAH) Swakelola (Rp)39 Bak Cuci Teraso buah 110,000.00 112,000.00 40 Bak Fibreglass buah 203,500.00 207,200.00 41 Bak Teraso buah 82,500.00 84,000.00 42 Bambu dia. 6-8 cm/6m Btg 44,000.00 44,800.00 43 Batako buah 2,750.00 2,800.00 44 Batu Andesit hitam kecoklatan 275,000.00 280,000.00 45 Batu alam kecoklatan (Sangarong) 195,250.00 198,800.00 46 Batu Bata lobang 471,900.00 480,480.00 47 Batu Bata Kecil buah 517.00 526.40 48 Batu Bata Lobang buah 605.00 616.00 49 Batu Candi hitam 231,000.00 235,200.00 50 Batu Kali 308,000.00 313,600.00 51 Batu Kali tempel 68,750.00 70,000.00 52 Batu Karang Pilang 302,500.00 308,000.00 53 Batu Kerikil 247,500.00 252,000.00 54 Batu Koral beton 220,000.00 224,000.00 55 Batu Koral Jagung 297,000.00 302,400.00 56 Batu Krokos 236,500.00 240,800.00 57 Batu Palimanan kuning/hijau 198,000.00 201,600.00 58 Batu Palimanan kuning/hijau + bevel 220,000.00 224,000.00 59 Batu Pecah 0.5 - 1 (screen) 302,500.00 308,000.00 60 Batu Abu 0.00 - 0.5 (filler) 302,500.00 308,000.00 61 Batu Pecah 1.3 - 1.9 (spilt) 357,500.00 364,000.00 62 Batu Pecah 2/3 258,500.00 263,200.00 63 Batu Pecah 3/5 247,500.00 252,000.00 64 Batu Pecah 5/7 236,500.00 240,800.00 65 Batu Marmer 283,200.00 288,400.00 66 Batu Roster / Terawang keramik buah 44,000.00 44,800.00 67 Besi dia. 5 mm Batang 13,200.00 13,440.00 68 Besi dia. 6 mm KS Batang 18,150.00 18,480.00 69 Besi dia. 8 mm KS TI Batang 44,000.00 44,800.00 70 Besi dia. 10 mm KS TI Batang 67,100.00 68,320.00 71 Besi dia. 12 mm KS TI Batang 94,600.00 96,320.00 72 Besi dia. 14 mm KS TI Batang 159,500.00 162,400.00 73 Besi dia. 16 mm KS TI Batang 167,750.00 170,800.00 74 Besi dia. 19 mm KS TI Batang 343,750.00 350,000.00 75 Besi Beton Polos kg 11,550.00 11,760.00 76 Besi Baja Profil WF, I dan H kg 15,950.00 16,240.00 77 Besi Baja Konstruksi ( CNP, INP,dan besi L) kg 13,750.00 14,000.00 78 Besi Beam Clamp dan Plat Siku 24,750.00 25,200.00 79 Besi Hollow baja 20 X 40, tb. 2mm Batang 178,750.00 182,000.00 80 Besi Hollow baja 40 X 40, tb. 2mm Batang 200,750.00 204,400.00 81 Besi Hollow baja 30 X 60, tb. 2mm Batang 214,500.00 218,400.00 82 Besi Hollow Plafond 2 X 4 Batang 23,650.00 24,080.00 83 Besi Strip kg 8,250.00 8,400.00 84 Besi Strip 2 X 3 M' 3,300.00 3,360.00 85 Beton Ready Mix K - 125 665,500.00 677,600.00 86 Beton Ready Mix K - 175 689,333.33 701,866.67 87 Beton Ready Mix K - 225 723,250.00 736,400.00 88 Beton Ready Mix K - 250 745,250.00 758,800.00 89 Beton Ready Mix K - 275 779,166.67 793,333.33 90 Beton Ready Mix K - 300 800,250.00 814,800.00 91 Beton Ready Mix K - 350 833,250.00 848,400.00 92 Beton Ready Mix K - 400 836,000.00 851,200.00 93 Bubungan Asbes Gelombang Besar m' 16,500.00 16,800.00 94 Bubungan Asbes Gelombang Kecil m' 14,025.00 14,280.00 95 Bubungan/Nok Genteng Beton Buah 5,500.00 5,600.00 96 Bubungan Genteng Buleleng Buah 2,750.00 2,800.00 97 Bubungan/ Nok genteng Keramik biasa berglazur Buah 7,150.00 7,280.00 98 Bubungan/Nok genteng Keramik sejenis berglazur Buah 13,750.00 14,000.00 99 Bubungan gtg Keramik sejenis warna berglazur Buah 19,250.00 19,600.00

100 Bubungan/Nok Genteng Metal/aluminium M' 25,850.00 26,320.00 101 Bubungan Genteng Kodok Buah 2,062.50 2,100.00

m2

m2

m3

m2

m3

m2

m2

m3

m3

m3

m3

m2

m2

m3

m3

m3

m3

m3

m3

m2

m2

m3

m3

m3

m3

m3

m3

m3

m4

Page 25: DrfatAnalisa2010 Smt Iok Palembang

Daftar Harga Satuan Upah, Bahan Bangunan dan Peralatan Tahun 2010 Semester I

- 25 -

NO U R A I A N SATUANHRG SATUAN HARGA

(RUPIAH) Swakelola (Rp)102 Bubungan Genteng Palentong kecil Buah 2,090.00 2,128.00 103 Bubungan Genteng Palentong besar Buah 2,750.00 2,800.00 104 Cat Dasar kg 21,450.00 21,840.00 105 Cat Antara kg 20,900.00 21,280.00 106 Cat Kayu dan Besi Anti Rayap kg 22,550.00 22,960.00 107 Cat Khusus Glossy dan Quick Drying kg 22,550.00 22,960.00 108 Cat Minyak warna (biasa) mutu C kg 28,600.00 29,120.00 109 Cat Minyak mutu B kg 40,700.00 41,440.00 110 Cat Minyak Semprot kg 55,000.00 56,000.00 111 Cat Meni Besi kg 30,800.00 31,360.00 112 Cat Meni Besi /kayu/ Flincote kg 35,200.00 35,840.00 113 Cat Penutup kg 79,750.00 81,200.00 114 Cat Tembok mutu C (Vinotex,Q-Luc, dan sejenis) kg 10,450.00 10,640.00 115 Cat Tembok mutu B (Catylax,vinilex, dan sejenis) kg 15,400.00 15,680.00 116 Cat Tembok mutu B, Anti Lumut dan Jamur kg 19,250.00 19,600.00 117 Cat Tembok mutu A (Mowilex,Kemtone,Dulux,dll) kg 65,340.00 66,528.00 118 Closed Duduk Setara (sejenis standar KIA) unit 1,375,000.00 1,400,000.00 119 Closed Duduk Standar (sejenis Ex.TOTOC721FV1) unit 2,303,400.00 2,345,280.00 120 Closed Duduk Halmar unit 3,368,200.00 3,429,440.00 121 Closed Duduk mutu C unit 1,886,500.00 1,920,800.00 122 Closed Duduk mutu A unit 4,697,000.00 4,782,400.00 123 Closed Duduk mutu B unit 2,852,300.00 2,904,160.00 124 Closed Duduk standar unit 2,366,100.00 2,409,120.00 125 Closet Duduk / Monoblok bh 434,500.00 442,400.00 126 Closet Jongkok Porselen / biasa buah 88,000.00 89,600.00 127 Closet Jongkok Teraso buah 27,500.00 28,000.00 128 Closed Jongkok Standart / sejenis (mutu B) unit 165,000.00 168,000.00 129 Closed Jongkok sejenis ( mutu A) Unit 192,500.00 196,000.00 130 Shower Spray TX 403 SV 3 buah 357,500.00 364,000.00 131 Coneblock biasa tebal 6 cm buah 990.00 1,008.00 132 Coneblock warna tebal 6 cm buah 1,430.00 1,456.00 133 Coneblock biasa tebal 8 cm buah 1,320.00 1,344.00 134 Coneblock warna tebal 8 cm buah 1,980.00 2,016.00 135 Cornice (bubuk Semen putih utk gypsum) kg 6,600.00 6,720.00 136 Dempul Jadi kg 13,200.00 13,440.00 137 Dempul Ross Polac kg 14,300.00 14,560.00 138 Dempul Isamu kg 41,800.00 42,560.00 139 Dolken Kayu dia. 8 - 10/400 cm 247,500.00 252,000.00 140 Door Closer buah 418,000.00 425,600.00 141 Door Holder buah 33,000.00 33,600.00 142 Door Stoper buah 330,000.00 336,000.00 143 Door Stop buah 24,200.00 24,640.00 144 Ember hitam buah 5,500.00 5,600.00 145 Engsel Biasa buah 3,850.00 3,920.00 146 Engsel Kuningan 4" buah 6,050.00 6,160.00 147 Engsel Pintu buah 4,950.00 5,040.00 148 Epoxi kg 46,750.00 47,600.00 149 Eternit 100 x 100 tebal 2,7 mm Lbr 12,100.00 12,320.00 150 Eternit 100 x 100 tebal 3,5 mm Lbr 14,850.00 15,120.00 151 Filler 189,750.00 193,200.00 152 Fitting plafond listrik buah 5,500.00 5,600.00 153 Glass Block buah 24,750.00 25,200.00 154 Grendel/Slot Tanam 4" buah 79,750.00 81,200.00 155 Grendel biasa buah 14,850.00 15,120.00 156 Gypsum Board ( 120 x 240 x 9 ) mm lbr 159,500.00 162,400.00 157 Hordeng Horizontal Blind (aluminium) 96,250.00 98,000.00 158 Hordeng Vertikal Blind 99,000.00 100,800.00 159 Ijuk Kg 7,700.00 7,840.00 160 Jendela Aluminium + Kaca Reyband 5 mm 3,052,500.00 3,108,000.00 161 Jendela Besi 275,000.00 280,000.00 162 Jendela Bingkai Nako 100 cm X 70 cm Unit 66,000.00 67,200.00 163 Jendela Bingkai Nako 104,500.00 106,400.00 164 Kabel NYA 1,5 mm m' 2,200.00 2,240.00

m3

m3

m2

m3

m2

m2

m2

Page 26: DrfatAnalisa2010 Smt Iok Palembang

Daftar Harga Satuan Upah, Bahan Bangunan dan Peralatan Tahun 2010 Semester I

- 26 -

NO U R A I A N SATUANHRG SATUAN HARGA

(RUPIAH) Swakelola (Rp)165 Kabel NYA 2,5 mm m' 3,300.00 3,360.00 166 Kabel NYA 4.0 mm m' 4,400.00 4,480.00 167 Kabel NYM 2 X 1,5 mm m' 4,950.00 5,040.00 168 Kabel NYM 2 X 2,5 mm m' 7,700.00 7,840.00 169 Kabel NYM 2 X 4,0 mm m' 15,950.00 16,240.00 170 Kaca Cermin 3 mm 132,000.00 134,400.00 171 Kaca Cermin 5 mm 371,250.00 378,000.00 172 Kaca Patri 1,320,000.00 1,344,000.00 173 Kaca Bening 3 mm 79,750.00 81,200.00 174 Kaca Bening 4 mm 104,500.00 106,400.00 175 Kaca Bening 5 mm 134,750.00 137,200.00 176 Kaca Bening 8 mm 156,750.00 159,600.00 177 Kaca Bening 10 mm m2 385,000.00 392,000.00 178 Kaca Buram 12 mm 220,000.00 224,000.00 179 Kaca Rayband 5 mm 156,750.00 159,600.00 180 Kaca Buram/Es 5 mm 82,500.00 84,000.00 181 Bingkai Kaca Nako Set 27,500.00 28,000.00 182 Kaca Naco 6 daun Set 140,250.00 142,800.00 183 Kaca Naco 8 daun Set 156,750.00 159,600.00 184 Kaca Naco Rayben 5 mm, 6 daun Set 184,250.00 187,600.00 185 Kaca Naco Rayben 5 mm, 8 daun Set 195,250.00 198,800.00 186 Kait angin Jendela Buah 5,500.00 5,600.00 187 Kalsiboard 3,5 mm (120 cm X 240 cm) Kpg 58,300.00 59,360.00 188 Kalsiboard 4,5 mm (120 cm X 240 cm) Kpg 68,750.00 70,000.00 189 Kapur kg 3,300.00 3,360.00 190 Karpet tebal 6 mm 75,625.00 77,000.00 191 Kawat Beton kg 18,700.00 19,040.00 192 Kawat Burung 11,000.00 11,200.00 193 Kawat Duri m' 2,640.00 2,688.00 194 Kawat Harmonika 38,500.00 39,200.00 195 Kawat Jaring pagar lbr 27,500.00 28,000.00 196 Kawat Kassa 11,000.00 11,200.00 197 Kawat Las Dos 57,750.00 58,800.00 198 Kawat Nyamuk 18,700.00 19,040.00 199 Kawat Seng Polos kg 17,050.00 17,360.00 200 Kayu Gelam dia. 6-8 btg 5,500.00 5,600.00 201 Kayu Gelam dia. 10-12 btg 7,150.00 7,280.00 202 Kayu Hek btg 9,350.00 9,520.00 203 Kayu Lis 1/3 m' 1,237.50 1,260.00 204 Kayu Lis 1/4 m' 1,512.50 1,540.00 205 Kayu Lis Profil kecil m' 1,650.00 1,680.00 206 Kayu Lis Profil sedang m' 3,300.00 3,360.00 207 Kayu Lis Profil besar m' 7,150.00 7,280.00 208 Kayu Mosaik 30 x 30 cm Buah 6,050.00 6,160.00 209 Kayu Kaso 5/7 kelas III (Meranti dan sejenis) Btg 53,900.00 54,880.00 210 Kayu Kelas I (Unglen, Jati) 6,050,000.00 6,160,000.00 211 Kayu Kelas II (Petanang dan sejenis) 4,290,000.00 4,368,000.00 212 Kayu Kelas III (Meranti dan sejenis) 3,245,000.00 3,304,000.00 213 Kayu Papan 3/20 Kls. III 2,062,500.00 2,100,000.00 214 Kayu Kelas IV (Racuk dan sejenis) 1,210,000.00 1,232,000.00 215 Kayu Papan kelas IV keping 16,500.00 16,800.00 216 Kayu Racuk 935,000.00 952,000.00 217 Kayu Reng btg 13,200.00 13,440.00 218 Keramik lantai/dinding 20 x 20/25 cm putih polos Kotak 50,600.00 51,520.00

Keramik lantai/dinding 20 x 20/25 cm putih polos buah 2,024.00 2,060.80 219 Keramik lantai 20 x 20 cm warna, mutu C Kotak 46,750.00 47,600.00

Keramik lantai 20 x 20 cm warna, mutu C buah 1,870.00 1,904.00 220 Keramik lantai 20 x 20 cm warna, mutu B Kotak 68,200.00 69,440.00

Keramik lantai 20 x 20 cm warna, mutu B buah 2,728.00 2,777.60 221 Keramik dinding 20 x 25 cm warna Kotak 53,350.00 54,320.00

Keramik dinding 20 x 25 cm warna buah 2,667.50 2,716.00 222 Keramik lantai 20 x 25 cm warna, mutu B Kotak 74,800.00 76,160.00

Keramik lantai 20 x 25 cm warna, mutu B buah 2,992.00 3,046.40

m2

m2

m2

m2

m2

m2

m2

m2

m2

m2

m2

m2

m2

m2

m2

m3

m3

m3

m3

m3

m3

Page 27: DrfatAnalisa2010 Smt Iok Palembang

Daftar Harga Satuan Upah, Bahan Bangunan dan Peralatan Tahun 2010 Semester I

- 27 -

NO U R A I A N SATUANHRG SATUAN HARGA

(RUPIAH) Swakelola (Rp)223 Keramik lantai 30 x 30 cm warna Kotak 53,350.00 54,320.00

Keramik lantai 30 x 30 cm warna buah 4,801.50 4,888.80 224 Keramik lantai 30 x 30 cm putih polos Kotak 37,400.00 38,080.00

Keramik lantai 30 x 30 cm putih polos buah 3,366.00 3,427.20 225 Keramik lantai 40 x 40 cm warna mutu C Kotak 56,100.00 57,120.00

Keramik lantai 40 x 40 cm warna mutu C buah 8,976.00 9,139.20 226 Keramik lantai 40 x 40 cm warna mutu B Kotak 102,300.00 104,160.00

Keramik lantai 40 x 40 cm warna mutu B buah 16,368.00 16,665.60 227 Keramik lantai motif kayu (kasar) mutu A Kotak 127,600.00 129,920.00 228 Klem Talang Paralon Buah 2,475.00 2,520.00 229 Klem kabel listrik biasa Buah 82.50 84.00 230 Klem kabel listrik Buah 3,025.00 3,080.00 231 Korosin Ltr 2,200.00 2,240.00 232 Kran Air buah 9,350.00 9,520.00 233 Kuas 3"-4" buah 6,600.00 6,720.00 234 Kunci Gembok buah 9,900.00 10,080.00 235 Kunci Lemari buah 13,200.00 13,440.00 236 Kunci Pintu Kamar Tidur (Hotel) buah 495,000.00 504,000.00 237 Kunci Pintu KM/WC (lux) buah 396,000.00 403,200.00 238 Kunci Selot buah 3,850.00 3,920.00 239 Kunci Tanam biasa mutu C buah 24,750.00 25,200.00 240 Kunci Tanam 2 slaag biasa buah 79,750.00 81,200.00 241 Kunci Tanam 2 slaag mutu B buah 134,750.00 137,200.00 242 Kunci Tanam Kamar Mandi buah 24,750.00 25,200.00 243 L.bow listrik buah 550.00 560.00 244 Lampu Down Light buah 41,250.00 42,000.00 245 Lampu Hologen 50 watt buah 9,900.00 10,080.00 246 Lampu Hologen 150 watt buah 41,250.00 42,000.00 247 Lampu Hologen Box buah 33,000.00 33,600.00 248 Lampu TL 10 Watt buah 49,500.00 50,400.00 249 Lampu TL 20 Watt buah 71,500.00 72,800.00 250 Lampu TL 40 Watt (bambu) buah 82,500.00 84,000.00 251 Lampu Pijar 25 Watt Putih buah 12,100.00 12,320.00 252 Lampu Pijar 40 Watt Putih buah 13,200.00 13,440.00 253 Lantai Granit 30/30 Buah 18,810.00 19,152.00 254 Lantai Granit 40/40 Buah 40,480.00 41,216.00 255 Lantai Granit 60/60 Buah 114,840.00 116,928.00 256 Lantai Kayu Panil Gracewood 387,750.00 394,800.00 257 Las dop listrik Buah 1,100.00 1,120.00 258 Lem Kayu ltr 34,100.00 34,720.00 259 Lem Vinyl Kg 4,950.00 5,040.00 260 List Gypsum Besar m' 20,900.00 21,280.00 261 List Gypsum Kecil m' 15,400.00 15,680.00 262 Mangkok Saklar listrik Buah 990.00 1,008.00 263 MCB Buah 16,500.00 16,800.00 264 MCB Box isi 4 grup Buah 19,250.00 19,600.00 265 MCB Box isi 8 grup Buah 35,750.00 36,400.00 266 Melamic Clear kg 34,100.00 34,720.00 267 Melamic Gloss/dop (Finishing) kg 55,000.00 56,000.00 268 Mill kg 32,450.00 33,040.00 269 Minyak Bekisting liter 11,000.00 11,200.00 270 Minyak Cat liter 4,400.00 4,480.00 271 Minyak solar untuk industri / Minyak aspal liter 4,620.00 4,704.00 272 Minyak Gardan liter 17,050.00 17,360.00 273 Minyak Hidrolik liter 25,850.00 26,320.00 274 Minyak Selinder liter 17,050.00 17,360.00 275 Mozaik kayu lantai Uk. 30 x 30 cm buah 8,250.00 8,400.00 276 Pagar BRC, uk. 240 cm X 120 cm, dia. 5,5 mm Unit 341,000.00 347,200.00 277 Pagar BRC, uk. 240 cm X 90 cm, dia. 6 mm Unit 374,000.00 380,800.00 278 Paku Biasa bermacam ukuran 2" - 5" kg 18,150.00 18,480.00 279 kg 18,150.00 18,480.00 280 Paku Sumbat buah 522.50 532.00

m2

Paku Biasa 1/2" - 1"

Page 28: DrfatAnalisa2010 Smt Iok Palembang

Daftar Harga Satuan Upah, Bahan Bangunan dan Peralatan Tahun 2010 Semester I

- 28 -

NO U R A I A N SATUANHRG SATUAN HARGA

(RUPIAH) Swakelola (Rp)281 Paku Beton buah 605.00 616.00 282 Paku Gypsum kg 68,750.00 70,000.00 283 Paku Seng,Asbes kg 19,800.00 20,160.00 284 Paku Asbes buah 522.50 532.00 285 Paku Sekrup 3,5" Kg 41,250.00 42,000.00 286 Paku Sekrup 3,5" buah 412.50 420.00 287 Parquet Jati 423,500.00 431,200.00 288 Pasir Beton / Pasang 82,500.00 84,000.00 289 Pasir Urug 71,500.00 72,800.00 290 Pewarna nat Bks 1,650.00 1,680.00 291 Pintu Alluminium 495,000.00 504,000.00 292 Pintu Besi Baja 1,925,000.00 1,960,000.00 293 Pintu Lipat 371,250.00 378,000.00 294 Pintu PVC lengkap + pemasangan Unit 495,000.00 504,000.00 295 M' 9,166.67 9,333.33 296 M' 11,000.00 11,200.00 297 M' 13,750.00 14,000.00 298 M' 21,083.33 21,466.67 299 M' 30,250.00 30,800.00 300 M' 49,958.33 50,866.67 301 M' 57,291.67 58,333.33 302 M' 85,250.00 86,800.00 303 Pipa paralon listrik 5/8" Btg 4,950.00 5,040.00 304 M' 2,750.00 2,800.00 305 M' 1,375.00 1,400.00 306 M' 3,666.67 3,733.33 307 M' 1,833.33 1,866.67 308 M' 4,400.00 4,480.00 309 M' 2,750.00 2,800.00 310 M' 7,791.67 7,933.33 311 M' 3,116.67 3,173.33 312 M' 10,541.67 10,733.33 313 M' 4,950.00 5,040.00 314 M' 20,350.00 20,720.00 315 M' 7,333.33 7,466.67 316 M' 36,300.00 36,960.00 317 M' 11,458.33 11,666.67 318 M' 96,250.00 98,000.00 319 Pipa Stainless 2", tebal 1 mm M' 54,083.33 55,066.67 320 Pipa Stainless 2", tebal 0.8 mm M' 44,916.67 45,733.33 321 Pipa Stainless 2,5", tebal 1 mm M' 66,458.33 67,666.67 322 Pipa Stainless 2,5", tebal 1.2 mm M' 78,833.33 80,266.67 323 Plamir Tembok kg 24,750.00 25,200.00 324 Plamir Kayu kg 26,400.00 26,880.00 325 Plat stainless, tebal 1 mm, uk. 244 cm X 122 cm Lbr 1,705,000.00 1,736,000.00 326 Plint keramik 10 x 30 cm warna buah 3,300.00 3,360.00 327 Plint keramik 10 x 40 cm warna buah 3,850.00 3,920.00 328 Plint Ubin PC Abu-abu 15 x 20 cm buah 797.50 812.00 329 Plint Ubin PC Abu-abu 10 x 30 cm buah 852.50 868.00 330 Plint Ubin PC Abu-abu 10 x 40 cm buah 907.50 924.00 331 Plywood warna/Jabarwood Lbr 68,750.00 70,000.00 332 Plywood Jati 3 mm Lbr 121,000.00 123,200.00 333 Plywood Sungkay 3 mm/ megatick Lbr 121,000.00 123,200.00 334 Plywood 3 mm Lbr 45,100.00 45,920.00 335 Plywood 4 mm Lbr 61,600.00 62,720.00 336 Plywood 6 mm Lbr 82,500.00 84,000.00 337 Plywood 9 mm Lbr 126,500.00 128,800.00 338 Plywood 12 mm Lbr 162,250.00 165,200.00 339 Plywood 20 mm Lbr 195,250.00 198,800.00 340 Politur dasar ltr 29,700.00 30,240.00 341 Politur Jadi ltr 42,900.00 43,680.00 342 Porselin Putih Uk. 10 x 10 cm buah 440.00 448.00

m2

m3

m3

m2

m2

m2

Pipa besi medium 2 mm & 1/2", pjg 6 mPipa besi medium 2 mm & 3/4", pjg 6 mPipa besi medium 2 mm & 1", pjg 6 mPipa besi medium 2 mm & 1,5", pjg 6 mPipa besi medium 2 mm & 2", pjg 6 mPipa besi medium 2 mm & 2,5", pjg 6 mPipa besi medium 2 mm & 3", pjg 6 mPipa besi medium 2 mm & 4", pjg 6 m

Pipa PVC & 1/2" mutu A (Wavin dan sejenis)Pipa PVC biasa & 1/2" mutu BPipa PVC & 3/4" mutu A (Wavin dan sejenis)Pipa PVC & 3/4" mutu BPipa PVC & 1" mutu A (Wavin dan sejenis)Pipa PVC & 1" mutu BPipa PVC & 1.5" mutu A (Wavin dan sejenis)Pipa PVC & 1.5" mutu BPipa PVC & 2" mutu A ( Wavin dan sejenis)Pipa PVC & 2" mutu BPipa PVC & 3" mutu A (Wavin dan sejenis)Pipa PVC & 3" mutu BPipa PVC & 4" mutu A ( Wavin dan sejenis)Pipa PVC & 4" mutu BPipa PVC & 6" (15 cm) mutu A (Wavin dan sejenis)

Page 29: DrfatAnalisa2010 Smt Iok Palembang

Daftar Harga Satuan Upah, Bahan Bangunan dan Peralatan Tahun 2010 Semester I

- 29 -

NO U R A I A N SATUANHRG SATUAN HARGA

(RUPIAH) Swakelola (Rp)343 Porselin Warna Uk. 10 x 10 cm buah 852.50 868.00 344 Rangka Atap baja ringan untuk atap genteng, genteng 200,750.00 204,400.00

keramik, beton, dll + pemasangan345 Rangka Atap baja ringan untuk atap seng metal, atap 192,500.00 196,000.00

asbes, aluminium, sirap, dll + pemasangan346 Rangka Atap baja ringan bentuk joglo/bertumpuk/ 236,500.00 240,800.00

khusus + pemasangan347 Rangka Atap baja ringan "Pryda" untuk atap Pelana, 267,300.00 272,160.00

Metal dan keramik + pemasangan348 Rangka Atap baja ringan "Pryda" untuk atap Perisai, 287,650.00 292,880.00

Metal dan keramik + pemasangan349 Rangka Atap baja ringan "Pryda" untuk atap Joglo, 303,600.00 309,120.00

Metal dan keramik + pemasangan350 Rel Pintu Dorong Unit 214,500.00 218,400.00 351 Rolling Door Standar, t=4 mm, (minimal pas. 7 M2) 269,500.00 274,400.00 352 Rolling Door Standar, t=5 mm, (minimal pas. 7 M2) 297,000.00 302,400.00 353 Sanding Sealer Impra (Cat dasar) Kg 38,500.00 39,200.00 354 Seal Tape buah 2,200.00 2,240.00 355 Semen ( 50 kg ) Zak 57,200.00 58,240.00 356 Semen Portland ( PC ) kg 2,200.00 2,240.00 357 Semen Putih (40 kg) Zak 99,000.00 100,800.00 358 Semen Putih Kg 4,400.00 4,480.00 359 Semen Merah 38,500.00 39,200.00 360 Semen Nat kg 9,900.00 10,080.00 361 Seng Gelombang, lebar 70 cm 34,800.34 35,433.07 362 Seng Plat 120 cm X 240 cm lbr 96,250.00 98,000.00 363 Seng Plat 33 cm M' 10,450.00 10,640.00 364 Seng Plat 38 cm M' 13,750.00 14,000.00 365 Seng Plat 45 cm M' 16,500.00 16,800.00 366 Seng Plat 55 cm M' 20,075.00 20,440.00 367 Seng Plat 88 cm M' 30,800.00 31,360.00 368 Seng Plat 92 cm M' 30,250.00 30,800.00 369 Sabun Kg 11,000.00 11,200.00 370 Soda Api Kg 30,800.00 31,360.00 371 Soft Board ( 120 x 240 ) mm lbr 60,500.00 61,600.00 372 Saklar Tunggal biasa Buah 6,050.00 6,160.00 373 Saklar Ganda biasa Buah 8,800.00 8,960.00 374 Saklar Tunggal National Buah 18,700.00 19,040.00 375 Saklar Ganda National Buah 37,400.00 38,080.00 376 Scafolding tg 1,77 m X 1,77 m Unit 715,000.00 728,000.00 377 Roda Scafolding 4 buah Unit 385,000.00 392,000.00 378 Smartruss Aluminium Magnesium

- Lysaght Smartruss C 75.100 M' 24,200.00 24,640.00 - Lysaght Smartruss C 75.75 M' 19,250.00 19,600.00 - Reng U T S 40 M' 14,300.00 14,560.00 - Screw / Dynabolt Buah 1,320.00 1,344.00 - Valery Gutter Talang Jurai M' 110,000.00 112,000.00 - Strap Bracing M' 6,600.00 6,720.00

379 Stop Kontak biasa Buah 6,600.00 6,720.00 380 Stop kontak AC Buah 52,250.00 53,200.00 381 Sunscreen Aluminium M2 357,500.00 364,000.00 382 T.Duss listrik Buah 825.00 840.00 383 Talang Paralon, pjg 4 m btg 45,650.00 46,480.00 384 Tali Ijuk Kg 9,900.00 10,080.00 385 Ijuk 6,600.00 6,720.00 386 Tanah Liat/Urug 37,400.00 38,080.00 387 Tanah Puru 55,000.00 56,000.00 388 Tanah Sirtu 71,500.00 72,800.00 389 Taekwood 3 mm 29,150.00 29,680.00 390 Taekwood 4 mm biasa 34,650.00 35,280.00 391 Ter / Residu liter 2,475.00 2,520.00 392 Textil Tape roll 6,600.00 6,720.00

m2

m2

m2

m2

m2

m2

m2

m2

m3

m2

m3

m3

m3

m3

m2

m2

Page 30: DrfatAnalisa2010 Smt Iok Palembang

Daftar Harga Satuan Upah, Bahan Bangunan dan Peralatan Tahun 2010 Semester I

- 30 -

NO U R A I A N SATUANHRG SATUAN HARGA

(RUPIAH) Swakelola (Rp)393 Thinner biasa Liter 12,100.00 12,320.00 394 Thinner Cat Glossy (Cobra dan sejenis) Liter 25,300.00 25,760.00 395 Urinoir buah 1,338,700.00 1,363,040.00 396 Urinoir mutu A unit 1,540,000.00 1,568,000.00 397 Vernis ltr 44,000.00 44,800.00 398 Vernis Batu Kg 64,900.00 66,080.00 399 Wallpaper 49,500.00 50,400.00 400 Wastafel biasa buah 165,000.00 168,000.00 401 Wastafel Halmar unit 247,500.00 252,000.00 402 Wastafel mutu A unit 1,870,000.00 1,904,000.00 403 Wood Filler Impra (dempul) Klg 27,500.00 28,000.00 404 Wood Stain Impra (cat pewarna) Klg 55,000.00 56,000.00

C P E R A L A T A N1 Asphalt Finisher jam 236,500.00 240,800.00 2 Asphalt Mixing Plan jam 1,760,000.00 1,792,000.00 3 Asphalt Sprayer jam 71,500.00 72,800.00 4 Compresor jam 143,000.00 145,600.00 5 Concrete Mixer jam 16,500.00 16,800.00 6 Concrete Pump jam 206,250.00 210,000.00 7 Concrete Vibrator jam 24,200.00 24,640.00 8 Dump Truck jam 319,000.00 324,800.00 9 Excavator jam 654,500.00 666,400.00 10 Filter jam 44,000.00 44,800.00 11 Genset jam 11,000.00 11,200.00 12 Grader jam 517,000.00 526,400.00 13 Loader jam 412,500.00 420,000.00 14 Pneumatic Tired Roller jam 401,500.00 408,800.00 15 Tandem Roller jam 264,000.00 268,800.00 16 Flatbed Truck 3,5 ton jam 247,500.00 252,000.00 17 Water Tank Truck jam 330,000.00 336,000.00 18 Generator jam 38,500.00 39,200.00 19 Alat Bantu jam 82,500.00 84,000.00 20 Roller 3 roda jam 181,500.00 184,800.00 21 Sprayer, Selfprof jam 154,000.00 156,800.00 22 Buldozer jam 709,500.00 722,400.00 23 Scaffolding 177cm X 177 cm, Tg. 177 cm Set/Bulan 52,250.00 53,200.00 24 Stone Crusher (Pemecah batu) jam 858,000.00 873,600.00 25 Pengaduk beton jam 110,000.00 112,000.00 26 Stemper jam 26,400.00 26,880.00 27 Roller, Vibrator Pneu jam 99,000.00 100,800.00 28 Water Pump jam 23,650.00 24,080.00

D SERVICE1 AC Window/Split/Multi Ls 55,000.00 50,000.00 2 Dispenser Ls 38,500.00 35,000.00 3 Kulkas/Freezer Ls 38,500.00 35,000.00 4 Kompor Gas 2T Ls 38,500.00 35,000.00 5 Kompor Gas 4T Ls 60,500.00 55,000.00 6 Mesin Cuci Ls 38,500.00 35,000.00 7 Pompa Air Ls 38,500.00 35,000.00 8 Instalasi listrik Ls 49,500.00 45,000.00

Catatan : Harga satuan diatas belum termasuk PPn 10%.

m2

Page 31: DrfatAnalisa2010 Smt Iok Palembang

Daftar Harga Satuan Upah, Bahan Bangunan dan Peralatan Tahun 2010 Semester I

- 31 -

DAFTAR HARGA SATUAN UPAH, BAHAN BANGUNAN DAN PERALATAN TAHUN 2010 SEMESTER I

HARGADASAR (Rp)

90,000.00 70,000.00 95,000.00 40,000.00 60,000.00 75,000.00 75,000.00 55,000.00 60,000.00 75,000.00 45,000.00 40,000.00 50,000.00 80,000.00 75,000.00

271,000.00 265,000.00 255,000.00 225,000.00 215,000.00 15,000.00 1,250,000.00 3,000.00 6,000.00 39,000.00 50,000.00 76,000.00 56,000.00 78,000.00 88,000.00 105,000.00 37,037.04 2,250.00 3,750.00 6,000.00 1,100.00 6,000.00 7,500.00 13,500.00 53,571.43 71,052.63 137,987.01 159,740.26 71,428.57 2,500.00 1,000.00 1,225.00 79,000.00 18,500.00 29,166.67 30,232.50 33,360.00 24,000.00 44,000.00 180,000.00

Page 32: DrfatAnalisa2010 Smt Iok Palembang

Daftar Harga Satuan Upah, Bahan Bangunan dan Peralatan Tahun 2010 Semester I

- 32 -

HARGADASAR (Rp)

100,000.00 185,000.00 75,000.00 40,000.00 2,500.00 250,000.00 177,500.00 429,000.00 470.00 550.00 210,000.00 280,000.00 62,500.00 275,000.00 225,000.00 200,000.00 270,000.00 215,000.00 180,000.00 200,000.00 275,000.00 275,000.00 325,000.00 235,000.00 225,000.00 215,000.00 257,500.00 40,000.00 12,000.00 16,500.00 40,000.00 61,000.00 86,000.00 145,000.00 152,500.00 312,500.00 10,500.00 14,500.00 12,500.00 22,500.00 162,500.00 182,500.00 195,000.00 21,500.00 7,500.00 3,000.00 605,000.00 626,666.67 657,500.00 677,500.00 708,333.33 727,500.00 757,500.00 760,000.00 15,000.00 12,750.00 5,000.00 2,500.00 6,500.00 12,500.00 17,500.00 23,500.00 1,875.00

Page 33: DrfatAnalisa2010 Smt Iok Palembang

Daftar Harga Satuan Upah, Bahan Bangunan dan Peralatan Tahun 2010 Semester I

- 33 -

HARGADASAR (Rp)

1,900.00 2,500.00 19,500.00 19,000.00 20,500.00 20,500.00 26,000.00 37,000.00 50,000.00 28,000.00 32,000.00 72,500.00 9,500.00 14,000.00 17,500.00 59,400.00 1,250,000.00 2,094,000.00 3,062,000.00 1,715,000.00 4,270,000.00 2,593,000.00 2,151,000.00 395,000.00 80,000.00 25,000.00 150,000.00 175,000.00 325,000.00 900.00 1,300.00 1,200.00 1,800.00 6,000.00 12,000.00 13,000.00 38,000.00 225,000.00

380,000.0030,000.00

300,000.0022,000.00

5,000.00 3,500.00 5,500.00 4,500.00 42,500.00 11,000.00 13,500.00 172,500.00 5,000.00 22,500.00 72,500.00 13,500.00 145,000.00 87,500.00 90,000.00 7,000.00 2,775,000.00 250,000.00 60,000.00 95,000.00 2,000.00

Page 34: DrfatAnalisa2010 Smt Iok Palembang

Daftar Harga Satuan Upah, Bahan Bangunan dan Peralatan Tahun 2010 Semester I

- 34 -

HARGADASAR (Rp)

3,000.00 4,000.00 4,500.00 7,000.00 14,500.00 120,000.00 337,500.00 1,200,000.00 72,500.00 95,000.00 122,500.00 142,500.00 350,000.00 200,000.00 142,500.00 75,000.00 25,000.00 127,500.00 142,500.00 167,500.00 177,500.00 5,000.00 53,000.00 62,500.00 3,000.00 68,750.00 17,000.00 10,000.00 2,400.00 35,000.00 25,000.00 10,000.00 52,500.00 17,000.00 15,500.00 5,000.00 6,500.00 8,500.00 1,125.00 1,375.00 1,500.00 3,000.00 6,500.00 5,500.00 49,000.00 5,500,000.00 3,900,000.00 2,950,000.00 1,875,000.00 1,100,000.00 15,000.00 850,000.00 12,000.00 46,000.00 1,840.00 42,500.00 1,700.00 62,000.00 2,480.00 48,500.00 2,425.00 68,000.00 2,720.00

Page 35: DrfatAnalisa2010 Smt Iok Palembang

Daftar Harga Satuan Upah, Bahan Bangunan dan Peralatan Tahun 2010 Semester I

- 35 -

HARGADASAR (Rp)

48,500.00 4,365.00 34,000.00 3,060.00 51,000.00 8,160.00 93,000.00 14,880.00 116,000.00 2,250.00 75.00 2,750.00 2,000.00 8,500.00 6,000.00 9,000.00 12,000.00 450,000.00 360,000.00 3,500.00 22,500.00 72,500.00 122,500.00 22,500.00 500.00 37,500.00 9,000.00 37,500.00 30,000.00 45,000.00 65,000.00 75,000.00 11,000.00 12,000.00 17,100.00 36,800.00 104,400.00 352,500.00 1,000.00 31,000.00 4,500.00 19,000.00 14,000.00 900.00 15,000.00 17,500.00 32,500.00 31,000.00 50,000.00 29,500.00 10,000.00 4,000.00 4,200.00 15,500.00 23,500.00 15,500.00 7,500.00 310,000.00 340,000.00 16,500.00 16,500.00 475.00

Page 36: DrfatAnalisa2010 Smt Iok Palembang

Daftar Harga Satuan Upah, Bahan Bangunan dan Peralatan Tahun 2010 Semester I

- 36 -

HARGADASAR (Rp)

550.00 62,500.00 18,000.00 475.00 37,500.00 375.00 385,000.00 75,000.00 65,000.00 1,500.00 450,000.00 1,750,000.00 337,500.00 450,000.00 8,333.33 10,000.00 12,500.00 19,166.67 27,500.00 45,416.67 52,083.33 77,500.00 4,500.00 2,500.00 1,250.00 3,333.33 1,666.67 4,000.00 2,500.00 7,083.33 2,833.33 9,583.33 4,500.00 18,500.00 6,666.67 33,000.00 10,416.67 87,500.00 49,166.67 40,833.33 60,416.67 71,666.67 22,500.00 24,000.00 1,550,000.00 3,000.00 3,500.00 725.00 775.00 825.00 62,500.00 110,000.00 110,000.00 41,000.00 56,000.00 75,000.00 115,000.00 147,500.00 177,500.00 27,000.00 39,000.00 400.00

Page 37: DrfatAnalisa2010 Smt Iok Palembang

Daftar Harga Satuan Upah, Bahan Bangunan dan Peralatan Tahun 2010 Semester I

- 37 -

HARGADASAR (Rp)

775.00 182,500.00

175,000.00

215,000.00

243,000.00

261,500.00

276,000.00

195,000.00 245,000.00 270,000.00 35,000.00 2,000.00 52,000.00 2,000.00 90,000.00 4,000.00 35,000.00 9,000.00 6,750.00 87,500.00 9,500.00 12,500.00 15,000.00 18,250.00 28,000.00 27,500.00 10,000.00 28,000.00 55,000.00 5,500.00 8,000.00 17,000.00 34,000.00 650,000.00 350,000.00

22,000.00 17,500.00 13,000.00 1,200.00 100,000.00 6,000.00 6,000.00 47,500.00 325,000.00 750.00 41,500.00 9,000.00 6,000.00 34,000.00 50,000.00 65,000.00 26,500.00 31,500.00 2,250.00 6,000.00

Page 38: DrfatAnalisa2010 Smt Iok Palembang

Daftar Harga Satuan Upah, Bahan Bangunan dan Peralatan Tahun 2010 Semester I

- 38 -

HARGADASAR (Rp)

11,000.00 23,000.00 1,217,000.00 1,400,000.00 40,000.00 59,000.00 45,000.00 150,000.00 225,000.00 1,700,000.00 25,000.00 50,000.00

215,000.00 1,600,000.00 65,000.00 130,000.00 15,000.00 187,500.00 22,000.00 290,000.00 595,000.00 40,000.00 10,000.00 470,000.00 375,000.00 365,000.00 240,000.00 225,000.00 300,000.00 35,000.00 75,000.00 165,000.00 140,000.00 645,000.00 47,500.00 780,000.00 100,000.00 24,000.00 90,000.00 21,500.00

50,000.00 35,000.00 35,000.00 35,000.00 55,000.00 35,000.00 35,000.00 45,000.00

Page 39: DrfatAnalisa2010 Smt Iok Palembang

Daftar Analisa Pekerjaan Kota Palembang TA. 2010 Semester I

- 39 -

DAFTAR ANALISA PEKERJAAN KOTA PALEMBANGTAHUN ANGGARAN 2010 SEMESTER I

U R A I A N

SATUAN HARGA NO. Harga Jumlah Harga Jumlah Jumlah

Analisa Satuan Bahan Tenaga Bahan+Tenaga(Rp) (Rp) (Rp) (Rp)

1 2 3 4 5 6

I PEKERJAAN PERSIAPAN1.1 1 M' Pagar Sementara dari Kayu Tinggi 2 Meter

a. Bahan1.250 Btg Kayu Gelam dia. 6-8 5,500.00 6,875.00 6,875.002.500 Kg Semen Portland 2,200.00 5,500.00 5,500.000.005 Pasir Beton 82,500.00 412.50 412.500.009 Koral Beton 220,000.00 1,980.00 1,980.000.072 Kayu 5/7 kelas IV 1,210,000.00 87,120.00 87,120.000.060 Kg Paku Biasa 2"-5" 18,150.00 1,089.00 1,089.000.400 Lt Teer/Residu 2,475.00 990.00 990.00

103,966.50 103,966.50

b.Tenaga0.200 Oh Tukang Kayu 77,000.00 15,400.00 15,400.000.400 Oh Pekerja 44,000.00 17,600.00 17,600.000.020 Oh Kepala Tukang 99,000.00 1,980.00 1,980.000.020 Oh Mandor 104,500.00 2,090.00 2,090.00

37,070.00 37,070.00

Jumlah 103,966.50 37,070.00 141,036.50

1.2 1 M' Pagar Sementara dari Seng Gelombang Tinggi 2 Metera. Bahan

1.250 Btg Kayu Gelam dia. 6-8 5,500.00 6,875.00 6,875.002.500 Kg Semen Portland 2,200.00 5,500.00 5,500.001.200 Lbr Seng Gelombang 3"-5" 34,800.34 41,760.40 41,760.400.005 Pasir Beton 82,500.00 412.50 412.500.009 Koral Beton 220,000.00 1,980.00 1,980.000.072 Kayu 5/7 kelas IV 1,210,000.00 87,120.00 87,120.000.060 Kg Paku Biasa 2"-5" 18,150.00 1,089.00 1,089.000.450 Kg Meni Besi 30,800.00 13,860.00 13,860.00

158,596.90 158,596.90

b.Tenaga0.200 Oh Tukang Kayu 77,000.00 15,400.00 15,400.000.400 Oh Pekerja 44,000.00 17,600.00 17,600.000.020 Oh Kepala Tukang 99,000.00 1,980.00 1,980.000.020 Oh Mandor 104,500.00 2,090.00 2,090.00

37,070.00 37,070.00

Jumlah 158,596.90 37,070.00 195,666.90

1.3 1 M' Pagar Sementara dari Kawat Duri Tinggi 1,8 Metera. Bahan

1.000 Btg Kayu Gelam dia. 6-8 5,500.00 5,500.00 5,500.002.000 Kg Semen Portland 2,200.00 4,400.00 4,400.00

25.000 Kg Kawat Duri 2,640.00 66,000.00 66,000.000.005 Pasir Beton 82,500.00 412.50 412.500.009 Koral Beton 220,000.00 1,980.00 1,980.000.060 Kg Paku Biasa 2"-5" 18,150.00 1,089.00 1,089.00

79,381.50 79,381.50

b.Tenaga0.200 Oh Tukang Kayu 77,000.00 15,400.00 15,400.000.300 Oh Pekerja 44,000.00 13,200.00 13,200.000.020 Oh Kepala Tukang 99,000.00 1,980.00 1,980.000.020 Oh Mandor 104,500.00 2,090.00 2,090.00

32,670.00 32,670.00

Jumlah 79,381.50 32,670.00 112,051.50

1.4 1 M' Pengukuran dan Pemasangan Bouwplanka. Bahan

0.012 Kayu 5/7 kelas IV 1,210,000.00 14,520.00 14,520.000.020 Kg Paku Biasa 2" - 5" 18,150.00 363.00 363.000.007 Kayu Papan 3/20 2,062,500.00 14,437.50 14,437.50

29,320.50 29,320.50

b.Tenaga0.100 Oh Tukang Kayu 77,000.00 7,700.00 7,700.000.100 Oh Pekerja 44,000.00 4,400.00 4,400.000.010 Oh Kepala Tukang 99,000.00 990.00 990.000.005 Oh Mandor 104,500.00 522.50 522.50

13,612.50 13,612.50

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

Page 40: DrfatAnalisa2010 Smt Iok Palembang

Daftar Analisa Pekerjaan Kota Palembang TA. 2010 Semester I

- 40 -

U R A I A N

SATUAN HARGA NO. Harga Jumlah Harga Jumlah Jumlah

Analisa Satuan Bahan Tenaga Bahan+Tenaga(Rp) (Rp) (Rp) (Rp)

1 2 3 4 5 6Jumlah 29,320.50 13,612.50 42,933.00

1.5a. Bahan

1.250 Btg Kayu Gelam dia. 6-8 5,500.00 6,875.00 6,875.000.180 Kayu 1,210,000.00 217,800.00 217,800.000.850 Kg Paku Biasa 18,150.00 15,427.50 15,427.501.100 Kg Besi Strip 8,250.00 9,075.00 9,075.00

35.000 Kg Semen Portland 2,200.00 77,000.00 77,000.000.150 Pasir Pasang 82,500.00 12,375.00 12,375.000.100 Pasir Beton 82,500.00 8,250.00 8,250.000.150 Koral Beton 220,000.00 33,000.00 33,000.00

30 Bh Bata Merah 517.00 15,510.00 15,510.000.250 Lbr Seng Plat 96,250.00 24,062.50 24,062.502.000 Bh Jendela Nako 66,000.00 132,000.00 132,000.000.080 Kaca Polos 79,750.00 6,380.00 6,380.000.150 Bh Kunci Tanam 24,750.00 3,712.50 3,712.500.060 Lbr Plywood 4 mm 61,600.00 3,696.00 3,696.00

565,163.50 565,163.50

b. Tenaga2.000 Oh Tukang Kayu 77,000.00 154,000.00 154,000.001.000 Oh Tukang Batu 77,000.00 77,000.00 77,000.002.000 Oh Pekerja 44,000.00 88,000.00 88,000.000.300 Oh Kepala Tukang 99,000.00 29,700.00 29,700.000.050 Oh Mandor 104,500.00 5,225.00 5,225.00

353,925.00 353,925.00

Jumlah 565,163.50 353,925.00 919,088.50

1.6a. Bahan

1.700 Btg Kayu Gelam dia. 6-8 5,500.00 9,350.00 9,350.000.210 Kayu 1,210,000.00 254,100.00 254,100.000.300 Kg Paku Biasa 18,150.00 5,445.00 5,445.00

10.500 Kg Semen Portland 2,200.00 23,100.00 23,100.000.030 Pasir Beton 82,500.00 2,475.00 2,475.000.050 Koral Beton 220,000.00 11,000.00 11,000.001.500 Lbr Seng Gelombang BJLS 34,800.34 52,200.51 52,200.51

357,670.51 357,670.51

b. Tenaga2.000 Oh Tukang Kayu 77,000.00 154,000.00 154,000.001.000 Oh Pekerja 44,000.00 44,000.00 44,000.000.200 Oh Kepala Tukang 99,000.00 19,800.00 19,800.000.050 Oh Mandor 104,500.00 5,225.00 5,225.00

223,025.00 223,025.00

Jumlah 357,670.51 223,025.00 580,695.51

1.7a. Bahan

3.000 Btg Kayu Gelam dia. 6-8 5,500.00 16,500.00 16,500.000.276 Kayu 1,210,000.00 333,960.00 333,960.000.700 Kg Paku Biasa 18,150.00 12,705.00 12,705.00

1 M2 Seng Gelombang BJLS 34,800.34 34,800.34 34,800.34397,965.34 397,965.34

b. Tenaga1.500 Oh Tukang Kayu 77,000.00 115,500.00 115,500.001.000 Oh Pekerja 44,000.00 44,000.00 44,000.000.150 Oh Kepala Tukang 99,000.00 14,850.00 14,850.000.050 Oh Mandor 104,500.00 5,225.00 5,225.00

179,575.00 179,575.00

Jumlah 397,965.34 179,575.00 577,540.34

1.8a. Tenaga

0.100 Oh Pekerja 44,000.00 4,400.00 4,400.000.050 Oh Mandor 104,500.00 5,225.00 5,225.00

9,625.00 9,625.00

Jumlah 9,625.00 9,625.00

1.9a. Bahan

1.250 Btg Kayu Gelam dia. 6-8 5,500.00 6,875.00 6,875.000.186 Kayu 1,210,000 225,060.00 225,060.000.300 Kg Paku Biasa 18,150.00 5,445.00 5,445.00

18.000 Kg Semen Portland 2,200.00 39,600.00 39,600.000.030 Pasir Beton 82,500.00 2,475.00 2,475.000.050 Koral Beton 220,000.00 11,000.00 11,000.00

1 M2 Seng Gelombang BJLS 34,800.34 34,800.34 34,800.341.350 Lbr Plywood 4 mm 61,600.00 83,160.00 83,160.00

408,415.34 408,415.34

1 M2 Pembuatan Kantor Sementara, Dengan Lantai Plesteran

M3

M3

M3

M3

M2

1 M2 Pembuatan Gudang Semen dan Alat - Alat

M3

M3

M3

1 M2 Pembuatan Rumah Jaga/Konstruksi Kayu

M3

1 M2 Membersihkan Lapangan dan Perataan

1 M2 Pembuatan Bedeng Buruh

M3

M3

M3

Page 41: DrfatAnalisa2010 Smt Iok Palembang

Daftar Analisa Pekerjaan Kota Palembang TA. 2010 Semester I

- 41 -

U R A I A N

SATUAN HARGA NO. Harga Jumlah Harga Jumlah Jumlah

Analisa Satuan Bahan Tenaga Bahan+Tenaga(Rp) (Rp) (Rp) (Rp)

1 2 3 4 5 6

b. Tenaga2.000 Oh Tukang Kayu 77,000.00 154,000.00 154,000.001.000 Oh Pekerja 44,000.00 44,000.00 44,000.000.200 Oh Kepala Tukang 99,000.00 19,800.00 19,800.000.050 Oh Mandor 104,500.00 5,225.00 5,225.00

223,025.00 223,025.00

Jumlah 408,415.34 223,025.00 631,440.34

1.10a. Bahan

0.036 Kayu Kls. IV 1,210,000 43,560.00 43,560.00 0.080 Kg Paku Biasa 18,150.00 1,452.00 1,452.001.000 Btg Kaso 5/7 53,900.00 53,900.00 53,900.00

98,912.00 98,912.00

b. Tenaga0.300 Oh Tukang Kayu 77,000.00 23,100.00 23,100.00

0.0015 Oh Mandor 104,500.00 156.75 156.7523,256.75 23,256.75

Jumlah 98,912.00 23,256.75 122,168.75

1.11a. Bahan

1.000 Btg Bambu & 6 - 8 /600 cm 44,000.00 44,000.00 44,000.000.250 Kg Tali Ijuk 9,900.00 2,475.00 2,475.00

46,475.00 46,475.00

b. Tenaga0.017 Oh Tukang Kayu 77,000.00 1,309.00 1,309.000.002 Oh Kepala Tukang 99,000.00 198.00 198.000.250 Oh Pekerja 44,000.00 11,000.00 11,000.000.013 Oh Mandor 104,500.00 1,358.50 1,358.50

13,865.50 13,865.50

Jumlah 46,475.00 13,865.50 60,340.50

1.12a. Bahan

0.150 Batu Belah 15/20/Batu Kali 308,000.00 46,200.00 46,200.000.090 Batu Pecah 5/7 236,500.00 21,285.00 21,285.000.010 Pasir Pasang 82,500.00 825.00 825.00

68,310.00 68,310.00

b. Tenaga1.000 Oh Pekerja 44,000.00 44,000.00 44,000.000.050 Oh Mandor 104,500.00 5,225.00 5,225.00

49,225.00 49,225.00

Jumlah 68,310.00 49,225.00 117,535.00

1.13a. Tenaga

6.667 Oh Pekerja 44,000.00 293,348.00 293,348.000.333 Oh Mandor 104,500.00 34,798.50 34,798.50

328,146.50 328,146.50

Jumlah 328,146.50 328,146.50

1.14a. Tenaga

6.667 Oh Pekerja 44,000.00 293,348.00 293,348.000.033 Oh Mandor 104,500.00 3,448.50 3,448.50

296,796.50 296,796.50

Jumlah 296,796.50 296,796.50

1.15a. Bahan

0.434 Lbr Pagar Kawat Jaring 27,500.00 11,935.00 11,935.0011,935.00 11,935.00

b. Tenaga0.042 Oh Pekerja 44,000.00 1,848.00 1,848.000.004 Oh Kepala Tukang 99,000.00 396.00 396.000.042 Oh Tukang 77,000.00 3,234.00 3,234.000.002 Oh Mandor 104,500.00 209.00 209.00

5,687.00 5,687.00

Jumlah 11,935.00 5,687.00 17,622.00

1 M2 Pembuatan Bak Adukan Ukuran (40 x 50 x 20) cm

M3

1 M2 Pembuatan Stegger dari Bambu, Ukuran (40 x 50 x 20) cm

1 M2 Pembuatan Jalan Sementara

M3

M3

M3

1 M3 Bongkaran Beton Bertulang

1 M3 Bongkaran Dinding Tembok Bata Merah /Bata lobang

1 M' Pasang Pagar Kawat Jaring Galvanis Tinggi 1 Meter

Page 42: DrfatAnalisa2010 Smt Iok Palembang

Daftar Analisa Pekerjaan Kota Palembang TA. 2010 Semester I

- 42 -

U R A I A N

SATUAN HARGA NO. Harga Jumlah Harga Jumlah Jumlah

Analisa Satuan Bahan Tenaga Bahan+Tenaga(Rp) (Rp) (Rp) (Rp)

1 2 3 4 5 6

1.16a. Tenaga

0.7500 Oh Pekerja 44,000.00 33,000.00 33,000.000.0375 Oh Mandor 104,500.00 3,918.75 3,918.75

36,918.75 36,918.75

Jumlah 36,918.75 36,918.753,691.88 3,691.88

1.17a. Tenaga

0.250 Oh Tukang 77,000.00 19,250.00 19,250.000.025 Oh Kepala Tukang 99,000.00 2,475.00 2,475.001.000 Oh Pekerja 44,000.00 44,000.00 44,000.00

65,725.00 65,725.00

Jumlah 65,725.00 65,725.006,572.50 6,572.50

1.18a. Tenaga

6.000 Oh Tukang 77,000.00 462,000.00 462,000.000.600 Oh Kepala Tukang 99,000.00 59,400.00 59,400.004.000 Oh Pekerja 44,000.00 176,000.00 176,000.00

