LAMPIRAN L2 - 1 Perincian biaya mesin – mesin yang digunakan : Mesin - Mesin Harga Jumlah Jumlah Harga Washer Machine (550 lbs) 98,650,000.00 Rp 4 394,600,000.00 Rp Sample Machine (45 lbs) 24,000,000.00 Rp 1 24,000,000.00 Rp Extractor 58,750,000.00 Rp 2 117,500,000.00 Rp Dryer (250 lbs) 58,850,000.00 Rp 1 58,850,000.00 Rp Dryer Jumbo 72,000,000.00 Rp 3 216,000,000.00 Rp Boiler Solar (1500 kg) 150,000,000.00 Rp 2 300,000,000.00 Rp Washer Machine (250 lbs) 43,000,000.00 Rp 1 43,000,000.00 Rp Washer Machine (50 lbs) 25,000,000.00 Rp 1 25,000,000.00 Rp Washer Machine (45 lbs) 24,000,000.00 Rp 1 24,000,000.00 Rp Extractor (100 lbs) 20,000,000.00 Rp 1 20,000,000.00 Rp Dryer (250 lbs) 35,000,000.00 Rp 2 70,000,000.00 Rp Roll Machine 60,000,000.00 Rp 2 120,000,000.00 Rp Boiler Solar (300 kg) 50,000,000.00 Rp 1 50,000,000.00 Rp Mesin Generator (Genset) 250,000,000.00 Rp 1 250,000,000.00 Rp 1,712,950,000.00 Rp Perincian biaya perlengkapan lain : Investasi Lain Harga Jumlah Jumlah Harga Alat - alat dapur & makan 1,500,000.00 Rp 1 1,500,000.00 Rp Sofa 1,000,000.00 Rp 1 1,000,000.00 Rp Tabung Pemadam Kebakaran 750,000.00 Rp 5 3,750,000.00 Rp Tabung Gas 250,000.00 Rp 1 250,000.00 Rp Tempat Tidur 600,000.00 Rp 1 600,000.00 Rp Televisi 750,000.00 Rp 1 750,000.00 Rp Sapu 4,000.00 Rp 3 12,000.00 Rp Asbak 15,000.00 Rp 5 75,000.00 Rp Tempat Sampah 40,000.00 Rp 6 240,000.00 Rp Karpet Mushola 100,000.00 Rp 1 100,000.00 Rp 8,277,000.00 Rp Perincian modal kerja yang disiapkan : No Jenis Biaya Total biaya 1 Biaya Tenaga Kerja 42,300,000.00 Rp 2 Biaya Administrasi 244,000.00 Rp 3 Biaya Operasional 42,000,000.00 Rp 4 Biaya Energi 17,300,000.00 Rp 5 Biaya Pabrik 284,651,065.27 Rp 6 Biaya Lain - Lain 1,030,000.00 Rp Total 387,525,065.27 Rp Dana Cadangan 32,474,934.73 Rp Modal Kerja Disiapkan 420,000,000.00 Rp TUGAS AKHIR

Upload: hadien

Post on 14-Aug-2019

276 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: LAMPIRAN L2 - 1 - repository.maranatha.edu fileLAMPIRAN L2 - 1 Perincian biaya mesin – mesin yang digunakan : Mesin - Mesin Harga Jumlah Jumlah Harga Washer Machine (550 lbs) Rp

LAMPIRAN L2 - 1

Perincian biaya mesin – mesin yang digunakan : Mesin - Mesin Harga Jumlah Jumlah Harga

Washer Machine (550 lbs) 98,650,000.00Rp 4 394,600,000.00Rp Sample Machine (45 lbs) 24,000,000.00Rp 1 24,000,000.00Rp Extractor 58,750,000.00Rp 2 117,500,000.00Rp Dryer (250 lbs) 58,850,000.00Rp 1 58,850,000.00Rp Dryer Jumbo 72,000,000.00Rp 3 216,000,000.00Rp Boiler Solar (1500 kg) 150,000,000.00Rp 2 300,000,000.00Rp Washer Machine (250 lbs) 43,000,000.00Rp 1 43,000,000.00Rp Washer Machine (50 lbs) 25,000,000.00Rp 1 25,000,000.00Rp Washer Machine (45 lbs) 24,000,000.00Rp 1 24,000,000.00Rp Extractor (100 lbs) 20,000,000.00Rp 1 20,000,000.00Rp Dryer (250 lbs) 35,000,000.00Rp 2 70,000,000.00Rp Roll Machine 60,000,000.00Rp 2 120,000,000.00Rp Boiler Solar (300 kg) 50,000,000.00Rp 1 50,000,000.00Rp Mesin Generator (Genset) 250,000,000.00Rp 1 250,000,000.00Rp

1,712,950,000.00Rp Perincian biaya perlengkapan lain :

Investasi Lain Harga Jumlah Jumlah HargaAlat - alat dapur & makan 1,500,000.00Rp 1 1,500,000.00Rp Sofa 1,000,000.00Rp 1 1,000,000.00Rp Tabung Pemadam Kebakaran 750,000.00Rp 5 3,750,000.00Rp Tabung Gas 250,000.00Rp 1 250,000.00Rp Tempat Tidur 600,000.00Rp 1 600,000.00Rp Televisi 750,000.00Rp 1 750,000.00Rp Sapu 4,000.00Rp 3 12,000.00Rp Asbak 15,000.00Rp 5 75,000.00Rp Tempat Sampah 40,000.00Rp 6 240,000.00Rp Karpet Mushola 100,000.00Rp 1 100,000.00Rp

8,277,000.00Rp

Perincian modal kerja yang disiapkan :

No Jenis Biaya Total biaya1 Biaya Tenaga Kerja 42,300,000.00Rp 2 Biaya Administrasi 244,000.00Rp 3 Biaya Operasional 42,000,000.00Rp 4 Biaya Energi 17,300,000.00Rp 5 Biaya Pabrik 284,651,065.27Rp 6 Biaya Lain - Lain 1,030,000.00Rp

Total 387,525,065.27Rp Dana Cadangan 32,474,934.73Rp

Modal Kerja Disiapkan 420,000,000.00Rp

TUGAS AKHIR

Page 2: LAMPIRAN L2 - 1 - repository.maranatha.edu fileLAMPIRAN L2 - 1 Perincian biaya mesin – mesin yang digunakan : Mesin - Mesin Harga Jumlah Jumlah Harga Washer Machine (550 lbs) Rp

LAMPIRAN

L2 - 2

TUGAS AKHIR

Page 3: LAMPIRAN L2 - 1 - repository.maranatha.edu fileLAMPIRAN L2 - 1 Perincian biaya mesin – mesin yang digunakan : Mesin - Mesin Harga Jumlah Jumlah Harga Washer Machine (550 lbs) Rp

AMPIRAN L2 - 3

TUGAS AKHIR

1 Bahan LangsungPersediaan Awal -Rp -Rp Rp Pembelian 9,266,431.88Rp + 19,895,859.58Rp + 11,025,384.4Rp Bahan tersedia untuk digunakan 9,266,431.88Rp 19,895,859.58Rp 11,025,384Rp Persediaan Akhir -Rp -Rp -Rp Bahan tidak langsung -Rp + -Rp - -Rp + -Rp - -Rp + Rp Bahan Terpakai 9,266,431.88Rp 19,895,859.58Rp 11,025,384Rp

2 Pekerja Langsung 35,550,000.00Rp 35,550,000.00Rp 35,550,000Rp 3 Biaya Pabrik Tak langsung

Overhead 29,979,616.67Rp + 29,979,616.67Rp + 29,979,616.67Rp + 29,979,616.67Rp + 29,979,616.67Rp + 29,979,616.6Rp 4 Total Biaya Produksi 74,796,048.54Rp 85,425,476.24Rp 76,555,001Rp

5 Barang dalam ProsesPersediaan Awal dalam Proses -Rp -Rp -Rp Persediaan Akhir dalam Proses -Rp + -Rp + -Rp + -Rp + -Rp + Rp Harga Pokok Produksi 74,796,048.54Rp 85,425,476.24Rp 76,555,001Rp

