No Possible Root Cause Desc
1
- No planning; One day forecast of Rig
Activity/ HE Requirement
-Communication
Operation & Tac
forecase
2- Operation vs Tactical request was not fully
meet with Rig Requirement
Forecasting Hois
due to Operatio
Condition Chang
3
- Standard Definition of Urgent Moving or
standard of HE can be released or not relased
by WSM
- When and how the HE can be holded by the
WSM
HE is requested
otherwise the pl
urgent moving r
The definition of
not defined clea
3
- SOP of calling time or was not fully
implemented & Apply a consequency for not
applying SOP due to lack control from whom
responsible to control the implementation- Need control function for SOP
implementation
Lack of consequ
4Lack of applying PM & PdM on HE and need
to add backup unit
HE Serco rare to
36 hours for rou
otherwise we fa
thle last few mo
5
5a
5b
6Crane working load need to be defined for 20
or 24 hour effective working
The number of uvery low but the
ex ected
7 Crew was released earlier than working timeCrew already go
crew crane arriv
8Daily report is made for 12 hours work cycle
instead of 24 hours for integrated daily work
Daily report was
changed at the s
comes back to T
9
- Convoy of Crane is Transportation Serco
Responsibility
- Need to allocate more foreman to convoy
hoist
- Additional escort, add more foreman or
convo erformed b Ri Crew
There is only tw
when the crane
Crane has to wa
10 Back up Crane for HE DT
DT in April 2013
happened due t
11
- Lack of HE Monitoring Support Center
- Need to create & utilize a single support
center
- No dedicate pe
movement
- GPS Monitorin
further evaluatio
im rovement
12
Bi-weekly meeting & WDR Monthly meeting
for HE crew that caused no service during
that time
Moving was dela
Crews involved
13Incentive for moving crew between utilize HE
or empty trip
14
- HE has to be standby after arrived at Rig Site
- User requested HE before ensure the well is
ready, so HE will be waiting for job when
arrive the location
HE has to be put
order from
4 Rig CPI Operat
The number of High downtime at 6-8 PM and 6-8 AM
-
8/13/2019 Penempatan guide support ini dilakukan dengan menerapkan metode guided cantilever, yaitu jarak minimum uju
2/5
HES
No. OE Activity Type Time Currently (Min) Repetition
-
8/13/2019 Penempatan guide support ini dilakukan dengan menerapkan metode guided cantilever, yaitu jarak minimum uju
3/5
Total (Min) Comment
-
8/13/2019 Penempatan guide support ini dilakukan dengan menerapkan metode guided cantilever, yaitu jarak minimum uju
4/5
OE/Diversity Moments:
WDR was asked to serve other team (out of WDR Trps Responsibility), WDR will help others when
there is a stand by crew
PPE crew involved an indicent on which the poluntary crew finger was pitch at WPF Guard (ensure
the right people performs on his duty)
WIS Crew got involved an incident on which four of his fingers was hit by piling hammer
Issues:
Schedule downtime HE harus sudah di rencanakan pada awal bulan dan terus dimonitor..
Kenapa hal yang sudah baik untuk one day forecasting Hoist Activity masih belum bisa
dilaksanakan?
Real time issue for the Hoist activity
-