RENCANA ANGGARAN BIAYA RUMAH TIPE ASERA 10x20 PROYEK : LOKASI : SUB. PEKERJAAN : NO URAIAN PEKERJAAN SAT. VOLUME HARGA TOTAL SATUAN HARGA (Rp.) (Rp.) 1 2 4 5 6 7 I. PEKERJAAN PERSIAPAN 1 Pemasangan bouwplank M' 68.00 - - II. PEKERJAAN PONDASI 1 PONDASI BATU KALI a. Galian tanah 53.87 - b. Pasir Urug M2 76.96 - c. Urugan tanah kembali 27.90 - d. Pasangan pondasi batu kali 1:3 25.97 - III. PEKERJAAN STRUKTUR DAN DINDING 1 Sloof 15/20 cm M' 96.20 - 2 Kolom Praktis 15/15 cm 4.17 - 3 Ring Balok 10/15 cm 0.25 - Beton bertulang K-275 116.88 680,000.00 79,475,382.50 Besi beton kg 18,700.09 9,746.72 182,264,517.83 Bekisting 960.19 134,398.75 129,048,335.76 4 Pasangan Dinding Bata ( 1 : 3 ) 326.17 - 5 Pasangan Dinding Bata ( 1 : 5 ) 717.60 - 6 Plesteran Dinding ( 1 : 3 ) 652.34 - 7 Plesteran Dinding ( 1 : 5 ) 1,435.20 - Dinding finish batu paras andesit 8.45 390,788,236.09 IV. PEKERJAAN LANTAI 1 Timbunan tanah 193.30 - 2 Pasir Urug 386.39 - 3 Dinding Keramik KM/WC 30/30 cm 9.12 - Dinding Keramik KM/WC 30/60 cm 87.26 4 Lantai Keramik KM / WC 30/30 cm 2.70 - Lantai Keramik KM / WC 30/60 cm 24.90 5 Lantai Keramik 30/30 cm 94.12 - Lantai Keramik 60/60 cm 205.75 Lantai Parquet Tangga 52.80 Lantai batu andesit 30/30 cm 6.12 - V. PEKERJAAN ATAP DAN PLAFOND 1 Pekerjaan rangka atap baja ringan 38.50 - Pekerjaan rangka atap aluminium 9.00 2 Pasang Atap + insulator 43.05 - Pasang atap kaca entrance 9.00 Plafond Gypsum + rangka 291.57 Plafond Gypsum water resistant + rangka 15.80 Waterproofing lantai 67.42 Waterproofing dinding 9.00 - VI. PEKERJAAN PINTU DAN JENDELA 1 Pintu - Kayu solid engineering 2 Daun Pintu & Jendela (set lengkap terpasang) PJ1 unit 1.00 - 4 Pintu (set lengkap terpasang) P1 unit 1.00 - 5 Pintu (set lengkap terpasang) P2 unit 2.00 - Pintu (set lengkap terpasang) P3 unit 1.00 Pintu (set lengkap terpasang) P5 unit 2.00 Pintu (set lengkap terpasang) P6 unit 1.00 Pintu (set lengkap terpasang) P11 unit 2.00 Pintu (set lengkap terpasang) P12 unit 4.00 Pintu (set lengkap terpasang) P13 unit 1.00 Pintu (set lengkap terpasang) P14 unit 1.00 Jati kering oven Pintu (set lengkap terpasang) P4 unit 1.00 Aluminium ex YKK profile 4" good finish 3 Daun Pintu & Jendela (set lengkap terpasang) PJ2 unit 1.00 - Pintu (set lengkap terpasang) P7 unit 1.00 Pintu (set lengkap terpasang) P8 unit 1.00 Pintu (set lengkap terpasang) P9 unit 1.00 Pintu (set lengkap terpasang) P10 unit 1.00 Pintu (set lengkap terpasang) P15 unit 1.00 Pintu (set lengkap terpasang) P16 unit 1.00 Jendela 6 Daun Jendela (set lengkap terpasang) J1 unit 1.00 - Daun Jendela (set lengkap terpasang) J3 unit 1.00 Aluminium ex YKK profile 4" good finish 7 Daun Jendela (set lengkap terpasang) J2 unit 1.00 - Daun Jendela (set lengkap terpasang) J4 unit 1.00 Daun Jendela (set lengkap terpasang) J5 unit 1.00 Daun Jendela (set lengkap terpasang) J6 unit 1.00 Daun Jendela (set lengkap terpasang) J7 unit 1.00 Daun Jendela (set lengkap terpasang) J9 unit 1.00 Daun Jendela (set lengkap terpasang) J10 unit 1.00 Daun Jendela (set lengkap terpasang) J11 unit 1.00 Daun Jendela (set lengkap terpasang) J12 unit 1.00 Besi hollow 4x4 PG unit 1.00 Louvre aluminium unit 1.00 Aluminium ex YKK profile 4" good finish 8 BV1 unit 2.00 - - VII. PEKERJAAN PENGECATAN 1 Cat Dinding 2,087.54 - 3 Cat Plafond 307.37 - - VIII. PEKERJAAN ELEKTRIKAL 1 Pemasangan Lampu Taman + Aksesoris Bh 2.00 - Pemasangan Titik Lampu Ttk 77.00 Pemasangan Lampu Gantung Bh 3.00 Pemasangan Box Sekering Bh 6.00 Pemasangan Meter Listrik Bh 2.00 Pemasangan Saklar Double Bh 23.00 Pemasangan Saklar Tunggal Bh 15.00 Pemasangan Saklar Hotel Bh 1.00 Pemasangan Stop Kontak Bh 41.00 Pemasangan Stop Kontak Dgn Tutup Bh 1.00 Pemasangan TV Outlet Bh 8.00 M 3 M 3 M 3 M 3 M 3 M 3 M 2 M 2 M 2 M 2 M 2 M 2 M 3 M 2 M 2 M 2 M 2 M 2 M 2 M 2 M 2 M 2 M 2 M 2 M 2 M 2 M 2 M 2 M 2 M 2 M 2

Upload: deanz75

Post on 30-Nov-2015

23 views

Category:

Documents


3 download

DESCRIPTION

RAB

TRANSCRIPT

Page 1: RABTIPE10x20

RENCANA ANGGARAN BIAYA

RUMAH TIPE ASERA 10x20PROYEK :LOKASI :SUB. PEKERJAAN :

NO URAIAN PEKERJAAN SAT. VOLUMEHARGA TOTAL SATUAN HARGA

(Rp.) (Rp.)1 2 4 5 6 7

I. PEKERJAAN PERSIAPAN1 Pemasangan bouwplank M' 68.00 -

-

II. PEKERJAAN PONDASI

1 PONDASI BATU KALIa. Galian tanah 53.87 - b. Pasir Urug M2 76.96 - c. Urugan tanah kembali 27.90 -

d. Pasangan pondasi batu kali 1:3 25.97 -

III. PEKERJAAN STRUKTUR DAN DINDING1 Sloof 15/20 cm M' 96.20 - 2 Kolom Praktis 15/15 cm 4.17 - 3 Ring Balok 10/15 cm 0.25 -

Beton bertulang K-275 116.88 680,000.00 79,475,382.50 Besi beton kg 18,700.09 9,746.72 182,264,517.83 Bekisting 960.19 134,398.75 129,048,335.76

4 Pasangan Dinding Bata ( 1 : 3 ) 326.17 - 5 Pasangan Dinding Bata ( 1 : 5 ) 717.60 - 6 Plesteran Dinding ( 1 : 3 ) 652.34 - 7 Plesteran Dinding ( 1 : 5 ) 1,435.20 -

Dinding finish batu paras andesit 8.45 390,788,236.09

IV. PEKERJAAN LANTAI

1 Timbunan tanah 193.30 - 2 Pasir Urug 386.39 - 3 Dinding Keramik KM/WC 30/30 cm 9.12 -

Dinding Keramik KM/WC 30/60 cm 87.26 4 Lantai Keramik KM / WC 30/30 cm 2.70 -

Lantai Keramik KM / WC 30/60 cm 24.90 5 Lantai Keramik 30/30 cm 94.12 -

Lantai Keramik 60/60 cm 205.75 Lantai Parquet Tangga 52.80 Lantai batu andesit 30/30 cm 6.12

-

V. PEKERJAAN ATAP DAN PLAFOND1 Pekerjaan rangka atap baja ringan 38.50 -

Pekerjaan rangka atap aluminium 9.00 2 Pasang Atap + insulator 43.05 -

Pasang atap kaca entrance 9.00 Plafond Gypsum + rangka 291.57 Plafond Gypsum water resistant + rangka 15.80 Waterproofing lantai 67.42 Waterproofing dinding 9.00

-

VI. PEKERJAAN PINTU DAN JENDELA1 Pintu -

Kayu solid engineering2 Daun Pintu & Jendela (set lengkap terpasang) PJ1 unit 1.00 - 4 Pintu (set lengkap terpasang) P1 unit 1.00 - 5 Pintu (set lengkap terpasang) P2 unit 2.00 -

Pintu (set lengkap terpasang) P3 unit 1.00 Pintu (set lengkap terpasang) P5 unit 2.00 Pintu (set lengkap terpasang) P6 unit 1.00 Pintu (set lengkap terpasang) P11 unit 2.00 Pintu (set lengkap terpasang) P12 unit 4.00 Pintu (set lengkap terpasang) P13 unit 1.00 Pintu (set lengkap terpasang) P14 unit 1.00 Jati kering ovenPintu (set lengkap terpasang) P4 unit 1.00 Aluminium ex YKK profile 4" good finish

3 Daun Pintu & Jendela (set lengkap terpasang) PJ2 unit 1.00 - Pintu (set lengkap terpasang) P7 unit 1.00 Pintu (set lengkap terpasang) P8 unit 1.00 Pintu (set lengkap terpasang) P9 unit 1.00 Pintu (set lengkap terpasang) P10 unit 1.00 Pintu (set lengkap terpasang) P15 unit 1.00 Pintu (set lengkap terpasang) P16 unit 1.00 Jendela

6 Daun Jendela (set lengkap terpasang) J1 unit 1.00 - Daun Jendela (set lengkap terpasang) J3 unit 1.00 Aluminium ex YKK profile 4" good finish

7 Daun Jendela (set lengkap terpasang) J2 unit 1.00 - Daun Jendela (set lengkap terpasang) J4 unit 1.00 Daun Jendela (set lengkap terpasang) J5 unit 1.00 Daun Jendela (set lengkap terpasang) J6 unit 1.00 Daun Jendela (set lengkap terpasang) J7 unit 1.00 Daun Jendela (set lengkap terpasang) J9 unit 1.00 Daun Jendela (set lengkap terpasang) J10 unit 1.00 Daun Jendela (set lengkap terpasang) J11 unit 1.00 Daun Jendela (set lengkap terpasang) J12 unit 1.00 Besi hollow 4x4PG unit 1.00 Louvre aluminium unit 1.00 Aluminium ex YKK profile 4" good finish

8 BV1 unit 2.00 - -

VII. PEKERJAAN PENGECATAN1 Cat Dinding 2,087.54 - 3 Cat Plafond 307.37 -

-

VIII. PEKERJAAN ELEKTRIKAL1 Pemasangan Lampu Taman + Aksesoris Bh 2.00 -

Pemasangan Titik Lampu Ttk 77.00 Pemasangan Lampu Gantung Bh 3.00 Pemasangan Box Sekering Bh 6.00 Pemasangan Meter Listrik Bh 2.00 Pemasangan Saklar Double Bh 23.00 Pemasangan Saklar Tunggal Bh 15.00 Pemasangan Saklar Hotel Bh 1.00 Pemasangan Stop Kontak Bh 41.00 Pemasangan Stop Kontak Dgn Tutup Bh 1.00 Pemasangan TV Outlet Bh 8.00

M3

M3

M3

M3

M3

M3

M2

M2

M2

M2

M2

M2

M3

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

Page 2: RABTIPE10x20

NO URAIAN PEKERJAAN SAT. VOLUMEHARGA TOTAL SATUAN HARGA

(Rp.) (Rp.)1 2 4 5 6 7

-

VIII. PEKERJAAN PLUMBING DAN SANITASI

A Pekerjaan Pemasangan

1 Memasang Closet Jongkok Bh 1.00 - Memasang Closet Monoblok Bh 3.00

2 Pembuatan bak mandi Bh 1.00 - Memasang Eco Washer Bh 2.00

Memasang Wastafel Bh 4.00

Memasang Meja Wastafel Bh 1.00

Memasang Faucet Bh 2.00

Partisi kaca tempered 10 mm (2.1x1.75) set 2.00

Kaca cermin bevel frameless Bh 2.00

Bak kontrol dgn tutup (300x300) Bh 4.00

Flor drain Bh 16.00

Roof drain Bh 5.00

Titik jet washer Bh 6.00

Titik shower Bh 4.00

Titik kran biasa Bh 19.00

Ground water tank Unit 1.00

Septic Tank Dan Peresapan Unit 1.00 - Water tank Unit 2.00

-

B Pekerjaan Perpipaan Air Bersih/Bekas/Kotor1 M' - 2 Saluran air kotor Ø4" M' - 3 Saluran air faecalin Ø4" M' -

- -

IX. PEKERJAAN HALAMAN

Pintu garasi (92.6X2.775) + rangka Set 1.00 1 Pagar 17.00 - 2 Pekerjaan Carport 36.16 -

-

TOTAL I - IX 390,788,200.00

Per meter bangunan 10,855,200.00

Saluran air bersih Ø3/4"

M1

M2

Page 3: RABTIPE10x20

Bahan dan UpahPage 3 of 45

DAFTAR HARGA SATUAN UPAH DAN BAHAN

NO. URAIAN HARGA UPAH HARGA SATUAN

1 2 3 4

1 Pekerja Rp 40,000.00 Org/Hari 2 Mandor Rp 50,000.00 OH 3 Tukang Batu Rp 60,000.00 OH 4 Tukang Kayu Rp 60,000.00 OH 5 Tukang Besi Rp 60,000.00 OH 6 Tukang Keramik Rp 60,000.00 OH 7 Tukang Plafond Rp 60,000.00 OH 10 Tukang Pasang Pipa Rp 60,000.00 OH 11 Tukang Cat Rp 60,000.00 OH 12 Kepala Tukang Rp 70,000.00 OH

