rab mj sukaluyu jadi
TRANSCRIPT
-
7/21/2019 RAB MJ Sukaluyu Jadi
1/12
HRG SATUAN JML HAR
(Rp.) (Rp.)
I. PEK. LANTAI
1 Pas. Lantai Keramik 40 x 40 Sek. Mulia, Ruangan 63.66 m 89,790 5,71
2 Pas. Lantai Keramik 30 x 30 Sek. Mulia, Entrance 127.29 m 89,790 11,42
3 Pas. Lantai Keramik 20 x 20 Sek. Mulia KM/WC 5.00 m 99,760 49
4 Pas. Dinding Keramik 20 x 25 Sek. Mulia KM/WC 15.90 m 98,660 1,56
II. PEK. KUSEN ALUMUNIUM
1 Pas. Kusen Pintu , Jendela, Alumunium 402.700 m 59,000 23,75
2 Pas. Rangka Alm Daun Pintu Panel, Kaca 5mm uk.80x210cm 9.00 bh 710,000 6,39
3 Pas. Rangka Alm Daun Pintu Panel, takewood double 5mm uk.80x210cm 9.00 bh 700,000 6,30
4 Pas. Rangka Kayu Daun Pintu Panel, takewood double 5mm uk.80x210cm 1.00 bh 700,000 70
5 Pas. Kusen + Daun Pintu PVC lengkap 2.00 bh 200,000 40
6 Pas. Rangka Daun Jendela Alumunium+Kaca 5mm uk.115 x 55cm 5.00 bh 273,000 1,36
7 Pas. Rangka Daun Jendela Alumunium+Kaca 5mm uk.115 x 70 cm 15.00 bh 340,000 5,10
8 Pas. Rangka Daun Jendela Alumunium+Kaca 5mm uk.55 x 60 cm 20.00 bh 140,000 2,80
9 Kaca Polos 5 mm + List 42.36 m 60,000 2,54
10 Kunci Pintu 2 Slagh Setara Solid 17.00 bh 141,000 2,39
11 Pegangan Pintu 8.00 bh 53,000 424
12 Engsel Pintu 63.00 Ps 20,000 1,26
13 Engsel Jendela 80.00 Ps 10,000 80
14 Espagnolite 8.00 set 28,000 224
15 Slot Jendela 26.00 bh 9,000 234
16 Kait Angin 26.00 bh 10,000 26
III. PEK. PLAFOND
1 Pas. Penutup Plafond Gypsum 9mm Sek. Keouf 259.66 m 15,000 3,894
2 Pas. List Plafond 1/4 cm 236.70 m 6,000 1,42
IV. PEK. ATAP
1 Pas. Listplank dak atap 10/20 0.88 m 2,200,000 1,932 Pas. Ringbalk 15/20 3.28 m 2,100,000 6,88
VOLUMENO.
LAMPIRAN BERITA ACARA NEGOSIASI
PENGADAAN KONSTRUKSI GEDUNG KANTOR KELURAHAN SUKALUYU
KECAMATAN CIBEUNYIN KALER
JL. RERENG-WULUNG SUKALUYU BANDUNG
HARGA PENAWARAN
URAIAN PEKERJAAN
-
7/21/2019 RAB MJ Sukaluyu Jadi
2/12
V. PEK. INSTALASI AIR BERSIH, KOTOR & SANITAIR
- Instalasi Air Bersih
1 Gate Valve dia 3/4" 1.00 bh 50,000 5
-Sanitair
1 Closet Jongkok Sek INA 2.00 bh 210,000 42
2 Bak air Fibre Lapis Keramik 2.00 bh 300,000 60
3 Floor Drain Stainles Steil Sek.INA 2.00 bh 52,000 104
4 Kran Air dia 1/2" sek. San-ei 2.00 bh 40,000 8
5 Septicktank + Rembesan 1.00 bh 1,200,000 1,206 BP Air Bersih 1.00 bh 2,000,000 2,00
VI. PEK. INSTALASI LISTRIK
1 Pas. Titik cahaya 28.00 ttk 90,000 2,52
2 Pas. Titik Stop Kontak 10.00 ttk 106,000 1,06
