    Where We Are NowWhere We Are Now

  • 8/10/2019 MP (Lect 06) -- Dr. Imam Baihaqi

    3/40

    63

    Developing the Project PlanDeveloping the Project Plan

    The Project NetworkA flow chart that graphically depicts the sequence

    interdependencies and start and finish ti!es of the project

    jo" plan of activities that is the critical paththrough the

    network#

    Provides the basis for scheduling labor and equipment.

    Enhances communication among project participants.

    Provides an estimate of the projects duration.

    Provides a basis for budgeting cash ow.

    Identies activities that are critical.ighlights activities that are !critical" and can not be

    dela#ed.

    elp managers get and sta# on plan.

  • 8/10/2019 MP (Lect 06) -- Dr. Imam Baihaqi

    4/40

    64

    W$%&Work Packages to Network

    FIGURE 6.1

  • 8/10/2019 MP (Lect 06) -- Dr. Imam Baihaqi

    5/40

  • 8/10/2019 MP (Lect 06) -- Dr. Imam Baihaqi

    6/40

    66

    *onstructing a Project Network*onstructing a Project Network

    Ter!inologyActivity:an ele!ent of the

    project that requires ti!e#

    Me!e Activity:an activity thathas two or !ore preceding

    activities on which it depends#

    P""##e# (Conc$ent) Activitie%:

    Activities that can occurindependently and if desired

    not at the sa!e ti!e#

    A

    C

    &'

  • 8/10/2019 MP (Lect 06) -- Dr. Imam Baihaqi

    7/40

    67

    *onstructing a Project Network 'cont(d)*onstructing a Project Network 'cont(d)

    Ter!inologyP"t:a sequence of connected dependent activities#

    Citic"# "t:the longest path through the activity

    network that allows for the co!pletion of all project+

    related activities, the shortest e-pected ti!e in which

    the entire project can "e co!pleted# Delays on the

    critical path will delay co!pletion of the entire project#

    A ' &

    (A%%$*e% t"t *ini*$* o+ A , ' - *ini*$* o+ C in #en!t o+ ti*e% to co*#ete "ctivitie%.)

    C

  • 8/10/2019 MP (Lect 06) -- Dr. Imam Baihaqi

    8/40

    68

    *onstructing a Project Network 'cont(d)*onstructing a Project Network 'cont(d)

    Ter!inologyEvent:a point in ti!e when an activity is started

    or co!pleted# .t does not consu!e ti!e#

    '$%t Activity:an activity that has !ore than one

    activity i!!ediately following it '!ore than onedependency arrow flowing fro! it)#

    Two Approaches

    Activity+on+Node 'A/N)

    $ses a node to depict an activit#.

    Activity+on+Arrow 'A/A)

    $ses an arrow to depict an activit#.

    '

    &

    A C

  • 8/10/2019 MP (Lect 06) -- Dr. Imam Baihaqi

    9/40

    69

    $asic 0ules to 1ollow in Developing$asic 0ules to 1ollow in Developing

    Project NetworksProject Networks

    2# Networks typically flow fro! left to right#

    3# An activity cannot "egin until all preceding

    connected activities are co!plete#

    4# Arrows indicate precedence and flow

    and can cross over each other#

    5# 6ach activity !ust have a unique identify nu!"er

    that is greater than any of its predecessor activities#

    7# 8ooping is not allowed#

    9# *onditional state!ents are not allowed#

    :# ;se co!!on start and stop nodes#

  • 8/10/2019 MP (Lect 06) -- Dr. Imam Baihaqi

    10/40610

    Activity+on+Node 1unda!entalsActivity+on+Node 1unda!entals

    FIGURE 6.

  • 8/10/2019 MP (Lect 06) -- Dr. Imam Baihaqi

    11/40611

    Activity+on+Node 1unda!entals 'cont(d)Activity+on+Node 1unda!entals 'cont(d)

    FIGURE 6. (contd)

  • 8/10/2019 MP (Lect 06) -- Dr. Imam Baihaqi

    12/40612

    Network .nfor!ationNetwork .nfor!ation

    TA'/E 6.1

  • 8/10/2019 MP (Lect 06) -- Dr. Imam Baihaqi

    13/40613

  • 8/10/2019 MP (Lect 06) -- Dr. Imam Baihaqi

    14/40

  • 8/10/2019 MP (Lect 06) -- Dr. Imam Baihaqi

    15/40

  • 8/10/2019 MP (Lect 06) -- Dr. Imam Baihaqi

    16/40616

    Network .nfor!ationNetwork .nfor!ation

    TA'/E 6.

  • 8/10/2019 MP (Lect 06) -- Dr. Imam Baihaqi

    17/40617

    Activity+on+Node NetworkActivity+on+Node Network

    FIGURE 6.2

  • 8/10/2019 MP (Lect 06) -- Dr. Imam Baihaqi

    18/40618

    Activity+on+Node Network 1orward PassActivity+on+Node Network 1orward Pass

    FIGURE 6.6

  • 8/10/2019 MP (Lect 06) -- Dr. Imam Baihaqi

    19/40619

    1orward Pass *o!putation1orward Pass *o!putation

    Add activity ti!es along each path in thenetwork '6% @ Duration 61)#

    *arry the early finish '61) to the ne-t activity

    where it "eco!es its early start '6%) unless The ne-t succeeding activity is a !erge activity