Produk JadiPersediaan Awal -Rp -Rp -Rp Persediaan Akhir -Rp - -Rp + -Rp - -Rp + -Rp - Rp HARGA POKOK PENJUALAN 74,796,048.54Rp 85,425,476.24Rp 76,555,001Rp

Keterangan Garment Wash Enzym Wash Silicon Wash

-5 +

.45

- -.45

.00

7 +.12

- +.12

- +.12

Perincian perhitungan harga pokok setiap jenis washing :

L

Page 4: LAMPIRAN L2 - 1 - repository.maranatha.edu fileLAMPIRAN L2 - 1 Perincian biaya mesin – mesin yang digunakan : Mesin - Mesin Harga Jumlah Jumlah Harga Washer Machine (550 lbs) Rp

AMPIRAN L2 - 4

TUGAS AKHIR

1 Bahan LangsungPersediaan Awal -Rp -Rp Rp Pembelian 7,859,541.70Rp + 18,078,042.32Rp + 17,684,094.93Rp Bahan tersedia untuk digunakan 7,859,541.70Rp 18,078,042.32Rp 17,684,094.93Rp Persediaan Akhir -Rp -Rp -Rp Bahan tidak langsung -Rp + -Rp - -Rp + -Rp - -Rp + Rp Bahan Terpakai 7,859,541.70Rp 18,078,042.32Rp 17,684,094.93Rp

2 Pekerja Langsung 35,550,000.00Rp 35,550,000.00Rp 35,550,000.00Rp 3 Biaya Pabrik Tak langsung

Overhead 29,979,616.67Rp + 29,979,616.67Rp + 29,979,616.67Rp + 29,979,616.67Rp + 29,979,616.67Rp + 29,979,616.67Rp 4 Total Biaya Produksi 73,389,158.36Rp 83,607,658.99Rp 83,213,711.60Rp

5 Barang dalam ProsesPersediaan Awal dalam Proses -Rp -Rp -Rp Persediaan Akhir dalam Proses -Rp + -Rp + -Rp + -Rp + -Rp + Rp Harga Pokok Produksi 73,389,158.36Rp 83,607,658.99Rp 83,213,711.60Rp

Produk JadiPersediaan Awal -Rp -Rp -Rp Persediaan Akhir -Rp - -Rp + -Rp - -Rp + -Rp - Rp HARGA POKOK PENJUALAN 73,389,158.36Rp 83,607,658.99Rp 83,213,711.60Rp

Enzyme Stone BleachSand Wash Enzyme Stone WashKeterangan

- +

- -

+

- +

- +

L

Page 5: LAMPIRAN L2 - 1 - repository.maranatha.edu fileLAMPIRAN L2 - 1 Perincian biaya mesin – mesin yang digunakan : Mesin - Mesin Harga Jumlah Jumlah Harga Washer Machine (550 lbs) Rp

LAMPIRAN L2 - 5

1 Bahan LangsungPersediaan Awal -Rp -Rp Pembelian 656,385.42Rp + -Rp +Bahan tersedia untuk digunakan 656,385.42Rp -Rp Persediaan Akhir -Rp -Rp Bahan tidak langsung -Rp + -Rp - -Rp + -Rp -Bahan Terpakai 656,385.42Rp -Rp

2 Pekerja Langsung 6,750,000.00Rp 1,200,000.00Rp 3 Biaya Pabrik Tak langsung

Overhead 5,383,333.33Rp + 5,383,333.33Rp + 700,000.00Rp + 700,000.00Rp +4 Total Biaya Produksi 12,789,718.75Rp 1,900,000.00Rp

5 Barang dalam ProsesPersediaan Awal dalam Proses -Rp -Rp Persediaan Akhir dalam Proses -Rp + -Rp + -Rp + -Rp +Harga Pokok Produksi 12,789,718.75Rp 1,900,000.00Rp

Produk JadiPersediaan Awal -Rp -Rp Persediaan Akhir -Rp - -Rp + -Rp - -Rp +HARGA POKOK PENJUALAN 12,789,718.75Rp 1,900,000.00Rp

Keterangan Sprei Sarung Bantal

1 Bahan LangsungPersediaan Awal -Rp -Rp Pembelian 656,825.00Rp + 778,500.00Rp +Bahan tersedia untuk digunakan 656,825.00Rp 778,500.00Rp Persediaan Akhir -Rp -Rp Bahan tidak langsung -Rp + -Rp - -Rp + -Rp -Bahan Terpakai 656,825.00Rp 778,500.00Rp

2 Pekerja Langsung 6,750,000.00Rp 6,750,000.00Rp 3 Biaya Pabrik Tak langsung

Overhead 5,383,333.33Rp + 5,383,333.33Rp + 5,383,333.33Rp + 5,383,333.33Rp +4 Total Biaya Produksi 12,790,158.33Rp 12,911,833.33Rp

5 Barang dalam ProsesPersediaan Awal dalam Proses -Rp -Rp Persediaan Akhir dalam Proses -Rp + -Rp + -Rp + -Rp +Harga Pokok Produksi 12,790,158.33Rp 12,911,833.33Rp

Produk JadiPersediaan Awal -Rp -Rp Persediaan Akhir -Rp - -Rp + -Rp - -Rp +HARGA POKOK PENJUALAN 12,790,158.33Rp 12,911,833.33Rp

Handuk Bed CoverKeterangan

Keterangan untuk perhitungan harga pokok sarung bantal : biaya – biaya

yang semestinya dibebankan pada sarung bantal seperti biaya pembelian

(bahan kimia) telah dibebankan ke item lain yaitu sprei, handuk dan bed

cover. Hal ini dilakukan karena pada saat pencucian, item yang satu

TUGAS AKHIR

Page 6: LAMPIRAN L2 - 1 - repository.maranatha.edu fileLAMPIRAN L2 - 1 Perincian biaya mesin – mesin yang digunakan : Mesin - Mesin Harga Jumlah Jumlah Harga Washer Machine (550 lbs) Rp

LAMPIRAN

L2 - 6

TUGAS AKHIR

dengan yang lain dapat dicuci / diperas / dikeringkan bersama – sama dan

item sarung bantal ini selalu menjadi pengikut saat pencucian item lain.

Namun untuk item sarung bantal ini juga dilakukan pengerollan dan

pengepakan, maka pembebanan biaya depresiasi, listrik dan tenaga kerja

dilakukan untuk 1 mesin roll. Perhitungannya adalah sebagai berikut :

Depresiasi 1 buah mesin roll dalam 1 tahun = 2

000.000.12Rp =

Rp 6.000.000.

Depresiasi dalam 1 bulan = 12

000.000.6Rp = Rp 500.000

Biaya tenaga kerja yang dibebankan yaitu tenaga kerja untuk

melakukan pengerollan dan pengepakan sebanyak 2 orang, sehingga

biaya tenaga kerja ini adalah 2 x Rp 600.000 = Rp 1.200.000

Biaya listrik yang dibebankan adalah biaya penggunaan listrik untuk

1 mesin roll, sehingga dilakukan asumsi bahwa biaya listrik

pencucian hotel selama 1 bulan dibagi rata pada jenis mesin yang ada

yaitu 20 % untuk setiap jenis mesin. Maka untuk mesin roll, biaya

listriknya adalah 20 % * Rp 2.000.000 = Rp 400.000. Jumlah mesin

roll adalah 2 buah, sehingga diasumsikan perhitungan listriknya

dibagi 2 sama rata = 2

.400Rp 000 = Rp 200.000

Dari perhitungan itu, maka biaya yang dibebankan dalam pencucian

sarung bantal hanyalah biaya tenaga kerja sebesar Rp 1.200.000 dan biaya

overhead sebesar Rp 500.000 + Rp 200.000 = Rp 700.000

Page 7: LAMPIRAN L2 - 1 - repository.maranatha.edu fileLAMPIRAN L2 - 1 Perincian biaya mesin – mesin yang digunakan : Mesin - Mesin Harga Jumlah Jumlah Harga Washer Machine (550 lbs) Rp

