  • SISTEM TATA UDARA (HVAC)DIGEDUNG BERTINGKAT

    PHE Tower

    Iwan Sukirman, 2014

  • 3Adalah proses penurunan temperatur (pendinginan), dari suaturuangan atau suatu substansi menjadi lebih rendah dari temperaturlingkungan sekitarnya melalui perpindahan kalor (heat transfer).Refrigerasi dapat dianggap sebagai proses pembuangan kalor. Fluidayang dapat memindahkan /membawa kalor tersebut : Refrigerant /zatpendingin.

    Refrigerasi :

    Alat untuk mengatur temperatur, kelembaban, kebersihan danpasokan udara (dingin) ke suatu tempat ke tempat yang ingindikondisikan. Cara kerjanya adalah dengan memindahkan panas keudara luar menggunakan siklus refrigerasi.

    Air Conditioner (AC) :

    Terminologi

  • 4Apa arti Perpindahan Kalor (Heat Transfer)?

    Kalor (panas) selalu berpindah dari substansi yang lebih hangat ke substansi yang lebih dingin.Dalam kenyataan, molekul yang getarannya lebih cepat memindahkan sebagian dari energi merekake molekul yang getarannya lebih lambat. Maka molekul yang getarannya cepat sedikit melambatdan molekul yang lebih lambat menjadi lebih cepat. Secara sederhana, ini berarti jika diluar panas,maka panas dari luar cenderung untuk memasuki ruangan yang lebih sejuk didalam bangunan.

    Panas dapat dipindahkan dari suatu benda ke benda lain melalui metode sbb: RadiasiMelalui gerakan gelombang (serupa dengan gelombangcahaya) dimana energi dipindahkan dari suatu benda kebenda lain tanpa ada persentuhan.

    KonduksiMelalui aliran panas diantara bagian dari suatu bendaatau dari suatu benda ke benda lain melalui sentuhansecara langsung.

    KonveksiMelalui perpindahan fluida atau udara.

  • 5 Entropi dari sistem tertutup yang tidak berada dalam kesetimbanganakan cenderung bertambah, mendekati nilai maksimalnya dalamkesetimbangan = Panas tidak akan berpindah (heat transfer) dengansendirinya dari substansi /tempat yang temperaturnya lebih tinggi kesubstansi lain yang temperaturnya lebih rendah. Untuk memindahkanpanas perlu dilakukan kerja thd sistem tsb (Hukum thermodinamika). Sebaliknya panas akan berpindah dengan sendirinya dari substansiyang lebih tinggi temperaturnya ke substansi yang lebih rendahtemperaturnya (dS > 0). Tekanan dan temperatur fluida berkaitan erat. Setiap fluida akannaik temperaturnya (titik didihnya) bila tekanannya dinaikandemikian pula sebaliknya.

    Hukum Fisika dan Thermodinamika yang digunakan dalam proses Refrigerasi

    Terminologi

  • 6Vapour Compression Refrigeration Process

    C

    BD

    A

    1 2

    4

    3

    5

    A

    B

    C

    D

    C

    B

    D

    A

  • 7Proses-proses yang terjadi :1. Kompresor sebagai alat yang memompa zat pendingindalam sistem, adalah jantung dari sistem AC. Sebelum masukke kompresor, zat pendingin adalah gas bertekanan rendah.Oleh kompresor gas tersebut ditekan menjadi gas bertekanantinggi, menjadi panas dan mengalir menuju ke kondenser.

    2. Di dalam kondenser, gas bertemperatur dan bertekanantinggi tersebut melepaskan panasnya ke udara luar danmenjadi cairan subcool bertekanan tinggi.

    3. Cairan bertekanan tinggi itu melalui expansion valve, yangmenurunkan tekanan dan sekaligus temperaturnya dibawahtemperatur dari ruangan atau materi yang didinginkan. Prosesini menghasilkan cairan zat pendingin yang dingin danbertekanan rendah.