697,400.00 697,400.00

Jumlah 697,400.00 697,400.00Untuk tidak dipakai lagi = 0,5 x Jumlah 348,700.00 348,700.00

1.19a. Tenaga

0.600 Oh Tukang 77,000.00 46,200.00 46,200.000.060 Oh Kepala Tukang 99,000.00 5,940.00 5,940.002.000 Oh Pekerja 44,000.00 88,000.00 88,000.00

140,140.00 140,140.00

Jumlah 140,140.00 140,140.0014,014.00 14,014.00

1.20a. Bahan

6.000 Btg Gelam dia. 6 - 8 cm 5,500.00 33,000.00 33,000.006.000 Btg Gelam dia. 10 - 12 cm 7,150.00 42,900.00 42,900.00

33,000.00 33,000.0042,900.00 42,900.00

b. Tenaga0.320 Oh Pekerja 44,000.00 14,080.00 14,080.000.019 Oh Mandor 104,500.00 1,985.50 1,985.50

16,065.50 16,065.50

33,000.00 16,065.50 49,065.5042,900.00 16,065.50 58,965.50

1.21a. Bahan

14.000 Btg Gelam dia. 6 - 8 cm 5,500.00 77,000.00 77,000.0077,000.00 77,000.00

b. Tenaga0.320 Oh Pekerja 44,000.00 14,080.00 14,080.000.019 Oh Mandor 104,500.00 1,985.50 1,985.50

16,065.50 16,065.50

77,000.00 16,065.50 93,065.50

1.22a. Bahan

1.250 Kpg Papan Kayu kls IV 16,500.00 20,625.00 20,625.000.100 Kg Paku biasa 2"- 5" 18,150.00 1,815.00 1,815.002.000 Btg Gelam dia. 10 - 12 cm 5,500.00 11,000.00 11,000.00

33,440.00 33,440.00

b. Tenaga0.320 Oh Pekerja 44,000.00 14,080.00 14,080.000.019 Oh Mandor 104,500.00 1,985.50 1,985.50

16,065.50 16,065.50

33,440.00 16,065.50 49,505.50

1.23 1 Unit Papan Nama biasa

10 M2 Pembersihan Akhir Lapangan

Untuk 1 M2 Jumlah

10 M2 Bongkaran Rangka Atap

Untuk 1 M2 Jumlah

1 M3 Bongkaran Kuda-kuda Kayu

10 M2 Bongkaran Plafond + Rangka

Untuk 1 M2 Jumlah

1 M2 Pasang Cerucup Gelam

1 M2 Pasang Cerucup Gelam dia. 6-8 cm1 M2 Pasang Cerucup Gelam dia. 10-12 cm

1 M' Pasang Turap Gelam

1 M' Pasang Turap Gelam dia. 6-8 cm

1 M2 Pasang Kisdam

1 M2 Pasang Kisdam Gelam dia. 6-8 cm

Page 43: DrfatAnalisa2010 Smt Iok Palembang

Daftar Analisa Pekerjaan Kota Palembang TA. 2010 Semester I

- 43 -

U R A I A N

SATUAN HARGA NO. Harga Jumlah Harga Jumlah Jumlah

Analisa Satuan Bahan Tenaga Bahan+Tenaga(Rp) (Rp) (Rp) (Rp)

1 2 3 4 5 6a. Bahan

1.000 Kpg Papan Kayu kls IV 16,500.00 16,500.00 16,500.000.050 Kg Paku biasa 1/2"- 1" 18,150.00 907.50 907.501.000 Lbr Plywood 4 mm 61,600.00 61,600.00 61,600.000.800 Kg Cat Minyak Mutu C 28,600.00 22,880.00 22,880.00

101,887.50 101,887.50

b. Tenaga0.320 Oh Pekerja 44,000.00 14,080.00 14,080.001.000 Oh Mandor 104,500.00 104,500.00 104,500.00

118,580.00 118,580.00

1 Unit Papan Nama Biasa 101,887.50 118,580.00 220,467.50

1.24 1 Unit Sewa Scafoldinga. Bahan

1.000 bln Scafolding tg. 1,77 m X 1,77 m 52,250.00 52,250.00 52,250.0052,250.00 52,250.00

b. Upah Bongkar pasang1.000 Oh Mandor 10,000.00 10,000.00 10,000.00

10,000.00 10,000.00

1 Unit Sewa Scafolding per bulan 52,250.00 10,000.00 62,250.00

II PEKERJAAN TANAH

2.1a. Tenaga

0.400 Oh Pekerja 44,000.00 17,600.00 17,600.00- - Tukang Gali - - -- - Kepala Tukang - - -

0.040 Oh Mandor 104,500.00 4,180.00 4,180.0021,780.00 21,780.00

Jumlah 21,780.00 21,780.002.2

a. Tenaga0.526 Oh Pekerja 44,000.00 23,144.00 23,144.00

- - Tukang Gali - - -- - Kepala Tukang - - -

0.052 Oh Mandor 104,500.00 5,434.00 5,434.0028,578.00 28,578.00

Jumlah 28,578.00 28,578.00

2.3a. Tenaga

0.735 Oh Pekerja 44,000.00 32,340.00 32,340.00- - Tukang Gali - - -- - Kepala Tukang - - -

0.073 Oh Mandor 104,500.00 7,628.50 7,628.5039,968.50 39,968.50

Jumlah 39,968.50 39,968.502.4

a. Tenaga0.625 Oh Pekerja 44,000.00 27,500.00 27,500.00

- - Tukang Gali - - -- - Kepala Tukang - - -

0.062 Oh Mandor 104,500.00 6,479.00 6,479.0033,979.00 33,979.00

Jumlah 33,979.00 33,979.002.5

a. Tenaga1.250 Oh Pekerja 44,000.00 55,000.00 55,000.00

- - Tukang Gali - - -- - Kepala Tukang - - -

0.125 Oh Mandor 104,500.00 13,062.50 13,062.5068,062.50 68,062.50

Jumlah 68,062.50 68,062.50

2.6a. Tenaga

0.823 Oh Pekerja 44,000.00 36,212.00 36,212.00- - Tukang Gali - - -- - Kepala Tukang - - -

0.083 Oh Mandor 104,500.00 8,673.50 8,673.5044,885.50 44,885.50

Jumlah 44,885.50 44,885.50

2.7

1 M3 Galian Tanah Biasa Sedalam 1 Meter

1 M3 Galian Tanah Biasa Sedalam 2 Meter

1 M3 Galian Tanah Biasa Sedalam 3 Meter

1 M3 Galian Tanah Keras Sedalam 1 Meter

1 M3 Galian Tanah Cadas Sedalam 1 Meter

1 M3 Galian Tanah Lumpur Sedalam 1 Meter

1 M2 Pekerjaan Stripping Setinggi 1 Meter

Page 44: DrfatAnalisa2010 Smt Iok Palembang

Daftar Analisa Pekerjaan Kota Palembang TA. 2010 Semester I

- 44 -

U R A I A N

SATUAN HARGA NO. Harga Jumlah Harga Jumlah Jumlah

Analisa Satuan Bahan Tenaga Bahan+Tenaga(Rp) (Rp) (Rp) (Rp)

1 2 3 4 5 6a. Tenaga

0.050 Oh Pekerja 44,000.00 2,200.00 2,200.00- - Tukang Gali - - -- - Kepala Tukang - - -

0.005 Oh Mandor 104,500.00 522.50 522.502,722.50 2,722.50

Jumlah 2,722.50 2,722.50

2.8a. Tenaga

0.516 Oh Pekerja 44,000.00 22,704.00 22,704.00- - Tukang Gali - - -- - Kepala Tukang - - -

0.050 Oh Mandor 104,500.00 5,225.00 5,225.0027,929.00 27,929.00

Jumlah 27,929.00 27,929.002.9

a. Tenaga0.192 Oh Pekerja 44,000.00 8,448.00 8,448.00

- - Tukang Gali - - -- - Kepala Tukang - - -

0.019 Oh Mandor 104,500.00 1,985.50 1,985.5010,433.50 10,433.50

Jumlah 10,433.50 10,433.50

2.10a. Tenaga

0.500 Oh Pekerja 44,000.00 22,000.00 22,000.00- - Tukang Gali - - -- - Kepala Tukang - - -

0.050 Oh Mandor 104,500.00 5,225.00 5,225.0027,225.00 27,225.00

Jumlah 27,225.00 27,225.00

2.11a. Bahan

1.200 Pasir Urug 71,500.00 85,800.00 85,800.0085,800.00 85,800.00

b.Tenaga0.300 Oh Pekerja 44,000.00 13,200.00 13,200.00

- - Tukang Gali - - -- - Kepala Tukang - - -

0.010 Oh Mandor 104,500.00 1,045.00 1,045.0014,245.00 14,245.00

Jumlah 85,800.00 14,245.00 100,045.002.12

a. Bahan1.200 Sirtu 71,500.00 85,800.00 85,800.00

85,800.00 85,800.00b.Tenaga

0.250 Oh Pekerja 44,000.00 11,000.00 11,000.00- Oh Tukang Gali - - -- Oh Kepala Tukang - - -

0.025 Oh Mandor 104,500.00 2,612.50 2,612.5013,612.50 13,612.50

Jumlah 85,800.00 13,612.50 99,412.50

2.13a. Bahan

1.200 Koral 220,000.00 264,000.00 264,000.00264,000.00 264,000.00

b.Tenaga1.000 Upah dan Pemadatan 6,600.00 6,600.00 6,600.00

6,600.00 6,600.00

Jumlah 264,000.00 6,600.00 270,600.00

2.14a. Bahan

1.2000 Tanah Urug 55,000.00 66,000.00 66,000.0066,000.00 66,000.00

b.Tenaga0.3000 Pekerja 44,000.00 13,200.00 13,200.000.0330 Mandor 104,500.00 3,448.50 3,448.50

16,648.50 16,648.50

Jumlah 66,000.00 16,648.50 82,648.50

1 M3 Pembuangan Tanah Sejauh 150 meter

1 M3 Urugan Kembali

1 M3 Pemadatan Tanah

1 M3 Urugan Pasir

M3

1 M3 Urugan Sirtu

M3

1 M3 Urugan Koral

M3

M3

1 M3 Urugan Tanah

M3

Page 45: DrfatAnalisa2010 Smt Iok Palembang

Daftar Analisa Pekerjaan Kota Palembang TA. 2010 Semester I

- 45 -

U R A I A N

SATUAN HARGA NO. Harga Jumlah Harga Jumlah Jumlah

Analisa Satuan Bahan Tenaga Bahan+Tenaga(Rp) (Rp) (Rp) (Rp)

1 2 3 4 5 6III PEKERJAAN PONDASI

3.1a. Bahan

1.100 Batu Belah 15/20 cm / batu kali 308,000.00 338,800.00 338,800.00392.000 Kg Semen Portland 2,200.00 862,400.00 862,400.00

0.314 Pasir Pasang 82,500.00 25,905.00 25,905.001,227,105.00 1,227,105.00

b.Tenaga1.500 Oh Pekerja 44,000.00 66,000.00 66,000.000.600 Oh Tukang Batu 77,000.00 46,200.00 46,200.000.060 Oh Kepala Tukang 99,000.00 5,940.00 5,940.000.075 Oh Mandor 104,500.00 7,837.50 7,837.50

125,977.50 125,977.50

Jumlah 1,227,105.00 125,977.50 1,353,082.50

3.2a. Bahan

1.100 Batu Belah 15/20 cm / batu kali 308,000.00 338,800.00 338,800.00267.000 Kg Semen Portland 2,200.00 587,400.00 587,400.00

0.427 Pasir Pasang 82,500.00 35,227.50 35,227.50961,427.50 961,427.50

b.Tenaga1.500 Oh Pekerja 44,000.00 66,000.00 66,000.000.600 Oh Tukang Batu 77,000.00 46,200.00 46,200.000.060 Oh Kepala Tukang 99,000.00 5,940.00 5,940.000.075 Oh Mandor 104,500.00 7,837.50 7,837.50

125,977.50 125,977.50Jumlah 961,427.50 125,977.50 1,087,405.00

3.3a. Bahan

1.100 Batu Belah 15/20 cm / batu kali 308,000.00 338,800.00 338,800.00392.000 Kg Semen Portland 2,200.00 862,400.00 862,400.00

0.314 Pasir Pasang 82,500.00 25,905.00 25,905.001,227,105.00 1,227,105.00

b.Tenaga1.500 Oh Pekerja 44,000.00 66,000.00 66,000.000.600 Oh Tukang Batu 77,000.00 46,200.00 46,200.000.060 Oh Kepala Tukang 99,000.00 5,940.00 5,940.000.075 Oh Mandor 104,500.00 7,837.50 7,837.50

125,977.50 125,977.50

Jumlah 1,227,105.00 125,977.50 1,353,082.50

3.4a. Bahan

1.100 Batu Belah 15/20 cm / batu kali 308,000.00 338,800.00 338,800.00202.000 Kg Semen Portland 2,200.00 444,400.00 444,400.00

0.485 Pasir Pasang 82,500.00 40,012.50 40,012.50823,212.50 823,212.50

b.Tenaga1.500 Oh Pekerja 44,000.00 66,000.00 66,000.000.600 Oh Tukang Batu 77,000.00 46,200.00 46,200.000.060 Oh Kepala Tukang 99,000.00 5,940.00 5,940.000.075 Oh Mandor 104,500.00 7,837.50 7,837.50

125,977.50 125,977.50

Jumlah 823,212.50 125,977.50 949,190.003.5

a. Bahan1.100 Batu Belah 15/20 cm / batu kali 308,000.00 338,800.00 338,800.00

163.000 Kg Semen Portland 2,200.00 358,600.00 358,600.000.520 Pasir Pasang 82,500.00 42,900.00 42,900.00

740,300.00 740,300.00b.Tenaga

1.500 Oh Pekerja 44,000.00 66,000.00 66,000.000.600 Oh Tukang Batu 77,000.00 46,200.00 46,200.000.060 Oh Kepala Tukang 99,000.00 5,940.00 5,940.000.075 Oh Mandor 104,500.00 7,837.50 7,837.50

125,977.50 125,977.50

Jumlah 740,300.00 125,977.50 866,277.503.6

a. Bahan1.100 Batu Belah 15/20 cm / batu kali 308,000.00 338,800.00 338,800.00

136.000 Kg Semen Portland 2,200.00 299,200.00 299,200.000.544 Pasir Pasang 82,500.00 44,880.00 44,880.00

682,880.00 682,880.00

1 M3 Pasang Pondasi Batu Kali, 1 Pc : 1 Ps

M3

M3

1 M3 Pasang Pondasi Batu Kali, 1 Pc : 2 Ps

M3

M3

1 M3 Pasang Pondasi Batu Kali, 1 Pc : 2,5 Ps

M3

M3

1 M3 Pasang Pondasi Batu Kali, 1 Pc : 3 Ps

M3

M3

1 M3 Pasang Pondasi Batu Kali, 1 Pc : 4 Ps

M3

M3

1 M3 Pasang Pondasi Batu Kali, 1 Pc : 5 Ps

M3

M3

Page 46: DrfatAnalisa2010 Smt Iok Palembang

Daftar Analisa Pekerjaan Kota Palembang TA. 2010 Semester I

- 46 -

U R A I A N

SATUAN HARGA NO. Harga Jumlah Harga Jumlah Jumlah

Analisa Satuan Bahan Tenaga Bahan+Tenaga(Rp) (Rp) (Rp) (Rp)

1 2 3 4 5 6b.Tenaga

1.500 Oh Pekerja 44,000.00 66,000.00 66,000.000.600 Oh Tukang Batu 77,000.00 46,200.00 46,200.000.060 Oh Kepala Tukang 99,000.00 5,940.00 5,940.000.075 Oh Mandor 104,500.00 7,837.50 7,837.50

125,977.50 125,977.50

Jumlah 682,880.00 125,977.50 808,857.50

3.7a. Bahan

1.100 Batu Belah 15/20 cm / batu kali 308,000.00 338,800.00 338,800.00117.000 Kg Semen Portland 2,200.00 257,400.00 257,400.00

0.561 Pasir Pasang 82,500.00 46,282.50 46,282.50642,482.50 642,482.50

b.Tenaga1.500 Oh Pekerja 44,000.00 66,000.00 66,000.000.600 Oh Tukang Batu 77,000.00 46,200.00 46,200.000.060 Oh Kepala Tukang 99,000.00 5,940.00 5,940.000.075 Oh Mandor 104,500.00 7,837.50 7,837.50

125,977.50 125,977.50

Jumlah 642,482.50 125,977.50 768,460.003.8

a. Bahan1.100 Batu Belah 15/20 cm / batu kali 308,000.00 338,800.00 338,800.00

91.000 Kg Semen Portland 2,200.00 200,200.00 200,200.000.561 Pasir Pasang 82,500.00 46,282.50 46,282.50

585,282.50 585,282.50

b.Tenaga1.500 Oh Pekerja 44,000.00 66,000.00 66,000.000.600 Oh Tukang Batu 77,000.00 46,200.00 46,200.000.060 Oh Kepala Tukang 99,000.00 5,940.00 5,940.000.075 Oh Mandor 104,500.00 7,837.50 7,837.50

125,977.50 125,977.50

Jumlah 585,282.50 125,977.50 711,260.00

3.9a. Bahan

0.450 Batu Belah 15/20 cm / batu kali 308,000.00 138,600.00 138,600.00280.000 Kg Semen Portland 2,200.00 616,000.00 616,000.00

0.450 Pasir Beton 82,500.00 37,125.00 37,125.000.670 Koral Beton 220,000.00 147,400.00 147,400.00

939,125.00 939,125.00

b.Tenaga2.380 Oh Pekerja 44,000.00 104,720.00 104,720.000.300 Oh Tukang Batu 77,000.00 23,100.00 23,100.000.030 Oh Kepala Tukang 99,000.00 2,970.00 2,970.000.080 Oh Mandor 104,500.00 8,360.00 8,360.00

139,150.00 139,150.00

Jumlah 939,125.00 139,150.00 1,078,275.00

3.10a. Bahan

0.019 Pasir Urug 71,500.00 1,358.50 1,358.500.094 Pasir Beton 82,500.00 7,755.00 7,755.000.150 Koral Beton 220,000.00 33,000.00 33,000.00

60.500 Kg Semen Portland 2,200.00 133,100.00 133,100.0045.000 Kg Besi Beton 11,550.00 519,750.00 519,750.00

0.900 Kg Kawat Beton 18,700.00 16,830.00 16,830.000.032 Kayu Kaso 5/7 1,210,000.00 38,720.00 38,720.000.120 Kg Paku 18,150.00 2,178.00 2,178.000.090 Ltr Minyak Bekisting 11,000.00 990.00 990.000.240 Kg Plamir Tembok 24,750.00 5,940.00 5,940.00

759,621.50 759,621.50

b.Tenaga1.000 Oh Pekerja 44,000.00 44,000.00 44,000.000.670 Oh Tukang Batu 77,000.00 51,590.00 51,590.000.067 Oh Kepala Tukang 99,000.00 6,633.00 6,633.000.050 Oh Mandor 104,500.00 5,225.00 5,225.00

107,448.00 107,448.00

Jumlah 759,621.50 107,448.00 867,069.50

3.11a. Bahan

0.016 Pasir Urug Darat 71,500.00 1,144.00 1,144.000.080 Pasir Beton 82,500.00 6,600.00 6,600.000.125 Koral Beton 220,000.00 27,500.00 27,500.00

1 M3 Pasang Pondasi Batu Kali, 1 Pc : 6 Ps

M3

M3

1 M3 Pasang Pondasi Batu Kali, 1 Pc : 8 Ps

M3

M3

1 M3 Pasang Pondasi Sumuran & 100 cm

M3

M3

M3

1 M' Pembuatan Tiang Pancang (40 x 40) cm, Beton Bertulang

M3

M3

M3

M3

1 M' Pembuatan Tiang Pancang (35 x 35) cm, Beton Bertulang

M3

M3

M3

Page 47: DrfatAnalisa2010 Smt Iok Palembang

Daftar Analisa Pekerjaan Kota Palembang TA. 2010 Semester I

- 47 -

U R A I A N

SATUAN HARGA NO. Harga Jumlah Harga Jumlah Jumlah

Analisa Satuan Bahan Tenaga Bahan+Tenaga(Rp) (Rp) (Rp) (Rp)

1 2 3 4 5 649.000 Kg Semen Portland 2,200.00 107,800.00 107,800.0034.500 Kg Besi Beton 11,550.00 398,475.00 398,475.00

0.700 Kg Kawat Beton 18,700.00 13,090.00 13,090.000.027 Kayu Kaso 5/7 1,210,000.00 32,670.00 32,670.000.120 Kg Paku 18,150.00 2,178.00 2,178.000.090 Ltr Minyak Bekisting 11,000.00 990.00 990.000.200 Kg Plamir Tembok 24,750.00 4,950.00 4,950.00

595,397.00 595,397.00

b.Tenaga0.800 Oh Pekerja 44,000.00 35,200.00 35,200.000.500 Oh Tukang Batu 77,000.00 38,500.00 38,500.000.050 Oh Kepala Tukang 99,000.00 4,950.00 4,950.000.040 Oh Mandor 104,500.00 4,180.00 4,180.00

82,830.00 82,830.00

Jumlah 595,397.00 82,830.00 678,227.00

3.12a. Bahan

782 Bh Batu Bata Lobang 605.00 473,110.00 473,110.002.024 Zak Semen Portland 57,200.00 115,772.80 115,772.800.406 Pasir Pasang 82,500.00 33,495.00 33,495.00

622,377.80 622,377.80

b.Tenaga0.600 Oh Tukang Batu 77,000.00 46,200.00 46,200.000.060 Oh Kepala Tukang 99,000.00 5,940.00 5,940.001.500 Oh Pekerja 44,000.00 66,000.00 66,000.000.075 Oh Mandor 104,500.00 7,837.50 7,837.50

125,977.50 125,977.50

Jumlah 622,377.80 125,977.50 748,355.30

3.13a. Bahan

782 Bh Batu Bata Lobang 605.00 473,110.00 473,110.003.296 Zak Semen Portland 57,200.00 188,531.20 188,531.200.333 Pasir Pasang 82,500.00 27,472.50 27,472.50

689,113.70 689,113.70

b.Tenaga0.600 Oh Tukang Batu 77,000.00 46,200.00 46,200.000.060 Oh Kepala Tukang 99,000.00 5,940.00 5,940.001.500 Oh Pekerja 44,000.00 66,000.00 66,000.000.075 Oh Mandor 104,500.00 7,837.50 7,837.50

125,977.50 125,977.50

Jumlah 689,113.70 125,977.50 815,091.20

IV PEKERJAAN DINDING4.1

a. Bahan140 Bh Bata Merah 5 x 11 x 22 cm 517.00 72,380.00 72,380.00

64.030 Kg Semen Portland 2,200.00 140,866.00 140,866.000.059 Pasir Pasang 82,500.00 4,867.50 4,867.50

218,113.50 218,113.50

b.Tenaga0.650 Oh Pekerja 44,000.00 28,600.00 28,600.000.200 Oh Tukang Batu 77,000.00 15,400.00 15,400.000.020 Oh Kepala Tukang 99,000.00 1,980.00 1,980.000.030 Oh Mandor 104,500.00 3,135.00 3,135.00

49,115.00 49,115.00

Jumlah 218,113.50 49,115.00 267,228.504.2

a. Bahan140 Bh Bata Merah 5 x 11 x 22 cm 517.00 72,380.00 72,380.00

43.500 Kg Semen Portland 2,200.00 95,700.00 95,700.000.080 Pasir Pasang 82,500.00 6,600.00 6,600.00

174,680.00 174,680.00

b.Tenaga0.650 Oh Pekerja 44,000.00 28,600.00 28,600.000.200 Oh Tukang Batu 77,000.00 15,400.00 15,400.000.020 Oh Kepala Tukang 99,000.00 1,980.00 1,980.000.030 Oh Mandor 104,500.00 3,135.00 3,135.00

49,115.00 49,115.00

Jumlah 174,680.00 49,115.00 223,795.00

4.3a. Bahan

M3

1 M3 Pas. Pondasi Batu Bata Ad. 1 : 4

M3

1 M3 Pas. Pondasi Batu Bata Ad. 1 : 2

M3

1 M2 Pasangan Bata Merah Tebal 1 Bata, 1 Pc : 1 Ps

M3

1 M2 Pasangan Bata Merah Tebal 1 Bata, 1 Pc : 2 Ps

M3

1 M2 Pasangan Bata Merah Tebal 1 Bata, 1 Pc : 3 Ps

Page 48: DrfatAnalisa2010 Smt Iok Palembang

Daftar Analisa Pekerjaan Kota Palembang TA. 2010 Semester I

- 48 -

U R A I A N

SATUAN HARGA NO. Harga Jumlah Harga Jumlah Jumlah

Analisa Satuan Bahan Tenaga Bahan+Tenaga(Rp) (Rp) (Rp) (Rp)

1 2 3 4 5 6140 Bh Bata Merah 5 x 11 x 22 cm 517.00 72,380.00 72,380.00

32.950 Kg Semen Portland 2,200.00 72,490.00 72,490.000.091 Pasir Pasang 82,500.00 7,507.50 7,507.50

152,377.50 152,377.50b.Tenaga

0.650 Oh Pekerja 44,000.00 28,600.00 28,600.000.200 Oh Tukang Batu 77,000.00 15,400.00 15,400.000.020 Oh Kepala Tukang 99,000.00 1,980.00 1,980.000.030 Oh Mandor 104,500.00 3,135.00 3,135.00

49,115.00 49,115.00

Jumlah 152,377.50 49,115.00 201,492.50

4.4a. Bahan

140 Bh Bata Merah 5 x 11 x 22 cm 517.00 72,380.00 72,380.0026.550 Kg Semen Portland 2,200.00 58,410.00 58,410.00

0.093 Pasir Pasang 82,500.00 7,672.50 7,672.50138,462.50 138,462.50

b.Tenaga0.650 Oh Pekerja 44,000.00 28,600.00 28,600.000.200 Oh Tukang Batu 77,000.00 15,400.00 15,400.000.020 Oh Kepala Tukang 99,000.00 1,980.00 1,980.000.030 Oh Mandor 104,500.00 3,135.00 3,135.00

49,115.00 49,115.00

Jumlah 138,462.50 49,115.00 187,577.50

4.5a. Bahan

117 Bh Bata Lobang 9 x 9 x 19 cm 605.00 70,785.00 70,785.0026.550 Kg Semen Portland 2,200.00 58,410.00 58,410.00

0.093 Pasir Pasang 82,500.00 7,672.50 7,672.50136,867.50 136,867.50

b.Tenaga0.650 Oh Pekerja 44,000.00 28,600.00 28,600.000.200 Oh Tukang Batu 77,000.00 15,400.00 15,400.000.020 Oh Kepala Tukang 99,000.00 1,980.00 1,980.000.030 Oh Mandor 104,500.00 3,135.00 3,135.00

49,115.00 49,115.00

Jumlah 136,867.50 49,115.00 185,982.50

4.6a. Bahan

140 Bh Bata Merah 5 x 11 x 22 cm 517.00 72,380.00 72,380.0022.200 Kg Semen Portland 2,200.00 48,840.00 48,840.00

0.102 Pasir Pasang 82,500.00 8,415.00 8,415.00129,635.00 129,635.00

b.Tenaga0.650 Oh Pekerja 44,000.00 28,600.00 28,600.000.200 Oh Tukang Batu 77,000.00 15,400.00 15,400.000.020 Oh Kepala Tukang 99,000.00 1,980.00 1,980.000.030 Oh Mandor 104,500.00 3,135.00 3,135.00

49,115.00 49,115.00

Jumlah 129,635.00 49,115.00 178,750.00

4.7a. Bahan

140 Bh Bata Merah 5 x 11 x 22 cm 517.00 72,380.00 72,380.0022.200 Kg Semen Portland 2,200.00 48,840.00 48,840.00

0.102 Pasir Pasang 82,500.00 8,415.00 8,415.00129,635.00 129,635.00

b.Tenaga0.650 Oh Pekerja 44,000.00 28,600.00 28,600.000.200 Oh Tukang Batu 77,000.00 15,400.00 15,400.000.020 Oh Kepala Tukang 99,000.00 1,980.00 1,980.000.030 Oh Mandor 104,500.00 3,135.00 3,135.00

49,115.00 49,115.00

Jumlah 129,635.00 49,115.00 178,750.00

4.8a. Bahan

70 Bh Bata Merah 5 x 11 x 22 cm 517.00 36,190.00 36,190.0027.800 Kg Semen Portland 2,200.00 61,160.00 61,160.000.0280 Pasir Pasang 82,500.00 2,310.00 2,310.00

99,660.00 99,660.00b.Tenaga

0.320 Oh Pekerja 44,000.00 14,080.00 14,080.00

M3

1 M2 Pasangan Bata Merah Tebal 1 Bata, 1 Pc : 4 Ps

M3

1 M2 Pasangan Bata Lobang Tebal 1 Bata, 1 Pc : 4 Ps

M3

1 M2 Pasangan Bata Merah Tebal 1 Bata, 1 Pc : 5 Ps

M3

1 M2 Pasangan Bata Merah Tebal 1 Bata, 1 Pc : 6 Ps

M3

1 M2 Pasangan Bata Merah Tebal 1/2 Bata, 1 Pc : 1 Ps

M3

Page 49: DrfatAnalisa2010 Smt Iok Palembang

Daftar Analisa Pekerjaan Kota Palembang TA. 2010 Semester I

- 49 -

U R A I A N

SATUAN HARGA NO. Harga Jumlah Harga Jumlah Jumlah

Analisa Satuan Bahan Tenaga Bahan+Tenaga(Rp) (Rp) (Rp) (Rp)

1 2 3 4 5 60.100 Oh Tukang Batu 77,000.00 7,700.00 7,700.000.010 Oh Kepala Tukang 99,000.00 990.00 990.000.015 Oh Mandor 104,500.00 1,567.50 1,567.50

24,337.50 24,337.50

Jumlah 99,660.00 24,337.50 123,997.50

4.9a. Bahan

70 Bh Bata Merah 5 x 11 x 22 cm 517.00 36,190.00 36,190.0018.950 Kg Semen Portland 2,200.00 41,690.00 41,690.000.0380 Pasir Pasang 82,500.00 3,135.00 3,135.00

81,015.00 81,015.00

b.Tenaga0.320 Oh Pekerja 44,000.00 14,080.00 14,080.000.100 Oh Tukang Batu 77,000.00 7,700.00 7,700.000.010 Oh Kepala Tukang 99,000.00 990.00 990.000.015 Oh Mandor 104,500.00 1,567.50 1,567.50

24,337.50 24,337.50

Jumlah 81,015.00 24,337.50 105,352.50

4.10a. Bahan

58.5 Bh Bata Lobang 9 x 9 x 19 cm 605.00 35,392.50 35,392.5018.950 Kg Semen Portland 2,200.00 41,690.00 41,690.000.0380 Pasir Pasang 82,500.00 3,135.00 3,135.00

80,217.50 80,217.50

b.Tenaga0.320 Oh Pekerja 44,000.00 14,080.00 14,080.000.100 Oh Tukang Batu 77,000.00 7,700.00 7,700.000.010 Oh Kepala Tukang 99,000.00 990.00 990.000.015 Oh Mandor 104,500.00 1,567.50 1,567.50

24,337.50 24,337.50

Jumlah 80,217.50 24,337.50 104,555.00

4.11a. Bahan

70 Bh Bata Merah 5 x 11 x 22 cm 517.00 36,190.00 36,190.0014.370 Kg Semen Portland 2,200.00 31,614.00 31,614.000.0400 Pasir Pasang 82,500.00 3,300.00 3,300.00

71,104.00 71,104.00

b.Tenaga0.320 Oh Pekerja 44,000.00 14,080.00 14,080.000.100 Oh Tukang Batu 77,000.00 7,700.00 7,700.000.010 Oh Kepala Tukang 99,000.00 990.00 990.000.015 Oh Mandor 104,500.00 1,567.50 1,567.50

24,337.50 24,337.50

Jumlah 71,104.00 24,337.50 95,441.50

4.12a. Bahan

70 Bh Bata Merah 5 x 11 x 22 cm 517.00 36,190.00 36,190.0011.500 Kg Semen Portland 2,200.00 25,300.00 25,300.000.0430 Pasir Pasang 82,500.00 3,547.50 3,547.50

65,037.50 65,037.50

b.Tenaga0.320 Oh Pekerja 44,000.00 14,080.00 14,080.000.100 Oh Tukang Batu 77,000.00 7,700.00 7,700.000.010 Oh Kepala Tukang 99,000.00 990.00 990.000.015 Oh Mandor 104,500.00 1,567.50 1,567.50

24,337.50 24,337.50

Jumlah 65,037.50 24,337.50 89,375.00

4.13a. Bahan

58.5 Bh Bata Lobang 9 x 9 x 19 cm 605.00 35,392.50 35,392.5011.500 Kg Semen Portland 2,200.00 25,300.00 25,300.000.0430 Pasir Pasang 82,500.00 3,547.50 3,547.50

64,240.00 64,240.00b.Tenaga

0.320 Oh Pekerja 44,000.00 14,080.00 14,080.000.100 Oh Tukang Batu 77,000.00 7,700.00 7,700.000.010 Oh Kepala Tukang 99,000.00 990.00 990.000.015 Oh Mandor 104,500.00 1,567.50 1,567.50

24,337.50 24,337.50

Jumlah 64,240.00 24,337.50 88,577.50

1 M2 Pasangan Bata Merah Tebal 1/2 Bata, 1 Pc : 2 Ps

M3

1 M2 Pasangan Bata Lobang Tebal 1/2 Bata, 1 Pc : 2 Ps

M3

1 M2 Pasangan Bata Merah Tebal 1/2 Bata, 1 Pc : 3 Ps

M3

1 M2 Pasangan Bata Merah Tebal 1/2 Bata, 1 Pc : 4 Ps

M3

1 M2 Pasangan Bata Lobang Tebal 1/2 Bata, 1 Pc : 4 Ps

M3

Page 50: DrfatAnalisa2010 Smt Iok Palembang

Daftar Analisa Pekerjaan Kota Palembang TA. 2010 Semester I

- 50 -

U R A I A N

SATUAN HARGA NO. Harga Jumlah Harga Jumlah Jumlah

Analisa Satuan Bahan Tenaga Bahan+Tenaga(Rp) (Rp) (Rp) (Rp)

1 2 3 4 5 64.14

a. Bahan70 Bh Bata Merah 5 x 11 x 22 cm 517.00 36,190.00 36,190.00

9.680 Kg Semen Portland 2,200.00 21,296.00 21,296.000.0450 Pasir Pasang 82,500.00 3,712.50 3,712.50

61,198.50 61,198.50b.Tenaga

0.320 Oh Pekerja 44,000.00 14,080.00 14,080.000.100 Oh Tukang Batu 77,000.00 7,700.00 7,700.000.010 Oh Kepala Tukang 99,000.00 990.00 990.000.015 Oh Mandor 104,500.00 1,567.50 1,567.50

24,337.50 24,337.50

Jumlah 61,198.50 24,337.50 85,536.00

4.15a. Bahan

70 Bh Bata Merah 5 x 11 x 22 cm 517.00 36,190.00 36,190.008.320 Kg Semen Portland 2,200.00 18,304.00 18,304.00

0.0490 Pasir Pasang 82,500.00 4,042.50 4,042.5058,536.50 58,536.50

b.Tenaga0.320 Oh Pekerja 44,000.00 14,080.00 14,080.000.100 Oh Tukang Batu 77,000.00 7,700.00 7,700.000.010 Oh Kepala Tukang 99,000.00 990.00 990.000.015 Oh Mandor 104,500.00 1,567.50 1,567.50

24,337.50 24,337.50

Jumlah 58,536.50 24,337.50 82,874.00

4.16a. Bahan

70 Bh Bata Merah 5 x 11 x 22 cm 517.00 36,190.00 36,190.006.500 Kg Semen Portland 2,200.00 14,300.00 14,300.000.050 Pasir Pasang 82,500.00 4,125.00 4,125.00

54,615.00 54,615.00

b.Tenaga0.320 Oh Pekerja 44,000.00 14,080.00 14,080.000.100 Oh Tukang Batu 77,000.00 7,700.00 7,700.000.010 Oh Kepala Tukang 99,000.00 990.00 990.000.015 Oh Mandor 104,500.00 1,567.50 1,567.50

24,337.50 24,337.50

Jumlah 54,615.00 24,337.50 78,952.50

4.17a. Bahan

36 Bh Roster / Terawang 44,000.00 1,584,000.00 1,584,000.0012.800 Kg Semen Portland 2,200.00 28,160.00 28,160.00

0.035 Pasir Pasang 82,500.00 2,887.50 2,887.501,615,047.50 1,615,047.50

b.Tenaga0.300 Oh Pekerja 44,000.00 13,200.00 13,200.000.100 Oh Tukang Batu 77,000.00 7,700.00 7,700.000.010 Oh Kepala Tukang 99,000.00 990.00 990.00

0.0150 Oh Mandor 104,500.00 1,567.50 1,567.5023,457.50 23,457.50

Jumlah 1,615,047.50 23,457.50 1,638,505.00

4.18a. Bahan

12.5 Bh Bataco 10 X 20 X 40 2,750.00 34,375.00 34,375.000.0194 Zak Semen Portland (PC) 57,200.00 1,109.68 1,109.680.0225 Pasir Pasang 82,500.00 1,856.25 1,856.25

37,340.93 37,340.93

b.Tenaga0.150 Oh Tukang Batu 77,000.00 11,550.00 11,550.000.015 Oh Kepala Tukang 99,000.00 1,485.00 1,485.000.450 Oh Pekerja 44,000.00 19,800.00 19,800.00

32,835.00 32,835.00

Jumlah 37,340.93 32,835.00 70,175.93

V PEKERJAAN PLESTERAN5.1

a. Bahan12.920 Kg Semen Portland 2,200.00 28,424.00 28,424.00

0.013 Pasir Pasang 82,500.00 1,072.50 1,072.5029,496.50 29,496.50

b.Tenaga

1 M2 Pasangan Bata Merah Tebal 1/2 Bata, 1 Pc : 5 Ps

M3

1 M2 Pasangan Bata Merah Tebal 1/2 Bata, 1 Pc : 6 Ps

M3

1 M2 Pasangan Bata Merah Tebal 1/2 Bata, 1 Pc : 8 Ps

M3

1 M2 Pasang Dinding Roster / Terawang ( 12 x 11 x 24 ) cm

M3

1 M2 Pasangan Bataco

M3

1 M2 Plesteran 1 Pc : 1 Ps, Tebal 15 mm

M3

Page 51: DrfatAnalisa2010 Smt Iok Palembang

Daftar Analisa Pekerjaan Kota Palembang TA. 2010 Semester I

- 51 -

U R A I A N

SATUAN HARGA NO. Harga Jumlah Harga Jumlah Jumlah

Analisa Satuan Bahan Tenaga Bahan+Tenaga(Rp) (Rp) (Rp) (Rp)

1 2 3 4 5 60.200 Oh Pekerja 44,000.00 8,800.00 8,800.000.150 Oh Tukang Batu 77,000.00 11,550.00 11,550.000.015 Oh Kepala Tukang 99,000.00 1,485.00 1,485.000.010 Oh Mandor 104,500.00 1,045.00 1,045.00

22,880.00 22,880.00

Jumlah 29,496.50 22,880.00 52,376.50

5.2a. Bahan

8.520 Kg Semen Portland 2,200.00 18,744.00 18,744.000.017 Pasir Pasang 82,500.00 1,402.50 1,402.50

20,146.50 20,146.50

b.Tenaga0.200 Oh Pekerja 44,000.00 8,800.00 8,800.000.150 Oh Tukang Batu 77,000.00 11,550.00 11,550.000.015 Oh Kepala Tukang 99,000.00 1,485.00 1,485.000.010 Oh Mandor 104,500.00 1,045.00 1,045.00

22,880.00 22,880.00

Jumlah 20,146.50 22,880.00 43,026.505.3

a. Bahan6.480 Kg Semen Portland 2,200.00 14,256.00 14,256.000.019 Pasir Pasang 82,500.00 1,567.50 1,567.50

15,823.50 15,823.50

b.Tenaga0.200 Oh Pekerja 44,000.00 8,800.00 8,800.000.150 Oh Tukang Batu 77,000.00 11,550.00 11,550.000.015 Oh Kepala Tukang 99,000.00 1,485.00 1,485.000.010 Oh Mandor 104,500.00 1,045.00 1,045.00

22,880.00 22,880.00

Jumlah 15,823.50 22,880.00 38,703.50

5.4a. Bahan

5.200 Kg Semen Portland 2,200.00 11,440.00 11,440.000.020 Pasir Pasang 82,500.00 1,650.00 1,650.00

13,090.00 13,090.00b.Tenaga

0.200 Oh Pekerja 44,000.00 8,800.00 8,800.000.150 Oh Tukang Batu 77,000.00 11,550.00 11,550.000.015 Oh Kepala Tukang 99,000.00 1,485.00 1,485.000.010 Oh Mandor 104,500.00 1,045.00 1,045.00

22,880.00 22,880.00

Jumlah 13,090.00 22,880.00 35,970.00

5.5a. Bahan

4.320 Kg Semen Portland 2,200.00 9,504.00 9,504.000.022 Pasir Pasang 82,500.00 1,815.00 1,815.00

11,319.00 11,319.00

b.Tenaga0.200 Oh Pekerja 44,000.00 8,800.00 8,800.000.150 Oh Tukang Batu 77,000.00 11,550.00 11,550.000.015 Oh Kepala Tukang 99,000.00 1,485.00 1,485.000.010 Oh Mandor 104,500.00 1,045.00 1,045.00

22,880.00 22,880.00

Jumlah 11,319.00 22,880.00 34,199.00

5.6a. Bahan

3.680 Kg Semen Portland 2,200.00 8,096.00 8,096.000.023 Pasir Pasang 82,500.00 1,897.50 1,897.50

9,993.50 9,993.50b.Tenaga

0.200 Oh Pekerja 44,000.00 8,800.00 8,800.000.150 Oh Tukang Batu 77,000.00 11,550.00 11,550.000.015 Oh Kepala Tukang 99,000.00 1,485.00 1,485.000.010 Oh Mandor 104,500.00 1,045.00 1,045.00

22,880.00 22,880.00

Jumlah 9,993.50 22,880.00 32,873.50

5.7a. Bahan

2.880 Kg Semen Portland 2,200.00 6,336.00 6,336.000.024 Pasir Pasang 82,500.00 1,980.00 1,980.00

1 M2 Plesteran 1 Pc : 2 Ps, Tebal 15 mm

M3

1 M2 Plesteran 1 Pc : 3 Ps, Tebal 15 mm

M3

1 M2 Plesteran 1 Pc : 4 Ps, Tebal 15 mm

M3

1 M2 Plesteran 1 Pc : 5 Ps, Tebal 15 mm

M3

1 M2 Plesteran 1 Pc : 6 Ps, Tebal 15 mm

M3

1 M2 Plesteran 1 Pc : 8 Ps, Tebal 15 mm

M3

Page 52: DrfatAnalisa2010 Smt Iok Palembang

Daftar Analisa Pekerjaan Kota Palembang TA. 2010 Semester I

- 52 -

U R A I A N

SATUAN HARGA NO. Harga Jumlah Harga Jumlah Jumlah

Analisa Satuan Bahan Tenaga Bahan+Tenaga(Rp) (Rp) (Rp) (Rp)

1 2 3 4 5 68,316.00 8,316.00

b.Tenaga0.200 Oh Pekerja 44,000.00 8,800.00 8,800.000.150 Oh Tukang Batu 77,000.00 11,550.00 11,550.000.015 Oh Kepala Tukang 99,000.00 1,485.00 1,485.000.010 Oh Mandor 104,500.00 1,045.00 1,045.00

22,880.00 22,880.00

Jumlah 8,316.00 22,880.00 31,196.00

5.8a. Bahan

5.760 Kg Semen Portland 2,200.00 12,672.00 12,672.000.013 Pasir Pasang 82,500.00 1,072.50 1,072.50

13,744.50 13,744.50

b.Tenaga0.200 Oh Pekerja 44,000.00 8,800.00 8,800.000.150 Oh Tukang Batu 77,000.00 11,550.00 11,550.000.015 Oh Kepala Tukang 99,000.00 1,485.00 1,485.000.010 Oh Mandor 104,500.00 1,045.00 1,045.00

22,880.00 22,880.00

Jumlah 13,744.50 22,880.00 36,624.50

5.9a. Bahan

1.840 Kg Semen Portland 2,200.00 4,048.00 4,048.000.014 Pasir Pasang 82,500.00 1,155.00 1,155.00

5,203.00 5,203.00b.Tenaga

0.200 Oh Pekerja 44,000.00 8,800.00 8,800.000.150 Oh Tukang Batu 77,000.00 11,550.00 11,550.000.015 Oh Kepala Tukang 99,000.00 1,485.00 1,485.000.010 Oh Mandor 104,500.00 1,045.00 1,045.00

22,880.00 22,880.00

Jumlah 5,203.00 22,880.00 28,083.00

5.10a. Bahan

3.000 Kg Semen Portland 2,200.00 6,600.00 6,600.000.019 Pasir Pasang 82,500.00 1,567.50 1,567.50

8,167.50 8,167.50b.Tenaga

0.200 Oh Pekerja 44,000.00 8,800.00 8,800.000.150 Oh Tukang Batu 77,000.00 11,550.00 11,550.000.015 Oh Kepala Tukang 99,000.00 1,485.00 1,485.000.010 Oh Mandor 104,500.00 1,045.00 1,045.00

22,880.00 22,880.00

Jumlah 8,167.50 22,880.00 31,047.50

5.11a. Bahan

0.009 Semen Merah 38,500.00 346.50 346.500.009 Pasir Pasang 82,500.00 742.50 742.50

1,089.00 1,089.00b.Tenaga

0.200 Oh Pekerja 44,000.00 8,800.00 8,800.000.150 Oh Tukang Batu 77,000.00 11,550.00 11,550.000.015 Oh Kepala Tukang 99,000.00 1,485.00 1,485.000.010 Oh Mandor 104,500.00 1,045.00 1,045.00

22,880.00 22,880.00

Jumlah 1,089.00 22,880.00 23,969.00

5.12a. Bahan

0.007 Semen Merah 38,500.00 269.50 269.500.015 Pasir Pasang 82,500.00 1,237.50 1,237.50

1,507.00 1,507.00b.Tenaga

0.200 Oh Pekerja 44,000.00 8,800.00 8,800.000.150 Oh Tukang Batu 77,000.00 11,550.00 11,550.000.015 Oh Kepala Tukang 99,000.00 1,485.00 1,485.000.010 Oh Mandor 104,500.00 1,045.00 1,045.00

22,880.00 22,880.00

Jumlah 1,507.00 22,880.00 24,387.00

5.13a. Bahan

14.280 Kg Semen Portland 2,200.00 31,416.00 31,416.000.023 Pasir Pasang 82,500.00 1,897.50 1,897.50

1 M2 Plesteran 1 Pc : 0,5 Kp : 3 Ps, Tebal 15 mm

M3

1 M2 Plesteran 1 Pc : 3 Kp : 10 Ps, Tebal 15 mm

M3

1 M2 Plesteran 0,5 Pc : 1 Kp : 4 Ps, Tebal 15 mm

M3

1 M2 Plesteran 1 Kp : 1 Sm : 1 Ps, Tebal 15 mm

M3

M3

1 M2 Plesteran 1 Kp : 1 Sm : 2 Ps, Tebal 15 mm

M3

M3

1 M2 Plesteran 1 Pc : 2 Ps, Tebal 20 mm

M3

Page 53: DrfatAnalisa2010 Smt Iok Palembang

Daftar Analisa Pekerjaan Kota Palembang TA. 2010 Semester I

- 53 -

U R A I A N

SATUAN HARGA NO. Harga Jumlah Harga Jumlah Jumlah

Analisa Satuan Bahan Tenaga Bahan+Tenaga(Rp) (Rp) (Rp) (Rp)

1 2 3 4 5 633,313.50 33,313.50

b.Tenaga0.250 Oh Pekerja 44,000.00 11,000.00 11,000.000.200 Oh Tukang Batu 77,000.00 15,400.00 15,400.000.020 Oh Kepala Tukang 99,000.00 1,980.00 1,980.00

0.0125 Oh Mandor 104,500.00 1,306.25 1,306.2529,686.25 29,686.25

Jumlah 33,313.50 29,686.25 62,999.75

5.14a. Bahan

10.800 Kg Semen Portland 2,200.00 23,760.00 23,760.000.026 Pasir Pasang 82,500.00 2,145.00 2,145.00

25,905.00 25,905.00

b.Tenaga0.250 Oh Pekerja 44,000.00 11,000.00 11,000.000.200 Oh Tukang Batu 77,000.00 15,400.00 15,400.000.020 Oh Kepala Tukang 99,000.00 1,980.00 1,980.00

0.0125 Oh Mandor 104,500.00 1,306.25 1,306.2529,686.25 29,686.25

Jumlah 25,905.00 29,686.25 55,591.25

5.15a. Bahan

8.680 Kg Semen Portland 2,200.00 19,096.00 19,096.000.028 Pasir Pasang 82,500.00 2,310.00 2,310.00

21,406.00 21,406.00

b.Tenaga0.250 Oh Pekerja 44,000.00 11,000.00 11,000.000.200 Oh Tukang Batu 77,000.00 15,400.00 15,400.000.020 Oh Kepala Tukang 99,000.00 1,980.00 1,980.00

0.0125 Oh Mandor 104,500.00 1,306.25 1,306.2529,686.25 29,686.25

Jumlah 21,406.00 29,686.25 51,092.25

5.16a. Bahan

7.290 Kg Semen Portland 2,200.00 16,038.00 16,038.000.028 Pasir Pasang 82,500.00 2,310.00 2,310.00

18,348.00 18,348.00b.Tenaga

0.250 Oh Pekerja 44,000.00 11,000.00 11,000.000.200 Oh Tukang Batu 77,000.00 15,400.00 15,400.000.020 Oh Kepala Tukang 99,000.00 1,980.00 1,980.00

0.0125 Oh Mandor 104,500.00 1,306.25 1,306.2529,686.25 29,686.25

Jumlah 18,348.00 29,686.25 48,034.25

5.17a. Bahan

6.240 Kg Semen Portland 2,200.00 13,728.00 13,728.000.030 Pasir Pasang 82,500.00 2,475.00 2,475.00

16,203.00 16,203.00

b.Tenaga0.250 Oh Pekerja 44,000.00 11,000.00 11,000.000.200 Oh Tukang Batu 77,000.00 15,400.00 15,400.000.020 Oh Kepala Tukang 99,000.00 1,980.00 1,980.00

0.0125 Oh Mandor 104,500.00 1,306.25 1,306.2529,686.25 29,686.25

Jumlah 16,203.00 29,686.25 45,889.25

5.18a. Bahan

0.009 Semen Merah 38,500.00 346.50 346.500.018 Pasir Pasang 82,500.00 1,485.00 1,485.00

1,831.50 1,831.50

b.Tenaga0.250 Oh Pekerja 44,000.00 11,000.00 11,000.000.200 Oh Tukang Batu 77,000.00 15,400.00 15,400.000.020 Oh Kepala Tukang 99,000.00 1,980.00 1,980.00

0.0125 Oh Mandor 104,500.00 1,306.25 1,306.2529,686.25 29,686.25

Jumlah 1,831.50 29,686.25 31,517.755.19

1 M2 Plesteran 1 Pc : 3 Ps, Tebal 20 mm

M3

1 M2 Plesteran 1 Pc : 4 Ps, Tebal 20 mm

M3

1 M2 Plesteran 1 Pc : 5 Ps, Tebal 20 mm

M3

1 M2 Plesteran 1 Pc : 6 Ps, Tebal 20 mm

M3

1 M2 Plesteran 1 Kp : 1 Sm : 2 Ps, Tebal 20 mm

M3

M3

1 M2 Berapen 1 Pc : 5 Ps, Tebal 15 mm

Page 54: DrfatAnalisa2010 Smt Iok Palembang

Daftar Analisa Pekerjaan Kota Palembang TA. 2010 Semester I

- 54 -

U R A I A N

SATUAN HARGA NO. Harga Jumlah Harga Jumlah Jumlah

Analisa Satuan Bahan Tenaga Bahan+Tenaga(Rp) (Rp) (Rp) (Rp)

1 2 3 4 5 6a. Bahan

5.670 Kg Semen Portland 2,200.00 12,474.00 12,474.000.023 Pasir Pasang 82,500.00 1,897.50 1,897.50

14,371.50 14,371.50b.Tenaga

0.150 Oh Pekerja 44,000.00 6,600.00 6,600.000.070 Oh Tukang Batu 77,000.00 5,390.00 5,390.000.007 Oh Kepala Tukang 99,000.00 693.00 693.000.008 Oh Mandor 104,500.00 836.00 836.00

13,519.00 13,519.00

Jumlah 14,371.50 13,519.00 27,890.50

5.20a. Bahan

9.300 Kg Semen Portland 2,200.00 20,460.00 20,460.000.018 Pasir Pasang 82,500.00 1,485.00 1,485.00

21,945.00 21,945.00

b.Tenaga0.260 Oh Pekerja 44,000.00 11,440.00 11,440.000.200 Oh Tukang Batu 77,000.00 15,400.00 15,400.000.020 Oh Kepala Tukang 99,000.00 1,980.00 1,980.000.013 Oh Mandor 104,500.00 1,358.50 1,358.50

30,178.50 30,178.50

Jumlah 21,945.00 30,178.50 52,123.50

5.21a. Bahan

7.070 Kg Semen Portland 2,200.00 15,554.00 15,554.000.021 Pasir Pasang 82,500.00 1,732.50 1,732.50

17,286.50 17,286.50b.Tenaga

0.260 Oh Pekerja 44,000.00 11,440.00 11,440.000.200 Oh Tukang Batu 77,000.00 15,400.00 15,400.000.020 Oh Kepala Tukang 99,000.00 1,980.00 1,980.000.013 Oh Mandor 104,500.00 1,358.50 1,358.50

30,178.50 30,178.50

Jumlah 17,286.50 30,178.50 47,465.00

5.22a. Bahan

4.320 Kg Semen Portland 2,200.00 9,504.00 9,504.000.016 Pasir Pasang 82,500.00 1,320.00 1,320.00

10,824.00 10,824.00b.Tenaga

0.250 Oh Pekerja 44,000.00 11,000.00 11,000.000.100 Oh Tukang Batu 77,000.00 7,700.00 7,700.000.010 Oh Kepala Tukang 99,000.00 990.00 990.000.015 Oh Mandor 104,500.00 1,567.50 1,567.50

21,257.50 21,257.50

Jumlah 10,824.00 21,257.50 32,081.50

5.23a. Bahan

4.320 Kg Semen Portland 2,200.00 9,504.00 9,504.000.016 Pasir Pasang 82,500.00 1,320.00 1,320.00

10,824.00 10,824.00b.Tenaga

0.150 Oh Pekerja 44,000.00 6,600.00 6,600.000.070 Oh Tukang Batu 77,000.00 5,390.00 5,390.000.007 Oh Kepala Tukang 99,000.00 693.00 693.000.008 Oh Mandor 104,500.00 836.00 836.00

13,519.00 13,519.00

Jumlah 10,824.00 13,519.00 24,343.005.24

a. Bahan10.588 Zak Semen Portland 57,200.00 605,633.60 605,633.60

1.080 Pasir Pasang 82,500.00 89,100.00 89,100.00694,733.60 694,733.60

Jumlah 694,733.60 694,733.60

5.25a. Bahan

0.060 Kg Semen Portland 57,200.00 3,432.00 3,432.000.024 Pasir Pasang 82,500.00 1,980.00 1,980.00

5,412.00 5,412.00b.Tenaga

1.200 Oh Tukang Batu 77,000.00 92,400.00 92,400.000.120 Oh Kepala Tukang 99,000.00 11,880.00 11,880.000.600 Oh Pekerja 44,000.00 26,400.00 26,400.00

M3

1 M2 Plesteran Beton 1 Pc : 2 Ps, Tebal 15 mm

M3

1 M2 Plesteran Beton 1 Pc : 3 Ps, Tebal 15 mm

M3

1 M2 Plesteran Ciprat 1 Pc : 2 Ps

M3

1 M2 Plesteran Siar Adukan 1 Pc : 2 Ps

M3

1 M3 Perekat

M3

1 M' Plesteran dibentuk Profil uk. 10 x 10 cm

M3

Page 55: DrfatAnalisa2010 Smt Iok Palembang

Daftar Analisa Pekerjaan Kota Palembang TA. 2010 Semester I

- 55 -

U R A I A N

SATUAN HARGA NO. Harga Jumlah Harga Jumlah Jumlah

Analisa Satuan Bahan Tenaga Bahan+Tenaga(Rp) (Rp) (Rp) (Rp)

1 2 3 4 5 60.030 Oh Mandor 104,500.00 3,135.00 3,135.00

133,815.00 133,815.00

Jumlah 5,412.00 133,815.00 139,227.00

VI PEKERJAAN KAYU

6.1a. Bahan

1.100 Kayu Jati, Balok ( Kayu kelas I) 6,050,000.00 6,655,000.00 6,655,000.00 6,655,000.00 6,655,000.00

b.Tenaga6.000 Oh Pekerja 44,000.00 264,000.00 264,000.00

20.000 Oh Tukang Kayu 77,000.00 1,540,000.00 1,540,000.002.000 Oh Kepala Tukang 99,000.00 198,000.00 198,000.000.300 Oh Mandor 104,500.00 31,350.00 31,350.00

