bab ii rencana garis tb ''makmoer berdjaya'' 1600 bhp.pdf

Upload: arimbi-gadih-ranti

Post on 08-Feb-2018

243 views

Category:

Documents


0 download

TRANSCRIPT

  • 7/22/2019 BAB II Rencana Garis TB ''MAKMOER BERDJAYA'' 1600 BHP.pdf

    1/36

    II-21

    BAB II

    PERHITUNGAN RENCANA GARIS

    (LINES PLAN)

    A. PERHITUNGAN DASARA.1. Panjang Garis Air (LWL) *1

    LWL = LPP + 2 % LPP

    = 31,22 + ( 2% x 31,22 )

    = 31,844 m

    A.2 Panjang DisplacementUntuk Kapal BalingBaling Tunggal (LDISPL)*2

    LDISPL = 0,5x( LWL+LPP)

    = 0,5x(31,844+31,22)

    = 31,532 m

    A.3. Coefficient Midship(Cm) *3(Range Cm = 0,73~0,88 for Tug Boat s)

    Cm = 0,90 (0,1 x Cb)

    = 0,90 (0,1 x 0,59 )

    = 0,824

    A.4. Coefficient Pri smat ic (Cp)*4(Range Cp = 0,58~0,71 for Tug Boat s)

    Cp =Cm

    Cb

    =0,824

    0,59

    1Length Water Line Formula.2012. Buku Ajar Perkuliahan: Rencana Garis. Program Studi Diploma

    III Teknik Perkapalan: Universitas Diponegoro.2Length Displacement Formula. 2012. Buka Ajar Perkuliahan: Rencana Garis. Program StudiDiploma III Teknik Perkapalan: Universitas Diponegoro.3Arkent Bont Shocker Formula for Midship Coefficient. 2012. Buku Ajar Perkuliahan: Rencana Garis.Program Studi Diploma III Teknik Perkapalan: Universitas Diponegoro. 4Troast Formula for Prismatic Coefficient.2012. Buku Ajar Perkuliahan: Rencana Garis. ProgramStudi Diploma III Teknik Perkapalan: Universitas Diponegoro.

  • 7/22/2019 BAB II Rencana Garis TB ''MAKMOER BERDJAYA'' 1600 BHP.pdf

    2/36

    II-22

    = 0,710

    A.5. Coefficient W ater Line (Cw)*5(Range Cw = 0,74~0,83 for T ug Boats)

    Cw = 0,025Cb

    = 0,0250,55

    = 0,740

    A.6. Luas Garis Air (AWL) *6

    AWL = LWL x B x Cw

    = 31,22 x 6,90 x 0,740

    = 162,565 m2

    A.7. Luas Midship(Am)*7

    Am = B x T x Cm

    =6,90 x 2,35 x 0,824

    = 13,353 m2

    A.8. Volume Displacement(VDISPL) *8

    VDISPL = LPP x B x T x Cb

    = 31,22 x 6,90 x 2,35 x 0,59

    = 296,146 m3

    A.9. Displacement *9

    D = VDISPLx x c

    = 296,146 x 1,025 x 1,004

    = 304,764 Ton

    5Troast Formula for Water Line Cofficient. 2012. Buku Ajar Perkuliahan: Rencana Garis. ProgramStudi Diploma III Teknik Perkapalan: Universitas Diponegoro.6Kusna Djaya, Indra dan Moch. Sofii. 2008. Teknik Konstruksi Kapal Jilid 1 hal: 19. Direktorat

    Pembinaan Sekolah Menengah Kejuruan: Departemen Pendidikan Nasional.7Kusna Djaya, Indra dan Moch. Sofii. 2008. Teknik Konstruksi Kapal Jilid 1 hal: 20. Direktorat

    Pembinaan Sekolah Menengah Kejuruan: Departemen Pendidikan Nasional.8Kusna Djaya, Indra dan Moch. Sofii. 2008. Teknik Konstruksi Kapal Jilid 1 hal: 27. DirektoratPembinaan Sekolah Menengah Kejuruan: Departemen Pendidikan Nasional.9Kusna Djaya, Indra dan Moch. Sofii. 2008. Teknik Konstruksi Kapal Jilid 1 hal: 27. Direktorat

    Pembinaan Sekolah Menengah Kejuruan: Departemen Pendidikan Nasional.