3 Pas. Lampu TL. 2x18 watt Type TKI Sek.Artolite 9.00 bh 80,000 72
4 Pas. Lampu DL. 20 watt Sek.Philips 5.00 bh 90,000 45
5 Pas. Lampu Pijar. 20 watt Sek.Philips 10.00 bh 70,000 70
6 Pas. Lampu Baret. 20 watt Sek.Philips 4.00 bh 100,000 40
7 Saklar Tunggal Sek.Broco 11.00 bh 26,500 29
8 Saklar Seri Sek.Broco 4.00 bh 31,000 124
9 Stop Kontak Sek.Broco 10.00 bh 39,000 39
10 Panel LP-PP A 1.00 unit 300,000 30
11 Tambah Daya Listrik menjadi 220 VA 1.00 Ls 1,250,000 1,25
VII. PEK. CAT
1 Pek. Cat Tembok Dinding Sek. Vinilex 684.26 m 13,770 9,422
2 Pek. Cat Plafond Sek. Vinilex 259.66 m 14,840 3,85
3 Pek. Polituran Panel Daun Pintu 38.81 m 60,000 2,32
VII. PEK. LAIN-LAIN
1 Pek. Pemberesan kembali bekas pekerjaan 0.500 ls 200,000 10
2 Pek. Logo Pemkot Bandung (Plat metal 70,90) 1.000 1,200,000 1,20
-
7/21/2019 RAB MJ Sukaluyu Jadi
3/12
I. PEK. LANTAIII. PEK. KUSEN ALUMUNIUM
III. PEK. PLAFOND
IV. PEK. ATAP
V. PEK. INSTALASI AIR BERSIH, KOTOR & SANITAIR
VI. PEK. INSTALASI LISTRIK
VII. PEK. CAT
VIII. PEK. LAIN-LAIN
Jumlah 117,87
PPN 10% 11,78
Jumlah 129,65
Menyetujui Hasil Negosiasi Bandung,
CV. MEKAR JAYA PEJABAT PENGADAAN
ASEP HIDAYAT, ST RUDI ANSO
Direktur NIP.
4,454
JML HARGANO NAMA PEKERJAAN
54,954
5,31
REKAPITULASI
PENGADAAN KONSTRUKSI GEDUNG KANTOR KELURAHAN SUKALUYU
KECAMATAN CIBEUNYIN KALER
JL. RERENG-WULUNG SUKALUYU BANDUNG
8,824
PENAWARAN
19,212
8,20
15,604
1,30
-
7/21/2019 RAB MJ Sukaluyu Jadi
4/12
HARGA SATUAN JUMLAH HARGA
(Rp.) (Rp.)
I. PEK. LANTAI
1 Pas. Lantai Keramik 40 x 40 Sek. Mulia, Ruangan 63.66 m 89,790 5,716,031
2 Pas. Lantai Keramik 30 x 30 Sek. Mulia, Entrance 127.29 m 89,790 11,429,369
3 Pas. Lantai Keramik 20 x 20 Sek. Mulia KM/WC 5.00 m 99,760 498,800
4 Pas. Dinding Keramik 20 x 25 Sek. Mulia KM/WC 15.90 m 98,660 1,568,694
II. PEK. KUSEN ALUMUNIUM
1 Pas. Kusen Pintu , Jendela, Alumunium 402.700 m 59,000 23,759,300
2 Pas. Rangka Alm Daun Pintu Panel, Kaca 5mm uk.80x210cm 9.00 bh 710,000 6,390,000
3 Pas. Rangka Alm Daun Pintu Panel, takewood double 5mm uk.80x210cm 9.00 bh 700,000 6,300,000
4 Pas. Rangka Kayu Daun Pintu Panel, takewood double 5mm uk.80x210cm 1.00 bh 700,000 700,000
5 Pas. Kusen + Daun Pintu PVC lengkap 2.00 bh 200,000 400,000
6 Pas. Rangka Daun Jendela Alumunium+Kaca 5mm uk.115 x 55cm 5.00 bh 273,000 1,365,000
7 Pas. Rangka Daun Jendela Alumunium+Kaca 5mm uk.115 x 70 cm 15.00 bh 340,000 5,100,000