2,033,350.00 2,033,350.00

Jumlah 6,655,000.00 2,033,350.00 8,688,350.00

6.2a. Bahan

1.200 Kayu Kelas II+C1434 4,290,000.00 5,148,000.00 5,148,000.005,148,000.00 5,148,000.00

b.Tenaga6.000 Oh Pekerja 44,000.00 264,000.00 264,000.00

18.000 Oh Tukang Kayu 77,000.00 1,386,000.00 1,386,000.002.000 Oh Kepala Tukang 99,000.00 198,000.00 198,000.000.300 Oh Mandor 104,500.00 31,350.00 31,350.00

1,879,350.00 1,879,350.00

Jumlah 5,148,000.00 1,879,350.00 7,027,350.00

6.3a. Bahan

1.200 Kayu Kls. III 3,245,000.00 3,894,000.00 3,894,000.003,894,000.00 3,894,000.00

b.Tenaga6.000 Oh Pekerja 44,000.00 264,000.00 264,000.00

18.000 Oh Tukang Kayu 77,000.00 1,386,000.00 1,386,000.002.000 Oh Kepala Tukang 99,000.00 198,000.00 198,000.000.300 Oh Mandor 104,500.00 31,350.00 31,350.00

1,879,350.00 1,879,350.00

Jumlah 3,894,000.00 1,879,350.00 5,773,350.00

6.4a. Bahan

0.036 Kayu Kls. III 3,245,000.00 116,820.00 116,820.000.050 Kg Paku Biasa 2" - 5" 18,150.00 907.50 907.50

117,727.50 117,727.50

b.Tenaga0.350 Oh Pekerja 44,000.00 15,400.00 15,400.001.050 Oh Tukang Kayu 77,000.00 80,850.00 80,850.000.105 Oh Kepala Tukang 99,000.00 10,395.00 10,395.000.018 Oh Mandor 104,500.00 1,881.00 1,881.00

108,526.00 108,526.00

Jumlah 117,727.50 108,526.00 226,253.506.5

a. Bahan0.036 Kayu Kls. IV 1,210,000.00 43,560.00 43,560.000.050 Kg Paku Biasa 2" - 5" 18,150.00 907.50 907.50

44,467.50 44,467.50

b.Tenaga0.350 Oh Pekerja 44,000.00 15,400.00 15,400.001.050 Oh Tukang Kayu 77,000.00 80,850.00 80,850.000.105 Oh Kepala Tukang 99,000.00 10,395.00 10,395.000.018 Oh Mandor 104,500.00 1,881.00 1,881.00

108,526.00 108,526.00

Jumlah 44,467.50 108,526.00 152,993.50

6.6a. Bahan

0.040 Kayu Jati, Papan 6,050,000.00 242,000.00 242,000.00 242,000.00 242,000.00

b.Tenaga1.000 Oh Pekerja 44,000.00 44,000.00 44,000.002.500 Oh Tukang Kayu 77,000.00 192,500.00 192,500.000.250 Oh Kepala Tukang 99,000.00 24,750.00 24,750.00

1 M3 Pasang Kusen Pintu dan Jendela K.kls. I (Kayu Jati, Unglen)

M3

1 M3 Pasang Kusen Pintu dan Jendela Kayu Kls. II

M3

1 M3 Pasang Kusen Pintu dan Jendela Kayu Kelas III

M3

1 M2 Pasang Pintu Klam Kayu Kls. III

M3

1 M2 Pasang Pintu Klam Kayu Kls. IV

M3

1 M2 Pasang Pintu Panel Kayu Jati

M3

Page 56: DrfatAnalisa2010 Smt Iok Palembang

Daftar Analisa Pekerjaan Kota Palembang TA. 2010 Semester I

- 56 -

U R A I A N

SATUAN HARGA NO. Harga Jumlah Harga Jumlah Jumlah

Analisa Satuan Bahan Tenaga Bahan+Tenaga(Rp) (Rp) (Rp) (Rp)

1 2 3 4 5 60.050 Oh Mandor 104,500.00 5,225.00 5,225.00

266,475.00 266,475.00

Jumlah 242,000.00 266,475.00 508,475.00

6.7a. Bahan

0.040 Kayu Kls. II 4,290,000.00 171,600.00 171,600.00171,600.00 171,600.00

b.Tenaga1.000 Oh Pekerja 44,000.00 44,000.00 44,000.002.500 Oh Tukang Kayu 77,000.00 192,500.00 192,500.000.250 Oh Kepala Tukang 99,000.00 24,750.00 24,750.000.050 Oh Mandor 104,500.00 5,225.00 5,225.00

266,475.00 266,475.00

Jumlah 171,600.00 266,475.00 438,075.00

6.8a. Bahan

0.035 Kayu Jati, 6,050,000.00 211,750.00 211,750.00 211,750.00 211,750.00

b.Tenaga0.800 Oh Pekerja 44,000.00 35,200.00 35,200.002.000 Oh Tukang Kayu 77,000.00 154,000.00 154,000.000.200 Oh Kepala Tukang 99,000.00 19,800.00 19,800.000.040 Oh Mandor 104,500.00 4,180.00 4,180.00

213,180.00 213,180.00

Jumlah 211,750.00 213,180.00 424,930.00

6.9a. Bahan

0.035 Kayu Kls. II 4,290,000.00 150,150.00 150,150.00150,150.00 150,150.00

b.Tenaga0.800 Oh Pekerja 44,000.00 35,200.00 35,200.002.000 Oh Tukang Kayu 77,000.00 154,000.00 154,000.000.200 Oh Kepala Tukang 99,000.00 19,800.00 19,800.000.040 Oh Mandor 104,500.00 4,180.00 4,180.00

213,180.00 213,180.00

Jumlah 150,150.00 213,180.00 363,330.00

6.10a. Bahan

0.035 Kayu Kls. III 3,245,000.00 113,575.00 113,575.00113,575.00 113,575.00

b.Tenaga0.800 Oh Pekerja 44,000.00 35,200.00 35,200.002.000 Oh Tukang Kayu 77,000.00 154,000.00 154,000.000.200 Oh Kepala Tukang 99,000.00 19,800.00 19,800.000.040 Oh Mandor 104,500.00 4,180.00 4,180.00

213,180.00 213,180.00

Jumlah 113,575.00 213,180.00 326,755.00

6.11a. Bahan

0.064 Kayu Jati, Papan 6,050,000.00 387,200.00 387,200.00 387,200.00 387,200.00

b.Tenaga1.000 Oh Pekerja 44,000.00 44,000.00 44,000.003.000 Oh Tukang Kayu 77,000.00 231,000.00 231,000.000.300 Oh Kepala Tukang 99,000.00 29,700.00 29,700.000.300 Oh Mandor 104,500.00 31,350.00 31,350.00

336,050.00 336,050.00

Jumlah 387,200.00 336,050.00 723,250.00

6.12a. Bahan

0.064 Kayu Kls. II 4,290,000.00 274,560.00 274,560.00274,560.00 274,560.00

b.Tenaga1.000 Oh Pekerja 44,000.00 44,000.00 44,000.00

1 M2 Pasang Pintu Panel Kayu Kls. II

M3

1 M2 Pasang Pintu dan Jendela Kaca Kayu Jati

M3

1 M2 Pasang Pintu dan Jendela Kaca Kayu Kls. II

M3

1 M2 Pasang Pintu dan Jendela Kaca Kayu Kls. III

M3

1 M2 Pasang Pintu dan Jendela Jalusi Kayu Jati

M3

1 M2 Pasang Pintu dan Jendela Jalusi Kayu Kls. II

M3

Page 57: DrfatAnalisa2010 Smt Iok Palembang

Daftar Analisa Pekerjaan Kota Palembang TA. 2010 Semester I

- 57 -

U R A I A N

SATUAN HARGA NO. Harga Jumlah Harga Jumlah Jumlah

Analisa Satuan Bahan Tenaga Bahan+Tenaga(Rp) (Rp) (Rp) (Rp)

1 2 3 4 5 63.000 Oh Tukang Kayu 77,000.00 231,000.00 231,000.000.300 Oh Kepala Tukang 99,000.00 29,700.00 29,700.000.500 Oh Mandor 104,500.00 52,250.00 52,250.00

356,950.00 356,950.00

Jumlah 274,560.00 356,950.00 631,510.00

6.13a. Bahan

0.0196 Kayu Jati, Papan 6,050,000.00 118,580.00 118,580.00 0.030 Kg 18,150.00 544.50 544.500.300 Ltr Lem Kayu 34,100.00 10,230.00 10,230.001.000 Lbr Plywood 4' x 8' x 4 mm 61,600.00 61,600.00 61,600.00

190,954.50 190,954.50b.Tenaga

0.600 Oh Pekerja 44,000.00 26,400.00 26,400.002.000 Oh Tukang Kayu 77,000.00 154,000.00 154,000.000.200 Oh Kepala Tukang 99,000.00 19,800.00 19,800.000.030 Oh Mandor 104,500.00 3,135.00 3,135.00

203,335.00 203,335.00

Jumlah 190,954.50 203,335.00 394,289.50

6.14a. Bahan

0.0196 Kayu Kls. II 4,290,000.00 84,084.00 84,084.000.030 Kg 18,150.00 544.50 544.500.300 Ltr Lem Kayu 34,100.00 10,230.00 10,230.001.000 Lbr Plywood 4' x 8' x 4 mm 61,600.00 61,600.00 61,600.00

156,458.50 156,458.50

b.Tenaga0.600 Oh Pekerja 44,000.00 26,400.00 26,400.002.000 Oh Tukang Kayu 77,000.00 154,000.00 154,000.000.200 Oh Kepala Tukang 99,000.00 19,800.00 19,800.000.030 Oh Mandor 104,500.00 3,135.00 3,135.00

203,335.00 203,335.00Jumlah 156,458.50 203,335.00 359,793.50

6.15a. Bahan

0.0196 Kayu Kelas II 4,290,000.00 84,084.00 84,084.001.000 Lbr Plywood Sungkai 3 mm 121,000.00 121,000.00 121,000.000.300 Ltr Lem Kayu 34,100.00 10,230.00 10,230.000.030 Kg 18,150.00 544.50 544.50

215,858.50 215,858.50b.Tenaga

2.000 Oh Tukang Kayu 77,000.00 154,000.00 154,000.000.200 Oh Kepala Tukang 99,000.00 19,800.00 19,800.000.600 Oh Pekerja 44,000.00 26,400.00 26,400.000.030 Oh Mandor 104,500.00 3,135.00 3,135.00

203,335.00 203,335.00

Jumlah 215,858.50 203,335.00 419,193.50

6.16a. Bahan

1.100 Kayu Jati, Balok 6,050,000.00 6,655,000.00 6,655,000.00 15.000 Kg Besi Strip 8,250.00 123,750.00 123,750.00

0.800 Kg Paku Biasa 2" - 5" 18,150.00 14,520.00 14,520.006,793,270.00 6,793,270.00

b.Tenaga4.000 Oh Pekerja 44,000.00 176,000.00 176,000.00

12.000 Oh Tukang Kayu 77,000.00 924,000.00 924,000.001.200 Oh Kepala Tukang 99,000.00 118,800.00 118,800.000.200 Oh Mandor 104,500.00 20,900.00 20,900.00

1,239,700.00 1,239,700.00

Jumlah 6,793,270.00 1,239,700.00 8,032,970.00

6.17a. Bahan

1.100 Kayu Kelas II, Balok 4,290,000.00 4,719,000.00 4,719,000.0015 Kg Besi Strip 8,250.00 123,750.00 123,750.00

0.800 Kg Paku Biasa 2" - 5" 18,150.00 14,520.00 14,520.004,857,270.00 4,857,270.00

b.Tenaga4.000 Oh Pekerja 44,000.00 176,000.00 176,000.00

12.000 Oh Tukang Kayu 77,000.00 924,000.00 924,000.001.200 Oh Kepala Tukang 99,000.00 118,800.00 118,800.000.200 Oh Mandor 104,500.00 20,900.00 20,900.00

1,239,700.00 1,239,700.00

Jumlah 4,857,270.00 1,239,700.00 6,096,970.00

1 M2 Pasang Pintu Plywood Rangkap, Rangka Kayu Jati

M3

Paku Biasa 1/2" - 1"

1 M2 Pasang Pintu Plywood Rangkap, Rangka Kayu Kls. II

M3

Paku Biasa 1/2" - 1"

1 M2 Daun Pintu Plywood Sungkay rangkap, kayu kls. II

M3

Paku Biasa 1/2" - 1"

1 M3 Pasang Konstruksi Kuda-kuda Kayu Jati

M3

1 M3 Pasang Konstruksi Kuda-kuda Kayu Kls. II

M3

Page 58: DrfatAnalisa2010 Smt Iok Palembang

Daftar Analisa Pekerjaan Kota Palembang TA. 2010 Semester I

- 58 -

U R A I A N

SATUAN HARGA NO. Harga Jumlah Harga Jumlah Jumlah

Analisa Satuan Bahan Tenaga Bahan+Tenaga(Rp) (Rp) (Rp) (Rp)

1 2 3 4 5 6

6.18a. Bahan

1.100 Kayu Kls. III, Balok 3,245,000.00 3,569,500.00 3,569,500.0015.000 Kg Besi Strip 8,250.00 123,750.00 123,750.00

0.800 Kg Paku Biasa 2" - 5" 18,150.00 14,520.00 14,520.003,707,770.00 3,707,770.00

b.Tenaga4.000 Oh Pekerja 44,000.00 176,000.00 176,000.00

12.000 Oh Tukang Kayu 77,000.00 924,000.00 924,000.001.200 Oh Kepala Tukang 99,000.00 118,800.00 118,800.000.200 Oh Mandor 104,500.00 20,900.00 20,900.00

1,239,700.00 1,239,700.00

Jumlah 3,707,770.00 1,239,700.00 4,947,470.00

6.19a. Bahan

0.012 Kayu Kelas III, Untuk genteng kodok/biasa 3,245,000.00 38,940.00 38,940.000.014 Kayu Kelas III, untuk genteng beton/keramik 3,245,000.00 45,430.00 45,430.000.150 Kg Paku Biasa 2" - 5" 18,150.00 2,722.50 2,722.50

kayu kls. III, untuk genteng kodok/biasa 41,662.50 41,662.50kayu kls. III, untuk genteng beton 48,152.50 48,152.50

b.Tenaga0.100 Oh Pekerja 44,000.00 4,400.00 4,400.000.100 Oh Tukang Kayu 77,000.00 7,700.00 7,700.000.010 Oh Kepala Tukang 99,000.00 990.00 990.000.005 Oh Mandor 104,500.00 522.50 522.50

13,612.50 13,612.50kayu kls. III, untuk genteng kodok/biasa 41,662.50 13,612.50 55,275.00

kayu kls. III, untuk genteng beton 48,152.50 13,612.50 61,765.00

6.20a. Bahan

0.012 Kayu Kelas II, Untuk genteng kodok/biasa 4,290,000.00 51,480.00 51,480.000.014 Kayu Kelas II, untuk genteng beton/keramik 4,290,000.00 60,060.00 60,060.000.150 Kg Paku Biasa 2" - 5" 18,150.00 2,722.50 2,722.50

kayu kls. II, untuk genteng kodok/biasa 54,202.50 54,202.50kayu kls. II, untuk genteng beton 62,782.50 62,782.50

b.Tenaga0.100 Oh Pekerja 44,000.00 4,400.00 4,400.000.100 Oh Tukang Kayu 77,000.00 7,700.00 7,700.000.010 Oh Kepala Tukang 99,000.00 990.00 990.000.005 Oh Mandor 104,500.00 522.50 522.50

13,612.50 13,612.50kayu kls. II, untuk genteng kodok/biasa 54,202.50 13,612.50 67,815.00

kayu kls. II, untuk genteng beton 62,782.50 13,612.50 76,395.00

6.21a. Bahan

0.0165 Kayu Kls. II, untuk sirap 4,290,000.00 70,785.00 70,785.000.0100 Kayu Kls. II, untuk seng dan asbes 4,290,000.00 42,900.00 42,900.00

0.200 Kg Paku Biasa 2" - 5" 18,150.00 3,630.00 3,630.00kayu kls. II, untuk sirap 74,415.00 74,415.00

kayu kls. II, untuk seng/asbes 46,530.00 46,530.00b.Tenaga

0.120 Oh Pekerja 44,000.00 5,280.00 5,280.000.120 Oh Tukang Kayu 77,000.00 9,240.00 9,240.000.012 Oh Kepala Tukang 99,000.00 1,188.00 1,188.000.006 Oh Mandor 104,500.00 627.00 627.00

16,335.00 16,335.00kayu kls. II, untuk sirap 74,415.00 16,335.00 90,750.00

kayu kls. II, untuk seng/asbes 46,530.00 16,335.00 62,865.00

6.22a. Bahan

0.0165 Kayu Kls. III, Untuk sirap 3,245,000.00 53,542.50 53,542.500.0100 Kayu Kls. III, untuk seng dan asbes 3,245,000.00 32,450.00 32,450.00

0.200 Kg Paku Biasa 2" - 5" 18,150.00 3,630.00 3,630.00kayu kls. III, untuk sirap 57,172.50 57,172.50

kayu kls. III, untuk seng/asbes 36,080.00 36,080.00b.Tenaga

0.120 Oh Pekerja 44,000.00 5,280.00 5,280.000.120 Oh Tukang Kayu 77,000.00 9,240.00 9,240.000.012 Oh Kepala Tukang 99,000.00 1,188.00 1,188.000.006 Oh Mandor 104,500.00 627.00 627.00

16,335.00 16,335.00kayu kls. III, untuk sirap 57,172.50 16,335.00 73,507.50

kayu kls. III, untuk seng/asbes 36,080.00 16,335.00 52,415.00

6.23a. Bahan

0.012 Kayu Jati, Unglen 6,050,000.00 72,600.00 72,600.00 0.100 Kg Paku Biasa 2" - 5" 18,150.00 1,815.00 1,815.00

1 M3 Pasang Konstruksi Kuda-kuda Kayu Kls. III

M3

1 M2 Pasang Kaso + Reng Genteng Kayu Kls. III

M3

M3

1 M2 Pasang Kaso + Reng Genteng Kayu Kls. II

M3

M3

1 M2 Pasang Kaso + Reng Atap Sirap,seng/asbes Kayu Kls. II

M3

M3

1 M2 Pasang Kaso + Reng Atap Sirap,seng/asbes Kayu Kls. III

M3

M3

1 M2 Pasang Rangka Langit-langit (1,00 x 1,00) m, Kayu Jati

M3

Page 59: DrfatAnalisa2010 Smt Iok Palembang

Daftar Analisa Pekerjaan Kota Palembang TA. 2010 Semester I

- 59 -

U R A I A N

SATUAN HARGA NO. Harga Jumlah Harga Jumlah Jumlah

Analisa Satuan Bahan Tenaga Bahan+Tenaga(Rp) (Rp) (Rp) (Rp)

1 2 3 4 5 674,415.00 74,415.00

b.Tenaga0.150 Oh Pekerja 44,000.00 6,600.00 6,600.000.250 Oh Tukang Kayu 77,000.00 19,250.00 19,250.000.025 Oh Kepala Tukang 99,000.00 2,475.00 2,475.000.075 Oh Mandor 104,500.00 7,837.50 7,837.50

36,162.50 36,162.50

Jumlah 74,415.00 36,162.50 110,577.50

6.24a. Bahan

0.012 Kayu Kls. II 4,290,000.00 51,480.00 51,480.000.100 Kg Paku Biasa 2" - 5" 18,150.00 1,815.00 1,815.00

53,295.00 53,295.00

b.Tenaga0.150 Oh Pekerja 44,000.00 6,600.00 6,600.000.250 Oh Tukang Kayu 77,000.00 19,250.00 19,250.000.025 Oh Kepala Tukang 99,000.00 2,475.00 2,475.000.075 Oh Mandor 104,500.00 7,837.50 7,837.50

36,162.50 36,162.50

Jumlah 53,295.00 36,162.50 89,457.50

6.25a. Bahan

0.012 Kayu Kls. III, Balok 3,245,000.00 38,940.00 38,940.000.100 Kg Paku Biasa 2" - 5" 18,150.00 1,815.00 1,815.00

40,755.00 40,755.00b.Tenaga

0.150 Oh Pekerja 44,000.00 6,600.00 6,600.000.250 Oh Tukang Kayu 77,000.00 19,250.00 19,250.000.025 Oh Kepala Tukang 99,000.00 2,475.00 2,475.000.075 Oh Mandor 104,500.00 7,837.50 7,837.50

36,162.50 36,162.50

Jumlah 40,755.00 36,162.50 76,917.50

6.26a. Bahan

0.023 Kayu Jati, Balok 6,050,000.00 139,150.00 139,150.00 0.150 Kg Paku Biasa 2" - 5" 18,150.00 2,722.50 2,722.50

141,872.50 141,872.50b.Tenaga

0.200 Oh Pekerja 44,000.00 8,800.00 8,800.000.300 Oh Tukang Kayu 77,000.00 23,100.00 23,100.000.030 Oh Kepala Tukang 99,000.00 2,970.00 2,970.000.010 Oh Mandor 104,500.00 1,045.00 1,045.00

35,915.00 35,915.00

Jumlah 141,872.50 35,915.00 177,787.50

6.27a. Bahan

0.023 Kayu Kls. II 4,290,000.00 98,670.00 98,670.000.150 Kg Paku Biasa 2" - 5" 18,150.00 2,722.50 2,722.50

101,392.50 101,392.50b.Tenaga

0.200 Oh Pekerja 44,000.00 8,800.00 8,800.000.300 Oh Tukang Kayu 77,000.00 23,100.00 23,100.000.030 Oh Kepala Tukang 99,000.00 2,970.00 2,970.000.010 Oh Mandor 104,500.00 1,045.00 1,045.00

35,915.00 35,915.00

Jumlah 101,392.50 35,915.00 137,307.50

6.28a. Bahan

0.023 Kayu Kls. III 3,245,000.00 74,635.00 74,635.000.150 Kg Paku Biasa 2" - 5" 18,150.00 2,722.50 2,722.50

77,357.50 77,357.50

b.Tenaga0.200 Oh Pekerja 44,000.00 8,800.00 8,800.000.300 Oh Tukang Kayu 77,000.00 23,100.00 23,100.000.030 Oh Kepala Tukang 99,000.00 2,970.00 2,970.000.010 Oh Mandor 104,500.00 1,045.00 1,045.00

35,915.00 35,915.00

Jumlah 77,357.50 35,915.00 113,272.50

6.29a. Bahan

1 M2 Pasang Rangka Langit-langit (1,00 x 1,00) m, Kayu Kls. II

M3

1 M2 Pasang Rangka Langit-langit (1,00 x 1,00) m, Kayu Kls. III

M3

1 M2 Pasang Rangka Langit-langit (30 x 60) cm, Kayu Jati

M3

1 M2 Pasang Rangka Langit-langit (30 x 60) cm, Kayu Kls. II

M3

1 M2 Pasang Rangka Langit-langit (30 x 60) m, Kayu Kls. III

M3

1 M2 Pasang Rangka Langit-langit (30 x 30) cm, Kayu Jati

Page 60: DrfatAnalisa2010 Smt Iok Palembang

Daftar Analisa Pekerjaan Kota Palembang TA. 2010 Semester I

- 60 -

U R A I A N

SATUAN HARGA NO. Harga Jumlah Harga Jumlah Jumlah

Analisa Satuan Bahan Tenaga Bahan+Tenaga(Rp) (Rp) (Rp) (Rp)

1 2 3 4 5 60.027 Kayu Jati, Balok 6,050,000.00 163,350.00 163,350.00 0.200 Kg Paku Biasa 2" - 5" 18,150.00 3,630.00 3,630.00

166,980.00 166,980.00

b.Tenaga0.250 Oh Pekerja 44,000.00 11,000.00 11,000.000.350 Oh Tukang Kayu 77,000.00 26,950.00 26,950.000.035 Oh Kepala Tukang 99,000.00 3,465.00 3,465.00

0.0125 Oh Mandor 104,500.00 1,306.25 1,306.2542,721.25 42,721.25

Jumlah 166,980.00 42,721.25 209,701.25

6.30a. Bahan

0.027 Kayu Kls. II 4,290,000.00 115,830.00 115,830.000.200 Kg Paku Biasa 2" - 5" 18,150.00 3,630.00 3,630.00

119,460.00 119,460.00

b.Tenaga0.250 Oh Pekerja 44,000.00 11,000.00 11,000.000.350 Oh Tukang Kayu 77,000.00 26,950.00 26,950.000.035 Oh Kepala Tukang 99,000.00 3,465.00 3,465.00

0.0125 Oh Mandor 104,500.00 1,306.25 1,306.2542,721.25 42,721.25

Jumlah 119,460.00 42,721.25 162,181.25

6.31a. Bahan

0.027 Kayu Kls. III 3,245,000.00 87,615.00 87,615.000.200 Kg Paku Biasa 2" - 5" 18,150.00 3,630.00 3,630.00

91,245.00 91,245.00b.Tenaga

0.250 Oh Pekerja 44,000.00 11,000.00 11,000.000.350 Oh Tukang Kayu 77,000.00 26,950.00 26,950.000.035 Oh Kepala Tukang 99,000.00 3,465.00 3,465.00

0.0125 Oh Mandor 104,500.00 1,306.25 1,306.2542,721.25 42,721.25

Jumlah 91,245.00 42,721.25 133,966.25

6.32 1 M' Pasang Lisplang Ukuran (3 x 20) cm, Kayu Jatia. Bahan

0.0072 Kayu Jati, Papan 6,050,000.00 43,560.00 43,560.00 0.050 Kg Paku Biasa 2" - 5" 18,150.00 907.50 907.50

44,467.50 44,467.50b.Tenaga

0.100 Oh Pekerja 44,000.00 4,400.00 4,400.000.200 Oh Tukang Kayu 77,000.00 15,400.00 15,400.000.025 Oh Kepala Tukang 99,000.00 2,475.00 2,475.00

0.0050 Oh Mandor 104,500.00 522.50 522.5022,797.50 22,797.50

Jumlah 44,467.50 22,797.50 67,265.00

6.33 1 M' Pasang Lisplang Ukuran (3 x 20) cm, Kayu Kls. IIa. Bahan

0.0072 Kayu Kls. II 4,290,000.00 30,888.00 30,888.000.050 Kg Paku Biasa 2" - 5" 18,150.00 907.50 907.50

31,795.50 31,795.50

b.Tenaga0.100 Oh Pekerja 44,000.00 4,400.00 4,400.000.200 Oh Tukang Kayu 77,000.00 15,400.00 15,400.000.025 Oh Kepala Tukang 99,000.00 2,475.00 2,475.00

0.0050 Oh Mandor 104,500.00 522.50 522.5022,797.50 22,797.50

Jumlah 31,795.50 22,797.50 54,593.00

6.34 1 M' Pasang Lisplang Ukuran (3 x 30) cm, Kayu Jatia. Bahan

0.011 Kayu Jati, Papan 6,050,000.00 66,550.00 66,550.00 0.050 Kg Paku Biasa 2" - 5" 18,150.00 907.50 907.50

67,457.50 67,457.50b.Tenaga

0.110 Oh Pekerja 44,000.00 4,840.00 4,840.000.220 Oh Tukang Kayu 77,000.00 16,940.00 16,940.000.022 Oh Kepala Tukang 99,000.00 2,178.00 2,178.000.005 Oh Mandor 104,500.00 522.50 522.50

24,480.50 24,480.50

Jumlah 67,457.50 24,480.50 91,938.00

M3

1 M2 Pasang Rangka Langit-langit (30 x 30) cm, Kayu Kls. II

M3

1 M2 Pasang Rangka Langit-langit (30 x 30) m, Kayu Kls. III

M3

M3

M3

M3

Page 61: DrfatAnalisa2010 Smt Iok Palembang

Daftar Analisa Pekerjaan Kota Palembang TA. 2010 Semester I

- 61 -

U R A I A N

SATUAN HARGA NO. Harga Jumlah Harga Jumlah Jumlah

Analisa Satuan Bahan Tenaga Bahan+Tenaga(Rp) (Rp) (Rp) (Rp)

1 2 3 4 5 66.35 1 M' Pasang Lisplang Ukuran (3 x 30) cm, Kayu Kls. II

a. Bahan0.011 Kayu Kls. II 4,290,000.00 47,190.00 47,190.000.050 Kg Paku Biasa 2" - 5" 18,150.00 907.50 907.50

48,097.50 48,097.50

b.Tenaga0.110 Oh Pekerja 44,000.00 4,840.00 4,840.000.220 Oh Tukang Kayu 77,000.00 16,940.00 16,940.000.022 Oh Kepala Tukang 99,000.00 2,178.00 2,178.000.005 Oh Mandor 104,500.00 522.50 522.50

24,480.50 24,480.50

Jumlah 48,097.50 24,480.50 72,578.00

6.36 1 M' Pasang Lisplang Ukuran 2 x (3 x 20) cm, Kayu Kls.IIa. Bahan

0.0145 Kayu Kls.II 4,290,000.00 62,205.00 62,205.000.060 Kg Paku Biasa 2" - 5" 18,150.00 1,089.00 1,089.00

63,294.00 63,294.00

b.Tenaga0.150 Oh Pekerja 44,000.00 6,600.00 6,600.000.250 Oh Tukang Kayu 77,000.00 19,250.00 19,250.000.025 Oh Kepala Tukang 99,000.00 2,475.00 2,475.000.075 Oh Mandor 104,500.00 7,837.50 7,837.50

36,162.50 36,162.50

Jumlah 63,294.00 36,162.50 99,456.50

6.37 1 M' Pasang Lisplang Ukuran 2 x (2 x 20) cm, Kayu Kls. IIa. Bahan

0.0086 Kayu Kls. II 4,290,000.00 36,894.00 36,894.000.060 Kg Paku Biasa 2" - 5" 18,150.00 1,089.00 1,089.00

37,983.00 37,983.00

b.Tenaga0.100 Oh Pekerja 44,000.00 4,400.00 4,400.000.100 Oh Tukang Kayu 77,000.00 7,700.00 7,700.000.010 Oh Kepala Tukang 99,000.00 990.00 990.000.050 Oh Mandor 104,500.00 5,225.00 5,225.00

18,315.00 18,315.00

Jumlah 37,983.00 18,315.00 56,298.00

6.38 1 M' Pasang Lisplang Ukuran 2 x (2 x 20) cm, Kayu Kls. IIIa. Bahan

0.0088 Kayu Kls. III 3,245,000.00 28,556.00 28,556.000.060 Kg Paku Biasa 2" - 5" 18,150.00 1,089.00 1,089.00

29,645.00 29,645.00

b.Tenaga0.100 Oh Pekerja 44,000.00 4,400.00 4,400.000.100 Oh Tukang Kayu 77,000.00 7,700.00 7,700.000.010 Oh Kepala Tukang 99,000.00 990.00 990.000.050 Oh Mandor 104,500.00 5,225.00 5,225.00

18,315.00 18,315.00

Jumlah 29,645.00 18,315.00 47,960.00

6.39a. Bahan

0.0195 Kayu Kls. II, Balok 4,290,000.00 83,655.00 83,655.000.007 Kayu Kls.II, Papan 4,290,000.00 30,030.00 30,030.000.100 Kg Paku Biasa 2" - 5" 18,150.00 1,815.00 1,815.00

115,500.00 115,500.00

b.Tenaga0.150 Oh Pekerja 44,000.00 6,600.00 6,600.000.450 Oh Tukang Kayu 77,000.00 34,650.00 34,650.000.045 Oh Kepala Tukang 99,000.00 4,455.00 4,455.000.075 Oh Mandor 104,500.00 7,837.50 7,837.50

53,542.50 53,542.50

Jumlah 115,500.00 53,542.50 169,042.50

6.40a. Bahan

0.0195 Kayu Kls. III, Balok 3,245,000.00 63,277.50 63,277.500.007 Kayu Kls. III, Papan 3,245,000.00 22,715.00 22,715.000.100 Kg Paku Biasa 2" - 5" 18,150.00 1,815.00 1,815.00

87,807.50 87,807.50

b.Tenaga0.150 Oh Pekerja 44,000.00 6,600.00 6,600.000.450 Oh Tukang Kayu 77,000.00 34,650.00 34,650.00

M3

M3

M3

M3

1 M2 Pasang Rangka Dinding Pemisah + Papan Kayu Kls. II

M3

M3

1 M2 Pasang Rangka Dinding Pemisah + Papan Kayu Kls. III

M3

M3

Page 62: DrfatAnalisa2010 Smt Iok Palembang

Daftar Analisa Pekerjaan Kota Palembang TA. 2010 Semester I

- 62 -

U R A I A N

SATUAN HARGA NO. Harga Jumlah Harga Jumlah Jumlah

Analisa Satuan Bahan Tenaga Bahan+Tenaga(Rp) (Rp) (Rp) (Rp)

1 2 3 4 5 60.045 Oh Kepala Tukang 99,000.00 4,455.00 4,455.000.075 Oh Mandor 104,500.00 7,837.50 7,837.50

53,542.50 53,542.50

Jumlah 87,807.50 53,542.50 141,350.00

6.41a. Bahan

0.0195 Kayu Kls. II, Balok 4,290,000.00 83,655.00 83,655.000.007 Kayu Kls. II, Papan 4,290,000.00 30,030.00 30,030.000.100 Kg Paku Biasa 2" - 5" 18,150.00 1,815.00 1,815.00

115,500.00 115,500.00b.Tenaga

0.150 Oh Pekerja 44,000.00 6,600.00 6,600.000.450 Oh Tukang Kayu 77,000.00 34,650.00 34,650.000.045 Oh Kepala Tukang 99,000.00 4,455.00 4,455.000.075 Oh Mandor 104,500.00 7,837.50 7,837.50

53,542.50 53,542.50

Jumlah 115,500.00 53,542.50 169,042.50

6.42a. Bahan

0.0195 Kayu Kelas III, Balok 3,245,000.00 63,277.50 63,277.500.007 Kayu Kelas III, Papan 3,245,000.00 22,715.00 22,715.000.100 Kg Paku Biasa 2" - 5" 18,150.00 1,815.00 1,815.000.560 Ltr Lem Kayu 34,100.00 19,096.00 19,096.001.000 Lbr Plywood 4' x 8' x 4 mm 61,600.00 61,600.00 61,600.00

168,503.50 168,503.50

b.Tenaga0.200 Oh Pekerja 44,000.00 8,800.00 8,800.000.600 Oh Tukang Kayu 77,000.00 46,200.00 46,200.000.060 Oh Kepala Tukang 99,000.00 5,940.00 5,940.000.010 Oh Mandor 104,500.00 1,045.00 1,045.00

61,985.00 61,985.00

Jumlah 168,503.50 61,985.00 230,488.50

6.43a. Bahan

0.007 Kayu Jati, Balok 6,050,000.00 42,350.00 42,350.00 0.100 Kg Paku Biasa 2" - 5" 18,150.00 1,815.00 1,815.000.150 Kg Paku Skrup 3,5" 41,250.00 6,187.50 6,187.50

50,352.50 50,352.50b.Tenaga

0.600 Oh Pekerja 44,000.00 26,400.00 26,400.001.800 Oh Tukang Kayu 77,000.00 138,600.00 138,600.000.180 Oh Kepala Tukang 99,000.00 17,820.00 17,820.000.030 Oh Mandor 104,500.00 3,135.00 3,135.00

185,955.00 185,955.00

Jumlah 50,352.50 185,955.00 236,307.506.44

a. Bahan0.400 Lbr Plywood 4' x 8' x 4 mm 61,600.00 24,640.00 24,640.000.050 Kg 18,150.00 907.50 907.50

25,547.50 25,547.50b.Tenaga

0.025 Oh Pekerja 44,000.00 1,100.00 1,100.000.075 Oh Tukang Kayu 77,000.00 5,775.00 5,775.00

0.0075 Oh Kepala Tukang 99,000.00 742.50 742.500.0013 Oh Mandor 104,500.00 135.85 135.85

7,753.35 7,753.35

Jumlah 25,547.50 7,753.35 33,300.85

6.45 1 M' Pasang List Plafond Kayu Profila. Bahan

1.050 M' Kayu Profil kecil 1,650.00 1,732.50 1,732.501.050 M' Kayu Profil sedang 3,300.00 3,465.00 3,465.001.050 M' Kayu Profil besar 7,150.00 7,507.50 7,507.50

Kayu Profil kecil 1,732.50 1,732.50Kayu Profil sedang 3,465.00 3,465.00

Kayu Profil besar 7,507.50 7,507.50b.Tenaga

0.021 Oh Pekerja 44,000.00 924.00 924.000.021 Oh Tukang Kayu 77,000.00 1,617.00 1,617.000.002 Oh Kepala Tukang 99,000.00 198.00 198.000.001 Oh Mandor 104,500.00 104.50 104.50

2,843.50 2,843.50

Kayu Profil kecil 1,732.50 2,843.50 4,576.00Kayu Profil sedang 3,465.00 2,843.50 6,308.50

Kayu Profil Besar 7,507.50 2,843.50 10,351.00

1 M2 Pasang Dinding Pemisah Teakwood Rangkap, Rangka Kayu kls. II

M3

M3

1 M2 Pasang Dinding Pemisah Plywood Rangkap, Rangka Kayu Kelas III

M3

M3

1 M2 Pasang Dinding Lambriziring Dari Papan Jati

M3

1 M2 Pasang Plywood Tebal 4 mm, Untuk Dinding

Paku Biasa 1/2" - 1"

Page 63: DrfatAnalisa2010 Smt Iok Palembang

Daftar Analisa Pekerjaan Kota Palembang TA. 2010 Semester I

- 63 -

U R A I A N

SATUAN HARGA NO. Harga Jumlah Harga Jumlah Jumlah

Analisa Satuan Bahan Tenaga Bahan+Tenaga(Rp) (Rp) (Rp) (Rp)

1 2 3 4 5 6

6.46a. Bahan

0.36 Kpg Plywood Sungkay 3 mm 121,000.00 43,560.00 43,560.000.36 Kpg Plywood 4 mm 61,600.00 22,176.00 22,176.00

0.600 Kg Lem Vinyl 4,950.00 2,970.00 2,970.000.150 Ltr Politur dasar 29,700.00 4,455.00 4,455.000.372 Ltr Politur jadi 42,900.00 15,958.80 15,958.802.000 Lbr Amplas 3,300.00 6,600.00 6,600.000.220 Kg Paku Biasa 18,150.00 3,993.00 3,993.00

99,712.80 99,712.80b. Tenaga

0.145 Oh Tukang Cat 77,000.00 11165 11,165.000.008 Oh Kepala Tukang 99,000.00 792 792.000.110 Oh Pekerja 44,000.00 4840 4,840.000.005 Oh Mandor 104,500.00 522.5 522.50

17,319.50 17,319.50

99,712.80 17,319.50 117,032.30

6.47 1 M2 Pasang lapis plywood Sungkay tanpa rangka, politur dan lis profila. Bahan

0.36 Kpg Plywood Sungkay 3 mm 121,000.00 43,560.00 43,560.000.050 Kg Paku 1/2" - 1 " 18,150.00 907.50 907.50

44,467.50 44,467.50b. Tenaga

0.075 Oh Tukang Kayu 77,000.00 5,775.00 5,775.000.0075 Oh Kepala Tukang 99,000.00 742.50 742.50

0.025 Oh Pekerja 44,000.00 1,100.00 1,100.000.0013 Oh Mandor 104,500.00 135.85 135.85

7,753.35 7,753.3544,467.50 7,753.35 52,220.85

6.48 1 M2 Pasang lapis plywood Sungkay + list kayu, tanpa rangka dan politur a. Bahan

0.36 Kpg Plywood Sungkay 3 mm 121,000.00 43,560.00 43,560.000.250 LS List kayu 1,650.00 412.50 412.500.150 Kg Paku 1/2" - 2 " 18,150.00 2,722.50 2,722.502.000 Lbr Amplas 3,300.00 6,600.00 6,600.00

53,295.00 53,295.00b. Tenaga

0.096 Oh Tukang Kayu 77,000.00 7,392.00 7,392.000.010 Oh Kepala Tukang 99,000.00 940.50 940.500.046 Oh Pekerja 44,000.00 2,024.00 2,024.00

0.0023 Oh Mandor 104,500.00 240.35 240.3510,596.85 10,596.85

53,295.00 10,596.85 63,891.85

6.49Bahan

0.36 Kpg Plywood Jati 3 mm 121,000.00 43,560.00 43,560.000.36 Kpg Plywood 20 mm 195,250.00 70,290.00 70,290.00

0.600 Kg Lem Vinyl 4,950.00 2,970.00 2,970.000.150 Ltr Politur dasar 29,700.00 4,455.00 4,455.000.372 Ltr Politur jadi 42,900.00 15,958.80 15,958.802.000 Lbr Amplas 3,300.00 6,600.00 6,600.000.220 Kg Paku 18,150.00 3,993.00 3,993.00

147,826.80 147,826.80Tenaga

0.025 Oh Pekerja 44,000.00 1,100.00 1,100.000.135 Oh Tukang Kayu 77,000.00 10,395.00 10,395.000.024 Oh Kepala Tukang 99,000.00 2,326.50 2,326.50

0.0038 Oh Mandor 104,500.00 397.10 397.10 14,218.60 14,218.60

147,826.80 14,218.60 162,045.40

6.50a. Bahan

0.0195 Kayu Kelas II 4,290,000.00 83,655.00 83,655.002.000 Teakwood 4 mm 34,650.00 69,300.00 69,300.000.100 Kg Paku Biasa 2"-5" 18,150.00 1,815.00 1,815.000.050 Kg Paku Plywood 18,150.00 907.50 907.50

155,677.50 155,677.50

b.Tenaga0.450 Oh Tukang Kayu 77,000.00 34,650.00 34,650.00

0.0450 Oh Kepala Tukang 99,000.00 4,455.00 4,455.000.150 Oh Pekerja 44,000.00 6,600.00 6,600.000.075 Oh Mandor 104,500.00 7,837.50 7,837.50

53,542.50 53,542.50

Jumlah 155,677.50 53,542.50 209,220.00

6.51

1 M2 Pasang Interior Display lapis plywood Sungkay + politur

1 M2 Pasangan Interior display + lapis jati dipolitur

1 M2 Dinding Sekat Teakwood 4 mm, Rangkap + Rangka Kayu kls. II

M3

M2

1 M2 Dinding Plywood / Multiplek + rangka kayu kls. III

Page 64: DrfatAnalisa2010 Smt Iok Palembang

Daftar Analisa Pekerjaan Kota Palembang TA. 2010 Semester I

- 64 -

U R A I A N

SATUAN HARGA NO. Harga Jumlah Harga Jumlah Jumlah

Analisa Satuan Bahan Tenaga Bahan+Tenaga(Rp) (Rp) (Rp) (Rp)

1 2 3 4 5 6a. Bahan

0.0195 Kayu Kelas III 4,290,000.00 83,655.00 83,655.00

1.0000 Hpl 0.00 0.00

1.0000 Melamic0.100 Kg Paku Biasa 2"-5" 18,150.00 1,815.00 1,815.001.000 Lbr Multiplek 6 mm 121,000.00 121,000.00 121,000.000.050 Kg Paku Multileks 18,150.00 907.50 907.50

207,377.50 207,377.50b.Tenaga

0.600 Oh Tukang Kayu 77,000.00 46,200.00 46,200.000.0600 Oh Kepala Tukang 99,000.00 5,940.00 5,940.00

0.200 Oh Pekerja 44,000.00 8,800.00 8,800.000.010 Oh Mandor 104,500.00 1,045.00 1,045.00

61,985.00 61,985.00

Jumlah 207,377.50 61,985.00 269,362.50

VII PEKERJAAN BETON

7.1a. Bahan

218 Kg Semen Portland 2,200.00 479,600.00 479,600.000.520 Pasir Beton 82,500.00 42,900.00 42,900.000.870 Koral Beton 220,000.00 191,400.00 191,400.00

713,900.00 713,900.00b.Tenaga

1.650 Oh Pekerja 44,000.00 72,600.00 72,600.000.250 Oh Tukang Batu 77,000.00 19,250.00 19,250.000.025 Oh Kepala Tukang 99,000.00 2,475.00 2,475.000.080 Oh Mandor 104,500.00 8,360.00 8,360.00

102,685.00 102,685.00

Jumlah 713,900.00 102,685.00 816,585.00

7.2a. Bahan

197.000 Kg Semen Portland 2,200.00 433,400.00 433,400.000.470 Pasir Beton 82,500.00 38,775.00 38,775.000.940 Koral Beton 220,000.00 206,800.00 206,800.00

678,975.00 678,975.00

b.Tenaga1.650 Oh Pekerja 44,000.00 72,600.00 72,600.000.250 Oh Tukang Batu 77,000.00 19,250.00 19,250.000.025 Oh Kepala Tukang 99,000.00 2,475.00 2,475.000.080 Oh Mandor 104,500.00 8,360.00 8,360.00

102,685.00 102,685.00

Jumlah 678,975.00 102,685.00 781,660.00

7.3a. Bahan

173.000 Kg Semen Portland 2,200.00 380,600.00 380,600.000.570 Pasir Beton 82,500.00 47,025.00 47,025.000.870 Koral Beton 220,000.00 191,400.00 191,400.00

619,025.00 619,025.00

b.Tenaga1.650 Oh Pekerja 44,000.00 72,600.00 72,600.000.250 Oh Tukang Batu 77,000.00 19,250.00 19,250.000.025 Oh Kepala Tukang 99,000.00 2,475.00 2,475.000.080 Oh Mandor 104,500.00 8,360.00 8,360.00

102,685.00 102,685.00

Jumlah 619,025.00 102,685.00 721,710.00

7.4a. Bahan

10.000 Kg Semen Portland 2,200.00 22,000.00 22,000.000.026 Pasir Beton 82,500.00 2,145.00 2,145.000.044 Koral Beton 220,000.00 9,680.00 9,680.00

33,825.00 33,825.00b.Tenaga

1.150 Oh Pekerja 44,000.00 50,600.00 50,600.000.020 Oh Tukang Batu 77,000.00 1,540.00 1,540.000.002 Oh Kepala Tukang 99,000.00 198.00 198.000.006 Oh Mandor 104,500.00 627.00 627.00

52,965.00 52,965.00

Jumlah 33,825.00 52,965.00 86,790.00

7.5a. Bahan

232.000 Kg Semen Portland 2,200.00 510,400.00 510,400.00

M3

M2

M2

1 M3 Membuat Beton Tumbuk, 1 Pc : 3 Ps : 5 Kr

M3

M3

1 M3 Membuat Beton Tumbuk, 1 Pc : 3 Ps : 6 Kr

M3

M3

1 M3 Membuat Beton Tumbuk, 1 Pc : 4 Ps : 6 Kr

M3

M3

1 M2 Membuat Lantai Kerja Beton Tumbuk, 1 Pc : 3 Ps : 5 Kr, Tebal 5 cm

M3

M3

1 M3 Membuat Beton Tak Bertulang, 1 Pc : 2 Ps : 3 Kr

Page 65: DrfatAnalisa2010 Smt Iok Palembang

Daftar Analisa Pekerjaan Kota Palembang TA. 2010 Semester I

- 65 -

U R A I A N

SATUAN HARGA NO. Harga Jumlah Harga Jumlah Jumlah

Analisa Satuan Bahan Tenaga Bahan+Tenaga(Rp) (Rp) (Rp) (Rp)

1 2 3 4 5 60.520 Pasir Beton 82,500.00 42,900.00 42,900.000.780 Koral Beton 220,000.00 171,600.00 171,600.00

724,900.00 724,900.00b.Tenaga

1.650 Oh Pekerja 44,000.00 72,600.00 72,600.000.250 Oh Tukang Batu 77,000.00 19,250.00 19,250.000.025 Oh Kepala Tukang 99,000.00 2,475.00 2,475.000.080 Oh Mandor 104,500.00 8,360.00 8,360.00

102,685.00 102,685.00

Jumlah 724,900.00 102,685.00 827,585.00

7.6a. Bahan

280.000 Kg Semen Portland 2,200.00 616,000.00 616,000.000.450 Pasir Beton 82,500.00 37,125.00 37,125.000.900 Koral Beton 220,000.00 198,000.00 198,000.00

851,125.00 851,125.00

b.Tenaga1.650 Oh Pekerja 44,000.00 72,600.00 72,600.000.250 Oh Tukang Batu 77,000.00 19,250.00 19,250.000.025 Oh Kepala Tukang 99,000.00 2,475.00 2,475.000.080 Oh Mandor 104,500.00 8,360.00 8,360.00

102,685.00 102,685.00

Jumlah 851,125.00 102,685.00 953,810.00

7.7a. Bahan

352.000 Kg Semen Portland 2,200.00 774,400.00 774,400.000.560 Pasir Beton 82,500.00 46,200.00 46,200.000.700 Koral Beton 220,000.00 154,000.00 154,000.00

974,600.00 974,600.00

b.Tenaga1.650 Oh Pekerja 44,000.00 72,600.00 72,600.000.250 Oh Tukang Batu 77,000.00 19,250.00 19,250.000.025 Oh Kepala Tukang 99,000.00 2,475.00 2,475.000.080 Oh Mandor 104,500.00 8,360.00 8,360.00

102,685.00 102,685.00

Jumlah 974,600.00 102,685.00 1,077,285.00

7.8a. Bahan

357.000 Kg Semen Portland 2,200.00 785,400.00 785,400.000.420 Pasir Beton 82,500.00 34,650.00 34,650.000.540 Koral Beton 220,000.00 118,800.00 118,800.00

938,850.00 938,850.00b.Tenaga

1.650 Oh Pekerja 44,000.00 72,600.00 72,600.000.250 Oh Tukang Batu 77,000.00 19,250.00 19,250.000.025 Oh Kepala Tukang 99,000.00 2,475.00 2,475.000.080 Oh Mandor 104,500.00 8,360.00 8,360.00

102,685.00 102,685.00

Jumlah 938,850.00 102,685.00 1,041,535.00

7.9a. Bahan

386.000 Kg Semen Portland 2,200.00 849,200.00 849,200.000.470 Pasir Beton 82,500.00 38,775.00 38,775.000.780 Koral Beton 220,000.00 171,600.00 171,600.00

1,059,575.00 1,059,575.00

b.Tenaga1.650 Oh Pekerja 44,000.00 72,600.00 72,600.000.250 Oh Tukang Batu 77,000.00 19,250.00 19,250.000.025 Oh Kepala Tukang 99,000.00 2,475.00 2,475.000.080 Oh Mandor 104,500.00 8,360.00 8,360.00

102,685.00 102,685.00

Jumlah 1,059,575.00 102,685.00 1,162,260.00

7.10a. Bahan

479.000 Kg Semen Portland 2,200.00 1,053,800.00 1,053,800.000.370 Pasir Beton 82,500.00 30,525.00 30,525.000.740 Koral Beton 220,000.00 162,800.00 162,800.00

1,247,125.00 1,247,125.00b.Tenaga

1.650 Oh Pekerja 44,000.00 72,600.00 72,600.000.250 Oh Tukang Batu 77,000.00 19,250.00 19,250.00

M3

M3

1 M3 Membuat Beton Tak Bertulang, 1 Pc : 2 Ps : 4 Kr

M3

M3

1 M3 Membuat Beton Tak Bertulang, 1 Pc : 2 Ps : 2,5 Kr

M3

M3

1 M3 Membuat Beton Tak Bertulang, 1 Pc : 1,5 Ps : 3 Kr

M3

M3

1 M3 Membuat Beton Tak Bertulang, 1 Pc : 1,5 Ps : 2,5 Kr

M3

M3

1 M3 Membuat Beton Tak Bertulang, 1 Pc : 1 Ps : 2 Kr

M3

M3

Page 66: DrfatAnalisa2010 Smt Iok Palembang

Daftar Analisa Pekerjaan Kota Palembang TA. 2010 Semester I

- 66 -

U R A I A N

SATUAN HARGA NO. Harga Jumlah Harga Jumlah Jumlah

Analisa Satuan Bahan Tenaga Bahan+Tenaga(Rp) (Rp) (Rp) (Rp)

1 2 3 4 5 60.025 Oh Kepala Tukang 99,000.00 2,475.00 2,475.000.080 Oh Mandor 104,500.00 8,360.00 8,360.00

102,685.00 102,685.00

Jumlah 1,247,125.00 102,685.00 1,349,810.00

7.11a. Bahan

440.000 Kg Semen Portland 2,200.00 968,000.00 968,000.000.500 Pasir Beton 82,500.00 41,250.00 41,250.000.800 Koral Beton Pecah Split 357,500.00 286,000.00 286,000.002.460 Gln Rapidrant - - -

1,295,250.00 1,295,250.00b.Tenaga

1.650 Oh Pekerja 44,000.00 72,600.00 72,600.000.250 Oh Tukang Batu 77,000.00 19,250.00 19,250.000.025 Oh Kepala Tukang 99,000.00 2,475.00 2,475.000.080 Oh Mandor 104,500.00 8,360.00 8,360.00

102,685.00 102,685.00

Jumlah 1,295,250.00 102,685.00 1,397,935.00

7.12a. Bahan

336.000 Kg Semen Portland 2,200.00 739,200.00 739,200.000.540 Pasir Beton 82,500.00 44,550.00 44,550.000.810 Koral Beton Pecah Split 357,500.00 289,575.00 289,575.00

1,073,325.00 1,073,325.00b.Tenaga

2.000 Oh Pekerja 44,000.00 88,000.00 88,000.000.350 Oh Tukang Batu 77,000.00 26,950.00 26,950.000.035 Oh Kepala Tukang 99,000.00 3,465.00 3,465.001.000 Oh Mandor 104,500.00 104,500.00 104,500.00

222,915.00 222,915.00

Jumlah 1,073,325.00 222,915.00 1,296,240.00

7.13a. Bahan

291.000 Kg Semen Portland 2,200.00 640,200.00 640,200.000.470 Pasir Beton 82,500.00 38,775.00 38,775.000.930 Koral Beton pecah Split 357,500.00 332,475.00 332,475.00

1,011,450.00 1,011,450.00

b.Tenaga2.000 Oh Pekerja 44,000.00 88,000.00 88,000.000.350 Oh Tukang Batu 77,000.00 26,950.00 26,950.000.035 Oh Kepala Tukang 99,000.00 3,465.00 3,465.001.000 Oh Mandor 104,500.00 104,500.00 104,500.00

222,915.00 222,915.00

Jumlah 1,011,450.00 222,915.00 1,234,365.00

7.14a. Bahan

367.000 Kg Semen Portland 2,200.00 807,400.00 807,400.000.440 Pasir Beton 82,500.00 36,300.00 36,300.000.880 Koral Beton 2/3 Split 258,500.00 227,480.00 227,480.00

1,071,180.00 1,071,180.00

b.Tenaga2.000 Oh Pekerja 44,000.00 88,000.00 88,000.000.350 Oh Tukang Batu 77,000.00 26,950.00 26,950.000.035 Oh Kepala Tukang 99,000.00 3,465.00 3,465.001.000 Oh Mandor 104,500.00 104,500.00 104,500.00

222,915.00 222,915.00

Jumlah 1,071,180.00 222,915.00 1,294,095.00

7.15a. Bahan

400.000 Kg Semen Portland 2,200.00 880,000.00 880,000.000.480 Pasir Beton 82,500.00 39,600.00 39,600.000.800 Koral Beton 2/3 Split 258,500.00 206,800.00 206,800.00

1,126,400.00 1,126,400.00

b.Tenaga2.000 Oh Pekerja 44,000.00 88,000.00 88,000.000.350 Oh Tukang Batu 77,000.00 26,950.00 26,950.000.035 Oh Kepala Tukang 99,000.00 3,465.00 3,465.001.000 Oh Mandor 104,500.00 104,500.00 104,500.00

222,915.00 222,915.00

Jumlah 1,126,400.00 222,915.00 1,349,315.00

1 M3 Membuat Tiang Pancang Prestressed Beton

M3

M3

1 M3 Membuat Beton Tak Bertulang, 1 Pc : 2 Ps : 3 Split

M3

M3

1 M3 Membuat Beton Tak Bertulang, 1 Pc : 2 Ps : 4 Split

M3

M3

1 M3 Membuat Beton Tak Bertulang, 1 Pc : 1,5 Ps : 3 Split

M3

M3

1 M3 Membuat Beton Tak Bertulang, 1 Pc : 1,5 Ps : 2,5 Split

M3

M3

Page 67: DrfatAnalisa2010 Smt Iok Palembang

Daftar Analisa Pekerjaan Kota Palembang TA. 2010 Semester I

- 67 -

U R A I A N

SATUAN HARGA NO. Harga Jumlah Harga Jumlah Jumlah

Analisa Satuan Bahan Tenaga Bahan+Tenaga(Rp) (Rp) (Rp) (Rp)

