RENCANA ANGGARAN BIAYA PEMBUATAN 10 MCKKerjasama PT CMWI dan KPDS
NO URAIAN KETERANGANVOLUME
SATUAN KUANTITAS MTERIAL BANGUNANBatu merah biji 2000Pasir truck 1Semen sak 12Usuk 4x 6 bendel 1Pompa Air set 1Harplek biji 10Paku Kg 1Keramik dus 8Paralon 1.25 inchi Batang 6Kran pcs 5Kloset pcs 1Pintu KM aluminium unit 1
ONGKOS TENAGA KERJA Tukang 1 orang 10 hari orang 10Kuli 1 orang 10 hari orang 10
TRANSPORTASI Angkut Material 1 truck, 10 lokasi paket 1Survey Lokasi & Bahan 6 orang, 3 toko, 10 desa paket 6
SUB TOTAL
LAIN-LAINTak Terduga prosentase biaya subtotal 5%
TOTAL 1 UNIT MCK
GRAND TOTAL 10 UNIT MCK 10
Pasuruan, 5 Pebruari 2010Ketua KPDS
M. Yusuf SSi
HARGA SATUAN JUMLAH
380 760,000 350,000 350,000 50,000 600,000 150,000 150,000 550,000 550,000 35,000 350,000 20,000 20,000 31,250 250,000 25,000 150,000 7,500 37,500 95,000 95,000 350,000 350,000
50,000 500,000 35,000 350,000
400,000 400,000 25,000 150,000
5,062,500
253,125
5,315,625
5,315,625 53,156,250
Pasuruan, 5 Pebruari 2010
RENCANA ANGGARAN BIAYA PEMBUATAN 10 MCKKerjasama PT CMWI dan KPDSPROGRAM BAKTI SOSIAL
Survey
NO URAIAN KETERANGAN NAMA TOKO VOLUME
HARGA SATUAN JUMLAH SATUAN KUANTITAS
Batu merah biji 2000Pasir truck 1Semen sak 12Usuk 4x 6 bendel 1Pompa Air set 1Harplek biji 10Paku Kg 1Keramik dus 8Paralon 1.25 inchi Batang 6Kran pcs 5Kloset pcs 1Pintu KM aluminium unit 1
TOTAL BAHAN 1 UNIT MCK
GRAND TOTAL 10 UNIT MCK 10
Pasuruan, 5 Pebruari 2010PETUGAS SURVEY