13 Jaga Malam Rp 25,000.00 OH

NO. URAIAN HARGA BAHAN_BAHAN HARGA SATUAN

1 2 3 4

A. TIMBUNAN/GALIAN

1 Tanah Timbun/Merah Rp 57,500.00 2 Pasir Timbun/Urug Rp 61,500.00

3 Pasir Pasang Rp 75,500.00

4 Pasir Beton Rp 86,400.00

5 Sirtu Rp 81,500.00

6 Tanah Humus Rp 65,000.00

B. BAHAN PEREKAT

1 Portland Cement (PC) Rp 1,100.00 Kg2 Semen Putih Rp 2,150.00 Kg3 Lem Kayu Rp 32,500.00 Kg4 Lem Vinyl/Karet Rp 39,000.00 Kg5 Perekat Kaca Rp 76,500.00 Kg6 Waterproof Rp 47,500.00 Kg

C. BATU / BATU CETAKAN

1 Batu Kerikil/Koral 3 - 5 cm Rp 159,900.00

2 Batu Kerikil/Koral 5 - 7 cm Rp 144,900.00

3 Batu Kerikil/Koral 7 - 10 cm Rp 129,900.00

4 Batu Kerikil/Koral 10 - 15 cm Rp 114,900.00

5 Batu Kerikil/Koral 15 - 20 cm Rp 99,900.00

6 Batu Pecah 1 - 2 cm Rp 190,200.00

7 Batu Pecah 2 - 3 cm Rp 177,700.00

8 Batu Pecah 3 - 5 cm Rp 165,200.00

9 Batu Pecah 5 - 7 cm Rp 150,200.00

10 Batu Kacang/Jagung 0,5 - 1 cm Rp 202,700.00

11 Batu Splyt Rp 212,700.00

12 Batu Bata Biasa 5x10x20 cm Rp 380.00 Bh

13 Batu Bata Mesin 5x10x20 cm Rp 550.00 Bh

14 Batu Bataco 6x12x24 cm Rp 3,360.00 Bh

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

Page 4: RABTIPE10x20

Bahan dan UpahPage 4 of 45

15 Batu Krawang 10x10x20 cm Rp 2,480.00 Bh

16 Batu Krawang 10x15x15 cm Rp 2,750.00 Bh

17 Batu Krawang 10x20x20 cm Rp 3,030.00 Bh

18 Concrete Block (CB) 10 Rp 675.00 Bh

19 Concrete Block (CB) 15 Rp 1,450.00 Bh

20 Concrete Block (CB) 20 Rp 2,650.00 Bh

21 Bondbeam 40x20x20 cm Rp 26,330.00 Bh

22 Con Block Warna Type Hollan tbl 6 cm Rp 1,570.00 Bh

23 Con Block Warna Type Uni Pave tbl 6 cm Rp 1,460.00 Bh

24 Con Block Warna Type Dosex Six tbl 6 cm Rp 1,680.00 Bh

25 Con Block Warna Type Hexagon tbl 6 cm Rp 1,600.00 Bh

26 Con Block K 125 Rp 1,610.00 Bh

27 Con Block K 175 Rp 2,630.00 Bh

D. KAYU/LANGIT-LANGIT

1 Balok Kayu Jati Rp 21,750,000.00

2 Papan Kayu Jati Rp 21,913,130.00

3 Balok Kayu Damar Laut Rp 8,750,000.00

4 Papan Kayu Damar Laut Rp 9,050,000.00

5 Balok Kayu Meranti Batu Rp 8,250,000.00

6 Papan Kayu Meranti Batu Rp 8,550,000.00

7 Balok Kayu Kapur Rp 5,900,000.00

8 Papan Kayu Kapur Rp 6,200,000.00

9 Balok Kayu Meranti Kls. II Rp 4,950,000.00

10 Papan Kayu Meranti Kls. II Rp 5,200,000.00

11 Kayu Sembarang/Bekisting Rp 2,825,000.00

12 Kayu Bakar Rp 174,900.00

13 Papan Lambsering/Rider Rp 205,200.00

14 Kayu Lat Asbes 5x30x400 mm Rp 6,750.00 Btg

15 Kayu Kaso 5 - 7/400 cm Rp 83,160.00 Btg

16 Rp 17,500.00 Btg

17 Rp 12,500.00 Btg

18 Bilik Bambu Rp 14,850.00

19 Kayu Profil 1" Rp 5,700.00 M'

20 Kayu Profil 2" Rp 11,400.00 M'

21 Kayu Profil 3" Rp 17,100.00 M'

22 Kayu Profil 4" Rp 22,800.00 M'

23 Profil Gypsum 2" Rp 4,180.00 M'

24 Profil Gypsum 3" Rp 4,950.00 M'

25 Profil Gypsum 4" Rp 6,050.00 M'

26 Profil Gypsum 6" Rp 7,150.00 M'

27 Playwood 120x240 tbl. 18 mm Rp 223,020.00 Lbr

28 Playwood 120x240 tbl. 12 mm Rp 148,680.00 Lbr

29 Playwood 120x240 tbl. 9 mm Rp 111,510.00 Lbr

30 Playwood 120x240 tbl. 6 mm Rp 74,340.00 Lbr

31 Playwood 120x240 tbl. 4 mm Rp 49,560.00 Lbr

32 Teakwood 120x240 tbl. 3 mm Rp 51,980.00 Lbr

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M2

Kayu Dolken/Kayu Laut Æ 7,5 - 10/400 cm

Bambu Æ 6 - 8/600 cm

M2

Page 5: RABTIPE10x20

Bahan dan UpahPage 5 of 45

33 Triplek Jati 120x240 tbl. 3 mm Rp 81,380.00 Lbr

34 Triplek Sungkai 120x240 tbl. 3 mm Rp 76,130.00 Lbr

35 Formica 120x240 cm Rp 70,880.00 Lbr

36 Soft Board 120x240 tbl. 4 mm Rp 53,450.00 Lbr

37 Soft Board 120x240 tbl. 6 mm Rp 80,330.00 Lbr

38 Soft Board 120x240 tbl. 9 mm Rp 120,490.00 Lbr

39 Soft Board 120x240 tbl. 12 mm Rp 160,600.00 Lbr

40 Gypsum 120x240 tbl. 6 mm Rp 57,230.00 Lbr

41 Gypsum 120x240 tbl. 9 mm Rp 68,250.00 Lbr

42 Gypsum 120x240 tbl. 12 mm Rp 89,250.00 Lbr

43 Asbes Lokal 100x100 cm Rp 7,880.00 Lbr

44 Asbes Atrisco 100x100 cm t=4 mm Rp 11,030.00 Lbr

45 Asbes Atrisco 100x100 cm t=5 mm Rp 13,790.00 Lbr

46 Asbes Atrisco 100x100 cm t=6 mm Rp 16,550.00 Lbr

47 Akustik 30x30 cm Rp 7,760.00 Lbr

48 Akustik 30x60 cm Rp 15,520.00 Lbr

49 Akustik 30x120 cm Rp 62,080.00 Lbr

E. BESI/ALLUMINIUM

1 Besi Beton Polos Rp 11,850.00 Kg

2 Besi Beton Ulir Rp 11,940.00 Kg

3 Besi Profil WF/INP Rp 13,170.00 Kg

4 Besi Siku Rp 6,740.00 Kg

5 Besi CNP Rp 11,220.00 Kg

6 Besi Plat Strip Rp 7,320.00 Kg

7 Besi Plat Polos Rp 12,390.00 Kg

8 Kawat Besi Beton Rp 13,750.00 Kg

9 Kawat Licin/Seng Polos Rp 20,480.00 Kg

10 Kawat Duri Rp 3,660.00 M'

11 Kawat Nyamuk Rp 10,890.00

12 Kawat Kasa Rp 12,650.00

13 Kawat Harmonika # 1" Rp 21,450.00

14 Kawat Burung Rp 11,550.00

15 Pagar Kawat BRC 120 Polos Rp 214,500.00 Lbr

16 Pintu Besi Rp 742,500.00

17 Pintu Gulung Besi Rp 753,500.00

18 Pintu Lipat Besi Rp 761,200.00

19 Pintu Rolling Door Rp 423,500.00

20 Jerajak Besi Bermotif Rp 315,700.00

21 Jerajak Besi Strip Rp 283,800.00

22 Rangka Baja Ringan Rp 161,700.00

23 Kosen Pintu Alluminium (80x210) Coklat Rp 368,500.00 Bh

24 Kosen Pintu Alluminium (80x210) Putih Rp 337,700.00 Bh

25 Kosen Jendela Alluminium (120x60) Coklat Rp 261,250.00 Bh

26 Kosen Jendela Alluminium (120x60) Putih Rp 225,500.00 Bh

27 Pintu Alluminium (80x210) Coklat Rp 646,800.00 Bh

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

Page 6: RABTIPE10x20

Bahan dan UpahPage 6 of 45

28 Pintu Alluminium (80x210) Putih Rp 554,400.00 Bh

29 Jendela Alluminium + Kaca 5 mm (120x60) Coklat Rp 277,200.00 Bh

30 Jendela Alluminium + Kaca 5 mm (120x60) Putih Rp 237,600.00 Bh

31 Kosen Pintu/Jendela Alluminium Coklat Rp 71,500.00 M'

32 Kosen Pintu/Jendela Alluminium Putih Rp 60,500.00 M'

33 Daun Jendela Alluminium Coklat Rp 49,500.00 M'

34 Daun Jendela Alluminium Putih Rp 44,000.00 M'

35 Profil Alluminium T Rp 7,700.00 M'

36 Vention Blinds Rp 148,500.00

37 Vertical Blinds Rp 159,500.00

38 Bingkai Naco Niki Hitam Rp 183,330.00

39 Bingkai Naco Niki Putih Rp 152,780.00

40 Paku Beton 0,5" - 2" Rp 280.00 Bh

41 Paku Beton 2" - 5" Rp 480.00 Bh

42 Paku Biasa 0,5" - 2" Rp 15,400.00 Kg

43 Paku Biasa 2" - 5" Rp 13,200.00 Kg

44 Sekrup Macam Ukuran Rp 19,250.00 Kg

45 Sekrup 0,5" - 2" Rp 385.00 Bh

46 Sekrup Fisher Rp 325.00 Bh

47 Rp 18,150.00 Bh

48 Rp 41,250.00 Bh

49 Bout Ramset/Dina Bolt Rp 650.00 Bh

F. PENUTUP LANTAI DAN DINDING

1 Ubin Granito 30x30 cm Rp 23,870.00 Bh

2 Ubin Granito 40x40 cm Rp 42,350.00 Bh

3 Ubin Granito 60x60 cm Rp 95,150.00 Bh

4 Ubin Mosaik 30x30 cm Rp 12,650.00 Bh

5 Ubin Marmer Ex. Dn Rp 238,150.00

6 Ubin Teralux Marmer 30x30 cm Rp 24,750.00 Bh

7 Ubin Teralux Marmer 40x40 cm Rp 44,000.00 Bh

8 Ubin Teralux Marmer 60x60 cm Rp 99,550.00 Bh

9 Ubin Keramik 10x20 cm Rp 1,100.00 Bh

10 Ubin Keramik 15x15 cm Rp 1,270.00 Bh

11 Ubin Keramik 20x20 cm Rp 2,260.00 Bh

12 Ubin Keramik 20x25 cm Rp 2,860.00 Bh

13 Ubin Keramik 25x25 cm Rp 3,520.00 Bh

14 Ubin Keramik 30x30 cm Rp 5,060.00 Bh

15 Ubin Keramik 30x30 cm anti slip Rp 5,720.00 Bh

16 Ubin Keramik 40x40 cm Rp 8,800.00 Bh

17 Ubin Keramik Artistik 5x20 cm Rp 830.00 Bh

18 Ubin Keramik Artistik 10x10 cm Rp 830.00 Bh

19 Ubin Keramik Artistik 10x20 cm Rp 1,650.00 Bh

20 Ubin Keramik Essenza 30x30 cm Rp 19,250.00 Bh

21 Ubin Keramik Essenza 40x40 cm Rp 34,210.00 Bh

22 Porselen 11x11 cm Putih Rp 1,100.00 Bh

M2

M2

M2

M2

Bout Æ 5/8" - 8"

Bout Angker Æ 3/4" - 10"

