rab mapolsek revisi weda utara ok

241
JADWAL WAKTU PELAKSANAAN TIME SCHEDULE PROGRAM : PEMBANGUNAN GEDUNG BNN KOTA TIDORE KEPULAUAN PEKERJAAN : BANGUNAN GEDUNG BNN KOTA TIDORE KEPULAUAN LOKASI : SOA-SIO KOTA TIDORE KEPULAUAN T. A. : 2013 NO URAIAN PEKERJAAN BOBOT PERMINGGU = 7 HK SELAMA 180 HARI KALENDER (TAHUN 2013) PEK. 7-Jun 14-Jun 21-Jun 28-Jun 5-Jul 12-Jul 19-Jul 26-Jul 2-Aug 9-Aug 16-Aug 23-Aug 30-Aug 6-Sep 13-Sep 20-Sep 27-Sep 4-Oct 11-Oct 18-Oct 25-Oct 1-Nov 8-Nov 15-Nov 22-Nov (%) 14-Jun 21-Jun 28-Jun 5-Jul 12-Jul 19-Jul 26-Jul 2-Aug 9-Aug 16-Aug 23-Aug 30-Aug 6-Sep 13-Sep 20-Sep 27-Sep 4-Oct 11-Oct 18-Oct 25-Oct 1-Nov 8-Nov 15-Nov 22-Nov 29-Nov A PEKERJAAN BANGUNAN UTAMA I PEKERJAAN LANTAI I Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 II PEKERJAAN LANTAI II Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 III PEKERJAAN FURNITURE Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 IV PEKERJAAN ELEKTRIKAL LANTAI I Err:509 Err:509 Err:509 Err:509 Err:509 PEKERJAAN ELEKTRIKAL LANTAI II Err:509 Err:509 Err:509 Err:509 Err:509 PEKERJAAN ELEKTRIKAL ATAP Err:509 Err:509 Err:509 PEKERJAAN ELEKTRIKAL KAWASAN Err:509 Err:509 Err:509 B PEKERJAAN BANGUNAN POS JAGA Err:509 Err:509 C PEKERJAAN LANDSCAPE Err:509 Err:509 Err:509 Err:509 D PENYAMBUNGAN I LISTRIK PLN 33 KVA Err:509 Err:509 Err:509 II TELEPON 1 LINE Err:509 JUMLAH Err:509 A RENCANA KEMAJUAN FISIK MINGGUAN Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 B RENCANA KEMAJUAN FISIK MINGGUAN (KUMULATIF) Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 C REALISASI KEMAJUAN FISIK MINGGUAN D REALISASI KEMAJUAN FISIK MINGGUAN (KUMULATIF) Ternate, 15 April 2014 Perencana CV.MEGACOTAMA Ir. NASRUN GAUZIAH Direktur Utama

Upload: -

Post on 17-Dec-2015

311 views

Category:

Documents


1 download

DESCRIPTION

Rencana anggaran biaya

TRANSCRIPT

Sheet4 (4)ANGKAMAX. 11 DIGIT ANGKARp904,864,000TERBILANG :SEMBILAN RATUS EMPAT JUTA DELAPAN RATUS ENAM PULUH EMPAT RIBU RUPIAHMILYAR 00 0 0 900000000900SEMBILAN RATUS 100SERATUS 1SATU JUTA 40000004EMPAT 200DUA RATUS 2DUA 800000800DELAPAN RATUS 300TIGA RATUS 3TIGA RIBU 6400064ENAM PULUH EMPAT 400EMPAT RATUS 4EMPAT 00 500LIMA RATUS 5LIMA RUPIAH00 600ENAM RATUS 6ENAM 700TUJUH RATUS 7TUJUH 800DELAPAN RATUS 8DELAPAN 900SEMBILAN RATUS 9SEMBILAN 10SEPULUH 11SEBELAS 12DUA BELAS 13TIGA BELAS 14EMPAT BELAS 15LIMA BELAS 16ENAM BELAS 17TUJUH BELAS 18DELAPAN BELAS 19SEMBILAN BELAS 20DUA PULUH 21DUA PULUH SATU 22DUA PULUH DUA 23DUA PULUH TIGA 24DUA PULUH EMPAT 25DUA PULUH LIMA 26DUA PULUH ENAM 27DUA PULUH TUJUH 28DUA PULUH DELAPAN 29DUA PULUH SEMBILAN 30TIGA PULUH 31TIGA PULUH SATU 32TIGA PULUH DUA 33TIGA PULUH TIGA 34TIGA PULUH EMPAT 35TIGA PULUH LIMA 36TIGA PULUH ENAM 37TIGA PULUH TUJUH 38TIGA PULUH DELAPAN 39TIGA PULUH SEMBILAN 40EMPAT PULUH 41EMPAT PULUH SATU 42EMPAT PULUH DUA 43EMPAT PULUH TIGA 44EMPAT PULUH EMPAT 45EMPAT PULUH LIMA 46EMPAT PULUH ENAM 47EMPAT PULUH TUJUH 48EMPAT PULUH DELAPAN 49EMPAT PULUH SEMBILAN 50LIMA PULUH 51LIMA PULUH SATU 52LIMA PULUH DUA 53LIMA PULUH TIGA 54LIMA PULUH EMPAT 55LIMA PULUH LIMA 56LIMA PULUH ENAM 57LIMA PULUH TUJUH 58LIMA PULUH DELAPAN 59LIMA PULUH SEMBILAN 60ENAM PULUH 61ENAM PULUH SATU 62ENAM PULUH DUA 63ENAM PULUH TIGA 64ENAM PULUH EMPAT 65ENAM PULUH LIMA 66ENAM PULUH ENAM 67ENAM PULUH TUJUH 68ENAM PULUH DELAPAN 69ENAM PULUH SEMBILAN 70TUJUH PULUH 71TUJUH PULUH SATU 72TUJUH PULUH DUA 73TUJUH PULUH TIGA 74TUJUH PULUH EMPAT 75TUJUH PULUH LIMA 76TUJUH PULUH ENAM 77TUJUH PULUH TUJUH 78TUJUH PULUH DELAPAN 79TUJUH PULUH SEMBILAN 80DELAPAN PULUH 81DELAPAN PULUH SATU 82DELAPAN PULUH DUA 83DELAPAN PULUH TIGA 84DELAPAN PULUH EMPAT 85DELAPAN PULUH LIMA 86DELAPAN PULUH ENAM 87DELAPAN PULUH TUJUH 88DELAPAN PULUH DELAPAN 89DELAPAN PULUH SEMBILAN 90SEMBILAN PULUH 91SEMBILAN PULUH SATU 92SEMBILAN PULUH DUA 93SEMBILAN PULUH TIGA 94SEMBILAN PULUH EMPAT 95SEMBILAN PULUH LIMA 96SEMBILAN PULUH ENAM 97SEMBILAN PULUH TUJUH 98SEMBILAN PULUH DELAPAN 99SEMBILAN PULUH SEMBILAN 45678910MILYARSEMBILAN RATUS EMPAT JUTA DELAPAN RATUS ENAM PULUH EMPAT RIBU RUPIAH MILYAR SEMBILAN RATUS EMPAT JUTA DELAPAN RATUS ENAM PULUH EMPAT RIBU RUPIAH MILYAR SEMBILAN RATUS EMPAT JUTA DELAPAN RATUS ENAM PULUH EMPAT RIBU RUPIAH MILYAR SEMBILAN RATUS EMPAT JUTA DELAPAN RATUS ENAM PULUH EMPAT RIBU RUPIAH MILYAR SEMBILAN RATUS EMPAT JUTA DELAPAN RATUS ENAM PULUH EMPAT RIBU RUPIAH MILYAR SEMBILAN RATUS EMPAT JUTA DELAPAN RATUS ENAM PULUH EMPAT RIBU RUPIAH MILYAR SEMBILAN RATUS EMPAT JUTA DELAPAN RATUS ENAM PULUH EMPAT RIBU RUPIAH MILYAR SEMBILAN RATUS EMPAT JUTA DELAPAN RATUS ENAM PULUH EMPAT RIBU RUPIAHSEMBILAN RATUS EMPAT JUTA DELAPAN RATUS ENAM PULUH EMPAT RIBU RUPIAH MILYAR EMPAT JUTA DELAPAN RATUS ENAM PULUH EMPAT RIBU RUPIAH MILYAR SEMBILAN RATUS JUTA DELAPAN RATUS ENAM PULUH EMPAT RIBU RUPIAH MILYAR SEMBILAN RATUS EMPAT JUTA ENAM PULUH EMPAT RIBU RUPIAH MILYAR SEMBILAN RATUS EMPAT JUTA DELAPAN RATUS RIBU RUPIAH MILYAR SEMBILAN RATUS EMPAT JUTA DELAPAN RATUS ENAM PULUH EMPAT RIBU RUPIAH MILYAR SEMBILAN RATUS EMPAT JUTA DELAPAN RATUS ENAM PULUH EMPAT RIBU RUPIAHEMPAT JUTA DELAPAN RATUS ENAM PULUH EMPAT RIBU RUPIAH MILYAR DELAPAN RATUS ENAM PULUH EMPAT RIBU RUPIAH MILYAR SEMBILAN RATUS JUTA ENAM PULUH EMPAT RIBU RUPIAH MILYAR SEMBILAN RATUS EMPAT JUTA RUPIAH MILYAR SEMBILAN RATUS EMPAT JUTA DELAPAN RATUS RIBU RUPIAH MILYAR SEMBILAN RATUS EMPAT JUTA DELAPAN RATUS ENAM PULUH EMPAT RIBU RUPIAHSEMBILAN RATUS EMPAT JUTA DELAPAN RATUS ENAM PULUH EMPAT RIBU RUPIAH MILYAR EMPAT JUTA DELAPAN RATUS ENAM PULUH EMPAT RIBU RUPIAH MILYAR SEMBILAN RATUS JUTA DELAPAN RATUS ENAM PULUH EMPAT RIBU RUPIAH MILYAR SEMBILAN RATUS EMPAT JUTA ENAM PULUH EMPAT RIBU RUPIAH MILYAR SEMBILAN RATUS EMPAT JUTA DELAPAN RATUS RIBU RUPIAH MILYAR SEMBILAN RATUS EMPAT JUTA DELAPAN RATUS ENAM PULUH EMPAT RIBU RUPIAHDELAPAN RATUS ENAM PULUH EMPAT RIBU RUPIAH MILYAR ENAM PULUH EMPAT RIBU RUPIAH MILYAR SEMBILAN RATUS JUTA RUPIAH MILYAR SEMBILAN RATUS EMPAT JUTA RUPIAH MILYAR SEMBILAN RATUS EMPAT JUTA DELAPAN RATUS RIBU RUPIAHEMPAT JUTA DELAPAN RATUS ENAM PULUH EMPAT RIBU RUPIAH MILYAR DELAPAN RATUS ENAM PULUH EMPAT RIBU RUPIAH MILYAR SEMBILAN RATUS JUTA ENAM PULUH EMPAT RIBU RUPIAH MILYAR SEMBILAN RATUS EMPAT JUTA RUPIAH MILYAR SEMBILAN RATUS EMPAT JUTA DELAPAN RATUS RIBU RUPIAHSEMBILAN RATUS JUTA DELAPAN RATUS ENAM PULUH EMPAT RIBU RUPIAH MILYAR EMPAT JUTA ENAM PULUH EMPAT RIBU RUPIAH MILYAR SEMBILAN RATUS JUTA DELAPAN RATUS RIBU RUPIAH MILYAR SEMBILAN RATUS EMPAT JUTA ENAM PULUH EMPAT RIBU RUPIAH MILYAR SEMBILAN RATUS EMPAT JUTA DELAPAN RATUS RIBU RUPIAHSEMBILAN RATUS EMPAT JUTA DELAPAN RATUS ENAM PULUH EMPAT RIBU RUPIAH MILYAR EMPAT JUTA DELAPAN RATUS ENAM PULUH EMPAT RIBU RUPIAH MILYAR SEMBILAN RATUS JUTA DELAPAN RATUS ENAM PULUH EMPAT RIBU RUPIAH MILYAR SEMBILAN RATUS EMPAT JUTA ENAM PULUH EMPAT RIBU RUPIAH MILYAR SEMBILAN RATUS EMPAT JUTA DELAPAN RATUS RIBU RUPIAHENAM PULUH EMPAT RIBU RUPIAH MILYAR RUPIAH MILYAR SEMBILAN RATUS JUTA RUPIAH MILYAR SEMBILAN RATUS EMPAT JUTA RUPIAHDELAPAN RATUS ENAM PULUH EMPAT RIBU RUPIAH MILYAR ENAM PULUH EMPAT RIBU RUPIAH MILYAR SEMBILAN RATUS JUTA RUPIAH MILYAR SEMBILAN RATUS EMPAT JUTA RUPIAHEMPAT JUTA ENAM PULUH EMPAT RIBU RUPIAH MILYAR DELAPAN RATUS RIBU RUPIAH MILYAR SEMBILAN RATUS JUTA ENAM PULUH EMPAT RIBU RUPIAH MILYAR SEMBILAN RATUS EMPAT JUTA RUPIAHEMPAT JUTA DELAPAN RATUS ENAM PULUH EMPAT RIBU RUPIAH MILYAR DELAPAN RATUS ENAM PULUH EMPAT RIBU RUPIAH MILYAR SEMBILAN RATUS JUTA ENAM PULUH EMPAT RIBU RUPIAH MILYAR SEMBILAN RATUS EMPAT JUTA RUPIAHSEMBILAN RATUS JUTA ENAM PULUH EMPAT RIBU RUPIAH MILYAR EMPAT JUTA RUPIAH MILYAR SEMBILAN RATUS JUTA DELAPAN RATUS RIBU RUPIAH MILYAR SEMBILAN RATUS EMPAT JUTA ENAM PULUH EMPAT RIBU RUPIAHSEMBILAN RATUS JUTA DELAPAN RATUS ENAM PULUH EMPAT RIBU RUPIAH MILYAR EMPAT JUTA ENAM PULUH EMPAT RIBU RUPIAH MILYAR SEMBILAN RATUS JUTA DELAPAN RATUS RIBU RUPIAH MILYAR SEMBILAN RATUS EMPAT JUTA ENAM PULUH EMPAT RIBU RUPIAHSEMBILAN RATUS EMPAT JUTA ENAM PULUH EMPAT RIBU RUPIAH MILYAR EMPAT JUTA DELAPAN RATUS RIBU RUPIAH MILYAR SEMBILAN RATUS JUTA DELAPAN RATUS ENAM PULUH EMPAT RIBU RUPIAH MILYAR SEMBILAN RATUS EMPAT JUTA ENAM PULUH EMPAT RIBU RUPIAHSEMBILAN RATUS EMPAT JUTA DELAPAN RATUS ENAM PULUH EMPAT RIBU RUPIAH MILYAR EMPAT JUTA DELAPAN RATUS ENAM PULUH EMPAT RIBU RUPIAH MILYAR SEMBILAN RATUS JUTA DELAPAN RATUS ENAM PULUH EMPAT RIBU RUPIAH MILYAR SEMBILAN RATUS EMPAT JUTA ENAM PULUH EMPAT RIBU RUPIAHGOBLOK BANGET SIH, TAU BEKING RAB KA' NYANDA MILYAR RUPIAH MILYAR SEMBILAN RATUS JUTA RUPIAHENAM PULUH EMPAT RIBU RUPIAH MILYAR RUPIAH MILYAR SEMBILAN RATUS JUTA RUPIAHDELAPAN RATUS RIBU RUPIAH MILYAR ENAM PULUH EMPAT RIBU RUPIAH MILYAR SEMBILAN RATUS JUTA RUPIAHDELAPAN RATUS ENAM PULUH EMPAT RIBU RUPIAH MILYAR ENAM PULUH EMPAT RIBU RUPIAH MILYAR SEMBILAN RATUS JUTA RUPIAHEMPAT JUTA RUPIAH MILYAR DELAPAN RATUS RIBU RUPIAH MILYAR SEMBILAN RATUS JUTA ENAM PULUH EMPAT RIBU RUPIAHEMPAT JUTA ENAM PULUH EMPAT RIBU RUPIAH MILYAR DELAPAN RATUS RIBU RUPIAH MILYAR SEMBILAN RATUS JUTA ENAM PULUH EMPAT RIBU RUPIAHEMPAT JUTA DELAPAN RATUS RIBU RUPIAH MILYAR DELAPAN RATUS ENAM PULUH EMPAT RIBU RUPIAH MILYAR SEMBILAN RATUS JUTA ENAM PULUH EMPAT RIBU RUPIAHEMPAT JUTA DELAPAN RATUS ENAM PULUH EMPAT RIBU RUPIAH MILYAR DELAPAN RATUS ENAM PULUH EMPAT RIBU RUPIAH MILYAR SEMBILAN RATUS JUTA ENAM PULUH EMPAT RIBU RUPIAHSEMBILAN RATUS JUTA RUPIAH MILYAR EMPAT JUTA RUPIAH MILYAR SEMBILAN RATUS JUTA DELAPAN RATUS RIBU RUPIAHSEMBILAN RATUS JUTA ENAM PULUH EMPAT RIBU RUPIAH MILYAR EMPAT JUTA RUPIAH MILYAR SEMBILAN RATUS JUTA DELAPAN RATUS RIBU RUPIAHSEMBILAN RATUS JUTA DELAPAN RATUS RIBU RUPIAH MILYAR EMPAT JUTA ENAM PULUH EMPAT RIBU RUPIAH MILYAR SEMBILAN RATUS JUTA DELAPAN RATUS RIBU RUPIAHSEMBILAN RATUS JUTA DELAPAN RATUS ENAM PULUH EMPAT RIBU RUPIAH MILYAR EMPAT JUTA ENAM PULUH EMPAT RIBU RUPIAH MILYAR SEMBILAN RATUS JUTA DELAPAN RATUS RIBU RUPIAHSEMBILAN RATUS EMPAT JUTA RUPIAH MILYAR EMPAT JUTA DELAPAN RATUS RIBU RUPIAH MILYAR SEMBILAN RATUS JUTA DELAPAN RATUS ENAM PULUH EMPAT RIBU RUPIAHSEMBILAN RATUS EMPAT JUTA ENAM PULUH EMPAT RIBU RUPIAH MILYAR EMPAT JUTA DELAPAN RATUS RIBU RUPIAH MILYAR SEMBILAN RATUS JUTA DELAPAN RATUS ENAM PULUH EMPAT RIBU RUPIAHSEMBILAN RATUS EMPAT JUTA DELAPAN RATUS RIBU RUPIAH MILYAR EMPAT JUTA DELAPAN RATUS ENAM PULUH EMPAT RIBU RUPIAH MILYAR SEMBILAN RATUS JUTA DELAPAN RATUS ENAM PULUH EMPAT RIBU RUPIAHSEMBILAN RATUS EMPAT JUTA DELAPAN RATUS ENAM PULUH EMPAT RIBU RUPIAH MILYAR EMPAT JUTA DELAPAN RATUS ENAM PULUH EMPAT RIBU RUPIAH MILYAR SEMBILAN RATUS JUTA DELAPAN RATUS ENAM PULUH EMPAT RIBU RUPIAHGOBLOK BANGET SIH, TAU BEKING RAB KA' NYANDA MILYAR RUPIAHGILE BENER !!! BUAT APAAN TUH DUIT SEGITU, NGAK ONGKOS BUAT BAPIKIR MILYAR RUPIAHENAM PULUH EMPAT RIBU RUPIAH MILYAR RUPIAHENAM PULUH EMPAT RIBU RUPIAH MILYAR RUPIAHDELAPAN RATUS RIBU RUPIAH MILYAR ENAM PULUH EMPAT RIBU RUPIAHDELAPAN RATUS RIBU RUPIAH MILYAR ENAM PULUH EMPAT RIBU RUPIAHDELAPAN RATUS ENAM PULUH EMPAT RIBU RUPIAH MILYAR ENAM PULUH EMPAT RIBU RUPIAHDELAPAN RATUS ENAM PULUH EMPAT RIBU RUPIAH MILYAR ENAM PULUH EMPAT RIBU RUPIAHEMPAT JUTA RUPIAH MILYAR DELAPAN RATUS RIBU RUPIAHEMPAT JUTA RUPIAH MILYAR DELAPAN RATUS RIBU RUPIAHEMPAT JUTA ENAM PULUH EMPAT RIBU RUPIAH MILYAR DELAPAN RATUS RIBU RUPIAHEMPAT JUTA ENAM PULUH EMPAT RIBU RUPIAH MILYAR DELAPAN RATUS RIBU RUPIAHEMPAT JUTA DELAPAN RATUS RIBU RUPIAH MILYAR DELAPAN RATUS ENAM PULUH EMPAT RIBU RUPIAHEMPAT JUTA DELAPAN RATUS RIBU RUPIAH MILYAR DELAPAN RATUS ENAM PULUH EMPAT RIBU RUPIAHEMPAT JUTA DELAPAN RATUS ENAM PULUH EMPAT RIBU RUPIAH MILYAR DELAPAN RATUS ENAM PULUH EMPAT RIBU RUPIAHEMPAT JUTA DELAPAN RATUS ENAM PULUH EMPAT RIBU RUPIAH MILYAR DELAPAN RATUS ENAM PULUH EMPAT RIBU RUPIAHSEMBILAN RATUS JUTA RUPIAH MILYAR EMPAT JUTA RUPIAHSEMBILAN RATUS JUTA RUPIAH MILYAR EMPAT JUTA RUPIAHSEMBILAN RATUS JUTA ENAM PULUH EMPAT RIBU RUPIAH MILYAR EMPAT JUTA RUPIAHSEMBILAN RATUS JUTA ENAM PULUH EMPAT RIBU RUPIAH MILYAR EMPAT JUTA RUPIAHSEMBILAN RATUS JUTA DELAPAN RATUS RIBU RUPIAH MILYAR EMPAT JUTA ENAM PULUH EMPAT RIBU RUPIAHSEMBILAN RATUS JUTA DELAPAN RATUS RIBU RUPIAH MILYAR EMPAT JUTA ENAM PULUH EMPAT RIBU RUPIAHSEMBILAN RATUS JUTA DELAPAN RATUS ENAM PULUH EMPAT RIBU RUPIAH MILYAR EMPAT JUTA ENAM PULUH EMPAT RIBU RUPIAHSEMBILAN RATUS JUTA DELAPAN RATUS ENAM PULUH EMPAT RIBU RUPIAH MILYAR EMPAT JUTA ENAM PULUH EMPAT RIBU RUPIAHSEMBILAN RATUS EMPAT JUTA RUPIAH MILYAR EMPAT JUTA DELAPAN RATUS RIBU RUPIAHSEMBILAN RATUS EMPAT JUTA RUPIAH MILYAR EMPAT JUTA DELAPAN RATUS RIBU RUPIAHSEMBILAN RATUS EMPAT JUTA ENAM PULUH EMPAT RIBU RUPIAH MILYAR EMPAT JUTA DELAPAN RATUS RIBU RUPIAHSEMBILAN RATUS EMPAT JUTA ENAM PULUH EMPAT RIBU RUPIAH MILYAR EMPAT JUTA DELAPAN RATUS RIBU RUPIAHSEMBILAN RATUS EMPAT JUTA DELAPAN RATUS RIBU RUPIAH MILYAR EMPAT JUTA DELAPAN RATUS ENAM PULUH EMPAT RIBU RUPIAHSEMBILAN RATUS EMPAT JUTA DELAPAN RATUS RIBU RUPIAH MILYAR EMPAT JUTA DELAPAN RATUS ENAM PULUH EMPAT RIBU RUPIAHSEMBILAN RATUS EMPAT JUTA DELAPAN RATUS ENAM PULUH EMPAT RIBU RUPIAH MILYAR EMPAT JUTA DELAPAN RATUS ENAM PULUH EMPAT RIBU RUPIAHSEMBILAN RATUS EMPAT JUTA DELAPAN RATUS ENAM PULUH EMPAT RIBU RUPIAH MILYAR EMPAT JUTA DELAPAN RATUS ENAM PULUH EMPAT RIBU RUPIAHGOBLOK BANGET SIH, TAU BEKING RAB KA' NYANDABUSYETTT !!!!! LEBIH BAIK BUAT BELI KOREK KUPING, KALO KURANG LOE TAMBAH NECH !!!GILE BENER !!! BUAT APAAN TUH DUIT SEGITU, NGAK ONGKOS BUAT BAPIKIRLEBIH BAGUS TIDUR JOO !!! KALO MO URISIN DUIT CUMA SEGITU !!!ENAM PULUH EMPAT RIBU RUPIAHENAM PULUH EMPAT RIBU RUPIAHENAM PULUH EMPAT RIBU RUPIAHENAM PULUH EMPAT RIBU RUPIAHENAM PULUH EMPAT RIBU RUPIAHENAM PULUH EMPAT RIBU RUPIAHENAM PULUH EMPAT RIBU RUPIAHENAM PULUH EMPAT RIBU RUPIAHDELAPAN RATUS RIBU RUPIAHDELAPAN RATUS RIBU RUPIAHDELAPAN RATUS RIBU RUPIAHDELAPAN RATUS RIBU RUPIAHDELAPAN RATUS RIBU RUPIAHDELAPAN RATUS RIBU RUPIAHDELAPAN RATUS RIBU RUPIAHDELAPAN RATUS RIBU RUPIAHDELAPAN RATUS ENAM PULUH EMPAT RIBU RUPIAHDELAPAN RATUS ENAM PULUH EMPAT RIBU RUPIAHDELAPAN RATUS ENAM PULUH EMPAT RIBU RUPIAHDELAPAN RATUS ENAM PULUH EMPAT RIBU RUPIAHDELAPAN RATUS ENAM PULUH EMPAT RIBU RUPIAHDELAPAN RATUS ENAM PULUH EMPAT RIBU RUPIAHDELAPAN RATUS ENAM PULUH EMPAT RIBU RUPIAHDELAPAN RATUS ENAM PULUH EMPAT RIBU RUPIAHEMPAT JUTA RUPIAHEMPAT JUTA RUPIAHEMPAT JUTA RUPIAHEMPAT JUTA RUPIAHEMPAT JUTA ENAM PULUH EMPAT RIBU RUPIAHEMPAT JUTA ENAM PULUH EMPAT RIBU RUPIAHEMPAT JUTA ENAM PULUH EMPAT RIBU RUPIAHEMPAT JUTA ENAM PULUH EMPAT RIBU RUPIAHEMPAT JUTA DELAPAN RATUS RIBU RUPIAHEMPAT JUTA DELAPAN RATUS RIBU RUPIAHEMPAT JUTA DELAPAN RATUS RIBU RUPIAHEMPAT JUTA DELAPAN RATUS RIBU RUPIAHEMPAT JUTA DELAPAN RATUS ENAM PULUH EMPAT RIBU RUPIAHEMPAT JUTA DELAPAN RATUS ENAM PULUH EMPAT RIBU RUPIAHEMPAT JUTA DELAPAN RATUS ENAM PULUH EMPAT RIBU RUPIAHEMPAT JUTA DELAPAN RATUS ENAM PULUH EMPAT RIBU RUPIAHSEMBILAN RATUS JUTA RUPIAHSEMBILAN RATUS JUTA RUPIAHSEMBILAN RATUS JUTA RUPIAHSEMBILAN RATUS JUTA RUPIAHSEMBILAN RATUS JUTA ENAM PULUH EMPAT RIBU RUPIAHSEMBILAN RATUS JUTA ENAM PULUH EMPAT RIBU RUPIAHSEMBILAN RATUS JUTA ENAM PULUH EMPAT RIBU RUPIAHSEMBILAN RATUS JUTA ENAM PULUH EMPAT RIBU RUPIAHSEMBILAN RATUS JUTA DELAPAN RATUS RIBU RUPIAHSEMBILAN RATUS JUTA DELAPAN RATUS RIBU RUPIAHSEMBILAN RATUS JUTA DELAPAN RATUS RIBU RUPIAHSEMBILAN RATUS JUTA DELAPAN RATUS RIBU RUPIAHSEMBILAN RATUS JUTA DELAPAN RATUS ENAM PULUH EMPAT RIBU RUPIAHSEMBILAN RATUS JUTA DELAPAN RATUS ENAM PULUH EMPAT RIBU RUPIAHSEMBILAN RATUS JUTA DELAPAN RATUS ENAM PULUH EMPAT RIBU RUPIAHSEMBILAN RATUS JUTA DELAPAN RATUS ENAM PULUH EMPAT RIBU RUPIAHSEMBILAN RATUS EMPAT JUTA RUPIAHSEMBILAN RATUS EMPAT JUTA RUPIAHSEMBILAN RATUS EMPAT JUTA RUPIAHSEMBILAN RATUS EMPAT JUTA RUPIAHSEMBILAN RATUS EMPAT JUTA ENAM PULUH EMPAT RIBU RUPIAHSEMBILAN RATUS EMPAT JUTA ENAM PULUH EMPAT RIBU RUPIAHSEMBILAN RATUS EMPAT JUTA ENAM PULUH EMPAT RIBU RUPIAHSEMBILAN RATUS EMPAT JUTA ENAM PULUH EMPAT RIBU RUPIAHSEMBILAN RATUS EMPAT JUTA DELAPAN RATUS RIBU RUPIAHSEMBILAN RATUS EMPAT JUTA DELAPAN RATUS RIBU RUPIAHSEMBILAN RATUS EMPAT JUTA DELAPAN RATUS RIBU RUPIAHSEMBILAN RATUS EMPAT JUTA DELAPAN RATUS RIBU RUPIAHSEMBILAN RATUS EMPAT JUTA DELAPAN RATUS ENAM PULUH EMPAT RIBU RUPIAHSEMBILAN RATUS EMPAT JUTA DELAPAN RATUS ENAM PULUH EMPAT RIBU RUPIAHSEMBILAN RATUS EMPAT JUTA DELAPAN RATUS ENAM PULUH EMPAT RIBU RUPIAHSEMBILAN RATUS EMPAT JUTA DELAPAN RATUS ENAM PULUH EMPAT RIBU RUPIAH

