PEKERJAAN PENGECATAN
Pengecatan Dinding No URAIAN PEKERJAAN SATUAN VOLUME HARGA SATUAN (Rp)
1 Lantai 1 - Exsterior M2 480.00 55,820.00 - Interior M2 450.00 39,610.00
2 Lantai 2 - Exsterior M2 550.00 55,820.00 - Interior M2 500.00 39,610.00
3 Lantai 3 - Exsterior M2 550.00 55,820.00 - Interior M2 500.00 39,610.00
4 Lantai 4 - Exsterior M2 420.00 55,820.00 - Interior M2 450.00 39,610.00
5 Basement - Exsterior M2 150.00 55,820.00 - Interior M2 300.00 39,610.00
Jumlah
Pengecatan Besi No URAIAN PEKERJAAN SATUAN VOLUME HARGA SATUAN (Rp)
1 Lantai 1 - Exsterior M2 40.00 26,230.00 - Interior M2 35.00 12,130.00
2 Lantai 2 - Exsterior M2 70.00 26,230.00 - Interior M2 35.00 12,130.00
3 Lantai 3 - Exsterior M2 70.00 26,230.00 - Interior M2 35.00 12,130.00
4 Lantai 4 - Exsterior M2 60.00 26,230.00 - Interior M2 35.00 12,130.00
5 Basement - Interior M2 20.00 12,130.00
Jumlah
XV. PEKERJAAN PENGECATAN
NO
1 JUMLAH HARGA (Rp) 2
3 26,793,600.00 4 17,824,500.00
XV 30,701,000.00 NO 19,805,000.00 1
30,701,000.00 19,805,000.00
23,444,400.00 17,824,500.00
8,373,000.00 11,883,000.00
207,155,000.00
2
JUMLAH HARGA (Rp)
1,049,200.00 424,550.00
1,836,100.00 424,550.00
1,836,100.00 424,550.00
1,573,800.00 3 424,550.00
242,600.00
7,993,400.00
4
XV. PEKERJAAN PENGECATAN
MACAM PEKERJAAN SATUAN VOLUME
Pengecatan Tembok Baru Kwalitas Baik M2 2,200.00 Pengecatan exterior M2 1,870.00 Pengecatan Permukaan Baja dengan Meni Besi M2 160.00 Pengecatan Permukaan Baja dengan Meni Besi dan cat M2 240.00
PEKERJAAN PENGECATAN KOEFISIEN SAT
Pengecatan Tembok Baru kwalitas baikPlamir 0.1000 kgRol cat 0.0100 bhCat tembok kwalitas mowilex 0.5000 kgAmpelas 0.5000 lbrPembantu Tukang 0.0200 orgTukang cat 0.0630 orgKepala tukang 0.0063 orgMandor 0.0025 orgJUMLAHPAJAK (10%)TOTALDIBULATKANPengecatan exteriorCat tembok Dulux Weathershield 0.3600 kgPlamir tembok 0.1600 kgRol cat 0.0100 bhAmpelas 0.5000 lbrPembantu Tukang 0.2000 orgTukang cat 0.3000 orgKepala tukang 0.0063 orgMandor 0.0025 orgJUMLAHPAJAK (10%)TOTALDIBULATKANPengecatan Permukaan Baja dengan Meni BesiMeni besi 0.1000 kgKuas 0.0100 bhPembantu Tukang 0.0200 orgTukang cat 0.2000 orgKepala tukang 0.0063 orgMandor 0.0025 orgJUMLAHPAJAK (10%)TOTALDIBULATKANPengecatan Permukaan Baja dengan Meni Besi dan CatMeni besi 0.1000 kg
ANALISIS PEKERJAAN (per M²)
Cat besi 0.1300 kgKuas 0.0100 bhAmpelas 0.5000 lbrPembantu Tukang 0.2000 orgTukang cat 0.2000 orgKepala tukang 0.0063 orgMandor 0.0025 orgJUMLAHPAJAK (10%)TOTALDIBULATKAN
HARGA SATUAN JUMLAH BIAYA
10,000.00 1,000.00 20,000.00 200.00 60,000.00 30,000.00 2,500.00 1,250.00 32,500.00 650.00 40,000.00 2,520.00 42,500.00 267.75 47,500.00 118.75
36,006.50 3,600.65 39,607.15
