ptmp & ded nagan raya - rab total
TRANSCRIPT
-
7/25/2019 Ptmp & Ded Nagan Raya - Rab Total
1/65
-
7/25/2019 Ptmp & Ded Nagan Raya - Rab Total
2/65
Tahun Anggaran 2016
RENCANA ANGGARAN BIAYA
Detail Engineering Design (DED)
Tempat Pemrosesan Akhir Sampah (TPA) Tadu Raya
Kabupaten Nagan Raya
-
7/25/2019 Ptmp & Ded Nagan Raya - Rab Total
3/65
PEKERJAAN
LOKASI : Kec. Tadu Raya, Kabupaten Nagan Raya
TA : APBN TAHUN 2015
A. PEKERJAAN SITE LANDFILL 15.532.811.030,83
A.1. Pekerjaan Persiapan 71.100.262,00
A.2. Pekerjaan Galian 499.118.400,00
A.3. Pekerjaan Tanggul 4.593.030.975,00
A.4. Pekerjaan Jalan Masuk dan Penghub ung 182.324.520,00
A.5. Pekerjaan Jalan Operasi 1.233.771.672,00
A.6. Pekerjaan Pembuatan Drainase 83.000.800,03
A.7. Pekerjaan Sistem Blok Landfill 5.146.645.516,67
A.8. Pekerjaan Instalasi Pengolah Lindi (IPL) 4.283.537.547,13
A.9. Pekerjaan Sumur Pantau 10.500.000,00
B. PEKERJAAN PERLENGKAPAN 1.224.003.490,56
B.1. Pekerjaan Jaringan Lampu Penerangan 651.650.000,00
B.2. Pekerjaan Buffer Area 555.853.490,56
B.3. Pekerjaan Pembangunan Menara Air 16.500.000,00
C. PEKERJAAN BANGUNAN 1.746.859.438,04
C.1. Pekerjaan Pembangunan Pos Jaga 82.477.892,13
C.2. Pekerjaan Pembangunan Bengkel dan Garasi Alat Berat 715.849.995,77
C.3. Pekerjaan Pembangunan Kantor 589.954.014,39
C.4. Pekerjaan Pembangunan Jembatan Timbang 287.577.535,75
C.5. Pekerjaan Pembangunan Tempat Cuci Truk Sampah 71.000.000,00
D. PEKERJAAN PENGADAAN PERALATAN PENDUKUNG LAINNYA 460.540.000,00
D.1. Pengadaan Jembatan Timbang Pitless-Type Kapasitas 20 ton 307.190.000,00
D.2. Pekerjaan Pengadaan Alat Laboratorium TPA 153.350.000,00
JUMLAH TOTAL Rp 18.964.213.959,43
PPN 10 % Rp 1.896.421.395,94
JUMLAH SETELAH PPN Rp 20.860.635.355,37
DIBULATKAN Rp 20.860.635.000,00
Jakarta, Desember 2015
Konsultan Perencana,
CV. SIGMA SELARAS DESIGN
RENCANA ANGGARAN BIAYA
Detail Engineering Design (DED)
REKAPITULASI
NO. HARGA (Rp) JUMLAH HARGA (Rp)
: Detail Engineering Design (DED) TPA Kab. Nagan Raya
URAIAN PEKERJAAN
Rekap RAB Total Page 1
-
7/25/2019 Ptmp & Ded Nagan Raya - Rab Total
4/65
PEKERJAAN : Detail Engineering Design (DED) TPA Kab. Nagan Raya
LOKASI : Kec. Tadu Raya, Kabupaten Nagan Raya
TA : APBN TAHUN 2015
1 - Pekerjaan Persiapan
- Pekerjaan persiapan dan mobilisasi 1,00 ls 15.400.000,00 15.400.00
- Direksi keet 45,00 m2 655.823,60 29.512.06
- Penyediaan air bersih 1,00 Is 10.155.000,00 10.155.00
- Pengukuran kembali 1,00 ls 13.230.000,00 13.230.00
- Keselamatan kerja 1,00 Is 2.160.000,00 2.160.00
- Pembuatan bedeng pekerja 20,00 m2 32.160,00 643.20
71.100.26
1 - Pekerjaan Galian Blok 1
- Pekerjaan galian dasar Landfill 4.650,00 m3 55.200,00 256.680.00
2 - Pekerjaan Galian Blok 2
- Pekerjaan galian dasar Landfill 3.042,00 m3 55.200,00 167.918.40
3 - Pekerjaan Galian Blok 3- Pekerjaan galian dasar Landfill 1.350,00 m3 55.200,00 74.520.00
499.118.40
1 - Pekerjaan Pengurukan Jalan/Tanggul Blok 1
- Urugan tanah bekas galian blok landfill 4.650,00 m3 52.500,00 244.125.00
- Urugan tanah luar blok landfill 4.350,00 m3 117.490,00 511.081.50
- Pemadatan per lapis 50 cm 18.000,00 m2 8.804,00 158.472.00
2 - Pekerjaan Pengurukan Jalan/Tanggul Blok 2
- Urugan tanah bekas galian blok landfill 3.042,00 m3 52.500,00 159.705.00
- Urugan tanah luar blok landfill 7.630,50 m3 117.490,00 896.507.44- Pemadatan per lapis 50 cm 21.345,00 m
2 8.804,00 187.921.38
3 - Pekerjaan Pengurukan Jalan/Tanggul Blok 3
- Urugan tanah bekas galian blok landfill 1.350,00 m3 52.500,00 70.875.00
- Urugan tanah luar blok landfill 17.325,00 m3 117.490,00 2.035.514.25
- Pemadatan per lapis 50 cm 37.350,00 m2 8.804,00 328.829.40
4.593.030.97
A.1. Pekerjaan Persiapan
Sub Total A.1. (Rp)
A.2. Pekerjaan Galian
Sub Total A.2. (Rp)
A.3. Pekerjaan Urugan Tanggul
Sub Total A.3. (Rp)
RENCANA ANGGARAN BIAYADetail Engineering Design (DED)
NO URAIAN PEKERJAAN VOLUME SAT.HARGA SATUAN
(Rp)JUMLAH HARGA (
-
7/25/2019 Ptmp & Ded Nagan Raya - Rab Total
5/65
PEKERJAAN : Detail Engineering Design (DED) TPA Kab. Nagan Raya
LOKASI : Kec. Tadu Raya, Kabupaten Nagan Raya
TA : APBN TAHUN 2015
RENCANA ANGGARAN BIAYADetail Engineering Design (DED)
NO URAIAN PEKERJAAN VOLUME SAT.HARGA SATUAN
(Rp)JUMLAH HARGA (
1 - Perkerasan Jalan Baru
(STA 0+000 s/d STA 0+67,500)
- Penyiapan Badan Jalan 270,00 m2 8.804,00 2.377.08
- Base Jalan hamparan batu 5-7 T. 40 cm 108,00 m3 473.680,00 51.157.44
- Asphalt concrete binder coarse (AC-BC) 6 cm 270,00 m2 286.200,00 77.274.00
- Asphalt concrete Surface coarse (AC-WC) 4 cm 270,00m
2 190.800,00 51.516.00
182.324.52
1 - Perkerasan Jalan Operasional I
- Sub grade CBR 5% 1.062,00 m2 8.804,00 9.349.84
- Base Jalan hamparan batu 5-7 CBR 10 % T. 40 cm 424,80 m3 473.680,00 201.219.26
- Asphalt concrete binder coarse (AC-BC) 6 cm 1.062,00 m2 286.200,00 303.944.40
- Asphalt concrete Surface coarse (AC-WC) 4 cm 1.062,00 m2 190.800,00 202.629.60
2 - Perkerasan Jalan Operasional II- Sub grade CBR 5% 580,00 m
2 8.804,00 5.106.32
- Base Jalan hamparan batu 5-7 CBR 10 % T. 40 cm 232,00 m3 473.680,00 109.893.76
- Asphalt concrete binder coarse (AC-BC) 6 cm 580,00 m2 286.200,00 165.996.00
- Asphalt concrete Surface coarse (AC-WC) 4 cm 580,00 m2 190.800,00 110.664.00
4 - Perkerasan Jalan Operasional III
- Sub grade CBR 5% 280,00 m2 8.804,00 2.465.12
- Base Jalan hamparan batu 5-7 CBR 10 % T. 40 cm 112,00 m3 473.680,00 53.052.16
- Asphalt concrete binder coarse (AC-BC) 6 cm 56,00 m2 286.200,00 16.027.20
- Asphalt concrete Surface coarse (AC-WC) 4 cm 280,00 m2 190.800,00 53.424.00
1.233.771.67
1 - Pekerjaan Pendahuluan
- Pasangan bouwplank 125,76 m1 32.162,28 4.044.72
2 - Pekerjaan Saluran Drainase Jalan
- Galian 30,80 m3 55.200,00 1.700.16
- Tanah urug 3,08 m3 17.206,67 52.99
- Pasir urug 3,08 m3 138.540,00 426.70
Sub Total A.5. (Rp)
A.6. Pekerjaan Pembangunan Drainase
A.4. Pekerjaan Jalan Utama dan Perkerasan
Sub Total A.4. (Rp)
A.5. Pekerjaan Jalan Operasi
-
7/25/2019 Ptmp & Ded Nagan Raya - Rab Total
6/65
PEKERJAAN : Detail Engineering Design (DED) TPA Kab. Nagan Raya
LOKASI : Kec. Tadu Raya, Kabupaten Nagan Raya
TA : APBN TAHUN 2015
RENCANA ANGGARAN BIAYADetail Engineering Design (DED)
NO URAIAN PEKERJAAN VOLUME SAT.HARGA SATUAN
(Rp)JUMLAH HARGA (
- Drainase Pasangan Batu kali 1:4 6,93 m3 910.958,96 6.312.94
-
7/25/2019 Ptmp & Ded Nagan Raya - Rab Total
7/65
PEKERJAAN : Detail Engineering Design (DED) TPA Kab. Nagan Raya
LOKASI : Kec. Tadu Raya, Kabupaten Nagan Raya
TA : APBN TAHUN 2015
RENCANA ANGGARAN BIAYADetail Engineering Design (DED)
NO URAIAN PEKERJAAN VOLUME SAT.HARGA SATUAN
(Rp)JUMLAH HARGA (
3 - Pekerjaan Saluran Drainase Blok 1
- Galian 42,40 m3 55.200,00 2.340.48
- Tanah urug 4,24 m3 17.206,67 72.95
- Pasir urug 35,10 m3 138.540,00 4.862.75
- Drainase Pasangan Batu kali 1:4 12,52 m3 910.958,96 11.406.34
4 - Pekerjaan Saluran Lahan 2
- Galian 42,40 m3
55.200,00 2.340.48- Tanah urug 4,24 m
3 17.206,67 72.95
- Pasir urug 40,10 m3 138.540,00 5.555.45
- Drainase Pasangan Batu kali 1:4 12,52 m3 910.958,96 11.406.34
5 - Pekerjaan Saluran Drainase Blok 3
- Galian 40,96 m3 55.200,00 2.260.99
- Tanah urug 4,10 m3 17.206,67 70.47
- Pasir urug 43,79 m3 138.540,00 6.066.66
- Drainase Pasangan Batu kali 1:4 12,10 m3 910.958,96 11.018.95
5 - Pekerjaan Saluran Pembawa dari IPL menuju Badan Sungai (+/- 20M)
- Galian 25,60 m3 120.760,57 3.091.47
- Tanah urug 2,56 m3 71.551,88 183.17
- Pasir urug 2,00 m3 3.824.477,95 7.648.95
- Drainase Pasangan Batu kali 1:4 120,00 m3 17.206,67 2.064.80
83.000.80
1 - Pekerjaan Lapisan Liner dan Pipa Gas untuk Blok 1
- Pekerjaan pengadaan lapisan Geomembrane 5.406,00 m2 130.000,00 702.780.00
- Pekerjaan pengadaan lapisan Geotextile 5.406,00 m2 87.500,00 473.025.00
Pekerjaan Pemasangan Geomembrane dan Geo Textile 5.406,00 m2
12.500,00 67.575.00- Pekerjaan Pengadaan Gravel 20-30 mm tebal 30 cm 861,60 m
3 360.000,00 310.176.00
Pekerjaan Perataan dan Pemasangan Gravel 20-30 mm tebal 30 cm 861,60 m3 21.500,00 18.524.40
- Saluran drain Pipa HDPE 300 mm 125,00 m1 620.000,00 77.500.00
- Saluran drain Pipa HDPE 200 mm 150,67 m1 324.133,33 48.836.08
- Saluran Pipa Gas PVC 200 mm 31,50 m1 324.133,33 10.210.20
- Gravel 20-30 mm untuk penangkap gas 12,60 m3 360.000,00 4.536.00
- Pembuatan cassing dari drum bekas 27,00 bh 54.000,00 1.458.00
- Box joint pipa lindi dengan pipa gas 4,00 unit 265.000,00 1.060.00
- Box kontrol saluran lindi 1,00 unit 9.412.500,00 9.412.50
2 - Pekerjaan Lapisan Liner dan Pipa Gas untuk Blok 2
Sub Total A.6. (Rp)
A.7. Pekerjaan Sistem Blok Landfill
-
7/25/2019 Ptmp & Ded Nagan Raya - Rab Total
8/65
PEKERJAAN : Detail Engineering Design (DED) TPA Kab. Nagan Raya
LOKASI : Kec. Tadu Raya, Kabupaten Nagan Raya
TA : APBN TAHUN 2015
RENCANA ANGGARAN BIAYADetail Engineering Design (DED)
NO URAIAN PEKERJAAN VOLUME SAT.HARGA SATUAN
(Rp)JUMLAH HARGA (
- Pekerjaan pengadaan lapisan Geomembrane 5.436,00 m2 130.000,00 706.680.00
- Pekerjaan pengadaan lapisan Geotextile 5.436,00 m2 87.500,00 475.650.00
Pekerjaan Pemasangan Geomembrane dan Geo Textile 5.436,00 m2 12.500,00 67.950.00
- Pekerjaan Pengadaan Gravel 20-30 mm tebal 30 cm 861,00 m3 360.000,00 309.960.00
Pekerjaan Perataan dan Pemasangan Gravel 20-30 mm tebal 30 cm 861,00 m3 21.500,00 18.511.50