TSJADWAL WAKTU PELAKSANAANTIME SCHEDULEPROGRAM:PEMBANGUNAN GEDUNG BNN KOTA TIDORE KEPULAUANPEKERJAAN:BANGUNAN GEDUNG BNN KOTA TIDORE KEPULAUANLOKASI:SOA-SIO KOTA TIDORE KEPULAUANT. A.:2013

NOURAIAN PEKERJAANJUMLAH BOBOTPERMINGGU = 7 HK SELAMA 180 HARI KALENDER (TAHUN 2013)KETHARGAPEK. 7-Jun14-Jun21-Jun28-Jun5-Jul12-Jul19-Jul26-Jul2-Aug9-Aug16-Aug23-Aug30-Aug6-Sep13-Sep20-Sep27-Sep4-Oct11-Oct18-Oct25-Oct1-Nov8-Nov15-Nov22-Nov29-NovHARGA (RP)(%)14-Jun21-Jun28-Jun5-Jul12-Jul19-Jul26-Jul2-Aug9-Aug16-Aug23-Aug30-Aug6-Sep13-Sep20-Sep27-Sep4-Oct11-Oct18-Oct25-Oct1-Nov8-Nov15-Nov22-Nov29-Nov4-DecAPEKERJAAN BANGUNAN UTAMAIPEKERJAAN LANTAI I25,552,574.65ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!IIPEKERJAAN LANTAI II47,530,453.68ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!IIIPEKERJAAN FURNITURE91,258,034.13ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!IVPEKERJAAN ELEKTRIKAL LANTAI I123,133,317.38ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!PEKERJAAN ELEKTRIKAL LANTAI II92,141,583.24ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!PEKERJAAN ELEKTRIKAL ATAP58,220,113.87ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!PEKERJAAN ELEKTRIKAL KAWASAN106,295,624.14ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!BPEKERJAAN BANGUNAN POS JAGA0.0ERROR:#REF!ERROR:#REF!ERROR:#REF!CPEKERJAAN LANDSCAPE0.0ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!DPENYAMBUNGANILISTRIK PLN 33 KVAERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!IITELEPON 1 LINEERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!JUMLAHERROR:#REF!ERROR:#REF!ARENCANA KEMAJUAN FISIK MINGGUANERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!BRENCANA KEMAJUAN FISIK MINGGUAN (KUMULATIF)ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!CREALISASI KEMAJUAN FISIK MINGGUANDREALISASI KEMAJUAN FISIK MINGGUAN (KUMULATIF)

Ternate, 15 April 2014PerencanaCV.MEGACOTAMA

Ir. NASRUN GAUZIAHDirektur Utama

RAB MASTERRENCANA ANGGARAN BIAYA(Cost Estimate / Bill of Quantity)PROGRAM:PEKERJAAN:LOKASI:TAHUN ANGGARAN:

NO URAIAN PEKERJAANSATUANVOLUMEHARGA SATUANJUMLAH HARGANOWork DescriptionUnitVolumeUnit Price (Rp)Amount (RP)123456APEKERJAAN STRUKTUR BANGUNAN UTAMAaLANTAI IIPEKERJAAN PERSIAPAN1Pembersihan LapanganM21,200.0012,400.0014,880,000.002Uitzet & BouwplankM'164.0054,774.158,982,960.603Pagar Pengaman KelilingM'101.00205,594.2020,765,014.204Direksi keetM29.00899,924.708,099,322.305Air & Listrik KerjaLs1.005,000,000.005,000,000.00101TOTAL PEKERJAAN PERSIAPAN57,727,297.10IIPEKERJAAN TANAH1Galian Tanah PondasiM3185.5643,280.008,031,036.802Urugan Tanah KembaliM361.8515,800.00977,230.003Urugan Pasir Bawah Sloof t = 10 cmM311.000.04Urugan Pasir Bawah Pondasi Batu Kali t = 10 cmM321.47290,517.506,236,829.69

5Urugan Pasir Bawah Poer t = 10 cmM33.60290,517.501,045,863.006Urugan Pasir Bawah Lantai t = 10 cmM322.50290,517.506,536,643.757Urugan Tanah Peninggial Elevasi BangunanM3156.31249,800.0039,046,737.60

8Pemadatan TanahM3156.3141,200.006,440,054.40TOTAL PEKERJAAN TANAH68,314,395.2472IIIPEKERJAAN PASANGAN BATU PONDASIERROR:#REF!1Pasangan Batu PondasiM396.601,084,952.00104,806,363.2046.82Pelesteran PondasiM371.5653,683.403,841,584.10ERROR:#REF!0.90.45TOTAL PEKERJAAN TANAH108,647,947.30ERROR:#REF!ERROR:#REF!ERROR:#REF!

