2. laporan mingguan_4_ok
TRANSCRIPT
5/17/2018 2. Laporan Mingguan_4_OK - slidepdf.com
http://slidepdf.com/reader/full/2-laporan-mingguan4ok 1/39
Pekerjaan : REHABILITASI RUANG KELAS RUSAK BERAT SD
Luas Bangunan dan Teras : 3X64 m2
Tahun Anggaran : 2012
Lokasi : XX
IKK Kabupaten/Kota : XX
IKK Nasional : XX
: XX
: #VALUE!
I Rp. 648,000.00
II Rp. 4,962,945.60
III Rp. 0.00
IV Rp. 9,204,427.70V Rp. 3,892,649.92
VI Rp. 22,681,651.50
VII Rp. #VALUE!
VIII Rp. 27,734,740.00
IX Rp. #VALUE!
X Rp. 2,452,600.00
XI Rp. #VALUE!
XII Rp. #VALUE!
Rp. #VALUE!
XIII Rp. 15,000,000.00
Rp. #VALUE!
PEKERJAAN KUSEN, DAUN PINTU & JENDELA
PEKERJAAN RANGKA ATAP & PENUTUP ATAP
REHABILITASI MEUBELAIR UNTUK 3 (TIGA) RUANG
TOTAL
PEKERJAAN LISTRIK
PEKERJAAN KUNCI & PENGGANTUNG
PEKERJAAN LANTAI/PASANG KERAMIK
JUMLAH
REKAPITULASI RENCANA ANGGARAN BIAYA
NO URAIAN PEKERJAAN JUMLAH HARGA
PEKERJAAN LANGIT-LANGIT
PEKERJAAN CAT
Tingkat Kerusakan
Biaya Rehabilitasi Sekolah
PEKERJAAN PERSIAPAN
PEKERJAAN TANAH
PEKERJAAN PONDASI
PEKERJAAN BETONPEKERJAAN PASANGAN & PLESTERAN
5/17/2018 2. Laporan Mingguan_4_OK - slidepdf.com
http://slidepdf.com/reader/full/2-laporan-mingguan4ok 2/39
1 Pondasi batu kali/gunung
2 Struktur beton bertulang
3 Dinding batu bata/batako diplester finishing cat
4 Rangka atap kayu kelas II
5 Penutup atap genteng
6 Plafon eternit + list kayu
7 Kosen kayu kelas II
8 Daun pintu kayu kelas II
9 Daun jendela kayu kelas II10 Kaca polos 5 mm
11 Lantai keramik dalam 30x30 KW I (polos)
12 Lantai karamik teras 30x30 KWI (polos)
13 Bangunan anti rayap
SPESIFIKASI BANGUNAN
5/17/2018 2. Laporan Mingguan_4_OK - slidepdf.com
http://slidepdf.com/reader/full/2-laporan-mingguan4ok 3/39
Luas Bangunan : 64 m2 (Ruang Kelas dan Selasar)
Ukuran Bangunan : 7 x 8m (Ruang Kelas)
2 x 8m (Selasar)
Luas Bangunan : 64 m2 (Selasar dihitung 0,5 kalinya)
Metode Pelaks. : Swakelola
Fisik Bangunan :
Meubelair :
Total Biaya :
Jangka Waktu Pelaksanaan: 105 hari kalender
#REF!
#REF!
13,750,000.00Rp
IKK = 100 = 1 (NASIONAL)
REHABILITASI RUANG KELAS RUSAK BERAT SD
RENCANA ANGGARAN BIAYA (RAB)
KEMENTERIAN PENDIDIKAN DAN KEBUDAYAANDIREKTORAT JENDERAL PENDIDIKAN DASARDIREKTORAT PEMBINAAN SEKOLAH DASAR
5/17/2018 2. Laporan Mingguan_4_OK - slidepdf.com
http://slidepdf.com/reader/full/2-laporan-mingguan4ok 4/39
5/17/2018 2. Laporan Mingguan_4_OK - slidepdf.com
http://slidepdf.com/reader/full/2-laporan-mingguan4ok 5/39
5/17/2018 2. Laporan Mingguan_4_OK - slidepdf.com
http://slidepdf.com/reader/full/2-laporan-mingguan4ok 6/39
5/17/2018 2. Laporan Mingguan_4_OK - slidepdf.com
http://slidepdf.com/reader/full/2-laporan-mingguan4ok 7/39
5/17/2018 2. Laporan Mingguan_4_OK - slidepdf.com
http://slidepdf.com/reader/full/2-laporan-mingguan4ok 8/39
5/17/2018 2. Laporan Mingguan_4_OK - slidepdf.com
http://slidepdf.com/reader/full/2-laporan-mingguan4ok 9/39
5/17/2018 2. Laporan Mingguan_4_OK - slidepdf.com
http://slidepdf.com/reader/full/2-laporan-mingguan4ok 10/39
5/17/2018 2. Laporan Mingguan_4_OK - slidepdf.com
http://slidepdf.com/reader/full/2-laporan-mingguan4ok 11/39
Pekerjaan : Rehabilitasi Ruang Kelas Minggu ke : 4
Nama Sekolah : ......................................... Tanggal : 23 s/d 28 April 2
Lokasi : Jl. .................................... Bulan : April
Desa .................. Kec.......
Kab./Kota............ Prov......
