perhitungan sludge drying bed.docx
Post on 19-Feb-2016
175 Views
Preview:
TRANSCRIPT
Perhitungan Sludge Drying Bed
td (hari) 15hl (m) 1.8n 2S dasar bak 0.005d pipa drain (m) 0.2032p (m) 15Kedalaman media tanah dan kerikil (m) 0.45Freeboard (m) 0.2
Jumlah Lumpur dari Unit Sedimentasi (VLs)
V Ls=ns×QLs×td
V Ls=2×( 17,93m3
15 jam× 24 jam
1hari )×15hari=537,93m3
Jumlah Lumpur per Bak (VLb)
V Lb=V Ls
n
V Lb=537,93
2=268,96m3
Luas Permukaan Bak (As)
A s=V LbhL
A s=268,96
1,8=149,42m2
Lebar Bed (l)
l=A sp
l=149,4215
=9,96m
Kapasitas Bak Sebenarnya (Vbak)
media ES (mm) H (mm)pasir halus 0.4 150pasir kasar 0.6 75kerikil halus 5 75kerikil sedang 20 75kerikil kasar 40 75
V bak=p×l×h
V bak=15×9,96×1,8=268,96m3
top related