    4. Zat pendingin cair bertekanan rendah mengalir keevaporator dimana zat itu menyerap panas dari udara ruanganmelalui proses penguapan dan menjadi gas bertekananrendah. Gas tersebut mengalir kembali ke kompresor dimanasiklusnya akan berulang kembali seperti awalnya.

    Untuk pompa kalor, siklusnya berputar terbalik.

    Prinsip Dasar Siklus Refrigerasi

  • 8Sifat kimia ideal zat pendingin :

    Mempunyai titik didih rendah. Memiliki latent heat yang tinggi. Mudah mencair pada tekanan dan temperatur yang relatif rendah. Tidak bersifat korosif thd logam. Aman untuk digunakan dan disimpan.

    Titik didih fluida pada tekanan atmosfir :Air (H2O) = 100o C (212o F). Amonia (NH3) = - 2,2o C (28o F).R22 (CHClF2) = - 40,7o C (- 41,4o F).R134a (CH CCl3F) = - 26,1o C (- 14,92o F).

  • 9Window air conditioner Package air conditioner (split ducted)

  • 10

    Pola Konsumsi Energi di Gedung Bertingkat

  • 11

    No. Type Kapasitas & Daya listrik(*) Indoor unit

    1. Wall mounted pk; 5.000 Btuh; 390 W; EER 12,8 pk; 7.000 Btuh; 590 W; EER 11,9 1 pk; 9.000 Btuh; 795 W; EER 11,7 1,5 pk; 12.000 Btuh; 1,1 kW; EER 10,9 2 pk; 18.000 Btuh; 1,68 kW; EER 10,7 2,5 pk; 24.000 Btuh; 2,7 kW; EER 8,92. Cassette 2 pk; 18.000 Btuh; 2,05 kW 1ph; EER 8,78 2,5 pk; 24.000 Btuh; 2,6 kW 1 ph; EER 8,97 4 pk; 36.000 Btuh; 4 kW 3 ph; EER 9 5 pk; 48.000 Btuh; 4,9 kW 3 ph; EER 9,8 6 pk; 54.000 Btuh; 5,6 kW 3 ph; EER 9,64

    3. Floor Standing 3 pk; 27.800 Btuh; 3 kW 1 ph; EER 9,27 4 pk; 36.000 Btuh; 4 kW 3 ph; EER 9 5 pk; 44.000 Btuh; 4,45 kW 3 ph; EER 9,88 7,5 pk; 71.400 Btuh; 6,9 kW 3 ph; EER 10,35(*) = diambil dari katalog suatu merk AC

    AC Split (condensing unit dan indoor unit terpisah) :

  • 12

    No. Type Kapasitas & Daya listrik(*) Foto unit

    4. Floor mounted pk; 7.900 Btuh; (sama dengan wall mounted) 1 pk; 9.900 Btuh; --------------- 1,5 pk; 12..500 Btuh; --------------- 2 pk; 19.900 Btuh; ----------------- 2,5 pk; 25.000 Btuh; -----------------5. Multi Split

    (*) = diambil dari katalog suatu merk AC

    2 indoor; R410A; 1 phase; RLA 7,87A :

    a. 1 pk (19 W, 470 m3/h)

    b. 1,5 pk (19 W, 520 m3/h)

    Outdoor P = 1,72 kW; Cap = 5,2 kW; COP = 3,02

    3 indoor; R410A; 1 phase; RLA 9,84A :

    a. 1 pk (19 W, 470 m3/h)

    b. 1,5 pk (19 W, 520 m3/h)

    c. 1,75 pk (19 W, 600 m3/h)

    Outdoor P = 2,15 kW; Cap = 6,7 kW; COP = 3,12

    4 indoor; R410A; 1 phase; RLA 12,75A :

    a. 1 pk (19 W, 470 m3/h)

    b. 1,5 pk (19 W, 520 m3/h)

    c. 1,75 pk (19 W, 600 m3/h)

    d. 2,5 pk (30 W, 950 m3/h)

