  • ANALISA PENYEBAB TRIP DAN UPAYA PENINGKATAN KEHANDALAN OPERASI

    CIRCULATIG WATER PUMP PLTU JERANJANG UNIT 3

    i

    Halaman

    PT PLN (PERSERO)

    WILAYAH NTB SEKTOR LOMBOK

    TELAAHAN STAF

    NAMA : DODDY HERTANTO ARIBOWO

    NIP : 8206597Z

    JABATAN : SUPERVISOR OPERASI SHIFT A

    UNIT OJT : PLTU JERANJANG

    JUDUL : ANALISA PENYEBAB TRIP DAN UPAYA

    PENINGKATAN KEHANDALAN OPERASI

    CIRCULATING WATER PUMP PLTU

    JERANJANG UNIT 3

    TAHUN 2012

  • ANALISA PENYEBAB TRIP DAN UPAYA PENINGKATAN KEHANDALAN OPERASI

    CIRCULATIG WATER PUMP PLTU JERANJANG UNIT 3

    ii

    Halaman

    LEMBAR PENGESAHAN

    JUDUL : Analisa Penyebab Trip dan Upaya Peningkatan Kehandalan

    Operasi Circulating Water Pump PLTU Jeranjang Unit #3

    NAMA : Doddy Hertanto Aribowo

    JABATAN : Supervisor Operasi Shift A

    NIP : 8206597Z

    Menyetujui,

    Mentor

    Manajer PLTU Jeranjang

    ADAM PRIYO PERDANA

    NIP : 8006216Z

    Mataram, 7 Januari 2013

    Siswa OJT

    DODDY HERTANTO ARIBOWO

    NIP : 8206597Z

    Mengetahui,

    Manajer Bidang SDM & KHA

    PT PLN (Persero)

    Wilayah NTB

    M ZAHIDI

    NIP : 61910767

    Manajer Sektor Lombok

    PT PLN (Persero)

    Wilayah NTB

    ERI SURYANA

    NIP : 6685282M

  • ANALISA PENYEBAB TRIP DAN UPAYA PENINGKATAN KEHANDALAN OPERASI

    CIRCULATIG WATER PUMP PLTU JERANJANG UNIT 3

    iii

    Halaman

    KATA PENGANTAR

    Puji syukur penulis panjatkan ke hadirat Allah SWT, atas segala nikmat

    dan karuniaNya sehingga penulis dapat menyelesaikan Telaahan Staf dengan

    judul Analisa Penyebab Trip dan Upaya Peningkatan Kehandalan Operasi

    Circulating Water Pump PLTU Jeranjang Unit #3 .

    Penulisan Telaahan Staf ini tidak lepas dari dukungan serta bimbingan

    berbagai pihak. Untuk itu, penulis mengucapkan terima kasih yang sebesar-

    besarnya kepada:

    1. Keluarga tercinta, untuk semua doa dan kasih sayang yang tak terputus

    sepanjang waktu.

    2. Manajemen PT PLN (Persero) Wilayah NTB untuk bimbingan dan

    dukungan.

    3. Bpk. Adam Priyo Perdana selaku Mentor, atas segala bimbingan dan

    dukungannya dalam penyelesaian Telaahan Staf ini.

    4. Rekan-rekan kerja PT PLN (Persero) Wilayah NTB Sektor Lombok PLTU

    Jeranjang, atas bantuan dan dukungan yang telah diberikan.

    5. Teman-teman Angkatan VII Diklat EE-4 atas segala kekompakan dan

    kebersamaan selama ini.

    6. Semua pihak yang telah membantu dan tak dapat disebutkan satu persatu

    Semoga apa yang tertulis dan apa yang telah dan akan penulis lakukan

    untuk Telaahan Staf ini dapat memberi kontribusi pada perusahaan dan dapat

    dinilai sebagai salah satu bentuk ibadah kepada Allah SWT. Aamiin.

    Mataram, 7 Januari 2013

    Penulis

    Doddy Hertanto Aribowo

  • ANALISA PENYEBAB TRIP DAN UPAYA PENINGKATAN KEHANDALAN OPERASI

    CIRCULATIG WATER PUMP PLTU JERANJANG UNIT 3

    iv

    Halaman

    DAFTAR ISI

    HALAMAN JUDUL .................................................................................................. i

    LEMBAR PENGESAHAN ....................................................................................... ii

    KATA PENGANTAR ............................................................................................... iii

    DAFTAR ISI .............................................................................................................. iv

    DAFTAR GAMBAR ................................................................................................. v

    DAFTAR TABEL ...... ............................................................................................... vi

    ABSTRAK ................................................................................................................. vii

