document.xlsx DAFTAR KUANTITAS DAN HARGA PEMBANGUNAN JALAN TOL CIAWI - SUKABUMI SEKSI - 1, CIAWI - CIGOMBONG/LIDO PAKET-3 : Pasir Jaya - Cigombong/Lido (STA. 10+300 - STA. 14+600) MATA CONTRACT (A) BUDGET(B) PEMBA- U R A I A N SATUAN Q'TY UPAH MATERIAL ALAT YARAN HARGA TOTAL BOBOT HARGA TOTAL BOBOT HARGA TOTAL BOBOT BAB 1 UMUM 1.19 Pemeliharaan dan Perlindungan Lalu Lintas lump sum 1 - - - 1.20 (1) Mobilisasi dan pekerjaan Persiapan lump sum 1 - - - 1.20 (2) Mobilisasi (yang tidak tercakup pada 1.20(1)) lump sum 1 - - - 1.26 Pekerjaan dan Penanganan Aliran Air yang Sudahlump sum 1 - - - TOTAL HARGA BAB 1 BAB 2 PEMBERSIHAN TEMPAT KERJA 2.01 Pembersihan Tempat Kerja m2 530,284 450 238,627,800 10.36% - - 0.00% 3,893 2,064,578,022 89.64% 2.02 (1) ## Penebangan & Pembuangan Pohon Dia 20 - 40 cm Pcs 100 20,412 2,041,200 46.07% - - 0.00% 23,896 2,389,565 53.93% 2.02 (2) ## Penebangan & Pembuangan Pohon Dia 40 - 50 cm Pcs 50 20,412 1,020,600 31.49% - - 0.00% 44,404 2,220,190 68.51% TOTAL HARGA BAB 2 BAB 3 PEMBONGKARAN 3.01 (1) Pembongkaran Pasangan Batu m3 7,800 68,390 533,442,000 100.00% - - 0.00% - - 0.00% 3.01 (2) Pembongkaran Kerb m' 200 7,851 1,570,154 100.00% - - 0.00% - - 0.00% 3.01 (3) Pembongkaran Perkerasan Jalan Aspal atau Beton m2 5,300 7,058 37,409,167 100.00% - - 0.00% - - 0.00% 3.01 (6) Pembongkaran Rambu Lalu Lintas buah 5 19,240 96,200 100.00% - - 0.00% - - 0.00% 3.01 (11) Pembongkaran Guardrail m' 100 9,278 927,818 100.00% - - 0.00% - - 0.00% TOTAL HARGA BAB 3 BAB 4 PEKERJAAN TANAH 4.03 (1) Galian Biasa untuk Timbunan m3 ### 415 690,262,522 2.04% - 0.00% 19,989 33,212,979,823 97.96% 4.03 (2) Galian untuk Dibuang m3 ### 572 ### 3.61% - 0.00% 15,298 29,382,372,473 96.39% sk.23 Galian Biasa untuk Timbunan dari luar paket m3 - 892 - 112,200 - 0.00% 27,585 - 4.09 Urugan Material Berbutir (Granular Backfill) m3 8,749 1,301 11,384,241 0.61% 181,800 ### 85.37% 29,857 261,220,505 14.02% 4.10 Urugan Rembesan (Permeable Backfill) m3 1,750 1,301 2,277,108 0.65% 187,709 328,489,875 93.15% 12,509 21,890,885 6.21% SK.12 (1) Geotextile Woven m2 100,000 3,402 340,200,000 28.94% 7,854 785,400,000 66.81% 500 50,000,000 4.25% 4.12 Pasangan Batu Kosong (Blinding Stone) m3 6,362 24,243 154,236,087 13.86% 149,531 951,313,041 85.46% 1,200 7,634,400 0.69% TOTAL HARGA BAB 4 BAB 5 GALIAN STRUKTUR 5.01 (1) Penggalian Struktur sampai kedalaman tidak leb m3 23,519 2,870 67,506,697 11.43% - 0.00% 22,247 523,236,525 88.57% 5.01 (2) Penggalian Struktur sampai kedalaman lebih dar m3 12,762 8,236 105,110,598 22.32% - 0.00% 28,656 365,711,506 77.68% 5.01 (3) Penggalian Struktur sampai kedalaman lebih da m3 8,777 31,238 274,176,503 28.76% - 0.00% 77,369 679,071,180 71.24% TOTAL HARGA BAB 5 BAB 6 DRAINASE 6.05 (1) Pipa Gorong-gorong Beton Tak Bertulang, dia. 4 m' 200 48,487 9,697,333 7.44% 558,641 111,728,261 85.75% 44,382 8,876,439 6.81% 6.05 (6) Pipa Gorong-gorong Beton Bertulang, dia. 60 cm m' 3,259 72,730 237,027,070 6.49% 1,007,744 ### 89.89% 40,669 132,540,520 3.63% 6.05 (7) Pipa Gorong-gorong Beton Bertulang, dia. 60 cm m' 214 48,487 10,376,147 3.04% 