REKAPITULASI RENCANA ANGGARAN BIAYA
PEMELIHARAAN DRAINASE RW 01,02,04,05,06,07,08,11,13
KELURAHAN BANDUNGREJOSARI KECAMATAN SUKUN KOTA MALANG
TAHUN 2016
Harga Satuan Jumlah Total
( Rp ) Harga Harga
1 2 3 4 5 6 7 8
I PEKERJAAN PENDAHULUAN
1 - - - 0.00 0.00
JUMLAH 0.00
II PEKERJAAN TANAH
1 Galian tanah biasa se dalam 1 m B.001 106.35 m³ 49,625.00 5,277,378.07
2 Galian tanah keras sedalam 1m B.004 22.63 m³ 66,020.00 1,494,032.60
3 Urugan pasir B.011 0.56 m³ 95,000.00 53,200.00
JUMLAH PEKERJAAN TANAH 6,824,610.67
III PEKERJAAN PASANGAN
1 Pasangan bata merah tebal 1/2 bata, 1Pc : 6Ps D.013 36.32 m² 110,508.00 4,014,045.21
2 Plesteran 1Pc : 5Ps, tebal 15 mm E.005 37.55 m² 41,399.60 1,554,506.59
3 Beton mutu fc'=9,8 Mpa (K125) slump (12 ± 2) cm, w/c = 0,78 G.002 23.30 m³ 1,018,040.32 23,722,204.45
4 Beton mutu fc'=19,3 Mpa (K225) slump (12 ± 2) cm, w/c = 0,58 G.007 14.88 m³ 1,185,445.00 17,635,094.73
5 Pasang pipa beton, Ø 30 cm J.019 472.28 m¹ 155,182.00 73,289,354.96
6 Pasang pipa beton, Ø 20 cm J.017 259.17 m¹ 107,698.00 27,912,090.66
7 Pasang pipa beton U, diameter 30 J.026 83.51 m¹ 211,205.00 17,636,673.53
8 Pembesian dengan besi polos G.019 1,501.14 kg 16,125.50 24,206,657.26
9 BURTU (+Material Aspal Untuk Pelaburan) 10.1.(2) 28.00 m² 21,840.89 611,544.87
10 Pasang grill penutup saluran K.016a 10.00 m¹ 296,725.00 2,967,250.00
11 Pasang Bekisting G.022 44.90 m² 248,010.00 11,135,649.00
12 Pasang paving stone (blok) M.050 8.81 m² 174,750.00 1,539,722.25
JUMLAH PEKERJAAN PASANGAN 206,224,793.50
Jumlah harga konstruksi 213,049,404.16
Ppn 10 % 21,304,940.42
Total biaya konstruksi 234,354,344.58
Total biaya dibulatkan 234,350,000.00
LPMK BANDUNGREJOSARI POKMAS BANDUNG I
KELURAHAN BANDUNGREJOSARI KELURAHAN BANDUNGREJOSARI
Ketua, Ketua,
PURYANTO MAKIN
KELURAHAN BANDUNGREJOSARILurah,
ZAINUL AMALI, S.Sos. M.Si
Pembina
NIP. 19641109 198810 1 001
No. Macam Pekerjaan Analisa Volume Satuan
PEKERJAAN PENDAHULUAN