    RENCANA ANGGARAN BIAYA

    PEKERJAAN PELEBARAN POS RT.22

    No. URAIAN PEKERJAAN QTY. SAT.HARGA SAT. TOTAL

    (Rp) (Rp)

    A PEKERJAAN STRUKTUR

    1 Cor strous dia.25 0.39 m3 2,000,000.00 785,000.00

    2 Cor poor 0.8x0.8x0.2 0.39 m3 2,000,000.00 784,000.003 Pekerjaan kolom 25x24 0.32 m3 2,000,000.00 640,000.00

    4 alok 15!25 "eton "ertulan# 0.47 m3 2,000,000.00 945,000.00

    5 $in# "alok 10!20 utk landasan papan 0.19 m3 2,000,000.00 378,000.00

    6 $in# "alok 10!20 atas 0.19 m3 2,000,000.00 378,000.00

    7 %antai kerja te"al 5&m 1.50 m3 650,000.00 975,000.00

    8 Pasir dipadatkan te"al 5&m 3.00 m3 120,000.00 360,000.00

    9 'alian pondasi 4.00 m3 38,700.00 154,800.00

    10 or strous dia 25 4.00 ttk 73,000.00 292,000.00

    Sub total !"#$!%&&.&&

    B PEKERJAAN PASANGAN

    1 Pasan# pa(in# te"al 6 &m 18.00 m2 55,000.00 990,000.00

    2 Pasan# kanstin dari "ata 2.70 m2 150,000.00 405,000.00

    3 Pasan# keramik moti) 30!30 9.00 m2 75,000.00 675,000.00

    4 Papan dari ka*u kamper utk dudukan +nis plitur 26.00 "tn# 145,000.00 3,770,000.005 Pasan# "ata mera "a#ian "a-a 5.60 m2 150,000.00 840,000.00

    6 Plester dan a&ian 5.60 m2 29,700.00 166,320.00

    Sub total "!%'"!2&.&&

    C PEKERJAAN ATAP

    1 tap as"es #elom"an# 24.00 m2 33,600.00 806,400.00

    2 $an#ka atap "aan ka*u 6!12 4.00 "j 125,000.00 500,000.00

    3 $an#ka usuk "aan ka*u 5!7 4.00 "j 67,000.00 268,000.00

    4 Pla)on #ipsun 55.80 m2 48,000.00 2,678,400.00

    5 lisplank 15.00 m1 60,000.00 900,000.00

    Sub total !$2!%&&.&&

    PENGECATAN AN PAGAR BESI

    1 &at ka*u 4.00 m2 24,000.00 96,000.00

    2 Cat dindin# 23.85 m2 24,000.00 572,400.00

    3 Cat "esi 1.00 ls 100,000.00 100,000.004 Pipa "esi utk pa#ar dia.2/ 20.00 m1 25,000.00 500,000.00

    Sub total $!2"%!'&&.&&

    JU*LAH $%!##!2&.&&

    RENCANA ANGGARAN BIAYA PEKERJAAN SALURAN

    No. URAIAN PEKERJAAN QTY. SAT.HARGA SAT. TOTAL

    (Rp) (Rp)

    A PEKERJAAN SALURAN

    1 'ali tana 14.69 m3 38,700.00 568,425.60

    2 ru# pasi "a-a pondasi 1.22 m3 140,000.00 171,360.00

    3 nstampin# te"al 15&m 1.84 m3 211,000.00 387,396.00

    4 Pasan#an "atu kali 7.04 m3 350,000.00 2,463,300.00

    5 Cor tutup saluran 0.84 m3 2,500,000.00 2,100,000.00

    6 Plesteran 17.68 m2 29,700.00 525,096.00

    Ju+la, total "!2$!--."&

  • 7/26/2019 RAB POS RT

    2/40

    No. URAIAN PEKERJAAN QTY. SAT.HARGA SAT. TOTAL

    (Rp) (Rp)

  • 7/26/2019 RAB POS RT

    3/40

    No. URAIAN PEKERJAAN QTY. SAT.HARGA SAT. TOTAL

    (Rp) (Rp)

  • 7/26/2019 RAB POS RT

    4/40

    No. URAIAN PEKERJAAN QTY. SAT.HARGA SAT. TOTAL

    (Rp) (Rp)

  • 7/26/2019 RAB POS RT

    5/40

    No. URAIAN PEKERJAAN QTY. SAT.HARGA SAT. TOTAL

    (Rp) (Rp)

  • 7/26/2019 RAB POS RT

    6/40

    No. URAIAN PEKERJAAN QTY. SAT.HARGA SAT. TOTAL

    (Rp) (Rp)

  • 7/26/2019 RAB POS RT

    7/40

    No. URAIAN PEKERJAAN QTY. SAT.HARGA SAT. TOTAL

    (Rp) (Rp)

  • 7/26/2019 RAB POS RT

    8/40

    No. URAIAN PEKERJAAN QTY. SAT.HARGA SAT. TOTAL

    (Rp) (Rp)

  • 7/26/2019 RAB POS RT

    9/40

    No. URAIAN PEKERJAAN QTY. SAT.HARGA SAT. TOTAL

    (Rp) (Rp)

  • 7/26/2019 RAB POS RT

    10/40

    No. URAIAN PEKERJAAN QTY. SAT.HARGA SAT. TOTAL

    (Rp) (Rp)

  • 7/26/2019 RAB POS RT

    11/40

    RENCANA ANGGARAN BIAYA

    PEKERJAAN PELEBARAN POS RT.22

    No. URAIAN PEKERJAAN QTY. SAT.HARGA SAT.