M2

Page 7: RABTIPE10x20

Bahan dan UpahPage 7 of 45

23 Porselen 11x11 cm Warna Rp 1,320.00 Bh

24 Porselen 15x15 cm Putih Rp 2,090.00 Bh

25 Porselen 15x15 cm Warna Rp 2,310.00 Bh

26 Plint Ubin Teralux Marmer 10x30 cm Rp 14,850.00 Bh

27 Plint Ubin Teralux Marmer 10x40 cm Rp 26,400.00 Bh

28 Plint Ubin Teralux Marmer 10x60 cm Rp 59,730.00 Bh

29 Plint Ubin Granito 10x30 cm Rp 25,410.00 Bh

30 Plint Ubin Granito 10x40 cm Rp 57,090.00 Bh

31 Plint Ubin Granito 10x60 cm Rp 142,890.00 Bh

32 Plint Ubin Keramik 10x30 cm Rp 3,740.00 Bh

33 Plint Ubin Keramik 10x40 cm Rp 5,170.00 Bh

34 Plint Ubin Keramik 10x60 cm Rp 7,370.00 Bh

35 Plint Ubin Keramik 15x30 cm Rp 5,280.00 Bh

36 Plint Ubin Keramik 15x40 cm Rp 7,040.00 Bh

37 Plint Ubin Keramik 15x60 cm Rp 10,560.00 Bh

38 Batu Lapis Dinding 7x3x24 Rp 1,850.00 Bh

39 Batu Tempel Hitam Rp 95,000.00

40 Batu Poros Rp 104,250.00

41 Carpet Rp 82,500.00

42 Carpet 80% Wool, 20% Nylon Rp 79,500.00

43 Feltex Carpet 100% Wool-T-21 Rp 77,500.00

44 Underlyer tebal 6 mm/Rubber Corrugated Rp 95,000.00

45 Vynil Asbes 30x30 cm Rp 7,480.00 Bh

46 Vynil Karet 30x30 cm KL I Rp 8,910.00 Bh

47 Vynil Karet 30x30 cm KL II Rp 8,250.00 Bh

48 Vynil Motif Kembang Ex. Dn 30x30 cm Rp 8,580.00 Bh

49 Vynil Wall Covering lebar 50 cm Rp 57,500.00

50 Perquet Jati Rp 335,000.00

51 Gymfloor Rp 72,500.00

52 Paku Pancing 60 - 230 Rp 650.00 Bh

53 Sekrup 3,5" Rp 370.00 Bh

54 Sekrup 3,5" Rp 18,500.00 Kg

G. PENUTUP ATAP

1 Atap Genteng Palentong Rp 1,520.00 Bh

2 Atap Genteng Palentong Super Rp 3,620.00 Bh

3 Atap Genteng Kodok Rp 1,970.00 Bh

4 Atap Genteng Beton Rp 5,430.00 Bh

5 Atap Genteng Keramik Rp 10,350.00 Bh

6 Atap Genteng Aspal Rp 10,290.00 Lbr

7 Atap GentengMetal/Multi Roof 35 Rp 58,300.00

8 Atap Genteng Asbes Cement 0,35 Rp 60,720.00 Lbr

9 Atap Sirap Rp 940.00 Bh

10 Atap Alluminium Gelombang tebal 0,55 Rp 89,250.00 Lbr

11 Atap Seng Gelombang 3'x6' BJLS 35 Rp 54,220.00 Lbr

12 Atap Seng super Deck 3'x6' tebal 0,30 Rp 66,000.00 Lbr

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

Page 8: RABTIPE10x20

Bahan dan UpahPage 8 of 45

13 Roof Light Fibreglass Gelombang 180x90 cm Rp 41,170.00 Lbr

14 Atap Asbes Gelombang 1,8x1,05 tbl. 4 mm Rp 51,980.00 Lbr

15 Atap Asbes Gelombang 2,1x1,05 tbl. 4 mm Rp 81,530.00 Lbr

16 Atap Asbes Gelombang 2,4x1,05 tbl. 4 mm Rp 94,500.00 Lbr

17 Atap Asbes Gelombang 2,7x1,05 tbl. 4 mm Rp 99,000.00 Lbr

18 Atap Asbes Gelombang 1,8x0,92 tbl. 5 mm Rp 60,860.00 Lbr

19 Atap Asbes Gelombang 2,1x0,92 tbl. 5 mm Rp 76,090.00 Lbr

20 Atap Asbes Gelombang 2,4x0,92 tbl. 5 mm Rp 83,000.00 Lbr

21 Atap Asbes Gelombang 2,7x0,92 tbl. 5 mm Rp 91,300.00 Lbr

22 Atap Asbes Gelombang 1,8x1,08 tbl. 6 mm Rp 87,420.00 Lbr

23 Atap Asbes Gelombang 2,1x1,08 tbl. 6 mm Rp 101,700.00 Lbr

24 Atap Asbes Gelombang 2,4x1,08 tbl. 6 mm Rp 108,330.00 Lbr

25 Atap Asbes Gelombang 2,7x1,08 tbl. 6 mm Rp 131,130.00 Lbr

26 Genteng Bubung Palentong Rp 8,500.00 Bh

27 Genteng Bubung Palentong super Rp 11,580.00 Bh

28 Genteng Bubung Kodok Rp 8,690.00 Bh

29 Nok Genteng Beton Rp 12,220.00 Bh

30 Nok Genteng Keramik Rp 13,670.00 Bh

31 Nok Genteng Aspal Rp 26,680.00 Bh

32 Nok Genteng Metal/Multu Roof (Decra Bond) Rp 37,400.00 Bh

33 Nok Genteng Asbes Gelombang Cement 0,35 Rp 30,700.00 Lbr

34 Nok Alluminium Standard 40 cm 18swg 22 Rp 43,540.00

35 Bubung/Nok Stel Gelombang 0,92 m' tbl. 5 mm Rp 17,810.00 Lbr

36 Bubung/Nok Stel Gelombang 1,05 m' tbl. 4 mm Rp 23,630.00 Lbr

37 Bubung/Nok Stel Gelombang 1,08 m' tbl. 6 mm Rp 25,920.00 Lbr

38 Bubung/Nok Paten 0,92 m' tbl. 5 mm Rp 33,460.00 Lbr

39 Bubung/Nok Paten 1,05 m' tbl. 4 mm Rp 28,140.00 Lbr

40 Bubung/Nok Paten 1,08 m' tbl. 6 mm Rp 39,050.00 Lbr

41 Bubung/Nok Stel Rata 0,92 m' tbl. 5 mm Rp 32,800.00 Lbr

42 Bubung/Nok Stel Rata 1,05 m' tbl. 4 mm Rp 27,500.00 Lbr

43 Bubung/Nok Stel Rata 1,08 m' tbl. 6 mm Rp 36,910.00 Lbr

44 Seng Plat 3'x6' BJLS 35 Rp 105,000.00 Lbr

45 Seng Plat 3'x6' BJLS 30 Rp 94,500.00 Lbr

46 Plastic Aerator Rp 25,000.00 Bh

47 Sisalation/Alluminium Foil Rp 70,180.00

48 Paku Seng + ring Karet Rp 18,500.00 Kg

49 Paku Seng + ring Karet Rp 370.00 Bh

50 Paku Hak panjang 15 cm Rp 27,750.00 Kg

H. KUNCI DAN KACA

1 Kunci Tanam Antik Rp 203,500.00 Bh

2 Kunci Tanam Biasa Rp 81,840.00 Bh

3 Kunci Tanam Kamar Mandi Rp 49,720.00 Bh

4 Kunci Silinder Rp 31,350.00 Bh

5 Kunci Selot Rp 24,750.00 Bh

6 Kunci Lemari Rp 11,220.00 Bh

M2

M2

Page 9: RABTIPE10x20

Bahan dan UpahPage 9 of 45

7 Engsel Pintu 4" Rp 13,750.00 Bh

8 Engsel Jendela 3" Rp 10,230.00 Bh

9 Engsel Angin Rp 22,770.00 Bh

10 Kait Angin Rp 17,380.00 Bh

11 Rel Pintu Dorong Rp 145,750.00 Bh

12 Sealent Rp 35,750.00 Kg

13 Spring Knip Rp 8,250.00 Bh

14 Door Closer Rp 99,770.00 Bh

15 Door Handle Rp 102,740.00 Bh

16 Door Stop Rp 34,650.00 Bh

17 Espanyolet Rp 80,410.00 Bh

18 Kaca Block 20x20 cm Rp 23,650.00 Bh

19 Kaca Polos tbl. 3 mm Rp 79,200.00

20 Kaca Polos tbl. 5 mm Rp 132,000.00

21 Kaca Polos tbl. 8 mm Rp 211,200.00

22 Kaca Reyben tbl. 5 mm Rp 175,560.00

23 Kaca Reyben tbl. 8 mm Rp 280,896.00

24 Kaca Buram tbl. 3 mm Rp 66,000.00

25 Kaca Buram tbl. 5 mm Rp 101,200.00

26 Kaca Buram tbl. 8 mm Rp 176,000.00

27 Kaca Cermin tbl. 5 mm Rp 147,000.00

28 Kaca Cermin tbl. 6 mm Rp 176,400.00

29 Kaca Cermin tbl. 8 mm Rp 235,200.00

30 Kaca Patri Rp 154,000.00

31 Kaca Wireglass Rp 137,500.00

32 Kaca Reyben Naco 30x60 cm tbl. 5 mm Rp 12,350.00 Lbr

33 Kaca Bening Naco 30x60 cm tbl. 5 mm Rp 9,750.00 Lbr

I. CAT/MINYAK

1 Cat Dasar Rp 14,300.00 Kg

2 Cat Tembok setara Vinilex Rp 17,600.00 Kg

3 Cat Minyak untuk Kayu Rp 32,450.00 Kg

4 Cat Minyak untuk Besi Rp 35,750.00 Kg

5 Cat Menie Kayu Rp 18,700.00 Kg

6 Cat Menie Besi Rp 23,100.00 Kg

7 Cat Sending Rp 49,500.00 Kg

8 Cat Melamix Rp 53,900.00 Kg

9 Cat Vernis Jadi Rp 43,890.00 Kg

10 Plamir Rp 14,300.00 Kg

11 Dempul Gypsum Rp 9,460.00 Kg

12 Dempul Cat Rp 10,780.00 Kg

13 Minyak Cat Rp 10,010.00 Kg

14 Minyak Bekisting Rp 5,720.00 Ltr

15 Residu/Kolter Rp 5,940.00 Ltr

16 Soda Api Rp 11,000.00 Kg

17 Sabun Rp 9,350.00 Kg

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

Page 10: RABTIPE10x20

Bahan dan UpahPage 10 of 45

18 Kuas Rp 7,150.00 Bh

19 Ampelas/Kertas Pasir Rp 1,650.00 Lbr

20 Wallpaper Rp 27,830.00

J. SANITASI/PIPA

1 Kloset Duduk/Monoblok Lengkap Tangki Rp 1,756,700.00 Bh

2 Kloset Duduk/Monoblok Tangki Rp 1,265,000.00 Bh

3 Kloset Jongkok Porselen Rp 204,820.00 Bh

4 Bakkif Porselen Rp 2,750,000.00 Bh

5 Wastafel Rp 478,500.00 Bh

6 Urinoir Rp 506,880.00 Bh

7 Rp 24,860.00 Bh

8 Rp 70,180.00 Bh

9 Kran shower Rp 84,150.00 Bh

10 Kran Cebok Rp 65,670.00 Bh

11 Rp 165,000.00 Bh

12 Rp 475,200.00 Bh

13 Bak Cuci Piring Stainless 2 Lobang Rp 424,270.00 Bh

14 Bak Cuci Piring Teraso 2 Lobang Rp 247,500.00 Bh

15 Tempat Sabun Keramik Rp 51,150.00 Bh

16 Rp 15,000.00 Bh

17 Rp 27,500.00 Bh

18 Rp 12,500.00 Bh

19 Instalasi Air Bersih Rp 100,000.00 Ttk

20 Instalasi Air kotor/Limbah Rp 125,000.00 Ttk

21 Rp 10,230.00 M'

22 Rp 16,170.00 M'

23 Rp 18,260.00 M'

24 Rp 17,490.00 M'

25 Rp 24,860.00 M'

26 Rp 51,150.00 M'

27 Rp 57,640.00 M'

28 Rp 87,230.00 M'

29 Rp 123,640.00 M'

30 Rp 182,820.00 M'

31 Rp 314,380.00 M'

32 Rp 30,250.00 Btg

33 Rp 40,540.00 Btg

34 Rp 67,500.00 Btg

35 Rp 97,500.00 Btg

36 Rp 115,000.00 Btg

37 Rp 132,000.00 Btg

38 Rp 162,800.00 Btg

39 Rp 272,500.00 Btg

40 Rp 80,580.00 Btg

41 Rp 109,840.00 Btg

M2

Kran Air Æ ½" - ¾"

Kran Air Leher Angsa Æ ½"

Bak Fibreglass 0,3 M3

Bak Fibreglass 1 M3

Floor Drain Æ 4" Stainless

Stop Kran Æ ¾"

Tutup Bak Air Æ 1" Kuningan

Buis Beton ½ Æ 15 cm

Buis Beton ½ Æ 20 cm

Buis Beton ½ Æ 30 cm

Buis Beton Æ 15 cm

Buis Beton Æ 20 cm

Buis Beton Æ 30 cm

Buis Beton Æ 40 cm

Buis Beton Æ 50 cm

Buis Beton Æ 60 cm

Buis Beton Æ 80 cm

Buis Beton Æ 100 cm

Pipa PVC Tipe AW Æ ½"

Pipa PVC Tipe AW Æ ¾"

Pipa PVC Tipe AW Æ 1"

Pipa PVC Tipe AW Æ 1 ½"

Pipa PVC Tipe AW Æ 2"

Pipa PVC Tipe AW Æ 2 ½"

Pipa PVC Tipe AW Æ 3"

Pipa PVC Tipe AW Æ 4"

Pipa Besi Hitam Æ ½"

Pipa Besi Hitam Æ ¾"

Page 11: RABTIPE10x20

Bahan dan UpahPage 11 of 45

42 Rp 161,040.00 Btg

43 Rp 204,930.00 Btg

44 Rp 259,600.00 Btg

45 Rp 274,000.00 Btg

46 Rp 80,580.00 Btg

47 Rp 109,840.00 Btg

48 Rp 161,040.00 Btg

49 Rp 183,040.00 Btg

50 Rp 204,930.00 Btg

51 Rp 259,600.00 Btg

52 Rp 286,000.00 Btg

53

54 Knee AW 1" Rp 4,750.00 Bh

55 Tee AW 1" Rp 6,500.00 Bh

56 Socht AW 1" Rp 4,250.00 Bh

57 F-Knee 1" Rp 7,250.00 Bh

58 F-Tee 1" Rp 11,500.00 Bh

59 Bocht LL-D 1" Rp 22,500.00 Bh

60 Union Socht 1" Rp 67,500.00 Bh

61 D-Nipple 1" Rp 16,500.00 Bh

62 Water Moer 1" Rp 29,500.00 Bh

K. LISTRIK/ACCESORIES

1 Lampu TL 1x20 W Lengkap Kotak Rp 49,500.00 Set

2 Lampu TL 1x40 W Lengkap Kotak Rp 55,000.00 Set

3 Lampu TL 2x20 W Lengkap Kotak Rp 148,500.00 Set

4 Lampu TL 2x40 W Lengkap Kotak Rp 167,200.00 Set

5 Lampu TL Bambu 1x20 W Lengkap Rp 99,000.00 Set

6 Lampu TL Bambu 1x40 W Lengkap Rp 112,200.00 Set

7 Lampu XL 5 W + Fitting Rp 23,100.00 Set

8 Lampu XL 8 W + Fitting Rp 24,750.00 Set

9 Lampu XL 10 W + Fitting Rp 26,400.00 Set

10 Lampu XL 14 W + Fitting Rp 30,250.00 Set

11 Lampu XL 18 W + Fitting Rp 30,800.00 Set

12 Lampu XL 24 W + Fitting Rp 35,200.00 Set

13 Lampu Down Light 5 W Lengkap Rp 49,500.00 Set

14 Lampu Pijar 5 W + Fitting Rp 3,960.00 Set

15 Lampu Pijar 10 W + Fitting Rp 4,070.00 Set

16 Lampu Pijar 15 W + Fitting Rp 4,180.00 Set

17 Lampu Pijar 20 W + Fitting Rp 4,290.00 Set

18 Lampu Pijar 25 W + Fitting Rp 4,400.00 Set

19 Lampu Pijar 40 W + Fitting Rp 4,510.00 Set

20 Stop Kontak Tanam Rp 9,350.00 Bh

21 Saklar Tunggal Rp 13,200.00 Bh

22 Saklar Ganda Rp 14,300.00 Bh

23 Saklar Triple Rp 16,500.00 Bh

Pipa Besi Hitam Æ 1"

