PEKERJAAN PENGECATAN

Pengecatan Dinding No URAIAN PEKERJAAN SATUAN VOLUME HARGA SATUAN (Rp)

1 Lantai 1 - Exsterior M2 480.00 55,820.00 - Interior M2 450.00 39,610.00

2 Lantai 2 - Exsterior M2 550.00 55,820.00 - Interior M2 500.00 39,610.00

3 Lantai 3 - Exsterior M2 550.00 55,820.00 - Interior M2 500.00 39,610.00

4 Lantai 4 - Exsterior M2 420.00 55,820.00 - Interior M2 450.00 39,610.00

5 Basement - Exsterior M2 150.00 55,820.00 - Interior M2 300.00 39,610.00

Jumlah

Pengecatan Besi No URAIAN PEKERJAAN SATUAN VOLUME HARGA SATUAN (Rp)

1 Lantai 1 - Exsterior M2 40.00 26,230.00 - Interior M2 35.00 12,130.00

2 Lantai 2 - Exsterior M2 70.00 26,230.00 - Interior M2 35.00 12,130.00

3 Lantai 3 - Exsterior M2 70.00 26,230.00 - Interior M2 35.00 12,130.00

4 Lantai 4 - Exsterior M2 60.00 26,230.00 - Interior M2 35.00 12,130.00

5 Basement - Interior M2 20.00 12,130.00

Jumlah

Page 2: rab-cat-rev

XV. PEKERJAAN PENGECATAN

NO

1 JUMLAH HARGA (Rp) 2

3 26,793,600.00 4 17,824,500.00

XV 30,701,000.00 NO 19,805,000.00 1

30,701,000.00 19,805,000.00

23,444,400.00 17,824,500.00

8,373,000.00 11,883,000.00

207,155,000.00

2

JUMLAH HARGA (Rp)

1,049,200.00 424,550.00

1,836,100.00 424,550.00

1,836,100.00 424,550.00

1,573,800.00 3 424,550.00

242,600.00

7,993,400.00

4

Page 3: rab-cat-rev
Page 4: rab-cat-rev

XV. PEKERJAAN PENGECATAN

MACAM PEKERJAAN SATUAN VOLUME

Pengecatan Tembok Baru Kwalitas Baik M2 2,200.00 Pengecatan exterior M2 1,870.00 Pengecatan Permukaan Baja dengan Meni Besi M2 160.00 Pengecatan Permukaan Baja dengan Meni Besi dan cat M2 240.00

PEKERJAAN PENGECATAN KOEFISIEN SAT

Pengecatan Tembok Baru kwalitas baikPlamir 0.1000 kgRol cat 0.0100 bhCat tembok kwalitas mowilex 0.5000 kgAmpelas 0.5000 lbrPembantu Tukang 0.0200 orgTukang cat 0.0630 orgKepala tukang 0.0063 orgMandor 0.0025 orgJUMLAHPAJAK (10%)TOTALDIBULATKANPengecatan exteriorCat tembok Dulux Weathershield 0.3600 kgPlamir tembok 0.1600 kgRol cat 0.0100 bhAmpelas 0.5000 lbrPembantu Tukang 0.2000 orgTukang cat 0.3000 orgKepala tukang 0.0063 orgMandor 0.0025 orgJUMLAHPAJAK (10%)TOTALDIBULATKANPengecatan Permukaan Baja dengan Meni BesiMeni besi 0.1000 kgKuas 0.0100 bhPembantu Tukang 0.0200 orgTukang cat 0.2000 orgKepala tukang 0.0063 orgMandor 0.0025 orgJUMLAHPAJAK (10%)TOTALDIBULATKANPengecatan Permukaan Baja dengan Meni Besi dan CatMeni besi 0.1000 kg

ANALISIS PEKERJAAN (per M²)

Page 5: rab-cat-rev

Cat besi 0.1300 kgKuas 0.0100 bhAmpelas 0.5000 lbrPembantu Tukang 0.2000 orgTukang cat 0.2000 orgKepala tukang 0.0063 orgMandor 0.0025 orgJUMLAHPAJAK (10%)TOTALDIBULATKAN

Page 6: rab-cat-rev

HARGA SATUAN JUMLAH BIAYA

10,000.00 1,000.00 20,000.00 200.00 60,000.00 30,000.00 2,500.00 1,250.00 32,500.00 650.00 40,000.00 2,520.00 42,500.00 267.75 47,500.00 118.75

36,006.50 3,600.65 39,607.15

39,610.00

80,000.00 28,800.00 10,000.00 1,600.00 20,000.00 200.00 2,500.00 1,250.00 32,500.00 6,500.00 40,000.00 12,000.00 42,500.00 267.75 47,500.00 118.75

50,736.50 5,073.65 55,810.15

55,820.00

19,000.00 1,900.00 9,000.00 90.00 32,500.00 650.00 40,000.00 8,000.00 42,500.00 267.75 47,500.00 118.75

