PERENCANAAN PERSEDIAAN BAHAN BAKU DENGAN MENGGUNAKAN METODE ALGORITMA WAGNER- WHITIN DENGAN KENDALA KAPASITAS GUDANG (Studi Kasus: UD. Barokah Jaya) Skripsi Diajukan Kepada Universitas Muhammadiyah Malang Untuk Memenuhi Salah Satu Persyaratan Akademik Dalam Menyelesaikan Program Sarjana Teknik Disusun Oleh : HARIS PAMUNGKAS 201310140311032 JURUSAN TEKNIK INDUSTRI FAKULTAS TEKNIK UNIVERSITAS MUHAMMADIYAH MALANG 2017

Upload: others

Post on 30-Jan-2020

18 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: PERENCANAAN PERSEDIAAN BAHAN BAKU …eprints.umm.ac.id/37570/1/jiptummpp-gdl-harispamun-50679...PERENCANAAN PERSEDIAAN BAHAN BAKU DENGAN MENGGUNAKAN METODE ALGORITMA WAGNER-W HIT IN

PERENCANAAN PERSEDIAAN BAHAN BAKU DENGAN

MENGGUNAKAN METODE ALGORITMA WAGNER-

WHITIN DENGAN KENDALA KAPASITAS GUDANG

(Studi Kasus: UD. Barokah Jaya)

Skripsi

Diajukan Kepada Universitas Muhammadiyah Malang

Untuk Memenuhi Salah Satu Persyaratan Akademik

Dalam Menyelesaikan Program Sarjana Teknik

Disusun Oleh :

HARIS PAMUNGKAS

201310140311032

JURUSAN TEKNIK INDUSTRI

FAKULTAS TEKNIK

UNIVERSITAS MUHAMMADIYAH MALANG

2017

Page 2: PERENCANAAN PERSEDIAAN BAHAN BAKU …eprints.umm.ac.id/37570/1/jiptummpp-gdl-harispamun-50679...PERENCANAAN PERSEDIAAN BAHAN BAKU DENGAN MENGGUNAKAN METODE ALGORITMA WAGNER-W HIT IN
Page 3: PERENCANAAN PERSEDIAAN BAHAN BAKU …eprints.umm.ac.id/37570/1/jiptummpp-gdl-harispamun-50679...PERENCANAAN PERSEDIAAN BAHAN BAKU DENGAN MENGGUNAKAN METODE ALGORITMA WAGNER-W HIT IN
Page 4: PERENCANAAN PERSEDIAAN BAHAN BAKU …eprints.umm.ac.id/37570/1/jiptummpp-gdl-harispamun-50679...PERENCANAAN PERSEDIAAN BAHAN BAKU DENGAN MENGGUNAKAN METODE ALGORITMA WAGNER-W HIT IN
Page 5: PERENCANAAN PERSEDIAAN BAHAN BAKU …eprints.umm.ac.id/37570/1/jiptummpp-gdl-harispamun-50679...PERENCANAAN PERSEDIAAN BAHAN BAKU DENGAN MENGGUNAKAN METODE ALGORITMA WAGNER-W HIT IN
Page 6: PERENCANAAN PERSEDIAAN BAHAN BAKU …eprints.umm.ac.id/37570/1/jiptummpp-gdl-harispamun-50679...PERENCANAAN PERSEDIAAN BAHAN BAKU DENGAN MENGGUNAKAN METODE ALGORITMA WAGNER-W HIT IN
Page 7: PERENCANAAN PERSEDIAAN BAHAN BAKU …eprints.umm.ac.id/37570/1/jiptummpp-gdl-harispamun-50679...PERENCANAAN PERSEDIAAN BAHAN BAKU DENGAN MENGGUNAKAN METODE ALGORITMA WAGNER-W HIT IN
Page 8: PERENCANAAN PERSEDIAAN BAHAN BAKU …eprints.umm.ac.id/37570/1/jiptummpp-gdl-harispamun-50679...PERENCANAAN PERSEDIAAN BAHAN BAKU DENGAN MENGGUNAKAN METODE ALGORITMA WAGNER-W HIT IN

