No Nama Alat Diameter (m) Jumlah 1 Accumulator-01 1.116 1 2 Accumulator-02 0.336 1 3 Accumulator-03 1.735 1 4 Cooler-01 0.850 1 5 Cooler-02 0.850 1 6 Cooler-03 0.850 1 7 Cooler-04 0.950 1 8 Cooler-05 0.950 1 9 Condenser-01 0.950 1 10 Condenser-02 0.850 1 11 Condenser-03 0.950 1 12 Control Valve Pressure-0 0.300 1 13 Control Valve Pressure-0 0.300 1 14 Control Valve Pressure-0 0.300 1 15 Control Valve Pressure-0 0.300 1 16 Control Valve Pressure-0 0.300 1 17 Control Valve Pressure-0 0.300 1 18 Control Valve Pressure-0 0.300 1 19 Control Valve Pressure-0 0.300 1 20 Control Valve Pressure-0 0.300 1 21 Heater-01 0.850 1 22 Heater-02 0.850 1 23 Heater-03 0.850 1 24 Heater-04 0.850 1 25 Heater-05 0.850 1 26 Kompressor-01 2.000 1 27 Kolom Destilasi-01 2.100 1 28 Kolom Destilasi-02 0.590 1 29 Kolom Destilasi-03 2.400 1 30 Kolom Ektraksi 2.100 1 31 Knock Out Drum-01 2.339 1 32 Parsial Kondensor 0.950 1 33 Pompa-01 0.550 1 34 Pompa-02 0.550 1 35 Pompa-03 0.550 1 36 Pompa-04 0.550 1 37 Pompa-05 0.550 1 38 Pompa-06 0.550 1 39 Pompa-07 0.550 1 40 Pompa-08 0.550 1 41 Reaktor-01 2.104 1 42 Reboiler-01 0.950 1

Upload: karina-fillia-darmawan

Post on 29-Jan-2016

219 views

Category:

Documents


0 download

DESCRIPTION

oooo

TRANSCRIPT

Page 1: Menentukan Luas Pabrik Adit (1)

No Nama Alat Diameter (m) Jumlah Total Diameter1 Accumulator-01 1.116 1 1.1162 Accumulator-02 0.336 1 0.3363 Accumulator-03 1.735 1 1.7354 Cooler-01 0.850 1 0.8505 Cooler-02 0.850 1 0.8506 Cooler-03 0.850 1 0.8507 Cooler-04 0.950 1 0.9508 Cooler-05 0.950 1 0.9509 Condenser-01 0.950 1 0.95010 Condenser-02 0.850 1 0.85011 Condenser-03 0.950 1 0.95012 Control Valve Pressure-01 0.300 1 0.30013 Control Valve Pressure-02 0.300 1 0.30014 Control Valve Pressure-03 0.300 1 0.30015 Control Valve Pressure-04 0.300 1 0.30016 Control Valve Pressure-05 0.300 1 0.30017 Control Valve Pressure-06 0.300 1 0.30018 Control Valve Pressure-07 0.300 1 0.30019 Control Valve Pressure-08 0.300 1 0.30020 Control Valve Pressure-09 0.300 1 0.30021 Heater-01 0.850 1 0.85022 Heater-02 0.850 1 0.85023 Heater-03 0.850 1 0.85024 Heater-04 0.850 1 0.85025 Heater-05 0.850 1 0.85026 Kompressor-01 2.000 1 2.00027 Kolom Destilasi-01 2.100 1 2.10028 Kolom Destilasi-02 0.590 1 0.59029 Kolom Destilasi-03 2.400 1 2.40030 Kolom Ektraksi 2.100 1 2.10031 Knock Out Drum-01 2.339 1 2.33932 Parsial Kondensor 0.950 1 0.95033 Pompa-01 0.550 1 0.55034 Pompa-02 0.550 1 0.55035 Pompa-03 0.550 1 0.55036 Pompa-04 0.550 1 0.55037 Pompa-05 0.550 1 0.55038 Pompa-06 0.550 1 0.55039 Pompa-07 0.550 1 0.55040 Pompa-08 0.550 1 0.55041 Reaktor-01 2.104 1 2.10442 Reboiler-01 0.950 1 0.950

Page 2: Menentukan Luas Pabrik Adit (1)

43 Reboiler-02 0.850 1 0.85044 Reboiler-03 0.950 1 0.95045 Tangki-01 8.919 2 17.83746 Tangki-02 17.139 6 102.83547 Tangki-03 3.651 1 3.65148 Tangki-04 5.541 1 5.54149 Tangki-05 8.298 2 16.59550 Vaporizer-01 2.071 1 2.071

Total 57 187.601

Page 3: Menentukan Luas Pabrik Adit (1)

No. Jabatan Jumlah1 Direktur Utama 12 Sekretaris Direktur Utama 13 Manajer 34 Sekertaris Manajer 35 Kepala Bagian 76 Kepala Seksi 167 Operator 728 Dokter 19 Perawat 210 Analis 211 Satpam 1212 Damkar 412 Pengemudi 513 Penjaga Gudang 214 Karyawan 26

total 157

Page 4: Menentukan Luas Pabrik Adit (1)