Prestasi Rerata Prestasi Rera
(1) (2) (3) (4) (5) (6) (6)/100x(5) (8) (8)/100
I PEKERJAAN PERSIAPAN1 Pengukuran dan pas. Bouwplank m1
2 Pembersihan Lokasi/Bongkaran 216.000 m2 #VALUE! 50.00 #VALUE! 0.00 #VALU
II PEKERJAAN TANAH
1 Gali tanah pondasi induk (0.70X1.00), L=76m m3
2 Gali tanah pondasi teras (0.50X0.60), L=24m m3
3 Urug pasir bawah pondasi, t=10 cm m3
4 Urugan pasir bawah lantai, t=10cm 21.600 m3 #VALUE! 0.00 #VALUE! 0.00 #VALU
5 Urug tanah kembali m3
6 Rabatan bawah lantai, t=5cm 21.600 m2 #VALUE! 0.00 #VALUE! 0.00 #VALU
7 Anti rayap 216.000 m2 #VALUE! 0.00 #VALUE! 0.00 #VALU
III PEKERJAAN PONDASI
1 Pas. Batu kosongan m3
2 Pas. Pondasi batu kali m3
IV PEKERJAAN BETON
1 Pekerjaan Balok Sloof (12x20)cm, L=76
a. Beton m3
b. Bekisting m2
c. Pembesian kg
2 Pek. Balok latei (12x12)cm, L=48m
a. Beton 0.691 m3 #VALUE! 100.00 #VALUE! 0.00 #VALU
b. Bekisting 19.200 m2 #VALUE! 100.00 #VALUE! 0.00 #VALU
c. Pembesian 86.400 kg #VALUE! 100.00 #VALUE! 0.00 #VALU
3 Pek. kolom beton (15x20)cm, h=4.00m, 34bh
a. Beton m3
b. Bekisting m2
c. Pembesian kg
4 Pek. balok ring, gewel & konsol teras (12x20)
a. Beton 1.536 m3 #VALUE! 100.00 #VALUE! 0.00 #VALUb. Bekisting 22.800 m2 #VALUE! 100.00 #VALUE! 0.00 #VALU
c. Pembesian 192.000 kg #VALUE! 100.00 #VALUE! 0.00 #VALU
V PEKERJAAN PASANGAN & PLESTERAN
1 Pas. Dinding 1/2 bata, 1:3, h=30 cm, L=76 m2
2 Pas. Dinding 1/2 bata, 1:6 48.800 m2 #VALUE! 100.00 #VALUE! 0.00 #VALU
3 Plesteran 1 : 3, tebal 15 mm m2
4 Plesteran 1 : 6, tebal 15 mm 73.100 m2 #VALUE! 0.00 #VALUE! 0.00 #VALU
TIDAK DIKERJAKAN
TIDAK DIKERJAKAN
TIDAK DIKERJAKAN
TIDAK DIKERJAKAN
No. Jenis Pekerjaan Volume
LAPORAN MINGGUAN
SatuanBobot
Pekerjaan
%
Dana diterima tanggal
Besar Dana:
TIDAK DIKERJAKAN
TIDAK DIKERJAKAN
TIDAK DIKERJAKAN
Prestasi pekerjaan
Minggu lalu (%)
Prestasi pekerja
Minggu Ini (%
TIDAK DIKERJAKAN
TIDAK DIKERJAKAN
TIDAK DIKERJAKAN
TIDAK DIKERJAKAN
TIDAK DIKERJAKAN
TIDAK DIKERJAKAN
TIDAK DIKERJAKAN
TIDAK DIKERJAKAN
5/17/2018 2. Laporan Mingguan_4_OK - slidepdf.com
http://slidepdf.com/reader/full/2-laporan-mingguan4ok 12/39
VI PEKERJAAN KUSEN, DAUN PINTU & JENDELA
1 Kusen pintu dan jendela 1.473 m3 #VALUE! 100.00 #VALUE! 0.00 #V
2 Pas. pintu panil 7.560 m2 #VALUE! 0.00 #VALUE! 0.00 #V
3 Pas. Jendela kaca 21.591 m2 #VALUE! 0.00 #VALUE! 0.00 #V
4 Pasang kaca 5 mm 29.400 m2 #VALUE! 0.00 #VALUE! 0.00 #V
VII PEKERJAAN RANGKA ATAP & PENUTUP ATAP
Atap genteng
1 Kuda-kuda Kayu 8/12 1.613 m3 #VALUE! 50.00 #VALUE! 50.00 #V
2 Gording Kayu 8/12 1.498 m3 #VALUE! 0.00 #VALUE! 50.00 #V
3 Usuk kayu 5/7, Reng 3/4 330.254 m2 #VALUE! 0.00 #VALUE! 50.00 #V
4 Pasangan Lisplang 2/20 130.000 m' #VALUE! 0.00 #VALUE! 50.00 #V
5 Penutup atap Genting kodok 330.254 m2 #VALUE! 0.00 #VALUE! 0.00 #V
6 Pasang Genting Bubungan bulat 26.000 m' #VALUE! 0.00 #VALUE! 0.00 #V
VIII PEKERJAAN LANGIT-LANGIT
Langit-langit eternit 1.00X1.00
1 Pas. Rangka 1.00X1.00, Kayu 4/6 286.000 m2 #VALUE! 0.00 #VALUE! 0.00 #V
2 Pas. Plafon 286.000 m2 #VALUE! 0.00 #VALUE! 0.00 #V
3 Pas. List plafon 360.000 m1 #VALUE! 0.00 #VALUE! 0.00 #V
IX PEKERJAAN CAT
1 Melabur Kayu Atap dengan residu 330.254 m2 #VALUE! 0.00 #VALUE! 0.00 #V
2 Pengecatan Dinding 73.100 m2 #VALUE! 0.00 #VALUE! 0.00 #V
3 Pengecatan Plafon 286.000 m2 #VALUE! 0.00 #VALUE! 0.00 #V
4 Pengecatan Kayu 96.000 m2 #VALUE! 0.00 #VALUE! 0.00 #V
X PEKERJAAN LISTRIK
1 Pas. Instalasi titik lampu 24.000 Ttk #VALUE! 0.00 #VALUE! 0.00 #V
2 Pas. Instalasi Stop Kontak 3.000 ttk #VALUE! 0.00 #VALUE! 0.00 #V
3 Pas. Sakelar tunggal 3.000 bh #VALUE! 0.00 #VALUE! 0.00 #V
4 Pas. sakelar ganda 3.000 bh #VALUE! 0.00 #VALUE! 0.00 #V
5 Pas. Lampu TL 20 w 4.000 bh #VALUE! 0.00 #VALUE! 0.00 #V
6 Pas. lampu SL 18 w 3.000 bh #VALUE! 0.00 #VALUE! 0.00 #V
XI PEKERJAAN KUNCI & PENGGANTUNG
1 Pas. Kunci tanam 2 xputar 3.000 bh #VALUE! 0.00 #VALUE! 0.00 #V2 Pas. Engsel jendela 3" 72.000 bh #VALUE! 0.00 #VALUE! 0.00 #V
3 Pas. engsel pintu 4" 18.000 bh #VALUE! 0.00 #VALUE! 0.00 #V
4 Pas. Grendel pintu 3.000 bh #VALUE! 0.00 #VALUE! 0.00 #V
5 Pas. Grendel jendela 36.000 bh #VALUE! 0.00 #VALUE! 0.00 #V