- Saluran drain Pipa HDPE 300 mm 125,00 m1 620.000,00 77.500.00
- Saluran drain Pipa HDPE 200 mm 150,67 m1 324.133,33 48.836.08
- Saluran Pipa Gas PVC 200 mm 31,50 m1 324.133,33 10.210.20- Gravel 20-30 mm untuk penangkap gas 12,60 m
3 60.000,00 756.00
- Pembuatan cassing drum bekas 27,00 bh 54.000,00 1.458.00
- Box joint pipa lindi dengan pipa gas 4,00 unit 65.000,00 260.00
- Box kontrol saluran lindi 1,00 unit 9.412.500,00 9.412.50
3 - Pekerjaan Lapisan Liner dan Pipa Gas untuk Blok 3
- Pekerjaan pengadaan lapisan Geomembrane 5.256,00 m2 130.000,00 683.280.00
- Pekerjaan pengadaan lapisan Geotextile 5.256,00 m2 87.500,00 459.900.00
Pekerjaan Pemasangan Geomembrane dan Geo Textile 5.256,00 m2 12.500,00 65.700.00
Pekerjaan Pengadaan Gravel 20-30 mm tebal 30 cm 883,50 m3 360.000,00 318.060.00
Pekerjaan Perataan dan Pemasangan Gravel 20-30 mm tebal 30 cm 883,50 m3 21.500,00 18.995.25
- Saluran drain Pipa HDPE 300 mm 125,00 m1 620.000,00 77.500.00
- Saluran drain Pipa HDPE 200 mm 150,67 m1 324.133,33 48.836.08
- Saluran Pipa Gas PVC 200 mm 31,50 m1 324.133,33 10.210.20
- Gravel 20-30 mm untuk penangkap gas 12,60 m3 60.000,00 756.00
- Pembuatan cassing drum bekas 27,00 bh 54.000,00 1.458.00
- Box joint pipa lindi dengan pipa gas 4,00 unit 65.000,00 260.00
- Box kontrol saluran lindi 1,00 unit 9.412.500,00 9.412.50
5.146.645.51
1 - Pekerjaan Pendahuluan- Pasangan bouwplank 80,00 m
1 32.162,28 2.572.98
- Pekerjaan persiapan dan mobilisasi 1,00 ls 15.400.000,00 15.400.00
- Penerangan dan keselamatan kerja 1,00 Is 4.435.736,00 4.435.73
- Penyediaan air bersih 1,00 Is 1.300.314,64 1.300.31
- Pengukuran kembali 1,00 ls 2.538.750,00 2.538.75
2 - Pekerjaan Kolam Anaerob
- Galian 1.025,00 m3 55.200,00 56.580.00
- Tanah urug 102,50 m3 52.500,00 5.381.25
- Pasir urug 24,00 m3 128.241,66 3.077.79
A.8. Pekerjaan Pembangunan Instalasi Pengolah Lindi (IPL)
Sub Total A.7. (Rp)
-
7/25/2019 Ptmp & Ded Nagan Raya - Rab Total
9/65
PEKERJAAN : Detail Engineering Design (DED) TPA Kab. Nagan Raya
LOKASI : Kec. Tadu Raya, Kabupaten Nagan Raya
TA : APBN TAHUN 2015
RENCANA ANGGARAN BIAYADetail Engineering Design (DED)
NO URAIAN PEKERJAAN VOLUME SAT.HARGA SATUAN
(Rp)JUMLAH HARGA (
- Pekerjaan Beton bertulang K-225 388,40 m3 3.824.477,95 1.485.427.23
- Pekerjaan plesteran 1 : 2 784,00 m2 63.494,74 49.779.87
- Pekerjaan perpipaan dia. 8" 32,00 m1 653.197,00 20.902.30
- Alat Ukur Thompson 60odan 90
o 1,00 unit 800.000,00 800.00
-
7/25/2019 Ptmp & Ded Nagan Raya - Rab Total
10/65
PEKERJAAN : Detail Engineering Design (DED) TPA Kab. Nagan Raya
LOKASI : Kec. Tadu Raya, Kabupaten Nagan Raya
TA : APBN TAHUN 2015
RENCANA ANGGARAN BIAYADetail Engineering Design (DED)
NO URAIAN PEKERJAAN VOLUME SAT.HARGA SATUAN
(Rp)JUMLAH HARGA (
3 - Pekerjaan Kolam Fakultatif
- Galian 896,88 m3 55.200,00 49.507.50
- Tanah urug 89,69 m3 52.500,00 4.708.59
- Pasir urug 34,00 m3 128.241,66 4.360.21
- Pekerjaan beton bertulang K-225 346,00 m3 3.824.477,95 1.323.269.37
- Pekerjaan plesteran 1 : 2 532,00 m2 63.494,74 33.779.20
- Pekerjaan perpipaan dia. 8" 32,00 m1 653.197,00 20.902.30
- Pekerjaan pengadaan pompa resirkulasi 3,00 bh 5.000.000,00 15.000.00- Saluran pipa resirkulasi PVC 150 mm 200,00 m
1 60.060,00 12.012.00
4 - Pekerjaan Kolam Maturasi
- Galian 528,00 m3 55.200,00 29.145.60
- Tanah urug 52,80 m3 52.500,00 2.772.00
- Pasir urug 28,00 m3 128.241,66 3.590.76
- Pekerjaan beton bertulang K-225 170,55 m3 3.824.477,95 652.264.71
- Pekerjaan plesteran 1 : 2 348,00 m2 63.494,74 22.096.16
- Pekerjaan pengadaan pompa resirkulasi 3,00 bh 10.000.000,00 30.000.00
- Saluran pipa resirkulasi PVC 150 mm 200,00 m1 256.890,00 51.378.00
5 - Pekerjaan Kolam Wetland
- Galian 264,00 m3 55.200,00 14.572.80
- Tanah urug 26,40 m3 52.500,00 1.386.00
- Pasir urug 12,00 m3 52.500,00 630.00
- Pekerjaan beton bertulang K-225 75,75 m3 185.207,20 14.029.44
- Pekerjaan plesteran 1 : 2 172,00 m2 63.494,74 10.921.09
- Pekerjaan pengadaan pompa resirkulasi 3,00 bh 10.000.000,00 30.000.00
- Saluran pipa resirkulasi PVC 150 mm 200,00 m1 40.227,00 8.045.40
5 - Pondasi
- Bore Pile Dia 400mm kedalaman 8m 40,00 titik 1.760.000,00 70.400.00- Pekerjaan beton bore pile K-225 40,19 m
3 3.824.477,95 153.713.41
- Pekerjaan beton pile cap K-225 Ukuran 1,2 * 2,4 20,10 nh 3.824.477,95 76.856.70
4.283.537.54
1 - Pembuatan Sumur Pantau dengan Kedalaman 15 m UNIT 2,00 5.250.000,00 10.500.00
- Pekerjaan galian
- Pekerjaan bis beton dia 100 cm
Sub Total A.8. (Rp)
A.9. Pekerjaan Sumur Pantau
-
7/25/2019 Ptmp & Ded Nagan Raya - Rab Total
11/65
PEKERJAAN : Detail Engineering Design (DED) TPA Kab. Nagan Raya
LOKASI : Kec. Tadu Raya, Kabupaten Nagan Raya
TA : APBN TAHUN 2015
RENCANA ANGGARAN BIAYADetail Engineering Design (DED)
NO URAIAN PEKERJAAN VOLUME SAT.HARGA SATUAN
(Rp)JUMLAH HARGA (
- Pekerjaan pasir beton
- Semen
- Teral is besi penutup
- Ongkos pasang
10.500.00Sub Total A.9. (Rp)
-
7/25/2019 Ptmp & Ded Nagan Raya - Rab Total
12/65
PEKERJAAN : Detail Engineering Design (DED) TPA Kab. Nagan Raya
LOKASI : Kec. Tadu Raya, Kabupaten Nagan Raya
TA : APBN TAHUN 2015
RENCANA ANGGARAN BIAYADetail Engineering Design (DED)
NO URAIAN PEKERJAAN VOLUME SAT.HARGA SATUAN
(Rp)JUMLAH HARGA (
1 Area Jalan Masuk dan Bangunan
Pemasangan tiang listrik PJU 8,00 bt 4.200.000,00 33.600.00
2 Area Jalan Operasi dan Blok Landfill 1
Pemasangan tiang listrik PJU 10,00 bt 4.200.000,00 42.000.00
3 Area Jalan Operasi dan Blok Landfill 2
Pemasangan tiang listrik PJU 10,00 bt 4.200.000,00 42.000.00
4 Area Jalan Operasi dan Blok Landfill 3
Pemasangan tiang listrik PJU 10,00 bt 4.200.000,00 42.000.00
5 Pekerjaan Jaringan Listrik Bangunan Kantor dan Penunjang 1,00 lot 330.000.000,00 330.000.00
Kabel jaringan 1.118,00 m1 175.000,00 195.650.00
651.650.00
1 - Pekerjaan penghijauan buffer area
- Pekerjaan penghijauan buffer area 1,00 ls 35.000.000,00 35.000.00
2 - Pekerjaan pembangunan pintu gerbang
- Pekerjaan pembuatan pintu gerbang TPA sesuai aspirasi daerah 1,00 ls 80.000.000,00 80.000.00
3 - Taman 100,00 m2 50.000,00 5.000.00
4 - Pekerjaan Pemasangan Pagar Keliling BRC
- Pagar Kawat BRC Tinggi 180cm 990,00 m' 310.000,00 306.900.00
- Pondasi tiang pasangan batu kali setempat 30x30x50 cm 14,85 m3 905.958,96 13.453.49
- Tiang dan Frame Besi Siku 50 x 50 x 5 mm T. 2 meter 330,00 bh 350.000,00 115.500.00
555.853.49
B.2.4. Pekerjaan Pembuatan Pagar Keliling
Sub Total B.2. (Rp)
Sub Total B.1. (Rp)
B.2. Pekerjaan Buffer Area, Pintu Gerbang, Taman, dan Pagar Keliling
B.2.1. Pekerjaan Penghijauan Buffer Area
B.2.2. Pekerjaan Pintu Gerbang
B.2.3. Pekerjaan Penghijauan Buffer Area
B.1. Pekerjaan Jaringan Lampu Penerangan
-
7/25/2019 Ptmp & Ded Nagan Raya - Rab Total
13/65
PEKERJAAN : Detail Engineering Design (DED) TPA Kab. Nagan Raya
LOKASI : Kec. Tadu Raya, Kabupaten Nagan Raya
TA : APBN TAHUN 2015
RENCANA ANGGARAN BIAYADetail Engineering Design (DED)
NO URAIAN PEKERJAAN VOLUME SAT.HARGA SATUAN
(Rp)JUMLAH HARGA (
-
7/25/2019 Ptmp & Ded Nagan Raya - Rab Total
14/65
PEKERJAAN : Detail Engineering Design (DED) TPA Kab. Nagan Raya
LOKASI : Kec. Tadu Raya, Kabupaten Nagan Raya
TA : APBN TAHUN 2015
RENCANA ANGGARAN BIAYADetail Engineering Design (DED)
NO URAIAN PEKERJAAN VOLUME SAT.HARGA SATUAN
(Rp)JUMLAH HARGA (
1 - Pemasangan Menara Air 1000 L 1,00 bh 3.000.000,00 3.000.00
2 - Konstruksi baja siku 60.60.5 1,00 bh 8.000.000,00 8.000.00
3 - Konstruksi pondasi 1,00 bh 4.000.000,00 4.000.00
4 - Instalasi pipa dan keran 1,00 pak 1.500.000,00 1.500.00
16.500.00
1 - Pekerjaan persiapan
- Pembersihan lokasi 1,00 ls 300.000,00 300.00
- Pengukuran / bouwplank 1,00 ls 200.000,00 200.00
2 - Pekerjaan tanah
- Galian tanah untuk pondasi lajur 8,00 m3 27.700,00 221.60
- Urugan kembali tanah setempat 4,00 m3 128.241,66 512.96
- Timbunan tanah padat 5,00 m3 156.832,46 784.16
3 - Pekerjaan struktur
- Pasangan batu kosong 3,65 m3 699.811,00 2.554.31
- Pondasi lajur (batu belah) 6,10 m3 910.958,96 5.556.84
- Sloop 15/20 0,55 m3 5.831.880,90 3.207.53
- Kolom 15/15 0,41 m3 6.642.801,27 2.723.54
- Ring 15/15 0,41 m3 6.642.801,27 2.723.54
4 - Pekerjaan dinding
- Pasangan bata 46,80 m2 113.818,43 5.326.70
- Plesteran + acian 93,60 m2 71.722,58 6.713.23
5 - Pekerjaan kusen
- Kusen pintu / jendela 0,29 m3 4.646.975,00 1.347.62
- Daun pintu panel 2,00 lb 816.255,00 1.632.51- Daun / bingkai jendela 5,00 lb 510.627,50 2.553.13
- Daun / bingkai ventilasi 7,00 daun 175.000,00 1.225.00
- Kaca jendela 5,00 lb 60.000,00 300.00
- Kaca ventilasi 7,00 lb 30.000,00 210.00
6 - Alat bantu
- Engsel pintu 2,00 ps 23.400,00 46.80
- Engsel jendela dan engsel ventilasi 12,00 ps 17.040,00 204.48
- Kunci pintu ruang 2,00 set 210.000,00 420.00
- Slot jendela dan slot ventilasi 12,00 bh 10.000,00 120.00
- Hak angin jendela dan hak angin ventilasi 12,00 bh 10.000,00 120.00
B.3. Pekerjaan Pembangunan Menara Air
Sub Total B.3. (Rp)
C.1. Pekerjaan Pembangunan Pos Jaga
-
7/25/2019 Ptmp & Ded Nagan Raya - Rab Total
15/65
PEKERJAAN : Detail Engineering Design (DED) TPA Kab. Nagan Raya
LOKASI : Kec. Tadu Raya, Kabupaten Nagan Raya
TA : APBN TAHUN 2015
RENCANA ANGGARAN BIAYADetail Engineering Design (DED)
NO URAIAN PEKERJAAN VOLUME SAT.HARGA SATUAN
(Rp)JUMLAH HARGA (
7 - Atap
- Kuda-kuda rangka atap Baja Ringan 45,50 m3 185.000,00 8.417.50