Pipa Besi Hitam Æ 1 ½"

Pipa Besi Hitam Æ 2"

Pipa Besi Hitam Æ 2 ½"

Pipa Galvanis Æ ½"

Pipa Galvanis Æ ¾"

Pipa Galvanis Æ 1"

Pipa Galvanis Æ 1 ¼"

Pipa Galvanis Æ 1 ½"

Pipa Galvanis Æ 2"

Pipa Galvanis Æ 2 ½"

Fitting Pipa AW Æ 1"

Page 12: RABTIPE10x20

Bahan dan UpahPage 12 of 45

24 Zekring Box 1 Grup Rp 22,000.00 Unit

25 Zekring Box 2 Grup Rp 27,500.00 Unit

26 Zekring Box 3 Grup Rp 33,000.00 Unit

27 Zekring Box 4 Grup Rp 38,500.00 Unit

28 MCB 2 Ampere Rp 30,250.00 Unit

29 MCB 4 Ampere Rp 38,500.00 Unit

30 MCB 6 Ampere Rp 61,600.00 Unit

31 MCB 8 Ampere Rp 90,200.00 Unit

32 Rp 940.00 M'

33 Rp 1,650.00 M'

34 Rp 7,260.00 M'

35 Rp 3,630.00 M'

36 Rp 9,080.00 M'

37 Rp 14,520.00 M'

38 Instalasi Listrik Titik Api/Lampu Nyala Rp 85,000.00 Ttk

Kabel Listrik NYA Æ 1,5 mm

Kabel Listrik NYA Æ 2,5 mm

Kabel Listrik NYA Æ 4 mm

Kabel Listrik NYM 2 Æ 1,5 mm

Kabel Listrik NYM 2 Æ 2,5 mm

Kabel Listrik NYM 2 Æ 4 mm

Page 13: RABTIPE10x20

Analisa Pekerjaan Page 13 of 45

ANALISA ANGGARAN BIAYA BANGUNAN

ID VOLUME SAT. URAIAN

PEKERJAAN TANAH

An. A.1 1 m3 Galian Tanah Biasa Manual < 1500mm -

0.65 org Pekerja @ Rp. 35,000 ### org Mandor @ Rp. 40,000

Jumlah Upah x 3/4

An. A.3 1 m3 Menimbun dan Memadatkan < 1500mm -

0.1625 org Pekerja @ Rp. 35,000 ### org Mandor @ Rp. 40,000

An. A.18a 1 m3 Timbunan Pasir Urug Rp. 60,000

1.2 m3 Pasir urug @ Rp. 50,000 = Rp. 60,000 0.21125 org Pekerja @ Rp. 35,000

### org Mandor @ Rp. 40,000 Jumlah

Upah x 1

An. A.18b 1 m3 Timbunan Tanah Rp. 38,500

1.1 m3 Tanah urug @ Rp. 35,000 = Rp. 38,500 0.21125 org Pekerja @ Rp. 35,000

### org Mandor @ Rp. 40,000

An. G.31.m 1 M3 Pasangan Batu Kali 1:3 Rp. 319,550

1.2 M3 Batu Kali @ Rp. 120,000 = Rp. 144,000 4.0321 Zak Semen PC @ 40 Kg @ Rp. 38,850 = Rp. 156,647 0.378 M3 Pasir Pasang @ Rp. 50,000 = Rp. 18,900

4 Org Pekerja @ Rp. 35,000 0.2 Org Mandor @ Rp. 40,000

2 Org Tukang Batu @ Rp. 50,000 0.2 Org Kepala Tukang @ Rp. 60,000

Jumlah Upah x 2/5

An. F.0 1 m' Pekerjaan Bowplank Rp. 11,330

0.0045 m3 Kayu sembarang @ Rp. 2,500,000 = Rp. 11,250 ### kg Paku kayu @ Rp. 11,500 = Rp. 77

0.004 org Kepala tukang @ Rp. 60,000 0.04 org Tukang Batu @ Rp. 50,000

0.014 org Pekerja @ Rp. 35,000 0.0007 org Mandor @ Rp. 40,000

Jumlah Upah x 2/5

An. G.32.g 1 M3 Pasangan Batu Bata 1:3 Rp. 354,810

420 Buah Batu Bata @ Rp. 380 = Rp. 159,600 4.6 Zak Semen PC @ 40 Kg @ Rp. 38,850 = Rp. 178,710

0.33 M3 Pasir Pasang @ Rp. 50,000 = Rp. 16,500 4 Org Pekerja @ Rp. 35,000

0.2 Org Mandor @ Rp. 40,000 1.5 Org Tukang Batu @ Rp. 50,000

0.15 Org Kepala Tukang @ Rp. 60,000 Jumlah

Upah x 7/20

PEKERJAAN PONDASI

PP 6.5. Pasangan pondasi batu kali, 1Pc : 4Ps

HARGA SATUAN (Rp.)

JUMLAH HARGA MATERIAL (Rp.)

1 m3

Page 14: RABTIPE10x20

Analisa Pekerjaan Page 14 of 45

6.5.1. BahanBatu Belah 15/20 cm 1.100 xSemen Portland 163.000 Kg xPasir Pasang 0.520 x

6.5.2. TenagaPekerja 1.500 OH xTukang Batu 0.600 OH xKepala Tukang 0.060 OH xMandor 0.075 OH x

PEKERJAAN BETON

An. I.2 110 Kg Mengerjakan (memotong/memasang) besi beton bertulang

110 Kg Besi Beton @ Rp. 17,500 = Rp. 1,925,000 1.5 Kg Kawat Beton @ Rp. 9,000 = Rp. 13,500

9 Org Pekerja @ Rp. 35,000 9 Org Tukang @ Rp. 40,000 3 Org Kepala Tukang @ Rp. 50,000

Jumlah Upah x 1/8

Untuk 1 Kg pembesian Rp. 17,620

Sup. G.42 1 M3 Pekerjaan betonan K175 Rp. 269,080

1 M3 An. G.44 = Rp. 243,720 20 M2 An.F.8c = Rp. 7,740

124 Kg An.I.2 = Rp. 17,620

An. G.44 1 M3 Beton Cor 1:3:6 Rp. 243,720

4.24 Zak Semen PC @ 40 Kg @ Rp. 38,850 = Rp. 164,724 0.34 M3 Pasir Pasang @ Rp. 50,000 = Rp. 17,000 0.62 M3 Batu Kerikil @ Rp. 100,000 = Rp. 62,000

6 Org Pekerja @ Rp. 35,000 0.3 Org Mandor @ Rp. 40,000

1 Org Tukang @ Rp. 50,000 0.1 Org Kepala Tukang @ Rp. 60,000

Jumlah Upah x 4/9

An. F.8a 1 M2 Mengerjakan Cetakan Beton Rp. 52,300

0.04 M3 Kayu Kelas Kuat IV (Sembarang) @ Rp. 2,500,000 = Rp. 100,000 0.4 Kg Paku @ Rp. 11,500 = Rp. 4,600 0.2 Org Pekerja @ Rp. 35,000

0.01 Org Mandor @ Rp. 40,000 0.5 Org Tukang @ Rp. 50,000

0.05 Org Kepala Tukang @ Rp. 60,000 Jumlah = Rp. 104,600

Bahan x 1/2 = Rp. 52,300

Upah x 5/8

An. F.8c 1 M2 Mengerjakan bekisting sloof, kolom dan balok praktis Rp. 7,740

0.0123 M3 Kayu Kelas Kuat IV (Sembarang) @ Rp. 2,500,000 = Rp. 30,750 0.01845 Kg Paku @ Rp. 11,500 = Rp. 212

1.25 Jam Memasang dan menyetel 0.75 Jam Membongkar dan reparasi

0.285714285714286 Org Pekerja @ Rp. 35,000 ### Org Mandor @ Rp. 40,000

0.142857142857143 Org Tukang @ Rp. 50,000 ### Org Kepala Tukang @ Rp. 60,000

Jumlah = Rp. 30,962 Bahan x 1/4 = Rp. 7,740

Upah x 2/5

An. F.8e 1 M2 Mengerjakan bekisting lantai/duck beton Rp. 36,780

M3

M3

Page 15: RABTIPE10x20

Analisa Pekerjaan Page 15 of 45

### M3 Kayu Kelas Kuat IV (Sembarang) @ Rp. 2,500,000 = Rp. 88,889 0.355555555555556 Kg Paku @ Rp. 11,500 = Rp. 4,089 0.385868935185185 lbr Triplex 4mm @ Rp. 45,000 = Rp. 17,364

2 Jam Memasang dan menyetel 1 Jam Membongkar dan reparasi

0.428571428571429 Org Pekerja @ Rp. 35,000 ### Org Mandor @ Rp. 40,000

0.214285714285714 Org Tukang @ Rp. 50,000 ### Org Kepala Tukang @ Rp. 60,000

Jumlah = Rp. 110,342 Bahan x 1/3 = Rp. 36,780

Sup. G.43a 1 M3 Pekerjaan beton bertulang sloof & kolom/balok praktis K175 Rp. 2,263,960

1 M3 An. G.43 = Rp. 243,720 10 M2 An.F.8c = Rp. 82,040

110 Kg An.I.2 = Rp. 1,938,200

Sup. G.43b 1 M3 Pekerjaan beton bertulang pondasi & kolom K175 Rp. 2,409,340

1 M3 An. G.43 = Rp. 243,720 18 M2 An.F.8c = Rp. 139,320

115 Kg An.I.2 = Rp. 2,026,300

Sup. G.43c 1 M3 Pekerjaan beton bertulang balok & plat K175 Rp. 2,627,200

1 M3 An. G.43 = Rp. 243,720 12 M2 An.F.8c = Rp. 92,880

130 Kg An.I.2 = Rp. 2,290,600

PB 6.46. Membuat ring balok beton bertulang (10x15) cm6.46.1. Bahan

Kayu Sembarang, papan 0.003 xPaku Biasa 2" - 5" 0.020 Kg xBesi Beton Polos 3.600 Kg xKawat Beton 0.050 Kg xSemen Portland 5.500 Kg xPasir Beton 0.009 xKoral Beton 1/ 2 0.015 x

6.46.2. TenagaPekerja 0.100 OH xTukang Batu 0.033 OH xTukang Kayu 0.033 OH xTukang Besi 0.033 OH xKepala Tukang 0.010 OH xMandor 0.005 OH x

