Page 1: Step 5

PENENTUAN RANCANGAN PENAMBANGAN DENGAN METODE LERCHS-GROSSMAN 18 Mei 2015

Mohammad Arief Wibowo | 112 .12.0135 Kelas :C 1

Page 2: Step 5

PENENTUAN RANCANGAN PENAMBANGAN DENGAN METODE LERCHS-GROSSMAN 18 Mei 2015

Mohammad Arief Wibowo | 112 .12.0135 Kelas :C 2

Page 3: Step 5

PENENTUAN RANCANGAN PENAMBANGAN DENGAN METODE LERCHS-GROSSMAN 18 Mei 2015

Mohammad Arief Wibowo | 112 .12.0135 Kelas :C 3

Page 4: Step 5

PENENTUAN RANCANGAN PENAMBANGAN DENGAN METODE LERCHS-GROSSMAN 18 Mei 2015

Mohammad Arief Wibowo | 112 .12.0135 Kelas :C 4

Page 5: Step 5

PENENTUAN RANCANGAN PENAMBANGAN DENGAN METODE LERCHS-GROSSMAN 18 Mei 2015

Mohammad Arief Wibowo | 112 .12.0135 Kelas :C 5

Step 5

Net Value = 1198 x $1,000 = $ 1,198,000

Misal 1 blok = 10.000 ton/blok

Total Ton = 56 x 10.000 ton/blok = 560.000 ton

Ton ore = 50 blok x 10.000 ton/blok = 500.000 ton

Ton Waste = 6 x 10.000 ton/blok = 60.000 ton

SR =

Profitabilitas rata-rata per ton

2,139