IIIPEKERJAAN BETONERROR:#REF!3Beton Pondasi Poer Plat Beton3.616.7-120 x 120 cmM311.254,617,803.8651,950,293.43ERROR:#REF!-100 x 100 cmM30.504,617,803.862,308,901.934Lantai Kerja Bawah Pondasi t = 10 cmM33.601,048,337.503,774,015.00ERROR:#REF!5Sloof0.0240.48-S1 20 x 40 cmM312.265,764,157.6070,668,572.1824.048-S2 20 x 30 cmM31.805,764,157.6010,375,483.686Lantai Kerja Bawah Sloof t = 5 cmM33.670.07Rabatan Beton t = 10 cmM322.501,048,337.5023,587,593.758Kolom0.00.250.09-K1 30 x 30 cmM310.807,611,456.3582,203,728.620.52.25-K2 25 x 25 cmM30.607,012,750.054,207,650.032.75-KP 15 x 15 cmM32.654,645,001.8812,309,254.979Balok0.0-BL 15 x 15 cmM31.054,645,001.884,877,251.9710Plat0.0-Plat Meja Dapur t = 7 cmM30.053,917,220.42195,861.02-Plat Meja Wastafel t = 7 cmM30.193,917,220.42744,271.8811Tangga0.0-Plat Tangga t = 14 cmM34.425,909,729.1626,121,002.90-Anak TanggaM30.894,031,843.463,588,340.68-Plat Bordes t = 14 cmM30.806,237,047.164,989,637.73TOTAL PEKERJAAN BETON LANTAI I301,901,859.76TOTAL PEKERJAAN LANTAI I536,591,499.40

bLANTAI IIIPEKERJAAN BETON1Kolom-K1 30 x 30 cmM39.347,611,456.3571,091,002.34K2 25 x 25 cmM30.527,012,750.053,646,630.03KP 15 x 15 cmM32.244,645,001.8810,404,804.202Balok0.0-B1 30 x 40 cmM35.906,673,500.0539,373,650.27-B2-1 20 x 40 cmM38.936,632,960.2559,232,335.00-B2-2 20 x 40 cmM30.616,632,960.254,046,105.75-B3-1 20 x 30 cmM32.916,616,070.5519,252,765.29-BL 15 x 15 cmM31.124,897,270.455,484,942.903Plat0.0-Plat Lantai t = 12 cmM323.586,417,152.00151,316,444.164Water Profing CoatingM228.22280,314.757,910,482.25

TOTAL PEKERJAAN BETON LANTAI II371,759,162.18TOTAL PEKERJAAN LANTAI II371,759,162.18

CLANTAI ATAPIPEKERJAAN BETON1Kolom-K1 30 x 30 cmM31.897,611,456.3514,385,652.512Balok0.0-B1 30 x 40 cmM37.136,673,500.0547,582,055.33-B2-1 20 x 40 cmM314.116,632,960.2593,591,069.07-B2-2 20 x 40 cmM31.526,632,960.2510,082,099.57-B2-3 20 x 40 cmM32.305,951,674.5513,688,851.46-B3-1 20 x 30 cmM31.536,616,070.5510,122,587.94-B3-2 20 x 30 cmM30.146,350,312.15889,043.70-BL 15 x 15 cmM30.164,897,270.45783,563.273Plat0.0-Plat Atap t = 10 cmM324.055,793,259.54139,327,892.03-Plat Atap t = 12 cmM33.116,417,152.0019,957,342.724Water Profing Membran 3 mmM2266.44164,750.0043,895,990.00

TOTAL PEKERJAAN BETON LANTAI ATAP394,306,147.59TOTAL PEKERJAAN LANTAI ATAP766,065,309.77TOTAL PEKERJAAN STRUKTUR1,302,656,809.18

BPEKERJAAN ARSITEK BANGUNAN UTAMAPEKERJAAN ARSITEKaLANTAI 1IPEKERJAAN PASANGAN2Pasangan AanstampengM31.68652,819.501,096,736.763Pasangan Pondasi Batu Kali 1 : 5M35.361,084,952.005,815,342.724Pasangan Rollag 1 BataM224.60363,864.538,951,067.325Pasangan Trasram 1/2 Bata 1 Pc : 3 PsM283.69174,825.8314,631,173.296Pasangan Dinding 1/2 Bata 1 Pc : 5 PsM2503.40166,941.1584,038,174.91

TOTAL PEKERJAAN PASANGAN LANTAI I114,532,495.00

IIPEKERJAAN PINTU,1PTBH1.0018,128,451.4418,128,451.442P1BH1.004,498,995.374,498,995.373P2BH2.002,759,989.495,519,978.974P3BH3.002,670,851.908,012,555.705P4BH6.001,649,549.929,897,299.516P5BH1.001,514,523.921,514,523.927J2BH2.004,872,149.019,744,298.028J3BH2.004,157,315.848,314,631.689J4BH2.005,746,340.7011,492,681.4010J5BH1.004,110,019.244,110,019.2411J6BH1.001,848,043.751,848,043.7512BV1BH1.001,698,381.001,698,381.0013BV3BH1.00621,331.20621,331.2014Partisi 1BH3.007,895,910.8023,687,732.4015Partisi 2BH1.008,199,116.278,199,116.2716Partisi 3BH3.007,803,619.2023,410,857.6017Partisi 4BH1.004,084,217.284,084,217.2818Partisi 5BH1.001,811,257.921,811,257.92

TOTAL PEKERJAAN PINTU, JENDELA, & PARTISI LANTAI 1146,594,372.69

IIIPEKERJAAN PLESTERAN & ACIAN1Plesteran Dinding Trasram 1/2 Bata 1 : 3, t = 15 cmM2167.3763,920.1010,698,307.1422Plesteran Dinding 1/2 Bata 1 : 5, t = 15 cmM21,006.8053,683.4054,048,447.1233Acian Dinding & BetonM21,224.8393,268.18114,237,658.7944BenanganM'480.0015,421.807,402,464.00

TOTAL PEKERJAAN PLESTERAN & ACIAN LANTAI 1186,386,877.04

IVPEKERJAAN PLAFOND1Plafond Gypsum Board 9 mm + Rangka Metal FuringM2179.14393,165.0270,431,581.682Plafond Gypsum Board WR 4 mm + Rangka Metal FuringM228.22361,486.1010,201,137.743List PlafondM'257.78174,607.0045,010,192.46

TOTAL PEKERJAAN PLAFOND LANTAI 1125,642,911.88

VPEKERJAAN KERAMIK1Keramik Lantai 40 x 40 cmM2196.78250,948.3049,381,606.472Keramik Lantai KM/WC 20 x 20 cmM228.22191,450.505,402,733.113Keramik Dinding KM/WC 20 x 25 cmM290.00260,438.3523,439,451.504Border Keramik 10 x 20 cmM'60.00234,672.6014,080,356.005Keramik Tangga 30 x 30 cmM218.97248,680.004,717,459.606Plint Keramik 10 x 20 cmM'99.37234,672.6023,319,416.267StepnoisM'32.88234,672.607,716,035.098Keramik Meja Pantry 30 x 30 cmM20.75248,680.00186,510.009Keramik Meja Wastafel 30 x 30 cmM22.70248,680.00671,436.00

TOTAL PEKERJAAN KERAMIK LANTAI 1128,915,004.03

VIPEKERJAAN SANITAIR1Kloset DudukBH4.002,787,144.0011,148,576.002Jet SprayBH4.00616,794.002,467,176.003Head ShowerBH2.00712,194.001,424,388.004Floor DrainBH9.00135,437.201,218,934.805Wastafel + AsesorisBH5.00846,040.204,230,201.006Kaca Cermin WastafelM23.40550,872.601,872,966.847UrinoirBH3.001,833,144.005,499,432.008Kitchen ZinkBH1.001,279,347.001,279,347.009Kran Kitchen ZinkBH1.00236,320.00236,320.00

TOTAL PEKERJAAN SANITAIR LANTAI 129,377,341.64

VIIPEKERJAAN PENGECATAN1Cat Tembok LuarM2243.8463,251.7515,423,306.722Cat Tembok DalamM2980.9954,563.6053,526,345.963Cat PlafondM2207.3644,979.509,326,949.12

TOTAL PEKERJAAN PENGECATAN LANTAI 178,276,601.80

VIIIPEKERJAAN LAIN-LAIN1Railing TanggaBH1.004,382,910.004,382,910.002Penyekat UrinoirBH3.00750,000.002,250,000.003Main HoleBH1.00250,000.00250,000.00

TOTAL PEKERJAAN LAIN-LAIN LANTAI 16,882,910.00TOTAL PEKERJAAN LANTAI 1816,608,514.09

bLANTAI 2IPEKERJAAN PASANGAN1Pasangan Trasram 1/2 Bata 1 Pc : 3 PsM281.572Pasangan Dinding 1/2 Bata 1 Pc : 5 PsM2431.62

TOTAL PEKERJAAN PASANGAN LANTAI 2823,741,424.09

IIPEKERJAAN PINTU, JENDELA, & PARTISI1P2BH1.002P3BH3.003P4BH6.004P5BH1.005J1BH1.006J2BH2.007J3BH4.008J4BH2.009J5BH1.0010J6BH1.0011BV1BH1.0012BV3BH1.0013Partisi 1BH3.0014Partisi 2BH1.0015Partisi 3BH3.0016Partisi 4BH1.0017Partisi 5BH1.00

TOTAL PEKERJAAN PINTU, JENDELA, & PARTISI LANTAI 20.00

IIIPEKERJAAN PLESTERAN & ACIAN1Plesteran Dinding Trasram 1/2 Bata 1 : 3M2163.142Plesteran Dinding 1/2 Bata 1 : 5, t = 15 cmM2863.243Acian Dinding & BetonM21 ,057.464BenanganM'415.00

TOTAL PEKERJAAN PLESTERAN & ACIAN LANTAI 20.00

IVPEKERJAAN PLAFOND1Plafond Gypsum Board 9 mm + Rangka Metal FuringM2179.14

2Plafond Gypsum Board WR 4 mm + Rangka Metal FuringM228.22

33 List PlafondM'250.48

TOTAL PEKERJAAN PLAFOND LANTAI 20.00

VPEKERJAAN KERAMIK1Keramik Lantai 40 x 40 cmM2179.142Keramik Lantai KM/WC 20 x 20 cmM228.223Keramik Dinding KM/WC 20 x 25 cmM290.004Border Keramik 10 x 20 cmM'60.005Plint Keramik 10 x 20 cmM'99.376Keramik Meja Wastafel 30 x 30 cmM22.70

TOTAL PEKERJAAN KERAMIK LANTAI 20.00

VIPEKERJAAN SANITAIR1Kloset DudukBH4.002Jet SprayBH4.003Head ShowerBH2.004Floor DrainBH9.005Wastafel + AsesorisBH5.006Kaca Cermin WastafelM'3.407UrinoirBH3.00

TOTAL PEKERJAAN SANITAIR LANTAI 20.00

VIIPEKERJAAN PENGECATAN1Cat Tembok LuarM2210.822Cat Tembok DalamM2846.643Cat PlafondM2207.36

TOTAL PEKERJAAN PENGECATAN LANTAI 20.00

VIIIPEKERJAAN LAIN-LAIN1Logo BNNLs1.002Tulisan-BADAN NARKOTIKA NASIONAL KOTA TIDORE KEPULAUANLs1.00

3Fasade-Pasangan Dinding 1/4 Bata 1 Pc : 5 PsM213.11-Plesteran Dinding 1/2 Bata 1 : 5, t = 15 cmM2211.20-Acian Dinding & BetonM2211.20-BenanganM2211.20-Cat Tembok LuarM2211.204KanopiLs1.005RaillingBH1.006Penyekat UrinoirBH3.00

TOTAL PEKERJAAN LAIN-LAIN LANTAI 20.00TOTAL PEKERJAAN LANTAI 20.00

cLANTAI ATAPIPEKERJAAN PASANGAN1Pasangan Dinding 1/2 Bata 1 Pc : 5 PsM242.92

TOTAL PEKERJAAN PASANGAN LANTAI ATAP0.00

IIPEKERJAAN PINTU, JENDELA, & PARTISI1P6BH1.002BV2BH2.00

TOTAL PEKERJAAN PINTU, JENDELA, & PARTISI LANTAI ATAP0.00

IIIPEKERJAAN PLESTERAN & ACIAN1Plesteran Dinding 1/2 Bata 1 : 5, t = 15 cmM285.842Acian Dinding & BetonM2569.393BenanganM'215.60

TOTAL PEKERJAAN PINTU, JENDELA, & PARTISI LANTAI ATAP0.00

IVPEKERJAAN PENGECATAN1Cat Tembok LuarM2171.792Cat Tembok DalamM2397.60

TOTAL PEKERJAAN PENGECATAN LANTAI ATAP0.00TOTAL PEKERJAAN LANTAI ATAP0.00TOTAL PEKERJAAN ARSITEK0.00

APEKERJAAN FURNITURaLANTAI 1ILobby1Counter reception 70x220x110Multiplek 18 mm lapis HPL, kaca 10mm, stainless steel hairlinesUnit1.00

2Kursi reception (dengan logo BNN di embossed)Unit2.003Back drop counterMultiplek 18 mm lapis HPL, kaca duco, stainless steel hairlinesM29.30

4Logo BNNStainless stell hairlines+cutting stikerUnit1.005Sofa three seaterRangka kayu solid, busa density 32, artificial leather(oscar),kaki stainless stellSet1.00

6Cofee table 50x900x45Multiplek 18 mm lapis HPL+ kaca 8 mm+spacer stainless stellUnit1.00

7Meja sudut 45x45x45Multiplek 18 mm lapis HPL+ kaca 8 mm+spacer stainless stellUnit2.00

TOTAL I0.00

IIRuang Eselon IV A & Staff1Meja kerja 70x140x75 (dengan plat stainless stell di gravire )Multiplek 18 mm lapis HPL+ handle stainless stellUnit2.002meja samping 60x120x75Multiplek 18 mm lapis HPL+ handle stainless stellUnit2.003kursi kerja ( dengan logo BNN di embossed )Unit2.004Kursi hadap ( dengan logo BNN di embossed )Unit4.005Meja kerja 60x120x75 (dengan plat stainless stell di gravire )Multiplek 18 mm lapis HPL+ handle stainless stellUnit4.006Kursi kerja ( dengan logo BNN di embossed )Unit4.007Panel Workstation 160x120Frame aluminium powder coating, panel fabric 2 colourUnit2.008Credenza 40x200x75 (dengan plat stainless stell di gravire )Multiplek 18 mm lapis HPL+ handle stainless stellUnit2.00

TOTAL II0.00

IIIRuang Penjangkauan dan tim penyuluh1Meja rapat 150x300x75multiplek lapis HPL, inlay stainless steelUnit2.002Kursi kerja ( dengan logo BNN di embossed )Unit16.00

TOTAL III0.00

IVR. Makan1Meja makan 80x75multiplek lapis HPL, support leg powder coatingUnit1.002kursi makanUnit4.00

TOTAL IV0.00

bLANTAI IIVRuang Eselon IVA & Staff1Meja kerja 70x140x75 (dengan plat stainless stell di gravire )Multiplek 18 mm lapis HPL+ handle stainless stellUnit2.002meja samping 60x120x75Multiplek 18 mm lapis HPL+ handle stainless stellUnit2.003kursi kerja ( dengan logo BNN di embossed )Unit2.004Kursi hadap ( dengan logo BNN di embossed )Unit4.005Meja kerja 60x120x75 (dengan plat stainless stell di gravire )Multiplek 18 mm lapis HPL+ handle stainless stellUnit4.006Kursi kerja ( dengan logo BNN di embossed )Unit4.007Panel Workstation 160x120Frame aluminium powder coating, panel fabric 2 colourUnit2.008Credenza 40x200x75 (dengan plat stainless stell di gravire )Multiplek 18 mm lapis HPL+ handle stainless stellUnit2.00

TOTAL V0.00

VIRuang Eselon IIIA1Meja kerja 90x180x75 (dengan plat stainless stell di gravire )Multiplek 18 mm lapis HPL+ handle stainless stellUnit1.002meja samping 60x120x75Multiplek 18 mm lapis HPL+ handle stainless stellUnit1.003kursi kerja ( dengan logo BNN di embossed )Unit1.004Kursi hadap ( dengan logo BNN di embossed )Unit2.005Sofa single seaterUnit2.00Rangka kayu solid, busa density 32, artificial leather(oscar),kaki stainless stellUnit2.006Sofa three seaterRangka kayu solid, busa density 32, artificial leather(oscar),kaki stainless stellSet1.007Cofee table 50x100x45Multiplek 18 mm lapis HPL+ kaca 8 mm+spacer stainless stellUnit1.008Meja sudut 50x50x45Multiplek 18 mm lapis HPL+ kaca 8 mm+spacer stainless stellUnit2.009Credenza 40x200x75 (dengan plat stainless stell di gravire )Multiplek 18 mm lapis HPL+ handle stainless stellUnit1.00

TOTAL VI0.00

VIIRuang Rapat1Meja rapat 120x350x75multiplek lapis HPL, inlay stainless steelUnit1.002kursi rapat ( dengan logo BNN di embossed )Unit10.00

TOTAL VII0.00

VIIIR. Arsip1Meja kerja 60x120x75 (dengan plat stainless stell di gravire )Multiplek 18 mm lapis HPL+ handle stainless stell2.002Kursi kerja ( dengan logo BNN di embossed )2.003Panel Workstation 160x120Frame aluminium powder coating, panel fabric 2 colour1.00

TOTAL VIII0.00TOTAL PEKERJAAN FURNITURE0.00

APEKERJAAN ELEKTRIKALaLANTAI 11INSTALASI PENERANGAN & STOP KONTAK1Lampu RMI + Grille 2x36 W M1BH13.002Down Light + PLC 18 WBH8.003Lampu baret TL bulat 22 WBH9.004SL 18 WBH9.005Stop kontakBH35.006Saklar tunggalBH7.007Saklar seriBH12.008Saklar hotelBH1.009Instalasi peneranganPoint39.0010Instalasi stop kontakPoint35.0011Tes komisioningLs1.002PEKERJAAN PANEL1PANEL GEDUNG LT. 1 ( SDP 1 )Unit1.003PEKERJAAN SOUND SYSTEMIInstalasi :1Kabel feeder NYMHY 2 x 2,5 mm2M22.002Terminal Box Sound sytemBH1.003Volume ControlBH6.004Ceiling SpeakerBH13.005Instalasi sound systemPoint13.004PEKERJAAN TELEPON1PABX 8 PTT 32 Ext + battUnit1.002MDF 40 pairUnit1.003TB Telepon 20 PairBH1.004Kabel ITC 40x2x0,6 mmM10.005Kabel ITC 20x2x0,6 mmM15.006Outlet teleponBH10.007Instalasi Telepon dan pemrogramanPoint10.008Jelly Armoured 10x2x 0,6 mmM30.005PEKERJAAN FIRE ALARM & PAR1Kabel feeder NYMHY 8 x ( 2x2,5 mm2 )M16.002Terminal Box Fire AlarmBH1.003ROR Heat DetectorBH13.004Fix DetectorBH1.005Indikator LampBH1.006Alarm BellBH1.007Instalasi Fire AlarmPoint16.008Pemadam Api Ringan Dry powder 3 kgBH1.006PEKERJAAN LAN1Outlet DataM10.002Instalasi Outlet DataBH10.007AC & EXHASUT FAN1AC 1.5 PK + BraketUnit2.002AC 2 PK + BraketUnit3.003Exhaust Fan CeilingUnit5.004Instalasi Exhaust FanBH5.005Stop Kontak ACBH5.006Instalasi Stop Kontak ACPoint5.007Instalasi AC Dinding c/w Kabel Instalasi Indoor ke Outdoor,Pipa Drain & pipa refrigerantPoint5.00