  • 7/22/2019 BAB II Rencana Garis TB ''MAKMOER BERDJAYA'' 1600 BHP.pdf

    3/36

  • 7/22/2019 BAB II Rencana Garis TB ''MAKMOER BERDJAYA'' 1600 BHP.pdf

    4/36

    II-24

    Gambar 2.02. Letak LCB dan Luas Stationpada Grafik NSP

  • 7/22/2019 BAB II Rencana Garis TB ''MAKMOER BERDJAYA'' 1600 BHP.pdf

    5/36

    II-25

    B.1.1.Letak LCB DisplacementMenurut Grafik NSP

    Letak LCB adalah = 0,926% dari LDISPL

    LCBDISPL = 0,926% x LDISPL

    = 0,926% x 31,532

    = 0,292 m (Di DepanLDISPL)

    B.1.2. Jarak Midship() LDISPLke FP

    LDISPL = 0,5 x LDISPL

    = 0,5 x 31,532

    = 15,766 m

    B.1.3. Jarak Midship() LPP ke FP

    LPP = 0,5 x LPP

    = 0,5 x 31,22

    = 15,61 m

    B.1.4. Jarak antara Midship() LDISPLdengan Midship() LPP

    = LDISPL LPP

    = 15,766 15,61

    = 0,156 m

    B.1.5. Jarak antara LCBDISPLTerhadap () LPP

    = LCBDISPL LPP

    = 0,292 0,156

    = 0,136 m (Di DepanLPP)

    Rumus Menghitung Volume

    Volume atau luasan lengkung dihitung menggunakan metode integrasi

    numerik dengan aturan trapesium dan aturan Simpson, yaitu :

    aV *11

    Dimana :

    V = Volume atau Luas (m3)

    11http://www.google.com/Ekoblog: INTEGRASI NUMERIK APPROXIMATE INTEGRATION.

  • 7/22/2019 BAB II Rencana Garis TB ''MAKMOER BERDJAYA'' 1600 BHP.pdf

    6/36

    II-26

    Gambar 2.03. Letak LCB, MidshipLPP, dan MidshipL-Displacement

  • 7/22/2019 BAB II Rencana Garis TB ''MAKMOER BERDJAYA'' 1600 BHP.pdf

    7/36

    II-27

    k = Angka pengali

    a = Jarak Antar Ordinat (m)

    = Jumlah Hasil (m2)

    B.2. Luas Stationdari Grafik NSP

    Am = 13,391 m2

    Ordinat Luas Luas Terhadap Am FS Hasil FM Hasil

    AP 0 0 1 - -10 -

    1 0.102 1.362 4 5.448 -9 -49.033

    2 0.298 3.979 2 7.959 -8 -63.668

    3 0.503 6.717 4 26.867 -7 -188.068

    4 0.698 9.321 2 18.641 -6 -111.847

    5 0.835 11.150 4 44.600 -5 -223.000

    6 0.925 12.352 2 24.704 -4 -98.814

    7 0.970 12.953 4 51.811 -3 -155.432

    8 0.990 13.220 2 26.440 -2 -52.879

    9 1 13.353 4 53.413 -1 -53.413

    2 -996.156

    10 1 13.353 2 26.707 0 -

    11 1 13.353 4 53.413 1 53.413

    12 1 13.353 2 26.707 2 53.413

    13 0.987 13.180 4 52.719 3 158.156

    14 0.955 12.752 2 25.505 4 102.019

    15 0.895 11.951 4 47.805 5 239.024

    16 0.780 10.416 2 20.831 6 124.987

    17 0.580 7.745 4 30.980 7 216.857

    18 0.350 4.674 2 9.347 8 74.778

    19 0.140 1.869 4 7.478 9 67.301

    FP 0 0 1 - 10 -

    1 561.372 3 1,089.949

    B.2.1. h =20

    LDISPL

    =20

    31,532

  • 7/22/2019 BAB II Rencana Garis TB ''MAKMOER BERDJAYA'' 1600 BHP.pdf

    8/36

    II-28

    = 1,577 m

    B.2.2. Volume Displacement NSPVDISPLNSP =

    3

    1x h x1

    =3

    1x 1,577 x 561,372

    = 295,022 m3

    B.2.3. Letak LCB NSPLCB NSP = h

    1

    32

    = 1,577561,372

    ,996,156 9491089

    = 0,263 m

    B.2.4. Koreksi Letak LCB ( 0,1% LDISPL) *12= 100%

    L

    NSPLCBLCB

    DISPL

    DISPL < 0,1%

    = %10031,532

    0,263-0,292 < 0,1%

    = 0,091% < 0,1 %

    B.2.5. Koreksi Volume Diplacement( 0,5% VDISPL) *13= %100

    V

    NSP-VV

    DISPL

    DISPLDISPL < 0,5%

    = %100296,146

    295,022-296,146 < 0,5%

    = 0,380% < 0,5 %

    12 Koreksi Letak LCB. Tugas Rencana Garis & Bukaan Kulit Hal : 17. 2009. Fakultas TeknologiKelautan: ITS.13 Koreksi Volume Displacement. Tugas Rencana Garis & Bukaan Kulit Hal : 17. 2009. Fakultas

    Teknologi Kelautan: ITS.

