  • (1) (4) (5) (6)

    1 BAHAN BANGUNANPC ( Portland Cement 50 kg) Zak 70.000 71.400Pasir M3 95.000 96.900Batu Kali M3 125.000 127.500Bronjong 0,50 m x 1,00 m x 2,00 m Lbr 385.000 392.700Karung Plastik Bh 5.500 5.610Plamir Tembok Kg 22.000 22.440Cat Tembok Kg 65.000 66.300Cat Meni (5 Kg x 16 Rumah/kantor ) Kg 20.000 20.400Cat Kayu (5 Kg x 16 Rumah/kantor ) Kg 50.000 51.000Minyak Cat (3 Kg x 16 Rumah/kantor ) Kg 20.000 20.400Patok Kayu M3 2.750.000 2.805.000Paku Payung Kg 30.000 30.600Kuas Bh 20.000 20.400Multiplek 3 mm Lbr 125000 127.500

    2 BAHAN BAKAR MINYAK (BBM )- Solar : Non subsidi Lt 11.700 11.934- Olie Sae 40 : Lt 45.000 45.900- Premium : subsidi Lt 7.200 7.344- Solar : subsidi Lt 6.900 7.038

    3 BAHAN UNTUK PEMELIHARAAN PINTU AIR- Pelumas Ltr 38.000 38.760- Cat brown Kg 45.000 45.900- Cat Besi Kg 45.000 45.900- Teer Kg 20.000 20.400- Kuas Bh 13.000 13.260- Stemvet Kg 32.000 32.640- Minyak cat Ltr 10.000 10.200- Kain pembersih Lbr 5.500 5.610- Solar Ltr 5.500 5.610- Sikat Baja bh 5.500 5.610- Kertas Gosok Lbr 8.000 8.160- Soda api Kg 10.000 10.200

    4 PERLENGKAPAN KERJA- Sepatu kerja Lapangan Bh 75.000 76.500- Topi lapangan Bh 35.000 35.700- Jas hujan Bh 50.000 51.000- Senter Bh 55.000 56.100- Baterai ( Jumlah Senter x 3 Bh x 4 Kali) Bh 3.850 3.927- Rollmeter 5 m Bh 14.850 15.147- Rollmeter 50 m Bh 110.000 112.200- Gembok Pintu Air Bh 50.000 51.000- Mesin Pemotong Rumput Bh 5.500.000 5.610.000- Papan Larangan Bh 1.100.000 1.122.000- Papan eksploitasi Bh 3.850.000 3.927.000- Peilschaal Bh 275.000 280.500

    (2)

    HARGA SATUAN UNTUK PROGRAM 2016

    KODE URAIAN SATUAN HARGASATUANDASAR

    HARGA SATUANx 2 % KETERANGAN

  • 4 BAHANATK dan Bahan Komputer- Kertas HVS 70 gr F4 rim 87.840 89.597- Kertas HVS 70 gr A4 rim 47.580 48.532- Pensil 2B rim 3.630 3.703- Ballpoint Pentel roll 11.000 11.220- Kapur Tulis bh 11.000 11.220- Staples Kecil bh 19.520 19.910- Isi staples kecil bh 5.500 5.610- Penggaris segi tiga no. 12 bh 13.750 14.025- Stop map bh 3.360 3.427- Ordner besar bh 34.100 34.782- Plakband bh 12.100 12.342- Lem kertas kecil bh 16.800 17.136- Cutter dos 12.100 12.342- Isi cutter dos 16.500 16.830- Korektor/ Type Ex bh 12.200 12.444

    Stop map plastik bh 5.600 5.712Staples Tanggung bh 16.500 16.830Isi staples besar bh 8.250 8.415Paper Klip bh 4.400 4.488Toner printer bh 814.000 830.280Isi ulang Toner bh 330.000 336.600Snelhecter map bh - -Karet penghapus bh - -Portepel bh - -Catridge Black bh - -Catridge Colour bh - -Refill DP 002 Black bh - -Refill DP 005 Colour bh - -