1 2 3 4 5 67.16

a. Bahan615.000 Kg Semen Portland 2,200.00 1,353,000.00 1,353,000.00

0.520 Pasir Beton 82,500.00 42,900.00 42,900.000.520 Koral Beton Pecah Split 357,500.00 185,900.00 185,900.00

1,581,800.00 1,581,800.00

b.Tenaga2.000 Oh Pekerja 44,000.00 88,000.00 88,000.000.350 Oh Tukang Batu 77,000.00 26,950.00 26,950.000.035 Oh Kepala Tukang 99,000.00 3,465.00 3,465.001.000 Oh Mandor 104,500.00 104,500.00 104,500.00

222,915.00 222,915.00

Jumlah 1,581,800.00 222,915.00 1,804,715.00

7.17a. Bahan

400.000 Kg Semen Portland 2,200.00 880,000.00 880,000.000.480 Pasir Beton 82,500.00 39,600.00 39,600.000.800 Koral Beton 2/3 297,000.00 237,600.00 237,600.001.200 Kg Strorox - 100 - - -

1,157,200.00 1,157,200.00

b.Tenaga2.000 Oh Pekerja 44,000.00 88,000.00 88,000.000.350 Oh Tukang Batu 77,000.00 26,950.00 26,950.000.035 Oh Kepala Tukang 99,000.00 3,465.00 3,465.001.000 Oh Mandor 104,500.00 104,500.00 104,500.00

222,915.00 222,915.00

Jumlah

7.18 1 Kg Pembesian dengan Besi Polos atau Besi Ulira. Bahan

1.050 Kg Besi Beton ( Polos / Ulir ) 11,550.00 12,127.50 12,127.500.015 Kg Kawat Beton 18,700.00 280.50 280.50

12,408.00 12,408.00

b.Tenaga0.007 Oh Pekerja 44,000.00 308.00 308.000.007 Oh Tukang Besi 77,000.00 539.00 539.00

0.0007 Oh Kepala Tukang 99,000.00 69.30 69.300.0003 Oh Mandor 104,500.00 31.35 31.35

947.65 947.65

Jumlah 12,408.00 947.65 13,355.65

7.19 1 Kg Kabel Presstressed Polos / Strandsa. Bahan

1.050 Kg Besi Presstressed Polos - - - 0.010 Kg Kawat Beton 18,700.00 187.00 187.00

187.00 187.00

b.Tenaga0.005 Oh Pekerja 44,000.00 220.00 220.000.005 Oh Tukang Besi 77,000.00 385.00 385.00

0.0005 Oh Kepala Tukang 99,000.00 49.50 49.500.0003 Oh Mandor 104,500.00 31.35 31.35

685.85 685.85

Jumlah

7.20a. Bahan

0.040 Kayu Kls. IV 1,210,000.00 48,400.00 48,400.00 0.300 Kg Paku Biasa 2"- 5" 18,150.00 5,445.00 5,445.00

53,845.00 53,845.00

b.Tenaga0.300 Oh Pekerja 44,000.00 13,200.00 13,200.000.260 Oh Tukang Kayu 77,000.00 20,020.00 20,020.000.026 Oh Kepala Tukang 99,000.00 2,574.00 2,574.000.005 Oh Mandor 104,500.00 522.50 522.50

36,316.50 36,316.50

Jumlah 53,845.00 36,316.50 90,161.50

7.21a. Bahan

0.045 Kayu Kls. IV 1,210,000.00 54,450.00 54,450.00 0.300 Kg Paku Biasa 2"- 5" 18,150.00 5,445.00 5,445.00

59,895.00 59,895.00

b.Tenaga

1 M3 Membuat Beton Tak Bertulang, 1 Pc : 1 Ps : 1 Split

M3

M3

1 M3 Membuat Beton Kedap Air dengan Strorox - 100

M3

M3

1 M2 Pasang Bekisting Untuk Pondasi

M3

1 M2 Pasang Bekisting Untuk Sloof

M3

Page 68: DrfatAnalisa2010 Smt Iok Palembang

Daftar Analisa Pekerjaan Kota Palembang TA. 2010 Semester I

- 68 -

U R A I A N

SATUAN HARGA NO. Harga Jumlah Harga Jumlah Jumlah

Analisa Satuan Bahan Tenaga Bahan+Tenaga(Rp) (Rp) (Rp) (Rp)

1 2 3 4 5 60.300 Oh Pekerja 44,000.00 13,200.00 13,200.000.260 Oh Tukang Kayu 77,000.00 20,020.00 20,020.000.026 Oh Kepala Tukang 99,000.00 2,574.00 2,574.000.005 Oh Mandor 104,500.00 522.50 522.50

36,316.50 36,316.50

Jumlah 59,895.00 36,316.50 96,211.50

7.22a. Bahan

0.040 Kayu Kls. IV 1,210,000.00 48,400.00 48,400.00 0.400 Kg Paku Biasa 2"- 5" 18,150.00 7,260.00 7,260.000.015 Balok Kayu Kls. IV 1,210,000.00 18,150.00 18,150.002.000 Btg Kayu Gelam dia. 6-8 cm 5,500.00 11,000.00 11,000.00

84,810.00 84,810.00b.Tenaga

0.300 Oh Pekerja 44,000.00 13,200.00 13,200.000.330 Oh Tukang Kayu 77,000.00 25,410.00 25,410.000.033 Oh Kepala Tukang 99,000.00 3,267.00 3,267.000.006 Oh Mandor 104,500.00 627.00 627.00

42,504.00 42,504.00

Jumlah 84,810.00 42,504.00 127,314.00

7.23a. Bahan

0.020 Kayu Kls. IV 1,210,000.00 24,200.00 24,200.00 0.500 Btg Hek 9,350.00 4,675.00 4,675.00 0.200 Kg Paku Biasa 2"- 5" 18,150.00 3,630.00 3,630.00

32,505.00 32,505.00b.Tenaga

0.150 Oh Pekerja 44,000.00 6,600.00 6,600.000.165 Oh Tukang Kayu 77,000.00 12,705.00 12,705.000.017 Oh Kepala Tukang 99,000.00 1,633.50 1,633.500.003 Oh Mandor 104,500.00 313.50 313.50

21,252.00 21,252.00

Jumlah 32,505.00 21,252.00 53,757.00

7.24a. Bahan

0.040 Kayu Kls. IV 1,210,000.00 48,400.00 48,400.00 0.400 Kg Paku Biasa 2"- 5" 18,150.00 7,260.00 7,260.000.018 Balok Kayu Kls. IV 1,210,000.00 21,780.00 21,780.002.000 Btg Kayu Gelam dia. 6-8 cm 5,500.00 11,000.00 11,000.00

88,440.00 88,440.00b.Tenaga

0.320 Oh Pekerja 44,000.00 14,080.00 14,080.000.330 Oh Tukang Kayu 77,000.00 25,410.00 25,410.000.033 Oh Kepala Tukang 99,000.00 3,267.00 3,267.000.006 Oh Mandor 104,500.00 627.00 627.00

43,384.00 43,384.00

Jumlah 88,440.00 43,384.00 131,824.00

7.25a. Bahan

0.020 Kayu Kls. IV 1,210,000.00 24,200.00 24,200.00 0.500 Btg Hek 9,350.00 4,675.00 4,675.00 2.000 Btg Kayu Gelam dia. 6-8 cm 5,500.00 11,000.00 11,000.000.200 Kg Paku Biasa 2"- 5" 18,150.00 3,630.00 3,630.00

43,505.00 43,505.00b.Tenaga

0.160 Oh Pekerja 44,000.00 7,040.00 7,040.000.165 Oh Tukang Kayu 77,000.00 12,705.00 12,705.000.017 Oh Kepala Tukang 99,000.00 1,633.50 1,633.500.003 Oh Mandor 104,500.00 313.50 313.50

21,692.00 21,692.00

Jumlah 43,505.00 21,692.00 65,197.00

7.26a. Bahan

0.040 Kayu Kls. IV 1,210,000.00 48,400.00 48,400.00 0.400 Kg Paku Biasa 2"- 5" 18,150.00 7,260.00 7,260.000.015 Balok Kayu Kls.IV 1,210,000.00 18,150.00 18,150.006.000 Btg Kayu Gelam dia. 6-8 cm 5,500.00 33,000.00 33,000.00

106,810.00 106,810.00b.Tenaga

0.320 Oh Pekerja 44,000.00 14,080.00 14,080.000.330 Oh Tukang Batu 77,000.00 25,410.00 25,410.000.033 Oh Kepala Tukang 99,000.00 3,267.00 3,267.000.006 Oh Mandor 104,500.00 627.00 627.00

43,384.00 43,384.00

1 M2 Pasang Bekisting Untuk Kolom (Untuk bangunan gedung)

M3

M3

1 M2 Pasang Bekisting Untuk Kolom (Jerambah Beton)

M3

1 M2 Pasang Bekisting Untuk Balok (Untuk bangunan gedung)

M3

M3

1 M2 Pasang Bekisting Untuk Balok (Jerambah Beton)

M3

1 M2 Pasang Bekisting Untuk Lantai, plat dak (untuk bangunan gedung)

M3

M3

Page 69: DrfatAnalisa2010 Smt Iok Palembang

Daftar Analisa Pekerjaan Kota Palembang TA. 2010 Semester I

- 69 -

U R A I A N

SATUAN HARGA NO. Harga Jumlah Harga Jumlah Jumlah

Analisa Satuan Bahan Tenaga Bahan+Tenaga(Rp) (Rp) (Rp) (Rp)

1 2 3 4 5 6Jumlah 106,810.00 43,384.00 150,194.00

7.27a. Bahan

1.500 Kpg Papan Kayu Kls IV 16,500.00 24,750.00 24,750.00 0.200 Kg Paku Biasa 2"- 5" 18,150.00 3,630.00 3,630.002.000 Btg Kayu Gelam dia. 6-8 cm 5,500.00 11,000.00 11,000.00

39,380.00 39,380.00b.Tenaga

0.320 Oh Pekerja 44,000.00 14,080.00 14,080.000.330 Oh Tukang Batu 77,000.00 25,410.00 25,410.000.033 Oh Kepala Tukang 99,000.00 3,267.00 3,267.000.006 Oh Mandor 104,500.00 627.00 627.00

43,384.00 43,384.00

Jumlah 39,380.00 43,384.00 82,764.00

7.28a. Bahan

0.030 Kayu Kls. IV 1,210,000.00 36,300.00 36,300.00 0.400 Kg Paku Biasa 2"- 5" 18,150.00 7,260.00 7,260.000.020 Balok Kayu Kls.IV 1,210,000.00 24,200.00 24,200.003.000 Btg Kayu Gelam dia. 6-8 cm 5,500.00 16,500.00 16,500.004.000 Bh Formtie / Penjaga Jarak Bekisting / Spacer 0.00 0.00 0.00

84,260.00 84,260.00

b.Tenaga0.320 Oh Pekerja 44,000.00 14,080.00 14,080.000.330 Oh Tukang Kayu 77,000.00 25,410.00 25,410.000.033 Oh Kepala Tukang 99,000.00 3,267.00 3,267.000.006 Oh Mandor 104,500.00 627.00 627.00

43,384.00 43,384.00

Jumlah 84,260.00 43,384.00 127,644.00

7.29a. Bahan

0.030 Kayu Kls. IV 1,210,000.00 36,300.00 36,300.00 0.400 Kg Paku Biasa 2"- 5" 18,150.00 7,260.00 7,260.000.015 Balok Kayu Kls. IV 1,210,000.00 18,150.00 18,150.00

2 Btg Kayu Gelam dia. 6-8 cm 5,500.00 11,000.00 11,000.0072,710.00 72,710.00

b.Tenaga0.320 Oh Pekerja 44,000.00 14,080.00 14,080.000.330 Oh Tukang Kayu 77,000.00 25,410.00 25,410.000.033 Oh Kepala Tukang 99,000.00 3,267.00 3,267.000.006 Oh Mandor 104,500.00 627.00 627.00

43,384.00 43,384.00Jumlah 72,710.00 43,384.00 116,094.00

7.30a. Bahan

1.1 M3 Beton Ready Mix K 175 689,333.33 758,266.67 758,266.67758,266.67 758,266.67

b.Tenaga2 Oh Pekerja 44,000.00 88,000.00 88,000.00

0.1667 Oh Tukang batu 77,000.00 12,835.90 12,835.900.00167 Oh Kepala Tukang 99,000.00 165.03 165.03

0.050 Oh Mandor 104,500.00 5,225.00 5,225.001 Ls Pengangkutan dan mobilisasi mobil Pick up 14,666.66 14,666.66 14,666.66

120,892.59 120,892.59

Jumlah 758,266.67 120,892.59 879,159.26

7.31a. Bahan

1.1 M3 Beton Ready Mix K 175 689,333.33 758,266.67 758,266.67758,266.67 758,266.67

b.Tenaga2 Oh Pekerja 44,000.00 88,000.00 88,000.00

0.1667 Oh Tukang batu 77,000.00 12,835.90 12,835.900.00167 Oh Kepala Tukang 99,000.00 165.03 165.03

0.050 Oh Mandor 104,500.00 5,225.00 5,225.00106,225.93 106,225.93

Jumlah 758,266.67 106,225.93 864,492.60

7.32a. Bahan

1.1 M3 Beton Ready Mix K 225 723,250.00 795,575.00 795,575.00795,575.00 795,575.00

b.Tenaga2 Oh Pekerja 44,000.00 88,000.00 88,000.00

0.1667 Oh Tukang batu 77,000.00 12,835.90 12,835.900.00167 Oh Kepala Tukang 99,000.00 165.03 165.03

0.050 Oh Mandor 104,500.00 5,225.00 5,225.001 Ls Pengangkutan dan mobilisasi mobil Pick up 14,666.66 14,666.66 14,666.66

1 M2 Pasang Bekisting Untuk Lantai ( jerambah beton)

1 M2 Pasang Bekisting Untuk Dinding

M3

M3

1 M2 Pasang Bekisting Untuk Tangga

M3

M3

1 M3 Beton Ready Mix K 175 dengan pengangkutan

1 M3 Beton Ready Mix K 175 tanpa pengangkutan

1 M3 Beton Ready Mix K 225 dengan pengangkutan

Page 70: DrfatAnalisa2010 Smt Iok Palembang

Daftar Analisa Pekerjaan Kota Palembang TA. 2010 Semester I

- 70 -

U R A I A N

SATUAN HARGA NO. Harga Jumlah Harga Jumlah Jumlah

Analisa Satuan Bahan Tenaga Bahan+Tenaga(Rp) (Rp) (Rp) (Rp)

1 2 3 4 5 6120,892.59 120,892.59

Jumlah 795,575.00 120,892.59 916,467.59

7.33a. Bahan

1.1 M3 Beton Ready Mix K 225 723,250.00 795,575.00 795,575.00795,575.00 795,575.00

b.Tenaga2 Oh Pekerja 44,000.00 88,000.00 88,000.00

0.1667 Oh Tukang batu 77,000.00 12,835.90 12,835.900.00167 Oh Kepala Tukang 99,000.00 165.03 165.03

0.050 Oh Mandor 104,500.00 5,225.00 5,225.00106,225.93 106,225.93

Jumlah 795,575.00 106,225.93 901,800.93

7.34a. Bahan

1.1 M3 Beton Ready Mix K 250 745,250.00 819,775.00 819,775.00819,775.00 819,775.00

b.Tenaga2 Oh Pekerja 44,000.00 88,000.00 88,000.00

0.1667 Oh Tukang batu 77,000.00 12,835.90 12,835.900.00167 Oh Kepala Tukang 99,000.00 165.03 165.03

0.050 Oh Mandor 104,500.00 5,225.00 5,225.001 Ls Pengangkutan dan mobilisasi mobil Pick up 14,666.66 14,666.66 14,666.66

120,892.59 120,892.59

Jumlah 819,775.00 120,892.59 940,667.59

7.35a. Bahan

1.1 M3 Beton Ready Mix K 250 745,250.00 819,775.00 819,775.00819,775.00 819,775.00

b.Tenaga2 Oh Pekerja 44,000.00 88,000.00 88,000.00

0.1667 Oh Tukang batu 77,000.00 12,835.90 12,835.900.00167 Oh Kepala Tukang 99,000.00 165.03 165.03

0.050 Oh Mandor 104,500.00 5,225.00 5,225.00106,225.93 106,225.93

Jumlah 819,775.00 106,225.93 926,000.937.36

a. Bahan1.1 M3 Beton Ready Mix K 275 779,166.67 857,083.33 857,083.33

857,083.33 857,083.33

b.Tenaga2 Oh Pekerja 44,000.00 88,000.00 88,000.00

0.1667 Oh Tukang batu 77,000.00 12,835.90 12,835.900.00167 Oh Kepala Tukang 99,000.00 165.03 165.03

0.050 Oh Mandor 104,500.00 5,225.00 5,225.001 Ls Pengangkutan dan mobilisasi mobil Pick up 14,666.66 14,666.66 14,666.66

120,892.59 120,892.59

Jumlah 857,083.33 120,892.59 977,975.93

7.37a. Bahan

1.1 M3 Beton Ready Mix K 275 779,166.67 857,083.33 857,083.33857,083.33 857,083.33

b.Tenaga2 Oh Pekerja 44,000.00 88,000.00 88,000.00

0.1667 Oh Tukang batu 77,000.00 12,835.90 12,835.900.00167 Oh Kepala Tukang 99,000.00 165.03 165.03

0.050 Oh Mandor 104,500.00 5,225.00 5,225.00106,225.93 106,225.93

Jumlah 857,083.33 106,225.93 963,309.27

7.38a. Bahan

1.1 M3 Beton Ready Mix K 300 800,250.00 880,275.00 880,275.00880,275.00 880,275.00

b.Tenaga2 Oh Pekerja 44,000.00 88,000.00 88,000.00

0.1667 Oh Tukang batu 77,000.00 12,835.90 12,835.900.00167 Oh Kepala Tukang 99,000.00 165.03 165.03

0.050 Oh Mandor 104,500.00 5,225.00 5,225.001 Ls Pengangkutan dan mobilisasi mobil Pick up 14,666.66 14,666.66 14,666.66

120,892.59 120,892.59

Jumlah 880,275.00 120,892.59 1,001,167.59

1 M3 Beton Ready Mix K 225 tanpa pengangkutan

1 M3 Beton Ready Mix K 250 dengan pengangkutan

1 M3 Beton Ready Mix K 250 tanpa pengangkutan

1 M3 Beton Ready Mix K 275 dengan pengangkutan

1 M3 Beton Ready Mix K 275 tanpa pengangkutan

1 M3 Beton Ready Mix K 300 dengan pengangkutan

Page 71: DrfatAnalisa2010 Smt Iok Palembang

Daftar Analisa Pekerjaan Kota Palembang TA. 2010 Semester I

- 71 -

U R A I A N

SATUAN HARGA NO. Harga Jumlah Harga Jumlah Jumlah

Analisa Satuan Bahan Tenaga Bahan+Tenaga(Rp) (Rp) (Rp) (Rp)

1 2 3 4 5 6

7.39a. Bahan

1.1 M3 Beton Ready Mix K 300 800,250.00 880,275.00 880,275.00880,275.00 880,275.00

b.Tenaga2 Oh Pekerja 44,000.00 88,000.00 88,000.00

0.1667 Oh Tukang batu 77,000.00 12,835.90 12,835.900.00167 Oh Kepala Tukang 99,000.00 165.03 165.03

0.050 Oh Mandor 104,500.00 5,225.00 5,225.00106,225.93 106,225.93

Jumlah 880,275.00 106,225.93 986,500.93

7.40a. Bahan

1.1 M3 Beton Ready Mix K 350 833,250.00 916,575.00 916,575.00916,575.00 916,575.00

b.Tenaga2 Oh Pekerja 44,000.00 88,000.00 88,000.00

0.1667 Oh Tukang batu 77,000.00 12,835.90 12,835.900.00167 Oh Kepala Tukang 99,000.00 165.03 165.03

0.050 Oh Mandor 104,500.00 5,225.00 5,225.001 Ls Pengangkutan dan mobilisasi mobil Pick up 14,666.66 14,666.66 14,666.66

120,892.59 120,892.59

Jumlah 916,575.00 120,892.59 1,037,467.59

7.41a. Bahan

1.1 M3 Beton Ready Mix K 350 833,250.00 916,575.00 916,575.00916,575.00 916,575.00

b.Tenaga2 Oh Pekerja 44,000.00 88,000.00 88,000.00

0.1667 Oh Tukang batu 77,000.00 12,835.90 12,835.900.00167 Oh Kepala Tukang 99,000.00 165.03 165.03

0.050 Oh Mandor 104,500.00 5,225.00 5,225.00106,225.93 106,225.93

Jumlah 916,575.00 106,225.93 1,022,800.93

7.42 1 M' Pasang Kayu Mal Bekisting untuk Beton Ready Mix jalan a. Bahan

0.5 Kpg Papan Kayu Kls. IV 16,500.00 8,250.00 8,250.000.200 Kg Paku Biasa 2"- 5" 18,150.00 3,630.00 3,630.000.009 Balok Kayu Kls. IV 1,210,000.00 10,890.00 10,890.00

22,770.00 22,770.00

b.Tenaga0.160 Oh Pekerja 44,000.00 7,040.00 7,040.000.165 Oh Tukang Kayu 77,000.00 12,705.00 12,705.00

0.0165 Oh Kepala Tukang 99,000.00 1,633.50 1,633.500.003 Oh Mandor 104,500.00 313.50 313.50

21,692.00 21,692.00

Jumlah 22,770.00 21,692.00 44,462.00

7.43a. Bahan

388 Kg Semen Portland 2,200.00 853,600.00 853,600.000.650 Pasir Beton 82,500.00 53,625.00 53,625.000.650 Koral Beton 220,000.00 143,000.00 143,000.00

1,050,225.00 1,050,225.00b.Tenaga

6 Oh Pekerja 44,000.00 264,000.00 264,000.001 Oh Tukang Batu 77,000.00 0.166667 77,000.00 77,000.00

0.100 Oh Kepala Tukang 99,000.00 0.016667 9,900.00 9,900.000.300 Oh Mandor 104,500.00 0.0500 31,350.00 31,350.00

382,250.00 382,250.00

Jumlah 1,050,225.00 382,250.00 1,432,475.00

7.44a. Bahan

400 Kg Semen Portland 2,200.00 880,000.00 880,000.000.400 Pasir Beton 82,500.00 33,000.00 33,000.000.820 Koral Beton 220,000.00 180,400.00 180,400.00

1,093,400.00 1,093,400.00b.Tenaga

6 Oh Pekerja 44,000.00 264,000.00 264,000.001 Oh Tukang Batu 77,000.00 77,000.00 77,000.00

0.100 Oh Kepala Tukang 99,000.00 9,900.00 9,900.000.300 Oh Mandor 104,500.00 31,350.00 31,350.00

1 M3 Beton Ready Mix K 300 tanpa pengangkutan

1 M3 Beton Ready Mix K 350 dengan pengangkutan

1 M3 Beton Ready Mix K 350 tanpa pengangkutan

M3

1 M3 Membuat Beton dengan Mutu K 225

M3

M3

1 M3 Membuat Beton dengan Mutu K 275

M3

M3

Page 72: DrfatAnalisa2010 Smt Iok Palembang

Daftar Analisa Pekerjaan Kota Palembang TA. 2010 Semester I

- 72 -

U R A I A N

SATUAN HARGA NO. Harga Jumlah Harga Jumlah Jumlah

Analisa Satuan Bahan Tenaga Bahan+Tenaga(Rp) (Rp) (Rp) (Rp)

1 2 3 4 5 6382,250.00 382,250.00

Jumlah 1,093,400.00 382,250.00 1,475,650.00

7.45a. Bahan

0.0264 Kayu Kls. IV 1,210,000.00 31,944.00 31,944.00 0.600 Kg Paku Biasa 2"- 5" 18,150.00 10,890.00 10,890.000.500 Btg Kayu Gelam dia. 6-8 cm 5,500.00 2,750.00 2,750.00

45,584.00 45,584.00b.Tenaga

0.150 Oh Pekerja 44,000.00 6,600.00 6,600.000.050 Oh Tukang Kayu 77,000.00 3,850.00 3,850.000.005 Oh Kepala Tukang 99,000.00 495.00 495.000.007 Oh Mandor 104,500.00 731.50 731.50

11,676.50 11,676.50

Jumlah 45,584.00 11,676.50 57,260.50

7.46a. Bahan

0.200 Kayu Kls. IV 1,210,000.00 242,000.00 242,000.00 1.500 Kg Paku Biasa 2"- 5" 18,150.00 27,225.00 27,225.00

150 Kg Besi Beton Polos 11,550.00 1,732,500.00 1,732,500.002.250 Kg Kawat Beton 18,700.00 42,075.00 42,075.00

323 Kg Semen Portland 2,200.00 710,600.00 710,600.000.520 Pasir Beton 82,500.00 42,900.00 42,900.000.780 Koral Beton 220,000.00 171,600.00 171,600.00

2,968,900.00 2,968,900.00

b.Tenaga3.900 Oh Pekerja 44,000.00 171,600.00 171,600.000.350 Oh Tukang Batu 77,000.00 26,950.00 26,950.001.040 Oh Tukang Kayu 77,000.00 80,080.00 80,080.001.050 Oh Tukang Besi 77,000.00 80,850.00 80,850.000.245 Oh Kepala Tukang 99,000.00 24,255.00 24,255.000.165 Oh Mandor 104,500.00 17,242.50 17,242.50

400,977.50 400,977.50

Jumlah 2,968,900.00 400,977.50 3,369,877.50

7.47a. Bahan

0.270 Kayu Kls. IV 1,210,000.00 326,700.00 326,700.00 2.000 Kg Paku Biasa 2"- 5" 18,150.00 36,300.00 36,300.00

200 Kg Besi Beton Polos 11,550.00 2,310,000.00 2,310,000.003.000 Kg Kawat Beton 18,700.00 56,100.00 56,100.00

323 Kg Semen Portland 2,200.00 710,600.00 710,600.000.520 Pasir Beton 82,500.00 42,900.00 42,900.000.780 Koral Beton 220,000.00 171,600.00 171,600.00

3,654,200.00 3,654,200.00b.Tenaga

4.850 Oh Pekerja 44,000.00 213,400.00 213,400.000.350 Oh Tukang Batu 77,000.00 26,950.00 26,950.001.560 Oh Tukang Kayu 77,000.00 120,120.00 120,120.001.400 Oh Tukang Besi 77,000.00 107,800.00 107,800.000.331 Oh Kepala Tukang 99,000.00 32,769.00 32,769.000.170 Oh Mandor 104,500.00 17,765.00 17,765.00

518,804.00 518,804.00

Jumlah 3,654,200.00 518,804.00 4,173,004.00

7.48a. Bahan

0.400 Kayu Kls. IV 1,210,000.00 484,000.00 484,000.00 4.000 Kg Paku Biasa 2"- 5" 18,150.00 72,600.00 72,600.00

300 Kg Besi Beton Polos 11,550.00 3,465,000.00 3,465,000.004.500 Kg Kawat Beton 18,700.00 84,150.00 84,150.00

323 Kg Semen Portland 2,200.00 710,600.00 710,600.000.520 Pasir Beton 82,500.00 42,900.00 42,900.000.780 Koral Beton 220,000.00 171,600.00 171,600.000.150 Kayu Balok Kls. IV 1,210,000.00 181,500.00 181,500.00

20 Btg Kayu Gelam dia. 6-8 cm 5,500.00 110,000.00 110,000.005,322,350.00 5,322,350.00

b.Tenaga7.300 Oh Pekerja 44,000.00 321,200.00 321,200.000.350 Oh Tukang Batu 77,000.00 26,950.00 26,950.003.300 Oh Tukang Kayu 77,000.00 254,100.00 254,100.002.100 Oh Tukang Besi 77,000.00 161,700.00 161,700.000.570 Oh Kepala Tukang 99,000.00 56,430.00 56,430.000.250 Oh Mandor 104,500.00 26,125.00 26,125.00

846,505.00 846,505.00

Jumlah 5,322,350.00 846,505.00 6,168,855.00

1 M2 Pasang Jembatan Cor

M3

1 M3 Membuat Pondasi Beton Bertulang ( 150 Kg Besi + Bekisting )

M3

M3

M3

1 M3 Membuat Sloof Beton Bertulang ( 200 Kg Besi + Bekisting )

M3

M3

M3

1 M3 Membuat Kolom Beton Bertulang ( 300 Kg Besi + Bekisting )

M3

M3

M3

M3

Page 73: DrfatAnalisa2010 Smt Iok Palembang

Daftar Analisa Pekerjaan Kota Palembang TA. 2010 Semester I

- 73 -

U R A I A N

SATUAN HARGA NO. Harga Jumlah Harga Jumlah Jumlah

Analisa Satuan Bahan Tenaga Bahan+Tenaga(Rp) (Rp) (Rp) (Rp)

1 2 3 4 5 6

7.49a. Bahan

0.400 Kayu Kls. IV 1,210,000.00 484,000.00 484,000.00 4.000 Kg Paku Biasa 2"- 5" 18,150.00 72,600.00 72,600.00

200 Kg Besi Beton Polos 11,550.00 2,310,000.00 2,310,000.004.500 Kg Kawat Beton 18,700.00 84,150.00 84,150.00

232 Kg Semen Portland 2,200.00 510,400.00 510,400.000.520 Pasir Beton 82,500.00 42,900.00 42,900.000.780 Koral Beton 220,000.00 171,600.00 171,600.000.150 Kayu Balok Kls. IV 1,210,000.00 181,500.00 181,500.00

20 Btg Kayu Gelam dia. 6-8 cm 5,500.00 110,000.00 110,000.003,967,150.00 3,967,150.00

b.Tenaga7.300 Oh Pekerja 44,000.00 321,200.00 321,200.000.350 Oh Tukang Batu 77,000.00 26,950.00 26,950.003.300 Oh Tukang Kayu 77,000.00 254,100.00 254,100.002.100 Oh Tukang Besi 77,000.00 161,700.00 161,700.000.570 Oh Kepala Tukang 99,000.00 56,430.00 56,430.000.250 Oh Mandor 104,500.00 26,125.00 26,125.00

846,505.00 846,505.00

Jumlah 3,967,150.00 846,505.00 4,813,655.00

7.50a. Bahan

0.400 Kayu Kls. IV 1,210,000.00 484,000.00 484,000.00 4.000 Kg Paku Biasa 2"- 5" 18,150.00 72,600.00 72,600.00

100 Kg Besi Beton Polos 11,550.00 1,155,000.00 1,155,000.004.500 Kg Kawat Beton 18,700.00 84,150.00 84,150.00

232 Kg Semen Portland 2,200.00 510,400.00 510,400.000.520 Pasir Beton 82,500.00 42,900.00 42,900.000.780 Koral Beton 220,000.00 171,600.00 171,600.000.150 Kayu Balok Kls. IV 1,210,000.00 181,500.00 181,500.00

20 Btg Kayu Gelam dia. 6-8 cm 5,500.00 110,000.00 110,000.002,812,150.00 2,812,150.00

b.Tenaga7.300 Oh Pekerja 44,000.00 321,200.00 321,200.000.350 Oh Tukang Batu 77,000.00 26,950.00 26,950.003.300 Oh Tukang Kayu 77,000.00 254,100.00 254,100.002.100 Oh Tukang Besi 77,000.00 161,700.00 161,700.000.570 Oh Kepala Tukang 99,000.00 56,430.00 56,430.000.250 Oh Mandor 104,500.00 26,125.00 26,125.00

846,505.00 846,505.00Jumlah 2,812,150.00 846,505.00 3,658,655.00

7.51a. Bahan

0.320 Kayu Kls. IV 1,210,000.00 387,200.00 387,200.00 3.200 Kg Paku Biasa 2"- 5" 18,150.00 58,080.00 58,080.00

200 Kg Besi Beton Polos 11,550.00 2,310,000.00 2,310,000.003 Kg Kawat Beton 18,700.00 56,100.00 56,100.00

232 Kg Semen Portland 2,200.00 510,400.00 510,400.000.520 Pasir Beton 82,500.00 42,900.00 42,900.000.780 Koral Beton 220,000.00 171,600.00 171,600.000.140 Kayu Balok Kls. IV 1,210,000.00 169,400.00 169,400.00

16 Btg Kayu Gelam dia. 6-8 cm 5,500.00 88,000.00 88,000.003,793,680.00 3,793,680.00

b.Tenaga5.960 Oh Pekerja 44,000.00 262,240.00 262,240.000.350 Oh Tukang Batu 77,000.00 26,950.00 26,950.002.800 Oh Tukang Kayu 77,000.00 215,600.00 215,600.001.400 Oh Tukang Besi 77,000.00 107,800.00 107,800.000.455 Oh Kepala Tukang 99,000.00 45,045.00 45,045.000.208 Oh Mandor 104,500.00 21,736.00 21,736.00

679,371.00 679,371.00

Jumlah 3,793,680.00 679,371.00 4,473,051.00

7.52a. Bahan

0.320 Kayu Kls. IV 1,210,000.00 387,200.00 387,200.00 3.200 Kg Paku Biasa 2"- 5" 18,150.00 58,080.00 58,080.00

150 Kg Besi Beton Polos 11,550.00 1,732,500.00 1,732,500.002.250 Kg Kawat Beton 18,700.00 42,075.00 42,075.00

232 Kg Semen Portland 2,200.00 510,400.00 510,400.000.520 Pasir Beton 82,500.00 42,900.00 42,900.000.780 Koral Beton 220,000.00 171,600.00 171,600.000.120 Kayu Balok Kls. IV 1,210,000.00 145,200.00 145,200.00

32 Btg Kayu Gelam dia. 6-8 cm 5,500.00 176,000.00 176,000.003,265,955.00 3,265,955.00

1 M3 Membuat Kolom Beton Bertulang ( 200 Kg Besi + Bekisting )

M3

M3

M3

M3

1 M3 Membuat Kolom Beton Bertulang ( 100 Kg Besi + Bekisting )

M3

M3

M3

M3

1 M3 Membuat Balok Beton Bertulang ( 200 Kg Besi + Bekisting )

M3

M3

M3

M3

1 M3 Membuat Balok Beton Bertulang ( 150 Kg Besi + Bekisting )

M3

M3

M3

M3

Page 74: DrfatAnalisa2010 Smt Iok Palembang

Daftar Analisa Pekerjaan Kota Palembang TA. 2010 Semester I

- 74 -

U R A I A N

SATUAN HARGA NO. Harga Jumlah Harga Jumlah Jumlah

Analisa Satuan Bahan Tenaga Bahan+Tenaga(Rp) (Rp) (Rp) (Rp)

1 2 3 4 5 6

b.Tenaga5.800 Oh Pekerja 44,000.00 255,200.00 255,200.000.350 Oh Tukang Batu 77,000.00 26,950.00 26,950.002.800 Oh Tukang Kayu 77,000.00 215,600.00 215,600.001.050 Oh Tukang Besi 77,000.00 80,850.00 80,850.000.420 Oh Kepala Tukang 99,000.00 41,580.00 41,580.000.185 Oh Mandor 104,500.00 19,332.50 19,332.50

639,512.50 639,512.50

Jumlah 3,265,955.00 639,512.50 3,905,467.50

7.53a. Bahan

0.320 Kayu Kls. IV 1,210,000.00 387,200.00 387,200.00 3.200 Kg Paku Biasa 2"- 5" 18,150.00 58,080.00 58,080.00

110 Kg Besi Beton Polos 11,550.00 1,270,500.00 1,270,500.002.250 Kg Kawat Beton 18,700.00 42,075.00 42,075.00

232 Kg Semen Portland 2,200.00 510,400.00 510,400.000.520 Pasir Beton 82,500.00 42,900.00 42,900.000.780 Koral Beton 220,000.00 171,600.00 171,600.000.120 Kayu Balok Kls. IV 1,210,000.00 145,200.00 145,200.00

32 Btg Kayu Gelam dia. 6-8 cm 5,500.00 176,000.00 176,000.002,803,955.00 2,803,955.00

b.Tenaga5.800 Oh Pekerja 44,000.00 255,200.00 255,200.000.350 Oh Tukang Batu 77,000.00 26,950.00 26,950.002.800 Oh Tukang Kayu 77,000.00 215,600.00 215,600.001.050 Oh Tukang Besi 77,000.00 80,850.00 80,850.000.420 Oh Kepala Tukang 99,000.00 41,580.00 41,580.000.185 Oh Mandor 104,500.00 19,332.50 19,332.50

639,512.50 639,512.50

Jumlah 2,803,955.00 639,512.50 3,443,467.50

7.54a. Bahan

0.240 Kayu Kls. IV 1,210,000.00 290,400.00 290,400.00 3.200 Kg Paku Biasa 2"- 5" 18,150.00 58,080.00 58,080.00

150.000 Kg Besi Beton Polos 11,550.00 1,732,500.00 1,732,500.002.250 Kg Kawat Beton 18,700.00 42,075.00 42,075.00

232.000 Kg Semen Portland 2,200.00 510,400.00 510,400.000.520 Pasir Beton 82,500.00 42,900.00 42,900.000.780 Koral Beton 220,000.00 171,600.00 171,600.000.160 Kayu Balok Kls. IV 1,210,000.00 193,600.00 193,600.00

24.000 Btg Kayu Gelam dia. 6-8 cm 5,500.00 132,000.00 132,000.003,173,555.00 3,173,555.00

b.Tenaga5.600 Oh Pekerja 44,000.00 246,400.00 246,400.000.350 Oh Tukang Batu 77,000.00 26,950.00 26,950.002.640 Oh Tukang Kayu 77,000.00 203,280.00 203,280.001.050 Oh Tukang Besi 77,000.00 80,850.00 80,850.000.400 Oh Kepala Tukang 99,000.00 39,600.00 39,600.000.193 Oh Mandor 104,500.00 20,168.50 20,168.50

617,248.50 617,248.50

Jumlah 3,173,555.00 617,248.50 3,790,803.50

7.55a. Bahan

0.120 Kayu Kls. IV 1,210,000.00 145,200.00 145,200.00 3.200 Kg Paku Biasa 2"- 5" 18,150.00 58,080.00 58,080.00

100.000 Kg Besi Beton Polos 11,550.00 1,155,000.00 1,155,000.001.250 Kg Kawat Beton 18,700.00 23,375.00 23,375.00

232.000 Kg Semen Portland 2,200.00 510,400.00 510,400.000.520 Pasir Beton 82,500.00 42,900.00 42,900.000.780 Koral Beton 220,000.00 171,600.00 171,600.00

2,106,555.00 2,106,555.00

b.Tenaga5.600 Oh Pekerja 83,600.00 468,160.00 468,160.000.350 Oh Tukang Batu 42,900.00 15,015.00 15,015.002.640 Oh Tukang Kayu 42,900.00 113,256.00 113,256.001.050 Oh Tukang Besi 42,900.00 45,045.00 45,045.000.400 Oh Kepala Tukang 6,600.00 2,640.00 2,640.000.193 Oh Mandor 55,000.00 10,615.00 10,615.00

654,731.00 654,731.00

Jumlah 2,106,555.00 654,731.00 2,761,286.00

7.56a. Bahan

0.250 Kayu Kls. IV 1,210,000.00 302,500.00 302,500.00

1 M3 Membuat Balok Beton Bertulang ( 100 Kg Besi + Bekisting )

M3

M3

M3

M3

1 M3 Membuat Dinding Beton Bertulang ( 150 Kg Besi + Bekisting )

M3

M3

M3

M3

1 M3 Membuat 1/2 Dinding Beton Bertulang ( 100 Kg Besi + Bekisting)

M3

M3

M3

1 M3 Membuat Tangga Beton Bertulang ( 200 Kg Besi + Bekisting )

M3

Page 75: DrfatAnalisa2010 Smt Iok Palembang

Daftar Analisa Pekerjaan Kota Palembang TA. 2010 Semester I

- 75 -

U R A I A N

SATUAN HARGA NO. Harga Jumlah Harga Jumlah Jumlah

Analisa Satuan Bahan Tenaga Bahan+Tenaga(Rp) (Rp) (Rp) (Rp)

1 2 3 4 5 63.000 Kg Paku Biasa 2"- 5" 18,150.00 54,450.00 54,450.00

200.000 Kg Besi Beton Polos 11,550.00 2,310,000.00 2,310,000.003.000 Kg Kawat Beton 18,700.00 56,100.00 56,100.00

232.000 Kg Semen Portland 2,200.00 510,400.00 510,400.000.520 Pasir Beton 82,500.00 42,900.00 42,900.000.780 Koral Beton 220,000.00 171,600.00 171,600.000.105 Kayu Balok Kls. IV 1,210,000.00 127,050.00 127,050.00

14.000 Btg Kayu Gelam dia. 6-8 cm 5,500.00 77,000.00 77,000.003,652,000.00 3,652,000.00

b.Tenaga5.600 Oh Pekerja 44,000.00 246,400.00 246,400.000.350 Oh Tukang Batu 77,000.00 26,950.00 26,950.002.300 Oh Tukang Kayu 77,000.00 177,100.00 177,100.001.400 Oh Tukang Besi 77,000.00 107,800.00 107,800.000.405 Oh Kepala Tukang 99,000.00 40,095.00 40,095.000.202 Oh Mandor 104,500.00 21,109.00 21,109.00

619,454.00 619,454.00

Jumlah 3,652,000.00 619,454.00 4,271,454.00

7.57 1 M' Membuat Kolom Penguat Beton Bertulang ( 11 x 11 ) cm + bekisting (kolom praktis)a. Bahan

0.002 Kayu Kls. IV 1,210,000.00 2,420.00 2,420.00 0.010 Kg Paku Biasa 2"- 5" 18,150.00 181.50 181.503.000 Kg Besi Beton Polos 11,550.00 34,650.00 34,650.000.450 Kg Kawat Beton 18,700.00 8,415.00 8,415.004.000 Kg Semen Portland 2,200.00 8,800.00 8,800.000.006 Pasir Beton 82,500.00 495.00 495.000.009 Koral Beton 220,000.00 1,980.00 1,980.00

56,941.50 56,941.50b.Tenaga

0.060 Oh Pekerja 44,000.00 2,640.00 2,640.000.020 Oh Tukang Batu 77,000.00 1,540.00 1,540.000.020 Oh Tukang Kayu 77,000.00 1,540.00 1,540.000.020 Oh Tukang Besi 77,000.00 1,540.00 1,540.000.006 Oh Kepala Tukang 99,000.00 594.00 594.000.003 Oh Mandor 104,500.00 313.50 313.50

8,167.50 8,167.50

Jumlah 56,941.50 8,167.50 65,109.00

7.58 1 M' Membuat Ring Balok Beton Bertulang ( 10 x 15 ) cma. Bahan

0.003 Kayu Kls. IV 1,210,000.00 3,630.00 3,630.00 0.020 Kg Paku Biasa 2"- 5" 18,150.00 363.00 363.003.600 Kg Besi Beton Polos 11,550.00 41,580.00 41,580.000.050 Kg Kawat Beton 18,700.00 935.00 935.005.500 Kg Semen Portland 2,200.00 12,100.00 12,100.000.009 Pasir Beton 82,500.00 742.50 742.500.015 Koral Beton 220,000.00 3,300.00 3,300.00

62,650.50 62,650.50b.Tenaga

0.100 Oh Pekerja 44,000.00 4,400.00 4,400.000.033 Oh Tukang Batu 77,000.00 2,541.00 2,541.000.033 Oh Tukang Kayu 77,000.00 2,541.00 2,541.000.033 Oh Tukang Besi 77,000.00 2,541.00 2,541.000.010 Oh Kepala Tukang 99,000.00 990.00 990.000.005 Oh Mandor 104,500.00 522.50 522.50

13,535.50 13,535.50Jumlah 62,650.50 13,535.50 76,186.00

7.59a. Bahan

0.040 Kayu Kls. IV 1,210,000.00 48,400.00 48,400.00 0.400 Kg Paku Biasa 2"- 5" 18,150.00 7,260.00 7,260.000.015 Balok Kayu Kls.IV 1,210,000.00 18,150.00 18,150.000.350 Lbr Plywood 4 mm 61,600.00 21,560.00 21,560.006.000 Btg Kayu Gelam dia. 6-8 cm 5,500.00 33,000.00 33,000.00

128,370.00 128,370.00

b.Tenaga0.320 Oh Pekerja 44,000.00 14,080.00 14,080.000.330 Oh Tukang Batu 77,000.00 25,410.00 25,410.000.033 Oh Kepala Tukang 99,000.00 3,267.00 3,267.000.006 Oh Mandor 104,500.00 627.00 627.00

43,384.00 43,384.00

Jumlah 128,370.00 43,384.00 171,754.00

7.60a. Bahan

1.020 Beton Ready Mix K-175 689,333.33 703,120.00 703,120.00703,120.00 703,120.00

b.Tenaga2 Oh Pekerja 44,000.00 88,000.00 88,000.00

M3

M3

M3

M3

M3

M3

M3

M3

M3

1 M2 Pasang Bekisting Untuk Lantai, plat dak dengan plywood 4 mm

M3

M3

1 M3 Beton Ready Mix K-175 untuk Kolom, Balok, Plat Lantai, tangga dengan Concrete Pump (belalai)

M3

Page 76: DrfatAnalisa2010 Smt Iok Palembang

Daftar Analisa Pekerjaan Kota Palembang TA. 2010 Semester I

- 76 -

U R A I A N

SATUAN HARGA NO. Harga Jumlah Harga Jumlah Jumlah

Analisa Satuan Bahan Tenaga Bahan+Tenaga(Rp) (Rp) (Rp) (Rp)

1 2 3 4 5 60.1667 Oh Tukang batu 77,000.00 12,835.90 12,835.90

0.00167 Oh Kepala Tukang 99,000.00 165.03 165.030.050 Oh Mandor 104,500.00 5,225.00 5,225.00

0.16667 Concrete Pump 206,250.00 34,375.69 34,375.69140,601.62 140,601.62

Jumlah 703,120.00 140,601.62 843,721.62

7.61a. Bahan

1.020 Beton Ready Mix K-175 689,333.33 703,120.00 703,120.00703,120.00 703,120.00

b.Tenaga2 Oh Pekerja 44,000.00 88,000.00 88,000.00

0.1667 Oh Tukang batu 77,000.00 12,835.90 12,835.900.00167 Oh Kepala Tukang 99,000.00 165.03 165.03

0.050 Oh Mandor 104,500.00 5,225.00 5,225.00106,225.93 106,225.93

Jumlah 703,120.00 106,225.93 809,345.93

7.62a. Bahan

1.020 Beton Ready Mix K-225 723,250.00 737,715.00 737,715.00737,715.00 737,715.00

b.Tenaga2 Oh Pekerja 44,000.00 88,000.00 88,000.00

0.1667 Oh Tukang batu 77,000.00 12,835.90 12,835.900.00167 Oh Kepala Tukang 99,000.00 165.03 165.03

0.050 Oh Mandor 104,500.00 5,225.00 5,225.000.16667 Concrete Pump 206,250.00 34,375.69 34,375.69

140,601.62 140,601.62

Jumlah 737,715.00 140,601.62 878,316.62

7.63a. Bahan

1.020 Beton Ready Mix K-225 723,250.00 737,715.00 737,715.00737,715.00 737,715.00

b.Tenaga2 Oh Pekerja 44,000.00 88,000.00 88,000.00

0.1667 Oh Tukang batu 77,000.00 12,835.90 12,835.900.00167 Oh Kepala Tukang 99,000.00 165.03 165.03

0.050 Oh Mandor 104,500.00 5,225.00 5,225.00106,225.93 106,225.93

Jumlah 737,715.00 106,225.93 843,940.93

7.64a. Bahan

1.020 Beton Ready Mix K-275 779,166.67 794,750.00 794,750.00794,750.00 794,750.00

b.Tenaga2 Oh Pekerja 44,000.00 88,000.00 88,000.00

0.1667 Oh Tukang batu 77,000.00 12,835.90 12,835.900.00167 Oh Kepala Tukang 99,000.00 165.03 165.03

0.050 Oh Mandor 104,500.00 5,225.00 5,225.000.16667 Concrete Pump 206,250.00 34,375.69 34,375.69

140,601.62 140,601.62

Jumlah 794,750.00 140,601.62 935,351.62

VIII PEKERJAAN PENUTUP ATAP

8.1a. Bahan

25.000 Bh Genteng Palentong 1,100.00 27,500.00 27,500.0027,500.00 27,500.00

b.Tenaga0.150 Oh Pekerja 44,000.00 6,600.00 6,600.000.075 Oh Tukang Kayu 77,000.00 5,775.00 5,775.000.008 Oh Kepala Tukang 99,000.00 792.00 792.000.008 Oh Mandor 104,500.00 836.00 836.00

14,003.00 14,003.00

Jumlah 27,500.00 14,003.00 41,503.00

8.2a. Bahan

M3

1 M3 Beton Ready Mix K-175 untuk Kolom, Balok, Plat Lantai, tangga tanpa Concrete Pump (belalai)

M3

1 M3 Beton Ready Mix K-225 untuk Kolom, Balok, Plat Lantai, tangga dengan Concrete Pump (belalai)

M3

M3

1 M3 Beton Ready Mix K-225 untuk Kolom, Balok, Plat Lantai, tangga tanpa Concrete Pump (belalai)

M3

1 M3 Beton Ready Mix K-275 untuk Kolom, Balok, Plat Lantai, tangga dengan Concrete Pump (belalai)

M3

M3

1 M2 Pasang Atap Genteng Palentong Kecil

1 M2 Pasang Atap Genteng Kodok

Page 77: DrfatAnalisa2010 Smt Iok Palembang

Daftar Analisa Pekerjaan Kota Palembang TA. 2010 Semester I

- 77 -

U R A I A N

SATUAN HARGA NO. Harga Jumlah Harga Jumlah Jumlah

Analisa Satuan Bahan Tenaga Bahan+Tenaga(Rp) (Rp) (Rp) (Rp)

1 2 3 4 5 625.000 Bh Genteng Kodok 2,750.00 68,750.00 68,750.00

68,750.00 68,750.00

b.Tenaga0.150 Oh Pekerja 44,000.00 6,600.00 6,600.000.075 Oh Tukang Kayu 77,000.00 5,775.00 5,775.000.008 Oh Kepala Tukang 99,000.00 792.00 792.000.008 Oh Mandor 104,500.00 836.00 836.00

14,003.00 14,003.00

Jumlah 68,750.00 14,003.00 82,753.00

8.3a. Bahan

18 Bh Genteng Keramik biasa/lokal 6,600.00 118,800.00 118,800.00118,800.00 118,800.00

b.Tenaga0.150 Oh Pekerja 44,000.00 6,600.00 6,600.000.075 Oh Tukang Kayu 77,000.00 5,775.00 5,775.000.008 Oh Kepala Tukang 99,000.00 792.00 792.000.008 Oh Mandor 104,500.00 836.00 836.00

14,003.00 14,003.00

Jumlah 118,800.00 14,003.00 132,803.00

8.4a. Bahan

15 Bh Genteng Keramik KIA Natural atau sejenis 8,250.00 123,750.00 123,750.00123,750.00 123,750.00

b.Tenaga0.150 Oh Pekerja 44,000.00 6,600.00 6,600.000.075 Oh Tukang Kayu 77,000.00 5,775.00 5,775.000.008 Oh Kepala Tukang 99,000.00 792.00 792.000.008 Oh Mandor 104,500.00 836.00 836.00

14,003.00 14,003.00

Jumlah 123,750.00 14,003.00 137,753.00

8.5a. Bahan

15 Bh Genteng Keramik KIA Warna atau sejenis 14,850.00 222,750.00 222,750.00222,750.00 222,750.00

b.Tenaga0.150 Oh Pekerja 44,000.00 6,600.00 6,600.000.075 Oh Tukang Kayu 77,000.00 5,775.00 5,775.000.008 Oh Kepala Tukang 99,000.00 792.00 792.000.008 Oh Mandor 104,500.00 836.00 836.00

14,003.00 14,003.00

Jumlah 222,750.00 14,003.00 236,753.00

8.6a. Bahan

12.000 Bh Genteng Palentong Super 1,347.50 16,170.00 16,170.0016,170.00 16,170.00

b.Tenaga0.150 Oh Pekerja 44,000.00 6,600.00 6,600.000.060 Oh Tukang Kayu 77,000.00 4,620.00 4,620.000.006 Oh Kepala Tukang 99,000.00 594.00 594.000.008 Oh Mandor 104,500.00 836.00 836.00

12,650.00 12,650.00

Jumlah 16,170.00 12,650.00 28,820.00

8.7 1 M' Pasang Bubung Genteng Kodoka. Bahan

5.000 Bh Genteng Bubung Kodok 2,062.50 10,312.50 10,312.508.000 Kg Semen Portland 2,200.00 17,600.00 17,600.000.032 Pasir Pasang 82,500.00 2,640.00 2,640.00

30,552.50 30,552.50b.Tenaga

0.400 Oh Pekerja 44,000.00 17,600.00 17,600.000.200 Oh Tukang Kayu 77,000.00 15,400.00 15,400.000.020 Oh Kepala Tukang 99,000.00 1,980.00 1,980.000.002 Oh Mandor 104,500.00 209.00 209.00

35,189.00 35,189.00

Jumlah 30,552.50 35,189.00 65,741.50

8.8 1 M' Pasang Bubung Genteng Keramik biasa berglazzura. Bahan

4.000 Bh Genteng Bubung Keramik lokal 7,150.00 28,600.00 28,600.008.000 Kg Semen Portland 2,200.00 17,600.00 17,600.00

1 M2 Pasang Atap Genteng keramik biasa bergalzur

1 M2 Pasang Atap Genteng keramik KIA Natural / sejenis

1 M2 Pasang Atap Genteng keramik KIA Berwarna / sejenis

1 M2 Pasang Atap Genteng Palentong Super / Besar

M3

Page 78: DrfatAnalisa2010 Smt Iok Palembang

Daftar Analisa Pekerjaan Kota Palembang TA. 2010 Semester I

- 78 -

U R A I A N

SATUAN HARGA NO. Harga Jumlah Harga Jumlah Jumlah

Analisa Satuan Bahan Tenaga Bahan+Tenaga(Rp) (Rp) (Rp) (Rp)

1 2 3 4 5 60.032 Pasir Pasang 82,500.00 2,640.00 2,640.00

48,840.00 48,840.00

b.Tenaga0.400 Oh Pekerja 44,000.00 17,600.00 17,600.000.200 Oh Tukang Kayu 77,000.00 15,400.00 15,400.000.020 Oh Kepala Tukang 99,000.00 1,980.00 1,980.000.002 Oh Mandor 104,500.00 209.00 209.00

35,189.00 35,189.00

Jumlah 48,840.00 35,189.00 84,029.00

8.9 1 M' Pasang Bubung Genteng Keramik KIA Natural atau sejenisa. Bahan

3.000 Bh Genteng Bubung Keramik KIA Natural atau sejenis 13,750.00 41,250.00 41,250.008.000 Kg Semen Portland 2,200.00 17,600.00 17,600.000.032 Pasir Pasang 82,500.00 2,640.00 2,640.00

61,490.00 61,490.00

b.Tenaga0.400 Oh Pekerja 44,000.00 17,600.00 17,600.000.200 Oh Tukang Kayu 77,000.00 15,400.00 15,400.000.020 Oh Kepala Tukang 99,000.00 1,980.00 1,980.000.002 Oh Mandor 104,500.00 209.00 209.00

35,189.00 35,189.00

Jumlah 61,490.00 35,189.00 96,679.00

8.10 1 M' Pasang Bubung Genteng Keramik KIA Warna atau sejenisa. Bahan

3.000 Bh Genteng Bubung Keramik KIA Warna atau sejenis 19,250.00 57,750.00 57,750.008.000 Kg Semen Portland 2,200.00 17,600.00 17,600.000.032 Pasir Pasang 82,500.00 2,640.00 2,640.00

77,990.00 77,990.00

b.Tenaga0.400 Oh Pekerja 44,000.00 17,600.00 17,600.000.200 Oh Tukang Kayu 77,000.00 15,400.00 15,400.000.020 Oh Kepala Tukang 99,000.00 1,980.00 1,980.000.002 Oh Mandor 104,500.00 209.00 209.00

35,189.00 35,189.00

Jumlah 77,990.00 35,189.00 113,179.00

8.11 1 M' Pasang Bubung Genteng Palentong Kecila. Bahan

5.000 Bh Genteng Bubung Palentong 2,090.00 10,450.00 10,450.008.000 Kg Semen Portland 2,200.00 17,600.00 17,600.000.032 Pasir Pasang 82,500.00 2,640.00 2,640.00

30,690.00 30,690.00

b.Tenaga0.400 Oh Pekerja 44,000.00 17,600.00 17,600.000.200 Oh Tukang Kayu 77,000.00 15,400.00 15,400.000.020 Oh Kepala Tukang 99,000.00 1,980.00 1,980.000.002 Oh Mandor 104,500.00 209.00 209.00

35,189.00 35,189.00

Jumlah 30,690.00 35,189.00 65,879.00

8.12 1 M' Pasang Bubung Genteng Palentong Besara. Bahan

4.000 Bh Genteng Bubung Palentong 2,750.00 11,000.00 11,000.008.000 Kg Semen Portland 2,200.00 17,600.00 17,600.000.032 Pasir Pasang 82,500.00 2,640.00 2,640.00

31,240.00 31,240.00

b.Tenaga0.400 Oh Pekerja 44,000.00 17,600.00 17,600.000.200 Oh Tukang Kayu 77,000.00 15,400.00 15,400.000.020 Oh Kepala Tukang 99,000.00 1,980.00 1,980.000.002 Oh Mandor 104,500.00 209.00 209.00