    (Rp)

    A PEKERJAAN STRUKTUR

    1 Cor poor 0.8x0.8x0.2 0.51 m3 1,800,000.00

    2 Pekerjaan kolom 25x24 0.84 m3 1,800,000.00

    3 alok 15!25 "eton "ertulan# 0.47 m3 1,800,000.00

    4 $in# "alok 10!20 utk landasan papan 0.37 m3 1,800,000.00

    5 $in# "alok 10!20 atas 0.25 m3 1,800,000.00

    6 %antai kerja te"al 5&m 1.50 m3 500,000.00

    7 Pasir dipadatkan te"al 5&m 3.00 m3 120,000.00

    8 'alian pondasi 4.00 m3 38,700.00

    Sub total

    B PEKERJAAN PASANGAN

    1 Pasan# pa(in# te"al 6 &m 18.00 m2 40,000.00

    2 Pasan# kanstin dari "ata 2.70 m2 150,000.00

    3 Pasan# keramik moti) 30!30 12.00 m2 108,000.00

    4 Papan dari ka*u kamper utk dudukan +nis plitur 40.00 m1 103,000.00

    5 Pasan# "ata mera "a#ian "a-a 5.60 m2 150,000.00

    6 Plester dan a&ian 5.60 m2 29,700.00

    Sub total

    C PEKERJAAN ATAP

    1 tap as"es #elom"an# 48.00 m2 33,600.00

    2 $an#ka atap "aan ka*u 6!12 6.00 "j 139,900.00

    3 $an#ka usuk "aan ka*u 5!7 6.00 "j 65,100.00

    4 Pla)on #ipsun 60.00 m2 45,000.00

    5 lisplank ka*u kamper 15.00 m1 88,000.00

    Sub total

    PENGECATAN AN PAGAR BESI

    1 &at lisplank 4.20 m2 27,000.00

    2 Cat dindin# 23.85 m2 32,000.00

    3 Cat kolom 11.93 m2 32,000.00

    4 Cat pintu dan kusen 4.00 m2 27,000.00

    5 Pipa "esi utk pa#ar dia.2/ 5.00 "tn# 125,000.00

    Sub total

    JU*LAH

  • 7/26/2019 RAB POS RT

    12/40

    No. URAIAN PEKERJAAN QTY. SAT.HARGA SAT.

    (Rp)

  • 7/26/2019 RAB POS RT

    13/40

    No. URAIAN PEKERJAAN QTY. SAT.HARGA SAT.

    (Rp)

  • 7/26/2019 RAB POS RT

    14/40

    No. URAIAN PEKERJAAN QTY. SAT.HARGA SAT.

    (Rp)

  • 7/26/2019 RAB POS RT

    15/40

    No. URAIAN PEKERJAAN QTY. SAT.HARGA SAT.

    (Rp)

  • 7/26/2019 RAB POS RT

    16/40

    No. URAIAN PEKERJAAN QTY. SAT.HARGA SAT.

    (Rp)

  • 7/26/2019 RAB POS RT

    17/40

    No. URAIAN PEKERJAAN QTY. SAT.HARGA SAT.

    (Rp)

  • 7/26/2019 RAB POS RT

    18/40

    No. URAIAN PEKERJAAN QTY. SAT.HARGA SAT.

    (Rp)

  • 7/26/2019 RAB POS RT

    19/40

    No. URAIAN PEKERJAAN QTY. SAT.HARGA SAT.

    (Rp)

  • 7/26/2019 RAB POS RT

    20/40

    No. URAIAN PEKERJAAN QTY. SAT.HARGA SAT.

    (Rp)

  • 7/26/2019 RAB POS RT

    21/40

    TOTAL

    (Rp)

    921,600.00

    1,518,750.00

    850,500.00

    663,840.00

    453,600.00

    750,000.00

    360,000.00

    154,800.00

    !"-!&.&&

    720,000.00

    405,000.00

    1,296,000.00

    4,120,000.00

    840,000.00

    166,320.00

    -!'-!2&.&&

    1,612,800.00

    839,400.00

    390,600.00

    2,700,000.00

    1,320,000.00

    "!%"2!%&&.&&

    113,400.00

    763,200.00

    381,600.00

    108,000.00

    625,000.00

    $!##$!2&&.&&

    22!&-'!'$&.&&

  • 7/26/2019 RAB POS RT

    22/40

    TOTAL

    (Rp)

  • 7/26/2019 RAB POS RT

    23/40

    TOTAL

    (Rp)

