leapcon
DESCRIPTION
LEAPCON. Lean Apartment Construction Workshop. Apartment Construction. Ceilings. HVAC. Drywall. Flooring. Design Changes. Simulation setup. 29. 25. 21. 13. 9. 5. 17. 1. 14. 10. 22. 18. 6. 30. 2. 26. 8. 7. 6. 4. 5. 3. 1. 2. 27. 19. 11. 3. 31. 7. 23. 15. 12. - PowerPoint PPT PresentationTRANSCRIPT
Assoc. Prof. Rafael [email protected]
www.technion.ac.il/~cvsacks
Civil and Environmental Engineering Technion - Israel Institute of Technology
LEAPCON
Lean Apartment ConstructionWorkshop
Assoc. Prof. Rafael [email protected]
www.technion.ac.il/~cvsacks
Civil and Environmental Engineering Technion - Israel Institute of Technology
Apartment Construction
Flooring Drywall HVAC Ceilings
Design Changes
Assoc. Prof. Rafael [email protected]
www.technion.ac.il/~cvsacks
Civil and Environmental Engineering Technion - Israel Institute of Technology
Simulation setup
Quality Control
Client
Project Manager
Material Store
Client Rep
1
3
2
41
5
7
6
82
9
11
10
123
13
15
14
164
17
19
18
205
21
23
22
246
25
27
26
287
29
31
30
328
Ceiling team
HVAC team
Drywall team
Flooring team
Client Changes
Rep
Crane
Design Changes
Building floors and apartments
Assoc. Prof. Rafael [email protected]
www.technion.ac.il/~cvsacks
Civil and Environmental Engineering Technion - Israel Institute of Technology
Production Plan(Gantt Chart)
Assoc. Prof. Rafael [email protected]
www.technion.ac.il/~cvsacks
Civil and Environmental Engineering Technion - Israel Institute of Technology
Results for 2 groups
Assoc. Prof. Rafael [email protected]
www.technion.ac.il/~cvsacks
Civil and Environmental Engineering Technion - Israel Institute of Technology
Discussion between rounds:Difficulties with the system
Management Team: What did you feel during the game? Were you busy? Did you manage to implement your plan? Were you in control?
Drywall team: Were you busy?
HVAC team Were you busy?
Bottleneck, Cycle time, WIP, Push What is the meaning of cycle time for apartment
construction in real projects? How would you improve the process?
Assoc. Prof. Rafael [email protected]
www.technion.ac.il/~cvsacks
Civil and Environmental Engineering Technion - Israel Institute of Technology
Discussion after the second round
Management Team: What did you feel during the game? Were you busy? Did you manage to implement your plan? Were you in control?
Drywall team: Were you busy? Was your productivity improved?
HVAC team Were you busy? Was your productivity improved?
Bottleneck, Cycle time, WIP, Push What is the meaning of cycle time for apartment
construction in real projects? How would you improve the process?
Assoc. Prof. Rafael [email protected]
www.technion.ac.il/~cvsacks
Civil and Environmental Engineering Technion - Israel Institute of Technology
LEAPCON – typical results
Assoc. Prof. Rafael [email protected]
www.technion.ac.il/~cvsacks
Civil and Environmental Engineering Technion - Israel Institute of Technology
LEAPCON - Cash Flows
9
09:27
($20,000)
($15,000)
($10,000)
($5,000)
$0
$5,000
$10,000
$15,000
$20,000
0.00 2.00 4.00 6.00 8.00 10.00 12.00 14.00 16.00 18.00 20.00 22.00 24.00
Simulation Time (min.sec)
Cas
hFl
owF': Lean, no
customization
F: Lean
A': Conventional, no customization
A: Conventional
LEAPCON Simulationwww.technion.ac.il/~cvsacks/tech-leap.htm
Assoc. Prof. Rafael [email protected]
www.technion.ac.il/~cvsacks
Civil and Environmental Engineering Technion - Israel Institute of Technology
LEAPCON Users around the world
10
09:27
Assoc. Prof. Rafael [email protected]
www.technion.ac.il/~cvsacks
Civil and Environmental Engineering Technion - Israel Institute of Technology
Background Reading
“The Goal” Eli Goldratt www.leanconstruction.org “Lean Thinking” Womack and Jones www.iglc.net “The Critical Chain” Eli Goldratt “Factory Physics” Hopp and Spearman Sacks, R., Esquenazi, A., and Goldin, M., (2007). ‘
LEAPCON: Simulation of Lean Construction of High-rise Apartment Buildings’, Journal of Construction Engineering and Management, Vol. 133 No. 7 pp. 529-539.