6 Pas. Hak angin 72.000 bh #VALUE! 0.00 #VALUE! 0.00 #V
XII PEKERJAAN LANTAI/PASANG KERAMIK
1 Pas. Keramik lantai 30/30 216.000 m2 #VALUE! 0.00 #VALUE! 0.00 #V
XIII PEKERJAAN MEUBELAIR
1 Rehabilitasi Meubelair 3.000 bh #VALUE! 0.00 #VALUE! 0.00 #V
#VALUE! #VALUE! #V
Jaka
Mengetahui Menyetujui Dibu
Kepala Sekolah Pere
ttd
(stempel & ttd)
Nama terang Nama terang Nam
NIP NIP
Ketua Tim Pelaksana
Rehabilitasi Ruang Kelas
Jumlah dana yang digunakan sampai dengan minggu ini (minggu ke 4) 50,000,000.00Rp
JUMLAH
5/17/2018 2. Laporan Mingguan_4_OK - slidepdf.com
http://slidepdf.com/reader/full/2-laporan-mingguan4ok 13/39
BIDANG B
1 1 m2 Membersihkan Lapangan dan Perataan
0.100 Org Pekerja @ Rp 30,000.00 = 3,000.00Rp
0.100 Org Mandor @ Rp - = -Rp
Jumlah = 3,000.00Rp
2 1 m' Pengukuran dan pemasangan bouwplank
1.2.1 Bahan
0.012 M³ Kayu 5/7 @ Rp 2,740,000.00 = 32,880.00Rp
0.020 Kg Paku biasa 2" - 5" @ Rp 9,000.00 = 180.00Rp
0.007 M³ Kayu papan 3/20 @ Rp 3,500,000.00 = 24,500.00Rp
Jumlah (1) = 57,560.00Rp
1.2.2 Tenaga
0.100 Org Pekerja @ Rp 30,000.00 = 3,000.00Rp
0.100 Org Tukang kayu @ Rp 45,000.00 = 4,500.00Rp
0.010 Org Kepala tukang @ Rp 50,000.00 = 500.00Rp
0.010 Org Mandor @ Rp - = -Rp
Jumlah (2) = 5,000.00Rp
Jumlah (1) + (2) = 62,560.00Rp
3 1 m³ Galian tanah keras sedalam 1 meter
2.1.1 Tenaga
0.625 Org Pekerja @ Rp 30,000.00 = 18,750.00Rp
0.062 Org Mandor @ Rp - = -Rp
Jumlah = 18,750.00Rp
4 1 m³ Urugan kembali
2.4.1 Tenaga
0.192 Org Pekerja @ Rp 30,000.00 = 5,760.00Rp
0.019 Org Mandor @ Rp - = -Rp
Jumlah = 5,760.00Rp
5 1 m³ Urugan pasir
2.6.1 Bahan
1.200 M³ Pasir urug @ Rp 75,000.00 = 90,000.00Rp
Jumlah (1) = 90,000.00Rp
2.6.2 Tenaga
0.300 Org Pekerja @ Rp 30,000.00 = 9,000.00Rp
0.010 Org Mandor @ Rp - = -Rp
Jumlah (2) = 9,000.00Rp
Jumlah (1) + (2) = 99,000.00Rp
6 1 m³ Pasang pondasi batu kosong
4.2.1 Bahan
1.200 M³ Batu belah 15/20 cm @ Rp 125,000.00 = 150,000.00Rp
0.300 M³ Pasir urug @ Rp 75,000.00 = 22,500.00Rp
Jumlah (1) 172,500.00Rp
4.2.2 Tenaga
0.780 Org Pekerja @ Rp 30,000.00 = 23,400.00Rp
0.390 Org Tukang batu @ Rp 45,000.00 = 17,550.00Rp
0.039 Org Kepala tukang @ Rp 50,000.00 = 1,950.00Rp
0.039 Org Mandor @ Rp - = -Rp
Jumlah (2) = 42,900.00Rp
Jumlah (1) + (2) = 215,400.00Rp
ANALISA BIAYA KONSTRUKSI
REHABILITASI RUANG KELAS RUSAK BERAT SD
Tahun 2012
5/17/2018 2. Laporan Mingguan_4_OK - slidepdf.com
http://slidepdf.com/reader/full/2-laporan-mingguan4ok 14/39
BIDANG
7 1 m³ Pasang pondasi batu kali, 1 Pc :4 Ps
4.1.1 Bahan
1.100 M³ Batu belah 15/20 cm @ Rp 125,000.00 = 137,500.00Rp
163.000 Kg Semen portland @ Rp 1,160.00 = 189,080.00Rp
0.520 M³ Pasir pasang @ Rp 85,000.00 = 44,200.00Rp
Jumlah (1) 370,780.00Rp
4.1.2 Tenaga
1.500 Org Pekerja @ Rp 30,000.00 = 45,000.00Rp
0.600 Org Tukang batu @ Rp 45,000.00 = 27,000.00Rp
0.060 Org Kepala tukang batu @ Rp 50,000.00 = 3,000.00Rp
0.075 Org Mandor @ Rp - = -Rp
Jumlah (2) = 75,000.00Rp
Jumlah (1) + (2) = 445,780.00Rp
8 1 m² Pasangan bata merah tebal ½ bata, 1 Pc : 3 Ps
3.3.1 Bahan
70.000 Bh Bata merah 5 x 11 x 22 cm @ Rp 350.00 = 24,500.00Rp
14.370 Kg Semen portland @ Rp 1,160.00 = 16,669.20Rp
0.040 M³ Pasir pasang @ Rp 85,000.00 = 3,400.00Rp
Jumlah (1) = 44,569.20Rp
3.3.2 Tenaga
0.320 Org Pekerja @ Rp 30,000.00 = 9,600.00Rp
0.100 Org Tukang batu @ Rp 45,000.00 = 4,500.00Rp
0.010 Org Kepala tukang @ Rp 50,000.00 = 500.00Rp
0.015 Org Mandor @ Rp - = -Rp
Jumlah (2) = 14,600.00Rp
Jumlah (1) + (2) = 59,169.20Rp
9 1 m² Pasangan bata merah tebal ½ bata, 1 Pc : 6Ps
3.4.1 Bahan
70.000 Bh Bata merah 5 x 11 x 22 cm @ Rp 350.00 = 24,500.00Rp11.500 Kg Semen portland @ Rp 1,160.00 = 13,340.00Rp
0.043 M³ Pasir pasang @ Rp 85,000.00 = 3,655.00Rp
Jumlah (1) = 41,495.00Rp
3.4.2 Tenaga
0.320 Org Pekerja @ Rp 30,000.00 = 9,600.00Rp
0.100 Org Tukang batu @ Rp 45,000.00 = 4,500.00Rp
0.010 Org Kepala tukang @ Rp 50,000.00 = 500.00Rp
0.015 Org Mandor @ Rp - = -Rp
Jumlah (2) = 14,600.00Rp
Jumlah (1) + (2) = 56,095.00Rp
10 1 m² Plesteran 1 Pc : 3 Ps, tebal 15 mm7.1.1 Bahan
6.480 Kg Semen portland @ Rp 1,160.00 = 7,516.80Rp
