    Geotechnical Role

    Melaksanakan analisa, rekomendasi ,

    pemantauan dan evaluasi terhadap

    seluruh rencana & kegiatan operasional

    / project dari aspek geoteknik :kemantapan lereng tambang ,

    infrastruktur tambang dan kemantapan

    sipil infrastruktur di seluruh wilayah

    tambang.

  • 8/11/2019 PENDAHULUAN GEOTEKNIK TAMBANG.pptx

    3/12

    Geotechnic & Hydrology Role (continue.2).

    Hydrological Role

    Melaksanakan analisa, rekomendasi,

    pemantauan dan evaluasi terhadap seluruh

    rencana dan kegiatan operasional / project dari

    aspek hidrologi: pola aliran sungai, besaran

    area tangkapan hujan, pola penyaliran,besaran curah hujan, pasang surut, besaran

    kebutuhan kolam penampungan dan

    pengendap yang dintegrasikan dalam desain

    mine surface water management.

  • 8/11/2019 PENDAHULUAN GEOTEKNIK TAMBANG.pptx

    4/12

    SISTEM ORGANISASI

    BERAU COAL G&H Management System (G&H Dept.)

    Work Management & Risk Control

  • 8/11/2019 PENDAHULUAN GEOTEKNIK TAMBANG.pptx

    5/12

    BERAU COAL G&H Management System (G&H Dept.)

  • 8/11/2019 PENDAHULUAN GEOTEKNIK TAMBANG.pptx

    6/12

    Strategi Organisasi (HR G&H Model for L&G)HR G&H Learning & Growth

  • 8/11/2019 PENDAHULUAN GEOTEKNIK TAMBANG.pptx

    7/12

    Strategi Organisasi (Strategy Map)GNH

  • 8/11/2019 PENDAHULUAN GEOTEKNIK TAMBANG.pptx

    8/12

    Strategi Organisasi (OTPGeotech. & Hydrology)

    NO PRIORITY TARGET MEASUREMENT

    1 Geotechnical &

    Hydrological Drilling

    1. Geotechnical holes are to identify and

    collect subsurface information (soil &

    rock) to support slope stability analysis.

    2. Dewatering holes are to identify

    groundwater characteristic and reduce

    groundwater pressure behind pit wall.

    2,000 meters of core

    drilling at SMO, BMO, LMO

    and PMO site and 600

    meters of soil drilling.

    1,500 meters of vertical

    drain hole (VDH) drilling atSMO, BMO and LMO site.

    2 Monitoring System

    Improvement

    1. Extensometer installation with alarm

    system for slope stability monitoring

    (ground surface movement)

    2. Inclinometer Installation for slope stability

    monitoring (ground subsurfacemovement).

    3. Vibrating Wire Piezometer (VWP)

    installation for groundwater pressure

    monitoring.

    To be installed 1 unit at

    SMO at the middle of 2012

    To be installed 1 unit at

    BMO at September 2012

    To be installed at SMO,LMO and BMO. 3 holes for

    each site at October 2012.

    3 Improve

    geotechnical logging

    data base

    1. giNT software acqusition for geotechnical

    logging data base.

    To be started at the middle

    of April 2012.

  • 8/11/2019 PENDAHULUAN GEOTEKNIK TAMBANG.pptx

    9/12

    Strategi Organisasi (OTPGeotech. & Hydrology)

    N

    O

    PRIORIT TARGET MEASUREMENT

    1 Geology Exploration

    Mine development

    and mine planning

    Identify potential resources/reserve in all

    area

    Improve accuracy and time frame

    Continue exploration activity at

    Binungan Block 10 & Block 8West, northern part Binungan

    Block 7 west, eastern part of Lati,

    northern part of Sambarata,

    Punan, and Gurimbang area

    Develop new reserves

    statement for End of Y11 status.

    Develop an update to Life of

    Mine Plan refer to new reserves

    statement

    Acquire approval from ESDM for

    revision of FS Sambarata to 10

    Mtpa

    Develop FS Berau Coal for 40

    Mtpa production capacity

    2 geotechnic Accurate & reliable geotechnic

    recommendation

    Extensive & Intensive

    monitoring

    3 Improve

    organization

    capability

    Efficient and productive operation Job evaluation review andcompetency assessment, develop

    training and career path

    On the job

    program/benchmarking

    Fulfilment manpower plan

    Retaining program by maintain

    good working climate

  • 8/11/2019 PENDAHULUAN GEOTEKNIK TAMBANG.pptx

    10/12

    GEOTECHNICAL FIELD WORK

    Geotechnical Rock Drilling

  • 8/11/2019 PENDAHULUAN GEOTEKNIK TAMBANG.pptx

    11/12

    GEOTECHNICAL FIELD WORK

    Geotechnical Soil Drilling

  • 8/11/2019 PENDAHULUAN GEOTEKNIK TAMBANG.pptx

    12/12

    GEOTECHNICAL FIELD WORK

    Field Tools