KATA PENGANTAR

Assalamu’alaikum Wr.Wb

Alhamdulllahirobbil ‘Alamin, puji syukur kehadirat Allah SWT yang telah

melimpahkan rahmat, taufiq dan hidayah-Nya. Sholawat serta salam selalu tercurah

kepada Rosulullah Muhammad SAW, sehingga penyusun dapat menyelesaikan tugas

akhir dengan judul “Perencanaan Persediaan Bahan Baku Dengan Menggunakan

Metode Algoritma Wagner-Whitin Dengan Kendala Kapasitas Gudang (Studi

Kasus: UD. Barokah Jaya)” sebagai syarat untuk memperoleh gelar Kesarjanaan

Strata 1 Jurusan Teknik Industri Fakultas Teknik Universitas Muhammadiyah Malang.

Dalam penyusunan laporan tugas akhir ini, tentunya tidak lepas dari bantuan

dan dukungan dari berbagai pihak. Untuk itu pada kesempatan ini penulis ingin

mengucapkan rasa terima kasih kepada :

1. Allah SWT, karena telah memberikan kesehatan, pengetahuan dan ilmu, serta

kekuatan mental dalam mengerjakan skripsi.

2. Kedua orang tua saya tercinta, Bapak Kasnuri dan Ibu Nunuk Rusmini yang

senantiasa mencurahkan doa ikhlas setiap saat, dukungan, kesabaran, perjuangan,

menjadi motivator bagi penulis untuk terus berusaha tiada henti serta segala hal

yang tak terkira harganya sehingga penulis dapat menyelesaikan skripsi ini.

3. Bapak Ilyas Mas’udin ST.,M.Log.,Scm.,Ph.D selaku Ketua Jurusan Teknik Industri

Universitas Muhammadiyah Malang

4. Ibu Annisa Kesy Garside, S.T., M.T., selaku dosen pembimbing I yang telah

meluangkan waktu setiap saat dalam membimbing, memberikan semanagat,

motivasi, nasihat, bimbingan, serta kesabaran yang luar biasa. Terimakasih atas

ilmu, dan mau diganggu bahkan direpotkan. Semoga dengan ilmu yang penulis

dapatkan dari Ibu, dapat menjadi barokah. Aamiin

5. Dana Marsetiya S.T., M.T., selaku dosen pembimbing II yang bersedia meluangkan

waktu untuk memberikan bimbingan dan arahan dalam penyusunan Skripsi ini.

Terimakasih atas ilmu, dan mau diganggu bahkan direpotkan. Semoga dengan ilmu

yang penulis dapatkan dari Ibu, dapat menjadi barokah. Aamiin

6. Bapak Ilyas Mas’udin ST.,M.Log.,Scm.,Ph.D selaku dosen penguji I dalam ujian

skripsi. Terima kasih bapak atas semua masukan, saran dan bimbingannya untuk

membangun dan memperbaiki skripsi penulis.

Page 9: PERENCANAAN PERSEDIAAN BAHAN BAKU …eprints.umm.ac.id/37570/1/jiptummpp-gdl-harispamun-50679...PERENCANAAN PERSEDIAAN BAHAN BAKU DENGAN MENGGUNAKAN METODE ALGORITMA WAGNER-W HIT IN

7. Bapak Ir. H. M. Kholik M.T.,selaku dosen penguji II dalam ujian sidang penulis.

Terimakasih bapak untuk saran dan masukan yang membangun untuk perbaikan

skripsi penulis.

8. Bapak M. Lukman M.T., selaku dosen wali penulis. Terimakasih atas arahan dan

bimbingan bapak selama kurang lebih 4 tahun ini.

9. Segenap Dosen Jurusan Teknik Industri Universitas Muhammadiyah Malang atas

segala bimbingan dan arahannya.

10. Kedua saudara kandung penulis, Fajar Eko Rubianto dan Sigit Dwi Wijanarko yang

telah menjadi semangat dalam menyelesaikan skripsi ini dan memberikan

dukungan baik moril dan materiil.

11. Rekan seperjuanagan Mahasiswa Jurusan Teknik Industri, khususnya Teknik

Industri 2013 A (IDEA) yang telah memberikan dukungan, doa, waktu dan tenaga

dalam penyusunan skripsi ini. Semoga nantinya kita semua diberi kesempatan

untuk berkumpul kembali dengan keadaan sehat wal’afiat. Aamiin.