JUMLAH PEKERJAAN ELEKTRIKAL LANTAI 10.00

bLANTAI II1INSTALASI PENERANGAN & STOP KONTAK1Lampu RMI + Grille 2x36 W M1BH14.002Down Light + PLC 18 WBH10.003Lampu TL baret bulat 22 WBH5.004SL 18 WBH7.005Stop kontakBH29.006Saklar tunggalBH6.007Saklar seriBH10.008Saklar hotelBH1.009Instalasi peneranganPoint36.0010Instalasi stop kontakPoint29.002PEKERJAAN PANEL1PANEL GEDUNG LT. 2 ( SDP 2 )Unit1.003PEKERJAAN SOUND SYSTEM1Kabel feeder NYMHY 2 x 2,5 mm2M26.002Terminal Box Sound sytemBH1.003Volume ControlBH5.004Ceiling SpeakerBH12.005Instalasi sound systemPoint12.004PEKERJAAN TELEPON1TB Telepon 20 PairBH1.002Kabel ITC 20x2x0,6 mmM20.003outlet teleponBH9.004Instalasi Telepon dan pemrogramanPoint9.005PEKERJAAN FIRE ALARM & PAR1Kabel feeder NYMHY 4 x ( 2x2,5 mm2 )M30.002Terminal Box Fire AlarmBH1.003ROR Heat DetectorBH15.004Indikator LampBH1.005Alarm BellBH1.006Instalasi Fire AlarmPoint17.007Pemadam Api Ringan Dry powder 3 kgBH1.006PEKERJAAN LAN1Outlet DataM9.002Instalasi Outlet DataBH9.007AC & EXHASUT FAN1AC 1.5 PK + BraketUnit2.002AC 2 PK + BraketUnit3.003Exhaust Fan CeilingUnit5.004Instalasi Exhaust FanBH5.005Stop Kontak ACBH5.006Instalasi Stop Kontak ACPoint5.007Instalasi AC Dinding c/w Kabel Instalasi Indoor ke Outdoor,Pipa Drain & pipa refrigerantPoint5.00

JUMLAH PEKERJAAN ELEKTRIKAL LANTAI 2

cLANTAI ATAP1INSTALASI PENERANGAN & STOP KONTAK1Lampu TL Balak 2x36 WBH3.002Lampu sorot Logo BNN, halogen 150 WBH3.003Stop kontakBH1.004Saklar seriBH1.005Instalasi peneranganPoint6.006Instalasi stop kontakPoint1.002PEKERJAAN PANEL PENERANGAN & STOP KONTAK1PANEL ROOF TANKUnit1.003PEKERJAAN KABEL FEEDER PENERANGAN & STOP KOTAK1Kabel Feeder NYY 4 x 4 mm + BC 10 mmSDP 2 Ke SDP ROOF TANKM20.00

JUMLAH PEKERJAAN ELEKTRIKAL LANTAI ATAP

APEKERJAAN MEKANIKALaLANTAI 11INSTALASI AIR BERSIH1Pipa GI diameter 2"M9.122Pipa GI diameter 1 1/2"M9.603Pipa GI diameter 1 "M4.804Pipa GI diameter 3/4 "M118.325Pipa GI diameter 1/2 "M7.202SANITAIR1Stop Kran Dia 2 "BH1.002Stop Kran Dia 1 "BH3.003Stop Kran Dia 3/4 "BH2.004Kran Dia 1/2 "BH1.003PEKERJAAN AIR KOTOR & AIR BEKASINSTALASI AIR KOTOR & AIR BEKAS1Pipa PVC Type D dia 2 "M20.162Pipa PVC Type D dia 3 "M49.443Pipa PVC Type D dia 4 "M57.964Pipa PVC Type D dia 5 "M38.405Pipa PVC Type D dia 1 1/2 " (vent)M59.406Pipa PVC Type D dia 2 " (vent)M23.407Pipa PVC Type D dia 3 " (vent)M10.804SANITAIR1Clean Out dia 4" stainlessBH2.005PEKERJAAN AIR HUJANINSTALASI AIR HUJAN1Pipa PVC D dia 4 "2Pipa PVC D dia 4 " (Pipa Tegak)

JUMLAH PEKERJAAN MEKANIKAL LANTAI 1

bLANTAI 21PEKERJAAN AIR BERSIHINSTALASI AIR BERSIH1Pipa GI diameter 2 1/2"M9.002Pipa GI diameter 2"M9.123Pipa GI diameter 1 1/2"M9.604Pipa GI diameter 1 "M4.805Pipa GI diameter 3/4 "M118.326Pipa GI diameter 1/2 "M7.202SANITAIR1Stop Kran Dia 2 "BH1.002Stop Kran Dia 1 "BH3.003Stop Kran Dia 3/4 "BH2.004Kran Dia 1/2 "BH2.003PEKERJAAN AIR KOTOR & AIR BEKASINSTALASI AIR KOTOR & BEKAS1Pipa PVC Type D dia 2 "M12.842Pipa PVC Type D dia 3 "M34.323Pipa PVC Type D dia 4 "M17.524Pipa PVC Type D dia 5 "M8.805Pipa PVC Type D dia 1 1/2 " (vent)M59.406Pipa PVC Type D dia 2 " (vent)M23.407Pipa PVC Type D dia 3 " (vent)M10.808Pipa Vent Tegak Air Kotor PVC Type Ddia 5 "M6.609Pipa Vent Tegak Air Bekas PVC Type D dia 4 "M16.004SANITAIR1Clean Out dia 4" stainlessBH1.002Clean Out dia 3" stainlessBH1.005PEKERJAAN AIR HUJANINSTALASI AIR HUJAN1Pipa PVC D dia 4 " (Pipa Tegak)M57.60

JUMLAH PEKERJAAN MEKANIKAL LANTAI 2

cLANTAI ATAP1INSTALASI TANDON AIR ATAS1Tandon Air Atas (Roof Tank) Stainless Stell Kap. 1 m3BH2.002Floating Valve 1 " (Katup Pelampung)BH2.003Header 4"Ls1.004Stop Kran dia 1"BH10.005Pipa GI 1 "M38.886Pipa GI 1 1/2 "M23.107Pipa GI 2 1/2 "M9.608Pipa GI 1 1/2 " (Pipa Wash Out)M2.209Pompa dari roof tank (mini booster)Q = 50 lpm, head = 10 mBH1.002PEKERJAAN AIR HUJANINSTALASI AIR HUJAN1Pipa PVC Type D dia 4 "M9.602Roof Drain 4"BH9.00

JUMLAH PEKERJAAN MEKANIKAL LANTAI ATAP

BPEKERJAAN STRUKTUR BANGUNAN POS JAGAIPEKERJAAN TANAH1Galian Tanah PondasiM39.202Urugan Tanah KembaliM35.623Urugan Pasir Bawah Pondasi t = 10 cmM30.644Urugan Pasir Bawah Lantai t = 10 cmM30.905Urugan Tanah Pilihan Peninggian ElevasiM31.806Pemadatan TanahM31.80

TOTAL PEKERJAAN TANAH

IIPEKERJAAN BETON1Sloof 15 x 25 cmM30.302Rabatan Beton t = 10 cmM30.903Kolom 15 x 15 cmM30.274Balok 15 x 20 cmM30.415Plat Atap t = 10 cmM30.766Water ProfingM37.56

TOTAL PEKERJAAN BETONJUMLAH PEKERJAAN STRUKTUR BANGUNAN POS JAGA

PEKERJAAN ARSITEK BANGUNAN POS JAGAIPEKERJAAN PASANGAN1Pasangan AanstampengM30.962Pasangan Pondasi Batu Kali 1 : 5M32.883Pasangan Trasram 1/2 Bata 1 Pc : 3 PsM22.404Pasangan Dinding 1/2 Bata 1 Pc : 5 PsM26.405Pondasi RollagM21.54

TOTAL PEKERJAAN PASANGAN0.00

IIPEKERJAAN PLESTERAN & ACIAN1Plesteran Dinding Trasram 1/2 Bata 1 : 3, t = 15 cmM24.802Plesteran Dinding 1/2 Bata 1 : 5, t = 15 cmM212.803Plesteran Beton 1 : 2M220.264Acian BetonM220.265BenanganM'48.00

TOTAL PEKERJAAN PLESTERAN & ACIAN0.00

IIIPEKERJAAN PENGECATAN1Cat Tembok LuarM28.802Cat Tembok DalamM28.803Cat BetonM220.26

TOTAL PEKERJAAN PENGECATAN0.00TOTAL PEKERJAAN ARSITEKTUR 0.00TOTAL PEKERJAAN POS JAGA0.00

CPEKERJAAN LANDSCAPE1Pekerjaan R.Pompa1Galian TanahM30.362Urugan TanahM31.013Pasangan Rollag 1 BataM20.904Rabatan Beton t = 5 cmM30.155Pasangan Dinding 1/2 Bata 1 Pc : 5 PsM23.406Plat Tutup Bordes lengkap aksesorisLs1.007Plesteran Dinding 1/2 Bata 1 : 5, t = 1,5 cmM22.508Acian BetonM22.509Cat Tembok LuarM22.5010Pintu TeralisBH2.002Septiktank + ResapanBH1.00

TOTAL PEKERJAAN LANDSCAPE0.00

APEKERJAAN ELEKTRIKAL KAWASAN1ELEKTRIKAL KAWASANPEKERJAAN PANEL1Panel Induk ( MDP )Unit1.002Pembuatan Grounding ElektrikalPoint1.002PEKERJAAN KABEL FEEDER1Kabel Feeder NYFGBY 4 x 25 mm dari Meter PLN ke MDPM'41.002Kabel Feeder NYY 4 x 10 mm, MDP Ke SDP 1M'20.003Kabel Feeder NYY 4 x 10 mm, MDP Ke SDP 2M'28.003PEKERJAAN PENANGKAL PETIR1Penangkal petir konvensional split 1"c/w pipa supportUnit4.002Kawat BC 50mm in conduit PVC AW 1'M'86.003bak kontrol + groundingBH1.004Izin-Izin InstansiLs1.004PEKERJAAN GROUNDING1Pembuatan Grounding ElectronicLs1.00

TOTAL PEKERJAAN ELEKTRIKAL KAWASAN0.00

BMEKANIKAL1INSTALASI AIR BERSIH1Pipa GI 1 1/2" (Dari Ruang Pompa Ke Roof Tank Kantor BNN)M50.002PEMBUATAN SUMUR BOR1Pembuatan Sumur Bor Sampai Air LayakLot1.003INSTALASI SUMUR BOR1Pipa PVC AW 1"M28.602Pipa PVC AW 1 1/4"M31.203Stop Kran 1 "BH1.004Pompa sumur bor otomatis (type jet pump)+ accesoris lengkap( Tangki tekan, Foot Valve ,Pressure Switch)Unit1.005Instalasi pompaUnit1.004INSTALASI AIR BERSIH TAMAN1Pipa PVC AW 1"M7.202Stop Kran 1 1/2 "BH1.003Pipa GI 3/4" (pipa tegak kran taman)M3.004Kran Dia 1/2 "BH1.00

TOTAL PEKERJAAN MEKANIKAL KAWASAN0.00

RAB FURNITURE MAKODAFTAR KUANTITAS DAN HARGA

KEGIATAN:PEMBANGUNAN GEDUNG MAKO MAPOLSEK WEDA UTARAPEKERJAAN:BANGUNAN MAKO MAPOLSEK WEDA UTARALOKASI:SAGEA TAHUN ANGGARAN:2014

NO URAIAN PEKERJAANSATUANVOLUMEHARGA SATUANJUMLAH HARGA (Rp) (Rp)123456

IRuang Unit Yan Kepolisian1Meja KantorUnit2.00695,000.001,390,000.002Kursi kerja Lipat BesiUnit2.00305,000.00610,000.00

TOTAL I2,000,000.00IIRuang Tunggu1Kursi besi panjang dudukan 4 buahUnit1.001,705,000.001,705,000.002Meja Unit1.00250,000.00250,000.00

TOTAL II250,000.00IIIRuang Kapolsek1Meja kerja 70x140x75 (dengan plat stainless stell di gravire )Unit1.001,500,000.001,500,000.002Kursi kerja KapolsekUnit1.001,500,000.001,500,000.003Sofa 1 set dan mejaUnit1.005,500,000.005,500,000.004Kursi Lipat Kerja HadapUnit2.00305,000.00610,000.00TOTAL V9,110,000.00IVRuang Briefing1Meja rapat 150x300x75Unit1.001,100,000.001,100,000.002Kursi rapatUnit11.00305,000.003,355,000.00TOTAL III4,455,000.00VR. Urmin1Meja KerjaUnit1.00695,000.00695,000.002kursi Kerja besi LipatUnit1.00305,000.00305,000.000.00.03kursi Kerja Lipat besi HadapUnit2.00305,000.00610,000.00TOTAL IV1,610,000.00

VIR.Unit Patroli1Meja kerja 70x140x75 Unit1.00695,000.00695,000.002kursi Kerja besi LipatUnit1.00305,000.00305,000.003kursi Kerja Lipat besi HadapUnit2.00305,000.00610,000.00TOTAL V1,610,000.00VIIRuang besuk1Meja kerjaUnit2.00695,000.001,390,000.002kursi Kerja besi LipatUnit2.00305,000.00610,000.003kursi Kerja Lipat besi HadapUnit2.00305,000.00610,000.00TOTAL VI2,610,000.00VIIRuang Unit Kepolisian1Meja KerjaUnit1.00695,000.00695,000.002kursi Kerja besi LipatUnit1.00305,000.00305,000.003kursi Kerja Lipat besi HadapUnit2.00305,000.00610,000.00TOTAL VII1,610,000.00VIIIR. Interogasi1Meja KerjaUnit1.001,500,000.001,500,000.002kursi Kerja besi LipatUnit4.00305,000.001,220,000.00TOTAL VIII2,720,000.00TOTAL PEKERJAAN FURNITURE25,975,000.008,550,000.00

RAB STRUKTUR MAKO

DAFTAR KUANTITAS DAN HARGA

KEGIATAN:PEMBANGUNAN GEDUNG MAKO MAPOLSEK WEDA UTARAPEKERJAAN:BANGUNAN MAKO MAPOLSEK WEDA UTARALOKASI:SAGEA TAHUN ANGGARAN:2014

NO URAIAN PEKERJAANSATUANVOLUMEHARGA SATUANJUMLAH HARGA (Rp) (Rp)123456

IPEKERJAAN PERSIAPAN1Pembersihan LapanganM2374.1012,400.004,638,840.002Uitzet & BouwplankM'163.0054,774.158,928,186.45

4Direksi keetM26.00899,924.705,399,548.20904,864,000.005Air & Listrik KerjaBln4.001,646,500.006,586,000.00904,864,000.00TOTAL PEKERJAAN PERSIAPAN25,552,574.653.1119770283IIPEKERJAAN TANAH1Galian Tanah PondasiM3188.3843,280.008,153,086.402Urugan Tanah KembaliM395.9015,800.001,515,220.004Urugan Pasir Bawah Pondasi Batu Kali t = 5 cmM38.56290,517.502,486,829.80ijuk5Urugan Pasir Bawah Poer t = 10 cmM30.05Urugan Pasir Bawah Lantai t = 5 cmM37.71290,517.502,239,889.930.129,051.75pasir6Urugan Tanah Peninggial Elevasi BangunanM3131.90249,800.0032,948,620.000.134,666.50kriki0.07Galian Tanah Untuk Pondasi Menara AirM30.9643,280.0041,548.8012,984.00tanah8Urugan Pasir untuk Menara AirM30.50290,517.50145,258.7576,702.25TOTAL PEKERJAAN TANAH47,530,453.685.7886018145IIIPEKERJAAN PASANGAN BATU PONDASI1Pasangan Batu Pondasi 1 : 5M368.501,084,952.0074,319,212.002Plesteran PondasiM334.3853,683.401,845,635.293Pasangan Batu KosongM323.12652,819.5015,093,186.84TOTAL PEKERJAAN PASANGAN91,258,034.1311.114062272IVPEKERJAAN BETON

1Sloof beton 15 x 17.5 cmM34.505,764,157.6025,909,888.412Rabatan Beton t = 10 cmM331.881,048,337.5033,420,999.50

3Kolom 17.5 x17.5 cmM34.877,012,750.0534,145,080.014Balok 15 x 17.5 cmM34.504,645,001.8820,879,283.435Pondasi Beton untuk menara profil tankM30.421,418,333.50595,700.076Plat Beton Atap R.TahananM35.771,418,333.508,182,365.96TOTAL PEKERJAAN BETON 123,133,317.3814.9960644033VPEKERJAAN ATAP

1Pemasangan Atap Genteng OnduvillaM3234.74142,364.1033,418,548.832Pemasangan Nok Genteng OnduvillaM356.30198,400.2011,169,931.263Rangka Kayu Kuda-KudaM32.858,010,436.0022,829,742.604Pekerjaan Gording dan KasoM33.132,905,200.009,093,276.000.05Pekerjaan WaterProofing 3mm Plat AtapM257.69164,750.009,504,427.506Atap Jeruji Besi Untuk JemuranM24.76379,137.641,806,211.707Pekerjaan ListPlankM271.1560,709.004,319,445.35TOTAL PEKERJAAN ATAP92,141,583.2411.221667262VIPEKERJAAN PINTU DAN JENDELA1Pekerjaan kusen Pintu Kayu dan jendelaM32.165,696,487.0012,310,108.412Pekerjaan Pasang daun Kayu pintu dan Jendela Kelas IM232.08457,024.0014,659,044.803Pekerjaan Pasang Daun Pintu Papan Kelas IM26.46381,229.602,462,743.224Pekerjaan Pintu AlumuniumLs1.001,514,523.921,514,523.925Pekerjaan Kaca 3 mm BeningM237.30195,785.307,302,791.696Pekerjaan Pintu Besi Ruang TahananM216.80379,137.646,369,512.297Pekerjaan Jendela Terali BesiM20.36379,137.64136,489.55712,215,518.998Pasang Engsel Pintu Bh36.0057,150.002,057,400.009Pasang Engsel JendelaBh64.0032,130.002,056,320.0010Pasang Handle PintuBH17.00495,000.008,415,000.0011Pasang Kunci PintuBh3.0085,500.00256,500.0012GrendelBh32.0021,240.00679,680.00TOTAL PEKERJAAN PINTU DAN JENDELA58,220,113.877.0904658118VIIPEKERJAAN DINDING PLESTERAN & ACIAN1Pekerjaan DindingM2404.60166,941.1567,544,389.292Plesteran Dinding Trasram 1/2 Bata 1 : 3, t = 15 cmM25.6463,920.10360,509.362Plesteran Dinding 1/2 Bata 1 : 5, t = 15 cmM2404.6053,683.4021,720,303.643Acian Dinding & BetonM2404.6032,663.3813,215,601.534Lapisan anyaman besi profil dinding R.tahananM247.1073,350.753,454,820.33TOTAL PEKERJAAN DINDING PLESTERAN & ACIAN106,295,624.1412.9454485538VIIIPEKERJAAN PLAFOND1Plafond Gypsum Board 9 mm + Rangka Metal FuringM2156.08393,165.0261,365,196.322List PlafondM'131.00174,607.0022,873,517.00TOTAL PEKERJAAN PLAFOND84,238,713.3210.2591987048IXPEKERJAAN LANTAI1Keramik Lantai 40 x 40 cmM2133.70250,948.3033,551,787.712Keramik Lantai KM/WC 20 x 20 cmM25.59191,450.501,070,208.303Keramik Dinding KM/WC 20 x 25 cmM25.64260,438.351,468,872.294Lantai vynilM'30.75160,556.004,937,097.00TOTAL PEKERJAAN LANTAI41,027,965.304.9966818326XPEKERJAAN SANITAIR