- Atap genteng metal 45,50 m3 75.000,00 3.412.50
- Nok / bubungan 35,00 m1 102.754,33 3.596.40
- Lisplank GRC 26,00 m1 35.000,00 910.00
-
7/25/2019 Ptmp & Ded Nagan Raya - Rab Total
16/65
PEKERJAAN : Detail Engineering Design (DED) TPA Kab. Nagan Raya
LOKASI : Kec. Tadu Raya, Kabupaten Nagan Raya
TA : APBN TAHUN 2015
RENCANA ANGGARAN BIAYADetail Engineering Design (DED)
NO URAIAN PEKERJAAN VOLUME SAT.HARGA SATUAN
(Rp)JUMLAH HARGA (
8 - Plafon
- Plafon berikut rangka 38,20 m2 299.432,60 11.438.32
9 - Pekerjaan lantai
- Lantai keramik 15,50 m2 195.979,80 3.037.68
10 - Instalasi listrik
- Lampu TL 40 4,00 titik 58.200,00 232.80
- Lampu titik 2,00 titik 45.000,00 90.00
- Stop kontak 6,00 titik 21.120,00 126.72
11 - Pengecatan
- Cat dinding / tembok 93,60 m2 41.316,40 3.867.21
- Cat plafon 38,20 m2 43.556,40 1.663.85
- Politur kusen 31,20 m1 40.227,00 1.255.08
- Politur bingkai daun jendela 5,00 m2 542.580,00 2.712.90
- Poli tur daun pintu 5,00 m2 542.580,00 2.712.90
82.477.89
1 - Pekerjaan persiapan
- Pembersihan lokasi 1,00 ls 1.000.000,00 1.000.00
- Pengukuran / bouwplank 1,00 ls 500.000,00 500.00
2 - Pekerjaan tanah
- Galian tanah untuk pondasi 56,00 m3 27.700,00 1.551.20
- Urugan kembali tanah setempat 8,00 m3 17.206,67 137.65
- Timbunan sirtu padat 60,00 m3 88.500,00 5.310.00
3 - Pekerjaan struktur
- Pasangan batu kosong 11,00 m3 699.811,00 7.697.92
- Pasangan pondasi lajur batu kali 21,30 m3 910.958,96 19.403.42
- Cor sloop 15/25 3,10 m3 5.831.880,90 18.078.83
- Cor kolom 25/25 3,87 m3 6.642.801,27 25.707.64
- Cor balok ring 15/30 5,30 m3 5.831.880,90 30.908.96
4 - Pekerjaan dinding
- Pasangan bata 97,00 m2 113.818,43 11.040.38
- Plesteran + acian 194,00 m2 71.722,58 13.914.18
5 - Pekerjaan kusen
Sub Total C.1. (Rp)
C.2. Pekerjaan Pembangunan Kantor
-
7/25/2019 Ptmp & Ded Nagan Raya - Rab Total
17/65
PEKERJAAN : Detail Engineering Design (DED) TPA Kab. Nagan Raya
LOKASI : Kec. Tadu Raya, Kabupaten Nagan Raya
TA : APBN TAHUN 2015
RENCANA ANGGARAN BIAYADetail Engineering Design (DED)
NO URAIAN PEKERJAAN VOLUME SAT.HARGA SATUAN
(Rp)JUMLAH HARGA (
- Kusen pintu / jendela 0,75 m3 4.646.975,00 3.485.23
- Daun pintu panel 1,00 lb 816.255,00 816.25
- Daun pintu KM 1,00 lb 816.255,00 816.25
- Daun / bingkai jendela 6,00 lb 510.627,50 3.063.76
- Daun / bingkai ventilasi 12,00 lb 510.627,50 6.127.53
- Kaca jendela 5,00 lb 120.000,00 600.00
- Kaca ventilasi 14,00 lb 60.000,00 840.00
6 - Alat penggantung
- Engsel pintu 2,00 ps 23.400,00 46.80
- Engsel jendela dan engsel ventilasi 22,00 ps 17.040,00 374.88
- Kunci pintu ruang 2,00 set 210.000,00 420.00
- Slot jendela dan slot ventilasi 22,00 bh 10.000,00 220.00
- Hak angin jendela dan hak angin ventilasi 22,00 bh 10.000,00 220.00
7 - Atap
- Kuda - kuda INP 1.980,00 kg 33.048,38 65.435.78
- Gording C 12 850,00 kg 33.048,38 28.091.11
- Gording Kayu 6/12 2,50 m3 5.758.098,00 14.395.24
- Asesoris 350,00 kg 33.048,38 11.566.93
- Penutup atap genteng METAL 175,00 m2 350.000,00 61.250.00
- Kaso - kaso dan reng 175,00 m2 116.852,00 20.449.10
- Nok / bubungan metal 13,00 m1 102.754,33 1.335.80
- Pipa buangan air hujan pvc 4" 41,00 m1 256.890,00 10.532.49
- Lisplank 63,60 m1 225.361,00 14.332.95
8 - Plafon
- Plafon berikut rangka 210,60 m2 299.432,60 63.060.50
- Lis plafon 197,60 m1 14.000,00 2.766.40
9 - Pekerjaan lantai
- Lantai rabat beton 115,00 m3 1.827.978,35 210.217.51
- Lantai keramik 28,00 m2 195.979,80 5.487.43
10 - Pekerjaan kamar mandi
- Keramik dinding 14,00 m2 185.207,20 2.592.90
- Keramik lantai 4,00 m2 195.979,80 783.91
- Bak air fiber + aksesoris 1,00 bh 300.000,00 300.00
- Kran air 1,00 bh 60.000,00 60.00
- Kloset duduk 1,00 set 2.400.000,00 2.400.00
- Jet washer 1,00 bh 225.000,00 225.00
- Instalasi air bersih (pipa pvc 1/2" ) 20,00 m1 42.170,00 843.40
- Instalasi air bersih (pipa pvc 3/4" ) 20,00 m1 50.870,00 1.017.40
- Instalasi air kotor (pipa pvc 2" ) 20,00 m1 118.105,00 2.362.10
-
7/25/2019 Ptmp & Ded Nagan Raya - Rab Total
18/65
PEKERJAAN : Detail Engineering Design (DED) TPA Kab. Nagan Raya
LOKASI : Kec. Tadu Raya, Kabupaten Nagan Raya
TA : APBN TAHUN 2015
RENCANA ANGGARAN BIAYADetail Engineering Design (DED)
NO URAIAN PEKERJAAN VOLUME SAT.HARGA SATUAN
(Rp)JUMLAH HARGA (
- Instalasi air kotoran (pipa pvc 4" ) 12,00 m1 256.890,00 3.082.68
- Septick tank 1,00 unit 22.627.453,64 22.627.45
11 - Instalasi listrik
- Lampu TL 40 10,00 titik 58.200,00 582.00
- Lampu titik 2,00 titik 45.000,00 90.00
- Stop kontak 6,00 titik 21.120,00 126.72
-
7/25/2019 Ptmp & Ded Nagan Raya - Rab Total
19/65
PEKERJAAN : Detail Engineering Design (DED) TPA Kab. Nagan Raya
LOKASI : Kec. Tadu Raya, Kabupaten Nagan Raya
TA : APBN TAHUN 2015
RENCANA ANGGARAN BIAYADetail Engineering Design (DED)
NO URAIAN PEKERJAAN VOLUME SAT.HARGA SATUAN
(Rp)JUMLAH HARGA (
12 - Pengecatan
- Cat dinding / tembok 124,00 m2 41.316,40 5.123.23
- Cat plafon 38,50 m2 43.556,40 1.676.92
- Politur kusen 80,50 m1 40.227,00 3.238.27
- Politur bingkai daun jendela 5,00 m2 542.580,00 2.712.90
- Poli tur daun pintu 5,00 m2 542.580,00 2.712.90
- Cat lisplang 63,60 m1 32.861,40 2.089.98
715.849.99
1 - Pekerjaan persiapan
- Pembersihan lokasi 1,00 ls 1.000.000,00 1.000.00
- Pengukuran / bouwplank 1,00 ls 500.000,00 500.00
2 - Pekerjaan tanah
- Galian tanah untuk pondasi 76,00 m3 27.700,00 2.105.20
- Urugan kembali tanah setempat 12,00 m3 17.206,67 206.48
- Timbunan sirtu padat 60,00 m3 128.241,66 7.694.49
3 - Pekerjaan struktur
- Pasangan batu kosong 11,00 m3 699.811,00 7.697.92
- Pasangan pondasi lajur batu kali 21,30 m3 910.958,96 19.403.42
- Cor sloop 15/25 3,10 m3 5.831.880,90 18.078.83
- Cor kolom 25/25 3,87 m3 6.642.801,27 25.707.64
- Cor balok ring 15/30 5,30 m3 6.642.801,27 35.206.84
4 - Pekerjaan dinding
- Pasangan bata 203,00 m2 120.760,57 24.514.39
- Plesteran + acian 406,00 m2 63.494,74 25.778.86
5 - Pekerjaan kusen
- Kusen pintu / jendela 1,75 m3 4.646.975,00 8.132.20
- Daun pintu panel 1,00 lb 816.255,00 816.25
- Daun pintu ruangan 4,00 lb 325.000,00 1.300.00
- Daun pintu KM 1,00 lb 375.000,00 375.00
- Daun / bingkai jendela 6,00 lb 510.627,50 3.063.76
- Daun / bingkai ventilasi 12,00 lb 175.000,00 2.100.00
- Kaca jendela 15,00 lb 120.000,00 1.800.00
- Kaca ventilasi 14,00 lb 60.000,00 840.00
6 - Alat penggantung
- Engsel pintu 2,00 ps 23.400,00 46.80
Sub Total C.2. (Rp)
C.3. Pekerjaan Pembangunan Garasi Alat Berat
-
7/25/2019 Ptmp & Ded Nagan Raya - Rab Total
20/65
PEKERJAAN : Detail Engineering Design (DED) TPA Kab. Nagan Raya
LOKASI : Kec. Tadu Raya, Kabupaten Nagan Raya
TA : APBN TAHUN 2015
RENCANA ANGGARAN BIAYADetail Engineering Design (DED)
NO URAIAN PEKERJAAN VOLUME SAT.HARGA SATUAN
(Rp)JUMLAH HARGA (
- Engsel jendela dan engsel ventilasi 22,00 ps 17.040,00 374.88
- Kunci pintu ruang 2,00 set 210.000,00 420.00
- Slot jendela dan slot ventilasi 22,00 bh 10.000,00 220.00
- Hak angin jendela dan hak angin ventilasi 22,00 bh 10.000,00 220.00
-
7/25/2019 Ptmp & Ded Nagan Raya - Rab Total
21/65
PEKERJAAN : Detail Engineering Design (DED) TPA Kab. Nagan Raya
LOKASI : Kec. Tadu Raya, Kabupaten Nagan Raya
TA : APBN TAHUN 2015
RENCANA ANGGARAN BIAYADetail Engineering Design (DED)
NO URAIAN PEKERJAAN VOLUME SAT.HARGA SATUAN
(Rp)JUMLAH HARGA (
7 - Atap
- Kuda - kuda INP 1.980,00 kg 17.265,31 34.185.31
- Gording C 12 850,00 kg 17.265,31 14.675.51
- Gording Kayu 6/12 2,50 m3 5.758.098,00 14.395.24
- Asesoris 350,00 kg 17.265,31 6.042.85
- Penutup atap genteng metal 175,00 m2 136.800,00 23.940.00
- Kaso - kaso dan reng 175,00 m2 116.852,00 20.449.10
- Nok / bubungan metal 13,00m
1 102.754,33 1.335.80
- Pipa buangan air hujan pvc 4" 41,00 m1 256.890,00 10.532.49
- Lisplank 63,60 m1 225.361,00 14.332.95
8 - Plafon
- Plafon berikut rangka 210,60 m2 299.432,60 63.060.50
- Lis plafon 197,60 m1 37.800,00 7.469.28
9 - Pekerjaan lantai
- Lantai rabat beton 115,00 m3 979.560,25 112.649.42
- Lantai keramik 28,00 m2 195.979,80 5.487.43
10 - Pekerjaan kamar mandi
- Keramik dinding 14,00 m2 185.207,20 2.592.90
- Keramik lantai 4,00 m2 195.979,80 783.91
- Bak air fiber + aksesoris 1,00 bh 300.000,00 300.00
- Kran air 1,00 bh 60.000,00 60.00
- Kloset duduk 1,00 set 2.400.000,00 2.400.00
- Jet washer 1,00 bh 225.000,00 225.00
- Instalasi air bersih (pipa pvc 1/2" ) 20,00 m1 42.170,00 843.40
- Instalasi air bersih (pipa pvc 3/4" ) 20,00 m1 50.870,00 1.017.40
- Instalasi air kotor (pipa pvc 2" ) 20,00 m1 118.105,00 2.362.10
- Instalasi air kotoran (pipa pvc 4" ) 12,00 m1 256.890,00 3.082.68
- Septick tank 1,00 unit 22.627.453,64 22.627.45
11 - Instalasi listrik
- Lampu TL 40 10,00 titik 58.200,00 582.00
- Lampu titik 2,00 titik 45.000,00 90.00
- Stop kontak 6,00 titik 21.120,00 126.72
12 - Pengecatan
- Cat dinding / tembok 406,00 m2 41.316,40 16.774.45
- Cat plafon 210,60 m2 43.556,40 9.172.97
- Politur kusen 80,50 m1 40.227,00 3.238.27
- Politur bingkai daun jendela 5,00 m2 542.580,00 2.712.90
- Poli tur daun pintu 5,00 m2 542.580,00 2.712.90
- Cat lisplang 63,60 m1 32.861,40 2.089.98
-
7/25/2019 Ptmp & Ded Nagan Raya - Rab Total
22/65
PEKERJAAN : Detail Engineering Design (DED) TPA Kab. Nagan Raya
LOKASI : Kec. Tadu Raya, Kabupaten Nagan Raya
TA : APBN TAHUN 2015
RENCANA ANGGARAN BIAYADetail Engineering Design (DED)
