ANALISA HARGA SATUAN PEKERJAAN KOMITE SEKOLAH 2007 A. ANALISA PENGUKURAN , PERSIAPAN & GALIAN TANAH NO URAIAN PEKERJAAN KOEF SAT HARGA SAT HARGA BAHAN HARGA UPAH ( Rp ) ( Rp ) ( Rp ) 1 2 3 4 5 6 7 A.011 1 M3 PEK. GALIAN TANAH BIASA MAX. KEDALAMAN 1M' Pekerja 0.400 org 17,000.00 6,800.00 Mandor 0.040 org 31,000.00 1,240.00 Alat bantu 0.000 lot 35,000.00 0.00 Jumlah 8,040.00 A.012 1 M3 PEK. GALIAN TANAH BIASA MAX. KEDALAMAN 2M' Pekerja 0.526 org 17,000.00 8,942.00 Mandor 0.052 org 31,000.00 1,612.00 Alat bantu 0.000 lot 35,000.00 0.00 Jumlah 10,554.00 A.015 1 M3 PEK. PEMBUANGAN DALAM RADIUS 150 M Pekerja 0.516 org 17,000.00 8,772.00 Mandor 0.050 org 31,000.00 1,550.00 Alat bantu 0.000 lot 35,000.00 0.00 Jumlah 10,322.00 A.016 1 M3 PEK. URUGAN TANAH KEMBALI Pekerja 0.192 org 17,000.00 3,264.00 Mandor 0.019 org 31,000.00 589.00 Alat bantu 0.000 lot 35,000.00 0.00 Jumlah 3,853.00 A.017 1 M3 URUGAN TANAH Tanah urug 1.200 m3 30,700.00 36,840.00 Pekerja 0.300 org 17,000.00 5,100.00 Mandor 0.010 org 31,000.00 310.00 Jumlah 36,840.00 5,410.00 A.018 1 M3 PEMADATAN TANAH Pekerja 0.500 org 17,000.00 8,500.00 Mandor 0.050 org 31,000.00 1,550.00 Jumlah 10,050.00 A.019 1 M3 URUGAN PASIR URUG Pasir urug 1.200 m3 47,700.00 57,240.00 Pekerja 0.150 org 17,000.00 2,550.00 Mandor 0.010 org 31,000.00 310.00 Jumlah 57,240.00 2,860.00

Upload: agus-ariyanto

Post on 29-Dec-2015

63 views

Category:

Documents


6 download

TRANSCRIPT

Page 1: Rab Sd Negeri Soko 1

ANALISA HARGA SATUAN PEKERJAAN

KOMITE SEKOLAH 2007

A. ANALISA PENGUKURAN , PERSIAPAN & GALIAN TANAH

NO URAIAN PEKERJAAN KOEF SAT HARGA SAT HARGA BAHAN HARGA UPAH JUMLAH

( Rp ) ( Rp ) ( Rp ) ( Rp )

1 2 3 4 5 6 7 8

A.011 1 M3 PEK. GALIAN TANAH BIASA MAX. KEDALAMAN 1M'

Pekerja 0.400 org 17,000.00 6,800.00 6,800.00

Mandor 0.040 org 31,000.00 1,240.00 1,240.00

Alat bantu 0.000 lot 35,000.00 0.00 0.00

Jumlah 8,040.00 8,040.00

A.012 1 M3 PEK. GALIAN TANAH BIASA MAX. KEDALAMAN 2M'

Pekerja 0.526 org 17,000.00 8,942.00 8,942.00

Mandor 0.052 org 31,000.00 1,612.00 1,612.00

Alat bantu 0.000 lot 35,000.00 0.00 0.00

Jumlah 10,554.00 10,554.00

A.015 1 M3 PEK. PEMBUANGAN DALAM RADIUS 150 M

Pekerja 0.516 org 17,000.00 8,772.00 8,772.00

Mandor 0.050 org 31,000.00 1,550.00 1,550.00

Alat bantu 0.000 lot 35,000.00 0.00 0.00

Jumlah 10,322.00 10,322.00

A.016 1 M3 PEK. URUGAN TANAH KEMBALI

Pekerja 0.192 org 17,000.00 3,264.00 3,264.00

Mandor 0.019 org 31,000.00 589.00 589.00

Alat bantu 0.000 lot 35,000.00 0.00 0.00

Jumlah 3,853.00 3,853.00

A.017 1 M3 URUGAN TANAH

Tanah urug 1.200 m3 30,700.00 36,840.00 36,840.00

Pekerja 0.300 org 17,000.00 5,100.00 5,100.00

Mandor 0.010 org 31,000.00 310.00 310.00

Jumlah 36,840.00 5,410.00 42,250.00

A.018 1 M3 PEMADATAN TANAH

Pekerja 0.500 org 17,000.00 8,500.00 8,500.00

Mandor 0.050 org 31,000.00 1,550.00 1,550.00

Jumlah 10,050.00 10,050.00

A.019 1 M3 URUGAN PASIR URUG

Pasir urug 1.200 m3 47,700.00 57,240.00 57,240.00

Pekerja 0.150 org 17,000.00 2,550.00 2,550.00

Mandor 0.010 org 31,000.00 310.00 310.00

Jumlah 57,240.00 2,860.00 60,100.00

Page 2: Rab Sd Negeri Soko 1

B. ANALISA PERKERASAN & COR BETON

NO URAIAN PEKERJAAN KOEF SAT HARGA SAT HARGA BAHAN HARGA UPAH JUMLAH

( Rp ) ( Rp ) ( Rp ) ( Rp )

1 2 3 4 5 6 7 8

B.001 1 M3 LANTAI KERJA/ BETON TUMBUK 1:3:5

Semen PC 218.000 kg 800.00 174,400.00 174,400.00

Pasir beton 0.520 m3 126,400.00 65,728.00 65,728.00

Split 2/3 0.870 m3 116,000.00 100,920.00 100,920.00

Pekerja 1.650 org 17,000.00 28,050.00 28,050.00

Tukang batu 0.250 org 27,000.00 6,750.00 6,750.00

Kepala tukang 0.025 org 28,000.00 700.00 700.00

Mandor 0.080 org 31,000.00 2,480.00 2,480.00

Jumlah 341,048.00 37,980.00 379,028.00

B.002 1 M3 BETON BERTULANG 1:2:3

Semen PC 340.000 kg 800.00 272,000.00 272,000.00

Pasir beton 0.520 m3 126,400.00 65,728.00 65,728.00

Split 2/3 0.780 m3 116,000.00 90,480.00 90,480.00

Pekerja 1.650 org 17,000.00 28,050.00 28,050.00

Tukang batu 0.250 org 27,000.00 6,750.00 6,750.00

Kepala tukang 0.025 org 28,000.00 700.00 700.00

Mandor 0.080 org 31,000.00 2,480.00 2,480.00

Jumlah 428,208.00 37,980.00 466,188.00

B.012 1 KG BESI BETON TERPASANG U-24

Besi beton 1.050 kg 8,400.00 8,820.00 8,820.00

Kawat beton 0.015 kg 9,700.00 145.50 145.50

Pekerja 0.040 org 17,000.00 680.00 680.00

Tukang batu 0.015 org 27,000.00 405.00 405.00

Kepala tukang 0.015 org 28,000.00 420.00 420.00

Mandor 0.008 org 31,000.00 232.50 232.50

Alat bantu 0.020 lot 50,000.00 1,000.00 1,000.00

Jumlah 8,965.50 2,737.50 11,703.00

B.014 1 M2 BEGESTING DENGAN PAPAN

Kaso 5/7 (2 x pakai ) 50% 0.017 m3 2,832,500.00 24,076.25 24,076.25

Papan ( 2 x pakai ) 50% 0.024 m3 1,035,000.00 12,420.00 12,420.00

Paku 0.400 kg 10,200.00 4,080.00 4,080.00

Pekerja 0.300 org 17,000.00 5,100.00 5,100.00

Tukang kayu 0.150 org 27,000.00 4,050.00 4,050.00

Kepala tukang 0.150 org 28,000.00 4,200.00 4,200.00

Mandor 0.050 org 31,000.00 1,550.00 1,550.00

Jumlah 40,576.25 14,900.00 55,476.25

B.021 1 KG PEKERJAAN BAJA IWF

Besi IWF 1.100 kg 13,800.00 15,180.00 15,180.00

Meni 0.005 kg 9,700.00 48.50 48.50

Minyak cat 0.003 kg 8,700.00 26.10 26.10

Pekerja 0.045 org 17,000.00 765.00 765.00

Tukang besi 0.045 org 27,000.00 1,215.00 1,215.00

Kepala tukang 0.015 org 28,000.00 420.00 420.00

Mandor 0.002 org 31,000.00 62.00 62.00

Jumlah 15,254.60 2,462.00 17,716.60

Page 3: Rab Sd Negeri Soko 1

1 2 3 4 5 6 7 8

B.022 1 KG PEKERJAAN BESI SIKU / PROFIL

Besi siku/profil 1.100 kg 11,600.00 12,760.00 12,760.00

Meni 0.005 kg 9,700.00 48.50 48.50

Minyak cat 0.003 kg 8,700.00 26.10 26.10

Pekerja 0.045 org 17,000.00 765.00 765.00

Tukang besi 0.045 org 27,000.00 1,215.00 1,215.00

Kepala tukang 0.015 org 28,000.00 420.00 420.00

Mandor 0.002 org 31,000.00 62.00 62.00

Jumlah 12,834.60 2,462.00 15,296.60

C. ANALISA PASANGAN BATU BELAH, DINDING DAN LANTAI

NO URAIAN PEKERJAAN KOEF SAT HARGA SAT HARGA BAHAN HARGA UPAH JUMLAH

( Rp ) ( Rp ) ( Rp ) ( Rp )