    Outdoor P = 2,95 kW; Cap = 9,0 kW; COP = 3,05

    AC Split (condensing unit dan indoor unit terpisah) :

  • 13

    Perhitungan pay back period AC split dengan EER yang berbedaEER = Energy Efficiency Ratio = perbandingan Btu/h kapasitas AC dengan

    konsumsi listriknya. TARIF LISTRIK = Rp 550,-/kWh, PEMAKAIAN LISTRIKUNTUK AC = 12 Jam/hari. DALAM SATU TAHUN = 365 hari. 1 pk = 9.000Btu/h. Berapa lama PAY BACK PERIOD-nya?

    DALAM 1 TAHUN, BIAYA LISTRIK UNTUK SEBUAH : AC dengan EER =11, konsumsi listrik = (9.000 Btuh / 11) = 818 Watt. Dalam 1tahun = (818 Watt X 12 JAM X 365 HARI X Rp 550,-) / 1.000 = Rp 1.970.562,- AC dengan EER =8,5, konsumsi listrik = (9.000 Btuh / 8,5) = 1.059 Watt. Dalam1 tahun = 1.059 Watt X 12 JAM X 365 HARI X Rp 550,-) / 1.000 = Rp2.551.131,-

    Selisih antara kedua AC dalam biaya pembayaran listrik pertahun = Rp 580.569,-

    Bila selisih harga kedua AC Rp 1.000.000,- maka Pay Back Period-nya tercapaisebelum 2 tahun.

  • 14

    Penghematan Energi dalam bidang Tata Udara (HVAC)

  • 15

    1. Water Cooled Chiller2. Air Cooled Chiller3. Water Cooled Package4. Air Cooled Package (Split ducted)

    Catatan : VRV (variabel refrigerant volume) hampir sama dengan Air Cooled Packaged

    4 Sistem Tata Udara Terpusat (Centralized HVAC System) untuk Gedung Bertingkat :

  • 16

    Water Cooled Chiller (WCC)

    Chilled water, condenser water & hot waterpumps

    Water Cooled Chiller

    Komponen WCC System :1. Air Handling Unit (AHU)2. Chilled & Condenser Water Piping3. Chilled Water Pumps (ChWP)4. Condenser Water Pumps (CWP)5. Water Cooled Chiller (WCC)6. Cooling Tower (CT)(7. Boiler)(8. Hot water pump)(9. Hot water piping)

  • 17

    Suply Air Return Air

    LEVEL-2

    LEVEL-1

    Ground Floor

    Office Space

    AC-SYSTEMCHILLED WATER DISTRIBUTION SYSTEM (WATER COOLED CHILLER)

    AHU / FCU

    Cooling Tower (CT)

    Chilled Water Pump (ChWP)WATER COOLED CHILLER

    Condenser Water Pump (CWP)

    AHU / FCU

  • 18

    AHU AHU

    Return Air

    LEVEL-3

    AHU

    LEVEL-2

    AHU

    LEVEL-1

    GROUND FLOOR

    Chilled WaterSuply Chilled Water Return

    FIG.NO.2

    Suply Air

    CHILLED WATER DISTRIBUTION SYSTEM(AIR COOLED CHILLER)

    A/C-SYSTEM

    Office Space

    AIR COOLED CHILLER

    CONDENSER WATER PUMP (CWP)

  • 19

    Cooling -Tower

    Condensor Water Pumps

    Condensor Water Suply Condensor Water Return

    Return Air AHU/WCP AHU/WCP

    LEVEL-3

    AHU/WCP

    LEVEL-2

    AHU/WCP

    LEVEL-1

    GROUND FLOOR

    Condensor Water Return

    Suply Air

    Office Spaces

    AHU/WCP

    A/C-SYSTEMWATER COOLED PACKAGED SYSTEM

  • 20

    Refrigerant Discharged LinesSuply Air Return Air

    LEVEL-2

    AHU(Indoor Unit)

    LEVEL-1

    AHU(Indoor Unit)

    GR-FLOOR

    OUTDOOR UNIT

    Suction Line

    Office Spaces

    AC-SYSTEMAIR COOLED PACKAGED UNIT

  • 21

    The Comparison Among HVAC Systems

    Water Cooled Chiller Air Cooled Chiller Water Cooled Package Air Cooled Package

    1 MaintenanceAHU filter & coil required regular

    cleaning.The condenser water system

    required water treatment.Equipment involve in condenser

    system (CT & CWP) required maintenance.