NO URAIAN PEKERJAAN VOLUME SAT.HARGA SATUAN
(Rp)JUMLAH HARGA (
589.954.01Sub Total C.3. (Rp)
-
7/25/2019 Ptmp & Ded Nagan Raya - Rab Total
23/65
PEKERJAAN : Detail Engineering Design (DED) TPA Kab. Nagan Raya
LOKASI : Kec. Tadu Raya, Kabupaten Nagan Raya
TA : APBN TAHUN 2015
RENCANA ANGGARAN BIAYADetail Engineering Design (DED)
NO URAIAN PEKERJAAN VOLUME SAT.HARGA SATUAN
(Rp)JUMLAH HARGA (
1 - Pekerjaan tanah
- Galian tanah untuk pondasi 42,38 m3 27.700,00 1.173.92
- Timbunan sirtu padat 15,09 m3 88.500,00 1.335.46
2 - Pekerjaan struktur
- Pasangan batu kosong 3,84m
3 699.811,00 2.687.27
- Pasangan pondasi batu kali 9,45 m3 910.958,96 8.608.56
- Cor pondasi telapak 2,46 m3 5.028.827,95 12.370.91
- Cor sloop 20/25 1,50 m3 5.831.880,90 8.747.82
- Cor kolom 20/20 2,02 m3 6.642.801,27 13.418.45
- Cor ring balok 20/30 1,80 m3 6.642.801,27 11.957.04
- Cor pondasi Jembatan timbang 1,00 ls 72.000.000,00 72.000.00
3 - Pekerjaan dinding
- Pasangan dinding bata merah 95,23 m2 113.818,43 10.838.92
- Plesteran + acian 190,46 m2 71.722,58 13.660.28
- Pasangan batu paras sarwa genap 15,70 m2 624.254,71 9.800.79
4 - Pekerjaan kusen
- Kusen pintu / jendela 0,71 m3 4.646.975,00 3.299.35
- Daun pintu panel ruang laboratorium 1,00 daun 816.255,00 816.25
- Daun pintu panel ruang mesin 2,00 daun 816.255,00 1.632.51
- Daun pintu KM 1,00 daun 816.255,00 816.25
- Bingkai daun jendela 10,00 daun 510.627,50 5.106.27
- Bingkai daun ventilasi 12,00 daun 510.627,50 6.127.53
- Kaca jendela 10,00 lb 120.000,00 1.200.00
- Kaca ventilasi 12,00 lb 60.000,00 720.00
5 - Alat penggantung
- Engsel pintu ruang mesin 2,00 ps 23.400,00 46.80
- Engsel pintu ruang laboratorium dan ruang panel 2,00 ps 23.400,00 46.80
- Engsel jendela dan engsel ventilasi 22,00 ps 17.040,00 374.88
- Kunci pintu ruang mesin 2,00 set 150.000,00 300.00
- Kunci pintu ruang laboratorium dan ruang panel 2,00 set 210.000,00 420.00
- Slot jendela dan slot ventilasi 22,00 bh 10.000,00 220.00
- Hak angin jendela dan hak angin ventilasi 22,00 bh 10.000,00 220.00
6 - Atap
- Plaat atap beton bertulang 3,00 m3 5.028.827,95 15.086.48
- Kosol siku 0,20 m3 5.758.098,00 1.151.61
- Gording 0,39 m3 5.758.098,00 2.245.65
- Kaso + reng 37,52 m2 116.852,00 4.384.28
C.4. Pekerjaan Pembangunan Jembatan Timbang
-
7/25/2019 Ptmp & Ded Nagan Raya - Rab Total
24/65
PEKERJAAN : Detail Engineering Design (DED) TPA Kab. Nagan Raya
LOKASI : Kec. Tadu Raya, Kabupaten Nagan Raya
TA : APBN TAHUN 2015
RENCANA ANGGARAN BIAYADetail Engineering Design (DED)
NO URAIAN PEKERJAAN VOLUME SAT.HARGA SATUAN
(Rp)JUMLAH HARGA (
- Genting abadi 37,52 m2 350.000,00 13.132.00
- Nok / bubungan 7,20 m1 102.754,33 739.83
- Lisplang 32,00 m1 225.361,00 7.211.55
- Pasang ikut celedu 4,00 bh 400.000,00 1.600.00
- Pipa air hujan 4" 20,00 m1 256.890,00 5.137.80
-
7/25/2019 Ptmp & Ded Nagan Raya - Rab Total
25/65
PEKERJAAN : Detail Engineering Design (DED) TPA Kab. Nagan Raya
LOKASI : Kec. Tadu Raya, Kabupaten Nagan Raya
TA : APBN TAHUN 2015
RENCANA ANGGARAN BIAYADetail Engineering Design (DED)
NO URAIAN PEKERJAAN VOLUME SAT.HARGA SATUAN
(Rp)JUMLAH HARGA (
7 - Plafon
- Plafon berikut rangka ( rambu ) 32,16 m2 299.432,60 9.629.75
- Lis plafon 49,60 m2 14.000,00 694.40
8 - Pekerjaan lantai
- Cor beton dengan tulangan ringan (lap. atas) 0,84 m3 5.028.827,95 4.244.33
- Cor beton dengan tulangan ringan (lap. bawah) 0,21 m3 5.028.827,95 1.056.05
- Lapisan karet ( 5 cm ) 7,50 m2
500.000,00 3.750.00- Lantai keramik 24,38 m
2 111.137,00 2.709.52
- Cor beton (lantai raam) 0,42 m3 1.827.978,35 767.75
9 - Instalasi listrik
- Lampu TL 40 6,00 titik 58.200,00 349.20
- Lampu titik 2,00 titik 90.000,00 180.00
- Stop kontak 6,00 titik 21.120,00 126.72
11 - Pengecatan
- Cat dinding / tembok 190,46 m2 41.316,40 7.869.12
- Cat plafon 62,16 m2 43.556,40 2.707.46
- Cat lis plang 32,00 m1 32.861,40 1.051.56
- Politur kusen 78,50 m1 40.227,00 3.157.81
- Politur bingkai daun jendela dan ventilasi 45,80 m1 40.227,00 1.842.39
- Politur daun pintu 16,23 m2 542.580,00 8.806.07
287.577.53
1 - Pekerjaan pembangunan tempat cuci truk sampah
- Pekerjaan pembangunan tempat cuci mobil 1,00 ls 60.000.000,00 60.000.00
- Pipa saluran air bersih 1,00 ls 6.000.000,00 6.000.00
- Pipa saluran air kotor menuju pipa lindi 1,00 ls 5.000.000,00 5.000.00
71.000.00
1 - Jembatan Timbang Pitless-Type Kapasitas 20 ton 1,00 unit 225.000.000,00 225.000.00
- Model indicator : E-1205
- Kapasi tas : 40 tons x 10 kg
- Ukuran platform : 9 x 3 m
- Electronic equipment, terdiri dari :
- 1 (satu) unit Weighting Indicator Type E-1205
- 4 (empat) pcs Load Cell (IP-68)
- 1 (satu) unit printer
D.1. Pekerjaan Pengadaan Peralatan Pendukung Administrasi
Sub Total C.6. (Rp)
Sub Total C.4. (Rp)
C.5. Pekerjaan Pembangunan Tempat Cuci Truk Sampah
-
7/25/2019 Ptmp & Ded Nagan Raya - Rab Total
26/65
PEKERJAAN : Detail Engineering Design (DED) TPA Kab. Nagan Raya
LOKASI : Kec. Tadu Raya, Kabupaten Nagan Raya
TA : APBN TAHUN 2015
RENCANA ANGGARAN BIAYADetail Engineering Design (DED)
NO URAIAN PEKERJAAN VOLUME SAT.HARGA SATUAN
(Rp)JUMLAH HARGA (
- 1 (satu) set junction box and cable 30 meter, to weighting indicator
- Konstruksi timbangan Pitless Type :
- 1 (satu) set bottom work pitless-type, deck module c/w accessories
- Perincian material
- Main Beam WF 500 x 200 x 10 x 16 x 9.000 mm (2 pcs)
- Cross Beam WF 200 x 100 x 5,5 x 8 x 3.200 mm (24 pcs)
-
7/25/2019 Ptmp & Ded Nagan Raya - Rab Total
27/65
PEKERJAAN : Detail Engineering Design (DED) TPA Kab. Nagan Raya
LOKASI : Kec. Tadu Raya, Kabupaten Nagan Raya
TA : APBN TAHUN 2015
RENCANA ANGGARAN BIAYADetail Engineering Design (DED)
NO URAIAN PEKERJAAN VOLUME SAT.HARGA SATUAN
(Rp)JUMLAH HARGA (
- Cover modul joint plate 200 x 160 x 10 mm (48 pcs)
- Cover modul joint plate 500 x 200 x 10 mm (4 pcs)
- Support Beam WF 200 x 100 x 10 mm (192 pcs)
- Cover plate 1500 x 3000 x 10 mm (Mild Steel) (6 pcs)
- Accessories plate termasuk angkur, stopper, bold, dan nuts
- Plat fondasi 400 x 400 x 38 cm (4 pcs)
- Plat atas bawah penahan Load Cell (8 pcs)
- Sistem pengecatan konstruksi
- Brassing and zinzromate green
- Duco super black doff dan thinner super ND
- Erection pemasangan dan kalibrasi
- Fondasi civil work Pitless-Type 40 tons ukuran Platform 9 x 3 meter.
- Akomodasi dan pemasangan
2 - Personal Komputer (PCs) 2,00 unit 5.500.000,00 11.000.00
- Core2 Duo 6300
- Motherboard Asus P5LD2SE-C
- DDRII 512 MB PC 4200 Visipro
- A.Radeon X1050 256 MB P.C.
- FDD 1.44 MB Panasonic
- HDD 120 GB Seagate Sata
- Sc + Lan Card + Sata
- COMBO Samsung/LG 16X Black
- Casing ATX 400 Watt
- Moni tor Advance 17" S/F
3 - Printer Laser Jet BW 1,00 unit 3.190.000,00 3.190.00
4 - Furniture ruangan dan perlengkapan kantor 1,00 ls 50.000.000,00 50.000.00
Safety Sign Board ( 15 unit)
- Furni ture pimpinan TPA
- Furni ture karyawan TPA
- Furni ture ruang tamu
- Furni ture ruang rapat
- Furniture pos jaga atas dan jembatan timbang
- Furni ture pos jaga bawah
- Furniture bangunan bawah
- Furniture lainnya
- Akomodasi dan pemasangan
-
7/25/2019 Ptmp & Ded Nagan Raya - Rab Total
28/65
PEKERJAAN : Detail Engineering Design (DED) TPA Kab. Nagan Raya
LOKASI : Kec. Tadu Raya, Kabupaten Nagan Raya
TA : APBN TAHUN 2015
RENCANA ANGGARAN BIAYADetail Engineering Design (DED)
NO URAIAN PEKERJAAN VOLUME SAT.HARGA SATUAN
(Rp)JUMLAH HARGA (
5 - Perlengkapan Keselamatan dan Kesehatan Kerja (K3)
alat Pemadam Api (Type Co Kap 10 kg) 4,00 ls 4.500.000,00 18.000.00
307.190.00
- Spektrofotometer UV/VIS (UV/Vis Single Beam + 1 unit PC) 1,00 unit 88.500.000,00 88.500.00
- pH meter digital 1,00 unit 4.900.000,00 4.900.00
- COD meter 1,00 unit 30.000.000,00 30.000.00
- Kuvet UV/Vis Quartz 2,00 unit 1.800.000,00 3.600.00
Kalium Dikromat 500 g per botol 1,00 unit 600.000,00 600.00
- Color Standard Solution 500 Pt Co Units (1 liter) 1,00 unit 3.500.000,00 3.500.00
- Kertas saring 0,45 mikron 1,00 unit 100.000,00 100.00
- Gelas ukur (1000 ml) 10,00 unit 300.000,00 3.000.00
- Gelas ukur (500 ml) 10,00 unit 200.000,00 2.000.00
Freezer (102 liter) 1,00 unit 3.000.000,00 3.000.00
- Sampling box (75 liter) 1,00 unit 900.000,00 900.00
- Botol Sampling (10 buah) 10,00 unit 100.000,00 1.000.00
- Larutan KMnO4 (500 gram) 1,00 pas 600.000,00 600.00
- Larutan K2Cr2O7 (500 ml) 1,00 pas 250.000,00 250.00
- Larutan HgCl2 (1 gram) 50,00 pas 25.000,00 1.250.00
- Larutan NaOH 1N (1 liter) 1,00 pas 150.000,00 150.00
- Lain-lain 1,00 pas 10.000.000,00 10.000.00
153.350.00Sub Total D.4. (Rp)
Sub Total D.3. (Rp)
D.2. Pekerjaan Pengadaan Alat Laboratorium TPA
-
7/25/2019 Ptmp & Ded Nagan Raya - Rab Total
29/65
No SATUAN HARGA SAT. (Rp)
1 ls 8.000.000,00
2 ls 15.400.000,00
3 m1 32.162,28
4 m2 1.500,00
5 ls 13.230.000,00
6 ls 22.178.680,00
7 ls 18.650.000,00
8 ls 10.155.000,00
9 unit 996.697,80
10 m3 156.832,46
11 m3
128.241,6612 m
2 8.804,00
13 m2 26.015,00
14 m3 1.978.228,35
15 m3 1.827.978,35
16 m3 1.903.703,35
17 m3 6.642.801,27
18 m3 5.831.880,90
19 m3 979.560,25
20 kg 17.265,31
21 m2 288.924,00
22 m2 191.964,00
23 m3 473.680,00
24 m2 22.002,47
25 m3 910.958,96
26 m3 699.811,00
27 m3 655.823,60
28 m3 27.700,00
29 m3 52.500,00
30 m3 55.200,00
31 m3 17.206,67
32 bh 134.700,00
33 bh 182.700,00
34 bh 220.800,00
35 m2 152.477,96
36 m2 120.760,57
37 m2 71.551,88
