REKAPITULASI RENCANA ANGGARAN BIAYA PEMELIHARAAN DRAINASE RW 01,02,04,05,06,07,08,11,13 KELURAHAN BANDUNGREJOSARI KECAMATAN SUKUN KOTA MALANG TAHUN 2016 Harga Satuan Jumlah Total ( Rp ) Harga Harga 1 2 3 4 5 6 7 8 I PEKERJAAN PENDAHULUAN 1- - - 0.00 0.00 JUMLAH 0.00 II PEKERJAAN TANAH 1 Galian tanah biasa se dalam 1 m B.001 106.35 49,625.00 5,277,378.07 2 Galian tanah keras sedalam 1m B.004 22.63 66,020.00 1,494,032.60 3 Urugan pasir B.011 0.56 95,000.00 53,200.00 JUMLAH PEKERJAAN TANAH 6,824,610.67 III PEKERJAAN PASANGAN 1 Pasangan bata merah tebal 1/2 bata, 1Pc : 6Ps D.013 36.32 110,508.00 4,014,045.21 2 Plesteran 1Pc : 5Ps, tebal 15 mm E.005 37.55 41,399.60 1,554,506.59 3 Beton mutu fc'=9,8 Mpa (K125) slump (12 ± 2) cm, w/c = 0,78 G.002 23.30 1,018,040.32 23,722,204.45 4 Beton mutu fc'=19,3 Mpa (K225) slump (12 ± 2) cm, w/c = 0,58 G.007 14.88 1,185,445.00 17,635,094.73 5 Pasang pipa beton, Ø 30 cm J.019 472.28 155,182.00 73,289,354.96 6 Pasang pipa beton, Ø 20 cm J.017 259.17 107,698.00 27,912,090.66 7 Pasang pipa beton U, diameter 30 J.026 83.51 211,205.00 17,636,673.53 8 Pembesian dengan besi polos G.019 1,501.14 kg 16,125.50 24,206,657.26 9 BURTU (+Material Aspal Untuk Pelaburan) 10.1.(2) 28.00 21,840.89 611,544.87 10 Pasang grill penutup saluran K.016a 10.00 296,725.00 2,967,250.00 11 Pasang Bekisting G.022 44.90 248,010.00 11,135,649.00 12 Pasang paving stone (blok) M.050 8.81 174,750.00 1,539,722.25 JUMLAH PEKERJAAN PASANGAN 206,224,793.50 Jumlah harga konstruksi 213,049,404.16 Ppn 10 % 21,304,940.42 Total biaya konstruksi 234,354,344.58 Total biaya dibulatkan 234,350,000.00 LPMK BANDUNGREJOSARI POKMAS BANDUNG I KELURAHAN BANDUNGREJOSARI KELURAHAN BANDUNGREJOSARI Ketua, Ketua, PURYANTO MAKIN KELURAHAN BANDUNGREJOSARI Lurah, ZAINUL AMALI, S.Sos. M.Si Pembina NIP. 19641109 198810 1 001 No. Macam Pekerjaan Analisa Volume Satuan PEKERJAAN PENDAHULUAN

Upload: taufikkurrahman-upik-teler

Post on 08-Jul-2016

237 views

Category:

Documents


0 download

DESCRIPTION

rab

TRANSCRIPT

Page 1: rab total

REKAPITULASI RENCANA ANGGARAN BIAYA

PEMELIHARAAN DRAINASE RW 01,02,04,05,06,07,08,11,13

KELURAHAN BANDUNGREJOSARI KECAMATAN SUKUN KOTA MALANG

TAHUN 2016

Harga Satuan Jumlah Total

( Rp ) Harga Harga

1 2 3 4 5 6 7 8

I PEKERJAAN PENDAHULUAN

1 - - - 0.00 0.00

JUMLAH 0.00

II PEKERJAAN TANAH

1 Galian tanah biasa se dalam 1 m B.001 106.35 m³ 49,625.00 5,277,378.07

2 Galian tanah keras sedalam 1m B.004 22.63 m³ 66,020.00 1,494,032.60

3 Urugan pasir B.011 0.56 m³ 95,000.00 53,200.00

JUMLAH PEKERJAAN TANAH 6,824,610.67

III PEKERJAAN PASANGAN

1 Pasangan bata merah tebal 1/2 bata, 1Pc : 6Ps D.013 36.32 m² 110,508.00 4,014,045.21

2 Plesteran 1Pc : 5Ps, tebal 15 mm E.005 37.55 m² 41,399.60 1,554,506.59

3 Beton mutu fc'=9,8 Mpa (K125) slump (12 ± 2) cm, w/c = 0,78 G.002 23.30 m³ 1,018,040.32 23,722,204.45

4 Beton mutu fc'=19,3 Mpa (K225) slump (12 ± 2) cm, w/c = 0,58 G.007 14.88 m³ 1,185,445.00 17,635,094.73

5 Pasang pipa beton, Ø 30 cm J.019 472.28 m¹ 155,182.00 73,289,354.96

6 Pasang pipa beton, Ø 20 cm J.017 259.17 m¹ 107,698.00 27,912,090.66

7 Pasang pipa beton U, diameter 30 J.026 83.51 m¹ 211,205.00 17,636,673.53

8 Pembesian dengan besi polos G.019 1,501.14 kg 16,125.50 24,206,657.26

9 BURTU (+Material Aspal Untuk Pelaburan) 10.1.(2) 28.00 m² 21,840.89 611,544.87

10 Pasang grill penutup saluran K.016a 10.00 m¹ 296,725.00 2,967,250.00

11 Pasang Bekisting G.022 44.90 m² 248,010.00 11,135,649.00

12 Pasang paving stone (blok) M.050 8.81 m² 174,750.00 1,539,722.25

JUMLAH PEKERJAAN PASANGAN 206,224,793.50

Jumlah harga konstruksi 213,049,404.16

Ppn 10 % 21,304,940.42

Total biaya konstruksi 234,354,344.58

Total biaya dibulatkan 234,350,000.00

LPMK BANDUNGREJOSARI POKMAS BANDUNG I

KELURAHAN BANDUNGREJOSARI KELURAHAN BANDUNGREJOSARI

Ketua, Ketua,

PURYANTO MAKIN

KELURAHAN BANDUNGREJOSARILurah,

ZAINUL AMALI, S.Sos. M.Si

Pembina

NIP. 19641109 198810 1 001

No. Macam Pekerjaan Analisa Volume Satuan

PEKERJAAN PENDAHULUAN