LAMPIRAN

L2 - 7

TUGAS AKHIR

Contoh perhitungan bahan kimia :

No Jenis Bahan Kimia Penggunaan 1x cuci No Jenis Bahan Kimia Penggunaan 1x cuci1 OBA 15,547.01Rp 1 Bio Polish L 7 52,727.62Rp 2 ABS 11,686.00Rp 2 Clean L 2 37,361.29Rp 3 Clean L 2 10,707.88Rp 3 Silicon 38,867.79Rp 4 Primafix 6,537.98Rp 4 Bio 205 59,356.24Rp 5 Primacone 7,001.30Rp 5 Acco Soft 48,810.71Rp

51,480.18Rp 6 Primazym 44,140.55Rp 7 OBA 20,036.50Rp

301,300.71Rp No Jenis Bahan Kimia Penggunaan 1x cuci1 OBA 28,252.12Rp 2 Enzym 34,088.24Rp No Jenis Bahan Kimia Penggunaan 1x cuci3 Primazym 33,292.41Rp 1 Bio A 82 46,862.85Rp 4 Primasoft FL 19,232.66Rp 2 Primazym 34,778.72Rp 5 Primacone II 17,773.63Rp 3 Primacone II 33,010.31Rp

132,639.06Rp 4 Bio 200 37,726.07Rp 5 Clean L 2 39,494.48Rp 6 OBA 38,020.80Rp

No123456

No1234567

S

ENZYM STONE WASH

ENZYM STONE BLEACH

GARMENT WASH

ENZYM WASH

SILICON WASHJenis Bahan Kimia Penggunaan 1x cuci 7 Enzym 19,599.87Rp

Primasoft FL 14,884.27Rp 8 Acco Soft 45,241.81Rp Silicon 19,570.06Rp 294,734.92Rp Bio FB 13,597.97Rp Tov Chem B 15 P 17,824.37Rp Primafix 12,954.83Rp No Jenis Bahan Kimia Penggunaan 1 hariFalcon FA 100 N 13,046.70Rp 1 Sabun 11,377.35Rp

91,878.20Rp 2 Softener 10,502.17Rp 21,879.51Rp

Jenis Bahan Kimia Penggunaan 1x cuciBio 205 22,923.66Rp No Jenis Bahan Kimia Penggunaan 1 hariOBA 16,243.05Rp 1 Sabun 11,319.28Rp ABS 16,898.01Rp 2 Softener 10,574.88Rp Primacone 25,805.50Rp 21,894.17Rp Clean L 2 21,220.76Rp Primasoft 19,190.38Rp Tov Chem B 15 P 8,710.99Rp No Jenis Bahan Kimia Penggunaan 1 hari

130,992.36Rp 1 OBA 12,975.00Rp 2 Softener 12,975.00Rp

25,950.00Rp

HANDUK

BED COVER

AND WASH

SPREI

Page 8: LAMPIRAN L2 - 1 - repository.maranatha.edu fileLAMPIRAN L2 - 1 Perincian biaya mesin – mesin yang digunakan : Mesin - Mesin Harga Jumlah Jumlah Harga Washer Machine (550 lbs) Rp

LAMPIRAN L2 - 8

Perhitungan Rugi – Laba :

Keterangan

Hasil Penjualan 567,467,423.38Rp 709,334,279.22Rp 709,334,279.22Rp 780,742,320.44Rp - -

LABA KOTOR 567,467,423.38Rp 709,334,279.22Rp 709,334,279.22Rp 780,742,320.44Rp Biaya Tenaga Kerja 42,300,000.00Rp 42,300,000.00Rp 84,600,000.00Rp 42,300,000.00Rp Biaya per bulan 374,000.00Rp 374,000.00Rp 374,000.00Rp 374,000.00Rp Biaya per 6 bulan 213,000.00Rp -Rp -Rp -Rp Biaya per tahun 687,000.00Rp -Rp -Rp -Rp Biaya Operasional 42,000,000.00Rp 12,000,000.00Rp 12,000,000.00Rp 42,000,000.00Rp Biaya Depresiasi 23,062,950.00Rp 23,062,950.00Rp 23,062,950.00Rp 23,062,950.00Rp Biaya Energi 17,300,000.00Rp 17,300,000.00Rp 17,300,000.00Rp 17,300,000.00Rp Biaya Maintenance 65,000,000.00Rp 65,000,000.00Rp 65,000,000.00Rp 65,000,000.00Rp Biaya Pabrik 268,091,218.59Rp + 459,028,168.59Rp - 272,391,970.01Rp + 432,428,920.01Rp - 272,391,970.01Rp + 474,728,920.01Rp - 276,371,141.93Rp + 466,408,091.93Rp -LABA DARI OPERASI 108,439,254.79Rp 276,905,359.21Rp 234,605,359.21Rp 314,334,228.51Rp

Penerimaan / PengeluaranPenerimaan lain-lain -Rp -Rp -Rp -Rp Pengeluaran lain-lain -Rp + -Rp - -Rp + -Rp - -Rp + -Rp - -Rp + -Rp -LABA SEBELUM PAJAK 108,439,254.79Rp 276,905,359.21Rp 234,605,359.21Rp 314,334,228.51Rp Bunga -Rp -Rp -Rp Pajak Penghasilana. 10% dari 50jt pertama 5,000,000.00Rp 5,000,000.00Rp 5,000,000.00Rp 5,000,000.00Rp b. 15% dari 50jt kedua 15%*(laba kotor-50jt) 8,765,888.22Rp 7,500,000.00Rp 7,500,000.00Rp 7,500,000.00Rp c. 30% dari (laba kotor - 100jt) -Rp - 53,071,607.76Rp - 40,381,607.76Rp - 64,300,268.55Rp LABA BERSIH SETELAH PAJAK 94,673,366.57Rp 211,333,751.45Rp 181,723,751.45Rp 237,533,959.96Rp

Untuk akhir bulan ke-1 Untuk akhir bulan ke-2 Untuk akhir bulan ke-3 Untuk akhir bulan ke-4

TUGAS AKHIR

Page 9: LAMPIRAN L2 - 1 - repository.maranatha.edu fileLAMPIRAN L2 - 1 Perincian biaya mesin – mesin yang digunakan : Mesin - Mesin Harga Jumlah Jumlah Harga Washer Machine (550 lbs) Rp

LAMPIRAN L2 - 9

Keterangan

Hasil Penjualan 780,742,320.44Rp 882,846,090.20Rp 882,846,090.20Rp 882,846,090.20Rp - -

LABA KOTOR 780,742,320.44Rp 882,846,090.20Rp 882,846,090.20Rp 882,846,090.20Rp Biaya Tenaga Kerja 42,300,000.00Rp 42,300,000.00Rp 42,300,000.00Rp 42,300,000.00Rp Biaya per bulan 374,000.00Rp 374,000.00Rp 374,000.00Rp 374,000.00Rp Biaya per 6 bulan -Rp -Rp 213,000.00Rp -Rp Biaya per tahun -Rp -Rp -Rp -Rp Biaya Operasional 12,000,000.00Rp 12,000,000.00Rp 42,000,000.00Rp 12,000,000.00Rp Biaya Depresiasi 23,062,950.00Rp 23,062,950.00Rp 23,062,950.00Rp 23,062,950.00Rp Biaya Energi 17,300,000.00Rp 17,300,000.00Rp 17,300,000.00Rp 17,300,000.00Rp Biaya Maintenance 65,000,000.00Rp 65,000,000.00Rp 65,000,000.00Rp 65,000,000.00Rp Biaya Pabrik 276,371,141.93Rp + 436,408,091.93Rp - 284,651,065.27Rp + 444,688,015.27Rp - 284,651,065.27Rp + 474,901,015.27Rp - 284,651,065.27Rp + 444,688,015.27Rp -LABA DARI OPERASI 344,334,228.51Rp 438,158,074.93Rp 407,945,074.93Rp 438,158,074.93Rp