1 2 3 4 5 6 7 8

C.001 1 M3 PASANG AANSTAMPING BATU BELAH

Batu belah 1.000 m3 83,250.00 83,250.00 83,250.00

Pasir urug 0.100 m3 47,700.00 4,770.00 4,770.00

Pekerja 0.500 org 17,000.00 8,500.00 8,500.00

Tukang batu 0.390 org 27,000.00 10,530.00 10,530.00

Kepala tukang 0.039 org 28,000.00 1,092.00 1,092.00

Mandor 0.039 org 31,000.00 1,209.00 1,209.00

Jumlah 88,020.00 21,331.00 109,351.00

C.009 1 M3 PASANGAN BATU BELAH 1:3:10

Batu belah 1.000 m3 83,250.00 83,250.00 83,250.00

Semen PC 61.000 kg 800.00 48,800.00 48,800.00

Kapur 0.147 m3 157,500.00 23,152.50 23,152.50

Pasir pasang 0.492 m3 85,300.00 41,967.60 41,967.60

Pekerja 1.500 org 17,000.00 25,500.00 25,500.00

Tukang batu 0.600 org 27,000.00 16,200.00 16,200.00

Kepala tukang 0.060 org 28,000.00 1,680.00 1,680.00

Mandor 0.075 org 31,000.00 2,325.00 2,325.00

Jumlah 197,170.10 45,705.00 242,875.10

C.011 1 M2 PAS LANTAI TEGEL ABU-ABU SPESI 1:3:10 TEBAL 2,5 CM

Tegel Abu-Abu 1.000 m2 20,700.00 20,700.00 20,700.00

Semen PC 4.094 kg 800.00 3,275.20 3,275.20

Kawur 0.010 m3 157,500.00 1,575.00 1,575.00

Pasir pasang 0.033 m3 85,300.00 2,814.90 2,814.90

Pekerja 0.500 org 17,000.00 8,500.00 8,500.00

Tukang batu 0.250 org 27,000.00 6,750.00 6,750.00

Kepala tukang 0.025 org 28,000.00 700.00 700.00

Mandor 0.025 org 31,000.00 775.00 775.00

Jumlah 28,365.10 16,725.00 45,090.10

C.023 1 M2 DINDING KERAMIK 20/25

Keramik 1.000 m2 46,250.00 46,250.00 46,250.00

Semen PC 9.300 kg 800.00 7,440.00 7,440.00

Pasir pasang 0.018 m3 85,300.00 1,535.40 1,535.40

Semen warna 1.500 kg 1,500.00 2,250.00 2,250.00

Pekerja 0.600 org 17,000.00 10,200.00 10,200.00

Page 4: Rab Sd Negeri Soko 1

Tukang batu 0.100 org 27,000.00 2,700.00 2,700.00

Kepala tukang 0.045 org 28,000.00 1,260.00 1,260.00

Mandor 0.030 org 31,000.00 930.00 930.00

Jumlah 57,475.40 15,090.00 72,565.40

C.025 1 M2 LANTAI KERAMIK 20/20

Keramik 1.000 m2 37,500.00 37,500.00 37,500.00

Semen PC 8.000 kg 800.00 6,400.00 6,400.00

Pasir pasang 0.018 m3 85,300.00 1,535.40 1,535.40

Semen warna 1.500 kg 1,500.00 2,250.00 2,250.00

Pekerja 0.600 org 17,000.00 10,200.00 10,200.00

Tukang batu 0.350 org 27,000.00 9,450.00 9,450.00

Kepala tukang 0.035 org 28,000.00 980.00 980.00

Mandor 0.030 org 31,000.00 930.00 930.00

Jumlah 47,685.40 21,560.00 69,245.40

1 2 3 4 5 6 7 8

C.026 1 M2 LANTAI KERAMIK 30/30

Keramik 1.000 m2 33,750.00 33,750.00 33,750.00

Semen PC 8.000 kg 800.00 6,400.00 6,400.00

Pasir pasang 0.018 m3 85,300.00 1,535.40 1,535.40

Semen warna 1.500 kg 1,500.00 2,250.00 2,250.00

Pekerja 0.600 org 17,000.00 10,200.00 10,200.00

Tukang batu 0.350 org 27,000.00 9,450.00 9,450.00

Kepala tukang 0.035 org 28,000.00 980.00 980.00

Mandor 0.030 org 31,000.00 930.00 930.00

Jumlah 43,935.40 21,560.00 65,495.40

C.035 1 M2 PASANG PAVING SEGI ENAM tb. 6 CM

Paving segi enam 1.000 m2 22,000.00 22,000.00 22,000.00

Pasir pasang 0.100 m3 85,300.00 8,530.00 8,530.00

Pekerja 0.250 org 17,000.00 4,250.00 4,250.00

Tukang batu 0.500 org 27,000.00 13,500.00 13,500.00

Kepala tukang 0.050 org 28,000.00 1,400.00 1,400.00

Mandor 0.025 org 31,000.00 775.00 775.00

Jumlah 30,530.00 19,925.00 50,455.00

D. ANALISA PASANGAN BATU MERAH PLESTERAN DAN PENGECATAN

NO URAIAN PEKERJAAN KOEF SAT HARGA SAT HARGA BAHAN HARGA UPAH JUMLAH

( Rp ) ( Rp ) ( Rp ) ( Rp )