39,610.00
80,000.00 28,800.00 10,000.00 1,600.00 20,000.00 200.00 2,500.00 1,250.00 32,500.00 6,500.00 40,000.00 12,000.00 42,500.00 267.75 47,500.00 118.75
50,736.50 5,073.65 55,810.15
55,820.00
19,000.00 1,900.00 9,000.00 90.00 32,500.00 650.00 40,000.00 8,000.00 42,500.00 267.75 47,500.00 118.75
11,026.50 1,102.65 12,129.15
12,130.00
19,000.00 1,900.00
44,000.00 5,720.00 9,000.00 90.00 2,500.00 1,250.00 32,500.00 6,500.00 40,000.00 8,000.00 42,500.00 267.75 47,500.00 118.75
23,846.50 2,384.65 26,231.15
26,230.00
FURNITURE
NO JENIS FURNITURE SATUAN VOLUME HARGA SATUAN MEJA
1 Meja Pimpinan Kantor Cabang HSB Bh 1.00 630,000.00 2 Meja Staff Bh 9.00 442,000.00 3 Meja Bulat Bh 17.00 465,000.00 4 Meja Rapat Bh 2.00 5,750,000.00 5 Meja Tamu Bh 8.00 625,000.00
KURSI 6 Kursi Staff Bh 33.00 247,000.00 7 Kursi Staff tanpa santaran tangan Bh 33.00 247,000.00 8 Kursi Pimpinan Cabang Bh 10.00 465,000.00 9 Kursi Tunggu Nasabah Bh 12.00 1,395,000.00 10 Kursi Plastik Bh 48.00 210,000.00
12 Kursi Tamu set 8.00 3,250,000.00
Total
JUMLAH HARGA (RP)
630,000.00 3,978,000.00 7,905,000.00 11,500,000.00 5,000,000.00
8,151,000.00 8,151,000.00 4,650,000.00 16,740,000.00 10,080,000.00 26,000,000.00
102,785,000.00
PEKERJAAN PAVING DAN GROUND COVER
no jenis pekerjaan volume satuan harga jumlah harga Pekerjaan Tanah
1 urugan tanah + pemadatan halaman 1,500.00 m3 157,135.00 235,702,500.00 JUMLAH 235,702,500.00
Pekerjaan Ground Cover
2 paving block 343.98 m2 89,075.25 30,640,131.22 3 kanstein 163.56 m1 50,295.85 8,226,535.08 4 rumput 115.74 m2 25,000.00 2,893,462.50
JUMLAH 41,760,128.80
no jenis pekerjaan volume satuan 1 1 M2 PASANG paving block
BAHAN
paving beton (segi enam 6x6) 1.100 m2
Pasir pasang 0.048 m3
Sirtu 0.240 m3
UPAH
Pekerja 0.200 oh
Tukang batu 0.120 oh
Kepala tukang 0.012 oh
Mandor 0.001 oh
2 1 M PASANG kanstin
BAHAN
kanstin 2.500 bh
Semen 0.720 kg
Sirtu 0.120 m3
Pasir pasang 0.022 m3
UPAH
Pekerja 0.150 oh
Tukang batu 0.070 oh
Kepala tukang 0.012 oh
Mandor 0.007 oh
3 1 M3 PEMADATAN TANAH
UPAH
Pekerja 0.500 oh
Mandor 0.050 oh
4 1 M3 URUGAN TANAH
BAHAN
tanah urug 1.200 m3
UPAH
Pekerja 0.300 oh
Mandor 0.010 oh
ANALISIS BIAYA (per m²)
5 PEKERJAAN VEGETASI
Urugan Tanah Humus t; 20 cm 9.20 m3
Pasang Rumput gajah mini 46.00 m2
harga jumlah harga
NO URAIAN PEKERJAAN 36,000.00 39,600.00
140,000.00 6,720.00 V PEKERJAAN BANGUNAN LANDSCAPE PARKIR
95,000.00 22,800.00 AREAL PARKIR, TROTOAR, DAN SALURAN DRAINASE
69,120.00 1 #NAME?
2 #NAME?
32,500.00 6,500.00 3 #NAME?
40,000.00 4,800.00 4 #NAME?
42,500.00 510.00 5 #NAME?
47,500.00 47.50 6 #NAME?
11,857.50 7 #NAME?
sub jumlah 80,977.50 8 #NAME?
pajak 8,097.75 9 #NAME?
jumlah 89,075.25 10 #NAME?