Penerimaan / PengeluaranPenerimaan lain-lain -Rp -Rp -Rp -Rp Pengeluaran lain-lain -Rp + -Rp - -Rp + -Rp - -Rp + -Rp - -Rp + -Rp -LABA SEBELUM PAJAK 344,334,228.51Rp 438,158,074.93Rp 407,945,074.93Rp 438,158,074.93Rp Bunga -Rp -Rp -Rp Pajak Penghasilana. 10% dari 50jt pertama 5,000,000.00Rp 5,000,000.00Rp 5,000,000.00Rp 5,000,000.00Rp b. 15% dari 50jt kedua 7,500,000.00Rp 7,500,000.00Rp 7,500,000.00Rp 7,500,000.00Rp c. 30% dari (laba kotor - 100jt) 73,300,268.55Rp - 101,447,422.48Rp - 92,383,522.48Rp - 101,447,422.48Rp LABA BERSIH SETELAH PAJAK 258,533,959.96Rp 324,210,652.45Rp 303,061,552.45Rp 324,210,652.45Rp

LAPORAN RUGI LABAUntuk akhir bulan ke-5 Untuk akhir bulan ke-6 Untuk akhir bulan ke-7 Untuk akhir bulan ke-8

TUGAS AKHIR

Page 10: LAMPIRAN L2 - 1 - repository.maranatha.edu fileLAMPIRAN L2 - 1 Perincian biaya mesin – mesin yang digunakan : Mesin - Mesin Harga Jumlah Jumlah Harga Washer Machine (550 lbs) Rp

L2 - 10

TUGAS AKHIR

Keterangan

enjualan 882,846,090.20Rp 882,846,090.20Rp 882,846,090.20Rp 882,Rp -

OTOR 882,846,090.20Rp 882,846,090.20Rp 882,846,090.20Rp 882,Rp a Tenaga Kerja 42,300,000.00Rp 42,300,000.00Rp 42,300,000.00Rp 42,300,000.00Rp a per bulan 374,000.00Rp 374,000.00Rp 374,000.00Rp 374,000.00Rp a per 6 bulan -Rp -Rp -Rp -Rp a per tahun -Rp -Rp -Rp -Rp a Operasional 12,000,000.00Rp 42,000,000.00Rp 12,000,000.00Rp 12,000,000.00Rp a Depresiasi 23,062,950.00Rp 23,062,950.00Rp 23,062,950.00Rp 23,062,950.00Rp a Energi 17,300,000.00Rp 17,300,000.00Rp 17,300,000.00Rp 17,300,000.00Rp a Maintenance 65,000,000.00Rp 65,000,000.00Rp 65,000,000.00Rp 65,000,000.00Rp a Pabrik 284,651,065.27Rp + 444,688,015.27Rp - 284,651,065.27Rp + 474,688,015.27Rp - 284,651,065.27Rp + 444,688,015.27Rp - 284,651,065.27Rp + 444,Rp

OPERASI 438,158,074.93Rp 408,158,074.93Rp 438,158,074.93Rp 438,Rp

aan / Pengeluaranrimaan lain-lain -Rp -Rp -Rp -Rp eluaran lain-lain -Rp + -Rp - -Rp + -Rp - -Rp + -Rp - -Rp + Rp A SEBELUM PAJAK 438,158,074.93Rp 408,158,074.93Rp 438,158,074.93Rp 438,Rp a -Rp -Rp -Rp k Penghasilan% dari 50jt pertama 5,000,000.00Rp 5,000,000.00Rp 5,000,000.00Rp Rp

ari 50jt kedua 7,500,000.00Rp 7,500,000.00Rp 7,500,000.00Rp Rp % dari (laba kotor - 100jt) 101,447,422.48Rp - 92,447,422.48Rp - 101,447,422.48Rp - 101,Rp A BERSIH SETELAH PAJAK 324,210,652.45Rp 303,210,652.45Rp 324,210,652.45Rp 324,Rp

Untuk akhir bulan ke-9 Untuk akhir bulan ke-10 Untuk akhir bulan ke-11 Untuk akhir bulan ke-12

Hasil P 846,090.20-

LABA K 846,090.20BiayBiayBiayBiayBiayBiayBiayBiayBiay 688,015.27 -LABA DARI 158,074.93

PenerimPenePeng - -LAB 158,074.93BungPajaa. 10 5,000,000.00 b. 15% d 7,500,000.00 c. 30 447,422.48LAB 210,652.45

LAMPIRAN

Page 11: LAMPIRAN L2 - 1 - repository.maranatha.edu fileLAMPIRAN L2 - 1 Perincian biaya mesin – mesin yang digunakan : Mesin - Mesin Harga Jumlah Jumlah Harga Washer Machine (550 lbs) Rp

L2 - 11

TUGAS AKHIR

Keterangan

l Penjualan 10,594,153,082.36Rp 10,594,153,082.36Rp 10,594,153,082.36Rp 10,594,Rp - - -

A KOTOR 10,594,153,082.36Rp 10,594,153,082.36Rp 10,594,153,082.36Rp 10,594,Rp a Tenaga Kerja 549,900,000.00Rp 549,900,000.00Rp 549,900,000.00Rp 549,900,000.00Rp a Administrasi 2,513,000.00Rp 2,513,000.00Rp 2,513,000.00Rp 2,513,000.00Rp a Operasional 264,000,000.00Rp 264,000,000.00Rp 264,000,000.00Rp 264,000,000.00Rp a Depresiasi 276,755,400.00Rp 276,755,400.00Rp 276,755,400.00Rp 276,755,400.00Rp a Energi 207,600,000.00Rp 207,600,000.00Rp 207,600,000.00Rp 207,600,000.00Rp a Maintenance 780,000,000.00Rp 780,000,000.00Rp 780,000,000.00Rp 780,000,000.00Rp a Pabrik 3,415,812,783.24Rp + 5,496,581,183.24Rp - 3,415,812,783.24Rp + 5,496,581,183.24Rp - 3,415,812,783.24Rp + 5,496,581,183.24Rp - 3,415,812,783.24Rp + 5,496,Rp

OPERASI 5,097,571,899.13Rp 5,097,571,899.13Rp 5,097,571,899.13Rp 5,097,Rp

aan / Pengeluaranrimaan lain-lain -Rp -Rp -Rp -Rp eluaran lain-lain 3,088,000.00Rp + 3,088,000.00Rp - 3,088,000.00Rp + 3,088,000.00Rp - 3,088,000.00Rp + 3,088,000.00Rp - 3,088,000.00Rp + Rp A SEBELUM PAJAK 5,094,483,899.13Rp 5,094,483,899.13Rp 5,094,483,899.13Rp 5,094,Rp a -Rp -Rp -Rp Rp k Penghasilan% dari 50jt pertama 5,000,000.00Rp 5,000,000.00Rp 5,000,000.00Rp Rp

ari 50jt kedua 7,500,000.00Rp 7,500,000.00Rp 7,500,000.00Rp Rp % dari (laba kotor - 100jt) 1,498,345,169.74Rp - 1,498,345,169.74Rp - 1,498,345,169.74Rp - 1,498,Rp A BERSIH SETELAH PAJAK 3,583,638,729.39Rp 3,583,638,729.39Rp 3,583,638,729.39Rp 3,583,Rp

Untuk akhir tahun ke-3 Untuk akhir tahun ke-4 Untuk akhir tahun ke-Untuk akhir tahun ke-2

Hasi 153,082.36-

LAB 153,082.36BiayBiayBiayBiayBiayBiayBiay 581,183.24 -LABA DARI 571,899.13

PenerimPenePeng 3,088,000.00 -LAB 483,899.13Bung - Pajaa. 10 5,000,000.00 b. 15% d 7,500,000.00 c. 30 345,169.74 -LAB 638,729.39

5

LAMPIRAN

Page 12: LAMPIRAN L2 - 1 - repository.maranatha.edu fileLAMPIRAN L2 - 1 Perincian biaya mesin – mesin yang digunakan : Mesin - Mesin Harga Jumlah Jumlah Harga Washer Machine (550 lbs) Rp

LAMPIRAN L2 - 12

TUGAS AKHIR

Perhitungan biaya bahan kimia yang termasuk dalam biaya pabrik setiap bulan

pada tahun pertama :