1,510,661 323,281,466 94.80% 34,361 7,353,149 2.16% 6.05 (8) Pipa Gorong-gorong Beton Bertulang, dia. 80 cm m' 80 98,770 7,901,600 4.32% 2,152,086 172,166,880 94.13% 35,458 2,836,659 1.55% 6.05 (9) Pipa Gorong-gorong Beton Bertulang, dia. 80 cm m' 87 48,487 4,218,340 0.97% 4,918,756 427,931,767 98.77% 12,588 1,095,196 0.25% 6.05 (10) Pipa Gorong-gorong Beton Bertulang, dia. 100 c m' 100 117,600 11,760,000 5.56% 1,940,633 194,063,256 91.83% 54,988 5,498,815 2.60% 6.05 (11) Pipa Gorong-gorong Beton Bertulang, dia. 100 c m' 88 117,600 10,348,800 1.75% 6,570,928 578,241,705 97.79% 31,099 2,736,743 0.46% 6.05 (21) Pipa Gorong-gorong Beton Bertulang, 2 dia. 100 m' 44 161,000 7,084,000 1.46% 10,806,477 475,485,008 97.68% 95,220 4,189,666 0.86% 6.05 (22) Pipa Gorong-gorong Beton Bertulang, 2 dia. 120 m' 67 161,000 10,787,000 1.13% 13,983,102 936,867,850 98.21% 93,135 6,240,068 0.65% 6.05 (23) Pipa Gorong-gorong Beton Bertulang, 2 dia. 150 m' 54 161,000 8,694,000 0.84% 18,945,611 ### 98.89% 52,406 2,829,936 0.27% 6.06 (5) Saluran Beton Bertulang Tertutup, DS - 3 A m' 106 27,320 2,895,920 3.18% 831,990 88,190,955 96.69% 1,150 121,900 0.13% 6.06 (12) Inlet Drain, Tipe DI-1 (dia 40 - 80 cm) buah 1 273,117 273,117 1.47% 18,318,288 18,318,288 98.51% 3,250 3,250 0.02% 6.06 (13) Inlet Drain, Tipe DI-2 (dia 100 - 150 cm) buah - 273,117 - 14,018,830 - 3,250 - 6.06 (14) Inlet Drain, Tipe DI-3 (dia 2x100 - 2x150 cm) buah 1 273,117 273,117 0.90% 29,906,777 29,906,777 99.08% 3,250 3,250 0.01% 6.06 (15) Outlet Drain, Tipe DO-1 (dia 40 - 80 cm) buah 13 273,117 3,550,517 1.47% 18,318,288 238,137,739 98.51% 3,250 42,250 0.02% 6.06 (16) Outlet Drain, Tipe DO-2 (dia 100 - 150 cm) buah - 273,117 - 14,018,830 - 3,250 - 6.06 (17) Outlet Drain, Tipe DO-3 (dia 2x100 - 2x150 cm) buah 1 273,117 273,117 0.90% 29,906,777 29,906,777 99.08% 3,250 3,250 0.01% 6.06 (18) Drainage Catch Basin (DCB) buah 648 34,150 22,129,200 1.45% 2,322,708 ### 98.50% 1,150 745,200 0.05% 6.06 (6) Selokan Pasangan Batu, Tipe Ds-4 m' 2,430 184,500 448,335,000 30.72% 412,891 ### 68.74% 3,250 7,897,500 0.54% 6.06 (8) Selokan Pasangan Batu, Tipe Ds-5 m' 10,681 184,500 ### 28.45% 460,758 ### 71.05% 3,250 34,713,250 0.50% 6.06 (9) Selokan Pasangan Batu, Tipe Ds-7 m' 128 184,500 23,616,000 8.30% 2,034,244 260,383,188 91.55% 3,250 416,000 0.15% 6.06 (10) Saluran Tipe DS-8 m' 25,312 29,092 736,376,704 12.11% 190,631 ### 79.33% 20,591 521,188,166 8.57% 6.06 (11) ## Selokan Pasangan Batu, Tipe Ds-10 m' 140 244,183 34,185,667 43.45% 314,530 44,034,131 55.97% 3,250 455,000 0.58% 6.08 (2) Anyaman Filter Plastik (Geotextile) m2 29,412 3,402 100,059,624 28.94% 7,854 231,001,848 66.81% 500 14,706,000 4.25% 6.08 (3) Pipa Berlubang Banyak (Perforated Pipe) untuk m' 8,170 51,567 421,299,667 20.59% 198,356 ### 79.19% 550 4,493,500 0.22% 6.08 (1) Bahan / aggregat Porous (Sub drain) m3 4,412 28,233 124,565,467 8.75% 205,535 906,820,420 63.66% 89,076 393,003,312 27.59% TOTAL HARGA BAB 6 BAB 7 SUB GRADE 7.01 Persiapan Tanah Dasar m2 214,534 521 111,710,919 10.24% - - 0.00% 4,566 979,505,945 89.76% TOTAL HARGA BAB 7