1Kloset JongkokBh5.00700,904.003,504,520.002Profil TankBh2.002,725,200.005,450,400.003Wastafel + AsesorisBh1.00846,040.20846,040.204Kaca Cermin WastafelM20.20550,872.60110,174.520.245UrinoirBh2.001,833,144.003,666,288.00

TOTAL PEKERJAAN SANITAIR 13,577,422.721.6535565667XIPEKERJAAN PENGECATAN1Cat Tembok LuarM2404.6063,251.7525,591,658.052Cat Tembok DalamM2404.6054,563.6022,076,432.563Cat PlafondM2120.9844,979.505,441,619.914Cat KayuM238.5443,663.701,682,580.68TOTAL PEKERJAAN PENGECATAN54,792,291.206.6730008181

0

XIIINSTALASI AIR BERSIH01Pipa GI diameter 2"M48.57300,874.7514,613,486.612Buis Beton 100 cmM3.00246,131.20738,393.603Pompa pengisap air 50 literBH1.002,000,000.002,000,000.004Menara Rangka BajaKg600.1428,804.3517,286,642.610.005Stop Kran Dia 2 "Bh9.00162,150.001,459,350.002,064,000.00TOTAL PEKERJAAN AIR BERSIH36,097,872.82

XIIIPEKERJAAN AIR KOTOR & AIR BEKAS0INSTALASI AIR KOTOR & AIR BEKAS7.6210.161Pipa PVC Type D dia 5 "M25.1872,301.501,820,551.772Instalasi Pemasangan Biofill Septik TankBh2.006,500,000.0013,000,000.000.00.00.00.000.000.00.00.03Pekerjaan Resapan AirBh2.005,000,000.0010,000,000.00TOTAL PEKERJAAN AIR KOTOR24,820,551.77XIVPEKERJAAN INSTALASI LISTRIK1Pekerjaan Kabel NYMM115.0035,910.004,129,650.0015510002Pemasangan MCB 10 ALs1.0048,960.0048,960.003Titik Lampu + Instalasititik29.00200,000.005,800,000.004Saklar TunggalBh13.0021,960.00285,480.005Saklar GandaBh12.0027,450.00329,400.006Stop KontakBh10.0032,670.00326,700.007Klem 12Dos5.0032,940.00164,700.008VetengBh15.0049,410.00741,150.009Lampu SL 40 wattBh15.0021,780.00326,700.0010Lampu TL 40 wattBh14.00179,640.002,514,960.0011AC Spit 0.75 PKBh1.002,750,000.002,750,000.00

12Generator 1 KVABh1.002,000,000.002,000,000.0013Televisi LCD 24 inchi Bh1.003,000,000.003,000,000.00TOTAL PEKERJAAN INSTALASI LISTRIKJUMLAH PEKERJAAN MEKANIKAL LANTAI 122,417,700.00

PEKERJAAN STRUKTUR + ARSITEK + INSTALASI AIR DAN LISTRIK821,104,218.23840,578,294.2484,057,829.420.10924,636,123.67(19,772,123.67)1Penyambungan daya listrik + PenyambunganLs1.005,000,000.005,000,000.00

904,864,000.00

REKAP FASUMREKAPITULASIDAFTAR KUANTITAS DAN HARGA

KEGIATAN:PEMBANGUNAN GEDUNG MAKO MAPOLSEK WEDA UTARAPEKERJAAN:FASILITAS UMUM LOKASI:SAGEA TAHUN ANGGARAN:2014

NOURAIAN PEKERJAANJUMLAH HARGA (RP)APEKERJAAN FASUMFASUM123,390,005.35

1,813,885,500.00(1,813,885,500.00)(1,813,885,500.00)

0.0104,000,000.00

B50,000,000.00(104,000,000.00)(50,000,000.00)

AJUMLAH123,390,005.353,813,500,000.00BPPN 10%12,339,000.53CTOTAL135,729,005.88DDIBULATKAN135,729,000.00(3,677,771,000.00)TERBILANG : SERATUS TIGA PULUH LIMA JUTA TUJUH RATUS RIBU RUPIAH3,627,771,000.00

Ternate, 15 April 20141,813,885,500.00ERROR:#REF!PerencanaCV. MEGACOTAMA

Ir.NASRUN GAUZIAHDirektur Utama

Rekap MAKOREKAPITULASIDAFTAR KUANTITAS DAN HARGA

KEGIATAN:PEMBANGUNAN GEDUNG MAKO MAPOLSEK WEDA UTARAPEKERJAAN:BANGUNAN MAKO MAPOLSEK WEDA UTARALOKASI:SAGEA TAHUN ANGGARAN:2014

NOURAIAN PEKERJAANJUMLAH HARGA (RP)APEKERJAAN BANGUNAN UTAMAI. PEKERJAAN PERSIAPAN25,552,574.65II. PEKERJAAN TANAH47,530,453.68III. PEKERJAAN PASANGAN PONDASI91,258,034.13IV. PEKERJAAN BETON123,133,317.381,619,213,319.32(1,496,080,001.94)V. PEKERJAAN ATAP92,141,583.24(1,527,071,736.08)VI. PEKERJAAN PINTU DAN JENDELA58,220,113.87VII. PEKERJAAN DINDING PLESTERAN DAN ACIAN106,295,624.14379,790,638.64104,000,000.00VIII. PEKERJAAN PLAFOND84,238,713.32IX. PEKERJAAN LANTAI41,027,965.30X. PEKERJAAN SANITAIR13,577,422.72XI .PEKERJAAN PENGECATAN54,792,291.20XII. PEKERJAAN INSTALASI AIR BERSIH36,097,872.82XIII. PEKERJAAN INSTALASI AIR KOTOR24,820,551.77XIV. PEKERJAAN INSTALASI LISTRIK22,417,700.001,500,000.0050,000,000.00(12,741,965.87)329,790,638.64

1,650,000.00AJUMLAH821,104,218.233,813,500,000.00BPPN 10%82,110,421.82CPEKERJAAN PEMASANGAN DAYA LISTRIK 2200 VA1,650,000.00904,864,000.00DTOTAL904,864,640.050.0EDIBULATKAN904,864,000.00(2,908,636,000.00)TERBILANG : SEMBILAN RATUS EMPAT JUTA DELAPAN RATUS ENAM PULUH EMPAT RIBU RUPIAH3,238,426,638.640.0Ternate, 15 April 20141,619,213,319.32ERROR:#REF!PerencanaCV.MEGACOTAMA

Ir. NASRUN GAUZIAHDirektur Utama

RAB FASUM OK

DAFTAR KUANTITAS DAN HARGA

KEGIATAN:PEMBANGUNAN GEDUNG MAKO MAPOLSEK WEDA UTARAPEKERJAAN:FASILITAS UMUM MAPOLSEKLOKASI:SAGEATAHUN ANGGARAN:2014

NO URAIAN PEKERJAANSATUANVOLUMEHARGA SATUANJUMLAH HARGA (Rp) (Rp)123456

IPEKERJAAN PERSIAPAN1Pembersihan LapanganM2525.0012,400.006,510,000.0082.42Uitzet & BouwplankM'98.8954,774.155,416,341.82102.60bowplank

TOTAL PEKERJAAN PERSIAPAN11,926,341.821.4524762817IIPEKERJAAN TANAH1Galian Tanah PondasiM329.1543,280.001,261,612.002Urugan Tanah KembaliM37.2915,800.00115,142.500.00.00.03Timbunan Elevasi Peninggi Lantai TanahM312.00249,800.002,997,600.0012.88pondasi pagarTOTAL PEKERJAAN TANAH4,374,354.507.02pondasi parkir15.244smping sirtuIIIPEKERJAAN PASANGAN19.91Pasangan Pondasi 1 : 5M321.201,025,373.1021,737,909.7217.71pagargalianTOTAL PEKERJAAN PASANGAN21,737,909.722.647400078812parkirgalian

0.288

TOTAL PEKERJAAN BETON 0.0029.7152.74

IVPEKERJAAN BETON7.92dinding1 kolom 30 x 30M31.7641,326,271.402,339,542.758.25dinding dalamTOTAL PEKERJAAN BETON2,339,542.7515.84dinding smpngVPEKERJAAN LAPIS BERBUTIR3.52dinding smng luar38.728bata samping sirtu

1SirtuM344.50427,058.2519,004,092.2235.53total0.00.00.00.00.02Bata 1/2 bata 2 susun M230.49160,013.404,878,808.57TOTAL PEKERJAAN LAPIS BERBUTIR23,882,900.79VI PEKERJAAN DINDING DAN PLESTERAN0.1056hole241Dinding 1Pc : 5PsM2115.20160,013.4018,433,543.682keramik 20 x 20M25.48184,522.751,010,262.0635.4244total dinding terpakai3Tulisan AlumuniumLs1.001,500,000.001,500,000.000.004PlesteranM2230.4049,680.7011,446,433.28PEKERJAAN DINDING DAN PLESTERAN32,390,239.021,405,000.0015.244VIIPEKERJAAN ATAP30.48877.456

1Pekerjaan Atap Seng GelombangM235.42110,954.503,930,274.6828.0162Rangka KayuM30.902,905,200.002,617,585.20

2.908632626ERROR:#REF!ERROR:#REF!

24.72TOTAL PEKERJAAN ATAP6,547,859.88

0.7974457981

VIIIPEKERJAAN LANTAI01Floor LantaiM240.0055,150.002,206,000.00ERROR:#REF!

TOTAL PEKERJAAN LANTAI2,206,000.00

0

0

0.1050.26866265660.17280.26880.5466kayu

0

0

0

0

0

07.620.010.16IXPEKERJAAN INSTALASI LISTRIK

1Pekerjaan Kabel NYMM20.0035,910.00718,200.00

2Titik Lampu + Instalasititik2.00150,000.00300,000.00ukuran lapangan upacara3Lampu SL 40 wattBh2.0021,780.0043,560.00206.0411,363,106.00

00

4Neon Box Stainlees 0.5 x 3 mLs1.002,000,000.002,000,000.00TOTAL PEKERJAAN INSTALASI LISTRIKJUMLAH PEKERJAAN MEKANIKAL LANTAI 13,061,760.00XPEKERJAAN BESI DAN ALUMUNIUM1Pekerjaan Tiang BenderaLs1.002,250,000.002,250,000.001.0932TOTAL PEKERJAAN BESI DAN ALUMUNIUM2,250,000.00

151.89

XIPEKERJAAN FINISHING1Cat KayuM21.4443,663.7062,875.73293,304.002Cat TembokM2230.4054,563.6012,571,453.4444,549,944.563Cat BesiM21.0038,767.7038,767.70TOTAL PEKERJAAN FINISHING12,673,096.87PEKERJAAN FASILITAS UMUM123,390,005.35

10%12,339,000.53135,729,005.88(11,363,111.88)PAGU135,729,000.00(5.88)SELISIH-5.8824,811,711.20

(24,811,717.08)

135,729,005.88

RAB PAGAR MAKODAFTAR KUANTITAS DAN HARGA

KEGIATAN:PEMBANGUNAN GEDUNG MAKO MAPOLSEK WEDA UTARAPEKERJAAN:BANGUNAN MAKO MAPOLSEK WEDA UTARALOKASI:SAGEA TAHUN ANGGARAN:2014

NO URAIAN PEKERJAANSATUANVOLUMEHARGA SATUANJUMLAH HARGA (Rp) (Rp)123456

IPEKERJAAN TANAH1Galian TanahM310.1251,500.00521,180.002Urugan TanahM32.5315,800.0039,974.00561,154.00

IIPEKRJAAN PASANGAN1Pondasi Batu KaliM39.661,049,982.0010,147,026.0510,147,026.05IIPEKERJAAN BETON1Kolom Praktis 30x30 cmM31.531,337,864.502,046,932.692,046,932.69

IIIPEKERJAAN DINDING1Pekerjaan Dinding Bata MerahM223.76156,281.153,713,240.123,713,240.12

IVPEKERJAAN CAT1Pekerjaan Cat Tembok LuarM347.5263,251.753,005,723.163,005,723.16

TOTAL PEKERJAAN PAGAR MAKO19,474,076.02

Persiapan

PEKERJAAN PERSIAPAN

11 m' Pagar Sementara dari Dari Seng Gelombang tinggi 2 meterDolken Kayu 8-10/400 cm1.2500BtgxRp.9,550.00=Rp.11,937.50Semen Portland0.0500zakxRp.108,975.00=Rp.5,448.75Seng Gelombang BJLS 0.20 mm1.2000LbrxRp.92,000.00=Rp.110,400.00Pasir Beton0.0050M3xRp.450,000.00=Rp.2,250.00Koral Beton0.0090M3xRp.238,750.00=Rp.2,148.75Kayu 5/70.0110M3xRp.1,815,000.00=Rp.19,965.00Paku Biasa 2" - 5"0.0600KgxRp.38,070.00=Rp.2,284.20Meni Besi0.4500KgxRp.32,130.00=Rp.14,458.50JUMLAH BAHAN=Rp.154,434.20Tukang Kayu0.2000OhxRp.91,000.00=Rp.18,200.00Pekerja0.4000OhxRp.72,000.00=Rp.28,800.00Kepala Tukang0.0200OhxRp.104,000.00=Rp.2,080.00Mandor0.0200OhxRp.104,000.00=Rp.2,080.00JUMLAH TENAGA=Rp.51,160.00TOTAL=Rp.205,594.20

21 m' Pengukuran dan Pemasangan BouwplankKayu 5/70.0120BtgxRp.1,815,000.00=Rp.21,780.00Paku Biasa 2" - 5"0.0200KgxRp.38,070.00=Rp.761.40Kayu Papan 3/200.0070M2xRp.2,053,250.00=Rp.14,372.75JUMLAH BAHAN=Rp.36,914.15Tukang Kayu0.1000OhxRp.91,000.00=Rp.9,100.00Pekerja0.1000OhxRp.72,000.00=Rp.7,200.00Kepala Tukang0.0100OhxRp.104,000.00=Rp.1,040.00Mandor0.0050OhxRp.104,000.00=Rp.520.00JUMLAH TENAGA=Rp.17,860.00TOTAL=Rp.54,774.15

31 m2 Pembuatan Kantor Sementara, dengan Lantai PlesteranDolken Kayu 8-10/400 cm1.2500BtgxRp.9,550.00=Rp.11,937.50Kayu Kelas II0.1800M3xRp.1,815,000.00=Rp.326,700.00Paku0.8500KgxRp.38,070.00=Rp.32,359.50Besi Strip1.1000KgxRp.13,500.00=Rp.14,850.00Semen Portland0.7000ZakxRp.108,975.00=Rp.76,282.500.014Pasir Pasang0.1500M3xRp.450,000.00=Rp.67,500.00Pasir Beton0.1000M3xRp.243,525.00=Rp.24,352.50Koral Beton0.1500M3xRp.238,750.00=Rp.35,812.50Bata Merah30.0000BhxRp.2,250.00=Rp.67,500.00Seng Plat0.2500LbrxRp.92,000.00=Rp.23,000.00Jendela Nako2.0000BhxRp.16,830.00=Rp.33,660.00Kaca Polos0.0800M2xRp.65,340.00=Rp.5,227.20Kunci Tanam0.1500BhxRp.196,200.00=Rp.29,430.00Plywood 4 mm0.0600LbrxRp.152,550.00=Rp.9,153.00JUMLAH BAHAN=Rp.757,764.70Tukang Kayu0.2000OhxRp.91,000.00=Rp.18,200.00Tukang Bata1.0000OhxRp.91,000.00=Rp.91,000.00Pekerja0.4000OhxRp.72,000.00=Rp.28,800.00Kepala Tukang0.0200OhxRp.104,000.00=Rp.2,080.00Mandor0.0200OhxRp.104,000.00=Rp.2,080.00JUMLAH TENAGA=Rp.142,160.00TOTAL=Rp.899,924.70

51 m2 Membersihkan Lapangan dan PerataanPekerja0.1000OhxRp.72,000.00=Rp.7,200.00Mandor0.0500OhxRp.104,000.00=Rp.5,200.00JUMLAH TENAGA=Rp.12,400.00JUMLAH (a) =Rp.12,400.00

61 m2 Pembuatan Bak adukan Ukuran (40 x 50 x 20) cmKayu Terentang0.0360M3xRp.1,815,000.00=Rp.65,340.00Paku Biasa0.0800KgxRp.38,070.00=Rp.3,045.60Kaso 5/71.0000BtgxRp.25,410.00=Rp.25,410.00JUMLAH BAHAN=Rp.93,795.60Tukang Kayu0.3000OhxRp.91,000.00=Rp.27,300.00Mandor0.0015OhxRp.104,000.00=Rp.156.00JUMLAH TENAGA=Rp.27,456.00TOTAL=Rp.121,251.60

71 m2 Pembuatan Jalan SementaraBatu Belah 15/200.1500M3xRp.262,625.00=Rp.39,393.75Batu Pecah 5/70.0900M3xRp.334,250.00=Rp.30,082.50Pasir Pasang0.0100M3xRp.450,000.00=Rp.4,500.00JUMLAH BAHAN=Rp.73,976.25Pekerja1.0000OhxRp.72,000.00=Rp.72,000.00Mandor0.0500OhxRp.104,000.00=Rp.5,200.00JUMLAH TENAGA=Rp.77,200.00TOTAL=Rp.151,176.25