8 Pas. Rangka Daun Jendela Alumunium+Kaca 5mm uk.55 x 60 cm 20.00 bh 140,000 2,800,000
9 Kaca Polos 5 mm + List 42.36 m 60,000 2,541,600
10 Kunci Pintu 2 Slagh Setara Solid 17.00 bh 141,000 2,397,000
11 Pegangan Pintu 8.00 bh 53,000 424,000
12 Engsel Pintu 63.00 Ps 20,000 1,260,000
13 Engsel Jendela 80.00 Ps 10,000 800,00014 Espagnolite 8.00 set 28,000 224,000
15 Slot Jendela 26.00 bh 9,000 234,000
16 Kait Angin 26.00 bh 10,000 260,000
III. PEK. PLAFOND
1 Pas. Penutup Plafond Gypsum 9mm Sek. Keouf 259.66 m 15,000 3,894,900
2 Pas. List Plafond 1/4 cm 236.70 m 6,000 1,420,200
IV. PEK. ATAP
1 Pas. Listplank dak atap 10/20 0.88 m 2,200,000 1,936,000
2 Pas. Ringbalk 15/20 3.28 m 2,100,000 6,888,000
V. PEK. INSTALASI AIR BERSIH, KOTOR & SANITAIR
- Instalasi Air Bersih
1 Gate Valve dia 3/4" 1.00 bh 50,000 50,000-Sanitair
1 Closet Jongkok Sek INA 2.00 bh 210,000 420,000
2 Bak air Fibre Lapis Keramik 2.00 bh 300,000 600,000
3 Floor Drain Stainles Steil Sek.INA 2.00 bh 52,000 104,000
4 Kran Air dia 1/2" sek. San-ei 2.00 bh 40,000 80,000
5 Septicktank + Rembesan 1.00 bh 1,200,000 1,200,000
6 BP Air Bersih 1.00 bh 2,000,000 2,000,000
VI. PEK. INSTALASI LISTRIK
1 Pas. Titik cahaya 28.00 ttk 90,000 2,520,000
2 Pas. Titik Stop Kontak 10.00 ttk 106,000 1,060,000
3 Pas. Lampu TL. 2x18 watt Type TKI Sek.Artolite 9.00 bh 80,000 720,000
4 Pas. Lampu DL. 20 watt Sek.Philips 5.00 bh 90,000 450,000
5 Pas. Lampu Pijar. 20 watt Sek.Philips 10.00 bh 70,000 700,000
6 Pas. Lampu Baret. 20 watt Sek.Philips 4.00 bh 100,000 400,0007 Saklar Tunggal Sek.Broco 11.00 bh 26,500 291,500
8 Saklar Seri Sek.Broco 4.00 bh 31,000 124,000
9 Stop Kontak Sek.Broco 10.00 bh 39,000 390,000
10 Panel LP-PP A 1.00 unit 300,000 300,000
11 Tambah Daya Listrik menjadi 220 VA 1.00 Ls 1,250,000 1,250,000
VII. PEK. CAT
1 Pek. Cat Tembok Dinding Sek. Vinilex 684.26 m 13,770 9,422,260
2 Pek. Cat Plafond Sek. Vinilex 259.66 m 14,840 3,853,354
3 Pek. Polituran Panel Daun Pintu 38.81 m 60,000 2,328,600
VII. PEK. LAIN-LAIN
1 Pek. Pemberesan kembali bekas pekerjaan 0.500 ls 200,000 100,000
2 Pek. Logo Pemkot Bandung (Plat metal 70,90) 1.000 1,200,000 1,200,000
URAIAN PEKERJAAN VOLUME
RENCANA ANGGARAN BIAYA
PENGADAAN KONSTRUKSI GEDUNG KANTOR KELURAHAN SUKALUYU
KECAMATAN CIBEUNYIN KALER
JL. RERENG-WULUNG SUKALUYU BANDUNG
NO.