12. Sahabat-sahabat yang gak jelas Salman, Intan, Mawi dan Khaerul yang telah

memberikan saran, dukungan, doa, waktu dan tenaga dalam penyusunan skripsi ini

(dan juga liburannya). Semoga apa yang dicita-citakan dapat terwujud dikemudian

hari. Aamiin

14. Keluarga besar UD. Barokah Jaya yang sudah membimbing dan membantu

penyusunan skripsi ini.

15. Saudaraku seperjuangan Meidina, Dina, Yani, Septian, Yanu, dan teman-teman

yang lain yang sudah menemani dan berjuang bersama. Dan akhirnya bisa wisuda

bareng. Semoga kita dipertemukan lagi dalam keadaan sudah mendapatkan apa

yang dicita-citakan.

16. Sahabat dari SMA yang sudah seperti saudara Maulana, Dimas, Simon, dan Tiwi

yang telah memberikan saran, dukungan, doa, waktu dan tenaga dalam penyusunan

skripsi ini (dan juga liburannya). Semoga apa yang kalian cita-citakan dapat

terwujud dikemudian hari. Aamiin

17. Adik-adik teknik industri yang tidak dapat disebutkan satu persatu, terimakasih

sudah selalu menghibur dan memberikan semangat dalam proses pengerjaan

skripsi. Semoga kalian cepat lulus juga.

18. Semua sahabat dan teman yang memotivasi, teman jalan, teman ngumpul, teman

sharing, dan semuanya yang pernah meluangkan waktu untuk penulis.

Page 10: PERENCANAAN PERSEDIAAN BAHAN BAKU …eprints.umm.ac.id/37570/1/jiptummpp-gdl-harispamun-50679...PERENCANAAN PERSEDIAAN BAHAN BAKU DENGAN MENGGUNAKAN METODE ALGORITMA WAGNER-W HIT IN

19. Semua pihak yang tidak dapat penulis sebutkan satu persatu yang telah membantu

dalam penyelesaian Skripsi ini, Semoga amal kebaikannya mendapat ridho dari

Allah SWT. Aamiin.

Dengan segala kerendahan hati, penulis menyadari bahwa skripsi ini masih

terdapat banyak kekurangan karena berbagai keterbatasan. Namun penulis berharap

bahwa skripsi ini dapat memberi manfaat kepada pembaca. Kritik dan saran akan sangat

bermanfaat bagi pengembangan penelitian lebih lanjut.

Akhir kata penulis mohon maaf yang sebesar-besarnya jika dalam proses

penyusunan skripsi ini penulis melakukan kesalahan baik disengaja maupun tidak

disengaja.

Wassalamu’alaikum Wr.Wb.

Malang, 20 November 2017

Penulis

Page 11: PERENCANAAN PERSEDIAAN BAHAN BAKU …eprints.umm.ac.id/37570/1/jiptummpp-gdl-harispamun-50679...PERENCANAAN PERSEDIAAN BAHAN BAKU DENGAN MENGGUNAKAN METODE ALGORITMA WAGNER-W HIT IN

DAFTAR ISI

HALAMAN JUDUL ........................................................................................................

LEMBAR PENGESAHAN SKRIPSI ..............................................................................

LEMBAR ASISTENSI SKRIPSI .....................................................................................

BERITA ACARA UJIAN SKRIPSI.................................................................................

SURAT PERNYATAAN KEASLIAN ............................................................................

SURAT KETERANGAN PENGAMBILAN DATA DARI PERUSAHAAN ................

Kata Pengantar ................................................................................................................. i

Abstrak ............................................................................................................................ ii

Abstract .......................................................................................................................... iii

Daftar Isi ........................................................................................................................ iv

Daftar Tabel .................................................................................................................... v

Daftar Gambar ............................................................................................................... vi

Daftar Lampiran ............................................................................................................ vii

BAB 1. PENDAHULUAN ........................................................................................... 1

1.1 Latar Belakang Penelitian ................................................................................. 1

1.2 Rumusan Masalah ............................................................................................. 2

1.3 Tujuan Penelitian .............................................................................................. 2

1.4 Manfaat Penelitian ............................................................................................ 2

1.5 Batasan Masalah dan Asumsi ........................................................................... 3

BAB II. LANDASAN TEORI ...................................................................................... 4

2.1 Persediaan ......................................................................................................... 4