  • 7/22/2019 BAB II Rencana Garis TB ''MAKMOER BERDJAYA'' 1600 BHP.pdf

    9/36

    II-29

    B.3. Dengan Tabel Van LammerentMenghitung koefisien prismatik depan (Qf) dan menghitung koefisien

    prismatik belakang (Qa), dengan formula:

    eCp)(1,4CpQf

    eCp)(1,4CpQa

    Dimana :

    Cp = Coefficient Prismatic= 0,710

    e = 100%LPP

    LCB LPP

    = 100%31,22

    0,136

    = 0,0044

    Sehingga :

    Qf = Cp + (1,4 + Cp) x e

    = 0,710 + (1,4 + 0,710) x 0,0044

    = 0,720

    Qa = Cp ( 1,4 + Cp ) x e

    = 0,710 (1,4 + 0,710) x 0,0044

    = 0,701

    B.3.1. Tabel Curve of Selectional Area Lama

    Am = 13,353 m2

    Ordinat Luas Luas Terhadap Am

    AP 0 0

    0,25 0.075 1.001

    0,5 0.162 2.163

    0,75 0.255 3.405

    1 0.35 4.674

    1,5 0.54 7.211

    2 0.707 9.441

    2,5 0.839 11.203

    3 0.926 12.365

    4 0.995 13.287

  • 7/22/2019 BAB II Rencana Garis TB ''MAKMOER BERDJAYA'' 1600 BHP.pdf

    10/36

    II-30

    5 1 13.353

    6 0.988 13.193

    7 0.948 12.6597,5 0.87 11.617

    8 0.746 9.962

    8,5 0.582 7.772

    9 0.385 5.141

    9,25 0.282 3.766

    9,5 0.18 2.404

    9,75 0.085 1.135

    FP 0 0

    145.751

    B.3.2. Transformasi Titik Tekan pada Kurva CSA

    6

    1-4b *14

    Dimana : = Coefficient Prismatic

    Sehingga :

    b = 0,2180 m

    P = LCBDISPL = 0,292 m

    Q = LCB-NSP = 0,263 m

    Gambar 2.04. Transformasi Titik Tekan P ke Q

    14Prohaska Fomula.Tugas Rencana Garis & Bukaan Kulit Hal : 17. 2009. Fakultas Teknologi

    Kelautan: ITS.