-
7/21/2019 RAB MJ Sukaluyu Jadi
5/12
NO JML HARGA
I. PEK. LANTAI 19,212,895
II. PEK. KUSEN ALUMUNIUM 54,954,900
III. PEK. PLAFOND 5,315,100IV. PEK. ATAP 8,824,000
V. PEK. INSTALASI AIR BERSIH, KOTOR & SANITAIR 4,454,000
VI. PEK. INSTALASI LISTRIK 8,205,500
VII. PEK. CAT 15,604,215
VIII. PEK. LAIN-LAIN 1,300,000
Jumlah 117,870,609
PPN 10% 11,787,061
Jumlah 129,657,670
Terbilang : Seratus Dua Puluh Sembilan Juta Enam Ratus Lima Puluh Tujuh Ribu Enam Ratus Tujuh Puluh Rupiah
Bandung, 4 Maret 2013CV. MEKAR JAYA
ASEP HIDAYAT, ST
Direktur
NAMA PEKERJAAN
REKAPITULASI
PENGADAAN KONSTRUKSI GEDUNG KANTOR KELURAHAN SUKALUYU
KECAMATAN CIBEUNYIN KALER
JL. RERENG-WULUNG SUKALUYU BANDUNG
-
7/21/2019 RAB MJ Sukaluyu Jadi
6/12
1-7 8-14 15-21 22-28 2
1 2 3 4
I. PEK. LANTAI 16.30 5.43
II. PEK. KUSEN ALUMUNIUM 46.62 15.54 15.54
III. PEK. PLAFOND 4.51 2.25 2.25
IV. PEK. ATAP 7.49 3.74 3.74
V. PEK. INSTALASI AIR BERSIH, KOTOR & SANITAIR 3.78 3.78
VI. PEK. INSTALASI LISTRIK 6.96 3.48
VII. PEK. CAT 13.24
VIII. PEK. LAIN-LAIN 1.10
JUMLAH BOBOT TOTAL 100
RENCANA PRESTASI PEKERJAAN MINGGU INI 3.74 6.00 21.28 24.75
RENCANA KUMULATIP PRESTASI PEK S/D MINGGU INI - 3.74 9.74 31.02 55.77
\
Bandung, 4 Maret 201
CV. MEKAR JAYA
ASEP HIDAYAT, ST
Direktur
BOBOT
(%) MINGGU KE
HARI KE
TIME SCHEDULEPENGADAAN KONSTRUKSI GEDUNG KANTOR KELURAHAN SUKALUYU
KECAMATAN CIBEUNYIN KALER
JL. RERENG-WULUNG SUKALUYU BANDUNG
NO URAIAN PEKERJAAN
-
7/21/2019 RAB MJ Sukaluyu Jadi
7/12
-
7/21/2019 RAB MJ Sukaluyu Jadi
8/12
Bahan Upah
Rp. Rp. Rp. Rp.
1 3 4 5 6 7 8
1
Bahan :Ubin Keramik, uk. 30 x 30 cm Bh 11.8700 2,880.00 34,185.60 34,185.60
Semen Portland Kg 11.3800 1,050.00 11,949.00 11,949.00
Pasir Pasang M3 0.0420 90,000.00 3,780.00 3,780.00
Semen Warna ( putih ) Kg 1.5000 5,000.00 7,500.00 7,500.00
Tenaga Kerja :
Pekerja Oh 0.4200 33,000.00 13,860.00 13,860.00
Tukang Batu Oh 0.2000 40,000.00 8,000.00 8,000.00
Kepala Tukang Batu Oh 0.0200 43,000.00 860.00 860.00
Mandor Oh 0.0300 50,000.00 1,500.00 1,500.00
81,634.60
8,163.46
89,798.06
89,790.002
Bahan :
Ubin Keramik, uk. 20 x 25 cm Bh 20.0000 1,450.00 29,000.00 29,000.00
Semen Portland Kg 11.3800 1,050.00 11,949.00 11,949.00
Pasir Pasang M3 0.0420 90,000.00 3,780.00 3,780.00
Semen Warna Kg 1.5000 5,000.00 7,500.00 7,500.00
Tenaga Kerja : -
Pekerja Oh 0.6200 33,000.00 20,460.00 20,460.00
Tukang Batu Oh 0.3500 40,000.00 14,000.00 14,000.00
Kepala Tukang Batu Oh 0.0350 43,000.00 1,505.00 1,505.00