Upload: gun-ardi

Post on 06-Nov-2015

50 views

Category:

Documents


0 download

DESCRIPTION

lido

TRANSCRIPT

DKH Paket-3DAFTAR KUANTITAS DAN HARGAPEMBANGUNAN JALAN TOL CIAWI - SUKABUMISEKSI - 1, CIAWI - CIGOMBONG/LIDOPAKET-3 : Pasir Jaya - Cigombong/Lido (STA. 10+300 - STA. 14+600)MATACONTRACT (A)BUDGET(B)PEMBA-U R A I A NSATUANQ'TYUPAHMATERIALALATUPAMOUNTYARANHARGATOTALBOBOTHARGATOTALBOBOTHARGATOTALBOBOT

BAB 1UMUM

1.19Pemeliharaan dan Perlindungan Lalu Lintas lump sum10.00.00.04,706,563,8004,706,563,8001.20 (1)Mobilisasi dan pekerjaan Persiapanlump sum10.00.00.03,239,055,0003,239,055,0001.20 (2)Mobilisasi (yang tidak tercakup pada 1.20(1))lump sum10.00.00.0357,655,592357,655,5921.26Pekerjaan dan Penanganan Aliran Air yang Sudah Adalump sum10.00.00.0272,000,000272,000,000

TOTAL HARGA BAB 18,575,274,392

BAB 2PEMBERSIHAN TEMPAT KERJA

2.01Pembersihan Tempat Kerjam2530,284450238,627,80010.36%0.00.00.00%3,8932,064,578,02289.64%4,3432,303,205,8222.02 (1)0.0Penebangan & Pembuangan Pohon Dia 20 - 40 cmPcs10020,4122,041,20046.07%0.00.00.00%23,8962,389,56553.93%44,3084,430,7652.02 (2)0.0Penebangan & Pembuangan Pohon Dia 40 - 50 cmPcs5020,4121,020,60031.49%0.00.00.00%44,4042,220,19068.51%64,8163,240,790

TOTAL HARGA BAB 22,310,877,377

BAB 3PEMBONGKARAN

3.01 (1)Pembongkaran Pasangan Batu m37,80068,390533,442,000100.00%0.00.00.00%0.00.00.00%68,390533,442,0003.01 (2)Pembongkaran Kerbm'2007,8511,570,154100.00%0.00.00.00%0.00.00.00%7,8511,570,1543.01 (3)Pembongkaran Perkerasan Jalan Aspal atau Betonm25,3007,05837,409,167100.00%0.00.00.00%0.00.00.00%7,05837,409,1673.01 (6)Pembongkaran Rambu Lalu Lintasbuah519,24096,200100.00%0.00.00.00%0.00.00.00%19,24096,2003.01 (11)Pembongkaran Guardrailm'1009,278927,818100.00%0.00.00.00%0.00.00.00%9,278927,818

TOTAL HARGA BAB 3573,445,339

BAB 4PEKERJAAN TANAH

4.03 (1) Galian Biasa untuk Timbunanm31,661,581415690,262,5222.04%0.00.00%19,98933,212,979,82397.96%20,40433,903,242,3444.03 (2)Galian untuk Dibuangm31,920,6835721,099,328,8983.61%0.00.00%15,29829,382,372,47396.39%15,87030,481,701,371sk.23Galian Biasa untuk Timbunan dari luar paketm30.08920.0112,2000.00.00%27,5850.0140,6760.04.09Urugan Material Berbutir (Granular Backfill)m38,7491,30111,384,2410.61%181,8001,590,568,20085.37%29,857261,220,50514.02%212,9581,863,172,9464.10Urugan Rembesan (Permeable Backfill)m31,7501,3012,277,1080.65%187,709328,489,87593.15%12,50921,890,8856.21%201,519352,657,869SK.12 (1)Geotextile Wovenm2100,0003,402340,200,00028.94%7,854785,400,00066.81%50050,000,0004.25%11,7561,175,600,0004.12Pasangan Batu Kosong (Blinding Stone)m36,36224,243154,236,08713.86%149,531951,313,04185.46%1,2007,634,4000.69%174,9741,113,183,528

TOTAL HARGA BAB 468,889,558,058

BAB 5GALIAN STRUKTUR

5.01 (1)Penggalian Struktur sampai kedalaman tidak lebih dari 2 mm323,5192,87067,506,69711.43%0.00.00%22,247523,236,52588.57%25,118590,743,2225.01 (2)Penggalian Struktur sampai kedalaman lebih dari 2 m, tapi tidak lebih dari 4 mm312,7628,236105,110,59822.32%0.00.00%28,656365,711,50677.68%36,893470,822,1035.01 (3)Penggalian Struktur sampai kedalaman lebih dari 4 mm38,77731,238274,176,50328.76%0.00.00%77,369679,071,18071.24%108,607953,247,683