35,189.00 35,189.00

Jumlah 31,240.00 35,189.00 66,429.00

8.13a. Bahan

1.000 M2 Fiber warna Polycarbon 40,740.74 40,740.74 40,740.74 0.050 Kg 18,150.00 907.50 907.50

41,648.24 41,648.24

M3

M3

M3

M3

M3

1 M2 Pasang Roof Light Fibreglass Polycarbon

Paku Biasa 1/2" - 1"

Page 79: DrfatAnalisa2010 Smt Iok Palembang

Daftar Analisa Pekerjaan Kota Palembang TA. 2010 Semester I

- 79 -

U R A I A N

SATUAN HARGA NO. Harga Jumlah Harga Jumlah Jumlah

Analisa Satuan Bahan Tenaga Bahan+Tenaga(Rp) (Rp) (Rp) (Rp)

1 2 3 4 5 6b.Tenaga

0.140 Oh Pekerja 44,000.00 6,160.00 6,160.000.067 Oh Tukang Kayu 77,000.00 5,159.00 5,159.000.007 Oh Kepala Tukang 99,000.00 693.00 693.000.007 Oh Mandor 104,500.00 731.50 731.50

12,743.50 12,743.50

Jumlah 41,648.24 12,743.50 54,391.74

8.14a. Bahan

1.100 M2 Asbes Gelombang kecil lebar 80 cm 32,083.33 35,291.67 35,291.670.120 Kg Paku Pancing 19,800.00 2,376.00 2,376.00

37,667.67 37,667.67

b.Tenaga0.140 Oh Pekerja 44,000.00 6,160.00 6,160.000.067 Oh Tukang Kayu 77,000.00 5,159.00 5,159.000.007 Oh Kepala Tukang 99,000.00 693.00 693.000.007 Oh Mandor 104,500.00 731.50 731.50

12,743.50 12,743.50

Jumlah 37,667.67 12,743.50 50,411.17

8.15a. Bahan

1.100 M2 Asbes Gelombang kecil lebar 105 cm 33,255.75 36,581.33 36,581.330.120 Kg Paku Pancing 19,800.00 2,376.00 2,376.00

38,957.33 38,957.33

b.Tenaga0.140 Oh Pekerja 44,000.00 6,160.00 6,160.000.067 Oh Tukang Kayu 77,000.00 5,159.00 5,159.000.007 Oh Kepala Tukang 99,000.00 693.00 693.000.007 Oh Mandor 104,500.00 731.50 731.50

12,743.50 12,743.50

Jumlah 38,957.33 12,743.50 51,700.83

8.16a. Bahan

1.100 M2 Onduline gel. 75 X 200 cm 86,900.00 95,590.00 95,590.000.120 Kg Paku Pancing 19,800.00 2,376.00 2,376.00

97,966.00 97,966.00

b.Tenaga0.140 Oh Pekerja 44,000.00 6,160.00 6,160.000.067 Oh Tukang Kayu 77,000.00 5,159.00 5,159.000.007 Oh Kepala Tukang 99,000.00 693.00 693.000.007 Oh Mandor 104,500.00 731.50 731.50

12,743.50 12,743.50

Jumlah 97,966.00 12,743.50 110,709.50

8.17a. Bahan

1.100 M2 Asbes Gelombang besar lebar 105 cm 36,696.00 40,365.60 40,365.600.120 Kg Paku Pancing 19,800.00 2,376.00 2,376.00

42,741.60 42,741.60

b.Tenaga0.140 Oh Pekerja 44,000.00 6,160.00 6,160.000.067 Oh Tukang Kayu 77,000.00 5,159.00 5,159.000.007 Oh Kepala Tukang 99,000.00 693.00 693.000.007 Oh Mandor 104,500.00 731.50 731.50

12,743.50 12,743.50

Jumlah 42,741.60 12,743.50 55,485.10

8.18 1 M' Pasang Bubung/nok Asbes Gelombang kecila. Bahan

1.100 M' Bubung Asbes Gelombang Kecil 14,025.00 15,427.50 15,427.50 6.000 Bh Paku Asbes 522.50 3,135.00 3,135.00

18,562.50 18,562.50

b.Tenaga0.084 Oh Pekerja 44,000.00 3,696.00 3,696.000.125 Oh Tukang Kayu 77,000.00 9,625.00 9,625.000.013 Oh Kepala Tukang 99,000.00 1,287.00 1,287.000.004 Oh Mandor 104,500.00 418.00 418.00

15,026.00 15,026.00

Jumlah 18,562.50 15,026.00 33,588.50

1 M2 Pasang Atap Asbes Gelombang kecil lbr 0,8 tbl 4 mm

1 M2 Pasang Atap Asbes Gelombang kecil lbr 1,05 tbl 4 mm

1 M2 Pasang Atap Onduline

1 M2 Pasang Atap Asbes Gelombang besar lbr 1,05 tbl 4 mm

Page 80: DrfatAnalisa2010 Smt Iok Palembang

Daftar Analisa Pekerjaan Kota Palembang TA. 2010 Semester I

- 80 -

U R A I A N

SATUAN HARGA NO. Harga Jumlah Harga Jumlah Jumlah

Analisa Satuan Bahan Tenaga Bahan+Tenaga(Rp) (Rp) (Rp) (Rp)

1 2 3 4 5 68.19 1 M' Pasang Bubung/Nok Asbes Gelombang besar

a. Bahan1.100 M' Bubung Asbes Gelombang Besar 16,500.00 18,150.00 18,150.00 6.000 Bh Paku Asbes 522.50 3,135.00 3,135.00

21,285.00 21,285.00

b.Tenaga0.084 Oh Pekerja 44,000.00 3,696.00 3,696.000.125 Oh Tukang Kayu 77,000.00 9,625.00 9,625.000.013 Oh Kepala Tukang 99,000.00 1,287.00 1,287.000.004 Oh Mandor 104,500.00 418.00 418.00

15,026.00 15,026.00

Jumlah 21,285.00 15,026.00 36,311.00

8.20a. Bahan

17 Bh Genteng Beton Cisangkan 6,600.00 112,200.00 112,200.000.030 Kg Paku Biasa 2" - 5" 18,150.00 544.50 544.50

112,744.50 112,744.50

b.Tenaga0.200 Oh Pekerja 44,000.00 8,800.00 8,800.000.100 Oh Tukang Kayu 77,000.00 7,700.00 7,700.000.010 Oh Kepala Tukang 99,000.00 990.00 990.000.010 Oh Mandor 104,500.00 1,045.00 1,045.00

18,535.00 18,535.00

Jumlah 112,744.50 18,535.00 131,279.50

8.21a. Bahan

11 Bh Genteng Beton 4,125.00 45,375.00 45,375.000.030 Kg Paku Biasa 2" - 5" 18,150.00 544.50 544.50

45,919.50 45,919.50b.Tenaga

0.200 Oh Pekerja 44,000.00 8,800.00 8,800.000.100 Oh Tukang Kayu 77,000.00 7,700.00 7,700.000.010 Oh Kepala Tukang 99,000.00 990.00 990.000.010 Oh Mandor 104,500.00 1,045.00 1,045.00

18,535.00 18,535.00

Jumlah 45,919.50 18,535.00 64,454.50

8.22a. Bahan

1.020 M2 Genteng Metal 58,928.57 60,107.14 60,107.140.200 Kg Paku Biasa 2" - 5" 18,150.00 3,630.00 3,630.00

63,737.14 63,737.14

b.Tenaga0.200 Oh Pekerja 44,000.00 8,800.00 8,800.000.100 Oh Tukang Kayu 77,000.00 7,700.00 7,700.000.010 Oh Kepala Tukang 99,000.00 990.00 990.000.001 Oh Mandor 104,500.00 104.50 104.50

17,594.50 17,594.50

Jumlah 63,737.14 17,594.50 81,331.64

8.23a. Bahan

1.020 M2 Genteng Metal 151,785.71 154,821.43 154,821.430.200 Kg Paku Biasa 2" - 5" 18,150.00 3,630.00 3,630.00

158,451.43 158,451.43

b.Tenaga0.200 Oh Pekerja 44,000.00 8,800.00 8,800.000.100 Oh Tukang Kayu 77,000.00 7,700.00 7,700.000.010 Oh Kepala Tukang 99,000.00 990.00 990.000.001 Oh Mandor 104,500.00 104.50 104.50

17,594.50 17,594.50

Jumlah 158,451.43 17,594.50 176,045.93

8.24a. Bahan

1.020 M2 Genteng Metal Zincalume berpasir 175,714.29 179,228.57 179,228.570.200 Kg Paku Biasa 2" - 5" 18,150.00 3,630.00 3,630.00

182,858.57 182,858.57b.Tenaga

0.200 Oh Pekerja 44,000.00 8,800.00 8,800.000.100 Oh Tukang Kayu 77,000.00 7,700.00 7,700.000.010 Oh Kepala Tukang 99,000.00 990.00 990.000.001 Oh Mandor 104,500.00 104.50 104.50

17,594.50 17,594.50

1 M2 Pasang Atap Beton Cisangkan

1 M2 Pasang Atap Genteng Beton

1 M2 Pasang Atap Genteng Metal biasa (77 cm X 88 cm)

1 M2 Pasang Atap Genteng Metal Zincalume

1 M2 Pasang Atap Genteng Metal Zincalume berpasir mutu A

Page 81: DrfatAnalisa2010 Smt Iok Palembang

Daftar Analisa Pekerjaan Kota Palembang TA. 2010 Semester I

- 81 -

U R A I A N

SATUAN HARGA NO. Harga Jumlah Harga Jumlah Jumlah

Analisa Satuan Bahan Tenaga Bahan+Tenaga(Rp) (Rp) (Rp) (Rp)

1 2 3 4 5 6Jumlah 182,858.57 17,594.50 200,453.07

8.25a. Bahan

1.020 M2 Genteng Metal warna 78,157.89 79,721.05 79,721.050.200 Kg Paku Biasa 2" - 5" 18,150.00 3,630.00 3,630.00

83,351.05 83,351.05b.Tenaga

0.200 Oh Pekerja 44,000.00 8,800.00 8,800.000.100 Oh Tukang Kayu 77,000.00 7,700.00 7,700.000.010 Oh Kepala Tukang 99,000.00 990.00 990.000.001 Oh Mandor 104,500.00 104.50 104.50

17,594.50 17,594.50

Jumlah 83,351.05 17,594.50 100,945.55

8.26a. Bahan

1.020 M2 Genteng Metal Zincalume 78,571.43 80,142.86 80,142.86berpasir kualitas biasa

0.200 Kg Paku Biasa 2" - 5" 18,150.00 3,630.00 3,630.0083,772.86 83,772.86

b.Tenaga0.200 Oh Pekerja 44,000.00 8,800.00 8,800.000.100 Oh Tukang Kayu 77,000.00 7,700.00 7,700.000.010 Oh Kepala Tukang 99,000.00 990.00 990.000.001 Oh Mandor 104,500.00 104.50 104.50

17,594.50 17,594.50

Jumlah 83,772.86 17,594.50 101,367.36

8.27a. Bahan

3.500 Bh Nok Genteng Beton 5,500.00 19,250.00 19,250.000.050 Kg Paku Biasa 2" - 5" 18,150.00 907.50 907.50

10.800 Kg Semen Abu-abu 2,200.00 23,760.00 23,760.000.032 Pasir Pasang 82,500.00 2,640.00 2,640.001.000 Kg Semen Warna 9,900.00 9,900.00 9,900.00

56,457.50 56,457.50

b.Tenaga0.400 Oh Pekerja 44,000.00 17,600.00 17,600.000.200 Oh Tukang Kayu 77,000.00 15,400.00 15,400.000.020 Oh Kepala Tukang 99,000.00 1,980.00 1,980.000.020 Oh Mandor 104,500.00 2,090.00 2,090.00

37,070.00 37,070.00

Jumlah 56,457.50 37,070.00 93,527.50

8.28a. Bahan

5.000 Bh Nok Genteng Beton 6,100.00 30,500.00 30,500.000.050 Kg Paku Biasa 2" - 5" 18,150.00 907.50 907.50

10.800 Kg Semen Abu-abu 2,200.00 23,760.00 23,760.000.032 Pasir Pasang 82,500.00 2,640.00 2,640.001.000 Kg Semen Warna 9,900.00 9,900.00 9,900.00

67,707.50 67,707.50

b.Tenaga0.400 Oh Pekerja 44,000.00 17,600.00 17,600.000.200 Oh Tukang Kayu 77,000.00 15,400.00 15,400.000.020 Oh Kepala Tukang 99,000.00 1,980.00 1,980.000.020 Oh Mandor 104,500.00 2,090.00 2,090.00

37,070.00 37,070.00

Jumlah 67,707.50 37,070.00 104,777.50

8.29a. Bahan

1.100 Bh Nok Genteng Metal 25,850.00 28,435.00 28,435.00 0.050 Kg 18,150.00 907.50 907.50

29,342.50 29,342.50

b.Tenaga0.250 Oh Pekerja 44,000.00 11,000.00 11,000.000.150 Oh Tukang Kayu 77,000.00 11,550.00 11,550.000.015 Oh Kepala Tukang 99,000.00 1,485.00 1,485.000.013 Oh Mandor 104,500.00 1,358.50 1,358.50

25,393.50 25,393.50

Jumlah 29,342.50 25,393.50 54,736.00

8.30a. Bahan

1.020 M2 Seng Gelombang BJLS 34,800.34 35,496.34 35,496.34

1 M2 Pasang Atap Genteng Metal Warna

1 M2 Pasang Atap Genteng Metal Zincalume berpasir mutu B

1 M' Pasang Nok Genteng Beton

M3

1 M' Pasang Nok Genteng Beton Cisangkan

M3

1 M' Pasang Nok Genteng Metal

Paku Biasa 1/2" - 1"

1 M2 Pasang Atap Seng Gelombang

Page 82: DrfatAnalisa2010 Smt Iok Palembang

Daftar Analisa Pekerjaan Kota Palembang TA. 2010 Semester I

- 82 -

U R A I A N

SATUAN HARGA NO. Harga Jumlah Harga Jumlah Jumlah

Analisa Satuan Bahan Tenaga Bahan+Tenaga(Rp) (Rp) (Rp) (Rp)

1 2 3 4 5 60.020 Kg 18,150.00 363.00 363.00

35,859.34 35,859.34

b.Tenaga0.120 Oh Pekerja 44,000.00 5,280.00 5,280.000.060 Oh Tukang Kayu 77,000.00 4,620.00 4,620.000.006 Oh Kepala Tukang 99,000.00 594.00 594.000.006 Oh Mandor 104,500.00 627.00 627.00

11,121.00 11,121.00

Jumlah 35,859.34 11,121.00 46,980.34

8.31a. Bahan

1 M' Seng Plat BJLS 33 cm X 100 cm 10,450.00 10,450.00 10,450.000.040 Kg 18,150.00 726.00 726.00

11,176.00 11,176.00

b.Tenaga0.150 Oh Pekerja 44,000.00 6,600.00 6,600.000.070 Oh Tukang Kayu 77,000.00 5,390.00 5,390.000.008 Oh Kepala Tukang 99,000.00 792.00 792.000.006 Oh Mandor 104,500.00 627.00 627.00

13,409.00 13,409.00

Jumlah 11,176.00 13,409.00 24,585.00

8.32a. Bahan

1.050 Atap Alluminium Gelombang Tebal 0,5 115,500.00 121,275.00 121,275.000.020 Kg Paku Hak Panjang 15 cm 41,250.00 825.00 825.00

122,100.00 122,100.00

b.Tenaga0.150 Oh Pekerja 44,000.00 6,600.00 6,600.000.750 Oh Tukang Kayu 77,000.00 57,750.00 57,750.000.008 Oh Kepala Tukang 99,000.00 792.00 792.000.006 Oh Mandor 104,500.00 627.00 627.00

65,769.00 65,769.00

Jumlah 122,100.00 65,769.00 187,869.00

8.33a. Bahan

1.200 M' Nok Standar 25,850.00 31,020.00 31,020.00 0.040 Kg Paku Hak Panjang 15 cm 41,250.00 1,650.00 1,650.00

32,670.00 32,670.00

b.Tenaga0.100 Oh Pekerja 44,000.00 4,400.00 4,400.001.000 Oh Tukang Kayu 77,000.00 77,000.00 77,000.000.010 Oh Kepala Tukang 99,000.00 990.00 990.000.010 Oh Mandor 104,500.00 1,045.00 1,045.00

83,435.00 83,435.00

Jumlah 32,670.00 83,435.00 116,105.00

8.34a. Bahan

1.050 Sisalation / Alluminium Foil 16,500.00 17,325.00 17,325.00 17,325.00 17,325.00

b.Tenaga0.150 Oh Pekerja 44,000.00 6,600.00 6,600.000.050 Oh Tukang Kayu 77,000.00 3,850.00 3,850.000.005 Oh Kepala Tukang 99,000.00 495.00 495.000.008 Oh Mandor 104,500.00 836.00 836.00

11,781.00 11,781.00

Jumlah 17,325.00 11,781.00 29,106.00

8.35(F1) a. Bahan

1.100 Kayu Kelas II 4,290,000.00 4,719,000.00 4,719,000.000.250 Kg Paku 18,150.00 4,537.50 4,537.50

4,723,537.50 4,723,537.50b.Tenaga

15.000 Oh Tukang 77,000.00 1,155,000.00 1,155,000.001.500 Oh Kepala Tukang 99,000.00 148,500.00 148,500.000.100 Oh Pekerja 44,000.00 4,400.00 4,400.000.250 Oh Mandor 104,500.00 26,125.00 26,125.00

1,334,025.00 1,334,025.00

Paku Biasa 1/2" - 1"

1 M' Pasang Atap Nok Seng

Paku Biasa 1/2" - 1"

1 M2 Pasang Atap Aluminium

M2

1 M' Pasang Nok Aluminium

1 M2 Pasang Aluminium Foil / Sisalation

M2

1 M3 Gording, Sako, Kitau, Blandar kayu Kelas II

M3

Page 83: DrfatAnalisa2010 Smt Iok Palembang

Daftar Analisa Pekerjaan Kota Palembang TA. 2010 Semester I

- 83 -

U R A I A N

SATUAN HARGA NO. Harga Jumlah Harga Jumlah Jumlah

Analisa Satuan Bahan Tenaga Bahan+Tenaga(Rp) (Rp) (Rp) (Rp)

1 2 3 4 5 6Jumlah 4,723,537.50 1,334,025.00 6,057,562.50

8.36(F1) a. Bahan

1.100 Kayu Kelas III 3,245,000.00 3,569,500.00 3,569,500.000.250 Kg Paku 18,150.00 4,537.50 4,537.50

3,574,037.50 3,574,037.50b.Tenaga

15.000 Oh Tukang 77,000.00 1,155,000.00 1,155,000.001.500 Oh Kepala Tukang 99,000.00 148,500.00 148,500.000.100 Oh Pekerja 44,000.00 4,400.00 4,400.000.250 Oh Mandor 104,500.00 26,125.00 26,125.00

1,334,025.00 1,334,025.00

Jumlah 3,574,037.50 1,334,025.00 4,908,062.50

8.37a. Bahan

2.100 M' Smartruss C 75.100 24,200.00 50,820.00 50,820.001.200 M' Smartruss C 75.75 19,250.00 23,100.00 23,100.006.200 M' Reng U T S 40 14,300.00 88,660.00 88,660.00

30BuahSrew / Dynabolt 1,320.00 39,600.00 39,600.000.030 M' Valery Gutter Talang Jurai 110,000.00 3,300.00 3,300.000.700 M' Strap Bracing 6,600.00 4,620.00 4,620.00

210,100.00 210,100.00b.Tenaga

0.100 Oh Tukang Terampil 77,000.00 7,700.00 7,700.000.100 Oh Tukang biasa 44,000.00 4,400.00 4,400.000.050 Oh Kepala Tukang 82,500.00 4,125.00 4,125.000.010 Oh Mandor 104,500.00 1,045.00 1,045.00

17,270.00 17,270.00

Jumlah 210,100.00 17,270.00 227,370.00

IX PEKERJAAN LANGIT-LANGIT9.1

a. Bahan1.100 Lbr Asbes/Eternit Tebal 2,7 mm 12,100.00 13,310.00 13,310.000.010 Kg Paku 18,150.00 181.50 181.50

13,491.50 13,491.50b.Tenaga

0.030 Oh Pekerja 44,000.00 1,320.00 1,320.000.070 Oh Tukang Kayu 77,000.00 5,390.00 5,390.000.007 Oh Kepala Tukang 99,000.00 693.00 693.00

0.0015 Oh Mandor 104,500.00 156.75 156.757,559.75 7,559.75

Jumlah 13,491.50 7,559.75 21,051.25

9.2a. Bahan

1.100 Lbr Asbes / Eternit Tebal 3,5 mm 14,850.00 16,335.00 16,335.000.010 Kg Paku 18,150.00 181.50 181.50

16,516.50 16,516.50b.Tenaga

0.030 Oh Pekerja 44,000.00 1,320.00 1,320.000.070 Oh Tukang Kayu 77,000.00 5,390.00 5,390.000.007 Oh Kepala Tukang 99,000.00 693.00 693.00

0.0015 Oh Mandor 104,500.00 156.75 156.757,559.75 7,559.75

Jumlah 16,516.50 7,559.75 24,076.25

9.3a. Bahan

0.360 Kpg Kalsiboard Tebal 3,5 mm 58,300.00 20,988.00 20,988.000.010 Kg Paku 18,150.00 181.50 181.50

21,169.50 21,169.50

b.Tenaga0.070 Oh Pekerja 44,000.00 3,080.00 3,080.000.100 Oh Tukang Kayu 77,000.00 7,700.00 7,700.000.010 Oh Kepala Tukang 99,000.00 990.00 990.00

0.0035 Oh Mandor 104,500.00 365.75 365.7512,135.75 12,135.75

Jumlah 21,169.50 12,135.75 33,305.25

9.4a. Bahan

0.360 Kpg Kalsiboard Tebal 4,5 mm 68,750.00 24,750.00 24,750.000.010 Kg Paku 18,150.00 181.50 181.50

24,931.50 24,931.50

b.Tenaga0.070 Oh Pekerja 44,000.00 3,080.00 3,080.00

1 M3 Gording, Sako, Kitau, Blandar kayu Kelas III

M3

1 M2 Rangka atap baja ringan "Superdyma" Al-Magnesium

1 M2 Langit-langit Asbes/Eternit ( 1,00 x 1,00 ) m, Tebal 2,7 mm

1 M2 Langit-langit Asbes / Eternit ( 1,00 x 1,00 ) m, Tebal 3,5 mm

1 M2 Langit-langit Kalsiboard ( 1,20 x 2,40 ) m, Tebal 3,5 mm

1 M2 Langit-langit Kalsiboard ( 1,20 x 2,40 ) m, Tebal 4,5 mm

Page 84: DrfatAnalisa2010 Smt Iok Palembang

Daftar Analisa Pekerjaan Kota Palembang TA. 2010 Semester I

- 84 -

U R A I A N

SATUAN HARGA NO. Harga Jumlah Harga Jumlah Jumlah

Analisa Satuan Bahan Tenaga Bahan+Tenaga(Rp) (Rp) (Rp) (Rp)

1 2 3 4 5 60.100 Oh Tukang Kayu 77,000.00 7,700.00 7,700.000.010 Oh Kepala Tukang 99,000.00 990.00 990.00

0.0035 Oh Mandor 104,500.00 365.75 365.7512,135.75 12,135.75

Jumlah 24,931.50 12,135.75 37,067.25

9.5a. Bahan

0.012 Kayu Kls. II, Balok 4,290,000.00 51,480.00 51,480.000.060 Kg Paku Biasa 18,150.00 1,089.00 1,089.001.100 M2 Asbes / Eternit tebal 2,7 mm 12,100.00 13,310.00 13,310.001.100 M2 Asbes / Eternit tebal 3,5 mm 14,850.00 16,335.00 16,335.00

Tebal 2,7 mm 65,879.00 65,879.00Tebal 3,5 mm 68,904.00 68,904.00

b.Tenaga0.180 Oh Pekerja 44,000.00 7,920.00 7,920.000.320 Oh Tukang Kayu 77,000.00 24,640.00 24,640.000.032 Oh Kepala Tukang 99,000.00 3,168.00 3,168.000.009 Oh Mandor 104,500.00 940.50 940.50

36,668.50 36,668.50

1 M2 Eternit tebal 2,7 mm, rangka kayu kls. II 65,879.00 36,668.50 102,547.501 M2 Eternit tebal 3,5 mm, rangka kayu kls. II 68,904.00 36,668.50 105,572.50

9.6a. Bahan

0.012 Kayu Kls. III, Balok 3,245,000.00 38,940.00 38,940.000.060 Kg Paku Biasa 18,150.00 1,089.00 1,089.001.100 M2 Asbes / Eternit tebal 2,7 mm 12,100.00 13,310.00 13,310.001.100 M2 Asbes / Eternit tebal 3,5 mm 14,850.00 16,335.00 16,335.00

Tebal 2,7 mm 53,339.00 53,339.00Tebal 3,5 mm 56,364.00 56,364.00

b.Tenaga0.180 Oh Pekerja 44,000.00 7,920.00 7,920.000.320 Oh Tukang Kayu 77,000.00 24,640.00 24,640.000.032 Oh Kepala Tukang 99,000.00 3,168.00 3,168.000.009 Oh Mandor 104,500.00 940.50 940.50

36,668.50 36,668.50

1 M2 Eternit tebal 2,7 mm, rangka kayu kls. III 53,339.00 36,668.50 90,007.501 M2 Eternit tebal 3,5 mm, rangka kayu kls. III 56,364.00 36,668.50 93,032.50

9.7a. Bahan

0.012 Kayu Kls. II, Balok 4,290,000.00 51,480.00 51,480.000.060 Kg Paku Biasa 18,150.00 1,089.00 1,089.000.360 Kpg Kalsiboard tebal 3,5 mm 58,300.00 20,988.00 20,988.000.360 Kpg Kalsiboard tebal 4,5 mm 68,750.00 24,750.00 24,750.00

Tebal 3,5 mm 73,557.00 73,557.00Tebal 4,5 mm 77,319.00 77,319.00

b.Tenaga0.270 Oh Pekerja 44,000.00 11,880.00 11,880.000.400 Oh Tukang Kayu 77,000.00 30,800.00 30,800.000.040 Oh Kepala Tukang 99,000.00 3,960.00 3,960.00

0.0135 Oh Mandor 104,500.00 1,410.75 1,410.7548,050.75 48,050.75

1 M2 Kalsiboard tebal 3,5 mm, rangka kayu kls. II 73,557.00 48,050.75 121,607.751 M2 Kalsiboard tebal 4,5 mm, rangka kayu kls. II 77,319.00 48,050.75 125,369.75

9.8a. Bahan

0.012 Kayu Kls. III, Balok 3,245,000.00 38,940.00 38,940.000.060 Kg Paku Biasa 18,150.00 1,089.00 1,089.000.360 Kpg Kalsiboard tebal 3,5 mm 58,300.00 20,988.00 20,988.000.600 Kpg Kalsiboard tebal 4,5 mm 68,750.00 41,250.00 41,250.00

Tebal 3,5 mm 61,017.00 61,017.00Tebal 4,5 mm 81,279.00 81,279.00

b.Tenaga0.270 Oh Pekerja 44,000.00 11,880.00 11,880.000.400 Oh Tukang Kayu 77,000.00 30,800.00 30,800.000.040 Oh Kepala Tukang 99,000.00 3,960.00 3,960.00

0.0135 Oh Mandor 104,500.00 1,410.75 1,410.7548,050.75 48,050.75

1 M2 Kalsiboard tebal 3,5 mm, rangka kayu kls. III 61,017.00 48,050.75 109,067.751 M2 Kalsiboard tebal 4,5 mm, rangka kayu kls. III 81,279.00 48,050.75 129,329.75

9.9a. Bahan

0.360 Lbr Plywood 4' x 8' x 3 mm 45,100.00 16,236.00 16,236.000.030 Kg Paku 18,150.00 544.50 544.50

16,780.50 16,780.50

1 M2 Langit-langit Asbes/Eternit, Rangka Kayu Kls. II

M3

1 M2 Langit-langit Asbes/Eternit, Rangka Kayu Kls. III

M3

1 M2 Langit-langit Kalsiboard, Rangka Kayu Kls. II

M3

1 M2 Langit-langit Kalsiboard, Rangka Kayu Kls. III

M3

1 M2 Langit-langit Plywood ( 120 x 240 ) cm, Tebal 3 mm

Page 85: DrfatAnalisa2010 Smt Iok Palembang

Daftar Analisa Pekerjaan Kota Palembang TA. 2010 Semester I

- 85 -

U R A I A N

SATUAN HARGA NO. Harga Jumlah Harga Jumlah Jumlah

Analisa Satuan Bahan Tenaga Bahan+Tenaga(Rp) (Rp) (Rp) (Rp)

1 2 3 4 5 6

b.Tenaga0.070 Oh Pekerja 44,000.00 3,080.00 3,080.000.100 Oh Tukang Kayu 77,000.00 7,700.00 7,700.000.010 Oh Kepala Tukang 99,000.00 990.00 990.00

0.0035 Oh Mandor 104,500.00 365.75 365.7512,135.75 12,135.75

Jumlah 16,780.50 12,135.75 28,916.25

9.10a. Bahan

0.360 Lbr Plywood 4' x 8' x 4 mm 61,600.00 22,176.00 22,176.000.030 Kg Paku 18,150.00 544.50 544.50

22,720.50 22,720.50

b.Tenaga0.070 Oh Pekerja 44,000.00 3,080.00 3,080.000.100 Oh Tukang Kayu 77,000.00 7,700.00 7,700.000.010 Oh Kepala Tukang 99,000.00 990.00 990.00

0.0035 Oh Mandor 104,500.00 365.75 365.7512,135.75 12,135.75

Jumlah 22,720.50 12,135.75 34,856.25

9.11a. Bahan

0.360 Lbr Plywood 4' x 8' x 6 mm 82,500.00 29,700.00 29,700.000.030 Kg Paku 18,150.00 544.50 544.50

30,244.50 30,244.50b.Tenaga

0.070 Oh Pekerja 44,000.00 3,080.00 3,080.000.100 Oh Tukang Kayu 77,000.00 7,700.00 7,700.000.010 Oh Kepala Tukang 99,000.00 990.00 990.00

0.0035 Oh Mandor 104,500.00 365.75 365.7512,135.75 12,135.75

Jumlah 30,244.50 12,135.75 42,380.25

9.12a. Bahan

0.360 Lbr Plywood 4' x 8' x 9 mm 126,500.00 45,540.00 45,540.000.030 Kg Paku 18,150.00 544.50 544.50

46,084.50 46,084.50b.Tenaga

0.070 Oh Pekerja 44,000.00 3,080.00 3,080.000.100 Oh Tukang Kayu 77,000.00 7,700.00 7,700.000.010 Oh Kepala Tukang 99,000.00 990.00 990.00

0.0035 Oh Mandor 104,500.00 365.75 365.7512,135.75 12,135.75

Jumlah 46,084.50 12,135.75 58,220.25

9.13a. Bahan

0.360 Lbr Plywood 4' x 8' x 12 mm 162,250.00 58,410.00 58,410.000.030 Kg Paku 18,150.00 544.50 544.50

58,954.50 58,954.50

b.Tenaga0.070 Oh Pekerja 44,000.00 3,080.00 3,080.000.100 Oh Tukang Kayu 77,000.00 7,700.00 7,700.000.010 Oh Kepala Tukang 99,000.00 990.00 990.00

0.0035 Oh Mandor 104,500.00 365.75 365.7512,135.75 12,135.75

Jumlah 58,954.50 12,135.75 71,090.25

9.14a. Bahan

1.000 M2 Teakwood 4' x 8' x 3 mm 29,150.00 29,150.00 29,150.000.030 Kg Paku 18,150.00 544.50 544.50

29,694.50 29,694.50

b.Tenaga0.070 Oh Pekerja 44,000.00 3,080.00 3,080.000.100 Oh Tukang Kayu 77,000.00 7,700.00 7,700.000.010 Oh Kepala Tukang 99,000.00 990.00 990.00

0.0035 Oh Mandor 104,500.00 365.75 365.7512,135.75 12,135.75

1 M2 Langit-langit Plywood ( 120 x 240 ) cm, Tebal 4 mm

1 M2 Langit-langit Plywood ( 120 x 240 ) cm, Tebal 6 mm

1 M2 Langit-langit Plywood ( 120 x 240 ) cm, Tebal 9 mm

1 M2 Langit-langit Plywood ( 120 x 240 ) cm, Tebal 12 mm

1 M2 Langit-langit Teakwood (120 X 240), Tebal 3 mm

Page 86: DrfatAnalisa2010 Smt Iok Palembang

Daftar Analisa Pekerjaan Kota Palembang TA. 2010 Semester I

- 86 -

U R A I A N

SATUAN HARGA NO. Harga Jumlah Harga Jumlah Jumlah

Analisa Satuan Bahan Tenaga Bahan+Tenaga(Rp) (Rp) (Rp) (Rp)

1 2 3 4 5 6Jumlah 29,694.50 12,135.75 41,830.25

9.15a. Bahan

1.000 M2 Teakwood 4' x 8' x 4 mm 34,650.00 34,650.00 34,650.000.030 Kg Paku 18,150.00 544.50 544.50

35,194.50 35,194.50

b.Tenaga0.070 Oh Pekerja 44,000.00 3,080.00 3,080.000.100 Oh Tukang Kayu 77,000.00 7,700.00 7,700.000.010 Oh Kepala Tukang 99,000.00 990.00 990.00

0.0035 Oh Mandor 104,500.00 365.75 365.7512,135.75 12,135.75

Jumlah 35,194.50 12,135.75 47,330.25

9.16a. Bahan

0.012 Kayu Kls.II, Balok 4,290,000.00 51,480.00 51,480.000.060 Kg Paku Biasa 2" - 5" 18,150.00 1,089.00 1,089.000.360 Lbr Plywood 4' x 8' x 3 mm 45,100.00 16,236.00 16,236.000.360 Lbr Plywood 4' x 8' x 4 mm 61,600.00 22,176.00 22,176.000.360 Lbr Plywood 4' x 8' x 6 mm 82,500.00 29,700.00 29,700.000.360 Lbr Plywood 4' x 8' x 9 mm 126,500.00 45,540.00 45,540.000.360 Lbr Plywood 4' x 8' x 12 mm 162,250.00 58,410.00 58,410.00

Tebal 3 mm 68,805.00 68,805.00Tebal 4 mm 74,745.00 74,745.00Tebal 6 mm 82,269.00 82,269.00Tebal 9 mm 98,109.00 98,109.00

Tebal 12 mm 110,979.00 110,979.00

b.Tenaga0.270 Oh Pekerja 44,000.00 11,880.00 11,880.000.400 Oh Tukang Kayu 77,000.00 30,800.00 30,800.000.040 Oh Kepala Tukang 99,000.00 3,960.00 3,960.00

0.0135 Oh Mandor 104,500.00 1,410.75 1,410.7548,050.75 48,050.75

1 M2 Plywood tebal 3 mm, rangka kayu kls. II 68,805.00 48,050.75 116,855.751 M2 Plywood tebal 4 mm, rangka kayu kls. II 74,745.00 48,050.75 122,795.751 M2 Plywood tebal 6 mm, rangka kayu kls. II 82,269.00 48,050.75 130,319.751 M2 Plywood tebal 9 mm, rangka kayu kls. II 98,109.00 48,050.75 146,159.751 M2 Plywood tebal 12 mm, rangka kayu kls. II 110,979.00 48,050.75 159,029.75

9.17a. Bahan

0.012 Kayu Kls.III, Balok 3,245,000.00 38,940.00 38,940.000.060 Kg Paku Biasa 2" - 5" 18,150.00 1,089.00 1,089.000.360 Lbr Plywood 4' x 8' x 3 mm 45,100.00 16,236.00 16,236.000.360 Lbr Plywood 4' x 8' x 4 mm 61,600.00 22,176.00 22,176.000.360 Lbr Plywood 4' x 8' x 6 mm 82,500.00 29,700.00 29,700.000.360 Lbr Plywood 4' x 8' x 9 mm 126,500.00 45,540.00 45,540.000.360 Lbr Plywood 4' x 8' x 12 mm 162,250.00 58,410.00 58,410.00

Tebal 3 mm 56,265.00 56,265.00Tebal 4 mm 62,205.00 62,205.00Tebal 6 mm 69,729.00 69,729.00Tebal 9 mm 85,569.00 85,569.00

Tebal 12 mm 98,439.00 98,439.00b.Tenaga

0.270 Oh Pekerja 44,000.00 11,880.00 11,880.000.400 Oh Tukang Kayu 77,000.00 30,800.00 30,800.000.040 Oh Kepala Tukang 99,000.00 3,960.00 3,960.00

0.0135 Oh Mandor 104,500.00 1,410.75 1,410.7548,050.75 48,050.75

1 M2 Plywood tebal 3 mm, rangka kayu kls. III 56,265.00 48,050.75 104,315.751 M2 Plywood tebal 4 mm, rangka kayu kls. III 62,205.00 48,050.75 110,255.751 M2 Plywood tebal 6 mm, rangka kayu kls. III 69,729.00 48,050.75 117,779.751 M2 Plywood tebal 9 mm, rangka kayu kls. III 85,569.00 48,050.75 133,619.751 M2 Plywood tebal 12 mm, rangka kayu kls. III 98,439.00 48,050.75 146,489.75

9.18a. Bahan

0.024 Kayu Jati, Papan 6,050,000.00 145,200.00 145,200.00 0.010 Kg Paku 18,150.00 181.50 181.500.050 Kg Paku Sekrup 41,250.00 2,062.50 2,062.50

145,381.50 145,381.50

b.Tenaga0.200 Oh Pekerja 44,000.00 8,800.00 8,800.000.600 Oh Tukang Kayu 77,000.00 46,200.00 46,200.000.060 Oh Kepala Tukang 99,000.00 5,940.00 5,940.000.010 Oh Mandor 104,500.00 1,045.00 1,045.00

61,985.00 61,985.00

1 M2 Langit-langit Teakwood ( 120 x 240 ) cm, Tebal 4 mm

1 M2 Langit-langit Plywood + Rangka Kayu Kls. II

M3

1 M2 Langit-langit Plywood + Rangka Kayu Kls. III

M3

1 M2 Langit-langit Lat Kayu Jati

M3

Page 87: DrfatAnalisa2010 Smt Iok Palembang

Daftar Analisa Pekerjaan Kota Palembang TA. 2010 Semester I

- 87 -

U R A I A N

SATUAN HARGA NO. Harga Jumlah Harga Jumlah Jumlah

Analisa Satuan Bahan Tenaga Bahan+Tenaga(Rp) (Rp) (Rp) (Rp)

1 2 3 4 5 6Jumlah 145,381.50 61,985.00 207,366.50

9.19a. Bahan

0.350 Lbr Soft Board 4' x 8' x 4 mm 60,500.00 21,175.00 21,175.00 0.030 Kg Paku Biasa 18,150.00 544.50 544.50

21,175.00 21,175.00b.Tenaga

0.600 Oh Pekerja 44,000.00 26,400.00 26,400.000.100 Oh Tukang Kayu 77,000.00 7,700.00 7,700.000.010 Oh Kepala Tukang 99,000.00 990.00 990.000.003 Oh Mandor 104,500.00 313.50 313.50

35,403.50 35,403.50

Jumlah 21,175.00 35,403.50 56,578.50

9.20 1 M' List Langit-langit Gypsuma. Bahan

1.100 M' List Gypsum Besar 20,900.00 22,990.00 22,990.001.100 M' List Gypsum Kecil 15,400.00 16,940.00 16,940.000.010 Kg Paku Gypsum 68,750.00 687.50 687.50

List Gypsum besar 23,677.50 23,677.50List Gypsum kecil 17,627.50 17,627.50

b.Tenaga0.050 Oh Pekerja 44,000.00 2,200.00 2,200.000.050 Oh Tukang Kayu 77,000.00 3,850.00 3,850.000.005 Oh Kepala Tukang 99,000.00 495.00 495.000.003 Oh Mandor 104,500.00 313.50 313.50

6,858.50 6,858.50

List Gypsum Besar 23,677.50 6,858.50 30,536.00List Gypsum Kecil 17,627.50 6,858.50 24,486.00

9.21a. Bahan

0.364 Lbr Gypsum Board ( 120 x 240 x 9 ) mm 159,500.00 58,058.00 58,058.000.300 Kg Cornes 6,600.00 1,980.00 1,980.000.025 roll Textile Tape 6,600.00 165.00 165.000.110 Kg Paku Sekrup 41,250.00 4,537.50 4,537.500.060 Kg Paku Biasa 2" - 5" 18,150.00 1,089.000.040 Kg Paku Gypsum 68,750.00 2,750.00

68,579.50 64,740.50

b.Tenaga0.100 Oh Pekerja 44,000.00 4,400.00 4,400.000.050 Oh Tukang Kayu 77,000.00 3,850.00 3,850.000.005 Oh Kepala Tukang 99,000.00 495.00 495.000.005 Oh Mandor 104,500.00 522.50 522.50

9,267.50 9,267.50

Jumlah 68,579.50 9,267.50 77,847.00

9.22a. Bahan

0.012 Kayu Kls.III, Balok 3,245,000.00 38,940.00 38,940.000.012 Kayu Kls.II, Balok 4,290,000.00 51,480.00 51,480.000.300 Kg Cornes 6,600.00 1,980.00 1,980.000.025 roll Textile Tape 6,600.00 165.00 165.000.110 Kg Paku Sekrup 41,250.00 4,537.50 4,537.500.060 Kg Paku Biasa 2" - 5" 18,150.00 1,089.00 1,089.000.040 Kg Paku Gypsum 68,750.00 2,750.00 2,750.000.364 Lbr Gypsum Board x 9 mm 159,500.00 58,058.00 58,058.00

Kayu Kls.II, Balok 120,059.50 120,059.50Kayu Kls.III, Balok 107,519.50 107,519.50

b.Tenaga0.260 Oh Pekerja 44,000.00 11,440.00 11,440.000.400 Oh Tukang Kayu 77,000.00 30,800.00 30,800.000.040 Oh Kepala Tukang 99,000.00 3,960.00 3,960.00

0.0130 Oh Mandor 104,500.00 1,358.50 1,358.5047,558.50 47,558.50

1 M2 Gypsum Board 9 mm, rangka kayu kls. III 107,519.50 47,558.50 155,078.001 M2 Gypsum Board 9 mm, rangka kayu kls. II 120,059.50 47,558.50 167,618.00

9.23a. Bahan

1.500 Btg Besi hollow galvanis 2/4 22,000.00 33,000.00 33,000.000.300 Kg Cornes 6,600.00 1,980.00 1,980.000.025 roll Textile Tape 6,600.00 165.00 165.000.110 Kg Paku Sekrup 41,250.00 4,537.50 4,537.500.060 Kg Paku Biasa 2" - 5" 18,150.00 1,089.00 1,089.000.040 Kg Paku Gypsum 68,750.00 2,750.00 2,750.000.364 Lbr Gypsum Board x 9 mm 159,500.00 58,058.00 58,058.00

101,579.50 101,579.50

1 M2 Langit-langit Soft Board

1 M2 Langit-langit Gypsum Board, Tebal 9 mm

1 M2 Langit-langit Gypsum Board 9 mm + Rangka Kayu

M3

M3

1 M2 Langit-langit Gypsum Board 9 mm + Rangka besi hollow

Page 88: DrfatAnalisa2010 Smt Iok Palembang

Daftar Analisa Pekerjaan Kota Palembang TA. 2010 Semester I

- 88 -

U R A I A N

SATUAN HARGA NO. Harga Jumlah Harga Jumlah Jumlah

Analisa Satuan Bahan Tenaga Bahan+Tenaga(Rp) (Rp) (Rp) (Rp)

1 2 3 4 5 6b.Tenaga

0.260 Oh Pekerja 44,000.00 11,440.00 11,440.000.400 Oh Tukang Kayu 77,000.00 30,800.00 30,800.000.040 Oh Kepala Tukang 99,000.00 3,960.00 3,960.00

0.0130 Oh Mandor 104,500.00 1,358.50 1,358.5047,558.50 47,558.50

1 M2 Gypsum Board 9 mm, rangka besi hollow 2/4 galvanis 101,579.50 47,558.50 149,138.00

X PEKERJAAN SANITASI

10.1 Memasang 1 Buah Kloset Duduk / Monobloka. Bahan

1 Bh Kloset Duduk / Monoblok 434,500.00 434,500.00 434,500.00Perlengkapan ( 6 % Harga Kloset ) 26,070.00 26,070.00

460,570.00 460,570.00b.Tenaga

3.300 Oh Pekerja 44,000.00 145,200.00 145,200.001.100 Oh Tukang Batu 77,000.00 84,700.00 84,700.000.001 Oh Kepala Tukang 99,000.00 99.00 99.000.160 Oh Mandor 104,500.00 16,720.00 16,720.00

246,719.00 246,719.00

Jumlah 460,570.00 246,719.00 707,289.00

10.2 Memasang 1 Buah Kloset Jongkok Porselena. Bahan

1 Bh Kloset Jongkok Porselen 88,000.00 88,000.00 88,000.006 Kg Semen Portland 2,200.00 13,200.00 13,200.00

0.010 Pasir Pasang 82,500.00 825.00 825.00102,025.00 102,025.00

b.Tenaga1.000 Oh Pekerja 44,000.00 44,000.00 44,000.001.500 Oh Tukang Batu 77,000.00 115,500.00 115,500.001.500 Oh Kepala Tukang 99,000.00 148,500.00 148,500.000.160 Oh Mandor 104,500.00 16,720.00 16,720.00

324,720.00 324,720.00

Jumlah 102,025.00 324,720.00 426,745.00

10.3 Memasang 1 Buah Kloset Jongkok Terasoa. Bahan

1 Bh Kloset Jongkok Teraso 27,500.00 27,500.00 27,500.007 Bh Bata Merah/kecil 5 x 10x 20 cm 517.00 3,619.00 3,619.006 Kg Semen Portland 2,200.00 13,200.00 13,200.00

0.010 Pasir Pasang 82,500.00 825.00 825.0045,144.00 45,144.00

b.Tenaga1.000 Oh Pekerja 44,000.00 44,000.00 44,000.001.500 Oh Tukang Batu 77,000.00 115,500.00 115,500.000.300 Oh Kepala Tukang 99,000.00 29,700.00 29,700.000.110 Oh Mandor 104,500.00 11,495.00 11,495.00

200,695.00 200,695.00

Jumlah 45,144.00 200,695.00 245,839.00

10.4 Memasang 1 Buah Urinoira. Bahan

1 Bh Urinoir 1,338,700.00 1,338,700.00 1,338,700.00Perlengkapan ( 30 % Harga Urinoir ) 401,610.00 401,610.00

6 Kg Semen Portland 2,200.00 13,200.00 13,200.000.010 Pasir Pasang 82,500.00 825.00 825.00

1,754,335.00 1,754,335.00

b.Tenaga1.000 Oh Pekerja 44,000.00 44,000.00 44,000.001.000 Oh Tukang Batu 77,000.00 77,000.00 77,000.000.100 Oh Kepala Tukang 99,000.00 9,900.00 9,900.000.100 Oh Mandor 104,500.00 10,450.00 10,450.00

141,350.00 141,350.00

Jumlah 1,754,335.00 141,350.00 1,895,685.00

10.5 Memasang 1 Buah Wastafela. Bahan

1 Bh Wastafel 165,000.00 165,000.00 165,000.00Perlengkapan ( 12 % Harga Wastafel ) 19,800.00 19,800.00

6 Kg Semen Portland 2,200.00 13,200.00 13,200.000.010 Pasir Pasang 82,500.00 825.00 825.00

198,825.00 198,825.00

b.Tenaga1.200 Oh Pekerja 44,000.00 52,800.00 52,800.00

M3

M3

M3

M3

Page 89: DrfatAnalisa2010 Smt Iok Palembang

Daftar Analisa Pekerjaan Kota Palembang TA. 2010 Semester I

- 89 -

U R A I A N

SATUAN HARGA NO. Harga Jumlah Harga Jumlah Jumlah

Analisa Satuan Bahan Tenaga Bahan+Tenaga(Rp) (Rp) (Rp) (Rp)

1 2 3 4 5 61.450 Oh Tukang Batu 77,000.00 111,650.00 111,650.000.150 Oh Kepala Tukang 99,000.00 14,850.00 14,850.000.100 Oh Mandor 104,500.00 10,450.00 10,450.00

189,750.00 189,750.00

Jumlah 198,825.00 189,750.00 388,575.00

10.6a. Bahan

1 Bh Bak Teraso 82,500.00 82,500.00 82,500.006 Kg Semen Portland 2,200.00 13,200.00 13,200.00

0.010 Pasir Pasang 82,500.00 825.00 825.0096,525.00 96,525.00

b.Tenaga2.100 Oh Pekerja 44,000.00 92,400.00 92,400.000.750 Oh Tukang Batu 77,000.00 57,750.00 57,750.000.070 Oh Kepala Tukang 99,000.00 6,930.00 6,930.000.110 Oh Mandor 104,500.00 11,495.00 11,495.00

168,575.00 168,575.00

Jumlah 96,525.00 168,575.00 265,100.00

10.7a. Bahan

1.000 Bh Bak Fibreglass 203,500.00 203,500.00 203,500.00Perlengkapan ( 18 % Harga Bak Fibreglass ) 36,630.00 36,630.00

240,130.00 240,130.00

b.Tenaga1.800 Oh Pekerja 44,000.00 79,200.00 79,200.002.700 Oh Tukang Batu 77,000.00 207,900.00 207,900.000.540 Oh Kepala Tukang 99,000.00 53,460.00 53,460.000.110 Oh Mandor 104,500.00 11,495.00 11,495.00

352,055.00 352,055.00

Jumlah 240,130.00 352,055.00 592,185.00

10.8a. Bahan

0.400 Batu Bata 471,900.00 188,760.00 188,760.00120 Kg Semen Portland 2,200.00 264,000.00 264,000.00

0.300 Pasir Pasang 82,500.00 24,750.00 24,750.00360 Bh Porselen ( 11 x 11 ) cm 440.00 158,400.00 158,400.00

6 Kg Semen Nat 9,900.00 59,400.00 59,400.00695,310.00 695,310.00

b.Tenaga6 Oh Pekerja 44,000.00 264,000.00 264,000.003 Oh Tukang Batu 77,000.00 231,000.00 231,000.00

0.300 Oh Kepala Tukang 99,000.00 29,700.00 29,700.000.300 Oh Mandor 104,500.00 31,350.00 31,350.00

556,050.00 556,050.00

Jumlah 695,310.00 556,050.00 1,251,360.00

10.9a. Bahan

0.900 Beton 1 : 1,5 : 2,5 1,349,315.00 1,214,383.50 1,214,383.50180 Kg Besi Beton 11,550.00 2,079,000.00 2,079,000.00

8 Kayu Cetakan - - - 5 Ubin Porselen 9,377.50 46,887.50 46,887.50

Perlengkapan ( 10 % Harga Total Bahan ) 137,024.25 137,024.253,477,295.25 3,477,295.25

b.Tenaga3.500 Oh Pekerja 44,000.00 154,000.00 154,000.004.500 Oh Tukang Batu 77,000.00 346,500.00 346,500.000.900 Oh Kepala Tukang 99,000.00 89,100.00 89,100.000.900 Oh Mandor 104,500.00 94,050.00 94,050.00

683,650.00 683,650.00

Jumlah 3,477,295.25 683,650.00 4,160,945.25

10.10a. Bahan

1 Bh Bak Fibreglass 203,500.00 203,500.00 203,500.00Perlengkapan ( 12 % Harga Bak Fibreglass ) 24,420.00 24,420.00

227,920.00 227,920.00

b.Tenaga3.000 Oh Pekerja 44,000.00 132,000.00 132,000.00

Memasang 1 Buah Bak Mandi Teraso Volume 0,30 m3

M3

Memasang 1 Buah Bak Mandi Fibreglass Volume 0,30 m3

Memasang 1 Buah Bak Mandi Porselin Batu Bata Volume 0,30 m3

M3

M3

Memasang 1 Buah Bak Beton Volume 1 m3 Air

M3

M3

M2

Memasang 1 Buah Bak Fibreglass Volume 1 m3 Air

Page 90: DrfatAnalisa2010 Smt Iok Palembang

Daftar Analisa Pekerjaan Kota Palembang TA. 2010 Semester I

- 90 -

U R A I A N

SATUAN HARGA NO. Harga Jumlah Harga Jumlah Jumlah

Analisa Satuan Bahan Tenaga Bahan+Tenaga(Rp) (Rp) (Rp) (Rp)

1 2 3 4 5 64.500 Oh Tukang Batu 77,000.00 346,500.00 346,500.000.900 Oh Kepala Tukang 99,000.00 89,100.00 89,100.000.900 Oh Mandor 104,500.00 94,050.00 94,050.00

661,650.00 661,650.00

Jumlah 227,920.00 661,650.00 889,570.00

10.11 Memasang 1 M' Pipa Penyalur Air Limbah Jenis Pipa Tanah, dia. 15 cm

a. Bahan1.600 M' Pipa Tanah (Paralon) dia. 15 cm 96,250.00 154,000.00 154,000.00 0.680 Kg Semen Portland 2,200.00 1,496.00 1,496.000.013 Pasir Pasang 82,500.00 1,072.50 1,072.500.011 Pasir Urug 71,500.00 786.50 786.50

157,355.00 157,355.00b.Tenaga

0.060 Oh Pekerja 44,000.00 2,640.00 2,640.000.030 Oh Tukang Batu 77,000.00 2,310.00 2,310.000.003 Oh Kepala Tukang 99,000.00 297.00 297.00

0.0025 Oh Mandor 104,500.00 261.25 261.255,508.25 5,508.25

Jumlah 157,355.00 5,508.25 162,863.25

10.12

a. Bahan0.145 Batu Bata 471,900.00 68,425.50 68,425.50

44.000 Kg Semen Portland 2,200.00 96,800.00 96,800.000.070 Pasir Pasang 82,500.00 5,775.00 5,775.000.070 Batu Kerikil 247,500.00 17,325.00 17,325.001.600 Kg Besi Beton 11,550.00 18,480.00 18,480.000.060 Pasir Beton 82,500.00 4,950.00 4,950.00

211,755.50 211,755.50b.Tenaga

3.200 Oh Pekerja 44,000.00 140,800.00 140,800.001.015 Oh Tukang Batu 77,000.00 78,155.00 78,155.00

0.0015 Oh Kepala Tukang 99,000.00 148.50 148.500.016 Oh Mandor 104,500.00 1,672.00 1,672.00

220,775.50 220,775.50

Jumlah 211,755.50 220,775.50 432,531.00

10.13

a. Bahan0.250 Batu Bata 471,900.00 117,975.00 117,975.00

77.000 Kg Semen Portland 2,200.00 169,400.00 169,400.000.130 Pasir Pasang 82,500.00 10,725.00 10,725.000.020 Batu Kerikil 247,500.00 4,950.00 4,950.002.600 Kg Besi Beton 11,550.00 30,030.00 30,030.000.090 Pasir Beton 82,500.00 7,425.00 7,425.00

340,505.00 340,505.00b.Tenaga

1.420 Oh Pekerja 44,000.00 62,480.00 62,480.000.473 Oh Tukang Batu 77,000.00 36,421.00 36,421.000.047 Oh Kepala Tukang 99,000.00 4,653.00 4,653.000.071 Oh Mandor 104,500.00 7,419.50 7,419.50

110,973.50 110,973.50

Jumlah 340,505.00 110,973.50 451,478.50

10.14

a. Bahan0.371 Batu Bata 471,900.00 175,074.90 175,074.90

114.000 Kg Semen Portland 2,200.00 250,800.00 250,800.000.184 Pasir Pasang 82,500.00 15,180.00 15,180.000.033 Batu Kerikil 247,500.00 8,167.50 8,167.504.850 Kg Besi Beton 11,550.00 56,017.50 56,017.500.120 Pasir Beton 82,500.00 9,900.00 9,900.00

515,139.90 515,139.90

b.Tenaga2.160 Oh Pekerja 44,000.00 95,040.00 95,040.000.720 Oh Tukang Batu 77,000.00 55,440.00 55,440.000.100 Oh Tukang Gali 77,000.00 7,700.00 7,700.000.072 Oh Kepala Tukang 99,000.00 7,128.00 7,128.000.108 Oh Mandor 104,500.00 11,286.00 11,286.00

176,594.00 176,594.00

Jumlah 515,139.90 176,594.00 691,733.90

10.15a. Bahan

1.200 M' Pipa Galvanis 9,166.67 11,000.00 11,000.00Perlengkapan ( 35 % Harga Pipa Galvanis ) 3,208.33 3,208.33

14,208.33 14,208.33

M3

M3

Memasang 1 Buah Bak Kontrol Pasangan Batu Bata Ukuran (30 x 30) cm, Tinggi 35 cm

M3

M3

M3

M3

Memasang 1 Buah Bak Kontrol Pasangan Batu Bata Ukuran (45 x 45) cm, Tinggi 50 cm

M3

M3

M3

M3

Memasang 1 Buah Bak Kontrol Pasangan Batu Bata Ukuran (60 x 60) cm, Tinggi 65 cm

M3

M3

M3

M3

Memasang 1 m' Pipa Galvanis Dia. 1/2"