2.1.1 Definisi Persediaan .................................................................................. 4

2.1.2 Tujuan Persediaaan .................................................................................. 5

2.1.3 Keputusan dan Manajemen Persediaan ................................................... 5

2.1.4 Biaya Dalam Persediaan .......................................................................... 6

2.2 Safety Stock ....................................................................................................... 7

2.3 Mterial Requirement Planning (MRP) ............................................................. 7

2.3.1 Definisi MRP .......................................................................................... 7

2.3.2 Tujuan dan Filosofi MRP ........................................................................ 8

2.3.3 Input Sistem MRP ................................................................................... 8

Page 12: PERENCANAAN PERSEDIAAN BAHAN BAKU …eprints.umm.ac.id/37570/1/jiptummpp-gdl-harispamun-50679...PERENCANAAN PERSEDIAAN BAHAN BAKU DENGAN MENGGUNAKAN METODE ALGORITMA WAGNER-W HIT IN

2.3.4 Input Sistem MRP ................................................................................. 10

2.3.5 Langkah – Langkah Dasar MRP ........................................................... 10

2.4 MRP Lot Sizing ............................................................................................... 11

2.4.1 Fixed Period Requirement (FPR) .......................................................... 11

2.4.2 EOQ Multi Item dengan Kendala Kapasitas Gudang ............................ 12

2.4.3 Wagner-Whitin Algorithm (WW) ......................................................... 13

2.4.4 Wagner-Whitin Algorithm (WW) dengan Kendala Kapasitas Gudang 15

2.5 Penelitian Terdahulu ....................................................................................... 17

BAB III. METODOLOGI PENELITIAN ................................................................ 19

3.1 Tahap Persiapan ........................................................................................... 20

3.2 Tahap Pengumpulan Data ............................................................................ 21

3.3 Tahap Pengolahan Data ................................................................................ 22

3.4 Tahap Akhir .................................................................................................. 24

BAB IV. PENGUMPULAN DAN PENGOLAHAN DATA ................................... 25

4.1 Profil Perusahaan Perusahaan ...................................................................... 25

4.2 Pengumpulan Data ....................................................................................... 26

4.2.1 Data Permintaan Kebutuhan Bahan Baku .......................................... 26

4.2.2 Catatan Persediaan .............................................................................. 27

4.2.3 Lead Time ........................................................................................... 27

4.2.4 Biaya Pesan (Ordering Cost) .............................................................. 27

4.2.5 Biaya Simpan ...................................................................................... 28

4.2.6 Kapasitas Gudang ................................................................................ 28

4.2.7 Safety Stock ......................................................................................... 28

4.3 Pengolahan Data ........................................................................................... 29

4.3.1 Perencanaan Kebutuhan Bahan Baku Dengan Metode Perusahaan ... 29

4.3.2 Perencanaan Kebutuhan Bahan Baku Dengan Metode EOQ Multi Item

Dengan Kendala Kapasitas Gudang ................................................... 31

4.3.3 Perencanaan Kebutuhan Bahan Baku Dengan Metode Wagner-Whitin

Multi Item Dengan Kendala Kapasitas Gudang .................................. 35

4.3.3.1 Proses Netting ....................................................................... 35

4.3.3.2 Matriks Alternatif Pemenuhan Order (Qce) .......................... 35

4.3.3.3 Perhitungan Biaya Variabel .................................................. 41

4.3.3.4 Perhitungan Biaya Minimum ............................................... 44

Page 13: PERENCANAAN PERSEDIAAN BAHAN BAKU …eprints.umm.ac.id/37570/1/jiptummpp-gdl-harispamun-50679...PERENCANAAN PERSEDIAAN BAHAN BAKU DENGAN MENGGUNAKAN METODE ALGORITMA WAGNER-W HIT IN

4.3.3.5 Penentuan Periode dan Jumlah Pemesanan ............................ 48

4.3.3.6 Rencana Kebutuhan Bahan Baku Metode Wagner-Whitin

Algorithm Dengan Kendala Kapasitas Gudang .................... 49

4.3.4 Perhitungan Total Biaya Persediaan ........................................................ 50

BAB V. ANALISA PEMBAHASAN ......................................................................... 52

5.1 Analisa Hasil Perencanaan Kebutuhan Bahan Baku dengan Metode Perusahaan

........................................................................................................................ 52