TOTAL HARGA BAB 52,014,813,009

BAB 6DRAINASE

6.05 (1)Pipa Gorong-gorong Beton Tak Bertulang, dia. 40 cmm'20048,4879,697,3337.44%558,641111,728,26185.75%44,3828,876,4396.81%651,510130,302,0336.05 (6)Pipa Gorong-gorong Beton Bertulang, dia. 60 cm, Tipe Am'3,25972,730237,027,0706.49%1,007,7443,284,236,73789.89%40,669132,540,5203.63%1,121,1433,653,804,3276.05 (7)Pipa Gorong-gorong Beton Bertulang, dia. 60 cm, Tipe Bm'21448,48710,376,1473.04%1,510,661323,281,46694.80%34,3617,353,1492.16%1,593,508341,010,7616.05 (8)Pipa Gorong-gorong Beton Bertulang, dia. 80 cm, Tipe Am'8098,7707,901,6004.32%2,152,086172,166,88094.13%35,4582,836,6591.55%2,286,314182,905,1396.05 (9)Pipa Gorong-gorong Beton Bertulang, dia. 80 cm, Tipe Bm'8748,4874,218,3400.97%4,918,756427,931,76798.77%12,5881,095,1960.25%4,979,831433,245,3036.05 (10)Pipa Gorong-gorong Beton Bertulang, dia. 100 cm, Tipe Am'100117,60011,760,0005.56%1,940,633194,063,25691.83%54,9885,498,8152.60%2,113,221211,322,0716.05 (11)Pipa Gorong-gorong Beton Bertulang, dia. 100 cm, Tipe Bm'88117,60010,348,8001.75%6,570,928578,241,70597.79%31,0992,736,7430.46%6,719,628591,327,2496.05 (21)Pipa Gorong-gorong Beton Bertulang, 2 dia. 100 cm, Tipe Dm'44161,0007,084,0001.46%10,806,477475,485,00897.68%95,2204,189,6660.86%11,062,697486,758,6746.05 (22)Pipa Gorong-gorong Beton Bertulang, 2 dia. 120 cm, Tipe Dm'67161,00010,787,0001.13%13,983,102936,867,85098.21%93,1356,240,0680.65%14,237,238953,894,9186.05 (23)Pipa Gorong-gorong Beton Bertulang, 2 dia. 150 cm, Tipe Dm'54161,0008,694,0000.84%18,945,6111,023,062,97298.89%52,4062,829,9360.27%19,159,0171,034,586,9086.06 (5)Saluran Beton Bertulang Tertutup, DS - 3 Am'10627,3202,895,9203.18%831,99088,190,95596.69%1,150121,9000.13%860,46091,208,7756.06 (12)Inlet Drain, Tipe DI-1 (dia 40 - 80 cm)buah1273,117273,1171.47%18,318,28818,318,28898.51%3,2503,2500.02%18,594,65418,594,6546.06 (13)Inlet Drain, Tipe DI-2 (dia 100 - 150 cm)buah0.0273,1170.014,018,8300.03,2500.014,295,1970.06.06 (14)Inlet Drain, Tipe DI-3 (dia 2x100 - 2x150 cm)buah1273,117273,1170.90%29,906,77729,906,77799.08%3,2503,2500.01%30,183,14330,183,1436.06 (15)Outlet Drain, Tipe DO-1 (dia 40 - 80 cm)buah13273,1173,550,5171.47%18,318,288238,137,73998.51%3,25042,2500.02%18,594,654241,730,5066.06 (16)Outlet Drain, Tipe DO-2 (dia 100 - 150 cm)buah0.0273,1170.014,018,8300.03,2500.014,295,1970.06.06 (17)Outlet Drain, Tipe DO-3 (dia 2x100 - 2x150 cm)buah1273,117273,1170.90%29,906,77729,906,77799.08%3,2503,2500.01%30,183,14330,183,1436.06 (18)Drainage Catch Basin (DCB)buah64834,15022,129,2001.45%2,322,7081,505,114,50298.50%1,150745,2000.05%2,358,0081,527,988,9026.06 (6)Selokan Pasangan Batu, Tipe Ds-4m'2,430184,500448,335,00030.72%412,8911,003,325,48968.74%3,2507,897,5000.54%600,6411,459,557,9896.06 (8)Selokan Pasangan Batu, Tipe Ds-5m'10,681184,5001,970,644,50028.45%460,7584,921,355,57871.05%3,25034,713,2500.50%648,5086,926,713,3286.06 (9)Selokan Pasangan Batu, Tipe Ds-7m'128184,50023,616,0008.30%2,034,244260,383,18891.55%3,250416,0000.15%2,221,994284,415,1886.06 (10)Saluran Tipe DS-8m'25,31229,092736,376,70412.11%190,6314,825,262,91979.33%20,591521,188,1668.57%240,3146,082,827,7886.06 (11)0.0Selokan Pasangan Batu, Tipe Ds-10m'140244,18334,185,66743.45%314,53044,034,13155.97%3,250455,0000.58%561,96378,674,7986.08 (2)Anyaman Filter Plastik (Geotextile)m229,4123,402100,059,62428.94%7,854231,001,84866.81%50014,706,0004.25%11,756345,767,4726.08 (3)Pipa Berlubang Banyak (Perforated Pipe) untuk Pekerjaan Drainase Bawah Permukaan 6 Inchm'8,17051,567421,299,66720.59%198,3561,620,565,26879.19%5504,493,5000.22%250,4722,046,358,4356.08 (1)Bahan / aggregat Porous (Sub drain)m34,41228,233124,565,4678.75%205,535906,820,42063.66%89,076393,003,31227.59%322,8441,424,389,199

TOTAL HARGA BAB 628,607,750,704

BAB 7SUB GRADE

7.01Persiapan Tanah Dasarm2214,534521111,710,91910.24%0.00.00.00%4,566979,505,94589.76%5,0861,091,216,864

TOTAL HARGA BAB 71,091,216,864

BAB 8LAPIS PONDASI AGREGAT (SUBBASE)

8.01 (1)Lapis Pondasi Agregat Kelas Am335,9253,262117,195,3331.21%236,2328,486,634,60087.32%31,0411,115,146,18611.47%270,5359,718,976,1208.01 (2)Lapis Pondasi Agregat Kelas Bm335,4123,262115,521,8131.19%236,2328,365,447,58486.37%34,0131,204,468,53112.44%273,5079,685,437,928

TOTAL HARGA BAB 819,404,414,048

BAB 9PERKERJAAN PERKERASAN

9.04Bitumen Lapis Resap Pengikat (Prime Coat)kg39,3234396,8572,0209,3159.05Bitumen Lapis Pengikat (Tack Coat)kg89,2954396,8572,0209,3159.07 (1)Asphalt Treated Base Course/AC-Baseton6,8681,206419,53780,046500,7899.07 (3)Asphalt Concrete Wearing Courseton22,7821,105445,53171,577518,2139.07 (4)Semen Aspal ton1,9251,322,5589,257,9032,645,11513,225,5759.08 (1)Perkerasan Beton (t = 28 cm)m2211,3327,326272,19543,092322,6129.08 (2)Perkerasan Beton (t = 28 cm), Double Wire Meshm20.08,194329,83748,024386,0559.08 (3)Perkerasan Beton (t = 28 cm), Single Wire Meshm20.08,194378,06148,024434,2799.08 (4)0.0Perkerasan Beton (t = 33 cm)m25,2447,326321,44948,024376,7999.08 (5)0.0Perkerasan Beton (t = 33 cm), Double Wire Meshm29,0008,194396,25148,024452,4699.08 (6)0.0Perkerasan Beton (t = 33 cm), Single Wire Meshm21,9808,194444,47448,024500,6929.09 (1)Lean Concrete (t = 10 cm)m2233,2458,19481,1577,00396,353

