PATOK (STA)
JARAK TITIK (cm)
KEMIRINGAN EXISTING (%)
ELEVASI EXISTING
ELEVASI RENCANA
KEMIRINGAN RENCANA (%)
P4 (0+200)
1000
1 0 1
. 6 3
A D
2%
2%
1 0 1
. 9 8
2%
2%
B C
1 0 1
. 6 3
1 0 1
. 7 9
1 0 1
. 7 9
3 0 6 .
0 0
2 7 2 .
0 0
2 7 0 .
0 0
3 0 3 .
0 0
2 8 7 . 0
0
+99.00
+101.00
+102.00
PATOK (STA)
JARAK TITIK (cm)
KEMIRINGAN EXISTING (%)
ELEVASI EXISTING
ELEVASI RENCANA
KEMIRINGAN RENCANA (%)
P5 (0+250)
1000
1 0 1 .
7 0
A D
2%
2%
1 0 2 .
0 3
2%
2%
B C
1 0 1 .
7 2
1 0 2 .
0 6
1 0 1 .
8 7
+103.00
2000.00
URUGAN PILIHAN T : 20 CM
URUGAN BIASAGALIAN URUGAN PILIHAN T : 20 CM
URUGAN BIASAGALIAN
500.00 500.00
2000.00
URUGAN PILIHAN T : 20 CM
URUGAN BIASAGALIAN URUGAN PILIHAN T : 20 CM
URUGAN BIASAGALIAN
500.00 500.00
+100.00
+99.00
+101.00
+102.00
+103.00
MUH. SAID, STDIREKTUR
JASMAN, ST
KEGIATAN
SIPIL
DRAFTER
DINAS PEKERJAAN UMUMPROVINSI SULAWESI TENGGARA
IRFAN M. MANOPPO, ST
RIJAL ANSAPUTRA, ST
SURVEYOR
PEKERJAAN
CATATAN / REVISI
KONSULTAN PERENCANA
TEAM PERENCANA
NAMA GAMBAR SKALA
NO. LEMBAR JML. LEMBAR KODE GAMBAR
08
PEJABAT PELAKSANA TEKNIS KEGIATAN (PPTK)
DINAS PEKERJAAN UMUM
PROVINSI SULAWESI TENGGARA
MENGETAHUI / MENYETUJUI
HAMKA, ST
NIP. 19770630 201001 1 010
PERENCANAAN PEMBANGUNAN DRAINASE JALANPROVINSI POROS ANDOLO - PALANGGA
(RUAS PUNGGALUKU - ALANGGA)
PEMBANGUNAN DRAINASE JALAN PROVINSI POROS
ANDOLO - PALANGGA
(RUAS PUNGGALUKU - ALANGGA)
PROFIL MELINTANG SEGMEN 3
STA. 0+200 - 0+250
05
H = 1 : 20
V = 1 : 10
+100.00