38 m2 63.494,74
39 m2 54.899,00
40 m3 5.758.098,00
41 m1 225.361,00
42 m2 67.716,60
ANALISIS HARGA SATUAN
RESUME HARGA SATUAN PEKERJAAN
BAHAN / MATERIAL
PENGUKURAN , POSITIONING
GALIAN TANAH
LAPISAN PERKERASAN ASPHALT PASIR
PASANGAN BATU KALI 1:4
1 M3 PASANGAN AANSTAMPING
ADUKAN 1:4
PEMBESIAN - 1 kg
PASANGAN BUIS BETON DIAMETER 40
PASANGAN BUIS BETON DIAMETER 50
1 M2 PASANGAN BATA MERAH 1 : 2
1 M2 PLESTERAN 1:2 + ACIAN
1 M2 PASANGAN BATA MERAH 1 : 4
GALIAN TANAH DENGAN ALAT BERAT
1 M2 LISTPLANG KAYU KAMPER 3/20
MOBILISASI - DEMOBILISASI PERALATAN
MOBILISASI - DEMOBILISASI URUGAN & DARAT
BETON K 250 ( tanpa tulangan )
PENERANGAN DAN KESELAMATAN KERJA
DOKUMENTASI/ADMINISTRASI/AS-BUILT DRAWING
PENGADAAN AIR BERSIH PEKERJA
PEK. TIMBUNAN TANAH KEMBALI
PASANGAN BUIS BETON DIAMETER 35
1 M2 PLESTERAN 1:4 + ACIAN
1 M2 PENGECATAN DINDING SETARA VINILEX (3X)
1 M2 PENGECATAN KAYU (3X) BERIKUT MENI
1 M3 KUDA-KUDA
PEK. PASANGAN BOUWPLANK
STRIPPING DAN PEMBERSIHAN
BEKISTING MULTIPLEX 12 MM - 10 M2
BEKISTING PAPAN - 10 M2
HAMPARAN BATU 5-7 UNTUK BASE JALAN
PEK. PASANGAN PAPAN NAMA
PEK. TIMBUNAN TANAH
PEK. TIMBUNAN PASIRPEMADATAN 1 M LAPISAN TERATAS
PEK. CRUSHED STONE DIA 2-3 TEBAL 5 CM
BETON K 300 ( tanpa tulangan )
BETON K 225 ( tanpa tulangan )
URUGAN DENGAN TANAH TPA SENDIRI
PEKERJAAN KOLOM 15X15 CM
PEKERJAAN SLOOF BETON 15X20 CM
LANTAI KERJA 1:3:5
-
7/25/2019 Ptmp & Ded Nagan Raya - Rab Total
30/65
ANALISIS HARGA SATUAN
43 m2 104.197,50
44 m1 121.197,50
45 m2 269.677,50
46 bh 68.500,00
47 m2 14.500,001 M2 PEMBERSIHAN LOKASI & PERATAAN TANAH
1 M2 DAUN PINTU TEAKWOOD LAPIS ALUMINIUM
PEMASANGAN CERUCUK DOLKEN DIA 10 CM
1 M2 PAVINGBLOCK BERIKUT PEMASANGAN
1 M PEMASANGAN CANSTINE
-
7/25/2019 Ptmp & Ded Nagan Raya - Rab Total
31/65
ANALISIS HARGA SATUAN
48 m2 1.583.829,25
49 m2 1.300.314,64
50 m2 1.340.917,00
51 m1 62.978,70
52 m3 117.490,00
53 m3 138.540,00
54 m3 88.500,00
55 m3 548.018,90
56 m3 1.258.962,22
57 m3 5.726.942,95
58 m3 5.028.827,95
59m
3 3.824.477,95
60 m2 113.818,43
61 m2 71.722,58
62 m2 624.254,71
63 m3 4.646.975,00
64 lb 816.255,00
65 lb 325.000,00
66 lb 375.000,00
67 lb 510.627,50
68 m2 195.979,80
69 m2 185.207,20
70m
1 128.519,51
71 m2 116.852,00
72 m2 350.000,00
73 m1 102.754,33
74 kg 33.048,38
75 m2 299.432,60
76 m1 42.170,00
77 m1 50.870,00
78 m1 63.655,00
79 m1 118.105,00
80 m1 174.180,00
81 m1
256.890,0082 m
1 653.197,00
83 unit 22.627.453,64
84 m2 112.966,30
85 m2 41.316,40
86 m2 43.556,40
87 m2 112.310,00
88 m1 27.384,50
89 m1 32.861,40
90 m2 542.580,00
INSTALASI PIPA PVC 8 "
1 M3 TIMBUNAN / URUGAN PASIR
1 M2 BANGUNAN KANTOR DIREKSI LANTAI PLESTER
1 M2 BANGUNAN LOS KERJA / GUDANG
1 M2 BANGUNAN RUMAH JAGA
1 M2 PASANGAN BEBATURAN PARAS SARWA GENAP
1 M1 BOUWPLANK
1 LB DAUN PINTU PANEL
1 M2 KERAMIK LANTAI 30/30
1 M2 KERAMIK DINDING 20/25
1 KG PEK. KONST.BESI WF
1 LB BINGKAI DAUN JENDELA POLOS
1 M2 POLITURAN / MELAMIC
1 UNIT SEPTICTANK + REMBESAN
1 M2 PASANG PAVING BLOCK NATURAL 6 CM
1 M2 PENGECATAN DINDING
1LB DAUN PINTU RUANGAN
1 LB DAUN PINTU KAMAR MANDI
1 M3 COR PLAT KOLAM BETON BERTULANG K 225
1 M3 TIMBUNAN / URUGAN SIRTU
1 M3 PASANGAN BATU KOSONG
1 M3 PASANGAN PONDASI BATU KALI 1 PC : 3 PS
1 M3 TIMBUNAN / URUGAN TANAH
1 M3 COR BALOK / KOLOM BETON BERTULANG K 225
1 M3 COR PLAAT ATAP BETON BERTULANG K 225
1 M2 PASANGAN BATA MERAH 1 PC : 3 PS
1 M2 PLESTERAN 1 PC : 3 PS
INSTALASI PIPA PVC 1/2 "
INSTALASI PIPA PVC 3/4 "
INSTALASI PIPA PVC 4 "
1 M2 PASANG PLAFOND GYPSUM BERIKUT RANGKA
1 M2 KASO + RENG
1 M1 PLIN / LIS KERAMIK DINDING 10/20
INSTALASI PIPA PVC 1 "
INSTALASI PIPA PVC 2 "
INSTALASI PIPA PVC 3 "
1 M3 KUSEN PINTU / JENDELA
1 M2 ATAP GENTING
1 M1 NOK / BUBUNGAN
1 M2 PENGECATAN PLAFOND
1 M2 PENGECATAN BESI / KAYU
1 M1 CAT BESI RANGKA RAM KAWAT
1 M1 CAT KAYU LISPLANG
-
7/25/2019 Ptmp & Ded Nagan Raya - Rab Total
32/65
ANALISIS HARGA SATUAN
91 m1 40.227,00
92 m3 3.090.845,45
93 unit 4.991.206,35
94 m2 24.500,00
1 UNIT PEKERJAAN SAMBUNGAN PIPA GAS
1 M3 COR STRAUSPILE BETON BERTULANG K 125
1 M1 POLITUR / MELAMIC KUSEN
1M2 PASANG ATAP ASBES GELOMBANG BESAR
-
7/25/2019 Ptmp & Ded Nagan Raya - Rab Total
33/65
ANALISIS HARGA SATUAN
No SATUAN HARGA SAT. (Rp.)
1 zak 75.725,00
2 m3 407.750,00
3 m3 131.063,00
4 m3 93.200,00
5 m3 131.063,00
6 m3 79.200,00
7 m3 360.000,00
8 m3 318.000,00
9 m3 294.000,00
10 m3 259.440,00
11 m3 412.000,00
12 bh 466,0013 kg 12.233,00
14 kg 21.533,00
15 M2 51.000,00
16 lembar 303.600,00
17 lembar 136.888,00
18 lembar 99.025,00
17 lembar 73.395,00
18 m3 2.563.000,00
19 m3 4.077.500,00
21 m3 4.077.500,00
20 kg 16.310,00
21 kg 42.000,00
22 kg 22.135,00
23 kg 64.800,00
24 tabung 414.000,00
25 tabung 534.000,00
26 ltr 31.680,00
27 kg 47.520,00
28 liter 7.975,20
29 m3 4.800,00
30 ltr 38.400,00
31 m1 171.255,00
32 kg 14.400,00
33 bh 90.000,00
34 bh 138.000,00
35 bh 176.100,00
36 bh 17.400,00
37 kg 26.400,00
38 kg 11.400,00
39 bh 30.120,00
40 lbr 5.040,00
41 m3 4.200.000,00
42 m3 4.200.000,00
43 m3 7.560.000,00
44 m3 7.560.000,00
45 m2 136.800,00
46 m1 50.400,00
47 m3 6.240.000,00
48 m3 6.480.000,00
KAYU KAMPER USUK 5/7
KAYU KAMPER RENG 2/3
SOLAR
AIR
CAT ANTI KARAT UNTUK BAJA
PIPA GIP 2"
ASPHALT
BUIS BETON DIAMETER 35 PANJANG 1,00 M
BUIS BETON DIAMETER 40 PANJANG 1,00 M
OXIGEN
ACETYLENE
OLIE
PAPAN MULTIPLEX 6 MM
PAPAN TRIPLEX 4 MM
KAYU PERANCAH
KAYU MERANTI BALOK
PAKU
BAUT
BAJA PROFIL DAN PLAT
KAYU MERANTI PAPAN
ELECTRODE (KAWAT LAS)
GEMUK DLL.
RAM KAWAT PVC COATED
PAPAN MULTIPLEX 12 MM
TANAH URUG
KRIKIL BIASA
BATU 5-7 CM UNTUK SUBBASE JALAN
BATU KALI/BATU GUNUNG
PAPAN MULTIPLEX 9 MM
BAJA TULANGAN
KAWAT BINRAD
DAFTAR HARGA MATERIAL
BAHAN / MATERIAL
SEMEN PC
BATU SPLIT/KERIKIL UNTUK BETON DILOKASI
PASIR BETON DI LAPANGAN
PASIR URUG
BATA MERAH
PASIR PASANG
BATU DIAMETER 7-20 CM/UNIT
BATU DIAMETER 50-70 CM/UNIT
BUIS BETON DIAMETER 50 PANJANG 1,00 M
STEGER WORK
CAT TEMBOK VINILEX
PLAMIR TEMBOK
ROL CAT
AMPELAS
KAYU KELAS I BALOK 8/12
GENTENG METAL RAINBOW
BUBUNGAN GENTENG METAL
KAYU BESI BALOK
KAYU BESI PAPAN
KAYU KELAS I BALOK 8/12
-
7/25/2019 Ptmp & Ded Nagan Raya - Rab Total
34/65
ANALISIS HARGA SATUAN
49 m1 37.800,00
50 m1 43.560,00
51 m3 2.160.000,00
52 kg 42.720,00
53 kg 16.188,00
54 kg 20.400,00
55 bh 4.560,00
56 ltr 5.400,00
57 lbr 66.000,00
58 lbr 72.000,00
59 lbr 110.400,00
60 lbr 120.000,00
61 lbr 85.200,00
62 m2 53.040,00
63 m2 120.000,00
64 m2 102.720,00
65 m2 189.000,00
66 ltr 29.280,00
67 btg 3.720.000,00
68 btg 1.944.800,00
69 btg 856.900,00
70 btg 492.516,00
71 btg 398.940,00
72 btg 290.400,00
73 btg 200.400,00
74 btg 27.840,00
75 btg 18.480,00
76 btg 320.400,00
77 btg 267.600,00
78 btg 16.320,00
79 kg 58.320,00
80 kg 58.800,00
81 kg 27.240,00
82 ltr 15.240,00
83 m2 85.000,00
84 m2 90.000,00
85 m2 61.200,00
86 m2 66.600,00
87 m2 78.000,00
88 m2 80.400,00
89 m2 130.000,00
90 m2 87.500,00
91 BH 23.400,00
92 BH 17.040,00
93 BH 210.000,00
94 BH 32.160,00
95 BH 234.000,00
96 BH 2.400.000,00
97 BH 672.240,00
98 BH 202.800,00
99 BH 58.200,00
100 BH 18.960,00
101 BH 25.920,00
102 BH 21.120,00
SPIRITUS
KUNCI TANAM
CAT ANTI KARAT ( ZINC RICH BASED )
CAT ANTI KARAT ( EPOXI )
KERAMIK LANTAI TOILET 20X20
GEOTEXTILE
GRENDEL
WASHTAFEL
KLOSET JONGKOK
PAPAN TERENTANG
CAT MINYAK SETARA SEIV
LIST KAYU KAMPER
LIST KAYU KAMPER UNTUK DAUN JENDELA
Pipa PVC - AW'A Dia. 12" x 600 cm
Pipa PVC - AW'A Dia. 8" x 600 cm
CAT MENI KAYU
PLAMIR KAYU
KUAS
MINYAK CAT TERPENTIN
TRIPLEK 3 MM
TRIPLEK 4 MM (UKURAN PINTU)
PLYWOOD
TEAKWOOD
GYPSUM
ALUMINIUM SHEET 0,30 MM
KACA BENING 5 MM
KACA BENING 3 MM
KACA RAYBAND 5 MM
DEMPUL
Pipa PVC - AW'A Dia. 5" x 600 cm
Elbow PVC Dia. 2"
Elbow PVC Dia. 8"
Pipa PVC - AW'A Dia. 4" x 600 cm
TINNER
Pipa PVC - AW'A Dia. 3" x 600 cm
Elbow PVC Dia. 12"
Elbow PVC Dia. 1,5"
Tee PVC Dia.10"
Tee PVC Dia. 8"Tee PVC Dia. 2"
GEOMEMBRANE
STOP KONTAK
KERAMIK LANTAI TOILET 25X25
KERAMIK DINDING TOILET 20X25
KERAMIK DINDING TOILET 30X25
ENGSEL PINTU
ENGSEL JENDELA
KERAMIK MULIA 30X30 KW 1
KERAMIK MULIA 40X40 KW 1
KLOSET DUDUK
LAMPU TL 40 WATT
SAKELAR ENGKEL
SAKELAR DOUBLE
LAMPU TL 2 X 25
-
7/25/2019 Ptmp & Ded Nagan Raya - Rab Total
35/65
ANALISIS HARGA SATUAN
103 BH 298.500,00
104 BH 33.000,00
PAGAR BRC 120 X 240
PAVING BLOCK
-
7/25/2019 Ptmp & Ded Nagan Raya - Rab Total
36/65
ANALISIS HARGA SATUAN
No SATUAN UPAH (Rp.)
1 hari 85.000,00
2 hari 100.000,00
3 hari 120.000,00
4 hari 120.000,00
5 hari 110.000,00
6 hari 200.000,00
7 hari 160.000,00
8 hari 84.000,00
9 hari 84.000,00
10 hari 120.000,00
11 hari 100.000,00
MEKANIK
JURU UKUR
JURU GAMBAR
KLASIFIKASI
DAFTAR UPAH
KEPALA TUKANG CAT/POLITUR
TUKANG LAS
OPERATOR
TUKANG CAT
PEKERJA
TUKANG BESI/BETON/KAYU
KEPALA TUKANG
MANDOR
-
7/25/2019 Ptmp & Ded Nagan Raya - Rab Total
37/65
ANALISIS HARGA SATUAN
No SATUAN HARGA (Rp.)
1 jam 150.000,00
2 jam 102.000,00
3 jam 342.000,00
4 jam 51.600,00
5 jam 144.000,00
6 jam 114.000,00
7 jam 150.000,00
8 jam 686.582,87
9 jam 570.000,00
10 jam 420.000,00
11 jam 134.400,00MESIN GILAS
EXCAVATOR
LOADER
SEWA PERALATAN
VIBRATOR
DUMP TRUCK
BULDOZER
CONCRETE MIXER
COMPRESSOR
POMPA AIR
PERALATAN
GENSET
MESIN LAS
-
7/25/2019 Ptmp & Ded Nagan Raya - Rab Total
38/65
ANALISIS HARGA SATUAN
JENIS PEKERJAAN : MOBILISASI - DEMOBILISASI PERALATAN
HARGA SATUAN : LUMP SUM Rp 8.000.000,00
No SATUAN VOLUME HARGA SAT. (Rp.) JUMLAH (Rp.)