TOTAL HARGA BAB 90.0

BAB 10STRUKTUR BETON

10.01 (4)Beton Kelas B - 1.1 (Slab, diapragma, umum)m37,45533,343248,574,8493.00%958,5657,146,101,74486.38%117,758877,882,72410.61%1,109,6668,272,559,31710.01 (5)Beton Kelas B - 1.2 (Pier Head)m35,15033,343171,718,3732.96%973,7735,014,930,69886.57%117,758606,451,51310.47%1,124,8745,793,100,58510.01 (6)Beton Kelas B - 1.3 (Columms solid < 12 m )m33,91842,028164,666,1453.48%1,034,6054,053,582,12985.69%130,705512,103,62610.83%1,207,3384,730,351,89910.01 (7)Beton Kelas B - 1.4 (Columms solid 12 m )m344044,45819,561,4463.55%1,049,813461,917,68983.93%156,60168,904,41712.52%1,250,872550,383,55210.01 (8)Beton Kelas B - 1.5 (Columms Hollo )m30.058,8390.01,049,8130.0182,4970.01,291,1490.010.01 (9)Beton Kelas C - 1 (abt, pile cap, Box)m321,88329,639648,580,4822.64%986,88221,595,948,28988.01%104,8102,293,552,5069.35%1,121,33124,538,081,27710.01 (10)Beton Kelas C - 2 (umum)m398029,63929,045,7832.84%910,842892,625,60687.14%104,810102,713,58810.03%1,045,2911,024,384,97810.01 (11)Beton Kelas Dm312529,6393,704,8192.90%888,875111,109,36986.86%104,81013,101,22310.24%1,023,323127,915,41210.01 (12)Beton Kelas Em33,18114,81947,140,1201.69%831,6652,645,526,25994.67%31,982101,736,2533.64%878,4672,794,402,63210.02 (2)Batang Baja Tulangan Ulirkg7,384,1781,48410,958,120,15215.95%7,79457,551,712,36583.78%25184,604,4500.27%9,30368,694,436,96710.03(1)P.C.I Girder, bentang 15.0 mbuah2424,38051,163,2001,260,82352,448,40210.03(2)P.C.I Girder, bentang 20 mbuah5526,62073,740,9001,800,74775,568,26710.03 (3)P.C.I Girder, bentang 25 mbuah3126,620109,109,4002,731,651111,867,67110.03 (4)P.C.I Girder, bentang 30.0 mbuah226,620164,923,8004,159,036169,109,45710.03 (5)P.C.I Girder, bentang 35.0 mbuah5426,620191,280,6004,841,699196,148,91910.03 (6)P.C.IGirder, bentang 40,0 m buah13726,620226,746,0005,710,542232,483,16310.03 (9)Plat Precetak (Concrete Plate)m219,16914,819284,070,7234.58%289,6315,551,944,25589.42%19,443372,708,0446.00%323,8946,208,723,02110.05 (1)Penyediaan Tiang Pancang Beton Bulat Pretensioned, dia 50 cmm'27,9660.0402,5720.0402,57210.05 (2)Pemancangan Tiang Pancang Beton Bulat Pretensioned, dia 50 cmm'27,15221,8070.0204,185225,99310.05 (3)Penyediaan & Pemancangan Tiang Pancang Beton Bulat Pretensioned, Pile Test, dia 50 cmm'1,39219,667962,117206,4611,188,24510.07 (1)Tiang bor beton cast-in-place, dia. 50 cmm766159,0071,003,37686,7141,249,09710.07 (5)Tiang bor beton cast-in-place, dia. 120 cmm0.0378,5882,388,991206,4612,974,04110.08 Pengeboran Percobaanm0.06,51539,27041,93787,72210.07 (12)PDA Testbuah301,750,00012,250,0003,500,00017,500,00010.09 (1)Sambungan Ekspansi (Expansion Joint)m'0.071,6330.03,345,6000.083,8950.03,501,1280.010.09 (1)0.0Expansion joint Asphaltic plug celah 5 cm (move)m'45036,91316,611,00021.58%50,23522,605,75029.37%83,89537,752,75049.05%171,04376,969,50010.09 (2)0.0Expansion joint Asphaltic plug celah 2 cm (fix)m'33671,63324,068,80040.79%20,0946,751,58411.44%83,89528,188,72047.77%175,62259,009,10410.10 (2)Perletakan Elastomer 350 x 280 x 51buah2200.00.00%486,923107,122,950100.00%0.00.00%486,923107,122,95010.10 (3)Perletakan Elastomer 480 x 300 x 51buah40.00.00%705,8402,823,360100.00%0.00.00%705,8402,823,36010.10 (4)Perletakan Elastomer 480 x 380 x 68buah3820.00.00%1,098,540419,642,280100.00%0.00.00%1,098,540419,642,28010.11Turap (sheet pile) Beton lengkap sampai pemancanganm'26361,64716,213,0527.74%734,400193,147,20092.26%0.00.00%796,047209,360,25210.12 (1)Deck Drain beserta asessorisnya, Tipe 1buah4810.00.00%624,750300,504,750100.00%0.00.00%624,750300,504,75010.12 (3)Pipa Drainase, dia. 15 cm, dengan perlengkapan sambungan dan penyanggam'2,58120,41252,683,3728.57%217,641561,730,68591.43%0.00.00%238,053614,414,05710.12 (4)Pipa Drainase, dia. 20 cm, dengan perlengkapan sambungan dan penyanggam'2,58025,51565,828,7007.54%312,863807,187,53392.46%0.00.00%338,378873,016,233

