bi tm bab 14

Upload: jo-sky

Post on 07-Jul-2018

212 views

Category:

Documents


0 download

TRANSCRIPT

  • 8/19/2019 BI TM BAB 14

    1/3

    Exercise 14.4.2

    1. You’re lucky, aren’t you?

    2. I can use his fishing rod, can I?

    3. You’re not going to catch fish, are you?

    4. Mr. endro couldn’t !e kidding, could he?

    ". It’s not a real !o#!, is it?

    $. %ife here is dull, isn’t it?

    &. You’'e had lunch, haven’t you?

    (. You #ake a lot of #oney !y )orking o'erti#e, don’t you?

    *. e needs a !reak, doesn’t he?

    1+. inishing in drilling o-eration doesn’t in'ol'e real fish, does it?

    Exercise 14.".1 o#-rehension

    1. /hat does a ce#enting cre) usually consist of?

    It usually consists of a junior engineer, a mechanic, two pump

    operators and five roustabouts.

    2. /hat is annulus?

    Annulus is an empty space between the outer wall of a casing and the

    wall of the hole.

    3. /hat does a !otto# -lug do?A bottom plug drives drill fluid out of casing.

    4. o) do you kno) ho) #uch ce#ent is re0uired to fill the annulus?

    By calculating the volume of the annulus.

    ". /hy do you ha'e to add 1" to the 'olu#e of the annulus )hen you

    calculate the a#ount of ce#ent slurry to fill the annulus?

    Because the calculation could be wrong.

    $. a#e t)o #ethods of #ixing ce#ent.

    Batch mixing and jet mixing.

    &. /hat do you do )hen you ha'e got all the re0uired slurry -u#-ed?

    Pump displacement fluid.(. /hat do you use for dis-lace#ent?

    Brine or drill fluid.

    *. /hat is !rine?

    alt water.

    1+. /hat do you doi f the ce#ent does not fill all the s-ace in the annulus?

    !o top job.

    11. /hat does / stand for?

    "aiting on cement.

    12. /hy do you ha'e to circulate the ce#ent into the -it )hen the #ixing

     -u#- is !roken?

    Because we do not want it to harden in the casing.

  • 8/19/2019 BI TM BAB 14

    2/3

    Exercise 14.".2 oun lause

    1. /hat kind of ce#ent do they use?5

    #et’s as$ %i$e what $ind of cement they use.

    2. o) old is Mike?5

    I’ll as$ %r. &endro how old %i$e is.

    3. o) #uch ce#ent is needed to fill the annulus?

    #et’s find out how much cement is needed to fill the annulus.

    4. /hat ty-e of -u#-s do they use to #ix ce#ent?

    I don’t have any idea what type of pumps they use to mix cement.

    ". /hen )ill you run the to- -lug?

    'he operators $now when we will run the top plug.

    $. /hat do they use for dis-lace#ent?'he engineers decides what we use for displacement.

    &. /here does Mike co#e fro#?

    &ow do I $now where %i$e comes from(

    (. o) long does it take to harden the ce#ent?

    I don’t $now how long it ta$es to harden the cement.

    *. an Mr. endro s-eak rench?

    I’ll as$ %i$e if %r. &endro can spea$ )rench.

    1+. 6oes Mike like his 7o!?

    *obody $nows whether %i$e li$e his job.

    Exercise 14.$.1

    1. /hat is a !lo)out?

    An uncontrollable spew of oil and gas from a well.

    2. o) does it !egin?

    It begins with a $ic$.

    3. /hat causes a kick?

    A $ic$ is caused by the formation pressure which is higher than the

    hydrostatic pressure in the wellbore.4. 8he #ud -u#-s are shut in, !ut #ud is still flo)ing fro# the hole. /hat

    does it tell you?

    It means that a $ic$ is coming.

    ". /hat #ay cause a significant increase in the le'el of the #ud -it?

    'he presence of hydrocarbons from the wellbore.

    $. /hat syste# do you ha'e to -re'ent a !lo)out?

    B+P stac$.

    &. /hat is the first thing to do )hen a kick is detected?

    'o stop drilling.

    (. /hat is the #ost likely reason for a !lo)out?

    &uman error.

  • 8/19/2019 BI TM BAB 14

    3/3

    *. /hat is a 9:?

    Blow +ut Preventer.

    1+. /hat is it designed for?)or blowout preventer.

    11. /hat is ;ed