1 bh 3,00 100.000,00 300.000,00
2 bh 1,00 300.000,00 300.000,00
3 bh 1,00 500.000,00 500.000,00
4 bh 1,00 500.000,00 500.000,00
5 bh 1,00 800.000,00 800.000,00
6 bh 1,00 800.000,00 800.000,00
7 bh 2,00 800.000,00 1.600.000,00
8 bh 1,00 150.000,00 150.000,00
9 bh 1,00 150.000,00 150.000,00
10 bh 1,00 350.000,00 350.000,0011 orang 30,00 85.000,00 2.550.000,00
8.000.000,00
JENIS PEKERJAAN : MOBILISASI - DEMOBILISASI URUGAN & DARAT
HARGA SATUAN : LUMP SUM Rp 15.400.000,00
No SATUAN VOLUME HARGA SAT. (Rp.) JUMLAH (Rp.)
1 bh 4,00 1.000.000,00 4.000.000,00
2 bh 1,00 1.000.000,00 1.000.000,00
3 bh 1,00 2.000.000,00 2.000.000,00
4 bh 1,00 2.000.000,00 2.000.000,00
5 bh 1,00 800.000,00 800.000,00
6 bh 1,00 800.000,00 800.000,00
7 bh 2,00 800.000,00 1.600.000,00
8 bh 1,00 150.000,00 150.000,00
9 bh 1,00 150.000,00 150.000,00
10 bh 1,00 350.000,00 350.000,00
11 orang 30,00 85.000,00 2.550.000,00
15.400.000,00
JENIS PEKERJAAN : PENGUKURAN , POSITIONING
HARGA SATUAN/ LUMPSUM : Rp 13.230.000,00
No SATUAN VOLUME HARGA SAT. (Rp.) JUMLAH (Rp.)
1
hr 45,00 50.000,00 2.250.000,00
hr 45,00 75.000,00 3.375.000,00
2
hr 45,00 85.000,00 3.825.000,00
hr 45,00 84.000,00 3.780.000,00
13.230.000,00
JENIS PEKERJAAN : PENERANGAN DAN KESELAMATAN KERJA
HARGA SATUAN/ LUMPSUM : Rp 22.178.680,00
No SATUAN VOLUME HARGA SAT. (Rp.) JUMLAH (Rp.)
1
jam 90,00 150.000,00 13.500.000,00
ls ls 55.000,00 55.000,00
2
hr 30,00 160.000,00 4.800.000,00
3
Mesin Gilas
Buldoser
Mesin Gilas
Excavator
Vibrator beton
Compressor
U R A I A N
Dumptruck
T O T A L
Pompa air
Pekerja
Mesin las
Beton molen
U R A I A N
ANALISA HARGA SATUAN PEKERJAAN
Dumptruck
T O T A L
U R A I A N
Beton molen
Vibrator beton
Compressor
Pompa air
Pekerja
- Juru ukur
- Pekerja
Genset
Buldoser
Excavator
PERALATAN
- Waterpass
- Theodolite
Mesin las
Genset
T O T A L
UPAH
- Sewa Genset
- Kabel dan Lampu
UPAH
U R A I A N
PERALATAN
- Mekanik
BAHAN
-
7/25/2019 Ptmp & Ded Nagan Raya - Rab Total
39/65
ANALISIS HARGA SATUAN
ls 400,00 7.975,20 3.190.080,00
ls 20,00 31.680,00 633.600,00
22.178.680,00T O T A L
- Solar
- Olie
-
7/25/2019 Ptmp & Ded Nagan Raya - Rab Total
40/65
ANALISIS HARGA SATUAN
JENIS PEKERJAAN : DOKUMENTASI/ADMINISTRASI/AS-BUILT DRAWING
HARGA SATUAN/ LUMPSUM : Rp 18.650.000,00
No SATUAN VOLUME HARGA SAT. (Rp.) JUMLAH (Rp.)
1
roll 6,00 30.000,00 180.000,00
roll 6,00 75.000,00 450.000,00
bh 7,00 75.000,00 525.000,00
2
rim 10,00 30.000,00 300.000,00
ls 1,00 500.000,00 500.000,00
3
bh 1,00 6.500.000,00 6.500.000,00
rim 3,00 65.000,00 195.000,00
lbr 100,00 100.000,00 10.000.000,00
18.650.000,00
JENIS PEKERJAAN : PENGADAAN AIR BERSIH PEKERJA
HARGA SATUAN/ LUMPSUM : Rp 10.155.000,00
No SATUAN VOLUME HARGA SAT. (Rp.) JUMLAH (Rp.)
1
ls 1,00 4.500.000,00 4.500.000,00
ls 1,00 55.000,00 55.000,00
2
hr 20,00 160.000,00 3.200.000,00
3
bln 8,00 300.000,00 2.400.000,00
10.155.000,00
JENIS PEKERJAAN : PEK. PASANGAN PAPAN NAMA
HARGA SATUAN/M1 : Rp 996.697,80
No SATUAN VOLUME HARGA SAT. (Rp.) JUMLAH (Rp.)
1
m3
0,200 4.077.500,00 815.500,00
lb 1,000 65.000,00 65.000,00
kg 0,380 16.310,00 6.197,80
2
ls 1,000 85.000,00 85.000,00
3
ls 1,000 25.000,00 25.000,00
996.697,80
JENIS PEKERJAAN : PEK. PASANGAN BOUWPLANK
HARGA SATUAN/M1 : Rp 32.162,28
No SATUAN VOLUME HARGA SAT. (Rp.) JUMLAH (Rp.)
1
m3
0,007 4.077.500,00 28.542,50
kg 0,038 16.310,00 619,78
2
ls 1,000 2.500,00 2.500,00
3
ls 1,000 500,00 500,00
32.162,28T O T A L
T O T A L
U R A I A N
BAHAN
UPAH
- Cuci Cetak
U P A H
- Ongkos pasang
PERALATAN
- Pasang sumur bor air
- Kabel dan Lampu
U R A I A N
DOKUMENTASI
- Film
ALAT
- Peralatan
- Paku 5-7
- Album
ADMINISTRASI
- Listrik
AS-BUILT DRAWING
- Sewa Komputer & Printer & Tinta
U R A I A N
- Kertas A3
BAHAN
T O T A L
BAHAN
U R A I A N
U P A H
- Mekanik
T O T A L
- Kayu Meranti Papan
- Paku 5-7
- Ongkos pasang
ALAT
- Cat
- Kayu Kamper Papan
- Seng
- Kertas
- Fotocopy
- Juru gambar
-
7/25/2019 Ptmp & Ded Nagan Raya - Rab Total
41/65
ANALISIS HARGA SATUAN
JENIS PEKERJAAN : PEK. TIMBUNAN PASIR
HARGA SATUAN/ M3 : Rp 128.241,66
No SATUAN VOLUME HARGA SAT. (Rp.) JUMLAH (Rp.)
1
m3 1,20 93.200,00 111.840,00
2
hari 0,001 120.000,00 120,00
hari 0,03 85.000,00 2.550,00
3
jam 0,02 686.582,87 13.731,66
128.241,66
JENIS PEKERJAAN : PEK. TIMBUNAN TANAH
HARGA SATUAN/ M3 : Rp 156.832,46
No SATUAN VOLUME HARGA SAT. (Rp.) JUMLAH (Rp.)
1
m3 1,20 79.200,00 95.040,00
2
jam 0,09 686.582,87 61.792,46
156.832,46
JENIS PEKERJAAN : PEK. TIMBUNAN TANAH KEMBALI
HARGA SATUAN/ M3 : Rp 17.206,67
No SATUAN VOLUME HARGA SAT. (Rp.) JUMLAH (Rp.)
1
hari 0,017 120.000,00 2.040,00
hari 0,17 85.000,00 14.166,67
2
ls 1,00 1.000,00 1.000,00
17.206,67
JENIS PEKERJAAN : PEMADATAN 1 M LAPISAN TERATAS
HARGA SATUAN/ M2 : Rp 8.804,00
No SATUAN VOLUME HARGA SAT. (Rp.) JUMLAH (Rp.)
1.
hari 0,002 120.000,00 240,00
hari 0,02 25.000,00 500,00
2.
jam 0,06 134.400,00 8.064,00
8.804,00
JENIS PEKERJAAN : PEK. CRUSHED STONE DIA 2-3 TEBAL 5 CM
HARGA SATUAN/ M3 : Rp 26.015,00
No SATUAN VOLUME HARGA SAT. (Rp.) JUMLAH (Rp.)
1
m3 1,20 407.750,00 489.300,00
2
org. 0,05 120.000,00 6.000,00
org. 1,00 25.000,00 25.000,00
520.300,00
JENIS PEKERJAAN : CERUCUK DOKLEN dia 10 cm l=4 m
HARGA SATUAN/ batang : Rp 116.625,00
No SATUAN VOLUME HARGA SAT. (Rp.) JUMLAH (Rp.)U R A I A N
T O T A L
U R A I A N
U R A I A N
T O T A L
U P A H
- Mandor
- Pekerja
ALAT
- Pekerja
BAHAN
- Batu Bulat
U P A H
- Mandor
ALAT
- Cangkul,sekop dan bakul
BAHAN
T O T A L
BAHAN
U P A H
- Buldozer
T O T A L
- Mandor
- Pekerja
ALAT
- Mesin gilas
U R A I A N
- Pasir urug
ALAT
- Buldozer
U R A I A N
U P A H
- Mandor
- Pekerja
T O T A L
- Tanah urug
U R A I A N
-
7/25/2019 Ptmp & Ded Nagan Raya - Rab Total
42/65
ANALISIS HARGA SATUAN
1.
batang 1,250 68.500,00 85.625,00
2.
org. 0,05 120.000,00 6.000,00
org. 1,00 25.000,00 25.000,00
116.625,00
JENIS PEKERJAAN : BETON K 300 ( tanpa tulangan )
HARGA SATUAN/ M3 : Rp 1.978.228,35
No SATUAN VOLUME HARGA SAT. (Rp.) JUMLAH (Rp.)
1
zak 10,00 75.725,00 757.250,00
m3 0,80 360.000,00 288.000,00
m3 0,45 131.063,00 58.978,35
m3 0,20 4.800,00 960,00
2
hari 6,00 85.000,00 510.000,00
hari 0,10 120.000,00 12.000,00
hari 1,00 100.000,00 100.000,00
hari 0,30 120.000,00 36.000,00
3
jam 0,40 342.000,00 136.800,00
jam 0,40 51.600,00 20.640,00
jam 0,40 144.000,00 57.600,00
1.978.228,35
JENIS PEKERJAAN : BETON K 225 ( tanpa tulangan )
HARGA SATUAN/ M3 : Rp 1.827.978,35
No SATUAN VOLUME HARGA SAT. (Rp.) JUMLAH (Rp.)
1
zak 8,00 75.725,00 605.800,00
m3 0,80 360.000,00 288.000,00
m3 0,45 131.063,00 58.978,35
m3 0,45 4.800,00 2.160,00
2
hari 6,00 85.000,00 510.000,00
hari 0,10 120.000,00 12.000,00
hari 1,00 100.000,00 100.000,00
hari 0,30 120.000,00 36.000,00
3
jam 0,40 342.000,00 136.800,00
jam 0,40 51.600,00 20.640,00
jam 0,40 144.000,00 57.600,00
1.827.978,35
JENIS PEKERJAAN : BETON K 250 ( tanpa tulangan )
HARGA SATUAN/ M3 : Rp 1.903.703,35
No SATUAN VOLUME HARGA SAT. (Rp.) JUMLAH (Rp.)
1
zak 9,00 75.725,00 681.525,00
m3 0,80 360.000,00 288.000,00
m3 0,45 131.063,00 58.978,35
m3 0,45 4.800,00 2.160,00
2
hari 6,00 85.000,00 510.000,00
BAHAN
- Dolken dia 10 cm l = 4 mUPAH
- Mandor
- Pekerja
T O T A L
U R A I A N
BAHAN
- Semen P.C (50 kg)
- Compressor
- Tukang
- Air
- Kerikil
- Kerikil
- Pasir
- Air
- Pasir
- Tukang
T O T A L
BAHAN
- Kepala Tukang
U P A H
U P A H
- Pekerja
- Pasir
- Air
U P A H
U R A I A N
- Semen P.C (50 kg)
A L A T
- Kepala Tukang
- Beton Mixer
- Beton Vibrator
- Pekerja
- Mandor
- Mandor
- Beton Vibrator
- Semen P.C (50 kg)
A L A T
- Beton Mixer
- Kerikil
- Pekerja
- Compressor
U R A I A N
T O T A L
BAHAN
-
7/25/2019 Ptmp & Ded Nagan Raya - Rab Total
43/65
ANALISIS HARGA SATUAN
hari 0,10 120.000,00 12.000,00
hari 1,00 100.000,00 100.000,00
hari 0,30 120.000,00 36.000,00
3
jam 0,40 342.000,00 136.800,00
jam 0,40 51.600,00 20.640,00
jam 0,40 144.000,00 57.600,00
1.903.703,35
- Kepala Tukang
A L A T
- Beton Mixer
- Tukang
- Compressor
T O T A L
- Mandor
- Beton Vibrator
-
7/25/2019 Ptmp & Ded Nagan Raya - Rab Total
44/65
ANALISIS HARGA SATUAN
JENIS PEKERJAAN : LANTAI KERJA 1:3:5
HARGA SATUAN/ M3 : Rp 979.560,25
No SATUAN VOLUME HARGA SAT. (Rp.) JUMLAH (Rp.)
1
zak 3,9560 75.725,00 299.568,10
m3
0,5500 131.063,00 72.084,65
m3
0,9300 407.750,00 379.207,50
2
orang 2,0000 85.000,00 170.000,00
orang 0,5000 100.000,00 50.000,00
orang 0,0500 120.000,00 6.000,00
orang 0,0100 120.000,00 1.200,00
3
ls 1,0000 1.500,00 1.500,00
979.560,25
JENIS PEKERJAAN : PEMBESIAN - 1 kg
HARGA SATUAN/ 100 kg : Rp 1.726.531,00
HARGA SATUAN/ kg : Rp 17.265,31
No SATUAN VOLUME HARGA SAT. (Rp.) JUMLAH (Rp.)