PEKERJAAN DINDING DAN LANTAI

An. G.32.l 1 M2 Pasangan 1/2 Batu Bata 1:5 Rp. 35,640

60 Buah Batu Bata @ Rp. 380 = Rp. 22,800 0.26 Zak Semen PC @ 40 Kg @ Rp. 38,850 = Rp. 10,101

0.05472 M3 Pasir Pasang @ Rp. 50,000 = Rp. 2,736 0.54 Org Pekerja @ Rp. 35,000

0.027 Org Mandor @ Rp. 40,000 0.18 Org Tukang Batu @ Rp. 50,000

0.018 Org Kepala Tukang @ Rp. 60,000 Jumlah

Upah x 1/3

An. G.32.k 1 M2 Pasangan 1/2 Batu Bata 1:3 Rp. 42,740

60 Buah Batu Bata @ Rp. 380 = Rp. 22,800 0.46 Zak Semen PC @ 40 Kg @ Rp. 38,850 = Rp. 17,871

0.04134 M3 Pasir Pasang @ Rp. 50,000 = Rp. 2,067 0.54 Org Pekerja @ Rp. 35,000

0.027 Org Mandor @ Rp. 40,000 0.18 Org Tukang Batu @ Rp. 50,000

1 m3

M3

M3

M3

Page 16: RABTIPE10x20

Analisa Pekerjaan Page 16 of 45

0.018 Org Kepala Tukang @ Rp. 60,000 Jumlah

Upah x 1/3

An. G.50.l 1 M2 Plasteran 1:3 tebal 15 mm Rp. 8,900

0.204 Zak Semen PC @ 40 Kg @ Rp. 38,850 = Rp. 7,925 0.0194 M3 Pasir Pasang @ Rp. 50,000 = Rp. 970

0.4 Org Pekerja @ Rp. 35,000 0.02 Org Mandor @ Rp. 40,000 0.15 Org Tukang @ Rp. 50,000

0.015 Org Kepala Tukang @ Rp. 60,000 Jumlah

Upah x 1/3

An. G.50.r 1 M2 Plasteran 1:5 tebal 15 mm Rp. 6,550

0.135 Zak Semen PC @ 40 Kg @ Rp. 38,850 = Rp. 5,245 0.026125 M3 Pasir Pasang @ Rp. 50,000 = Rp. 1,306

0.4 Org Pekerja @ Rp. 35,000 0.02 Org Mandor @ Rp. 40,000 0.15 Org Tukang @ Rp. 50,000

0.015 Org Kepala Tukang @ Rp. 60,000 Jumlah

Upah x 1/3

An. G.16 1 M3 Perekat 1:3 Rp. 491,020

11.249 Zak Semen PC @ 40 Kg @ Rp. 38,850 = Rp. 437,024 1.08 M3 Pasir Pasang @ Rp. 50,000 = Rp. 54,000

An. G.72c 1 M2 Ubin Keramik 20 x 20 cm Pas 1:3 Rp. 53,940

1 M2 Keramik 20 x 20 cm @ Rp. 38,850 = Rp. 38,850 0.32 Zak Semen PC @ 40 Kg @ Rp. 38,850 = Rp. 12,432

0.01076 Zak Semen Putih @ Rp. 70,000 = Rp. 753 0.038 M3 Pasir Pasang @ Rp. 50,000 = Rp. 1,900

0.5 Org Pekerja @ Rp. 35,000 0.025 Org Mandor @ Rp. 40,000 0.25 Org Tukang @ Rp. 50,000

0.025 Org Kepala Tukang @ Rp. 60,000 Jumlah

Upah x 1/2

An. G.72d 1 M2 Ubin Keramik 30 x 30 cm Pas 1:4 Rp. 47,760

1 M2 Keramik 30 x 30 cm @ Rp. 35,000 = Rp. 35,000 0.256 Zak Semen PC @ 40 Kg @ Rp. 38,000 = Rp. 9,728

0.0124 Zak Semen Putih @ Rp. 75,000 = Rp. 930 0.042 M3 Pasir Pasang @ Rp. 50,000 = Rp. 2,100

0.5 Org Pekerja @ Rp. 35,000 0.025 Org Mandor @ Rp. 40,000 0.25 Org Tukang @ Rp. 50,000

0.025 Org Kepala Tukang @ Rp. 60,000 Jumlah

Upah x 3/8

An. G. 141 1 M2 Pemasangan Keramik Dinding 20 x 25 cm Pas 1:3 Rp. 39,050

1 M2 Keramik 20 x 25 cm @ Rp. 38,850 = Rp. 38,850 0.02 M3 Perekat 1:3 (G.16) @ Rp. 9,820 = Rp. 196

1 Org Pekerja @ Rp. 35,000 0.05 Org Mandor @ Rp. 40,000 0.5 Org Tukang @ Rp. 50,000

0.05 Org Kepala Tukang @ Rp. 60,000 Jumlah

Upah x 7/25

An. G.68b 1 M' Pasangan Plint Ubin Keramik 10 x 30 cm Pas 1:4 Rp. 11,840

0.25 M2 Keramik 30 x 30 cm @ Rp. 35,700 = Rp. 8,925 0.064 Zak Semen PC @ 40 Kg @ Rp. 38,850 = Rp. 2,486

Page 17: RABTIPE10x20

Analisa Pekerjaan Page 17 of 45

0.0085 M3 Pasir Pasang @ Rp. 50,000 = Rp. 425 0.3 Org Pekerja @ Rp. 35,000

0.015 Org Mandor @ Rp. 40,000 0.15 Org Tukang @ Rp. 50,000

0.015 Org Kepala Tukang @ Rp. 60,000 Jumlah

Upah x 1/2

An. G.70 1 M' Pasangan bon-bon keramik Rp. 8,870

1 m' Bon-bon keramik kecil @ Rp. 8,400 = Rp. 8,400 0.00625 Zak Semen Putih @ Rp. 75,000 = Rp. 469

0.1 Org Tukang @ Rp. 50,000 0.01 Org Kepala Tukang @ Rp. 60,000

Jumlah Upah x 1/2

PEKERJAAN KAYU, ATAP & PLAFOND

An. F.22 1 m3 Pekerjaan Kuda-Kuda Rp. 2,750,000

1.1 m3 Kayu SK @ Rp. 2,500,000 = Rp. 2,750,000 8 org Pekerja @ Rp. 35,000

0.4 org Mandor @ Rp. 40,000 24 org Tukang @ Rp. 50,000 2.4 org Kepala tukang @ Rp. 60,000

Jumlah Upah x 2/5

An. F.21 1 m' Pekerjaan Lesplank 22 cm Rp. 13,590

0.005 m3 Papan sembarang @ Rp. 2,500,000 = Rp. 13,333 0.022 kg Paku @ Rp. 11,500 = Rp. 256 0.062 org Pekerja @ Rp. 35,000 0.003 org Mandor @ Rp. 40,000 0.178 org Tukang @ Rp. 50,000 0.018 org Kepala tukang @ Rp. 60,000

Jumlah Upah x 3/4

An. F.27a 1 m3 Pekerjaan Kozen Tanpa Jalusi/Ventilasi Rp. 2,750,000

1.1 m3 Kayu Damar @ Rp. 2,500,000 = Rp. 2,750,000 12 org Pekerja @ Rp. 35,000 0.6 org Mandor @ Rp. 40,000 36 org Tukang @ Rp. 50,000 3.6 org Kepala tukang @ Rp. 60,000

Jumlah Upah x 2/5

An. F.33a 1 m2 Pekerjaan Daun Pintu Panel Rp. 87,500

0.035 m3 Papan Meranti @ Rp. 2,500,000 = Rp. 87,500 2.5 org Pekerja @ Rp. 35,000

0.125 org Mandor @ Rp. 40,000 7.5 org Tukang @ Rp. 50,000

0.75 org Kepala tukang @ Rp. 60,000 Jumlah

Upah x 1/30

An. F.36 1 m2 Pekerjaan Daun Pintu/Jendela Kaca Rp. 105,080

0.037 m3 Papan Meranti (steam) @ Rp. 2,500,000 = Rp. 92,500 0.8 m2 Kaca 4mm @ Rp. 15,000 = Rp. 12,000

0.05 kg Paku @ Rp. 11,500 = Rp. 575 2 org Pekerja @ Rp. 35,000

0.1 org Mandor @ Rp. 40,000 6 org Tukang @ Rp. 50,000

0.6 org Kepala tukang @ Rp. 60,000 Jumlah

Upah x 1/10

Page 18: RABTIPE10x20

Analisa Pekerjaan Page 18 of 45

An. F.80a2 1 m2 Pekerjaan Plafond Asbes + Rangka Rp. 31,040

Hitungan 15.92 17 lbr Asbes @ Rp. 12,000 = Rp. 204,000 0.090 m3 Kayu SK @ Rp. 2,500,000 = Rp. 225,000

8.358 bt Kayu lat @ Rp. 7,500 = Rp. 62,685 Kayu Profil

0.219 kg Paku @ Rp. 11,500 = Rp. 2,519 0.09 Upah An. F10 @ Rp. 7,090

15.92 Upah An. H.80a @ Rp. 6,430 Jumlah = Rp. 494,204

Untuk 1 m2 = Bahan x 1 = Rp. 31,040

Upah x 1

An. F.19 1 m2 Pekerjaan Rangka Atap Seng Rp. 28,650

0.011 m3 Kayu Meranti @ Rp. 2,500,000 = Rp. 27,500 0.1 kg Paku @ Rp. 11,500 = Rp. 1,150

0.015 org Pekerja @ Rp. 35,000 0.00075 org Mandor @ Rp. 40,000

0.1 org Tukang @ Rp. 50,000 0.01 org Kepala tukang @ Rp. 60,000

Jumlah Upah x 3/4

PPA 6.38. Pasang atap seng gelombang6.38.1. Bahan

Seng Gelombang 3'x6' BJLS 30 0.700 Lbr xPaku Seng 0.040 Kg x

6.38.2. TenagaPekerja 0.120 OH xTukang Kayu 0.060 OH xKepala Tukang 0.006 OH xMandor 0.006 OH x

PPA 6.39. 1 m' Pasang atap nok seng6.39.1. Bahan

Seng Plat 3'x6' BJLS 35 0.300 Lbr xPaku Seng 0.020 Kg x

6.39.2. TenagaPekerja 0.150 OH xTukang Kayu 0.070 OH xKepala Tukang 0.008 OH xMandor 0.006 OH x

PLL 6.20. Langit-langit asbes (1,00x1,00) m rangka kayu meranti6.20.1. Bahan

Kayu Meranti, balok 0.012 xPaku 0.060 Kg xAsbes 1,00x1,00 m 1.100 Lbr x

6.20.2. TenagaPekerja 0.180 OH xTukang Kayu 0.320 OH xKepala Tukang 0.032 OH xMandor 0.009 OH x

PEKERJAAN SANITASI

PS 6.25. Memasang 1 m' pipa PVC tipe AW diameter ½"6.25.1. Bahan

Pipa PVC 1.200 M' xPerlengkapan 35% harga pipa x

6.25.2. TenagaPekerja 0.036 OH x

1 m2

1 m2

M3

Page 19: RABTIPE10x20

Analisa Pekerjaan Page 19 of 45

Tukang Batu 0.060 OH xKepala Tukang 0.006 OH xMandor 0.0018 OH x

PS 6.31. Memasang 1 m' pipa PVC tipe AW diameter 3"6.31.1. Bahan

Pipa PVC 1.200 M' xPerlengkapan 35% harga pipa x

6.31.2. TenagaPekerja 0.081 OH xTukang Batu 0.135 OH xKepala Tukang 0.0135 OH xMandor 0.0041 OH x

PS 6.35. Memasang 1 buah kran diameter ¾" atau ½"6.35.1. Bahan

Kran air 1.000 Bh xSeal Tape 0.025 Kg x

6.35.2. TenagaPekerja 0.010 OH xTukang Batu 0.100 OH xKepala Tukang 0.010 OH xMandor 0.005 OH x

PS 6.36. Memasang 1 buah floor drain6.36.1. Bahan

Floor Drain 1.000 Bh x

6.36.2. TenagaPekerja 0.010 OH xTukang Batu 0.100 OH xKepala Tukang 0.010 OH xMandor 0.005 OH x

PEKERJAAN KUNCI DAN KACA

PKK 6.2. 1 buah Pasang kunci tanam biasa6.2.1. Bahan

Kunci Tanam Biasa 1.000 Bh x

6.2.2. TenagaPekerja 0.010 OH xTukang Kayu 0.500 OH xKepala Tukang 0.010 OH xMandor 0.005 OH x

PKK 6.3. 1 buah Pasang kunci tanam kamar mandi6.3.1. Bahan

Kunci Tanam Kamar Mandi 1.000 Bh x

6.3.2. TenagaPekerja 0.005 OH xTukang Kayu 0.500 OH xKepala Tukang 0.005 OH xMandor 0.0025 OH x

PKK 6.5. 1 buah Pasang engsel pintu6.5.1. Bahan

Engsel Pintu 1.000 Bh x

6.5.2. Tenaga

Page 20: RABTIPE10x20

Analisa Pekerjaan Page 20 of 45

Pekerja 0.015 OH xTukang Kayu 0.150 OH xKepala Tukang 0.015 OH xMandor 0.00075 OH x

PKK 6.9. 1 buah Pasang kait angin6.9.1. Bahan

Kait Angin 1.000 Bh x

6.9.2. TenagaPekerja 0.015 OH xTukang Kayu 0.150 OH xKepala Tukang 0.015 OH xMandor 0.00075 OH x

PKK 6.10. 1 buah Pasang door closer6.10.1. Bahan

Door Closer 1.000 Bh x

6.10.2. TenagaPekerja 0.050 OH xTukang Kayu 0.500 OH xKepala Tukang 0.050 OH xMandor 0.0025 OH x

PKK 6.12. 1 buah Pasang pegangan pintu/door holder6.12.1. Bahan

Pegangan Pintu/Door Holder 1.000 Bh x

6.12.2. TenagaPekerja 0.050 OH xTukang Kayu 0.500 OH xKepala Tukang 0.050 OH xMandor 0.0025 OH x

PKK 6.16. Pasang kaca tebal 3 mm6.16.1. Bahan

Kaca Polos 1.100 x

6.16.2. TenagaPekerja 0.015 OH xTukang Kayu 0.150 OH xKepala Tukang 0.015 OH xMandor 0.00075 OH x

PEKERJAAN ELEKTRIKAL

An. R.21 1 titik Pekerjaan jaringan lampu Rp. 59,620

12.5 m' Kabel NYA 2,5 mm2 @ Rp. 2,100 = Rp. 26,250 9.4 m' Kabel NYA 1,5 mm2 @ Rp. 2,100 = Rp. 19,740

1.55 btg Pipa kabel @ Rp. 7,500 = Rp. 11,625 1 ls Fittings, t-dos & inbow @ Rp. 2,000 = Rp. 2,000

10 m' Upah pemasangan @ Rp. 3,150

An. R.41 Pekerjaan Panel Bagi (PB) Dalam dg Grounding Rp. 143,800

4.5 m' Kabel NYA 4 mm2 @ Rp. 5,400 = Rp. 24,300 5 m' Kawat BC 4mm2 @ Rp. 5,400 = Rp. 27,000 2 Unit Stud MG @ Rp. 40,000 = Rp. 80,000

0.166666666666667 btg Pipa kabel @ Rp. 7,500 = Rp. 1,250 0.25 btg Pipa Galvanis 5/8" @ Rp. 45,000 = Rp. 11,250

1 Unit Upah pemasangan @ Rp. 30,000

PEKERJAAN PENGECATAN

1 m2

M2

Page 21: RABTIPE10x20

Analisa Pekerjaan Page 21 of 45

An. K23 100 m2 Upah pengecatan 1 lapis

4 Org Pekerja @ Rp. 35,000 0.2 Org Mandor @ Rp. 40,000

6 Org Tukang @ Rp. 50,000 0.6 Org Kepala Tukang @ Rp. 60,000

Jumlah Untuk 1 m2 = 1/100 Upah x 1/300

An. K23.a 1 m2 Pengecatan dengan Cat Tembok 3x Rp. 3,300

0.333333333333333 kg Cat tembok @ Rp. 9,000 = Rp. 3,000 1 Ls Peralatan @ Rp. 300 = Rp. 300 3 Upah K.23 @ Rp. 1,610

An. K23.b 1 m2 Pengecatan dengan Cat Kayu 3x Rp. 6,310

0.22664 kg Cat minyak @ Rp. 20,000 = Rp. 4,533 0.038 ltr Minyak cat @ Rp. 5,000 = Rp. 190

### kg Wood Filler @ Rp. 6,000 = Rp. 343 1 Ls Peralatan @ Rp. 1,240 = Rp. 1,240

7.5 Upah K.23 @ Rp. 1,610

An. K23.c 1 m2 Pengecatan plafond dengan Cat Tembok 3x Rp. 3,450

0.333333333333333 kg Cat tembok @ Rp. 9,000 = Rp. 3,000 1 Ls Peralatan @ Rp. 450 = Rp. 450

3.6 Upah K.23 @ Rp. 1,610

An. K23.d 1 m2 Pengecatan seng 2x Rp. 4,300

0.212475 kg Cat seng @ Rp. 17,500 = Rp. 3,718 1 Ls Peralatan @ Rp. 583 = Rp. 583

2.4 Upah K.23 @ Rp. 1,610

PEKERJAAN TAMAN

An. T.81 1 m' Pekerjaan pagar batu bata -

Dihitung untuk 10.00 m' Tinggi arsitektural 0.40 m'