    AHU filter & coil required regular cleaning.

    AHU filter & coil required regular cleaning.

    The condenser water system required water treatment.

    Equipment involve in condenser system (CT & CWP) required

    maintenance.

    AHU filter & coil required regular cleaning.

    2 Power ConsumptionThe best power consumption:

    kW/TR around 0.65For 570 TR required = 570 TR x 0.65

    = 370.5 kW

    Bad power consumption:kW/TR around 1.2

    For 570 TR required = 570 TR x 1.2 = 684 kW

    Good power consumption:kW/TR around 0.8

    For 570 TR required = 570 TR x 0.8 = 456 kW

    The worst power consumption:kW/TR around 1.3

    For 570 TR required = 570 TR x 1.3 = 741 kW

    3 Water ConsumptionCooling Tower constantly loosing

    water along its process to decrease condenser water

    temperatureWe have to provide make up water:

    2,5% of condenser water flow rate.

    For 570 TR required = 570TR x 3 x 2,5% = 42.75 gpm.

    No continuous water consumption Cooling Tower constantly loosing water along its process to decrease condenser water

    temperatureWe have to provide make up water:

    2,5% of condenser water flow rate.

    For 570 TR required = 570TR x 3 x 2,5% = 42.75 gpm.

    No continuous water consumption

    4 Initial vs Operating costThe initial cost is the most cheaper

    than others system for big cooling capacity

    The operating cost is the most cheaper than others system for

    similar cooling capacity

    In Total:Initial cost WCC < Initial cost ACC

    < Initial cost WCP < Initial cost ACP

    Water cooled packaged could be install phase by phase in

    accordance with floor area occupancy growth

    The initial and operating cost is the most Expensive than others system for similar

    cooling capacity. However for small cooling load (15 75 pk),

    ACP is the best option.

  • 22

    The Comparison Among HVAC Systems (cont..)Water Cooled Chiller Air Cooled Chiller Water Cooled Package Air Cooled Package

    5 Life timeIn general, WCC lifetime could

    achieve more than 30 years.As common practice we expect to

    replace the chillers after 20 years of service.

    When the age of equipment increase, the operating cost will increase

    as well.

    Similar with WCC.(Depreciation period of ACC & WCC

    are 10 years).

    In general, lifetime of WCP could achieve 20 years.

    As common practice we expect to replace the WCP after 15 years

    of service.

    Similar with WCP.(Depreciation period of ACP & WCP

    are 10 years).

    6 Piping InstallationPiping installation is taking long

    construction period since there are 2 piping system.

    Chilled water system must be insulated and balanced.

    Piping installation period is average (only condenser water

    system).Condenser water system must be

    balanced.

    Piping installation period is average (only condenser water system).

    Condenser water system must be balanced.

    Refrigerant piping installation is relatively simple and

    construction period is fast.Refrigerant piping system must be

    insulated.

    7 Equipment PriceEstimated equipment price (only

    WCC) = USD 225 - 250/TR.570 TR capacity of WCC = 570TR x $

    250 = $ 142,500

    Estimated equipment price (only ACC) = USD 275 - 300/TR.

    570 TR capacity of ACC = 570TR x $ 300 = $ 171,000

    Estimated equipment price (only ACC) = USD 330 - 350/TR.

    570 TR capacity of WCP = 570TR x $ 350 = $ 199,500

    Estimated equipment price (only ACC) = USD 350 - 400/TR.