81 m2 Pekerjaan Penyiapan Lahan Land ClearingPekerja (L01)0.0161JamxRp.72,000.00=Rp.1,159.20Mandor (L02)0.0040JamxRp.104,000.00=Rp.416.00Wheel LoaderSopir Truck0.0833JamxRp.105,000.00=Rp.8,750.00JUMLAH TENAGA=Rp.1,575.20Dump TruckBulldozer 100-150 HP (E04)0.0142JamxRp.630,137.00=Rp.8,947.95Vibro RollerWheel Loader (E15)0.0022JamxRp.603,859.00=Rp.1,328.49Dump Truck (E08)0.1211JamxRp.260,000.00=Rp.31,486.00Alat Bantu1.0000LsxRp.7,500.00=Rp.7,500.00Water TankerMandor LapanganJUMLAH ALAT=Rp.49,262.44Alat BantuMekanikTOTAL=Rp.50,837.64ExcavatorKepala Tukang

TanahPEKERJAAN TANAH

11 m3 Galian Tanah Biasa Sedalam 2 Meter Pekerja0.5260OhxRp.72,000.00=Rp.37,872.00Mandor0.0520OhxRp.104,000.00=Rp.5,408.00JUMLAH TENAGA=Rp.43,280.00

21 m3 Galian Tanah Keras Sedalam 1 Meter Pekerja0.6250OhxRp.72,000.00=Rp.45,000.00Mandor0.0625OhxRp.104,000.00=Rp.6,500.00JUMLAH TENAGA=Rp.51,500.00

31 m3 Urugan KembaliPekerja0.1920OhxRp.72,000.00=Rp.13,824.00Mandor0.0190OhxRp.104,000.00=Rp.1,976.00JUMLAH TENAGA=Rp.15,800.00

41 m3 Pemadatan TanahPekerja0.5000OhxRp.72,000.00=Rp.36,000.00Mandor0.0500OhxRp.104,000.00=Rp.5,200.00JUMLAH TENAGA=Rp.41,200.00

51 m3 Urugan PasirPasir Urug1.1000M3xRp.243,525.00=Rp.267,877.50JUMLAH BAHAN=Rp.267,877.50Pekerja0.3000OhxRp.72,000.00=Rp.21,600.00Mandor0.0100OhxRp.104,000.00=Rp.1,040.00JUMLAH TENAGA=Rp.22,640.00TOTAL=Rp.290,517.50

61 m3 Urugan Tanah BiasaTanah Urug / Timbunan1.2000M3xRp.191,000.00=Rp.229,200.00JUMLAH BAHAN=Rp.229,200.00Pekerja0.2500OhxRp.72,000.00=Rp.18,000.00Mandor0.0250OhxRp.104,000.00=Rp.2,600.00JUMLAH TENAGA=Rp.20,600.00TOTAL=Rp.249,800.00

PondasiPEKERJAAN PONDASI

11 m3 Pasang Pondasi Batu Kali 1 Pc : 5 PsBatu Kali1.1000M3xRp.400,000.00=Rp.440,000.00Semen Portland2.7200ZakxRp.108,975.00=Rp.296,412.00Pasir Beton/Pasangan0.3820M3xRp.450,000.00=Rp.171,900.00JUMLAH BAHAN=Rp.908,312.00Pekerja1.5000OhxRp.72,000.00=Rp.108,000.00Tukang Batu0.6000OhxRp.91,000.00=Rp.54,600.00Kepala Tukang0.0600OhxRp.104,000.00=Rp.6,240.00Mandor0.0750OhxRp.104,000.00=Rp.7,800.00JUMLAH TENAGA=Rp.176,640.00TOTAL=Rp.1,084,952.00

21 m3 Pasang Pondasi KosongBatu Belah 15 / 20 cm1.2000M3xRp.400,000.00=Rp.480,000.00Pasir Urug0.3000M3xRp.243,525.00=Rp.73,057.50JUMLAH BAHAN=Rp.553,057.50Pekerja0.7800OhxRp.72,000.00=Rp.56,160.00Tukang Batu0.3900OhxRp.91,000.00=Rp.35,490.00Kepala Tukang0.0390OhxRp.104,000.00=Rp.4,056.00Mandor0.0390OhxRp.104,000.00=Rp.4,056.00JUMLAH TENAGA=Rp.99,762.00TOTAL=Rp.652,819.50

31 m3 Membuat pondasi beton bertulang K 250 ( 250 kg besi + bekisting )Kayu Terentang0.2000M3xRp.2,053,250.00=Rp.410,650.00Paku biasa 2" - 5"1.5000KgxRp.38,070.00=Rp.57,105.00Minyak bekisting0.4000LtxRp.27,900.00=Rp.11,160.00Besi Beton Polos250.0000KgxRp.13,066.00=Rp.3,266,500.00Kawat Beton3.0000KgxRp.42,300.00=Rp.126,900.00Semen Portland393.7500KgxRp.2,179.50=Rp.858,178.13Pasir Beton0.4922M3xRp.450,000.00=Rp.221,484.38Koral Beton0.6828M3xRp.238,750.00=Rp.163,030.16JUMLAH BAHAN=Rp.5,115,007.66Pekerja3.9000OhxRp.72,000.00=Rp.280,800.00Tukang Batu0.3500OhxRp.91,000.00=Rp.31,850.00Tukang kayu1.0400OhxRp.91,000.00=Rp.94,640.00Tukang besi1.0500OhxRp.91,000.00=Rp.95,550.00Kepala Tukang0.2450OhxRp.104,000.00=Rp.25,480.00Mandor0.1650OhxRp.104,000.00=Rp.17,160.00ERROR:#REF!JUMLAH TENAGA=Rp.545,480.00ERROR:#REF!TOTAL=Rp.5,660,487.66ERROR:#REF!

BetonPEKERJAAN BETON

1.1 m3 Membuat Beton fc' = 7.4 Mpa ( K-100), Slump (12 2 ) cm, w/c : 0.87Semen Portland4.9400ZakxRp.108,975.00=Rp.538,336.50Pasir Beton0.7450M3xRp.450,000.00=Rp.335,250.00Koral Beton0.8700M3xRp.238,750.00=Rp.207,712.50Air215.0000LtrxRp.0.0=Rp.0.04.94JUMLAH BAHAN=Rp.1,081,299.00247.00Pekerja1.6500OhxRp.72,000.00=Rp.118,800.00Tukang Batu0.2500OhxRp.91,000.00=Rp.22,750.00Kepala Tukang0.0250OhxRp.104,000.00=Rp.2,600.00Mandor0.0800OhxRp.104,000.00=Rp.8,320.00JUMLAH TENAGA=Rp.152,470.00TOTAL=Rp.1,233,769.00200

21 m3 Membuat Beton, fc' = 14.5 Mpa ( K-175), Slump (12 2 ) cm, w/c : 0.66Semen Portland6.5200ZakxRp.108,975.00=Rp.710,517.00Pasir Beton0.6510M3xRp.450,000.00=Rp.292,950.00Koral Beton0.7620M3xRp.238,750.00=Rp.181,927.50Air215.0000LtrxRp.0.0=Rp.0.0JUMLAH BAHAN=Rp.1,185,394.50Pekerja1.6500OhxRp.72,000.00=Rp.118,800.00Tukang Batu0.2500OhxRp.91,000.00=Rp.22,750.00Kepala Tukang0.0250OhxRp.104,000.00=Rp.2,600.00Mandor0.0800OhxRp.104,000.00=Rp.8,320.00JUMLAH TENAGA=Rp.152,470.00TOTAL=Rp.1,337,864.50

31 m3 Membuat Beton, fc' = 19.3 Mpa ( K-225), Slump (12 2 ) cm, w/c : 0.58Semen Portland7.4200zakxRp.108,975.00=Rp.808,594.50Pasir Beton0.5980M3xRp.450,000.00=Rp.269,100.00Koral Beton0.7760M3xRp.238,750.00=Rp.185,270.00Air215.0000LtrxRp.0.0=Rp.0.0JUMLAH BAHAN=Rp.1,262,964.50Pekerja1.6500OhxRp.72,000.00=Rp.118,800.00Tukang Batu0.2750OhxRp.91,000.00=Rp.25,025.00Kepala Tukang0.0280OhxRp.104,000.00=Rp.2,912.00Mandor0.0830OhxRp.104,000.00=Rp.8,632.00JUMLAH TENAGA=Rp.155,369.00TOTAL=Rp.1,418,333.50

41 m3 Membuat Beton, fc' = 21.7 Mpa ( K-250), Slump (12 2 ) cm, w/c : 0.56Semen Portland7.6800ZakxRp.108,975.00=Rp.836,928.00Pasir Beton0.5930M3xRp.450,000.00=Rp.266,850.00Koral Beton0.7700M3xRp.238,750.00=Rp.183,837.50Air215.0000LtrxRp.0.0=Rp.0.0JUMLAH BAHAN=Rp.1,287,615.50Pekerja1.6500OhxRp.72,000.00=Rp.118,800.00Tukang Batu0.2750OhxRp.91,000.00=Rp.25,025.00Kepala Tukang0.0280OhxRp.104,000.00=Rp.2,912.00Mandor0.0830OhxRp.104,000.00=Rp.8,632.00JUMLAH TENAGA=Rp.155,369.00TOTAL=Rp.1,442,984.50

51 m3 Membuat Beton Tumbuk, 1 PC : 3 PS : 5 KRSemen Portland4.3600KgxRp.108,975.00=Rp.475,131.00Pasir Beton0.5200M3xRp.450,000.00=Rp.234,000.00Koral Beton0.7700M3xRp.238,750.00=Rp.183,837.50JUMLAH BAHAN=Rp.892,968.50Pekerja1.6500OhxRp.72,000.00=Rp.118,800.00Tukang Batu0.2750OhxRp.91,000.00=Rp.25,025.00Kepala Tukang0.0280OhxRp.104,000.00=Rp.2,912.00Mandor0.0830OhxRp.104,000.00=Rp.8,632.00JUMLAH TENAGA=Rp.155,369.00TOTAL=Rp.1,048,337.50

6Pembesian Per 10 Kg Besi PolosBesi Beton Polos10.0000KgxRp.13,500.00=Rp.135,000.00Kawat Beton0.1500KgxRp.42,300.00=Rp.6,345.00JUMLAH BAHAN=Rp.141,345.00Pekerja0.0700OhxRp.72,000.00=Rp.5,040.00Tukang Batu0.0700OhxRp.91,000.00=Rp.6,370.00Kepala Tukang0.0070OhxRp.104,000.00=Rp.728.00Mandor0.0040OhxRp.104,000.00=Rp.416.00JUMLAH TENAGA=Rp.12,554.00Jumlah Harga per 10 Kg153,899.0000Jumlah untuk per 1 Kg=Rp.15,389.901,538.99

7Pembesian Per 10 Kg Besi UlirBesi Beton Ulir10.0000KgxRp.14,476.00=Rp.144,760.00Kawat Beton0.1500KgxRp.42,300.00=Rp.6,345.00JUMLAH BAHAN=Rp.151,105.00Pekerja0.0700OhxRp.72,000.00=Rp.5,040.00Tukang Batu0.0700OhxRp.91,000.00=Rp.6,370.00Kepala Tukang0.0070OhxRp.104,000.00=Rp.728.00Mandor0.0040OhxRp.104,000.00=Rp.416.00JUMLAH TENAGA=Rp.12,554.00Jumlah Harga per 10 Kg163,659.0000Jumlah untuk per 1 Kg=Rp.16,365.90

8Memasang 1 m2 Begisting Untuk Pondasi 2x PakaiKayu Kelas III0.0200M3xRp.1,575,750.00=Rp.31,515.00Paku 5 - 10 cm0.3000KgxRp.38,070.00=Rp.11,421.00Minyak Begisting0.1000M3xRp.27,900.00=Rp.2,790.00JUMLAH BAHAN=Rp.45,726.00Pekerja0.5200OhxRp.72,000.00=Rp.37,440.00Tukang Batu0.2600OhxRp.91,000.00=Rp.23,660.00Kepala Tukang0.0260OhxRp.104,000.00=Rp.2,704.00Mandor0.0260OhxRp.104,000.00=Rp.2,704.00JUMLAH TENAGA=Rp.66,508.00TOTAL=Rp.112,234.00

9Memasang 1 m2 Begisting Untuk Sloof 2x PakaiKayu Kelas III0.0230M3xRp.1,575,750.00=Rp.36,242.25Paku 5 - 10 cm0.3000KgxRp.38,070.00=Rp.11,421.00Minyak Begisting0.1000M3xRp.27,900.00=Rp.2,790.00JUMLAH BAHAN=Rp.50,453.25Pekerja0.5200OhxRp.72,000.00=Rp.37,440.00Tukang Batu0.2600OhxRp.91,000.00=Rp.23,660.00Kepala Tukang0.0260OhxRp.104,000.00=Rp.2,704.00Mandor0.0260OhxRp.104,000.00=Rp.2,704.00JUMLAH TENAGA=Rp.66,508.00TOTAL=Rp.116,961.25

10Memasang 1 m2 Begisting Untuk Kolom 2x PakaiKayu Kelas III0.0200M3xRp.1,575,750.00=Rp.31,515.00Paku 5 - 12 cm0.3000KgxRp.38,070.00=Rp.11,421.00Minyak Begisting0.2000M3xRp.27,900.00=Rp.5,580.00Balok Kayu Kls II0.0080M3xRp.2,053,250.00=Rp.16,426.00Playwood t = 9 mm0.1250M3xRp.147,510.00=Rp.18,438.75Dolken Kayu dia 8 - 10 cm1.0000BtgxRp.9,550.00=Rp.9,550.00JUMLAH BAHAN=Rp.92,930.75Pekerja0.5200OhxRp.72,000.00=Rp.37,440.00Tukang Batu0.2600OhxRp.91,000.00=Rp.23,660.00Kepala Tukang0.0260OhxRp.104,000.00=Rp.2,704.00Mandor0.0260OhxRp.104,000.00=Rp.2,704.00JUMLAH TENAGA=Rp.66,508.00TOTAL=Rp.159,438.75

11Memasang 1 m2 Begisting Untuk Balok 2x PakaiKayu Kelas III0.0200M3xRp.27,900.00=Rp.558.00Paku 5 - 12 cm0.3000KgxRp.38,070.00=Rp.11,421.00Minyak Begisting0.2000M3xRp.27,900.00=Rp.5,580.00Balok Kayu Kls II0.0080M3xRp.2,053,250.00=Rp.16,426.00Playwood t = 9 mm0.1350M3xRp.147,510.00=Rp.19,913.85Dolken Kayu dia 8 - 10 cm3.0000BtgxRp.9,550.00=Rp.28,650.00JUMLAH BAHAN=Rp.82,548.85Pekerja0.6600OhxRp.72,000.00=Rp.47,520.00Tukang Batu0.3300OhxRp.91,000.00=Rp.30,030.00Kepala Tukang0.0330OhxRp.104,000.00=Rp.3,432.00Mandor0.0330OhxRp.104,000.00=Rp.3,432.00JUMLAH TENAGA=Rp.84,414.00TOTAL=Rp.166,962.85

12Memasang 1 m2 Begisting Untuk Plat 2x PakaiKayu Kelas III0.0200M3xRp.1,575,750.00=Rp.31,515.00Paku 5 - 12 cm0.2500KgxRp.38,070.00=Rp.9,517.50Minyak Begisting0.2000M3xRp.27,900.00=Rp.5,580.00Balok Kayu Kls II0.0080M3xRp.2,053,250.00=Rp.16,426.00Playwood t = 9 mm0.1750M3xRp.147,510.00=Rp.25,814.25Dolken Kayu dia 8 - 10 cm3.0000BtgxRp.9,550.00=Rp.28,650.00JUMLAH BAHAN=Rp.117,502.75Pekerja0.6600OhxRp.72,000.00=Rp.47,520.00Tukang Batu0.2200OhxRp.91,000.00=Rp.20,020.00Kepala Tukang0.0220OhxRp.104,000.00=Rp.2,288.00Mandor0.0220OhxRp.104,000.00=Rp.2,288.00JUMLAH TENAGA=Rp.72,116.00TOTAL=Rp.189,618.75

13Pekerjaan 1 m2 Rabat Beton Dengan Wire Mesh, Mutu Beton K-175Spesi Beton1.0000M3xRp.1,337,864.50=Rp.1,337,864.50Pembesian Beton Polos100.0000KgxRp.15,389.90=Rp.1,538,990.00ro7850kg/m3JUMLAH BAHAN=Rp.2,876,854.50massavolume014Pekerjaan 1 m3 Beton Strouss dia 30 cm, Mutu Beton K-250 Untuk Bangunan UtamaSpesi Beton1.0000M3xRp.1,442,984.50=Rp.1,442,984.50Pembesian Beton Polos70.0000KgxRp.15,389.90=Rp.1,077,293.00Pembesian Beton Ulir140.0000KgxRp.16,365.90=Rp.2,291,226.00JUMLAH BAHAN=Rp.4,811,503.50

15Pekerjaan 1 m3 Beton Poor P1 120 x 120 cm, Mutu Beton K-250 Untuk Bangunan UtamaSpesi Beton1.0000M3xRp.1,442,984.50=Rp.1,442,984.50Pembesian Beton Ulir180.0000KgxRp.16,365.90=Rp.2,945,862.00Begisting2.0400M2xRp.112,234.00=Rp.228,957.36JUMLAH BAHAN=Rp.4,617,803.86

16Pekerjaan 1 m3 Beton Sloof S1 20 x 40 cm, Mutu Beton K-250 Untuk Bangunan UtamaSpesi Beton1.0000M3xRp.1,442,984.50=Rp.1,442,984.50Pembesian Beton Polos24.0000KgxRp.15,389.90=Rp.369,357.60Pembesian Beton Ulir170.0000KgxRp.16,365.90=Rp.2,782,203.00Begisting10.0000M2xRp.116,961.25=Rp.1,169,612.50JUMLAH BAHAN=Rp.5,764,157.60

17Pekerjaan 1 m3 Beton Sloof S2 15 x 25 cm, Mutu Beton K-250 Untuk Bangunan UtamaSpesi Beton1.0000M3xRp.1,442,984.50=Rp.1,442,984.50Pembesian Beton Polos28.0000KgxRp.15,389.90=Rp.430,917.20Pembesian Beton Ulir170.0000KgxRp.16,365.90=Rp.2,782,203.00Begisting10.0000M2xRp.116,961.25=Rp.1,169,612.50JUMLAH BAHAN=Rp.5,825,717.20