0.019 M³ Pasir pasang @ Rp 85,000.00 = 1,615.00Rp
Jumlah (1) = 9,131.80Rp
7.1.2 Tenaga
0.200 Org Pekerja @ Rp 30,000.00 = 6,000.00Rp
0.150 Org Tukang batu @ Rp 45,000.00 = 6,750.00Rp
0.015 Org Kepala tukang @ Rp 50,000.00 = 750.00Rp
0.010 Org Mandor @ Rp - = -Rp
Jumlah (2) = 13,500.00Rp
Jumlah (1) + (2) = 22,631.80Rp
5/17/2018 2. Laporan Mingguan_4_OK - slidepdf.com
http://slidepdf.com/reader/full/2-laporan-mingguan4ok 15/39
BIDANG
11 1 m² Plesteran 1 Pc : 6 Ps, tebal 15 mm
7.2.1 Bahan
0.520 Kg Semen portland @ Rp 1,160.00 = 603.20Rp
0.020 M³ Pasir pasang @ Rp 85,000.00 = 1,700.00Rp
Jumlah (1) = 2,303.20Rp
7.2.2 Tenaga
0.200 Org Pekerja @ Rp 30,000.00 = 6,000.00Rp
0.150 Org Tukang batu @ Rp 45,000.00 = 6,750.00Rp
0.015 Org Kepala tukang @ Rp 50,000.00 = 750.00Rp
0.010 Org Mandor @ Rp - = -Rp
Jumlah (2) = 13,500.00Rp
Jumlah (1) + (2) = 15,803.20Rp
12 1 m³ Pasang kusen pintu dan jendela kayu kelas II
5.2.1 Bahan
1.100 M³ Kayu Kelas II, balok @ Rp 5,000,000.00 = 5,500,000.00Rp
Jumlah (1) = 5,500,000.00Rp
5.2.2 Tenaga
6.000 Org Pekerja @ Rp 30,000.00 = 180,000.00Rp
18.000 Org Tukang kayu @ Rp 45,000.00 = 810,000.00Rp2.000 Org Kepala tukang @ Rp 50,000.00 = 100,000.00Rp
0.300 Org Mandor @ Rp - = -Rp
Jumlah (2) = 1,090,000.00Rp
Jumlah (1) + (2) = 6,590,000.00Rp
13 1 m² Pasang pintu panel kayu Kelas II
5.8.1 Bahan
0.040 M³ Kayu kelas II, papan @ Rp 5,500,000.00 = 220,000.00Rp
Jumlah (1) = 220,000.00Rp
5.8.2 Tenaga
1.000 Org Pekerja @ Rp 30,000.00 = 30,000.00Rp
2.500 Org Tukang kayu @ Rp 45,000.00 = 112,500.00Rp
0.250 Org Kepala tukang @ Rp 50,000.00 = 12,500.00Rp
0.050 Org Mandor @ Rp - = -Rp
Jumlah (2) = 155,000.00Rp
Jumlah (1) + (2) = 375,000.00Rp
14 1 m² Pasang jendela kaca kayu kelas II
5.10.1 Bahan
0.035 M³ Kayu kelas II, papan @ Rp 5,500,000.00 = 192,500.00Rp
Jumlah (1) = 192,500.00Rp
5.10.2 Tenaga
0.800 Org Pekerja @ Rp 30,000.00 = 24,000.00Rp2.000 Org Tukang kayu @ Rp 45,000.00 = 90,000.00Rp
0.200 Org Kepala tukang @ Rp 50,000.00 = 10,000.00Rp
0.040 Org Mandor @ Rp - = -Rp
Jumlah (2) = 124,000.00Rp
Jumlah (1) + (2) = 316,500.00Rp
5/17/2018 2. Laporan Mingguan_4_OK - slidepdf.com
http://slidepdf.com/reader/full/2-laporan-mingguan4ok 16/39
BIDANG
15 1 m³ Pasang konstruksi kuda-kuda kayu kelas II
5.30.1 Bahan
1.100 M³ Kayu kelas II, balok @ Rp 5,000,000.00 = 5,500,000.00Rp
15.000 Kg Besi strip & baut @ Rp 13.300,00 = #VALUE!
0.800 Kg Paku biasa 2" - 5" @ Rp 9,000.00 = 7,200.00Rp
Jumlah (1) = #VALUE!
5.30.2 Tenaga
4.000 Org Pekerja @ Rp 30,000.00 = 120,000.00Rp
12.000 Org Tukang kayu @ Rp 45,000.00 = 540,000.00Rp
1.200 Org Kepala tukang @ Rp 50,000.00 = 60,000.00Rp
0.200 Org Mandor @ Rp - = -Rp
Jumlah (2) = 720,000.00Rp
Jumlah (1) + (2) = #VALUE!
16 1 m² Pasang usuk kayu kelas II+reng kayu kelas II
5.31.1 Bahan
0.008 M³ Kayu kelas II Usuk @ Rp 5,000,000.00 = 40,000.00Rp
0.007 M³ Kayu kelas II Reng @ Rp 5,000,000.00 = 35,000.00Rp
0.150 Kg Paku biasa 2" - 5" @ Rp 9,000.00 = 1,350.00Rp
Jumlah (1) = 76,350.00Rp
5.31.2 Tenaga
0.100 Org Pekerja @ Rp 30,000.00 = 3,000.00Rp
0.100 Org Tukang kayu @ Rp 45,000.00 = 4,500.00Rp
0.010 Org Kepala tukang @ Rp 50,000.00 = 500.00Rp
0.050 Org Mandor @ Rp - = -Rp
Jumlah (2) = 8,000.00Rp
Jumlah (1) + (2) = 84,350.00Rp
17 1 m² Pasang rangka langit-langit (1.00 x 1.00) m, kayu kelas III
5.40.1 Bahan
0.012 M³ Kayu Kelas III @ Rp 4,250,000.00 = 51,000.00Rp
0.100 Kg Paku biasa 2" - 5" @ Rp 9,000.00 = 900.00Rp
Jumlah (1) = 51,900.00Rp
5.40.2 Tenaga
0.150 Org Pekerja @ Rp 30,000.00 = 4,500.00Rp
0.250 Org Tukang kayu @ Rp 45,000.00 = 11,250.00Rp
0.025 Org Kepala tukang @ Rp 50,000.00 = 1,250.00Rp
0.075 Org Mandor @ Rp - = -Rp
Jumlah (2) = 17,000.00Rp
Jumlah (1) + (2) = 68,900.00Rp
18 1 m' Pasang lisplang ukuran (2 x 20) cm, kayu kelas II
5.48.1 Bahan0.0072 M³ Kayu kelas II, papan @ Rp 5,500,000.00 = 39,600.00Rp
0.050 Kg Paku biasa 2" - 5" @ Rp 9,000.00 = 450.00Rp
Jumlah (1) = 40,050.00Rp
5.48.2 Tenaga
0.100 Org Pekerja @ Rp 30,000.00 = 3,000.00Rp
0.200 Org Tukang kayu @ Rp 45,000.00 = 9,000.00Rp
0.020 Org Kepala tukang @ Rp 50,000.00 = 1,000.00Rp