  • 7/22/2019 BAB II Rencana Garis TB ''MAKMOER BERDJAYA'' 1600 BHP.pdf

    11/36

    II-31

    Gambar 2.05. Tabel Van Lammerent

  • 7/22/2019 BAB II Rencana Garis TB ''MAKMOER BERDJAYA'' 1600 BHP.pdf

    12/36

    II-32

    B.3.3. Tabel Curve of Selectional Area Baru Menurut Van Lamerent

    Am = 13,353 m2

    Ordinat Luas Luas x Am FS Hasil FM Hasil

    AP 0.024 0.357 0.25 0.089 -5 -0.447

    0.25 0.076 1.013 1 1.013 -4.75 -4.811

    0.5 0.165 2.198 0.5 1.099 -4.5 -4.946

    0.75 0.259 3.459 1 3.459 -4.25 -14.701

    1 0.356 4.751 0.75 3.563 -4 -14.253

    1.5 0.548 7.322 2 14.644 -3.5 -51.255

    2 0.716 9.562 1 9.562 -3 -28.686

    2.5 0.847 11.306 2 22.611 -2.5 -56.528

    3 0.931 12.431 1.5 18.646 -2 -37.292

    4 0.996 13.301 4 53.205 -1 -53.205

    5 1 13.348 2 26.696 0 -

    2 -266.125

    6 0.987 13.186 4 52.743 1 52.743

    7 0.948 12.602 1.5 18.904 2 37.807

    7.5 0.865 11.516 2 23.033 2.5 57.582

    8 0.745 9.841 1 9.841 3 29.524

    8.5 0.582 7.654 2 15.309 3.5 53.5809 0.383 5.064 0.75 3.798 4 15.192

    9.25 0.280 3.702 1 3.702 4.25 15.732

    9.5 0.177 2.365 0.5 1.182 4.5 5.320

    9.75 0.084 1.118 1 1.118 4.75 5.312

    FP 0.000 - 0.25 - 0 -

    1 284.218 3 272.793

    1. Volume Displacementpada Main Part (VDISPLMP)VDISPLMP =

    3

    1x

    10

    LPPx1

    =3

    1 x10

    31,22 x 284,218

    = 295,777 m3

  • 7/22/2019 BAB II Rencana Garis TB ''MAKMOER BERDJAYA'' 1600 BHP.pdf

    13/36

    II-33

    2. Letak LCB pada Main Part(LCB-MP)LCB-MP =

    10

    LPP

    1

    32

    =10

    31,22

    284,218

    ,,

    793272125266

    = 0,073 m

    Ordinat Luas FS Hasil FM Hasil

    0 0 1 0 0 0

    0,5 AP 0.179 4 0.715 1 0.715

    AP 0.357 1 0.357 2 0.715

    1

    1.072 3

    1.429

    3. Jarak 0- AP, dan AP-AP

    e =2

    LPPLWL

    =2

    31,2231,844

    = 0,312 m

    4. Volume Displacementpada Cant Part(VDISPLCP)VDISPLCP =

    3

    1 x e x 1

    =3

    1x 0,312 x 1,072

    = 0,112m3

    5. Letak LCB pada Cant Partterhadap AP (LCB-CP)=

    1

    2

    x e

    = 1,072

    1,429x 0,312

    = 0,416 m

    0 AP

    0,179 0,357

    AP

  • 7/22/2019 BAB II Rencana Garis TB ''MAKMOER BERDJAYA'' 1600 BHP.pdf

    14/36

    II-34

    6. Jarak LCB Cant Partterhadap LPP= x LPP + LCB-CP

    = x 31,22 + 0,416

    = 16,026 m

    7. Volume DisplacementTotal (VDISPL)VDISPL = VDISPLMP + VDISPLCP

    = 295,777 + 0,112

    = 295,888 m3

    8. LCB Total terhadap LPP (LCB)LCB =

    DISPL

    DISPLDISPL

    V

    CPVCP-LCBMPVMP-LCB

    = 295,888

    0,11216,026295,7770,073

    = 0,079 m

    B.3.4. Koreksi Perhitungan

    1. Koreksi Volume Displacement= 100%

    NSPV

    V-NSPV

    DISPL

    DISPLDISPL < 0,5%

    = 100%295,022

    295,888-295,022 < 0,5%

    = -0,294% < 0,5%

    2. Koreksi LCB= 100%

    LPP

    LCBLCB LPP < 0,1%

    = 100%31,22

    0,079-0,136 < 0,1%

    = 0,09% < 0,1%

  • 7/22/2019 BAB II Rencana Garis TB ''MAKMOER BERDJAYA'' 1600 BHP.pdf

    15/36

    II-35

    Gambar 2.06. Curve Selection Areadan Bentuk Garis Air

  • 7/22/2019 BAB II Rencana Garis TB ''MAKMOER BERDJAYA'' 1600 BHP.pdf

    16/36

    II-36

    C. RENCANA BENTUK GARIS AIRC.1. Perhitungan Besarnya Sudut Masuk ()

    Untuk menghitung besarnya sudut masuk garis air berdasarkan

    Coefficient Prismatic Depan (Qf), dimana :

    Pada perhitungan penentuan letak LCB, Qf = 0,72

    Dari grafik Lastlundidapat sudut masuk = + 17,4

    Penyimpangan =3

    Maka besarnya sudut masuk yang diperoleh = + 20,4

    Gambar 2.07. Grafik Lastlun

    C.2. Perhitungan Luas Garis Air (AWL)Tabel Main Part( Lebar Kapal)

    Ordinat Y = B FS Hasil

    AP 0.81 0.25 0.202

    0.25 1.26 1 1.256

    0.5 1.63 0.5 0.814

    0.75 1.94 1 1.941

    1 2.21 0.75 1.656

    1.5 2.63 2 5.261

    2 2.94 1 2.940

  • 7/22/2019 BAB II Rencana Garis TB ''MAKMOER BERDJAYA'' 1600 BHP.pdf

    17/36

    II-37

    2.5 3.16 2 6.318

    3 3.30 1.5 4.955

    4 3.43 4 13.729

    5 3.45 2 6.900

    6 3.33 4 13.308

    7 2.91 1.5 4.364

    7.5 2.59 2 5.185

    8 2.20 1 2.204

    8.5 1.75 2 3.490

    9 1.22 0.75 0.913

    9.25 0.93 1 0.934

    9.5 0.64 0.5 0.322

    9.75 0.35 1 0.348

    FP 0 0.25 0

    77.043

    Luas Garis Air Pada Main Part (AWLMP)