TOTAL HARGA BAB 10125,397,202,126

BAB 11PEKERJAAN BAJA STRUKTURAL

TOTAL HARGA BAB 11

BAB 12PEKERJAAN LAIN-LAIN

12.01 (1)Solid Soddingm2137,6003,402468,115,20033.31%5,610771,936,00054.94%1,200165,120,00011.75%10,2121,405,171,20012.01 (2)Strip sodingm2206,4003,402702,172,80035.06%5,1001,052,640,00052.57%1,200247,680,00012.37%9,7022,002,492,80012.01 (3)Pohon ( Lansekap lingkungan jalan )Kelompok0.00.00.00%0.00.00%0.00.00%0.00.012.02 (1)Pasangan Batu Kali 1 : 3m3600234,100140,460,00034.08%449,600269,759,97765.45%3,2501,950,0000.47%686,950412,169,97712.05 (1)Guardrail, tipe Am'11,1809,952111,259,6333.45%276,0393,086,110,43095.66%2,56928,723,7700.89%288,5593,226,093,83312.05 (2)End Section Guardrailbuah553,981218,9371.07%367,20020,196,00098.57%1,32873,0230.36%372,50820,487,95912.05 (6)Chainlink fencem'9903,9813,940,8601.97%197,208195,235,62397.36%1,3581,344,3860.67%202,546200,520,86912.05 (7)Railing fencem'8423,9813,351,7210.60%656,208552,526,88399.20%1,3281,117,9100.20%661,516556,996,51512.06 (1)Rambu Pengaturan dan Peringatan, Tipe A-1buahERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!0.0ERROR:#REF!12.06 (2)Rambu Pengaturan dan Peringatan, Tipe A-2buahERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!0.0ERROR:#REF!12.06 (3)Rambu Pengaturan dan Peringatan, Tipe B-1buahERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!0.0ERROR:#REF!12.06 (4)Rambu Pengaturan dan Peringatan, Tipe B-2buahERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!0.0ERROR:#REF!12.06 (5)Rambu Pengaturan dan Peringatan, Tipe CbuahERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!0.0ERROR:#REF!12.07 (1)Rambu Petunjuk, Peringatan dan Larangan Tipe A - 1buahERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!0.0ERROR:#REF!12.07 (2)Rambu Petunjuk, Peringatan dan Larangan Tipe A - 2buahERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!0.0ERROR:#REF!12.07 (3)Rambu Petunjuk, Peringatan dan Larangan Tipe A - 3buahERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!0.0ERROR:#REF!12.07 (4)Rambu Petunjuk, Peringatan dan Larangan Tipe A - 4buahERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!0.0ERROR:#REF!12.08 (1)Marka Jalan Tipe 1m2ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!0.0ERROR:#REF!12.08 (2)Marka Jalan Tipe 2m2ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!0.0ERROR:#REF!12.08 (3)Rumble Strips m2ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!0.0ERROR:#REF!12.09 (1)Guide Post, Tipe A (bahu)buahERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!0.0ERROR:#REF!12.09 (2)Guide Post, Tipe B (barrier, guardrail)buahERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!0.0ERROR:#REF!12.09 (3)Patok Damijabuah3440.0ERROR:#DIV/0!0.0ERROR:#DIV/0!0.0ERROR:#DIV/0!0.00.012.09 (5)Kilometer Postbuah230.0ERROR:#DIV/0!0.0ERROR:#DIV/0!0.0ERROR:#DIV/0!0.00.012.08 (1)0.0Marka Jalanm28,43512,675106,913,6255.38%198,9771,678,366,77884.45%23,953202,039,33810.17%235,6041,987,319,74012.08 (3)0.0Rumble Strips m230012,6753,802,5001.96%621,032186,309,69496.25%11,5103,453,0001.78%645,217193,565,1949112.09 (3)Patok Damijabuah34423,8848,216,0961.15%2,040,000701,760,00098.57%5,6481,942,8400.27%2,069,532711,918,93612.09 (5)Kilometer Postbuah0.00.00.00.00%0.00.00.00%0.00.00.00%0.00.012.10 (1)Concrete Barrier, tipe-Am'5,85739,807233,147,6473.27%1,168,8186,845,767,02696.11%7,44443,602,2680.61%1,216,0697,122,516,94112.10 (2)Concrete Barrier, tipe-Bm'0.00.00.00.00%0.00.00.00%0.00.00.00%0.00.012.11 (1)Kerb Beton, Tipe-Am'1,32539,80752,743,83316.53%192,179254,636,72979.82%8,77711,629,3143.65%240,762319,009,87712.11 (2)Kerb Beton, Tipe-Bm'26539,80710,548,76718.13%170,98145,310,03277.87%8,7772,325,8634.00%219,56558,184,66212.12 (1)Pagar ROW, Tipe 1 (Panel Beton)m'3,22550,600163,185,00010.00%354,2001,142,295,00070.00%101,200326,370,00020.00%506,0001,631,850,00012.12 (2)Pagar ROW, Tipe 2 (Kawat Berduri)m'10,7508,25088,687,50010.00%57,750620,812,50070.00%16,500177,375,00020.00%82,500886,875,00012.12 (3)Pagar ROW, Tipe 3 (BRC)m'5,91329,855176,532,6159.18%287,5901,700,518,19288.40%7,88946,645,2592.42%325,3331,923,696,06512.13 (1)Blok Beton Perlindungan Lereng / Taludm2875161,000140,875,0003.65%4,155,1033,635,715,12294.24%93,13581,493,4242.11%4,409,2383,858,083,545