0.050 Org Mandor @ Rp - = -Rp
Jumlah (2) = 13,000.00Rp
Jumlah (1) + (2) = 53,050.00Rp
5/17/2018 2. Laporan Mingguan_4_OK - slidepdf.com
http://slidepdf.com/reader/full/2-laporan-mingguan4ok 17/39
BIDANG B
19 1 m' Pasang list plafon - kayu polos
5.60.1 Bahan
1.050 M' Kayu polos 1/5 @ Rp 9,900.00 = 10,395.00Rp
Jumlah (1) = 10,395.00Rp
5.60.2 Tenaga
0.021 Org Pekerja @ Rp 30,000.00 = 630.00Rp
0.021 Org Tukang kayu @ Rp 45,000.00 = 945.00Rp
0.002 Org Kepala tukang @ Rp 50,000.00 = 100.00Rp
0.001 Org Mandor @ Rp - = -Rp
Jumlah (2) = 1,675.00Rp
Jumlah (1) + (2) = 12,070.00Rp
20 1 m² Pasang atap lokal
6.2.1 Bahan
25.000 Bh Genteng @ Rp 3,000.00 = 75,000.00Rp
Jumlah (1) = 75,000.00Rp
6.2.2 Tenaga
0.150 Org Pekerja @ Rp 30,000.00 = 4,500.00Rp
0.075 Org Tukang kayu @ Rp 45,000.00 = 3,375.00Rp
0.008 Org Kepala tukang @ Rp 50,000.00 = 400.00Rp
0.008 Org Mandor @ Rp - = -RpJumlah (2) = 8,275.00Rp
Jumlah (1) + (2) = 83,275.00Rp
21 1 m' Pasang genteng bubungan
6.4.1 Bahan
3.500 Bh Genteng bubung @ Rp 3,500.00 = 12,250.00Rp
8.000 Kg Semen portland @ Rp 1,160.00 = 9,280.00Rp
0.032 M³ Pasir pasang @ Rp 85,000.00 = 2,720.00Rp
Jumlah (1) = 24,250.00Rp
6.4.2 Tenaga
0.400 Org Pekerja @ Rp 30,000.00 = 12,000.00Rp
0.200 Org Tukang kayu @ Rp 45,000.00 = 9,000.00Rp
0.020 Org Kepala tukang @ Rp 50,000.00 = 1,000.00Rp
0.020 Org Mandor @ Rp - = -Rp
Jumlah (2) = 22,000.00Rp
Jumlah (1) + (2) = 46,250.00Rp
22 1 m² Langit - langit eternit (1,00 x 1,00) m, tebal 3,5 mm
8.4.1 Bahan
1.100 Lbr Eternit tebal 3,5 mm @ Rp 7,000.00 = 7,700.00Rp
0.010 Kg Paku @ Rp 9,000.00 = 90.00Rp
Jumlah (1) = 7,790.00Rp
8.4.2 Tenaga
0.090 Org Pekerja @ Rp 30,000.00 = 2,700.00Rp
0.090 Org Tukang kayu @ Rp 45,000.00 = 4,050.00Rp0.009 Org Kepala tukang @ Rp 50,000.00 = 450.00Rp
0.040 Org Mandor @ Rp - = -Rp
Jumlah (2) = 7,200.00Rp
Jumlah (1) + (2) = 14,990.00Rp
5/17/2018 2. Laporan Mingguan_4_OK - slidepdf.com
http://slidepdf.com/reader/full/2-laporan-mingguan4ok 18/39
BIDANG
23 1 m' Pasang talang datar, seng bjls 28
11.10.1 Bahan
0.500 m1
Seng plat 3"X6" bjls 28 @ Rp 22,500.00 = 11,250.00Rp
0.015 Kg Paku biasa ½" - 1" @ Rp 9,000.00 = 135.00Rp
0.0096 M³ Kayu Kelas II, papan @ Rp 5,000,000.00 = 48,000.00Rp
Jumlah (1) 59,385.00Rp
11.10.2 Tenaga
0.150 Org Pekerja @ Rp 30,000.00 = 4,500.00Rp
0.400 Org Tukang kayu @ Rp 45,000.00 = 18,000.00Rp
0.040 Org Kepala tukang @ Rp 50,000.00 = 2,000.00Rp
0.075 Org Mandor @ Rp - = -Rp
Jumlah (2) = 24,500.00Rp
Jumlah (1) + (2) = 83,885.00Rp
24 1 bh Pasang kunci tanam
11.1.1 Bahan
1.000 Bh Kunci tanam @ Rp 150,000.00 = 150,000.00Rp
Jumlah (1) = 150,000.00Rp
12.1.2 Tenaga
0.060 Org Pekerja @ Rp 30,000.00 = 1,800.00Rp
0.500 Org Tukang kayu @ Rp 45,000.00 = 22,500.00Rp0.060 Org Kepala tukang @ Rp 50,000.00 = 3,000.00Rp
0.030 Org Mandor @ Rp - = -Rp
Jumlah (2) = 27,300.00Rp
Jumlah (1) + (2) = 177,300.00Rp
25 1 bh Pasang engsel pintu
11.4.1 Bahan
1.000 Bh Engsel pintu @ Rp 12,500.00 = 12,500.00Rp
Jumlah (1) = 12,500.00Rp
11.4.2 Tenaga
0.015 Org Pekerja @ Rp 30,000.00 = 450.00Rp
0.150 Org Tukang kayu @ Rp 45,000.00 = 6,750.00Rp
0.015 Org Kepala tukang @ Rp 50,000.00 = 750.00Rp0.008 Org Mandor @ Rp - = -Rp
Jumlah (2) = 7,950.00Rp
Jumlah (1) + (2) = 20,450.00Rp
26 1 bh Pasang engsel jendela
11.5.1 Bahan
1.000 Bh Engsel jendela @ Rp 7,500.00 = 7,500.00Rp
Jumlah (1) = 7,500.00Rp
11.5.2 Tenaga
0.010 Org Pekerja @ Rp 30,000.00 = 300.00Rp
0.100 Org Tukang kayu @ Rp 45,000.00 = 4,500.00Rp
0.010 Org Kepala tukang @ Rp 50,000.00 = 500.00Rp
0.005 Org Mandor @ Rp - = -Rp
Jumlah (2) = 5,300.00Rp
Jumlah (1) + (2) = 12,800.00Rp
5/17/2018 2. Laporan Mingguan_4_OK - slidepdf.com
http://slidepdf.com/reader/full/2-laporan-mingguan4ok 19/39
BIDANG
27 1 bh Pasang kait angin
11.8.1 Bahan
1.000 Bh Hak angin @ Rp 8.500,00 = #VALUE!
Jumlah (1) = #VALUE!
11.8.2 Tenaga
0.015 Org Pekerja @ Rp 30,000.00 = 450.00Rp
0.150 Org Tukang kayu @ Rp 45,000.00 = 6,750.00Rp
0.015 Org Kepala tukang @ Rp 50,000.00 = 750.00Rp
0.007 Org Mandor @ Rp - = -Rp
Jumlah (2) = 7,950.00Rp
Jumlah (1) + (2) = #VALUE!