11,026.50 1,102.65 12,129.15

12,130.00

19,000.00 1,900.00

Page 7: rab-cat-rev

44,000.00 5,720.00 9,000.00 90.00 2,500.00 1,250.00 32,500.00 6,500.00 40,000.00 8,000.00 42,500.00 267.75 47,500.00 118.75

23,846.50 2,384.65 26,231.15

26,230.00

Page 8: rab-cat-rev

FURNITURE

NO JENIS FURNITURE SATUAN VOLUME HARGA SATUAN MEJA

1 Meja Pimpinan Kantor Cabang HSB Bh 1.00 630,000.00 2 Meja Staff Bh 9.00 442,000.00 3 Meja Bulat Bh 17.00 465,000.00 4 Meja Rapat Bh 2.00 5,750,000.00 5 Meja Tamu Bh 8.00 625,000.00

KURSI 6 Kursi Staff Bh 33.00 247,000.00 7 Kursi Staff tanpa santaran tangan Bh 33.00 247,000.00 8 Kursi Pimpinan Cabang Bh 10.00 465,000.00 9 Kursi Tunggu Nasabah Bh 12.00 1,395,000.00 10 Kursi Plastik Bh 48.00 210,000.00

12 Kursi Tamu set 8.00 3,250,000.00

Total

Page 9: rab-cat-rev

JUMLAH HARGA (RP)

630,000.00 3,978,000.00 7,905,000.00 11,500,000.00 5,000,000.00

8,151,000.00 8,151,000.00 4,650,000.00 16,740,000.00 10,080,000.00 26,000,000.00

102,785,000.00

Page 10: rab-cat-rev

PEKERJAAN PAVING DAN GROUND COVER

no jenis pekerjaan volume satuan harga jumlah harga Pekerjaan Tanah

1 urugan tanah + pemadatan halaman 1,500.00 m3 157,135.00 235,702,500.00 JUMLAH 235,702,500.00

Pekerjaan Ground Cover

2 paving block 343.98 m2 89,075.25 30,640,131.22 3 kanstein 163.56 m1 50,295.85 8,226,535.08 4 rumput 115.74 m2 25,000.00 2,893,462.50

JUMLAH 41,760,128.80

Page 11: rab-cat-rev

no jenis pekerjaan volume satuan 1 1 M2 PASANG paving block

BAHAN

paving beton (segi enam 6x6) 1.100 m2

Pasir pasang 0.048 m3

Sirtu 0.240 m3

UPAH

Pekerja 0.200 oh

Tukang batu 0.120 oh

Kepala tukang 0.012 oh

Mandor 0.001 oh

2 1 M PASANG kanstin

BAHAN

kanstin 2.500 bh

Semen 0.720 kg

Sirtu 0.120 m3

Pasir pasang 0.022 m3

UPAH

Pekerja 0.150 oh

Tukang batu 0.070 oh

Kepala tukang 0.012 oh

Mandor 0.007 oh

3 1 M3 PEMADATAN TANAH

UPAH

Pekerja 0.500 oh

Mandor 0.050 oh

4 1 M3 URUGAN TANAH

BAHAN

tanah urug 1.200 m3

UPAH

Pekerja 0.300 oh

Mandor 0.010 oh

ANALISIS BIAYA (per m²)

Page 12: rab-cat-rev

5 PEKERJAAN VEGETASI

Urugan Tanah Humus t; 20 cm 9.20 m3

Pasang Rumput gajah mini 46.00 m2

Page 13: rab-cat-rev

harga jumlah harga

NO URAIAN PEKERJAAN 36,000.00 39,600.00

140,000.00 6,720.00 V PEKERJAAN BANGUNAN LANDSCAPE PARKIR

95,000.00 22,800.00 AREAL PARKIR, TROTOAR, DAN SALURAN DRAINASE

69,120.00 1 #NAME?

2 #NAME?

32,500.00 6,500.00 3 #NAME?

40,000.00 4,800.00 4 #NAME?

42,500.00 510.00 5 #NAME?

47,500.00 47.50 6 #NAME?

11,857.50 7 #NAME?

sub jumlah 80,977.50 8 #NAME?

pajak 8,097.75 9 #NAME?

jumlah 89,075.25 10 #NAME?