Page 91: DrfatAnalisa2010 Smt Iok Palembang

Daftar Analisa Pekerjaan Kota Palembang TA. 2010 Semester I

- 91 -

U R A I A N

SATUAN HARGA NO. Harga Jumlah Harga Jumlah Jumlah

Analisa Satuan Bahan Tenaga Bahan+Tenaga(Rp) (Rp) (Rp) (Rp)

1 2 3 4 5 6

b.Tenaga0.054 Oh Pekerja 44,000.00 2,376.00 2,376.000.090 Oh Tukang Batu 77,000.00 6,930.00 6,930.000.009 Oh Kepala Tukang 99,000.00 891.00 891.000.027 Oh Mandor 104,500.00 2,821.50 2,821.50

13,018.50 13,018.50

Jumlah 14,208.33 13,018.50 27,226.83

10.16a. Bahan

1.200 M' Pipa Galvanis 11,000.00 13,200.00 13,200.00Perlengkapan ( 35 % Harga Pipa Galvanis ) 3,850.00 3,850.00

17,050.00 17,050.00

b.Tenaga0.054 Oh Pekerja 44,000.00 2,376.00 2,376.000.090 Oh Tukang Batu 77,000.00 6,930.00 6,930.000.009 Oh Kepala Tukang 99,000.00 891.00 891.000.027 Oh Mandor 104,500.00 2,821.50 2,821.50

13,018.50 13,018.50

Jumlah 17,050.00 13,018.50 30,068.50

10.17 Memasang 1 m' Pipa Galvanis Dia. 1"a. Bahan

1.200 M' Pipa Galvanis 13,750.00 16,500.00 16,500.00Perlengkapan ( 35 % Harga Pipa Galvanis ) 4,812.50 4,812.50

21,312.50 21,312.50

b.Tenaga0.054 Oh Pekerja 44,000.00 2,376.00 2,376.000.090 Oh Tukang Batu 77,000.00 6,930.00 6,930.000.009 Oh Kepala Tukang 99,000.00 891.00 891.000.027 Oh Mandor 104,500.00 2,821.50 2,821.50

13,018.50 13,018.50

Jumlah 21,312.50 13,018.50 34,331.00

10.18a. Bahan

1.200 M' Pipa Galvanis 21,083.33 25,300.00 25,300.00Perlengkapan ( 35 % Harga Pipa Galvanis ) 7,379.17 7,379.17

32,679.17 32,679.17

b.Tenaga0.108 Oh Pekerja 44,000.00 4,752.00 4,752.000.180 Oh Tukang Batu 77,000.00 13,860.00 13,860.000.018 Oh Kepala Tukang 99,000.00 1,782.00 1,782.00

0.0054 Oh Mandor 104,500.00 564.30 564.3020,958.30 20,958.30

Jumlah 32,679.17 20,958.30 53,637.47

10.19 Memasang 1 m' Pipa Galvanis Dia. 3"a. Bahan

1.200 M' Pipa Galvanis 57,291.67 68,750.00 68,750.00Perlengkapan ( 35 % Harga Pipa Galvanis ) 20,052.08 20,052.08

88,802.08 88,802.08

b.Tenaga0.108 Oh Pekerja 44,000.00 4,752.00 4,752.000.180 Oh Tukang Batu 77,000.00 13,860.00 13,860.000.018 Oh Kepala Tukang 99,000.00 1,782.00 1,782.00

0.0054 Oh Mandor 104,500.00 564.30 564.3020,958.30 20,958.30

Jumlah 88,802.08 20,958.30 109,760.38

10.20 Memasang 1 m' Pipa Galvanis Dia. 4"a. Bahan

1.200 M' Pipa Galvanis 85,250.00 102,300.00 102,300.00Perlengkapan ( 35 % Harga Pipa Galvanis ) 29,837.50 29,837.50

132,137.50 132,137.50b.Tenaga

0.135 Oh Pekerja 44,000.00 5,940.00 5,940.000.225 Oh Tukang Batu 77,000.00 17,325.00 17,325.00

0.0225 Oh Kepala Tukang 99,000.00 2,227.50 2,227.500.0068 Oh Mandor 104,500.00 710.60 710.60

26,203.10 26,203.10

Jumlah 132,137.50 26,203.10 158,340.60

Memasang 1 m' Pipa Galvanis Dia. 3/4"

Memasang 1 m' Pipa Galvanis Dia. 11/2"

Page 92: DrfatAnalisa2010 Smt Iok Palembang

Daftar Analisa Pekerjaan Kota Palembang TA. 2010 Semester I

- 92 -

U R A I A N

SATUAN HARGA NO. Harga Jumlah Harga Jumlah Jumlah

Analisa Satuan Bahan Tenaga Bahan+Tenaga(Rp) (Rp) (Rp) (Rp)

1 2 3 4 5 610.21

a. Bahan1.200 M' Pipa PVC 2,750.00 3,300.00 3,300.00

Perlengkapan ( 35 % Harga Pipa Galvanis ) 962.50 962.504,262.50 4,262.50

b.Tenaga0.036 Oh Pekerja 44,000.00 1,584.00 1,584.000.060 Oh Tukang Batu 77,000.00 4,620.00 4,620.000.006 Oh Kepala Tukang 99,000.00 594.00 594.00

0.0018 Oh Mandor 104,500.00 188.10 188.106,986.10 6,986.10

Jumlah 4,262.50 6,986.10 11,248.60

10.22a. Bahan

1.200 M' Pipa PVC 3,666.67 4,400.00 4,400.00Perlengkapan ( 35 % Harga Pipa Galvanis ) 1,283.33 1,283.33

5,683.33 5,683.33b.Tenaga

0.036 Oh Pekerja 44,000.00 1,584.00 1,584.000.060 Oh Tukang Batu 77,000.00 4,620.00 4,620.000.006 Oh Kepala Tukang 99,000.00 594.00 594.00

0.0018 Oh Mandor 104,500.00 188.10 188.106,986.10 6,986.10

Jumlah 5,683.33 6,986.10 12,669.43

10.23 Memasang 1 m' Pipa PVC Tipe AW Dia. 1"a. Bahan

1.200 M' Pipa PVC 4,400.00 5,280.00 5,280.00Perlengkapan ( 35 % Harga Pipa Galvanis ) 1,540.00 1,540.00

6,820.00 6,820.00

b.Tenaga0.036 Oh Pekerja 44,000.00 1,584.00 1,584.000.060 Oh Tukang Batu 77,000.00 4,620.00 4,620.000.006 Oh Kepala Tukang 99,000.00 594.00 594.00

0.0018 Oh Mandor 104,500.00 188.10 188.106,986.10 6,986.10

Jumlah 6,820.00 6,986.10 13,806.10

10.24a. Bahan

1.200 M' Pipa PVC 7,791.67 9,350.00 9,350.00Perlengkapan ( 35 % Harga Pipa Galvanis ) 2,727.08 2,727.08

12,077.08 12,077.08b.Tenaga

0.036 Oh Pekerja 44,000.00 1,584.00 1,584.000.060 Oh Tukang Batu 77,000.00 4,620.00 4,620.000.006 Oh Kepala Tukang 99,000.00 594.00 594.00

0.0018 Oh Mandor 104,500.00 188.10 188.106,986.10 6,986.10

Jumlah 12,077.08 6,986.10 19,063.18

10.25 Memasang 1 m' Pipa PVC Tipe AW Dia. 2"a. Bahan

1.200 M' Pipa PVC 10,541.67 12,650.00 12,650.00Perlengkapan ( 35 % Harga Pipa Galvanis ) 3,689.58 3,689.58

16,339.58 16,339.58

b.Tenaga0.054 Oh Pekerja 44,000.00 2,376.00 2,376.000.090 Oh Tukang Batu 77,000.00 6,930.00 6,930.000.009 Oh Kepala Tukang 99,000.00 891.00 891.00

0.0027 Oh Mandor 104,500.00 282.15 282.1510,479.15 10,479.15

Jumlah 16,339.58 10,479.15 26,818.73

10.26 Memasang 1 m' Pipa PVC Tipe AW Dia. 3"a. Bahan

1.200 M' Pipa PVC 20,350.00 24,420.00 24,420.00Perlengkapan ( 35 % Harga Pipa Galvanis ) 7,122.50 7,122.50

31,542.50 31,542.50b.Tenaga

0.081 Oh Pekerja 44,000.00 3,564.00 3,564.000.135 Oh Tukang Batu 77,000.00 10,395.00 10,395.00

0.0135 Oh Kepala Tukang 99,000.00 1,336.50 1,336.500.0041 Oh Mandor 104,500.00 428.45 428.45

15,723.95 15,723.95

Memasang 1 m' Pipa PVC Tipe AW Dia. 1/2"

Memasang 1 m' Pipa PVC Tipe AW Dia. 3/4"

Memasang 1 m' Pipa PVC Tipe AW Dia. 11/2"

Page 93: DrfatAnalisa2010 Smt Iok Palembang

Daftar Analisa Pekerjaan Kota Palembang TA. 2010 Semester I

- 93 -

U R A I A N

SATUAN HARGA NO. Harga Jumlah Harga Jumlah Jumlah

Analisa Satuan Bahan Tenaga Bahan+Tenaga(Rp) (Rp) (Rp) (Rp)

1 2 3 4 5 6Jumlah 31,542.50 15,723.95 47,266.45

10.27 Memasang 1 m' Pipa PVC Tipe AW Dia. 4"a. Bahan

1.200 M' Pipa PVC 36,300.00 43,560.00 43,560.00Perlengkapan ( 35 % Harga Pipa Galvanis ) 12,705.00 12,705.00

56,265.00 56,265.00

b.Tenaga0.081 Oh Pekerja 44,000.00 3,564.00 3,564.000.135 Oh Tukang Batu 77,000.00 10,395.00 10,395.00

0.0135 Oh Kepala Tukang 99,000.00 1,336.50 1,336.500.0041 Oh Mandor 104,500.00 428.45 428.45

15,723.95 15,723.95

Jumlah 56,265.00 15,723.95 71,988.95

10.28 Memasang 1 Buah Bak Cuci Piring Stainless Steela. Bahan

1 Bh Bak Cuci Stainless Steel 198,000.00 198,000.00 198,000.001 Set Kran air+ Asesories 25,000.00 25,000.00 25,000.00

223,000.00 223,000.00b.Tenaga

0.030 Oh Pekerja 44,000.00 1,320.00 1,320.000.300 Oh Tukang Batu 77,000.00 23,100.00 23,100.000.030 Oh Kepala Tukang 99,000.00 2,970.00 2,970.00

0.0015 Oh Mandor 104,500.00 156.75 156.7527,546.75 27,546.75

Jumlah 223,000.00 27,546.75 250,546.75

10.29 Memasang 1 Buah Bak Cuci Piring Terasoa. Bahan

1 Bh Bak Cuci Teraso 110,000.00 110,000.00 110,000.001 Set Kran air+ Asesories 25,000.00 25,000.00 25,000.00

20 Kg Semen Portland 2,200.00 44,000.00 44,000.000.050 Pasir pasang 82,500.00 4,125.00 4,125.00

183,125.00 183,125.00b.Tenaga

0.050 Oh Pekerja 44,000.00 2,200.00 2,200.000.500 Oh Tukang Batu 77,000.00 38,500.00 38,500.000.050 Oh Kepala Tukang 99,000.00 4,950.00 4,950.00

0.0025 Oh Mandor 104,500.00 261.25 261.2545,911.25 45,911.25

Jumlah 183,125.00 45,911.25 229,036.25

10.30a. Bahan

1.000 Bh Kran Air 9,350.00 9,350.00 9,350.000.025 Bh Seal Tape 2,200.00 55.00 55.00

9,405.00 9,405.00

b.Tenaga0.010 Oh Pekerja 44,000.00 440.00 440.000.100 Oh Tukang Batu 77,000.00 7,700.00 7,700.000.010 Oh Kepala Tukang 99,000.00 990.00 990.000.005 Oh Mandor 104,500.00 522.50 522.50

9,652.50 9,652.50

Jumlah 9,405.00 9,652.50 19,057.50

10.31 1 Bh Septiktank 1,5 m x 2,0 m x 1 m dan Resapan10.5 Galian Tanah 21,780.00 228,690.00 228,690.002.625 Urugan Kembali 10,433.50 27,387.94 27,387.948.400 M2 Pas. Batu Bata 1 : 3 201,492.50 1,692,537.00 1,692,537.000.300 M3 Beton Tumbuk 1 : 3 : 5 816,585.00 244,975.50 244,975.5013.5 M2 Plesteran 1 : 2 43,026.50 580,857.75 580,857.750.2 M3 Plat Beton bertulang (besi 100kg,1/2 dinding)1 : 2 : 3 2,761,286.00 552,257.20 552,257.201 Bh Pipa Hawa 2" 20,000.00 20,000.00 20,000.00

Resapan0.750 M3 Koral Beton 220,000.00 165,000.00 165,000.00

1 M3 Pasir Pasang 82,500.00 82,500.00 82,500.004 M' Pipa dia. 4" 36,300.00 145,200.00 145,200.002 Bh Buis Beton dia. 50 cm 75,000.00 150,000.00 150,000.0010 Kg Ijuk 7,700.00 77,000.00 77,000.00

3,966,405.39 3,966,405.39

Jumlah 3,966,405.39 3,966,405.39

XI PEKERJAAN BESI DAN ALUMINIUM

11.1 1 Kg Pasang besi WF dan Rangka Atap Bajaa. Bahan

M3

Memasang 1 Buah Kran Dia. 3/4" atau 1/2"

M3

M3

Page 94: DrfatAnalisa2010 Smt Iok Palembang

Daftar Analisa Pekerjaan Kota Palembang TA. 2010 Semester I

- 94 -

U R A I A N

SATUAN HARGA NO. Harga Jumlah Harga Jumlah Jumlah

Analisa Satuan Bahan Tenaga Bahan+Tenaga(Rp) (Rp) (Rp) (Rp)

1 2 3 4 5 61.100 Kg Besi Profil WF 15,950.00 17,545.00 17,545.000.080 Kg Meni Besi 35,200.00 2,816.00 2,816.00

20,361.00 20,361.00

b.Tenaga0.006 Oh Tukang Besi 77,000.00 462.00 462.000.060 Oh Pekerja 44,000.00 2,640.00 2,640.000.006 Oh Kepala Tukang 99,000.00 594.00 594.00

0.0003 Oh Mandor 104,500.00 31.35 31.353,727.35 3,727.35

Jumlah 20,361.00 3,727.35 24,088.35

11.2 1 Kg Pasang besi CNP,INP,L dan Rangka Atap Bajaa. Bahan

1.100 Kg Besi CNP,INP dan L 13,750.00 15,125.00 15,125.000.080 Kg Meni Besi 35,200.00 2,816.00 2,816.00

17,941.00 17,941.00

b.Tenaga0.006 Oh Tukang 77,000.00 462.00 462.000.006 Oh Kepala Tukang 99,000.00 594.00 594.000.06 Oh Pekerja 44,000.00 2,640.00 2,640.00

0.0003 Oh Mandor 104,500.00 31.35 31.353,727.35 3,727.35

Jumlah 17,941.00 3,727.35 21,668.35

11.3a. Bahan

1.000 Pintu Besi Baja 1,925,000.00 1,925,000.00 1,925,000.001,925,000.00 1,925,000.00

b.Tenaga0.650 Oh Tukang Besi Konstruksi 77,000.00 50,050.00 50,050.000.650 Oh Pekerja 44,000.00 28,600.00 28,600.000.065 Oh Kepala Tukang 99,000.00 6,435.00 6,435.000.032 Oh Mandor 104,500.00 3,344.00 3,344.00

88,429.00 88,429.00

Jumlah 1,925,000.00 88,429.00 2,013,429.00

11.4a. Bahan

1.000 Jendela Besi 275,000.00 275,000.00 275,000.00275,000.00 275,000.00

b.Tenaga1.050 Oh Tukang Besi Konstruksi 77,000.00 80,850.00 80,850.001.050 Oh Pekerja 44,000.00 46,200.00 46,200.000.105 Oh Kepala Tukang 99,000.00 10,395.00 10,395.00

0.00525 Oh Mandor 104,500.00 548.63 548.63137,993.63 137,993.63

Jumlah 275,000.00 137,993.63 412,993.63

11.5a. Bahan

1.000 Pintu Lipat 371,250.00 371,250.00 371,250.00371,250.00 371,250.00

b.Tenaga1.050 Oh Tukang Besi Konstruksi 77,000.00 80,850.00 80,850.001.050 Oh Pekerja 44,000.00 46,200.00 46,200.000.105 Oh Kepala Tukang 99,000.00 10,395.00 10,395.00

0.0052 Oh Mandor 104,500.00 543.40 543.40137,988.40 137,988.40

Jumlah 371,250.00 137,988.40 509,238.40

11.6a. Bahan

1.000 Sunscreen Alluminium 357,500.00 357,500.00 357,500.00357,500.00 357,500.00

b.Tenaga0.800 Oh Tukang Besi Konstruksi 77,000.00 61,600.00 61,600.000.080 Oh Pekerja 44,000.00 3,520.00 3,520.000.080 Oh Kepala Tukang 99,000.00 7,920.00 7,920.000.004 Oh Mandor 104,500.00 418.00 418.00

73,458.00 73,458.00

Jumlah 357,500.00 73,458.00 430,958.00

1 m2 Pasang Pintu Besi Baja

M2

1 m2 Pasang Jendela Besi

M2

1 m2 Pasang Pintu Lipat

M2

1 m2 Pasang Pintu Sunscreen Alluminium

M2

Page 95: DrfatAnalisa2010 Smt Iok Palembang

Daftar Analisa Pekerjaan Kota Palembang TA. 2010 Semester I

- 95 -

U R A I A N

SATUAN HARGA NO. Harga Jumlah Harga Jumlah Jumlah

Analisa Satuan Bahan Tenaga Bahan+Tenaga(Rp) (Rp) (Rp) (Rp)

1 2 3 4 5 611.7

a. Bahan1.000 Btg Besi Holo 30/30 178,750.00 178,750.00 178,750.00

178,750.00 178,750.00b.Tenaga

0.800 Oh Tukang Besi Konstruksi 77,000.00 61,600.00 61,600.000.080 Oh Pekerja 44,000.00 3,520.00 3,520.000.080 Oh Kepala Tukang 99,000.00 7,920.00 7,920.000.004 Oh Mandor 104,500.00 418.00 418.00

73,458.00 73,458.00

Jumlah 178,750.00 73,458.00 252,208.00

11.8a. Bahan

1.000 Roll Door 269,500.00 269,500.00 269,500.00269,500.00 269,500.00

b.Tenaga1.500 Oh Tukang Besi Konstruksi 77,000.00 115,500.00 115,500.001.050 Oh Pekerja 44,000.00 46,200.00 46,200.000.105 Oh Kepala Tukang 99,000.00 10,395.00 10,395.00

0.0052 Oh Mandor 104,500.00 543.40 543.40172,638.40 172,638.40

Jumlah 269,500.00 172,638.40 442,138.40

11.9a. Bahan

1.000 Pintu Alluminium 495,000.00 495,000.00 495,000.00495,000.00 495,000.00

b.Tenaga1.050 Oh Tukang Besi Konstruksi 77,000.00 80,850.00 80,850.001.050 Oh Pekerja 44,000.00 46,200.00 46,200.000.105 Oh Kepala Tukang 99,000.00 10,395.00 10,395.00

0.0052 Oh Mandor 104,500.00 543.40 543.40137,988.40 137,988.40

Jumlah 495,000.00 137,988.40 632,988.40

11.10 Bahan

1.000 Vertikals Blinds 99,000.00 99,000.00 99,000.0099,000.00 99,000.00

b.Tenaga0.350 Oh Tukang Kayu 77,000.00 26,950.00 26,950.000.350 Oh Pekerja 44,000.00 15,400.00 15,400.000.035 Oh Kepala Tukang 99,000.00 3,465.00 3,465.00

0.00175 Oh Mandor 104,500.00 182.88 182.8845,997.88 45,997.88

Jumlah 99,000.00 45,997.88 144,997.88

11.11 Bahan

1.000 Horizontal Blinds 96,250.00 96,250.00 96,250.0096,250.00 96,250.00

b.Tenaga0.350 Oh Tukang Kayu 77,000.00 26,950.00 26,950.000.350 Oh Pekerja 44,000.00 15,400.00 15,400.000.035 Oh Kepala Tukang 99,000.00 3,465.00 3,465.00

0.00175 Oh Mandor 104,500.00 182.88 182.8845,997.88 45,997.88

Jumlah 96,250.00 45,997.88 142,247.88

11.12a. Bahan

11.500 M' Besi Strip 2 x 3 3,300.00 37,950.00 37,950.0037,950.00 37,950.00

b.Tenaga1.200 Oh Tukang Las 77,000.00 92,400.00 92,400.001.200 Oh Pekerja 44,000.00 52,800.00 52,800.000.012 Oh Kepala Tukang 99,000.00 1,188.00 1,188.00

0.00060 Oh Mandor 104,500.00 62.70 62.70146,450.70 146,450.70

Jumlah 37,950.00 146,450.70 184,400.70

1 m2 Pasang Sunscreen Besi Holo 30/30

1 m2 Pasang Rolling Door

M2

1 m2 Pasang Pintu Alluminium

M2

1 m2 Pasang Hordeng Vertikals Blinds

M2

1 m2 Pasang Hordeng Horizontal Blinds (aluminium)

M2

1 m2 Pasang Terali Besi Strip

Page 96: DrfatAnalisa2010 Smt Iok Palembang

Daftar Analisa Pekerjaan Kota Palembang TA. 2010 Semester I

- 96 -

U R A I A N

SATUAN HARGA NO. Harga Jumlah Harga Jumlah Jumlah

Analisa Satuan Bahan Tenaga Bahan+Tenaga(Rp) (Rp) (Rp) (Rp)

1 2 3 4 5 6

11.13a. Bahan

1.100 Kawat Harmonika 38,500.00 42,350.00 42,350.000.020 Kg 18,150.00 363.00 363.00

0.0018 Kayu Kls.III, Papan 3,245,000.00 5,841.00 5,841.0048,554.00 48,554.00

b.Tenaga0.100 Oh Pekerja 44,000.00 4,400.00 4,400.000.100 Oh Tukang Kayu 77,000.00 7,700.00 7,700.000.010 Oh Kepala Tukang 99,000.00 990.00 990.00

0.0005 Oh Mandor 104,500.00 52.25 52.2513,142.25 13,142.25

Jumlah 48,554.00 13,142.25 61,696.25

11.14a. Bahan

1.100 Kawat Nyamuk 18,700.00 20,570.00 20,570.000.020 Kg 18,150.00 363.00 363.00

0.0018 Kayu Kls.III, Papan 3,245,000.00 5,841.00 5,841.0026,774.00 26,774.00

b.Tenaga0.100 Oh Pekerja 44,000.00 4,400.00 4,400.000.100 Oh Tukang Kayu 77,000.00 7,700.00 7,700.000.010 Oh Kepala Tukang 99,000.00 990.00 990.00

0.0005 Oh Mandor 104,500.00 52.25 52.2513,142.25 13,142.25

Jumlah 26,774.00 13,142.25 39,916.2511.15

a. Bahan1.100 Kawat Kassa 11,000.00 12,100.00 12,100.000.020 Kg 18,150.00 363.00 363.00

0.0018 Kayu Kls.III, Papan 3,245,000.00 5,841.00 5,841.0018,304.00 18,304.00

b.Tenaga0.100 Oh Pekerja 44,000.00 4,400.00 4,400.000.100 Oh Tukang Kayu 77,000.00 7,700.00 7,700.000.010 Oh Kepala Tukang 99,000.00 990.00 990.00

0.0005 Oh Mandor 104,500.00 52.25 52.2513,142.25 13,142.25

Jumlah 18,304.00 13,142.25 31,446.25

11.16a. Bahan

1.100 Kawat Burung 11,000.00 12,100.00 12,100.000.020 Kg 18,150.00 363.00 363.00

0.0018 Kayu Kls.III, Papan 3,245,000.00 5,841.00 5,841.0018,304.00 18,304.00

b.Tenaga0.100 Oh Pekerja 44,000.00 4,400.00 4,400.000.100 Oh Tukang Kayu 77,000.00 7,700.00 7,700.000.010 Oh Kepala Tukang 99,000.00 990.00 990.00

0.0005 Oh Mandor 104,500.00 52.25 52.2513,142.25 13,142.25

Jumlah 18,304.00 13,142.25 31,446.25

11.17a. Bahan

1.100 Jendela Nako 104,500.00 114,950.00 114,950.000.020 Kg 18,150.00 363.00 363.000.025 Kg Besi Strip 8,250.00 206.25 206.25

115,519.25 115,519.25b.Tenaga

0.200 Oh Pekerja 44,000.00 8,800.00 8,800.000.200 Oh Tukang Kayu 77,000.00 15,400.00 15,400.000.020 Oh Kepala Tukang 99,000.00 1,980.00 1,980.000.001 Oh Mandor 104,500.00 104.50 104.50

26,284.50 26,284.50

Jumlah 115,519.25 26,284.50 141,803.75

11.18 1 m' Pasang Talang Datar, Seng BJLSa. Bahan

0.500 Lbr Seng Plat 3' x 6' bjls 96,250.00 48,125.00 48,125.000.015 Kg 18,150.00 272.25 272.25

0.0096 Kayu Kls.III, Papan 3,245,000.00 31,152.00 31,152.000.250 Kg Flincote / Meni Besi 35,200.00 8,800.00 8,800.00

88,349.25 88,349.25

1 m2 Pasang Kawat Harmonika

M2

Paku Biasa 1/2" - 1"M3

1 m2 Pasang Kawat Nyamuk

M2

Paku Biasa 1/2" - 1"M3

1 m2 Pasang Kawat Kassa

M2

Paku Biasa 1/2" - 1"M3

1 m2 Pasang Kawat Burung

M2

Paku Biasa 1/2" - 1"M3

1 m2 Pasang Jendela Nako dan Tralis

M2

Paku Biasa 1/2" - 1" atau Sekrup

Paku Biasa 1/2" - 1" M3

Page 97: DrfatAnalisa2010 Smt Iok Palembang

Daftar Analisa Pekerjaan Kota Palembang TA. 2010 Semester I

- 97 -

U R A I A N

SATUAN HARGA NO. Harga Jumlah Harga Jumlah Jumlah

Analisa Satuan Bahan Tenaga Bahan+Tenaga(Rp) (Rp) (Rp) (Rp)

1 2 3 4 5 6

b.Tenaga0.150 Oh Pekerja 44,000.00 6,600.00 6,600.000.400 Oh Tukang Kayu 77,000.00 30,800.00 30,800.000.025 Oh Kepala Tukang 99,000.00 2,475.00 2,475.00

0.00125 Oh Mandor 104,500.00 130.63 130.6340,005.63 40,005.63

Jumlah 88,349.25 40,005.63 128,354.88

11.19 1 m' Pasang Talang Miring, Seng BJLSa. Bahan

0.500 Lbr Seng Plat 3' x 6' bjls 96,250.00 48,125.00 48,125.000.015 Kg 18,150.00 272.25 272.250.019 Kayu Kls.III, Papan 3,245,000.00 61,655.00 61,655.000.300 Kg Flincote / Meni Besi 35,200.00 10,560.00 10,560.00

120,612.25 120,612.25

b.Tenaga0.040 Oh Pekerja 44,000.00 1,760.00 1,760.000.400 Oh Tukang Kayu 77,000.00 30,800.00 30,800.000.025 Oh Kepala Tukang 99,000.00 2,475.00 2,475.00

0.00125 Oh Mandor 104,500.00 130.63 130.6335,165.63 35,165.63

Jumlah 120,612.25 35,165.63 155,777.88

11.20a. Bahan

0.300 Lbr Seng Plat 3' x 6' bjls 96,250.00 28,875.00 28,875.000.100 Kg 18,150.00 1,815.00 1,815.000.019 Kayu Kls.III, Papan 3,245,000.00 61,655.00 61,655.000.500 Kg Besi Strip 8,250.00 4,125.00 4,125.00

96,470.00 96,470.00

b.Tenaga0.150 Oh Pekerja 44,000.00 6,600.00 6,600.000.250 Oh Tukang Kayu 77,000.00 19,250.00 19,250.000.025 Oh Kepala Tukang 99,000.00 2,475.00 2,475.00

0.00125 Oh Mandor 104,500.00 130.63 130.6328,455.63 28,455.63

Jumlah 96,470.00 28,455.63 124,925.63

XII PEKERJAAN KUNCI DAN KACA

12.1 1 Buah Pasang Kunci Tanam mutu Ba. Bahan

1.000 Bh Kunci Tanam mutu B 134,750.00 134,750.00 134,750.00134,750.00 134,750.00

b.Tenaga0.060 Oh Pekerja 44,000.00 2,640.00 2,640.000.600 Oh Tukang Kayu 77,000.00 46,200.00 46,200.000.060 Oh Kepala Tukang 99,000.00 5,940.00 5,940.000.003 Oh Mandor 104,500.00 313.50 313.50

55,093.50 55,093.50

Jumlah 134,750.00 55,093.50 189,843.50

12.2 1 Buah Pasang Kunci Tanam Biasaa. Bahan

1.000 Bh Kunci Tanam Biasa 24,750.00 24,750.00 24,750.0024,750.00 24,750.00

b.Tenaga0.010 Oh Pekerja 44,000.00 440.00 440.000.500 Oh Tukang Kayu 77,000.00 38,500.00 38,500.000.010 Oh Kepala Tukang 99,000.00 990.00 990.000.005 Oh Mandor 104,500.00 522.50 522.50

40,452.50 40,452.50

Jumlah 24,750.00 40,452.50 65,202.50

12.3 1 Buah Pasang Kunci Tanam Kamar Mandia. Bahan

1.000 Bh Kunci Tanam Kamar Mandi 24,750.00 24,750.00 24,750.0024,750.00 24,750.00

b.Tenaga0.005 Oh Pekerja 44,000.00 220.00 220.000.500 Oh Tukang Kayu 77,000.00 38,500.00 38,500.000.005 Oh Kepala Tukang 99,000.00 495.00 495.00

0.0025 Oh Mandor 104,500.00 261.25 261.2539,476.25 39,476.25

Paku Biasa 1/2" - 1" M3

1 m' Pasang Talang 1/2 Lingkaran Dia. 10 cm, Seng BJLS

Paku Biasa 1/2" - 1" M3

Page 98: DrfatAnalisa2010 Smt Iok Palembang

Daftar Analisa Pekerjaan Kota Palembang TA. 2010 Semester I

- 98 -

U R A I A N

SATUAN HARGA NO. Harga Jumlah Harga Jumlah Jumlah

Analisa Satuan Bahan Tenaga Bahan+Tenaga(Rp) (Rp) (Rp) (Rp)

1 2 3 4 5 6

Jumlah 24,750.00 39,476.25 64,226.25

12.4 1 Buah Pasang Engsel Pintua. Bahan

1.000 Bh Engsel Pintu 4,950.00 4,950.00 4,950.004,950.00 4,950.00

b.Tenaga0.015 Oh Pekerja 44,000.00 660.00 660.000.150 Oh Tukang Kayu 77,000.00 11,550.00 11,550.000.015 Oh Kepala Tukang 99,000.00 1,485.00 1,485.00

0.00075 Oh Mandor 104,500.00 78.38 78.3813,773.38 13,773.38

Jumlah 4,950.00 13,773.38 18,723.38

12.5 1 Buah Pasang Engsel Jendela Kuningana. Bahan

1.000 Bh Engsel Kuningan Jendela 6,050.00 6,050.00 6,050.00 6,050.00 6,050.00

b.Tenaga0.010 Oh Pekerja 44,000.00 440.00 440.000.100 Oh Tukang Kayu 77,000.00 7,700.00 7,700.000.010 Oh Kepala Tukang 99,000.00 990.00 990.00

0.0005 Oh Mandor 104,500.00 52.25 52.259,182.25 9,182.25

Jumlah 6,050.00 9,182.25 15,232.25

12.6 1 Buah Pasang Engsel Angina. Bahan

1.000 Bh Engsel Angin 3,850.00 3,850.00 3,850.003,850.00 3,850.00

b.Tenaga0.020 Oh Pekerja 44,000.00 880.00 880.000.200 Oh Tukang Kayu 77,000.00 15,400.00 15,400.000.020 Oh Kepala Tukang 99,000.00 1,980.00 1,980.000.010 Oh Mandor 104,500.00 1,045.00 1,045.00

19,305.00 19,305.00

Jumlah 3,850.00 19,305.00 23,155.0012.7 1 Buah Pasang Kait Angin

a. Bahan1.000 Bh Kait Angin 5,500.00 5,500.00 5,500.00

5,500.00 5,500.00b.Tenaga

0.015 Oh Pekerja 44,000.00 660.00 660.000.150 Oh Tukang Kayu 77,000.00 11,550.00 11,550.000.015 Oh Kepala Tukang 99,000.00 1,485.00 1,485.00

0.00075 Oh Mandor 104,500.00 78.38 78.3813,773.38 13,773.38

Jumlah 5,500.00 13,773.38 19,273.38

12.8 1 Buah Pasang Door Closera. Bahan

1.000 Bh Door Closer 418,000.00 418,000.00 418,000.00418,000.00 418,000.00

b.Tenaga0.050 Oh Pekerja 44,000.00 2,200.00 2,200.000.500 Oh Tukang Kayu 77,000.00 38,500.00 38,500.000.050 Oh Kepala Tukang 99,000.00 4,950.00 4,950.00

0.0025 Oh Mandor 104,500.00 261.25 261.2545,911.25 45,911.25

Jumlah 418,000.00 45,911.25 463,911.25

12.9 1 Buah Pasang Kunci Selota. Bahan

1.000 Bh Kunci Selot 3,850.00 3,850.00 3,850.003,850.00 3,850.00

b.Tenaga0.020 Oh Pekerja 44,000.00 880.00 880.000.200 Oh Tukang Kayu 77,000.00 15,400.00 15,400.000.020 Oh Kepala Tukang 99,000.00 1,980.00 1,980.000.001 Oh Mandor 104,500.00 104.50 104.50

18,364.50 18,364.50

Jumlah 3,850.00 18,364.50 22,214.50

12.10 1 Buah Pasang Pegangan Pintu / Door Holdera. Bahan

1.000 Bh Door Holder 33,000.00 33,000.00 33,000.0033,000.00 33,000.00

b.Tenaga

Page 99: DrfatAnalisa2010 Smt Iok Palembang

Daftar Analisa Pekerjaan Kota Palembang TA. 2010 Semester I

- 99 -

U R A I A N

SATUAN HARGA NO. Harga Jumlah Harga Jumlah Jumlah

Analisa Satuan Bahan Tenaga Bahan+Tenaga(Rp) (Rp) (Rp) (Rp)

1 2 3 4 5 60.050 Oh Pekerja 44,000.00 2,200.00 2,200.000.500 Oh Tukang Kayu 77,000.00 38,500.00 38,500.000.050 Oh Kepala Tukang 99,000.00 4,950.00 4,950.00

0.0025 Oh Mandor 104,500.00 261.25 261.2545,911.25 45,911.25

Jumlah 33,000.00 45,911.25 78,911.25

12.11 1 Buah Pasang Door Stopa. Bahan

1.000 Bh Door Stop 24,200.00 24,200.00 24,200.0024,200.00 24,200.00

b.Tenaga0.010 Oh Pekerja 44,000.00 440.00 440.000.100 Oh Tukang Kayu 77,000.00 7,700.00 7,700.000.010 Oh Kepala Tukang 99,000.00 990.00 990.00

0.0005 Oh Mandor 104,500.00 52.25 52.259,182.25 9,182.25

Jumlah 24,200.00 9,182.25 33,382.25

12.12 1 Buah Pasang Rel Pintu Doronga. Bahan

1.000 Bh Rel Pintu Dorong 214,500.00 214,500.00 214,500.00214,500.00 214,500.00

b.Tenaga0.060 Oh Pekerja 44,000.00 2,640.00 2,640.000.600 Oh Tukang Kayu 77,000.00 46,200.00 46,200.000.060 Oh Kepala Tukang 99,000.00 5,940.00 5,940.000.003 Oh Mandor 104,500.00 313.50 313.50

55,093.50 55,093.50

Jumlah 214,500.00 55,093.50 269,593.50

12.13 1 Buah Pasang Kunci Lemaria. Bahan

1.000 Bh Kunci Lemari 13,200.00 13,200.00 13,200.0013,200.00 13,200.00

b.Tenaga0.025 Oh Pekerja 44,000.00 1,100.00 1,100.000.250 Oh Tukang Kayu 77,000.00 19,250.00 19,250.000.025 Oh Kepala Tukang 99,000.00 2,475.00 2,475.00

0.00125 Oh Mandor 104,500.00 130.63 130.6322,955.63 22,955.63

Jumlah 13,200.00 22,955.63 36,155.63

12.14a. Bahan

1.100 Kaca Tebal 3 mm 79,750.00 87,725.00 87,725.0087,725.00 87,725.00

b.Tenaga0.015 Oh Pekerja 44,000.00 660.00 660.000.150 Oh Tukang Kayu/kaca 77,000.00 11,550.00 11,550.000.015 Oh Kepala Tukang 99,000.00 1,485.00 1,485.00

0.00075 Oh Mandor 104,500.00 78.38 78.3813,773.38 13,773.38

Jumlah 87,725.00 13,773.38 101,498.38

12.15a. Bahan

1.100 Kaca Tebal 5 mm 134,750.00 148,225.00 148,225.00148,225.00 148,225.00

b.Tenaga0.015 Oh Pekerja 44,000.00 660.00 660.000.150 Oh Tukang Kayu/kaca 77,000.00 11,550.00 11,550.000.015 Oh Kepala Tukang 99,000.00 1,485.00 1,485.00

0.00075 Oh Mandor 104,500.00 78.38 78.3813,773.38 13,773.38

Jumlah 148,225.00 13,773.38 161,998.38

12.16a. Bahan

1.100 Kaca Polos 156,750.00 172,425.00 172,425.00172,425.00 172,425.00

b.Tenaga0.0165 Oh Pekerja 44,000.00 726.00 726.00

0.165 Oh Tukang Kayu/kaca 77,000.00 12,705.00 12,705.000.0165 Oh Kepala Tukang 99,000.00 1,633.50 1,633.500.0008 Oh Mandor 104,500.00 83.60 83.60

15,148.10 15,148.10

1 m2 Pasang Kaca, Tebal 3 mm

M2

1 m2 Pasang Kaca, Tebal 5 mm

M2

1 m2 Pasang Kaca, Tebal 8 mm

M2

Page 100: DrfatAnalisa2010 Smt Iok Palembang

Daftar Analisa Pekerjaan Kota Palembang TA. 2010 Semester I

- 100 -

U R A I A N

SATUAN HARGA NO. Harga Jumlah Harga Jumlah Jumlah

Analisa Satuan Bahan Tenaga Bahan+Tenaga(Rp) (Rp) (Rp) (Rp)

1 2 3 4 5 6Jumlah 172,425.00 15,148.10 187,573.10

12.17a. Bahan

1.100 Kaca Buram 220,000.00 242,000.00 242,000.000.050 Kg Sealent 45,000.00 2,250.00 2,250.00

244,250.00 244,250.00

b.Tenaga0.025 Oh Pekerja 44,000.00 1,100.00 1,100.000.250 Oh Tukang Kayu/kaca 77,000.00 19,250.00 19,250.000.025 Oh Kepala Tukang 99,000.00 2,475.00 2,475.00

0.00125 Oh Mandor 104,500.00 130.63 130.6322,955.63 22,955.63

Jumlah 244,250.00 22,955.63 267,205.63

12.18a. Bahan

1.100 Kaca Cermin Tebal 3 mm 132,000.00 145,200.00 145,200.00145,200.00 145,200.00

b.Tenaga0.015 Oh Pekerja 44,000.00 660.00 660.000.150 Oh Tukang Kayu/kaca 77,000.00 11,550.00 11,550.000.015 Oh Kepala Tukang 99,000.00 1,485.00 1,485.00

0.00075 Oh Mandor 104,500.00 78.38 78.3813,773.38 13,773.38

Jumlah 145,200.00 13,773.38 158,973.38

12.19a. Bahan

1.100 Kaca Cermin Tebal 5 mm 371,250.00 408,375.00 408,375.00 408,375.00 408,375.00

b.Tenaga0.015 Oh Pekerja 44,000.00 660.00 660.000.150 Oh Tukang Kayu/kaca 77,000.00 11,550.00 11,550.000.015 Oh Kepala Tukang 99,000.00 1,485.00 1,485.00

0.00075 Oh Mandor 104,500.00 78.38 78.3813,773.38 13,773.38

Jumlah 408,375.00 13,773.38 422,148.38

12.20a. Bahan

1.100 Kaca Patri 1,320,000.00 1,452,000.00 1,452,000.001,452,000.00 1,452,000.00

b.Tenaga0.015 Oh Pekerja 44,000.00 660.00 660.000.150 Oh Tukang Kayu/kaca 77,000.00 11,550.00 11,550.000.015 Oh Kepala Tukang 99,000.00 1,485.00 1,485.00

0.00075 Oh Mandor 104,500.00 78.38 78.3813,773.38 13,773.38

Jumlah 1,452,000.00 13,773.38 1,465,773.38

12.21 1 Set Pekerjaan Pasang Jendela Kaca Nako Biasaa. Bahan

1 Set Bingkai Nako 27,500.00 27,500.00 27,500.001 Set Kaca Nako 6 daun 140,250.00 140,250.00 140,250.001 Set Kaca Nako 8 daun 156,750.00 156,750.00 156,750.00

Nako 6 daun 167,750.00 167,750.00Nako 8 daun 184,250.00 184,250.00

b.Tenaga0.015 Oh Pekerja 44,000.00 660.00 660.000.150 Oh Tukang Kayu/kaca 77,000.00 11,550.00 11,550.000.015 Oh Kepala Tukang 99,000.00 1,485.00 1,485.00

0.00075 Oh Mandor 104,500.00 78.38 78.3813,773.38 13,773.38

Nako 6 daun 167,750.00 13,773.38 181,523.38Nako 8 daun 184,250.00 13,773.38 198,023.38

12.22 1 Set Pekerjaan Pasang Jendela Kaca Nako Raybena. Bahan

1 Set Bingkai Naco 27,500.00 27,500.00 27,500.001 Set Kaca Naco 6 daun Rayben 184,250.00 184,250.00 184,250.001 Set Kaca Naco 8 daun Rayben 195,250.00 195,250.00 195,250.00

Nako 6 daun 211,750.00 211,750.00Nako 8 daun 222,750.00 222,750.00

b.Tenaga0.015 Oh Pekerja 44,000.00 660.00 660.000.150 Oh Tukang Kayu/kaca 77,000.00 11,550.00 11,550.00

1 m2 Pasang Kaca Buram, Tebal 12 mm

M2

1 m2 Pasang Kaca Cermin, Tebal 3 mm

M2

1 m2 Pasang Kaca Cermin, Tebal 5 mm

M2

1 m2 Pasang Kaca Patri, Tebal 5 mm

M2

Page 101: DrfatAnalisa2010 Smt Iok Palembang

Daftar Analisa Pekerjaan Kota Palembang TA. 2010 Semester I

- 101 -

U R A I A N

SATUAN HARGA NO. Harga Jumlah Harga Jumlah Jumlah

Analisa Satuan Bahan Tenaga Bahan+Tenaga(Rp) (Rp) (Rp) (Rp)

1 2 3 4 5 60.015 Oh Kepala Tukang 99,000.00 1,485.00 1,485.00

0.00075 Oh Mandor 104,500.00 78.38 78.3813,773.38 13,773.38

Nako 6 daun Rayben 211,750.00 13,773.38 225,523.38Nako 8 daun Rayben 222,750.00 13,773.38 236,523.38

XIII PEKERJAAN PENUTUP LANTAI DAN DINDING

13.1a. Bahan

6.930 Bh Ubin Granito 40 x 40 cm 40,480.00 280,526.40 280,526.409.800 Kg Semen Portland 2,200.00 21,560.00 21,560.00

0.0215 Pasir Pasang 82,500.00 1,773.75 1,773.751.300 Kg Semen Warna 9,900.00 12,870.00 12,870.00

316,730.15 316,730.15b.Tenaga

0.250 Oh Pekerja 44,000.00 11,000.00 11,000.000.120 Oh Tukang Batu 77,000.00 9,240.00 9,240.000.012 Oh Kepala Tukang 99,000.00 1,188.00 1,188.00

0.0125 Oh Mandor 104,500.00 1,306.25 1,306.2522,734.25 22,734.25

Jumlah 316,730.15 22,734.25 339,464.40

13.2a. Bahan

11.870 Bh Ubin Granito 30 x 30 cm 18,810.00 223,274.70 223,274.70 10.000 Kg Semen Portland 2,200.00 22,000.00 22,000.000.0215 Pasir Pasang 82,500.00 1,773.75 1,773.75

1.500 Kg Semen Warna 9,900.00 14,850.00 14,850.00261,898.45 261,898.45

b.Tenaga0.260 Oh Pekerja 44,000.00 11,440.00 11,440.000.125 Oh Tukang Batu 77,000.00 9,625.00 9,625.00

0.0125 Oh Kepala Tukang 99,000.00 1,237.50 1,237.500.013 Oh Mandor 104,500.00 1,358.50 1,358.50

23,661.00 23,661.00

Jumlah 261,898.45 23,661.00 285,559.45

13.3a. Bahan

3.000 Bh Ubin Teralux Marmer 60 x 60 cm 94,400.00 283,200.00 283,200.00 8.190 Kg Semen Portland 2,200.00 18,018.00 18,018.000.045 Pasir Pasang 82,500.00 3,712.50 3,712.501.000 Kg Semen Warna 9,900.00 9,900.00 9,900.00

314,830.50 314,830.50

b.Tenaga0.250 Oh Pekerja 44,000.00 11,000.00 11,000.000.120 Oh Tukang Batu 77,000.00 9,240.00 9,240.00

0.0120 Oh Kepala Tukang 99,000.00 1,188.00 1,188.000.0125 Oh Mandor 104,500.00 1,306.25 1,306.25

22,734.25 22,734.25

Jumlah 314,830.50 22,734.25 337,564.75

13.4a. Bahan

6.250 Bh Ubin Teralux Marmer 40 x 40 cm 45,312.00 283,200.00 283,200.00 8.800 Kg Semen Portland 2,200.00 19,360.00 19,360.00

0.0215 Pasir Pasang 82,500.00 1,773.75 1,773.751.300 Kg Semen Warna 9,900.00 12,870.00 12,870.00

317,203.75 317,203.75

b.Tenaga0.672 Oh Pekerja 44,000.00 29,568.00 29,568.000.224 Oh Tukang Batu 77,000.00 17,248.00 17,248.000.022 Oh Kepala Tukang 99,000.00 2,178.00 2,178.000.034 Oh Mandor 104,500.00 3,553.00 3,553.00

52,547.00 52,547.00

Jumlah 317,203.75 52,547.00 369,750.75

13.5a. Bahan

11.870 Bh Ubin Teralux Marmer 30 x 30 cm 23,858.47 283,200.00 283,200.00 10.000 Kg Semen Portland 2,200.00 22,000.00 22,000.000.0215 Pasir Pasang 82,500.00 1,773.75 1,773.75

1.500 Kg Semen Warna 9,900.00 14,850.00 14,850.00321,823.75 321,823.75

b.Tenaga0.700 Oh Pekerja 44,000.00 30,800.00 30,800.00

1 m2 Pasang Lantai Granito Ukuran 40 x 40 cm

M3

1 m2 Pasang Lantai Granito Ukuran 30 x 30 cm

M3

1 m2 Pasang Lantai Ubin Teralux Marmer Ukuran 60 x 60 cm

M3

1 m2 Pasang Lantai Ubin Teralux Marmer Ukuran 40 x 40 cm

M3

1 m2 Pasang Lantai Ubin Teralux Marmer Ukuran 30 x 30 cm

M3

Page 102: DrfatAnalisa2010 Smt Iok Palembang

Daftar Analisa Pekerjaan Kota Palembang TA. 2010 Semester I

- 102 -

U R A I A N

SATUAN HARGA NO. Harga Jumlah Harga Jumlah Jumlah

Analisa Satuan Bahan Tenaga Bahan+Tenaga(Rp) (Rp) (Rp) (Rp)

1 2 3 4 5 60.340 Oh Tukang Batu 77,000.00 26,180.00 26,180.000.034 Oh Kepala Tukang 99,000.00 3,366.00 3,366.000.035 Oh Mandor 104,500.00 3,657.50 3,657.50

64,003.50 64,003.50

Jumlah 321,823.75 64,003.50 385,827.25

13.6a. Bahan

3.530 Bh Plint Ubin Teraso 10 x 30 cm 852.50 3,009.33 3,009.331.560 Kg Semen Portland 2,200.00 3,432.00 3,432.000.003 Pasir Pasang 82,500.00 247.50 247.500.190 Kg Semen Warna 9,900.00 1,881.00 1,881.00

8,569.83 8,569.83

b.Tenaga0.080 Oh Pekerja 44,000.00 3,520.00 3,520.000.040 Oh Tukang Batu 77,000.00 3,080.00 3,080.000.004 Oh Kepala Tukang 99,000.00 396.00 396.000.004 Oh Mandor 104,500.00 418.00 418.00

7,414.00 7,414.00

Jumlah 8,569.83 7,414.00 15,983.83

13.7a. Bahan

2.650 Bh Plint Ubin Teraso 10 x 40 cm 907.50 2,404.88 2,404.881.200 Kg Semen Portland 2,200.00 2,640.00 2,640.000.003 Pasir Pasang 82,500.00 247.50 247.500.100 Kg Semen Warna 9,900.00 990.00 990.00

6,282.38 6,282.38

b.Tenaga0.800 Oh Pekerja 44,000.00 35,200.00 35,200.000.040 Oh Tukang Batu 77,000.00 3,080.00 3,080.000.004 Oh Kepala Tukang 99,000.00 396.00 396.000.004 Oh Mandor 104,500.00 418.00 418.00

39,094.00 39,094.00

Jumlah 6,282.38 39,094.00 45,376.3813.8

a. Bahan2.650 Bh Plint Ubin Granito 10 x 40 cm 10,120.00 26,818.00 26,818.001.200 Kg Semen Portland 2,200.00 2,640.00 2,640.000.003 Pasir Pasang 82,500.00 247.50 247.500.100 Kg Semen Warna 9,900.00 990.00 990.00

30,695.50 30,695.50

b.Tenaga0.060 Oh Pekerja 44,000.00 2,640.00 2,640.000.030 Oh Tukang Batu 77,000.00 2,310.00 2,310.000.003 Oh Kepala Tukang 99,000.00 297.00 297.000.003 Oh Mandor 104,500.00 313.50 313.50

5,560.50 5,560.50

Jumlah 30,695.50 5,560.50 36,256.00

13.9a. Bahan

3.330 Bh Plint Ubin Granito 10 x 30 cm 6,270.00 20,879.10 20,879.101.650 Kg Semen Portland 2,200.00 3,630.00 3,630.00

0.0032 Pasir Pasang 82,500.00 264.00 264.000.100 Kg Semen Warna 9,900.00 990.00 990.00

25,763.10 25,763.10

b.Tenaga0.900 Oh Pekerja 44,000.00 39,600.00 39,600.000.090 Oh Tukang Batu 77,000.00 6,930.00 6,930.000.009 Oh Kepala Tukang 99,000.00 891.00 891.00

0.0045 Oh Mandor 104,500.00 470.25 470.2547,891.25 47,891.25

Jumlah 25,763.10 47,891.25 73,654.35

13.10a. Bahan

1.700 Bh Plint Ubin Teralux Marmer 10 x 60 cm 15,733.33 26,746.67 26,746.671.650 Kg Semen Portland 2,200.00 3,630.00 3,630.00

0.0032 Pasir Pasang 82,500.00 264.00 264.000.100 Kg Semen Warna 9,900.00 990.00 990.00

31,630.67 31,630.67

b.Tenaga0.900 Oh Pekerja 44,000.00 39,600.00 39,600.000.090 Oh Tukang Batu 77,000.00 6,930.00 6,930.000.009 Oh Kepala Tukang 99,000.00 891.00 891.00

1 m' Pasang Plint Ubin Teraso Ukuran 10 x 30 cm

M3

1 m' Pasang Plint Ubin Teraso Ukuran 10 x 40 cm

M3

1 m' Pasang Plint Ubin Granito Ukuran 10 x 40 cm

M3

1 m' Pasang Plint Ubin Granito Ukuran 10 x 30 cm

M3

1 m' Pasang Plint Ubin Teralux Marmer Ukuran 10 x 60 cm

M3

Page 103: DrfatAnalisa2010 Smt Iok Palembang

Daftar Analisa Pekerjaan Kota Palembang TA. 2010 Semester I

- 103 -

U R A I A N

SATUAN HARGA NO. Harga Jumlah Harga Jumlah Jumlah

Analisa Satuan Bahan Tenaga Bahan+Tenaga(Rp) (Rp) (Rp) (Rp)

1 2 3 4 5 60.0045 Oh Mandor 104,500.00 470.25 470.25

47,891.25 47,891.25

Jumlah 31,630.67 47,891.25 79,521.92

13.11a. Bahan

2.500 Bh Plint Ubin Teralux Marmer 10 x 40 cm 11,328.00 28,320.00 28,320.001.650 Kg Semen Portland 2,200.00 3,630.00 3,630.00

0.0032 Pasir Pasang 82,500.00 264.00 264.000.100 Kg Semen Warna 9,900.00 990.00 990.00

33,204.00 33,204.00b.Tenaga

0.900 Oh Pekerja 44,000.00 39,600.00 39,600.000.090 Oh Tukang Batu 77,000.00 6,930.00 6,930.000.009 Oh Kepala Tukang 99,000.00 891.00 891.00

0.0045 Oh Mandor 104,500.00 470.25 470.2547,891.25 47,891.25

Jumlah 33,204.00 47,891.25 81,095.25

13.12a. Bahan

3.330 Bh Plint Ubin Teralux Marmer 10 x 30 cm 7,952.82 26,482.90 26,482.901.650 Kg Semen Portland 2,200.00 3,630.00 3,630.00

0.0032 Pasir Pasang 82,500.00 264.00 264.000.100 Kg Semen Warna 9,900.00 990.00 990.00

31,366.90 31,366.90

b.Tenaga0.900 Oh Pekerja 44,000.00 39,600.00 39,600.000.090 Oh Tukang Batu 77,000.00 6,930.00 6,930.000.009 Oh Kepala Tukang 99,000.00 891.00 891.00

0.0045 Oh Mandor 104,500.00 470.25 470.2547,891.25 47,891.25

Jumlah 31,366.90 47,891.25 79,258.15

13.13a. Bahan

50 Bh Ubin Keramik Artistik 10 x 20 cm 6,100.00 305,000.00 305,000.0011.380 Kg Semen Portland 2,200.00 25,036.00 25,036.00

0.042 Pasir Pasang 82,500.00 3,465.00 3,465.001.500 Kg Semen Warna 9,900.00 14,850.00 14,850.00

348,351.00 348,351.00

b.Tenaga0.620 Oh Pekerja 44,000.00 27,280.00 27,280.000.350 Oh Tukang Batu 77,000.00 26,950.00 26,950.000.035 Oh Kepala Tukang 99,000.00 3,465.00 3,465.000.030 Oh Mandor 104,500.00 3,135.00 3,135.00

60,830.00 60,830.00

Jumlah 348,351.00 60,830.00 409,181.00

13.14a. Bahan

50 Bh Ubin Keramik Artistik 10 x 10 cm 6,100.00 305,000.00 305,000.00 11.380 Kg Semen Portland 2,200.00 25,036.00 25,036.00

0.042 Pasir Pasang 82,500.00 3,465.00 3,465.002.000 Kg Semen Warna 9,900.00 19,800.00 19,800.00

353,301.00 353,301.00

b.Tenaga0.620 Oh Pekerja 44,000.00 27,280.00 27,280.000.350 Oh Tukang Batu 77,000.00 26,950.00 26,950.000.035 Oh Kepala Tukang 99,000.00 3,465.00 3,465.000.030 Oh Mandor 104,500.00 3,135.00 3,135.00

60,830.00 60,830.00

Jumlah 353,301.00 60,830.00 414,131.00

13.15a. Bahan

100 Bh Ubin Keramik Artistik 5 x 20 cm 6,100.00 610,000.00 610,000.00 11.380 Kg Semen Portland 2,200.00 25,036.00 25,036.00

0.042 Pasir Pasang 82,500.00 3,465.00 3,465.001.500 Kg Semen Warna 9,900.00 14,850.00 14,850.00

653,351.00 653,351.00b.Tenaga

0.620 Oh Pekerja 44,000.00 27,280.00 27,280.000.350 Oh Tukang Batu 77,000.00 26,950.00 26,950.000.035 Oh Kepala Tukang 99,000.00 3,465.00 3,465.000.030 Oh Mandor 104,500.00 3,135.00 3,135.00

