    No Possible Root Cause Desc

    1

    - No planning; One day forecast of Rig

    Activity/ HE Requirement

    -Communication

    Operation & Tac

    forecase

    2- Operation vs Tactical request was not fully

    meet with Rig Requirement

    Forecasting Hois

    due to Operatio

    Condition Chang

    3

    - Standard Definition of Urgent Moving or

    standard of HE can be released or not relased

    by WSM

    - When and how the HE can be holded by the

    WSM

    HE is requested

    otherwise the pl

    urgent moving r

    The definition of

    not defined clea

    3

    - SOP of calling time or was not fully

    implemented & Apply a consequency for not

    applying SOP due to lack control from whom

    responsible to control the implementation- Need control function for SOP

    implementation

    Lack of consequ

    4Lack of applying PM & PdM on HE and need

    to add backup unit

    HE Serco rare to

    36 hours for rou

    otherwise we fa

    thle last few mo

    5

    5a

    5b

    6Crane working load need to be defined for 20

    or 24 hour effective working

    The number of uvery low but the

    ex ected

    7 Crew was released earlier than working timeCrew already go

    crew crane arriv

    8Daily report is made for 12 hours work cycle

    instead of 24 hours for integrated daily work

    Daily report was

    changed at the s

    comes back to T

    9

    - Convoy of Crane is Transportation Serco

    Responsibility

    - Need to allocate more foreman to convoy

    hoist

    - Additional escort, add more foreman or

    convo erformed b Ri Crew

    There is only tw

    when the crane

    Crane has to wa

    10 Back up Crane for HE DT

    DT in April 2013

    happened due t

    11

    - Lack of HE Monitoring Support Center

    - Need to create & utilize a single support

    center

    - No dedicate pe

    movement

    - GPS Monitorin

    further evaluatio

    im rovement

    12

    Bi-weekly meeting & WDR Monthly meeting

    for HE crew that caused no service during

    that time

    Moving was dela

    Crews involved

    13Incentive for moving crew between utilize HE

    or empty trip

    14

    - HE has to be standby after arrived at Rig Site

    - User requested HE before ensure the well is

    ready, so HE will be waiting for job when

    arrive the location

    HE has to be put

    order from

    4 Rig CPI Operat

    The number of High downtime at 6-8 PM and 6-8 AM

  • 8/13/2019 Penempatan guide support ini dilakukan dengan menerapkan metode guided cantilever, yaitu jarak minimum uju

    2/5

    HES

    No. OE Activity Type Time Currently (Min) Repetition

  • 8/13/2019 Penempatan guide support ini dilakukan dengan menerapkan metode guided cantilever, yaitu jarak minimum uju

    3/5

    Total (Min) Comment

  • 8/13/2019 Penempatan guide support ini dilakukan dengan menerapkan metode guided cantilever, yaitu jarak minimum uju

    4/5

    OE/Diversity Moments:

    WDR was asked to serve other team (out of WDR Trps Responsibility), WDR will help others when

    there is a stand by crew

    PPE crew involved an indicent on which the poluntary crew finger was pitch at WPF Guard (ensure

    the right people performs on his duty)

    WIS Crew got involved an incident on which four of his fingers was hit by piling hammer

    Issues:

    Schedule downtime HE harus sudah di rencanakan pada awal bulan dan terus dimonitor..

    Kenapa hal yang sudah baik untuk one day forecasting Hoist Activity masih belum bisa

    dilaksanakan?