    in which case the largest 61 of all preceding

    activities is selected#

  • 8/10/2019 MP (Lect 06) -- Dr. Imam Baihaqi

    20/40620

    Activity+on+Node Network $ackward PassActivity+on+Node Network $ackward Pass

    FIGURE 6.3

  • 8/10/2019 MP (Lect 06) -- Dr. Imam Baihaqi

    21/40621

    $ackward Pass *o!putation$ackward Pass *o!putation

    %u"tract activity ti!es along each path in thenetwork '81 + Duration 8%)#

    *arry the late start '8%) to the ne-t activity

    where it "eco!es its late finish '81) unless

    The ne-t succeeding activity is a "urst activity in

    which case the s!allest 81 of all preceding

    activities is selected#

  • 8/10/2019 MP (Lect 06) -- Dr. Imam Baihaqi

    22/40

  • 8/10/2019 MP (Lect 06) -- Dr. Imam Baihaqi

    23/40623

    Activity+on+Node Network with %lackActivity+on+Node Network with %lack

    FIGURE 6.4

  • 8/10/2019 MP (Lect 06) -- Dr. Imam Baihaqi

    24/40624

    1ree %lack 6-a!ple1ree %lack 6-a!ple

    FIGURE 6.5

  • 8/10/2019 MP (Lect 06) -- Dr. Imam Baihaqi

    25/40625

    Practical *onsiderationsPractical *onsiderations

    Network 8ogic 6rrorsActivity Nu!"ering

    ;se of *o!puters to

    Develop Networks

    *alendar Dates

    Bultiple %tarts and

    Bultiple Projects

  • 8/10/2019 MP (Lect 06) -- Dr. Imam Baihaqi

    26/40626

    .llogical 8oop.llogical 8oop

    FIGURE 6.1

  • 8/10/2019 MP (Lect 06) -- Dr. Imam Baihaqi

    27/40

  • 8/10/2019 MP (Lect 06) -- Dr. Imam Baihaqi

    28/40628

    Air *ontrol Project=Cantt *hartAir *ontrol Project=Cantt *hart

    FIGURE 6.1

  • 8/10/2019 MP (Lect 06) -- Dr. Imam Baihaqi

    29/40629

    6-tended Network Techniques6-tended Network Techniques

    to *o!e *lose to 0ealityto *o!e *lose to 0eality

    8addering

    Activities are "roken into seg!ents so the following

    activity can "egin sooner and not delay the work#

    8ags

    The !ini!u! a!ount of ti!e a dependent activity !ust

    "e delayed to "egin or end#

    %ength# activities are bro&en down to reduce the dela#

    in the start of successor activities.%ags can be used to constrain nish'to'start( start'to'

    start( nish'to'nish( start'to'nish( or combinationrelationships.

  • 8/10/2019 MP (Lect 06) -- Dr. Imam Baihaqi

    30/40630

    6-a!ple of 8addering ;sing6-a!ple of 8addering ;sing

    1inish+to+%tart 0elationship1inish+to+%tart 0elationship

    FIGURE 6.10

  • 8/10/2019 MP (Lect 06) -- Dr. Imam Baihaqi

    31/40

    631

    ;se of 8ags;se of 8ags

    FIGURE 6.1

    FIGURE 6.12

    Fini%7to7St"t Re#"tion%i

    St"t7to7St"t Re#"tion%i

  • 8/10/2019 MP (Lect 06) -- Dr. Imam Baihaqi

    32/40

    632

    ;se of 8ags *ont(d;se of 8ags *ont(d

    FIGURE 6.16

    U%e o+ /"!% to Red$ce &et"i#

  • 8/10/2019 MP (Lect 06) -- Dr. Imam Baihaqi

    33/40

    633

    New Product Develop!entNew Product Develop!ent

    ProcessProcess

    FIGURE 6.13

  • 8/10/2019 MP (Lect 06) -- Dr. Imam Baihaqi

    34/40

    634

    ;se of 8ags 'cont(d);se of 8ags 'cont(d)

    FIGURE 6.14

    FIGURE 6.15

    FIGURE 6.

    Fini%7to7Fini%

    Re#"tion%i

    St"t7to7Fini%

    Re#"tion%i

    Co*8in"tion

    Re#"tion%i

  • 8/10/2019 MP (Lect 06) -- Dr. Imam Baihaqi

    35/40

    635

    Network ;sing 8agsNetwork ;sing 8ags

    FIGURE 6.1

  • 8/10/2019 MP (Lect 06) -- Dr. Imam Baihaqi

    36/40

    636

    >a!!ock Activities>a!!ock Activities

    >a!!ock ActivityAn activity that spans over a seg!ent of a project#

    Duration of ha!!ock activities is deter!ined

    after the network plan is drawn#

    >a!!ock activities are used to aggregate

    sections of the project to facilitate getting

    the right a!ount of detail for specific sections

    of a project#

  • 8/10/2019 MP (Lect 06) -- Dr. Imam Baihaqi

    37/40

    637

    >a!!ock Activity 6-a!ple>a!!ock Activity 6-a!ple

    FIGURE 6.

  • 8/10/2019 MP (Lect 06) -- Dr. Imam Baihaqi

    38/40

    638

  • 8/10/2019 MP (Lect 06) -- Dr. Imam Baihaqi

    39/40

    639

    Activity+on+Arrow Network $uilding $locksActivity+on+Arrow Network $uilding $locks

    FIGURE A6.1

  • 8/10/2019 MP (Lect 06) -- Dr. Imam Baihaqi

    40/40

    Activity+on+Arrow Network 1unda!entalsActivity+on+Arrow Network 1unda!entals

    FIGURE A6.