1 2 3 4 5 6 7 8

D.003 1 M2 PASANG BATA MERAH 1:3

Bata merah 70.000 bh 260.00 18,200.00 18,200.00

Semen PC 14.370 kg 800.00 11,496.00 11,496.00

Pasir pasang 0.040 m3 85,300.00 3,412.00 3,412.00

Pekerja 0.320 org 17,000.00 5,440.00 5,440.00

Tukang batu 0.100 org 27,000.00 2,700.00 2,700.00

Kepala tukang 0.010 org 28,000.00 280.00 280.00

Mandor 0.015 org 31,000.00 465.00 465.00

Jumlah 33,108.00 8,885.00 41,993.00

D.006 1 M2 PASANG BATA MERAH 1:3:10

Bata merah 70.000 bh 260.00 18,200.00 18,200.00

Semen PC 4.500 kg 800.00 3,600.00 3,600.00

Page 5: Rab Sd Negeri Soko 1

Pasir pasang 0.050 m3 85,300.00 4,265.00 4,265.00

Kawur 0.015 m3 157,500.00 2,362.50 2,362.50

Pekerja 0.320 org 17,000.00 5,440.00 5,440.00

Tukang batu 0.100 org 27,000.00 2,700.00 2,700.00

Kepala tukang 0.010 org 28,000.00 280.00 280.00

Mandor 0.015 org 31,000.00 465.00 465.00

Jumlah 28,427.50 8,885.00 37,312.50

D.009 10 M' LIST DAN SPONENGAN

Semen PC 0.800 kg 800.00 640.00 640.00

Pasir pasang 0.002 m3 85,300.00 170.60 170.60

Pekerja 0.700 org 17,000.00 11,900.00 11,900.00

Tukang batu 0.350 org 27,000.00 9,450.00 9,450.00

Kepala tukang 0.035 org 28,000.00 980.00 980.00

Mandor 0.035 org 31,000.00 1,085.00 1,085.00

Jumlah 810.60 23,415.00 24,225.60

1 m' list dan sponengan 81.06 2,341.50 2,422.56

1 2 3 4 5 6 7 8

D.010 1 M2 PLESTERAN DINDING 1:3 + ACIAN

Semen PC 6.480 kg 800.00 5,184.00 5,184.00

Pasir pasang 0.019 m3 85,300.00 1,620.70 1,620.70

Pekerja 0.200 org 17,000.00 3,400.00 3,400.00

Tukang batu 0.150 org 27,000.00 4,050.00 4,050.00

Kepala tukang 0.015 org 28,000.00 420.00 420.00

Mandor 0.010 org 31,000.00 310.00 310.00

Jumlah 6,804.70 8,180.00 14,984.70

D.011 1 M2 PLESTERAN DINDING 1:3:10 + ACIAN

Semen PC 1.840 kg 800.00 1,472.00 1,472.00

Kapur 0.006 m3 157,500.00 945.00 945.00

Pasir pasang 0.014 m3 85,300.00 1,194.20 1,194.20

Pekerja 0.200 org 17,000.00 3,400.00 3,400.00

Tukang batu 0.150 org 27,000.00 4,050.00 4,050.00

Kepala tukang 0.015 org 28,000.00 420.00 420.00

Mandor 0.010 org 31,000.00 310.00 310.00

Jumlah 3,611.20 8,180.00 11,791.20

D.012 1 M2 PENGECATAN DINDING 3X

Plamir tembok 0.100 kg 5,700.00 570.00 570.00

Cat dasar 0.100 kg 13,800.00 1,380.00 1,380.00

Cat penutup 0.260 kg 13,800.00 3,588.00 3,588.00

Pekerja 0.020 org 17,000.00 340.00 340.00

Tukang cat 0.063 org 27,000.00 1,701.00 1,701.00

Kepala tukang 0.006 org 28,000.00 176.40 176.40

Mandor 0.003 org 31,000.00 77.50 77.50

Jumlah 5,538.00 2,294.90 7,832.90

D.013 1 M2 PENGECATAN KAYU 3X BERIKUT MENI

Meni kayu 0.167 kg 9,700.00 1,619.90 1,619.90

Plamir kayu 0.083 kg 14,000.00 1,162.00 1,162.00

Cat kayu 0.200 kg 33,600.00 6,720.00 6,720.00

Amplas kayu 0.400 lbr 1,600.00 640.00 640.00

Minyak cat terpentin 0.150 ltr 8,700.00 1,305.00 1,305.00

Kwas 3" 0.050 bh 4,600.00 230.00 230.00

Pekerja 0.200 org 17,000.00 3,400.00 3,400.00

Tukang cat 0.300 org 27,000.00 8,100.00 8,100.00

Kepala tukang 0.030 org 28,000.00 840.00 840.00

Page 6: Rab Sd Negeri Soko 1

Mandor 0.010 org 31,000.00 310.00 310.00

Jumlah 11,676.90 12,650.00 24,326.90

D.014 1 M2 PENGECATAN BESI 3X BERIKUT MENI

Meni besi 0.167 kg 9,700.00 1,619.90 1,619.90

Cat besi 0.200 kg 33,600.00 6,720.00 6,720.00

Amplas besi 0.400 lbr 1,600.00 640.00 640.00

Minyak cat thiner B 0.150 ltr 8,700.00 1,305.00 1,305.00

Kwas 3" 0.050 bh 4,600.00 230.00 230.00

Pekerja 0.200 org 17,000.00 3,400.00 3,400.00

Tukang cat 0.300 org 27,000.00 8,100.00 8,100.00

Kepala tukang 0.030 org 28,000.00 840.00 840.00

Mandor 0.010 org 31,000.00 310.00 310.00

Jumlah 10,514.90 12,650.00 23,164.90

E. ANALISA PLITURAN, PLAFOND & LISPLANK

NO URAIAN PEKERJAAN KOEF SAT HARGA SAT HARGA BAHAN HARGA UPAH JUMLAH

( Rp ) ( Rp ) ( Rp ) ( Rp )

1 2 3 4 5 6 7 8

E.002 1 M2 PAS. PLAFOND CALSIBOARD 4 MM BERIKUT RANGKA

Calsiboard 4mm 1.000 m2 16,600.00 16,600.00 16,600.00

Kaso-kaso kruing 5/7 0.014 m3 3,712,500.00 51,975.00 51,975.00

Kayu kruing 5/10 0.004 m3 3,712,500.00 12,993.75 12,993.75

Paku 0.220 kg 10,200.00 2,244.00 2,244.00

Pekerja 0.280 org 17,000.00 4,760.00 4,760.00

Tukang kayu 0.400 org 27,000.00 10,800.00 10,800.00

Kepala tukang 0.080 org 28,000.00 2,240.00 2,240.00

Mandor 0.014 org 31,000.00 434.00 434.00

Jumlah 83,812.75 18,234.00 102,046.75

E.003 1 M2 PAS. PLAFOND ETERNIT BERIKUT RANGKA

Eternit 1.000 m2 6,700.00 6,700.00 6,700.00

Kaso-kaso kruing 5/7 0.014 m3 3,712,500.00 51,975.00 51,975.00

Kayu kruing 5/10 0.004 m3 3,712,500.00 12,993.75 12,993.75

Paku 0.220 kg 10,200.00 2,244.00 2,244.00

Pekerja 0.280 org 17,000.00 4,760.00 4,760.00

Tukang kayu 0.400 org 27,000.00 10,800.00 10,800.00

Kepala tukang 0.080 org 28,000.00 2,240.00 2,240.00

Mandor 0.014 org 31,000.00 434.00 434.00

Jumlah 73,912.75 18,234.00 92,146.75

E.005 1 M2 PAS. PLAFOND ETERNIT 4MM PENUTUP PADA RANGKA

Eternit 1x1 1.000 m2 6,700.00 6,700.00 6,700.00

Paku 0.020 kg 10,200.00 204.00 204.00

Pekerja 0.047 org 17,000.00 804.10 804.10

Tukang kayu 0.113 org 27,000.00 3,037.50 3,037.50

Kepala tukang 0.010 org 28,000.00 274.40 274.40

Mandor 0.003 org 31,000.00 93.00 93.00

Alat bantu 0.085 lot 25,000.00 2,125.00 2,125.00

Jumlah 6,904.00 6,334.00 13,238.00

E.007 1 M' PEKERJAAN LISTPLANK KAYU JATI 3/20

Page 7: Rab Sd Negeri Soko 1

Kayu jati papan 20cm 0.007 m3 8,525,000.00 61,380.00 61,380.00

Paku 0.050 kg 10,200.00 510.00 510.00

Pekerja 0.100 org 17,000.00 1,700.00 1,700.00

Tukang kayu 0.200 org 27,000.00 5,400.00 5,400.00

Kepala tukang 0.025 org 28,000.00 700.00 700.00

Mandor 0.005 org 31,000.00 155.00 155.00

Jumlah 61,890.00 7,955.00 69,845.00

E.009 1 M' PEKERJAAN LISTPLANK KAYU BENGKIRAI 3/20

Kayu bengkirai papan 20cm 0.007 m3 4,357,500.00 31,374.00 31,374.00

Paku 0.050 kg 10,200.00 510.00 510.00

Pekerja 0.100 org 17,000.00 1,700.00 1,700.00

Tukang kayu 0.200 org 27,000.00 5,400.00 5,400.00

Kepala tukang 0.025 org 28,000.00 700.00 700.00

Mandor 0.005 org 31,000.00 155.00 155.00

Jumlah 31,884.00 7,955.00 39,839.00

F. ANALISA KUZEN & DAUN PINTU

NO URAIAN PEKERJAAN KOEF SAT HARGA SAT HARGA BAHAN HARGA UPAH JUMLAH

( Rp ) ( Rp ) ( Rp ) ( Rp )