60,830.00 60,830.00

Jumlah 653,351.00 60,830.00 714,181.00

1 m' Pasang Plint Ubin Teralux Marmer Ukuran 10 x 40 cm

M3

1 m' Pasang Plint Ubin Teralux Marmer Ukuran 10 x 30 cm

M3

1 m2 Pasang Lantai Keramik Artistik Ukuran 10 x 20 cm

M3

1 m2 Pasang Lantai Keramik Artistik Ukuran 10 x 10 cm

M3

1 m2 Pasang Lantai Keramik Artistik Ukuran 5 x 20 cm

M3

Page 104: DrfatAnalisa2010 Smt Iok Palembang

Daftar Analisa Pekerjaan Kota Palembang TA. 2010 Semester I

- 104 -

U R A I A N

SATUAN HARGA NO. Harga Jumlah Harga Jumlah Jumlah

Analisa Satuan Bahan Tenaga Bahan+Tenaga(Rp) (Rp) (Rp) (Rp)

1 2 3 4 5 6

13.16a. Bahan

5 Bh Plint Keramik Artistik 10 x 20 cm 6,100.00 30,500.00 30,500.00 1.650 Kg Semen Portland 2,200.00 3,630.00 3,630.00

0.0032 Pasir Pasang 82,500.00 264.00 264.000.100 Kg Semen Warna 9,900.00 990.00 990.00

35,384.00 35,384.00

b.Tenaga0.090 Oh Pekerja 44,000.00 3,960.00 3,960.000.090 Oh Tukang Batu 77,000.00 6,930.00 6,930.000.009 Oh Kepala Tukang 99,000.00 891.00 891.00

0.0045 Oh Mandor 104,500.00 470.25 470.2512,251.25 12,251.25

Jumlah 35,384.00 12,251.25 47,635.25

13.17a. Bahan

5 Bh Plint Keramik Artistik 10 x 10 cm 6,100.00 30,500.00 30,500.00 1.650 Kg Semen Portland 2,200.00 3,630.00 3,630.00

0.0032 Pasir Pasang 82,500.00 264.00 264.000.120 Kg Semen Warna 9,900.00 1,188.00 1,188.00

35,582.00 35,582.00

b.Tenaga0.090 Oh Pekerja 44,000.00 3,960.00 3,960.000.090 Oh Tukang Batu 77,000.00 6,930.00 6,930.000.009 Oh Kepala Tukang 99,000.00 891.00 891.00

0.0045 Oh Mandor 104,500.00 470.25 470.2512,251.25 12,251.25

Jumlah 35,582.00 12,251.25 47,833.25

13.18a. Bahan

5 Bh Plint Keramik Artistik 5 x 20 cm 6,100.00 30,500.00 30,500.00 0.850 Kg Semen Portland 2,200.00 1,870.00 1,870.00

0.0022 Pasir Pasang 82,500.00 181.50 181.500.080 Kg Semen Warna 9,900.00 792.00 792.00

33,343.50 33,343.50

b.Tenaga0.090 Oh Pekerja 44,000.00 3,960.00 3,960.000.090 Oh Tukang Batu 77,000.00 6,930.00 6,930.000.009 Oh Kepala Tukang 99,000.00 891.00 891.00

0.0045 Oh Mandor 104,500.00 470.25 470.2512,251.25 12,251.25

Jumlah 33,343.50 12,251.25 45,594.75

13.19a. Bahan

50 Bh Ubin Keramik 10 x 20 cm 935.00 46,750.00 46,750.0011.380 Kg Semen Portland 2,200.00 25,036.00 25,036.00

0.042 Pasir Pasang 82,500.00 3,465.00 3,465.001.500 Kg Semen Warna 9,900.00 14,850.00 14,850.00

90,101.00 90,101.00

b.Tenaga0.620 Oh Pekerja 44,000.00 27,280.00 27,280.000.350 Oh Tukang Batu 77,000.00 26,950.00 26,950.000.035 Oh Kepala Tukang 99,000.00 3,465.00 3,465.000.030 Oh Mandor 104,500.00 3,135.00 3,135.00

60,830.00 60,830.00

Jumlah 90,101.00 60,830.00 150,931.00

13.20a. Bahan

25 Bh Ubin Keramik 20 x 20 cm 1,870.00 46,750.00 46,750.0011.380 Kg Semen Portland 2,200.00 25,036.00 25,036.00

0.042 Pasir Pasang 82,500.00 3,465.00 3,465.001.500 Kg Semen Warna 9,900.00 14,850.00 14,850.00

90,101.00 90,101.00

b.Tenaga0.620 Oh Pekerja 44,000.00 27,280.00 27,280.000.350 Oh Tukang Batu 77,000.00 26,950.00 26,950.000.035 Oh Kepala Tukang 99,000.00 3,465.00 3,465.000.030 Oh Mandor 104,500.00 3,135.00 3,135.00

60,830.00 60,830.00

Jumlah 90,101.00 60,830.00 150,931.00

1 m2 Pasang Plint Keramik Artistik Ukuran 10 x 20 cm

M3

1 m2 Pasang Plint Keramik Artistik Ukuran 10 x 10 cm

M3

1 m2 Pasang Plint Keramik Artistik Ukuran 5 x 20 cm

M3

1 m2 Pasang Lantai Keramik Ukuran 10 x 20 cm

M3

1 m2 Pasang Lantai Keramik Ukuran 20 x 20 cm

M3

Page 105: DrfatAnalisa2010 Smt Iok Palembang

Daftar Analisa Pekerjaan Kota Palembang TA. 2010 Semester I

- 105 -

U R A I A N

SATUAN HARGA NO. Harga Jumlah Harga Jumlah Jumlah

Analisa Satuan Bahan Tenaga Bahan+Tenaga(Rp) (Rp) (Rp) (Rp)

1 2 3 4 5 6

13.21a. Bahan

35 Bh Ubin Keramik 15 x 20 cm 1,524.29 53,350.00 53,350.00 11.380 Kg Semen Portland 2,200.00 25,036.00 25,036.00

0.042 Pasir Pasang 82,500.00 3,465.00 3,465.001.500 Kg Semen Warna 9,900.00 14,850.00 14,850.00

96,701.00 96,701.00

b.Tenaga0.620 Oh Pekerja 44,000.00 27,280.00 27,280.000.350 Oh Tukang Batu 77,000.00 26,950.00 26,950.000.035 Oh Kepala Tukang 99,000.00 3,465.00 3,465.000.030 Oh Mandor 104,500.00 3,135.00 3,135.00

60,830.00 60,830.00

Jumlah 96,701.00 60,830.00 157,531.00

13.22a. Bahan

11.11 Bh Ubin Keramik Warna 30 x 30 cm 4,801.50 53,344.72 53,344.72 11.380 Kg Semen Portland 2,200.00 25,036.00 25,036.00

0.042 Pasir Pasang 82,500.00 3,465.00 3,465.001.500 Kg Semen Warna 9,900.00 14,850.00 14,850.00

96,695.72 96,695.72

b.Tenaga0.620 Oh Pekerja 44,000.00 27,280.00 27,280.000.350 Oh Tukang Batu 77,000.00 26,950.00 26,950.000.035 Oh Kepala Tukang 99,000.00 3,465.00 3,465.000.030 Oh Mandor 104,500.00 3,135.00 3,135.00

60,830.00 60,830.00

Jumlah 96,695.72 60,830.00 157,525.72

13.23a. Bahan

11.11 Bh Ubin Keramik Putih 30 x 30 cm 3,366.00 37,396.30 37,396.30 11.380 Kg Semen Portland 2,200.00 25,036.00 25,036.00

0.042 Pasir Pasang 82,500.00 3,465.00 3,465.001.500 Kg Semen Warna 9,900.00 14,850.00 14,850.00

80,747.30 80,747.30

b.Tenaga0.620 Oh Pekerja 44,000.00 27,280.00 27,280.000.350 Oh Tukang Batu 77,000.00 26,950.00 26,950.000.035 Oh Kepala Tukang 99,000.00 3,465.00 3,465.000.030 Oh Mandor 104,500.00 3,135.00 3,135.00

60,830.00 60,830.00

Jumlah 80,747.30 60,830.00 141,577.30

13.24a. Bahan

6.25 Bh Keramik Warna 40 x 40 cm mutu C 8,976.00 56,100.00 56,100.00 6.25 Bh Keramik Warna 40 x 40 cm mutu B 16,368.00 102,300.00 102,300.00

11.380 Kg Semen Portland 2,200.00 25,036.00 25,036.000.042 Pasir Pasang 82,500.00 3,465.00 3,465.001.500 Kg Semen Warna 9,900.00 14,850.00 14,850.00

Mutu C 99,451.00 99,451.00Mutu B 145,651.00 145,651.00

b.Tenaga0.620 Oh Pekerja 44,000.00 27,280.00 27,280.000.350 Oh Tukang Batu 77,000.00 26,950.00 26,950.000.035 Oh Kepala Tukang 99,000.00 3,465.00 3,465.000.030 Oh Mandor 104,500.00 3,135.00 3,135.00

60,830.00 60,830.00

Mutu C , Jumlah 99,451.00 60,830.00 160,281.00Mutu B , Jumlah 145,651.00 60,830.00 206,481.00

13.25 1 m' Pasang Plint Keramik a. Bahan

3 Bh Plint Keramik Putih 10 x 30 cm 1,122.00 3,366.00 3,366.00 3 Bh Plint Keramik Warna 10 x 30 cm 1,600.50 4,801.50 4,801.50

2.5 Bh Plint Keramik Warna 10 x 40 cm mutu C 3,590.40 8,976.00 8,976.00 2.5 Bh Plint Keramik Warna 10 x 40 cm mutu B 6,547.20 16,368.00 16,368.00

0.850 Kg Semen Portland 2,200.00 1,870.00 1,870.000.0022 Pasir Pasang 82,500.00 181.50 181.50

0.080 Kg Semen Warna 9,900.00 792.00 792.00Plint keramik putih 10 X 30 cm 6,209.50 6,209.50

Plint keramik Warna 10 X 30 cm 7,645.00 7,645.00Plint keramik Warna 10 X 40 cm, mutu C 11,819.50 11,819.50Plint keramik Warna 10 X 40 cm, mutu B 19,211.50 19,211.50

1 m2 Pasang Lantai Keramik Ukuran 15 x 20 cm

M3

1 m2 Pasang Lantai Keramik Warna Ukuran 30 x 30 cm

M3

1 m2 Pasang Lantai Keramik Putih Ukuran 30 x 30 cm

M3

1 m2 Pasang Lantai Keramik Warna Ukuran 40 x 40 cm

M3

M3

Page 106: DrfatAnalisa2010 Smt Iok Palembang

Daftar Analisa Pekerjaan Kota Palembang TA. 2010 Semester I

- 106 -

U R A I A N

SATUAN HARGA NO. Harga Jumlah Harga Jumlah Jumlah

Analisa Satuan Bahan Tenaga Bahan+Tenaga(Rp) (Rp) (Rp) (Rp)

1 2 3 4 5 6

b.Tenaga0.090 Oh Pekerja 44,000.00 3,960.00 3,960.000.090 Oh Tukang Batu 77,000.00 6,930.00 6,930.000.009 Oh Kepala Tukang 99,000.00 891.00 891.00

0.0045 Oh Mandor 104,500.00 470.25 470.2512,251.25 12,251.25

Plint keramik putih 10 X 30 cm 6,209.50 12,251.25 18,460.75Plint keramik Warna 10 X 30 cm 7,645.00 12,251.25 19,896.25

Plint keramik Warna 10 X 40 cm, mutu C 11,819.50 12,251.25 24,070.75Plint keramik Warna 10 X 40 cm, mutu B 19,211.50 12,251.25 31,462.75

13.26a. Bahan

1.052 Marmer 283,200.00 297,926.40 297,926.4014.150 Kg Semen Portland 2,200.00 31,130.00 31,130.00

0.039 Pasir Pasang 82,500.00 3,217.50 3,217.502.000 Kg Semen Warna 9,900.00 19,800.00 19,800.00

352,073.90 352,073.90b.Tenaga

0.620 Oh Pekerja 44,000.00 27,280.00 27,280.000.350 Oh Tukang Batu 77,000.00 26,950.00 26,950.000.035 Oh Kepala Tukang 99,000.00 3,465.00 3,465.000.030 Oh Mandor 104,500.00 3,135.00 3,135.00

60,830.00 60,830.00Jumlah 352,073.90 60,830.00 412,903.90

13.27a. Bahan

1.050 Carpet 6 mm 75,625.00 79,406.25 79,406.25 0.350 Kg Lem Vinyl 4,950.00 1,732.50 1,732.50

81,138.75 81,138.75

b.Tenaga0.170 Oh Pekerja 44,000.00 7,480.00 7,480.000.170 Oh Tukang Batu 77,000.00 13,090.00 13,090.000.017 Oh Kepala Tukang 99,000.00 1,683.00 1,683.00

0.0085 Oh Mandor 104,500.00 888.25 888.2523,141.25 23,141.25

Jumlah 81,138.75 23,141.25 104,280.00

13.28a. Bahan

1.020 Wallpaper 49,500.00 50,490.00 50,490.00 0.350 Kg Lem Vinyl 4,950.00 1,732.50 1,732.50

52,222.50 52,222.50

b.Tenaga0.170 Oh Pekerja 44,000.00 7,480.00 7,480.000.170 Oh Tukang Batu 77,000.00 13,090.00 13,090.000.017 Oh Kepala Tukang 99,000.00 1,683.00 1,683.00

0.0085 Oh Mandor 104,500.00 888.25 888.2523,141.25 23,141.25

Jumlah 52,222.50 23,141.25 75,363.75

13.29a. Bahan

1.050 Parquet Jati 423,500.00 444,675.00 444,675.00 0.600 Kg Lem Vinyl 4,950.00 2,970.00 2,970.00

447,645.00 447,645.00

b.Tenaga0.650 Oh Pekerja 44,000.00 28,600.00 28,600.000.350 Oh Tukang Batu 77,000.00 26,950.00 26,950.000.035 Oh Kepala Tukang 99,000.00 3,465.00 3,465.00

0.0325 Oh Mandor 104,500.00 3,396.25 3,396.2562,411.25 62,411.25

Jumlah 447,645.00 62,411.25 510,056.25

13.30a. Bahan

100 Bh Porselin 11 x 11 cm, Putih 440.00 44,000.00 44,000.00 9.300 Kg Semen Abu-abu 2,200.00 20,460.00 20,460.000.018 Pasir Pasang 82,500.00 1,485.00 1,485.001.500 Kg Semen Puith 4,400.00 6,600.00 6,600.00

72,545.00 72,545.00

b.Tenaga0.620 Oh Pekerja 44,000.00 27,280.00 27,280.000.500 Oh Tukang Batu 77,000.00 38,500.00 38,500.000.050 Oh Kepala Tukang 99,000.00 4,950.00 4,950.000.030 Oh Mandor 104,500.00 3,135.00 3,135.00

73,865.00 73,865.00

1 m2 Pasang Lantai Marmer

M2

M3

1 m2 Pasang Lantai Karpet 6 mm

M2

1 m2 Pasang dinding Wallpaper

M2

1 m2 Pasang Lantai Parquet Jati

M2

1 m2 Pasang Dinding Porselin 10 x 10 cm, putih

M3

Page 107: DrfatAnalisa2010 Smt Iok Palembang

Daftar Analisa Pekerjaan Kota Palembang TA. 2010 Semester I

- 107 -

U R A I A N

SATUAN HARGA NO. Harga Jumlah Harga Jumlah Jumlah

Analisa Satuan Bahan Tenaga Bahan+Tenaga(Rp) (Rp) (Rp) (Rp)

1 2 3 4 5 6Jumlah 72,545.00 73,865.00 146,410.00

13.31a. Bahan

100 Bh Porselin 11 x 11 cm warna 852.50 85,250.00 85,250.00 9.300 Kg Semen Abu-abu 2,200.00 20,460.00 20,460.000.018 Pasir Pasang 82,500.00 1,485.00 1,485.001.500 Kg Semen Warna 9,900.00 14,850.00 14,850.00

122,045.00 122,045.00

b.Tenaga0.620 Oh Pekerja 44,000.00 27,280.00 27,280.000.500 Oh Tukang Batu 77,000.00 38,500.00 38,500.000.050 Oh Kepala Tukang 99,000.00 4,950.00 4,950.000.030 Oh Mandor 104,500.00 3,135.00 3,135.00

73,865.00 73,865.00

Jumlah 122,045.00 73,865.00 195,910.00

13.32a. Bahan

1.020 Marmer 283,200.00 288,864.00 288,864.002.000 Bh Paku Pancing 60 x 230 - - -

12.440 Kg Semen Abu-abu 2,200.00 27,368.00 27,368.000.025 Pasir Pasang 82,500.00 2,062.50 2,062.501.500 Kg Semen Warna 9,900.00 14,850.00 14,850.00

333,144.50 333,144.50b.Tenaga

0.720 Oh Pekerja 44,000.00 31,680.00 31,680.000.650 Oh Tukang Batu 77,000.00 50,050.00 50,050.000.065 Oh Kepala Tukang 99,000.00 6,435.00 6,435.000.035 Oh Mandor 104,500.00 3,657.50 3,657.50

91,822.50 91,822.50

Jumlah 333,144.50 91,822.50 424,967.00

13.33a. Bahan

1.050 Batu Tempel Hitam 68,750.00 72,187.50 72,187.500.100 Kg Anti Lumut/Vernis batu 64,900.00 6,490.00 6,490.00

11.750 Kg Semen Abu-abu 2,200.00 25,850.00 25,850.000.035 Pasir Pasang 82,500.00 2,887.50 2,887.50

107,415.00 107,415.00

b.Tenaga0.620 Oh Pekerja 44,000.00 27,280.00 27,280.000.350 Oh Tukang Batu 77,000.00 26,950.00 26,950.000.035 Oh Kepala Tukang 99,000.00 3,465.00 3,465.000.030 Oh Mandor 104,500.00 3,135.00 3,135.00

60,830.00 60,830.00

Jumlah 107,415.00 60,830.00 168,245.00

13.34a. Bahan

1.050 Batu Candi hitam 231,000.00 242,550.00 242,550.000.100 Kg Anti Lumut/Vernis batu 64,900.00 6,490.00 6,490.00

11.750 Kg Semen Abu-abu 2,200.00 25,850.00 25,850.000.035 Pasir Pasang 82,500.00 2,887.50 2,887.50

277,777.50 277,777.50

b.Tenaga0.620 Oh Pekerja 44,000.00 27,280.00 27,280.000.350 Oh Tukang Batu 77,000.00 26,950.00 26,950.000.035 Oh Kepala Tukang 99,000.00 3,465.00 3,465.000.030 Oh Mandor 104,500.00 3,135.00 3,135.00

60,830.00 60,830.00

Jumlah 277,777.50 60,830.00 338,607.50

13.35a. Bahan

1.020 Batu alam/Palimanan 198,000.00 201,960.00 201,960.000.100 Kg Anti Lumut/Vernis batu 64,900.00 6,490.00 6,490.00

12.440 Kg Semen Abu-abu 2,200.00 27,368.00 27,368.000.025 Pasir Pasang 82,500.00 2,062.50 2,062.501.500 Kg Semen Warna 9,900.00 14,850.00 14,850.00

252,730.50 252,730.50b.Tenaga

0.720 Oh Pekerja 44,000.00 31,680.00 31,680.000.650 Oh Tukang Batu 77,000.00 50,050.00 50,050.000.065 Oh Kepala Tukang 99,000.00 6,435.00 6,435.000.035 Oh Mandor 104,500.00 3,657.50 3,657.50

91,822.50 91,822.50

1 m2 Pasang Dinding Porselin 10 x 10 cm, Warna

M3

1 m2 Pasang Dinding Marmer

M2

M3

1 m2 Pasang Dinding Batu Tempel Hitam/Kali + anti lumut (vernis)

M2

M3

1 m2 Pasang Dinding Batu Candi Hitam + anti lumut (vernis)

M2

M3

1 m2 Pasang Dinding batu Alam / Palimanan + anti lumut(vernis)

M2

M3

Page 108: DrfatAnalisa2010 Smt Iok Palembang

Daftar Analisa Pekerjaan Kota Palembang TA. 2010 Semester I

- 108 -

U R A I A N

SATUAN HARGA NO. Harga Jumlah Harga Jumlah Jumlah

Analisa Satuan Bahan Tenaga Bahan+Tenaga(Rp) (Rp) (Rp) (Rp)

1 2 3 4 5 6Jumlah 252,730.50 91,822.50 344,553.00

13.36a. Bahan

1.020 Batu alam/KarangPilang 302,500.00 308,550.00 308,550.000.100 Kg Anti Lumut/Vernis batu 64,900.00 6,490.00 6,490.00

12.440 Kg Semen Abu-abu 2,200.00 27,368.00 27,368.000.025 Pasir Pasang 82,500.00 2,062.50 2,062.501.500 Kg Semen Warna 9,900.00 14,850.00 14,850.00

359,320.50 359,320.50b.Tenaga

0.720 Oh Pekerja 44,000.00 31,680.00 31,680.000.650 Oh Tukang Batu 77,000.00 50,050.00 50,050.000.065 Oh Kepala Tukang 99,000.00 6,435.00 6,435.000.035 Oh Mandor 104,500.00 3,657.50 3,657.50

91,822.50 91,822.50

Jumlah 359,320.50 91,822.50 451,143.00

13.37a. Bahan

1.020 Batu alam/Andesit(garis-garis) 275,000.00 280,500.00 280,500.000.100 Kg Anti Lumut/Vernis batu 64,900.00 6,490.00 6,490.00

12.440 Kg Semen Abu-abu 2,200.00 27,368.00 27,368.000.025 Pasir Pasang 82,500.00 2,062.50 2,062.501.500 Kg Semen Warna 9,900.00 14,850.00 14,850.00

331,270.50 331,270.50b.Tenaga

0.720 Oh Pekerja 44,000.00 31,680.00 31,680.000.650 Oh Tukang Batu 77,000.00 50,050.00 50,050.000.065 Oh Kepala Tukang 99,000.00 6,435.00 6,435.000.035 Oh Mandor 104,500.00 3,657.50 3,657.50

91,822.50 91,822.50

Jumlah 331,270.50 91,822.50 423,093.00

13.38a. Bahan

0.0024 Kayu Jati Papan 6,050,000.00 14,520.00 14,520.00 0.050 Kg Paku Skrup 3,5" 41,250.00 2,062.50 2,062.50

16,582.50 16,582.50

b.Tenaga0.120 Oh Pekerja 44,000.00 5,280.00 5,280.000.120 Oh Tukang Batu 77,000.00 9,240.00 9,240.000.012 Oh Kepala Tukang 99,000.00 1,188.00 1,188.000.006 Oh Mandor 104,500.00 627.00 627.00

16,335.00 16,335.00

Jumlah 16,582.50 16,335.00 32,917.50

13.39a. Bahan

58.5 Bh Bata Lobang 9 x 9 x 19 cm 605.00 35,392.50 35,392.5070.0 Bh Bata Lobang 5 x 11 x 22 cm 517.00 36,190.00 36,190.00

0.2480 Zak Semen Portland (PC) 57,200.00 14,185.60 14,185.600.047 Pasir Pasang 82,500.00 3,877.50 3,877.50

53,455.60 53,455.6054,253.10 54,253.10

b.Tenaga0.250 Oh Pekerja 44,000.00 11,000.00 11,000.000.160 Oh Tukang Batu 77,000.00 12,320.00 12,320.000.076 Oh Kepala Tukang 99,000.00 7,524.00 7,524.00

0.0250 Oh Mandor 104,500.00 2,612.50 2,612.5033,456.50 33,456.50

Bata lobang 53,455.60 33,456.50 86,912.10Bata merah/kecil 54,253.10 33,456.50 87,709.60

13.40a. Bahan

50 Bh Conblock 8 cm biasa, 10 X 20 cm 1,320.00 66,000.00 66,000.0050 Bh Conblock 8 cm Warna, 10 X 20 cm 1,980.00 99,000.00 99,000.0044 Bh Conblock segi enam warna, tbl. 8 cm, 15 X 25 cm 1,980.00 87,120.00 87,120.00

0.10 Pasir Pasang 82,500.00 8,250.00 8,250.00Coneblock biasa 8 cm 74,250.00 74,250.00

Coneblock warna 8 cm 107,250.00 107,250.00Coneblock segienam, warna tbl.8 cm 95,370.00 95,370.00

b.Tenaga0.3500 Oh Pekerja 44,000.00 15,400.00 15,400.000.0175 Oh Mandor 104,500.00 1,828.75 1,828.75

17,228.75 17,228.75

Coneblock biasa, tbl 8 cm 74,250.00 17,228.75 91,478.75

1 m2 Pasang Dinding batu Alam/KarangPilang + anti lumut(vernis)

M2

M3

1 m2 Pasang Dinding batu Alam/Andesit + anti lumut(vernis)

M2

M3

1 m2 plint Kayu 2 x 10 cm

M3

1 m2 Pas. Lantai Batu Bata Diplester

M3

1 m2 Pas. Coneblock, tebal 8 cm

M3

Page 109: DrfatAnalisa2010 Smt Iok Palembang

Daftar Analisa Pekerjaan Kota Palembang TA. 2010 Semester I

- 109 -

U R A I A N

SATUAN HARGA NO. Harga Jumlah Harga Jumlah Jumlah

Analisa Satuan Bahan Tenaga Bahan+Tenaga(Rp) (Rp) (Rp) (Rp)

1 2 3 4 5 6Coneblock warna, tbl. 8 cm 107,250.00 17,228.75 124,478.75

Coneblock segienam warna, tbl. 8 cm 95,370.00 17,228.75 112,598.75

13.41a. Bahan

50 Bh Coneblock 6 cm biasa, 10 X 20 cm 990.00 49,500.00 49,500.0050 Bh Coneblock 6 cm Warna, 10 X 20 cm 1,430.00 71,500.00 71,500.00

0.1000 Pasir Pasang 82,500.00 8,250.00 8,250.0057,750.00 57,750.0079,750.00 79,750.00

b.Tenaga0.3500 Oh Pekerja 44,000.00 15,400.00 15,400.000.0175 Oh Mandor 104,500.00 1,828.75 1,828.75

17,228.75 17,228.75

Coneblock biasa 6 cm 57,750.00 17,228.75 74,978.75Coneblock warna 6 cm 79,750.00 17,228.75 96,978.75

13.42a. Bahan

11.100 Bh Mozaik uk. 30 x 30 8,250.00 91,575.00 91,575.000.096 Zak Semen Portland (PC) 57,200.00 5,491.20 5,491.200.050 Perekat 694,733.60 34,736.68 34,736.68

131,802.88 131,802.88b.Tenaga

0.250 Oh Tukang Batu 77,000.00 19,250.00 19,250.000.025 Oh Kepala Tukang 99,000.00 2,475.00 2,475.000.500 Oh Pekerja 44,000.00 22,000.00 22,000.000.025 Oh Mandor 104,500.00 2,612.50 2,612.50

46,337.50 46,337.50

Jumlah 131,802.88 46,337.50 178,140.38

XIV PEKERJAAN PENGECATAN

14.1a. Bahan

0.050 Kg Soda Api 30,800.00 1,540.00 1,540.001,540.00 1,540.00

b.Tenaga0.150 Oh Pekerja 44,000.00 6,600.00 6,600.00

Oh Tukang Cat 77,000.00 0.00 0.00Oh Kepala Tukang 99,000.00 0.00 0.00

0.0025 Oh Mandor 104,500.00 261.25 261.256,861.25 6,861.25

Jumlah 1,540.00 6,861.25 8,401.25

14.2

a. Bahan0.050 Kg Sabun 11,000.00 550.00 550.00

550.00 550.00

b.Tenaga0.150 Oh Pekerja 44,000.00 6,600.00 6,600.00

Oh Tukang Cat 77,000.00 0.00 0.00Oh Kepala Tukang 99,000.00 0.00 0.00

0.0025 Oh Mandor 104,500.00 261.25 261.256,861.25 6,861.25

Jumlah 550.00 6,861.25 7,411.25

14.3

a. Bahan0.050 Kg Sabun 11,000.00 550.00 550.00

550.00 550.00b.Tenaga

0.150 Oh Pekerja 44,000.00 6,600.00 6,600.00Oh Tukang Cat 77,000.00 0.00 0.00Oh Kepala Tukang 99,000.00 0.00 0.00

0.0025 Oh Mandor 104,500.00 261.25 261.256,861.25 6,861.25

Jumlah 550.00 6,861.25 7,411.25

14.4a. Bahan

0.050 Kg Sabun 11,000.00 550.00 550.00550.00 550.00

b.Tenaga0.150 Oh Pekerja 44,000.00 6,600.00 6,600.00

1 m2 Pas. Coneblock, tebal 6 cm

M3

1 m2 Pas. Lantai Mozaik 30/30

M3

1 m2 Mengikis / Mengerok Permukaan Cat Tembok Lama

1 m2 Mencuci bidang permukaan tembok yang pernah di cat

1 m2 Mengerok karat cat lama permukaan baja dengan cara manual

1 m2 Menyabun Permukaan Tembok Lama

Page 110: DrfatAnalisa2010 Smt Iok Palembang

Daftar Analisa Pekerjaan Kota Palembang TA. 2010 Semester I

- 110 -

U R A I A N

SATUAN HARGA NO. Harga Jumlah Harga Jumlah Jumlah

Analisa Satuan Bahan Tenaga Bahan+Tenaga(Rp) (Rp) (Rp) (Rp)

1 2 3 4 5 6Oh Tukang Cat 77,000.00 0.00 0.00Oh Kepala Tukang 99,000.00 0.00 0.00

0.0025 Oh Mandor 104,500.00 261.25 261.256,861.25 6,861.25

Jumlah 550.00 6,861.25 7,411.25

14.5a. Bahan

0.080 Kg Dempul Jadi 13,200.00 1,056.00 1,056.000.020 Kg Minyak Cat 4,400.00 88.00 88.000.010 Kg Batu Apung 2,000.00 20.00 20.00

1,164.00 1,164.00b.Tenaga

0.040 Oh Pekerja 44,000.00 1,760.00 1,760.000.040 Oh Tukang Cat 77,000.00 3,080.00 3,080.000.004 Oh Kepala Tukang 99,000.00 396.00 396.00

0.0025 Oh Mandor 104,500.00 261.25 261.255,497.25 5,497.25

Jumlah 1,164.00 5,497.25 6,661.25

14.6a. Bahan

0.150 Kg Plamir 26,400.00 3,960.00 3,960.000.170 Kg Cat Dasar 21,450.00 3,646.50 3,646.500.170 Kg Cat Penutup 79,750.00 13,557.50 13,557.50

21,164.00 21,164.00b.Tenaga

0.070 Oh Pekerja 44,000.00 3,080.00 3,080.000.075 Oh Tukang Cat 77,000.00 5,775.00 5,775.00

0.0075 Oh Kepala Tukang 99,000.00 742.50 742.500.0025 Oh Mandor 104,500.00 261.25 261.25

9,858.75 9,858.75

Jumlah 21,164.00 9,858.75 31,022.75

14.7Dasar, 2 Lapis Cat Penutup )a. Bahan

0.200 Kg Cat Meni 30,800.00 6,160.00 6,160.000.150 Kg Plamir 26,400.00 3,960.00 3,960.000.170 Kg Cat Dasar 21,450.00 3,646.50 3,646.500.260 Kg Cat Penutup 2 Kali 79,750.00 20,735.00 20,735.00

34,501.50 34,501.50b.Tenaga

0.070 Oh Pekerja 44,000.00 3,080.00 3,080.000.009 Oh Tukang Cat 77,000.00 693.00 693.000.006 Oh Kepala Tukang 99,000.00 594.00 594.00

0.0025 Oh Mandor 104,500.00 261.25 261.254,628.25 4,628.25

Jumlah 34,501.50 4,628.25 39,129.75

14.8Dasar, 3 Lapis Cat Penutup )a. Bahan

0.200 Kg Cat Meni 30,800.00 6,160.00 6,160.000.150 Kg Plamir 26,400.00 3,960.00 3,960.000.170 Kg Cat Dasar 21,450.00 3,646.50 3,646.500.350 Kg Cat Penutup 2 Kali 79,750.00 27,912.50 27,912.50

41,679.00 41,679.00

b.Tenaga0.070 Oh Pekerja 44,000.00 3,080.00 3,080.000.105 Oh Tukang Cat 77,000.00 8,085.00 8,085.000.004 Oh Kepala Tukang 99,000.00 396.00 396.00

0.0025 Oh Mandor 104,500.00 261.25 261.2511,822.25 11,822.25

Jumlah 41,679.00 11,822.25 53,501.25

14.9a. Bahan

0.150 Ltr Politur 29,700.00 4,455.00 4,455.000.372 Ltr Politur Jadi 42,900.00 15,958.80 15,958.802.000 Lbr Ampelas 3,300.00 6,600.00 6,600.00

27,013.80 27,013.80b.Tenaga

Oh Pekerja 44,000.00 0.00 0.000.060 Oh Tukang Cat 77,000.00 4,620.00 4,620.000.016 Oh Kepala Tukang 99,000.00 1,584.00 1,584.00

0.0025 Oh Mandor 104,500.00 261.25 261.256,465.25 6,465.25

Jumlah 27,013.80 6,465.25 33,479.05

1 m2 Mendempul dan Menggosok Kayu

1 m2 Pengecatan Bidang Kayu Lama

1 m2 Pengecatan Bidang Kayu Baru ( 1 Lapis Plamir, 1 lapis Cat

1 m2 Pengecatan Bidang Kayu Baru ( 1 Lapis Plamir, 1 lapis Cat

1 m2 Pelaburan Bidang Kayu dengan Politur

Page 111: DrfatAnalisa2010 Smt Iok Palembang

Daftar Analisa Pekerjaan Kota Palembang TA. 2010 Semester I

- 111 -

U R A I A N

SATUAN HARGA NO. Harga Jumlah Harga Jumlah Jumlah

Analisa Satuan Bahan Tenaga Bahan+Tenaga(Rp) (Rp) (Rp) (Rp)

1 2 3 4 5 6

14.10a. Bahan

0.350 Ltr Residu atau Ter 2,475.00 866.25 866.25866.25 866.25

b.Tenaga0.100 Oh Pekerja 44,000.00 4,400.00 4,400.00

Oh Tukang Cat 77,000.00 0.00 0.00Oh Kepala Tukang 99,000.00 0.00 0.00

0.006 Oh Mandor 104,500.00 627.00 627.005,027.00 5,027.00

Jumlah 866.25 5,027.00 5,893.25

14.11a. Bahan

0.150 Ltr Vernis 44,000.00 6,600.00 6,600.000.050 Kg Dempul 13,200.00 660.00 660.000.100 Lbr Ampelas 3,300.00 330.00 330.000.010 Bh Kuas 6,600.00 66.00 66.00

7,656.00 7,656.00

b.Tenaga0.160 Oh Pekerja 44,000.00 7,040.00 7,040.000.160 Oh Tukang Cat 77,000.00 12,320.00 12,320.000.016 Oh Kepala Tukang 99,000.00 1,584.00 1,584.00

0.0025 Oh Mandor 104,500.00 261.25 261.2521,205.25 21,205.25

Jumlah 7,656.00 21,205.25 28,861.25

14.12Dasar, 2 Lapis Cat Penutup )a. Bahan

0.100 Kg Plamir 24,750.00 2,475.00 2,475.000.100 Kg Cat Dasar 21,450.00 2,145.00 2,145.000.260 Kg Cat Penutup 2 Kali, mutu C 10,450.00 2,717.00 2,717.000.260 Kg Cat Penutup 2 Kali, mutu B 15,400.00 4,004.00 4,004.000.260 Kg Cat Penutup 2 Kali, mutu B anti lumut/jamur 19,250.00 5,005.00 5,005.000.260 Kg Cat Penutup 2 Kali, mutu A anti lumut/jamur 65,340.00 16,988.40 16,988.40

Cat Mutu C 7,337.00 7,337.00Cat Mutu B 8,624.00 8,624.00

Cat Mutu B, anti lumut/jamur 9,625.00 9,625.00Cat Mutu A, anti lumut/jamur 21,608.40 21,608.40

b.Tenaga0.020 Oh Pekerja 44,000.00 880.00 880.000.063 Oh Tukang Cat 77,000.00 4,851.00 4,851.00

0.0063 Oh Kepala Tukang 99,000.00 623.70 623.700.0025 Oh Mandor 104,500.00 261.25 261.25

6,615.95 6,615.95

Cat Tembok/plafond Mutu C 7,337.00 6,615.95 13,952.95Cat tembok/plafond Mutu B 8,624.00 6,615.95 15,239.95

Cat tembok/plafond Mutu B, anti lumut/jamur 9,625.00 6,615.95 16,240.95Cat tembok/plafond Mutu A, anti lumut/jamur 21,608.40 6,615.95 28,224.35

14.13Penutup )a. Bahan

0.120 Kg Cat Dasar 21,450.00 2,574.00 2,574.000.180 Kg Cat Penutup 2 Kali, mutu C 10,450.00 1,881.00 1,881.000.180 Kg Cat Penutup 2 Kali, mutu B 15,400.00 2,772.00 2,772.000.180 Kg Cat Penutup 2 Kali, Mutu B, anti lumut/jamur 19,250.00 3,465.00 3,465.00

Cat Mutu C 4,455.00 4,455.00Cat Mutu B 6,039.00 6,039.00

Cat Mutu B, anti lumut/jamur 6,336.00 6,336.00

b.Tenaga0.028 Oh Pekerja 44,000.00 1,232.00 1,232.000.042 Oh Tukang Cat 77,000.00 3,234.00 3,234.00

0.0042 Oh Kepala Tukang 99,000.00 415.80 415.800.0025 Oh Mandor 104,500.00 261.25 261.25

5,143.05 5,143.05

Cat Tembok/plafond Mutu C 4,455.00 5,143.05 9,598.05Cat tembok/plafond Mutu B 6,039.00 5,143.05 11,182.05

Cat tembok/plafond Mutu B, anti lumut/jamur 6,336.00 5,143.05 11,479.05

14.14a. Bahan

0.100 Kg Meni Besi 35,200.00 3,520.00 3,520.000.010 Bh Kuas 6,600.00 66.00 66.00

3,586.00 3,586.00

1 m2 Pelaburan Bidang Kayu dengan Cat Residu dan Ter

1 m2 Pelaburan Bidang Kayu dengan Vernis

1 m2 Pengecatan Tembok Baru ( 1 Lapis Plamir, 1 lapis Cat

1 m2 Pengecatan Tembok Lama ( 1 lapis Cat Dasar, 2 Lapis cat

1 m2 Pengecatan Permukaan Baja dengan Meni Besi

Page 112: DrfatAnalisa2010 Smt Iok Palembang

Daftar Analisa Pekerjaan Kota Palembang TA. 2010 Semester I

- 112 -

U R A I A N

SATUAN HARGA NO. Harga Jumlah Harga Jumlah Jumlah

Analisa Satuan Bahan Tenaga Bahan+Tenaga(Rp) (Rp) (Rp) (Rp)

1 2 3 4 5 6b.Tenaga

0.020 Oh Pekerja 44,000.00 880.00 880.000.200 Oh Tukang Cat 77,000.00 15,400.00 15,400.000.020 Oh Kepala Tukang 99,000.00 1,980.00 1,980.000.010 Oh Mandor 104,500.00 1,045.00 1,045.00

19,305.00 19,305.00

Jumlah 3,586.00 19,305.00 22,891.00

14.15

a. Bahan0.100 Kg Meni Besi 35,200.00 3,520.00 3,520.000.010 Bh Kuas 6,600.00 66.00 66.000.002 Perancah Kayu/Gelam dia. 8 247,500.00 495.00 495.00

4,081.00 4,081.00b.Tenaga

0.250 Oh Pekerja 44,000.00 11,000.00 11,000.000.225 Oh Tukang Cat 77,000.00 17,325.00 17,325.00

0.0225 Oh Kepala Tukang 99,000.00 2,227.50 2,227.500.0075 Oh Mandor 104,500.00 783.75 783.75

31,336.25 31,336.25

Jumlah 4,081.00 31,336.25 35,417.25

14.16a. Bahan

7.560 Kg Cat Kilat 28,600.00 216,216.00 216,216.005.320 Ltr Thinner 12,100.00 64,372.00 64,372.00

5 Kg Ross Polac 14,300.00 71,500.00 71,500.004 Kg Isamu 41,800.00 167,200.00 167,200.004 Kg Epoxi 46,750.00 187,000.00 187,000.004 Lbr Amplas Niken 6,600.00 26,400.00 26,400.001 Ls Alat Bantu / Compressor 5,500.00 5,500.00 5,500.00

738,188.00 738,188.00

b.Tenaga8.000 Oh Tukang Cat 77,000.00 616,000.00 616,000.000.800 Oh Kepala Tukang 99,000.00 79,200.00 79,200.004.000 Oh Pekerja 44,000.00 176,000.00 176,000.000.200 Oh Mandor 104,500.00 20,900.00 20,900.00

892,100.00 892,100.00

Jumlah 738,188.00 892,100.00 1,630,288.0073,818.80 89,210.00 163,028.80

14.17a. Bahan

0.466 Kg Cat Tembok mutu B, anti lumut/jamur 19,250.00 8,970.50 8,970.500.100 Kg Epoxi 46,750.00 4,675.00 4,675.000.233 Kg Mill 32,450.00 7,560.85 7,560.851.000 Ls Alat Bantu / Compressor 550.00 550.00 550.00

21,756.35 21,756.35b. Tenaga

0.524 Oh Tukang Cat 77,000.00 40,311.04 40,311.040.080 Oh Kepala Tukang 99,000.00 7,920.00 7,920.000.400 Oh Pekerja 44,000.00 17,600.00 17,600.000.020 Oh Mandor 104,500.00 2,090.00 2,090.00

67,921.04 67,921.04Jumlah 21,756.35 67,921.04 89,677.39

14.18a. Bahan

1.500 Kg Wood Filler ( dempul) 27,500.00 41,250.00 41,250.001.500 Kg Wood Stain ( pewarna) 55,000.00 82,500.00 82,500.001.500 Kg Sanding Sealer ( Cat dasar ) 38,500.00 57,750.00 57,750.002.400 Kg Melamic Clear 34,100.00 81,840.00 81,840.00

2 Ltr Thinner 25,300.00 50,600.00 50,600.006 Lbr Amplas Niken 6,600.00 39,600.00 39,600.001 Ls Alat Bantu / Compressor 5,500.00 5,500.00 5,500.00

359,040.00 359,040.00

b.Tenaga12 Oh Tukang Cat 77,000.00 924,000.00 924,000.00

1.200 Oh Kepala Tukang 99,000.00 118,800.00 118,800.002.000 Oh Pekerja 44,000.00 88,000.00 88,000.000.100 Oh Mandor 104,500.00 10,450.00 10,450.00

1,141,250.00 1,141,250.00

Jumlah 359,040.00 1,141,250.00 1,500,290.00Jumlah 35,904.00 114,125.00 150,029.00

XV PEKERJAAN INSTALASI LISTRIK GEDUNG

15.1 1 Titik Pemasangan Saklar Lampua. Bahan

1 m2 Pengecatan Permukaan Baja dengan Meni Besi dan perancah

M3

10 m2 Cat Semprot minyak Chames Stones ( 1/2 Ducco )

Untuk 1 M2 Jumlah

1 M2 Cat tembok/Plafond Chames Stone (berkerikil)

10 m2 Cat Melamic

Untuk 1 M2 Jumlah

Page 113: DrfatAnalisa2010 Smt Iok Palembang

Daftar Analisa Pekerjaan Kota Palembang TA. 2010 Semester I

- 113 -

U R A I A N

SATUAN HARGA NO. Harga Jumlah Harga Jumlah Jumlah

Analisa Satuan Bahan Tenaga Bahan+Tenaga(Rp) (Rp) (Rp) (Rp)

1 2 3 4 5 63 btg Pipa listrik 5/8" 4,950.00 14,850.00 14,850.00

24 m' Kabel NYA 1,5 mm 2,200.00 52,800.00 52,800.003BuahT Duss 825.00 2,475.00 2,475.004BuahL Bow 550.00 2,200.00 2,200.003BuahLas dop 1,100.00 3,300.00 3,300.001BuahSaklar Ganda 8,800.00 8,800.00 8,800.00

24BuahKlem biasa 82.50 1,980.00 1,980.001BuahMangkok 990.00 990.00 990.001BuahFitting 5,500.00 5,500.00 5,500.00

92,895.00 92,895.00

b.Upah1.000 ls Tukang Instalasi listrik 49,500.00 49,500.00 49,500.00

49,500.00 49,500.00

Jumlah 92,895.00 49,500.00 142,395.00

15.2 1 Titik Pemasangan Stop Kontak Biasaa. Bahan

2 btg Pipa listrik 5/8" 4,950.00 9,900.00 9,900.0015 m' Kabel NYA 2,5 mm 3,300.00 49,500.00 49,500.001BuahT Duss 825.00 825.00 825.001BuahL Bow 550.00 550.00 550.002BuahLas dop 1,100.00 2,200.00 2,200.001BuahStop kontak biasa 6,050.00 6,050.00 6,050.00

16BuahKlem biasa 82.50 1,320.00 1,320.001BuahMangkok 990.00 990.00 990.00

71,335.00 71,335.00

b.Upah1.000 ls Tukang Instalasi listrik 49,500.00 49,500.00 49,500.00

49,500.00 49,500.00

Jumlah 71,335.00 49,500.00 120,835.00

15.3 1 Titik Pemasangan Stop Kontak ACa. Bahan

25 m' Kabel NYM 2 X 2,5 mm 7,700.00 192,500.00 192,500.001BuahStop kontak AC 52,250.00 52,250.00 52,250.00

50BuahKlem biasa 82.50 4,125.00 4,125.00248,875.00 248,875.00

b.Upah1.000 ls Tukang Instalasi listrik 49,500.00 49,500.00 49,500.00

49,500.00 49,500.00

Jumlah 248,875.00 49,500.00 298,375.00

15.4 1 Titik Pemasangan MCBa. Bahan

3 btg Pipa listrik 5/8" 4,950.00 14,850.00 14,850.0015 m' Kabel NYA 2,5 mm 3,300.00 49,500.00 49,500.001BuahT Duss 825.00 825.00 825.002BuahL Bow 550.00 1,100.00 1,100.00

24BuahKlem biasa 82.50 1,980.00 1,980.001BuahMCB 16,500.00 16,500.00 16,500.00

84,755.00 84,755.00

b.Upah1.000 ls Tukang Instalasi listrik 49,500.00 49,500.00 49,500.00

49,500.00 49,500.00

Jumlah 84,755.00 49,500.00 134,255.00

Page 114: DrfatAnalisa2010 Smt Iok Palembang

Daftar Analisa Pekerjaan Taksir Tahun 2010 Semester I

- 114 -

DAFTAR ANALISA PEKERJAAN TAKSIRTAHUN ANGGARAN 2010 SEMESTER I

U R A I A N

SATUAN HARGA NO. Harga Jumlah Harga Jumlah Jumlah

Analisa Satuan Bahan Tenaga Bahan+Tenaga(Rp) (Rp) (Rp) (Rp)

1 2 3 4 5 6

1 PEKERJAAN BESI HOLLOW 2/4 CM a. Bahan besi hollow 1 m' 8,000.00 8,000.00 8,000.00 b. Perlengkapan 7,000.00 7,000.00 7,000.00

15,000.00 15,000.00 c. Upah 18,000.00 18,000.00 18,000.00

18,000.00 18,000.00

Jumlah 15,000.00 18,000.00 33,000.00

2 1 M2 PAS. DINDING SKAT ALUMINIUM HITAM + KACAa. Bahan

1.00 m2 Kaca Ryben Tebal 5 mm 134,750.00 134,750.00 134,750.004.00 m' Kusen aluminium 4" hitam 45,000.00 180,000.00 180,000.00

Ls 75,000.00 75,000.00 75,000.00389,750.00 389,750.00

b. Upah1.00 Ls Tukang dinding skat 138,250.00 138,250.00

138,250.00 138,250.00

Jumlah 389,750.00 138,250.00 528,000.00

3 1 SET PAS. ENGSEL TANAM KUSEN ALUMINIUMa Bahan

1.00 set Engsel tanam 200,000.00 200,000.00 200,000.00Ls Kelengkapan lain-lain 15,000.00 15,000.00 15,000.00

215,000.00 215,000.00

b. Upah1.00 Ls Tukang engsel tanam 75,000.00 75,000.00

75,000.00 75,000.00

Jumlah 215,000.00 75,000.00 290,000.00

4 1 BUAH PAS. LAMPU TL BOX 2 x 20 WATTa Bahan

1.00 Bh Lampu TL Box 2 x 20 watt 205,000.00 205,000.00 205,000.00205,000.00 205,000.00

b. Upah1.00 Ls Tukang Lampu TL Box 20,000.00 20,000.00

20,000.00 20,000.00

Jumlah 205,000.00 20,000.00 225,000.00

5 1 BUAH PAS. LAMPU DOWN LIGHTa Bahan

1.00 Bh Lampu Down Light 40,000.00 40,000.00 40,000.0040,000.00 40,000.00

b. Upah1.00 Ls Tukang Lampu Down Light 5,000.00 5,000.00

5,000.00 5,000.00

Jumlah 40,000.00 5,000.00 45,000.00

6 1 BUAH PAS. LAMPU SL 15 WATTa Bahan

1.00 Bh Lampu SL 15 Watt 40,000.00 40,000.00 40,000.0040,000.00 40,000.00

b. Upah1.00 Ls Tukang Lampu SL 2,500.00 2,500.00

2,500.00 2,500.00

Jumlah 40,000.00 2,500.00 42,500.00

7 1 BUAH PAS. CLOSED DUDUKa Bahan

1.00 Bh Closed Duduk (standar Toto dan sejenis) 2,303,400.00 2,303,400.00 2,303,400.00Ls Kelengkapan lainnya 150,000.00 150,000.00 150,000.00

2,453,400.00 2,453,400.00

b. Upah1.00 Ls Tukang Pasang Closed Duduk 150,000.00 150,000.00 150,000.00

150,000.00 150,000.00

Jumlah 2,453,400.00 150,000.00 2,603,400.00

Page 115: DrfatAnalisa2010 Smt Iok Palembang

Daftar Analisa Pekerjaan Taksir Tahun 2010 Semester I

- 115 -

U R A I A N

SATUAN HARGA NO. Harga Jumlah Harga Jumlah Jumlah

Analisa Satuan Bahan Tenaga Bahan+Tenaga(Rp) (Rp) (Rp) (Rp)

1 2 3 4 5 68 1 BUAH PAS. PINTU PVC + KUSEN TYPE B

a Bahan1.00 Bh Pintu PVC + kusen 545,595.00 545,595.00 545,595.001.00 Set Engsel 8,437.50 8,437.50 8,437.501.00 Bh Kunci 28,125.00 28,125.00 28,125.00

582,157.50 582,157.50

b. Upah1.00 Ls Tukang Pasang Closed Duduk 65,000.00 65,000.00

65,000.00 65,000.00

Jumlah 582,157.50 65,000.00 647,157.50

9 1 M2 PAS. KACA FILM SUN GLASS KOTAKa Bahan

1.00 m2 Kaca film sun glass kotak 220,000.00 220,000.00 220,000.00Ls Alat bantu 5,000.00 5,000.00 5,000.00

225,000.00 225,000.00

b. Upah1.00 Ls Tukang Kaca film 35,000.00 35,000.00

35,000.00 35,000.00

Jumlah 225,000.00 35,000.00 260,000.00

10 1 BUAH PAS. SARINGAN AIRa Bahan

1.00 bh Saringan air 10,650.00 10,650.00 10,650.0010,650.00 10,650.00

b. Upah1.00 Oh Tukang saringan air 4,350.00 4,350.00

4,350.00 4,350.00

Jumlah 10,650.00 4,350.00 15,000.00

11 1 BUAH PAS. AC 3/4 PKa Bahan

1.00 bh AC 3/4 PK 3,650,000.00 3,650,000.00 3,650,000.00Ls Kelengkapan lain-lain 50,000.00 50,000.00 50,000.00

3,700,000.00 3,700,000.00

b. Upah1.00 Ls Tukang AC 150,000.00 150,000.00

150,000.00 150,000.00

Jumlah 3,700,000.00 150,000.00 3,850,000.00

12 1 BUAH PAS. PINTU PANEL LAPIS SUNGKAI + LIST STAINLIS a Bahan

1.60 bh Pintu panel (SNI. 6.7) 438,075.00 700,920.00 700,920.001.12 kpg Sungkai (SNI 6.46) 117,032.30 131,076.18 131,076.184.80 m' List steinlis 75,000.00 360,000.00 360,000.000.10 kg Paku plywood 15,400.00 1,540.00 1,540.003.20 m2 Plituran (SNI. 14.9) 33,479.05 107,132.96 107,132.961.00 bh Kunci (SNI 12.1) 189,843.50 189,843.50 189,843.503.00 bh Engsel (SNI 12.4) 18,723.38 56,170.13 56,170.13

1,546,682.76 1,546,682.76

b. Upah1.00 Ls Pekerja + tukang 45,000.00 45,000.00

Jumlah 1,546,682.76 45,000.00 1,591,682.76

13 PAS. LIST PLAFON 1/4 / M'a Bahan

1.00 m' List plafon 1/4 2,000.00 2,000.00 2,000.002,000.00 2,000.00

b. Upah1.00 Ls Pekerja 250.00 250.00

Jumlah 2,000.00 250.00 2,250.00

14 PAS. PINTU PVC TYPE C/ BUAHa Bahan

1.00 bh Pintu PVC 344,500.00 344,500.00 344,500.001.00 bh Kunci 20,000.00 20,000.00 20,000.003.00 bh Engsel 10,500.00 31,500.00 31,500.00

396,000.00 396,000.00

b. Upah1.00 Ls Pekerja pintu 75,000.00 75,000.00

75,000.00 75,000.00

Jumlah 396,000.00 75,000.00 471,000.00

Page 116: DrfatAnalisa2010 Smt Iok Palembang

Daftar Analisa Pekerjaan Taksir Tahun 2010 Semester I

- 116 -

U R A I A N

SATUAN HARGA NO. Harga Jumlah Harga Jumlah Jumlah

Analisa Satuan Bahan Tenaga Bahan+Tenaga(Rp) (Rp) (Rp) (Rp)

1 2 3 4 5 6

15 PAS. KUSEN DAN JENDELA ALUMINIUMa Bahan

1.00 set Kusen dan jendela aluminium 1,232,000.00 1,232,000.00 1,232,000.001,232,000.00 1,232,000.00

b. Upah1.00 Ls Tukang 431,200.00 431,200.00

431,200.00 431,200.00

Jumlah 1,232,000.00 431,200.00 1,663,200.00

16 PAS. LAMPU TL 20 WATTa Bahan

1.00 bh Lampu TL 26,000.00 26,000.00 26,000.00Ls Perlengkapan lain-lain 7,800.00 7,800.00 7,800.00

33,800.00 33,800.00

b. Upah1.00 Oh Pekerja/Tukang 3,200.00 3,200.00

3,200.00 3,200.00

Jumlah 33,800.00 3,200.00 37,000.00

17 1 M' PAS. BESI HOLLOW 2/4 CM T=1,2 ma Bahan

1.00 m' Besi hollow 8,000.00 8,000.00 8,000.008,000.00 8,000.00

b. Upah1.00 Oh Pekerja 7,000.00 7,000.001.00 Oh Pekerja Pemasangan Hollow 18,000.00 18,000.00

25,000.00 25,000.00

Jumlah 8,000.00 25,000.00 33,000.00

18 1 M' PAS. LISTPLANK WOODPLANKa Bahan

1.00 m' Woodplank 16,875.00 16,875.00 16,875.00Ls Peralatan kecil 1,500.00 1,500.00 1,500.00

18,375.00 18,375.00

b. Upah1.00 Oh Pekerja 5,000.00 5,000.00

5,000.00 5,000.00

Jumlah 18,375.00 5,000.00 23,375.00

19 1 M3 PAS. HURUF NAMA KANTOR a Bahan

1.00 m' Plat stainless 17,500.00 17,500.00 17,500.001.00 Perlengkapan 30% 5,250.00 5,250.00 5,250.00

22,750.00 22,750.00

b. Upah0.15 Oh Pekerja 44,000.00 6,600.00 6,600.000.03 Oh Kepala tukang 99,000.00 2,970.00 2,970.00

0.0252 Oh Mandor 104,500.00 2,650.00 2,650.0012,220.00 12,220.00

Jumlah 22,750.00 12,220.00 34,970.00

20 PAS. PAPAN NAMA DAN PLAT BESI a Bahan

1.00 Ls Besi T=2mm 750,000.00 750,000.00 750,000.001.00 Perlengkapan 30% 225,000.00 225,000.00 225,000.001.00 Besi siku 40x40x4mm 245,000.00 245,000.00 245,000.001.00 Perlengkapan 35% 85,750.00 85,750.00 85,750.002.00 Btg Besi siku 245,000.00 490,000.00 490,000.00

1,795,750.00 1,795,750.00

b. Upah3.00 Oh Pekerja 44,000.00 132,000.00 132,000.001.00 Oh Kepala tukang 99,000.00 99,000.00 99,000.00