1
kg 105,00 12.233,00 1.284.465,00
kg 2,00 21.533,00 43.066,00
2
hari 2,00 85.000,00 170.000,00
hari 2,00 100.000,00 200.000,00
hari 0,20 120.000,00 24.000,00
3
ls 1,00 5.000,00 5.000,00
1.726.531,00
JENIS PEKERJAAN : BEKISTING MULTIPLEX 12 MM - 10 M2
HARGA SATUAN/ M2 : Rp 288.924,00
No SATUAN VOLUME HARGA SAT. (Rp.) JUMLAH (Rp.)
1
bh 4,00 303.600,00 1.214.400,00
kg 4,00 16.310,00 65.240,00
m3 0,20 2.563.000,00 512.600,00
2
hari 6,00 85.000,00 510.000,00
hari 0,10 120.000,00 12.000,00
hari 5,00 100.000,00 500.000,00hari 0,50 120.000,00 60.000,00
3
ls 1,00 15.000,00 15.000,00
2.889.240,00
ALAT
- PC (50 kg)
- Pasir beton
U R A I A N
BAHAN
- Besi beton
- Kawat beton
U P A H
- Split Pecah mesin 2/3
U P A H
- Pekerja
- Peralatan
- Tukang Batu Setengah Terampil
- Kepala Tukang Batu
- Mandor
A L A T
- Alat bantuT O T A L
U R A I A N
T O T A L
- Pekerja
- Tukang
- Kepala Tukang
BAHAN
U R A I A N
- Tukang
BAHAN
- Papan multiplex 12 mm (2 x pakai)
- Paku
- Kayu perancah (2 x pakai)
U P A H
- Pekerja
- Mandor
- Kepala Tukang
A L A T
- Alat bantu
T O T A L
-
7/25/2019 Ptmp & Ded Nagan Raya - Rab Total
45/65
ANALISIS HARGA SATUAN
JENIS PEKERJAAN : BEKISTING PAPAN - 10 M2
HARGA SATUAN/ M2 : Rp 191.964,00
No SATUAN VOLUME HARGA SAT. (Rp.) JUMLAH (Rp.)
1
m3 0,0170 4.200.000,00 71.400,00
m3 0,0240 2.160.000,00 51.840,00
kg 0,4000 16.310,00 6.524,00
2
hari 0,1200 85.000,00 10.200,00
hari 0,1500 100.000,00 15.000,00
hari 0,1500 120.000,00 18.000,00
hari 0,0500 120.000,00 6.000,00
hari 0,1200 100.000,00 12.000,00
3
ls 1,00 1.000,00 1.000,00
191.964,00
JENIS PEKERJAAN : PEKERJAAN KOLOM 15X15 CM
HARGA SATUAN/ M3 : Rp 6.642.801,27
No SATUAN VOLUME HARGA SAT. (Rp.) JUMLAH (Rp.)
1 m3 1,00 1.827.978,35 1.827.978,35
2 m2 5,40 288.924,00 1.560.189,60
3 ls 1,00 150.000,00 150.000,00
4 kg 172,00 17.265,31 2.969.633,32
6 ls 5,40 25.000,00 135.000,00
6.642.801,27
JENIS PEKERJAAN : PEKERJAAN SLOOF BETON 15X20 CM
HARGA SATUAN/ M3 : Rp 5.831.880,90
No SATUAN VOLUME HARGA SAT. (Rp.) JUMLAH (Rp.)
1 m3 1,00 1.827.978,35 1.827.978,35
2 m2 3,60 288.924,00 1.040.126,40
3 ls 1,00 25.000,00 25.000,00
4 kg 165,00 17.265,31 2.848.776,15
6 ls 3,60 25.000,00 90.000,00
5.831.880,90
JENIS PEKERJAAN : HAMPARAN BATU 5-7 UNTUK BASE JALAN
HARGA SATUAN/ M3 : Rp 473.680,00
No SATUAN VOLUME HARGA SAT. (Rp.) JUMLAH (Rp.)
1
m3 1,10 318.000,00 349.800,00
2.
hari 0,10 120.000,00 12.000,00
hari 1,00 85.000,00 85.000,00
3.
jam 0,20 134.400,00 26.880,00
473.680,00
BAHAN
- Batu
U P A H
- Mandor
- PEKERJA
U R A I A N
U R A I A N
- Besi Beton
- Bongkar Bekisting dan perawatan beton
- Alat bantu
- Besi Beton
T O T A L
- Beton K 225
- Bekisting
- Bongkar Bekisting dan perawatan beton
T O T A L
U R A I A N
T O T A L
- Beton K 225
- Bekisting
- Tukang Kayu (Bongkar cetakan)
A L A T
- Alat bantu
- Alat bantu
- Kepala Tukang Kayu
- Mandor
U P A H
- Pekerja
- Papan Terentang ( 2x pakai ) 75%
U R A I A N
BAHAN
- Kaso 5/7 borneo sp (2 x pakai) 50%
- Tukang Kayu Terampil
- Paku
ALAT
- Mesin gilas
T O T A L
-
7/25/2019 Ptmp & Ded Nagan Raya - Rab Total
46/65
ANALISIS HARGA SATUAN
JENIS PEKERJAAN : LAPISAN PERKERASAN ASPHALT PASIR
HARGA SATUAN/ M3 : Rp 440.049,30
No SATUAN VOLUME HARGA SAT. (Rp.) JUMLAH (Rp.)
1
m3 1,10 131.063,00 144.169,30
ton 0,08 14.400,00 1.080,00
2.
hari 0,20 120.000,00 24.000,00
hari 2,00 85.000,00 170.000,00
3.
jam 0,75 134.400,00 100.800,00
440.049,30
JENIS PEKERJAAN : STRIPPING DAN PEMBERSIHAN
HARGA SATUAN/ M2 : Rp 2.845,00
No SATUAN VOLUME HARGA SAT. (Rp.) JUMLAH (Rp.)
1
hari 0,005 120.000,00 600,00
hari 0,025 85.000,00 2.125,00
2
hari 0,01 10.000,00 120,00
2.845,00
JENIS PEKERJAAN : PASANGAN BATU KALI 1:4
HARGA SATUAN/ M3 : Rp 910.958,96
No SATUAN VOLUME HARGA SAT. (Rp.) JUMLAH (Rp.)
1
m3 1,20 412.000,00 494.400,00
zak 2,50 75.725,00 189.312,50
m3 0,42 131.063,00 55.046,46
2.
hari 0,01 120.000,00 1.200,00
hari 1,00 85.000,00 85.000,00
hari 0,75 100.000,00 75.000,00
hari 0,05 120.000,00 6.000,00
3
hari 1,00 5.000,00 5.000,00
910.958,96
JENIS PEKERJAAN : ADUKAN 1:4
HARGA SATUAN/ M3 : Rp 655.823,60
No SATUAN VOLUME HARGA SAT. (Rp.) JUMLAH (Rp.)
1
zak 3,95 75.725,00 299.113,75
m3 0,95 131.063,00 124.509,85
2.
hari 0,01 120.000,00 1.200,00
hari 2,00 85.000,00 170.000,00
hari 0,50 100.000,00 50.000,00
hari 0,05 120.000,00 6.000,00
3
hari 1,00 5.000,00 5.000,00
655.823,60
- Mandor
U P A H
- Asphalt
U R A I A N
BAHAN
U R A I A N
U R A I A N
BAHAN
- Batu kali
- Semen (50kg)
- Pekerja
U P A H
- Mandor
- Pekerja
ALAT
- Alat bantu
T O T A L
- Pasir
T O T A L
ALAT
- Mesin gilas
ALAT
- Tukang batu
- Kepala tukang batu
ALAT
BAHAN
T O T A L
U R A I A N
- Pekerja
- Tukang batu
- Kepala tukang batu
- Pasir pasang
U P A H
- Mandor
- Alat bantu
- Pekerja
U P A H
T O T A L
- Mandor
- Alat bantu
- Semen (50kg)
- Pasir pasang
-
7/25/2019 Ptmp & Ded Nagan Raya - Rab Total
47/65
ANALISIS HARGA SATUAN
JENIS PEKERJAAN : GALIAN TANAH
HARGA SATUAN/ M3 : Rp 27.700,00
No SATUAN VOLUME HARGA SAT. (Rp.) JUMLAH (Rp.)
1
hari 0,01 120.000,00 1.200,00
hari 0,30 85.000,00 25.500,00
2
hari 1,00 1.000,00 1.000,00
27.700,00
JENIS PEKERJAAN : GALIAN TANAH DENGAN ALAT BERAT
HARGA SATUAN/ M3 : Rp 55.200,00
No SATUAN VOLUME HARGA SAT. (Rp.) JUMLAH (Rp.)
1
hari 0,01 120.000,00 1.200,00
hari 0,30 85.000,00 25.500,00
2
jam 0,05 570.000,00 28.500,00
55.200,00
JENIS PEKERJAAN : TIMBUNAN TANAH DARI TPA SENDIRI
HARGA SATUAN/ M3 : Rp 52.500,00
No SATUAN VOLUME HARGA SAT. (Rp.) JUMLAH (Rp.)
1
hari 0,20 120.000,00 24.000,00
2
jam 0,05 570.000,00 28.500,00
52.500,00
JENIS PEKERJAAN : PASANGAN BUIS BETON DIAMETER 35
HARGA SATUAN/BH : Rp 134.700,00
No SATUAN VOLUME HARGA SAT. (Rp.) JUMLAH (Rp.)
1
m1 1,00 90.000,00 90.000,00
2
hari 0,01 120.000,00 1.200,00
hari 0,50 85.000,00 42.500,00
3
hari 1,00 1.000,00 1.000,00
134.700,00
JENIS PEKERJAAN : PASANGAN BUIS BETON DIAMETER 40
HARGA SATUAN/BH : Rp 182.700,00
No SATUAN VOLUME HARGA SAT. (Rp.) JUMLAH (Rp.)
1
m1 1,00 138.000,00 138.000,00
2
hari 0,01 120.000,00 1.200,00
hari 0,50 85.000,00 42.500,00
3
hari 1,00 1.000,00 1.000,00
182.700,00
T O T A L
- Pekerja
ALAT
- Alat bantu
T O T A L
U R A I A N
BAHAN
T O T A L
- Mandor
- Pekerja
ALAT
T O T A L
ALAT
- Alat bantu
U P A H
- Mandor
U R A I A N
U P A H
- Pekerja
ALAT
- Excavator
- Buis beton
- Alat bantu
- Mandor
U R A I A N
BAHAN
- Buis beton
U P A H
- Excavator
- Mandor
ALAT
U P A H
- Mandor
- Pekerja
U R A I A N
T O T A L
U R A I A N
U P A H
-
7/25/2019 Ptmp & Ded Nagan Raya - Rab Total
48/65
ANALISIS HARGA SATUAN
JENIS PEKERJAAN : PASANGAN BUIS BETON DIAMETER 50
HARGA SATUAN/BH : Rp 220.800,00
No SATUAN VOLUME HARGA SAT. (Rp.) JUMLAH (Rp.)
1
m1 1,00 176.100,00 176.100,00
2
hari 0,01 120.000,00 1.200,00
hari 0,50 85.000,00 42.500,00
3
hari 1,00 1.000,00 1.000,00
220.800,00
JENIS PEKERJAAN : 1 M2 PASANGAN BATA MERAH 1 : 2
HARGA SATUAN/M2 : Rp 152.477,96
No SATUAN VOLUME HARGA SAT. (Rp.) JUMLAH (Rp.)
1
bh 70,0000 466,00 32.620,00
zak 0,6800 75.725,00 51.493,00
m3 0,0470 131.063,00 6.159,96
2
orang 0,4290 85.000,00 36.465,00
orang 0,2140 100.000,00 21.400,00
orang 0,0210 120.000,00 2.520,00
orang 0,0110 120.000,00 1.320,00
3
hari 1,00 500,00 500,00
152.477,96
JENIS PEKERJAAN : 1 M2 PASANGAN BATA MERAH 1 : 4
HARGA SATUAN/M2 : Rp 120.760,57
No SATUAN VOLUME HARGA SAT. (Rp.) JUMLAH (Rp.)
1
bh 70,0000 466,00 32.620,00
zak 0,4192 75.725,00 31.743,92
m3 0,0580 131.063,00 7.601,65
2
orang 0,3218 85.000,00 27.353,00
orang 0,1805 100.000,00 18.050,00
orang 0,0158 120.000,00 1.896,00
orang 0,0083 120.000,00 996,00
3
hari 1,00 500,00 500,00
120.760,57
JENIS PEKERJAAN : 1 M2 PLESTERAN 1:2 + ACIAN
HARGA SATUAN/M2 : Rp 71.551,88
No SATUAN VOLUME HARGA SAT. (Rp.) JUMLAH (Rp.)
1
zak 0,2368 75.725,00 17.931,68
m3
0,0190 131.063,00 2.490,20
2
orang 0,2860 85.000,00 24.310,00
orang 0,2140 100.000,00 21.400,00
orang 0,0210 120.000,00 2.520,00
BAHAN
- Bata merah
- P.C (50 kg)
- Pasir Pasang
U P A H
- Pekerja
- Tukang Batu
- Kepala Tukang
- Mandor
ALAT
U R A I A N
- Mandor
- Pekerja
- Pasir Pasang
U P A H
- Pekerja
- Tukang Batu
BAHAN
- P.C (50 kg)
- Pasir Pasang
U P A H
- Alat bantu
T O T A L
ALAT
- Alat bantu
T O T A L
U R A I A N
U R A I A N
BAHAN
- Buis beton
U P A H
BAHAN
- Bata merah
U R A I A N
T O T A L
- Kepala Tukang
- Mandor
ALAT
- Alat bantu
- P.C (50 kg)
- Pekerja
- Tukang Batu
- Kepala Tukang
-
7/25/2019 Ptmp & Ded Nagan Raya - Rab Total
49/65
ANALISIS HARGA SATUAN
orang 0,0200 120.000,00 2.400,00
3
hari 1,00 500,00 500,00
71.551,88
- Alat bantu
- Mandor
ALAT
T O T A L
-
7/25/2019 Ptmp & Ded Nagan Raya - Rab Total
50/65
ANALISIS HARGA SATUAN
JENIS PEKERJAAN : 1 M2 PLESTERAN 1:4 + ACIAN
HARGA SATUAN/M2 : Rp 63.494,74
No SATUAN VOLUME HARGA SAT. (Rp.) JUMLAH (Rp.)