5.2 Analisa Hasil Perencanaan Kebutuhan Bahan Baku dengan Metode EOQ Multi

Item dengan Kendala Kapasitas Gudang ........................................................ 53

5.3 Analisa Hasil Perencanaan Kebutuhan Bahan Baku dengan Metode Wagner-

Whitin Algorithm Multi Item dengan Kendala Kapasitas Gudang ................. 54

5.4 Analisa Perbandingan Performansi Metode Perencanaan Bahan Baku .......... 55

BAB VI. PENUTUP .................................................................................................... 56

6.1 Kesimpulan ................................................................................................... 56

6.2 Saran ............................................................................................................. 57

DAFTAR PUSTAKA .................................................................................................. 58

LAMPIRAN ................................................................................................................ 60

Page 14: PERENCANAAN PERSEDIAAN BAHAN BAKU …eprints.umm.ac.id/37570/1/jiptummpp-gdl-harispamun-50679...PERENCANAAN PERSEDIAAN BAHAN BAKU DENGAN MENGGUNAKAN METODE ALGORITMA WAGNER-W HIT IN

DAFTAR TABEL

Tabel 2.1 Penjabaran fe Ke Dalam Ukuran Lot Pemesanan ........................................ 15

Tabel 4.1 Data Kebutuhan Bahan Baku Bulan Juli – Oktober 2017 ........................... 26

Tabel 4.2 Data Aktual Persediaan Bahan Baku (Juni 2017) ........................................ 27

Tabel 4.3 Lead Time Pemesanan Bahan Baku ............................................................. 27

Tabel 4.4 Biaya Pesan Bahan Baku ............................................................................. 27

Tabel 4.5 Biaya Simpan Bahan Baku .......................................................................... 28

Tabel 4.6 Safety Stock Bahan Baku ............................................................................. 28

Tabel 4.7 Rencana Kebutuhan Tepung Terigu Metode Perusahaan ........................... 30

Tabel 4.8 Rencana Kebutuhan Mentega Metode Perusahaan ...................................... 30

Tabel 4.9 Kuantitas Pemesanan Optimum dan Kebutuhan Kapasitas Gudang ........... 32

Tabel 4.10 Rencana Kebutuhan Tepung Terigu EOQ Multi Item Dengan Kendala

Kapasitas Gudang ........................................................................................ 34

Tabel 4.11 Rencana Kebutuhan Mentega EOQ Multi Item Dengan Kendala Kapasitas

Gudang ......................................................................................................... 34

Tabel 4.12 Matriks Alternatif Kuantitas Order Bahan Baku Tepung Terigu (Qce) ....... 36

Tabel 4.13 Matriks Alternatif Kuantitas Order Mentega Tepung Terigu (Qce) ............. 38

Tabel 4.14 Matriks Alternatif Pemenuhan Order Bahan Baku Multi Item Kendala

Kapasitas Gudang ........................................................................................ 40

Tabel 4.15 Biaya Variabel Bahan Baku ......................................................................... 42

Tabel 4.16 Matriks Biaya Minimum .............................................................................. 45

Tabel 4.17 Rencana Kebutuhan Bahan Baku Tepung Terigu Wagner-Whitin Multi Item

Dengan Kendala Kapasitas Gudang ............................................................. 49

Tabel 4.18 Rencana Kebutuhan Bahan Baku Mentega Wagner-Whitin Multi Item

Dengan Kendala Kapasitas Gudang ............................................................. 49

Tabel 4.19 Total Biaya Persediaan Tiap Metode Lot Size ............................................. 51

Tabel 5.1 Perbandingan Total Biaya Persediaan Tiap Metode Lot Size ...................... 55

Page 15: PERENCANAAN PERSEDIAAN BAHAN BAKU …eprints.umm.ac.id/37570/1/jiptummpp-gdl-harispamun-50679...PERENCANAAN PERSEDIAAN BAHAN BAKU DENGAN MENGGUNAKAN METODE ALGORITMA WAGNER-W HIT IN