    570 TR capacity of WCP = 570TR x $ 400 = $ 228,000

    8 Space requirementWCC usually install in less valuable

    and confine space such as basement or parking area. The

    CT required open space to reject heat out of building such

    as roof top.No limitation between WCC and

    AHUs distance.

    The ACC required open space to reject heat out of building

    (such as roof top).No limitation between ACC and

    AHUs distance.

    WCP usually install AHU room. The CT required open space to

    reject heat out of building such as roof top.

    No limitation between WCP and CT distance.

    The ACP required open space to reject heat out of building

    (such as roof top, AC ledge or ground area).

    The maximum distance between ACPs outdoor and indoor (AHU) is only 20 meter.

  • 23

    Water Cooled Chiller, komponen :

    1. AHU (Air Handling Unit)2. Chilled Water & Condenser Water Piping3. Chilled Water Pumps (ChWP)4. Condenser Water Pumps (CWP)5. Water Cooled Chiller (WCC)6. Cooling Tower (CT)

    Air Cooled Chiller, komponen : 1. AHU (Air Handling Unit)2. Condenser Water Piping3. Condenser Water Pumps (CWP)4. Air Cooled Chiller (ACC)

  • 24

    1. Water Cooled Chiller, menurunkan temperatur chilled water yang berasal dariChWP menjadi 4 7oC.

    Sistem Water / Air Cooled Chiller

    2. Chilled Water Pump (ChWP), mensirkulasikan Chilled water dari AHU ke Chillerdan sebaliknya.

  • 25

    Sistem Water / Air Cooled Chiller

    3. Cooling Tower, membuang kalor ke atmosfir atau menurunkan temperaturcondensor water yang berasal dari WCC /ACC 3o - 5o C lebih rendah

    4. Condensor Water Pump (CWP), mensirkulasikan condensor water dari WCC /ACC ke CT dan sebaliknya.

  • 26

    Sistem Water / Air Cooled Chiller

    5. Air Handling Unit / indoor unit, mengambil kalor (panas) dari ruang yangdikondisikan melalui proses heat transfer di cooling coil.

  • 27

    Sistem Water / Air Cooled Chiller

    6. Sistem pemipaan dan accessories, mensirkulasikan chilled /condensor waterdari tiap equipment.

  • 28

    Air Cooled Package & Water Cooled Package

  • 29

    1. Diffuser. SAD = supply air diffuser, SLAD = slot linear air diffuser dll.

    2. Grille. SAG = suplai air grille, RAG = return air grille, FAG = fresh air grille dll.

    3. Damper. VD = volume damper, FD = fire damper dan spliter.

    Air Side Equipment

  • 30

    4. Flexible duct. Insulated dan non insulated flexible duct.

    5. Ducting neck. Untuk Difuser dan Grille.

    6. Plenum. Sebelum atau sesudah AHU/FCU.

    Air Side Equipment (lanjutan..)

  • 31

    Outdoor Air Requirement for Ventilation (ASHRAE Standard 62-1989)

    ApplicationEstimated Max. Occ.(P/100 m2 or P/1000 ft2)

    Outdoor air requirement CFM per ft2 of Floor

    Cfm /Person L/s per Person Cfm /ft2 L/s /m2

    1 Retail Stores, Show roomBasement and street 30 0.3 1.5

    Cafeteria, food court 100 20 10

    Mall and arcades 20 0.2 1

    Smoking lounge* 70 60 30 Mech. Exhaust, no circulation

    Storage rooms 15 0.15 0.75

    2 OfficesOffices space 7 20 10

    Reception areas 60 15 8

    Conference room 50 20 10

    Telecomunication center and data entry area

    60 20 10

    3 Public SpacesCorridors and utilities 0.05 0.25

    Public restroom 50 25

    Locker and dressing room 0.5 2.5

    Elevators 1 5

    4 ResidentialLiving Area 15 7.5

    Kitchen 100 / 25 50 / 12 Intermittent / continuous

    Baths, toilets** 50 / 20 20 / 10 Intermittent / continuous

  • 32

    Refrigeration Load Check figure (Rule of thumb)Application Refrigeration (Btuh/m2) Refrigeration (ft2/TR)

