5 274,5 cm

6

7

8

9

10

2,745 m 2,44 m 2 = 13,395 m 2 Permeter Harga nya =Rp 1.467.500 13,395 = Rp 109.555

ANALISA BEGISTING/M3 BETON I. BAHAN . MAL 1. Triplet 9 m = 2 1/4 Lembar 2 = 4,5 lembar 2. Kayu 5-7 = 10 Batang 2 = 20 Batang II. SKOR MAL ( KAYU BULAT ) A . 10 1 m = 10 m B. 10 1 m = 10 m C. 10 2m = 20 m D. 10 2,50m = 25 m E. 10 3m = 30 m Jml 95 m = 24 BT 24 2 = 48 Btg Ditambah Landasan Skor 5 2 = 10 Btg TOTAL Bahan / m3 Beton 1. 2. 3. 4. Triplet Kayu 5-7 Kayu Bulat Palu = 4,5 Lembar 95.000 = 427.500 = 20 Btg 20.500 = 400.000 = 58 Btg 10.000 = 580.000 = 4 Kg 15.000 = 60.000 Jml Rp 1.467.500

ANALISA HARGA 1 M3 BETON JADI PADA TURAP MESJID

NO KETERANGAN

SATUAN

1 2 3 4 5

PENGUKURAN GALIAN BESI BEGISTING PENGECORAN

LS M3 BETON /M3 BETON /M3 BETON M3 JUMLAH

HARGA SATUAN (RP) 10.000 50.000 175.000 300.000 130.000 665.000

PENAWARAN

PEKANBARU,11 JUNI 2011

Kepada Yth, Bapak FERLIARDI PT. DI PEKANBARU Perihal : Penawaran pekerjaan tembok penahan tanah (TURAP) Di MESJID RAYA KANDIS

Sehubungan akan dimulainya pekerjaan Turap MESJID RAYA KANDIS, di mana pada pekerjaan tersebut Bapak adalah selaku pemimpin pelaksananya, maka pada hari ini saya mengajukan penawaran untuk mengerjakan pekerjaan tersebut kepada bapak secara sub upah ( borongan). Adapun penawaran yang kami ajukan untuk pekerjaan tersebut adalah sbb: HARGA UNTUK 1 M3 BETON JADI NO 1 2 3 4 5 6 KETERANGAN BARAK KERJA POTONG PANCANG PENGECORAN PLASTERAN PENGECATAN PENGADAAN BEGISTING SATUAN LS BH M3 M2 M2 M2 HARGA SATUAN (Rp) 2.500.000 60.000 595.000 15.000 7.500 75.000

Untuk lebih lengkapnya saya lampirkan analisa berikut ini . Demikianlah penawaran ini saya buat agar dapat jadi pertimbangan bagi bapak. HORMAT SAYA :

( YUHERMAN )