28 1 bh Pasang grendel pintu
11.10.1 Bahan
1.000 Bh grendel @ Rp 12,500.00 = 12,500.00Rp
Jumlah (1) = 12,500.00Rp
11.10.2 Tenaga
0.020 Org Pekerja @ Rp 30,000.00 = 600.00Rp
0.100 Org Tukang kayu @ Rp 45,000.00 = 4,500.00Rp
0.020 Org Kepala tukang @ Rp 50,000.00 = 1,000.00Rp
0.001 Org Mandor @ Rp - = -Rp
Jumlah (2) = 6,100.00Rp
Jumlah (1) + (2) = 18,600.00Rp
29 1 bh Pasang grendel jendela
11.10.1 Bahan
1.000 Bh grendel jendela @ Rp 12,500.00 = 12,500.00Rp
Jumlah (1) = 12,500.00Rp
11.10.2 Tenaga
0.020 Org Pekerja @ Rp 30,000.00 = 600.00Rp
0.100 Org Tukang kayu @ Rp 45,000.00 = 4,500.00Rp
0.020 Org Kepala tukang @ Rp 50,000.00 = 1,000.00Rp
0.001 Org Mandor @ Rp - = -Rp
Jumlah (2) = 6,100.00Rp
Jumlah (1) + (2) = 18,600.00Rp
30 1 m² Pasang kaca, tebal 5 mm
11.15.1 Bahan
1.100 M² Kaca @ Rp 95,000.00 = 104,500.00Rp
Jumlah (1) = 104,500.00Rp
11.15.2 Tenaga
0.015 Org Pekerja @ Rp 30,000.00 = 450.00Rp
0.150 Org Tukang kayu @ Rp 45,000.00 = 6,750.00Rp
0.015 Org Kepala tukang @ Rp 50,000.00 = 750.00Rp
0.008 Org Mandor @ Rp - = -Rp
Jumlah (2) = 7,950.00Rp
Jumlah (1) + (2) = 112,450.00Rp
31 1 m³ Membuat beton bertulang 1 Pc : 2 Ps : 3 Kr12.2.1 Bahan
232.000 Kg Semen portland @ Rp 1,160.00 = 269,120.00Rp
0.520 M³ Pasir beton @ Rp 110,000.00 = 57,200.00Rp
0.780 M³ Koral beton/split @ Rp 150,000.00 = 117,000.00Rp
Jumlah (1) 443,320.00Rp
12.2.2 Tenaga
1.650 Org Pekerja @ Rp 30,000.00 = 49,500.00Rp
0.250 Org Tukang batu @ Rp 45,000.00 = 11,250.00Rp
0.025 Org Kepala tukang @ Rp 50,000.00 = 1,250.00Rp
0.080 Org Mandor @ Rp - = -Rp
Jumlah (2) = 62,000.00Rp
Jumlah (1) + (2) = 505,320.00Rp
5/17/2018 2. Laporan Mingguan_4_OK - slidepdf.com
http://slidepdf.com/reader/full/2-laporan-mingguan4ok 20/39
BIDANG B
32.0 1 Kg Pembesian dengan besi polos
12.4.1 Bahan
1.050 Kg Besi beton (polos) @ Rp 10,500.00 = 11,025.00Rp
0.015 Kg Kawat beton @ Rp 12,500.00 = 187.50Rp
Jumlah (1) 11,212.50Rp
12.4.2 Tenaga
0.007 Org Pekerja @ Rp 30,000.00 = 210.00Rp
0.007 Org Tukang besi @ Rp 45,000.00 = 315.00Rp
0.0007 Org Kepala tukang @ Rp 50,000.00 = 35.00Rp
0.0004 Org Mandor @ Rp - = -Rp
Jumlah (2) = 560.00Rp
Jumlah (1) + (2) = 11,772.50Rp
33 1 m² Pasang bekisting untuk sloof
12.6.1 Bahan
0.045 M³ Kayu kelas III @ Rp 2,740,000.00 = 123,300.00Rp
0.300 Kg Paku biasa 2" - 5" @ Rp 9,000.00 = 2,700.00Rp
0.100 Lt Minyak bekisting @ Rp 9,750.00 = 975.00Rp
Jumlah (1) 126,975.00Rp
12.6.2 Tenaga
0.300 Org Pekerja @ Rp 30,000.00 = 9,000.00Rp
0.260 Org Tukang kayu @ Rp 45,000.00 = 11,700.00Rp
0.026 Org Kepala tukang @ Rp 50,000.00 = 1,300.00Rp0.015 Org Mandor @ Rp - = -Rp
Jumlah (2) = 22,000.00Rp
Jumlah (1) + (2) = 148,975.00Rp
Untuk 2xpakai = 74,487.50Rp
34 1 m² Pasang bekisting untuk kolom
12.7.1 Bahan
0.040 M³ Kayu kelas III @ Rp 2,740,000.00 = 109,600.00Rp
0.400 Kg Paku biasa 2" - 5" @ Rp 9,000.00 = 3,600.00Rp
0.200 Lt Minyak bekisting @ Rp 9,750.00 = 1,950.00Rp
0.015 M³ Balok kayu kelas III, begesting @ Rp 3,500,000.00 = 52,500.00Rp
0.028 M³ Kaso 5/7x400 m @ Rp 4,250,000.00 = 119,000.00Rp
Jumlah (1) 286,650.00Rp
12.7.2 Tenaga
0.300 Org Pekerja @ Rp 30,000.00 = 9,000.00Rp
0.330 Org Tukang kayu @ Rp 45,000.00 = 14,850.00Rp
0.033 Org Kepala tukang @ Rp 50,000.00 = 1,650.00Rp
0.015 Org Mandor @ Rp - = -Rp
Jumlah (2) = 25,500.00Rp
Jumlah (1) + (2) = 312,150.00Rp
Untuk2xpakai = 156,075.00Rp
35 1 m² Pasang bekisting untuk balok
12.8.1 Bahan
0.040 M³ Kayu Kelas III @ Rp 2,740,000.00 = 109,600.00Rp
0.400 Kg Paku biasa 2" - 5" @ Rp 9,000.00 = 3,600.00Rp
0.200 Lt Minyak bekisting @ Rp 9,750.00 = 1,950.00Rp
0.018 M³ Balok kayu borneo @ Rp 3,500,000.00 = 63,000.00Rp
0.028 M³ Kaso 5/7x400 m @ Rp 4,250,000.00 = 119,000.00RpJumlah (1) 297,150.00Rp
12.38.2 Tenaga
0.320 Org Pekerja @ Rp 30,000.00 = 9,600.00Rp
0.330 Org Tukang kayu @ Rp 45,000.00 = 14,850.00Rp
0.033 Org Kepala tukang @ Rp 50,000.00 = 1,650.00Rp
0.016 Org Mandor @ Rp - = -Rp
Jumlah (2) = 26,100.00Rp
Jumlah (1) + (2) = 323,250.00Rp
Untuk 2xpakai = 161,625.00Rp
5/17/2018 2. Laporan Mingguan_4_OK - slidepdf.com
http://slidepdf.com/reader/full/2-laporan-mingguan4ok 21/39
BIDANG
36 1 m² Pasang lantai keramik 30 x 30 cm
13.17.1 Bahan
1.000 m2 Ubin keramik 30 x 30 cm @ Rp 45,000.00 = 45,000.00Rp
11.380 Kg Semen portland @ Rp 1,200.00 = 13,656.00Rp
0.042 M³ Pasir pasang @ Rp 85,000.00 = 3,570.00Rp
1.500 Kg Semen putih @ Rp 2.500,00 = #VALUE!
Jumlah (1) #VALUE!
13.17.1 Tenaga
0.150 Org Pekerja @ Rp 30,000.00 = 4,500.00Rp0.160 Org Tukang batu @ Rp 45,000.00 = 7,200.00Rp
0.035 Org Kepala tukang @ Rp 50,000.00 = 1,750.00Rp
0.008 Org Mandor @ Rp - = -Rp
Jumlah (2) = 13,450.00Rp
Jumlah (1) + (2) = #VALUE!
37 1 m² Pengecatan bidang kayu baru ( 1 lapis plamir ), 1 lapis cat dasar,
2 lapis cat penutup.
14.6.1 Bahan
0.200 Kg Cat meni @ Rp 22,500.00 = 4,500.00Rp
0.150 Kg Plamir @ Rp 20.800,00 = #VALUE!
0.200 lbr Kertas gosok @ Rp 2,750.00 550.00Rp
0.260 Kg Cat penutup 2 kali @ Rp 45,000.00 = 11,700.00RpJumlah (1) = #VALUE!
14.6.2 Tenaga
0.070 Org Pekerja @ Rp 30,000.00 = 2,100.00Rp
0.090 Org Tukang cat @ Rp 45,000.00 = 4,050.00Rp
0.006 Org Kepala tukang @ Rp 50,000.00 = 300.00Rp
0.004 Org Mandor @ Rp - = -Rp
Jumlah (2) = 6,450.00Rp
Jumlah (1) + (2) = #VALUE!
