bi tm bab 14
TRANSCRIPT
-
8/19/2019 BI TM BAB 14
1/3
Exercise 14.4.2
1. You’re lucky, aren’t you?
2. I can use his fishing rod, can I?
3. You’re not going to catch fish, are you?
4. Mr. endro couldn’t !e kidding, could he?
". It’s not a real !o#!, is it?
$. %ife here is dull, isn’t it?
&. You’'e had lunch, haven’t you?
(. You #ake a lot of #oney !y )orking o'erti#e, don’t you?
*. e needs a !reak, doesn’t he?
1+. inishing in drilling o-eration doesn’t in'ol'e real fish, does it?
Exercise 14.".1 o#-rehension
1. /hat does a ce#enting cre) usually consist of?
It usually consists of a junior engineer, a mechanic, two pump
operators and five roustabouts.
2. /hat is annulus?
Annulus is an empty space between the outer wall of a casing and the
wall of the hole.
3. /hat does a !otto# -lug do?A bottom plug drives drill fluid out of casing.
4. o) do you kno) ho) #uch ce#ent is re0uired to fill the annulus?
By calculating the volume of the annulus.
". /hy do you ha'e to add 1" to the 'olu#e of the annulus )hen you
calculate the a#ount of ce#ent slurry to fill the annulus?
Because the calculation could be wrong.
$. a#e t)o #ethods of #ixing ce#ent.
Batch mixing and jet mixing.
&. /hat do you do )hen you ha'e got all the re0uired slurry -u#-ed?
Pump displacement fluid.(. /hat do you use for dis-lace#ent?
Brine or drill fluid.
*. /hat is !rine?
alt water.
1+. /hat do you doi f the ce#ent does not fill all the s-ace in the annulus?
!o top job.
11. /hat does / stand for?
"aiting on cement.
12. /hy do you ha'e to circulate the ce#ent into the -it )hen the #ixing
-u#- is !roken?
Because we do not want it to harden in the casing.
-
8/19/2019 BI TM BAB 14
2/3
Exercise 14.".2 oun lause
1. /hat kind of ce#ent do they use?5
#et’s as$ %i$e what $ind of cement they use.
2. o) old is Mike?5
I’ll as$ %r. &endro how old %i$e is.
3. o) #uch ce#ent is needed to fill the annulus?
#et’s find out how much cement is needed to fill the annulus.
4. /hat ty-e of -u#-s do they use to #ix ce#ent?
I don’t have any idea what type of pumps they use to mix cement.
". /hen )ill you run the to- -lug?
'he operators $now when we will run the top plug.
$. /hat do they use for dis-lace#ent?'he engineers decides what we use for displacement.
&. /here does Mike co#e fro#?
&ow do I $now where %i$e comes from(
(. o) long does it take to harden the ce#ent?
I don’t $now how long it ta$es to harden the cement.
*. an Mr. endro s-eak rench?
I’ll as$ %i$e if %r. &endro can spea$ )rench.
1+. 6oes Mike like his 7o!?
*obody $nows whether %i$e li$e his job.
Exercise 14.$.1
1. /hat is a !lo)out?
An uncontrollable spew of oil and gas from a well.
2. o) does it !egin?
It begins with a $ic$.
3. /hat causes a kick?
A $ic$ is caused by the formation pressure which is higher than the
hydrostatic pressure in the wellbore.4. 8he #ud -u#-s are shut in, !ut #ud is still flo)ing fro# the hole. /hat
does it tell you?
It means that a $ic$ is coming.
". /hat #ay cause a significant increase in the le'el of the #ud -it?
'he presence of hydrocarbons from the wellbore.
$. /hat syste# do you ha'e to -re'ent a !lo)out?
B+P stac$.
&. /hat is the first thing to do )hen a kick is detected?
'o stop drilling.
(. /hat is the #ost likely reason for a !lo)out?
&uman error.
-
8/19/2019 BI TM BAB 14
3/3
*. /hat is a 9:?
Blow +ut Preventer.
1+. /hat is it designed for?)or blowout preventer.
11. /hat is ;ed