    BAB I LATAR BELAKANG .............................................................................. 1

    BAB II PERMASALAHAN ................................................................................. 2

    BAB III PERSOALAN ........................................................................................... 3

    BAB IV PRA ANGGAPAN ................................................................................... 4

    BAB V FAKTA YANG MEMPENGARUHI ...................................................... 5

    BAB VI PEMBAHASAN ....................................................................................... 6

    VI.1 Fungsi Circulating Water Pump (CWP) ................................................... 6

    VI.2 Sistem Operasi pada Circulating Water Pump (CWP) ............................ 6

    VI.3 Kondisi Existing Sistem Circulating Water Pump (CWP) PLTU

    Jeranjang Unit 3 ....................................................................................... 8

    VI.4 Data Operasi Circulating Water Pump (CWP) PLTU Jeranjang Unit 3 . 13

    VI.6 Analisa Penyebab Trip Circulating Water Pump (CWP) PLTU

    Jeranjang Unit 3 ...................................................................................... 16

    VI.5 Kebutuhan Pendinginan Kondensor ........................................................ 19

    VI.7 Solusi Peningkatan Kehandalan Operasi Circulating Water Pump

    (CWP) PLTU Jeranjang Unit 3 ................................................................ 22

    BAB VII KESIMPULAN ........................................................................................ 25

    BAB VIII TINDAKAN YANG DISARANKAN..................................................... 26

    REFERENSI

  • ANALISA PENYEBAB TRIP DAN UPAYA PENINGKATAN KEHANDALAN OPERASI

    CIRCULATIG WATER PUMP PLTU JERANJANG UNIT 3

    v

    Halaman

    DAFTAR GAMBAR

    Gambar VI.1 Sketsa Areal Intake Room ................................................................... 9

    Gambar VI.2 Areal Intake Room Potongan Samping ................................................ 10

    Gambar VI.3 Pompa Poros Vertikal CWP PLTU Jeranjang Unit 3 .......................... 11

    Gambar VI.4 Pompa Poros Vertical CWP PLTU Jeranjang Unit 1 & 2 ................... 12

    Gambar VI.5 Kondisi Ujung Kanal Berhimpit Muara Sungai ................................... 16

    Gambar VI.6 Elevasi intake dan elevasi Circulating Water Pump ............................ 17

    Gambar VI.7 Pemindahan Muara Sungai .................................................................. 22

    Gambar VI.8 Penurunan Elevasi Intake ..................................................................... 23

  • ANALISA PENYEBAB TRIP DAN UPAYA PENINGKATAN KEHANDALAN OPERASI

    CIRCULATIG WATER PUMP PLTU JERANJANG UNIT 3

    vi

    Halaman

    DAFTAR TABEL

    Tabel VI.1 Data Kejadian Trip Circulating Water Pump .......................................... 13

    Tabel VI.2 Data Penurunan Beban............................................................................. 14

    Tabel VI.3 Data Pasang Surut Air Laut Bulan Nopember 2012 ................................ 15

    Tabel VI.4 Data Performa Operasi Kondensor .......................................................... 20

  • ANALISA PENYEBAB TRIP DAN UPAYA PENINGKATAN KEHANDALAN OPERASI

    CIRCULATIG WATER PUMP PLTU JERANJANG UNIT 3

    vii

    Halaman

    ABSTRAK

    PLTU yang merupakan pembangkit berbahan bakar batubara yang menjadi

    program percepatan pembangkit 10.000 MW yang dicanangkan PT.PLN (Persero)

    dan salah satunya adalah PLTU Jeranjang Unit 3 yang berlokasi di pulau Lombok.

    Pada tahap commissioning test ternyata terdapat beberapa permasalahan antara

    lain pada Circulating Water Pump (CWP). Circulating Water Pump merupakan

    peralatan utama PLTU yang berfungsi untuk mengisap air laut dari intake menuju

    ke kondensor untuk proses pendinginan. Circulating Water Pump beberapa kali

    mengalami trip karena level air laut di intake turun mencapai seting tripnya

    akibatnya proses pendinginan di Kondensor tidak optimal dan pada akhirnya

    performa pembangkit secara keseluruhan menurun. Beberapa hal yang menjadi

    penyebab trip Circulating Water Pump yaitu banyaknya sampah dan lumpur yang

    masuk ke kanal karena berdekatan dengan muara sungai, penyumbatan sampah

    pada gate, desain elevasi intake yang terlalu tinggi dan pasang surut air laut.

    Beberapa alternatif solusi untuk meningkatkan kehandalan operasi Circulating

    Water Pump yaitu memindahkan letak muara sungai, memasang saringan sampah,

    menurunkan elevasi intake, memperbesar lubang gate, memperbesar tekanan

    spray traveling screen dan membuat saluran pipa di kedalaman laut.