38 1 m² Pengecatan bidang kayu baru ( 1 lapis plamir ), 1 lapis cat dasar,
3 lapis cat penutup.
14.7.1 Bahan
0.200 Kg Cat meni @ Rp 22,500.00 = 4,500.00Rp
0.150 Kg Plamir @ Rp 20.800,00 = #VALUE!
0.200 lbr Ketas gosok @ Rp 2,750.00 550.00Rp0.350 Kg Cat penutup 3 kali @ Rp 45,000.00 = 15,750.00Rp
Jumlah (1) = #VALUE!
14.7.2 Tenaga
0.070 Org Pekerja @ Rp 30,000.00 = 2,100.00Rp
0.105 Org Tukang cat @ Rp 45,000.00 = 4,725.00Rp
0.004 Org Kepala tukang @ Rp 50,000.00 = 200.00Rp
0.003 Org Mandor @ Rp - = -Rp
Jumlah (2) = 7,025.00Rp
Jumlah (1) + (2) = #VALUE!
39 1 m² Pengecatan tembok baru ( 1 lapis plamir, 1 lapis cat dasar, 2 lapis
cat penutup )
14.11.1 Bahan
0.100 Kg Plamir @ Rp 4.800,00 = #VALUE!0.100 Kg Cat dasar @ Rp 15.400,00 = #VALUE!
0.200 lbr Kertas gosok @ Rp 2,750.00 550.00Rp
0.260 Kg Cat penutup 2x @ Rp 15.400,00 = #VALUE!
Jumlah (1) = #VALUE!
14.11.1 Tenaga
0.020 Org Pekerja @ Rp 30,000.00 = 600.00Rp
0.063 Org Tukang cat @ Rp 45,000.00 = 2,835.00Rp
0.0063 Org Kepala tukang @ Rp 50,000.00 = 315.00Rp
0.003 Org Mandor @ Rp - = -Rp
Jumlah (2) 3,750.00Rp
Jumlah (1) + (2) = #VALUE!
5/17/2018 2. Laporan Mingguan_4_OK - slidepdf.com
http://slidepdf.com/reader/full/2-laporan-mingguan4ok 22/39
5/17/2018 2. Laporan Mingguan_4_OK - slidepdf.com
http://slidepdf.com/reader/full/2-laporan-mingguan4ok 23/39
5/17/2018 2. Laporan Mingguan_4_OK - slidepdf.com
http://slidepdf.com/reader/full/2-laporan-mingguan4ok 24/39
5/17/2018 2. Laporan Mingguan_4_OK - slidepdf.com
http://slidepdf.com/reader/full/2-laporan-mingguan4ok 25/39
5/17/2018 2. Laporan Mingguan_4_OK - slidepdf.com
http://slidepdf.com/reader/full/2-laporan-mingguan4ok 26/39
5/17/2018 2. Laporan Mingguan_4_OK - slidepdf.com
http://slidepdf.com/reader/full/2-laporan-mingguan4ok 27/39
5/17/2018 2. Laporan Mingguan_4_OK - slidepdf.com
http://slidepdf.com/reader/full/2-laporan-mingguan4ok 28/39
5/17/2018 2. Laporan Mingguan_4_OK - slidepdf.com
http://slidepdf.com/reader/full/2-laporan-mingguan4ok 29/39
5/17/2018 2. Laporan Mingguan_4_OK - slidepdf.com
http://slidepdf.com/reader/full/2-laporan-mingguan4ok 30/39
5/17/2018 2. Laporan Mingguan_4_OK - slidepdf.com
http://slidepdf.com/reader/full/2-laporan-mingguan4ok 31/39
A. BAHAN BANGUNAN
1 m3 75,000.002 Pasir Pasang m3 85,000.00
3 m3 110,000.00
4 m3 125,000.00
5 Kerikil 2/3 pecah mesin m3 150,000.00
6 bj 350.00
7 Portland Cement (PC) 40 Kg kg 1,160.00
8 Portland Cement (PC) Putih kg 2.500,00
9 Semen Warna kg 7,500.00
10 Besi Beton Polos kg 10,500.00
11 Kawat Beton (bendrat) kg 12,500.00
12 Besi Beugel/dook, angker kg 10,500.00
13 kg 13.300,00
14 ltr 4.300,00
15 Cat Meni Kayu kg 22,500.0016 kg 15.400,00
17 kg 45,000.00
18 Plamur Dinding kg 4.800,00
19 Plamur Kayu kg 20.800,00
20 Kertas Gosok lbr 2,750.00
21 bh 15,000.00
22 Teer/Residu ltr 32,500.00
23 Kaca Bening 5 mm m2 95,000.00
24 Kaca Rayband 5 mm m2 189.500,00
28 Kayu balok/papan begesting m3 2,740,000.00
25 Kayu Papan mutu C m3 3,500,000.00
27 Kayu papan mutu A m3 4,250,000.00
26 Kayu Papan sgl ukuran kelas II m3 5,500,000.00
29 Kayu Balok sgl ukuran kelas II m3 5,000,000.00
26 Kayu Balok sgl ukuran kelas II m3 5,000,000.00
28 List gypsum 8 cm m' 15,000.00
27 Asbes Datar 1x1 lbr 7,000.00
30 Keramik (30x30) kw 1 m2 45,000.00
27 Seng Plat 3"X6" BJLS 28 m' 22,500.00
29 kg 9,000.00
28 Engsel Pintu ukuran 12 Cm bj 12,500.00
31 Engsel Jendela ukuran 6 Cm bj 7,500.00
28 Grendel tanam pintu bj 8.000,00
30 Grendel Jendela bj 12,500.00
29 Hak Angin Sikutan bj 5,500.00
32 Hak Angin Kait bj 8.500,00
29 Pasang instalasi ttk 110,000.00
31 Pasang Stop kontak ttk 25,000.00
30 Saklar Tunggal bj 25,000.00
33 Saklar Ganda bj 35,000.00
30 Lampu TL 20 w lengkap bj 125,000.00
32 Lampu SL 18 w bj 36,000.00
31 Kunci Tanam2 x putar bh 150,000.00
34 Fitting Lampu pijar bj 17,500.00
31 Genteng Lokal Kodok bj 3,000.00
33 Genteng bubungan lokal bj 3,500.00
Kuas 4"
Paku
Besi Strip
Minyak Cat
Cat Kayu
Cat Dinding
DAFTAR HARGA BAHAN BANGUNAN & UPAH KERJA
REHABILITASI RUANG KELAS RUSAK BERAT SD
TAHUN 2012
Jumlah Harga (Rp)No. Sat.JENIS BAHAN
Pasir Urug
Pasir Cor
Batu Belah
Bata Merah
5/17/2018 2. Laporan Mingguan_4_OK - slidepdf.com
http://slidepdf.com/reader/full/2-laporan-mingguan4ok 32/39
B. UPAH TENAGA KERJA
1 Org/Hr 0.00
2 Kepala Tukang Kayu Org/Hr 50,000.00
3 Kepala Tukang batu Org/Hr 50,000.00
4 Tukang Kayu Org/Hr 45,000.00
5 Tukang Batu Org/Hr 45,000.00
6 Org/Hr 45,000.00
7 Org/Hr 30,000.00
No. DAFTAR KEAHLIAN
Mandor
Upah Harian (Rp)Sat.
