SISTEM OTOMASI GARDU INDUK

(SOGI)

Jakarta, 1 Juni 2011 PT PLN (Persero) P3B Jawa Bali

Fungsi Yang Terpasang Di P3B JBNo 1 2 Perangkat RTU C264 SAS Pacis Fungsi % 100 80 Time Tag di HMI, Lokal HMI, IED beda Keterangan

3 4

PLC T390 PLC 5000

40 0 Belum berfungsi

Uji Fungsi SCADA Di P3B JBSOGINARI RCS 9698 L ABB SYS 600 L Siemens SICAM PAS L ALSTOM PACIS BL

RTUL = Lulus BL = Belum Lulus

SELTA STCE L

ABB 560 L

Siemens AK 1703 L

ALSTOM C264 L

SOGI

Standard SPLN Teleinformasi Data untuk Pemeliharaan Instalasi Sistem Tenaga Listrik SPLN S5.002:2008 dengan SK Dir No.169.K/DIR/2009 Protokol IEC 61850 : IED proteksi dan IED BCU Protokol IEC 60870-5-101

Syarat Teknis

Relay Proteksi lulus Real Time Digital Simulator (RTDS) dari PLN PUSLITBANG Lulus uji protokol IEC 60870-5-101 dan IEC 61850 Lulus komunikasi partyline dan serial port RS232 Lulus uji digital input, digital output ,analog input, analog output Time tag di IED, Lokal HMI, Dispatcher

Syarat Non Teknis Surat keterangan kepuasan pengguna dari P3B JB Sudah diimplementasikan di negara maju diluar negara pembuat Original Engineering Manufacture

Proses Lelang Dua sampul satu tahap : Sampul pertama : Syarat administrasi dan teknik dan Uji fungsi Sampul ke dua : Penawaran harga

Perencanaan PLNMembangun secara terpadu untuk : Gardu Induk SOGI yang memenuhi Teleinformasi Data untuk Pemeliharaan Instalasi Sistem Tenaga Listrik SPLN S5.002:2008 dengan SK Dir No.169.K/DIR/2009

Konfigurasi Master Station01 02 03 04 05 06SD

PROLIANT

8000

ESC

SD

DLT

A

B

C

D

E

F

G

HSELECTED ON-LINE

A

B

C

D

E

F

G

HSELECTED ON-LINE

SD

CONSOLE LOOP BRI S/T CONSOLE WIC 0 OK FDX 100 LNK AUX LOOP DSU CPU S3 WIC 1 OK SD DSU CPU S3

Cisco 1720WIC 0 OK

BRI S/T

FDX 100 LNK

AUX

WIC 1 OK

08LCD 1 bh

12 13

Cisco 1720

14

OK

OK

Inter Center Link ( IEC 870-6 (ICCP) )

LP

B1

B2

LP

B1

B2

07

09

A

B

C

D

E

F

G

HSELECTED ON-LINE

11A B C D E F G HSELECTED ON-LINE

RTU IEC 870-5-101, DNP 3.0 Serial RTU IEC 870-5-104 Ethernet

SD

PROLIANT

8000

ESC

15SD

16DLT

10

Arsitektur SOGI

Kinerja SOGI Kapasitas station unit minimal 10.000 I/O. Kapasitas Otomasi GI minimal 96 IED Kapasitas switch 48 bh, fault recovery time max 150 ms. Pertukaran data peer to peer melalui protocol IEC 61850 maksimal 30 milidetik. Keakuratan telemetering dari IED BCU: Arus dan tegangan kelas 0,5 Daya aktif dan reaktif (MW dan MVAr) kelas 0,5 Energi meter (MWh dan MVArh) kelas 1,0

Switchover otomatis (failover) station unit maksimal 30 detik. Penyimpanan urutan kejadian minimal 120.000 event dan 60 recording pengukuran selama 100 hari.

Kapan SOGI Di Bangun Gardu Induk Baru Penambahan Bay baru Rehabilitasi Gardu Induk Tersedia media komunikasi 64 kbps

Opsi Pembangunan SOGIBay Level Opsi 1 Opsi 2 Opsi 3 : : : RTU IED I/O Proteksi Existing Existing Panel Kontrol Existing BCU per CB BCU & IED Proteksi Bay Baru BCU & IED Prot BCU & IED Prot

Yang Tidak Dibahas Pada Spesifikasi SOGI Peralatan tegangan tinggi Power supply Telekomunikasi Disturbance fault recorder Fault locator Energy meter

Standard Teleinformasi SCADA Fungsi Operasi Dan PemeliharaanMnemoVDCF

DesignationVDC FAILURE..