TOTAL HARGA BAB 12

BAB 13PENCAHAYAAN LAMPU LALU LINTAS DAN PEKERJAAN LISTRIK

13.01(2)Lampu Penerangan Jalan, Tinggi 13 m (1 x HPS 250 watt) Lengan TunggalbuahERROR:#REF!13.01(3)Lampu Penerangan Jalan, Tinggi 13 m (2 x HPS 250 watt), Lengan GandabuahERROR:#REF!13.01(3) aLampu Sorot, Tinggi 14 m, HPS-T 3x250 wattbuahERROR:#REF!13.01(4) a Lampu Sorot, Tinggi 14 m, HPS-T 3x400 wattbuahERROR:#REF!13.01(7)Lampu Pengendali Lalu LintasbuahERROR:#REF!13.01(5)Lampu Hight Mast, Tinggi 30 m (3 x HPS-T 1000 watt)buahERROR:#REF!13.01(5)aLampu Hight Mast, Tinggi 35 m (4 x HPS-T 1000 watt) buahERROR:#REF!13.01(8)Flashing LightbuahERROR:#REF!13.01(16)Kabel NYFGBY 4C - 10 mm2m'ERROR:#REF!13.01(17)Kabel NYFGBY 4C - 16 mm2m'ERROR:#REF!13.01(18)Kabel NYFGBY 4C - 25 mm2m'ERROR:#REF!13.01(19)Kabel NYFGBY 4C - 35 mm2m'ERROR:#REF!13.01(24)Panel PJUbuahERROR:#REF!13.01(29)Grounding PanelbuahERROR:#REF!13.01(25)aGrounding Tiang Lampu PJUbuahERROR:#REF!Komponen Pelengkap Instalasi ME hingga Peralatan beroperasilsERROR:#REF!

TOTAL HARGA BAB 13

BAB 14PLAZA TOL

14.01 (1)Pulau Tol Tipe A (standart)set148,000,000112,000,00010.00%56,000,000784,000,00070.00%16,000,000224,000,00020.00%80,000,0001,120,000,00014.01 (2)Pulau Tol Tipe B (reverse)set28,000,00016,000,00010.00%56,000,000112,000,00070.00%16,000,00032,000,00020.00%80,000,000160,000,00014.01 (3)Atap Gerbang Tol untuk Gerbang 3 Lajur lengkap pemipaan & listrikset0.00.00.00.0ERROR:#REF!14.01 (4)Atap Gerbang Tol untuk Gerbang 4 Lajur lengkap pemipaan & listrikset0.00.00.00.0ERROR:#REF!14.01 (5)Atap Gerbang Tol untuk Gerbang 8 Lajur lengkap pemipaan & listriksetERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!14.01 (6)Atap Gerbang Tol untuk Gerbang 10 Lajur lengkap pemipaan & listriksetERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!14.01 (7)Atap Gerbang Tol untuk Gerbang 12 Lajur lengkap pemipaan & listriksetERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!14.01 (8)Gardu Tol (pengumpul tiket)setERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!

TOTAL HARGA BAB 140.50%1,280,000,000

BAB 15PENGALIHAN DAN PERLINDUNGAN UTILITAS YANG ADA

15.1Provisional Sum untuk Pengalihan dan Perlindungan Utilitas Yang Adasum0.0

TOTAL HARGA BAB 150.0

BAB 16PEKERJAAN FASILITAS TOL DAN KANTOR GERBANG TOL

16.01 Kantor Gerbang Tol Ciawi, Termasuk Prasarana Jalan Lingkungan, Parkir & Pelengkap lainnya lsERROR:#REF!16.02Kantor Gerbang Tol Ciherang Pondok, Termasuk Prasarana Jalan Lingkungan, Parkir & Pelengkap lainnya lsERROR:#REF!16.03Kantor Gerbang Tol Caringin, Termasuk Prasarana Jalan Lingkungan, Parkir & Pelengkap lainnya lsERROR:#REF!16.04Kantor Gerbang Tol Cigombong 1, Termasuk Prasarana Jalan Lingkungan, Parkir & Pelengkap lainnya lsERROR:#REF!16.05Kantor Gerbang Tol Cigombong 2, Termasuk Prasarana Jalan Lingkungan, Parkir & Pelengkap lainnya lsERROR:#REF!

TOTAL HARGA BAB 16

JUMLAH HARGA BAB 1 S/D BAB 16 ( A )258,144,551,917PPN 10% = 10% X A ( B )25,814,455,192JUMLAH TOTAL HARGA ( C ) = ( A) + ( B )283,959,007,109

DRANASEDAFTAR KUANTITAS DAN HARGAPEMBANGUNAN JALAN TOL CIAWI - SUKABUMISEKSI - 1, CIAWI - CIGOMBONG/LIDOPAKET-3 : Pasir Jaya - Cigombong/Lido (STA. 10+300 - STA. 14+600)