0.63 m3 Galian An. A.1 @ Rp. 17,710 0.13 m3 Lantai Kerja An. G.44 @ Rp. 74,430 0.24 m3 Batu bata 1:3 @ Rp. 52,760 6.00 m2 Batu bata 1:5 @ Rp. 45,660 2.80 m2 Plasteran 1:4 @ Rp. 14,280 2.80 m2 Pengecatan An. K23a @ Rp. 8,130

Jumlah Untuk 1 m'

An. T.82 1 m' Pekerjaan pagar batu bata t: 1 m -

Dihitung untuk 10.00 m' Tinggi arsitektural 1.00 m'

2.03 m3 Galian An. A.1 @ Rp. 17,710 0.23 m3 Lantai Kerja An. G.44 @ Rp. 396,210 0.70 m3 Pasangan Batu Kali 1:3 @ Rp. 423,550 1.11 m3 Menimbun tanah kembali @ Rp. 5,910 12.00 m2 Batu bata 1:4 An. G.32i @ Rp. 45,660 3.50 m2 Plasteran 1:4 An. G.50q @ Rp. 14,280 3.50 m2 Pengecatan An. K23a @ Rp. 9,090

Jumlah Untuk 1 m'

PEKERJAAN SUPPLEMEN

An. Z.11 1 Unit Bak Mandi uk. 60 x 60 x 60 cm

0.018 m3 Timbunan pasir @ Rp. 46,180 0.018 m3 Beton 1:3:5 @ Rp. 368,820 0.72 m2 Pas.1/4 bata 1:2 An. G.32n 3/4 @ Rp. 52,760

An. Z.21 1 Unit septic tank uk. 1 x 1.5 x 1.5 m

Page 22: RABTIPE10x20

Analisa Pekerjaan Page 22 of 45

2.25 m3 Galian tanah @ Rp. 17,710 0.075 m3 Beton 1:3:5 @ Rp. 368,820

7.5 m2 Pasangan batu bata 1:3 @ Rp. 48,310 7.5 m2 Plasteran 1:3 @ Rp. 17,230

0.075 m3 Beton bertulang @ Rp. 611,860 0.5 m' Pipa GIP dia. 2" @ Rp. 10,000

An. T.81 1 m2 pekerjaan car port

0.125 m3 Galian tanah @ Rp. 17,710 0.125 m3 Rabat beton 1:3:6 @ Rp. 368,820 0.075 m3 Pasir Urug @ Rp. 46,180

Page 23: RABTIPE10x20

Analisa Pekerjaan Page 23 of 45

JUMLAH HARGA UPAH (Rp.)

Rp. 17,710

= Rp. 22,750 = Rp. 867 = Rp. 23,617 = Rp. 17,710

Rp. 5,910

= Rp. 5,688 = Rp. 217

Rp. 7,680

= Rp. 7,394 = Rp. 282 = Rp. 7,676 = Rp. 7,680

Rp. 7,680

= Rp. 7,394 = Rp. 282

Rp. 104,000

= Rp. 140,000 = Rp. 8,000 = Rp. 100,000 = Rp. 12,000 = Rp. 260,000 = Rp. 104,000

Rp. 2,760

= Rp. 240 = Rp. 2,000 = Rp. 490 = Rp. 28 = Rp. 2,758 = Rp. 1,100

Rp. 81,200

= Rp. 140,000 = Rp. 8,000 = Rp. 75,000 = Rp. 9,000 = Rp. 232,000 = Rp. 81,200

Page 24: RABTIPE10x20

Analisa Pekerjaan Page 24 of 45

Rp 175,000.00 = Rp 192,500.00 Rp 1,100.00 = Rp 179,300.00 Rp 50,000.00 = Rp 26,000.00 Jumlah (1) = Rp 397,800.00

Rp 35,000.00 = Rp 52,500.00 Rp 40,000.00 = Rp 24,000.00 Rp 50,000.00 = Rp 3,000.00 Rp 60,000.00 = Rp 4,500.00 Jumlah (2) = Rp 84,000.00 Jumlah (1) + (2) = Rp 481,800.00

= Rp. 315,000 = Rp. 360,000 = Rp. 150,000 = Rp. 825,000 = Rp. 99,000

Rp. 900

Rp. 133,430 ok= Rp. 125,100 = Rp. 7,430 = Rp. 900

ok Rp. 125,100

= Rp. 210,000 = Rp. 12,000 = Rp. 50,000 = Rp. 6,000 = Rp. 278,000 = Rp. 125,100

Rp. 22,130

= Rp. 7,000 = Rp. 400 = Rp. 25,000 = Rp. 3,000 = Rp. 35,400

= Rp. 22,130

Rp. 7,430 ok

= Rp. 10,000 = Rp. 571 = Rp. 7,143 = Rp. 857 = Rp. 18,571

= Rp. 7,430

Rp. 27,860

Page 25: RABTIPE10x20

Analisa Pekerjaan Page 25 of 45

= Rp. 15,000 = Rp. 857 = Rp. 10,714 = Rp. 1,286

-

Rp. 237,240

- = Rp. 133,740 = Rp. 103,500

Rp. 206,160

- = Rp. 89,160 = Rp. 117,000

Rp 2,500,000.00 = Rp 7,500.00 Rp 11,500.00 = Rp 230.00 Rp 10,000.00 = Rp 36,000.00 Rp 12,500.00 = Rp 625.00 Rp 1,100.00 = Rp 6,050.00 Rp 50,000.00 = Rp 450.00 Rp 125,000.00 = Rp 1,875.00 Jumlah (1) = Rp 52,730.00

Rp 35,000.00 = Rp 3,500.00 Rp 50,000.00 = Rp 1,650.00 Rp 50,000.00 = Rp 1,650.00 Rp 50,000.00 = Rp 1,650.00 Rp 60,000.00 = Rp 600.00 Rp 40,000.00 = Rp 200.00 Jumlah (2) = Rp 9,250.00 Jumlah (1) + (2) = Rp 61,980.00

Rp. 10,020

= Rp. 18,900 = Rp. 1,080 = Rp. 9,000 = Rp. 1,080 = Rp. 30,060 = Rp. 10,020

Rp. 10,020

= Rp. 18,900 = Rp. 1,080 = Rp. 9,000

Page 26: RABTIPE10x20

Analisa Pekerjaan Page 26 of 45

= Rp. 1,080 = Rp. 30,060 = Rp. 10,020

Rp. 7,730

= Rp. 14,000 = Rp. 800 = Rp. 7,500 = Rp. 900 = Rp. 23,200 = Rp. 7,730

Rp. 7,730

= Rp. 14,000 = Rp. 800 = Rp. 7,500 = Rp. 900 = Rp. 23,200 = Rp. 7,730

Rp. 16,250

= Rp. 17,500 = Rp. 1,000 = Rp. 12,500 = Rp. 1,500 = Rp. 32,500 = Rp. 16,250

Rp. 12,190

= Rp. 17,500 = Rp. 1,000 = Rp. 12,500 = Rp. 1,500 = Rp. 32,500 = Rp. 12,190

Rp. 18,200

= Rp. 35,000 = Rp. 2,000 = Rp. 25,000 = Rp. 3,000 = Rp. 65,000 = Rp. 18,200

Rp. 9,750

Page 27: RABTIPE10x20

Analisa Pekerjaan Page 27 of 45

= Rp. 10,500 = Rp. 600 = Rp. 7,500 = Rp. 900 = Rp. 19,500 = Rp. 9,750

Rp. 2,800

= Rp. 5,000 = Rp. 600 = Rp. 5,600 = Rp. 2,800

Rp. 656,000

= Rp. 280,000 = Rp. 16,000 = Rp. 1,200,000 = Rp. 144,000 = Rp. 1,640,000 = Rp. 656,000

Rp. 9,200

= Rp. 2,178 = Rp. 124 = Rp. 8,889 = Rp. 1,067 = Rp. 12,260 = Rp. 9,200

Rp. 1,082,400

= Rp. 420,000 = Rp. 24,000 = Rp. 1,800,000 = Rp. 216,000 = Rp. 2,460,000 = Rp. 1,082,400

Rp. 17,080 Rp. 104,580 Rp. 175,694 1.68

= Rp. 87,500 = Rp. 5,000 = Rp. 375,000 = Rp. 45,000 = Rp. 512,500 = Rp. 17,080

Rp. 41,000 Rp. 146,080 Rp. 166,531 1.14

= Rp. 70,000 = Rp. 4,000 = Rp. 300,000 = Rp. 36,000 = Rp. 410,000 = Rp. 41,000

Page 28: RABTIPE10x20

Analisa Pekerjaan Page 28 of 45

Rp. 6,470

= Rp. 638 = Rp. 102,366 = Rp. 103,004

= Rp. 6,470

Rp. 4,620

= Rp. 525 = Rp. 30 = Rp. 5,000 = Rp. 600 = Rp. 6,160 = Rp. 4,620

Rp 54,000.00 = Rp 37,800.00 Rp 11,500.00 = Rp 460.00 Jumlah (1) = Rp 38,260.00

Rp 35,000.00 = Rp 4,200.00 Rp 50,000.00 = Rp 3,000.00 Rp 60,000.00 = Rp 360.00 Rp 40,000.00 = Rp 240.00 Jumlah (2) = Rp 7,800.00 Jumlah (1) + (2) = Rp 46,060.00

Rp 100,000.00 = Rp 30,000.00 Rp 11,500.00 = Rp 230.00 Jumlah (1) = Rp 30,230.00

Rp 35,000.00 = Rp 5,250.00 Rp 50,000.00 = Rp 3,500.00 Rp 60,000.00 = Rp 480.00 Rp 40,000.00 = Rp 240.00 Jumlah (2) = Rp 9,470.00 Jumlah (1) + (2) = Rp 39,700.00

Rp 2,500,000.00 = Rp 30,000.00 Rp 11,500.00 = Rp 690.00 Rp 11,000.00 = Rp 12,100.00 Jumlah (1) = Rp 42,790.00

Rp 35,000.00 = Rp 6,300.00 Rp 50,000.00 = Rp 16,000.00 Rp 60,000.00 = Rp 1,920.00 Rp 40,000.00 = Rp 360.00 Jumlah (2) = Rp 24,580.00 Jumlah (1) + (2) = Rp 61,225.00

PEKERJAAN SANITASI

Rp 5,000.00 = Rp 6,000.00 Rp 5,000.00 = Rp 1,750.00 Jumlah (1) = Rp 7,750.00

Rp 35,000.00 = Rp 1,260.00

Page 29: RABTIPE10x20

Analisa Pekerjaan Page 29 of 45

Rp 50,000.00 = Rp 3,000.00 Rp 60,000.00 = Rp 360.00 Rp 40,000.00 = Rp 72.00 Jumlah (2) = Rp 4,692.00 Jumlah (1) + (2) = Rp 12,442.00

Rp 25,000.00 = Rp 30,000.00 Rp 25,000.00 = Rp 8,750.00 Jumlah (1) = Rp 38,750.00

Rp 35,000.00 = Rp 2,835.00 Rp 50,000.00 = Rp 6,750.00 Rp 60,000.00 = Rp 810.00 Rp 40,000.00 = Rp 164.00 Jumlah (2) = Rp 10,559.00 Jumlah (1) + (2) = Rp 49,309.00

Rp 15,000.00 = Rp 15,000.00 Rp 70,000.00 = Rp 1,750.00 Jumlah (1) = Rp 16,750.00

Rp 35,000.00 = Rp 350.00 Rp 50,000.00 = Rp 5,000.00 Rp 60,000.00 = Rp 600.00 Rp 40,000.00 = Rp 200.00 Jumlah (2) = Rp 6,150.00 Jumlah (1) + (2) = Rp 22,900.00

Rp 10,000.00 = Rp 10,000.00 Jumlah (1) = Rp 10,000.00

Rp 35,000.00 = Rp 350.00 Rp 50,000.00 = Rp 5,000.00 Rp 60,000.00 = Rp 600.00 Rp 40,000.00 = Rp 200.00 Jumlah (2) = Rp 6,150.00 Jumlah (1) + (2) = Rp 16,150.00

PEKERJAAN KUNCI DAN KACA

Rp 50,000.00 = Rp 50,000.00 Jumlah (1) = Rp 50,000.00

Rp 35,000.00 = Rp 350.00 Rp 50,000.00 = Rp 25,000.00 Rp 60,000.00 = Rp 600.00 Rp 40,000.00 = Rp 200.00 Jumlah (2) = Rp 26,150.00 Jumlah (1) + (2) = Rp 76,150.00

Rp 50,000.00 = Rp 50,000.00 Jumlah (1) = Rp 50,000.00

Rp 35,000.00 = Rp 175.00 Rp 50,000.00 = Rp 25,000.00 Rp 60,000.00 = Rp 300.00 Rp 40,000.00 = Rp 100.00 Jumlah (2) = Rp 25,575.00 Jumlah (1) + (2) = Rp 75,575.00

Rp 10,000.00 = Rp 10,000.00 Jumlah (1) = Rp 10,000.00

Page 30: RABTIPE10x20

Analisa Pekerjaan Page 30 of 45

Rp 35,000.00 = Rp 525.00 Rp 50,000.00 = Rp 7,500.00 Rp 60,000.00 = Rp 900.00 Rp 40,000.00 = Rp 30.00 Jumlah (2) = Rp 8,955.00 Jumlah (1) + (2) = Rp 18,955.00

Rp 12,500.00 = Rp 12,500.00 Jumlah (1) = Rp 12,500.00

Rp 35,000.00 = Rp 525.00 Rp 50,000.00 = Rp 7,500.00 Rp 60,000.00 = Rp 900.00 Rp 40,000.00 = Rp 30.00 Jumlah (2) = Rp 8,955.00 Jumlah (1) + (2) = Rp 21,455.00

Rp 50,000.00 = Rp 50,000.00 Jumlah (1) = Rp 50,000.00

Rp 35,000.00 = Rp 1,750.00 Rp 50,000.00 = Rp 25,000.00 Rp 60,000.00 = Rp 3,000.00 Rp 40,000.00 = Rp 100.00 Jumlah (2) = Rp 29,850.00 Jumlah (1) + (2) = Rp 79,850.00

Rp 45,000.00 = Rp 45,000.00 Jumlah (1) = Rp 45,000.00

Rp 35,000.00 = Rp 1,750.00 Rp 50,000.00 = Rp 25,000.00 Rp 60,000.00 = Rp 3,000.00 Rp 40,000.00 = Rp 100.00 Jumlah (2) = Rp 29,850.00 Jumlah (1) + (2) = Rp 74,850.00