220RF 220VDC RECTIFIER FAILURE110RF 10VDC RECTIFIER FAILURE

Jumlah Input/Output IBTOperasiTelemetering 4

Pemeliharaan37

Remote ControlTelesignal Double Telesignal Single

36 17

1817 129

Station Level Opsi 1Control Center

Gateway Station Unit 1 Station Unit 2

Switch

Switch

Switch

Station Level Opsi 2Control Center

Gateway Station Unit 1 Station Unit 2

Switch

Switch

Switch

Bay TransformerBus A

Q0A

Q0AB

Q0B

Bus B

1 IED untuk bay TRAFO

Bay Level Double BusbarBus 1Bus 2 Q1 Q2 Q1 Q2 Q1 Q2 Q0

Single Line Diagram

Q0 Q9 Q8 OHL

Q0

Transfor mer

Bus Coupler

Station LAN IEC 61850: Ethernet 100 Mbps Fiber Optic single ring

switch

switch

switch

switch

switch

OHL

Trafo

Trafo

Busbar & Coupler

Common

BCU MPU BPU

BCU AVR

MPU BPU1 BPU2

BCU MPU BPU

IED I/O

Level 150 kV One Half BreakerBus AStation LAN IEC 61850: Ethernet 100 Mbps Fiber Optic single ring

Q0A

switchQ0ABOHL

switch

switch

switch

switch

switch

Diameter

Trafo

Trafo

Busbar

Common

MPUQ0B

BCU A BCU AB BCU B

AVR

MPU BPU 1 BPU 2 CCP

BUS PRO BUS A BUS PRO BUS B CBF AB(N Diemeter)

IED I/O

BPUBus B

CCP

Level 500 kV One Half BreakerBus AStation LAN IEC 61850: Ethernet 100 Mbps Fiber Optic single ring

Q0Aswitch Bay switch switch

switch

switch

switch

switch

switch

switch

Q0AB

OHL

OHLMPU 2 CCP 2

DiameterBCU A BCU AB BCU B

TrafoBCU 150 kV AVR RST

TrafoMPU1 BPU1 CCP1

TrafoMPU2 BPU2

BUSBARBUSPRO Bus A Main 1 BUSPRO Bus B Main 1 CBF AB1(n diameter)

BUSBARBUSPRO Bus A Main 2 BUSPRO Bus B Main 2 CBF AB2(n diameter)

COMMONIED I/O

Q0B Bus BMPU 1

CCP 1

CCP2

Penambahan Bay Baru dan Up Grade RTU

Gateway Station Unit 1 Station Unit 2

Switch

Switch

Switch

Switch

Switch

IED I/O

MPU BPU-1 BPU-2

BCU AVR

Bay Trafo Baru

Penambahan Diameter, Unit Pembangkit dan IBT

Station Level HMI Station Unit : Server redundant Fungsi SCADA, historikal data dan statistik Server berfungsi untuk manajemen dari IED dan workstation.

Gateway Dapat menampung IED sesuai kapasitas I/O Dapat meneruskan perintah kontrol dari Master station atau lokal kontrol. Inverter 110 VDC ke 220 VAC.

Peralatan Yang Diakusisi SOGI1. Pemutus (CB): a. Status & perintah open-close b. Counter of circuit Breaker c. Pressure (SF6) d. Alarm gangguan (misal: SF6 alarm)CB untuk transmisi

Kontrol box CB

Indicator alarm tekanan SF6 (berupa kontak saja)

Transducer: tekanan SF6 ke 4-20 mA untuk monitor SF6 Pressure

Peralatan Yang Diakusisi SOGI2. Pemisah (DS/isolator) a. Status & perintah open-close b. Alarm gangguan

Peralatan Yang Diakusisi SOGI3. Sakelar pentanahan (Earthing Switch) a. Status & perintah open-close b. Alarm gangguan

Peralatan Yang Diakusisi SOGI4. Lightning Arrester

Lightning Arrester dengan counter

Lightning Arrester tanpa signal untuk SOGI

Peralatan Yang Diakusisi SOGI5. Transformator (Daya & Inter Bus Transformator)

a. Tap position indication dari OLTC b. Counter pengoperasian OLTC c. Temperature winding & oil d. Transformer electromechanical protection (level alarm maupun trip) e. Sistim pendinginan f. Early Warning System g. Alarm gangguan

Peralatan Yang Diakusisi SOGI6. Counter operasi OLTC

Counter operasi OLTC

OLTC Motor Drive Unit

Peralatan Yang Diakusisi SOGI7. Automatic Voltage Regulator

Automatic Voltage Regulator

Kontrol panel

Peralatan Yang Diakusisi SOGI8. Panel distribusi tegangan menengah 20kV a. Status dari Circuit Breaker, Earthing Switch, posisi CB rack in-rack out. b. Kontrol CB c. Alarm gangguan d. Pengukuran besaran-besaran listrik

Penyulang 20kV dengan IED

IED Kontrol & proteksi

Peralatan Yang Diakusisi SOGI9. Ruang kendali GITET/GI Temperatur & Kelembaban

Ruang kendali GI

IED sensor kelembaban dan suhu

Peralatan Yang Diakusisi SOGI10. Sistim SOGIControl centreIEC 60870 101 -5Time synchr (optional)Log.IN1 1100

ICCP/TASE 2

Control centre Lokal HMI

F1 F2

1530 1530

1503 Log.IN2 Log.IN3 1530 2173

>12173

8888

Log.Out1

Ethernet IEC 60870-5-104 (eksisting) IEC 60870-5-103 (eksisting) IEC 60870-5-101 LFC Modbus (temperatur & kelembaban)

IEC 61850

Kesimpulan Sertifikasi uji fungsi dari PUSLITBANG Kepuasan pengguna Pembangunan terpadu peralatan Gardu Induk dengan SOGI Audit spesifikasi teknik, proses lelang dan pengujian Performance terbaik yang terpasang di PLN ALSTOM agar mengganti/memperbaiki PLC T390, PLC 5000 dan PACIS