    AWLMP = 2 x3

    1x (

    10

    LPP ) x

    = 2 x3

    1x (

    10

    31,22 ) x 77,043

    = 160,353 m2

    Tabel Cant Part ( Lebar Kapal)

    Ordinat Luas FS Hasil

    AP 0.810 1 0.810

    AP 0.405 4 1.620

    0 0 1 0.000

    2,430

    e =2

    LPPLWL

    =2

    31,2231,844

    = 0,312 m

  • 7/22/2019 BAB II Rencana Garis TB ''MAKMOER BERDJAYA'' 1600 BHP.pdf

    18/36

    II-38

    Luas Garis Air pada Cant Part

    AWLCP = 2 x e x

    = 2 x 0,312 x 2,430

    = 1,517 m2

    Jadi :

    AWLTOTAL = AWLMP+ AWLCP

    = 160,353 + 1,517

    = 161,870 m2

    C.3. Koreksi Luas Garis Air= 100%xAWL

    AWLAWL TOTAL

    < 0,5%

    = 100%x162.565

    161.870-162.565 < 0,5%

    = 0,43% < 0,5%

    D. PERHITUNGAN RADIUS BILGA

    D.1. Dalam Segitiga ABCtan =

    0,4836,900,5

    aB0,5

    tan = 7,143

    = arctan 7,143

    Keterangan :

    B = 6,90 m

    T = 2,35 m

    H = 2,75 m

    M = Titik Pusat Kelengkungan

    a = Rise of Floor

    = 0,07 x B

    = 0,07 x 6,90

    = 0,483 m

    H

    C

    M

    G

    B

    F

    A B

    T-a

    T

    a

    E D

    R

  • 7/22/2019 BAB II Rencana Garis TB ''MAKMOER BERDJAYA'' 1600 BHP.pdf

    19/36

    II-39

    = 82,030o

    = (180 82,030 o)

    = 48,985o

    D.2. Luas Trapesium ACED

    = ( x B) x ( x (T + (T a)))

    = ( x 6,90) x ( x (2,35 + (2,35 0,483)))

    = 7,274 m2

    D.3. Luas AFHED

    = B x T x Cm

    = x 6,90 x 2,35 x 0,824

    = 6,677 m2

    D.4. Luas FGHC

    = Luas Trapesium ACED Luas AFHEDA

    = 7,274 6,677

    = 0,598 m2

    D.5. Luas FCM

    = MF x FC x tan

    = Rx R x tan

    = x R2x tan

    D.6. Luas Juring MFG

    = /3600x R2

    Sehingga :

    Luas FCGH = Luas FCM Luas juring MFG

    0,598 =( R2 tan ) (/360ox R2)

    0,598 = ( R2tan 48,99o) (48,99o/360ox 3,14 x R2)

    0,598 = (0,575 0,428) R2

    0,598 = 0,147 R2

    4,055 = R2

    R = 2,0137 m

  • 7/22/2019 BAB II Rencana Garis TB ''MAKMOER BERDJAYA'' 1600 BHP.pdf

    20/36

    II-40

    Gambar 2.08. Radius Bilga danCamber

  • 7/22/2019 BAB II Rencana Garis TB ''MAKMOER BERDJAYA'' 1600 BHP.pdf

    21/36

    II-41

    E. RENCANA BODY PLANPerhitungan bentuk body plan:

    1. Merencanakan bentuk body planadalah membentuk garis lengkung padapotongan ordinat.

    2. Langkah-langkahnya merencanakan body planadalah sebagai berikut.a. Membuat ukuran empat persegi panjang dengan ukuran B dengan

    tinggi (T).

    b. Buat garis horizontal dengan jarak Y dari center line sesuai dengannomor ordinat yang bentuk Y = B (setengah lebar kapal).

    c. Buat garis vertikal dengan jarak B dari center line sesuai nomorordinat yang akan dibentuk : B =

    2T

    StationLuas.

    d. Bentuk garis lengkung sedemikian rupa sehingga luas ABC samadengan luas EDC, dimana dalam hal ini dapat dicek dengan

    menggunakan Planimeter.