18Pekerjaan 1 m3 Beton Kolom K1 30/30 cm, Mutu Beton K-250 Untuk Bangunan UtamaSpesi Beton1.0000M3xRp.1,442,984.50=Rp.1,442,984.50Pembesian Beton Polos50.0000KgxRp.15,389.90=Rp.769,495.00Pembesian Beton Ulir200.0000KgxRp.16,365.90=Rp.3,273,180.00Begisting13.3330M2xRp.159,438.75=Rp.2,125,796.85JUMLAH BAHAN=Rp.7,611,456.35

19Pekerjaan 1 m3 Beton Kolom K2 25/25 cm, Mutu Beton K-250 Untuk Bangunan UtamaSpesi Beton1.0000M3xRp.1,442,984.50=Rp.1,442,984.50Pembesian Beton Polos43.0000KgxRp.15,389.90=Rp.661,765.70Pembesian Beton Ulir170.0000KgxRp.16,365.90=Rp.2,782,203.00Begisting13.3330M2xRp.159,438.75=Rp.2,125,796.85JUMLAH BAHAN=Rp.7,012,750.05

20Pekerjaan 1 m3 Beton Kolom KP 15 x 15 cm, Mutu Beton K-250 Untuk Bangunan UtamaSpesi Beton1.0000M3xRp.1,442,984.50=Rp.1,442,984.50Pembesian Beton Polos120.0000KgxRp.15,389.90=Rp.1,846,788.00Pembesian Beton Ulir0.0KgxRp.16,365.90=Rp.0.0Begisting8.5000M2xRp.159,438.75=Rp.1,355,229.38JUMLAH BAHAN=Rp.4,645,001.88

21Pekerjaan 1 m3 Beton Kolom KP 15 x 15 cm, Mutu Beton K-250 Untuk Bangunan UtamaSpesi Beton1.0000M3xRp.1,442,984.50=Rp.1,442,984.50Pembesian Beton Polos120.0000KgxRp.15,389.90=Rp.1,846,788.00Pembesian Beton Ulir0.0KgxRp.16,365.90=Rp.0.0Begisting8.5000M2xRp.159,438.75=Rp.1,355,229.38JUMLAH BAHAN=Rp.4,645,001.88

22Pekerjaan 1 m3 Beton Kolom 20 x 20 cm, Mutu Beton K-225 Untuk Pintu Temperet7850massa jenisSpesi Beton1.0000M3xRp.1,418,333.50=Rp.1,418,333.50massa Pembesian Beton Polos74.0000KgxRp.15,389.90=Rp.1,138,852.600.07536volumePembesian Beton Ulir0.0KgxRp.16,365.90=Rp.0.0Begisting10.5000M2xRp.159,438.75=Rp.1,674,106.881 staff beton591.576kgharga 1 staf besi126,025.00JUMLAH BAHAN=Rp.4,231,292.98Rp126,025.00213.03

23Pekerjaan 1 m3 Beton Kolom K1 15 x 15 cm, Mutu Beton K-250 Untuk Bangunan Pos Jaga126,025.00 Spesi Beton1.0000M3xRp.1,442,984.50=Rp.1,442,984.50Pembesian Beton Polos100.0000KgxRp.15,389.90=Rp.1,538,990.00Pembesian Beton Ulir0.0KgxRp.16,365.90=Rp.0.0Begisting8.5000M2xRp.159,438.75=Rp.1,355,229.38JUMLAH BAHAN=Rp.4,337,203.88

24Pekerjaan 1 m3 Beton Balok B1 30/40 cm, Mutu Beton K-250 Untuk Bangunan UtamaSpesi Beton1.0000M3xRp.1,442,984.50=Rp.1,442,984.50Pembesian Beton Polos49.0000KgxRp.15,389.90=Rp.754,105.10Pembesian Beton Ulir180.0000KgxRp.16,365.90=Rp.2,945,862.00Begisting9.1670M2xRp.166,962.85=Rp.1,530,548.45JUMLAH BAHAN=Rp.6,673,500.05

25Pekerjaan 1 m3 Beton Balok B2-1 20/40 cm, Mutu Beton K-250 Untuk Bangunan UtamaSpesi Beton1.0000M3xRp.1,442,984.50=Rp.1,442,984.50Pembesian Beton Polos57.0000KgxRp.15,389.90=Rp.877,224.30Pembesian Beton Ulir170.0000KgxRp.16,365.90=Rp.2,782,203.00Begisting9.1670M2xRp.166,962.85=Rp.1,530,548.45JUMLAH BAHAN=Rp.6,632,960.25

26Pekerjaan 1 m3 Beton Balok B2-2 20/40 cm, Mutu Beton K-250 Untuk Bangunan UtamaSpesi Beton1.0000M3xRp.1,442,984.50=Rp.1,442,984.50Pembesian Beton Polos63.0000KgxRp.15,389.90=Rp.969,563.70Pembesian Beton Ulir103.0000KgxRp.16,365.90=Rp.1,685,687.70Begisting9.1670M2xRp.166,962.85=Rp.1,530,548.45JUMLAH BAHAN=Rp.5,628,784.35

27Pekerjaan 1 m3 Beton Balok B2-3 20/40 cm, Mutu Beton K-250 Untuk Bangunan UtamaSpesi Beton1.0000M3xRp.1,442,984.50=Rp.1,442,984.50Pembesian Beton Polos34.0000KgxRp.15,389.90=Rp.523,256.60Pembesian Beton Ulir150.0000KgxRp.16,365.90=Rp.2,454,885.00Begisting9.1670M2xRp.166,962.85=Rp.1,530,548.45JUMLAH BAHAN=Rp.5,951,674.55

28Pekerjaan 1 m3 Beton Balok B2-3 20/40 cm, Mutu Beton K-250 Untuk Bangunan UtamaSpesi Beton1.0000M3xRp.1,442,984.50=Rp.1,442,984.50Pembesian Beton Polos34.0000KgxRp.15,389.90=Rp.523,256.60Pembesian Beton Ulir150.0000KgxRp.16,365.90=Rp.2,454,885.00Begisting9.1670M2xRp.166,962.85=Rp.1,530,548.45JUMLAH BAHAN=Rp.5,951,674.55

29Pekerjaan 1 m3 Beton Balok B3-1 20/30 cm, Mutu Beton K-250 Untuk Bangunan UtamaSpesi Beton1.0000M3xRp.1,442,984.50=Rp.1,442,984.50Pembesian Beton Polos24.0000KgxRp.15,389.90=Rp.369,357.60Pembesian Beton Ulir200.0000KgxRp.16,365.90=Rp.3,273,180.00Begisting9.1670M2xRp.166,962.85=Rp.1,530,548.45JUMLAH BAHAN=Rp.6,616,070.55

30Pekerjaan 1 m3 Beton Balok B3-2 20/30 cm, Mutu Beton K-250 Untuk Bangunan UtamaSpesi Beton1.0000M3xRp.1,442,984.50=Rp.1,442,984.50Pembesian Beton Polos28.0000KgxRp.15,389.90=Rp.430,917.20Pembesian Beton Ulir180.0000KgxRp.16,365.90=Rp.2,945,862.00Begisting9.1670M2xRp.166,962.85=Rp.1,530,548.45JUMLAH BAHAN=Rp.6,350,312.15

31Pekerjaan 1 m3 Beton Balok BL 15 x 15 cm, Mutu Beton K-250 Untuk Bangunan UtamaSpesi Beton1.0000M3xRp.1,442,984.50=Rp.1,442,984.50Pembesian Beton Polos125.0000KgxRp.15,389.90=Rp.1,923,737.50Pembesian Beton Ulir0.0KgxRp.16,365.90=Rp.0.0Begisting9.1670M2xRp.166,962.85=Rp.1,530,548.45JUMLAH BAHAN=Rp.4,897,270.45

32Pekerjaan 1 m3 Beton Plat Meja Dapur t = 7 cm, Mutu Beton K-250 Untuk Bangunan UtamaSpesi Beton1.0000M3xRp.1,442,984.50=Rp.1,442,984.50Pembesian Beton Polos100.0000KgxRp.15,389.90=Rp.1,538,990.00Pembesian Beton Ulir0.0KgxRp.16,365.90=Rp.0.0Begisting9.1670M2xRp.112,234.00=Rp.1,028,849.08JUMLAH BAHAN=Rp.4,010,823.58

33Pekerjaan 1 m3 Beton Plat Meja Dapur t = 7 cm, Mutu Beton K-250 Untuk Bangunan UtamaSpesi Beton1.0000M3xRp.1,442,984.50=Rp.1,442,984.50Pembesian Beton Polos100.0000KgxRp.15,389.90=Rp.1,538,990.00Pembesian Beton Ulir0.0KgxRp.16,365.90=Rp.0.0Begisting8.3330M2xRp.112,234.00=Rp.935,245.92JUMLAH BAHAN=Rp.3,917,220.42

34Pekerjaan 1 m3 Beton Plat Meja Wastafel t = 7 cm, Mutu Beton K-250 Untuk Bangunan UtamaSpesi Beton1.0000M3xRp.1,442,984.50=Rp.1,442,984.50Pembesian Beton Polos100.0000KgxRp.15,389.90=Rp.1,538,990.00Pembesian Beton Ulir0.0KgxRp.16,365.90=Rp.0.0Begisting8.3330M2xRp.112,234.00=Rp.935,245.92JUMLAH BAHAN=Rp.3,917,220.42

35Pekerjaan 1 m3 Beton Plat Lantai t = 12 cm, Mutu Beton K-250 Untuk Bangunan UtamaSpesi Beton1.0000M3xRp.1,442,984.50=Rp.1,442,984.50Pembesian Beton Polos200.0000KgxRp.15,389.90=Rp.3,077,980.00Pembesian Beton Ulir0.0KgxRp.16,365.90=Rp.0.0Begisting10.0000M2xRp.189,618.75=Rp.1,896,187.50JUMLAH BAHAN=Rp.6,417,152.00

36Pekerjaan 1 m3 Beton Plat atap t = 10 cm, Mutu Beton K-250 Untuk Bangunan UtamaSpesi Beton1.0000M3xRp.1,442,984.50=Rp.1,442,984.50Pembesian Beton Polos180.0000KgxRp.15,389.90=Rp.2,770,182.00Pembesian Beton Ulir0.0KgxRp.16,365.90=Rp.0.0Begisting8.3330M2xRp.189,618.75=Rp.1,580,093.04JUMLAH BAHAN=Rp.5,793,259.54

37Pekerjaan 1 m3 Beton Plat Tangga t = 14 cm, Mutu Beton K-250 Untuk Bangunan UtamaSpesi Beton1.0000M3xRp.1,442,984.50=Rp.1,442,984.50Pembesian Beton Polos68.0000KgxRp.15,389.90=Rp.1,046,513.20Pembesian Beton Ulir160.0000KgxRp.16,365.90=Rp.2,618,544.00Begisting7.1430M2xRp.112,234.00=Rp.801,687.46JUMLAH BAHAN=Rp.5,909,729.16

38Pekerjaan 1 m3 Beton Plat Bordes t = 14 cm, Mutu Beton K-250 Untuk Bangunan UtamaSpesi Beton1.0000M3xRp.1,442,984.50=Rp.1,442,984.50Pembesian Beton Polos68.0000KgxRp.15,389.90=Rp.1,046,513.20Pembesian Beton Ulir180.0000KgxRp.16,365.90=Rp.2,945,862.00Begisting7.1430M2xRp.112,234.00=Rp.801,687.46JUMLAH BAHAN=Rp.6,237,047.16

39Pekerjaan 1 m3 Beton Plat Atap t = 10 cm, Mutu Beton K-250 Untuk Bangunan Pos JagaSpesi Beton1.0000M3xRp.1,442,984.50=Rp.1,442,984.50Pembesian Beton Polos95.2910KgxRp.15,389.90=Rp.1,466,518.96Pembesian Beton Ulir0.0KgxRp.16,365.90=Rp.0.0Begisting10.0000M2xRp.112,234.00=Rp.1,122,340.00JUMLAH BAHAN=Rp.4,031,843.46

40Pekerjaan 1 m3 Beton Plat t = 12 cm, Mutu Beton K-250 Untuk SeptiktankSpesi Beton1.0000M3xRp.1,442,984.50=Rp.1,442,984.50Pembesian Beton Polos228.8280KgxRp.15,389.90=Rp.3,521,640.04Pembesian Beton Ulir0.0KgxRp.16,365.90=Rp.0.0Begisting8.3330M2xRp.112,234.00=Rp.935,245.92JUMLAH BAHAN=Rp.5,899,870.46

DindingPEKERJAAN DINDING

1Memasang 1 m2 Dinding Bata Merah uk. 22 x 11 x 5 cm Tebal 1/2 Beta, Camp 1 Pc : 3 PpBata Merah41.000BhxRp.2,250.00=Rp.92,250.00Semen Portland0.287ZakxRp.108,975.00=Rp.31,275.83Pasir Pasang0.040M3xRp.450,000.00=Rp.18,000.00JUMLAH BAHAN=Rp.141,525.83Pekerja0.300OhxRp.72,000.00=Rp.21,600.00Tukang Batu0.100OhxRp.91,000.00=Rp.9,100.00Kepala Tukang0.010OhxRp.104,000.00=Rp.1,040.00Mandor0.015OhxRp.104,000.00=Rp.1,560.00JUMLAH TENAGA=Rp.33,300.00TOTAL=Rp.174,825.83

2Memasang 1 m2 Dinding Bata Merah uk. 22 x 11 x 5 cm Tebal 1/2 Beta, Camp 1 Pc : 5 PpBata Merah41.000BhxRp.2,250.00=Rp.92,250.00Semen Portland0.194ZakxRp.108,975.00=Rp.21,141.15Pasir Pasang0.045M3xRp.450,000.00=Rp.20,250.00JUMLAH BAHAN=Rp.133,641.15Pekerja0.300OhxRp.72,000.00=Rp.21,600.00Tukang Batu0.100OhxRp.91,000.00=Rp.9,100.00Kepala Tukang0.010OhxRp.104,000.00=Rp.1,040.00Mandor0.015OhxRp.104,000.00=Rp.1,560.00JUMLAH TENAGA=Rp.33,300.00TOTAL=Rp.166,941.15

3Memasang 1 m2 Dinding Bata Merah uk. 22 x 11 x 5 cm Tebal 1 Beta, Camp 1 Pc : 3 PpBata Merah82.000BhxRp.2,250.00=Rp.184,500.00Semen Portland0.659zakxRp.108,975.00=Rp.71,814.53Pasir Pasang0.091M3xRp.450,000.00=Rp.40,950.00JUMLAH BAHAN=Rp.297,264.53Pekerja0.600OhxRp.72,000.00=Rp.43,200.00Tukang Batu0.200OhxRp.91,000.00=Rp.18,200.00Kepala Tukang0.020OhxRp.104,000.00=Rp.2,080.00Mandor0.030OhxRp.104,000.00=Rp.3,120.00JUMLAH TENAGA=Rp.66,600.00TOTAL=Rp.363,864.53

4Memasang 1 m2 Dinding Bata Merah uk. 22 x 11 x 5 cm Tebal 1 Beta, Camp 1 Pc : 5 PpBata Merah82.000BhxRp.2,250.00=Rp.184,500.00Semen Portland0.444ZakxRp.108,975.00=Rp.48,384.90Pasir Pasang0.102M3xRp.450,000.00=Rp.45,900.00JUMLAH BAHAN=Rp.278,784.90Pekerja0.600OhxRp.72,000.00=Rp.43,200.00Tukang Batu0.200OhxRp.91,000.00=Rp.18,200.00Kepala Tukang0.020OhxRp.104,000.00=Rp.2,080.00Mandor0.030OhxRp.104,000.00=Rp.3,120.00JUMLAH TENAGA=Rp.66,600.00TOTAL=Rp.345,384.90

5Memasang 1 m2 Dinding Bata Merah uk. 22 x 11 x 5 cm Tebal 1/2 BetaBata Merah41.000BhxRp.2,250.00=Rp.92,250.00JUMLAH BAHAN=Rp.92,250.00Pekerja0.300OhxRp.72,000.00=Rp.21,600.00Tukang Batu0.100OhxRp.91,000.00=Rp.9,100.00Kepala Tukang0.010OhxRp.104,000.00=Rp.1,040.00Mandor0.015OhxRp.104,000.00=Rp.1,560.00JUMLAH TENAGA=Rp.33,300.00TOTAL=Rp.125,550.00

PlesterPEKERJAAN PLESTERAN

1Memasang 1 m2 Plesteran Dinding 1 Pc : 3 Ps, tebal 15 mm.Semen Portland0.1560ZakxRp.108,975.00=Rp.17,000.10Pasir pasang0.0190M3xRp.450,000.00=Rp.8,550.00JUMLAH BAHAN=Rp.25,550.10Pekerja0.3000OhxRp.72,000.00=Rp.21,600.00Tukang Batu0.1500OhxRp.91,000.00=Rp.13,650.00Kepala Tukang0.0150OhxRp.104,000.00=Rp.1,560.00Mandor0.0150OhxRp.104,000.00=Rp.1,560.00JUMLAH TENAGA=Rp.38,370.00TOTAL=Rp.63,920.103,196.012Memasang 1 m2 Plesteran Dinding 1 Pc : 5 Ps, tebal 15 mm.5,113.61Semen Portland0.1040ZakxRp.108,975.00=Rp.11,333.40Pasir pasang0.0260M3xRp.450,000.00=Rp.11,700.00JUMLAH BAHAN=Rp.23,033.40Pekerja0.2000OhxRp.72,000.00=Rp.14,400.00Tukang Batu0.1500OhxRp.91,000.00=Rp.13,650.00Kepala Tukang0.0150OhxRp.104,000.00=Rp.1,560.00Mandor0.0100OhxRp.104,000.00=Rp.1,040.00JUMLAH TENAGA=Rp.30,650.00TOTAL=Rp.53,683.40

3Memasang 1 m2 Plesteran Beton 1 Pc : 2 Ps, tebal 20 mm.Semen Portland0.2730ZakxRp.108,975.00=Rp.29,750.18Pasir pasang0.0270M3xRp.450,000.00=Rp.12,150.00JUMLAH BAHAN=Rp.41,900.18Pekerja0.4000OhxRp.72,000.00=Rp.28,800.00Tukang Batu0.2000OhxRp.91,000.00=Rp.18,200.00Kepala Tukang0.0200OhxRp.104,000.00=Rp.2,080.00Mandor0.0220OhxRp.104,000.00=Rp.2,288.00JUMLAH TENAGA=Rp.51,368.00TOTAL=Rp.93,268.18

