No Nama Alat Diameter (m) Jumlah Total Diameter1 Accumulator-01 1.116 1 1.1162 Accumulator-02 0.336 1 0.3363 Accumulator-03 1.735 1 1.7354 Cooler-01 0.850 1 0.8505 Cooler-02 0.850 1 0.8506 Cooler-03 0.850 1 0.8507 Cooler-04 0.950 1 0.9508 Cooler-05 0.950 1 0.9509 Condenser-01 0.950 1 0.95010 Condenser-02 0.850 1 0.85011 Condenser-03 0.950 1 0.95012 Control Valve Pressure-01 0.300 1 0.30013 Control Valve Pressure-02 0.300 1 0.30014 Control Valve Pressure-03 0.300 1 0.30015 Control Valve Pressure-04 0.300 1 0.30016 Control Valve Pressure-05 0.300 1 0.30017 Control Valve Pressure-06 0.300 1 0.30018 Control Valve Pressure-07 0.300 1 0.30019 Control Valve Pressure-08 0.300 1 0.30020 Control Valve Pressure-09 0.300 1 0.30021 Heater-01 0.850 1 0.85022 Heater-02 0.850 1 0.85023 Heater-03 0.850 1 0.85024 Heater-04 0.850 1 0.85025 Heater-05 0.850 1 0.85026 Kompressor-01 2.000 1 2.00027 Kolom Destilasi-01 2.100 1 2.10028 Kolom Destilasi-02 0.590 1 0.59029 Kolom Destilasi-03 2.400 1 2.40030 Kolom Ektraksi 2.100 1 2.10031 Knock Out Drum-01 2.339 1 2.33932 Parsial Kondensor 0.950 1 0.95033 Pompa-01 0.550 1 0.55034 Pompa-02 0.550 1 0.55035 Pompa-03 0.550 1 0.55036 Pompa-04 0.550 1 0.55037 Pompa-05 0.550 1 0.55038 Pompa-06 0.550 1 0.55039 Pompa-07 0.550 1 0.55040 Pompa-08 0.550 1 0.55041 Reaktor-01 2.104 1 2.10442 Reboiler-01 0.950 1 0.950
43 Reboiler-02 0.850 1 0.85044 Reboiler-03 0.950 1 0.95045 Tangki-01 8.919 2 17.83746 Tangki-02 17.139 6 102.83547 Tangki-03 3.651 1 3.65148 Tangki-04 5.541 1 5.54149 Tangki-05 8.298 2 16.59550 Vaporizer-01 2.071 1 2.071
Total 57 187.601
No. Jabatan Jumlah1 Direktur Utama 12 Sekretaris Direktur Utama 13 Manajer 34 Sekertaris Manajer 35 Kepala Bagian 76 Kepala Seksi 167 Operator 728 Dokter 19 Perawat 210 Analis 211 Satpam 1212 Damkar 412 Pengemudi 513 Penjaga Gudang 214 Karyawan 26
total 157
Perhitungan Luas Area Pabrik
1. Luas Area Pabrik IControl room dan diameter peralatan
a Control Room operator instrument 8 orangb Control Room operator kontrol 40 orangc Control Room operator lapangan 24 orang
Total operator 72 orang 18 Org/shift
d Diameter peralatan total 187.601 m
e Persyaratan Ukuran Luas I (Sumber : Hendri, 2008)
Meja Kerja 2.25Jumlah Operator / Shift 18 orang/shift
Total Meja Kerja 40.5
f Ruang Gerak Operator (Sumber : Hendri, 2008)
RGO 1Jumlah Operator / Shift 18 orang / shift
Total Ruang Gerak Operator 18
g Penyalur (P)Penyalur 2.5 mTotal diameter 187.601 m
Total Penyalur (P) 469.003
h Penumpukan Material (PM)Penumpukan Material 5 mTotal diameter tangki 146.460 m
Total Penumpukan Material 732.300
i GangLebar gang 3 m
Total Luas Gang 684.303
j Akses Perawatan Mesin (APM)Akses perawatan mesin 3 m
Total APM 562.803
k Jarak tiap alatjarak tiap alat 6 m
Total jarak tiap Alat 1125.607
m2
m2
m2
m2
m2
m2
m2
m2
m2
Total Luas Pabrik I 3632.515
2 Luas area Pabrik II ( Sumber: Hendri, 2008)
a Produk /jam 13000 kg/jam
b Volume Unit PxLxT
Volume Unit 0.006
c Volume Kebutuhan (Q)Volume Kebutuhan = material x volume 78
d Luas LantaiLuas Lantai = PxQxLxQ + Total Luas I
Total Luas Lantai 4849.315
e Allowance LantaiAllowance Lantai = Luas Lantai x %Allowance
Total Allowance Lantai 16972.604
Total luas pabrik II
Total luas = Luas Lantai + Allowance Lantai 21821.919
3 Luas Area Perkantoran
a Kantor Teknik dan Produksi 5 Orangb Kantor Penelitian dan Pengembangan 10 Orangc Kantor Pemeliharaan dan Instrumentasi 5 Orangd Kantor Pemasaran dan Keuangan 14 Orange Kantor Umum dan Kepegawaian 21 Orangf Kantor HSE 5 Orang
Total Karyawan 60 Orang
g Persyaratan Ukuran Luas ( Hendri, 2008)
- Lebar Lorong (LB)
- Total Lebar lorong 54
-Lebar Pekerja (LP)
- Total Lebar Pekerja 1500
m2
unit / m3
m2
m2
m2
- Lebar lorong = total karyawan x 0,9 m2
m2
- Lebar Pekerja = Total Karyawan x 25 m2
m2
- Persyaratan Ukuran Luas I (Sumber : Hendri, 2008)
- Meja Kerja 2.25- Jumlah Karyawan 60 Orang
Total Meja Kerja 135
Ruang Gerak Operator (Sumber : Hendri, 2008)
RGO 1- Jumlah Karyawan 60 Orang
Total Ruang Gerak Operator 60
Total Luas Perkantoran (TLP) 1749
3 Luas Area perumahan dan Faslitas Penunjang
a PerumahanJumlah Karyawan 60 Orang
Luas rumah 108 12x9
Luas Perumahan Karyawan 6480
b Fasilitas Penunjang
- Ruang Parkir 2000
- Fire and Safety 500
- Masjid 700
- Klinik 750
- Laboratorium 800
- Lapangan Olahraga 3000
- Gudang 900
- Pos Pengamanan 40
- Area Hijau 2500
- Unit Utilitas 1500
Luas Fasilitas Penunjang 12690
Summary :1 Luas Pabrik
Luas Pabrik Bagian I 3632.515
Luas Pabrik Bagian II 21821.919
Total Luas Pabrik 25454.434 2.545 Ha
2 Luas Area Perkantoran
Luas Perkantoran 1749.00
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
Luas Fasilitas Penunjang 19170.00
Total Area Perkantoran 20919 2.092 Ha
3 Luas Area Perluasan 13626.566 1.363 Ha
Total Luas Pabrik 6.000 Ha
m2
m2
m2
Kapasitas
100,000 150
83,000 Z1
145,000 177
y = (x-x1)/(x2-x1) * (y2-y1) + y1
= -0.37777777778 *
= 139.800
53.800
Luas Total Pabrik
46373.43 m2
(x-x1)/(x2-x1) * (y2-y1) + y1
27 + 150