    E.1. Rencana Bentuk Body Plan

    B = x 6,90

    = 3,45 m

    T = 2,35 m

    b = Luas/2T

    Y = Lebar Garis Air

    Y

    b

    T

    B

    A B

    C

    D E

  • 7/22/2019 BAB II Rencana Garis TB ''MAKMOER BERDJAYA'' 1600 BHP.pdf

    22/36

    II-42

    Ordinat Y = B b = Luas/2T Luas

    AP 0.810 0.076 0.357

    0.25 1.256 0.215 1.0130.5 1.629 0.468 2.198

    0.75 1.941 0.736 3.459

    1 2.208 1.011 4.751

    1.5 2.631 1.558 7.322

    2 2.940 2.034 9.562

    2.5 3.159 2.405 11.306

    3 3.304 2.645 12.431

    4 3.432 2.830 13.301

    5 3.450 2.840 13.348

    6 3.327 2.805 13.186

    7 2.910 2.681 12.602

    7.5 2.592 2.450 11.516

    8 2.204 2.094 9.841

    8.5 1.745 1.629 7.654

    9 1.218 1.077 5.064

    9.25 0.934 0.788 3.702

    9.5 0.643 0.503 2.365

    9.75 0.348 0.238 1.118FP 0 0 0

    E.2. VolumeBody Plan

    E.2.1. Volume Body Planpada Main Part

    Ordinat Luas FS Hasil

    AP 0.357 0.25 0.089

    0.25 1.013 1 1.013

    0.5 2.198 0.5 1.099

    0.75 3.459 1 3.459

    1 4.751 0.75 3.563

    1.5 7.322 2 14.644

    2 9.562 1 9.562

    2.5 11.306 2 22.611

  • 7/22/2019 BAB II Rencana Garis TB ''MAKMOER BERDJAYA'' 1600 BHP.pdf

    23/36

    II-43

    3 12.431 1.5 18.646

    4 13.301 4 53.205

    5 13.348 2 26.696

    6 13.186 4 52.743

    7 12.602 1.5 18.904

    7.5 11.516 2 23.033

    8 9.841 1 9.841

    8.5 7.654 2 15.309

    9 5.064 0.75 3.798

    9.25 3.702 1 3.702

    9.5 2.365 0.5 1.182

    9.75 1.118 1 1.118

    FP 0 0.25 0

    284.218

    Volume Displacementpada Main Part(VDISPLMP)

    VDISPLMP = 10

    LPP31

    =10

    31,2231

    x 284,218

    = 295,777 m3

    E.2.2. Volume Body Planpada Cant Part

    Ordinat Luas FS Hasil

    0 0 1 0.000

    AP 0.179 4 0.715

    AP 0.357 1 0.357

    1,072

    e = (LWLLPP)/2

    = (31,844 31,22)/2

    = 0,312

    Volume Displacement pada Cant Part(VDISPLCP)

    VDISPLCP = 1/3 x e x

    = 1/3 x 0,312 x 1,072

  • 7/22/2019 BAB II Rencana Garis TB ''MAKMOER BERDJAYA'' 1600 BHP.pdf

    24/36

    II-44

    = 0,112 m3

    E.2.3. Volume DisplacementTotal (VDISPL)

    = VDISPLMP + VDISPLCP

    = 295,777 + 0,112

    = 295,888 m3

    E.3. Koreksi VolumeBody Plandengan VolumeDispl acement

    100%NPERENCANAAV

    V-NPERENCANAAV

    DISPL

    DISPLDISPL < 0,5%

    = 100%296,146

    295,888296,146

    < 0,5%

    = 0,087% < 0,5%

    F. PERHITUNGAN CAMBER, SHEER, JARAK GADING, DAN BULWARKF.1. Perhitungan Camber

    Camber adalah bentuk lengkung geladak.

    Cara membuat Camber:

    a. buat garis horizontal AB = Bb.

    buat garis vertikal CD = 1/25 B

    c. tarik garis dari A ke D dan dari B ke Dd. garis AD dan BD dibagi menjadi lima bagian sama panjange. tandai mulai dari A ke D dan B ke D dengan angka 1 5f. tarik garis dari 1 AD ke garis 5 BD, 2 AD ke 4 BD, dan 3 AD ke 3 BDg. tarik garis dari A mengikuti titik temu dari garis-garis yang telah

    dibuat sehingga membentuk lengkung Camber.

    Tinggi Camber

    = 1/25 x B *15

    15Camber Formula for Tug Boat & Fishing Vessel.2012. Buku Ajar Perkuliahan: Rencana Garis.Program Studi Diploma III Teknik Perkapalan: Universitas Diponegoro.