    5 PERALATAN KERJA LAPANGANKejuron1 Sekrop 75.000 76.5002 Lencek 38.500 39.2703 Cetok 27.500 28.0504 Linggis 55.000 56.1005 Ganco 66.000 67.3206 Palu 22.000 22.4407 Gergaji 55.000 56.1008 Ember 9.350 9.5379 Cangkul 82.500 84.15010 Sabit 55.000 56.10011 Garuk 55.000 56.10012 Cikrak 15.400 15.70813 Sapu lidi 10.000 10.20014 Pengki 25.000 25.50015 Busi 16.500 16.830

    6 BELANJA SEWA- Sewa Kendaraan Roda Empat ( 5 Unit x 8 Hari ) UH 825.000 841.500- Sewa Gedung Pertemuan ( 1 Unit x 2 Hari ) UH 1.650.000 1.683.000- Sewa Kamar Hotel ( 50 Unit x 2 Hari ) UH 357.500 364.650

    7 BELANJA PERJALANAN- Uang Harian Perjalanan Dinas (DKI Jakarta ) OHK 495.000 504.900- Biaya Taksi Perjalanan Dinas (DKI Jakarta ) OK 176.000 179.520- Biaya Taksi Perjalanan Dinas (Jawa Timur ) OK 132.000 134.640- Tiket Pesawat PP OK 2.750.000 2.805.000

    8 PERJALANAN KE LAPANGAN / JOB SITE- Uang Harian [17 Org x 1 HR x 20 Kali] OHK 434.500 443.190- Uang Transport PP [17 ORG x 20 KALI] OK 55.000 56.100- Penginapan [17 ORG x 20 KALI] OK 495.000 504.900- Uang Saku [ 90 ORG x 1KALI] OK 110.000 112.200- Bantuan Transport [ 90 ORG x 1KALI] OK 110.000 112.200

  • HARGA SATUAN UNTUK PROGRAM 20160 HARGA

    SATUANDASAR ( Rp. )

    1 2 3 4 5I UPAH PEKERJA1 Pekerja L. 01 65.0002 Tukang Gali L. 02 80.0003 Kepala Tukang batu L. 03 85.0004 Tukang batu L. 04 80.0005 Kepala Tukang kayu L. 05 85.0006 Tukang kayu L. 06 80.0007 Kepala Tukang besi beton L. 07 85.0008 Tukang besi beton L. 08 80.0009 Kepala Tukang cat/politur L. 09 85.00010 Tukang cat/politur L. 10 80.00011 Tukang pipa L. 11 80.00012 Tukang penganyam bronjong L. 12 80.00013 Tukang tebas L. 13 80.00014 Tukang las L. 14 80.00015 Mandor L. 15 85.00016 Juru Ukur L. 16 100.00017 Pembantu Juru Ukur L. 17 65.00018 Operator Alat Besar L. 18 90.00019 Pembantu operator / mekanik L. 19 65.00020 Supir truck L. 20 80.00021 Kenek truck L. 21 65.00022 Penjaga malam L. 22 75.000II BAHAN / MATERIAL

    1 Air M.01 3.0752 Tanah liat M.02 75.3503 Tanah urug M.03 30.0004 Lempengan rumput M.04 9.5005 Pasir urug M.05 70.0006 Sirtu M.06 30.0007 Pasir teras M.07 70.0008 Pasir pasang kali M.08 70.0009 Pasir beton M.09 96.90010 Abu Batu M.10 325.00011 Batu kali / belah M.11 380.00012 Batu Brojol (Untuk bronjong) M.12 350.00013 Batu bata / merah bakar kelas I M.13 6.32514 Batu bata / merah bakar kelas II M.14 8.30515 Batu bata / merah oven (Klingker) M.15 13.75016 Kerikil cor beton M.16 140.00017 Portland Cement (PC 50 kg / zak) M.17 71.40018 Kapur M.18 5.000

    NO URAIAN SATUAN KODE