1 2 3 4 5 6 7 8

F.002 1 M3 KUZEN KAYU JATI KWALITAS CAT

Kayu jati kwalitas cat 6/12 1.000 m3 8,585,000.00 8,585,000.00 8,585,000.00

Paku 2.500 kg 10,200.00 25,500.00 25,500.00

Lem putih ( FOX ) 1.000 kg 3,100.00 3,100.00 3,100.00

Pekerja 9.000 org 17,000.00 153,000.00 153,000.00

Tukang kayu 27.000 org 27,000.00 729,000.00 729,000.00

Kepala tukang 2.700 org 28,000.00 75,600.00 75,600.00

Mandor 0.900 org 31,000.00 27,900.00 27,900.00

Jumlah 8,613,600.00 985,500.00 9,599,100.00

F.005 1 M2 DAUN PINTU PANIL KAYU JATI

Rangka kayu jati ( ram pintu ) 0.035 m3 8,585,000.00 302,192.00 302,192.00

Lem putih ( FOX ) 0.750 kg 3,100.00 2,325.00 2,325.00

List kayu profil 4.000 m' 0.00 0.00 0.00

Pekerja 1.300 org 17,000.00 22,100.00 22,100.00

Tukang kayu 4.300 org 27,000.00 116,100.00 116,100.00

Kepala tukang 0.430 org 28,000.00 12,040.00 12,040.00

Mandor 0.130 org 31,000.00 4,030.00 4,030.00

Jumlah 304,517.00 154,270.00 458,787.00

F.009 1 M2 DAUN PINTU / JENDELA PANIL KACA RANGKA KAYU JATI TEBAL 3.5 CM

Kayu jati 0.019 m3 8,585,000.00 163,115.00 163,115.00

Kaca tebal 5mm 0.640 m2 55,900.00 35,776.00 35,776.00

Pekerja 2.500 org 17,000.00 42,500.00 42,500.00

Tukang kayu 7.500 org 27,000.00 202,500.00 202,500.00

Kepala tukang 0.750 org 28,000.00 21,000.00 21,000.00

Mandor 0.125 org 31,000.00 3,875.00 3,875.00

Jumlah 198,891.00 269,875.00 468,766.00

F.011 1 M2 PASANG DINDING SKAT TRIPLEKS RANGKA KAYU KRUING

Kayu kruing 0.024 m3 3,712,500.00 89,100.00 89,100.00

Page 8: Rab Sd Negeri Soko 1

Paku 0.500 kg 10,200.00 5,100.00 5,100.00

Tripleks t:6mm 1.000 m2 68,200.00 68,200.00 68,200.00

Pekerja 0.280 org 17,000.00 4,760.00 4,760.00

Tukang kayu 0.800 org 27,000.00 21,600.00 21,600.00

Kepala tukang 0.080 org 28,000.00 2,240.00 2,240.00

Mandor 0.014 org 31,000.00 434.00 434.00

Jumlah 162,400.00 29,034.00 191,434.00

G. ANALISA KUDA-KUDA, RANGKA ATAP & BUBUNGAN ATAP

NO URAIAN PEKERJAAN KOEF SAT HARGA SAT HARGA BAHAN HARGA UPAH JUMLAH

( Rp ) ( Rp ) ( Rp ) ( Rp )

1 2 3 4 5 6 7 8

G.002 1 M3 KUDA-KUDA KAYU JATI BENTANG S/D 7 M

Kayu balok 1.000 m3 8,525,000.00 8,525,000.00 8,525,000.00

Paku 0.800 kg 10,200.00 8,160.00 8,160.00

Besi strip 15.000 kg 23,600.00 354,000.00 354,000.00

Pekerja 4.000 org 17,000.00 68,000.00 68,000.00

Tukang kayu 12.000 org 27,000.00 324,000.00 324,000.00

Kepala tukang 1.200 org 28,000.00 33,600.00 33,600.00

Mandor 0.200 org 31,000.00 6,200.00 6,200.00

Jumlah 8,887,160.00 431,800.00 9,318,960.00

G.002 1 M3 KUDA-KUDA KAYUBANGKIRAI BENTANG S/D 7 M

Kayu balok 1.000 m3 4,357,500.00 4,357,500.00 4,357,500.00

Paku 0.800 kg 10,200.00 8,160.00 8,160.00

Besi strip 15.000 kg 23,600.00 354,000.00 354,000.00

Pekerja 4.000 org 17,000.00 68,000.00 68,000.00

Tukang kayu 12.000 org 27,000.00 324,000.00 324,000.00

Kepala tukang 1.200 org 28,000.00 33,600.00 33,600.00

Mandor 0.200 org 31,000.00 6,200.00 6,200.00

Jumlah 4,719,660.00 431,800.00 5,151,460.00

G.008 1 M2 RANGKA ATAP GENTENG ( HANYA RANGKA )

Kayu kaso 5/7 bengkirai 0.017 m3 4,357,500.00 73,206.00 73,206.00

Reng kayu jati 2/3 0.002 m3 8,525,000.00 20,460.00 20,460.00

Paku 5 s/d 7 cm 0.250 kg 10,200.00 2,550.00 2,550.00

Pekerja 0.150 org 17,000.00 2,550.00 2,550.00

Tukang kayu 0.150 org 27,000.00 4,050.00 4,050.00

Kepala tukang 0.010 org 28,000.00 280.00 280.00

Mandor 0.005 org 31,000.00 155.00 155.00

Jumlah 96,216.00 7,035.00 103,251.00

Page 9: Rab Sd Negeri Soko 1

G.011 1 M2 PENUTUP ATAP GENTENG PLENTONG KECIL KEBUMEN

Genteng plentong kebumen 25.000 bh 925.00 23,125.00 23,125.00

Pekerja 0.150 org 17,000.00 2,550.00 2,550.00

Tukang kayu 0.075 org 27,000.00 2,025.00 2,025.00

Kepala tukang 0.008 org 28,000.00 224.00 224.00

Mandor 0.008 org 31,000.00 248.00 248.00

Jumlah 23,125.00 5,047.00 28,172.00

G.018 1 M' PEK. BUBUNGAN ATAP GENTENG KODOK

Genteng bubungan 5.000 bh 2,500.00 12,500.00 12,500.00

Semen PC 8.000 kg 800.00 6,400.00 6,400.00

Pasir pasang 0.032 m3 85,300.00 2,729.60 2,729.60

Pekerja 0.400 org 17,000.00 6,800.00 6,800.00

Tukang batu 0.200 org 27,000.00 5,400.00 5,400.00

Kepala tukang 0.020 org 28,000.00 560.00 560.00

Mandor 0.002 org 31,000.00 62.00 62.00

Jumlah 21,629.60 12,822.00 34,451.60

G.022 1 M' PEK. PAS NOK / CENGGER KAYU BANGKIRAI 2/15

Kayu bangkirai 0.003 m3 4,357,500.00 13,072.50 13,072.50

Paku 0.030 kg 10,200.00 306.00 306.00

Pekerja 0.042 org 17,000.00 714.00 714.00

Tukang batu 0.120 org 27,000.00 3,240.00 3,240.00

Kepala tukang 0.012 org 28,000.00 336.00 336.00

Mandor 0.002 org 31,000.00 62.00 62.00

Jumlah 13,378.50 4,352.00 17,730.50

Page 10: Rab Sd Negeri Soko 1

83250

20700

Page 11: Rab Sd Negeri Soko 1

DAFTAR HARGA SATUAN UPAH DAN BAHAN

KOMITE SEKOLAH 2007

NO URAIAN SATUAN HARGA SATUAN

( Rp )