  • 7/22/2019 BAB II Rencana Garis TB ''MAKMOER BERDJAYA'' 1600 BHP.pdf

    25/36

    II-45

    Gambar 2.09.Body Plan

  • 7/22/2019 BAB II Rencana Garis TB ''MAKMOER BERDJAYA'' 1600 BHP.pdf

    26/36

    II-46

    =1/25 x 6,90

    = 0,276 m = 276 mm

    F.2. Perhitungan SheerF.2.1. Buritan (Stern)

    AP = 25 (3

    LPP+ 10) *16

    = 25 (3

    31,22+ 10)

    = 510,167 mm

    6

    1LPP dari AP

    = 11,1 (3

    LPP+ 10) *16

    = 11,1 (3

    31,22 + 10)

    = 226,514 mm

    3

    1LPP dari AP

    = 2,8 (3

    LPP+ 10) *16

    = 2,8 (3

    31,22+ 10)

    = 57,139 mm

    F.2.2. Midship = 0 mm

    F.2.3. Haluan (Stem)

    FP = 50 (3

    LPP+ 10) *16

    = 50 (3

    31,22 + 10)

    16 Menggambar Lengkung Membujur Geladak Utama (Main Deck). Tugas Rencana Garis & Bukaan

    Kulit Hal : 17. 2009. Fakultas Teknologi Kelautan: ITS.

  • 7/22/2019 BAB II Rencana Garis TB ''MAKMOER BERDJAYA'' 1600 BHP.pdf

    27/36

    II-47

    = 1020,333 mm

    6

    1LPP dari FP

    = 22,2 (3

    LPP+ 10) *16

    = 22,2 (3

    31,22 + 10)

    = 453,028 mm

    3

    1LPP dari FP

    = 5.6 ( 3

    LPP

    + 10) *16

    = 5.6 (3

    31,22 + 10)

    = 114,277 mm

    F.3. Perhitungan Jarak Gading

    Forward of the collision bulkhead and after of the afterpeak bulkhead, the

    frame spacing shall in general not exceed 600 mm. *17

    Berdasarkan ketentuan dari Biro Klasifikasi Indonesia di atas, maka

    jarak gading yang akan dirancangkan adalah 0,55 m, berjumlah 56

    gading (gading mayor) terhitung dari AP, dan gading minor dengan

    jarak gading 0,42 m terhitung dari gading 56 sampai FP.

    Perincian Gading :

    AP Frame 56 (Gading Mayor) = 0,55 x 56 = 30,80 m

    Frame56 FP (Gading Minor) = 0,42 x 1 = 0,42 m

    Jumlah jarak gading keseluruhan = 57 gading = 31,22 m

    F.4. Perhitungan Tinggi Bulwark

    Tinggi Bulwark = 1 m dari main deck

    17Biro Klasifikasi Indonesia. 2006. Volume II. Rules For Hull. Section 9-1.

  • 7/22/2019 BAB II Rencana Garis TB ''MAKMOER BERDJAYA'' 1600 BHP.pdf

    28/36

    II-48

    Gambar 2.10.Sheer Plan

  • 7/22/2019 BAB II Rencana Garis TB ''MAKMOER BERDJAYA'' 1600 BHP.pdf

    29/36

    II-49

    Gambar 2.11. Rencana Jarak Gading

  • 7/22/2019 BAB II Rencana Garis TB ''MAKMOER BERDJAYA'' 1600 BHP.pdf

    30/36

    II-50

    G. RENCANA DAUN KEMUDIG.1. Perhitungan Luas Daun Kemudi *18

    A = C1xC2x C3 x C4 x100

    TxLx1,75 (m2)

    Dimana :

    A = Luas daun kemudi (m2)

    L = Panjang Kapal = 31,22 m

    C1 = Faktor untuk Tipe Kapal = 1,7 (For Tugs and Trawlers)

    C2 = Faktor untuk Tipe Kemudi = 1,0(In General)

    C3 = Faktor untuk Profil Kemudi = 1,0 (For NACA-Profiles and Plate Rudder)

    C4 = Faktor untuk Perencanaan Kemudi = 1,0 (For Rudders in the Propeller Jet)

    T = Sarat kapal = 2,35 m

    Sehingga :

    A = C1xC2x C3 x C4 x100

    TL1,75 m2

    = 1,7 x 1,0 x 1,0 x 1,0 x100

    2,3531,221,75 m2

    = 2,183 m2

    Koreksi Luas Daun Kemudi *19

    0,0370,00,020

    7,26,90x0,59

    31,22

    0,03

    2,3531,22x

    2,183

    6,26,90x0,59

    31,22

    0,023

    7,2xBCb

    L

    0,03

    LxT

    A

    6,2BxCb

    L

    0,023

    33

    33

    30

    G.2. Ukuran Daun Kemudi

    h = x B = 0,8 ~ 2,0 (diambil 1,55)