Perhitungan Luas Area Pabrik

1. Luas Area Pabrik IControl room dan diameter peralatan

a Control Room operator instrument 8 orangb Control Room operator kontrol 40 orangc Control Room operator lapangan 24 orang

Total operator 72 orang 18 Org/shift

d Diameter peralatan total 187.601 m

e Persyaratan Ukuran Luas I (Sumber : Hendri, 2008)

Meja Kerja 2.25Jumlah Operator / Shift 18 orang/shift

Total Meja Kerja 40.5

f Ruang Gerak Operator (Sumber : Hendri, 2008)

RGO 1Jumlah Operator / Shift 18 orang / shift

Total Ruang Gerak Operator 18

g Penyalur (P)Penyalur 2.5 mTotal diameter 187.601 m

Total Penyalur (P) 469.003

h Penumpukan Material (PM)Penumpukan Material 5 mTotal diameter tangki 146.460 m

Total Penumpukan Material 732.300

i GangLebar gang 3 m

Total Luas Gang 684.303

j Akses Perawatan Mesin (APM)Akses perawatan mesin 3 m

Total APM 562.803

k Jarak tiap alatjarak tiap alat 6 m

Total jarak tiap Alat 1125.607

m2

m2

m2

m2

m2

m2

m2

m2

m2

Page 5: Menentukan Luas Pabrik Adit (1)

Total Luas Pabrik I 3632.515

2 Luas area Pabrik II ( Sumber: Hendri, 2008)

a Produk /jam 13000 kg/jam

b Volume Unit PxLxT

Volume Unit 0.006

c Volume Kebutuhan (Q)Volume Kebutuhan = material x volume 78

d Luas LantaiLuas Lantai = PxQxLxQ + Total Luas I

Total Luas Lantai 4849.315

e Allowance LantaiAllowance Lantai = Luas Lantai x %Allowance

Total Allowance Lantai 16972.604

Total luas pabrik II

Total luas = Luas Lantai + Allowance Lantai 21821.919

3 Luas Area Perkantoran

a Kantor Teknik dan Produksi 5 Orangb Kantor Penelitian dan Pengembangan 10 Orangc Kantor Pemeliharaan dan Instrumentasi 5 Orangd Kantor Pemasaran dan Keuangan 14 Orange Kantor Umum dan Kepegawaian 21 Orangf Kantor HSE 5 Orang

Total Karyawan 60 Orang

g Persyaratan Ukuran Luas ( Hendri, 2008)

- Lebar Lorong (LB)

- Total Lebar lorong 54

-Lebar Pekerja (LP)

- Total Lebar Pekerja 1500

m2

unit / m3

m2

m2

m2

- Lebar lorong = total karyawan x 0,9 m2

m2

- Lebar Pekerja = Total Karyawan x 25 m2

m2

Page 6: Menentukan Luas Pabrik Adit (1)

- Persyaratan Ukuran Luas I (Sumber : Hendri, 2008)

- Meja Kerja 2.25- Jumlah Karyawan 60 Orang

Total Meja Kerja 135

Ruang Gerak Operator (Sumber : Hendri, 2008)

RGO 1- Jumlah Karyawan 60 Orang

Total Ruang Gerak Operator 60

Total Luas Perkantoran (TLP) 1749

3 Luas Area perumahan dan Faslitas Penunjang

a PerumahanJumlah Karyawan 60 Orang

Luas rumah 108 12x9

Luas Perumahan Karyawan 6480

b Fasilitas Penunjang

- Ruang Parkir 2000

- Fire and Safety 500

- Masjid 700

- Klinik 750

- Laboratorium 800

- Lapangan Olahraga 3000

- Gudang 900

- Pos Pengamanan 40

- Area Hijau 2500

- Unit Utilitas 1500

Luas Fasilitas Penunjang 12690

Summary :1 Luas Pabrik

Luas Pabrik Bagian I 3632.515

Luas Pabrik Bagian II 21821.919

Total Luas Pabrik 25454.434 2.545 Ha

2 Luas Area Perkantoran

Luas Perkantoran 1749.00

m2

m2

m2

m2

m2

m2

m2

m2

m2

m2

m2

m2

m2

m2

m2

m2

m2

m2

m2

m2

m2

m2

Page 7: Menentukan Luas Pabrik Adit (1)

Luas Fasilitas Penunjang 19170.00

Total Area Perkantoran 20919 2.092 Ha

3 Luas Area Perluasan 13626.566 1.363 Ha

Total Luas Pabrik 6.000 Ha

m2

m2

m2

Page 8: Menentukan Luas Pabrik Adit (1)

Kapasitas

100,000 150

83,000 Z1

145,000 177

y = (x-x1)/(x2-x1) * (y2-y1) + y1

= -0.37777777778 *

= 139.800

53.800

Luas Total Pabrik

Page 9: Menentukan Luas Pabrik Adit (1)

46373.43 m2

Page 10: Menentukan Luas Pabrik Adit (1)

(x-x1)/(x2-x1) * (y2-y1) + y1

27 + 150