No Jenis Washing Biaya 1 bulan1 Garment Wash 6,177,621.25Rp 2 Enzyme Wash 11,937,515.75Rp 3 Silicon Wash 5,512,692.22Rp 4 Sand Wash 7,859,541.70Rp 5 Enzyme Stone Wash 18,078,042.32Rp 6 Enzyme Stone Bleach 17,684,094.93Rp 7 Sprei 656,385.42Rp 8 Sarung Bantal -Rp 9 Handuk 656,825.00Rp

10 Bad Cover 778,500.00Rp 69,341,218.59Rp

Biaya Bahan Kimia Bulan 1

No Jenis Washing Biaya 1 bulan1 Garment Wash 7,722,026.56Rp 2 Enzyme Wash 11,937,515.75Rp 3 Silicon Wash 8,269,038.34Rp 4 Sand Wash 7,859,541.70Rp 5 Enzyme Stone Wash 18,078,042.32Rp 6 Enzyme Stone Bleach 17,684,094.93Rp 7 Sprei 656,385.42Rp 8 Sarung Bantal -Rp 9 Handuk 656,825.00Rp

10 Bad Cover 778,500.00Rp 73,641,970.01Rp

Biaya Bahan Kimia Bulan 2-3

No Jenis Washing Biaya 1 bulan1 Garment Wash 7,722,026.56Rp 2 Enzyme Wash 15,916,687.66Rp 3 Silicon Wash 8,269,038.34Rp 4 Sand Wash 7,859,541.70Rp 5 Enzyme Stone Wash 18,078,042.32Rp 6 Enzyme Stone Bleach 17,684,094.93Rp 7 Sprei 656,385.42Rp 8 Sarung Bantal -Rp 9 Handuk 656,825.00Rp

10 Bad Cover 778,500.00Rp 77,621,141.93Rp

Biaya Bahan Kimia Bulan 4-5

Page 13: LAMPIRAN L2 - 1 - repository.maranatha.edu fileLAMPIRAN L2 - 1 Perincian biaya mesin – mesin yang digunakan : Mesin - Mesin Harga Jumlah Jumlah Harga Washer Machine (550 lbs) Rp

LAMPIRAN L2 - 13

TUGAS AKHIR

No Jenis Washing Biaya 1 bulan1 Garment Wash 9,266,431.88Rp 2 Enzyme Wash 19,895,859.58Rp 3 Silicon Wash 11,025,384.45Rp 4 Sand Wash 7,859,541.70Rp 5 Enzyme Stone Wash 18,078,042.32Rp 6 Enzyme Stone Bleach 17,684,094.93Rp 7 Sprei 656,385.42Rp 8 Sarung Bantal -Rp 9 Handuk 656,825.00Rp

10 Bad Cover 778,500.00Rp 85,901,065.27Rp

Biaya Bahan Kimia Bulan 6-12

No Jenis Washing Biaya 1 tahun1 Garment Wash 111,197,182.50Rp 2 Enzyme Wash 238,750,314.93Rp 3 Silicon Wash 132,304,613.40Rp 4 Sand Wash 94,314,500.36Rp 5 Enzyme Stone Wash 216,936,507.88Rp 6 Enzyme Stone Bleach 212,209,139.17Rp 7 Sprei 7,876,625.00Rp 8 Sarung Bantal -Rp 9 Handuk 7,881,900.00Rp

10 Bad Cover 9,342,000.00Rp 1,030,812,783.24Rp

Biaya Bahan Kimia Tahun 2-5

Page 14: LAMPIRAN L2 - 1 - repository.maranatha.edu fileLAMPIRAN L2 - 1 Perincian biaya mesin – mesin yang digunakan : Mesin - Mesin Harga Jumlah Jumlah Harga Washer Machine (550 lbs) Rp

LAMPIRAN L2 - 14

Perincian perhitungan Cash Flow :

Bulan Ke - 0 Bulan Ke - 1 Bulan Ke - 2 Bulan Ke - 3-Rp 420,000,000.00Rp 537,736,316.57Rp 772,133,018.02Rp

Modal Sendiri 3,550,477,000.00Rp -Rp -Rp -Rp Modal dari pinjaman Bank -Rp -Rp -Rp -Rp Penjualan -Rp 567,467,423.38Rp 709,334,279.22Rp 709,334,279.22Rp Total Penerimaan Kas 3,550,477,000.00Rp 567,467,423.38Rp 709,334,279.22Rp 709,334,279.22Rp

Investasi 2,978,477,000.00Rp -Rp -Rp -Rp Instalasi & Surat Izin 152,000,000.00Rp -Rp -Rp -Rp Biaya - biaya dalam 1 bulanBiaya Tenaga Kerja -Rp 42,300,000.00Rp 42,300,000.00Rp 84,600,000.00Rp Biaya per bulan -Rp 374,000.00Rp 374,000.00Rp 374,000.00Rp Biaya per 6 bulan -Rp 213,000.00Rp -Rp -Rp Biaya per tahun -Rp 687,000.00Rp -Rp -Rp Biaya Operasional -Rp 42,000,000.00Rp 12,000,000.00Rp 12,000,000.00Rp Biaya Energi -Rp 17,300,000.00Rp 17,300,000.00Rp 17,300,000.00Rp Biaya Maintenance -Rp 65,000,000.00Rp 65,000,000.00Rp 65,000,000.00Rp Biaya Pabrik -Rp 268,091,218.59Rp 272,391,970.01Rp 272,391,970.01Rp PPH -Rp 13,765,888.22Rp 65,571,607.76Rp 52,881,607.76Rp Total Pengeluaran Kas 3,130,477,000.00Rp 449,731,106.81Rp 474,937,577.78Rp 504,547,577.78Rp

Saldo Akhir 420,000,000.00Rp 537,736,316.57Rp 772,133,018.02Rp 976,919,719.46Rp

PENGELUARAN KAS

CASH FLOW

Saldo Awal KasPENERIMAAN KAS

TUGAS AKHIR

Page 15: LAMPIRAN L2 - 1 - repository.maranatha.edu fileLAMPIRAN L2 - 1 Perincian biaya mesin – mesin yang digunakan : Mesin - Mesin Harga Jumlah Jumlah Harga Washer Machine (550 lbs) Rp

LAMPIRAN L2 - 15

Bulan Ke - 4 Bulan Ke - 5 Bulan Ke - 6 Bulan Ke - 7976,919,719.46Rp 1,237,516,629.42Rp 1,519,113,539.38Rp 1,866,387,141.83Rp

Modal Sendiri -Rp -Rp -Rp -Rp Modal dari pinjaman Bank -Rp -Rp -Rp -Rp Penjualan 780,742,320.44Rp 780,742,320.44Rp 882,846,090.20Rp 882,846,090.20Rp Total Penerimaan Kas 780,742,320.44Rp 780,742,320.44Rp 882,846,090.20Rp 882,846,090.20Rp

Investasi -Rp -Rp -Rp -Rp Instalasi & Surat Izin -Rp -Rp -Rp -Rp Biaya - biaya dalam 1 bulanBiaya Tenaga Kerja 42,300,000.00Rp 42,300,000.00Rp 42,300,000.00Rp 42,300,000.00Rp Biaya per bulan 374,000.00Rp 374,000.00Rp 374,000.00Rp 374,000.00Rp Biaya per 6 bulan -Rp -Rp -Rp 213,000.00Rp Biaya per tahun -Rp -Rp -Rp -Rp Biaya Operasional 42,000,000.00Rp 12,000,000.00Rp 12,000,000.00Rp 42,000,000.00Rp Biaya Energi 17,300,000.00Rp 17,300,000.00Rp 17,300,000.00Rp 17,300,000.00Rp Biaya Maintenance 65,000,000.00Rp 65,000,000.00Rp 65,000,000.00Rp 65,000,000.00Rp Biaya Pabrik 276,371,141.93Rp 276,371,141.93Rp 284,651,065.27Rp 284,651,065.27Rp PPH 76,800,268.55Rp 85,800,268.55Rp 113,947,422.48Rp 104,883,522.48Rp Total Pengeluaran Kas 520,145,410.48Rp 499,145,410.48Rp 535,572,487.75Rp 556,721,587.75Rp