Mandor Oh 0.0300 50,000.00 1,500.00 1,500.00
89,694.00
8,969.40
98,663.40
98,660.00
3
Bahan :
Ubin Keramik, uk. 20 x 20 cm Bh 25.0000 1,200.00 30,000.00 30,000.00
Semen Portland Kg 11.3800 1,050.00 11,949.00 11,949.00
Pasir Pasang M3 0.0420 90,000.00 3,780.00 3,780.00
Semen Warna Kg 1.5000 5,000.00 7,500.00 7,500.00
Tenaga Kerja : -
Pekerja Oh 0.6200 33,000.00 20,460.00 20,460.00
Tukang Batu Oh 0.3500 40,000.00 14,000.00 14,000.00
Kepala Tukang Batu Oh 0.0350 43,000.00 1,505.00 1,505.00
Mandor Oh 0.0300 50,000.00 1,500.00 1,500.00
90,694.009,069.40
99,763.40
99,760.00
1 M2 PASANGAN LANTAI KERAMIK , UK. 20 x 25 CM ( SNI. Edisi Rev. 2002 )
1 M2 PASANGAN LANTAI KERAMIK , UK. 30x 30 CM ( SNI. Edisi Rev. 2002 )
Jumlah
Keuntungan maksimal 10%
Jumlah
Dibulatkan
Jumlah
Keuntungan maksimal 10%
Jumlah
Dibulatkan
1 M2 PASANGAN LANTAI KERAMIK , UK. 20 x 20 CM ( SNI. Edisi Rev. 2002 )
JumlahKeuntungan maksimal 10%
Jumlah
Dibulatkan
ANALISA HARGA SATUAN PEKERJAAN
No. Uraian Jenis Pekerjaan Sat. Koeff.
Harga Sat.
Bahan / UpahJumlah Harga Jumlah Harga
Bahan + Upah
2
-
7/21/2019 RAB MJ Sukaluyu Jadi
9/12
Bahan Upah
Rp. Rp. Rp. Rp.
1 3 4 5 6 7 8
No. Uraian Jenis Pekerjaan Sat. Koeff.
Harga Sat.
Bahan / UpahJumlah Harga Jumlah Harga
Bahan + Upah
2
4
Bahan :
Plamir Kg 0.1000 15,000.00 1,500.00 1,500.00
Ampelas Lbr 0.1500 3,000.00 450.00 450.00
Cat Dasar Kg 0.1000 22,000.00 2,200.00 2,200.00Cat Penutup, 2x Kg 0.2600 16,000.00 4,160.00 4,160.00
Rol cat Bh 0.0100 18,000.00 180.00 180.00
Tenaga Kerja : -
Pekerja Oh 0.0280 33,000.00 924.00 924.00
Tukang Cat Oh 0.0630 43,000.00 2,709.00 2,709.00
Kepala Tukang Cat Oh 0.0063 43,000.00 270.90 270.90
Mandor Oh 0.0025 50,000.00 125.00 125.00
12,518.90
1,251.89
13,770.79
13,770.00
5
Bahan :
Plamir Kg 0.1000 15,000.00 1,500.00 1,500.00Ampelas Lbr 0.1500 3,000.00 450.00 450.00
Cat Dasar Kg 0.1000 22,000.00 2,200.00 2,200.00
Cat Penutup, 2x Kg 0.2800 16,000.00 4,480.00 4,480.00
Rol cat Bh 0.0100 18,000.00 180.00 180.00
Tenaga Kerja : -
Pekerja Oh 0.0300 33,000.00 990.00 990.00
Tukang Cat Oh 0.0750 43,000.00 3,225.00 3,225.00
Kepala Tukang Cat Oh 0.0075 43,000.00 322.50 322.50
Mandor Oh 0.0030 50,000.00 150.00 150.00
13,497.50
1,349.75
14,847.25
14,840.00
1 M2 PENGECATAN BIDANG TEMBOK BARU DENGAN VINILEX, 2X LAPIS CAT PENUTUP ( SNI. Edisi Rev
Jumlah
Keuntungan maksimal 10%
Jumlah
Dibulatkan
1 M2 PENGECATAN PLAFOND BARU , 2X LAPIS CAT PENUTUP ( SNI. Edisi Rev. 2002 )
Jumlah
Keuntungan maksimal 10%
Jumlah
Dibulatkan
-