    Low Avg High Low Avg High

    1 Retail Stores, Show roomBasement and street 400 470 650 325 275 200

    Cafeteria 580 860 1.180 225 150 110

    Main floor 430 520 650 300 250 200

    Upper floor 330 430 520 400 300 250

    Beauty, barber shops 520 650 860 250 200 150

    2 OfficesPrivate 430 738 956 300 175 135

    General - Perimeter 330 520 860 400 250 150

    General Interior 275 330 430 475 400 300Conference room 650 860 1.300 200 150 100

    3 Public SpacesLibraries 330 470 740 400 275 175

    Doctors clinic 430 650 860 300 200 150Classrooms 470 650 860 275 200 150

    Hospitals public area 330 470 1.100 400 275 1204 Residential

    Apartment 330 430 650 400 300 200

    Auditoriums, theaters 650 860 1.300 200 150 100

  • 33

    Kebutuhan Ventilasi & Kapasitas pendinginan

    CONTOH PERHITUNGAN MENGGUNAKAN CHECK FIGUREDiketahui :

    a. Ruangan untuk meeting di sebuah kantor dengan luas 80 m2. b. Arkade di ground floor sebuah mall dengan luas = 21.528 ft2. (= 21.528 /10,764 = 2.000 m2)c. Foodcourt dilantai teratas gedung dengan luas = 500 m2.d. Ruangan kerja Direksi di dekat jendela yang menghadap ke Timur seluas = 60 m2

    Catatan : 1 CFM (ft3/min) = 0,4719 l/s = 1,7 m3/h1 TR = 12.000 Btuh = 3,5165 kW = 4/3 pk = 3.024 kcal/hr

    I. Kebutuhan kapasitas pendingina. Untuk ruang meeting = 80 m2 x 860 Btuh = 68.800 Btu/h = 7,64 pk = 20,16 kWb. Untuk arkade di mall = (21.528 ft2 /250 ft2) x 1TR = 86,1 TR = 115 pk = 302,8 kWc. Untuk food court = 500 m2 x 860 Btuh = 430.000 Btu/h = 35,8 TR = 47,8 pkd. Untuk ruang Direksi = 60 m2 x 956 Btuh = 57.360 Btu/h = 6,4 pk = 16,8 kW

    II. Kebutuhan Ventilasia. Untuk ruang meeting = (80 m2 /100) x 50 orang x 20 CFM = 800 CFM = 380 l/s = 1.360 m3/hb. Untuk arkade di mall = (2.000 m2 x 10,76) x 0,2 CFM = 4.304 CFM = 2.000 l/s = 7.300 m3/hc. Untuk food court = (500 m2 /100) x 100 orang x 10 l/s = 5.000 l/s = 10.600 CFM = 18.000 m3/hd. Untuk ruang Direksi = (60 m2 /20) x 1 orang x 20 CFM = 60 CFM = 28 l/s = 102 m3/h

  • 34

    RULE OF THUMB UNTUK MENGHITUNGVENTILASI NATURAL RUANG GENSET

    Perbedaan temperatur udara luar dan temperatur ruang genset diasumsikan 10o C

    Ditentukan kapasitas genset = 1.000 kVA = 800 kW = 1.072 Hp

    Diasumsikan kecepatan angin lewat grille (v) = 4 m/s & koefisien grile (b) = 0,5

    I. Udara untuk proses pembakaran mesin (Q1)

    Bila perbedaan temperatur udara luar dan temperatur ruang genset sekitar 10o C.