1 2 3 4

A UPAH

1 Mandor Per hari 31,000.00

2 Kepala tukang Per hari 28,000.00

3 Tukang Per hari 27,000.00

4 Pekerja Per hari 17,000.00

B BAHAN

1 Batu kali m3 69,300.00

2 Batu pecah m3 116,000.00

3 Tanah pilihan m3 30,700.00

4 Pasir urug m3 47,700.00

5 Pasir pasang m3 85,300.00

6 Semen PC kg 800.00

7 Semen putih kg 1,500.00

8 Semen merah kg 1,500.00

9 Kawur Per m3 157,500.00

10 Batu bata Per bh 240.00

11 Genteng mantili lokal Per bh 700.00

12 Genteng plentong kebumen Per bh 925.00

13 Genteng kerpus lokal Per bh 2,500.00

14 Genteng kerpus kebumen Per bh 3,500.00

15 Kayu jati klas 1 Per m3 10,542,200.00

16 Kayu jati klas 2 Per m3 8,525,000.00

17 Kayu sengon untuk begesting Per m3 1,035,000.00

18 Kayu kruing Per m3 3,712,500.00

19 Kayu kanfer Per m3 4,095,000.00

20 Kayu bagkirai Per m3 4,357,500.00

21 Plipit kayu Per m' 2,500.00

22 List gypsum Per m' 9,000.00

23 Buis beton Ø20cm Per m' 12,250.00

24 Buis beton Ø50cm Per m' 40,400.00

25 Buis beton Ø80cm Per m' 124,100.00

26 Buis beton Ø100cm Per m' 186,100.00

27 Paving I tb 6cm Per m2 22,000.00

28 Paving I tb 8cm Per m2 25,000.00

29 Paving segi enam tb 6cm Per m2 22,000.00

30 Paving segi enam tb 8cm Per m2 25,000.00

31 Keramik dinding 20x20 Per m2 34,300.00

32 Keramik dinding 20x25 Per m2 46,250.00

33 Keramik lantai 20x20 Per m2 37,500.00

34 Keramik lantai 30x30 Per m2 33,750.00

35 Keramik lantai 40x40 Per m2 48,900.00

36 Tegel abu-abu 20x20 Per m2 19,295.00

37 Asbes gelombang besar Per lb 114,400.00

38 Asbes gelombang kecil Per lb 71,300.00

39 Kloset porselin jongkok INA Per bh 96,000.00

40 Bak air viber sudut 40 x 60 cm Per bh 300,000.00

41 Slot pintu merek kuda terbang Per bh 70,000.00

42 Engsel kupu-kupu besar Per bh 7,500.00

43 Engsel kupu-kupu kecil Per bh 6,500.00

Page 12: Rab Sd Negeri Soko 1

1 2 3 4

44 Grendel ukuran besar Per bh 12,500.00

45 Grendel ukuran kecil Per bh 8,000.00

46 Kawat harmonika Per m2 32,000.00

47 Hak angin Per bh 5,000.00

48 Espanyolete Per bh 45,000.00

49 Spring knife Per bh 5,000.00

50 Cat tembok Per kg 13,800.00

51 Cat kayu / besi Per kg 33,600.00

52 Cat genteng Per kg 25,500.00

53 Plamir kayu Per kg 14,000.00

54 Plamir tembok Per kg 5,700.00

55 Meny Per kg 9,700.00

56 Teer Per kg 8,700.00

57 Minyak cat Per lt 8,700.00

58 Dempul Per kg 10,700.00

59 Amplas/ampril/kertas gosok Per lb 1,600.00

60 Bindrad Per kg 9,700.00

61 Baja gulungan ukuran ringan Per kg 8,400.00

62 Baja anyaman bronjongan Per kg 8,400.00

63 Baja (baut-baut) Per kg 13,800.00

64 Baja (paku jembatan) Per kg 13,800.00

65 Alat kerja (sekop, ikrak dll) Per unit 121,000.00

66 Besi beton Per kg 8,400.00

67 Besi siku Per kg 11,600.00

68 Besi kanal Per kg 13,800.00

69 Besi profil Per kg 13,800.00

70 Jendela nako ukuran 1m x 1m Per unit 166,700.00

71 Paku Per kg 10,200.00

72 Eternit Per m2 6,700.00

73 Gipsum Per m2 16,600.00

74 Harflek Per m2 11,500.00

75 Calsiboard Per m2 16,600.00

76 Kaca bening 3 mm Per m2 45,000.00

77 Kaca bening 5 mm Per m2 55,900.00

78 Kaca riband 5 mm Per m2 75,000.00

79 Kaca jeruk polos 3 mm Per m2 65,000.00

80 Kaca S 5 mm Per m2 65,000.00

81 Pipa galvanis diameter 3/4 Per m' 5,600.00

82 Pipa pralon PVC diameter 3" Per m' 15,000.00

83 Pipa pralon PVC diameter 2" Per m' 5,800.00

84 Pipa pralon PVC diameter 1" Per m' 2,100.00

85 Lem kayu (Fox) Per kg 3,100.00

86 Amplas besi Per m2 1,600.00

87 Vernis Per lt 8,700.00

88 Kuas 1" Per bh 1,700.00

89 Closet duduk Per bh 632,500.00

90 Urinoir Per bh 350,000.00

91 Wastafel Per bh 150,000.00

92 Bak teraso Per bh 250,000.00

93 Bak klip fiber Per bh 650,000.00

94 Bak cuci stainles steel 1 bak Per bh 200,000.00

95 Kran air 1/2" Per bh 17,500.00

Page 13: Rab Sd Negeri Soko 1

96 Kran air 3/4" Per bh 22,000.00

97 Seal tip Per bh 1,100.00

1 2 3 4

98 Seng plat (90 x 180) Per m2 39,100.00

99 Walpaper Per m2 143,700.00

100 Perekat (lem) Per bh 11,500.00

101 Pintu almunium Per bh 172,500.00

102 Strip plat 3/4" Per m2 23,000.00

103 Strip plat 1" Per m2 25,800.00

104 Strip plat 1 1/4" Per m2 28,700.00

105 Talang seng t = 0.2 mm L = 60 Per m2 17,200.00

106 Talang seng t = 0.3 mm L = 60 Per m2 21,200.00

107 Tali ijuk Per kg 6,300.00

Sragen, 3 Juni 2007

Team Perencana

Arif Fajar, ST

Page 14: Rab Sd Negeri Soko 1

REKAPUTULASI

PROGRAM : REHABILITASI SD/MI

KEGIATAN : REHABILITASI MI RODHOTUL SOLICHIN

LOKASI : KECAMATAN GEMOLONG

SUMBER DANA : DANA ALOKASI KHUSUS ( DAK )

TOTAL BIAYA : Rp 105,000,000.00

TAHUN ANGGARAN : 2 0 0 7

NO URAIANJUMLAH HARGA ( Rp ) TOTAL HARGA

BAHAN UPAH ( Rp )

1 2 3 4 5

A. REHABILITASI FISIK SEKOLAH

I GEDUNG SEKOLAH/RUANG KELAS #REF! #REF! #REF!

II SUMBER DAN SANITASI AIR BERSIH SERTA KM/WC #REF! #REF! #REF!

III MEBELAIR RUANG KELAS DAN LEMARI PERUSTAKAAN #REF! #REF! #REF!

IV RUMAH DINAS PEJAGA/GURU/KEPALA SEKOLAH #REF! #REF! #REF!

JUMLAH REHABILITASI FISIK SEKOLAH #REF! #REF! #REF!

B.

I#REF! #REF! #REF!

II

#REF! #REF! #REF!

III

#REF! #REF! #REF!

IV#REF! #REF! #REF!

#REF! #REF! #REF!

JUMLAH A+B #REF! #REF! #REF!

JUMLAH TOTAL #REF!

DIBULATKAN 168,094,000.00

TERBILANG " Seratus enam puluh juta sembilan puluh empat ribu rupiah"

Sragen, Mei 2007

Menyetujui,

Kepala Dinas Pekerjaan Umum Ketua Tim Perencana

Kabupaten Sragen

Ir. DARMAWAN MINTO BASUKI, MM.MT. ARIF FAJAR, ST

Pembina Utama Muda

NIP 110 033 077

Mengetahui,

Kepala Dinas Pendidikan dan Kebudayaan

Kabupaten Sragen

Drs. GATOT SUPADI, MBA.MM.

PENGADAAN SARANA PENDIDIKAN DAN SARANA PERPUSTAKAAN

ALAT PERAGA PENDIDIKAN (IPBA, KIT MATEMATIKA, IPS, BAHASA INDONESIA, KIT IPA, DAN KIT BAHASA INGGRIS

BUKU PENGAYAAN JENIS KETRAMPILAN, BUKU PENGAYAAN JENIS PENGETAHUAN (PANDUAN ANTI NARKOBA, SAINS, ATLAS PROVINSI + CD INTERAKTIF, BUKU BACAAN, SASTRA/BAHASA, BUKU BACAAN BUDI PEKERTI, DAN BUKU PANDUAN ICT)

BUKU REFERENSI ( FISIKA, PANDUAN OLIMPIADE IPA DAN MATEMATIKA, KAMUS BAHASA, DAN INSIKLOPEDI MATEMATIKA)

KOMPUTER, PRINTER, ACTIVE SPEAKER, CD INTERAKTIF DAN MESIN KETIK MANUAL.