    = 1,55 B

    A = h x B

    = 1,55 B x B

    18Biro Klasifikasi Indonesia. 2006. Volume II. Rules For Hull. Section14-1. A-319Koreksi Luas Daun Kemudi Menurut GW Sobolier. Buku Perlengkapan Kapal ITS B. Hal: 51

  • 7/22/2019 BAB II Rencana Garis TB ''MAKMOER BERDJAYA'' 1600 BHP.pdf

    31/36

    II-51

    = 1,55 B2

    B =1,55

    A =

    1,55

    2,183 = 1,187 m

    h = A/B

    = 2,183/1,187

    = 1,839 m

    Lebar bagian yang dibalancirpada potongan sembarang horizontal dari

    lebar sayap:

    B = 30% x B

    = 30% x 1,187

    = 0,356m

    Perhitungan Luas daerah balancir(

  • 7/22/2019 BAB II Rencana Garis TB ''MAKMOER BERDJAYA'' 1600 BHP.pdf

    32/36

    II-52

    Gambar 2.12. Ukuran Daun Kemudi

  • 7/22/2019 BAB II Rencana Garis TB ''MAKMOER BERDJAYA'' 1600 BHP.pdf

    33/36

    II-53

    =3

    2

    =Ah

    2

    =2,183

    (1,684)2

    = 1,30

    K1 = (1,3 + 2)/ 3 = 1,10

    K2 = Koefisien yang Bergantung pada Tipe Kemudi = 1,1 (NACA-00Series)

    K3 = Koefisien yang Bergantung pada Lokasi Kemudi = 1,15 (For The Rudder After of

    the Propeller Jet)

    Kt = Koefisien yang Bergantung pada Thrust Cofficient= 1,0 (Normally)

    Sehingga

    Cr = 132 x A x V2x K1x K2x K3x Kt ( N )

    = 132 x 2,183 x (9)2x 1,1 x 1,1 x 1,15 x 1,0

    = 32473,559 N

    = 3,2474 kN

    H. STERN CLEARANCE, STEMdan STERNH.1. Pr opell er Diameter

    Ukuran diameter propeller ideal (D) adalah (0,6 ~ 0,7) T*22, diambil

    0,7 T

    DPROPELLER = 0,70 x T

    = 0,70 x 2,35

    = 1,410 m

    H.2. JariJari Propeller(R)

    R = 0,5 x DPROPELLER

    = 0,5 x 1,645

    = 0,8225 m

    H.3.Boss Propeller Diam et er

    = 1/6 x DPROPELLER

    = 1/6 x 1,645

    22 Tugas Rencana Garis & Bukaan Kulit Hal : 30. 2009. Fakultas Teknologi Kelautan: ITS.

  • 7/22/2019 BAB II Rencana Garis TB ''MAKMOER BERDJAYA'' 1600 BHP.pdf

    34/36

    II-54

    = 0,2742 m

    H.4. Rencana Bentuk Stern

    Ketentuansterndengan sepatu kemudi *23

    a. = 0,45 T = 0,45 x 2,35 = 1,058 mb. = 0,35 T = 0,35 x 2,35 = 0,823 mc. = 0,10 T = 0,10 x 2,35 = 0,235 md. = 0,04 T = 0,04 x 2,35 = 0,094 me. = 0,12 T = 0,12 x 2,35 = 0,282 m

    Gambar 2.13. Bentuk Linggi Buritan dengan Sepatu Kemudi

    H.5. Bentuk Stem Ship

    Bentuk dari stem harus disesuaikan dengan sudut masuk garis air.

    Untuk stem, direncanakan membentuk sudut kemiringan sebesar =

    20,4odari garis tegak linggi haluan.

    23 Bentuk Linggi Buritan Memakai Sepatu Linggi. Tugas Rencana Garis & Bukaan Kulit Hal : 35.

    2009. Fakultas Teknologi Kelautan: ITS

  • 7/22/2019 BAB II Rencana Garis TB ''MAKMOER BERDJAYA'' 1600 BHP.pdf

    35/36

    II-55

    Gambar 2.14.Stern & Clearance

  • 7/22/2019 BAB II Rencana Garis TB ''MAKMOER BERDJAYA'' 1600 BHP.pdf

    36/36

    II-56

    Gambar 2.15.Stem of Ship