Saldo Akhir 1,237,516,629.42Rp 1,519,113,539.38Rp 1,866,387,141.83Rp 2,192,511,644.28Rp

PENGELUARAN KAS

Saldo Awal KasPENERIMAAN KAS

CASH FLOW

TUGAS AKHIR

Page 16: LAMPIRAN L2 - 1 - repository.maranatha.edu fileLAMPIRAN L2 - 1 Perincian biaya mesin – mesin yang digunakan : Mesin - Mesin Harga Jumlah Jumlah Harga Washer Machine (550 lbs) Rp

LAMPIRAN L2 - 16

Bulan Ke - 8 Bulan Ke - 9 Bulan Ke - 10 Bulan Ke - 11 Bulan Ke - 122,192,511,644.28Rp 2,539,785,246.73Rp 2,887,058,849.17Rp 3,213,332,451.62Rp 3,560,606,054.07Rp

Modal Sendiri -Rp -Rp -Rp -Rp -Rp Modal dari pinjaman Bank -Rp -Rp -Rp -Rp -Rp Penjualan 882,846,090.20Rp 882,846,090.20Rp 882,846,090.20Rp 882,846,090.20Rp 882,846,090.20Rp Total Penerimaan Kas 882,846,090.20Rp 882,846,090.20Rp 882,846,090.20Rp 882,846,090.20Rp 882,846,090.20Rp

Investasi -Rp -Rp -Rp -Rp -Rp Instalasi & Surat Izin -Rp -Rp -Rp -Rp -Rp Biaya - biaya dalam 1 bulanBiaya Tenaga Kerja 42,300,000.00Rp 42,300,000.00Rp 42,300,000.00Rp 42,300,000.00Rp 42,300,000.00Rp Biaya per bulan 374,000.00Rp 374,000.00Rp 374,000.00Rp 374,000.00Rp 374,000.00Rp Biaya per 6 bulan -Rp -Rp -Rp -Rp -Rp Biaya per tahun -Rp -Rp -Rp -Rp -Rp Biaya Operasional 12,000,000.00Rp 12,000,000.00Rp 42,000,000.00Rp 12,000,000.00Rp 12,000,000.00Rp Biaya Energi 17,300,000.00Rp 17,300,000.00Rp 17,300,000.00Rp 17,300,000.00Rp 17,300,000.00Rp Biaya Maintenance 65,000,000.00Rp 65,000,000.00Rp 65,000,000.00Rp 65,000,000.00Rp 65,000,000.00Rp Biaya Pabrik 284,651,065.27Rp 284,651,065.27Rp 284,651,065.27Rp 284,651,065.27Rp 284,651,065.27Rp PPH 113,947,422.48Rp 113,947,422.48Rp 104,947,422.48Rp 113,947,422.48Rp 113,947,422.48Rp Total Pengeluaran Kas 535,572,487.75Rp 535,572,487.75Rp 556,572,487.75Rp 535,572,487.75Rp 535,572,487.75Rp

Saldo Akhir 2,539,785,246.73Rp 2,887,058,849.17Rp 3,213,332,451.62Rp 3,560,606,054.07Rp 3,907,879,656.52Rp

CASH FLOW

PENGELUARAN KAS

Saldo Awal KasPENERIMAAN KAS

TUGAS AKHIR

Page 17: LAMPIRAN L2 - 1 - repository.maranatha.edu fileLAMPIRAN L2 - 1 Perincian biaya mesin – mesin yang digunakan : Mesin - Mesin Harga Jumlah Jumlah Harga Washer Machine (550 lbs) Rp

LAMPIRAN L2 - 17

Tahun Ke - 2 Tahun Ke - 3 Tahun Ke - 4 Tahun Ke - 53,907,879,656.52Rp 7,768,273,785.91Rp 11,628,667,915.30Rp 15,489,062,044.69Rp

Modal Sendiri -Rp -Rp -Rp -Rp Modal dari pinjaman Bank -Rp -Rp -Rp -Rp Penjualan 10,594,153,082.36Rp 10,594,153,082.36Rp 10,594,153,082.36Rp 10,594,153,082.36Rp Total Penerimaan Kas 10,594,153,082.36Rp 10,594,153,082.36Rp 10,594,153,082.36Rp 10,594,153,082.36Rp

Investasi -Rp -Rp -Rp -Rp Instalasi & Surat Izin -Rp -Rp -Rp -Rp Biaya - biaya dalam 1 tahunBiaya Tenaga Kerja 549,900,000.00Rp 549,900,000.00Rp 549,900,000.00Rp 549,900,000.00Rp Biaya Administrasi 2,513,000.00Rp 2,513,000.00Rp 2,513,000.00Rp 2,513,000.00Rp Biaya Operasional 264,000,000.00Rp 264,000,000.00Rp 264,000,000.00Rp 264,000,000.00Rp Biaya Energi 207,600,000.00Rp 207,600,000.00Rp 207,600,000.00Rp 207,600,000.00Rp Biaya Maintenance 780,000,000.00Rp 780,000,000.00Rp 780,000,000.00Rp 780,000,000.00Rp Biaya Pabrik 3,415,812,783.24Rp 3,415,812,783.24Rp 3,415,812,783.24Rp 3,415,812,783.24Rp Biaya Lain - Lain 3,088,000.00Rp 3,088,000.00Rp 3,088,000.00Rp 3,088,000.00Rp PPH 1,510,845,169.74Rp 1,510,845,169.74Rp 1,510,845,169.74Rp 1,510,845,169.74Rp Total Pengeluaran Kas 6,733,758,952.97Rp 6,733,758,952.97Rp 6,733,758,952.97Rp 6,733,758,952.97Rp

Saldo Akhir 7,768,273,785.91Rp 11,628,667,915.30Rp 15,489,062,044.69Rp 19,349,456,174.07Rp

CASH FLOW

PENGELUARAN KAS

Saldo Awal KasPENERIMAAN KAS

TUGAS AKHIR

Page 18: LAMPIRAN L2 - 1 - repository.maranatha.edu fileLAMPIRAN L2 - 1 Perincian biaya mesin – mesin yang digunakan : Mesin - Mesin Harga Jumlah Jumlah Harga Washer Machine (550 lbs) Rp

LAMPIRAN L2 - 18

Perincian perhitungan Neraca :

1 Aktiva Lancar 1 HutangKas 420,000,000.00Rp Hutang Lancar -Rp Piutang -Rp Hutang Dagang -Rp Total Aktiva Lancar 420,000,000.00Rp Hutang Jangka Panjang

Kredit Bank -Rp 2 Aktiva tetap Total Hutang -Rp

Investasi 2,978,477,000.00Rp Instalasi & Surat Izin 152,000,000.00Rp 2 Modal Depresiasi -Rp Modal Usaha 3,550,477,000.00Rp

Laba ditahan -Rp

Total Aktiva Tetap 3,130,477,000.00Rp Total Modal 3,550,477,000.00Rp

3,550,477,000.00Rp 3,550,477,000.00Rp

1 Aktiva Lancar 1 HutangKas 537,736,316.57Rp Hutang Lancar -Rp Piutang -Rp Hutang Dagang -Rp Total Aktiva Lancar 537,736,316.57Rp Hutang Jangka Panjang

Kredit Bank -Rp 2 Aktiva tetap Total Hutang -Rp

Investasi 2,978,477,000.00Rp Instalasi & Surat Izin 152,000,000.00Rp 2 Modal Depresiasi (23,062,950.00)Rp Modal Usaha 3,550,477,000.00Rp

Laba ditahan 94,673,367Rp

Total Aktiva Tetap 3,107,414,050.00Rp Total Modal 3,645,150,366.57Rp

3,645,150,366.57Rp 3,645,150,366.57Rp

TOTAL AKTIVA TOTAL PASIVA

NERACA KEUANGANBulan Ke - 1

AKTIVA PASIVA

TOTAL AKTIVA TOTAL PASIVA

NERACA KEUANGANBulan Ke - 0

AKTIVA PASIVA

TUGAS AKHIR

Page 19: LAMPIRAN L2 - 1 - repository.maranatha.edu fileLAMPIRAN L2 - 1 Perincian biaya mesin – mesin yang digunakan : Mesin - Mesin Harga Jumlah Jumlah Harga Washer Machine (550 lbs) Rp