  • 7/26/2019 RAB POS RT

    24/40

    TOTAL

    (Rp)

  • 7/26/2019 RAB POS RT

    25/40

    TOTAL

    (Rp)

  • 7/26/2019 RAB POS RT

    26/40

    TOTAL

    (Rp)

  • 7/26/2019 RAB POS RT

    27/40

    TOTAL

    (Rp)

  • 7/26/2019 RAB POS RT

    28/40

    TOTAL

    (Rp)

  • 7/26/2019 RAB POS RT

    29/40

    TOTAL

    (Rp)

  • 7/26/2019 RAB POS RT

    30/40

    TOTAL

    (Rp)

  • 7/26/2019 RAB POS RT

    31/40

    BAHAN UTK PEKERJAAN PELEBARAN POS RT.22

    No. KEBUTUHAN *ATERIAL QTY. SAT.HARGA SAT. TOTAL

    (Rp) (Rp)

    A BAHAN UNTUK PELEBARAN POS

    1 pasir &or 4.00 m3 125,000.00 500,000.00

    2 ata mera 600.00 "j 2,000.00 1,200,000.00

    3 emen #resik 40 k# 21.00 ak 52,000.00 1,092,000.00

    4 esi tulan#an dia.12 19.00 ljr 87,000.00 1,653,000.00

    6 esi tulan#an dia.8 13.00 ljr 43,000.00 559,000.00

    7 Pa(in# te"al 6 &m 18.00 m2 52,000.00 936,000.00

    8 s"es #elom"an# 8.00 l"r 92,000.00 736,000.00

    9 a*u 6!12 5.00 "tn# 125,000.00 625,000.00

    10 a*u 5!7 5.00 "tn# 67,000.00 335,000.00

    11 a*u 3!7 5.00 "tn# 45,000.00 225,000.00

    12 'ipsun 56.00 "tn# 48,000.00 2,688,000.00

    13 Papan lisplank 2!20 5.00 "tn# 60,000.00 300,000.00

    14 Papan meranti "atu 3!20 26.00 "tn# 145,000.00 3,770,000.00

    15 oral 3.00 m3 254,000.00 762,000.00

    16 eramik 30!30 kasar 9.00 m2 48,000.00 432,000.00

    17 Cat tem"ok 2.00 k# 95,000.00 190,000.00

    18 Cat ka*u 2.00 k# 65,000.00 130,000.00

    19 Cat "esi 2.00 k# 62,000.00 124,000.00

    20 Paku 3.00 k# 13,000.00 39,000.00

    21 endrat 5.00 k# 15,300.00 76,500.00

    Ju+la, total $"!2#"!&&&.&&

    BAHAN UTK PEKERJAAN PE*BUATAN SALURAN

    No. KEBUTUHAN *ATERIAL QTY. SAT.

    HARGA SAT. TOTAL

    (Rp) (Rp)

    1 atu kali 9.95 m3 154,000.00 1,532,608.00

    2 emen 20.88 ak 52,000.00 1,085,760.00

    3 Pasir 4.68 m3 125,000.00 585,000.00

    4 oral 1.00 m3 254,000.00 254,000.00

    5 esi tulan#an dia.12 31.00 ljr 87,000.00 2,697,000.00

    Ju+la, total "!$'!"%.&&

    21

  • 7/26/2019 RAB POS RT

    32/40

    No. KEBUTUHAN *ATERIAL QTY. SAT.HARGA SAT. TOTAL

    (Rp) (Rp)

  • 7/26/2019 RAB POS RT

    33/40

    No. KEBUTUHAN *ATERIAL QTY. SAT.HARGA SAT. TOTAL

    (Rp) (Rp)

  • 7/26/2019 RAB POS RT

    34/40

    No. KEBUTUHAN *ATERIAL QTY. SAT.HARGA SAT. TOTAL

    (Rp) (Rp)

  • 7/26/2019 RAB POS RT

    35/40

    No. KEBUTUHAN *ATERIAL QTY. SAT.HARGA SAT. TOTAL

    (Rp) (Rp)

  • 7/26/2019 RAB POS RT

    36/40

    No. KEBUTUHAN *ATERIAL QTY. SAT.HARGA SAT. TOTAL

    (Rp) (Rp)

  • 7/26/2019 RAB POS RT

    37/40

    No. KEBUTUHAN *ATERIAL QTY. SAT.HARGA SAT. TOTAL

    (Rp) (Rp)

  • 7/26/2019 RAB POS RT

    38/40

    No. KEBUTUHAN *ATERIAL QTY. SAT.HARGA SAT. TOTAL

    (Rp) (Rp)

  • 7/26/2019 RAB POS RT

    39/40

    No. KEBUTUHAN *ATERIAL QTY. SAT.HARGA SAT. TOTAL

    (Rp) (Rp)

  • 7/26/2019 RAB POS RT

    40/40

    No. KEBUTUHAN *ATERIAL QTY. SAT.HARGA SAT. TOTAL

    (Rp) (Rp)