JUMLAH PENGADAAN SARANA PENDIDIKAN DAN SARANA PERPUSTAKAAN

Page 15: Rab Sd Negeri Soko 1

Pembina Utama Muda

NIP 131 039 907

Page 16: Rab Sd Negeri Soko 1

HAL : RENCANA ANGGARAN BIAYA

LAMPIRAN : HARGA SATUAN PEKERJAAN, GAMBAR DAN

PERHITUNGAN VOLUME

PROGRAM : REHABILITASI SD/MI

KEGIATAN : REHABILITASI SD NEGERI SOKO 1

LOKASI : KECAMATAN MIRI

TOTAL BIAYA : Rp. 70,000,000.00

TAHUN ANGGARAN : 2 0 0 7

NO MACAM PEKERJAAN ANALISA VOLUME TOTAL HARGA

1 2 3 4 5 6

I REHABILITASI FISIK SEKOLAH

A REHABILITASI GEDUNG SEKOLAH/RUANG KELAS

1 PEKERJAAN PERSIAPAN

a Uitzet dan bouwplank Taksir Ls 300,000.00 300,000.00

b Steigerwerk Taksir Ls 360,000.00 360,000.00

c Administrasi dan dokumentasi Taksir Ls 250,000.00 250,000.00

d Bongkaran bangunan lama Taksir Ls 1,000,000.00 1,000,000.00

Jumlah Sub Pekerjaan Persiapan 1,910,000.00

2 PEKERJAAN TANAH

a. Pek. Galian tanah A.011 0.00 m3 8,040.00 0.00

b. Pek. Urugan tanah kembali A.016 0.00 m3 3,853.00 0.00

c. Pek. Urugan pasir A.019 0.00 m3 60,100.00 0.00

d. Pek. Pondasi A.019 0.00 m3 60,100.00 0.00

Sub Total Pekerjaan Tanah 0.00

3 PEKERJAAN BETON

a Cor rabat beton 1:3:5 B.001 0.00 m3 379,028.00 0.00

b Cor beton bertulang 1:2:3 B.002 0.00 m3 466,188.00 0.00

c Pembesian U 24 B.012 0.00 kg 11,703.00 0.00

d Begesting B.014 0.00 m2 55,476.25 0.00

Jumlah Sub Pekerjaan Beton 0.00

4 PEK. PASANGAN DAN PLESTERAN

a Pas. Bata merah 1:3:10 D.006 11.04 m2 37,312.50 411,795.68

b Plesteran 1:3:10 D.011 37.52 m2 11,791.20 442,450.16

c List dan sponengan D.009 99.01 m' 2,422.56 239,863.96

Jumlah Sub Pekerjaan Pasangan dan Plesteran 1,094,109.80

5 PEKERJAAN LANTAI

a Pas. Lantai keramik 30x30 C.026 132.66 m2 65,495.40 8,688,619.76

Jumlah Sub Pekerjaan Lantai 8,688,619.76

6 PEK. PINTU DAN JENDELA

a. Pek. Kuzen pintu, Jendela, dan BV 6/12 kayu jati kwalitas cat F.002 0.72 m3 9,599,100.00 6,865,336.22

b. Pas. Daun pintu panil kayu jati kayu jati tb 3.5 cm F.004 7.53 m2 458,787.00 3,452,574.04

c. Pas. Daun Pintu panil kayu jati kayu jati tb 3.5 cm Taksir 508,787.00 0.00

lapis Alumunium bagian dalam

d. Pas. Daun jendela panil kayu jati kaca bening 5mm F.009 3.38 m2 468,766.00 1,582,929.03

e. Kaca bening 5 mm Taksir 0.844 m3 65,000.00 54,873.00

Jumlah Sub Pekerjaan Pintu & Jendela 11,955,712.29

7 PEKERJAAN PLAFOND

a. Pasang Plafon Kalsiboard Penggantung Kruing E.001 0.00 m2 92,146.75 0.00

c. Pas List Gygsum 10 cm Taksir 0.00 m' 13,000.00 0.00

Jumlah Pekerjaan Plafon 0.00

HARGA SATUAN

Page 17: Rab Sd Negeri Soko 1

1 2 3 4 5 6

8 PEKERJAAN PENGGANTUNG

a Pas. Slot pintu Taksir 3.00 bh 72,500.00 217,500.00

b Pas. Engsel kupu-kupu 4" untuk pintu Taksir 10.00 bh 17,500.00 175,000.00

c Pas. Engsel kupu-kupu 3" untuk jendela Taksir 16.00 bh 17,500.00 280,000.00

d Pas. Sping knaife Taksir 8.00 bh 20,000.00 160,000.00

e Pas. Lamskar Taksir 16.00 bh 22,500.00 360,000.00

f Pas. Tarikan jendela Taksir 8.00 bh 15,000.00 120,000.00

Jumlah Sub Pekerjaan Penggantung 1,312,500.00

9 PEKERJAAN ATAP

a. Pas. Kuda - kuda kacal C ( hanya pasang ) B.022 277.75 kg 2,462.00 683,827.52

c. Pas. Strip Plat sambungan dan baut kuda-kuda B.022 0.00 kg 15,296.60 0.00

d. Pas. Kuda - kuda dobel siku ( hanya pasang ) B.022 0.00 kg 2,462.00 0.00

f. Pas. Kuda-kuda Kayu jati 8/12 G,002 0.00 m3 9,318,960.00 0.00

g. Pas. Nok, gording,murplat kayu jati 6/12 G.002 1.10 m3 9,318,960.00 10,279,632.95

h. Pas. Usuk kruing 5/7, reng jati 2/3 G.008 215.04 m2 103,251.00 22,202,733.66

j. Pas. Genteng plentong kebumen G.011 215.04 m2 28,172.00 6,058,008.28

k. Pas. Genteng kerpus kodok G.014 16.42 m' 34,451.60 565,523.01

l. Pas. Lisplank kayu jati 2/20 E.007 0.00 m' 69,845.00 0.00

m. Pas. Cengger Kayu 2/15 G.018 16.42 m' 17,730.50 291,046.16

Jumlah Sub Pekerjaan Atap 40,080,771.58

10 PEKERJAAN CAT

a Cat tembok D.012 343.15 m2 7,832.90 2,687,888.08

b. Cat Plafond D.012 0.00 m2 7,832.90 0.00

c. Cat kayu D.013 42.41 m2 24,326.90 1,031,662.96

Jumlah Sub Pekerjaan Cat 3,719,551.04

11 PEKERJAAN ELEKTRIKAL

a Pas. Instalasi titik lampu Taksir 12.00 titik 60,000.00 720,000.00

b Pas. Lampu TL 20 watt Taksir 10.00 bh 30,000.00 300,000.00

c Pas. Lampu pijar 20 watt Taksir 2.00 bh 20,000.00 40,000.00

d Pas. Saklar ganda Taksir 3.00 bh 22,500.00 67,500.00

e Pas. Stop kontak Taksir 2.00 bh 22,500.00 45,000.00

f Pas. MCB & BOX Taksir 1.00 unit 70,000.00 70,000.00

Jumlah Sub Pekerjaan Elektrikal 1,242,500.00

12 PEKERJAAN SANITASI

a. Pas. Closed jongkok INA Taksir 0.00 bh 85,068.00 0.00

b. Pas. Wastafel INA Lengkap dengan Aksesoris Taksir 0.00 bh 175,008.00 0.00

c. Pas. Kran 1/2" Morse Taksir 0.00 bh 17,350.50 0.00

d. Pas. Instalasi Air Bersih Taksir 0.00 unit 400,000.00 0.00

e. Pas. Instalasi Air Kotor Taksir 0.00 unit 400,000.00 0.00

f. Pas. Saringan Air Kotor Taksir 0.00 unit 12,500.00 0.00

g. Pas. Saluran U 20 cm Taksir 0.00 m' 17,500.00 0.00

Jumlah Pekerjaan Sanitasi 0.00

JUMLAH PEKERJAAN PENGADAAN/REHABILITASI GEDUNG SEKOLAH / RUANG KELAS 70,003,764.47

DIBULATKAN 70,000,000.00

Page 18: Rab Sd Negeri Soko 1

DAFTAR HARGA SATUAN PEKERJAAN

KOMITE SEKOLAH MI RODHOTUL SOLICHIN GEMOLONG

TAHUN 2007

NO URAIAN SATUAN ANALISA JUMLAH HARGA ( Rp ) TOTAL

BAHAN UPAH ( Rp )