PEKERJAAN VEGETASI
9,000.00 22,500.00 Urugan Tanah Humus t; 20 cm
1,100.00 792.00 Pasang Rumput gajah mini
95,000.00 11,400.00
140,000.00 3,024.00
37,716.00
32,500.00 4,875.00
40,000.00 2,800.00
42,500.00
47,500.00 332.50
8,007.50
sub jumlah 45,723.50
pajak 4,572.35
jumlah 50,295.85
32,500.00 16,250.00
47,500.00 2,375.00
18,625.00
pajak 1,862.50
jumlah 20,487.50
95,000.00 114,000.00
32,500.00 9,750.00
47,500.00 475.00
124,225.00
12,422.50
jumlah 136,647.50
30,000.00 276,000.00
15,000.00 690,000.00
966,000.00 96,600.00
jumlah 1,062,600.00
URAIAN PEKERJAAN SAT VOL HARGA SATUAN
(RP)
PEKERJAAN BANGUNAN LANDSCAPE PARKIR
AREAL PARKIR, TROTOAR, DAN SALURAN DRAINASE
### #NAME? #NAME?
### #NAME? #NAME?
### #NAME? #NAME?
### #NAME? #NAME?
### #NAME? #NAME?
### #NAME? #NAME?
### #NAME? #NAME?
### #NAME? #NAME?
### #NAME? #NAME?
### #NAME? #NAME?
JUMLAH
PEKERJAAN VEGETASI Err:509 Urugan Tanah Humus t; 20 cm M3 9.20 Err:509 Pasang Rumput gajah mini M2 46.00 Err:509
JML.HARGA
(RP)
PEKERJAAN BANGUNAN LANDSCAPE PARKIR
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
JUMLAH #NAME?
Err:509Err:509Err:509
1.0000 Unit Septictank
1.0000 unit Septictank Kap: 3m3 8500000 ###
1.0000 ls Asesoris dan perlengkapan @ Rp. ###
1.0000 ls Ongkos pasang @ Rp. ### #NAME?
JUMLAH ( BELUM TERMASUK PPN ) #NAME?
JASA 10 %
JUMLAH
DIBULATKAN
1.0000 Unit Sumur Peresapan dalam 5 m
5.0000 m1 Membuat sumur @ Rp. #REF!
1.0000 bh Tutup beton bertulang t: 10cm @ Rp. ###
1.0000 m3 Ijuk @ Rp. ###
JUMLAH ( BELUM TERMASUK PPN )
DIBULATKAN
#NAME? no jenis pekerjaan volume satuan #NAME? 1 Septictank
BAHAN
#NAME? #NAME? dinding bata trastam 15.000 m3
#NAME? kolom praktis 0.300 m3
#NAME? balok praktis 15.000 m1
#NAME? lantai beton 20cm 3.000 m3
tutup plat beton 12cm 3.000 m3
plesteran beton 6.200 m2
#REF! acian 6.200 m2
#NAME?
#NAME? UPAH
#REF! #REF! Ongkos pekerjaan 5.000 m
#REF!
2 Sumur resapan
BAHAN
galian tanah 15.000 m3
batu kerikil 0.300 m3
buis beton Ø1m 15.000 m1
tutup beton 3.000 m3
UPAH
Ongkos pekerjaan 3.000 m
harga jumlah harga #REF! 1unit sumur peresapan
galian tanah 3.400
batu kerikil 2.350
62,000.00 930,000.00 buis beton Ø1m 5.000
4,123,000.00 1,236,900.00 tutup beton 0.177
95,000.00 1,425,000.00
1,927,000.00 5,781,000.00
5,670,342.00 17,011,026.00
28,500.00 176,700.00 #REF! 1unit septiktang 6 m3
20,350.00 126,170.00 dinding bata trastam -
26,686,796.00 kolom praktis -
balok praktis -
187,000.00 935,000.00 lantai beton 20cm -
935,000.00 tutup plat beton 12cm -
sub jumlah 27,621,796.00 plesteran beton -
pajak 2,762,179.60 acian -
jumlah 30,383,975.60
62,000.00 930,000.00
4,123,000.00 1,236,900.00
95,000.00 1,425,000.00
1,927,000.00 5,781,000.00 no jenis pekerjaan volume 9,372,900.00 1 Septictank 1.00
2 Sumur resapan 2.00
187,000.00 561,000.00
561,000.00
sub jumlah 9,933,900.00
pajak 993,390.00
jumlah 10,927,290.00
m3 Err:509 Err:509
m3 #REF! #REF!
bh - -
m3 Err:509 Err:509
Err:509
jasa kontraktor Err:509
jumlah Err:509
m3 - -
m3 - -
m1 jumlah harga #VALUE!
m3 Err:509 Err:509
m3 Err:509 Err:509
m2 Err:509 Err:509
m2 Err:509 Err:509
#VALUE!
jasa kontraktor #VALUE!
jumlah #VALUE!
satuan harga jumlah harga bh 30,383,975.60 30,383,975.60
bh 10,927,290.00 21,854,580.00
jumlah 52,238,555.60