05.potongan melintang

1
8/17/2019 05.POTONGAN MELINTANG http://slidepdf.com/reader/full/05potongan-melintang 1/1           2          7           9   .           0           0           2           6           3   .           0           0           2           6           3   .           0           0           2           9           8   .           0           0           2          7           9   .           0           0  PATOK (STA)  JARAK TITIK (cm)  KEMIRINGAN EXISTING (%)  ELEVASI EXISTING  ELEVASI RENCANA  KEMIRINGAN RENCANA (%) P4 (0+200) 1000         1         0         1   .         6         3  A D 2% 2%         1         0         1   .         9         8 2% 2% B C         1         0         1   .         6         3         1         0         1   .         7         9         1         0         1   .         7         9           3           0           6   .           0           0           2          7           2   .           0           0           2          7           0   .           0           0           3           0           3   .           0           0           2           8          7   .           0           0  +99.00  +101.00  +102.00  PATOK (STA)  JARAK TITIK (cm)  KEMIRINGAN EXISTING (%)  ELEVASI EXISTING  ELEVASI RENCANA  KEMIRINGAN RENCANA (%) P5 (0+250) 1000         1         0         1   .         7         0  A D 2% 2%         1         0         2   .         0         3 2% 2% B C         1         0         1   .         7         2         1         0         2   .         0         6         1         0         1   .         8         7  +103.00 2000.00 URUGAN PILIHAN T : 20 CM URUGAN BIASA GALIAN URUGAN PILIHAN T : 20 CM URUGAN BIASA GALIAN 500.00 500.00 2000.00 URUGAN PILIHAN T : 20 CM URUGAN BIASA GALIAN URUGAN PILIHAN T : 20 CM URUGAN BIASA GALIAN 500.00 500.00  +100.00  +99.00  +101.00  +102.00  +103.00 MUH. SAID, ST DIREKTUR JASMAN, ST KEGIATAN SIPIL DRAFTER DINAS PEKERJAAN UMUM PROVINSI SULAWESI TENGGARA IRFAN M. MANOPPO, ST RIJAL ANSAPUTRA, ST SURVEYOR PEKERJAAN CATATAN / REVISI KONSULTAN PERENCANA TEAM PERENCANA NAMA GAMBAR SKALA NO. LEMBAR JML. LEMBAR K OD E GA MB AR 08 PEJABAT PELAKSANA TEKNIS KEGIATAN (PPTK) DINAS PEKERJAAN UMUM PROVINSI SULAWESI TENGGARA MENGETAHUI / MENYETUJUI HAMKA, ST NIP. 19770630 201001 1 010 PERENCANAAN PEMBANGUNAN DRAINASE JALAN PROVINSI POROS ANDOLO - PALANGGA (RUAS PUNGGALUKU - ALANGGA) PEMBANGUNAN DRAINASE JALAN PROVINSI POROS ANDOLO - PALANGGA (RUAS PUNGGALUKU - ALANGGA) PROFIL MELINTANG SEGMEN 3 STA. 0+200 - 0+250 05  H = 1 : 20  V = 1 : 10  +100.00

Upload: ajir-arch-en-ciel

Post on 06-Jul-2018

216 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: 05.POTONGAN MELINTANG

8/17/2019 05.POTONGAN MELINTANG

http://slidepdf.com/reader/full/05potongan-melintang 1/1

          2         7          9  .

          0          0

          2          6          3  .

          0          0

          2          6          3  .

          0          0

          2          9          8  .

          0          0

          2         7          9  .

          0          0

  PATOK (STA)

  JARAK TITIK (cm)

  KEMIRINGAN EXISTING (%)

  ELEVASI EXISTING

  ELEVASI RENCANA

  KEMIRINGAN RENCANA (%)

P4 (0+200)

1000

        1        0        1

  .        6        3

 A D

2%

2%

        1        0        1

  .        9        8

2%

2%

B C

        1        0        1

  .        6        3

        1        0        1

  .        7        9

        1        0        1

  .        7        9

          3          0          6  .

          0          0

          2         7          2  .

          0          0

          2         7          0  .

          0          0

          3          0          3  .

          0          0

          2          8         7  .          0

          0

  +99.00

  +101.00

  +102.00

  PATOK (STA)

  JARAK TITIK (cm)

  KEMIRINGAN EXISTING (%)

  ELEVASI EXISTING

  ELEVASI RENCANA

  KEMIRINGAN RENCANA (%)

P5 (0+250)

1000

        1        0        1  .

        7        0

 A D

2%

2%

        1        0        2  .

        0        3

2%

2%

B C

        1        0        1  .

        7        2

        1        0        2  .

        0        6

        1        0        1  .

        8        7

  +103.00

2000.00

URUGAN PILIHAN T : 20 CM

URUGAN BIASAGALIAN URUGAN PILIHAN T : 20 CM

URUGAN BIASAGALIAN

500.00 500.00

2000.00

URUGAN PILIHAN T : 20 CM

URUGAN BIASAGALIAN URUGAN PILIHAN T : 20 CM

URUGAN BIASAGALIAN

500.00 500.00

  +100.00

  +99.00

  +101.00

  +102.00

  +103.00

MUH. SAID, STDIREKTUR

JASMAN, ST

KEGIATAN

SIPIL

DRAFTER

DINAS PEKERJAAN UMUMPROVINSI SULAWESI TENGGARA

IRFAN M. MANOPPO, ST

RIJAL ANSAPUTRA, ST

SURVEYOR

PEKERJAAN

CATATAN / REVISI

KONSULTAN PERENCANA

TEAM PERENCANA

NAMA GAMBAR SKALA

NO. LEMBAR JML. LEMBAR KODE GAMBAR

08

PEJABAT PELAKSANA TEKNIS KEGIATAN (PPTK)

DINAS PEKERJAAN UMUM

PROVINSI SULAWESI TENGGARA

MENGETAHUI / MENYETUJUI

HAMKA, ST

NIP. 19770630 201001 1 010

PERENCANAAN PEMBANGUNAN DRAINASE JALANPROVINSI POROS ANDOLO - PALANGGA

(RUAS PUNGGALUKU - ALANGGA)

PEMBANGUNAN DRAINASE JALAN PROVINSI POROS

ANDOLO - PALANGGA

(RUAS PUNGGALUKU - ALANGGA)

PROFIL MELINTANG SEGMEN 3

STA. 0+200 - 0+250

05

  H = 1 : 20

  V = 1 : 10

  +100.00