Pekerja
Tukang Cat
5/17/2018 2. Laporan Mingguan_4_OK - slidepdf.com
http://slidepdf.com/reader/full/2-laporan-mingguan4ok 33/39
4 240 6
4 240 6
4 360 9
3.5 350 10
1.25 170 13
5/17/2018 2. Laporan Mingguan_4_OK - slidepdf.com
http://slidepdf.com/reader/full/2-laporan-mingguan4ok 34/39
5/17/2018 2. Laporan Mingguan_4_OK - slidepdf.com
http://slidepdf.com/reader/full/2-laporan-mingguan4ok 35/39
KF MA
0.05 0.05
0.08 0.06
4 4
125% 75 65000 25000
125% 75 0.016 0.012
125% 112.5 4062500 2083333
125% 125 120% 120%
125% 170 4875000 2500000
3.7
6.5
4.5
5/17/2018 2. Laporan Mingguan_4_OK - slidepdf.com
http://slidepdf.com/reader/full/2-laporan-mingguan4ok 36/39
TERENDAH (Rp)
A BAHAN BANGUNAN
1 Pasir Urug m3 85,000.00
2 Pasir Pasang m3 125,000.00
3 Pasir Cor m3 177,000.00
4 Batu Belah m3 100,280.00
5 Kerikil 2/3 pecah tangan m3 85,000.00
6 Bata Merah bj 350.00
7 Portland Cement (PC) 40 Kg kg 1,087.00
8 Portland Cement (PC) Putih kg 2,300.00
9 Semen Warna kg 6,500.00
10 Besi Beton Polos kg 10,500.00
11 Kawat Beton (bendrat) kg 11,500.00
12 Besi Beugel/dook, angker kg 11,500.00
13 Besi Strip kg 12,500.00
14 Minyak Cat ltr 4,000.00
15 Cat Meni Kayu kg 29,000.00
16 Cat Kayu kg 14,500.00
17 Cat Dinding kg 12,000.00
18 Plamur Dinding kg 4,500.00
19 Plamur Kayu kg 19,600.00
20 Kertas Gosok lbr 2,500.00
21 Kuas bh 11,000.00
22 Teer/Residu ltr 30,000.00
23 Kaca Bening 5 mm m2 85,000.00
24 Kaca Rayband 5 mm m2 178,000.00
25 Kayu Papan meranti B m3 2,650,000.00
26 Kayu Papan sgl ukuran (kampe m3 5,594,000.00
27 Kayu papan meranti A m3 2,950,000.00
28 Kayu Balok sgl ukuran meranti m3 2,750,000.00
29 Kayu Balok sgl ukuran (kamper) m3 6,700,000.00
30 Kayu Balok sgl ukuran (kruing) m3 4,590,000.00
31 List gypsum 8 cm m' 9,000.00
32 Asbes Datar 1x1 lbr 7,500.00
33 Keramik (30x30) kw 1 m2 51,700.00
34 Seng Plat BJLS 30 Ukuran 50 m' 14,000.00
35 Paku kg 15,000.00
36 Engsel Pintu ukuran 12 Cm bj 18,000.00
37 Engsel Jendela ukuran 6 Cm bj 16,000.00
38 Grendel tanam pintu bj 12,500.00
39 Grendel Jendela bj 7,500.00
40 Hak Angin Sikutan bj 4,750.00
41 Hak Angin Kait bj 8,000.00
42 Pasang instalasi ttk 388,000.00
43 Pasang Stop kontak ttk 15,000.00
44 Saklar Tunggal bj 14,500.00
45 Saklar Ganda bj 18,500.00
46 Lampu TL 20 w lengkap bj 40,000.00
NO NAMA BARANG SATUAN
5/17/2018 2. Laporan Mingguan_4_OK - slidepdf.com
http://slidepdf.com/reader/full/2-laporan-mingguan4ok 37/39
47 Lampu SL 18 w bj 24,500.00
48 Kunci Tanam2 x putar bh 113,800.00
49 Fitting Lampu pijar bj 13,500.00
50 Genteng Lokal Kodok bj 1,900.00
51 Genteng bubungan lokal bj 3,300.00
B UPAH TENAGA KERJA
1 Mandor Orang / Hari 50,000.002 Kepala Tukang Kayu Orang / Hari 42,500.00
3 Kepala Tukang batu Orang / Hari 42,500.00
4 Tukang Kayu Orang / Hari 35,000.00
5 Tukang Batu Orang / Hari 35,000.00
6 Tukang Cat Orang / Hari 40,000.00
7 Pekerja Orang / Hari 32,500.00
5/17/2018 2. Laporan Mingguan_4_OK - slidepdf.com
http://slidepdf.com/reader/full/2-laporan-mingguan4ok 38/39
TERTINGGI (Rp) RATA-RATA (Rp)
105,000.00 95,000.00
136,000.00 130,500.00
187,700.00 182,350.00
106,300.00 103,290.00
90,100.00 87,550.00
400.00 375.00
1,200.00 1,143.50
2,500.00 2,400.00
6,900.00 6,700.00
11,200.00 10,850.00
12,200.00 11,850.00
12,200.00 11,850.00
13,300.00 12,900.00
4,300.00 4,150.00
22,100.00 25,550.00
15,400.00 14,950.00
15,600.00 13,800.00
4,800.00 4,650.00
20,800.00 20,200.00
2,700.00 2,600.00
11,700.00 11,350.00
31,800.00 30,900.00
90,100.00 87,550.00
189,500.00 183,750.00
2,809,000.00 2,729,500.00
5,929,000.00 5,761,500.00
3,215,000.00 3,082,500.00
2,915,000.00 2,832,500.00
7,102,000.00 6,901,000.00
4,590,000.00 4,590,000.00
10,800.00 9,900.00
8,000.00 7,750.00
54,900.00 53,300.00
14,900.00 14,450.00
15,900.00 15,450.00
19,100.00 18,550.00
17,000.00 16,500.00
13,300.00 12,900.00
8,000.00 7,750.00
5,100.00 4,925.00
8,500.00 8,250.00
411,300.00 399,650.00
20,500.00 17,750.00
15,100.00 14,800.00
19,400.00 18,950.00
42,400.00 41,200.00
HARGA
5/17/2018 2. Laporan Mingguan_4_OK - slidepdf.com
http://slidepdf.com/reader/full/2-laporan-mingguan4ok 39/39
26,000.00 25,250.00
120,700.00 117,250.00
14,100.00 13,800.00
2,100.00 2,000.00
3,500.00 3,400.00
53,000.00 52,500.0045,100.00 43,800.00
45,100.00 43,800.00
37,100.00 36,050.00
37,100.00 36,050.00
42,400.00 41,200.00
34,555.00 33,527.50