1
zak 0,1304 75.725,00 9.874,54
m3 0,0190 131.063,00 2.490,20
2
orang 0,2860 85.000,00 24.310,00
orang 0,2140 100.000,00 21.400,00
orang 0,0210 120.000,00 2.520,00
orang 0,0200 120.000,00 2.400,00
3
hari 1,00 500,00 500,00
63.494,74
JENIS PEKERJAAN : 1 M2 PENGECATAN DINDING SETARA VINILEX (3X)
HARGA SATUAN/M2 : Rp 54.899,00
No SATUAN VOLUME HARGA SAT. (Rp.) JUMLAH (Rp.)
1
kg 0,1750 26.400,00 4.620,00
kg 0,1600 11.400,00 1.824,00
2
orang 0,1040 85.000,00 8.840,00
orang 0,1820 100.000,00 18.200,00
orang 0,0195 120.000,00 2.340,00
orang 0,0650 120.000,00 7.800,00
3
ls 0,5000 17.400,00 8.700,00
lbr 0,5000 5.040,00 2.520,00
bh 0,0100 5.500,00 55,00
54.899,00
JENIS PEKERJAAN : 1 M3 PASANGAN AANSTAMPING
HARGA SATUAN/M3 : Rp 699.811,00
No SATUAN VOLUME HARGA SAT. (Rp.) JUMLAH (Rp.)
1
m3 1,2000 412.000,00 494.400,00
m3 0,4000 93.200,00 37.280,00
2
orang 1,1250 85.000,00 95.625,00
orang 0,5625 100.000,00 56.250,00
orang 0,0750 120.000,00 9.000,00
orang 0,0563 120.000,00 6.756,00
3
hari 1,00 500,00 500,00
699.811,00
BAHAN
- P.C (50 kg)
T O T A L
- Pekerja
- Mandor
T O T A L
- Pekerja
ALAT
- Steger Work
- Ampelas
- Alat bantu
- Tukang Batu
- Kepala Tukang
- Mandor
ALAT
- Pasir Pasang
U P A H
U R A I A N
U R A I A N
BAHAN
- Cat tembok Vinilex
- Plamir tembok
U P A H
- Pekerja
- Tukang Kayu
- Kepala Tukang Kayu
- Rol cat
T O T A L
U R A I A N
BAHAN
- Batu Belah
- Pasir Urug
U P A H
- Alat bantu
- Tukang Batu
- Kepala Tukang Batu
- Mandor
ALAT
-
7/25/2019 Ptmp & Ded Nagan Raya - Rab Total
51/65
ANALISIS HARGA SATUAN
JENIS PEKERJAAN : 1 M3 KUDA-KUDA
HARGA SATUAN/M3 : Rp 5.758.098,00
No SATUAN VOLUME HARGA SAT. (Rp.) JUMLAH (Rp.)
1
m3 1,1000 4.200.000,00 4.620.000,00
kg 5,8000 16.310,00 94.598,00
2
orang 3,0000 85.000,00 255.000,00
orang 5,0000 100.000,00 500.000,00
orang 2,0000 120.000,00 240.000,00
orang 0,4000 120.000,00 48.000,00
3
hari 1,00 500,00 500,00
5.758.098,00
JENIS PEKERJAAN : 1 M2 LISTPLANG KAYU KAMPER 3/20
HARGA SATUAN/M2 : Rp 225.361,00
No SATUAN VOLUME HARGA SAT. (Rp.) JUMLAH (Rp.)
1
m3 0,0300 6.480.000,00 194.400,00
kg 0,1000 16.310,00 1.631,00
2
orang 0,0700 85.000,00 5.950,00
orang 0,2000 100.000,00 20.000,00
orang 0,0200 120.000,00 2.400,00
orang 0,0040 120.000,00 480,00
3
hari 1,00 500,00 500,00
225.361,00
JENIS PEKERJAAN : 1 M2 PENGECATAN KAYU (3X) BERIKUT MENI
HARGA SATUAN/M2 : Rp 67.716,60
No SATUAN VOLUME HARGA SAT. (Rp.) JUMLAH (Rp.)
1
kg 0,1670 16.188,00 2.703,40
kg 0,0830 20.400,00 1.693,20
kg 0,2000 42.720,00 8.544,00
lbr 0,4000 5.040,00 2.016,00
ltr 0,1500 5.400,00 810,00
bh 0,0500 3.000,00 150,00
2
orang 0,2000 85.000,00 17.000,00
orang 0,3000 100.000,00 30.000,00
orang 0,0300 120.000,00 3.600,00
orang 0,0100 120.000,00 1.200,00
67.716,60
JENIS PEKERJAAN : 1 M2 PAVINGBLOCK BERIKUT PEMASANGAN
HARGA SATUAN/M2 : Rp 104.197,50
No SATUAN VOLUME HARGA SAT. (Rp.) JUMLAH (Rp.)
1
m2 1,0000 58.500,00 58.500,00
2
orang 0,1875 85.000,00 15.937,50
U R A I A N
- Pekerja
- Alat bantu
BAHAN
- Kayu Kamper balok 6/12
- Tukang Kayu
- Kepala Tukang Kayu
- Plamir kayu
- Pekerja
- Minyak cat terpentin
- Cat kayu merk SEIV
- Amplas kayu
- Alat bantu
T O T A L
- Paku 8 s/d 12 cm
U P A H
- Pekerja
- Tukang Kayu
- Kepala Tukang Kayu
- Mandor
ALAT
T O T A L
U R A I A N
BAHAN
- Mandor
ALAT
- Kayu Kamper Papan
- Paku
U P A H
U R A I A N
BAHAN
- Meni kayu
- Kwas 3"
U P A H
- Pekerja
- Mandor
T O T A L
U R A I A N
BAHAN
- Paving block
U P A H
- Tukang Cat
- Kepala Tukang Cat
-
7/25/2019 Ptmp & Ded Nagan Raya - Rab Total
52/65
ANALISIS HARGA SATUAN
orang 0,2250 100.000,00 22.500,00
orang 0,0375 120.000,00 4.500,00
orang 0,0105 120.000,00 1.260,00
3
ls 1,0000 1.500,00 1.500,00
104.197,50
JENIS PEKERJAAN : 1 M PEMASANGAN CANSTINE
HARGA SATUAN/M2 : Rp 121.197,50
No SATUAN VOLUME HARGA SAT. (Rp.) JUMLAH (Rp.)
1
M1 1,0000 75.500,00 75.500,00
2
orang 0,1875 85.000,00 15.937,50
orang 0,2250 100.000,00 22.500,00
orang 0,0375 120.000,00 4.500,00
orang 0,0105 120.000,00 1.260,00
3
ls 1,0000 1.500,00 1.500,00
121.197,50
JENIS PEKERJAAN : 1 M2 DAUN PINTU TEAKWOOD LAPIS ALUMINIUM
HARGA SATUAN/M2 : Rp 269.677,50
No SATUAN VOLUME HARGA SAT. (Rp.) JUMLAH (Rp.)
1
m3
0,0150 6.240.000,00 20.250,00
lbr 2,0000 72.000,00 75.000,00
m2
1,8000 53.040,00 32,50
kg 0,2000 16.310,00 1.235,00
kg 0,5000 290.400,00
2
orang 0,3000 85.000,00 25.500,00
orang 1,3000 100.000,00 130.000,00
orang 0,1300 120.000,00 15.600,00
orang 0,0130 120.000,00 1.560,00
3
ls 1,0000 500,00 500,00
269.677,50
JENIS PEKERJAAN : 1 M2 PEMBERSIHAN LOKASI & PERATAAN TANAH
HARGA SATUAN/M2 : Rp 14.500,00
No SATUAN VOLUME HARGA SAT. (Rp.) JUMLAH (Rp.)
1 or 0,100 85.000,00 8.500,002 or 0,050 120.000,00 6.000,00
14.500,00
JENIS PEKERJAAN : 1 M2 BANGUNAN KANTOR DIREKSI LANTAI PLESTER
HARGA SATUAN/M2 : Rp 1.583.829,25
No SATUAN VOLUME HARGA SAT. (Rp.) JUMLAH (Rp.)
1 m3 0,200 4.077.500,00 815.500,00
2 kg 0,850 16.310,00 13.863,50
3 sak 0,700 75.725,00 53.007,50
4 lb 0,150 131.063,00 19.659,45
5 m3 0,100 131.063,00 13.106,30
6 m3 0,150 407.750,00 61.162,50
- Alumunium Sheet 0,3 mm
U R A I A N
BAHAN
- Rangka Kayu Kamper Banjar
- Triplek 4 mm ( ukuran pintu)
Seplit beton
T O T A L
U P A H
- Pekerja
ALAT
Kayu
- Tukang Kayu
- Kepala Tukang Kayu
- Mandor
Paku
Semen
ALAT
- Tukang Kayu
- Peralatan
T O T A L
- Paku triplek
- Lem putih (FOX)
T O T A L
- Kepala Tukang Kayu- Mandor
ALAT
- Peralatan
U P A H
- Pekerja
- Kepala Tukang Kayu
- Mandor
U R A I A N
Pekerja
U R A I A N
- Peralatan
- Tukang Kayu
Mandor
T O T A L
Pasir pasang
Pasir beton
U R A I A N
BAHAN
- Paving block
-
7/25/2019 Ptmp & Ded Nagan Raya - Rab Total
53/65
ANALISIS HARGA SATUAN
7 bh 30,000 466,00 13.980,00
8 lb 0,250 35.000,00 8.750,009 m1 0,750 75.000,00 56.250,00
10 m2 0,085 80.000,00 6.800,00
11 bh 0,150 45.000,00 6.750,00
12 lb 0,060 50.000,00 3.000,00
13 oh 2,000 85.000,00 170.000,00
14 oh 2,000 100.000,00 200.000,00
15 oh 1,000 100.000,00 100.000,00
16 oh 0,300 120.000,00 36.000,00
17 oh 0,050 120.000,00 6.000,00
1.583.829,25
JENIS PEKERJAAN : 1 M2 BANGUNAN LOS KERJA / GUDANG
HARGA SATUAN/M2 : Rp 1.300.314,64
No SATUAN VOLUME HARGA SAT. (Rp.) JUMLAH (Rp.)
1 bt 1,700 68.500,00 116.450,00
2 m3 0,200 4.077.500,00 815.500,00
3 kg 0,300 16.310,00 4.893,00
4 sak 0,210 75.725,00 15.902,25
5 m3 0,030 131.063,00 3.931,89
6 m3 0,050 407.750,00 20.387,50
7 lb 0,250 33.000,00 8.250,00
8 oh 1,000 85.000,00 85.000,00
9 oh 2,000 100.000,00 200.000,00
10 oh 0,200 120.000,00 24.000,00
11 oh 0,050 120.000,00 6.000,00
1.300.314,64
JENIS PEKERJAAN : 1 M2 BANGUNAN RUMAH JAGA
HARGA SATUAN/M2 : Rp 1.340.917,00
No SATUAN VOLUME HARGA SAT. (Rp.) JUMLAH (Rp.)
1 bt 3,000 68.500,00 205.500,00
2 m3 0,200 4.077.500,00 815.500,00
3 kg 0,700 16.310,00 11.417,00
4 lb 1,500 33.000,00 49.500,00
5 oh 1,000 85.000,00 85.000,00
6 oh 1,500 100.000,00 150.000,00
7 oh 0,150 120.000,00 18.000,00
8 oh 0,050 120.000,00 6.000,00
1.340.917,00
JENIS PEKERJAAN : 1 M1 BOUWPLANK
HARGA SATUAN/M1 : Rp 62.978,70
No SATUAN VOLUME HARGA SAT. (Rp.) JUMLAH (Rp.)
1 m3 0,004 4.077.500,00 16.310,00
2 m3 0,007 4.077.500,00 28.542,50
3 kg 0,020 16.310,00 326,20
4 or 0,100 85.000,00 8.500,00
5 or 0,075 100.000,00 7.500,00
6 or 0,010 120.000,00 1.200,00
7 or 0,005 120.000,00 600,00
62.978,70
JENIS PEKERJAAN : 1 M3 TIMBUNAN / URUGAN TANAH
HARGA SATUAN/M3 : Rp 117.490,00
No SATUAN VOLUME HARGA SAT. (Rp.) JUMLAH (Rp.)
1 m3 1,200 79.200,00 95.040,00
2 or 0,250 85.000,00 21.250,00
Kep. Tukang
Mandor
Paku
T O T A L
U R A I A N
Kayu 5/7 ( meranti )
Papan 3/20 ( meranti )
Jendela nako
Mandor
Kep. Tukang
Kaca polos
Kunci tanam
Triplex 4 mm
Bata merah
Seng gelombang
Tukang kayu
Tukang batu
Tukang kayu
T O T A L
U R A I A N
U R A I A N
Mandor
Pekerja
Pekerja
Tukang
Paku
Seng gelombang
Tukang kayu
Kep. Tukang
Mandor
Kayu ( meranti )
Seng gelombang
Pekerja
U R A I A N
Kayu dolken O 8 - O 10 / 400
T O T A L
Pekerja
Pekerja
T O T A L
Tanah Urug + transport
Kayu dolken O 8 - O 10 / 400
Kayu
Paku
Semen
Pasir beton
Seplit beton
Kep. Tukang
-
7/25/2019 Ptmp & Ded Nagan Raya - Rab Total
54/65
ANALISIS HARGA SATUAN
3 or 0,010 120.000,00 1.200,00
117.490,00
JENIS PEKERJAAN : 1 M3 TIMBUNAN / URUGAN PASIR
HARGA SATUAN/M3 : Rp 138.540,00
No SATUAN VOLUME HARGA SAT. (Rp.) JUMLAH (Rp.)
1 m3 1,200 93.200,00 111.840,00
2 or 0,300 85.000,00 25.500,00
3 or 0,010 120.000,00 1.200,00
138.540,00
JENIS PEKERJAAN : 1 M3 TIMBUNAN / URUGAN SIRTU
HARGA SATUAN/M3 : Rp 88.500,00
No SATUAN VOLUME HARGA SAT. (Rp.) JUMLAH (Rp.)
1 m3 1,200 50.000,00 60.000,00
2 or 0,300 85.000,00 25.500,00
3 or 0,025 120.000,00 3.000,0088.500,00T O T A L
Mandor
U R A I A N
Pasir urug
Pekerja
Mandor
Mandor
Sirtu
Pekerja
T O T A L
U R A I A N
T O T A L
-
7/25/2019 Ptmp & Ded Nagan Raya - Rab Total
55/65