4Memasang 1 m2 AcianSemen Portland0.0650ZakxRp.108,975.00=Rp.7,083.38JUMLAH BAHAN=Rp.7,083.38Pekerja0.2000OhxRp.72,000.00=Rp.14,400.00Tukang Batu0.1000OhxRp.91,000.00=Rp.9,100.00Kepala Tukang0.0100OhxRp.104,000.00=Rp.1,040.00Mandor0.0100OhxRp.104,000.00=Rp.1,040.00JUMLAH TENAGA=Rp.25,580.00TOTAL=Rp.32,663.38

5Memasang 1 m' BenanganSemen Portland0.0080ZakxRp.108,975.00=Rp.871.80Pasir pasang0.0020M3xRp.450,000.00=Rp.900.00JUMLAH BAHAN=Rp.1,771.80Tukang Batu0.1500OhxRp.91,000.00=Rp.13,650.00JUMLAH TENAGA=Rp.13,650.00TOTAL=Rp.15,421.80

LantaiPEKERJAAN LANTAI

1Memasang 1 m2 Keramik 40 x 40 CmKeramik 40 x 401.050BhxRp.80,640.00=Rp.84,672.00Semen Portland0.228ZakxRp.108,975.00=Rp.24,846.30Pasir Pasang0.042M3xRp.450,000.00=Rp.18,900.00Semen Warna1.500KgxRp.22,000.00=Rp.33,000.00JUMLAH BAHAN=Rp.161,418.30Pekerja0.700OhxRp.72,000.00=Rp.50,400.00Tukang Batu0.350OhxRp.91,000.00=Rp.31,850.00Kepala Tukang0.035OhxRp.104,000.00=Rp.3,640.00Mandor0.035OhxRp.104,000.00=Rp.3,640.00JUMLAH TENAGA=Rp.89,530.00TOTAL=Rp.250,948.30

2Memasang 1 m2 Keramik 30 x 30 CmKeramik 30 x 301.050BhxRp.80,100.00=Rp.84,105.00Semen Portland0.200ZakxRp.108,975.00=Rp.21,795.00Pasir Pasang0.045M3xRp.450,000.00=Rp.20,250.00Semen Warna1.500KgxRp.22,000.00=Rp.33,000.00JUMLAH BAHAN=Rp.159,150.00Pekerja0.700OhxRp.72,000.00=Rp.50,400.00Tukang Batu0.350OhxRp.91,000.00=Rp.31,850.00Kepala Tukang0.035OhxRp.104,000.00=Rp.3,640.00Mandor0.035OhxRp.104,000.00=Rp.3,640.00JUMLAH TENAGA=Rp.89,530.00TOTAL=Rp.248,680.00

3Memasang 1 m2 Dinding Keramik 20 x 25 CmKeramik 20 x 251.050BhxRp.81,180.00=Rp.85,239.00Semen Portland0.186ZakxRp.108,975.00=Rp.20,269.35Pasir Pasang0.018M3xRp.450,000.00=Rp.8,100.00Semen Warna1.900KgxRp.22,000.00=Rp.41,800.00JUMLAH BAHAN=Rp.155,408.35Pekerja0.760OhxRp.72,000.00=Rp.54,720.00Tukang Batu0.450OhxRp.91,000.00=Rp.40,950.00Kepala Tukang0.045OhxRp.104,000.00=Rp.4,680.00Mandor0.045OhxRp.104,000.00=Rp.4,680.00JUMLAH TENAGA=Rp.105,030.00TOTAL=Rp.260,438.35

4Memasang 1 m2 Lantai Keramik 20 x 20 CmKeramik 20 x 201.050BhxRp.68,130.00=Rp.71,536.50Semen Portland0.200ZakxRp.108,975.00=Rp.21,795.00Pasir Pasang0.045M3xRp.450,000.00=Rp.20,250.00Semen Warna1.500KgxRp.22,000.00=Rp.33,000.00JUMLAH BAHAN=Rp.146,581.50Pekerja0.350OhxRp.72,000.00=Rp.25,200.00Tukang Batu0.175OhxRp.91,000.00=Rp.15,925.00Kepala Tukang0.018OhxRp.104,000.00=Rp.1,872.00Mandor0.018OhxRp.104,000.00=Rp.1,872.00JUMLAH TENAGA=Rp.44,869.00TOTAL=Rp.191,450.50

5Memasang 1 m' Step Noise 10 x 20 CmKeramik 10 x 201.050BhxRp.76,950.00=Rp.80,797.50Semen Portland0.196ZakxRp.108,975.00=Rp.21,359.10Pasir Pasang0.045M3xRp.450,000.00=Rp.20,250.00Semen Warna4.370KgxRp.22,000.00=Rp.96,140.00JUMLAH BAHAN=Rp.218,546.60Pekerja0.090OhxRp.72,000.00=Rp.6,480.00Tukang Batu0.090OhxRp.91,000.00=Rp.8,190.00Kepala Tukang0.009OhxRp.104,000.00=Rp.936.00Mandor0.005OhxRp.104,000.00=Rp.520.00JUMLAH TENAGA=Rp.16,126.00TOTAL=Rp.234,672.60

6Memasang 1 m' Border Keramik 10 x 20 CmKeramik 10 x 201.050BhxRp.76,950.00=Rp.80,797.50Semen Portland0.196ZakxRp.108,975.00=Rp.21,359.10Pasir Pasang0.045M3xRp.450,000.00=Rp.20,250.00Semen Warna4.370KgxRp.22,000.00=Rp.96,140.00JUMLAH BAHAN=Rp.218,546.60Pekerja0.090OhxRp.72,000.00=Rp.6,480.00Tukang Batu0.090OhxRp.91,000.00=Rp.8,190.00Kepala Tukang0.009OhxRp.104,000.00=Rp.936.00Mandor0.005OhxRp.104,000.00=Rp.520.00JUMLAH TENAGA=Rp.16,126.00TOTAL=Rp.234,672.607Memasang 1 m' Vinyl (15x30cm)Vinyl Karet1.760BhxRp.80,100.00=Rp.140,976.00Lem Vinyl0.196kgxRp.27,000.00=Rp.5,292.00

JUMLAH BAHAN=Rp.146,268.00Pekerja0.080OhxRp.72,000.00=Rp.5,760.00Tukang Batu0.080OhxRp.91,000.00=Rp.7,280.00Kepala Tukang0.008OhxRp.104,000.00=Rp.832.00Mandor0.004OhxRp.104,000.00=Rp.416.00JUMLAH TENAGA=Rp.14,288.00TOTAL=Rp.160,556.0081 m2 Foor LantaiKeramik 30 x 301.050BhxRp.=Rp.0.0Semen Portland0.200ZakxRp.80,100.00=Rp.16,020.00Pasir Pasang0.045M3xRp.27,000.00=Rp.1,215.00Semen Warna1.500KgxRp.0.0=Rp.0.0JUMLAH BAHAN=Rp.17,235.00Pekerja0.700OhxRp.0.0=Rp.0.0Tukang Batu0.350OhxRp.91,000.00=Rp.31,850.00Kepala Tukang0.035OhxRp.104,000.00=Rp.3,640.00Mandor0.035OhxRp.104,000.00=Rp.3,640.00JUMLAH TENAGA=Rp.39,130.00TOTAL=Rp.56,365.00TOTAL=Rp.55,150.00

AlamHARGA MATERIAL ALAMIKOTA TIDORE KEPULAUAN3,813,500,000.00904,864,000.00(2,908,636,000.00)NoBahanSpesifikasi SatuanHarga (Rp.)KETMerk / Mode10.9 / Ukuran1Batu Kali / Batu GunungM3400,000.00270,000.0012,150.00257,850.002Batu Belah 10 - 15 cmM3262,625.00275,000.0012,375.00262,625.003Batu Belah 7 - 10 cmM3267,400.00280,000.0012,600.00267,400.004Batu Belah 5 - 7 cmM3334,250.00350,000.0015,750.00334,250.005Batu Belah 3 - 5 cmM3424,975.00445,000.0020,025.00424,975.00200,000.006Batu Belah 2 - 3 cmM3511,880.00536,000.0024,120.00511,880.007Batu Belah 1 - 2 cmM3577,775.00605,000.0027,225.00577,775.008Batu Belah 0.5 - 1 cmM3630,300.00660,000.0029,700.00630,300.009Agregat KasarM3346,665.00363,000.0016,335.00346,665.0010Agregat HalusM3429,750.00450,000.0020,250.00429,750.0011SituM3238,750.00250,000.0011,250.00238,750.0012Timbunan PilihanM3238,750.00250,000.0011,250.00238,750.0013Timbunan Biasa / Tanah UrugM3191,000.00200,000.009,000.00191,000.0014Pasir beton / pasanganM3450,000.00310,000.0013,950.00296,050.0015Pasir UrugM3243,525.00255,000.0011,475.00243,525.0016FillerKg5,252.505,500.00247.505,252.5017Koral / KerikilM3238,750.00250,000.0011,250.00238,750.0018Balok Kayu Klas I8x12 cmM34,210,800.005,250,000.00236,250.005,013,750.005x10 cmM34,210,800.005,300,000.00238,500.005,061,500.0019Balok kayu Klas II8x12 cmM31,815,000.002,000,000.0090,000.001,910,000.005x10 cmM31,815,000.002,150,000.0096,750.002,053,250.0020Kayu BegistingM31,766,750.001,850,000.0083,250.001,766,750.0021Papan Klas IM34,210,800.005,300,000.00238,500.005,061,500.0022Papan Klas IIM32,053,250.002,150,000.0096,750.002,053,250.0023Papan Klas IIIM31,575,750.001,650,000.0074,250.001,575,750.0024Dolken Kayu Galam 8-10 / 4 meterBtg9,550.0010,000.00450.009,550.0025Air BersihLtr0.0

0.03m331btg58,080.00btgpapan58,000.00btg30x6x40.0720.0240.012

Upah+Alat

DAFTAR HARGA SATUAN UPAH

NOTENAGA KERJAKODESATUANUPAH (Rp./Hari)KET23%6%11Mandor LapanganL 061OH104,00036,100.0075,0004,500.0070,500.0080,500.002MekanikL 071OH70,50035,200.0075,0004,500.0070,500.0087,500.003Pembantu MekanikOH91,00026,950.0060,0003,600.0056,400.0069,000.004Kepala TukangOH104,00034,650.0080,0004,800.0075,200.0077,000.005TukangL 073OH91,00033,000.0075,0004,500.0070,500.0072,300.006Operator TerlatihL 081OH129,00035,200.0075,0004,500.0070,500.0084,700.007Operator Kurang TerlatihL 082OH91,00030,000.0065,0003,900.0061,100.0077,000.008Pembantu OperatorL 083OH74,00026,950.0065,0003,900.0061,100.0066,000.009Supir Truck (Material)L 091OH105,00028,600.0065,0003,900.0061,100.0072,300.0010Pembantu Supir Truck (Kernet)L 099OH74,00065,0003,900.0061,100.0060,000.0011PekerjaL 106OH72,00025,000.0065,0003,900.0061,100.0053,900.0012Pekerja Pompa/listrikOH72,00060,0003,600.0056,400.0050,400.0013Tukang Pompa/listrikOH72,00065,0003,900.0061,100.0070,000.0014Kepala Tukang Pompa/listrikOH72,00070,0004,200.0065,800.0085,000.0015Tenaga Ahli Pompa/listrikOH75,20080,0004,800.0075,200.0090,000.00

DAFTAR HARGA SATUAN SEWA ALAT

NOTENAGA KERJAKODESATUANSEWA ALAT/JAMKET1ASPHALT SPRAYERE03Jam64,712.0064,712.00ASPHALT MIXING PLANTE01ASPHALT SPRAYERE0315800Liter8500000047,325.867,572.1454,897.992BULLDOZER 100-150 HPE04Jam630,137.00630,137.00ASPHALT FINISHERE02BULLDOZER 100-150 HPE04140 -825000000312,443.9149,991.03362,434.933COMPRESSOR 4000-6500 L\ME05Jam229,073.00229,073.00ASPHALT SPRAYERE03COMPRESSOR 4000-6500 L\ME0580 -85000000125,706.2420,113.00145,819.241Molen E06Jam169,947.9364,853.00BULLDOZER 100-150 HPE04CONCRETE MIXER 0.3-0.6 M3E0615500Liter12000000063,284.2510,125.4873,409.735CRANE 10-15 TONE07Jam565,729.00565,729.00COMPRESSOR 4000-6500 L\ME05CRANE 10-15 TONE0715025Ton777038177364,986.3958,397.82423,384.212Dump Truck 3.5 TE08Jam326,855.61317,423.00CONCRETE MIXER 0.3-0.6 M3E06DUMP TRUCK 3-4 M3E081006Ton120000000157,994.7425,279.16183,273.897DUMP TRUCKE09Jam260,000.00260,000.00CRANE 10-15 TONE07DUMP TRUCKE091258Ton315250250229,585.9436,733.75266,319.693ExcavatorE10Jam604,461.71518,439.00DUMP TRUCK 3-4 M3E08EXCAVATOR 80-140 HPE10800.5M3675600500221,869.4735,499.12257,368.599FLAT BED TRUCK 3-4 M3E11Jam376,962.00376,962.00DUMP TRUCKE09FLAT BED TRUCK 3-4 M3E111254M3115450350190,940.9030,550.54221,491.4510GENERATOR SETE12Jam670,907.00670,907.00EXCAVATOR 80-140 HPE10GENERATOR SETE12220180KVA135400000310,384.5149,661.52360,046.0311MOTOR GRADER >100 HPE13Jam609,794.00609,794.00FLAT BED TRUCK 3-4 M3E11MOTOR GRADER >100 HPE13125 -546350400259,243.7641,479.00300,722.7612TRACK LOADER 75-100 HPE14Jam602,226.00602,226.00GENERATOR SETE12TRACK LOADER 75-100 HPE14951.5M3528500000240,019.4738,403.12278,422.5913WHEEL LOADER 1.0-1.6 M3E15Jam603,859.00603,859.00MOTOR GRADER >100 HPE13WHEEL LOADER 1.0-1.6 M3E151251.5M3456458750253,851.4340,616.23294,467.6614THREE WHEEL ROLLER 6-8 TE16Jam370,959.00370,959.00TRACK LOADER 75-100 HPE14THREE WHEEL ROLLER 6-8 TE16608Ton187500785123,075.5619,692.09142,767.6515TANDEM ROLLER 6-8 T.E17Jam373,877.00373,877.00WHEEL LOADER 1.0-1.6 M3E15TANDEM ROLLER 6-8 T.E17608Ton184750000123,075.5619,692.09142,767.6516TIRE ROLLER 8-10 T.E18Jam420,527.00420,527.00THREE WHEEL ROLLER 6-8 TE16TIRE ROLLER 8-10 T.E186010Ton210300525131,763.2121,082.11152,845.324Vibrator RollerE19Jam361,336.63396,842.00TANDEM ROLLER 6-8 T.E17VIBRATORY ROLLER 5-8 T.E19608Ton234650000136,674.1221,867.86158,541.985Concrete VibratorE20Jam40,276.7537,599.00TIRE ROLLER 8-10 T.E18CONCRETE VIBRATORE203 -950050024,581.023,932.9628,513.9919STONE CRUSHERE21Jam886,266.00886,266.00VIBRATORY ROLLER 5-8 T.E19STONE CRUSHERE2122050T/Jam1350450000507,288.0581,166.09588,454.146Pompa AirE22Jam39,587.1041,998.00CONCRETE VIBRATORE20WATER PUMP 70-100 mmE226 -1250000027,866.554,458.6532,325.207Tangki AirE23Jam325,725.82379,316.00STONE CRUSHERE21WATER TANKER 3000-4500 L.E231254000Liter111250000190,940.9030,550.54221,491.4522PEDESTRIAN ROLLERE24Jam113,489.00113,489.00WATER PUMP 70-100 mmE22PEDESTRIAN ROLLERE24111Ton8465000047,479.067,596.6555,075.7123TAMPERE25Jam36,682.0036,682.00WATER TANKER 3000-4500 L.E23TAMPERE2550.2Ton750000026,462.734,234.0430,696.7724JACK HAMMERE26Jam53,194.0053,194.00PEDESTRIAN ROLLERE24JACK HAMMERE263 -3560000034,011.085,441.7739,452.8625FULVI MIXERE27Jam233,640.00233,640.00TAMPERE25FULVI MIXERE2775 -46000000117,815.5218,850.48136,666.0026CONCRETE PUMPE28Jam394,417.00394,417.00JACK HAMMERE26CONCRETE PUMPE281008M3112500000160,589.8425,694.37186,284.2127TRAILER 20 TONE29Jam633,475.00633,475.00FULVI MIXERE27TRAILER 20 TONE2917520Ton215000000262,026.2841,924.20303,950.4928PILE DRIVER + HAMMERE30Jam93,377.0093,377.00CONCRETE PUMPE28PILE DRIVER + HAMMERE30252.5Ton7000000062,450.829,992.1372,442.9529CRANE ON TRACK 35 TONE31Jam398,196.00398,196.00TRAILER 20 TONE29CRANE ON TRACK 35 TONE3112535Ton350000000238,059.0138,089.44276,148.4530WELDING SETE32Jam122,440.00122,440.00PILE DRIVER + HAMMERE30WELDING SETE3240250Amp1750000069,367.3511,098.7880,466.1231BORE PILE MACHINEE33Jam699,953.00699,953.00CRANE ON TRACK 35 TONE31BORE PILE MACHINEE331502000Meter2250000000646,062.42103,369.99749,432.4132ASPHALT LIQUID MIXERE34Jam50,141.0050,141.00WELDING SETE32ASPHALT LIQUID MIXERE3451000Liter1500000026,832.814,293.2531,126.0633TRAILLER 15 TONE35Jam28,541.0028,541.00BORE PILE MACHINEE33TRAILLER 15 TONE3515015Ton115000000224,917.5935,986.82260,904.4134ALAT BORED PILE ( set )E36Jam1,250,000.001,250,000.0035ALAT BORED AIR ( set )Jam1,250,000.001,250,000.0036Casing Bored Pile D 30 CmM2750,000.00750,000.0037ALAT BANTUE34Ls7,500.007,500.00ASPHALT LIQUID MIXERE34ALAT BANTU7Jam5,000.00800.005,800.0038Concr. PumpE28Jam500,000.0