1 2 3 4 5 6 7

A PENGUKURAN, PERSIAPAN & GALIAN

1 Pek. Galian tanah biasa kedalaman max. 1m' m3 A.011 8,040.00 8,040.00

2 Pek. Galian tanah biasa kedalaman max. 1m' m3 A.012 10,554.00 10,554.00

3 Pek. Pembuangan Dalam Radius 150 m m3 A.015 10,322.00 10,322.00

4 Pek. Urugan Tanah Kembali m3 A.016 3,853.00 3,853.00

5 Urugan tanah m3 A.017 36,840.00 5,410.00 42,250.00

6 Pemadatan Tanah m3 A.018 0.00 10,050.00 10,050.00

7 Urugan Pasir Urug m3 A.019 57,240.00 2,860.00 60,100.00

B PERKERASAN & COR BETON

1 Pek. Lantai Kerja / Beton Tumbuk 1:3:5 m3 B.001 341,048.00 37,980.00 379,028.00

2 Pek. Beton Bertulang 1:2:3 m3 B.002 428,208.00 37,980.00 466,188.00

3 Pek. Besi Beton Terpasang U-24 kg B.012 8,965.50 2,737.50 11,703.00

4 Pek. Begesting Dengan Papan m2 B.014 40,576.25 14,900.00 55,476.25

5 Pekerjaan Baja IWF kg B.021 15,254.60 2,462.00 17,716.60

6 Pekerjaan Besi Siku / Profil kg B.022 12,834.60 2,462.00 15,296.60

C PASANGAN BATU BELAH, DINDING DAN LANTAI

1 Pas. Aanstamping Batu Belah m3 C.001 88,020.00 21,331.00 109,351.00

2 Pas. Batu belah 1:3:10 m3 C.009 197,170.10 45,705.00 242,875.10

3 Pasang Lantai Tegel Abu-abu spesi 1:3:10 Tebal 2,5 cm m2 C.011 28,365.10 16,725.00 45,090.10

4 Pas. Dinding Keramik 20/25 m2 C.023 57,475.40 15,090.00 72,565.40

5 Pas. Lantai Keramik 20/20 m2 C.025 47,685.40 21,560.00 69,245.40

6 Pas. Lantai Keramik 30/30 m2 C.026 43,935.40 21,560.00 65,495.40

7 Pas. Paving Segi Enam tb: 6 cm m2 C.035 30,530.00 19,925.00 50,455.00

D PASANGAN BATU MERAH, PLESTERAN & CAT

1 Pas. Bata Merah 1:3 m2 D.003 33,108.00 8,885.00 41,993.00

2 Pas. Bata Merah 1:3:10 m2 D.006 28,427.50 8,885.00 37,312.50

3 List dan Sponengan m' D.009 81.06 2,341.50 2,422.56

4 Plesteran dinding 1:3 + Acian m2 D.010 6,804.70 8,180.00 14,984.70

5 Plesteran Dinding 1:3:10 + Acian m2 D.011 3,611.20 8,180.00 11,791.20

6 Pengecatan Dinding 3x m2 D.012 5,538.00 2,294.90 7,832.90

7 Pengecatan Kayu 3x Berikut Meni m2 D.013 11,676.90 12,650.00 24,326.90

8 Pengecatan Besi 3x Berikut Meni m2 D.014 10,514.90 12,650.00 23,164.90

E PELITURAN, PLAFOND & LISPLANK

1 Pas. Plafond Calsiboard 4mm Berikut Rangka m2 E.002 83,812.75 18,234.00 102,046.75

2 Pas. Plafond Eternit Berikut Rangka m2 E.003 73,912.75 18,234.00 92,146.75

3 Pas. Plafond Eternit Penutup Pada Rangka m2 E.005 6,904.00 6,334.00 13,238.00

4 Pek. Listplank Kayu Jati 3/20 m' E.007 61,890.00 7,955.00 69,845.00

5 Pek. Listplank Kayu Bengkirai 3/20 m' E.008 31,884.00 7,955.00 39,839.00

F KUZEN & DAUN PINTU

1 Kusen Kayu Jati Kualitas Cat m3 F.002 8,613,600.00 985,500.00 9,599,100.00

2 Daun Pintu Panil Kayu Jati m2 F.004 304,517.00 154,270.00 458,787.00

3 Daun Pintu / Jendela Panil Kaca Rangka Kayu Jati t:3.5cm m2 F.009 198,891.00 269,875.00 468,766.00

4 Pek. Dinding Sekat Tripleks Rangka Kayu Kruing m2 F.010 162,400.00 29,034.00 191,434.00

G KUDA-KUDA, RANGKA ATAP & BUBUNGAN

Page 19: Rab Sd Negeri Soko 1

1 2 3 4 5 6 7

1 Kuda-Kuda Kayu Jati Bentang s/d 7 m m3 G.002 8,887,160.00 431,800.00 9,318,960.00

2 Kuda-Kuda Kayu Bengkirai Bentang s/d 7 m m3 G.003 4,719,660.00 431,800.00 5,151,460.00

3 Rangka Atap Genteng ( Hanya Rangka ) m2 G.008 96,216.00 7,035.00 103,251.00

4 Penutup Atap Genteng Plentong Kecil Kebumen m2 G.011 23,125.00 5,047.00 28,172.00

5 Pek. Bubungan Atap Genteng Kodok m' G.018 21,629.60 12,822.00 34,451.60

6 Pek. cengger Kayu Bengkirai 2/15 m' G.022 13,378.50 4,352.00 17,730.50

Page 20: Rab Sd Negeri Soko 1

LUAS UKURAN ( 7 x 7,5 ) JUMLAH 3 LOKAL, PANJANG TERAS 1,8 M', KUDA-KUDA KAYU SUDUT 30No Uraian Jumlah Lebar Panjang Tinggi berat koefisien

II PEKERJAAN TANAHa Galian 0.800 75.000 0.700

b Urugan Tanah Kembali 75.000 urugan Tanah 30 CM 3 7.000 7.500 0.300

1 1.800 22.500 0.300 JMH VOL URUGAN TNH KEMBALI

c Urugan Pasir ( 5 cm ) 0.800 75.000 0.050 c Urugan Pasir u/. Keramik 9.300 22.500 0.050

JUMLAH VOL.URUGAN PASIR

d Pondasi 75.000

III PEKERJAAN BETONa Rabat beton 7 cm kelas 3 7.000 7.500 0.070

Rabat beton 7 cm teras 1 1.800 22.500 0.070 JUMLAH VOL RABAT BETON

b Kolom Kelas 6 0.120 0.150 4.000 Kolom Teras 7 0.150 0.150 2.600 Balok Ikat 1 0.050 22.500 0.250 Balok Konsul 14 0.120 2.300 0.150 kolom peninggian tembok 1 m 18 0.120 0.150 1.000 JUMLAH VOLUME KOLOM

C Pembesian Kolom Kelas 6 0.120 0.150 4.000 125.000 Pembesian Kolom Teras 7 0.150 0.150 2.600 125.000 Pembesian Balok Ikat 1 0.050 24.000 0.250 125.000 Pembesian Konsul depan 14 0.120 2.300 0.150 125.000 Pembesian konsul belakang 18 0.120 1.700 0.150 125.000 Pembesian peninggian tembok 1 m 125.000 JUMLAH VOLUME PEMBESIAN

d Bekesting Kolom Kelas 12 0.200 4.000 - Bekesting Kolom teras 14 0.200 2.600 -

Bekesting Balok Ikat 2 0.500 22.500 1 0.050 22.500

Bekesting Balok Konsul depan 7 0.420 2.300 Bekesting Balok Konsul belakang 7 0.420 1.700 bekistng peninggian tembok 1m 36 0.200 1.000 JMLH VOLUME BEKESTING

IV PEKERJAAN PASANGANa Pasang Bata

Page 21: Rab Sd Negeri Soko 1

Depan 3 7.500 3.500 Belakang 0 - - - Samping 1 7.500 3.500 Gunungan 1 7.500 3.500

a batu bata u/ peninggian 1 m'Depan + Belakang 2 1.000 22.500 Gunungan 8 4.400 0.700

JUMLAH VOLUME PAS. BATAb Plesteran Kelas

Depan 6 7.500 3.500 Belakang 0 - - Samping 1 7.500 3.500 - Gunungan 1 - 7.500 3.500

b Plesteran teras : Kolom depan 0 - - Konsul depan 0 - - Konsul belakang 0 - - Balok Ikat 0 - -

b Plesteran Peninggian 1 m' 4 1.000 22.500 16 4.400 0.700

JUMLAH VOLUME PLESTERANc skonengan

1. Pojok Dinding 4.000 3.500 2. Pintu utama 2.630 2.630 1.320 2.000 3.000 3. Jendela Depan 2.040 2.040 1.130 1.130 2.000 4. Pintu Penghubung 2.630 2.630 0.920 2.000 2.000 5. Balok Ikat 22.500 4.000 6.Kolom Teras 2.600 4.000 10.000 7. Konsul depan 2.300 2.300 0.120 7.000 8. konsul belakang 1.700 1.700 0.120 7.000 9. Sponengan Boven 1.780 1.780 0.920 0.920 2.000 JMLH VOLUME SPONENGAN

V LANTAIa Lantai ( Keramik 30x30)

Kelas 3 7.000 7.500 Teras 1 1.800 22.500 JUMLAH VOLUME LANTAI

VI PEKERJAAN KUSENa JENDELA

Belakang 0 - - - Depan 6/12 3 0.060 10.940 0.120 Depan 6/12 3 0.020 7.650 0.120 9.000 Depan krepyak 5 0.020 0.640 0.120 9.000