    Q1 = 0,1 m3/min x Hp genset

    Q1 = 0,1 m3/min.Hp x 1.072 Hp

    = 107 m3/min = 3.787 Cfm

    II. Udara untuk mempertahankan temperatur ruangan oleh panas dari mesin (Q2)

    Q2 = 0,5 m3/min x Hp genset

    Q2 = 0,5 m3/min.Hp x 1.072 Hp

    = 536 m3/min = 18.927 Cfm

    III. Kebutuhan total ventilasi ruangan genset (Qt) per 1.000 kVA

    Qt = Q1 + Q2

    Qt = 643 m3/min = 22.714 Cfm

    Bila Ventilasi mekanis diganti grile, maka kebutuhan area grile (Ag) minimal:

    Ag = m / ( b x v )

    Ag = (643 m3/min x 1/60 min/s) / (3 m/s x 0,5)

    = 7,2 m2 (untuk 1.000 kVA kapasitas genset)

  • 35

    Contoh Ventilasi di ruang Genset

    Ventilasi secara mekanis menggunakan axial fan

    Secara Natural menggunakan intake grille di dinding.

  • 36

    Exhaust Radiator Genset

    Saluran udara (ducting) setelah radiator genset seharusnya membesar. Pembesaranyang dianjurkan minimal 25% dari panjang atau lebar radiator genset. Selain itu, ventilasinatural untuk sirkulasi udara masuk keruang genset melalui grille udara setidaknyamemenuhi luas area minimum dalam perhitungan.

  • 37

    Solusi Masalah Sirkulasi Udara dan water treatment CT

    Meskipun untuk water treatment CT mengandungbiocide yang dapat mencegah pertumbuhanorganisme (lumut & ganggang). Akan tetapi apabilaterdapat genangan air diarea CT, maka lama-kelamaan di sekitar CT malah menjadi lahan yangsubur untuk tumbuhnya lumut dan tanaman.

    Penambahan cerobong udara (hood)pada unit Air cooled package yangterletak di AC ledge menjadi solusi thdmasalah sirkulasi udara kondenserunit tersebut.

  • 38

    Penggantian kondenser ACC

    Penggantian Condenser yang rontok sirip-siripnya, dapat meningkatkan kembali efisiensiAir Cooled Chiller yang sudah berusia > 10 tahun

  • 39

    Isolasi yang kalor perlu segera diganti

    Isolasi kalor yang sudah lapuk(kondensasi, robek) perlu diganti agartemperatur chilled water tetap rendah danAC tidak memboroskan listrik.

  • 40

    Masalah Pitting akibat chemical CT

    Cairan kimia untuk water treatment Cooling Tower

    mengakibatkan pipa dan benda2 logam disekitarnya

    berlubang-lubang (pitting) karena korosi. Salah satu cara

    yang dilakukan adalah dengan melapisi pipa dengan

    resin dan fiber glass serta mengganti sistem water

    treatment dengan non chemical.

  • 41

    Kerusakan Pressure Diffrential Valve pada ACC

    Karena PDV yang lama rusak tidakdiganti, tekanan yang berlebihanmenyebabkan timbulnya kebocoranpada sambungan pipa dan valve.Akibatnya timbul korosi pada valvedan pipa.

  • 42

    Pelaksanaan Program Preventive Maintenance

    Debu tebal di impeler blower AHUmenunjukan tidak jalanya programpreventive maintenance. Usia motordan kesehatan penghuni ruanganterabaikan.

    Perawatan AHU (pencucian filter, koilevaporator dan penggantian V belt /motorblower) sulit dilakukan tanpa menurunkanAHU-nya. Akibat dari kurangnya koordinasikontraktor pada masa konstruksi.

  • 43

    Akibat tidak cukupnya teknisi maka preventivemaintenance programs tidak jalan danmenyebabkan bagian dalam ahu ini (Lantai-1)kotor dan berkarat dan ditambah control valve ygtidak berfungsi maka chilled water terus mengalirwalaupun ahu off dan kondensasipun terjadi

    Threeway Valve rusak, chilled water AHU dibypass