Rp 50,000.00 = Rp 55,000.00 Jumlah (1) = Rp 55,000.00

Rp 35,000.00 = Rp 525.00 Rp 50,000.00 = Rp 7,500.00 Rp 60,000.00 = Rp 900.00 Rp 40,000.00 = Rp 30.00 Jumlah (2) = Rp 8,955.00 Jumlah (1) + (2) = Rp 63,955.00

Rp. 31,500

= Rp. 31,500

Rp. 30,000

= Rp. 30,000

Page 31: RABTIPE10x20

Analisa Pekerjaan Page 31 of 45

Rp. 1,610

= Rp. 140,000 = Rp. 8,000 = Rp. 300,000 = Rp. 36,000 = Rp. 484,000 = Rp. 1,610

Rp. 4,830

= Rp. 4,830

Rp. 12,080

= Rp. 12,075

Rp. 5,800

= Rp. 5,796

Rp. 3,860

= Rp. 3,864

Rp. 36,980

= Rp. 11,069 = Rp. 9,304 = Rp. 12,768 = Rp. 273,960 = Rp. 39,984 = Rp. 22,764 = Rp. 369,849 = Rp. 36,980

Rp. 105,790

= Rp. 35,951 = Rp. 89,147 = Rp. 296,485 = Rp. 6,560 = Rp. 547,920 = Rp. 49,980 = Rp. 31,815 = Rp. 1,057,858 = Rp. 105,790

Rp. 45,500

= Rp. 831 = Rp. 6,639 = Rp. 37,987

Rp. 610,000

Page 32: RABTIPE10x20

Analisa Pekerjaan Page 32 of 45

= Rp. 39,848 = Rp. 27,662 = Rp. 362,325 = Rp. 129,225 = Rp. 45,890 = Rp. 5,000

Rp. 51,800

= Rp. 2,214 = Rp. 46,103 = Rp. 3,464

Page 33: RABTIPE10x20

Analisa Pekerjaan Page 33 of 45

ANALISA ANGGARAN BIAYA

ID VOLUME SAT. URAIAN HARGA HARGA

SATUAN MATERIAL

PEKERJAAN PINTU JENDELA1 Pintu Panel (80 x 205) + 1 Jendela (60 x 120) Rp. 363,380

1.68 m2 An. F33a (daun pintu) @ Rp. 104,580 = Rp. 175,690

0.72 m2 An. F36 (daun jendela) @ Rp. 146,080 = Rp. 105,180

1 Bh Kunci slot @ Rp. 24,750 = Rp. 24,750

2 Bh Engsel 4" @ Rp. 9,450 = Rp. 18,900

2 Bh Engsel 3" @ Rp. 7,880 = Rp. 15,760

1 Bh Grendel 2" @ Rp. 5,250 = Rp. 5,250

1 Bh Hak angin @ Rp. 7,350 = Rp. 7,350

1 Bh Handle @ Rp. 10,500 = Rp. 10,500

8 Bh Upah pemasangan asesoris @ Rp. 7,500

2 Unit Upah pemasangan @ Rp. 10,000

1 Pintu Panel (80 x 205) + 1 Jendela (40 x 120) Rp. 328,320

1.68 m2 An. F33a (daun pintu) @ Rp. 104,580 = Rp. 175,690

0.48 m2 An. F36 (daun jendela) @ Rp. 146,080 = Rp. 70,120

1 Bh Kunci Slot @ Rp. 24,750 = Rp. 24,750

2 Bh Engsel 4" @ Rp. 9,450 = Rp. 18,900

2 Bh Engsel 3" @ Rp. 7,880 = Rp. 15,760

1 Bh Grendel 2" @ Rp. 5,250 = Rp. 5,250

1 Bh Hak angin @ Rp. 7,350 = Rp. 7,350

1 Bh Handle @ Rp. 10,500 = Rp. 10,500

8 Bh Upah pemasangan asesoris @ Rp. 7,500

2 Unit Upah pemasangan @ Rp. 10,000

1 Pintu Panel (80 x 205) Rp. 219,340

1.68 m2 An. F33a (daun pintu) @ Rp. 104,580 = Rp. 175,690

1 Bh Kunci Slot @ Rp. 24,750 = Rp. 24,750

2 Bh Engsel 4" @ Rp. 9,450 = Rp. 18,900

3 Bh Upah pemasangan asesoris @ Rp. 7,500

1 Unit Upah pemasangan @ Rp. 10,000

1 Pintu PVC KM Rp. 113,500

1 Unit Daun Pintu PVC Standart @ Rp. 54,600 = Rp. 54,600

1 Bh Kunci Putar @ Rp. 40,000 = Rp. 40,000

2 Bh Engsel 4" @ Rp. 9,450 = Rp. 18,900

3 Bh Upah pemasangan asesoris @ Rp. 7,500

1 Unit Upah pemasangan @ Rp. 10,000

1 Jendela (60 x 120) Rp. 144,040

0.72 m2 An. F36 (daun jendela) @ Rp. 146,080 = Rp. 105,180

2 Bh Engsel 3" @ Rp. 7,880 = Rp. 15,760

1 Bh Grendel 2" @ Rp. 5,250 = Rp. 5,250

1 Bh Hak angin @ Rp. 7,350 = Rp. 7,350

1 Bh Handle @ Rp. 10,500 = Rp. 10,500

5 Bh Upah pemasangan asesoris @ Rp. 7,500

1 Unit Upah pemasangan @ Rp. 10,000

1 Jendela (40 x 120) Rp. 108,980

0.48 m2 An. F36 (daun jendela) @ Rp. 146,080 = Rp. 70,120

2 Bh Engsel 3" @ Rp. 7,880 = Rp. 15,760

1 Bh Grendel 2" @ Rp. 5,250 = Rp. 5,250

1 Bh Hak angin @ Rp. 7,350 = Rp. 7,350

1 Bh Handle @ Rp. 10,500 = Rp. 10,500

5 Bh Upah pemasangan asesoris @ Rp. 7,500

Page 34: RABTIPE10x20

Analisa Pekerjaan Page 34 of 45

1 Unit Upah pemasangan @ Rp. 10,000

Ventilasi 15/20 Rp. 16,100

0.004 m3 Pemasangan kusen ### = Rp. 16,100

1 Unit Upah pemasangan @ Rp. 7,500

Page 35: RABTIPE10x20

Analisa Pekerjaan Page 35 of 45

HARGA

UPAH

Rp. 80,000 Rp. 443,380

= Rp. 60,000

= Rp. 20,000

Rp. 80,000 Rp. 408,320

= Rp. 60,000

= Rp. 20,000

Rp. 32,500 Rp. 251,840

= Rp. 22,500

= Rp. 10,000

Rp. 32,500 Rp. 146,000

= Rp. 22,500

= Rp. 10,000

Rp. 47,500 Rp. 191,540

= Rp. 37,500

= Rp. 10,000

Rp. 47,500 Rp. 156,480

= Rp. 37,500

Page 36: RABTIPE10x20

Analisa Pekerjaan Page 36 of 45

= Rp. 10,000

Rp. 7,500 Rp. 23,600

= Rp. 7,500

Page 37: RABTIPE10x20

REKAPITULASI DAFTAR ANALISA 2

No. JENIS PEKERJAAN ANALISA VOLUME

1 2 3 4 5 6

A PEKERJAAN TANAH1 m3 Galian Tanah Biasa Manual < 1500mm An. A.1 - 17,710.00 1 m3 Menimbun dan Memadatkan < 1500mm An. A.3 - 5,910.00 1 m3 Timbunan Pasir Urug An. A.18a 60,000.00 7,680.00 1 m3 Timbunan Tanah An. A.18b 38,500.00 7,680.00 1 M3 Pasangan Batu Kali 1:3 An. G.31.m 319,550.00 104,000.00 1 m' Pekerjaan Bowplank An. F.0 11,330.00 2,760.00 1 M3 Pasangan Batu Bata 1:3 An. G.32.g 354,810.00 81,200.00

B PEKERJAAN PONDASIPasangan pondasi batu kali, 1Pc : 4Ps 6.5. 397,800.00 84,000.00 110 Kg Mengerjakan (memotong/memasang) besi beton bertulang An. I.2 17,620.00 900.00 1 M3 Pekerjaan betonan K175 Sup. G.42 269,080.00 133,430.00 1 M3 Beton Cor 1:3:6 An. G.44 243,720.00 125,100.00 1 M2 Mengerjakan Cetakan Beton An. F.8a 52,300.00 22,130.00 1 M2 Mengerjakan bekisting sloof, kolom dan balok praktis An. F.8c 7,740.00 7,430.00 1 M2 Mengerjakan bekisting lantai/duck beton An. F.8e 36,780.00 27,860.00 1 M3 Pekerjaan beton bertulang sloof & kolom/balok praktis K175 Sup. G.43a 2,263,960.00 1 M3 Pekerjaan beton bertulang pondasi & kolom K175 Sup. G.43b 2,409,340.00 237,240.00 1 M3 Pekerjaan beton bertulang balok & plat K175 Sup. G.43c 2,627,200.00 206,160.00 1 M2 Mengerjakan bekisting lantai/duck beton An. F.8e 36,780.00 27,860.00 Membuat ring balok beton bertulang (10x15) cm 6.46. 52,730.00 9,250.00

C PEKERJAAN DINDING DAN LANTAI1 M2 Pasangan 1/2 Batu Bata 1:5 An. G.32.l 35,640.00 10,020.00 1 M2 Pasangan 1/2 Batu Bata 1:3 An. G.32.k 42,740.00 10,020.00 1 M2 Plasteran 1:3 tebal 15 mm An. G.50.l 8,900.00 7,730.00 1 M2 Plasteran 1:5 tebal 15 mm An. G.50.r 6,550.00 7,730.00 1 M3 Perekat 1:3 An. G.16 491,020.00 1 M2 Ubin Keramik 20 x 20 cm Pas 1:3 An. G.72c 53,940.00 16,250.00 1 M2 Ubin Keramik 30 x 30 cm Pas 1:4 An. G.72d 47,760.00 12,190.00 1 M2 Pemasangan Keramik Dinding 20 x 25 cm Pas 1:3 An. G. 141 39,050.00 18,200.00 1 M' Pasangan Plint Ubin Keramik 10 x 30 cm Pas 1:4 An. G.68b 11,840.00 9,750.00 1 M' Pasangan bon-bon keramik An. G.70 8,870.00 2,800.00

D PEKERJAAN KAYU, ATAP & PLAFOND1 m3 Pekerjaan Kuda-Kuda An. F.22 2,750,000.00 656,000.00 1 m' Pekerjaan Lesplank 22 cm An. F.21 13,590.00 9,200.00 1 m3 Pekerjaan Kozen Tanpa Jalusi/Ventilasi An. F.27a 2,750,000.00 1,082,400.00 1 m2 Pekerjaan Daun Pintu Panel An. F.33a 87,500.00 17,080.00 1 m2 Pekerjaan Daun Pintu/Jendela Kaca An. F.36 105,080.00 41,000.00 1 m2 Pekerjaan Plafond Asbes + Rangka An. F.80a2 31,040.00 6,470.00 1 m2 Pekerjaan Rangka Atap Seng An. F.19 28,650.00 4,620.00 Pasang atap seng gelombang 6.38. 38,260.00 7,800.00 Pasang atap nok seng 6.39. 30,230.00 9,470.00 Langit-langit asbes (1,00x1,00) m rangka kayu meranti 6.20. 42,790.00 24,580.00

E PEKERJAAN SANITASIMemasang 1 m' pipa PVC tipe AW diameter ½" 6.25. 7,750.00 4,692.00 Memasang 1 m' pipa PVC tipe AW diameter 3" 6.31. 38,750.00 10,559.00 Memasang 1 buah kran diameter ¾" atau ½" 6.35. 16,750.00 6,150.00

HARGA BAHAN (RP)

HARGA UPAH (Rp)

Page 38: RABTIPE10x20

Memasang 1 buah floor drain 6.36. 10,000.00 6,150.00

F PEKERJAAN KUNCI DAN KACAPasang kunci tanam biasa 6.2. 50,000.00 26,150.00 Pasang kunci tanam kamar mandi 6.3. 50,000.00 25,575.00 Pasang engsel pintu 6.5. 10,000.00 8,955.00 Pasang kait angin 6.9. 12,500.00 8,955.00 Pasang door closer 6.10. 50,000.00 29,850.00 Pasang pegangan pintu/door holder 6.12. 45,000.00 29,850.00 Pasang kaca tebal 3 mm 6.16. 55,000.00 8,955.00

G PEKERJAAN ELEKTRIKAL1 titik Pekerjaan jaringan lampu An. R.21 59,620.00 31,500.00 Pekerjaan Panel Bagi (PB) Dalam dg Grounding An. R.41 143,800.00 30,000.00

H PEKERJAAN PENGECATAN100 m2 Upah pengecatan 1 lapis An. K23 - 1,610.00 1 m2 Pengecatan dengan Cat Tembok 3x An. K23.a 3,300.00 4,830.00 1 m2 Pengecatan dengan Cat Kayu 3x An. K23.b 6,310.00 12,080.00 1 m2 Pengecatan plafond dengan Cat Tembok 3x An. K23.c 3,450.00 5,800.00 1 m2 Pengecatan seng 2x An. K23.d 4,300.00 3,860.00

I PEKERJAAN TAMAN 1 m' Pekerjaan pagar batu bata An. T.81 36,980.00 1 m' Pekerjaan pagar batu bata t: 1 m An. T.82 105,790.00

J PEKERJAAN SUPPLEMEN1 Unit Bak Mandi uk. 60 x 60 x 60 cm An. Z.11 45,500.00 1 Unit septic tank uk. 1 x 1.5 x 1.5 m An. Z.21 610,000.00 1 m2 pekerjaan car port An. T.81 51,800.00 1 Pintu Panel (80 x 205) + 1 Jendela (60 x 120) 363,380.00 80,000.00 1 Pintu Panel (80 x 205) + 1 Jendela (40 x 120) 328,320.00 80,000.00 1 Pintu Panel (80 x 205) 219,340.00 32,500.00 1 Pintu PVC 113,500.00 32,500.00 1 Jendela (60 x 120) 144,040.00 47,500.00 1 Jendela (40 x 120) 108,980.00 47,500.00 Ventilasi 15/20 16,100.00