PEKERJAAN VEGETASI

9,000.00 22,500.00 Urugan Tanah Humus t; 20 cm

1,100.00 792.00 Pasang Rumput gajah mini

95,000.00 11,400.00

140,000.00 3,024.00

37,716.00

32,500.00 4,875.00

40,000.00 2,800.00

42,500.00

47,500.00 332.50

8,007.50

sub jumlah 45,723.50

pajak 4,572.35

jumlah 50,295.85

32,500.00 16,250.00

47,500.00 2,375.00

18,625.00

pajak 1,862.50

jumlah 20,487.50

95,000.00 114,000.00

32,500.00 9,750.00

47,500.00 475.00

Page 14: rab-cat-rev

124,225.00

12,422.50

jumlah 136,647.50

30,000.00 276,000.00

15,000.00 690,000.00

966,000.00 96,600.00

jumlah 1,062,600.00

Page 15: rab-cat-rev

URAIAN PEKERJAAN SAT VOL HARGA SATUAN

(RP)

PEKERJAAN BANGUNAN LANDSCAPE PARKIR

AREAL PARKIR, TROTOAR, DAN SALURAN DRAINASE

### #NAME? #NAME?

### #NAME? #NAME?

### #NAME? #NAME?

### #NAME? #NAME?

### #NAME? #NAME?

### #NAME? #NAME?

### #NAME? #NAME?

### #NAME? #NAME?

### #NAME? #NAME?

### #NAME? #NAME?

JUMLAH

PEKERJAAN VEGETASI Err:509 Urugan Tanah Humus t; 20 cm M3 9.20 Err:509 Pasang Rumput gajah mini M2 46.00 Err:509

Page 16: rab-cat-rev

JML.HARGA

(RP)

PEKERJAAN BANGUNAN LANDSCAPE PARKIR

#NAME?

#NAME?

#NAME?

#NAME?

#NAME?

#NAME?

#NAME?

#NAME?

#NAME?

#NAME?

JUMLAH #NAME?

Err:509Err:509Err:509

Page 17: rab-cat-rev

1.0000 Unit Septictank

1.0000 unit Septictank Kap: 3m3 8500000 ###

1.0000 ls Asesoris dan perlengkapan @ Rp. ###

1.0000 ls Ongkos pasang @ Rp. ### #NAME?

JUMLAH ( BELUM TERMASUK PPN ) #NAME?

JASA 10 %

JUMLAH

DIBULATKAN

1.0000 Unit Sumur Peresapan dalam 5 m

5.0000 m1 Membuat sumur @ Rp. #REF!

1.0000 bh Tutup beton bertulang t: 10cm @ Rp. ###

1.0000 m3 Ijuk @ Rp. ###

JUMLAH ( BELUM TERMASUK PPN )

DIBULATKAN

Page 18: rab-cat-rev

#NAME? no jenis pekerjaan volume satuan #NAME? 1 Septictank

BAHAN

#NAME? #NAME? dinding bata trastam 15.000 m3

#NAME? kolom praktis 0.300 m3

#NAME? balok praktis 15.000 m1

#NAME? lantai beton 20cm 3.000 m3

tutup plat beton 12cm 3.000 m3

plesteran beton 6.200 m2

#REF! acian 6.200 m2

#NAME?

#NAME? UPAH

#REF! #REF! Ongkos pekerjaan 5.000 m

#REF!

2 Sumur resapan

BAHAN

galian tanah 15.000 m3

batu kerikil 0.300 m3

buis beton Ø1m 15.000 m1

tutup beton 3.000 m3

UPAH

Ongkos pekerjaan 3.000 m

Page 19: rab-cat-rev

harga jumlah harga #REF! 1unit sumur peresapan

galian tanah 3.400

batu kerikil 2.350

62,000.00 930,000.00 buis beton Ø1m 5.000

4,123,000.00 1,236,900.00 tutup beton 0.177

95,000.00 1,425,000.00

1,927,000.00 5,781,000.00

5,670,342.00 17,011,026.00

28,500.00 176,700.00 #REF! 1unit septiktang 6 m3

20,350.00 126,170.00 dinding bata trastam -

26,686,796.00 kolom praktis -

balok praktis -

187,000.00 935,000.00 lantai beton 20cm -

935,000.00 tutup plat beton 12cm -

sub jumlah 27,621,796.00 plesteran beton -

pajak 2,762,179.60 acian -

jumlah 30,383,975.60

62,000.00 930,000.00

4,123,000.00 1,236,900.00

95,000.00 1,425,000.00

1,927,000.00 5,781,000.00 no jenis pekerjaan volume 9,372,900.00 1 Septictank 1.00

2 Sumur resapan 2.00

187,000.00 561,000.00

561,000.00

sub jumlah 9,933,900.00

pajak 993,390.00

jumlah 10,927,290.00

Page 20: rab-cat-rev

m3 Err:509 Err:509

m3 #REF! #REF!

bh - -

m3 Err:509 Err:509

Err:509

jasa kontraktor Err:509

jumlah Err:509

m3 - -

m3 - -

m1 jumlah harga #VALUE!

m3 Err:509 Err:509

m3 Err:509 Err:509

m2 Err:509 Err:509

m2 Err:509 Err:509

#VALUE!

jasa kontraktor #VALUE!

jumlah #VALUE!

satuan harga jumlah harga bh 30,383,975.60 30,383,975.60

bh 10,927,290.00 21,854,580.00

jumlah 52,238,555.60