DAFTAR GAMBAR

Gambar 4.1 Flowchart Pelaksanaan Penelitian ............................................................. 19

Page 16: PERENCANAAN PERSEDIAAN BAHAN BAKU …eprints.umm.ac.id/37570/1/jiptummpp-gdl-harispamun-50679...PERENCANAAN PERSEDIAAN BAHAN BAKU DENGAN MENGGUNAKAN METODE ALGORITMA WAGNER-W HIT IN
Page 17: PERENCANAAN PERSEDIAAN BAHAN BAKU …eprints.umm.ac.id/37570/1/jiptummpp-gdl-harispamun-50679...PERENCANAAN PERSEDIAAN BAHAN BAKU DENGAN MENGGUNAKAN METODE ALGORITMA WAGNER-W HIT IN

58

DAFTAR PUSTAKA

Astana, Y., & Nyoman, I. (2007). Perencanaan persediaan bahan baku

berdasarkan metode MRP (Material Requirements Planning). Jurnal

Ilmiah Teknik Sipil, 11(2).

Bahagia, S. N. (2006). Sistem Inventori (1 ed.). Bandung: Insitut Teknologi

Bandung.

Jaya, S. S., Octavia, T., & Widyadana, I. G. A. (2012). Model Persediaan Bahan

Baku Multi Item dengan Mempertimbangkan Masa Kadaluwarsa, Unit

Diskon dan Permintaan yang Tidak Konstan Jurnal Teknik Industri, 14,

97-106.

Kusrini, E. (2005). Sistem Persediaan Multi Item dengan Kendala Investasi dan

Luas Gudang. Jurnal Teknoin, 10(2).

Limbong, I., Tarore, H., Tjakra, J., & Walangitan, D. (2013). Manajemen

Pengadaan Material Bangunan Dengan Menggunakan Metode MRP

(Material Requirement Planning) Studi Kasus: Revitalisasi Gedung Kantor

BPS Propinsi Sulawesi Utara. Jurnal Sipil Statik, 1(6).

Madinah, W. N., Sumantri, Y., & Azlia, W. (2015). Penentuan metode lot sizing

pada perencanaan pengadaan bahan baku kikir dan mata bor (Studi Kasus:

PT. X Sidoarjo). Jurnal Rekayasa dan Manajemen Sistem Industri, 3, 505-

515.

Mbota, H. K. W., Tantrika, C. F. M., & Eunike, A. (2015). Perencanaan

Persediaan Bahan Baku Dan Bahan Bakar Dengan Dynamic Lot Sizing

(Studi Kasus: PT Holcim Indonesia Tbk, Tuban Plant). Jurnal Rekayasa

dan Manajemen Sistem Industri, 3(1), p178-188.

Rangkuti, F. (2004). Manajemen Persediaan (6 ed.). Jakarta: PT. Raja Grafindo

Persada.

Silver, E. A., & Peterson, R. (1985). Decision System for Inventory Management

and Production Planning (2 ed.). New York: John Wiley & Sons.

Siswanto. (2007). Operations Research (2 ed.). Jakarta: Penerbit Erlangga.

Page 18: PERENCANAAN PERSEDIAAN BAHAN BAKU …eprints.umm.ac.id/37570/1/jiptummpp-gdl-harispamun-50679...PERENCANAAN PERSEDIAAN BAHAN BAKU DENGAN MENGGUNAKAN METODE ALGORITMA WAGNER-W HIT IN

59

Tersine, R. J. (1994). Principles Of Inventory Aand Materials Management. US:

Prentice Hall International Edition.

Utama, D. M. (2016). Penentuan Lot Size Pemesanan Bahan Baku Dengan

Batasan Kapasitas Gudang. Jurnal Ilmiah Teknik Industri, 15(1), 64-68.

Wagner, H. M., & Whitin, T. M. (1958). Dynamic version of the economic lot

size model. Management science, 5(1), 89-96.

Wiranata, R. (2002). Penerapan sistem material requirements planning (MRP)

sebagai alat untuk meningkatkan efisiensi biaya persediaan bahan baku

pada PT. Siantarjaya Ekatama Surabaya. Petra Christian University.

Zulfikarijah, F. (2005). Manajemen Persediaan. Malang: UMM Press.