Page 39: RABTIPE10x20

REKAPITULASI DAFTAR ANALISA 2

7

17,710.00 5,910.00 67,680.00 46,180.00 423,550.00 14,090.00 436,010.00

481,800.00 18,520.00 402,510.00 368,820.00 74,430.00 15,170.00 64,640.00 2,263,960.00 2,646,580.00 2,833,360.00 64,640.00 61,980.00

45,660.00 52,760.00 16,630.00 14,280.00 491,020.00 70,190.00 59,950.00 57,250.00 21,590.00 11,670.00

3,406,000.00 22,790.00 3,832,400.00 104,580.00 146,080.00 37,510.00 33,270.00 46,060.00 39,700.00 67,370.00

12,442.00 49,309.00 22,900.00

JUMLAH HARGA (Rp)

Page 40: RABTIPE10x20

16,150.00

76,150.00 75,575.00 18,955.00 21,455.00 79,850.00 74,850.00 63,955.00

91,120.00 173,800.00

1,610.00 8,130.00 18,390.00

9,250.00 8,160.00

36,980.00 105,790.00

45,500.00 610,000.00 51,800.00 443,380.00 408,320.00 251,840.00 146,000.00 191,540.00 156,480.00 16,100.00

Page 41: RABTIPE10x20

RENCANA ANGGARAN BIAYA

RUMAH TIPE ASERA 10x20PROYEK :LOKASI :SUB. PEKERJAAN :

NO URAIAN PEKERJAAN SAT. VOLUMEHARGA TOTAL SATUAN HARGA

(Rp.) (Rp.)1 2 4 5 6 7

I. PEKERJAAN PERSIAPAN1 Pemasangan bouwplank M' 68.00 14,090.00 958,120.00

Sub Total - I : 958,120.00

II. PEKERJAAN PONDASI

1 PONDASI BATU KALIa. Galian tanah 53.87 17,710.00 954,073.12 b. Pasir Urug M2 76.96 67,680.00 5,208,652.80 c. Urugan tanah kembali 27.90 5,910.00 164,877.18

d. Pasangan pondasi batu kali 1:3 25.97 423,550.00 11,001,287.70 Sub Total - II :

III. PEKERJAAN STRUKTUR DAN DINDING1 Sloof 15/20 cm M' 96.20 2,263,960.00 217,792,952.00 2 Kolom Praktis 15/15 cm 4.17 2,263,960.00 9,439,015.23 3 Ring Balok 10/15 cm 0.25 61,980.00 15,665.45

Beton bertulang 116.88 Bekisting 960.19

4 Pasangan Dinding Bata ( 1 : 3 ) 326.17 52,760.00 17,208,729.20 5 Pasangan Dinding Bata ( 1 : 5 ) 717.60 45,660.00 32,765,616.00 6 Plesteran Dinding ( 1 : 3 ) 652.34 16,630.00 10,848,414.20 7 Plesteran Dinding ( 1 : 5 ) 1,435.20 14,280.00 20,494,656.00

Dinding finish batu paras andesit 8.45 Sub Total - III : 308,565,048.08

IV. PEKERJAAN LANTAI

1 Timbunan tanah 193.30 46,180.00 8,926,386.19 2 Pasir Urug 386.39 67,680.00 26,150,536.80 3 Dinding Keramik KM/WC 30/30 cm 9.12 57,250.00 522,120.00

Dinding Keramik KM/WC 30/60 cm 87.26 4 Lantai Keramik KM / WC 30/30 cm 2.70 70,190.00 189,513.00

Lantai Keramik KM / WC 30/60 cm 24.90 5 Lantai Keramik 30/30 cm 94.12 59,950.00 5,642,194.25

Lantai Keramik 60/60 cm 205.75 Lantai Parquet Tangga 52.80 Lantai batu andesit 30/30 cm 6.12

Sub Total - IV : 41,430,750.24

V. PEKERJAAN ATAP DAN PLAFOND1 Pekerjaan rangka atap baja ringan 38.50 33,270.00 1,280,895.00

Pekerjaan rangka atap aluminium 9.00 2 Pasang Atap + insulator 43.05 46,060.00 1,982,883.00

Pasang atap kaca entrance 9.00 Plafond Gypsum + rangka 291.57 Plafond Gypsum water resistant + rangka 15.80 Waterproofing lantai 67.42 Waterproofing dinding 9.00

Sub Total - V : 3,263,778.00

VI. PEKERJAAN PINTU DAN JENDELA1 Pintu -

Kayu solid engineering2 Daun Pintu & Jendela (set lengkap terpasang) PJ1 unit 1.00 443,380.00 443,380.00 4 Pintu (set lengkap terpasang) P1 unit 1.00 251,840.00 251,840.00 5 Pintu (set lengkap terpasang) P2 unit 2.00 146,000.00 292,000.00

Pintu (set lengkap terpasang) P3 unit 1.00 Pintu (set lengkap terpasang) P5 unit 2.00 Pintu (set lengkap terpasang) P6 unit 1.00 Pintu (set lengkap terpasang) P11 unit 2.00 Pintu (set lengkap terpasang) P12 unit 4.00 Pintu (set lengkap terpasang) P13 unit 1.00 Pintu (set lengkap terpasang) P14 unit 1.00 Jati kering ovenPintu (set lengkap terpasang) P4 unit 1.00 Aluminium ex YKK profile 4" good finish

3 Daun Pintu & Jendela (set lengkap terpasang) PJ2 unit 1.00 408,320.00 408,320.00 Pintu (set lengkap terpasang) P7 unit 1.00 Pintu (set lengkap terpasang) P8 unit 1.00 Pintu (set lengkap terpasang) P9 unit 1.00 Pintu (set lengkap terpasang) P10 unit 1.00 Pintu (set lengkap terpasang) P15 unit 1.00 Pintu (set lengkap terpasang) P16 unit 1.00 Jendela

6 Daun Jendela (set lengkap terpasang) J1 unit 1.00 191,540.00 191,540.00 Daun Jendela (set lengkap terpasang) J3 unit 1.00 Aluminium ex YKK profile 4" good finish

7 Daun Jendela (set lengkap terpasang) J2 unit 1.00 50,000.00 50,000.00 Daun Jendela (set lengkap terpasang) J4 unit 1.00 Daun Jendela (set lengkap terpasang) J5 unit 1.00 Daun Jendela (set lengkap terpasang) J6 unit 1.00 Daun Jendela (set lengkap terpasang) J7 unit 1.00 Daun Jendela (set lengkap terpasang) J9 unit 1.00 Daun Jendela (set lengkap terpasang) J10 unit 1.00 Daun Jendela (set lengkap terpasang) J11 unit 1.00 Daun Jendela (set lengkap terpasang) J12 unit 1.00 Besi hollow 4x4PG unit 1.00 Louvre aluminium unit 1.00 Aluminium ex YKK profile 4" good finish

8 BV1 unit 2.00 16,100.00 32,200.00 Sub Total - VI : 1,669,280.00

VII. PEKERJAAN PENGECATAN1 Cat Dinding 2,087.54 8,130.00 16,971,700.20 3 Cat Plafond 307.37 9,250.00 2,843,184.06

Sub Total - VII : 19,814,884.26

VIII. PEKERJAAN ELEKTRIKAL1 Pemasangan Lampu Taman + Aksesoris Bh 2.00 26,400.00 52,800.00

Pemasangan Titik Lampu Ttk 77.00 Pemasangan Lampu Gantung Bh 3.00 Pemasangan Box Sekering Bh 6.00 Pemasangan Meter Listrik Bh 2.00 Pemasangan Saklar Double Bh 23.00 Pemasangan Saklar Tunggal Bh 15.00 Pemasangan Saklar Hotel Bh 1.00 Pemasangan Stop Kontak Bh 41.00 Pemasangan Stop Kontak Dgn Tutup Bh 1.00 Pemasangan TV Outlet Bh 8.00

M3

M3

M3

M3

M3

M3

M2

M2

M2

M2

M2

M2

M3

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

Page 42: RABTIPE10x20

NO URAIAN PEKERJAAN SAT. VOLUMEHARGA TOTAL SATUAN HARGA

(Rp.) (Rp.)1 2 4 5 6 7

Sub Total - VIII : 52,800.00

VIII. PEKERJAAN PLUMBING DAN SANITASI

A Pekerjaan Pemasangan

1 Memasang Closet Jongkok Bh 1.00 173,950.00 173,950.00 Memasang Closet Monoblok Bh 3.00

2 Pembuatan bak mandi Bh 1.00 45,500.00 45,500.00 Memasang Eco Washer Bh 2.00 -

Memasang Wastafel Bh 4.00 -

Memasang Meja Wastafel Bh 1.00 76,150.00

Memasang Faucet Bh 2.00 75,575.00

Partisi kaca tempered 10 mm (2.1x1.75) set 2.00 18,955.00

Kaca cermin bevel frameless Bh 2.00 21,455.00

Bak kontrol dgn tutup (300x300) Bh 4.00

Flor drain Bh 16.00

Roof drain Bh 5.00

Titik jet washer Bh 6.00

Titik shower Bh 4.00

Titik kran biasa Bh 19.00

Ground water tank Unit 1.00

Septic Tank Dan Peresapan Unit 1.00 610,000.00 610,000.00 Water tank Unit 2.00

Sub Total - VIIIA : 829,450.00

B Pekerjaan Perpipaan Air Bersih/Bekas/Kotor1 M' 49,309.00 - 2 Saluran air kotor Ø4" M' 49,309.00 - 3 Saluran air faecalin Ø4" M' 4,692.00 -

Sub Total - VIII B : - Total VIII A + VIII B: 829,450.00

IX. PEKERJAAN HALAMAN

Pintu garasi (92.6X2.775) + rangka Set 1.00 1 Pagar 17.00 105,790.00 1,798,430.00 2 Pekerjaan Carport 36.16 51,800.00 1,873,088.00

Sub Total - IX : 3,671,518.00

TOTAL I - IX 380,255,600.00

Per meter bangunan 10,562,700.00

Saluran air bersih Ø3/4"

M1

M2

Page 43: RABTIPE10x20

REKAPITULASI

RENCANA ANGGARAN BIAYA

PROYEK :LOKASI :SUB. PEKERJAAN :

NO URAIAN PEKERJAAN

I. PEKERJAAN PERSIAPAN 958,120.00 II. PEKERJAAN PONDASI - III. PEKERJAAN STRUKTUR DAN DINDING 308,565,048.08 IV. PEKERJAAN LANTAI 41,430,750.24 V. PEKERJAAN ATAP DAN PLAFOND 3,263,778.00 VI. PEKERJAAN PINTU DAN JENDELA 1,669,280.00 VII. PEKERJAAN PENGECATAN 19,814,884.26 VIII. PEKERJAAN ELEKTRIKAL 52,800.00 VIII. PEKERJAAN PLUMBING DAN SANITASI 829,450.00 IX. PEKERJAAN HALAMAN 3,671,518.00

JUMLAH 380,255,628.58 DIBULATKAN 380,255,600.00 permeter bangunan 10,562,700.00

TERBILANG : Tiga Puluh Delapan Juta Lima Ratus Tiga Puluh Ribu Empat Ratus Rupiah

JUMLAH HARGA (Rp.)

Page 44: RABTIPE10x20

PEKERJAAN PERSIAPANPemasangan bouwplank

PEKERJAAN PONDASI

PONDASI BATU KALI P= 33.125 m Galian tanah 7.95 Pasir Urug 0.6625 Urugan tanah kembali 2.815625 Pasangan pondasi batu kali 1:3 3.478125 PONDASI BATU BATA 6.625 m

Galian tanah 0.165625 Pasir Urug 0.0828125 Urugan tanah kembali 0.06625 Pasangan bata 1:3 0.19875

PEKERJAAN STRUKTUR DAN DINDINGSloof 15/20 cm 0.99375Kolom Praktis 15/15 cm 0.0675 11.5 bh 0.77625Ring Balok 10/15 cm 0.496875Pasangan Dinding Bata ( 1 : 3 ) 10.2375Pasangan Dinding Bata ( 1 : 5 ) 92.1375 8.7 7.56 93.2775Plesteran Dinding ( 1 : 3 ) 20.475Plesteran Dinding ( 1 : 5 ) 186.555

PEKERJAAN LANTAI Timbunan tanah 3.3125 Pasir Urug 1.65625

Dinding Keramik KM/WC 20/25 cm 5.2Lantai Keramik KM / WC 20/20 cm 1.89Lantai Keramik 30/30 cm 34.3

35

5

20

5

80

5

40

15

20

± 0.00

30

- 0.20

- 0.05

- 0.20

25

20

5

5

30

Page 45: RABTIPE10x20

Pekerjaan Bon-Bon Keramik 3

PEKERJAAN ATAP DAN PLAFONDPekerjaan rangka atap 3.3125Pasang Atap seng gelombangPasang atap nok sengPemasangan LesplankLangit-langit asbes + rangka kayu meranti

PEKERJAAN PINTU DAN JENDELAPekerjaan Kusen Pintu & JendelaDaun Pintu & Jendela (set lengkap terpasang) PJ1Daun Pintu & Jendela (set lengkap terpasang) PJ2Daun Pintu (set lengkap terpasang) P1Pintu PVC (set lengkap terpasang) P2Daun Jendela (set lengkap terpasang) J1Daun Jendela (set lengkap terpasang) J2Profil Ventilasi

PEKERJAAN PENGECATANCat DindingCat KayuCat Plafond

PEKERJAAN ELEKTRIKALPemasangan Lampu XL 10 W + AksesorisPemasangan Instalasi listrikPemasangan Panel sekering dalamPemasangan Stop KontakPemasangan Saklar TunggalPemasangan Saklar Ganda

PEKERJAAN PLUMBING DAN SANITASI Pekerjaan Pemasangan

Memasang Closed JongkokPembuatan bak mandiMemasang Floor DrainMemasang Kran airSeptic Tank Dan Peresapan

Pekerjaan Perpipaan Air Bersih/Bekas/KotorMemasang Pipa Buangan Air Limbah Type AW Dia. 3" + Ass.Memasang Pipa Buangan Air Kotor Type AW Dia. 3" + Ass.Memasang Pipa Air Bersih Type AW Dia. 1/2" + Ass.

PEKERJAAN HALAMANPagar Batu Bata t : 1mPekerjaan Carport