N0DRAINASESATUANVOLUMEHARGA SATUANTOTALJUMLAHUPAHMATERIALALAT

6.05 (1)Pipa Gorong-gorong Beton Tak Bertulang, dia. 40 cmm'2006.05 (6)Pipa Gorong-gorong Beton Bertulang, dia. 60 cm, Tipe Am'3,2596.05 (7)Pipa Gorong-gorong Beton Bertulang, dia. 60 cm, Tipe Bm'2146.05 (8)Pipa Gorong-gorong Beton Bertulang, dia. 80 cm, Tipe Am'806.05 (9)Pipa Gorong-gorong Beton Bertulang, dia. 80 cm, Tipe Bm'876.05 (10)Pipa Gorong-gorong Beton Bertulang, dia. 100 cm, Tipe Am'1006.05 (11)Pipa Gorong-gorong Beton Bertulang, dia. 100 cm, Tipe Bm'886.05 (21)Pipa Gorong-gorong Beton Bertulang, 2 dia. 100 cm, Tipe Dm'446.05 (22)Pipa Gorong-gorong Beton Bertulang, 2 dia. 120 cm, Tipe Dm'676.05 (23)Pipa Gorong-gorong Beton Bertulang, 2 dia. 150 cm, Tipe Dm'546.06 (5)Saluran Beton Bertulang Tertutup, DS - 3 Am'1066.06 (12)Inlet Drain, Tipe DI-1 (dia 40 - 80 cm)buah16.06 (13)Inlet Drain, Tipe DI-2 (dia 100 - 150 cm)buah0.06.06 (14)Inlet Drain, Tipe DI-3 (dia 2x100 - 2x150 cm)buah16.06 (15)Outlet Drain, Tipe DO-1 (dia 40 - 80 cm)buah136.06 (16)Outlet Drain, Tipe DO-2 (dia 100 - 150 cm)buah0.06.06 (17)Outlet Drain, Tipe DO-3 (dia 2x100 - 2x150 cm)buah16.06 (18)Drainage Catch Basin (DCB)buah6486.06 (6)Selokan Pasangan Batu, Tipe Ds-4m'2,4306.06 (8)Selokan Pasangan Batu, Tipe Ds-5m'10,6816.06 (9)Selokan Pasangan Batu, Tipe Ds-7m'1286.06 (10)Saluran Tipe DS-8m'25,3126.06 (11)0.0Selokan Pasangan Batu, Tipe Ds-10m'1406.08 (2)Anyaman Filter Plastik (Geotextile)m229,4126.08 (3)Pipa Berlubang Banyak (Perforated Pipe) untuk Pekerjaan Drainase Bawah Permukaan 6 Inchm'8,1706.08 (1)Bahan / aggregat Porous (Sub drain)m34,412

TOTAL HARGA BAB 6

supplaerBESI BETONNOSPECUNITMERKRATA 2XGGDELKOPRIMAMASTER STEELDELKOPRIMAGN RAJAWALISEKASABINTANG BAJA UTAMASEKASAWIRAWANRONNY BUDI HARTONODENI SANTOSO08526193937308158844384081613788820857273750691BESI POLOSKG6,769.916,650.006,925.006,350.006,673.732BESI ULIRKG6,769.916,600.006,950.006,300.006,654.98GORONG - GORONGNOSPECUNITMERKRATA 2XDURACONPRICONDUSASPUNDURACONPRICONDAVID LYUSTINEAMAN KUSUMA081596901160813190070680819341572721DIA 400M'276,000.00219,200.00247,600.002DIA 600M'606,600.00678,400.00416,000.00567,000.003DIA 800M'811,000.001,064,800.00610,000.00828,600.004DIA 1000M'1,157,480.001,657,600.00852,000.001,222,360.005DIA 1200M'1,555,080.002,367,600.001,159,600.001,694,093.33DIA 1500M'2,413,240.003,469,600.001,662,800.002,515,213.33BUIS BETON D 400250,000.00250,000.00PAGAR PANELNOSPECUNITMERKRATA 2XBAHANA MAKMUR JAYADURACONPRICONDUSASPUNDURACONPRICONPUTRA WICAKSONODAVID LYUSTINEAMAN KUSUMA02514750899081596901160813190070680819341572721PANEL BETON 5X40X240M'125,000.00173,700.00200,000.00135,000.00158,425.002KOLOM 17.5 X 17.5 X 320M'320,000.00398,700.00374,000.00155,000.00311,925.00RC- PLATE PRECASTNOSPECUNITMERKRATA 2XDCA

KARSONO0821679147691PANEL BETON 1000X1000X70m2320,000.00320,000.00

PAGAR KAWATNOSPECUNITMERKRATA 2X

1KAWAT DURIM'125,000.00173,700.00200,000.00166,233.332SIKU - SIKUM'320,000.00398,700.00374,000.00364,233.33BARRIERNOSPECUNITMERKRATA 2XSGCPT.NATA PERSADA INDONESIADUSASPUN

IWAN SUJATMIKOWAHYU WIDODOAMAN KUSUMA0813830707870813189762370819341572721BARIRIER 800X500X1000UNIT872,000.001,375,700.001,190,000.001,145,900.00CV.Banyoe Atika Mandirideck drainNOSPECUNITMERKRATA 2XCV.Banyoe Atika MandiriAli Jaya Teknik

munirfuad hasan08 111 925 021085627345271deck drainUNIT625,000.00600,000.00612,500.00readymixNOSPECUNITMERKRATA 2XADhIMIXmerah putihpt. sinar alia topazYAYANrio0812884571830813105676821Beton Class A (k 400)UNIT915,000855,000.00885,000.002Beton Class B (k 350)UNIT805,000792,000.00798,500.003Beton Class CUNIT760,000742,500.00751,250.004Beton Class DUNIT730,000729,000.00729,500.005Beton Class EUNIT710,000711,000.00710,500.006Beton Class PUNIT880,000819,000.00849,500.00Elastomer 480 x 380 x 68Elastomer 480 x 380 x 68NOSPECUNITMERKRATA 2XCV. BHENIKA CITRA SEJATERAPT. Adiyasa Cipta Gemilang

TUGAS DWI IRAWANUmam081556072220813341383841Perletakan Elastomer 350 x 280 x 51UNIT489,750465,000.00477,375.002Perletakan Elastomer 480 x 300 x 51UNIT745,000639,000.00692,000.003Perletakan Elastomer 480 x 380 x 68UNIT1,075,0001,079,000.001,077,000.00