7/21/2019 RAB MJ Sukaluyu Jadi
10/12
No. Sat. Harga Satuan
1 P e k e r j a Oh 33,000.00Rp
2 Tukang Batu Oh 40,000.00Rp
3 Kepala Tukang batu Oh 43,000.00Rp4 Tukang Kayu Oh 40,000.00Rp
5 Kepala Tukang Kayu Oh 47,000.00Rp
6 Tukang Besi profil / Tukang Las Oh 42,000.00Rp
7 Kepala Tukang Besi Profil / Tukang Las Oh 47,000.00Rp
8 Tukang Besi Beton Oh 42,000.00Rp
9 Kepala Tukang Besi Beton Oh 47,000.00Rp
10 Tukang Cat Oh 43,000.00Rp
11 Kepala Tukang Cat Oh 48,000.00Rp
12 Tukang Gali Oh 40,000.00Rp
13 Kepala Tukang Gali Oh 45,000.00Rp14 Tukang Pipa Oh 43,000.00Rp
15 Kepala Tukang Pipa Oh 48,000.00Rp
16 Ma n d o r Oh 50,000.00Rp
DAFTAR HARGA SATUAN UPAH
Jenis Bahan Bangunan
-
7/21/2019 RAB MJ Sukaluyu Jadi
11/12
No. Sat. Harga Satuan
A BAHAN AGREGAT KASAR & BAHAN PEREKAT
1 Tanah Urug m3 30,000.00
2 Pasir urug m3 65,000.00
3 Pasir pasang m3 90,000.00
4 Pasir beton m3 120,000.00
5 Batu belah pondasi m3 95,000.00
6 Batu pecah mesin 1/2 m3 125,000.00
7 Batu pecah mesin 2/3 m3 125,000.00
8 Semen Pc kg 1,050.00
9 Semen putih kg 5,000.00
B BAHAN PENUTUP DINDING
1 Bata merah bakar kelas I bh 350.00
2 Bata merah bakar kelas II bh 300.00
C BAHAN LOGAM
1 Besi baja beton U-24, polos kg 8,000.00
2 Kawat beton kg 15,000.00
3 Pakukaca kg 17,500.00
4 Paku1 s/d 3 cm kg 15,000.00
5 Paku 4 s/d 7 cm kg 15,000.00
6 Paku uk. 8 s/d 12 cm kg 15,000.00
7 Paku uk. 10" kg 15,000.00
D BAHAN PENUTUP LANTAI.
1 Keramik 40 x 40 Sek. Mulia m2
2 Keramik 30 x 30 Sek. Mulia m2 32,000.00
3 Keramik 20 x 20 Sek. Mulia m2 30,000.00
4 Keramik 20 x 25 Sek. Mulia m2 29,000.00
E BAHAN FINISHING.
1 Cat dasar tembok, Sealer Water Base kg 22,000.00
2 Cat dasar Kayu ltr 30,000.00
3 Cat tembok Vinilex kg 16,000.00
4 Cat tembok Sanlex kg 16,000.00
5 Cat kayu / besi kg 35,000.00
6 Cat kayu / besi kg 35,000.00
7 Meni kayu / besi kg 20,000.00
8 Dem pul tembok ( plamuur ) kg 15,000.00
DAFTAR HARGA SATUAN BAHAN
Jenis Bahan Bangunan
-
7/21/2019 RAB MJ Sukaluyu Jadi
12/12
9 Dempul kayu kg 27,500.00
10 Terpentin ( minyak cat ) ltr 5,000.00
11 Solignem ( 1 blek = 10 liter ) ltr 25,000.00
12 Kuas 3" bh 12,500.00
13 Rol cat bh 18,000.00
14 Kape tembok bh 15,000.00
15 Kape kayu bh 17,500.00
16 Ampelas lbr 3,000.00
17 Pe r n i s ltr 15,000.00
18 Minyak Bekisting ltr 4,500.00
F BAHAN / ALAT -ALAT SAN ITAIR.
1 Kloset jongkok porselen, putih bh 385,000.00
2 Bak mandi fibre glass, uk. Kecil bh 225,000.00
3 Bak mandi fibre glass, uk. Besar bh 335,000.00
4 Bak mandi Teraso bh 462,500.00