LAMPIRAN L2 - 19

1 Aktiva Lancar 1 HutangKas 772,133,018.02Rp Hutang Lancar -Rp Piutang -Rp Hutang Dagang -Rp Total Aktiva Lancar 772,133,018.02Rp Hutang Jangka Panjang

Kredit Bank -Rp 2 Aktiva tetap Total Hutang -Rp

Investasi 2,978,477,000.00Rp Instalasi & Surat Izin 152,000,000.00Rp 2 Modal Depresiasi (46,125,900.00)Rp Modal Usaha 3,550,477,000.00Rp

Laba ditahan 306,007,118Rp

Total Aktiva Tetap 3,084,351,100.00Rp Total Modal 3,856,484,118.02Rp

3,856,484,118.02Rp 3,856,484,118.02Rp

1 Aktiva Lancar 1 HutangKas 976,919,719.46Rp Hutang Lancar -Rp Piutang -Rp Hutang Dagang -Rp Total Aktiva Lancar 976,919,719.46Rp Hutang Jangka Panjang

Kredit Bank -Rp 2 Aktiva tetap Total Hutang -Rp

Investasi 2,978,477,000.00Rp Instalasi & Surat Izin 152,000,000.00Rp 2 Modal Depresiasi (69,188,850.00)Rp Modal Usaha 3,550,477,000.00Rp

Laba ditahan 487,730,869Rp

Total Aktiva Tetap 3,061,288,150.00Rp Total Modal 4,038,207,869.46Rp

4,038,207,869.46Rp 4,038,207,869.46Rp

AKTIVA PASIVA

TOTAL AKTIVA TOTAL PASIVA

TOTAL AKTIVA TOTAL PASIVA

NERACA KEUANGANBulan Ke - 3

NERACA KEUANGANBulan Ke - 2

AKTIVA PASIVA

TUGAS AKHIR

Page 20: LAMPIRAN L2 - 1 - repository.maranatha.edu fileLAMPIRAN L2 - 1 Perincian biaya mesin – mesin yang digunakan : Mesin - Mesin Harga Jumlah Jumlah Harga Washer Machine (550 lbs) Rp

LAMPIRAN L2 - 20

1 Aktiva Lancar 1 HutangKas 1,237,516,629.42Rp Hutang Lancar -Rp Piutang -Rp Hutang Dagang -Rp Total Aktiva Lancar 1,237,516,629.42Rp Hutang Jangka Panjang

Kredit Bank -Rp 2 Aktiva tetap Total Hutang -Rp

Investasi 2,978,477,000.00Rp Instalasi & Surat Izin 152,000,000.00Rp 2 Modal Depresiasi (92,251,800.00)Rp Modal Usaha 3,550,477,000.00Rp

Laba ditahan 725,264,829Rp

Total Aktiva Tetap 3,038,225,200.00Rp Total Modal 4,275,741,829.42Rp

4,275,741,829.42Rp 4,275,741,829.42Rp

1 Aktiva Lancar 1 HutangKas 1,519,113,539.38Rp Hutang Lancar -Rp Piutang -Rp Hutang Dagang -Rp Total Aktiva Lancar 1,519,113,539.38Rp Hutang Jangka Panjang

Kredit Bank -Rp 2 Aktiva tetap Total Hutang -Rp

Investasi 2,978,477,000.00Rp Instalasi & Surat Izin 152,000,000.00Rp 2 Modal Depresiasi (115,314,750.00)Rp Modal Usaha 3,550,477,000.00Rp

Laba ditahan 983,798,789Rp

Total Aktiva Tetap 3,015,162,250.00Rp Total Modal 4,534,275,789.38Rp

4,534,275,789.38Rp 4,534,275,789.38Rp

AKTIVA PASIVA

TOTAL AKTIVA TOTAL PASIVA

TOTAL AKTIVA TOTAL PASIVA

NERACA KEUANGANBulan Ke - 5

NERACA KEUANGANBulan Ke - 4

AKTIVA PASIVA

TUGAS AKHIR

Page 21: LAMPIRAN L2 - 1 - repository.maranatha.edu fileLAMPIRAN L2 - 1 Perincian biaya mesin – mesin yang digunakan : Mesin - Mesin Harga Jumlah Jumlah Harga Washer Machine (550 lbs) Rp

LAMPIRAN L2 - 21

1 Aktiva Lancar 1 HutangKas 1,866,387,141.83Rp Hutang Lancar -Rp Piutang -Rp Hutang Dagang -Rp Total Aktiva Lancar 1,866,387,141.83Rp Hutang Jangka Panjang

Kredit Bank -Rp 2 Aktiva tetap Total Hutang -Rp

Investasi 2,978,477,000.00Rp Instalasi & Surat Izin 152,000,000.00Rp 2 Modal Depresiasi (138,377,700.00)Rp Modal Usaha 3,550,477,000.00Rp

Laba ditahan 1,308,009,442Rp

Total Aktiva Tetap 2,992,099,300.00Rp Total Modal 4,858,486,441.83Rp

4,858,486,441.83Rp 4,858,486,441.83Rp

1 Aktiva Lancar 1 HutangKas -Rp Hutang Lancar -Rp Piutang 2,192,511,644.28Rp Hutang Dagang -Rp Total Aktiva Lancar 2,192,511,644.28Rp Hutang Jangka Panjang

Kredit Bank -Rp 2 Aktiva tetap Total Hutang -Rp

Investasi 2,978,477,000.00Rp Instalasi & Surat Izin 152,000,000.00Rp 2 Modal Depresiasi (161,440,650.00)Rp Modal Usaha 3,550,477,000.00Rp

Laba ditahan 1,611,070,994Rp

Total Aktiva Tetap 2,969,036,350.00Rp Total Modal 5,161,547,994.28Rp

5,161,547,994.28Rp 5,161,547,994.28Rp

AKTIVA PASIVA

TOTAL AKTIVA TOTAL PASIVA

TOTAL AKTIVA TOTAL PASIVA

NERACA KEUANGANBulan Ke - 7

NERACA KEUANGANBulan Ke - 6

AKTIVA PASIVA

TUGAS AKHIR

Page 22: LAMPIRAN L2 - 1 - repository.maranatha.edu fileLAMPIRAN L2 - 1 Perincian biaya mesin – mesin yang digunakan : Mesin - Mesin Harga Jumlah Jumlah Harga Washer Machine (550 lbs) Rp

LAMPIRAN L2 - 22

1 Aktiva Lancar 1 HutangKas 2,539,785,246.73Rp Hutang Lancar -Rp Piutang -Rp Hutang Dagang -Rp Total Aktiva Lancar 2,539,785,246.73Rp Hutang Jangka Panjang

Kredit Bank -Rp 2 Aktiva tetap Total Hutang -Rp

Investasi 2,978,477,000.00Rp Instalasi & Surat Izin 152,000,000.00Rp 2 Modal Depresiasi (184,503,600.00)Rp Modal Usaha 3,550,477,000.00Rp

Laba ditahan 1,935,281,647Rp

Total Aktiva Tetap 2,945,973,400.00Rp Total Modal 5,485,758,646.73Rp

5,485,758,646.73Rp 5,485,758,646.73Rp

1 Aktiva Lancar 1 HutangKas 2,887,058,849.17Rp Hutang Lancar -Rp Piutang -Rp Hutang Dagang -Rp Total Aktiva Lancar 2,887,058,849.17Rp Hutang Jangka Panjang

Kredit Bank -Rp 2 Aktiva tetap Total Hutang -Rp

Investasi 2,978,477,000.00Rp Instalasi & Surat Izin 152,000,000.00Rp 2 Modal Depresiasi (207,566,550.00)Rp Modal Usaha 3,550,477,000.00Rp