0.9048 Oh Mandor 104,500.00 94,551.60 94,551.60325,551.60 325,551.60

Jumlah 1,795,750.00 325,551.60 2,121,301.60

21 PAS. TIANG PROFIL TERASa Bahan

1.00 Tiang profil 250,000.00 250,000.00 250,000.001.00 Perlengkapan 30% 75,000.00 75,000.00 75,000.00

325,000.00 325,000.00

Page 117: DrfatAnalisa2010 Smt Iok Palembang

Daftar Analisa Pekerjaan Taksir Tahun 2010 Semester I

- 117 -

U R A I A N

SATUAN HARGA NO. Harga Jumlah Harga Jumlah Jumlah

Analisa Satuan Bahan Tenaga Bahan+Tenaga(Rp) (Rp) (Rp) (Rp)

1 2 3 4 5 6

b. Upah3.00 Oh Pekerja 44,000.00 132,000.00 132,000.003.00 Oh Kepala tukang 99,000.00 297,000.00 297,000.00

0.7619 Oh Mandor 104,500.00 80,000.00 80,000.00509,000.00 509,000.00

Jumlah 325,000.00 509,000.00 834,000.00

22 1 M2 PAS. DINDING SEKAT + JENDELA ALUMINIUMa Bahan

1.00 m2 Kaca tebal 5mm 148,225.00 148,225.00 148,225.004.00 m' Rangka aluminium 43,450.00 173,800.00 173,800.00

322,025.00 322,025.00

b. Upah0.80 Oh Pekerja 44,000.00 35,200.00 35,200.002.00 Oh Tukang 77,000.00 154,000.00 154,000.000.20 Oh Kepala tukang 99,000.00 19,800.00 19,800.00

0.040 Oh Mandor 104,500.00 4,180.00 4,180.00213,180.00 213,180.00

Jumlah 322,025.00 213,180.00 535,205.00

23 1 M2 PAS. PINTU KACA RANGKA ALUMINIUM + KUSENa Bahan

1.10 m2 Kaca tebal 5mm 148,225.00 148,225.00 148,225.008.60 m' Rangka aluminium 43,450.00 373,670.00 373,670.00

521,895.00 521,895.00

b. Upah0.80 Oh Pekerja 44,000.00 35,200.00 35,200.002.00 Oh Tukang 77,000.00 154,000.00 154,000.000.20 Oh Kepala tukang 99,000.00 19,800.00 19,800.00

0.040 Oh Mandor 104,500.00 4,180.00 4,180.00213,180.00 213,180.00

Jumlah 521,895.00 213,180.00 735,075.00

Page 118: DrfatAnalisa2010 Smt Iok Palembang

Rekapitulasi Harga Satuan Upah dan Bahan Bangunan TA. 2010 Semester I

- 118 -

REKAPITULASI HARGA SATUAN UPAH DAN BAHAN BANGUNAN TAHUN ANGGARAN 2010 SEMESTER I

NomorU R A I A N HARGA SATUAN

Analisa1 2 3

I PEKERJAAN PERSIAPAN

1.1 1 M' Pagar Sementara dari Kayu Tinggi 2 Meter Rp 141,036.50

1.2 1 M' Pagar Sementara dari Seng Gelombang Tinggi 2 Meter Rp 195,666.90

1.3 1 M' Pagar Sementara dari Kawat Duri Tinggi 1,8 Meter Rp 112,051.50

1.4 1 M' Pengukuran dan Pemasangan Bouwplank Rp 42,933.00

1.5 1 M2 Pembuatan Kantor Sementara, Dengan Lantai Plesteran Rp 919,088.50

1.6 1 M2 Pembuatan Gudang Semen dan Alat - Alat Rp 580,695.51

1.7 1 M2 Pembuatan Rumah Jaga/Konstruksi Kayu Rp 577,540.34

1.8 1 M2 Membersihkan Lapangan dan Perataan Rp 9,625.00

1.9 1 M2 Pembuatan Bedeng Buruh Rp 631,440.34

1.10 1 M2 Pembuatan Bak Adukan Ukuran (40 x 50 x 20) cm Rp 122,168.75

1.11 1 M2 Pembuatan Stegger dari Bambu, Ukuran (40 x 50 x 20) cm Rp 60,340.50

1.12 1 M2 Pembuatan Jalan Sementara Rp 117,535.00

1.13 1 M3 Bongkaran Beton Bertulang Rp 328,146.50

1.14 1 M3 Bongkaran Dinding Tembok Bata Merah /Bata lobang Rp 296,796.50

1.15 1 M' Pasang Pagar Kawat Jaring Galvanis Tinggi 1 Meter Rp 17,622.00

1.16 10 M2 Pembersihan Akhir Lapangan Rp 3,691.88

1.17 10 M2 Bongkaran Rangka Atap Rp 6,572.50

1.18 1 M3 Bongkaran Kuda-kuda Kayu Rp 348,700.00

1.19 10 M2 Bongkaran Plafond + Rangka Rp 14,014.00

1.20 1 M2 Pasang Cerucup Gelam dia. 6-8 cm Rp 49,065.50 1 M2 Pasang Cerucup Gelam dia. 10-12 cm Rp 58,965.50

1.21 1 M' Pasang Turap Gelam = 1 M' Rp 93,065.50

1.22 1 M2 Pasang Kisdam Gelam dia. 6-8 cm = 1 M' Rp 49,505.50

1.23 1 Unit Papan Nama biasa = 1 Unit Rp 220,467.50

1.24 1 Unit Sewa Scafolding per bulan = 1 Unit Rp 62,250.00

II PEKERJAAN TANAH

2.1 1 M3 Galian Tanah Biasa Sedalam 1 Meter Rp 21,780.00

2.2 1 M3 Galian Tanah Biasa Sedalam 2 Meter Rp 28,578.00

= 1 M2

= 1 M2

= 1 M2

= 1 M2

= 1 M2

Page 119: DrfatAnalisa2010 Smt Iok Palembang

Rekapitulasi Harga Satuan Upah dan Bahan Bangunan TA. 2010 Semester I

- 119 -

NomorU R A I A N HARGA SATUAN

Analisa1 2 3

2.3 1 M3 Galian Tanah Biasa Sedalam 3 Meter Rp 39,968.50

2.4 1 M3 Galian Tanah Keras Sedalam 1 Meter Rp 33,979.00

2.5 1 M3 Galian Tanah Cadas Sedalam 1 Meter Rp 68,062.50

2.6 1 M3 Galian Tanah Lumpur Sedalam 1 Meter Rp 44,885.50

2.7 1 M2 Pekerjaan Stripping Setinggi 1 Meter Rp 2,722.50

2.8 1 M3 Pembuangan Tanah Sejauh 150 meter Rp 27,929.00

2.9 1 M3 Urugan Kembali Rp 10,433.50

2.10 1 M3 Pemadatan Tanah Rp 27,225.00

2.11 1 M3 Urugan Pasir Rp 100,045.00

2.12 1 M3 Urugan Sirtu Rp 99,412.50

2.13 1 M3 Urugan Koral Rp 270,600.00

2.14 1 M3 Urugan Tanah Rp 82,648.50

III PEKERJAAN PONDASI

3.1 1 M3 Pasang Pondasi Batu Kali, 1 Pc : 1 Ps Rp 1,353,082.50

3.2 1 M3 Pasang Pondasi Batu Kali, 1 Pc : 2 Ps Rp 1,087,405.00

3.3 1 M3 Pasang Pondasi Batu Kali, 1 Pc : 2,5 Ps Rp 1,353,082.50

3.4 1 M3 Pasang Pondasi Batu Kali, 1 Pc : 3 Ps Rp 949,190.00

3.5 1 M3 Pasang Pondasi Batu Kali, 1 Pc : 4 Ps Rp 866,277.50

3.6 1 M3 Pasang Pondasi Batu Kali, 1 Pc : 5 Ps Rp 808,857.50

3.7 1 M3 Pasang Pondasi Batu Kali, 1 Pc : 6 Ps Rp 768,460.00

3.8 1 M3 Pasang Pondasi Batu Kali, 1 Pc : 8 Ps Rp 711,260.00

3.9 1 M3 Pasang Pondasi Sumuran & 100 cm Rp 1,078,275.00

3.10 1 M' Pembuatan Tiang Pancang (40 x 40) cm, Beton Bertulang Rp 867,069.50

3.11 1 M' Pembuatan Tiang Pancang (35 x 35) cm, Beton Bertulang Rp 678,227.00

3.12 1 M3 Pas. Pondasi Batu Bata Ad. 1 : 4 Rp 748,355.30

3.13 1 M3 Pas. Pondasi Batu Bata Ad. 1 : 2 Rp 815,091.20

IV PEKERJAAN DINDING

4.1 1 M2 Pasangan Bata Merah Tebal 1 Bata, 1 Pc : 1 Ps Rp 267,228.50

4.2 1 M2 Pasangan Bata Merah Tebal 1 Bata, 1 Pc : 2 Ps Rp 223,795.00

4.3 1 M2 Pasangan Bata Merah Tebal 1 Bata, 1 Pc : 3 Ps Rp 201,492.50

Page 120: DrfatAnalisa2010 Smt Iok Palembang

Rekapitulasi Harga Satuan Upah dan Bahan Bangunan TA. 2010 Semester I

- 120 -

NomorU R A I A N HARGA SATUAN

Analisa1 2 3

4.4 1 M2 Pasangan Bata Merah Tebal 1 Bata, 1 Pc : 4 Ps Rp 187,577.50

4.5 1 M2 Pasangan Bata Lobang Tebal 1 Bata, 1 Pc : 4 Ps Rp 185,982.50

4.6 1 M2 Pasangan Bata Merah Tebal 1 Bata, 1 Pc : 5 Ps Rp 178,750.00

4.7 1 M2 Pasangan Bata Merah Tebal 1 Bata, 1 Pc : 6 Ps Rp 178,750.00

4.8 1 M2 Pasangan Bata Merah Tebal 1/2 Bata, 1 Pc : 1 Ps Rp 123,997.50

4.9 1 M2 Pasangan Bata Merah Tebal 1/2 Bata, 1 Pc : 2 Ps Rp 105,352.50

4.10 1 M2 Pasangan Bata Lobang Tebal 1/2 Bata, 1 Pc : 2 Ps Rp 104,555.00

4.11 1 M2 Pasangan Bata Merah Tebal 1/2 Bata, 1 Pc : 3 Ps Rp 95,441.50

4.12 1 M2 Pasangan Bata Merah Tebal 1/2 Bata, 1 Pc : 4 Ps Rp 89,375.00

4.13 1 M2 Pasangan Bata Lobang Tebal 1/2 Bata, 1 Pc : 4 Ps Rp 88,577.50

4.14 1 M2 Pasangan Bata Merah Tebal 1/2 Bata, 1 Pc : 5 Ps Rp 85,536.00

4.15 1 M2 Pasangan Bata Merah Tebal 1/2 Bata, 1 Pc : 6 Ps Rp 82,874.00

4.16 1 M2 Pasangan Bata Merah Tebal 1/2 Bata, 1 Pc : 8 Ps Rp 78,952.50

4.17 1 M2 Pasang Dinding Roster / Terawang ( 12 x 11 x 24 ) cm Rp 1,638,505.00

4.18 1 M2 Pasangan Bataco Rp 70,175.93

V PEKERJAAN PLESTERAN

5.1 1 M2 Plesteran 1 Pc : 1 Ps, Tebal 15 mm Rp 52,376.50

5.2 1 M2 Plesteran 1 Pc : 2 Ps, Tebal 15 mm Rp 43,026.50

5.3 1 M2 Plesteran 1 Pc : 3 Ps, Tebal 15 mm Rp 38,703.50

5.4 1 M2 Plesteran 1 Pc : 4 Ps, Tebal 15 mm Rp 35,970.00

5.5 1 M2 Plesteran 1 Pc : 5 Ps, Tebal 15 mm Rp 34,199.00

5.6 1 M2 Plesteran 1 Pc : 6 Ps, Tebal 15 mm Rp 32,873.50

5.7 1 M2 Plesteran 1 Pc : 8 Ps, Tebal 15 mm Rp 31,196.00

5.8 1 M2 Plesteran 1 Pc : 0,5 Kp : 3 Ps, Tebal 15 mm Rp 36,624.50

5.9 1 M2 Plesteran 1 Pc : 3 Kp : 10 Ps, Tebal 15 mm Rp 28,083.00

5.10 1 M2 Plesteran 0,5 Pc : 1 Kp : 4 Ps, Tebal 15 mm Rp 31,047.50

5.11 1 M2 Plesteran 1 Kp : 1 Sm : 1 Ps, Tebal 15 mm Rp 23,969.00

5.12 1 M2 Plesteran 1 Kp : 1 Sm : 2 Ps, Tebal 15 mm Rp 24,387.00

5.13 1 M2 Plesteran 1 Pc : 2 Ps, Tebal 20 mm Rp 62,999.75

Page 121: DrfatAnalisa2010 Smt Iok Palembang

Rekapitulasi Harga Satuan Upah dan Bahan Bangunan TA. 2010 Semester I

- 121 -

NomorU R A I A N HARGA SATUAN

Analisa1 2 3 5.14 1 M2 Plesteran 1 Pc : 3 Ps, Tebal 20 mm Rp 55,591.25

5.15 1 M2 Plesteran 1 Pc : 4 Ps, Tebal 20 mm Rp 51,092.25

5.16 1 M2 Plesteran 1 Pc : 5 Ps, Tebal 20 mm Rp 48,034.25

5.17 1 M2 Plesteran 1 Pc : 6 Ps, Tebal 20 mm Rp 45,889.25

5.18 1 M2 Plesteran 1 Kp : 1 Sm : 2 Ps, Tebal 20 mm Rp 31,517.75

5.19 1 M2 Berapen 1 Pc : 5 Ps, Tebal 15 mm Rp 27,890.50

5.20 1 M2 Plesteran Beton 1 Pc : 2 Ps, Tebal 15 mm Rp 52,123.50

5.21 1 M2 Plesteran Beton 1 Pc : 3 Ps, Tebal 15 mm Rp 47,465.00

5.22 1 M2 Plesteran Ciprat 1 Pc : 2 Ps Rp 32,081.50

5.23 1 M2 Plesteran Siar Adukan 1 Pc : 2 Ps Rp 24,343.00

5.24 1 M3 Perekat Rp 694,733.60

5.25 1 M' Plesteran dibentuk Profil uk. 10 x 10 cm Rp 139,227.00

VI PEKERJAAN KAYU

6.1 1 M3 Pasang Kusen Pintu dan Jendela K.kls. I (Kayu Jati, Unglen) Rp 8,688,350.00

6.2 1 M3 Pasang Kusen Pintu dan Jendela Kayu Kls. II Rp 7,027,350.00

6.3 1 M3 Pasang Kusen Pintu dan Jendela Kayu Kelas III Rp 5,773,350.00

6.4 1 M2 Pasang Pintu Klam Kayu Kls. III Rp 226,253.50

6.5 1 M2 Pasang Pintu Klam Kayu Kls. IV Rp 152,993.50

6.6 1 M2 Pasang Pintu Panel Kayu Jati Rp 508,475.00

6.7 1 M2 Pasang Pintu Panel Kayu Kls. II Rp 438,075.00

6.8 1 M2 Pasang Pintu dan Jendela Kaca Kayu Jati Rp 424,930.00

6.9 1 M2 Pasang Pintu dan Jendela Kaca Kayu Kls. II Rp 363,330.00

6.10 1 M2 Pasang Pintu dan Jendela Kaca Kayu Kls. III Rp 326,755.00

6.11 1 M2 Pasang Pintu dan Jendela Jalusi Kayu Jati Rp 723,250.00

6.12 1 M2 Pasang Pintu dan Jendela Jalusi Kayu Kls. II Rp 631,510.00

6.13 1 M2 Pasang Pintu Plywood Rangkap, Rangka Kayu Jati Rp 394,289.50

6.14 1 M2 Pasang Pintu Plywood Rangkap, Rangka Kayu Kls. II Rp 359,793.50

6.15 1 M2 Daun Pintu Plywood Sungkay rangkap, kayu kls. II Rp 419,193.50

6.16 1 M3 Pasang Konstruksi Kuda-kuda Kayu Jati Rp 8,032,970.00

Page 122: DrfatAnalisa2010 Smt Iok Palembang

Rekapitulasi Harga Satuan Upah dan Bahan Bangunan TA. 2010 Semester I

- 122 -

NomorU R A I A N HARGA SATUAN

Analisa1 2 3 6.17 1 M3 Pasang Konstruksi Kuda-kuda Kayu Kls. II Rp 6,096,970.00

6.18 1 M3 Pasang Konstruksi Kuda-kuda Kayu Kls. III Rp 4,947,470.00

6.19 1 M2 Pasang Kaso + Reng Genteng Kayu Kls. III Genteng kodok Rp 55,275.00 Genteng beton Rp 61,765.00

6.20 1 M2 Pasang Kaso + Reng Genteng Kayu Kls. II Genteng kodok Rp 67,815.00 Genteng beton Rp 76,395.00

6.21 1 M2 Pasang Kaso + Reng Atap Sirap,seng/asbes Kayu Kls. II Atap sirap Rp 90,750.00 Atap seng/asbes Rp 62,865.00

6.22 1 M2 Pasang Kaso + Reng Atap Sirap,seng/asbes Kayu Kls. III Atap sirap Rp 73,507.50 Atap seng/asbes Rp 52,415.00

6.23 1 M2 Pasang Rangka Langit-langit (1,00 x 1,00) m, Kayu Jati Rp 110,577.50

6.24 1 M2 Pasang Rangka Langit-langit (1,00 x 1,00) m, Kayu Kls. II Rp 89,457.50

6.25 1 M2 Pasang Rangka Langit-langit (1,00 x 1,00) m, Kayu Kls. III Rp 76,917.50

6.26 1 M2 Pasang Rangka Langit-langit (30 x 60) cm, Kayu Jati Rp 177,787.50

6.27 1 M2 Pasang Rangka Langit-langit (30 x 60) cm, Kayu Kls. II Rp 137,307.50

6.28 1 M2 Pasang Rangka Langit-langit (30 x 60) m, Kayu Kls. III Rp 113,272.50

6.29 1 M2 Pasang Rangka Langit-langit (30 x 30) cm, Kayu Jati Rp 209,701.25

6.30 1 M2 Pasang Rangka Langit-langit (30 x 30) cm, Kayu Kls. II Rp 162,181.25

6.31 1 M2 Pasang Rangka Langit-langit (30 x 30) m, Kayu Kls. III Rp 133,966.25

6.32 1 M' Pasang Lisplang Ukuran (3 x 20) cm, Kayu Jati Rp 67,265.00

6.33 1 M' Pasang Lisplang Ukuran (3 x 20) cm, Kayu Kls. II Rp 54,593.00

6.34 1 M' Pasang Lisplang Ukuran (3 x 30) cm, Kayu Jati Rp 91,938.00

6.35 1 M' Pasang Lisplang Ukuran (3 x 30) cm, Kayu Kls. II Rp 72,578.00

6.36 1 M' Pasang Lisplang Ukuran 2 x (3 x 20) cm, Kayu Kls.II Rp 99,456.50

6.37 1 M' Pasang Lisplang Ukuran 2 x (2 x 20) cm, Kayu Kls. II Rp 56,298.00

6.38 1 M' Pasang Lisplang Ukuran 2 x (2 x 20) cm, Kayu Kls. III Rp 47,960.00

6.39 1 M2 Pasang Rangka Dinding Pemisah + Papan Kayu Kls. II Rp 169,042.50

6.40 1 M2 Pasang Rangka Dinding Pemisah + Papan Kayu Kls. III Rp 141,350.00

6.41 1 M2 Pasang Dinding Pemisah Teakwood Rangkap, Rangka Kayu kls. II Rp 169,042.50

6.42 1 M2 Pasang Dinding Pemisah Plywood Rangkap, Rangka Kayu Kelas III Rp 230,488.50

6.43 1 M2 Pasang Dinding Lambriziring Dari Papan Jati Rp 236,307.50

Page 123: DrfatAnalisa2010 Smt Iok Palembang

Rekapitulasi Harga Satuan Upah dan Bahan Bangunan TA. 2010 Semester I

- 123 -

NomorU R A I A N HARGA SATUAN

Analisa1 2 3 6.44 1 M2 Pasang Plywood Tebal 4 mm, Untuk Dinding Rp 33,300.85

6.45 1 M' Pasang List Plafond Kayu Profil Kayu Profil Kecil Rp 4,576.00 Kayu Profil Sedang Rp 6,308.50

Kayu Profil Besar Rp 10,351.00

6.46 1 M2 Pasang Interior Display lapis plywood Sungkay + politur Rp 117,032.30

6.47 1 M2 Pasang lapis plywood Sungkay tanpa rangka, politur dan lis profil Rp 52,220.85

6.48 1 M2 Pasang lapis plywood Sungkay + list kayu, tanpa rangka dan politur Rp 63,891.85

6.49 1 M2 Pasangan Interior display + lapis jati dipolitur Rp 162,045.40

6.50 1 M2 Dinding Sekat Teakwood 4 mm, Rangkap + Rangka Kayu kls. II Rp 209,220.00

6.51 1 M2 Dinding Plywood / Multiplek + rangka kayu kls. III Rp 269,362.50

VII PEKERJAAN BETON

7.1 1 M3 Membuat Beton Tumbuk, 1 Pc : 3 Ps : 5 Kr Rp 816,585.00

7.2 1 M3 Membuat Beton Tumbuk, 1 Pc : 3 Ps : 6 Kr Rp 781,660.00

7.3 1 M3 Membuat Beton Tumbuk, 1 Pc : 4 Ps : 6 Kr Rp 721,710.00

7.4 1 M2 Membuat Lantai Kerja Beton Tumbuk, 1 Pc : 3 Ps : 5 Kr, Tebal 5 cm Rp 86,790.00

7.5 1 M3 Membuat Beton Tak Bertulang, 1 Pc : 2 Ps : 3 Kr Rp 827,585.00

7.6 1 M3 Membuat Beton Tak Bertulang, 1 Pc : 2 Ps : 4 Kr Rp 953,810.00

7.7 1 M3 Membuat Beton Tak Bertulang, 1 Pc : 2 Ps : 2,5 Kr Rp 1,077,285.00

7.8 1 M3 Membuat Beton Tak Bertulang, 1 Pc : 1,5 Ps : 3 Kr Rp 1,041,535.00

7.9 1 M3 Membuat Beton Tak Bertulang, 1 Pc : 1,5 Ps : 2,5 Kr Rp 1,162,260.00

7.10 1 M3 Membuat Beton Tak Bertulang, 1 Pc : 1 Ps : 2 Kr Rp 1,349,810.00

7.11 1 M3 Membuat Tiang Pancang Prestressed Beton Rp 1,397,935.00

7.12 1 M3 Membuat Beton Tak Bertulang, 1 Pc : 2 Ps : 3 Split Rp 1,296,240.00

7.13 1 M3 Membuat Beton Tak Bertulang, 1 Pc : 2 Ps : 4 Split Rp 1,234,365.00

7.14 1 M3 Membuat Beton Tak Bertulang, 1 Pc : 1,5 Ps : 3 Split Rp 1,294,095.00

7.15 1 M3 Membuat Beton Tak Bertulang, 1 Pc : 1,5 Ps : 2,5 Split Rp 1,349,315.00

7.16 1 M3 Membuat Beton Tak Bertulang, 1 Pc : 1 Ps : 1 Split Rp 1,804,715.00

7.17 1 M3 Membuat Beton Kedap Air dengan Strorox - 100

7.18 1 Kg Pembesian dengan Besi Polos atau Besi Ulir Rp 13,355.65

7.19 1 Kg Kabel Presstressed Polos / Strands

7.20 1 M2 Pasang Bekisting Untuk Pondasi Rp 90,161.50

7.21 1 M2 Pasang Bekisting Untuk Sloof Rp 96,211.50

Page 124: DrfatAnalisa2010 Smt Iok Palembang

Rekapitulasi Harga Satuan Upah dan Bahan Bangunan TA. 2010 Semester I

- 124 -

NomorU R A I A N HARGA SATUAN

Analisa1 2 3

7.22 1 M2 Pasang Bekisting Untuk Kolom (Untuk bangunan gedung) Rp 127,314.00

7.23 1 M2 Pasang Bekisting Untuk Kolom (Jerambah Beton) Rp 53,757.00

7.24 1 M2 Pasang Bekisting Untuk Balok (Untuk bangunan gedung) Rp 131,824.00

7.25 1 M2 Pasang Bekisting Untuk Balok (Jerambah Beton) Rp 65,197.00

7.26 1 M2 Pasang Bekisting Untuk Lantai, plat dak (untuk bangunan gedung) Rp 150,194.00

7.27 1 M2 Pasang Bekisting Untuk Lantai ( jerambah beton) Rp 82,764.00

7.28 1 M2 Pasang Bekisting Untuk Dinding Rp 127,644.00

7.29 1 M2 Pasang Bekisting Untuk Tangga Rp 116,094.00

7.30 1 M3 Beton Ready Mix K 175 dengan pengangkutan Rp 879,159.26

7.31 1 M3 Beton Ready Mix K 175 tanpa pengangkutan Rp 864,492.60

7.32 1 M3 Beton Ready Mix K 225 dengan pengangkutan Rp 916,467.59

7.33 1 M3 Beton Ready Mix K 225 tanpa pengangkutan Rp 901,800.93

7.34 1 M3 Beton Ready Mix K 250 dengan pengangkutan Rp 940,667.59

7.35 1 M3 Beton Ready Mix K 250 tanpa pengangkutan Rp 926,000.93

7.36 1 M3 Beton Ready Mix K 275 dengan pengangkutan Rp 977,975.93

7.37 1 M3 Beton Ready Mix K 275 tanpa pengangkutan Rp 963,309.27

7.38 1 M3 Beton Ready Mix K 300 dengan pengangkutan Rp 1,001,167.59

7.39 1 M3 Beton Ready Mix K 300 tanpa pengangkutan Rp 986,500.93

7.40 1 M3 Beton Ready Mix K 350 dengan pengangkutan Rp 1,037,467.59

7.41 1 M3 Beton Ready Mix K 350 tanpa pengangkutan Rp 1,022,800.93

7.42 1 M' Pasang Kayu Mal Bekisting untuk Beton Ready Mix jalan Rp 44,462.00

7.43 1 M3 Membuat Beton dengan Mutu K 225 Rp 1,432,475.00

7.44 1 M3 Membuat Beton dengan Mutu K 275 Rp 1,475,650.00

7.45 1 M2 Pasang Jembatan Cor Rp 57,260.50

7.46 1 M3 Membuat Pondasi Beton Bertulang ( 150 Kg Besi + Bekisting ) Rp 3,369,877.50

7.47 1 M3 Membuat Sloof Beton Bertulang ( 200 Kg Besi + Bekisting ) Rp 4,173,004.00

7.48 1 M3 Membuat Kolom Beton Bertulang ( 300 Kg Besi + Bekisting ) Rp 6,168,855.00

7.49 1 M3 Membuat Kolom Beton Bertulang ( 200 Kg Besi + Bekisting ) Rp 4,813,655.00

7.50 1 M3 Membuat Kolom Beton Bertulang ( 100 Kg Besi + Bekisting ) Rp 3,658,655.00

7.51 1 M3 Membuat Balok Beton Bertulang ( 200 Kg Besi + Bekisting ) Rp 4,473,051.00

Page 125: DrfatAnalisa2010 Smt Iok Palembang

Rekapitulasi Harga Satuan Upah dan Bahan Bangunan TA. 2010 Semester I

- 125 -

NomorU R A I A N HARGA SATUAN

Analisa1 2 3 7.52 1 M3 Membuat Balok Beton Bertulang ( 150 Kg Besi + Bekisting ) Rp 3,905,467.50

7.53 1 M3 Membuat Balok Beton Bertulang ( 100 Kg Besi + Bekisting ) Rp 3,443,467.50

7.54 1 M3 Membuat Dinding Beton Bertulang ( 150 Kg Besi + Bekisting ) Rp 3,790,803.50

7.55 1 M3 Membuat 1/2 Dinding Beton Bertulang ( 100 Kg Besi + Bekisting) Rp 2,761,286.00

7.56 1 M3 Membuat Tangga Beton Bertulang ( 200 Kg Besi + Bekisting ) Rp 4,271,454.00

7.57 1 M' Membuat Kolom Penguat Beton Bertulang ( 11 x 11 ) cm + bekisting (kolom Rp 65,109.00

7.58 1 M' Membuat Ring Balok Beton Bertulang ( 10 x 15 ) cm Rp 76,186.00

7.59 1 M2 Pasang Bekisting Untuk Lantai, plat dak dengan plywood 4 mm Rp 171,754.00

7.60 1 M3 Beton Ready Mix K-175 untuk Kolom, Balok, Plat Lantai, tangga dengan Concrete Pu Rp 843,721.62

7.61 1 M3 Beton Ready Mix K-175 untuk Kolom, Balok, Plat Lantai, tangga tanpa Concrete Pump Rp 809,345.93

7.62 1 M3 Beton Ready Mix K-225 untuk Kolom, Balok, Plat Lantai, tangga dengan Concrete Pu Rp 878,316.62

7.63 1 M3 Beton Ready Mix K-225 untuk Kolom, Balok, Plat Lantai, tangga tanpa Concrete Pump Rp 843,940.93

7.64 1 M3 Beton Ready Mix K-275 untuk Kolom, Balok, Plat Lantai, tangga dengan Concrete Pu Rp 935,351.62

VIII PEKERJAAN PENUTUP ATAP

8.1 1 M2 Pasang Atap Genteng Palentong Kecil Rp 41,503.00

8.2 1 M2 Pasang Atap Genteng Kodok Rp 82,753.00

8.3 1 M2 Pasang Atap Genteng keramik biasa bergalzur Rp 132,803.00

8.4 1 M2 Pasang Atap Genteng keramik KIA Natural / sejenis Rp 137,753.00

8.5 1 M2 Pasang Atap Genteng keramik KIA Berwarna / sejenis Rp 236,753.00

8.6 1 M2 Pasang Atap Genteng Palentong Super / Besar Rp 28,820.00

8.7 1 M' Pasang Bubung Genteng Kodok Rp 65,741.50

8.8 1 M' Pasang Bubung Genteng Keramik biasa berglazzur Rp 84,029.00

8.9 1 M' Pasang Bubung Genteng Keramik KIA Natural atau sejenis Rp 96,679.00

8.10 1 M' Pasang Bubung Genteng Keramik KIA Warna atau sejenis Rp 113,179.00

8.11 1 M' Pasang Bubung Genteng Palentong Kecil Rp 65,879.00

8.12 1 M' Pasang Bubung Genteng Palentong Besar Rp 66,429.00

8.13 1 M2 Pasang Roof Light Fibreglass Polycarbon Rp 54,391.74

8.14 1 M2 Pasang Atap Asbes Gelombang kecil lbr 0,8 tbl 4 mm Rp 50,411.17

8.15 1 M2 Pasang Atap Asbes Gelombang kecil lbr 1,05 tbl 4 mm Rp 51,700.83

8.16 1 M2 Pasang Atap Onduline Rp 110,709.50

8.17 1 M2 Pasang Atap Asbes Gelombang besar lbr 1,05 tbl 4 mm Rp 55,485.10

Page 126: DrfatAnalisa2010 Smt Iok Palembang

Rekapitulasi Harga Satuan Upah dan Bahan Bangunan TA. 2010 Semester I

- 126 -

NomorU R A I A N HARGA SATUAN

Analisa1 2 3

8.18 1 M' Pasang Bubung/nok Asbes Gelombang kecil Rp 33,588.50

8.19 1 M' Pasang Bubung/Nok Asbes Gelombang besar Rp 36,311.00

8.20 1 M2 Pasang Atap Beton Cisangkan Rp 131,279.50

8.21 1 M2 Pasang Atap Genteng Beton Rp 64,454.50

8.22 1 M2 Pasang Atap Genteng Metal biasa (77 cm X 88 cm) Rp 81,331.64

8.23 1 M2 Pasang Atap Genteng Metal Zincalume Rp 176,045.93

8.24 1 M2 Pasang Atap Genteng Metal Zincalume berpasir mutu A Rp 200,453.07

8.25 1 M2 Pasang Atap Genteng Metal Warna Rp 100,945.55

8.26 1 M2 Pasang Atap Genteng Metal Zincalume berpasir mutu B Rp 101,367.36

8.27 1 M' Pasang Nok Genteng Beton Rp 93,527.50

8.28 1 M' Pasang Nok Genteng Beton Cisangkan Rp 104,777.50

8.29 1 M' Pasang Nok Genteng Metal Rp 54,736.00

8.30 1 M2 Pasang Atap Seng Gelombang Rp 46,980.34

8.31 1 M' Pasang Atap Nok Seng Rp 24,585.00

8.32 1 M2 Pasang Atap Aluminium Rp 187,869.00

8.33 1 M' Pasang Nok Aluminium Rp 116,105.00

8.34 1 M2 Pasang Aluminium Foil / Sisalation Rp 29,106.00

8.35 1 M3 Gording, Sako, Kitau, Blandar kayu Kelas II Rp 6,057,562.50

8.36 1 M3 Gording, Sako, Kitau, Blandar kayu Kelas III Rp 4,908,062.50

8.37 1 M2 Rangka atap baja ringan "Superdyma" Al-Magnesium Rp 227,370.00

IX PEKERJAAN LANGIT-LANGIT

9.1 1 M2 Langit-langit Asbes/Eternit ( 1,00 x 1,00 ) m, Tebal 2,7 mm Rp 21,051.25

9.2 1 M2 Langit-langit Asbes / Eternit ( 1,00 x 1,00 ) m, Tebal 3,5 mm Rp 24,076.25

9.3 1 M2 Langit-langit Kalsiboard ( 1,20 x 2,40 ) m, Tebal 3,5 mm Rp 33,305.25

9.4 1 M2 Langit-langit Kalsiboard ( 1,20 x 2,40 ) m, Tebal 4,5 mm Rp 37,067.25

9.5 1 M2 Langit-langit Asbes/Eternit, Rangka Kayu Kls. II Tebal 2,7 mm Rp 102,547.50 Tebal 3,5 mm Rp 105,572.50

9.6 1 M2 Langit-langit Asbes/Eternit, Rangka Kayu Kls. III Tebal 2,7 mm Rp 90,007.50 Tebal 3,5 mm Rp 93,032.50

9.7 1 M2 Langit-langit Kalsiboard, Rangka Kayu Kls. II Tebal 3,5 mm Rp 121,607.75 Tebal 4,5 mm Rp 125,369.75

9.8 1 M2 Langit-langit Kalsiboard, Rangka Kayu Kls. III Tebal 3,5 mm Rp 109,067.75

Page 127: DrfatAnalisa2010 Smt Iok Palembang

Rekapitulasi Harga Satuan Upah dan Bahan Bangunan TA. 2010 Semester I

- 127 -

NomorU R A I A N HARGA SATUAN

Analisa1 2 3

Tebal 4,5 mm Rp 129,329.75

9.9 1 M2 Langit-langit Plywood ( 120 x 240 ) cm, Tebal 3 mm Rp 28,916.25

9.10 1 M2 Langit-langit Plywood ( 120 x 240 ) cm, Tebal 4 mm Rp 34,856.25

9.11 1 M2 Langit-langit Plywood ( 120 x 240 ) cm, Tebal 6 mm Rp 42,380.25

9.12 1 M2 Langit-langit Plywood ( 120 x 240 ) cm, Tebal 9 mm Rp 58,220.25

9.13 1 M2 Langit-langit Plywood ( 120 x 240 ) cm, Tebal 12 mm Rp 71,090.25

9.14 1 M2 Langit-langit Teakwood (120 X 240), Tebal 3 mm Rp 41,830.25

9.15 1 M2 Langit-langit Teakwood ( 120 x 240 ) cm, Tebal 4 mm Rp 47,330.25

9.16 1 M2 Langit-langit Plywood + Rangka Kayu Kls. II Tebal 3 mm Rp 116,855.75 Tebal 4 mm Rp 122,795.75 Tebal 6 mm Rp 130,319.75 Tebal 9 mm Rp 146,159.75

Tebal 12 mm Rp 159,029.75

9.17 1 M2 Langit-langit Plywood + Rangka Kayu Kls. III Tebal 3 mm Rp 104,315.75 Tebal 4 mm Rp 110,255.75 Tebal 6 mm Rp 117,779.75 Tebal 9 mm Rp 133,619.75

Tebal 12 mm Rp 146,489.75

9.18 1 M2 Langit-langit Lat Kayu Jati Rp 207,366.50

9.19 1 M2 Langit-langit Soft Board Rp 56,578.50

9.20 1 M' List Langit-langit Gypsum Gypsum besar Rp 30,536.00 Gypsum kecil Rp 24,486.00

9.21 1 M2 Langit-langit Gypsum Board, Tebal 9 mm Rp 77,847.00

9.22 1 M2 Langit-langit Gypsum Board 9 mm + Rangka Kayu kayu kelas II Rp 167,618.00 kayu kelas III Rp 155,078.00

9.23 1 M2 Langit-langit Gypsum Board 9 mm + Rangka besi hollow Rp 149,138.00

X PEKERJAAN SANITASI

10.1 Memasang 1 Buah Kloset Duduk / Monoblok Rp 707,289.00

10.2 Memasang 1 Buah Kloset Jongkok Porselen Rp 426,745.00

10.3 Memasang 1 Buah Kloset Jongkok Teraso Rp 245,839.00

10.4 Memasang 1 Buah Urinoir Rp 1,895,685.00

10.5 Memasang 1 Buah Wastafel Rp 388,575.00

10.6 Memasang 1 Buah Bak Mandi Teraso Volume 0,30 m3 Rp 265,100.00

10.7 Memasang 1 Buah Bak Mandi Fibreglass Volume 0,30 m3 Rp 592,185.00

10.8 Memasang 1 Buah Bak Mandi Porselin Batu Bata Volume 0,30 m3 Rp 1,251,360.00

Page 128: DrfatAnalisa2010 Smt Iok Palembang

Rekapitulasi Harga Satuan Upah dan Bahan Bangunan TA. 2010 Semester I

- 128 -

NomorU R A I A N HARGA SATUAN

Analisa1 2 3

10.9 Memasang 1 Buah Bak Beton Volume 1 m3 Air Rp 4,160,945.25

10.10 Memasang 1 Buah Bak Fibreglass Volume 1 m3 Air Rp 889,570.00

10.11 Memasang 1 M' Pipa Penyalur Air Limbah Jenis Pipa Tanah, dia. 15 cm Rp 162,863.25

10.12 Memasang 1 Buah Bak Kontrol Pasangan Batu Bata Ukuran (30 x 30) cm, Tinggi Rp 432,531.00

10.13 Memasang 1 Buah Bak Kontrol Pasangan Batu Bata Ukuran (45 x 45) cm, Tinggi Rp 451,478.50

10.14 Memasang 1 Buah Bak Kontrol Pasangan Batu Bata Ukuran (60 x 60) cm, Tinggi Rp 691,733.90

10.15 Memasang 1 m' Pipa Galvanis Dia. 1/2" Rp 27,226.83

10.16 Memasang 1 m' Pipa Galvanis Dia. 3/4" Rp 30,068.50

10.17 Memasang 1 m' Pipa Galvanis Dia. 1" Rp 34,331.00

10.18 Memasang 1 m' Pipa Galvanis Dia. 11/2" Rp 53,637.47

10.19 Memasang 1 m' Pipa Galvanis Dia. 3" Rp 109,760.38

10.20 Memasang 1 m' Pipa Galvanis Dia. 4" Rp 158,340.60

10.21 Memasang 1 m' Pipa PVC Tipe AW Dia. 1/2" Rp 11,248.60

10.22 Memasang 1 m' Pipa PVC Tipe AW Dia. 3/4" Rp 12,669.43

10.23 Memasang 1 m' Pipa PVC Tipe AW Dia. 1" Rp 13,806.10

10.24 Memasang 1 m' Pipa PVC Tipe AW Dia. 11/2" Rp 19,063.18

10.25 Memasang 1 m' Pipa PVC Tipe AW Dia. 2" Rp 26,818.73

10.26 Memasang 1 m' Pipa PVC Tipe AW Dia. 3" Rp 47,266.45

10.27 Memasang 1 m' Pipa PVC Tipe AW Dia. 4" Rp 71,988.95

10.28 Memasang 1 Buah Bak Cuci Piring Stainless Steel Rp 250,546.75

10.29 Memasang 1 Buah Bak Cuci Piring Teraso Rp 229,036.25

10.30 Memasang 1 Buah Kran Dia. 3/4" atau 1/2" Rp 19,057.50

10.31 1 Bh Septiktank 1,5 m x 2,0 m x 1 m dan Resapan Rp 3,966,405.39

XI PEKERJAAN BESI DAN ALUMINIUM

11.1 1 Kg Pasang besi WF dan Rangka Atap Baja Rp 24,088.35

11.2 1 Kg Pasang besi CNP,INP,L dan Rangka Atap Baja Rp 21,668.35

11.3 1 m2 Pasang Pintu Besi Baja Rp 2,013,429.00

11.4 1 m2 Pasang Jendela Besi Rp 412,993.63

11.5 1 m2 Pasang Pintu Lipat Rp 509,238.40

11.6 1 m2 Pasang Pintu Sunscreen Alluminium Rp 430,958.00

Page 129: DrfatAnalisa2010 Smt Iok Palembang

Rekapitulasi Harga Satuan Upah dan Bahan Bangunan TA. 2010 Semester I

- 129 -

NomorU R A I A N HARGA SATUAN

Analisa1 2 3 11.7 1 m2 Pasang Sunscreen Besi Holo 30/30 Rp 252,208.00

11.8 1 m2 Pasang Rolling Door Rp 442,138.40

11.9 1 m2 Pasang Pintu Alluminium Rp 632,988.40

11.10 1 m2 Pasang Hordeng Vertikals Blinds Rp 144,997.88

11.11 1 m2 Pasang Hordeng Horizontal Blinds (aluminium) Rp 142,247.88

11.12 1 m2 Pasang Terali Besi Strip Rp 184,400.70

11.13 1 m2 Pasang Kawat Harmonika Rp 61,696.25

11.14 1 m2 Pasang Kawat Nyamuk Rp 39,916.25

11.15 1 m2 Pasang Kawat Kassa Rp 31,446.25

11.16 1 m2 Pasang Kawat Burung Rp 31,446.25

11.17 1 m2 Pasang Jendela Nako dan Tralis Rp 141,803.75

11.18 1 m' Pasang Talang Datar, Seng BJLS Rp 128,354.88

11.19 1 m' Pasang Talang Miring, Seng BJLS Rp 155,777.88

11.20 1 m' Pasang Talang 1/2 Lingkaran Dia. 10 cm, Seng BJLS Rp 124,925.63

XII PEKERJAAN KUNCI DAN KACA

12.1 1 Buah Pasang Kunci Tanam mutu B Rp 189,843.50

12.2 1 Buah Pasang Kunci Tanam Biasa Rp 65,202.50

12.3 1 Buah Pasang Kunci Tanam Kamar Mandi Rp 64,226.25

12.4 1 Buah Pasang Engsel Pintu Rp 18,723.38

12.5 1 Buah Pasang Engsel Jendela Kuningan Rp 15,232.25

12.6 1 Buah Pasang Engsel Angin Rp 23,155.00

12.7 1 Buah Pasang Kait Angin Rp 19,273.38

12.8 1 Buah Pasang Door Closer Rp 463,911.25

12.9 1 Buah Pasang Kunci Selot Rp 22,214.50

12.10 1 Buah Pasang Pegangan Pintu / Door Holder Rp 78,911.25

12.11 1 Buah Pasang Door Stop Rp 33,382.25

12.12 1 Buah Pasang Rel Pintu Dorong Rp 269,593.50

12.13 1 Buah Pasang Kunci Lemari Rp 36,155.63

12.14 1 m2 Pasang Kaca, Tebal 3 mm Rp 101,498.38

12.15 1 m2 Pasang Kaca, Tebal 5 mm Rp 161,998.38

12.16 1 m2 Pasang Kaca, Tebal 8 mm Rp 187,573.10

Page 130: DrfatAnalisa2010 Smt Iok Palembang

Rekapitulasi Harga Satuan Upah dan Bahan Bangunan TA. 2010 Semester I

- 130 -

NomorU R A I A N HARGA SATUAN

Analisa1 2 3

12.17 1 m2 Pasang Kaca Buram, Tebal 12 mm Rp 267,205.63

12.18 1 m2 Pasang Kaca Cermin, Tebal 3 mm Rp 158,973.38

12.19 1 m2 Pasang Kaca Cermin, Tebal 5 mm Rp 422,148.38

12.20 1 m2 Pasang Kaca Patri, Tebal 5 mm Rp 1,465,773.38

12.21 1 Set Pekerjaan Pasang Jendela Kaca Nako Biasa Nako 6 daun Rp 181,523.38 Nako 8 daun Rp 198,023.38

12.22 1 Set Pekerjaan Pasang Jendela Kaca Nako RaybenNako 6 daun, rayben Rp 225,523.38 Nako 8 daun, rayben Rp 236,523.38

XIII PEKERJAAN PENUTUP LANTAI DAN DINDING

13.1 1 m2 Pasang Lantai Granito Ukuran 40 x 40 cm Rp 339,464.40

13.2 1 m2 Pasang Lantai Granito Ukuran 30 x 30 cm Rp 285,559.45

13.3 1 m2 Pasang Lantai Ubin Teralux Marmer Ukuran 60 x 60 cm Rp 337,564.75

13.4 1 m2 Pasang Lantai Ubin Teralux Marmer Ukuran 40 x 40 cm Rp 369,750.75

13.5 1 m2 Pasang Lantai Ubin Teralux Marmer Ukuran 30 x 30 cm Rp 385,827.25

13.6 1 m' Pasang Plint Ubin Teraso Ukuran 10 x 30 cm Rp 15,983.83

13.7 1 m' Pasang Plint Ubin Teraso Ukuran 10 x 40 cm Rp 45,376.38

13.8 1 m' Pasang Plint Ubin Granito Ukuran 10 x 40 cm Rp 36,256.00

13.9 1 m' Pasang Plint Ubin Granito Ukuran 10 x 30 cm Rp 73,654.35

13.10 1 m' Pasang Plint Ubin Teralux Marmer Ukuran 10 x 60 cm Rp 79,521.92

13.11 1 m' Pasang Plint Ubin Teralux Marmer Ukuran 10 x 40 cm Rp 81,095.25

13.12 1 m' Pasang Plint Ubin Teralux Marmer Ukuran 10 x 30 cm Rp 79,258.15

13.13 1 m2 Pasang Lantai Keramik Artistik Ukuran 10 x 20 cm Rp 409,181.00

13.14 1 m2 Pasang Lantai Keramik Artistik Ukuran 10 x 10 cm Rp 414,131.00

13.15 1 m2 Pasang Lantai Keramik Artistik Ukuran 5 x 20 cm Rp 714,181.00

13.16 1 m2 Pasang Plint Keramik Artistik Ukuran 10 x 20 cm Rp 47,635.25

13.17 1 m2 Pasang Plint Keramik Artistik Ukuran 10 x 10 cm Rp 47,833.25

13.18 1 m2 Pasang Plint Keramik Artistik Ukuran 5 x 20 cm Rp 45,594.75

13.19 1 m2 Pasang Lantai Keramik Ukuran 10 x 20 cm Rp 150,931.00

13.20 1 m2 Pasang Lantai Keramik Ukuran 20 x 20 cm Rp 150,931.00

13.21 1 m2 Pasang Lantai Keramik Ukuran 15 x 20 cm Rp 157,531.00

13.22 1 m2 Pasang Lantai Keramik Warna Ukuran 30 x 30 cm Rp 157,525.72

Page 131: DrfatAnalisa2010 Smt Iok Palembang

Rekapitulasi Harga Satuan Upah dan Bahan Bangunan TA. 2010 Semester I

- 131 -

NomorU R A I A N HARGA SATUAN

Analisa1 2 3

13.23 1 m2 Pasang Lantai Keramik Putih Ukuran 30 x 30 cm Rp 141,577.30

13.24 1 m2 Pasang Lantai Keramik Warna Ukuran 40 x 40 cm Mutu C Rp 160,281.00 Mutu B Rp 206,481.00

13.25 1 m' Pasang Plint Keramik Plint keramik putih 10 X 30 cm Rp 18,460.75

Plint keramik Warna 10 X 30 cm Rp 19,896.25 Plint keramik Warna 10 X 40 cm, mutu C Rp 24,070.75 Plint keramik Warna 10 X 40 cm, mutu B Rp 31,462.75

13.26 1 m2 Pasang Lantai Marmer Rp 412,903.90

13.27 1 m2 Pasang Lantai Karpet 6 mm Rp 104,280.00

13.28 1 m2 Pasang dinding Wallpaper Rp 75,363.75

13.29 1 m2 Pasang Lantai Parquet Jati Rp 510,056.25

13.30 1 m2 Pasang Dinding Porselin 10 x 10 cm, putih Rp 146,410.00

13.31 1 m2 Pasang Dinding Porselin 10 x 10 cm, Warna Rp 195,910.00

13.32 1 m2 Pasang Dinding Marmer Rp 424,967.00

13.33 1 m2 Pasang Dinding Batu Tempel Hitam/Kali + anti lumut (vernis) Rp 168,245.00

13.34 1 m2 Pasang Dinding Batu Candi Hitam + anti lumut (vernis) Rp 338,607.50

13.35 1 m2 Pasang Dinding batu Alam / Palimanan + anti lumut(vernis) Rp 344,553.00

13.36 1 m2 Pasang Dinding batu Alam/KarangPilang + anti lumut(vernis) Rp 451,143.00

13.37 1 m2 Pasang Dinding batu Alam/Andesit + anti lumut(vernis) Rp 423,093.00

13.38 1 m2 plint Kayu 2 x 10 cm Rp 32,917.50

13.39 1 m2 Pas. Lantai Batu Bata Diplester Bata Lobang Rp 86,912.10 Bata Merah/Kecil Rp 87,709.60

13.40 1 m2 Pas. Coneblock, tebal 8 cm Biasa, tbl. 8 cm Rp 91,478.75 Warna, tbl. 8 cm Rp 124,478.75

Warna Segienam, tbl. 8 cm Rp 112,598.75

13.41 1 m2 Pas. Coneblock, tebal 6 cm Biasa, tbl. 6 cm Rp 74,978.75 Warna, tbl. 6 cm Rp 49,500.00

13.42 1 m2 Pas. Lantai Mozaik 30/30 Rp 178,140.38

XIV PEKERJAAN PENGECATAN

14.1 1 m2 Mengikis / Mengerok Permukaan Cat Tembok Lama Rp 8,401.25

14.2 1 m2 Mencuci bidang permukaan tembok yang pernah di cat Rp 7,411.25

14.3 1 m2 Mengerok karat cat lama permukaan baja dengan cara manual Rp 7,411.25

14.4 1 m2 Menyabun Permukaan Tembok Lama Rp 7,411.25

14.5 1 m2 Mendempul dan Menggosok Kayu Rp 6,661.25

Page 132: DrfatAnalisa2010 Smt Iok Palembang

Rekapitulasi Harga Satuan Upah dan Bahan Bangunan TA. 2010 Semester I

- 132 -

NomorU R A I A N HARGA SATUAN

Analisa1 2 3

14.6 1 m2 Pengecatan Bidang Kayu Lama Rp 31,022.75

14.7 Rp 39,129.75 Dasar, 2 Lapis Cat Penutup )

14.8 Rp 53,501.25 Dasar, 3 Lapis Cat Penutup )

14.9 1 m2 Pelaburan Bidang Kayu dengan Politur Rp 33,479.05

14.10 1 m2 Pelaburan Bidang Kayu dengan Cat Residu dan Ter Rp 5,893.25

14.11 1 m2 Pelaburan Bidang Kayu dengan Vernis Rp 28,861.25

14.12 1 m2 Pengecatan Tembok Baru ( 1 Lapis Plamir, 1 lapis Cat Cat mutu C Rp 13,952.95 Dasar, 2 Lapis Cat Penutup ) Cat mutu B Rp 15,239.95

Cat Mutu B Anti lumut/jamur Rp 16,240.95 Cat Mutu A Anti lumut/jamur Rp 28,224.35

14.13 Cat mutu C Rp 9,598.05 Penutup ) Cat mutu B Rp 11,182.05

Cat Mutu B Anti lumut/jamur Rp 11,479.05

14.14 1 m2 Pengecatan Permukaan Baja dengan Meni Besi Rp 22,891.00

14.15 1 m2 Pengecatan Permukaan Baja dengan Meni Besi dan perancah Rp 35,417.25

14.16 10 m2 Cat Semprot minyak Chames Stones ( 1/2 Ducco ) Rp 163,028.80

14.17 1 M2 Cat tembok/Plafond Chames Stone (berkerikil) Rp 89,677.39

14.18 10 m2 Cat Melamic Rp 150,029.00

XV PEKERJAAN INSTALASI LISTRIK GEDUNG

15.1 1 Titik Pemasangan Saklar Lampu = Untuk 1 Titik Rp 142,395.00

15.2 1 Titik Pemasangan Stop Kontak Biasa = Untuk 1 Titik Rp 120,835.00

15.3 1 Titik Pemasangan Stop Kontak AC = Untuk 1 Titik Rp 298,375.00

15.4 1 Titik Pemasangan MCB = Untuk 1 Titik Rp 134,255.00

PEKERJAAN TAKSIR

1 PEKERJAAN BESI HOLLOW 2/4 CM Rp 33,000.00

2 1 M2 PAS. DINDING SKAT ALUMINIUM HITAM + KACA Rp 528,000.00

3 1 SET PAS. ENGSEL TANAM KUSEN ALUMINIUM Rp 290,000.00

4 1 BUAH PAS. LAMPU TL BOX 2 x 20 WATT Rp 225,000.00

5 1 BUAH PAS. LAMPU DOWN LIGHT Rp 45,000.00

6 1 BUAH PAS. LAMPU SL 15 WATT Rp 42,500.00

7 1 BUAH PAS. CLOSED DUDUK Rp 2,603,400.00

8 1 BUAH PAS. PINTU PVC + KUSEN TYPE B Rp 647,157.50

1 m2 Pengecatan Bidang Kayu Baru ( 1 Lapis Plamir, 1 lapis Cat

1 m2 Pengecatan Bidang Kayu Baru ( 1 Lapis Plamir, 1 lapis Cat

1 m2 Pengecatan Tembok Lama ( 1 lapis Cat Dasar, 2 Lapis cat

= Untuk 1 M2

= Untuk 1 M2

Page 133: DrfatAnalisa2010 Smt Iok Palembang

Rekapitulasi Harga Satuan Upah dan Bahan Bangunan TA. 2010 Semester I

- 133 -

NomorU R A I A N HARGA SATUAN

Analisa1 2 3

9 1 M2 PAS. KACA FILM SUN GLASS KOTAK Rp 260,000.00

10 1 BUAH PAS. SARINGAN AIR Rp 15,000.00

11 1 BUAH PAS. AC 3/4 PK Rp 3,850,000.00

12 1 BUAH PAS. PINTU PANEL LAPIS SUNGKAI + LIST STAINLIS Rp 1,591,682.76

13 PAS. LIST PLAFON 1/4 / M' Rp 2,250.00

14 PAS. PINTU PVC TYPE C/ BUAH Rp 471,000.00

15 PAS. KUSEN DAN JENDELA ALUMINIUM Rp 1,663,200.00

16 PAS. LAMPU TL 20 WATT Rp 37,000.00

17 1 M' PAS. BESI HOLLOW 2/4 CM T=1,2 m Rp 33,000.00

18 1 M' PAS. LISTPLANK WOODPLANK Rp 23,375.00

19 1 M3 PAS. HURUF NAMA KANTOR Rp 34,970.00

20 PAS. PAPAN NAMA DAN PLAT BESI Rp 2,121,301.60

21 PAS. TIANG PROFIL TERAS Rp 834,000.00

22 1 M2 PAS. DINDING SEKAT + JENDELA ALUMINIUM Rp 535,205.00

23 1 M2 PAS. PINTU KACA RANGKA ALUMINIUM + KUSEN Rp 735,075.00

Page 134: DrfatAnalisa2010 Smt Iok Palembang

Rekapitulasi Harga Satuan Upah dan Bahan Bangunan TA. 2010 Semester I

- 134 -

Harga belum termasukPPn, PPh dan Biaya Transportserta Overhead Cost

Page 135: DrfatAnalisa2010 Smt Iok Palembang

Rekapitulasi Harga Satuan Upah dan Bahan Bangunan TA. 2010 Semester I

- 135 -

APBD-P 2009 ---> HARGA READY MIX MENGADOPS BM APBD 2009 ---> HARGA READY MIX SURVEI LSG

844,454.07 34,705.19 Rp812,829.07 -

829,787.41 34,705.19 Rp798,162.41 -

879,764.07 36,703.52 Rp832,079.07 47,685.00 -

865,097.41 36,703.52 Rp817,412.41 -

926,844.07 13,823.52 Rp873,329.07 -

912,177.41 13,823.52 Rp858,662.41 -

938,614.07 39,361.85 Rp892,579.07 -

923,947.41 39,361.85 Rp877,912.41 -

962,154.07 39,013.52 Rp925,579.07 -

947,487.41 39,013.52 Rp910,912.41 -

979,809.07 57,658.52 Rp955,829.07 -

965,142.41 57,658.52 Rp941,162.41

Page 136: DrfatAnalisa2010 Smt Iok Palembang

Rekapitulasi Harga Satuan Upah dan Bahan Bangunan TA. 2010 Semester I

- 136 -

APBD 2009 ---> HARGA READY MIX SURVEI LSG