Belakang 0 - - -

Page 22: Rab Sd Negeri Soko 1

a Kusen Pintu 3 0.060 7.810 0.120

a Kusen Pintu Penghubung 2 0.060 6.780 0.120

a boven 6 0.120 7.120 0.060 JUMLAH VOLUME KUSEN JEND,PNTU,BV

Daun Pintu 3 1.200 2.160 Daun Pintu Penghubung 2 0.800 2.160 JMLH VOLUME DAUN PINTU

d Daun JendelaBelakang 0 - - Depan 12 0.600 0.700 Belakang 0 - - JUMLAH VOLUME DAUN JENDELA KACA

e Blok Kaca Bening 3 0.600 0.700

f Kolom Kayu 7 0.100 0.100 2.600

VII PEKERJAAN PLAFONDa Plafon

Dalam 3 7.000 7.500 depan 1 22.500 1.800 belakang 1 22.500 1.500 Samping 2 13.100 1.000 JMLH VOLUME PLAFOND

c Lis PlafonDalam 3 7.000 7.000 7.500 7.500 depan 1 22.500 22.500 1.800 1.800 belakang 1 22.500 22.500 1.500 1.500 Samping 2 13.100 13.100 - - JMLH VOLUME LIST PLAFOND

VIII PEKERJAAN PENGANTUNGa Slot Pintu 5b Engsel Kupu2 4" 16c Engsel Kupu2 3" 24d Spring Knife 12e Lamskar 24f Tarikan Jendela 12

IX PEKERJAAN ATAPa Kuda-kuda Canal C > 30

( 2 C.125.50.20) 3 30.640 4.510

c Plat Landas + Baut 6 206.450 0.150

d Kuda-kuda Besi Siku > 30( 2 L.60.60.6) 3 16.160 5.420

Page 23: Rab Sd Negeri Soko 1

( 2 L.40.40.4) 3 9.779 2.420 JML VOLUME KUDA2 SIKU

f Kuda-kuda 8/12 kayu jati 3 0.080 20.300 0.120 3 0.060 7.000 0.120 0 - - -

JUMLAH VOLUME KUDA2

g NOK 8/12 1 0.120 24.500 0.080 Gording 8/12 4 0.120 24.500 0.080 Murplat 8/12 2 0.120 24.500 0.080 JUMLAH VOL NOK,GORDING.MPL

Usuk 5/7 & Reng 2/3 1 6.700 24.500 1 6.400 24.500

JUMLAH VOL URUK & RENG

j Luas Genteng 13.100 24.500 k Kerpus 1 24.500

Lisplang 1 - 75.200 Papan Riter 1 - 24.500

X PEKERJAAN CATa CAT TEMBOK------ KELAS

Depan 6 7.500 3.500 Belakang 6 7.500 3.500 Samping 8 7.000 3.500 Gunungan 8 7.000 2.300

a CAT TEMBOK------ TERASKolom 7 0.600 2.600 Konsul Depan 7 0.420 2.300 Belakang 7 0.420 1.700 Balok Ikat 1 0.600 24.500

JUMLAH CAT TEMBOKb Cat Plafon

Dalam 3 7.000 7.500 Depan 1 22.500 1.800 Belakang 1 22.500 1.500 Samping 2 13.100 JUMLAH CAT PLAFOND

c Cat Lisplang 1 75.200 0.200 c Cat Kusen & daun pintu 27.075 8.253 2.525 15.552 6.912

Cat BovenJUMLAH CAT KAYU

XI PEKERJAAN ELEKTRIKALa Penerangan 18b TL 20 Watt 15c L. Pijar 20 Watt 3d Saklar Ganda 4e Stop Kontak 3

Page 24: Rab Sd Negeri Soko 1

f Box M CB 1

Page 25: Rab Sd Negeri Soko 1

LUAS UKURAN ( 7 x 7,5 ) JUMLAH 3 LOKAL, PANJANG TERAS 1,8 M', KUDA-KUDA KAYU SUDUT 30Luas Volume Sat

42.000 m3 0% -

0.175 13.125 m3 0% - 47.250 m3 0% - 12.150 m3 0% - 72.525 m3 -

3.000 m3 0% - 10.463 m3 0% - 13.463 M3 -

0.350 26.250 m3 0% -

11.025 m3 0% - 2.835 m3 0% - 13.860 -

0.432 m3 0% - 0.410 m3 0% - 0.281 m3 0% - 0.580 m3 0% - 0.324 m3 0% - 2.026 m3 -

54.000 kg 0% - 51.188 kg 0% - 37.500 kg 0% - 72.450 kg 0% - 68.850 kg 0% -

0.360 45.000 kg 0% - 328.987 kg -

9.600 m2 0% - 7.280 m2 0% -

0% 22.500 m2 0% - 1.125 m2 0% - 23.625 m2 -

6.762 m2 0% - 4.998 m2 0% - 7.200 m2 0% - 47.705 m2 -

Page 26: Rab Sd Negeri Soko 1

55.182 m2 20% 11.036 - m2 0% - 26.250 m2 0% - 13.125 m2 0% - 94.557 m2 11.036

45.000 m2 0% - 24.640 m2 0% - 69.640 m2 - 164.197 m2 11.036

110.364 m2 34% 37.524 - 0% - 52.500 0% - 26.250 0% - 189.114 m2 37.524

- 100% - - 100% - - 100% - - 100% - - m2 -

90.000 m2 0% - 49.280 m2 0% - 139.280 m2 - 328.394 37.52

7.500 m' 67% 5.025 39.480 m' 67% 26.452

6.000 76.080 m' 67% 50.974 24.720 m' 67% 16.562 90.000 m' 0% - 104.000 m' 0% - 33.040 m' 0% - 24.640 m' 0% -

9.000 97.200 m' 0% - 496.660 m' 99.013

157.500 67% 105.525 40.500 67% 27.135 198.000 m2 132.660

- 0% - 0.236 m3 67% 0.158 0.496 m3 67% 0.332 0.069 m3 67% 0.046 0.801 m3 0.537 - m3 67% - - m3 -

Page 27: Rab Sd Negeri Soko 1

0.169 m3 67% 0.113

0.098 m3 67% 0.065

0.308 m3 0% - 1.375 0.72

7.776 m2 67% 5.210 3.456 m2 67% 2.316 11.232 7.525

- 100% - 5.040 67% 3.377 - 100% - 5.040 m2 3.377

1.260 m2 67% 0.844

0.182 m3 0% -

157.500 m2 0% - 40.500 m2 0% - 33.750 m2 0% - 26.200 m2 0% - 257.950 m2 -

87.000 m2 0% - 48.600 m2 0% - 48.000 m2 0% - 52.400 m2 0% - 236.000 m2 -

5 bh 67% 3.000 16 bh 67% 10.000 24 bh 67% 16.000 12 bh 67% 8.000 24 bh 67% 16.000 12 bh 67% 8.000

414.556 Kg 67% 277.753

185.805 Kg 0% -

262.765 Kg 0% -

Page 28: Rab Sd Negeri Soko 1

70.994 Kg 0% - 333.759 kg -

0.585 m3 0% - 0.151 m3 0% - - m3 0% - 0.736 m3 -

0.235 67% 0.158 0.941 67% 0.630 0.470 67% 0.315 1.646 M3 1.103

164.150 M2 67% 109.981 156.800 M2 67% 105.056 320.950 215.037

320.950 M2 67% 215.037 24.500 M' 67% 16.415 75.200 M' 0% -

- 24.500 m1 67% 16.415

109.008 67% 73.035 142.762 67% 95.650 196.000 67% 131.320 64.400 67% 43.148 512.170 m2 343.154

10.920 0% - 6.762 0% - 4.998 0% - 14.700 0% - 37.380 m2 - 549.550 343.15

157.500 0% - 40.500 0% - 33.750 0% - 26.200 0% - 257.950 m2 -

15.040 m2 0% - 53.405 m2 67% 35.781 9.891 m2 67% 6.627 78.336 42.408

18 bh 67% 12.000 15 bh 67% 10.000

3 bh 67% 2.000 4 bh 67% 3.000 3 bh 67% 2.000

Page 29: Rab Sd Negeri Soko 1

1 bh 67% 1.000

Page 30: Rab Sd Negeri Soko 1

LUAS UKURAN ( 7 x 7,5 ) JUMLAH 3 LOKAL, PANJANG TERAS 1,8 M', KUDA-KUDA KAYU SUDUT 30