Laba ditahan 2,259,492,299Rp

Total Aktiva Tetap 2,922,910,450.00Rp Total Modal 5,809,969,299.17Rp

5,809,969,299.17Rp 5,809,969,299.17Rp

AKTIVA PASIVA

TOTAL AKTIVA TOTAL PASIVA

TOTAL AKTIVA TOTAL PASIVA

NERACA KEUANGANBulan Ke - 9

NERACA KEUANGANBulan Ke - 8

AKTIVA PASIVA

TUGAS AKHIR

Page 23: LAMPIRAN L2 - 1 - repository.maranatha.edu fileLAMPIRAN L2 - 1 Perincian biaya mesin – mesin yang digunakan : Mesin - Mesin Harga Jumlah Jumlah Harga Washer Machine (550 lbs) Rp

LAMPIRAN L2 - 23

1 Aktiva Lancar 1 HutangKas 3,213,332,451.62Rp Hutang Lancar -Rp Piutang -Rp Hutang Dagang -Rp Total Aktiva Lancar 3,213,332,451.62Rp Hutang Jangka Panjang

Kredit Bank -Rp 2 Aktiva tetap Total Hutang -Rp

Investasi 2,978,477,000.00Rp Instalasi & Surat Izin 152,000,000.00Rp 2 Modal Depresiasi (230,629,500.00)Rp Modal Usaha 3,550,477,000.00Rp

Laba ditahan 2,562,702,952Rp

Total Aktiva Tetap 2,899,847,500.00Rp Total Modal 6,113,179,951.62Rp

6,113,179,951.62Rp 6,113,179,951.62Rp

1 Aktiva Lancar 1 HutangKas 3,560,606,054.07Rp Hutang Lancar -Rp Piutang -Rp Hutang Dagang -Rp Total Aktiva Lancar 3,560,606,054.07Rp Hutang Jangka Panjang

Kredit Bank -Rp 2 Aktiva tetap Total Hutang -Rp

Investasi 2,978,477,000.00Rp Instalasi & Surat Izin 152,000,000.00Rp 2 Modal Depresiasi (253,692,450.00)Rp Modal Usaha 3,550,477,000.00Rp

Laba ditahan 2,886,913,604Rp

Total Aktiva Tetap 2,876,784,550.00Rp Total Modal 6,437,390,604.07Rp

6,437,390,604.07Rp 6,437,390,604.07Rp

AKTIVA PASIVA

TOTAL AKTIVA TOTAL PASIVA

TOTAL AKTIVA TOTAL PASIVA

NERACA KEUANGANBulan Ke - 11

NERACA KEUANGANBulan Ke - 10

AKTIVA PASIVA

TUGAS AKHIR

Page 24: LAMPIRAN L2 - 1 - repository.maranatha.edu fileLAMPIRAN L2 - 1 Perincian biaya mesin – mesin yang digunakan : Mesin - Mesin Harga Jumlah Jumlah Harga Washer Machine (550 lbs) Rp

LAMPIRAN L2 - 24

1 Aktiva Lancar 1 HutangKas 3,907,879,656.52Rp Hutang Lancar -Rp Piutang -Rp Hutang Dagang -Rp Total Aktiva Lancar 3,907,879,656.52Rp Hutang Jangka Panjang

Kredit Bank -Rp 2 Aktiva tetap Total Hutang -Rp

Investasi 2,978,477,000.00Rp Instalasi & Surat Izin 152,000,000.00Rp 2 Modal Depresiasi (276,755,400.00)Rp Modal Usaha 3,550,477,000.00Rp

Laba ditahan 3,211,124,257Rp

Total Aktiva Tetap 2,853,721,600.00Rp Total Modal 6,761,601,256.52Rp

6,761,601,256.52Rp 6,761,601,256.52Rp

1 Aktiva Lancar 1 HutangKas 7,768,273,785.91Rp Hutang Lancar -Rp Piutang -Rp Hutang Dagang -Rp Total Aktiva Lancar 7,768,273,785.91Rp Hutang Jangka Panjang

Kredit Bank -Rp 2 Aktiva tetap Total Hutang -Rp

Investasi 2,978,477,000.00Rp Instalasi & Surat Izin 152,000,000.00Rp 2 Modal Depresiasi (553,510,800.00)Rp Modal Usaha 3,550,477,000.00Rp

Laba ditahan 6,794,762,986Rp

Total Aktiva Tetap 2,576,966,200.00Rp Total Modal 10,345,239,985.91Rp

10,345,239,985.91Rp 10,345,239,985.91Rp

TOTAL AKTIVA TOTAL PASIVA

NERACA KEUANGANBulan Ke - 12

AKTIVA PASIVA

TOTAL AKTIVA TOTAL PASIVA

NERACA KEUANGANTahun Ke - 2

AKTIVA PASIVA

TUGAS AKHIR

Page 25: LAMPIRAN L2 - 1 - repository.maranatha.edu fileLAMPIRAN L2 - 1 Perincian biaya mesin – mesin yang digunakan : Mesin - Mesin Harga Jumlah Jumlah Harga Washer Machine (550 lbs) Rp

LAMPIRAN L2 - 25

1 Aktiva Lancar 1 HutangKas 11,628,667,915.30Rp Hutang Lancar -Rp Piutang -Rp Hutang Dagang -Rp Total Aktiva Lancar 11,628,667,915.30Rp Hutang Jangka Panjang

Kredit Bank -Rp 2 Aktiva tetap Total Hutang -Rp

Investasi 2,978,477,000.00Rp Instalasi & Surat Izin 152,000,000.00Rp 2 Modal Depresiasi (830,266,200.00)Rp Modal Usaha 3,550,477,000.00Rp

Laba ditahan 10,378,401,715Rp

Total Aktiva Tetap 2,300,210,800.00Rp Total Modal 13,928,878,715.30Rp

13,928,878,715.30Rp 13,928,878,715.30Rp

1 Aktiva Lancar 1 HutangKas 15,489,062,044.69Rp Hutang Lancar -Rp Piutang -Rp Hutang Dagang -Rp Total Aktiva Lancar 15,489,062,044.69Rp Hutang Jangka Panjang

Kredit Bank -Rp 2 Aktiva tetap Total Hutang -Rp

Investasi 2,978,477,000.00Rp Instalasi & Surat Izin 152,000,000.00Rp 2 Modal Depresiasi (1,107,021,600.00)Rp Modal Usaha 3,550,477,000.00Rp

Laba ditahan 13,962,040,445Rp

Total Aktiva Tetap 2,023,455,400.00Rp Total Modal 17,512,517,444.69Rp

17,512,517,444.69Rp 17,512,517,444.69Rp TOTAL AKTIVA TOTAL PASIVA

NERACA KEUANGANTahun Ke - 4

AKTIVA PASIVA

AKTIVA PASIVA

TOTAL AKTIVA TOTAL PASIVA

NERACA KEUANGANTahun Ke - 3

TUGAS AKHIR

Page 26: LAMPIRAN L2 - 1 - repository.maranatha.edu fileLAMPIRAN L2 - 1 Perincian biaya mesin – mesin yang digunakan : Mesin - Mesin Harga Jumlah Jumlah Harga Washer Machine (550 lbs) Rp

LAMPIRAN L2 - 26

1 Aktiva Lancar 1 HutangKas 19,349,456,174.07Rp Hutang Lancar -Rp Piutang -Rp Hutang Dagang -Rp Total Aktiva Lancar 19,349,456,174.07Rp Hutang Jangka Panjang

Kredit Bank -Rp 2 Aktiva tetap Total Hutang -Rp

Investasi 2,978,477,000.00Rp Instalasi & Surat Izin 152,000,000.00Rp 2 Modal Depresiasi (1,383,777,000.00)Rp Modal Usaha 3,550,477,000.00Rp

Laba ditahan 17,545,679,174Rp

Total Aktiva Tetap 1,746,700,000.00Rp Total Modal 21,096,156,174.07Rp

21,096,156,174.07Rp 21,096,156,174.07Rp

AKTIVA PASIVA

TOTAL AKTIVA TOTAL PASIVA

NERACA KEUANGANTahun Ke - 5

TUGAS AKHIR